1 |
52911219 |
Extension of Pipe line near Uttar Fulbari Kabar Sthan 100 Mtr 15th FC |
67579 |
Extension of Pipe line near Uttar Fulbari Kabar Sthan 100 Mtr 15th FC1 |
Completion of work |
-

latitude : 24.440274999999996,24.440274999999996
Longitude : 92.22531333333333,92.22531333333333
file name : Image_16092021123324745.png
|
2021-09-16 12:33:24.853365 |
2 |
66247146 |
Creation of a new source of drinking water |
82238 |
Creation of a new source of drinking water1 |
Roof laid |
-

latitude : 24.44025619
Longitude : 92.22531106
file name : Image_19122022134715365.png
|
2022-12-19 13:47:15.482031 |
3 |
56562786 |
Maintinance of 9 nos. M-II and 1 nos. Ring Well |
29566 |
Maintinance of 9 nos. M-II and 1 nos. Ring Well 1 |
Completion of work |
-

latitude : 24.43919421
Longitude : 92.22608126
file name : Image_21072023173350478.png
|
2023-07-21 17:33:50.572273 |
4 |
56562786 |
Maintinance of 9 nos. M-II and 1 nos. Ring Well |
29566 |
Maintinance of 9 nos. M-II and 1 nos. Ring Well 1 |
Completion of work |
-

latitude : 24.439072
Longitude : 92.2260553
file name : Image_08082023131215049.png
|
2023-08-08 13:12:15.177902 |
5 |
57093619 |
Installation of 25 nos. Wastebin under Uttar Fulbari GP |
47354 |
Installation of 25 nos. Wastebin under Uttar Fulbari GP1 |
Plinth level |
-

latitude : 24.44673833333333
Longitude : 92.22638666666666
file name : Image_25012022113734120.png
|
2022-01-25 11:37:34.219986 |
6 |
57093619 |
Installation of 25 nos. Wastebin under Uttar Fulbari GP |
47354 |
Installation of 25 nos. Wastebin under Uttar Fulbari GP1 |
Roof laid |
-

latitude : 24.4386444
Longitude : 92.2260022
file name : Image_02082023124622418.png
|
2023-08-02 12:46:22.556464 |
7 |
56558429 |
Construction of water tank at Uttar Fulbari S.B School |
100000 |
Construction of water tank at Uttar Fulbari S.B School1 |
Completion of work |
-

latitude : 24.44698628
Longitude : 92.22499462
file name : Image_14082023154842888.png
|
2023-08-14 15:48:42.982265 |
8 |
61501118 |
CONST. OF RCC ROAD FROM RABI KUMAR DAS HOUSE TO CULVERT. W/5 |
313224 |
CONST. OF RCC ROAD FROM RABI KUMAR DAS HOUSE TO CULVERT. W/51 |
Completion of work |
-

latitude : 24.4389382,24.437693333333332
Longitude : 92.2260556,92.22394666666666
file name : Image_23032022114058690.png
|
2022-03-23 11:40:58.820685 |
9 |
61501118 |
CONST. OF RCC ROAD FROM RABI KUMAR DAS HOUSE TO CULVERT. W/5 |
313224 |
CONST. OF RCC ROAD FROM RABI KUMAR DAS HOUSE TO CULVERT. W/51 |
Completion of work |
-

latitude : 24.4379088,24.43792446,24.43792523,24.4379252
Longitude : 92.2237239,92.2237153,92.22371429,92.22371426
file name : Image_06122022151326788.png
|
2022-12-06 15:13:26.886301 |
10 |
61501118 |
CONST. OF RCC ROAD FROM RABI KUMAR DAS HOUSE TO CULVERT. W/5 |
313224 |
CONST. OF RCC ROAD FROM RABI KUMAR DAS HOUSE TO CULVERT. W/51 |
Plinth level |
-

latitude : 24.43796533,24.4379509
Longitude : 92.22369071,92.22367579
file name : Image_09082023133143290.png
|
2023-08-09 13:31:43.425658 |
11 |
61500730 |
CONST. OF WATER RESEVER WITH FILTER AT UTTAR FULBARI S.R MADRASA.W/4 (15TH FC) |
175834 |
CONST. OF WATER RESEVER WITH FILTER AT UTTAR FULBARI S.R MADRASA.W/4 (15TH FC)1 |
Completion of work |
-

latitude : 24.4357668
Longitude : 92.2253578
file name : Image_23032022114555530.png
|
2022-03-23 11:45:55.645115 |
12 |
61500730 |
CONST. OF WATER RESEVER WITH FILTER AT UTTAR FULBARI S.R MADRASA.W/4 (15TH FC) |
175834 |
CONST. OF WATER RESEVER WITH FILTER AT UTTAR FULBARI S.R MADRASA.W/4 (15TH FC)1 |
Completion of work |
-

latitude : 24.43558252
Longitude : 92.22632732
file name : Image_17042023133911187.png
|
2023-04-17 13:39:11.298804 |
13 |
61500730 |
CONST. OF WATER RESEVER WITH FILTER AT UTTAR FULBARI S.R MADRASA.W/4 (15TH FC) |
175834 |
CONST. OF WATER RESEVER WITH FILTER AT UTTAR FULBARI S.R MADRASA.W/4 (15TH FC)1 |
Plinth level |
-

latitude : 24.43572487
Longitude : 92.22619349
file name : Image_09082023133146488.png
|
2023-08-09 13:31:46.608483 |
14 |
61500730 |
CONST. OF WATER RESEVER WITH FILTER AT UTTAR FULBARI S.R MADRASA.W/4 (15TH FC) |
175834 |
CONST. OF WATER RESEVER WITH FILTER AT UTTAR FULBARI S.R MADRASA.W/4 (15TH FC)1 |
Roof laid |
-

latitude : 24.435696
Longitude : 92.22618694
file name : Image_23082023165517438.png
|
2023-08-23 16:55:17.55011 |
15 |
61500989 |
CONST. OF COMMUNITY COMPOST PIT THE NEAR COMMUNITY HALL |
31912 |
CONST. OF COMMUNITY COMPOST PIT THE NEAR COMMUNITY HALL 1 |
Completion of work |
-

latitude : 24.4386891
Longitude : 92.2260227
file name : Image_30042022122232599.png
|
2022-04-30 12:22:32.710922 |
16 |
61500989 |
CONST. OF COMMUNITY COMPOST PIT THE NEAR COMMUNITY HALL |
31912 |
CONST. OF COMMUNITY COMPOST PIT THE NEAR COMMUNITY HALL 1 |
Plinth level |
-

latitude : 24.43847439
Longitude : 92.22621368
file name : Image_02082023130426305.png
|
2023-08-02 13:04:26.454163 |
17 |
61500989 |
CONST. OF COMMUNITY COMPOST PIT THE NEAR COMMUNITY HALL |
31912 |
CONST. OF COMMUNITY COMPOST PIT THE NEAR COMMUNITY HALL 1 |
Roof laid |
-

latitude : 24.43847134
Longitude : 92.22621485
file name : Image_23082023165520982.png
|
2023-08-23 16:55:21.074875 |
18 |
61500989 |
CONST. OF COMMUNITY COMPOST PIT THE NEAR COMMUNITY HALL |
31912 |
CONST. OF COMMUNITY COMPOST PIT THE NEAR COMMUNITY HALL 1 |
Roof laid |
-

latitude : 24.43847134
Longitude : 92.22621485
file name : Image_23082023165524496.png
|
2023-08-23 16:55:24.57905 |
19 |
87170298 |
Operation & maintenance of Faecal Sludge Management Plant |
97982 |
Operation & maintenance of Faecal Sludge Management Plant1 |
Completion of work |
-

latitude : 24.43859919
Longitude : 92.22621703
file name : Image_04092023134652059.png
|
2023-09-04 13:46:57.481143 |
20 |
87170298 |
Operation & maintenance of Faecal Sludge Management Plant |
97982 |
Operation & maintenance of Faecal Sludge Management Plant1 |
Completion of work |
-

latitude : 24.4397
Longitude : 92.22786282
file name : Image_13032024132715782.png
|
2024-03-13 13:27:15.870191 |
21 |
52911056 |
Construction of CC Platform at Uttar Fulbari Kabar Sthan 15th FC |
247009 |
Construction of CC Platform at Uttar Fulbari Kabar Sthan 15th FC1 |
Completion of work |
-

latitude : 24.440184999999996,24.440184999999996
Longitude : 92.22541166666666,92.22541166666666
file name : Image_16092021120849983.png
|
2021-09-16 12:08:50.120717 |
22 |
52911056 |
Construction of CC Platform at Uttar Fulbari Kabar Sthan 15th FC |
247009 |
Construction of CC Platform at Uttar Fulbari Kabar Sthan 15th FC1 |
Roof laid |
-

latitude : 24.44027881,24.44024337
Longitude : 92.22539997,92.22539135
file name : Image_26092023123408920.png
|
2023-09-26 12:34:09.013002 |
23 |
52911056 |
Construction of CC Platform at Uttar Fulbari Kabar Sthan 15th FC |
247009 |
Construction of CC Platform at Uttar Fulbari Kabar Sthan 15th FC1 |
Plinth level |
-

latitude : 24.44022477,24.44023319
Longitude : 92.22538355,92.22537439
file name : Image_26092023120510599.png
|
2023-09-26 12:05:10.683755 |
24 |
52910923 |
Construction of Toilet Block at Uttar Fulbari Gram Panchayat Office 15th FC |
97606 |
Construction of Toilet Block at Uttar Fulbari Gram Panchayat Office 15th FC1 |
Completion of work |
-

latitude : 24.4386219
Longitude : 92.2259826
file name : Image_02092021132746739.png
|
2021-09-02 13:27:46.879229 |
25 |
52910923 |
Construction of Toilet Block at Uttar Fulbari Gram Panchayat Office 15th FC |
97606 |
Construction of Toilet Block at Uttar Fulbari Gram Panchayat Office 15th FC1 |
Completion of work |
-

latitude : 24.438633333333335
Longitude : 92.22597666666667
file name : Image_23032022113517039.png
|
2022-03-23 11:35:17.257529 |
26 |
52910923 |
Construction of Toilet Block at Uttar Fulbari Gram Panchayat Office 15th FC |
97606 |
Construction of Toilet Block at Uttar Fulbari Gram Panchayat Office 15th FC1 |
Completion of work |
-

latitude : 24.4386437
Longitude : 92.2259991
file name : Image_02082023121945228.png
|
2023-08-02 12:19:45.324181 |
27 |
52910923 |
Construction of Toilet Block at Uttar Fulbari Gram Panchayat Office 15th FC |
97606 |
Construction of Toilet Block at Uttar Fulbari Gram Panchayat Office 15th FC1 |
Completion of work |
-

latitude : 24.43868919
Longitude : 92.22594886
file name : Image_02082023123523194.png
|
2023-08-02 12:35:23.288754 |
28 |
52910923 |
Construction of Toilet Block at Uttar Fulbari Gram Panchayat Office 15th FC |
97606 |
Construction of Toilet Block at Uttar Fulbari Gram Panchayat Office 15th FC1 |
Roof laid |
-

latitude : 24.43879836
Longitude : 92.2259295
file name : Image_26092023122003434.png
|
2023-09-26 12:20:03.532015 |
29 |
52910923 |
Construction of Toilet Block at Uttar Fulbari Gram Panchayat Office 15th FC |
97606 |
Construction of Toilet Block at Uttar Fulbari Gram Panchayat Office 15th FC1 |
Plinth level |
-

latitude : 24.4387136
Longitude : 92.2260593
file name : Image_26092023120753304.png
|
2023-09-26 12:07:53.39827 |
30 |
87169243 |
Maintenance of Community Hall at Uttar Fulbari GP |
112161 |
Maintenance of Community Hall at Uttar Fulbari GP1 |
Completion of work |
-

latitude : 24.43870635
Longitude : 92.22611262
file name : Image_29082023114245873.png
|
2023-08-29 11:42:45.974406 |
31 |
87169243 |
Maintenance of Community Hall at Uttar Fulbari GP |
112161 |
Maintenance of Community Hall at Uttar Fulbari GP1 |
Plinth level |
-

latitude : 24.43872785
Longitude : 92.22621145
file name : Image_26092023131642729.png
|
2023-09-26 13:16:42.814029 |
32 |
87169243 |
Maintenance of Community Hall at Uttar Fulbari GP |
112161 |
Maintenance of Community Hall at Uttar Fulbari GP1 |
Roof laid |
-

latitude : 24.43874367
Longitude : 92.22622258
file name : Image_26092023132006953.png
|
2023-09-26 13:20:07.050884 |
33 |
56558261 |
Construction of water reserver at Alinagar J.B School |
198388 |
Construction of water reserver at Alinagar J.B School1 |
Completion of work |
-

latitude : 24.43864577
Longitude : 92.22873353
file name : Image_28122022125038717.png
|
2022-12-28 12:50:38.816581 |
34 |
56558825 |
Construction of water reserver near community Hall |
198388 |
Construction of water reserver near community Hall 1 |
Completion of work |
-

latitude : 24.4387098
Longitude : 92.2262501
file name : Image_28122022124838745.png
|
2022-12-28 12:48:38.848277 |
35 |
56558825 |
Construction of water reserver near community Hall |
198388 |
Construction of water reserver near community Hall 1 |
Completion of work |
-

latitude : 24.26953171
Longitude : 92.15499077
file name : Image_01072023132348051.png
|
2023-07-01 13:23:47.909725 |
36 |
56558825 |
Construction of water reserver near community Hall |
198388 |
Construction of water reserver near community Hall 1 |
Completion of work |
-

latitude : 24.438894
Longitude : 92.2260318
file name : Image_08082023131346394.png
|
2023-08-08 13:13:46.588478 |
37 |
56558825 |
Construction of water reserver near community Hall |
198388 |
Construction of water reserver near community Hall 1 |
Plinth level |
-

latitude : 24.4387149
Longitude : 92.22604
file name : Image_03102023135238434.png
|
2023-10-03 13:52:38.531687 |
38 |
86912512 |
Grey water management — treatment and reuse infrastructure |
200000 |
Grey water management — treatment and reuse infrastructure1 |
Completion of work |
-

latitude : 24.44699498
Longitude : 92.22452789
file name : Image_01092023145127056.png
|
2023-09-01 14:51:27.163226 |
39 |
86912512 |
Grey water management — treatment and reuse infrastructure |
200000 |
Grey water management — treatment and reuse infrastructure1 |
Completion of work |
-

latitude : 24.44700043
Longitude : 92.22454904
file name : Image_01092023151429629.png
|
2023-09-01 15:14:29.734015 |
40 |
86912512 |
Grey water management — treatment and reuse infrastructure |
200000 |
Grey water management — treatment and reuse infrastructure1 |
Plinth level |
-

latitude : 24.4387551
Longitude : 92.2261966
file name : Image_28032024123519850.png
|
2024-03-28 12:35:19.941814 |
41 |
86912512 |
Grey water management — treatment and reuse infrastructure |
200000 |
Grey water management — treatment and reuse infrastructure1 |
Roof laid |
-

latitude : 24.4387145
Longitude : 92.22592499
file name : Image_21022025151403373.png
|
2025-02-21 15:14:03.482806 |
42 |
52911328 |
Construction of Gate with stage near Uttar Fulbari Agri Store 15th FC |
74875 |
Construction of Gate with stage near Uttar Fulbari Agri Store 15th FC1 |
Completion of work |
-

latitude : 24.43835166666667
Longitude : 92.22624499999999
file name : Image_16092021123558284.png
|
2021-09-16 12:35:58.428373 |
43 |
52911328 |
Construction of Gate with stage near Uttar Fulbari Agri Store 15th FC |
74875 |
Construction of Gate with stage near Uttar Fulbari Agri Store 15th FC1 |
Completion of work |
-

latitude : 24.4360432
Longitude : 92.2318152
file name : Image_23032022113329306.png
|
2022-03-23 11:33:29.424493 |
44 |
52911328 |
Construction of Gate with stage near Uttar Fulbari Agri Store 15th FC |
74875 |
Construction of Gate with stage near Uttar Fulbari Agri Store 15th FC1 |
Plinth level |
-

latitude : 24.43842645
Longitude : 92.2261875
file name : Image_02082023121940355.png
|
2023-08-02 12:19:40.478004 |
45 |
52911328 |
Construction of Gate with stage near Uttar Fulbari Agri Store 15th FC |
74875 |
Construction of Gate with stage near Uttar Fulbari Agri Store 15th FC1 |
Plinth level |
-

latitude : 24.43846883
Longitude : 92.22621816
file name : Image_02082023123751342.png
|
2023-08-02 12:37:51.503861 |
46 |
52911328 |
Construction of Gate with stage near Uttar Fulbari Agri Store 15th FC |
74875 |
Construction of Gate with stage near Uttar Fulbari Agri Store 15th FC1 |
Roof laid |
-

latitude : 24.4386639
Longitude : 92.2260337
file name : Image_04122023125741764.png
|
2023-12-04 12:57:41.87501 |
47 |
87169265 |
Construction of Paver Block road from Matachin Ali house to AWC 100 mt at ward NO 3 |
491135 |
Construction of Paver Block road from Matachin Ali house to AWC 100 mt at ward NO 31 |
Plinth level |
-

latitude : 24.4387354,24.43871943,24.43871619
Longitude : 92.23021842,92.23018086,92.23017175
file name : Image_23072024142214818.png
|
2024-07-23 14:22:14.913268 |
48 |
87169265 |
Construction of Paver Block road from Matachin Ali house to AWC 100 mt at ward NO 3 |
491135 |
Construction of Paver Block road from Matachin Ali house to AWC 100 mt at ward NO 31 |
Completion of work |
-

latitude : 24.4398744,24.4398748
Longitude : 92.2275974,92.2275974
file name : Image_05122023130420840.png
|
2023-12-05 13:04:20.93834 |
49 |
97281449 |
Construction of toilets in public institutions |
109167 |
Construction of toilets in public institutions1 |
Completion of work |
-

latitude : 24.44041463
Longitude : 92.2250717
file name : Image_24102024150709978.png
|
2024-10-24 15:07:10.075012 |
50 |
76538479 |
Construction of Bus Stand Shed |
100000 |
Construction of Bus Stand Shed1 |
Completion of work |
-

latitude : 24.4385027
Longitude : 92.226003
file name : Image_24102024150216047.png
|
2024-10-24 15:02:16.134191 |
51 |
97047896 |
Construction of roads |
147137 |
Construction of roads1 |
Plinth level |
-

latitude : 24.44582433,24.44582309
Longitude : 92.22499161,92.22499568
file name : Image_29102024152848787.png
|
2024-10-29 15:28:48.882766 |
52 |
97047896 |
Construction of roads |
147137 |
Construction of roads1 |
Completion of work |
-

latitude : 24.44583439,24.44584684
Longitude : 92.22471838,92.22466928
file name : Image_19092024161641932.png
|
2024-09-19 16:16:42.022008 |
53 |
97047896 |
Construction of roads |
147137 |
Construction of roads1 |
Plinth level |
-

latitude : 24.44581521,24.4458149
Longitude : 92.22501981,92.22501996
file name : Image_29102024152852311.png
|
2024-10-29 15:28:52.418885 |
54 |
97047896 |
Construction of roads |
147137 |
Construction of roads1 |
Plinth level |
-

latitude : 24.44574293,24.44574415
Longitude : 92.22507317,92.22504302
file name : Image_29102024153929932.png
|
2024-10-29 15:39:30.04544 |
55 |
97047896 |
Construction of roads |
147137 |
Construction of roads1 |
Roof laid |
-

latitude : 24.4457286,24.4457708
Longitude : 92.22504312,92.22500959
file name : Image_01012025150545131.png
|
2025-01-01 15:05:45.160242 |
56 |
97047896 |
Construction of roads |
147137 |
Construction of roads1 |
Roof laid |
-

latitude : 24.44577156,24.44577222
Longitude : 92.22500897,92.22500885
file name : Image_01012025150547925.png
|
2025-01-01 15:05:47.905501 |
57 |
86912585 |
Grey water management — treatment and reuse infrastructure |
155000 |
Grey water management — treatment and reuse infrastructure1 |
Completion of work |
-

latitude : 24.4387565
Longitude : 92.226197
file name : Image_28032024130812358.png
|
2024-03-28 13:08:12.441766 |
58 |
86912585 |
Grey water management — treatment and reuse infrastructure |
155000 |
Grey water management — treatment and reuse infrastructure1 |
Plinth level |
-

latitude : 24.4387551
Longitude : 92.2261961
file name : Image_28032024131436273.png
|
2024-03-28 13:14:36.367091 |
59 |
86912585 |
Grey water management — treatment and reuse infrastructure |
155000 |
Grey water management — treatment and reuse infrastructure1 |
Roof laid |
-

latitude : 24.4385041
Longitude : 92.2260008
file name : Image_21022025151208669.png
|
2025-02-21 15:12:08.752699 |
60 |
96990266 |
Drainage Construction |
408374 |
Drainage Construction1 |
Completion of work |
-

latitude : 24.4398706
Longitude : 92.22416675
file name : Image_27072024172831949.png
|
2024-07-27 17:28:32.035296 |
61 |
96990266 |
Drainage Construction |
408374 |
Drainage Construction1 |
Completion of work |
-

latitude : 24.43988804
Longitude : 92.22414457
file name : Image_27072024173126268.png
|
2024-07-27 17:31:26.364663 |
62 |
96990266 |
Drainage Construction |
408374 |
Drainage Construction1 |
Plinth level |
-

latitude : 24.43992683
Longitude : 92.22413225
file name : Image_24102024150704985.png
|
2024-10-24 15:07:05.096211 |
63 |
96990266 |
Drainage Construction |
408374 |
Drainage Construction1 |
Roof laid |
-

latitude : 24.43997704
Longitude : 92.22413513
file name : Image_29102024153339191.png
|
2024-10-29 15:33:39.317658 |
64 |
96990266 |
Drainage Construction |
408374 |
Drainage Construction1 |
Roof laid |
-

latitude : 24.4401074
Longitude : 92.2238008
file name : Image_21022025150822433.png
|
2025-02-21 15:08:22.530293 |
65 |
120907603 |
Drinking water facilities/ Installation of RO/ Water Filter |
140000 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Completion of work |
-

latitude : 24.43910214
Longitude : 92.22608698
file name : Image_06032025154911060.png
|
2025-03-06 15:49:11.189168 |
66 |
120907603 |
Drinking water facilities/ Installation of RO/ Water Filter |
140000 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Plinth level |
-

latitude : 24.43918012
Longitude : 92.22613616
file name : Image_06032025155332680.png
|
2025-03-06 15:53:32.774475 |
67 |
120907603 |
Drinking water facilities/ Installation of RO/ Water Filter |
140000 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Plinth level |
-

latitude : 24.45217386
Longitude : 92.21814491
file name : Image_07032025133721323.png
|
2025-03-07 13:37:21.420529 |
68 |
121960111 |
Creation of a new source of drinking water |
140000 |
Creation of a new source of drinking water1 |
Completion of work |
-

latitude : 24.4387401
Longitude : 92.2261171
file name : Image_20032025122308582.png
|
2025-03-20 12:23:08.671221 |
69 |
121960111 |
Creation of a new source of drinking water |
140000 |
Creation of a new source of drinking water1 |
Plinth level |
-

latitude : 24.4387786
Longitude : 92.22611409
file name : Image_20032025122835877.png
|
2025-03-20 12:28:35.965074 |
70 |
121960111 |
Creation of a new source of drinking water |
140000 |
Creation of a new source of drinking water1 |
Roof laid |
-

latitude : 24.268998333333336
Longitude : 92.15564833333335
file name : Image_25032025115257220.png
|
2025-03-25 11:52:57.309014 |