1 |
19993712 |
Cons.of urinal at dhupirbond gp office |
38048 |
Other Sanitation Asset1 |
Stage 1 40% |
-
latitude : 24.34086152818054
Longitude : 92.16934986412525
file name : Image_09102018114327805.png
|
2018-10-09 11:43:27.929468 |
2 |
51527529 |
const brick soling road in the place of habij uddin to islam uddin w4 15fc |
113770 |
const brick soling road in the place of habij uddin to islam uddin w4 15fc1 |
Plinth level |
-
latitude : 24.3448370648548,24.344802740961313
Longitude : 92.16628812253475,92.16623825021088
file name : Image_06052021091839206.png
|
2021-05-06 09:18:39.309167 |
3 |
51527529 |
const brick soling road in the place of habij uddin to islam uddin w4 15fc |
113770 |
const brick soling road in the place of habij uddin to islam uddin w4 15fc1 |
Plinth level |
-
latitude : 24.3448370648548,24.344802740961313
Longitude : 92.16628812253475,92.16623825021088
file name : Image_06052021091904812.png
|
2021-05-06 09:19:04.902055 |
4 |
51527570 |
const of brick soling road in the place of rail line to maynul haque w01 15 fc |
105386 |
const of brick soling road in the place of rail line to maynul haque w01 15 fc1 |
Completion of work |
-
latitude : 24.351067962124944,24.351053084246814,24.351031710393727
Longitude : 92.16677016578615,92.16671601869166,92.16675641946495
file name : Image_06052021091846808.png
|
2021-05-06 09:18:46.900277 |
5 |
51527570 |
const of brick soling road in the place of rail line to maynul haque w01 15 fc |
105386 |
const of brick soling road in the place of rail line to maynul haque w01 15 fc1 |
Completion of work |
-
latitude : 24.351067962124944,24.351053084246814,24.351031710393727
Longitude : 92.16677016578615,92.16671601869166,92.16675641946495
file name : Image_06052021091914082.png
|
2021-05-06 09:19:14.17156 |
6 |
51527255 |
const of brick soling road in the place of samsad uddin to habij uddin w04 14fc |
183598 |
const of brick soling road in the place of samsad uddin to habij uddin w04 14fc1 |
Plinth level |
-
latitude : 24.344363906420767,24.34436436742544
Longitude : 92.16855643317103,92.16862541623414
file name : Image_30042021172952552.png
|
2021-04-30 17:29:52.648842 |
7 |
47389527 |
CONST OF BRICK SOLING ROAD IN THE PLACE OF RAIL GATE TO KAKRI BRIDGE VIA MAYNUL HAQUE W01 15FC |
10328 |
CONST OF BRICK SOLING ROAD IN THE PLACE OF RAIL GATE TO KAKRI BRIDGE VIA MAYNUL HAQUE W01 15FC1 |
Completion of work |
-
latitude : 24.333495595492423,24.333490733988583
Longitude : 92.12285427376628,92.12282954715192
file name : Image_01072021151047333.png
|
2021-07-01 15:10:47.420755 |
8 |
54666520 |
const of cross drain nof mahendra nath brindaban nath ward1 15fc |
60000 |
const of cross drain nof mahendra nath brindaban nath ward1 15fc1 |
Completion of work |
-
latitude : 24.35805668
Longitude : 92.16231047
file name : Image_01022022130104439.png
|
2022-02-01 13:01:04.573923 |
9 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.345813333333332
Longitude : 92.15850166666665
file name : Image_19012023162805755.png
|
2023-01-19 16:28:05.872828 |
10 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions3 |
Completion of work |
-
latitude : 24.345818333333334
Longitude : 92.15853333333334
file name : Image_19012023162817438.png
|
2023-01-19 16:28:17.551048 |
11 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions4 |
Completion of work |
-
latitude : 24.34581166666667
Longitude : 92.15852833333332
file name : Image_19012023162824769.png
|
2023-01-19 16:28:24.865358 |
12 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions5 |
Completion of work |
-
latitude : 24.345816666666664
Longitude : 92.15850833333334
file name : Image_19012023162834481.png
|
2023-01-19 16:28:34.601896 |
13 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions6 |
Completion of work |
-
latitude : 24.34579666666667
Longitude : 92.15851666666667
file name : Image_19012023162929303.png
|
2023-01-19 16:29:29.419775 |
14 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions6 |
Completion of work |
-
latitude : 24.34579666666667
Longitude : 92.15851666666667
file name : Image_19012023162845411.png
|
2023-01-19 16:28:45.525348 |
15 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions7 |
Completion of work |
-
latitude : 24.345808333333334
Longitude : 92.15851166666668
file name : Image_19012023162937755.png
|
2023-01-19 16:29:37.864611 |
16 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions7 |
Completion of work |
-
latitude : 24.345808333333334
Longitude : 92.15851166666668
file name : Image_19012023162854702.png
|
2023-01-19 16:28:54.837242 |
17 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions9 |
Completion of work |
-
latitude : 24.345808333333334
Longitude : 92.158515
file name : Image_19012023162946667.png
|
2023-01-19 16:29:46.826415 |
18 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions9 |
Completion of work |
-
latitude : 24.345808333333334
Longitude : 92.158515
file name : Image_19012023162908132.png
|
2023-01-19 16:29:08.267969 |
19 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions10 |
Completion of work |
-
latitude : 24.345815
Longitude : 92.158495
file name : Image_19012023163016463.png
|
2023-01-19 16:30:16.582986 |
20 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions10 |
Completion of work |
-
latitude : 24.345815
Longitude : 92.158495
file name : Image_19012023163005140.png
|
2023-01-19 16:30:05.287713 |
21 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions10 |
Completion of work |
-
latitude : 24.345818333333334
Longitude : 92.15855000000002
file name : Image_19012023162955861.png
|
2023-01-19 16:29:55.985294 |
22 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions10 |
Completion of work |
-
latitude : 24.345818333333334
Longitude : 92.15855000000002
file name : Image_19012023162918648.png
|
2023-01-19 16:29:18.816497 |
23 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions11 |
Completion of work |
-
latitude : 24.345795
Longitude : 92.15851833333333
file name : Image_19012023163042343.png
|
2023-01-19 16:30:42.463099 |
24 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions11 |
Completion of work |
-
latitude : 24.17113466
Longitude : 91.99594468
file name : Image_19012023163029182.png
|
2023-01-19 16:30:29.26974 |
25 |
66439464 |
Construction of toilets in public institutions |
75070 |
Construction of toilets in public institutions11 |
Completion of work |
-
latitude : 24.345795
Longitude : 92.15851833333333
file name : Image_19012023163027598.png
|
2023-01-19 16:30:27.725827 |
26 |
66439338 |
Providing piped water supply to public institutions |
38000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 24.35166097
Longitude : 92.17226202
file name : Image_11012023121705812.png
|
2023-01-11 12:17:05.918737 |
27 |
66439393 |
Providing piped water supply to public institutions |
38000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 24.35190947
Longitude : 92.17111681
file name : Image_11012023121709844.png
|
2023-01-11 12:17:09.942256 |
28 |
66439416 |
Providing piped water supply to public institutions |
38000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 24.35192733
Longitude : 92.17109131
file name : Image_11012023121718081.png
|
2023-01-11 12:17:18.183251 |
29 |
66439416 |
Providing piped water supply to public institutions |
38000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 24.3519269
Longitude : 92.17109193
file name : Image_11012023121713755.png
|
2023-01-11 12:17:13.845136 |
30 |
66589567 |
Operation & maintenance of community sanitary complex |
95414 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 24.34593
Longitude : 92.15859333333334
file name : Image_24012023144243295.png
|
2023-01-24 14:42:43.428483 |
31 |
79661363 |
Creation of community compost pits for a group of Households |
38700 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 24.339615000000002
Longitude : 92.15802166666666
file name : Image_14092023112944274.png
|
2023-09-14 11:29:44.393655 |
32 |
84826862 |
Construction of cross drain near the housse of Sribas Nath at Dhupirbond GP |
102118 |
Construction of cross drain near the housse of Sribas Nath at Dhupirbond GP1 |
Completion of work |
-
latitude : 24.357486666666667,24.357475,24.35747666666667,24.357475
Longitude : 92.16540000000002,92.16540000000002,92.16540166666667,92.16540000000002
file name : Image_14092023122802183.png
|
2023-09-14 12:28:02.292458 |
33 |
84827413 |
Creation of new Rainwater harvesting (RWH) structure |
269308 |
Creation of new Rainwater harvesting (RWH) structure1 |
Plinth level |
-
latitude : 24.351125000000003
Longitude : 92.16572
file name : Image_03052024170305470.png
|
2024-05-03 17:03:05.56169 |
34 |
84827413 |
Creation of new Rainwater harvesting (RWH) structure |
269308 |
Creation of new Rainwater harvesting (RWH) structure1 |
Completion of work |
-
latitude : 24.356406666666665
Longitude : 92.16546166666667
file name : Image_14092023123617884.png
|
2023-09-14 12:36:18.034753 |
35 |
57421260 |
Const of small boro tube well NH of Bishnupada Shil Ward1 15FC tide |
38000 |
Const of small boro tube well NH of Bishnupada Shil Ward1 15FC tide1 |
Completion of work |
-
latitude : 24.3337541
Longitude : 92.12273
file name : Image_11012023132906906.png
|
2023-01-11 13:29:07.012954 |
36 |
57425436 |
Const of hand pump in the place of Nasir uddin Ward7 15FC |
38000 |
Const of hand pump in the place of Nasir uddin Ward7 15FC 1 |
Completion of work |
-
latitude : 24.3337509
Longitude : 92.122723
file name : Image_11012023132910620.png
|
2023-01-11 13:29:10.726302 |
37 |
66614027 |
Construction of Community Sanitary Complex |
45000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.342213333333333
Longitude : 92.17540666666667
file name : Image_17092023144926824.png
|
2023-09-17 14:49:26.91986 |
38 |
66614027 |
Construction of Community Sanitary Complex |
45000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.35421
Longitude : 92.16229333333334
file name : Image_19012023155351497.png
|
2023-01-19 15:53:51.62142 |
39 |
66439368 |
Const of Ramp and mtc 29no polling station katauni school at dhupirband gp 15fc |
41500 |
Const of Ramp and mtc 29no polling station katauni school at dhupirband gp 15fc1 |
Roof laid |
-
latitude : 24.342158333333334
Longitude : 92.17541000000001
file name : Image_17092023144050836.png
|
2023-09-17 14:40:50.930136 |
40 |
66439368 |
Const of Ramp and mtc 29no polling station katauni school at dhupirband gp 15fc |
41500 |
Const of Ramp and mtc 29no polling station katauni school at dhupirband gp 15fc1 |
Plinth level |
-
latitude : 24.34221
Longitude : 92.17534499999998
file name : Image_17092023143153195.png
|
2023-09-17 14:31:53.289223 |
41 |
66439368 |
Const of Ramp and mtc 29no polling station katauni school at dhupirband gp 15fc |
41500 |
Const of Ramp and mtc 29no polling station katauni school at dhupirband gp 15fc1 |
Completion of work |
-
latitude : 24.35185722
Longitude : 92.16973662
file name : Image_11012023121725280.png
|
2023-01-11 12:17:25.373356 |
42 |
54666464 |
mtc of steel bridge NH of anjali das w03 15fc |
65000 |
mtc of steel bridge NH of anjali das w03 15fc1 |
Completion of work |
-
latitude : 24.34268088
Longitude : 92.16160308
file name : Image_06012022140220753.png
|
2022-01-06 14:02:20.860305 |
43 |
54666569 |
const of cross drain nh ofarfijUddinw5 15fc |
60000 |
const of cross drain nh ofarfijUddinw5 15fc 1 |
Completion of work |
-
latitude : 24.34304348
Longitude : 92.16977572
file name : Image_31012022142854182.png
|
2022-01-31 14:28:54.31541 |
44 |
54666543 |
const of cross drain nhof ala uddin w7 15fc |
60000 |
const of cross drain nhof ala uddin w7 15fc1 |
Completion of work |
-
latitude : 24.3395746
Longitude : 92.16664012
file name : Image_31012022152152820.png
|
2022-01-31 15:21:52.948003 |
45 |
54666543 |
const of cross drain nhof ala uddin w7 15fc |
60000 |
const of cross drain nhof ala uddin w7 15fc1 |
Completion of work |
-
latitude : 24.3395746
Longitude : 92.16664012
file name : Image_31012022150912355.png
|
2022-01-31 15:09:12.486126 |
46 |
47408343 |
CONST OF CROSS DRAIN N/H OF ALA UDDIN W07 15FC |
125000 |
CONST OF CROSS DRAIN N/H OF ALA UDDIN W07 15FC1 |
Completion of work |
-
latitude : 24.3456974
Longitude : 92.16689826
file name : Image_06012022105518265.png
|
2022-01-06 10:55:18.387178 |
47 |
47408343 |
CONST OF CROSS DRAIN N/H OF ALA UDDIN W07 15FC |
125000 |
CONST OF CROSS DRAIN N/H OF ALA UDDIN W07 15FC1 |
Completion of work |
-
latitude : 24.34598709
Longitude : 92.16693438
file name : Image_06012022105425543.png
|
2022-01-06 10:54:25.667355 |
48 |
63780688 |
const of water reserve tank in the place of krishnapur baul tilla 15fc |
200000 |
const of water reserve tank in the place of krishnapur baul tilla 15fc1 |
Plinth level |
-
latitude : 24.339103333333334
Longitude : 92.15759333333332
file name : Image_17092023132227413.png
|
2023-09-17 13:22:27.503666 |
49 |
63780688 |
const of water reserve tank in the place of krishnapur baul tilla 15fc |
200000 |
const of water reserve tank in the place of krishnapur baul tilla 15fc1 |
Completion of work |
-
latitude : 24.34091031
Longitude : 92.16938773
file name : Image_02072022145204668.png
|
2022-07-02 14:52:04.783724 |
50 |
47404843 |
CONST OF CROSS DRAIN N/H OF NIJAM UDDIN W05 15FC |
125000 |
CONST OF CROSS DRAIN N/H OF NIJAM UDDIN W05 15FC1 |
Completion of work |
-
latitude : 24.35619794
Longitude : 92.16561729
file name : Image_06012022154040127.png
|
2022-01-06 15:40:40.248608 |
51 |
63780602 |
Disrtribution of Community and indivusial dustbin |
275000 |
Disrtribution of Community and indivusial dustbin 1 |
Completion of work |
-
latitude : 24.35100197
Longitude : 92.17372305
file name : Image_30062022113754968.png
|
2022-06-30 11:37:55.082433 |
52 |
57419418 |
Const of brick soling road in the place DD road west to jurculvert AWC center Ward01 15FC untide |
206514 |
Const of brick soling road in the place DD road west to jurculvert AWC center Ward01 15FC untide 1 |
Roof laid |
-
latitude : 24.355293333333332,24.355293333333332
Longitude : 92.16539166666668,92.16539166666668
file name : Image_17092023134204685.png
|
2023-09-17 13:42:04.789947 |
53 |
57419418 |
Const of brick soling road in the place DD road west to jurculvert AWC center Ward01 15FC untide |
206514 |
Const of brick soling road in the place DD road west to jurculvert AWC center Ward01 15FC untide 1 |
Roof laid |
-
latitude : 24.355311666666662,24.355311666666662
Longitude : 92.16540666666667,92.16540666666667
file name : Image_17092023133718071.png
|
2023-09-17 13:37:18.181174 |
54 |
57419418 |
Const of brick soling road in the place DD road west to jurculvert AWC center Ward01 15FC untide |
206514 |
Const of brick soling road in the place DD road west to jurculvert AWC center Ward01 15FC untide 1 |
Plinth level |
-
latitude : 24.355315000000004,24.355313333333335
Longitude : 92.16537500000001,92.16537333333332
file name : Image_17092023133232257.png
|
2023-09-17 13:32:32.371759 |
55 |
57419418 |
Const of brick soling road in the place DD road west to jurculvert AWC center Ward01 15FC untide |
206514 |
Const of brick soling road in the place DD road west to jurculvert AWC center Ward01 15FC untide 1 |
Completion of work |
-
latitude : 24.35531317,24.35533739,24.35547398
Longitude : 92.16533125,92.16530415,92.1645097
file name : Image_16112022130900627.png
|
2022-11-16 13:09:00.735238 |
56 |
84824088 |
Retrofitting of single pit toilets to twin pit toilets or connecting septic tanks with soak pits |
297000 |
Retrofitting of single pit toilets to twin pit toilets or connecting septic tanks with soak pits1 |
Roof laid |
-
latitude : 24.3441739
Longitude : 92.1678964
file name : Image_01012024132054774.png
|
2024-01-01 13:20:54.866672 |
57 |
84824088 |
Retrofitting of single pit toilets to twin pit toilets or connecting septic tanks with soak pits |
297000 |
Retrofitting of single pit toilets to twin pit toilets or connecting septic tanks with soak pits1 |
Plinth level |
-
latitude : 24.344981666666666
Longitude : 92.167725
file name : Image_01012024131057896.png
|
2024-01-01 13:10:57.986579 |
58 |
84824088 |
Retrofitting of single pit toilets to twin pit toilets or connecting septic tanks with soak pits |
297000 |
Retrofitting of single pit toilets to twin pit toilets or connecting septic tanks with soak pits1 |
Completion of work |
-
latitude : 24.340963333333335
Longitude : 92.16942499999999
file name : Image_14092023155844786.png
|
2023-09-14 15:58:44.898731 |
59 |
86344941 |
Maintenance of Panchayat Bhawan |
156023 |
Maintenance of Panchayat Bhawan1 |
Roof laid |
-
latitude : 24.34095
Longitude : 92.16929666666668
file name : Image_09072024173114697.png
|
2024-07-09 17:31:14.793636 |
60 |
86344941 |
Maintenance of Panchayat Bhawan |
156023 |
Maintenance of Panchayat Bhawan1 |
Roof laid |
-
latitude : 24.340930000000004
Longitude : 92.169325
file name : Image_09072024171925889.png
|
2024-07-09 17:19:25.97872 |
61 |
86344941 |
Maintenance of Panchayat Bhawan |
156023 |
Maintenance of Panchayat Bhawan1 |
Roof laid |
-
latitude : 24.34092333333333
Longitude : 92.16935666666669
file name : Image_08072024121301537.png
|
2024-07-08 12:13:01.617716 |
62 |
86344941 |
Maintenance of Panchayat Bhawan |
156023 |
Maintenance of Panchayat Bhawan1 |
Roof laid |
-
latitude : 24.271388333333334
Longitude : 92.16609166666667
file name : Image_13062024113222319.png
|
2024-06-13 11:32:22.400869 |
63 |
86344941 |
Maintenance of Panchayat Bhawan |
156023 |
Maintenance of Panchayat Bhawan1 |
Plinth level |
-
latitude : 24.34104166666667
Longitude : 92.16922666666666
file name : Image_26022024140224301.png
|
2024-02-26 14:02:24.392501 |
64 |
86344941 |
Maintenance of Panchayat Bhawan |
156023 |
Maintenance of Panchayat Bhawan1 |
Completion of work |
-
latitude : 24.341025
Longitude : 92.16921499999998
file name : Image_26022024135730194.png
|
2024-02-26 13:57:30.346243 |
65 |
84826319 |
Construction of Bricksolling road from rail crossing to end bundh via Alauddin Brick kila at Dhupirb |
152831 |
Construction of Bricksolling road from rail crossing to end bundh via Alauddin Brick kila at Dhupirb1 |
Roof laid |
-
latitude : 24.351096666666663,24.351081666666666
Longitude : 92.16637833333334,92.16638999999999
file name : Image_03052024164938145.png
|
2024-05-03 16:49:38.234042 |
66 |
84826319 |
Construction of Bricksolling road from rail crossing to end bundh via Alauddin Brick kila at Dhupirb |
152831 |
Construction of Bricksolling road from rail crossing to end bundh via Alauddin Brick kila at Dhupirb1 |
Roof laid |
-
latitude : 24.35110666666667,24.351128333333335
Longitude : 92.16635333333333,92.16637666666665
file name : Image_03052024164546018.png
|
2024-05-03 16:45:46.103777 |
67 |
84826319 |
Construction of Bricksolling road from rail crossing to end bundh via Alauddin Brick kila at Dhupirb |
152831 |
Construction of Bricksolling road from rail crossing to end bundh via Alauddin Brick kila at Dhupirb1 |
Plinth level |
-
latitude : 24.340961666666665,24.351113333333334
Longitude : 92.16927166666667,92.166375
file name : Image_03052024164115572.png
|
2024-05-03 16:41:15.668105 |
68 |
84826319 |
Construction of Bricksolling road from rail crossing to end bundh via Alauddin Brick kila at Dhupirb |
152831 |
Construction of Bricksolling road from rail crossing to end bundh via Alauddin Brick kila at Dhupirb1 |
Completion of work |
-
latitude : 24.35109166666667,24.351098333333333
Longitude : 92.16605999999999,92.16607833333335
file name : Image_14092023130158193.png
|
2023-09-14 13:01:58.307544 |
69 |
63780648 |
Const of water reserve tank in the place of panchayat office 15 fc |
200000 |
Const of water reserve tank in the place of panchayat office 15 fc1 |
Plinth level |
-
latitude : 24.340955
Longitude : 92.16930499999998
file name : Image_02072024183933587.png
|
2024-07-02 18:39:33.699979 |
70 |
63780648 |
Const of water reserve tank in the place of panchayat office 15 fc |
200000 |
Const of water reserve tank in the place of panchayat office 15 fc1 |
Plinth level |
-
latitude : 24.340916666666665
Longitude : 92.16936833333332
file name : Image_13062024113405708.png
|
2024-06-13 11:34:05.806726 |
71 |
63780648 |
Const of water reserve tank in the place of panchayat office 15 fc |
200000 |
Const of water reserve tank in the place of panchayat office 15 fc1 |
Completion of work |
-
latitude : 24.34092725
Longitude : 92.16920918
file name : Image_02072022144953873.png
|
2022-07-02 14:49:53.996116 |
72 |
96280237 |
Construction of roads |
188482 |
Construction of roads1 |
Roof laid |
-
latitude : 24.345368333333333,24.345368333333333
Longitude : 92.16682666666665,92.16682166666666
file name : Image_05072024125103033.png
|
2024-07-05 12:51:03.122407 |
73 |
96280237 |
Construction of roads |
188482 |
Construction of roads1 |
Plinth level |
-
latitude : 24.345338333333334,24.345338333333334
Longitude : 92.16684500000001,92.16684500000001
file name : Image_05072024124920976.png
|
2024-07-05 12:49:21.073901 |
74 |
96280237 |
Construction of roads |
188482 |
Construction of roads1 |
Plinth level |
-
latitude : 24.345179999999996,24.34518666666667
Longitude : 92.16691,92.16689833333334
file name : Image_05072024124420859.png
|
2024-07-05 12:44:20.960966 |
75 |
96280237 |
Construction of roads |
188482 |
Construction of roads1 |
Completion of work |
-
latitude : 24.344913333333338,24.344908333333333
Longitude : 92.16689,92.16688833333335
file name : Image_05072024123940449.png
|
2024-07-05 12:39:40.559755 |