1 |
42177806 |
Laying of brick soling road from Narayan Pal house to Dharani Debnath house Routhlhala GP ( FFC) |
113348 |
Laying of brick soling road from Narayan Pal house to Dharani Debnath house Routhlhala GP ( FFC)1 |
Plinth level |
-

latitude : 23.66532205,23.66532199
Longitude : 91.28386023,91.28386017
file name : Image_09062021113217483.png
|
2021-06-09 11:32:17.583852 |
2 |
42177806 |
Laying of brick soling road from Narayan Pal house to Dharani Debnath house Routhlhala GP ( FFC) |
113348 |
Laying of brick soling road from Narayan Pal house to Dharani Debnath house Routhlhala GP ( FFC)1 |
Plinth level |
-

latitude : 23.66539584,23.66539689
Longitude : 91.28381234,91.28381466
file name : Image_03062021124949151.png
|
2021-06-03 12:49:49.252262 |
3 |
42177806 |
Laying of brick soling road from Narayan Pal house to Dharani Debnath house Routhlhala GP ( FFC) |
113348 |
Laying of brick soling road from Narayan Pal house to Dharani Debnath house Routhlhala GP ( FFC)1 |
Roof laid |
-

latitude : 23.66537023,23.66537025
Longitude : 91.28389136,91.28389084
file name : Image_26082021134254556.png
|
2021-08-26 13:42:54.672394 |
4 |
42180031 |
widening of road near the house of Usharanjan Bhattacharjee (FFC) |
15917 |
widening of road near the house of Usharanjan Bhattacharjee (FFC)1 |
Plinth level |
-

latitude : 23.66575492,23.6657554
Longitude : 91.29017833,91.29017798
file name : Image_09062021120724668.png
|
2021-06-09 12:07:24.755809 |
5 |
42180031 |
widening of road near the house of Usharanjan Bhattacharjee (FFC) |
15917 |
widening of road near the house of Usharanjan Bhattacharjee (FFC)1 |
Completion of work |
-

latitude : 23.66577729,23.66577725
Longitude : 91.29022095,91.29022081
file name : Image_25052021142732453.png
|
2021-05-25 14:27:32.580483 |
6 |
51715598 |
New Palasiding with earth filling and brick soling road from Subash Biswase to Janapriya Club(Untied |
118608 |
New Palasiding with earth filling and brick soling road from Subash Biswase to Janapriya Club(Untied1 |
Plinth level |
-

latitude : 23.67100441,23.6710039
Longitude : 91.29500256,91.29500267
file name : Image_09062021114026366.png
|
2021-06-09 11:40:26.476034 |
7 |
51715598 |
New Palasiding with earth filling and brick soling road from Subash Biswase to Janapriya Club(Untied |
118608 |
New Palasiding with earth filling and brick soling road from Subash Biswase to Janapriya Club(Untied1 |
Completion of work |
-

latitude : 23.67100233,23.67100485
Longitude : 91.29503494,91.29503417
file name : Image_27052021120220395.png
|
2021-05-27 12:02:20.503746 |
8 |
51723433 |
New Const. Of toilet for Jangalia AWC.(Tied) |
28686 |
New Const. Of toilet for Jangalia AWC.(Tied)1 |
Plinth level |
-

latitude : 23.66514409
Longitude : 91.29265581
file name : Image_09062021120004342.png
|
2021-06-09 12:00:04.473433 |
9 |
51723433 |
New Const. Of toilet for Jangalia AWC.(Tied) |
28686 |
New Const. Of toilet for Jangalia AWC.(Tied)1 |
Completion of work |
-

latitude : 23.66523781
Longitude : 91.29266275
file name : Image_27052021121011775.png
|
2021-05-27 12:10:11.868107 |
10 |
51723513 |
New const. Of toilet Rasis Fakir Tila AWC (Tied) |
28686 |
New const. Of toilet Rasis Fakir Tila AWC (Tied)1 |
Plinth level |
-

latitude : 23.66935169
Longitude : 91.3024347
file name : Image_09062021114653211.png
|
2021-06-09 11:46:53.315717 |
11 |
51723513 |
New const. Of toilet Rasis Fakir Tila AWC (Tied) |
28686 |
New const. Of toilet Rasis Fakir Tila AWC (Tied)1 |
Completion of work |
-

latitude : 23.66942776
Longitude : 91.30234859
file name : Image_03062021130818030.png
|
2021-06-03 13:08:18.124918 |
12 |
51723513 |
New const. Of toilet Rasis Fakir Tila AWC (Tied) |
28686 |
New const. Of toilet Rasis Fakir Tila AWC (Tied)1 |
Roof laid |
-

latitude : 23.66932716
Longitude : 91.30245501
file name : Image_26082021142239127.png
|
2021-08-26 14:22:39.234434 |
13 |
51723282 |
New Const. Of RCC Cross drain (Untied) |
137272 |
New Const. Of RCC Cross drain (Untied)1 |
Plinth level |
-

latitude : 23.6641549,23.6641552
Longitude : 91.2909138,91.2909114
file name : Image_09062021120418733.png
|
2021-06-09 12:04:18.815503 |
14 |
51723282 |
New Const. Of RCC Cross drain (Untied) |
137272 |
New Const. Of RCC Cross drain (Untied)1 |
Completion of work |
-

latitude : 23.66512435,23.66512211,23.66511853
Longitude : 91.29100425,91.29100994,91.29101404
file name : Image_27052021115243391.png
|
2021-05-27 11:52:43.574823 |
15 |
51722966 |
New providing brick soling (Untied) |
129244 |
New providing brick soling (Untied)1 |
Plinth level |
-

latitude : 23.66465354,23.6646528
Longitude : 91.29232103,91.29231993
file name : Image_09062021120209122.png
|
2021-06-09 12:02:09.208669 |
16 |
51722966 |
New providing brick soling (Untied) |
129244 |
New providing brick soling (Untied)1 |
Completion of work |
-

latitude : 23.66467702,23.66467728
Longitude : 91.29242848,91.29242844
file name : Image_27052021115649615.png
|
2021-05-27 11:56:49.747801 |
17 |
51723064 |
New palasiding with earth filling (Untied) |
68917 |
New palasiding with earth filling (Untied)1 |
Plinth level |
-

latitude : 23.66541908,23.66541882
Longitude : 91.29043114,91.29043024
file name : Image_09062021120612140.png
|
2021-06-09 12:06:12.231957 |
18 |
51723064 |
New palasiding with earth filling (Untied) |
68917 |
New palasiding with earth filling (Untied)1 |
Completion of work |
-

latitude : 23.66550443,23.66550669
Longitude : 91.29042009,91.29041962
file name : Image_27052021114952773.png
|
2021-05-27 11:49:52.892091 |
19 |
53755098 |
Construction of cross drain near Badal Debnath 15th FC Tied |
101658 |
Construction of cross drain near Badal Debnath 15th FC Tied1 |
Completion of work |
-

latitude : 23.66185293,23.6622255,23.66178999
Longitude : 91.28760228,91.2882408,91.28760393
file name : Image_26082021133805585.png
|
2021-08-26 13:38:05.683713 |
20 |
53755098 |
Construction of cross drain near Badal Debnath 15th FC Tied |
101658 |
Construction of cross drain near Badal Debnath 15th FC Tied1 |
Plinth level |
-

latitude : 23.6619084,23.66188709,23.6622224
Longitude : 91.28763065,91.28759776,91.288223
file name : Image_30112021123709739.png
|
2021-11-30 12:37:09.861923 |
21 |
53755098 |
Construction of cross drain near Badal Debnath 15th FC Tied |
101658 |
Construction of cross drain near Badal Debnath 15th FC Tied1 |
Plinth level |
-

latitude : 23.6622952,23.6622223
Longitude : 91.2880098,91.2881562
file name : Image_30112021123902060.png
|
2021-11-30 12:39:02.195873 |
22 |
53755098 |
Construction of cross drain near Badal Debnath 15th FC Tied |
101658 |
Construction of cross drain near Badal Debnath 15th FC Tied1 |
Roof laid |
-

latitude : 23.66186765,23.6622265
Longitude : 91.28760949,91.2881524
file name : Image_15122021140449753.png
|
2021-12-15 14:04:49.861577 |
23 |
53662542 |
Brick solling from Kislu Miah house to Alumghir Hossain 15th FC Untied |
60234 |
Brick solling from Kislu Miah house to Alumghir Hossain 15th FC Untied1 |
Plinth level |
-

latitude : 23.66965114,23.6692592
Longitude : 91.30195729,91.2880502
file name : Image_27092021140054021.png
|
2021-09-27 14:00:54.121197 |
24 |
53662542 |
Brick solling from Kislu Miah house to Alumghir Hossain 15th FC Untied |
60234 |
Brick solling from Kislu Miah house to Alumghir Hossain 15th FC Untied1 |
Completion of work |
-

latitude : 23.66954683,23.66955057
Longitude : 91.30198508,91.30198375
file name : Image_26082021141812601.png
|
2021-08-26 14:18:12.701322 |
25 |
53754934 |
Maintenance of Sub Mersible from Chandan Sutradhar house to Shyamal Shil house via Rakhal Debnath |
91786 |
Maintenance of Sub Mersible from Chandan Sutradhar house to Shyamal Shil house via Rakhal Debnath 1 |
Completion of work |
-

latitude : 23.66422475
Longitude : 91.29339736
file name : Image_27092021134102318.png
|
2021-09-27 13:41:02.49135 |
26 |
51776200 |
Sinking of oHP |
66035 |
Sinking of oHP1 |
Completion of work |
-

latitude : 23.67108769
Longitude : 91.29501963
file name : Image_27092021135111095.png
|
2021-09-27 13:51:11.224813 |
27 |
51776200 |
Sinking of oHP |
66035 |
Sinking of oHP1 |
Completion of work |
-

latitude : 23.6622252
Longitude : 91.2881584
file name : Image_30112021123717442.png
|
2021-11-30 12:37:17.570806 |
28 |
51776200 |
Sinking of oHP |
66035 |
Sinking of oHP1 |
Roof laid |
-

latitude : 23.6623124
Longitude : 91.2882259
file name : Image_04022022122233685.png
|
2022-02-04 12:22:33.783679 |
29 |
53754328 |
Sinking of OHP near Kalimandir Community 15th FC Tied |
39621 |
Sinking of OHP near Kalimandir Community 15th FC Tied1 |
Completion of work |
-

latitude : 23.66857918
Longitude : 91.29444263
file name : Image_27092021133934592.png
|
2021-09-27 13:39:34.726375 |
30 |
60137608 |
Distribution of 9 nos community Racycle bin (15th Tied) |
23850 |
Distribution of 9 nos community Racycle bin (15th Tied)1 |
Completion of work |
-

latitude : 23.66767525
Longitude : 91.28907125
file name : Image_07042022153611622.png
|
2022-04-07 15:36:11.742357 |
31 |
53745188 |
Brick solling from PWD road to Pramod Debnath house 15th FC Untied |
94328 |
Brick solling from PWD road to Pramod Debnath house 15th FC Untied1 |
Completion of work |
-

latitude : 23.66837604,23.66837617
Longitude : 91.29731656,91.29731637
file name : Image_29032022151318735.png
|
2022-03-29 15:13:18.834352 |
32 |
53755782 |
Const of Community Pukur Ghatla at Bishalgarh class XII school near Routhkhala 15th FC Untied |
276457 |
Const of Community Pukur Ghatla at Bishalgarh class XII school near Routhkhala 15th FC Untied1 |
Completion of work |
-

latitude : 23.66789628
Longitude : 91.28904376
file name : Image_10122021120446066.png
|
2021-12-10 12:04:46.170215 |
33 |
53755782 |
Const of Community Pukur Ghatla at Bishalgarh class XII school near Routhkhala 15th FC Untied |
276457 |
Const of Community Pukur Ghatla at Bishalgarh class XII school near Routhkhala 15th FC Untied1 |
Completion of work |
-

latitude : 23.66793702
Longitude : 91.28906404
file name : Image_10122021114242956.png
|
2021-12-10 11:42:43.094564 |
34 |
53755782 |
Const of Community Pukur Ghatla at Bishalgarh class XII school near Routhkhala 15th FC Untied |
276457 |
Const of Community Pukur Ghatla at Bishalgarh class XII school near Routhkhala 15th FC Untied1 |
Completion of work |
-

latitude : 23.66791697
Longitude : 91.28905174
file name : Image_13122021134709563.png
|
2021-12-13 13:47:09.686925 |
35 |
53755782 |
Const of Community Pukur Ghatla at Bishalgarh class XII school near Routhkhala 15th FC Untied |
276457 |
Const of Community Pukur Ghatla at Bishalgarh class XII school near Routhkhala 15th FC Untied1 |
Roof laid |
-

latitude : 23.66794064
Longitude : 91.28906394
file name : Image_24012023155223427.png
|
2023-01-24 15:52:23.522155 |
36 |
53755782 |
Const of Community Pukur Ghatla at Bishalgarh class XII school near Routhkhala 15th FC Untied |
276457 |
Const of Community Pukur Ghatla at Bishalgarh class XII school near Routhkhala 15th FC Untied1 |
Roof laid |
-

latitude : 23.66776282
Longitude : 91.28900878
file name : Image_24012023135605248.png
|
2023-01-24 13:56:05.369741 |
37 |
53755171 |
Palaciting work from Samir Saha to Biswajit Shil 15th FC Untied |
103479 |
Palaciting work from Samir Saha to Biswajit Shil 15th FC Untied1 |
Completion of work |
-

latitude : 23.66971368,23.66975336
Longitude : 91.29547034,91.29538795
file name : Image_26082021140400316.png
|
2021-08-26 14:04:00.408334 |
38 |
53755171 |
Palaciting work from Samir Saha to Biswajit Shil 15th FC Untied |
103479 |
Palaciting work from Samir Saha to Biswajit Shil 15th FC Untied1 |
Plinth level |
-

latitude : 23.66975426,23.66975497
Longitude : 91.29498726,91.29498747
file name : Image_10012022131305776.png
|
2022-01-10 13:13:05.897242 |
39 |
60371490 |
Distribution of nos Recycle bin 40 Nos at ward no (15th Tied)5 |
6920 |
Distribution of nos Recycle bin 40 Nos at ward no (15th Tied)5 1 |
Completion of work |
-

latitude : 23.6674931
Longitude : 91.2892222
file name : Image_25032022130709896.png
|
2022-03-25 13:07:09.995302 |
40 |
53714326 |
Earth filling Sabuj Miah house to Billal Miah house 15th FC Untied |
90252 |
Earth filling Sabuj Miah house to Billal Miah house 15th FC Untied1 |
Completion of work |
-

latitude : 23.66365362,23.66365259
Longitude : 91.29375038,91.29373924
file name : Image_29032022150257235.png
|
2022-03-29 15:02:57.348943 |
41 |
53714326 |
Earth filling Sabuj Miah house to Billal Miah house 15th FC Untied |
90252 |
Earth filling Sabuj Miah house to Billal Miah house 15th FC Untied1 |
Plinth level |
-

latitude : 23.66379826,23.66379865
Longitude : 91.29365221,91.29365123
file name : Image_07042022145745093.png
|
2022-04-07 14:57:45.202989 |
42 |
58070773 |
Const. of RCC Cross drain near Bhanu Saha .w-7 (15th-Tied) |
106454 |
Const. of RCC Cross drain near Bhanu Saha .w-7 (15th-Tied)1 |
Completion of work |
-

latitude : 23.66938803
Longitude : 91.30221715
file name : Image_25082022131732543.png
|
2022-08-25 13:17:32.616678 |
43 |
58070773 |
Const. of RCC Cross drain near Bhanu Saha .w-7 (15th-Tied) |
106454 |
Const. of RCC Cross drain near Bhanu Saha .w-7 (15th-Tied)1 |
Completion of work |
-

latitude : 23.66944088
Longitude : 91.30221535
file name : Image_28082022111229852.png
|
2022-08-28 11:12:29.923486 |
44 |
58070773 |
Const. of RCC Cross drain near Bhanu Saha .w-7 (15th-Tied) |
106454 |
Const. of RCC Cross drain near Bhanu Saha .w-7 (15th-Tied)1 |
Roof laid |
-

latitude : 23.66947681
Longitude : 91.30224742
file name : Image_12092022123549807.png
|
2022-09-12 12:35:49.903457 |
45 |
58366481 |
Mtc of Pipeline (TIED) |
110752 |
Mtc of Pipeline (TIED)1 |
Completion of work |
-

latitude : 23.66538081,23.66538137
Longitude : 91.29225979,91.29225997
file name : Image_13092022145429468.png
|
2022-09-13 14:54:29.54974 |
46 |
58366481 |
Mtc of Pipeline (TIED) |
110752 |
Mtc of Pipeline (TIED)1 |
Plinth level |
-

latitude : 23.6651956,23.66518871,23.66517149
Longitude : 91.29260109,91.29256317,91.29255115
file name : Image_10082023162415929.png
|
2023-08-10 16:24:16.00842 |
47 |
58067511 |
Const of RCC Cross drain near Subash Bhattacharjee,w-3 (15th-Tied) |
106454 |
Const of RCC Cross drain near Subash Bhattacharjee,w-3 (15th-Tied)1 |
Completion of work |
-

latitude : 23.66489649
Longitude : 91.29076322
file name : Image_08082022131447984.png
|
2022-08-08 13:14:48.073421 |
48 |
58067511 |
Const of RCC Cross drain near Subash Bhattacharjee,w-3 (15th-Tied) |
106454 |
Const of RCC Cross drain near Subash Bhattacharjee,w-3 (15th-Tied)1 |
Plinth level |
-

latitude : 23.66483152
Longitude : 91.29084295
file name : Image_19092022113639551.png
|
2022-09-19 11:36:39.681782 |
49 |
58067511 |
Const of RCC Cross drain near Subash Bhattacharjee,w-3 (15th-Tied) |
106454 |
Const of RCC Cross drain near Subash Bhattacharjee,w-3 (15th-Tied)1 |
Roof laid |
-

latitude : 23.66496146
Longitude : 91.2907622
file name : Image_26092022135108555.png
|
2022-09-26 13:51:08.646019 |
50 |
58069397 |
Const. of RCC Cross drain near Rabindra colony AWC .W-5 (untied |
101046 |
Const. of RCC Cross drain near Rabindra colony AWC .W-5 (untied1 |
Completion of work |
-

latitude : 23.66758444
Longitude : 91.29617295
file name : Image_30122022171236764.png
|
2022-12-30 17:12:36.842251 |
51 |
58365386 |
Sinking of OHP (Tied) |
149224 |
Sinking of OHP (Tied)1 |
Completion of work |
-

latitude : 23.66887821
Longitude : 91.29380741
file name : Image_13092022141855261.png
|
2022-09-13 14:18:55.329404 |
52 |
58365386 |
Sinking of OHP (Tied) |
149224 |
Sinking of OHP (Tied)2 |
Completion of work |
-

latitude : 23.66823169
Longitude : 91.29767804
file name : Image_13092022144403958.png
|
2022-09-13 14:44:04.043091 |
53 |
58365386 |
Sinking of OHP (Tied) |
149224 |
Sinking of OHP (Tied)3 |
Completion of work |
-

latitude : 23.66534699
Longitude : 91.29312851
file name : Image_13092022145441335.png
|
2022-09-13 14:54:41.421867 |
54 |
58365386 |
Sinking of OHP (Tied) |
149224 |
Sinking of OHP (Tied)4 |
Completion of work |
-

latitude : 23.6648939
Longitude : 91.29324292
file name : Image_14092022124914031.png
|
2022-09-14 12:49:14.12016 |
55 |
58365386 |
Sinking of OHP (Tied) |
149224 |
Sinking of OHP (Tied)4 |
Plinth level |
-

latitude : 23.6689376
Longitude : 91.29377686
file name : Image_26102022135031916.png
|
2022-10-26 13:50:33.638672 |
56 |
58365386 |
Sinking of OHP (Tied) |
149224 |
Sinking of OHP (Tied)5 |
Completion of work |
-

latitude : 23.66139992
Longitude : 91.29097121
file name : Image_14092022125103915.png
|
2022-09-14 12:51:04.010368 |
57 |
58365386 |
Sinking of OHP (Tied) |
149224 |
Sinking of OHP (Tied)5 |
Completion of work |
-

latitude : 23.66139992
Longitude : 91.29097121
file name : Image_14092022125502368.png
|
2022-09-14 12:55:02.468161 |
58 |
58365386 |
Sinking of OHP (Tied) |
149224 |
Sinking of OHP (Tied)5 |
Plinth level |
-

latitude : 23.6751917
Longitude : 91.2901569
file name : Image_05012023120907199.png
|
2023-01-05 12:09:07.300069 |
59 |
58365386 |
Sinking of OHP (Tied) |
149224 |
Sinking of OHP (Tied)6 |
Completion of work |
-

latitude : 23.6682354
Longitude : 91.288174
file name : Image_14092022125532173.png
|
2022-09-14 12:55:32.26314 |
60 |
58365386 |
Sinking of OHP (Tied) |
149224 |
Sinking of OHP (Tied)7 |
Completion of work |
-

latitude : 23.6647712
Longitude : 91.28596652
file name : Image_14092022125546465.png
|
2022-09-14 12:55:46.564522 |
61 |
58365386 |
Sinking of OHP (Tied) |
149224 |
Sinking of OHP (Tied)7 |
Plinth level |
-

latitude : 23.66878609
Longitude : 91.3027629
file name : Image_07022023123651068.png
|
2023-02-07 12:36:51.245427 |
62 |
58365386 |
Sinking of OHP (Tied) |
149224 |
Sinking of OHP (Tied)8 |
Completion of work |
-

latitude : 23.66892802
Longitude : 91.30282047
file name : Image_19092022131726870.png
|
2022-09-19 13:17:26.990708 |
63 |
58027943 |
Brick soling road from Babul Saha house to Naraura J B SChool W-6,7 (15th-Untied) |
41607 |
Brick soling road from Babul Saha house to Naraura J B SChool W-6,7 (15th-Untied)1 |
Completion of work |
-

latitude : 23.67224171,23.67224172
Longitude : 91.29622465,91.29622466
file name : Image_07022023123647189.png
|
2023-02-07 12:36:47.278452 |
64 |
58027943 |
Brick soling road from Babul Saha house to Naraura J B SChool W-6,7 (15th-Untied) |
41607 |
Brick soling road from Babul Saha house to Naraura J B SChool W-6,7 (15th-Untied)1 |
Completion of work |
-

latitude : 23.67231425,23.67231423,23.6723142
Longitude : 91.29642697,91.29642696,91.29642698
file name : Image_22022023135747191.png
|
2023-02-22 13:57:47.261706 |
65 |
86553843 |
Creation of community soak pits for group of Households |
118800 |
Creation of community soak pits for group of Households1 |
Completion of work |
-

latitude : 23.6685055
Longitude : 91.289254
file name : Image_12082023141919233.png
|
2023-08-12 14:19:19.315112 |
66 |
86553791 |
Creation of community soak pits for group of Households |
118800 |
Creation of community soak pits for group of Households1 |
Completion of work |
-

latitude : 23.66793664
Longitude : 91.29774646
file name : Image_12082023141851924.png
|
2023-08-12 14:18:52.009497 |
67 |
86553821 |
Creation of community soak pits for group of Households |
118800 |
Creation of community soak pits for group of Households1 |
Completion of work |
-

latitude : 23.66787397
Longitude : 91.29645979
file name : Image_12082023141858039.png
|
2023-08-12 14:18:58.110434 |
68 |
86553874 |
Creation of community soak pits for group of Households |
29700 |
Creation of community soak pits for group of Households1 |
Completion of work |
-

latitude : 23.66832263
Longitude : 91.29332554
file name : Image_02092023155811159.png
|
2023-09-02 15:58:11.240406 |
69 |
58348561 |
Construction of Pucca Dain (TIED) |
309399 |
Construction of Pucca Dain (TIED)1 |
Completion of work |
-

latitude : 23.66874003,23.66871363
Longitude : 91.29271606,91.29272279
file name : Image_16122022171945573.png
|
2022-12-16 17:19:45.675163 |
70 |
58348561 |
Construction of Pucca Dain (TIED) |
309399 |
Construction of Pucca Dain (TIED)1 |
Plinth level |
-

latitude : 23.66866051,23.66866049
Longitude : 91.29273149,91.2927321
file name : Image_10082023162408547.png
|
2023-08-10 16:24:08.620062 |
71 |
58033040 |
Brick soling road from near the PWD road to Pradip Kar house Via Debdhan Debnath w-2(15th-Untied) |
80000 |
Brick soling road from near the PWD road to Pradip Kar house Via Debdhan Debnath w-2(15th-Untied)1 |
Completion of work |
-

latitude : 23.6672872,23.6671725
Longitude : 91.288331,91.2881903
file name : Image_10102023133502488.png
|
2023-10-10 13:35:02.560749 |
72 |
58033040 |
Brick soling road from near the PWD road to Pradip Kar house Via Debdhan Debnath w-2(15th-Untied) |
80000 |
Brick soling road from near the PWD road to Pradip Kar house Via Debdhan Debnath w-2(15th-Untied)1 |
Completion of work |
-

latitude : 23.66700079,23.66700149
Longitude : 91.28778778,91.28778905
file name : Image_11062024142234656.png
|
2024-06-11 14:22:34.742398 |
73 |
86497928 |
Construction of roads |
75366 |
Construction of roads1 |
Completion of work |
-

latitude : 23.66577783,23.66580441
Longitude : 91.28963233,91.28962611
file name : Image_27062024003436444.png
|
2024-06-27 00:34:35.551141 |
74 |
86497928 |
Construction of roads |
75366 |
Construction of roads1 |
Completion of work |
-

latitude : 23.66577454,23.66577614
Longitude : 91.28965752,91.28965461
file name : Image_27062024003432236.png
|
2024-06-27 00:34:32.222345 |
75 |
86497928 |
Construction of roads |
75366 |
Construction of roads1 |
Completion of work |
-

latitude : 23.66579313,23.66579314
Longitude : 91.28967099,91.28967092
file name : Image_08112024164223908.png
|
2024-11-08 16:42:24.025967 |
76 |
86497928 |
Construction of roads |
75366 |
Construction of roads1 |
Completion of work |
-

latitude : 23.66583094,23.66582928
Longitude : 91.28962332,91.28962571
file name : Image_05112024123814383.png
|
2024-11-05 12:38:14.473663 |
77 |
86497928 |
Construction of roads |
75366 |
Construction of roads1 |
Completion of work |
-

latitude : 23.66582471,23.665826
Longitude : 91.28960983,91.28960907
file name : Image_05112024124059244.png
|
2024-11-05 12:40:59.338806 |
78 |
86497928 |
Construction of roads |
75366 |
Construction of roads1 |
Plinth level |
-

latitude : 23.66557402,23.66557784
Longitude : 91.28969994,91.28970544
file name : Image_21112024154038559.png
|
2024-11-21 15:40:38.728495 |
79 |
98081929 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
20000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
|
-

latitude : 23.6928128
Longitude : 91.2727052
file name : Image_18102024170252817.png
|
2024-10-18 17:02:53.03361 |
80 |
87588176 |
Construction of brick soling |
113274 |
Construction of brick soling1 |
Completion of work |
-

latitude : 23.66478388,23.66478018
Longitude : 91.2865691,91.28656735
file name : Image_14022025155942166.png
|
2025-02-14 15:59:42.274808 |
81 |
87588176 |
Construction of brick soling |
113274 |
Construction of brick soling1 |
Completion of work |
-

latitude : 23.66474685,23.66474657
Longitude : 91.28656195,91.28656121
file name : Image_14022025155830961.png
|
2025-02-14 15:58:31.133982 |
82 |
98078704 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-

latitude : 23.6621912
Longitude : 91.2868361
file name : Image_25022025133851895.png
|
2025-02-25 13:38:52.01783 |
83 |
98078704 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-

latitude : 23.6621907
Longitude : 91.2868328
file name : Image_25022025133719814.png
|
2025-02-25 13:37:19.908424 |
84 |
118910317 |
Drainage Construction |
375366 |
Drainage Construction1 |
Completion of work |
-

latitude : 23.664932
Longitude : 91.2926671
file name : Image_26022025134345783.png
|
2025-02-26 13:43:45.872576 |
85 |
118906021 |
Construction of roads |
442596 |
Construction of roads1 |
Completion of work |
-

latitude : 23.667847,23.6726036
Longitude : 91.2888338,91.2883512
file name : Image_03032025120015852.png
|
2025-03-03 12:00:15.979287 |