1 |
39734417 |
Const. of brick solling from fuleswari debbarma house to swapan banik house ward no 1 (15ffc) |
113742 |
Const. of brick solling from fuleswari debbarma house to swapan banik house ward no 1 (15ffc)1 |
Completion of work |
-

latitude : 23.9291067,23.9291067
Longitude : 91.3366259,91.3366259
file name : Image_07052021134027706.png
|
2021-05-07 13:40:27.820043 |
2 |
39734417 |
Const. of brick solling from fuleswari debbarma house to swapan banik house ward no 1 (15ffc) |
113742 |
Const. of brick solling from fuleswari debbarma house to swapan banik house ward no 1 (15ffc)1 |
Plinth level |
-

latitude : 23.92883651,23.92884531
Longitude : 91.33689564,91.33691949
file name : Image_15092023164344826.png
|
2023-09-15 16:43:44.912705 |
3 |
39734417 |
Const. of brick solling from fuleswari debbarma house to swapan banik house ward no 1 (15ffc) |
113742 |
Const. of brick solling from fuleswari debbarma house to swapan banik house ward no 1 (15ffc)1 |
Roof laid |
-

latitude : 23.9291959,23.9291952
Longitude : 91.336262,91.3362636
file name : Image_15092023165230788.png
|
2023-09-15 16:52:30.87274 |
4 |
51612343 |
Construction of AWC toilet at jamirghat kapali para 15th |
46581 |
Construction of AWC toilet at jamirghat kapali para 15th1 |
Completion of work |
-

latitude : 23.9290752
Longitude : 91.3366853
file name : Image_13082021120812315.png
|
2021-08-13 12:08:12.428659 |
5 |
45768887 |
brick solling from lefunga road to sambhu sarkar house ffc untied |
307729 |
brick solling from lefunga road to sambhu sarkar house ffc untied1 |
Completion of work |
-

latitude : 23.92431729,23.92431229
Longitude : 91.34379345,91.34379483
file name : Image_01092021134252138.png
|
2021-09-01 13:42:52.243622 |
6 |
86391327 |
Construction and repairing of Gate doors, window, fixtures etc. |
79144 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Completion of work |
-

latitude : 23.9290606
Longitude : 91.3365976
file name : Image_18032024135256711.png
|
2024-03-18 13:52:56.80112 |
7 |
86391327 |
Construction and repairing of Gate doors, window, fixtures etc. |
79144 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Plinth level |
-

latitude : 23.9290627
Longitude : 91.3364306
file name : Image_09072024111933689.png
|
2024-07-09 11:19:33.82586 |
8 |
86391327 |
Construction and repairing of Gate doors, window, fixtures etc. |
79144 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Roof laid |
-

latitude : 23.92926166666667
Longitude : 91.336595
file name : Image_28012025171734690.png
|
2025-01-28 17:17:34.824531 |
9 |
55498339 |
construction of water tank kamalghat bazar awc ward 1 |
81751 |
construction of water tank kamalghat bazar awc ward 11 |
Completion of work |
-

latitude : 23.928989
Longitude : 91.3367518
file name : Image_08022022125955647.png
|
2022-02-08 12:59:55.721107 |
10 |
55498339 |
construction of water tank kamalghat bazar awc ward 1 |
81751 |
construction of water tank kamalghat bazar awc ward 11 |
Completion of work |
-

latitude : 23.928989
Longitude : 91.3367518
file name : Image_08022022125929011.png
|
2022-02-08 12:59:29.097228 |
11 |
55498339 |
construction of water tank kamalghat bazar awc ward 1 |
81751 |
construction of water tank kamalghat bazar awc ward 11 |
Roof laid |
-

latitude : 23.9291917
Longitude : 91.3362539
file name : Image_10082023171232483.png
|
2023-08-10 17:12:32.576442 |
12 |
55498339 |
construction of water tank kamalghat bazar awc ward 1 |
81751 |
construction of water tank kamalghat bazar awc ward 11 |
Plinth level |
-

latitude : 23.9250256
Longitude : 91.3341189
file name : Image_10082023165838484.png
|
2023-08-10 16:58:38.5809 |
13 |
56933604 |
CONST OF TOILET AT KAMALGHAT BAZAR AWC TIED |
143900 |
CONST OF TOILET AT KAMALGHAT BAZAR AWC TIED1 |
Completion of work |
-

latitude : 23.9290218
Longitude : 91.3367338
file name : Image_02092022143455950.png
|
2022-09-02 14:34:56.087349 |
14 |
56933604 |
CONST OF TOILET AT KAMALGHAT BAZAR AWC TIED |
143900 |
CONST OF TOILET AT KAMALGHAT BAZAR AWC TIED1 |
Roof laid |
-

latitude : 23.9291917
Longitude : 91.3362539
file name : Image_10082023171139149.png
|
2023-08-10 17:11:39.253864 |
15 |
56933604 |
CONST OF TOILET AT KAMALGHAT BAZAR AWC TIED |
143900 |
CONST OF TOILET AT KAMALGHAT BAZAR AWC TIED1 |
Plinth level |
-

latitude : 23.9291932
Longitude : 91.3362545
file name : Image_10082023165921670.png
|
2023-08-10 16:59:21.756498 |
16 |
65518349 |
Laying flat brick solling from Sunil Kapali house to Kali Mandir untied |
265047 |
Laying flat brick solling from Sunil Kapali house to Kali Mandir untied1 |
Completion of work |
-

latitude : 23.93315669,23.93329084
Longitude : 91.34238988,91.34314946
file name : Image_14102022153452738.png
|
2022-10-14 15:34:52.866902 |
17 |
65518349 |
Laying flat brick solling from Sunil Kapali house to Kali Mandir untied |
265047 |
Laying flat brick solling from Sunil Kapali house to Kali Mandir untied1 |
Plinth level |
-

latitude : 23.93309925,23.93319013
Longitude : 91.34240846,91.34250708
file name : Image_13092023125755337.png
|
2023-09-13 12:57:55.435304 |
18 |
65518349 |
Laying flat brick solling from Sunil Kapali house to Kali Mandir untied |
265047 |
Laying flat brick solling from Sunil Kapali house to Kali Mandir untied1 |
Roof laid |
-

latitude : 23.93335384,23.93336045
Longitude : 91.34332454,91.34331705
file name : Image_13092023130322804.png
|
2023-09-13 13:03:22.904355 |
19 |
65518237 |
Laying flat brick solling from Simna road to Bikash Debnath house untied |
157002 |
Laying flat brick solling from Simna road to Bikash Debnath house untied1 |
Completion of work |
-

latitude : 23.9290808,23.9290808
Longitude : 91.3367563,91.3367563
file name : Image_30122022142622020.png
|
2022-12-30 14:26:22.124695 |
20 |
65518237 |
Laying flat brick solling from Simna road to Bikash Debnath house untied |
157002 |
Laying flat brick solling from Simna road to Bikash Debnath house untied1 |
Plinth level |
-

latitude : 23.9306929,23.9303887
Longitude : 91.3370767,91.3368341
file name : Image_13092023133121495.png
|
2023-09-13 13:31:21.595741 |
21 |
65518237 |
Laying flat brick solling from Simna road to Bikash Debnath house untied |
157002 |
Laying flat brick solling from Simna road to Bikash Debnath house untied1 |
Roof laid |
-

latitude : 23.9306967,23.9306967
Longitude : 91.337075,91.337075
file name : Image_13092023134007943.png
|
2023-09-13 13:40:08.050261 |
22 |
56934017 |
CONSTRUCTION OF TOILET AT JAMIRGHAT MANIPURI PARA AWC TIED |
143900 |
CONSTRUCTION OF TOILET AT JAMIRGHAT MANIPURI PARA AWC TIED1 |
Completion of work |
-

latitude : 23.92468453
Longitude : 91.34457699
file name : Image_02092022140719894.png
|
2022-09-02 14:07:20.017204 |
23 |
56934017 |
CONSTRUCTION OF TOILET AT JAMIRGHAT MANIPURI PARA AWC TIED |
143900 |
CONSTRUCTION OF TOILET AT JAMIRGHAT MANIPURI PARA AWC TIED1 |
Plinth level |
-

latitude : 23.92471691
Longitude : 91.34450564
file name : Image_13092023140537132.png
|
2023-09-13 14:05:37.240762 |
24 |
56934017 |
CONSTRUCTION OF TOILET AT JAMIRGHAT MANIPURI PARA AWC TIED |
143900 |
CONSTRUCTION OF TOILET AT JAMIRGHAT MANIPURI PARA AWC TIED1 |
Roof laid |
-

latitude : 23.92466062
Longitude : 91.34440341
file name : Image_13092023164433946.png
|
2023-09-13 16:44:34.030217 |
25 |
56935045 |
CONSTRUCTION OF PUCCA DRAIN FROM MITHU DAS HOUSE TO PACS TIED |
252271 |
CONSTRUCTION OF PUCCA DRAIN FROM MITHU DAS HOUSE TO PACS TIED1 |
Completion of work |
-

latitude : 23.92828679,23.92830363
Longitude : 91.33622414,91.3363575
file name : Image_16122022152312696.png
|
2022-12-16 15:23:12.790218 |
26 |
56935045 |
CONSTRUCTION OF PUCCA DRAIN FROM MITHU DAS HOUSE TO PACS TIED |
252271 |
CONSTRUCTION OF PUCCA DRAIN FROM MITHU DAS HOUSE TO PACS TIED1 |
Plinth level |
-

latitude : 23.9280863,23.9283961
Longitude : 91.336648,91.3358092
file name : Image_13092023123344501.png
|
2023-09-13 12:33:44.589561 |
27 |
56935045 |
CONSTRUCTION OF PUCCA DRAIN FROM MITHU DAS HOUSE TO PACS TIED |
252271 |
CONSTRUCTION OF PUCCA DRAIN FROM MITHU DAS HOUSE TO PACS TIED1 |
Roof laid |
-

latitude : 23.927986,23.9281579
Longitude : 91.3356252,91.3362318
file name : Image_13092023164635617.png
|
2023-09-13 16:46:35.701281 |
28 |
55498604 |
construction of water tank jamirghat manipuri para ward 4 |
81751 |
construction of water tank jamirghat manipuri para ward 41 |
Completion of work |
-

latitude : 23.924646666666664
Longitude : 91.34441833333334
file name : Image_08022022122636510.png
|
2022-02-08 12:26:36.590372 |
29 |
55498604 |
construction of water tank jamirghat manipuri para ward 4 |
81751 |
construction of water tank jamirghat manipuri para ward 41 |
Plinth level |
-

latitude : 23.92478388
Longitude : 91.34459952
file name : Image_13092023135328622.png
|
2023-09-13 13:53:28.721317 |
30 |
55498604 |
construction of water tank jamirghat manipuri para ward 4 |
81751 |
construction of water tank jamirghat manipuri para ward 41 |
Roof laid |
-

latitude : 23.92469041
Longitude : 91.3444575
file name : Image_13092023140339046.png
|
2023-09-13 14:03:39.157159 |
31 |
55498449 |
construction of water tank jamirghat kapalipara awc ward 2 |
81751 |
construction of water tank jamirghat kapalipara awc ward 21 |
Completion of work |
-

latitude : 23.932586666666666
Longitude : 91.34237833333333
file name : Image_08022022125921482.png
|
2022-02-08 12:59:21.558095 |
32 |
55498449 |
construction of water tank jamirghat kapalipara awc ward 2 |
81751 |
construction of water tank jamirghat kapalipara awc ward 21 |
Plinth level |
-

latitude : 23.93266379
Longitude : 91.34251167
file name : Image_13092023124852146.png
|
2023-09-13 12:48:52.286029 |
33 |
55498449 |
construction of water tank jamirghat kapalipara awc ward 2 |
81751 |
construction of water tank jamirghat kapalipara awc ward 21 |
Roof laid |
-

latitude : 23.93266146
Longitude : 91.3424794
file name : Image_13092023125517722.png
|
2023-09-13 12:55:17.848414 |
34 |
51612372 |
Construction of AWC toilet at jamirghat 15 |
46581 |
Construction of AWC toilet at jamirghat 151 |
Completion of work |
-

latitude : 23.93818066
Longitude : 91.31648213
file name : Image_13052021130357861.png
|
2021-05-13 13:03:57.937 |
35 |
51612372 |
Construction of AWC toilet at jamirghat 15 |
46581 |
Construction of AWC toilet at jamirghat 151 |
Completion of work |
-

latitude : 23.9290753
Longitude : 91.3366851
file name : Image_13082021142733690.png
|
2021-08-13 14:27:33.765598 |
36 |
51644714 |
operational and maintenance of drinking water under kamalghat gp |
228100 |
operational and maintenance of drinking water under kamalghat gp1 |
Completion of work |
-

latitude : 23.9291435
Longitude : 91.3366188
file name : Image_07102021142448489.png
|
2021-10-07 14:24:48.570792 |
37 |
51644714 |
operational and maintenance of drinking water under kamalghat gp |
228100 |
operational and maintenance of drinking water under kamalghat gp1 |
Plinth level |
-

latitude : 23.9291919
Longitude : 91.3362637
file name : Image_15092023164451708.png
|
2023-09-15 16:44:51.794342 |
38 |
51644714 |
operational and maintenance of drinking water under kamalghat gp |
228100 |
operational and maintenance of drinking water under kamalghat gp1 |
Roof laid |
-

latitude : 23.92913791
Longitude : 91.33695549
file name : Image_15092023165148305.png
|
2023-09-15 16:51:48.395329 |
39 |
86403883 |
Creation of a new source of drinking water |
84994 |
Creation of a new source of drinking water1 |
Completion of work |
-

latitude : 23.92522166666667
Longitude : 91.33789999999999
file name : Image_12032024120553544.png
|
2024-03-12 12:05:53.654992 |
40 |
86403883 |
Creation of a new source of drinking water |
84994 |
Creation of a new source of drinking water1 |
Plinth level |
-

latitude : 23.925306666666664
Longitude : 91.33805333333333
file name : Image_24062024123410658.png
|
2024-06-24 12:34:10.754793 |
41 |
86403883 |
Creation of a new source of drinking water |
84994 |
Creation of a new source of drinking water1 |
Roof laid |
-

latitude : 23.925218333333337
Longitude : 91.33799833333333
file name : Image_09072024141128156.png
|
2024-07-09 14:11:28.252979 |
42 |
86392698 |
Drainage Construction |
69655 |
Drainage Construction1 |
Completion of work |
-

latitude : 23.926740000000002
Longitude : 91.33735499999999
file name : Image_13032024132040258.png
|
2024-03-13 13:20:40.353233 |
43 |
86392698 |
Drainage Construction |
69655 |
Drainage Construction1 |
Plinth level |
-

latitude : 23.926798333333334
Longitude : 91.33739666666666
file name : Image_24062024123415042.png
|
2024-06-24 12:34:15.133244 |
44 |
86392698 |
Drainage Construction |
69655 |
Drainage Construction1 |
Roof laid |
-

latitude : 23.926696666666665
Longitude : 91.33747833333334
file name : Image_09072024111959916.png
|
2024-07-09 11:20:00.012483 |
45 |
51612466 |
Construction of slab for covering drain at kamalghat bazar under kamalghat untied |
144765 |
Construction of slab for covering drain at kamalghat bazar under kamalghat untied1 |
Completion of work |
-

latitude : 23.9279939,23.92726414
Longitude : 91.3347214,91.33502422
file name : Image_29082022125344817.png
|
2022-08-29 12:53:44.939175 |
46 |
51612466 |
Construction of slab for covering drain at kamalghat bazar under kamalghat untied |
144765 |
Construction of slab for covering drain at kamalghat bazar under kamalghat untied1 |
Plinth level |
-

latitude : 23.927286666666667,23.927293333333335
Longitude : 91.33480499999999,91.334825
file name : Image_15032024091051427.png
|
2024-03-15 09:10:51.530387 |
47 |
51612466 |
Construction of slab for covering drain at kamalghat bazar under kamalghat untied |
144765 |
Construction of slab for covering drain at kamalghat bazar under kamalghat untied1 |
Roof laid |
-

latitude : 23.9271502,23.927152
Longitude : 91.3347532,91.3347548
file name : Image_16032024111756414.png
|
2024-03-16 11:17:56.511583 |
48 |
108649155 |
Construction of Community Sanitary Complex |
243822 |
Construction of Community Sanitary Complex1 |
Completion of work |
-

latitude : 23.927151666666667
Longitude : 91.33562333333333
file name : Image_11122024110138203.png
|
2024-12-11 11:01:38.288939 |
49 |
108649155 |
Construction of Community Sanitary Complex |
243822 |
Construction of Community Sanitary Complex1 |
Completion of work |
-

latitude : 23.92716833333333
Longitude : 91.33560666666666
file name : Image_25122024183220249.png
|
2024-12-25 18:32:20.332988 |
50 |
108649155 |
Construction of Community Sanitary Complex |
243822 |
Construction of Community Sanitary Complex1 |
Plinth level |
-

latitude : 23.927223333333338
Longitude : 91.33554000000001
file name : Image_28012025153632565.png
|
2025-01-28 15:36:34.338531 |
51 |
108649155 |
Construction of Community Sanitary Complex |
243822 |
Construction of Community Sanitary Complex1 |
Plinth level |
-

latitude : 23.927223333333338
Longitude : 91.33554000000001
file name : Image_28012025153649896.png
|
2025-01-28 15:36:50.871524 |
52 |
97708465 |
Drinking water facilities/ Installation of RO/ Water Filter |
260307 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Completion of work |
-

latitude : 23.928974999999998
Longitude : 91.33550666666666
file name : Image_28012025153641752.png
|
2025-01-28 15:36:42.122597 |
53 |
115372261 |
Purchase of litter/ dustbin/ segregation bins to be fixed at public places |
39530 |
Purchase of litter/ dustbin/ segregation bins to be fixed at public places1 |
Completion of work |
-

latitude : 23.9290116
Longitude : 91.3366253
file name : Image_27022025124838941.png
|
2025-02-27 12:48:39.08459 |
54 |
115385976 |
Construction of Retaining Walls/ Fencing Work |
334849 |
Construction of Retaining Walls/ Fencing Work1 |
Completion of work |
-

latitude : 23.929063333333335
Longitude : 91.33646500000002
file name : Image_06032025140317945.png
|
2025-03-06 14:03:18.100625 |
55 |
116135944 |
Services of Collection & transportation of waste from household to treatment site |
52000 |
Services of Collection & transportation of waste from household to treatment site1 |
|
-

latitude : 23.929018333333335
Longitude : 91.33600166666665
file name : Image_06032025162219561.png
|
2025-03-06 16:22:19.721865 |
56 |
120849530 |
Installation of Solar lights |
366163 |
Installation of Solar lights1 |
Completion of work |
-

latitude : 23.92911333333333
Longitude : 91.33669333333334
file name : Image_07032025124538591.png
|
2025-03-07 12:45:38.714872 |
57 |
120850432 |
Purchase of litter/ dustbin/ segregation bins to be fixed at public places |
112495 |
Purchase of litter/ dustbin/ segregation bins to be fixed at public places1 |
Completion of work |
-

latitude : 23.9290153
Longitude : 91.3366201
file name : Image_07032025124544045.png
|
2025-03-07 12:45:44.169029 |
58 |
120850432 |
Purchase of litter/ dustbin/ segregation bins to be fixed at public places |
112495 |
Purchase of litter/ dustbin/ segregation bins to be fixed at public places1 |
Completion of work |
-

latitude : 23.9290153
Longitude : 91.3366201
file name : Image_07032025124548091.png
|
2025-03-07 12:45:48.225312 |
59 |
116202801 |
Creation of a new source of drinking water |
87370 |
Creation of a new source of drinking water1 |
Completion of work |
-

latitude : 23.9290349
Longitude : 91.3366116
file name : Image_07032025122204945.png
|
2025-03-07 12:22:05.088884 |
60 |
108649180 |
Creation of drainage channel for management of grey water |
59227 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-

latitude : 23.9285224
Longitude : 91.3356547
file name : Image_27012025142714231.png
|
2025-01-27 14:27:14.717278 |
61 |
108649180 |
Creation of drainage channel for management of grey water |
59227 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-

latitude : 23.928530000000002
Longitude : 91.33568666666666
file name : Image_27012025142718699.png
|
2025-01-27 14:27:19.286184 |