1 |
30397428 |
Hand Tubewell |
5396 |
Hand pump1
|
Completed |
-
latitude : 26.465529999999998
Longitude : 91.21702833333332
file name : Image_10022020111934674.png
|
2020-02-10 11:19:34.927475 |
2 |
30397302 |
Supply Installation of sun solar Street light at 122 No Tihu-dekhata G.P |
729000 |
Street Light1
|
Completed |
-
latitude : 26.465600000000002
Longitude : 91.21699166666667
file name : Image_10022020111629623.png
|
2020-02-10 11:16:29.906457 |
3 |
30397302 |
Supply Installation of sun solar Street light at 122 No Tihu-dekhata G.P |
729000 |
Street Light2
|
Completed |
-
latitude : 26.464838333333333
Longitude : 91.21701499999999
file name : Image_10022020111745428.png
|
2020-02-10 11:17:45.681606 |
4 |
30397302 |
Supply Installation of sun solar Street light at 122 No Tihu-dekhata G.P |
729000 |
Street Light3
|
Completed |
-
latitude : 26.45415666666667
Longitude : 91.20652666666668
file name : Image_10022020151813628.png
|
2020-02-10 15:18:14.097911 |
5 |
30397302 |
Supply Installation of sun solar Street light at 122 No Tihu-dekhata G.P |
729000 |
Street Light4
|
Completed |
-
latitude : 26.448915000000003
Longitude : 91.20702166666666
file name : Image_10022020152514372.png
|
2020-02-10 15:25:14.64495 |
6 |
30397302 |
Supply Installation of sun solar Street light at 122 No Tihu-dekhata G.P |
729000 |
Street Light5
|
Completed |
-
latitude : 26.448870000000003
Longitude : 91.208625
file name : Image_10022020152714387.png
|
2020-02-10 15:27:14.649571 |
7 |
30397302 |
Supply Installation of sun solar Street light at 122 No Tihu-dekhata G.P |
729000 |
Street Light6
|
Completed |
-
latitude : 26.461898333333338
Longitude : 91.21706999999999
file name : Image_10022020154257791.png
|
2020-02-10 15:42:58.103124 |
8 |
30397302 |
Supply Installation of sun solar Street light at 122 No Tihu-dekhata G.P |
729000 |
Street Light7
|
Completed |
-
latitude : 26.4642214
Longitude : 91.2199666
file name : Image_10022020154538718.png
|
2020-02-10 15:45:38.995062 |
9 |
30397302 |
Supply Installation of sun solar Street light at 122 No Tihu-dekhata G.P |
729000 |
Street Light8
|
Completed |
-
latitude : 26.456535
Longitude : 91.22358000000001
file name : Image_10022020155233792.png
|
2020-02-10 15:52:34.089437 |
10 |
30397302 |
Supply Installation of sun solar Street light at 122 No Tihu-dekhata G.P |
729000 |
Street Light9
|
Completed |
-
latitude : 26.451099999999997
Longitude : 91.22755666666666
file name : Image_10022020163109548.png
|
2020-02-10 16:31:09.865424 |
11 |
30397302 |
Supply Installation of sun solar Street light at 122 No Tihu-dekhata G.P |
729000 |
Street Light9
|
Completed |
-
latitude : 26.463898333333336
Longitude : 91.22623666666665
file name : Image_10022020160235679.png
|
2020-02-10 16:02:36.011869 |
12 |
30397302 |
Supply Installation of sun solar Street light at 122 No Tihu-dekhata G.P |
729000 |
Street Light10
|
Completed |
-
latitude : 26.43304
Longitude : 91.20165333333334
file name : Image_11022020125439224.png
|
2020-02-11 12:54:39.504552 |
13 |
30397302 |
Supply Installation of sun solar Street light at 122 No Tihu-dekhata G.P |
729000 |
Street Light11
|
Completed |
-
latitude : 26.439798333333336
Longitude : 91.19983666666667
file name : Image_11022020131259177.png
|
2020-02-11 13:12:59.444085 |
14 |
30397302 |
Supply Installation of sun solar Street light at 122 No Tihu-dekhata G.P |
729000 |
Street Light12
|
Completed |
-
latitude : 26.459200000000003
Longitude : 91.20924666666666
file name : Image_11022020134113864.png
|
2020-02-11 13:41:14.207159 |
15 |
30397302 |
Supply Installation of sun solar Street light at 122 No Tihu-dekhata G.P |
729000 |
Street Light13
|
Completed |
-
latitude : 26.459266666666668
Longitude : 91.21158666666666
file name : Image_11022020134733014.png
|
2020-02-11 13:47:33.298629 |
16 |
6584367 |
Land Devolopment New GP Bulding Campus with fenching |
60000 |
Grassland1
|
Completed |
-
latitude : 26.465645000000002
Longitude : 91.21714666666666
file name : Image_01032019120906454.png
|
2019-03-01 12:09:06.450662 |
17 |
6584367 |
Land Devolopment New GP Bulding Campus with fenching |
60000 |
Grassland1
|
25% |
-
latitude : 26.465601666666664
Longitude : 91.21722666666668
file name : Image_01032019111911483.png
|
2019-03-01 11:19:11.514037 |
18 |
6584367 |
Land Devolopment New GP Bulding Campus with fenching |
60000 |
Grassland1
|
25% |
-
latitude : 26.465601666666664
Longitude : 91.21703000000001
file name : Image_01032019105213891.png
|
2019-03-01 10:52:13.727806 |
19 |
11287230 |
Const. of Tube well facility |
650090 |
Well1
|
Completed |
-
latitude : 26.45405166666667
Longitude : 91.20676
file name : Image_10022020151927292.png
|
2020-02-10 15:19:27.656597 |
20 |
30397378 |
Hand Tubewell |
178315 |
Hand pump1
|
Completed |
-
latitude : 26.45381166666667
Longitude : 91.20692166666667
file name : Image_10022020152113407.png
|
2020-02-10 15:21:13.62409 |
21 |
30397378 |
Hand Tubewell |
178315 |
Hand pump2
|
Completed |
-
latitude : 26.444823333333336
Longitude : 91.21151333333334
file name : Image_10022020153119544.png
|
2020-02-10 15:31:19.82085 |
22 |
30397378 |
Hand Tubewell |
178315 |
Hand pump3
|
Completed |
-
latitude : 26.452623333333335
Longitude : 91.20886666666665
file name : Image_10022020153823848.png
|
2020-02-10 15:38:23.98769 |
23 |
30397378 |
Hand Tubewell |
178315 |
Hand pump4
|
Completed |
-
latitude : 26.457976666666664
Longitude : 91.22393166666667
file name : Image_10022020155026508.png
|
2020-02-10 15:50:26.779705 |
24 |
30397378 |
Hand Tubewell |
178315 |
Hand pump5
|
Completed |
-
latitude : 26.463766666666668
Longitude : 91.22633833333333
file name : Image_10022020160301723.png
|
2020-02-10 16:03:01.992734 |
25 |
30397378 |
Hand Tubewell |
178315 |
Hand pump5
|
Completed |
-
latitude : 26.463766666666668
Longitude : 91.22633833333333
file name : Image_10022020160320704.png
|
2020-02-10 16:03:20.960626 |
26 |
30397378 |
Hand Tubewell |
178315 |
Hand pump6
|
Completed |
-
latitude : 26.443414999999998
Longitude : 91.22792166666667
file name : Image_10022020163150630.png
|
2020-02-10 16:31:50.934611 |
27 |
30397378 |
Hand Tubewell |
178315 |
Hand pump6
|
Completed |
-
latitude : 26.443414999999998
Longitude : 91.22792166666667
file name : Image_10022020163129014.png
|
2020-02-10 16:31:29.294622 |
28 |
30397378 |
Hand Tubewell |
178315 |
Hand pump7
|
Completed |
-
latitude : 26.450958333333332
Longitude : 91.22766000000001
file name : Image_10022020163137534.png
|
2020-02-10 16:31:37.80026 |
29 |
30397378 |
Hand Tubewell |
178315 |
Hand pump8
|
Completed |
-
latitude : 26.444981666666664
Longitude : 91.20472833333334
file name : Image_11022020124606645.png
|
2020-02-11 12:46:06.914571 |
30 |
30397378 |
Hand Tubewell |
178315 |
Hand pump9
|
Completed |
-
latitude : 26.433035000000004
Longitude : 91.20178666666668
file name : Image_11022020125313433.png
|
2020-02-11 12:53:13.721083 |
31 |
30397378 |
Hand Tubewell |
178315 |
Hand pump10
|
Completed |
-
latitude : 26.43763
Longitude : 91.20270166666666
file name : Image_11022020130823922.png
|
2020-02-11 13:08:24.181535 |
32 |
30397378 |
Hand Tubewell |
178315 |
Hand pump11
|
Completed |
-
latitude : 26.447748333333333
Longitude : 91.19804500000001
file name : Image_11022020132059392.png
|
2020-02-11 13:20:59.705422 |
33 |
30397378 |
Hand Tubewell |
178315 |
Hand pump12
|
Completed |
-
latitude : 26.440541666666665
Longitude : 91.20294166666666
file name : Image_11022020133127740.png
|
2020-02-11 13:31:28.011845 |
34 |
30397378 |
Hand Tubewell |
178315 |
Hand pump13
|
Completed |
-
latitude : 26.46001833333333
Longitude : 91.20936166666667
file name : Image_11022020134339795.png
|
2020-02-11 13:43:40.012551 |
35 |
30397378 |
Hand Tubewell |
178315 |
Hand pump14
|
Completed |
-
latitude : 26.463796666666667
Longitude : 91.22812333333334
file name : Image_11022020135509248.png
|
2020-02-11 13:55:09.559106 |
36 |
33330032 |
Installation 22 Nos of Solar Street light at necessary place at 122 No Tihu-Dekhata GP area |
594000 |
Street Light1
|
Completed |
-
latitude : 26.438988333333334
Longitude : 91.20264
file name : Image_05032020142519175.png
|
2020-03-05 14:25:19.441453 |
37 |
33330032 |
Installation 22 Nos of Solar Street light at necessary place at 122 No Tihu-Dekhata GP area |
594000 |
Street Light2
|
Completed |
-
latitude : 26.43661666666667
Longitude : 91.20218166666668
file name : Image_05032020142805751.png
|
2020-03-05 14:28:05.998395 |
38 |
33330032 |
Installation 22 Nos of Solar Street light at necessary place at 122 No Tihu-Dekhata GP area |
594000 |
Street Light3
|
Completed |
-
latitude : 26.446493333333333
Longitude : 91.20556
file name : Image_05032020143551751.png
|
2020-03-05 14:35:51.981575 |
39 |
33330032 |
Installation 22 Nos of Solar Street light at necessary place at 122 No Tihu-Dekhata GP area |
594000 |
Street Light4
|
Completed |
-
latitude : 26.44756166666667
Longitude : 91.20618666666665
file name : Image_05032020143818379.png
|
2020-03-05 14:38:18.742772 |
40 |
33330032 |
Installation 22 Nos of Solar Street light at necessary place at 122 No Tihu-Dekhata GP area |
594000 |
Street Light5
|
Completed |
-
latitude : 26.457546666666666
Longitude : 91.21458666666668
file name : Image_05032020144326015.png
|
2020-03-05 14:43:26.29953 |
41 |
33330032 |
Installation 22 Nos of Solar Street light at necessary place at 122 No Tihu-Dekhata GP area |
594000 |
Street Light6
|
Completed |
-
latitude : 26.462508333333336
Longitude : 91.21768500000002
file name : Image_05032020144628008.png
|
2020-03-05 14:46:28.285961 |
42 |
33330032 |
Installation 22 Nos of Solar Street light at necessary place at 122 No Tihu-Dekhata GP area |
594000 |
Street Light7
|
Completed |
-
latitude : 26.466796666666664
Longitude : 91.21687666666666
file name : Image_05032020155607119.png
|
2020-03-05 15:56:07.39807 |
43 |
67776390 |
Materials required for composting |
9697 |
Materials required for composting1 |
Completion of work |
-
latitude : 26.43428531
Longitude : 91.21271368
file name : Image_30032023145513584.png
|
2023-03-30 14:55:13.681797 |
44 |
67776390 |
Materials required for composting |
9697 |
Materials required for composting1 |
Completion of work |
-
latitude : 26.43428531
Longitude : 91.21271368
file name : Image_30032023145530975.png
|
2023-03-30 14:55:31.066571 |
45 |
21085613 |
Earth filling (Low land) near Shiv Mandir at vill Bangaon, Ward No 4 |
140000 |
Earth filling (Low land) near Shiv Mandir at vill Bangaon, Ward No 41 |
50% |
-
latitude : 26.4484687,26.4470477
Longitude : 91.2029711,91.20160025
file name : Image_06022021121335407.png
|
2021-02-06 12:13:35.513672 |
46 |
21085635 |
Const of Store Room near Bargandubi Shiv Mandir |
175541 |
Const of Store Room near Bargandubi Shiv Mandir1 |
In Progress |
-
latitude : 26.45275298
Longitude : 91.20878723
file name : Image_25102020130059779.png
|
2020-10-25 13:01:05.179429 |
47 |
21085635 |
Const of Store Room near Bargandubi Shiv Mandir |
175541 |
Const of Store Room near Bargandubi Shiv Mandir1 |
In Progress |
-
latitude : 26.45275298
Longitude : 91.20878723
file name : Image_25102020130230092.png
|
2020-10-25 13:02:35.480372 |
48 |
67776461 |
Materials required for composting |
9697 |
Materials required for composting1 |
Completion of work |
-
latitude : 26.44845183
Longitude : 91.22777795
file name : Image_30032023145520027.png
|
2023-03-30 14:55:20.117477 |
49 |
67776461 |
Materials required for composting |
9697 |
Materials required for composting1 |
Completion of work |
-
latitude : 26.44845183
Longitude : 91.22777795
file name : Image_30032023145538661.png
|
2023-03-30 14:55:38.758632 |
50 |
37937826 |
Rep of road from Raben Medhi house to Rajen Medhi house at vill Rupdiga. Ward No 10 |
70000 |
Rep of road from Raben Medhi house to Rajen Medhi house at vill Rupdiga. Ward No 101 |
Completed |
-
latitude : 26.44262037,26.44261625
Longitude : 91.22734359,91.22737118
file name : Image_25102020123226377.png
|
2020-10-25 12:32:31.756944 |
51 |
67775946 |
Materials required for composting |
52500 |
Materials required for composting1 |
Completion of work |
-
latitude : 26.4667333
Longitude : 91.2161655
file name : Image_30032023124434739.png
|
2023-03-30 12:44:34.835355 |
52 |
43507330 |
Const of waiting shed near GP Office at vill Tihu-Dekhata; Ward No 8 |
150000 |
Const of waiting shed near GP Office at vill Tihu-Dekhata; Ward No 81 |
In Progress |
-
latitude : 26.46494398
Longitude : 91.21707473
file name : Image_25102020124542640.png
|
2020-10-25 12:45:48.028592 |
53 |
43508006 |
Earth filling near kochdiga Bajalia Para Namghar |
50000 |
Earth filling near kochdiga Bajalia Para Namghar1 |
25% |
-
latitude : 26.46123239,26.46122697
Longitude : 91.23153463,91.23153033
file name : Image_17112020141533211.png
|
2020-11-17 14:15:33.324375 |
54 |
43508424 |
Const of boundary fencing at Rupdiga LP School & Sub Centre |
150000 |
Const of boundary fencing at Rupdiga LP School & Sub Centre1 |
Completed |
-
latitude : 26.44866584
Longitude : 91.22976706
file name : Image_03122020132209694.png
|
2020-12-03 13:22:09.790588 |
55 |
21080954 |
Boundary fencing at Nalbari Suba Manasha Mandir, Ward No 8 |
170000 |
Boundary fencing at Nalbari Suba Manasha Mandir, Ward No 81 |
In Progress |
-
latitude : 26.45940889
Longitude : 91.2099597
file name : Image_25102020130049472.png
|
2020-10-25 13:00:54.878354 |
56 |
37936276 |
Const. of Cycle Stand at GP Office Campus |
70000 |
Const. of Cycle Stand at GP Office Campus1 |
In Progress |
-
latitude : 26.4656647
Longitude : 91.21703647
file name : Image_25102020124456437.png
|
2020-10-25 12:45:01.827276 |
57 |
37936276 |
Const. of Cycle Stand at GP Office Campus |
70000 |
Const. of Cycle Stand at GP Office Campus1 |
In Progress |
-
latitude : 26.465555000000002
Longitude : 91.21697333333334
file name : Image_07082020153649714.png
|
2020-08-07 15:36:50.387632 |
58 |
37935757 |
Const. of Boundary wall and CC Flooring at GP office Campus |
516564 |
Const. of Boundary wall and CC Flooring at GP office Campus1 |
In Progress |
-
latitude : 26.46559341
Longitude : 91.21699592
file name : Image_25102020124435306.png
|
2020-10-25 12:44:40.686666 |
59 |
37935757 |
Const. of Boundary wall and CC Flooring at GP office Campus |
516564 |
Const. of Boundary wall and CC Flooring at GP office Campus1 |
In Progress |
-
latitude : 26.465660000000003
Longitude : 91.21700166666666
file name : Image_07082020153902836.png
|
2020-08-07 15:39:03.53072 |
60 |
37937692 |
Earth filling Boundary fencing at Jyoti Sangha Bargandubi. Ward No 6 |
120000 |
Earth filling Boundary fencing at Jyoti Sangha Bargandubi. Ward No 61 |
25% |
-
latitude : 26.44670116,26.4425661
Longitude : 91.20560086,91.2032714
file name : Image_25102020130121605.png
|
2020-10-25 13:01:27.003002 |
61 |
37937692 |
Earth filling Boundary fencing at Jyoti Sangha Bargandubi. Ward No 6 |
120000 |
Earth filling Boundary fencing at Jyoti Sangha Bargandubi. Ward No 61 |
25% |
-
latitude : 26.44670116,26.4425661
Longitude : 91.20560086,91.2032714
file name : Image_25102020130306452.png
|
2020-10-25 13:03:11.844529 |
62 |
37957227 |
Rep of road from Kochdiga LP School to Priyonath Kalita house at vill Kochdiga. Ward No 9 |
150000 |
Rep of road from Kochdiga LP School to Priyonath Kalita house at vill Kochdiga. Ward No 91 |
25% |
-
latitude : 26.45744384,26.45743366
Longitude : 91.22864345,91.22865386
file name : Image_17112020140324332.png
|
2020-11-17 14:03:24.429282 |
63 |
66516347 |
Operation & maintenance of drinking water supply system |
90000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.43923607
Longitude : 91.19645963
file name : Image_11012023130848211.png
|
2023-01-11 13:08:48.300599 |
64 |
66516982 |
Operation & maintenance of drinking water supply system |
90000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.50604357
Longitude : 91.16973469
file name : Image_12012023141920177.png
|
2023-01-12 14:19:20.281262 |
65 |
54678628 |
Solid Waste Management Facility near GP Office |
141714 |
Solid Waste Management Facility near GP Office1 |
Completion of work |
-
latitude : 26.44847935
Longitude : 91.22777953
file name : Image_09032023153729799.png
|
2023-03-09 15:37:29.90811 |
66 |
66725299 |
Construction of Community Sanitary Complex |
153264 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.47002631
Longitude : 91.2123793
file name : Image_08062023134146305.png
|
2023-06-08 13:41:46.417445 |
67 |
66725299 |
Construction of Community Sanitary Complex |
153264 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.47000568
Longitude : 91.21243027
file name : Image_24032023141729570.png
|
2023-03-24 14:17:29.688092 |
68 |
66725299 |
Construction of Community Sanitary Complex |
153264 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.46998182
Longitude : 91.21239615
file name : Image_24032023141602727.png
|
2023-03-24 14:16:02.827422 |
69 |
66015235 |
Creation of a new source of drinking water |
147500 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.44817894
Longitude : 91.19809349
file name : Image_16062023152728507.png
|
2023-06-16 15:27:28.648632 |
70 |
66015235 |
Creation of a new source of drinking water |
147500 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.44811964
Longitude : 91.19803538
file name : Image_25032023223602024.png
|
2023-03-25 22:36:02.12189 |
71 |
67776304 |
Materials required for composting |
9697 |
Materials required for composting1 |
Completion of work |
-
latitude : 26.45727797
Longitude : 91.22836373
file name : Image_30032023145525436.png
|
2023-03-30 14:55:25.53073 |
72 |
67776304 |
Materials required for composting |
9697 |
Materials required for composting1 |
Completion of work |
-
latitude : 26.45727797
Longitude : 91.22836373
file name : Image_30032023145547104.png
|
2023-03-30 14:55:47.195971 |
73 |
67776536 |
Materials required for composting |
9697 |
Materials required for composting1 |
Completion of work |
-
latitude : 26.43428946
Longitude : 91.21281223
file name : Image_30032023145502920.png
|
2023-03-30 14:55:03.024384 |
74 |
67776067 |
Materials required for composting |
9697 |
Materials required for composting1 |
Completion of work |
-
latitude : 26.44923466
Longitude : 91.19703476
file name : Image_30032023130757726.png
|
2023-03-30 13:07:57.83412 |
75 |
67776151 |
Materials required for composting |
9697 |
Materials required for composting1 |
Completion of work |
-
latitude : 26.45282816
Longitude : 91.20882036
file name : Image_30032023130514837.png
|
2023-03-30 13:05:14.940686 |
76 |
67776151 |
Materials required for composting |
9697 |
Materials required for composting1 |
Completion of work |
-
latitude : 26.45282816
Longitude : 91.20882036
file name : Image_30032023130521361.png
|
2023-03-30 13:05:21.466511 |
77 |
67776235 |
Materials required for composting |
9697 |
Materials required for composting1 |
Completion of work |
-
latitude : 26.47143037
Longitude : 91.20363352
file name : Image_30032023130509248.png
|
2023-03-30 13:05:09.367621 |
78 |
67776235 |
Materials required for composting |
9697 |
Materials required for composting1 |
Completion of work |
-
latitude : 26.47148743
Longitude : 91.20350829
file name : Image_30032023130518114.png
|
2023-03-30 13:05:18.234392 |
79 |
66516520 |
Construction of Community Sanitary Complex |
248900 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.45383271
Longitude : 91.20874899
file name : Image_09042024154752359.png
|
2024-04-09 15:47:52.459407 |
80 |
66516520 |
Construction of Community Sanitary Complex |
248900 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.45305733
Longitude : 91.20950326
file name : Image_16092023134355306.png
|
2023-09-16 13:43:56.544043 |
81 |
66516520 |
Construction of Community Sanitary Complex |
248900 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.45303137
Longitude : 91.20947738
file name : Image_16092023134345271.png
|
2023-09-16 13:43:45.464737 |
82 |
66516520 |
Construction of Community Sanitary Complex |
248900 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.45303137
Longitude : 91.20947738
file name : Image_16092023134329904.png
|
2023-09-16 13:43:30.342921 |
83 |
66516520 |
Construction of Community Sanitary Complex |
248900 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.45310398
Longitude : 91.20935572
file name : Image_16092023134247461.png
|
2023-09-16 13:42:47.763337 |
84 |
66516520 |
Construction of Community Sanitary Complex |
248900 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.45305733
Longitude : 91.20950326
file name : Image_16092023134337956.png
|
2023-09-16 13:43:39.213532 |
85 |
54681656 |
Construction of Public Smashan at Tihudekhata reserve at vill Tihudekhata |
531299 |
Construction of Public Smashan at Tihudekhata reserve at vill Tihudekhata1 |
Roof laid |
-
latitude : 26.4480127
Longitude : 91.21968583
file name : Image_02112023120028736.png
|
2023-11-02 12:00:28.894748 |
86 |
54681656 |
Construction of Public Smashan at Tihudekhata reserve at vill Tihudekhata |
531299 |
Construction of Public Smashan at Tihudekhata reserve at vill Tihudekhata1 |
Roof laid |
-
latitude : 26.4480127
Longitude : 91.21968583
file name : Image_02112023120012854.png
|
2023-11-02 12:00:12.982752 |
87 |
54681656 |
Construction of Public Smashan at Tihudekhata reserve at vill Tihudekhata |
531299 |
Construction of Public Smashan at Tihudekhata reserve at vill Tihudekhata1 |
Roof laid |
-
latitude : 26.44807155
Longitude : 91.22024956
file name : Image_02112023115953785.png
|
2023-11-02 11:59:53.904525 |
88 |
54681656 |
Construction of Public Smashan at Tihudekhata reserve at vill Tihudekhata |
531299 |
Construction of Public Smashan at Tihudekhata reserve at vill Tihudekhata1 |
Plinth level |
-
latitude : 26.448027
Longitude : 91.22037084
file name : Image_07022023134929792.png
|
2023-02-07 13:49:29.915838 |
89 |
54681656 |
Construction of Public Smashan at Tihudekhata reserve at vill Tihudekhata |
531299 |
Construction of Public Smashan at Tihudekhata reserve at vill Tihudekhata1 |
Completion of work |
-
latitude : 26.4479789044708
Longitude : 91.22048146091402
file name : Image_21102022125012202.png
|
2022-10-21 12:50:12.325725 |
90 |
54681656 |
Construction of Public Smashan at Tihudekhata reserve at vill Tihudekhata |
531299 |
Construction of Public Smashan at Tihudekhata reserve at vill Tihudekhata1 |
Completion of work |
-
latitude : 26.447978233918548
Longitude : 91.22028306126595
file name : Image_21102022125015622.png
|
2022-10-21 12:50:15.754653 |
91 |
66015258 |
Creation of a new source of drinking water |
147500 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.47013253
Longitude : 91.212221
file name : Image_30092023125901617.png
|
2023-09-30 12:59:01.718845 |
92 |
66015258 |
Creation of a new source of drinking water |
147500 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.47011924
Longitude : 91.21224666
file name : Image_08062023133729359.png
|
2023-06-08 13:37:29.46412 |
93 |
66015258 |
Creation of a new source of drinking water |
147500 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.47008926
Longitude : 91.21214857
file name : Image_08062023133947375.png
|
2023-06-08 13:39:47.471978 |
94 |
54681101 |
Construction of Community Managed Sanitary Complex at Bangaon ward no4 |
90000 |
Construction of Community Managed Sanitary Complex at Bangaon ward no41 |
Plinth level |
-
latitude : 26.4409105
Longitude : 91.20222572
file name : Image_30092023135656797.png
|
2023-09-30 13:56:56.896788 |
95 |
54681101 |
Construction of Community Managed Sanitary Complex at Bangaon ward no4 |
90000 |
Construction of Community Managed Sanitary Complex at Bangaon ward no41 |
Plinth level |
-
latitude : 26.44085904
Longitude : 91.20225043
file name : Image_30092023135425883.png
|
2023-09-30 13:54:25.974102 |
96 |
54681101 |
Construction of Community Managed Sanitary Complex at Bangaon ward no4 |
90000 |
Construction of Community Managed Sanitary Complex at Bangaon ward no41 |
Plinth level |
-
latitude : 26.44082385
Longitude : 91.20222031
file name : Image_30092023135242396.png
|
2023-09-30 13:52:42.495956 |
97 |
54681101 |
Construction of Community Managed Sanitary Complex at Bangaon ward no4 |
90000 |
Construction of Community Managed Sanitary Complex at Bangaon ward no41 |
Completion of work |
-
latitude : 26.44078409
Longitude : 91.20227143
file name : Image_08062023163734037.png
|
2023-06-08 16:37:34.142409 |
98 |
54681239 |
Construction of Community Managed Sanitary Complex at Bargandubi ward no 6 |
90000 |
Construction of Community Managed Sanitary Complex at Bargandubi ward no 61 |
Plinth level |
-
latitude : 26.45347121
Longitude : 91.20942583
file name : Image_30092023133728677.png
|
2023-09-30 13:37:28.861256 |
99 |
54681239 |
Construction of Community Managed Sanitary Complex at Bargandubi ward no 6 |
90000 |
Construction of Community Managed Sanitary Complex at Bargandubi ward no 61 |
Plinth level |
-
latitude : 26.45343661
Longitude : 91.20943622
file name : Image_30092023133404153.png
|
2023-09-30 13:34:04.256453 |
100 |
54681239 |
Construction of Community Managed Sanitary Complex at Bargandubi ward no 6 |
90000 |
Construction of Community Managed Sanitary Complex at Bargandubi ward no 61 |
Completion of work |
-
latitude : 26.45334694
Longitude : 91.20929199
file name : Image_09062023161006689.png
|
2023-06-09 16:10:06.785138 |
101 |
66015286 |
Construction of Community Sanitary Complex |
295000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.46456508
Longitude : 91.21747918
file name : Image_20122023155436053.png
|
2023-12-20 15:54:36.207868 |
102 |
66015286 |
Construction of Community Sanitary Complex |
295000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.45332371
Longitude : 91.20940138
file name : Image_08062023163737618.png
|
2023-06-08 16:37:37.717333 |
103 |
66015286 |
Construction of Community Sanitary Complex |
295000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.45334628
Longitude : 91.2093504
file name : Image_08062023161034242.png
|
2023-06-08 16:10:34.345343 |
104 |
66015286 |
Construction of Community Sanitary Complex |
295000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.46448099
Longitude : 91.21751226
file name : Image_24032023140144037.png
|
2023-03-24 14:01:44.156961 |
105 |
66015185 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi |
590000 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi1 |
Completion of work |
-
latitude : 26.44353968
Longitude : 91.21587423
file name : Image_21122023153803301.png
|
2023-12-21 15:38:03.399236 |
106 |
66015185 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi |
590000 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi1 |
Completion of work |
-
latitude : 26.44353968
Longitude : 91.21587423
file name : Image_21122023153759295.png
|
2023-12-21 15:37:59.391062 |
107 |
66015185 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi |
590000 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi1 |
Completion of work |
-
latitude : 26.44353968
Longitude : 91.21587423
file name : Image_21122023153755858.png
|
2023-12-21 15:37:55.955516 |
108 |
66015185 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi |
590000 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi1 |
Completion of work |
-
latitude : 26.44353968
Longitude : 91.21587423
file name : Image_21122023153745060.png
|
2023-12-21 15:37:45.148405 |
109 |
66015185 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi |
590000 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi1 |
Completion of work |
-
latitude : 26.44353968
Longitude : 91.21587423
file name : Image_21122023153741699.png
|
2023-12-21 15:37:41.786389 |
110 |
66015185 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi |
590000 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi1 |
Completion of work |
-
latitude : 26.44353968
Longitude : 91.21587423
file name : Image_21122023153738437.png
|
2023-12-21 15:37:38.52569 |
111 |
66015185 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi |
590000 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi1 |
Completion of work |
-
latitude : 26.44353968
Longitude : 91.21587423
file name : Image_21122023153734395.png
|
2023-12-21 15:37:34.490412 |
112 |
66015185 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi |
590000 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi1 |
Completion of work |
-
latitude : 26.44353968
Longitude : 91.21587423
file name : Image_21122023153549222.png
|
2023-12-21 15:35:49.320206 |
113 |
66015185 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi |
590000 |
Const.of Public Smachan near Kaldia River Rajahuwa Place at Village Bargandubi1 |
Completion of work |
-
latitude : 26.45806847
Longitude : 91.20573909
file name : Image_21032023233521164.png
|
2023-03-21 23:35:21.257651 |
114 |
68122304 |
Repairing of 1442 No Dakhin Helona LP School at village Tihu Dekhata |
91150 |
Repairing of 1442 No Dakhin Helona LP School at village Tihu Dekhata1 |
Plinth level |
-
latitude : 26.45875871
Longitude : 91.21484528
file name : Image_17062023165530024.png
|
2023-06-17 16:55:30.132861 |
115 |
68122304 |
Repairing of 1442 No Dakhin Helona LP School at village Tihu Dekhata |
91150 |
Repairing of 1442 No Dakhin Helona LP School at village Tihu Dekhata1 |
Completion of work |
-
latitude : 26.45874229
Longitude : 91.21465595
file name : Image_08042023212354975.png
|
2023-04-08 21:23:55.078549 |
116 |
54681350 |
Construction of Toilet Facility at 25 No Helana LP School village Helana Ward No 7 |
115354 |
Construction of Toilet Facility at 25 No Helana LP School village Helana Ward No 71 |
Plinth level |
-
latitude : 26.46140188
Longitude : 91.22058837
file name : Image_07022023131256118.png
|
2023-02-07 13:12:56.22016 |
117 |
54681350 |
Construction of Toilet Facility at 25 No Helana LP School village Helana Ward No 7 |
115354 |
Construction of Toilet Facility at 25 No Helana LP School village Helana Ward No 71 |
Completion of work |
-
latitude : 26.461145617067814
Longitude : 91.22060911729932
file name : Image_31102022103428282.png
|
2022-10-31 10:34:28.376786 |