1 |
10949503 |
Const. of Urinal (out door) Drinking Water Facility at G.P. Office |
151290 |
Toilet1
|
Completed |
-
latitude : 26.35844886302948
Longitude : 90.87001740932465
file name : Image_11062019132511899.png
|
2019-06-11 13:25:11.965025 |
2 |
33094130 |
Repairing of GP office Building Const. of Boundary Wall of 58 No Barbhitha GP Office |
479387 |
Panchayat Bhawan1 |
Completed |
-
latitude : 26.2830731
Longitude : 90.7788786
file name : Image_09082020155717267.png
|
2020-08-09 15:57:17.935514 |
3 |
33094130 |
Repairing of GP office Building Const. of Boundary Wall of 58 No Barbhitha GP Office |
479387 |
Panchayat Bhawan1 |
25% |
-
latitude : 26.28149951
Longitude : 90.77923977
file name : Image_18022020104808427.png
|
2020-02-18 10:48:08.689641 |
4 |
43581242 |
Const.of Boundary Wall with Land Development work at 1437 No Dakshin Bartari LP School. |
250000 |
Const.of Boundary Wall with Land Development work at 1437 No Dakshin Bartari LP School.1 |
Completed |
-
latitude : 26.29723656
Longitude : 90.75241923
file name : Image_27012021100944015.png
|
2021-01-27 10:09:44.086642 |
5 |
43581422 |
Const. of Boundary Wall & Land Development work at Barbhitha Police Out Post. |
442360 |
Const. of Boundary Wall & Land Development work at Barbhitha Police Out Post.1 |
Completed |
-
latitude : 26.28194163
Longitude : 90.77878516
file name : Image_09122020062634658.png
|
2020-12-09 06:26:34.715403 |
6 |
37651454 |
Const. of Boundary Wall with Aju Khana at Kandulia Kari Maszid. |
490000 |
Const. of Boundary Wall with Aju Khana at Kandulia Kari Maszid.1 |
Completed |
-
latitude : 26.30346336
Longitude : 90.77416391
file name : Image_03092020175128437.png
|
2020-09-03 17:51:29.19239 |
7 |
37533352 |
Improvement of Road with Sand Gravelling from Badsha Miah house to West side Amzad Ali house |
482000 |
Improvement of Road with Sand Gravelling from Badsha Miah house to West side Amzad Ali house1 |
Completed |
-
latitude : 26.27809835,26.27809548
Longitude : 90.77823004,90.77822617
file name : Image_03092020162725264.png
|
2020-09-03 16:27:25.947237 |
8 |
37056802 |
Const. Of Boundary Wall at Dakshin Barbhitha 1255 No LP School. |
500000 |
Const. Of Boundary Wall at Dakshin Barbhitha 1255 No LP School.1 |
Completed |
-
latitude : 26.26901605
Longitude : 90.77230471
file name : Image_03092020150623987.png
|
2020-09-03 15:06:24.640646 |
9 |
37058342 |
Const. of Boundary Wall at Paschim Kandulia Maszid with Aju Khana. |
490000 |
Const. of Boundary Wall at Paschim Kandulia Maszid with Aju Khana.1 |
Completed |
-
latitude : 26.303715705871582
Longitude : 90.7666826248169
file name : Image_03092020172523479.png
|
2020-09-03 17:25:24.140771 |
10 |
37694395 |
Const. of Boundary Wall at Dakshin Chandmama Pucca Maszid. |
500000 |
Const. of Boundary Wall at Dakshin Chandmama Pucca Maszid.1 |
Completed |
-
latitude : 26.267967224121094
Longitude : 90.78056037425995
file name : Image_03092020151625405.png
|
2020-09-03 15:16:26.097163 |
11 |
37694777 |
Const. of Boundary Wall at Hajipara Maszid with Aju Khana |
500000 |
Const. of Boundary Wall at Hajipara Maszid with Aju Khana1 |
Completed |
-
latitude : 26.27247697
Longitude : 90.7942538
file name : Image_26012021140054422.png
|
2021-01-26 14:00:54.489704 |
12 |
37694777 |
Const. of Boundary Wall at Hajipara Maszid with Aju Khana |
500000 |
Const. of Boundary Wall at Hajipara Maszid with Aju Khana1 |
Completed |
-
latitude : 26.27242263
Longitude : 90.79401436
file name : Image_04092020092105673.png
|
2020-09-04 09:21:06.376082 |
13 |
37694998 |
Improvement of Road with Sand Gravelling from Bridge Par Bazar to south side 1437 No LP School |
488360 |
Improvement of Road with Sand Gravelling from Bridge Par Bazar to south side 1437 No LP School1 |
Completed |
-
latitude : 26.305936574935913,26.30595706
Longitude : 90.75538516044617,90.75536637
file name : Image_03092020171633890.png
|
2020-09-03 17:16:34.5613 |
14 |
43544543 |
Const. of Toilet at Dakshin Barbhitha ME Madrassa with Running Water Facility. |
250000 |
Const. of Toilet at Dakshin Barbhitha ME Madrassa with Running Water Facility.1 |
25% |
-
latitude : 26.26870181
Longitude : 90.77591853
file name : Image_26112020163111146.png
|
2020-11-26 16:31:11.215721 |
15 |
43581165 |
Const. of Community Toilet near at Bhuyan para Maszid with Running Water Facility. |
250000 |
Const. of Community Toilet near at Bhuyan para Maszid with Running Water Facility.1 |
25% |
-
latitude : 26.27049712
Longitude : 90.78982259
file name : Image_26012021140429757.png
|
2021-01-26 14:04:29.800454 |
16 |
37694189 |
Const. of Public Toilet near at Uttar Aprupi Jalil Maszid. |
200000 |
Const. of Public Toilet near at Uttar Aprupi Jalil Maszid.1 |
25% |
-
latitude : 26.29148694
Longitude : 90.76251312
file name : Image_26012021123030454.png
|
2021-01-26 12:30:30.569576 |
17 |
37694017 |
Const. of Culvert with Approach near at Nur Baksho Haji house Aprupi. |
300000 |
Const. of Culvert with Approach near at Nur Baksho Haji house Aprupi.1 |
50% |
-
latitude : 26.286892890930176,26.28689157
Longitude : 90.75591623783112,90.75591617
file name : Image_03092020164819387.png
|
2020-09-03 16:48:20.086015 |
18 |
38733366 |
Const. of Toilet at Uttar Pub High Madrassa with Running Water Facility, Chandmama |
250000 |
Const. of Toilet at Uttar Pub High Madrassa with Running Water Facility, Chandmama1 |
25% |
-
latitude : 26.27038089
Longitude : 90.79345607
file name : Image_26012021134601956.png
|
2021-01-26 13:46:02.058518 |
19 |
38733014 |
Const. of Paver Block Road from Ataur Rahman house to west side Madhaya Barbhitha Maszid. |
480000 |
Const. of Paver Block Road from Ataur Rahman house to west side Madhaya Barbhitha Maszid.1 |
Completed |
-
latitude : 26.2767882,26.27678829
Longitude : 90.77517564,90.77517563
file name : Image_27012021093313931.png
|
2021-01-27 09:33:14.042207 |
20 |
44543047 |
Const. of Boundary Wall and Approach Road at Dakshin Kandulia LP School |
500000 |
Const. of Boundary Wall and Approach Road at Dakshin Kandulia LP School1 |
In Progress |
-
latitude : 26.29017976
Longitude : 90.7758114
file name : Image_08022021130757887.png
|
2021-02-08 13:07:57.941728 |
21 |
44543868 |
Const. of Aju Khana at Uttar Chandmama Maszid near Mofazzal Hussain house. |
200000 |
Const. of Aju Khana at Uttar Chandmama Maszid near Mofazzal Hussain house.1 |
25% |
-
latitude : 26.27984446
Longitude : 90.79456299
file name : Image_10022021124055309.png
|
2021-02-10 12:40:55.373002 |
22 |
44543667 |
Const. of Boundary Wall at Paschim Bartari LP School. |
500000 |
Const. of Boundary Wall at Paschim Bartari LP School.1 |
In Progress |
-
latitude : 26.30389719
Longitude : 90.75458827
file name : Image_27022021101920567.png
|
2021-02-27 10:19:20.66595 |
23 |
44543667 |
Const. of Boundary Wall at Paschim Bartari LP School. |
500000 |
Const. of Boundary Wall at Paschim Bartari LP School.1 |
In Progress |
-
latitude : 26.30381665
Longitude : 90.75458286
file name : Image_27012021101416878.png
|
2021-01-27 10:14:16.94319 |
24 |
44539263 |
Const. of Paver Block from Jalal Uddin house to South side Mohir Uddin house. |
500000 |
Const. of Paver Block from Jalal Uddin house to South side Mohir Uddin house.1 |
50% |
-
latitude : 26.27470791,26.27471366
Longitude : 90.76770377,90.7676833
file name : Image_10022021124030112.png
|
2021-02-10 12:40:30.181865 |
25 |
44539263 |
Const. of Paver Block from Jalal Uddin house to South side Mohir Uddin house. |
500000 |
Const. of Paver Block from Jalal Uddin house to South side Mohir Uddin house.1 |
25% |
-
latitude : 26.2747605,26.27477545
Longitude : 90.76767347,90.76768483
file name : Image_27012021093646611.png
|
2021-01-27 09:36:46.707502 |
26 |
44543439 |
Const. of Boundary with Aju Khana at Chandmama Moulana para Maszid. |
500000 |
Const. of Boundary with Aju Khana at Chandmama Moulana para Maszid.1 |
Completed |
-
latitude : 26.27146337
Longitude : 90.79909656
file name : Image_23032021101200162.png
|
2021-03-23 10:12:00.216719 |
27 |
44543439 |
Const. of Boundary with Aju Khana at Chandmama Moulana para Maszid. |
500000 |
Const. of Boundary with Aju Khana at Chandmama Moulana para Maszid.1 |
Completed |
-
latitude : 26.27150629
Longitude : 90.79904816
file name : Image_29032021141004961.png
|
2021-03-29 14:10:05.015595 |
28 |
44543439 |
Const. of Boundary with Aju Khana at Chandmama Moulana para Maszid. |
500000 |
Const. of Boundary with Aju Khana at Chandmama Moulana para Maszid.1 |
In Progress |
-
latitude : 26.27139349
Longitude : 90.79883794
file name : Image_26012021135526017.png
|
2021-01-26 13:55:26.08509 |
29 |
44539224 |
Const. of Paver Block Road from Barbhitha HS School to North side Rice Mill. |
500000 |
Const. of Paver Block Road from Barbhitha HS School to North side Rice Mill.1 |
50% |
-
latitude : 26.2835029,26.2835029
Longitude : 90.7788267,90.7788267
file name : Image_14022021155235000.png
|
2021-02-14 15:52:35.094373 |
30 |
44539224 |
Const. of Paver Block Road from Barbhitha HS School to North side Rice Mill. |
500000 |
Const. of Paver Block Road from Barbhitha HS School to North side Rice Mill.1 |
25% |
-
latitude : 26.28320583,26.28327883
Longitude : 90.77879423,90.77876603
file name : Image_26012021133104934.png
|
2021-01-26 13:31:05.037792 |
31 |
44543111 |
Const. of Paver Block Road from Aprupi Milan Bazar to North side |
500000 |
Const. of Paver Block Road from Aprupi Milan Bazar to North side 1 |
50% |
-
latitude : 26.28402285,26.2840162
Longitude : 90.75657562,90.7565577
file name : Image_10022021124018448.png
|
2021-02-10 12:40:18.54012 |
32 |
44543111 |
Const. of Paver Block Road from Aprupi Milan Bazar to North side |
500000 |
Const. of Paver Block Road from Aprupi Milan Bazar to North side 1 |
25% |
-
latitude : 26.28403707,26.28404396
Longitude : 90.75660053,90.75661255
file name : Image_27012021094620743.png
|
2021-01-27 09:46:20.84656 |
33 |
44543160 |
Improv. Of Road with Sand Gravelling from SH-2 no North side Shirajul Hoque house. |
500000 |
Improv. Of Road with Sand Gravelling from SH-2 no North side Shirajul Hoque house.1 |
50% |
-
latitude : 26.30590133,26.30590149
Longitude : 90.76016744,90.76016789
file name : Image_25022021152554032.png
|
2021-02-25 15:25:54.076107 |
34 |
44543160 |
Improv. Of Road with Sand Gravelling from SH-2 no North side Shirajul Hoque house. |
500000 |
Improv. Of Road with Sand Gravelling from SH-2 no North side Shirajul Hoque house.1 |
25% |
-
latitude : 26.30590136,26.30589923
Longitude : 90.76016117,90.76015987
file name : Image_27012021102904887.png
|
2021-01-27 10:29:04.954917 |
35 |
44543080 |
Const. of Paver Block Road from SH-2 South side Sofiur Rahman house. |
500000 |
Const. of Paver Block Road from SH-2 South side Sofiur Rahman house.1 |
50% |
-
latitude : 26.30410218,26.3040892
Longitude : 90.77071557,90.77069996
file name : Image_22022021165454270.png
|
2021-02-22 16:54:54.36676 |
36 |
44543080 |
Const. of Paver Block Road from SH-2 South side Sofiur Rahman house. |
500000 |
Const. of Paver Block Road from SH-2 South side Sofiur Rahman house.1 |
25% |
-
latitude : 26.30408875,26.30408857
Longitude : 90.77073074,90.77073057
file name : Image_27012021115957863.png
|
2021-01-27 11:59:57.946316 |
37 |
44543193 |
Improv. Of Road with Sand Gravelling from Barbhitha Bazar to East side Rice mill via 1684No LPS |
500000 |
Improv. Of Road with Sand Gravelling from Barbhitha Bazar to East side Rice mill via 1684No LPS1 |
50% |
-
latitude : 26.2813087,26.28130004
Longitude : 90.77937282,90.77935617
file name : Image_10022021153036862.png
|
2021-02-10 15:30:36.962082 |
38 |
44543193 |
Improv. Of Road with Sand Gravelling from Barbhitha Bazar to East side Rice mill via 1684No LPS |
500000 |
Improv. Of Road with Sand Gravelling from Barbhitha Bazar to East side Rice mill via 1684No LPS1 |
25% |
-
latitude : 26.28125663,26.28124195
Longitude : 90.77943191,90.77944248
file name : Image_26012021133110175.png
|
2021-01-26 13:31:10.251695 |
39 |
44543760 |
Const. of Culvert Near Mofazzel Hussain house . |
250000 |
Const. of Culvert Near Mofazzel Hussain house .1 |
50% |
-
latitude : 26.3056526,26.30565081
Longitude : 90.76293262,90.7629414
file name : Image_22022021165457405.png
|
2021-02-22 16:54:57.486737 |
40 |
44543760 |
Const. of Culvert Near Mofazzel Hussain house . |
250000 |
Const. of Culvert Near Mofazzel Hussain house .1 |
25% |
-
latitude : 26.30565605,26.30565901
Longitude : 90.76300717,90.76299209
file name : Image_27012021105211855.png
|
2021-01-27 10:52:11.932425 |
41 |
44543710 |
Const. of Paver Block Road From CCMC Road to East side Barvitha Bazar via GP Office |
500000 |
Const. of Paver Block Road From CCMC Road to East side Barvitha Bazar via GP Office1 |
25% |
-
latitude : 26.28131992,26.28133989
Longitude : 90.77864541,90.77865171
file name : Image_26012021133055655.png
|
2021-01-26 13:30:55.756214 |
42 |
44543406 |
Improv. Of Road with Sand Gravelling from PK Moti Moszid to East side CK Modina Maszid. |
500000 |
Improv. Of Road with Sand Gravelling from PK Moti Moszid to East side CK Modina Maszid.1 |
50% |
-
latitude : 26.27633191,26.27633724
Longitude : 90.78702309,90.7870196
file name : Image_25022021152548211.png
|
2021-02-25 15:25:48.268639 |
43 |
44543406 |
Improv. Of Road with Sand Gravelling from PK Moti Moszid to East side CK Modina Maszid. |
500000 |
Improv. Of Road with Sand Gravelling from PK Moti Moszid to East side CK Modina Maszid.1 |
50% |
-
latitude : 26.27633191,26.27633724
Longitude : 90.78702309,90.7870196
file name : Image_25022021152559992.png
|
2021-02-25 15:26:00.050648 |
44 |
44543406 |
Improv. Of Road with Sand Gravelling from PK Moti Moszid to East side CK Modina Maszid. |
500000 |
Improv. Of Road with Sand Gravelling from PK Moti Moszid to East side CK Modina Maszid.1 |
25% |
-
latitude : 26.27638312,26.27638739
Longitude : 90.78707143,90.78707315
file name : Image_26012021133114855.png
|
2021-01-26 13:31:14.940162 |
45 |
44543927 |
Const. of Paver Block Road from CCMC Road to West side Barvitha Hafijia Madrassa. |
357000 |
Const. of Paver Block Road from CCMC Road to West side Barvitha Hafijia Madrassa.1 |
50% |
-
latitude : 26.2835038,26.2835028
Longitude : 90.7787848,90.7788136
file name : Image_14022021154940347.png
|
2021-02-14 15:49:40.441105 |
46 |
44543927 |
Const. of Paver Block Road from CCMC Road to West side Barvitha Hafijia Madrassa. |
357000 |
Const. of Paver Block Road from CCMC Road to West side Barvitha Hafijia Madrassa.1 |
25% |
-
latitude : 26.28320615,26.28320604
Longitude : 90.77879397,90.77879413
file name : Image_26012021133100289.png
|
2021-01-26 13:31:00.362552 |
47 |
44543739 |
Const. of Culvert Near Rejjak Ali house |
250000 |
Const. of Culvert Near Rejjak Ali house1 |
50% |
-
latitude : 26.30586017,26.30586032
Longitude : 90.76220628,90.76220633
file name : Image_25022021152539371.png
|
2021-02-25 15:25:39.429602 |
48 |
44543739 |
Const. of Culvert Near Rejjak Ali house |
250000 |
Const. of Culvert Near Rejjak Ali house1 |
25% |
-
latitude : 26.30583689,26.30583749
Longitude : 90.76218573,90.76218743
file name : Image_27012021104902372.png
|
2021-01-27 10:49:02.451148 |
49 |
67028127 |
Operation & maintenance of drinking water supply system |
567900 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.276621666666664
Longitude : 90.78351333333333
file name : Image_29122023143914039.png
|
2023-12-29 14:39:14.143587 |
50 |
61433624 |
Const of Toilet Near 1015 No Kandulia LP School with Running water Facility, Kandulia |
300000 |
Const of Toilet Near 1015 No Kandulia LP School with Running water Facility, Kandulia1 |
Roof laid |
-
latitude : 26.297811666666668
Longitude : 90.77879666666668
file name : Image_05092024163553191.png
|
2024-09-05 16:35:53.2582 |
51 |
61433624 |
Const of Toilet Near 1015 No Kandulia LP School with Running water Facility, Kandulia |
300000 |
Const of Toilet Near 1015 No Kandulia LP School with Running water Facility, Kandulia1 |
Plinth level |
-
latitude : 26.298213333333333
Longitude : 90.77852333333334
file name : Image_05092024163255688.png
|
2024-09-05 16:32:55.772768 |
52 |
61433624 |
Const of Toilet Near 1015 No Kandulia LP School with Running water Facility, Kandulia |
300000 |
Const of Toilet Near 1015 No Kandulia LP School with Running water Facility, Kandulia1 |
Completion of work |
-
latitude : 26.297866666666664
Longitude : 90.77876499999999
file name : Image_27042023172705125.png
|
2023-04-27 17:27:05.254479 |
53 |
61433624 |
Const of Toilet Near 1015 No Kandulia LP School with Running water Facility, Kandulia |
300000 |
Const of Toilet Near 1015 No Kandulia LP School with Running water Facility, Kandulia1 |
Completion of work |
-
latitude : 26.29786395
Longitude : 90.77875057
file name : Image_09022023151820258.png
|
2023-02-09 15:18:20.318749 |
54 |
61433599 |
Const of Surface Drain at Chandmama Model Hispital, Chandmama |
500000 |
Const of Surface Drain at Chandmama Model Hispital, Chandmama1 |
Roof laid |
-
latitude : 26.28317666666667,26.283156666666667
Longitude : 90.7781,90.77809666666666
file name : Image_24082024172530491.png
|
2024-08-24 17:25:30.542197 |
55 |
61433599 |
Const of Surface Drain at Chandmama Model Hispital, Chandmama |
500000 |
Const of Surface Drain at Chandmama Model Hispital, Chandmama1 |
Plinth level |
-
latitude : 26.282756666666668,26.282733333333333
Longitude : 90.77815000000001,90.77813999999998
file name : Image_24082024161214930.png
|
2024-08-24 16:12:15.004442 |
56 |
61433599 |
Const of Surface Drain at Chandmama Model Hispital, Chandmama |
500000 |
Const of Surface Drain at Chandmama Model Hispital, Chandmama1 |
Completion of work |
-
latitude : 26.28310183,26.28308213
Longitude : 90.77816103,90.77815146
file name : Image_01032023130614288.png
|
2023-03-01 13:06:14.424423 |
57 |
61433599 |
Const of Surface Drain at Chandmama Model Hispital, Chandmama |
500000 |
Const of Surface Drain at Chandmama Model Hispital, Chandmama1 |
Completion of work |
-
latitude : 26.28303062,26.28304248
Longitude : 90.77817312,90.77817131
file name : Image_09022023141928609.png
|
2023-02-09 14:19:28.6777 |
58 |
61173841 |
Const of Surface Drainage at Barbhitha Bazar area |
600000 |
Const of Surface Drainage at Barbhitha Bazar area1 |
Roof laid |
-
latitude : 26.281708,26.281708
Longitude : 90.7787477,90.7787477
file name : Image_24082024165513032.png
|
2024-08-24 16:55:13.099528 |
59 |
61173841 |
Const of Surface Drainage at Barbhitha Bazar area |
600000 |
Const of Surface Drainage at Barbhitha Bazar area1 |
Roof laid |
-
latitude : 26.28141333333333,26.28141666666667
Longitude : 90.77875,90.77878666666666
file name : Image_13102023142920866.png
|
2023-10-13 14:29:20.945422 |
60 |
61173841 |
Const of Surface Drainage at Barbhitha Bazar area |
600000 |
Const of Surface Drainage at Barbhitha Bazar area1 |
Roof laid |
-
latitude : 26.281331666666667,26.281335
Longitude : 90.77870999999999,90.77871333333333
file name : Image_27042023153424610.png
|
2023-04-27 15:34:24.741571 |
61 |
61173841 |
Const of Surface Drainage at Barbhitha Bazar area |
600000 |
Const of Surface Drainage at Barbhitha Bazar area1 |
Roof laid |
-
latitude : 26.28059166666667,26.28128333333333
Longitude : 90.77854166666665,90.77871833333332
file name : Image_22102022144416305.png
|
2022-10-22 14:44:16.439703 |
62 |
61173841 |
Const of Surface Drainage at Barbhitha Bazar area |
600000 |
Const of Surface Drainage at Barbhitha Bazar area1 |
Completion of work |
-
latitude : 26.28053166666667,26.28055
Longitude : 90.77858166666668,90.77856166666668
file name : Image_17102022124952572.png
|
2022-10-17 12:49:52.717535 |
63 |
61173841 |
Const of Surface Drainage at Barbhitha Bazar area |
600000 |
Const of Surface Drainage at Barbhitha Bazar area1 |
Completion of work |
-
latitude : 26.28133833333333,26.2813269
Longitude : 90.77866833333334,90.7786876
file name : Image_21092022134750492.png
|
2022-09-21 13:47:50.661659 |
64 |
61173841 |
Const of Surface Drainage at Barbhitha Bazar area |
600000 |
Const of Surface Drainage at Barbhitha Bazar area1 |
Completion of work |
-
latitude : 26.28128622,26.28128482
Longitude : 90.77873747,90.77874058
file name : Image_02072022111850819.png
|
2022-07-02 11:18:50.904068 |
65 |
67028357 |
Construction of Entry Gate 412 No Haldia Bartari LP School |
256900 |
Construction of Entry Gate 412 No Haldia Bartari LP School1 |
Roof laid |
-
latitude : 26.305043333333334
Longitude : 90.76543500000001
file name : Image_01092024180041915.png
|
2024-09-01 18:00:41.982872 |
66 |
67028357 |
Construction of Entry Gate 412 No Haldia Bartari LP School |
256900 |
Construction of Entry Gate 412 No Haldia Bartari LP School1 |
Plinth level |
-
latitude : 26.281411666666667
Longitude : 90.77919500000002
file name : Image_29122023162227728.png
|
2023-12-29 16:22:27.826784 |
67 |
67028357 |
Construction of Entry Gate 412 No Haldia Bartari LP School |
256900 |
Construction of Entry Gate 412 No Haldia Bartari LP School1 |
Completion of work |
-
latitude : 26.3052569
Longitude : 90.7653176
file name : Image_28052023173439155.png
|
2023-05-28 17:34:39.223961 |
68 |
81937982 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.28383666666667
Longitude : 90.77813999999998
file name : Image_24082024174035856.png
|
2024-08-24 17:40:35.915407 |
69 |
81937982 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.283838333333332
Longitude : 90.77814166666667
file name : Image_24082024173848155.png
|
2024-08-24 17:38:48.214573 |
70 |
81937982 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.28388166666667
Longitude : 90.77822166666668
file name : Image_24082024173430776.png
|
2024-08-24 17:34:30.845647 |
71 |
81937982 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.283853333333333
Longitude : 90.77818166666665
file name : Image_17102023105516005.png
|
2023-10-17 10:55:16.084105 |
72 |
81937982 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.283786666666668
Longitude : 90.77818333333335
file name : Image_15062023124504763.png
|
2023-06-15 12:45:04.849702 |
73 |
68751901 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.27625997
Longitude : 90.77425806
file name : Image_26042023124345629.png
|
2023-04-26 12:43:45.930971 |
74 |
81937602 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.285369999999997
Longitude : 90.75713166666668
file name : Image_16062023174008832.png
|
2023-06-16 17:40:08.942068 |
75 |
81937527 |
Creation of drainage channel for management of grey water |
309900 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.302770000000002
Longitude : 90.77909
file name : Image_29072023155815634.png
|
2023-07-29 15:58:15.700496 |
76 |
81938569 |
Const of Paver block road from chandmama Rice mill to PK masjid Chandmama gaon |
813200 |
Const of Paver block road from chandmama Rice mill to PK masjid Chandmama gaon1 |
Roof laid |
-
latitude : 26.276410000000002,26.276318333333332
Longitude : 90.78504666666667,90.78498499999999
file name : Image_01092024122322004.png
|
2024-09-01 12:23:22.348509 |
77 |
81938569 |
Const of Paver block road from chandmama Rice mill to PK masjid Chandmama gaon |
813200 |
Const of Paver block road from chandmama Rice mill to PK masjid Chandmama gaon1 |
Plinth level |
-
latitude : 26.276318333333332,26.276416666666666
Longitude : 90.785025,90.78504333333333
file name : Image_01092024121954058.png
|
2024-09-01 12:19:54.362753 |
78 |
81938569 |
Const of Paver block road from chandmama Rice mill to PK masjid Chandmama gaon |
813200 |
Const of Paver block road from chandmama Rice mill to PK masjid Chandmama gaon1 |
Completion of work |
-
latitude : 26.276456666666665,26.276443333333336
Longitude : 90.78512166666665,90.78516833333333
file name : Image_15062023131210034.png
|
2023-06-15 13:12:10.106074 |
79 |
50103680 |
Const of Community Manage Sanitary Toilet at Chandmama Gaon Village |
90000 |
Const of Community Manage Sanitary Toilet at Chandmama Gaon Village1 |
Roof laid |
-
latitude : 26.279755
Longitude : 90.79317999999999
file name : Image_01092024120711345.png
|
2024-09-01 12:07:11.487167 |
80 |
50103680 |
Const of Community Manage Sanitary Toilet at Chandmama Gaon Village |
90000 |
Const of Community Manage Sanitary Toilet at Chandmama Gaon Village1 |
Plinth level |
-
latitude : 26.27970833333333
Longitude : 90.79312499999999
file name : Image_01092024120357358.png
|
2024-09-01 12:03:57.450206 |
81 |
50103680 |
Const of Community Manage Sanitary Toilet at Chandmama Gaon Village |
90000 |
Const of Community Manage Sanitary Toilet at Chandmama Gaon Village1 |
Completion of work |
-
latitude : 26.279644
Longitude : 90.79315419
file name : Image_26042023174422173.png
|
2023-04-26 17:44:22.260613 |
82 |
61433714 |
Const of Open Stage at Chandmama ME School Playground |
500000 |
Const of Open Stage at Chandmama ME School Playground1 |
Roof laid |
-
latitude : 26.27192166666667
Longitude : 90.79468333333334
file name : Image_01092024124630523.png
|
2024-09-01 12:46:31.174962 |
83 |
61433714 |
Const of Open Stage at Chandmama ME School Playground |
500000 |
Const of Open Stage at Chandmama ME School Playground1 |
Plinth level |
-
latitude : 26.272006666666666
Longitude : 90.79483833333333
file name : Image_01092024124110602.png
|
2024-09-01 12:41:11.190995 |
84 |
61433714 |
Const of Open Stage at Chandmama ME School Playground |
500000 |
Const of Open Stage at Chandmama ME School Playground1 |
Completion of work |
-
latitude : 26.27181
Longitude : 90.79472833333332
file name : Image_25052023112709334.png
|
2023-05-25 11:27:09.466572 |
85 |
61433714 |
Const of Open Stage at Chandmama ME School Playground |
500000 |
Const of Open Stage at Chandmama ME School Playground1 |
Completion of work |
-
latitude : 26.27189
Longitude : 90.79469833333333
file name : Image_27042023154722920.png
|
2023-04-27 15:47:23.106361 |
86 |
61433714 |
Const of Open Stage at Chandmama ME School Playground |
500000 |
Const of Open Stage at Chandmama ME School Playground1 |
Completion of work |
-
latitude : 26.27181507
Longitude : 90.79475413
file name : Image_15032023111829552.png
|
2023-03-15 11:18:29.628439 |
87 |
61433714 |
Const of Open Stage at Chandmama ME School Playground |
500000 |
Const of Open Stage at Chandmama ME School Playground1 |
Completion of work |
-
latitude : 26.2718291
Longitude : 90.79467687
file name : Image_01032023132326570.png
|
2023-03-01 13:23:26.650124 |
88 |
61433714 |
Const of Open Stage at Chandmama ME School Playground |
500000 |
Const of Open Stage at Chandmama ME School Playground1 |
Completion of work |
-
latitude : 26.27180607
Longitude : 90.79464304
file name : Image_14022023150844653.png
|
2023-02-14 15:08:44.737628 |
89 |
67028480 |
Construction of Cross drainage on the road from Dakshin Barbhitha Chariali to West side near A Salam |
300000 |
Construction of Cross drainage on the road from Dakshin Barbhitha Chariali to West side near A Salam1 |
Roof laid |
-
latitude : 26.26905,26.269105
Longitude : 90.77141000000002,90.77154666666665
file name : Image_01092024141146935.png
|
2024-09-01 14:11:47.158427 |
90 |
67028480 |
Construction of Cross drainage on the road from Dakshin Barbhitha Chariali to West side near A Salam |
300000 |
Construction of Cross drainage on the road from Dakshin Barbhitha Chariali to West side near A Salam1 |
Plinth level |
-
latitude : 26.26917166666666,26.269068333333333
Longitude : 90.77156333333332,90.77154833333334
file name : Image_01092024140737898.png
|
2024-09-01 14:07:38.055935 |
91 |
67028480 |
Construction of Cross drainage on the road from Dakshin Barbhitha Chariali to West side near A Salam |
300000 |
Construction of Cross drainage on the road from Dakshin Barbhitha Chariali to West side near A Salam1 |
Completion of work |
-
latitude : 26.269115,26.26910181
Longitude : 90.77142282,90.77141873
file name : Image_12042023150141926.png
|
2023-04-12 15:01:41.976518 |
92 |
81937990 |
Construction of toilets in public institutions |
209900 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.27076833333333
Longitude : 90.76803333333334
file name : Image_02092024162101166.png
|
2024-09-02 16:21:01.490139 |
93 |
81937990 |
Construction of toilets in public institutions |
209900 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.270726666666665
Longitude : 90.767995
file name : Image_01092024143214118.png
|
2024-09-01 14:32:14.62361 |
94 |
81937990 |
Construction of toilets in public institutions |
209900 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.27052833333333
Longitude : 90.76787
file name : Image_01092024142942018.png
|
2024-09-01 14:29:42.519768 |
95 |
81937990 |
Construction of toilets in public institutions |
209900 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.27071
Longitude : 90.76807333333333
file name : Image_01092024142717683.png
|
2024-09-01 14:27:18.122248 |
96 |
81937990 |
Construction of toilets in public institutions |
209900 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.270755
Longitude : 90.76802333333332
file name : Image_15062023125355472.png
|
2023-06-15 12:53:55.548197 |
97 |
61174046 |
Const of Paver Block Road from Barbhitha HS School to North side Rice mill PH-2 |
500000 |
Const of Paver Block Road from Barbhitha HS School to North side Rice mill PH-21 |
Roof laid |
-
latitude : 26.283669999999997,26.283708333333333
Longitude : 90.77851333333335,90.77867999999998
file name : Image_01092024145220758.png
|
2024-09-01 14:52:21.524916 |
98 |
61174046 |
Const of Paver Block Road from Barbhitha HS School to North side Rice mill PH-2 |
500000 |
Const of Paver Block Road from Barbhitha HS School to North side Rice mill PH-21 |
Roof laid |
-
latitude : 26.283771666666667,26.283771666666667
Longitude : 90.77851166666666,90.77851166666666
file name : Image_17102023105219851.png
|
2023-10-17 10:52:19.954465 |
99 |
61174046 |
Const of Paver Block Road from Barbhitha HS School to North side Rice mill PH-2 |
500000 |
Const of Paver Block Road from Barbhitha HS School to North side Rice mill PH-21 |
Roof laid |
-
latitude : 26.283891666666666,26.283810000000003
Longitude : 90.77853166666667,90.77856833333333
file name : Image_27042023160002514.png
|
2023-04-27 16:00:02.637253 |
100 |
61174046 |
Const of Paver Block Road from Barbhitha HS School to North side Rice mill PH-2 |
500000 |
Const of Paver Block Road from Barbhitha HS School to North side Rice mill PH-21 |
Roof laid |
-
latitude : 26.283655,26.284198333333332
Longitude : 90.77855666666667,90.77824166666666
file name : Image_22102022144735975.png
|
2022-10-22 14:47:36.13125 |
101 |
61174046 |
Const of Paver Block Road from Barbhitha HS School to North side Rice mill PH-2 |
500000 |
Const of Paver Block Road from Barbhitha HS School to North side Rice mill PH-21 |
Completion of work |
-
latitude : 26.284153333333332,26.283758333333335
Longitude : 90.77829666666666,90.778545
file name : Image_17102022124554677.png
|
2022-10-17 12:45:54.837623 |
102 |
61174046 |
Const of Paver Block Road from Barbhitha HS School to North side Rice mill PH-2 |
500000 |
Const of Paver Block Road from Barbhitha HS School to North side Rice mill PH-21 |
Completion of work |
-
latitude : 26.283735,26.283645
Longitude : 90.77852166666668,90.77857999999999
file name : Image_21092022135529744.png
|
2022-09-21 13:55:29.875646 |
103 |
61174046 |
Const of Paver Block Road from Barbhitha HS School to North side Rice mill PH-2 |
500000 |
Const of Paver Block Road from Barbhitha HS School to North side Rice mill PH-21 |
Completion of work |
-
latitude : 26.28377645,26.28381061
Longitude : 90.77850912,90.77849382
file name : Image_02072022113856316.png
|
2022-07-02 11:38:56.415021 |
104 |
67028347 |
Construction of Paver Block of CCMC road from A Samad House to East Side of Chandamama Pathar |
500000 |
Construction of Paver Block of CCMC road from A Samad House to East Side of Chandamama Pathar1 |
Roof laid |
-
latitude : 26.27723,26.277371666666667
Longitude : 90.77798,90.77787666666667
file name : Image_01092024144501173.png
|
2024-09-01 14:45:01.831951 |
105 |
67028347 |
Construction of Paver Block of CCMC road from A Samad House to East Side of Chandamama Pathar |
500000 |
Construction of Paver Block of CCMC road from A Samad House to East Side of Chandamama Pathar1 |
Plinth level |
-
latitude : 26.277260000000002,26.277156666666663
Longitude : 90.77806166666666,90.77805333333332
file name : Image_01092024144146804.png
|
2024-09-01 14:41:47.446847 |
106 |
67028347 |
Construction of Paver Block of CCMC road from A Samad House to East Side of Chandamama Pathar |
500000 |
Construction of Paver Block of CCMC road from A Samad House to East Side of Chandamama Pathar1 |
Completion of work |
-
latitude : 26.277058333333336,26.277058333333336
Longitude : 90.778965,90.778965
file name : Image_13062023142536925.png
|
2023-06-13 14:25:37.104115 |
107 |
67028347 |
Construction of Paver Block of CCMC road from A Samad House to East Side of Chandamama Pathar |
500000 |
Construction of Paver Block of CCMC road from A Samad House to East Side of Chandamama Pathar1 |
Completion of work |
-
latitude : 26.277041666666666,26.277044999999998
Longitude : 90.77887833333334,90.77890666666666
file name : Image_31052023112750800.png
|
2023-05-31 11:27:50.893007 |
108 |
67028347 |
Construction of Paver Block of CCMC road from A Samad House to East Side of Chandamama Pathar |
500000 |
Construction of Paver Block of CCMC road from A Samad House to East Side of Chandamama Pathar1 |
Completion of work |
-
latitude : 26.27723973,26.27721604
Longitude : 90.77808386,90.7780416
file name : Image_12042023144614449.png
|
2023-04-12 14:46:14.510092 |
109 |
68751725 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.27265333333333
Longitude : 90.79407666666665
file name : Image_01092024125637569.png
|
2024-09-01 12:56:38.358274 |
110 |
68751725 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.272123333333337
Longitude : 90.79405333333334
file name : Image_01092024125411836.png
|
2024-09-01 12:54:12.616132 |
111 |
68751725 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.27235
Longitude : 90.79391166666667
file name : Image_25052023112923615.png
|
2023-05-25 11:29:23.791557 |
112 |
68751725 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.272325000000002
Longitude : 90.79402
file name : Image_27042023154454514.png
|
2023-04-27 15:44:54.640126 |
113 |
61174220 |
Const of Culvert on Road Ismail Hussain house to West side A Rahman Bhuyan house at Chandmama Pather |
350000 |
Const of Culvert on Road Ismail Hussain house to West side A Rahman Bhuyan house at Chandmama Pather1 |
Roof laid |
-
latitude : 26.268305,26.268261666666664
Longitude : 90.78828833333334,90.78832499999999
file name : Image_01092024131436993.png
|
2024-09-01 13:14:37.233056 |
114 |
61174220 |
Const of Culvert on Road Ismail Hussain house to West side A Rahman Bhuyan house at Chandmama Pather |
350000 |
Const of Culvert on Road Ismail Hussain house to West side A Rahman Bhuyan house at Chandmama Pather1 |
Plinth level |
-
latitude : 26.268338333333336,26.268266666666666
Longitude : 90.78832166666668,90.78842666666667
file name : Image_01092024131131254.png
|
2024-09-01 13:11:31.446441 |
115 |
61174220 |
Const of Culvert on Road Ismail Hussain house to West side A Rahman Bhuyan house at Chandmama Pather |
350000 |
Const of Culvert on Road Ismail Hussain house to West side A Rahman Bhuyan house at Chandmama Pather1 |
Completion of work |
-
latitude : 26.26828098,26.268281
Longitude : 90.78828061,90.78828061
file name : Image_01032023132110923.png
|
2023-03-01 13:21:10.994495 |
116 |
61174220 |
Const of Culvert on Road Ismail Hussain house to West side A Rahman Bhuyan house at Chandmama Pather |
350000 |
Const of Culvert on Road Ismail Hussain house to West side A Rahman Bhuyan house at Chandmama Pather1 |
Completion of work |
-
latitude : 26.26823681,26.26823817
Longitude : 90.7882515,90.78838756
file name : Image_14022023145118986.png
|
2023-02-14 14:51:19.135092 |
117 |
61174220 |
Const of Culvert on Road Ismail Hussain house to West side A Rahman Bhuyan house at Chandmama Pather |
350000 |
Const of Culvert on Road Ismail Hussain house to West side A Rahman Bhuyan house at Chandmama Pather1 |
Completion of work |
-
latitude : 26.26818409,26.26818479
Longitude : 90.7880972,90.78809872
file name : Image_02072022122038931.png
|
2022-07-02 12:20:39.020623 |
118 |
81939150 |
Const. of Market Shed at Barbitha GP Office Land |
813200 |
Const. of Market Shed at Barbitha GP Office Land1 |
Roof laid |
-
latitude : 26.28125
Longitude : 90.77924999999999
file name : Image_02092024133158534.png
|
2024-09-02 13:31:59.039051 |
119 |
81939150 |
Const. of Market Shed at Barbitha GP Office Land |
813200 |
Const. of Market Shed at Barbitha GP Office Land1 |
Roof laid |
-
latitude : 26.281101666666668
Longitude : 90.77931166666667
file name : Image_01092024150541772.png
|
2024-09-01 15:05:41.920449 |
120 |
81939150 |
Const. of Market Shed at Barbitha GP Office Land |
813200 |
Const. of Market Shed at Barbitha GP Office Land1 |
Plinth level |
-
latitude : 26.28119
Longitude : 90.77930833333333
file name : Image_01092024150252464.png
|
2024-09-01 15:02:52.572946 |
121 |
81939150 |
Const. of Market Shed at Barbitha GP Office Land |
813200 |
Const. of Market Shed at Barbitha GP Office Land1 |
Completion of work |
-
latitude : 26.281166666666664
Longitude : 90.77921833333333
file name : Image_01092024150028582.png
|
2024-09-01 15:00:28.669722 |
122 |
81939150 |
Const. of Market Shed at Barbitha GP Office Land |
813200 |
Const. of Market Shed at Barbitha GP Office Land1 |
Completion of work |
-
latitude : 26.281253333333332
Longitude : 90.7792
file name : Image_27102023151923802.png
|
2023-10-27 15:19:23.891068 |
123 |
61174111 |
Const of Paver Block Road from SH-2 to North side Bartari Bazar |
500000 |
Const of Paver Block Road from SH-2 to North side Bartari Bazar1 |
Roof laid |
-
latitude : 26.3040571,26.30481666666667
Longitude : 90.7661254,90.76547000000001
file name : Image_01092024180715510.png
|
2024-09-01 18:07:15.66038 |
124 |
61174111 |
Const of Paver Block Road from SH-2 to North side Bartari Bazar |
500000 |
Const of Paver Block Road from SH-2 to North side Bartari Bazar1 |
Plinth level |
-
latitude : 26.305308333333333,26.305296666666663
Longitude : 90.76540666666666,90.76548499999998
file name : Image_01092024180406061.png
|
2024-09-01 18:04:06.183477 |
125 |
61174111 |
Const of Paver Block Road from SH-2 to North side Bartari Bazar |
500000 |
Const of Paver Block Road from SH-2 to North side Bartari Bazar1 |
Completion of work |
-
latitude : 26.305150000000005,26.305163333333333
Longitude : 90.76533333333333,90.76535666666665
file name : Image_17102023095216658.png
|
2023-10-17 09:52:16.747107 |
126 |
61174111 |
Const of Paver Block Road from SH-2 to North side Bartari Bazar |
500000 |
Const of Paver Block Road from SH-2 to North side Bartari Bazar1 |
Completion of work |
-
latitude : 26.30512183,26.3056274
Longitude : 90.76538485,90.76555002
file name : Image_21012023163244304.png
|
2023-01-21 16:32:44.380177 |
127 |
61174111 |
Const of Paver Block Road from SH-2 to North side Bartari Bazar |
500000 |
Const of Paver Block Road from SH-2 to North side Bartari Bazar1 |
Completion of work |
-
latitude : 26.30513264,26.3049777
Longitude : 90.76535473,90.7657061
file name : Image_04072022111540244.png
|
2022-07-04 11:15:40.352212 |
128 |
67028218 |
Construction of toilets in public institutions |
227810 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.28151666666667
Longitude : 90.77940166666667
file name : Image_02092024125634044.png
|
2024-09-02 12:56:34.847658 |
129 |
67028218 |
Construction of toilets in public institutions |
227810 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.28151833333333
Longitude : 90.77922500000001
file name : Image_02092024125222750.png
|
2024-09-02 12:52:23.494478 |
130 |
67028218 |
Construction of toilets in public institutions |
227810 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.281475
Longitude : 90.779295
file name : Image_09092023170724261.png
|
2023-09-09 17:07:24.352986 |
131 |
61174360 |
Mask and Sanitization for Covid-19 @5 percent of untied grant |
72468 |
Mask and Sanitization for Covid-19 @5 percent of untied grant1 |
Roof laid |
-
latitude : 26.281433333333332
Longitude : 90.77937666666666
file name : Image_29082024154747483.png
|
2024-08-29 15:47:48.185732 |
132 |
61174360 |
Mask and Sanitization for Covid-19 @5 percent of untied grant |
72468 |
Mask and Sanitization for Covid-19 @5 percent of untied grant1 |
Plinth level |
-
latitude : 26.281513333333336
Longitude : 90.77934833333332
file name : Image_29082024154455567.png
|
2024-08-29 15:44:56.232205 |
133 |
61174360 |
Mask and Sanitization for Covid-19 @5 percent of untied grant |
72468 |
Mask and Sanitization for Covid-19 @5 percent of untied grant1 |
Completion of work |
-
latitude : 26.30191005
Longitude : 90.71129179
file name : Image_19062024165811599.png
|
2024-06-19 16:58:11.694949 |
134 |
68752338 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.30140666666667
Longitude : 90.77941333333335
file name : Image_05092024162530192.png
|
2024-09-05 16:25:30.264057 |
135 |
68752338 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.30129
Longitude : 90.77938333333334
file name : Image_05092024162249905.png
|
2024-09-05 16:22:50.010116 |
136 |
68752338 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.301170000000003
Longitude : 90.77933833333333
file name : Image_22052023125634083.png
|
2023-05-22 12:56:34.184049 |
137 |
68752338 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.30123685
Longitude : 90.77935171
file name : Image_26042023181930179.png
|
2023-04-26 18:19:30.235134 |
138 |
61173956 |
Const of Surface Drainage at Kandulia St from SH-2 to South side Sofiur Rahman house |
282468 |
Const of Surface Drainage at Kandulia St from SH-2 to South side Sofiur Rahman house1 |
Roof laid |
-
latitude : 26.304176666666663,26.304314999999995
Longitude : 90.77060000000002,90.77060166666666
file name : Image_05092024171314488.png
|
2024-09-05 17:13:44.2777 |
139 |
61173956 |
Const of Surface Drainage at Kandulia St from SH-2 to South side Sofiur Rahman house |
282468 |
Const of Surface Drainage at Kandulia St from SH-2 to South side Sofiur Rahman house1 |
Plinth level |
-
latitude : 26.30417,26.304154999999998
Longitude : 90.77067000000001,90.77063333333332
file name : Image_05092024171007872.png
|
2024-09-05 17:10:37.606827 |
140 |
61173956 |
Const of Surface Drainage at Kandulia St from SH-2 to South side Sofiur Rahman house |
282468 |
Const of Surface Drainage at Kandulia St from SH-2 to South side Sofiur Rahman house1 |
Completion of work |
-
latitude : 26.30413952,26.30414996
Longitude : 90.77069292,90.77069885
file name : Image_01032023125528759.png
|
2023-03-01 12:55:28.826521 |
141 |
61173956 |
Const of Surface Drainage at Kandulia St from SH-2 to South side Sofiur Rahman house |
282468 |
Const of Surface Drainage at Kandulia St from SH-2 to South side Sofiur Rahman house1 |
Completion of work |
-
latitude : 26.30403512,26.30407558
Longitude : 90.77067497,90.77068273
file name : Image_04072022105810035.png
|
2022-07-04 10:58:10.154019 |
142 |
68752165 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.30782166666667
Longitude : 90.76427
file name : Image_05092024172355205.png
|
2024-09-05 17:24:25.120397 |
143 |
68752165 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.307934999999997
Longitude : 90.76438166666667
file name : Image_05092024172132044.png
|
2024-09-05 17:22:01.927613 |
144 |
68752165 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.30787833333333
Longitude : 90.76441166666667
file name : Image_20052023155832136.png
|
2023-05-20 15:58:32.232991 |
145 |
68752165 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.30788946
Longitude : 90.76453741
file name : Image_26042023181107954.png
|
2023-04-26 18:11:07.99975 |
146 |
50103603 |
Const of Community Manage Sanitary Toilet at Bartari Village |
90000 |
Const of Community Manage Sanitary Toilet at Bartari Village1 |
Roof laid |
-
latitude : 26.30817833333333
Longitude : 90.76442
file name : Image_05092024172956165.png
|
2024-09-05 17:30:26.167603 |
147 |
50103603 |
Const of Community Manage Sanitary Toilet at Bartari Village |
90000 |
Const of Community Manage Sanitary Toilet at Bartari Village1 |
Plinth level |
-
latitude : 26.308110000000003
Longitude : 90.76444666666666
file name : Image_05092024172706695.png
|
2024-09-05 17:27:36.658802 |
148 |
50103603 |
Const of Community Manage Sanitary Toilet at Bartari Village |
90000 |
Const of Community Manage Sanitary Toilet at Bartari Village1 |
Completion of work |
-
latitude : 26.30809
Longitude : 90.76462166666667
file name : Image_27042023120431657.png
|
2023-04-27 12:04:31.769681 |
149 |
61433647 |
Providing Drinking water Facility at GP Office Campus |
322472 |
Providing Drinking water Facility at GP Office Campus1 |
Roof laid |
-
latitude : 26.281336666666668
Longitude : 90.77922500000001
file name : Image_24082024155634287.png
|
2024-08-24 15:56:34.346179 |
150 |
61433647 |
Providing Drinking water Facility at GP Office Campus |
322472 |
Providing Drinking water Facility at GP Office Campus1 |
Plinth level |
-
latitude : 26.281363333333335
Longitude : 90.77930166666665
file name : Image_24082024155236150.png
|
2024-08-24 15:52:36.218768 |
151 |
61433647 |
Providing Drinking water Facility at GP Office Campus |
322472 |
Providing Drinking water Facility at GP Office Campus1 |
Completion of work |
-
latitude : 26.281443333333332
Longitude : 90.77913500000001
file name : Image_13102023142308106.png
|
2023-10-13 14:23:08.194864 |
152 |
61433647 |
Providing Drinking water Facility at GP Office Campus |
322472 |
Providing Drinking water Facility at GP Office Campus1 |
Completion of work |
-
latitude : 26.28144666666667
Longitude : 90.77907666666667
file name : Image_13102023141441681.png
|
2023-10-13 14:14:41.759115 |
153 |
61433647 |
Providing Drinking water Facility at GP Office Campus |
322472 |
Providing Drinking water Facility at GP Office Campus1 |
Completion of work |
-
latitude : 26.281391666666664
Longitude : 90.77903333333333
file name : Image_29042023134100184.png
|
2023-04-29 13:41:00.286385 |
154 |
61433647 |
Providing Drinking water Facility at GP Office Campus |
322472 |
Providing Drinking water Facility at GP Office Campus1 |
Completion of work |
-
latitude : 26.28141126
Longitude : 90.77917798
file name : Image_15032023124922577.png
|
2023-03-15 12:49:22.673486 |
155 |
61433647 |
Providing Drinking water Facility at GP Office Campus |
322472 |
Providing Drinking water Facility at GP Office Campus1 |
Completion of work |
-
latitude : 26.28142817
Longitude : 90.77917349
file name : Image_09022023141247749.png
|
2023-02-09 14:12:47.803037 |
156 |
50103856 |
Const of Community Manage Sanitary Toilet at Kandulia Village |
90000 |
Const of Community Manage Sanitary Toilet at Kandulia Village1 |
Roof laid |
-
latitude : 26.295706666666668
Longitude : 90.78146166666666
file name : Image_05092024164526962.png
|
2024-09-05 16:45:27.029633 |
157 |
50103856 |
Const of Community Manage Sanitary Toilet at Kandulia Village |
90000 |
Const of Community Manage Sanitary Toilet at Kandulia Village1 |
Plinth level |
-
latitude : 26.295816666666664
Longitude : 90.78163833333335
file name : Image_05092024164148570.png
|
2024-09-05 16:41:48.641343 |
158 |
50103856 |
Const of Community Manage Sanitary Toilet at Kandulia Village |
90000 |
Const of Community Manage Sanitary Toilet at Kandulia Village1 |
Completion of work |
-
latitude : 26.295536666666667
Longitude : 90.78158333333334
file name : Image_27042023174036146.png
|
2023-04-27 17:40:36.262967 |
159 |
61433734 |
Const of Culvert Approach Road with Paver Block on Aprupi MNP Road at Aprupi |
422472 |
Const of Culvert Approach Road with Paver Block on Aprupi MNP Road at Aprupi1 |
Completion of work |
-
latitude : 26.289831666666668,26.289858333333335
Longitude : 90.75693500000001,90.75688999999998
file name : Image_17102023105143713.png
|
2023-10-17 10:51:43.811519 |
160 |
61433734 |
Const of Culvert Approach Road with Paver Block on Aprupi MNP Road at Aprupi |
422472 |
Const of Culvert Approach Road with Paver Block on Aprupi MNP Road at Aprupi1 |
Completion of work |
-
latitude : 26.289965,26.28998
Longitude : 90.75689666666668,90.75689666666668
file name : Image_27042023125725124.png
|
2023-04-27 12:57:25.766984 |
161 |
61433734 |
Const of Culvert Approach Road with Paver Block on Aprupi MNP Road at Aprupi |
422472 |
Const of Culvert Approach Road with Paver Block on Aprupi MNP Road at Aprupi1 |
Completion of work |
-
latitude : 26.28974235,26.28974779
Longitude : 90.75685281,90.75685688
file name : Image_16032023121343648.png
|
2023-03-16 12:13:43.718976 |
162 |
61433734 |
Const of Culvert Approach Road with Paver Block on Aprupi MNP Road at Aprupi |
422472 |
Const of Culvert Approach Road with Paver Block on Aprupi MNP Road at Aprupi1 |
Completion of work |
-
latitude : 26.28943603,26.28945098
Longitude : 90.7569055,90.75691652
file name : Image_14022023125809865.png
|
2023-02-14 12:58:09.973047 |
163 |
61433686 |
Const of Paver Block Road from Bartari Bridge Par Bazar to South side |
500000 |
Const of Paver Block Road from Bartari Bridge Par Bazar to South side 1 |
Roof laid |
-
latitude : 26.306058333333333,26.3059797
Longitude : 90.75530333333333,90.7554585
file name : Image_01092024164645343.png
|
2024-09-01 16:46:46.019523 |
164 |
61433686 |
Const of Paver Block Road from Bartari Bridge Par Bazar to South side |
500000 |
Const of Paver Block Road from Bartari Bridge Par Bazar to South side 1 |
Plinth level |
-
latitude : 26.3059758,26.306
Longitude : 90.7554561,90.75544
file name : Image_01092024164235791.png
|
2024-09-01 16:42:36.415668 |
165 |
61433686 |
Const of Paver Block Road from Bartari Bridge Par Bazar to South side |
500000 |
Const of Paver Block Road from Bartari Bridge Par Bazar to South side 1 |
Completion of work |
-
latitude : 26.306055,26.306055
Longitude : 90.75535666666669,90.75535666666669
file name : Image_28052023175831766.png
|
2023-05-28 17:58:31.837475 |
166 |
61433686 |
Const of Paver Block Road from Bartari Bridge Par Bazar to South side |
500000 |
Const of Paver Block Road from Bartari Bridge Par Bazar to South side 1 |
Completion of work |
-
latitude : 26.30608833333333,26.30609833333333
Longitude : 90.75535666666669,90.75534833333334
file name : Image_27042023121151199.png
|
2023-04-27 12:11:51.334689 |
167 |
61433686 |
Const of Paver Block Road from Bartari Bridge Par Bazar to South side |
500000 |
Const of Paver Block Road from Bartari Bridge Par Bazar to South side 1 |
Completion of work |
-
latitude : 26.30597111,26.30602969
Longitude : 90.75528485,90.75532683
file name : Image_14022023122310356.png
|
2023-02-14 12:23:10.452966 |
168 |
61433667 |
Providing Drinking water Facility at Dakshin Barbhitha Tiniali Chowk |
300000 |
Providing Drinking water Facility at Dakshin Barbhitha Tiniali Chowk1 |
Roof laid |
-
latitude : 26.27190166666667
Longitude : 90.77656833333334
file name : Image_01092024132928957.png
|
2024-09-01 13:29:29.392272 |
169 |
61433667 |
Providing Drinking water Facility at Dakshin Barbhitha Tiniali Chowk |
300000 |
Providing Drinking water Facility at Dakshin Barbhitha Tiniali Chowk1 |
Plinth level |
-
latitude : 26.27193333333333
Longitude : 90.77652666666667
file name : Image_01092024132622985.png
|
2024-09-01 13:26:23.394032 |
170 |
61433667 |
Providing Drinking water Facility at Dakshin Barbhitha Tiniali Chowk |
300000 |
Providing Drinking water Facility at Dakshin Barbhitha Tiniali Chowk1 |
Completion of work |
-
latitude : 26.27181
Longitude : 90.77653000000001
file name : Image_27042023155516038.png
|
2023-04-27 15:55:16.190501 |
171 |
61433667 |
Providing Drinking water Facility at Dakshin Barbhitha Tiniali Chowk |
300000 |
Providing Drinking water Facility at Dakshin Barbhitha Tiniali Chowk1 |
Completion of work |
-
latitude : 26.27176314
Longitude : 90.77648634
file name : Image_15032023110504691.png
|
2023-03-15 11:05:04.766478 |
172 |
67028160 |
Construction of Community Sanitary Complex |
267900 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.28095166666667
Longitude : 90.77913500000001
file name : Image_24082024170734052.png
|
2024-08-24 17:07:34.111799 |
173 |
67028160 |
Construction of Community Sanitary Complex |
267900 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.280966666666668
Longitude : 90.77908666666666
file name : Image_24082024170429225.png
|
2024-08-24 17:04:29.287873 |
174 |
67028160 |
Construction of Community Sanitary Complex |
267900 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.280928333333335
Longitude : 90.779095
file name : Image_31052023112055038.png
|
2023-05-31 11:20:55.138617 |
175 |
68752041 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.285431666666668
Longitude : 90.75430666666668
file name : Image_02092024172340893.png
|
2024-09-02 17:23:41.251935 |
176 |
68752041 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.285536666666665
Longitude : 90.75437666666667
file name : Image_02092024171932625.png
|
2024-09-02 17:19:32.92862 |
177 |
68752041 |
Creation of Shed for segregation and processing of wet and dry waste |
9697 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.285456666666665
Longitude : 90.75435
file name : Image_27042023125828129.png
|
2023-04-27 12:58:29.327554 |
178 |
68752465 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.280871666666666
Longitude : 90.779075
file name : Image_24082024171829005.png
|
2024-08-24 17:18:29.093122 |
179 |
68752465 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.280868333333334
Longitude : 90.77911833333334
file name : Image_24082024171556963.png
|
2024-08-24 17:15:57.025745 |
180 |
68752465 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.280798333333337
Longitude : 90.77906499999999
file name : Image_28052023172954024.png
|
2023-05-28 17:29:54.163325 |
181 |
68752465 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.28076262
Longitude : 90.77909446
file name : Image_26042023124143121.png
|
2023-04-26 12:41:43.242583 |
182 |
67028145 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.305753333333335
Longitude : 90.75645333333333
file name : Image_01092024165536901.png
|
2024-09-01 16:55:37.689464 |
183 |
67028145 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.30573
Longitude : 90.75551333333333
file name : Image_01092024165210703.png
|
2024-09-01 16:52:11.462356 |
184 |
67028145 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.30559333333333
Longitude : 90.75556666666668
file name : Image_31052023095525064.png
|
2023-05-31 09:55:25.157229 |
185 |
67028490 |
Construction of cross drainage on the road of Jakir Hussain B.Sc house near Billal Hussain House |
300000 |
Construction of cross drainage on the road of Jakir Hussain B.Sc house near Billal Hussain House1 |
Roof laid |
-
latitude : 26.28146166666667,26.281408333333335
Longitude : 90.79199666666666,90.79195333333334
file name : Image_01092024114821414.png
|
2024-09-01 11:48:22.121371 |
186 |
67028490 |
Construction of cross drainage on the road of Jakir Hussain B.Sc house near Billal Hussain House |
300000 |
Construction of cross drainage on the road of Jakir Hussain B.Sc house near Billal Hussain House1 |
Plinth level |
-
latitude : 26.281225000000003,26.281420000000004
Longitude : 90.79204166666665,90.79198333333333
file name : Image_01092024114226645.png
|
2024-09-01 11:42:27.279113 |
187 |
67028490 |
Construction of cross drainage on the road of Jakir Hussain B.Sc house near Billal Hussain House |
300000 |
Construction of cross drainage on the road of Jakir Hussain B.Sc house near Billal Hussain House1 |
Completion of work |
-
latitude : 26.28137483,26.28138298
Longitude : 90.79182071,90.791858
file name : Image_17042023124506173.png
|
2023-04-17 12:45:06.230986 |
188 |
67028497 |
Const of Cross drainage on the road of A Sattar House to Amzad Ali House |
159050 |
Const of Cross drainage on the road of A Sattar House to Amzad Ali House1 |
Completion of work |
-
latitude : 26.27679861,26.27679142
Longitude : 90.77252289,90.77250612
file name : Image_12042023145229547.png
|
2023-04-12 14:52:29.690079 |
189 |
50103754 |
Const of Community Manage Sanitary Toilet at Chandmama Pather Village |
90000 |
Const of Community Manage Sanitary Toilet at Chandmama Pather Village1 |
Completion of work |
-
latitude : 26.27996
Longitude : 90.75992333333333
file name : Image_09112024082924117.png
|
2024-11-09 08:29:24.105323 |
190 |
50103503 |
Const of Community Manage Sanitary Toilet at Barbhitha Village |
90000 |
Const of Community Manage Sanitary Toilet at Barbhitha Village1 |
Completion of work |
-
latitude : 26.279856666666667
Longitude : 90.75983666666667
file name : Image_09112024083450805.png
|
2024-11-09 08:34:50.862025 |
191 |
50103413 |
Const of Community Manage Sanitary Toilet at Aprupi Village |
90000 |
Const of Community Manage Sanitary Toilet at Aprupi Village1 |
Completion of work |
-
latitude : 26.280041666666662
Longitude : 90.75988666666666
file name : Image_09112024083447757.png
|
2024-11-09 08:34:47.813665 |