1 |
5428536 |
extension of nathghar |
200000 |
Cultural Stage1 |
25% |
-

latitude : 26.41434627
Longitude : 90.71271725
file name : Image_02032019164939861.png
|
2019-03-02 16:49:39.696631 |
2 |
5428455 |
const. of nathghar |
400000 |
Cultural Stage1 |
25% |
-

latitude : 26.48666184
Longitude : 90.64115123
file name : Image_01032019152413269.png
|
2019-03-01 15:24:13.331811 |
3 |
5428455 |
const. of nathghar |
400000 |
Cultural Stage1 |
25% |
-

latitude : 26.43103037
Longitude : 90.67066616
file name : Image_02032019155955937.png
|
2019-03-02 15:59:55.704339 |
4 |
12676989 |
Const. of Culvert Hume pipe from 31 No NH Kurshakata LP School via Tolob Barman house at 2Garugaon |
400000 |
Const. of Culvert Hume pipe from 31 No NH Kurshakata LP School via Tolob Barman house at 2Garugaon1 |
Substructure below GL |
-

latitude : 26.463526666666667,26.46355
Longitude : 90.64949333333334,90.64948000000001
file name : Image_06112020081520578.png
|
2020-11-06 08:15:22.006768 |
5 |
12676989 |
Const. of Culvert Hume pipe from 31 No NH Kurshakata LP School via Tolob Barman house at 2Garugaon |
400000 |
Const. of Culvert Hume pipe from 31 No NH Kurshakata LP School via Tolob Barman house at 2Garugaon1 |
Substructure below GL |
-

latitude : 26.463559999999998,26.463514999999997
Longitude : 90.64955499999999,90.64957166666666
file name : Image_22112020100256541.png
|
2020-11-22 10:02:56.608202 |
6 |
37957337 |
Const of Public Toilet near Botguri High School at Briddabashi |
200000 |
Const of Public Toilet near Botguri High School at Briddabashi1 |
25% |
-

latitude : 26.419178333333335
Longitude : 90.70140166666667
file name : Image_06112020081116458.png
|
2020-11-06 08:11:17.894313 |
7 |
37957337 |
Const of Public Toilet near Botguri High School at Briddabashi |
200000 |
Const of Public Toilet near Botguri High School at Briddabashi1 |
25% |
-

latitude : 26.419179999999997
Longitude : 90.70133333333334
file name : Image_26112020060613611.png
|
2020-11-26 06:06:13.653403 |
8 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area26 |
25% |
-

latitude : 26.48340166666667
Longitude : 90.638485
file name : Image_18112020090618625.png
|
2020-11-18 09:06:18.67853 |
9 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area27 |
25% |
-

latitude : 26.482171666666666
Longitude : 90.63941166666667
file name : Image_18112020090611464.png
|
2020-11-18 09:06:11.515631 |
10 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area28 |
25% |
-

latitude : 26.48535
Longitude : 90.64053
file name : Image_18112020090604362.png
|
2020-11-18 09:06:04.416943 |
11 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area29 |
25% |
-

latitude : 26.486833333333333
Longitude : 90.64108166666668
file name : Image_18112020090551351.png
|
2020-11-18 09:05:51.408982 |
12 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area30 |
25% |
-

latitude : 26.483596666666667
Longitude : 90.63952666666667
file name : Image_18112020090541207.png
|
2020-11-18 09:05:41.271174 |
13 |
37957135 |
Const of CC Block Rd from Shukcharan barman house to Pandibari Kalimandir at hapachara East |
700000 |
Const of CC Block Rd from Shukcharan barman house to Pandibari Kalimandir at hapachara East1 |
Earth Work |
-

latitude : 26.48621166666667,26.486218333333333
Longitude : 90.63927666666665,90.63928166666668
file name : Image_07112020071816195.png
|
2020-11-07 07:18:18.092027 |
14 |
37957135 |
Const of CC Block Rd from Shukcharan barman house to Pandibari Kalimandir at hapachara East |
700000 |
Const of CC Block Rd from Shukcharan barman house to Pandibari Kalimandir at hapachara East1 |
Earth Work |
-

latitude : 26.486133333333335,26.48621166666667
Longitude : 90.63932666666666,90.63935833333335
file name : Image_07112020071809295.png
|
2020-11-07 07:18:11.1957 |
15 |
37957135 |
Const of CC Block Rd from Shukcharan barman house to Pandibari Kalimandir at hapachara East |
700000 |
Const of CC Block Rd from Shukcharan barman house to Pandibari Kalimandir at hapachara East1 |
Earth Work |
-

latitude : 26.48714166666667,26.487191666666664
Longitude : 90.63943333333333,90.63945666666665
file name : Image_18112020090545813.png
|
2020-11-18 09:05:45.885373 |
16 |
37568302 |
Const of HP Culvert Abdul Mannaf house at 3No Jaraguri |
200000 |
Const of HP Culvert Abdul Mannaf house at 3No Jaraguri1 |
Substructure below GL |
-

latitude : 26.432471666666668,26.432493333333333
Longitude : 90.67430666666665,90.67430833333334
file name : Image_26112020060539112.png
|
2020-11-26 06:05:39.172716 |
17 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area3 |
25% |
-

latitude : 26.414570000000005
Longitude : 90.71237
file name : Image_06112020081145282.png
|
2020-11-06 08:11:46.751375 |
18 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area5 |
25% |
-

latitude : 26.415304999999996
Longitude : 90.71127333333334
file name : Image_06112020081157927.png
|
2020-11-06 08:11:59.36245 |
19 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area6 |
25% |
-

latitude : 26.416234999999997
Longitude : 90.712435
file name : Image_06112020081516763.png
|
2020-11-06 08:15:18.197508 |
20 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area9 |
25% |
-

latitude : 26.434123333333332
Longitude : 90.67023833333333
file name : Image_07112020071853151.png
|
2020-11-07 07:18:55.064842 |
21 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area13 |
25% |
-

latitude : 26.416436666666662
Longitude : 90.71236166666668
file name : Image_06122020101054160.png
|
2020-12-06 10:10:54.214398 |
22 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area14 |
25% |
-

latitude : 26.415923333333332
Longitude : 90.70125166666666
file name : Image_06122020101023443.png
|
2020-12-06 10:10:23.495356 |
23 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area14 |
25% |
-

latitude : 26.415923333333332
Longitude : 90.70125166666666
file name : Image_06122020101141266.png
|
2020-12-06 10:11:41.31594 |
24 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area19 |
25% |
-

latitude : 26.415271666666666
Longitude : 90.71128166666668
file name : Image_26112020060706375.png
|
2020-11-26 06:07:06.419906 |
25 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area19 |
25% |
-

latitude : 26.414445
Longitude : 90.71252166666666
file name : Image_26112020060651102.png
|
2020-11-26 06:06:51.14746 |
26 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area20 |
25% |
-

latitude : 26.418461666666666
Longitude : 90.69829999999999
file name : Image_26112020060638642.png
|
2020-11-26 06:06:38.688347 |
27 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area20 |
25% |
-

latitude : 26.423811666666666
Longitude : 90.70024166666666
file name : Image_26112020060632138.png
|
2020-11-26 06:06:32.183374 |
28 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area21 |
25% |
-

latitude : 26.42318833333333
Longitude : 90.70191333333332
file name : Image_26112020060624330.png
|
2020-11-26 06:06:24.378127 |
29 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area22 |
25% |
-

latitude : 26.418043333333337
Longitude : 90.70214833333333
file name : Image_26112020060608057.png
|
2020-11-26 06:06:08.104922 |
30 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area23 |
25% |
-

latitude : 26.471071666666663
Longitude : 90.64796
file name : Image_20112020082901169.png
|
2020-11-20 08:29:01.240204 |
31 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area23 |
25% |
-

latitude : 26.471071666666663
Longitude : 90.64796
file name : Image_20112020082731713.png
|
2020-11-20 08:27:31.777645 |
32 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area23 |
25% |
-

latitude : 26.41683666666667
Longitude : 90.70014666666665
file name : Image_26112020060555753.png
|
2020-11-26 06:05:55.823425 |
33 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area24 |
25% |
-

latitude : 26.470760000000002
Longitude : 90.6436
file name : Image_20112020082646076.png
|
2020-11-20 08:26:46.137752 |
34 |
37958425 |
Street Light at Hapachara GP area |
788946 |
Street Light at Hapachara GP area25 |
25% |
-

latitude : 26.486631666666668
Longitude : 90.63741333333334
file name : Image_18112020090628202.png
|
2020-11-18 09:06:28.258268 |
35 |
37957498 |
Const of CCB Rd from PMG Rd to Meser ali house at Dankinamari |
774000 |
Const of CCB Rd from PMG Rd to Meser ali house at Dankinamari1 |
Earth Work |
-

latitude : 26.492608333333337,26.492695000000005
Longitude : 90.63912333333334,90.63906999999999
file name : Image_06112020081109943.png
|
2020-11-06 08:11:11.386749 |
36 |
37957498 |
Const of CCB Rd from PMG Rd to Meser ali house at Dankinamari |
774000 |
Const of CCB Rd from PMG Rd to Meser ali house at Dankinamari1 |
Earth Work |
-

latitude : 26.492698333333337,26.49260333333333
Longitude : 90.63907166666668,90.63907499999999
file name : Image_20112020082926683.png
|
2020-11-20 08:29:26.741531 |
37 |
37957498 |
Const of CCB Rd from PMG Rd to Meser ali house at Dankinamari |
774000 |
Const of CCB Rd from PMG Rd to Meser ali house at Dankinamari1 |
Earth Work |
-

latitude : 26.492698333333337,26.49260333333333
Longitude : 90.63907166666668,90.63907499999999
file name : Image_20112020082805160.png
|
2020-11-20 08:28:05.213011 |
38 |
12677003 |
Const. of Culvert near Giyanpith ME School at 2 No Garugaon Village |
300000 |
Const. of Culvert near Giyanpith ME School at 2 No Garugaon Village1 |
Substructure below GL |
-

latitude : 26.458441666666666,26.458475
Longitude : 90.65155166666666,90.65152166666667
file name : Image_06112020081357153.png
|
2020-11-06 08:13:58.62585 |
39 |
37565983 |
Const of HP Culvert near Soban Ali house at 2No Jaraguri |
234840 |
Const of HP Culvert near Soban Ali house at 2No Jaraguri1 |
Substructure below GL |
-

latitude : 26.43566333333333,26.435578333333336
Longitude : 90.66875499999999,90.66874000000001
file name : Image_12122020065817260.png
|
2020-12-12 06:58:17.358116 |
40 |
37565460 |
Const of CCB Rd from 31No NH near MV School to Aie River |
500000 |
Const of CCB Rd from 31No NH near MV School to Aie River1 |
Earth Work |
-

latitude : 26.474913333333333,26.474901666666664
Longitude : 90.63894333333334,90.63894499999999
file name : Image_03122020075342400.png
|
2020-12-03 07:53:42.477627 |
41 |
37566500 |
Const of HP Culvert near Samesuddin house at 2No Jaraguri |
200000 |
Const of HP Culvert near Samesuddin house at 2No Jaraguri 1 |
25% |
-

latitude : 26.434354999999996,26.434414999999998
Longitude : 90.67217666666666,90.67218833333332
file name : Image_12122020065837678.png
|
2020-12-12 06:58:37.783152 |
42 |
37566500 |
Const of HP Culvert near Samesuddin house at 2No Jaraguri |
200000 |
Const of HP Culvert near Samesuddin house at 2No Jaraguri 1 |
Substructure below GL |
-

latitude : 26.43440666666667,26.43434666666667
Longitude : 90.67217833333333,90.67209166666667
file name : Image_26112020060533183.png
|
2020-11-26 06:05:33.286388 |
43 |
37566891 |
Const of RCC Cannel from Sangsar Ali house to Hasen Ali house at 3No Jaraguri |
1450000 |
Const of RCC Cannel from Sangsar Ali house to Hasen Ali house at 3No Jaraguri1 |
25% |
-

latitude : 26.430106666666667,26.430086666666664
Longitude : 90.67290999999999,90.67297333333333
file name : Image_26112020060544666.png
|
2020-11-26 06:05:44.719856 |
44 |
37567084 |
Const of Young Club new building with toilet at Dankinamari |
529336 |
Const of Young Club new building with toilet at Dankinamari 1 |
25% |
-

latitude : 26.491368333333337
Longitude : 90.63387666666668
file name : Image_18122020085057557.png
|
2020-12-18 08:50:57.642849 |
45 |
37567084 |
Const of Young Club new building with toilet at Dankinamari |
529336 |
Const of Young Club new building with toilet at Dankinamari 1 |
25% |
-

latitude : 26.491411666666668
Longitude : 90.63384166666668
file name : Image_02012021151545859.png
|
2021-01-02 15:15:45.922729 |
46 |
37567084 |
Const of Young Club new building with toilet at Dankinamari |
529336 |
Const of Young Club new building with toilet at Dankinamari 1 |
25% |
-

latitude : 26.491413333333337
Longitude : 90.63385000000001
file name : Image_12032021051649076.png
|
2021-03-12 05:16:49.233322 |
47 |
37568452 |
Const of RCC Box Culvert near Saidur Rahman house at 3No Nachanguri |
300000 |
Const of RCC Box Culvert near Saidur Rahman house at 3No Nachanguri1 |
Substructure below GL |
-

latitude : 26.459076666666668,26.45901333333334
Longitude : 90.65562666666668,90.655615
file name : Image_08122020121150488.png
|
2020-12-08 12:11:50.544015 |
48 |
37565707 |
Const of Public Toilet at 2No Garugaon Anganwadi Centre |
200000 |
Const of Public Toilet at 2No Garugaon Anganwadi Centre1 |
25% |
-

latitude : 26.466398333333338
Longitude : 90.65127333333334
file name : Image_06122020101045568.png
|
2020-12-06 10:10:45.630923 |
49 |
37565707 |
Const of Public Toilet at 2No Garugaon Anganwadi Centre |
200000 |
Const of Public Toilet at 2No Garugaon Anganwadi Centre1 |
25% |
-

latitude : 26.466428333333337
Longitude : 90.65127666666667
file name : Image_22112020100236224.png
|
2020-11-22 10:02:36.261723 |
50 |
23266683 |
Const. of Cannel |
1000000 |
Const. of Cannel1 |
Grounding |
-

latitude : 26.436040000000002,26.43607666666667
Longitude : 90.66961500000001,90.66960166666668
file name : Image_18122020085102183.png
|
2020-12-18 08:51:02.313567 |
51 |
43962525 |
Extention of Cannel from Kapin Ray house to Srijangram G.P area. |
500000 |
Extention of Cannel from Kapin Ray house to Srijangram G.P area.1 |
25% |
-

latitude : 26.414043333333332,26.41398333333333
Longitude : 90.71208666666668,90.71218166666668
file name : Image_25012021134704325.png
|
2021-01-25 13:47:04.427791 |
52 |
43962525 |
Extention of Cannel from Kapin Ray house to Srijangram G.P area. |
500000 |
Extention of Cannel from Kapin Ray house to Srijangram G.P area.1 |
25% |
-

latitude : 26.413953333333332,26.413988333333336
Longitude : 90.71211166666666,90.71213333333331
file name : Image_07022021184947421.png
|
2021-02-07 18:49:47.523312 |
53 |
43962525 |
Extention of Cannel from Kapin Ray house to Srijangram G.P area. |
500000 |
Extention of Cannel from Kapin Ray house to Srijangram G.P area.1 |
Completed |
-

latitude : 26.413958333333333,26.413995
Longitude : 90.71231166666666,90.71225000000001
file name : Image_06082021092559988.png
|
2021-08-06 09:26:00.094837 |
54 |
43962754 |
Const.of RCC Box culvert at Bridhabashi near Shyyma Prasad Ray house. |
250000 |
Const.of RCC Box culvert at Bridhabashi near Shyyma Prasad Ray house.1 |
Substructure below GL |
-

latitude : 26.415911666666663,26.415911666666663
Longitude : 90.70134666666667,90.70133833333333
file name : Image_07022021185017160.png
|
2021-02-07 18:50:17.261814 |
55 |
23164949 |
Const of C C Block Road from 31 No.NH Hapachara Bazar to Aie River. |
1400000 |
Const of C C Block Road from 31 No.NH Hapachara Bazar to Aie River.1 |
Earth Work |
-

latitude : 26.473295,26.47328
Longitude : 90.63989500000001,90.63978166666666
file name : Image_03122020075331493.png
|
2020-12-03 07:53:31.566299 |
56 |
23164299 |
Const. of C C Block Basudev Barman house to Pundibari Kalim Mondir |
595570 |
Const. of C C Block Basudev Barman house to Pundibari Kalim Mondir 1 |
Earth Work |
-

latitude : 26.486281666666667,26.486335
Longitude : 90.63946499999999,90.63947000000002
file name : Image_03122020075311853.png
|
2020-12-03 07:53:11.943302 |
57 |
23164299 |
Const. of C C Block Basudev Barman house to Pundibari Kalim Mondir |
595570 |
Const. of C C Block Basudev Barman house to Pundibari Kalim Mondir 1 |
Earth Work |
-

latitude : 26.48626,26.48621166666667
Longitude : 90.639475,90.63956666666667
file name : Image_31012021193018611.png
|
2021-01-31 19:30:18.70601 |
58 |
23163228 |
Const. of CC Block |
1407570 |
Const. of CC Block 1 |
Earth Work |
-

latitude : 26.470601666666667,26.47061833333333
Longitude : 90.64272666666666,90.64269666666665
file name : Image_03122020075322644.png
|
2020-12-03 07:53:22.719213 |
59 |
48448143 |
const of new building nath ghar lakhi mandir at biddhabashi |
400000 |
const of new building nath ghar lakhi mandir at biddhabashi1 |
50% |
-

latitude : 26.42352
Longitude : 90.70047166666667
file name : Image_12032021051655665.png
|
2021-03-12 05:16:55.781037 |
60 |
14255812 |
Const of GP Gate at hapachara gp office |
200000 |
Const of GP Gate at hapachara gp office1 |
In Progress |
-

latitude : 26.4358167
Longitude : 90.6708103
file name : Image_03022021142126736.png
|
2021-02-03 14:21:26.845954 |
61 |
21016453 |
Ext. Of CC Block from sultan Ali house to rakible Islam house at 2 no jaraguri |
700000 |
Ext. Of CC Block from sultan Ali house to rakible Islam house at 2 no jaraguri1 |
GSB |
-

latitude : 26.434905000000004,26.43492666666667
Longitude : 90.66875666666668,90.66873333333334
file name : Image_11022021083753582.png
|
2021-02-11 08:37:53.696248 |
62 |
43962799 |
Const.of Cycle stand at Hapachara GP office campus |
200000 |
Const.of Cycle stand at Hapachara GP office campus1 |
Stage 1 |
-

latitude : 26.4358161
Longitude : 90.6708103
file name : Image_03022021142132247.png
|
2021-02-03 14:21:32.343481 |
63 |
23162619 |
Const. of C C Block Road from sakmal SK house to Fulbabu SK house at 3 No Jaraguri . |
1000000 |
Const. of C C Block Road from sakmal SK house to Fulbabu SK house at 3 No Jaraguri .1 |
Earth Work |
-

latitude : 26.43260833333333,26.43250666666667
Longitude : 90.671085,90.67108666666667
file name : Image_18122020085108047.png
|
2020-12-18 08:51:08.146474 |
64 |
23268218 |
Const.of RCC Box culvert at Bridhabashi near Suresh Arjya house. |
250000 |
Const.of RCC Box culvert at Bridhabashi near Suresh Arjya house.1 |
Substructure below GL |
-

latitude : 26.421524999999995,26.421496666666666
Longitude : 90.69957333333332,90.69951999999999
file name : Image_06122020101034536.png
|
2020-12-06 10:10:34.582615 |
65 |
23268218 |
Const.of RCC Box culvert at Bridhabashi near Suresh Arjya house. |
250000 |
Const.of RCC Box culvert at Bridhabashi near Suresh Arjya house.1 |
Substructure below GL |
-

latitude : 26.415906666666668,26.415846666666667
Longitude : 90.70128000000001,90.70128000000001
file name : Image_06122020101108403.png
|
2020-12-06 10:11:08.450869 |
66 |
23268218 |
Const.of RCC Box culvert at Bridhabashi near Suresh Arjya house. |
250000 |
Const.of RCC Box culvert at Bridhabashi near Suresh Arjya house.1 |
Substructure below GL |
-

latitude : 26.415906666666668,26.415846666666667
Longitude : 90.70128000000001,90.70128000000001
file name : Image_06122020101017830.png
|
2020-12-06 10:10:17.886927 |
67 |
23264295 |
Const. of Market shed at Jaraguri bazar under FFC for the year 2019-20. |
400000 |
Const. of Market shed at Jaraguri bazar under FFC for the year 2019-20.1 |
25% |
-

latitude : 26.435188333333333
Longitude : 90.67042000000001
file name : Image_03022021142137638.png
|
2021-02-03 14:21:37.741568 |
68 |
23264295 |
Const. of Market shed at Jaraguri bazar under FFC for the year 2019-20. |
400000 |
Const. of Market shed at Jaraguri bazar under FFC for the year 2019-20.1 |
25% |
-

latitude : 26.435858333333332
Longitude : 90.67084000000001
file name : Image_06012021083443077.png
|
2021-01-06 08:34:43.14946 |
69 |
37568016 |
Const of Necessary Hume Pipe near Braja Medhi MV School at Chakrashila |
150000 |
Const of Necessary Hume Pipe near Braja Medhi MV School at Chakrashila1 |
Substructure below GL |
-

latitude : 26.414438333333337,26.414468333333335
Longitude : 90.71259,90.71251833333332
file name : Image_06122020100921462.png
|
2020-12-06 10:09:21.506509 |
70 |
37568016 |
Const of Necessary Hume Pipe near Braja Medhi MV School at Chakrashila |
150000 |
Const of Necessary Hume Pipe near Braja Medhi MV School at Chakrashila1 |
Substructure below GL |
-

latitude : 26.413940000000004,26.41398333333333
Longitude : 90.71211,90.71211166666666
file name : Image_07022021184956005.png
|
2021-02-07 18:49:56.119042 |
71 |
37568016 |
Const of Necessary Hume Pipe near Braja Medhi MV School at Chakrashila |
150000 |
Const of Necessary Hume Pipe near Braja Medhi MV School at Chakrashila1 |
Substructure below GL |
-

latitude : 26.41453,26.414438333333337
Longitude : 90.71247,90.71251833333332
file name : Image_06082021092506969.png
|
2021-08-06 09:25:07.067252 |
72 |
37568156 |
Const of Necessary Hume Pipe near Lakhi Kanta house at Chakrashila |
150000 |
Const of Necessary Hume Pipe near Lakhi Kanta house at Chakrashila1 |
50% |
-

latitude : 26.414445,26.414416666666664
Longitude : 90.71252833333334,90.71264333333332
file name : Image_07022021185005899.png
|
2021-02-07 18:50:06.004942 |
73 |
37568156 |
Const of Necessary Hume Pipe near Lakhi Kanta house at Chakrashila |
150000 |
Const of Necessary Hume Pipe near Lakhi Kanta house at Chakrashila1 |
50% |
-

latitude : 26.414,26.414
Longitude : 90.71218500000002,90.71218500000002
file name : Image_06082021092532176.png
|
2021-08-06 09:25:32.282373 |
74 |
37565781 |
Const of Public Toilet near Lakhi Mandir at Chakrashila |
200000 |
Const of Public Toilet near Lakhi Mandir at Chakrashila1 |
25% |
-

latitude : 26.413483333333335
Longitude : 90.71328666666668
file name : Image_06122020100902179.png
|
2020-12-06 10:09:02.224913 |
75 |
37565781 |
Const of Public Toilet near Lakhi Mandir at Chakrashila |
200000 |
Const of Public Toilet near Lakhi Mandir at Chakrashila1 |
25% |
-

latitude : 26.414446666666663
Longitude : 90.71284499999999
file name : Image_07022021185010683.png
|
2021-02-07 18:50:10.787406 |
76 |
37956982 |
Const of CC Box Culvert Gour Arjya house to Katuribari LP School at Briddabashi |
300000 |
Const of CC Box Culvert Gour Arjya house to Katuribari LP School at Briddabashi1 |
Substructure below GL |
-

latitude : 26.41674666666667,26.416786666666667
Longitude : 90.70012999999999,90.70011833333335
file name : Image_06122020101201823.png
|
2020-12-06 10:12:01.87221 |
77 |
37956982 |
Const of CC Box Culvert Gour Arjya house to Katuribari LP School at Briddabashi |
300000 |
Const of CC Box Culvert Gour Arjya house to Katuribari LP School at Briddabashi1 |
Substructure below GL |
-

latitude : 26.41674666666667,26.416786666666667
Longitude : 90.70012999999999,90.70011833333335
file name : Image_06122020101028955.png
|
2020-12-06 10:10:29.007733 |
78 |
37956982 |
Const of CC Box Culvert Gour Arjya house to Katuribari LP School at Briddabashi |
300000 |
Const of CC Box Culvert Gour Arjya house to Katuribari LP School at Briddabashi1 |
Substructure below GL |
-

latitude : 26.41683833333333,26.416816666666666
Longitude : 90.70016499999998,90.70011500000001
file name : Image_06112020081132445.png
|
2020-11-06 08:11:33.873688 |
79 |
37956982 |
Const of CC Box Culvert Gour Arjya house to Katuribari LP School at Briddabashi |
300000 |
Const of CC Box Culvert Gour Arjya house to Katuribari LP School at Briddabashi1 |
Substructure below GL |
-

latitude : 26.41679166666667,26.41676166666667
Longitude : 90.70026333333333,90.70019333333333
file name : Image_26112020060550698.png
|
2020-11-26 06:05:50.759148 |
80 |
47832098 |
Const of Community Hall near Chakrashila fiel;d at Chakrashila village |
700000 |
Const of Community Hall near Chakrashila fiel;d at Chakrashila village1 |
25% |
-

latitude : 26.413935
Longitude : 90.71282166666667
file name : Image_07022021184940886.png
|
2021-02-07 18:49:41.002315 |
81 |
47832098 |
Const of Community Hall near Chakrashila fiel;d at Chakrashila village |
700000 |
Const of Community Hall near Chakrashila fiel;d at Chakrashila village1 |
50% |
-

latitude : 26.413926666666665
Longitude : 90.71306666666666
file name : Image_06082021092440661.png
|
2021-08-06 09:24:40.760043 |
82 |
12676852 |
Const. of CCb Road from 31 no NH To Bolen Rabha house at Hapachara West. |
700000 |
Const. of CCb Road from 31 no NH To Bolen Rabha house at Hapachara West.1 |
Earth Work |
-

latitude : 26.47507666666667,26.475056666666667
Longitude : 90.63854833333335,90.63854
file name : Image_07112020071913071.png
|
2020-11-07 07:19:14.990722 |
83 |
12676852 |
Const. of CCb Road from 31 no NH To Bolen Rabha house at Hapachara West. |
700000 |
Const. of CCb Road from 31 no NH To Bolen Rabha house at Hapachara West.1 |
Earth Work |
-

latitude : 26.475101666666667,26.47510333333333
Longitude : 90.63848333333333,90.63847833333332
file name : Image_20112020082919224.png
|
2020-11-20 08:29:19.290348 |
84 |
12676852 |
Const. of CCb Road from 31 no NH To Bolen Rabha house at Hapachara West. |
700000 |
Const. of CCb Road from 31 no NH To Bolen Rabha house at Hapachara West.1 |
Earth Work |
-

latitude : 26.475101666666667,26.47510333333333
Longitude : 90.63848333333333,90.63847833333332
file name : Image_20112020082751568.png
|
2020-11-20 08:27:51.632905 |
85 |
14267627 |
Repairing at Gp Office |
167051 |
Repairing at Gp Office1 |
25% |
-

latitude : 26.4359769
Longitude : 90.6708286
file name : Image_07112020071832758.png
|
2020-11-07 07:18:34.670712 |
86 |
37958054 |
Const of Cannel from Jaber Ali house to Dohima house at 3No Jaraguri |
1000000 |
Const of Cannel from Jaber Ali house to Dohima house at 3No Jaraguri1 |
25% |
-

latitude : 26.428263333333334,26.428296666666665
Longitude : 90.67294833333332,90.67294500000001
file name : Image_07112020071841240.png
|
2020-11-07 07:18:43.146101 |
87 |
37956880 |
Const of CCB Rd from Abdul Latif house to Sahar ali house at Jaraguri 2 |
500000 |
Const of CCB Rd from Abdul Latif house to Sahar ali house at Jaraguri 21 |
Earth Work |
-

latitude : 26.437056666666663,26.437058333333333
Longitude : 90.66983499999999,90.66981833333332
file name : Image_07112020071901283.png
|
2020-11-07 07:19:03.18788 |
88 |
37956880 |
Const of CCB Rd from Abdul Latif house to Sahar ali house at Jaraguri 2 |
500000 |
Const of CCB Rd from Abdul Latif house to Sahar ali house at Jaraguri 21 |
Earth Work |
-

latitude : 26.43607833333333,26.43606333333333
Longitude : 90.66970666666666,90.66968999999999
file name : Image_12122020065827008.png
|
2020-12-12 06:58:27.12713 |
89 |
37957576 |
Const of CC Block Rd from 31No NH to Rofiqul Islam house at 1No garugaon |
765000 |
Const of CC Block Rd from 31No NH to Rofiqul Islam house at 1No garugaon1 |
Earth Work |
-

latitude : 26.470611666666667,26.470625000000002
Longitude : 90.641405,90.64134666666665
file name : Image_06112020081303495.png
|
2020-11-06 08:13:04.928223 |
90 |
37957576 |
Const of CC Block Rd from 31No NH to Rofiqul Islam house at 1No garugaon |
765000 |
Const of CC Block Rd from 31No NH to Rofiqul Islam house at 1No garugaon1 |
Earth Work |
-

latitude : 26.470551666666665,26.47053166666667
Longitude : 90.64145166666667,90.64151333333332
file name : Image_20112020082607127.png
|
2020-11-20 08:26:07.181037 |
91 |
14255445 |
Const. of Cannel from Patin Ray house to Srijangram Border at chakrashila |
300000 |
Const. of Cannel from Patin Ray house to Srijangram Border at chakrashila1 |
50% |
-

latitude : 26.414246666666667,26.414268333333332
Longitude : 90.71239833333333,90.71239500000001
file name : Image_06112020081138704.png
|
2020-11-06 08:11:40.137757 |
92 |
14255445 |
Const. of Cannel from Patin Ray house to Srijangram Border at chakrashila |
300000 |
Const. of Cannel from Patin Ray house to Srijangram Border at chakrashila1 |
50% |
-

latitude : 26.41422166666667,26.414301666666667
Longitude : 90.71247,90.71252666666666
file name : Image_26112020060644714.png
|
2020-11-26 06:06:44.755564 |
93 |
12676238 |
Const. of RCC.Box Culvert from NH 31 No Road to Abdul Hai House at 3 No Nachanguri. |
1000000 |
Const. of RCC.Box Culvert from NH 31 No Road to Abdul Hai House at 3 No Nachanguri.1 |
Substructure below GL |
-

latitude : 26.450375,26.450408333333332
Longitude : 90.65693666666667,90.656935
file name : Image_06112020081455982.png
|
2020-11-06 08:14:57.429447 |
94 |
12676334 |
Const. of Street Light at Hapachara GP Area. |
652260 |
Const. of Street Light at Hapachara GP Area.1 |
25% |
-

latitude : 26.46092833333333
Longitude : 90.65563666666667
file name : Image_06112020081104172.png
|
2020-11-06 08:11:05.657482 |
95 |
12676334 |
Const. of Street Light at Hapachara GP Area. |
652260 |
Const. of Street Light at Hapachara GP Area.3 |
25% |
-

latitude : 26.46056666666667
Longitude : 90.65501166666667
file name : Image_06112020081424470.png
|
2020-11-06 08:14:25.905821 |
96 |
12676334 |
Const. of Street Light at Hapachara GP Area. |
652260 |
Const. of Street Light at Hapachara GP Area.8 |
25% |
-

latitude : 26.473331666666663
Longitude : 90.64006666666667
file name : Image_26112020060526305.png
|
2020-11-26 06:05:26.493215 |
97 |
12676334 |
Const. of Street Light at Hapachara GP Area. |
652260 |
Const. of Street Light at Hapachara GP Area.22 |
25% |
-

latitude : 26.465255000000003
Longitude : 90.65031333333333
file name : Image_22112020100247635.png
|
2020-11-22 10:02:47.716393 |
98 |
12676334 |
Const. of Street Light at Hapachara GP Area. |
652260 |
Const. of Street Light at Hapachara GP Area.28 |
25% |
-

latitude : 26.471701666666664
Longitude : 90.64628499999999
file name : Image_20112020082702202.png
|
2020-11-20 08:27:02.299432 |
99 |
12676334 |
Const. of Street Light at Hapachara GP Area. |
652260 |
Const. of Street Light at Hapachara GP Area.28 |
25% |
-

latitude : 26.471701666666664
Longitude : 90.64628499999999
file name : Image_20112020083000328.png
|
2020-11-20 08:30:00.421524 |
100 |
12676334 |
Const. of Street Light at Hapachara GP Area. |
652260 |
Const. of Street Light at Hapachara GP Area.28 |
25% |
-

latitude : 26.471701666666664
Longitude : 90.64628499999999
file name : Image_20112020082943382.png
|
2020-11-20 08:29:43.475493 |
101 |
12676334 |
Const. of Street Light at Hapachara GP Area. |
652260 |
Const. of Street Light at Hapachara GP Area.29 |
25% |
-

latitude : 26.471803333333334
Longitude : 90.64509333333332
file name : Image_20112020082654502.png
|
2020-11-20 08:26:54.568473 |
102 |
12676334 |
Const. of Street Light at Hapachara GP Area. |
652260 |
Const. of Street Light at Hapachara GP Area.30 |
25% |
-

latitude : 26.470593333333333
Longitude : 90.64151833333332
file name : Image_20112020082622343.png
|
2020-11-20 08:26:22.422311 |
103 |
12676288 |
Extension of Building at 2 no jaraguri J.B . Club at 2No Jaraguri Bazar. |
600000 |
Extension of Building at 2 no jaraguri J.B . Club at 2No Jaraguri Bazar.1 |
25% |
-

latitude : 26.436164
Longitude : 90.6701053
file name : Image_10112020060820938.png
|
2020-11-10 06:08:24.218556 |
104 |
12676288 |
Extension of Building at 2 no jaraguri J.B . Club at 2No Jaraguri Bazar. |
600000 |
Extension of Building at 2 no jaraguri J.B . Club at 2No Jaraguri Bazar.1 |
25% |
-

latitude : 26.4361639
Longitude : 90.6701051
file name : Image_10112020060811371.png
|
2020-11-10 06:08:14.695491 |
105 |
14255720 |
Drinking water at Gp Office Area (Tara Pamp) |
200000 |
Drinking water at Gp Office Area (Tara Pamp)4 |
Ground work |
-

latitude : 26.414326666666664
Longitude : 90.71288833333334
file name : Image_26112020060657933.png
|
2020-11-26 06:06:57.995246 |
106 |
14255555 |
Const. of Culvert Hume pipe from PMGY Roads Munser Ali house at Dankinamari |
200000 |
Const. of Culvert Hume pipe from PMGY Roads Munser Ali house at Dankinamari1 |
Substructure below GL |
-

latitude : 26.494160000000004,26.49416666666667
Longitude : 90.63175666666666,90.631765
file name : Image_07112020071721387.png
|
2020-11-07 07:17:23.298884 |
107 |
14255555 |
Const. of Culvert Hume pipe from PMGY Roads Munser Ali house at Dankinamari |
200000 |
Const. of Culvert Hume pipe from PMGY Roads Munser Ali house at Dankinamari1 |
Substructure below GL |
-

latitude : 26.49423,26.494235000000003
Longitude : 90.63166833333335,90.63169500000001
file name : Image_20112020083010163.png
|
2020-11-20 08:30:10.222152 |
108 |
14255555 |
Const. of Culvert Hume pipe from PMGY Roads Munser Ali house at Dankinamari |
200000 |
Const. of Culvert Hume pipe from PMGY Roads Munser Ali house at Dankinamari1 |
Substructure below GL |
-

latitude : 26.49423,26.494235000000003
Longitude : 90.63166833333335,90.63169500000001
file name : Image_20112020082934251.png
|
2020-11-20 08:29:34.311185 |
109 |
14255555 |
Const. of Culvert Hume pipe from PMGY Roads Munser Ali house at Dankinamari |
200000 |
Const. of Culvert Hume pipe from PMGY Roads Munser Ali house at Dankinamari1 |
Substructure below GL |
-

latitude : 26.49423,26.494235000000003
Longitude : 90.63166833333335,90.63169500000001
file name : Image_20112020082952553.png
|
2020-11-20 08:29:52.613202 |
110 |
14255599 |
Ext. of CC Road from Tiken Ray house to abdul Gofur house Via Mathauri Bazar. |
1000000 |
Ext. of CC Road from Tiken Ray house to abdul Gofur house Via Mathauri Bazar.1 |
Earth Work |
-

latitude : 26.4359775,26.4359775,26.4359775,26.4359775
Longitude : 90.6708294,90.6708294,90.6708294,90.6708294
file name : Image_30102020142537286.png
|
2020-10-30 14:25:37.369039 |
111 |
14255317 |
Const. of RCC Road from 31 No NH to Golap hussain house at 3no Nachanguri |
1000000 |
Const. of RCC Road from 31 No NH to Golap hussain house at 3no Nachanguri1 |
Earth Work |
-

latitude : 26.449728333333336,26.44974333333333
Longitude : 90.65661,90.65654833333335
file name : Image_06112020081508861.png
|
2020-11-06 08:15:10.300474 |
112 |
14255384 |
Const. of CC Road 31 No NH to Rakhaldubi shiv mandir at hapachara East |
400000 |
Const. of CC Road 31 No NH to Rakhaldubi shiv mandir at hapachara East1 |
Earth Work |
-

latitude : 26.485221666666668,26.485249999999997
Longitude : 90.64165833333333,90.64163666666667
file name : Image_07112020071824616.png
|
2020-11-07 07:18:26.508431 |
113 |
14255384 |
Const. of CC Road 31 No NH to Rakhaldubi shiv mandir at hapachara East |
400000 |
Const. of CC Road 31 No NH to Rakhaldubi shiv mandir at hapachara East1 |
Earth Work |
-

latitude : 26.485284999999998,26.485294999999997
Longitude : 90.64156999999999,90.64166500000002
file name : Image_18112020090556805.png
|
2020-11-18 09:05:56.884696 |
114 |
14255495 |
Const.of cannel from shiv Mandir near Krishna ray house to Lambha ray house |
200000 |
Const.of cannel from shiv Mandir near Krishna ray house to Lambha ray house1 |
25% |
-

latitude : 26.41697333333333,26.41696833333333
Longitude : 90.70177833333334,90.70177333333335
file name : Image_06112020081126625.png
|
2020-11-06 08:11:28.05611 |
115 |
14255495 |
Const.of cannel from shiv Mandir near Krishna ray house to Lambha ray house |
200000 |
Const.of cannel from shiv Mandir near Krishna ray house to Lambha ray house1 |
25% |
-

latitude : 26.416908333333335,26.416949999999996
Longitude : 90.70176333333332,90.70180166666665
file name : Image_06112020081121029.png
|
2020-11-06 08:11:22.487542 |
116 |
14255495 |
Const.of cannel from shiv Mandir near Krishna ray house to Lambha ray house |
200000 |
Const.of cannel from shiv Mandir near Krishna ray house to Lambha ray house1 |
25% |
-

latitude : 26.416946666666664,26.417003333333334
Longitude : 90.70178666666668,90.70176666666666
file name : Image_26112020060602334.png
|
2020-11-26 06:06:02.420725 |
117 |
48284263 |
const of cc block road from jagadish barman house to sanjay barman house at dankinamari |
1000000 |
const of cc block road from jagadish barman house to sanjay barman house at dankinamari1 |
Earth Work |
-

latitude : 26.488135000000003,26.488135000000003
Longitude : 90.64372499999999,90.64372499999999
file name : Image_11022021083735917.png
|
2021-02-11 08:37:36.040141 |
118 |
23269073 |
Const. of C C Block Road |
1500000 |
Const. of C C Block Road1 |
Earth Work |
-

latitude : 26.46695666666667,26.46695666666667
Longitude : 90.64555166666666,90.64555
file name : Image_06122020101049967.png
|
2020-12-06 10:10:50.0326 |
119 |
23269073 |
Const. of C C Block Road |
1500000 |
Const. of C C Block Road1 |
Earth Work |
-

latitude : 26.46695666666667,26.46695666666667
Longitude : 90.64555166666666,90.64555
file name : Image_06122020101336056.png
|
2020-12-06 10:13:36.105602 |
120 |
37567435 |
Const of Cannel from Abdul Latif house to Sahar Ali house at 2No Jaraguri |
500000 |
Const of Cannel from Abdul Latif house to Sahar Ali house at 2No Jaraguri1 |
25% |
-

latitude : 26.43563333333333,26.435683333333333
Longitude : 90.66877833333335,90.66868666666666
file name : Image_12122020065712092.png
|
2020-12-12 06:57:12.18012 |
121 |
61795851 |
INST. OF TARA PUMP AT NACHANGURI 3 L.P SCHOOL {(400 no) Election Urgent} . |
47600 |
INST. OF TARA PUMP AT NACHANGURI 3 L.P SCHOOL {(400 no) Election Urgent} .1 |
Completion of work |
-

latitude : 26.45248174
Longitude : 90.65828943
file name : Image_14072023160651225.png
|
2023-07-14 16:06:51.325621 |
122 |
87785944 |
Water Supply to villages |
846500 |
Water Supply to villages1 |
Completion of work |
-

latitude : 26.49572231
Longitude : 90.63500611
file name : Image_29082024133931022.png
|
2024-08-29 13:39:31.635348 |
123 |
67300968 |
Water Supply to villages |
786116 |
Water Supply to villages1 |
Completion of work |
-

latitude : 26.49554072
Longitude : 90.63502238
file name : Image_12042023151538450.png
|
2023-04-12 15:15:38.559049 |
124 |
67300968 |
Water Supply to villages |
786116 |
Water Supply to villages1 |
Completion of work |
-

latitude : 26.41924213
Longitude : 90.69950651
file name : Image_10042023161233378.png
|
2023-04-10 16:12:33.477547 |
125 |
67300968 |
Water Supply to villages |
786116 |
Water Supply to villages1 |
Completion of work |
-

latitude : 26.46280168
Longitude : 90.64676117
file name : Image_10042023164921711.png
|
2023-04-10 16:49:21.831603 |
126 |
67297931 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Completion of work |
-

latitude : 26.4961609
Longitude : 90.6393429
file name : Image_16102023232333202.png
|
2023-10-16 23:23:33.283484 |
127 |
67297931 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Plinth level |
-

latitude : 26.49672748
Longitude : 90.63926387
file name : Image_30122023165440687.png
|
2023-12-30 16:54:40.785846 |
128 |
67297931 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Roof laid |
-

latitude : 26.4967293
Longitude : 90.63923047
file name : Image_30122023165838295.png
|
2023-12-30 16:58:38.396895 |
129 |
67298869 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Completion of work |
-

latitude : 26.43470566
Longitude : 90.67023918
file name : Image_26072023165824874.png
|
2023-07-26 16:58:24.976212 |
130 |
67298869 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Plinth level |
-

latitude : 26.43464138
Longitude : 90.67058138
file name : Image_30122023141422461.png
|
2023-12-30 14:14:22.557668 |
131 |
67298869 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Roof laid |
-

latitude : 26.43466015
Longitude : 90.67032389
file name : Image_30122023141931443.png
|
2023-12-30 14:19:31.541187 |
132 |
67213636 |
CONST. OF OPEN FIELD STAGE AT CHAKRASILA |
937000 |
CONST. OF OPEN FIELD STAGE AT CHAKRASILA1 |
Completion of work |
-

latitude : 26.41429631
Longitude : 90.71268398
file name : Image_26032023152359778.png
|
2023-03-26 15:23:59.867246 |
133 |
67213636 |
CONST. OF OPEN FIELD STAGE AT CHAKRASILA |
937000 |
CONST. OF OPEN FIELD STAGE AT CHAKRASILA1 |
Plinth level |
-

latitude : 26.41401338
Longitude : 90.71285873
file name : Image_03112023100753541.png
|
2023-11-03 10:07:53.633809 |
134 |
67213636 |
CONST. OF OPEN FIELD STAGE AT CHAKRASILA |
937000 |
CONST. OF OPEN FIELD STAGE AT CHAKRASILA1 |
Roof laid |
-

latitude : 26.41407634
Longitude : 90.71295725
file name : Image_09122023154836479.png
|
2023-12-09 15:48:36.58294 |
135 |
61844302 |
RENOVATION OF 186 No AWC at Village Garugaon No. 2 . |
100000 |
RENOVATION OF 186 No AWC at Village Garugaon No. 2 .1 |
Completion of work |
-

latitude : 26.46642314
Longitude : 90.6513729
file name : Image_23032023134912182.png
|
2023-03-23 13:49:12.27133 |
136 |
61844302 |
RENOVATION OF 186 No AWC at Village Garugaon No. 2 . |
100000 |
RENOVATION OF 186 No AWC at Village Garugaon No. 2 .1 |
Plinth level |
-

latitude : 26.46642354
Longitude : 90.65125438
file name : Image_09112023091503300.png
|
2023-11-09 09:15:03.391682 |
137 |
61844302 |
RENOVATION OF 186 No AWC at Village Garugaon No. 2 . |
100000 |
RENOVATION OF 186 No AWC at Village Garugaon No. 2 .1 |
Roof laid |
-

latitude : 26.4663983
Longitude : 90.65130544
file name : Image_02022024161052066.png
|
2024-02-02 16:10:52.162649 |
138 |
67297972 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Completion of work |
-

latitude : 26.46669196
Longitude : 90.65110494
file name : Image_02082023001605156.png
|
2023-08-02 00:16:05.264744 |
139 |
67297972 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Plinth level |
-

latitude : 26.46669019
Longitude : 90.65099246
file name : Image_28122023152811810.png
|
2023-12-28 15:28:11.917533 |
140 |
67297972 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Roof laid |
-

latitude : 26.4666851
Longitude : 90.65114358
file name : Image_30122023153136447.png
|
2023-12-30 15:31:36.552438 |
141 |
67257547 |
Creation of plastic waste storage unit |
175000 |
Creation of plastic waste storage unit 1 |
Completion of work |
-

latitude : 26.4357908
Longitude : 90.6709752
file name : Image_26072023165828293.png
|
2023-07-26 16:58:28.387786 |
142 |
67257547 |
Creation of plastic waste storage unit |
175000 |
Creation of plastic waste storage unit 1 |
Plinth level |
-

latitude : 26.435861
Longitude : 90.670958
file name : Image_30102023161541533.png
|
2023-10-30 16:15:41.658402 |
143 |
67257547 |
Creation of plastic waste storage unit |
175000 |
Creation of plastic waste storage unit 1 |
Roof laid |
-

latitude : 26.4358843
Longitude : 90.6709399
file name : Image_27122023150000626.png
|
2023-12-27 15:00:00.732359 |
144 |
67213743 |
IMP. OF DONKINAMARI KABARSTHAN . |
650000 |
IMP. OF DONKINAMARI KABARSTHAN .1 |
Completion of work |
-

latitude : 26.49623273,26.49623265
Longitude : 90.63164793,90.63164805
file name : Image_23032023152256337.png
|
2023-03-23 15:22:56.439281 |
145 |
67213743 |
IMP. OF DONKINAMARI KABARSTHAN . |
650000 |
IMP. OF DONKINAMARI KABARSTHAN .1 |
Roof laid |
-

latitude : 26.49623656,26.4962359
Longitude : 90.63157697,90.63157727
file name : Image_11112023134318074.png
|
2023-11-11 13:43:18.170216 |
146 |
67213743 |
IMP. OF DONKINAMARI KABARSTHAN . |
650000 |
IMP. OF DONKINAMARI KABARSTHAN .1 |
Roof laid |
-

latitude : 26.49615224,26.49616164
Longitude : 90.63182119,90.63176416
file name : Image_17112023162456070.png
|
2023-11-17 16:24:56.154279 |
147 |
67213743 |
IMP. OF DONKINAMARI KABARSTHAN . |
650000 |
IMP. OF DONKINAMARI KABARSTHAN .1 |
Plinth level |
-

latitude : 26.49617091,26.49621123
Longitude : 90.63182513,90.63174069
file name : Image_03112023100749741.png
|
2023-11-03 10:07:49.834979 |
148 |
67477695 |
Reparing of 185 No. AWC near Jaraguri No-3 Pub LP School |
203250 |
Reparing of 185 No. AWC near Jaraguri No-3 Pub LP School 1 |
Completion of work |
-

latitude : 26.43374043
Longitude : 90.67409902
file name : Image_21112023135211423.png
|
2023-11-21 13:52:11.51269 |
149 |
67477695 |
Reparing of 185 No. AWC near Jaraguri No-3 Pub LP School |
203250 |
Reparing of 185 No. AWC near Jaraguri No-3 Pub LP School 1 |
Plinth level |
-

latitude : 26.43380097
Longitude : 90.67404147
file name : Image_01122023142536160.png
|
2023-12-01 14:25:36.270432 |
150 |
67477695 |
Reparing of 185 No. AWC near Jaraguri No-3 Pub LP School |
203250 |
Reparing of 185 No. AWC near Jaraguri No-3 Pub LP School 1 |
Roof laid |
-

latitude : 26.43379072
Longitude : 90.67396558
file name : Image_21122023142232809.png
|
2023-12-21 14:22:32.920244 |
151 |
61796671 |
REPAIRING Of Nabajyoti Sangha BUILDING AT Briddhabashi 2 . |
100000 |
REPAIRING Of Nabajyoti Sangha BUILDING AT Briddhabashi 2 .1 |
Completion of work |
-

latitude : 26.42006747
Longitude : 90.69991149
file name : Image_03062023090241693.png
|
2023-06-03 09:02:41.847427 |
152 |
61796671 |
REPAIRING Of Nabajyoti Sangha BUILDING AT Briddhabashi 2 . |
100000 |
REPAIRING Of Nabajyoti Sangha BUILDING AT Briddhabashi 2 .1 |
Plinth level |
-

latitude : 26.42014078
Longitude : 90.69985516
file name : Image_16112023153738358.png
|
2023-11-16 15:37:38.458972 |
153 |
61796671 |
REPAIRING Of Nabajyoti Sangha BUILDING AT Briddhabashi 2 . |
100000 |
REPAIRING Of Nabajyoti Sangha BUILDING AT Briddhabashi 2 .1 |
Roof laid |
-

latitude : 26.42013124
Longitude : 90.69998872
file name : Image_16112023154806858.png
|
2023-11-16 15:48:06.946327 |
154 |
61796671 |
REPAIRING Of Nabajyoti Sangha BUILDING AT Briddhabashi 2 . |
100000 |
REPAIRING Of Nabajyoti Sangha BUILDING AT Briddhabashi 2 .1 |
Roof laid |
-

latitude : 26.42010499
Longitude : 90.70002391
file name : Image_16112023154308370.png
|
2023-11-16 15:43:08.461914 |
155 |
51243220 |
Construction of CMSC at Nachanguri No-3 Near Absar Ali House Tiniali. |
90000 |
Construction of CMSC at Nachanguri No-3 Near Absar Ali House Tiniali.1 |
Completion of work |
-

latitude : 26.4733757
Longitude : 90.8018735
file name : Image_25032022155406304.png
|
2022-03-25 15:54:06.412582 |
156 |
51243220 |
Construction of CMSC at Nachanguri No-3 Near Absar Ali House Tiniali. |
90000 |
Construction of CMSC at Nachanguri No-3 Near Absar Ali House Tiniali.1 |
Plinth level |
-

latitude : 26.45591126
Longitude : 90.65660881
file name : Image_05012024145838226.png
|
2024-01-05 14:58:38.311861 |
157 |
51243220 |
Construction of CMSC at Nachanguri No-3 Near Absar Ali House Tiniali. |
90000 |
Construction of CMSC at Nachanguri No-3 Near Absar Ali House Tiniali.1 |
Roof laid |
-

latitude : 26.45591238
Longitude : 90.65664087
file name : Image_05012024150307366.png
|
2024-01-05 15:03:07.462624 |
158 |
67298022 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Completion of work |
-

latitude : 26.43304964
Longitude : 90.67462912
file name : Image_17102023160005505.png
|
2023-10-17 16:00:05.684804 |
159 |
67298022 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Completion of work |
-

latitude : 26.41415076
Longitude : 90.71303396
file name : Image_03112023100758304.png
|
2023-11-03 10:07:58.420562 |
160 |
67298022 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Plinth level |
-

latitude : 26.41406233
Longitude : 90.71312993
file name : Image_04012024160246817.png
|
2024-01-04 16:02:46.930353 |
161 |
67298022 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Roof laid |
-

latitude : 26.41418037
Longitude : 90.71299669
file name : Image_04012024160452584.png
|
2024-01-04 16:04:52.674939 |
162 |
51243027 |
Construction of CMSC at Garugaon No-3 Near Maszid. |
90000 |
Construction of CMSC at Garugaon No-3 Near Maszid.1 |
Completion of work |
-

latitude : 26.46138332
Longitude : 90.65621884
file name : Image_05012024143814126.png
|
2024-01-05 14:38:14.207382 |
163 |
51243027 |
Construction of CMSC at Garugaon No-3 Near Maszid. |
90000 |
Construction of CMSC at Garugaon No-3 Near Maszid.1 |
Plinth level |
-

latitude : 26.46137612
Longitude : 90.65619527
file name : Image_05012024144119087.png
|
2024-01-05 14:41:19.171484 |
164 |
51243027 |
Construction of CMSC at Garugaon No-3 Near Maszid. |
90000 |
Construction of CMSC at Garugaon No-3 Near Maszid.1 |
Roof laid |
-

latitude : 26.46141331
Longitude : 90.65618095
file name : Image_05012024144456442.png
|
2024-01-05 14:44:56.537761 |
165 |
67477840 |
Const. of Open Field Stage near Botguri Sri Sri Durga Mandir |
616100 |
Const. of Open Field Stage near Botguri Sri Sri Durga Mandir1 |
Completion of work |
-

latitude : 26.41621786
Longitude : 90.70021552
file name : Image_11112023160933733.png
|
2023-11-11 16:09:33.825472 |
166 |
67477840 |
Const. of Open Field Stage near Botguri Sri Sri Durga Mandir |
616100 |
Const. of Open Field Stage near Botguri Sri Sri Durga Mandir1 |
Plinth level |
-

latitude : 26.4162596
Longitude : 90.70021245
file name : Image_22042024095707042.png
|
2024-04-22 09:57:07.129712 |
167 |
67473825 |
Reparing of Kurshakata LP School at Garugaon No-2 |
416100 |
Reparing of Kurshakata LP School at Garugaon No-21 |
Completion of work |
-

latitude : 26.46660301
Longitude : 90.65139434
file name : Image_10042023165348339.png
|
2023-04-10 16:53:48.4436 |
168 |
67473825 |
Reparing of Kurshakata LP School at Garugaon No-2 |
416100 |
Reparing of Kurshakata LP School at Garugaon No-21 |
Plinth level |
-

latitude : 26.46648159
Longitude : 90.65137745
file name : Image_16112023165353181.png
|
2023-11-16 16:53:53.262549 |
169 |
67473825 |
Reparing of Kurshakata LP School at Garugaon No-2 |
416100 |
Reparing of Kurshakata LP School at Garugaon No-21 |
Roof laid |
-

latitude : 26.46661185
Longitude : 90.65144431
file name : Image_06122023144408155.png
|
2023-12-06 14:44:08.307101 |
170 |
67473825 |
Reparing of Kurshakata LP School at Garugaon No-2 |
416100 |
Reparing of Kurshakata LP School at Garugaon No-21 |
Roof laid |
-

latitude : 26.46653056
Longitude : 90.65143377
file name : Image_09122023164006875.png
|
2023-12-09 16:40:06.972021 |
171 |
61844473 |
RENOVATION OF 191 No AWC at Village Hapachara West . |
100000 |
RENOVATION OF 191 No AWC at Village Hapachara West .1 |
Completion of work |
-

latitude : 26.47466552
Longitude : 90.63934249
file name : Image_25072023180706812.png
|
2023-07-25 18:07:06.914777 |
172 |
61844473 |
RENOVATION OF 191 No AWC at Village Hapachara West . |
100000 |
RENOVATION OF 191 No AWC at Village Hapachara West .1 |
Roof laid |
-

latitude : 26.4745199
Longitude : 90.6391565
file name : Image_09112023091458069.png
|
2023-11-09 09:14:58.167025 |
173 |
61844473 |
RENOVATION OF 191 No AWC at Village Hapachara West . |
100000 |
RENOVATION OF 191 No AWC at Village Hapachara West .1 |
Plinth level |
-

latitude : 26.47474307
Longitude : 90.63928721
file name : Image_27102023100141383.png
|
2023-10-27 10:01:41.477517 |
174 |
61844473 |
RENOVATION OF 191 No AWC at Village Hapachara West . |
100000 |
RENOVATION OF 191 No AWC at Village Hapachara West .1 |
Roof laid |
-

latitude : 26.47465567
Longitude : 90.63930631
file name : Image_08122023165131656.png
|
2023-12-08 16:51:31.762143 |
175 |
67159752 |
Operation & maintenance of drinking water supply system |
168000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-

latitude : 26.41935753
Longitude : 90.69960219
file name : Image_16112023160337976.png
|
2023-11-16 16:03:38.06384 |
176 |
67473638 |
Imp. of Rd from Rathin Das House to Felu Das House |
600000 |
Imp. of Rd from Rathin Das House to Felu Das House1 |
Completion of work |
-

latitude : 26.46729913,26.46729913
Longitude : 90.64830747,90.64830756
file name : Image_10042023164928230.png
|
2023-04-10 16:49:28.329059 |
177 |
67473638 |
Imp. of Rd from Rathin Das House to Felu Das House |
600000 |
Imp. of Rd from Rathin Das House to Felu Das House1 |
Plinth level |
-

latitude : 26.4673039,26.46732178,26.46732618
Longitude : 90.64827226,90.64824651,90.64824391
file name : Image_09112023091508312.png
|
2023-11-09 09:15:08.407248 |
178 |
67473638 |
Imp. of Rd from Rathin Das House to Felu Das House |
600000 |
Imp. of Rd from Rathin Das House to Felu Das House1 |
Roof laid |
-

latitude : 26.46734777,26.46732096
Longitude : 90.64832475,90.64826678
file name : Image_16112023163842426.png
|
2023-11-16 16:38:42.529962 |
179 |
67473638 |
Imp. of Rd from Rathin Das House to Felu Das House |
600000 |
Imp. of Rd from Rathin Das House to Felu Das House1 |
Roof laid |
-

latitude : 26.46731073,26.46731072
Longitude : 90.64829391,90.64829398
file name : Image_16112023164406026.png
|
2023-11-16 16:44:06.12641 |
180 |
51243660 |
Construction of CMSC at Garugaon No-2 Near Shive Mandir. |
90000 |
Construction of CMSC at Garugaon No-2 Near Shive Mandir.1 |
Completion of work |
-

latitude : 26.46548153
Longitude : 90.65038792
file name : Image_06022024134307850.png
|
2024-02-06 13:43:07.946384 |
181 |
51243660 |
Construction of CMSC at Garugaon No-2 Near Shive Mandir. |
90000 |
Construction of CMSC at Garugaon No-2 Near Shive Mandir.1 |
Plinth level |
-

latitude : 26.4656935
Longitude : 90.65066287
file name : Image_22112024133030889.png
|
2024-11-22 13:30:31.064845 |
182 |
51243660 |
Construction of CMSC at Garugaon No-2 Near Shive Mandir. |
90000 |
Construction of CMSC at Garugaon No-2 Near Shive Mandir.1 |
Roof laid |
-

latitude : 26.46561473
Longitude : 90.65026179
file name : Image_23112024130404877.png
|
2024-11-23 13:04:04.983639 |
183 |
51243163 |
Construction of CMSC at Jaraguri No-3 Near Ayub Ali House Tiniali. |
90000 |
Construction of CMSC at Jaraguri No-3 Near Ayub Ali House Tiniali.1 |
Completion of work |
-

latitude : 26.4733757
Longitude : 90.8018735
file name : Image_25032022155939649.png
|
2022-03-25 15:59:39.753343 |
184 |
51243163 |
Construction of CMSC at Jaraguri No-3 Near Ayub Ali House Tiniali. |
90000 |
Construction of CMSC at Jaraguri No-3 Near Ayub Ali House Tiniali.1 |
Roof laid |
-

latitude : 26.43537462
Longitude : 90.67055517
file name : Image_02122023150702178.png
|
2023-12-02 15:07:02.274119 |
185 |
51243163 |
Construction of CMSC at Jaraguri No-3 Near Ayub Ali House Tiniali. |
90000 |
Construction of CMSC at Jaraguri No-3 Near Ayub Ali House Tiniali.1 |
Plinth level |
-

latitude : 26.43532236
Longitude : 90.67052183
file name : Image_02122023150419891.png
|
2023-12-02 15:04:19.989135 |
186 |
51243163 |
Construction of CMSC at Jaraguri No-3 Near Ayub Ali House Tiniali. |
90000 |
Construction of CMSC at Jaraguri No-3 Near Ayub Ali House Tiniali.1 |
Roof laid |
-

latitude : 26.43542343
Longitude : 90.67052884
file name : Image_02122023151106479.png
|
2023-12-02 15:11:06.602729 |
187 |
61720385 |
CONST. OF CMSC AT BRIDDHABASHI NO 2 NEAR 256 NO AWC (30%) . |
90000 |
CONST. OF CMSC AT BRIDDHABASHI NO 2 NEAR 256 NO AWC (30%) .1 |
Completion of work |
-

latitude : 26.4733757
Longitude : 90.8018735
file name : Image_26032022075259249.png
|
2022-03-26 07:52:59.364519 |
188 |
61720385 |
CONST. OF CMSC AT BRIDDHABASHI NO 2 NEAR 256 NO AWC (30%) . |
90000 |
CONST. OF CMSC AT BRIDDHABASHI NO 2 NEAR 256 NO AWC (30%) .1 |
Plinth level |
-

latitude : 26.41605053
Longitude : 90.700481
file name : Image_06122023163842891.png
|
2023-12-06 16:38:43.00202 |
189 |
61720385 |
CONST. OF CMSC AT BRIDDHABASHI NO 2 NEAR 256 NO AWC (30%) . |
90000 |
CONST. OF CMSC AT BRIDDHABASHI NO 2 NEAR 256 NO AWC (30%) .1 |
Roof laid |
-

latitude : 26.41601946
Longitude : 90.70048516
file name : Image_06122023164214571.png
|
2023-12-06 16:42:14.652853 |
190 |
51243090 |
Construction of CMSC at JaraguriNo-2 Near Hapachara G.P Office. |
90000 |
Construction of CMSC at JaraguriNo-2 Near Hapachara G.P Office.1 |
Completion of work |
-

latitude : 26.4733757
Longitude : 90.8018735
file name : Image_25032022155936150.png
|
2022-03-25 15:59:36.261796 |
191 |
51243090 |
Construction of CMSC at JaraguriNo-2 Near Hapachara G.P Office. |
90000 |
Construction of CMSC at JaraguriNo-2 Near Hapachara G.P Office.1 |
Plinth level |
-

latitude : 26.4358599
Longitude : 90.6709335
file name : Image_07122023143110814.png
|
2023-12-07 14:31:10.917183 |
192 |
51243090 |
Construction of CMSC at JaraguriNo-2 Near Hapachara G.P Office. |
90000 |
Construction of CMSC at JaraguriNo-2 Near Hapachara G.P Office.1 |
Roof laid |
-

latitude : 26.4358599
Longitude : 90.6709335
file name : Image_07122023143515833.png
|
2023-12-07 14:35:15.923686 |
193 |
51243547 |
Construction of CMSC at Chakrasila No-2 Near Communityu Hall. |
90000 |
Construction of CMSC at Chakrasila No-2 Near Communityu Hall.1 |
Completion of work |
-

latitude : 26.4733757
Longitude : 90.8018735
file name : Image_26032022075311500.png
|
2022-03-26 07:53:11.616263 |
194 |
51243547 |
Construction of CMSC at Chakrasila No-2 Near Communityu Hall. |
90000 |
Construction of CMSC at Chakrasila No-2 Near Communityu Hall.1 |
Plinth level |
-

latitude : 26.41404486
Longitude : 90.71301579
file name : Image_09122023155600527.png
|
2023-12-09 15:56:00.603592 |
195 |
51243547 |
Construction of CMSC at Chakrasila No-2 Near Communityu Hall. |
90000 |
Construction of CMSC at Chakrasila No-2 Near Communityu Hall.1 |
Roof laid |
-

latitude : 26.41402565
Longitude : 90.71302143
file name : Image_09122023155839781.png
|
2023-12-09 15:58:39.853777 |
196 |
88209297 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Completion of work |
-

latitude : 26.43072587
Longitude : 90.67454495
file name : Image_14122023161803449.png
|
2023-12-14 16:18:03.55754 |
197 |
87786920 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Plinth level |
-

latitude : 26.41943515
Longitude : 90.70061465
file name : Image_26012024153519441.png
|
2024-01-26 15:35:19.555733 |
198 |
87786920 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Roof laid |
-

latitude : 26.41943836
Longitude : 90.7006554
file name : Image_26012024153928731.png
|
2024-01-26 15:39:28.816046 |
199 |
87786920 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Completion of work |
-

latitude : 26.41937099
Longitude : 90.7005305
file name : Image_14122023154845922.png
|
2023-12-14 15:48:46.017575 |
200 |
51243333 |
Construction of CMSC at Bridabashi No-1 Near Lakshi Mandir. |
90000 |
Construction of CMSC at Bridabashi No-1 Near Lakshi Mandir.1 |
Completion of work |
-

latitude : 26.4733757
Longitude : 90.8018735
file name : Image_26032022075241738.png
|
2022-03-26 07:52:41.832278 |
201 |
51243333 |
Construction of CMSC at Bridabashi No-1 Near Lakshi Mandir. |
90000 |
Construction of CMSC at Bridabashi No-1 Near Lakshi Mandir.1 |
Completion of work |
-

latitude : 26.4733757
Longitude : 90.8018735
file name : Image_26032022075226340.png
|
2022-03-26 07:52:26.451648 |
202 |
51243333 |
Construction of CMSC at Bridabashi No-1 Near Lakshi Mandir. |
90000 |
Construction of CMSC at Bridabashi No-1 Near Lakshi Mandir.1 |
Plinth level |
-

latitude : 26.42355115
Longitude : 90.70069276
file name : Image_14122023155604900.png
|
2023-12-14 15:56:04.983541 |
203 |
51243333 |
Construction of CMSC at Bridabashi No-1 Near Lakshi Mandir. |
90000 |
Construction of CMSC at Bridabashi No-1 Near Lakshi Mandir.1 |
Roof laid |
-

latitude : 26.42352428
Longitude : 90.70075883
file name : Image_14122023160210287.png
|
2023-12-14 16:02:10.385414 |
204 |
51242788 |
Construction of CMSC at Dankinamari Near Masket Ali House. |
90000 |
Construction of CMSC at Dankinamari Near Masket Ali House.1 |
Completion of work |
-

latitude : 26.4733757
Longitude : 90.8018735
file name : Image_25032022141404357.png
|
2022-03-25 14:14:04.435678 |
205 |
51242788 |
Construction of CMSC at Dankinamari Near Masket Ali House. |
90000 |
Construction of CMSC at Dankinamari Near Masket Ali House.1 |
Plinth level |
-

latitude : 26.49548628
Longitude : 90.6358475
file name : Image_15122023162424903.png
|
2023-12-15 16:24:25.03768 |
206 |
51242788 |
Construction of CMSC at Dankinamari Near Masket Ali House. |
90000 |
Construction of CMSC at Dankinamari Near Masket Ali House.1 |
Roof laid |
-

latitude : 26.49547738
Longitude : 90.63581436
file name : Image_15122023162821416.png
|
2023-12-15 16:28:21.520173 |
207 |
87787066 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Plinth level |
-

latitude : 26.48805462
Longitude : 90.64247705
file name : Image_25012024165937238.png
|
2024-01-25 16:59:37.329887 |
208 |
87787066 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Roof laid |
-

latitude : 26.48807679
Longitude : 90.64246759
file name : Image_25012024170624143.png
|
2024-01-25 17:06:24.238846 |
209 |
87787066 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Completion of work |
-

latitude : 26.48797067
Longitude : 90.64244895
file name : Image_14122023231233460.png
|
2023-12-14 23:12:33.533698 |
210 |
87786985 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Plinth level |
-

latitude : 26.47437318
Longitude : 90.63910528
file name : Image_26012024130725756.png
|
2024-01-26 13:07:25.84877 |
211 |
87786985 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Completion of work |
-

latitude : 26.47438802
Longitude : 90.63912576
file name : Image_14122023231230400.png
|
2023-12-14 23:12:30.474404 |
212 |
87786985 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Roof laid |
-

latitude : 26.47446834
Longitude : 90.63937038
file name : Image_26012024131232606.png
|
2024-01-26 13:12:32.698592 |
213 |
87787122 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Plinth level |
-

latitude : 26.47490212
Longitude : 90.64611725
file name : Image_26012024131729958.png
|
2024-01-26 13:17:30.031144 |
214 |
87787122 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Roof laid |
-

latitude : 26.47493799
Longitude : 90.64611274
file name : Image_26012024132103431.png
|
2024-01-26 13:21:03.517921 |
215 |
87787122 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Completion of work |
-

latitude : 26.47493884
Longitude : 90.64605557
file name : Image_14122023164831805.png
|
2023-12-14 16:48:31.893435 |
216 |
61797867 |
IMP. OF ROAD with sand gravelling FROM NH 31 TO BAGHMARA CHOWRAGURI GP BORDER at Hapachara East . |
490823 |
IMP. OF ROAD with sand gravelling FROM NH 31 TO BAGHMARA CHOWRAGURI GP BORDER at Hapachara East .1 |
Completion of work |
-

latitude : 26.48738572,26.48738735
Longitude : 90.64267339,90.6426708
file name : Image_27032023172112147.png
|
2023-03-27 17:21:12.235559 |
217 |
61797867 |
IMP. OF ROAD with sand gravelling FROM NH 31 TO BAGHMARA CHOWRAGURI GP BORDER at Hapachara East . |
490823 |
IMP. OF ROAD with sand gravelling FROM NH 31 TO BAGHMARA CHOWRAGURI GP BORDER at Hapachara East .1 |
Plinth level |
-

latitude : 26.48743212,26.48745019
Longitude : 90.64283924,90.6427032
file name : Image_25122023152207112.png
|
2023-12-25 15:22:06.228339 |
218 |
61797867 |
IMP. OF ROAD with sand gravelling FROM NH 31 TO BAGHMARA CHOWRAGURI GP BORDER at Hapachara East . |
490823 |
IMP. OF ROAD with sand gravelling FROM NH 31 TO BAGHMARA CHOWRAGURI GP BORDER at Hapachara East .1 |
Roof laid |
-

latitude : 26.48738126,26.48738167
Longitude : 90.64266348,90.64266591
file name : Image_20012024145501423.png
|
2024-01-20 14:55:01.528919 |
219 |
61802653 |
RENOVATION OF 189 NO AWC AT Village Chakrashila . |
100000 |
RENOVATION OF 189 NO AWC AT Village Chakrashila .1 |
Roof laid |
-

latitude : 26.41414783
Longitude : 90.71213002
file name : Image_26012024143339247.png
|
2024-01-26 14:33:39.394376 |
220 |
61802653 |
RENOVATION OF 189 NO AWC AT Village Chakrashila . |
100000 |
RENOVATION OF 189 NO AWC AT Village Chakrashila .1 |
Completion of work |
-

latitude : 26.41422669
Longitude : 90.71207314
file name : Image_26032023152434458.png
|
2023-03-26 15:24:34.550257 |
221 |
61802653 |
RENOVATION OF 189 NO AWC AT Village Chakrashila . |
100000 |
RENOVATION OF 189 NO AWC AT Village Chakrashila .1 |
Plinth level |
-

latitude : 26.41419528
Longitude : 90.7118524
file name : Image_03112023100802598.png
|
2023-11-03 10:08:02.692361 |
222 |
51243939 |
Construction of Community Urinal & Latrine at 184 No AWC at Jaraguri No-2. |
300000 |
Construction of Community Urinal & Latrine at 184 No AWC at Jaraguri No-2.1 |
Completion of work |
-

latitude : 26.436452
Longitude : 90.6703374
file name : Image_13042023094004105.png
|
2023-04-13 09:40:04.213773 |
223 |
51243939 |
Construction of Community Urinal & Latrine at 184 No AWC at Jaraguri No-2. |
300000 |
Construction of Community Urinal & Latrine at 184 No AWC at Jaraguri No-2.1 |
Plinth level |
-

latitude : 26.43603162
Longitude : 90.67137499
file name : Image_30102023161011550.png
|
2023-10-30 16:10:11.650043 |
224 |
51243939 |
Construction of Community Urinal & Latrine at 184 No AWC at Jaraguri No-2. |
300000 |
Construction of Community Urinal & Latrine at 184 No AWC at Jaraguri No-2.1 |
Plinth level |
-

latitude : 26.43600274
Longitude : 90.67141537
file name : Image_01122023142540415.png
|
2023-12-01 14:25:40.527236 |
225 |
51243939 |
Construction of Community Urinal & Latrine at 184 No AWC at Jaraguri No-2. |
300000 |
Construction of Community Urinal & Latrine at 184 No AWC at Jaraguri No-2.1 |
Roof laid |
-

latitude : 26.43604555
Longitude : 90.67145427
file name : Image_02022024151107819.png
|
2024-02-02 15:11:07.920476 |
226 |
51243939 |
Construction of Community Urinal & Latrine at 184 No AWC at Jaraguri No-2. |
300000 |
Construction of Community Urinal & Latrine at 184 No AWC at Jaraguri No-2.1 |
Roof laid |
-

latitude : 26.4360763
Longitude : 90.6718197
file name : Image_27122023144509463.png
|
2023-12-27 14:45:09.566282 |
227 |
61794247 |
CONST. OF COMMUNITY LATRINE cum URINAL AT JARAGURI 3 near Azad Ali House . |
300000 |
CONST. OF COMMUNITY LATRINE cum URINAL AT JARAGURI 3 near Azad Ali House .1 |
Roof laid |
-

latitude : 26.43081639
Longitude : 90.67455961
file name : Image_25012024161152724.png
|
2024-01-25 16:11:52.813543 |
228 |
61794247 |
CONST. OF COMMUNITY LATRINE cum URINAL AT JARAGURI 3 near Azad Ali House . |
300000 |
CONST. OF COMMUNITY LATRINE cum URINAL AT JARAGURI 3 near Azad Ali House .1 |
Completion of work |
-

latitude : 26.4307714
Longitude : 90.67455672
file name : Image_13042023093946470.png
|
2023-04-13 09:39:46.579924 |
229 |
61794247 |
CONST. OF COMMUNITY LATRINE cum URINAL AT JARAGURI 3 near Azad Ali House . |
300000 |
CONST. OF COMMUNITY LATRINE cum URINAL AT JARAGURI 3 near Azad Ali House .1 |
Plinth level |
-

latitude : 26.46351918
Longitude : 90.83136111
file name : Image_07102023151942480.png
|
2023-10-07 15:19:42.601828 |
230 |
51242867 |
Construction of CMSC at Garugaon No-1 Near Abdul Kalam Azad House. |
90000 |
Construction of CMSC at Garugaon No-1 Near Abdul Kalam Azad House.1 |
Completion of work |
-

latitude : 26.4733757
Longitude : 90.8018735
file name : Image_25032022145956281.png
|
2022-03-25 14:59:56.391217 |
231 |
51242867 |
Construction of CMSC at Garugaon No-1 Near Abdul Kalam Azad House. |
90000 |
Construction of CMSC at Garugaon No-1 Near Abdul Kalam Azad House.1 |
Plinth level |
-

latitude : 26.47188245
Longitude : 90.64486211
file name : Image_12022024160005497.png
|
2024-02-12 16:00:05.608364 |
232 |
51242867 |
Construction of CMSC at Garugaon No-1 Near Abdul Kalam Azad House. |
90000 |
Construction of CMSC at Garugaon No-1 Near Abdul Kalam Azad House.1 |
Plinth level |
-

latitude : 26.47191601
Longitude : 90.64489323
file name : Image_12022024160008866.png
|
2024-02-12 16:00:08.992387 |
233 |
51242867 |
Construction of CMSC at Garugaon No-1 Near Abdul Kalam Azad House. |
90000 |
Construction of CMSC at Garugaon No-1 Near Abdul Kalam Azad House.1 |
Roof laid |
-

latitude : 26.47194227
Longitude : 90.64501725
file name : Image_12022024160446148.png
|
2024-02-12 16:04:46.265214 |
234 |
51243282 |
Construction of CMSC at Bardhup Near Masjid. |
90000 |
Construction of CMSC at Bardhup Near Masjid.1 |
Completion of work |
-

latitude : 26.4733757
Longitude : 90.8018735
file name : Image_25032022150429349.png
|
2022-03-25 15:04:29.428949 |
235 |
51243282 |
Construction of CMSC at Bardhup Near Masjid. |
90000 |
Construction of CMSC at Bardhup Near Masjid.1 |
Completion of work |
-

latitude : 26.4733757
Longitude : 90.8018735
file name : Image_25032022150634615.png
|
2022-03-25 15:06:34.721872 |
236 |
51243282 |
Construction of CMSC at Bardhup Near Masjid. |
90000 |
Construction of CMSC at Bardhup Near Masjid.1 |
Plinth level |
-

latitude : 26.47115842
Longitude : 90.6478888
file name : Image_02022024132400438.png
|
2024-02-02 13:24:00.552846 |
237 |
51243282 |
Construction of CMSC at Bardhup Near Masjid. |
90000 |
Construction of CMSC at Bardhup Near Masjid.1 |
Roof laid |
-

latitude : 26.47112903
Longitude : 90.64794021
file name : Image_02022024133123489.png
|
2024-02-02 13:31:23.618539 |
238 |
67298902 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Completion of work |
-

latitude : 26.46098816
Longitude : 90.65560538
file name : Image_14102023104017821.png
|
2023-10-14 10:40:17.929417 |
239 |
67298902 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Plinth level |
-

latitude : 26.46087363
Longitude : 90.65564525
file name : Image_29122023152424123.png
|
2023-12-29 15:24:24.236816 |
240 |
67298902 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Roof laid |
-

latitude : 26.46088588
Longitude : 90.65551333
file name : Image_29122023152935097.png
|
2023-12-29 15:29:35.181874 |
241 |
67298932 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Completion of work |
-

latitude : 26.43322461
Longitude : 90.67478233
file name : Image_26072023165821095.png
|
2023-07-26 16:58:21.208229 |
242 |
67298932 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Plinth level |
-

latitude : 26.43328956
Longitude : 90.67483411
file name : Image_30122023142332928.png
|
2023-12-30 14:23:33.016999 |
243 |
67298932 |
Creation of plastic waste storage unit |
71814 |
Creation of plastic waste storage unit 1 |
Roof laid |
-

latitude : 26.433236
Longitude : 90.67473701
file name : Image_30122023142936764.png
|
2023-12-30 14:29:36.856838 |
244 |
61795248 |
IMP[ROVEMENT OF URINAL & LATRINE AT HAPACHARA GP OFFICE Campus . |
135632 |
IMP[ROVEMENT OF URINAL & LATRINE AT HAPACHARA GP OFFICE Campus .1 |
Roof laid |
-

latitude : 26.4358843
Longitude : 90.67094
file name : Image_26012024134330697.png
|
2024-01-26 13:43:30.788577 |
245 |
61795248 |
IMP[ROVEMENT OF URINAL & LATRINE AT HAPACHARA GP OFFICE Campus . |
135632 |
IMP[ROVEMENT OF URINAL & LATRINE AT HAPACHARA GP OFFICE Campus .1 |
Completion of work |
-

latitude : 26.4360804
Longitude : 90.6709303
file name : Image_28062023164012826.png
|
2023-06-28 16:40:12.942929 |
246 |
61795248 |
IMP[ROVEMENT OF URINAL & LATRINE AT HAPACHARA GP OFFICE Campus . |
135632 |
IMP[ROVEMENT OF URINAL & LATRINE AT HAPACHARA GP OFFICE Campus .1 |
Plinth level |
-

latitude : 26.4358351
Longitude : 90.6709509
file name : Image_20102023143435134.png
|
2023-10-20 14:34:35.244574 |
247 |
102740327 |
Const. of Gymnasium Hall with equipements at Jaraguri no 2 Village . |
938400 |
Const. of Gymnasium Hall with equipements at Jaraguri no 2 Village .1 |
Completion of work |
-

latitude : 26.4358151
Longitude : 90.6709214
file name : Image_19092024144432686.png
|
2024-09-19 14:44:32.783038 |
248 |
102740327 |
Const. of Gymnasium Hall with equipements at Jaraguri no 2 Village . |
938400 |
Const. of Gymnasium Hall with equipements at Jaraguri no 2 Village .1 |
Plinth level |
-

latitude : 26.43597022
Longitude : 90.67115799
file name : Image_15102024133316992.png
|
2024-10-15 13:33:17.213114 |
249 |
102740327 |
Const. of Gymnasium Hall with equipements at Jaraguri no 2 Village . |
938400 |
Const. of Gymnasium Hall with equipements at Jaraguri no 2 Village .1 |
Plinth level |
-

latitude : 26.43606113
Longitude : 90.67100569
file name : Image_17122024120303579.png
|
2024-12-17 12:03:03.655837 |
250 |
67157781 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-

latitude : 26.46992011
Longitude : 90.64154421
file name : Image_27072024004305590.png
|
2024-07-27 00:43:05.662401 |
251 |
67157781 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-

latitude : 26.47005556
Longitude : 90.64178766
file name : Image_30032025153439172.png
|
2025-03-30 15:34:39.253624 |
252 |
88209290 |
Repairing of 125 No AWC at Jaraguri No.2 . |
200000 |
Repairing of 125 No AWC at Jaraguri No.2 .1 |
Completion of work |
-

latitude : 26.46377377
Longitude : 90.83115284
file name : Image_24012024141632694.png
|
2024-01-24 14:16:32.805108 |
253 |
88209290 |
Repairing of 125 No AWC at Jaraguri No.2 . |
200000 |
Repairing of 125 No AWC at Jaraguri No.2 .1 |
Roof laid |
-

latitude : 26.43470893
Longitude : 90.67037884
file name : Image_02112024132012504.png
|
2024-11-02 13:20:12.59426 |
254 |
88209290 |
Repairing of 125 No AWC at Jaraguri No.2 . |
200000 |
Repairing of 125 No AWC at Jaraguri No.2 .1 |
Plinth level |
-

latitude : 26.43466974
Longitude : 90.67045685
file name : Image_04072024152520186.png
|
2024-07-04 15:25:20.364666 |
255 |
51243747 |
Construction of CMSC at Hapachora Near Madrassa. |
90000 |
Construction of CMSC at Hapachora Near Madrassa.1 |
Completion of work |
-

latitude : 26.47479417
Longitude : 90.64308698
file name : Image_06022024132201323.png
|
2024-02-06 13:22:01.413926 |
256 |
51243747 |
Construction of CMSC at Hapachora Near Madrassa. |
90000 |
Construction of CMSC at Hapachora Near Madrassa.1 |
Plinth level |
-

latitude : 26.47481692
Longitude : 90.64308581
file name : Image_06022024133925350.png
|
2024-02-06 13:39:25.438474 |
257 |
51243747 |
Construction of CMSC at Hapachora Near Madrassa. |
90000 |
Construction of CMSC at Hapachora Near Madrassa.1 |
Roof laid |
-

latitude : 26.47481191
Longitude : 90.64312605
file name : Image_08022025170956015.png
|
2025-02-08 17:09:56.100777 |
258 |
61795526 |
CONST. OF TOILET FOR GIRLS AT 400 NO NACHANGURI 3 L.P SCHOOL (Election Urgent) |
45000 |
CONST. OF TOILET FOR GIRLS AT 400 NO NACHANGURI 3 L.P SCHOOL (Election Urgent)1 |
Completion of work |
-

latitude : 26.45337091
Longitude : 90.66399778
file name : Image_02102024135951319.png
|
2024-10-02 13:59:51.400063 |
259 |
61845037 |
INSTALLATION OF Solar Street Light at Briddhabashi Medhi Para at BRIDDHABASHI . |
44800 |
INSTALLATION OF Solar Street Light at Briddhabashi Medhi Para at BRIDDHABASHI .1 |
Completion of work |
-

latitude : 26.41688233
Longitude : 90.69807421
file name : Image_29082024161211969.png
|
2024-08-29 16:12:12.217197 |
260 |
61845037 |
INSTALLATION OF Solar Street Light at Briddhabashi Medhi Para at BRIDDHABASHI . |
44800 |
INSTALLATION OF Solar Street Light at Briddhabashi Medhi Para at BRIDDHABASHI .1 |
Plinth level |
-

latitude : 26.41675468
Longitude : 90.6979326
file name : Image_18022025170534826.png
|
2025-02-18 17:05:34.916003 |
261 |
61845037 |
INSTALLATION OF Solar Street Light at Briddhabashi Medhi Para at BRIDDHABASHI . |
44800 |
INSTALLATION OF Solar Street Light at Briddhabashi Medhi Para at BRIDDHABASHI .1 |
Roof laid |
-

latitude : 26.41679346
Longitude : 90.69794517
file name : Image_18022025170900991.png
|
2025-02-18 17:09:01.083674 |
262 |
61844737 |
INSTALLATION OF Solar Street Light at Jaraguri Tiniali near Liyakat Ali house at JARAGURI No. 2 . |
44800 |
INSTALLATION OF Solar Street Light at Jaraguri Tiniali near Liyakat Ali house at JARAGURI No. 2 .1 |
Completion of work |
-

latitude : 26.4358144
Longitude : 90.670919
file name : Image_29082024161207393.png
|
2024-08-29 16:12:07.748255 |
263 |
61844737 |
INSTALLATION OF Solar Street Light at Jaraguri Tiniali near Liyakat Ali house at JARAGURI No. 2 . |
44800 |
INSTALLATION OF Solar Street Light at Jaraguri Tiniali near Liyakat Ali house at JARAGURI No. 2 .1 |
Plinth level |
-

latitude : 26.43578654
Longitude : 90.66871881
file name : Image_30092024131403143.png
|
2024-09-30 13:14:03.286043 |
264 |
61844737 |
INSTALLATION OF Solar Street Light at Jaraguri Tiniali near Liyakat Ali house at JARAGURI No. 2 . |
44800 |
INSTALLATION OF Solar Street Light at Jaraguri Tiniali near Liyakat Ali house at JARAGURI No. 2 .1 |
Roof laid |
-

latitude : 26.43575182
Longitude : 90.66872811
file name : Image_01102024125133997.png
|
2024-10-01 12:51:34.164291 |
265 |
102735140 |
Installation of 2 nos Solar Street Light at Chakrasila no 2 Amrit Sarovar . |
55200 |
Installation of 2 nos Solar Street Light at Chakrasila no 2 Amrit Sarovar .1 |
Completion of work |
-

latitude : 26.42613675
Longitude : 90.68725882
file name : Image_14112024151726271.png
|
2024-11-14 15:17:26.380357 |
266 |
102735140 |
Installation of 2 nos Solar Street Light at Chakrasila no 2 Amrit Sarovar . |
55200 |
Installation of 2 nos Solar Street Light at Chakrasila no 2 Amrit Sarovar .1 |
Plinth level |
-

latitude : 26.41611042
Longitude : 90.71397584
file name : Image_17122024120259996.png
|
2024-12-17 12:03:00.069524 |
267 |
102735140 |
Installation of 2 nos Solar Street Light at Chakrasila no 2 Amrit Sarovar . |
55200 |
Installation of 2 nos Solar Street Light at Chakrasila no 2 Amrit Sarovar .2 |
Completion of work |
-

latitude : 26.42600973
Longitude : 90.68851981
file name : Image_14112024151730240.png
|
2024-11-14 15:17:30.355915 |
268 |
102735140 |
Installation of 2 nos Solar Street Light at Chakrasila no 2 Amrit Sarovar . |
55200 |
Installation of 2 nos Solar Street Light at Chakrasila no 2 Amrit Sarovar .2 |
Plinth level |
-

latitude : 26.41637112
Longitude : 90.71411021
file name : Image_17122024120256027.png
|
2024-12-17 12:02:56.144068 |
269 |
67213686 |
IMP. OF FISHERY TANK AT GP OFFICE BOUNDARY . |
968632 |
IMP. OF FISHERY TANK AT GP OFFICE BOUNDARY .1 |
Completion of work |
-

latitude : 26.4358147
Longitude : 90.6709014
file name : Image_21042023150353878.png
|
2023-04-21 15:03:53.98742 |
270 |
67213686 |
IMP. OF FISHERY TANK AT GP OFFICE BOUNDARY . |
968632 |
IMP. OF FISHERY TANK AT GP OFFICE BOUNDARY .1 |
Completion of work |
-

latitude : 26.4358147
Longitude : 90.6709014
file name : Image_21042023150430427.png
|
2023-04-21 15:04:30.54215 |
271 |
67213686 |
IMP. OF FISHERY TANK AT GP OFFICE BOUNDARY . |
968632 |
IMP. OF FISHERY TANK AT GP OFFICE BOUNDARY .1 |
Plinth level |
-

latitude : 26.43517416
Longitude : 90.67098457
file name : Image_09042024141415191.png
|
2024-04-09 14:14:15.276313 |
272 |
67213686 |
IMP. OF FISHERY TANK AT GP OFFICE BOUNDARY . |
968632 |
IMP. OF FISHERY TANK AT GP OFFICE BOUNDARY .1 |
Roof laid |
-

latitude : 26.43528567
Longitude : 90.67045287
file name : Image_27112024153337353.png
|
2024-11-27 15:33:37.468924 |
273 |
87787719 |
Creation of community soak pits for group of Households |
484500 |
Creation of community soak pits for group of Households1 |
Completion of work |
-

latitude : 26.4634822
Longitude : 90.6466283
file name : Image_18122024151710361.png
|
2024-12-18 15:17:10.450979 |
274 |
87787719 |
Creation of community soak pits for group of Households |
484500 |
Creation of community soak pits for group of Households1 |
Plinth level |
-

latitude : 26.4634822
Longitude : 90.6466283
file name : Image_18122024152245333.png
|
2024-12-18 15:22:45.424865 |
275 |
87787719 |
Creation of community soak pits for group of Households |
484500 |
Creation of community soak pits for group of Households1 |
Roof laid |
-

latitude : 26.4634822
Longitude : 90.6466283
file name : Image_18122024152534237.png
|
2024-12-18 15:25:34.332664 |
276 |
87787719 |
Creation of community soak pits for group of Households |
484500 |
Creation of community soak pits for group of Households1 |
Plinth level |
-

latitude : 26.42008339
Longitude : 90.70020292
file name : Image_26012024154129718.png
|
2024-01-26 15:41:29.818476 |
277 |
87787719 |
Creation of community soak pits for group of Households |
484500 |
Creation of community soak pits for group of Households1 |
Completion of work |
-

latitude : 26.42010591
Longitude : 90.70007504
file name : Image_14122023154928418.png
|
2023-12-14 15:49:28.575118 |
278 |
87787719 |
Creation of community soak pits for group of Households |
484500 |
Creation of community soak pits for group of Households1 |
Roof laid |
-

latitude : 26.42011626
Longitude : 90.70013453
file name : Image_26012024154640937.png
|
2024-01-26 15:46:41.032395 |
279 |
87787719 |
Creation of community soak pits for group of Households |
484500 |
Creation of community soak pits for group of Households1 |
Completion of work |
-

latitude : 26.41371693
Longitude : 90.71188078
file name : Image_26012024143931555.png
|
2024-01-26 14:39:31.650074 |
280 |
87787719 |
Creation of community soak pits for group of Households |
484500 |
Creation of community soak pits for group of Households1 |
Plinth level |
-

latitude : 26.41379032
Longitude : 90.71187965
file name : Image_26012024144649839.png
|
2024-01-26 14:46:49.926048 |
281 |
87787719 |
Creation of community soak pits for group of Households |
484500 |
Creation of community soak pits for group of Households1 |
Roof laid |
-

latitude : 26.41374066
Longitude : 90.7119483
file name : Image_26012024145259350.png
|
2024-01-26 14:52:59.436463 |
282 |
102754359 |
Installation of 3 nos Solar Street Light at Chakrasila No 2 Amrit Sarovar . |
90000 |
Installation of 3 nos Solar Street Light at Chakrasila No 2 Amrit Sarovar .2 |
Completion of work |
-

latitude : 26.41398335
Longitude : 90.71368027
file name : Image_08022025170610239.png
|
2025-02-08 17:06:10.319892 |
283 |
102754359 |
Installation of 3 nos Solar Street Light at Chakrasila No 2 Amrit Sarovar . |
90000 |
Installation of 3 nos Solar Street Light at Chakrasila No 2 Amrit Sarovar .3 |
Completion of work |
-

latitude : 26.41398328
Longitude : 90.71361444
file name : Image_08022025170412883.png
|
2025-02-08 17:04:12.971832 |
284 |
102754359 |
Installation of 3 nos Solar Street Light at Chakrasila No 2 Amrit Sarovar . |
90000 |
Installation of 3 nos Solar Street Light at Chakrasila No 2 Amrit Sarovar .3 |
Completion of work |
-

latitude : 26.413977
Longitude : 90.71377733
file name : Image_08022025170814025.png
|
2025-02-08 17:08:14.108896 |
285 |
87787719 |
Creation of community soak pits for group of Households |
484500 |
Creation of community soak pits for group of Households3 |
Plinth level |
-

latitude : 26.4358848
Longitude : 90.6709395
file name : Image_25012024162338281.png
|
2024-01-25 16:23:38.366285 |
286 |
87787719 |
Creation of community soak pits for group of Households |
484500 |
Creation of community soak pits for group of Households3 |
Roof laid |
-

latitude : 26.435883
Longitude : 90.6709355
file name : Image_25012024162937844.png
|
2024-01-25 16:29:37.931329 |
287 |
87787719 |
Creation of community soak pits for group of Households |
484500 |
Creation of community soak pits for group of Households3 |
Completion of work |
-

latitude : 26.4358786
Longitude : 90.6709336
file name : Image_02122023145246311.png
|
2023-12-02 14:52:46.403968 |
288 |
87787719 |
Creation of community soak pits for group of Households |
484500 |
Creation of community soak pits for group of Households3 |
Roof laid |
-

latitude : 26.4358604
Longitude : 90.6709504
file name : Image_14022024140200209.png
|
2024-02-14 14:02:00.298462 |
289 |
87787719 |
Creation of community soak pits for group of Households |
484500 |
Creation of community soak pits for group of Households4 |
Completion of work |
-

latitude : 26.4368208
Longitude : 90.6703374
file name : Image_02122023150228053.png
|
2023-12-02 15:02:28.147089 |
290 |
61796937 |
INSTALLATION OF SOLAR Street LIght At Briddhabashi Daily Bazar . |
44800 |
INSTALLATION OF SOLAR Street LIght At Briddhabashi Daily Bazar .1 |
Completion of work |
-

latitude : 26.41802615
Longitude : 90.69891476
file name : Image_29082024161220295.png
|
2024-08-29 16:12:20.530179 |
291 |
61796937 |
INSTALLATION OF SOLAR Street LIght At Briddhabashi Daily Bazar . |
44800 |
INSTALLATION OF SOLAR Street LIght At Briddhabashi Daily Bazar .1 |
Plinth level |
-

latitude : 26.4231633
Longitude : 90.6955567
file name : Image_21032025155654752.png
|
2025-03-21 15:56:54.894797 |
292 |
61796937 |
INSTALLATION OF SOLAR Street LIght At Briddhabashi Daily Bazar . |
44800 |
INSTALLATION OF SOLAR Street LIght At Briddhabashi Daily Bazar .1 |
Roof laid |
-

latitude : 26.4232244
Longitude : 90.6958487
file name : Image_21032025160246619.png
|
2025-03-21 16:02:46.71888 |
293 |
61797200 |
ISTALLATION OF SOLAR Street Light At Bardhup . |
44800 |
ISTALLATION OF SOLAR Street Light At Bardhup .1 |
Completion of work |
-

latitude : 26.48746455
Longitude : 90.64581353
file name : Image_30082024133356914.png
|
2024-08-30 13:33:57.445276 |
294 |
61797200 |
ISTALLATION OF SOLAR Street Light At Bardhup . |
44800 |
ISTALLATION OF SOLAR Street Light At Bardhup .1 |
Plinth level |
-

latitude : 26.4790117
Longitude : 90.6697124
file name : Image_01102024125137448.png
|
2024-10-01 12:51:37.679774 |
295 |
61797200 |
ISTALLATION OF SOLAR Street Light At Bardhup . |
44800 |
ISTALLATION OF SOLAR Street Light At Bardhup .1 |
Roof laid |
-

latitude : 26.48758327
Longitude : 90.64574709
file name : Image_01102024154819477.png
|
2024-10-01 15:48:19.586661 |
296 |
123144202 |
Construction and repairing of Gate doors, window, fixtures etc. |
100000 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Completion of work |
-

latitude : 26.4196595
Longitude : 90.69951438
file name : Image_30032025153314201.png
|
2025-03-30 15:33:14.285416 |
297 |
102749191 |
Repairing of 98 no AWC at Garugaon no 1 |
191000 |
Repairing of 98 no AWC at Garugaon no 1 1 |
Completion of work |
-

latitude : 26.47011841
Longitude : 90.64146237
file name : Image_30032025153435762.png
|
2025-03-30 15:34:35.845306 |
298 |
102748135 |
Repairing of 184 no AWC at Jaraguri no 2 . |
191000 |
Repairing of 184 no AWC at Jaraguri no 2 .1 |
Completion of work |
-

latitude : 26.43613905
Longitude : 90.67148568
file name : Image_30032025153420109.png
|
2025-03-30 15:34:20.194997 |
299 |
102750066 |
Repairing of 102 no AWC at Donkinamari . |
191000 |
Repairing of 102 no AWC at Donkinamari .1 |
Completion of work |
-

latitude : 26.4957258
Longitude : 90.62937571
file name : Image_30032025153450458.png
|
2025-03-30 15:34:50.545659 |
300 |
108408787 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-

latitude : 26.41448091
Longitude : 90.71309209
file name : Image_30032025153128083.png
|
2025-03-30 15:31:28.174787 |
301 |
123145258 |
Construction and repairing of Gate doors, window, fixtures etc. |
260200 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Completion of work |
-

latitude : 26.41391824
Longitude : 90.71186503
file name : Image_30032025153056671.png
|
2025-03-30 15:30:56.750385 |
302 |
123130832 |
Construction of roads |
260200 |
Construction of roads1 |
Completion of work |
-

latitude : 26.414913,26.414913
Longitude : 90.7011801,90.7011801
file name : Image_30032025153155530.png
|
2025-03-30 15:31:55.614159 |
303 |
123134536 |
Construction and repairing of Gate doors, window, fixtures etc. |
150000 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Completion of work |
-

latitude : 26.4833978
Longitude : 90.6383057
file name : Image_30032025153446813.png
|
2025-03-30 15:34:46.895967 |
304 |
123133165 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-

latitude : 26.43123229,26.43123996
Longitude : 90.66994086,90.66996928
file name : Image_30032025153424434.png
|
2025-03-30 15:34:24.519178 |
305 |
108410429 |
Construction and repairing of Gate doors, window, fixtures etc. |
100000 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Completion of work |
-

latitude : 26.47034874
Longitude : 90.64863554
file name : Image_30032025153432248.png
|
2025-03-30 15:34:32.333163 |
306 |
102764219 |
Upgradation of Playground at Briddhabashi No 2 . |
266251 |
Upgradation of Playground at Briddhabashi No 2 .1 |
Completion of work |
-

latitude : 26.41985072,26.419742
Longitude : 90.69971288,90.69956357
file name : Image_30032025153415585.png
|
2025-03-30 15:34:15.679916 |
307 |
102752903 |
Repairing of 357 no JB L.P School at Hapachara East . |
194800 |
Repairing of 357 no JB L.P School at Hapachara East .1 |
Completion of work |
-

latitude : 26.48330734
Longitude : 90.63698286
file name : Image_30032025153443479.png
|
2025-03-30 15:34:43.556923 |
308 |
108411036 |
Construction and repairing of Gate doors, window, fixtures etc. |
200000 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Completion of work |
-

latitude : 26.45225851
Longitude : 90.65839337
file name : Image_30032025153428247.png
|
2025-03-30 15:34:28.320424 |
309 |
123141937 |
Construction and repairing of Gate doors, window, fixtures etc. |
700000 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Completion of work |
-

latitude : 26.41953354
Longitude : 90.70062211
file name : Image_30032025153252197.png
|
2025-03-30 15:32:52.295509 |
310 |
123811183 |
Construction of Building |
158849 |
Construction of Building1 |
Completion of work |
-

latitude : 26.4358457
Longitude : 90.6670187
file name : Image_02042025162939816.png
|
2025-04-02 16:29:39.907003 |