1 |
43975964 |
Construction of Boundary Wall at Dakhin Kandigram at Behara-V (Ph-II) |
150000 |
Construction of Boundary Wall at Dakhin Kandigram at Behara-V (Ph-II)1 |
In Progress |
-
latitude : 24.91466095
Longitude : 92.62802612
file name : Image_19022021123031668.png
|
2021-02-19 12:30:31.751168 |
2 |
43976018 |
Construction of Boundary wall of Kandigram Govt. Water Tank at Behara- V. |
150000 |
Construction of Boundary wall of Kandigram Govt. Water Tank at Behara- V.1 |
In Progress |
-
latitude : 24.91903084
Longitude : 92.62876572
file name : Image_06072021132835001.png
|
2021-07-06 13:28:35.07477 |
3 |
43976039 |
Construction of Brick Solling with Plaster road start from arirul Islam house at Behara-IV. |
166594 |
Construction of Brick Solling with Plaster road start from arirul Islam house at Behara-IV.1 |
25% |
-
latitude : 24.9430799,24.94307708
Longitude : 92.63114275,92.63114219
file name : Image_06072021163539218.png
|
2021-07-06 16:35:39.34991 |
4 |
43976063 |
Construction of Culvert on the Nala Athailkuri near the Abdulla land at Behara- V. |
150000 |
Construction of Culvert on the Nala Athailkuri near the Abdulla land at Behara- V.1 |
25% |
-
latitude : 24.91443399,24.91443467
Longitude : 92.62921293,92.62921202
file name : Image_13072021125818262.png
|
2021-07-13 12:58:18.371752 |
5 |
43976095 |
Construction of Community Ghat at Kolacharipar infront of Rahmatulla house at Behar-V. |
300000 |
Construction of Community Ghat at Kolacharipar infront of Rahmatulla house at Behar-V.1 |
25% |
-
latitude : 24.9039362
Longitude : 92.62917483
file name : Image_19122020142736358.png
|
2020-12-19 14:27:36.430311 |
6 |
43976103 |
Construction of Ring well near the house of Sirajul Islam at Behara-V. |
80000 |
Construction of Ring well near the house of Sirajul Islam at Behara-V.1 |
In Progress |
-
latitude : 24.91358246
Longitude : 92.62815184
file name : Image_18082021123523999.png
|
2021-08-18 12:35:24.108651 |
7 |
43976116 |
Construction of Boundary wall of Tintikri Graveyard at Behara-VI (Phase-III). |
180000 |
Construction of Boundary wall of Tintikri Graveyard at Behara-VI (Phase-III).1 |
Completed |
-
latitude : 24.91784881
Longitude : 92.6121535
file name : Image_21122020135530072.png
|
2020-12-21 13:55:30.140957 |
8 |
38506785 |
Construction of Waiting Sheed near GP office at Behara –V. |
200000 |
Construction of Waiting Sheed near GP office at Behara –V.1 |
25% |
-
latitude : 24.91374756
Longitude : 92.6280056
file name : Image_18082021123058580.png
|
2021-08-18 12:30:58.7166 |
9 |
38506814 |
Construction of Culvert near the house of Kunjo Babu Singh at Behara Pt.-V. |
160000 |
Construction of Culvert near the house of Kunjo Babu Singh at Behara Pt.-V.1 |
Substructure below GL |
-
latitude : 24.94156908,24.94155579
Longitude : 92.6298425,92.62980903
file name : Image_21082021122259954.png
|
2021-08-21 12:23:00.050944 |
10 |
38506837 |
Construction of Ring well near the house of Tara Mia at Behara Pt.-VI. |
80000 |
Construction of Ring well near the house of Tara Mia at Behara Pt.-VI.1 |
In Progress |
-
latitude : 24.91639361
Longitude : 92.6104238
file name : Image_07072021114655984.png
|
2021-07-07 11:46:56.155644 |
11 |
38513449 |
Construction of Boundary Wall of Saisakuri Pt. IV Jasirabad Mukam at Behara Pt.- IV. |
200000 |
Construction of Boundary Wall of Saisakuri Pt. IV Jasirabad Mukam at Behara Pt.- IV.1 |
In Progress |
-
latitude : 24.93315354
Longitude : 92.63106107
file name : Image_19042021224417170.png
|
2021-04-19 22:44:17.236981 |
12 |
38513534 |
Construction of Box Culvert near the house of Hussain Ali at Behara Pt.-IV. |
160000 |
Construction of Box Culvert near the house of Hussain Ali at Behara Pt.-IV.1 |
25% |
-
latitude : 24.93101376,24.93103384
Longitude : 92.63133528,92.63133176
file name : Image_17042021133952878.png
|
2021-04-17 13:39:52.978021 |
13 |
43976138 |
Construction of Community Ring Well at Behara Pt-V near the 164 NO ICDS |
80000 |
Construction of Community Ring Well at Behara Pt-V near the 164 NO ICDS1 |
In Progress |
-
latitude : 24.91289477
Longitude : 92.63034295
file name : Image_28062021130439296.png
|
2021-06-28 13:04:39.376193 |
14 |
43976143 |
Construction of Community Ring Well at Behara Pt-V near the house of Minarul Haque |
80000 |
Construction of Community Ring Well at Behara Pt-V near the house of Minarul Haque1 |
In Progress |
-
latitude : 24.91377776
Longitude : 92.62855267
file name : Image_13072021130516177.png
|
2021-07-13 13:05:16.276652 |
15 |
43976158 |
Construction of Waiting Shed near the house of Ilas Uddin at Behara-IV. |
200000 |
Construction of Waiting Shed near the house of Ilas Uddin at Behara-IV.1 |
25% |
-
latitude : 24.93010221
Longitude : 92.63306755
file name : Image_21082021112911293.png
|
2021-08-21 11:29:11.373814 |
16 |
43976168 |
Construction of CC Block road from PMGSY road to Baharul Islam house at Behara-V (Ph-I) |
400000 |
Construction of CC Block road from PMGSY road to Baharul Islam house at Behara-V (Ph-I)1 |
Earth Work |
-
latitude : 24.91870333,24.91870022
Longitude : 92.63450586,92.63449107
file name : Image_06072021112643766.png
|
2021-07-06 11:26:43.886479 |
17 |
43976174 |
Construction of Drain from Kamal Uddin shop to Nasir Uddin via Jamirul Rahman at Behara -VI. |
250000 |
Construction of Drain from Kamal Uddin shop to Nasir Uddin via Jamirul Rahman at Behara -VI.1 |
25% |
-
latitude : 24.91554297,24.91554112
Longitude : 92.61043199,92.61043394
file name : Image_13032021143749187.png
|
2021-03-13 14:37:49.259477 |
18 |
43976182 |
Construction of Culvert at Purbakuri at Behara Pt-V. |
120000 |
Construction of Culvert at Purbakuri at Behara Pt-V.1 |
Substructure below GL |
-
latitude : 24.90770562,24.9077233
Longitude : 92.63156007,92.63159844
file name : Image_25022021144445110.png
|
2021-02-25 14:44:45.222311 |
19 |
29971921 |
Const of Toilet |
60000 |
Toilet1 |
Completed |
-
latitude : 24.91316868
Longitude : 92.62826683
file name : Image_08032021133535521.png
|
2021-03-08 13:35:35.599354 |
20 |
29971921 |
Const of Toilet |
60000 |
Toilet1 |
25% |
-
latitude : 24.91309104
Longitude : 92.62819727
file name : Image_28012020152635935.png
|
2020-01-28 15:26:36.117303 |
21 |
29971921 |
Const of Toilet |
60000 |
Toilet1 |
25% |
-
latitude : 24.91309104
Longitude : 92.62819727
file name : Image_28012020152629095.png
|
2020-01-28 15:26:29.322331 |
22 |
43976109 |
Construction of CC Block road from PMGSY road to Forij Uddin house at Behara-IV. |
150000 |
Construction of CC Block road from PMGSY road to Forij Uddin house at Behara-IV.1 |
Earth Work |
-
latitude : 24.93145665,24.93146481
Longitude : 92.63573476,92.63579016
file name : Image_19022021130511053.png
|
2021-02-19 13:05:11.125815 |
23 |
43976178 |
Construction of Boundary wall of Kolacharipar Sabahi Maktab at Behara Pt-V (Ph-II), East |
172935 |
Construction of Boundary wall of Kolacharipar Sabahi Maktab at Behara Pt-V (Ph-II), East1 |
In Progress |
-
latitude : 24.90551004
Longitude : 92.63251413
file name : Image_26022021092923629.png
|
2021-02-26 09:29:23.711962 |
24 |
38506827 |
Construction of Boundary Wall with gate at Madani Idgah at Behara Pt.-IV. |
253221 |
Construction of Boundary Wall with gate at Madani Idgah at Behara Pt.-IV.1 |
Completed |
-
latitude : 24.93154517
Longitude : 92.62770737
file name : Image_26022021150014262.png
|
2021-02-26 15:00:14.344247 |
25 |
37513815 |
Const of Ring well |
80000 |
Const of Ring well 1 |
In Progress |
-
latitude : 24.93766357
Longitude : 92.63172076
file name : Image_19042021224421067.png
|
2021-04-19 22:44:21.162162 |
26 |
37513693 |
Const of Boundary wall |
200000 |
Const of Boundary wall 1 |
In Progress |
-
latitude : 24.90386748
Longitude : 92.63038587
file name : Image_17032021122126012.png
|
2021-03-17 12:21:26.198677 |
27 |
37513693 |
Const of Boundary wall |
200000 |
Const of Boundary wall 1 |
In Progress |
-
latitude : 24.90386748
Longitude : 92.63038587
file name : Image_17032021124215204.png
|
2021-03-17 12:42:15.32233 |
28 |
37514613 |
Const of Boundary wall |
204140 |
Const of Boundary wall 1 |
In Progress |
-
latitude : 24.91804614
Longitude : 92.62850299
file name : Image_26022021092933304.png
|
2021-02-26 09:29:33.405926 |
29 |
13387611 |
Const. of Boundary Wall |
150000 |
Const. of Boundary Wall 1 |
In Progress |
-
latitude : 24.92827221
Longitude : 92.63025583
file name : Image_06072021163606389.png
|
2021-07-06 16:36:06.513528 |
30 |
51418317 |
Construction of Boundary wall at Naymuja Sobahi Maktab at Behara V |
300800 |
Construction of Boundary wall at Naymuja Sobahi Maktab at Behara V1 |
Completion of work |
-
latitude : 24.91953944
Longitude : 92.62816648
file name : Image_31032022132252175.png
|
2022-03-31 13:22:52.258264 |
31 |
51418317 |
Construction of Boundary wall at Naymuja Sobahi Maktab at Behara V |
300800 |
Construction of Boundary wall at Naymuja Sobahi Maktab at Behara V1 |
Completion of work |
-
latitude : 24.91953944
Longitude : 92.62816648
file name : Image_31032022132256355.png
|
2022-03-31 13:22:56.436429 |
32 |
51418404 |
Construction of Brick soilling Road from SN road to 83 ICDS School |
166800 |
Construction of Brick soilling Road from SN road to 83 ICDS School1 |
Completion of work |
-
latitude : 24.94053549,24.94053565
Longitude : 92.63444534,92.63444533
file name : Image_16052022132905473.png
|
2022-05-16 13:29:05.575312 |
33 |
51418404 |
Construction of Brick soilling Road from SN road to 83 ICDS School |
166800 |
Construction of Brick soilling Road from SN road to 83 ICDS School1 |
Completion of work |
-
latitude : 24.94074125,24.94060393
Longitude : 92.63464213,92.63452334
file name : Image_29052022142643384.png
|
2022-05-29 14:26:43.473643 |
34 |
51418404 |
Construction of Brick soilling Road from SN road to 83 ICDS School |
166800 |
Construction of Brick soilling Road from SN road to 83 ICDS School1 |
Completion of work |
-
latitude : 24.9404226,24.94068761
Longitude : 92.63429634,92.63466593
file name : Image_31032022133756782.png
|
2022-03-31 13:37:56.898289 |
35 |
51418274 |
Construction of Boundary wall near Sarishakuri Purba Sobahi Maktab at Behara IV |
150000 |
Construction of Boundary wall near Sarishakuri Purba Sobahi Maktab at Behara IV1 |
Completion of work |
-
latitude : 24.92918643
Longitude : 92.63209171
file name : Image_31032022132838844.png
|
2022-03-31 13:28:38.933625 |
36 |
53350288 |
Construction of Girls Toilet at 1481 No Jasirabad LP School |
240500 |
Construction of Girls Toilet at 1481 No Jasirabad LP School1 |
Completion of work |
-
latitude : 24.93302196
Longitude : 92.63109078
file name : Image_23042022173227128.png
|
2022-04-23 17:32:27.233005 |
37 |
53351187 |
Renovation of Boys toilet at Ahmodia ME Madrassa |
50000 |
Renovation of Boys toilet at Ahmodia ME Madrassa1 |
Completion of work |
-
latitude : 24.91561506
Longitude : 92.61101267
file name : Image_25072022135911110.png
|
2022-07-25 13:59:11.205639 |
38 |
53351187 |
Renovation of Boys toilet at Ahmodia ME Madrassa |
50000 |
Renovation of Boys toilet at Ahmodia ME Madrassa1 |
Completion of work |
-
latitude : 24.91554877
Longitude : 92.61103712
file name : Image_31032022132247732.png
|
2022-03-31 13:22:47.817004 |
39 |
65266096 |
Operation & maintenance of drinking water supply system |
309000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.922851666666663
Longitude : 92.603365
file name : Image_29032023174645697.png
|
2023-03-29 17:46:45.815617 |
40 |
65266297 |
Const. of Boundary wall at Mattab near GP Office at Behara V ( Ward No. 04) |
200000 |
Const. of Boundary wall at Mattab near GP Office at Behara V ( Ward No. 04)1 |
Completion of work |
-
latitude : 24.91386
Longitude : 92.62793166666667
file name : Image_11062024105408882.png
|
2024-06-11 10:54:08.987936 |
41 |
65266297 |
Const. of Boundary wall at Mattab near GP Office at Behara V ( Ward No. 04) |
200000 |
Const. of Boundary wall at Mattab near GP Office at Behara V ( Ward No. 04)1 |
Completion of work |
-
latitude : 24.913693333333338
Longitude : 92.62793166666667
file name : Image_13122023085400578.png
|
2023-12-13 08:54:00.668178 |
42 |
65266297 |
Const. of Boundary wall at Mattab near GP Office at Behara V ( Ward No. 04) |
200000 |
Const. of Boundary wall at Mattab near GP Office at Behara V ( Ward No. 04)1 |
Completion of work |
-
latitude : 24.913703333333334
Longitude : 92.62793166666667
file name : Image_05112023150420603.png
|
2023-11-05 15:04:20.696518 |
43 |
65266297 |
Const. of Boundary wall at Mattab near GP Office at Behara V ( Ward No. 04) |
200000 |
Const. of Boundary wall at Mattab near GP Office at Behara V ( Ward No. 04)1 |
Completion of work |
-
latitude : 24.91377333333333
Longitude : 92.62804833333333
file name : Image_24042023171332748.png
|
2023-04-24 17:13:32.838877 |
44 |
65266352 |
Const. of CC Road from Abdul Aziz house to Azar Uddin house at Behara V (Ward No. 03) |
318000 |
Const. of CC Road from Abdul Aziz house to Azar Uddin house at Behara V (Ward No. 03)1 |
Completion of work |
-
latitude : 24.918776666666666,24.918774999999997,24.91876166666667
Longitude : 92.63449333333334,92.63464,92.63471166666668
file name : Image_14122023123944460.png
|
2023-12-14 12:39:44.559157 |
45 |
65266352 |
Const. of CC Road from Abdul Aziz house to Azar Uddin house at Behara V (Ward No. 03) |
318000 |
Const. of CC Road from Abdul Aziz house to Azar Uddin house at Behara V (Ward No. 03)1 |
Completion of work |
-
latitude : 24.918833333333335,24.918831666666666,24.91882666666667,24.91881166666667
Longitude : 92.63450166666668,92.63449999999999,92.63449833333334,92.634495
file name : Image_05112023153828636.png
|
2023-11-05 15:38:28.72201 |
46 |
65266352 |
Const. of CC Road from Abdul Aziz house to Azar Uddin house at Behara V (Ward No. 03) |
318000 |
Const. of CC Road from Abdul Aziz house to Azar Uddin house at Behara V (Ward No. 03)1 |
Completion of work |
-
latitude : 24.918744999999998,24.918723333333332
Longitude : 92.63447333333333,92.63446666666665
file name : Image_24042023175812587.png
|
2023-04-24 17:58:12.67573 |
47 |
65266270 |
Renovation of 181 (B) No. AWC at Behara V (Ward No. 04) |
100000 |
Renovation of 181 (B) No. AWC at Behara V (Ward No. 04)1 |
Completion of work |
-
latitude : 24.914573333333337
Longitude : 92.627965
file name : Image_01122023152612410.png
|
2023-12-01 15:26:12.501412 |
48 |
65266270 |
Renovation of 181 (B) No. AWC at Behara V (Ward No. 04) |
100000 |
Renovation of 181 (B) No. AWC at Behara V (Ward No. 04)1 |
Completion of work |
-
latitude : 24.91459166666667
Longitude : 92.62790833333332
file name : Image_24042023173445709.png
|
2023-04-24 17:34:45.810034 |
49 |
73631005 |
Administrative Expenses |
551250 |
Administrative Expenses1 |
Completion of work |
-
latitude : 24.8230079
Longitude : 92.7979655
file name : Image_10072023171549787.png
|
2023-07-10 17:15:49.879025 |
50 |
71925517 |
Operation & maintenance of drinking water supply system |
247475 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.89026666666667
Longitude : 92.62169333333334
file name : Image_11072023094744917.png
|
2023-07-11 09:47:45.042688 |
51 |
71921164 |
Operation & maintenance of drinking water supply system |
246600 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.890228333333333
Longitude : 92.62164666666668
file name : Image_11072023091723642.png
|
2023-07-11 09:17:23.734573 |
52 |
87376096 |
Operation & maintenance of drinking water supply system |
255075 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.8317554
Longitude : 92.8013763
file name : Image_13102023112100149.png
|
2023-10-13 11:21:00.34627 |
53 |
87376089 |
Operation & maintenance of drinking water supply system |
255075 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.838389
Longitude : 92.8299111
file name : Image_11102023162824342.png
|
2023-10-11 16:28:24.442363 |
54 |
65280822 |
Creation of a new source of drinking water |
327100 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.917993333333335
Longitude : 92.62855999999998
file name : Image_24022023115308800.png
|
2023-02-24 11:53:08.935346 |
55 |
65266222 |
Creation of drainage channel for management of grey water |
209000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.918543333333332
Longitude : 92.62836833333334
file name : Image_24042023174318707.png
|
2023-04-24 17:43:18.799759 |
56 |
65280755 |
Operation & maintenance of community sanitary complex |
50000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 24.92965333333333
Longitude : 92.63235000000002
file name : Image_11072023175603696.png
|
2023-07-11 17:56:03.796423 |
57 |
65266137 |
Operation & maintenance of community sanitary complex |
50000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 24.911703333333335
Longitude : 92.63221166666666
file name : Image_24042023172415664.png
|
2023-04-24 17:24:15.753599 |
58 |
103932090 |
Operation and Maintenance of drinking water supply system |
257925 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.9802
Longitude : 92.51480000000001
file name : Image_21062024125435679.png
|
2024-06-21 12:54:35.779275 |
59 |
103932090 |
Operation and Maintenance of drinking water supply system |
257925 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.980145
Longitude : 92.51477000000001
file name : Image_21062024125327312.png
|
2024-06-21 12:53:27.420528 |
60 |
103932090 |
Operation and Maintenance of drinking water supply system |
257925 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.874375
Longitude : 92.73865833333333
file name : Image_11062024110603486.png
|
2024-06-11 11:06:03.606519 |
61 |
103932090 |
Operation and Maintenance of drinking water supply system |
257925 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.874361666666665
Longitude : 92.73867999999999
file name : Image_11062024110559974.png
|
2024-06-11 11:06:00.101992 |
62 |
103932090 |
Operation and Maintenance of drinking water supply system |
257925 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.874381666666668
Longitude : 92.73868333333333
file name : Image_11062024110556075.png
|
2024-06-11 11:05:54.856207 |