1 |
45005987 |
Const of one side RCC drain at Mukam Tilla main Road to Jotin Babu 1020 2nd |
250000 |
Const of one side RCC drain at Mukam Tilla main Road to Jotin Babu 1020 2nd1 |
Completed |
-
latitude : 24.97905542,24.9790276
Longitude : 92.58457346,92.58456834
file name : Image_26032021194650839.png
|
2021-03-26 19:46:50.968776 |
2 |
45005935 |
Const of pacca floor near Bhairab Mandir 1920 1st |
127860 |
Const of pacca floor near Bhairab Mandir 1920 1st1 |
Completed |
-
latitude : 24.980099201202393
Longitude : 92.59500503540039
file name : Image_15082021164352450.png
|
2021-08-15 16:43:52.552141 |
3 |
45005935 |
Const of pacca floor near Bhairab Mandir 1920 1st |
127860 |
Const of pacca floor near Bhairab Mandir 1920 1st1 |
Completed |
-
latitude : 24.98005432
Longitude : 92.59499388
file name : Image_26032021194706063.png
|
2021-03-26 19:47:06.200774 |
4 |
25806760 |
Construction of CC Block starting from Main Road to the house of Krishna Deb via Romakanta 1920 2nd |
300000 |
Construction of CC Block starting from Main Road to the house of Krishna Deb via Romakanta 1920 2nd1 |
Completed |
-
latitude : 24.97895581,24.97894674
Longitude : 92.58537784,92.58538084
file name : Image_26032021194654443.png
|
2021-03-26 19:46:54.568896 |
5 |
45005976 |
Const of both side RCC drain from the house of Sital Karmakar to Kartik Tanti 1020 2nd |
500000 |
Const of both side RCC drain from the house of Sital Karmakar to Kartik Tanti 1020 2nd1 |
Completed |
-
latitude : 24.98288867,24.98289834
Longitude : 92.57862913,92.57863135
file name : Image_26032021194638616.png
|
2021-03-26 19:46:38.741538 |
6 |
45005950 |
Const of guard wall both side from the house of K Sing to Arobindo Rajuar 1920 1st |
800000 |
Const of guard wall both side from the house of K Sing to Arobindo Rajuar 1920 1st1 |
Completed |
-
latitude : 24.9814262,24.98143806
Longitude : 92.5792805,92.57925615
file name : Image_26032021194643217.png
|
2021-03-26 19:46:43.337225 |
7 |
12604422 |
Const. of Stair case road from Larang river to Milip Engleng,ward no-7 |
251729 |
Tracks and Foot Path1 |
25% |
-
latitude : 25.01622217,25.01625248
Longitude : 92.62591028,92.62586544
file name : Image_05012021214146785.png
|
2021-01-05 21:41:46.852376 |
8 |
12605840 |
Const. of brick soiling road from Prodip Deb house to kokil Mohali house via Sunil Gorah,Ward no-5 |
300000 |
Const. of brick soiling road from Prodip Deb house to kokil Mohali house via Sunil Gorah,Ward no-51 |
Completed |
-
latitude : 24.98229994,24.98227647
Longitude : 92.57853222,92.57854605
file name : Image_05012021214055295.png
|
2021-01-05 21:40:55.422299 |
9 |
21892892 |
Construction of Foot beridge at Ward No-10 |
200000 |
Construction of Foot beridge at Ward No-101 |
Completed |
-
latitude : 24.99010924
Longitude : 92.55974135
file name : Image_15082021164402975.png
|
2021-08-15 16:44:03.071607 |
10 |
22286872 |
Const of Boundary wall |
300000 |
Const of Boundary wall1 |
Completed |
-
latitude : 24.98357501
Longitude : 92.57851078
file name : Image_15082021164345098.png
|
2021-08-15 16:43:45.180114 |
11 |
21896433 |
Construction of CC Block road with Guard wall |
300000 |
Construction of CC Block road with Guard wall1 |
Completed |
-
latitude : 24.98281026,24.98280627
Longitude : 92.57915316,92.57916139
file name : Image_05012021214059844.png
|
2021-01-05 21:40:59.933454 |
12 |
12606159 |
Const. of RCC culvert near Ringu urang house at kalline TE,ward no-3 |
120000 |
Const. of RCC culvert near Ringu urang house at kalline TE,ward no-31 |
Completed |
-
latitude : 24.98483063,24.98485555
Longitude : 92.58527883,92.58526396
file name : Image_05012021214112005.png
|
2021-01-05 21:41:12.072059 |
13 |
21894590 |
Construction of Foot beridge at Ward No-6 |
250000 |
Construction of Foot beridge at Ward No-61 |
Completed |
-
latitude : 24.98508633
Longitude : 92.58096916
file name : Image_05012021214104177.png
|
2021-01-05 21:41:04.252208 |
14 |
22285818 |
Construction of CC Block road |
218381 |
Construction of CC Block road1 |
Completed |
-
latitude : 24.98367356,24.98370739,24.98370144
Longitude : 92.60389468,92.60387709,92.60389963
file name : Image_29092021183336877.png
|
2021-09-29 18:33:36.984919 |
15 |
22285818 |
Construction of CC Block road |
218381 |
Construction of CC Block road1 |
Completed |
-
latitude : 24.98392821,24.98382277
Longitude : 92.60355436,92.60361472
file name : Image_26032021194702408.png
|
2021-03-26 19:47:02.533681 |
16 |
21890567 |
Construction of Foot beridge at Ward No-9 |
700000 |
Construction of Foot beridge at Ward No-91 |
Completed |
-
latitude : 25.00126631
Longitude : 92.56820065
file name : Image_29092021183400213.png
|
2021-09-29 18:34:00.31527 |
17 |
12604950 |
Const. of boundary wall at Shiv bari at Sindura TE,ward no-8 |
150000 |
Const. of boundary wall at Shiv bari at Sindura TE,ward no-81 |
Completed |
-
latitude : 24.99924805
Longitude : 92.59470741
file name : Image_15082021164406900.png
|
2021-08-15 16:44:06.974075 |
18 |
21891701 |
Construction of culvert at Ward No-5 |
250000 |
Construction of culvert at Ward No-51 |
Completed |
-
latitude : 24.98267162,24.98268104
Longitude : 92.58033187,92.58034349
file name : Image_05012021214127243.png
|
2021-01-05 21:41:27.330176 |
19 |
12606009 |
Const. of culvert near Ashutosh Chasha house at Mejenta TE,ward no-9 |
120000 |
Const. of culvert near Ashutosh Chasha house at Mejenta TE,ward no-91 |
Completed |
-
latitude : 24.99789975,24.99790694
Longitude : 92.5694759,92.5694686
file name : Image_05012021214138591.png
|
2021-01-05 21:41:38.656274 |
20 |
12606348 |
Const. of ring well near Abdul Khalik house at sunduara ,ward no-2 |
80000 |
Const. of ring well near Abdul Khalik house at sunduara ,ward no-21 |
Completed |
-
latitude : 24.97575002
Longitude : 92.58227722
file name : Image_05012021214123374.png
|
2021-01-05 21:41:23.479662 |
21 |
45005942 |
Const of Waiting Shed near Bhubon Mahali Shib mandir 1920 1st |
150000 |
Const of Waiting Shed near Bhubon Mahali Shib mandir 1920 1st1 |
25% |
-
latitude : 24.97848002
Longitude : 92.57236124
file name : Image_15082021164410432.png
|
2021-08-15 16:44:10.523018 |
22 |
45005942 |
Const of Waiting Shed near Bhubon Mahali Shib mandir 1920 1st |
150000 |
Const of Waiting Shed near Bhubon Mahali Shib mandir 1920 1st1 |
25% |
-
latitude : 24.97849324
Longitude : 92.57236483
file name : Image_26032021194647015.png
|
2021-03-26 19:46:47.141701 |
23 |
45005997 |
Const of CC Blk road from Shasan Kalibari to the house of Binod Roy at Sundaura 1920 2nd |
250000 |
Const of CC Blk road from Shasan Kalibari to the house of Binod Roy at Sundaura 1920 2nd1 |
completed |
-
latitude : 24.97708811,24.97707976
Longitude : 92.57229754,92.57228921
file name : Image_29092021183343352.png
|
2021-09-29 18:33:43.463096 |
24 |
12606102 |
Const. of culvert near Bimal Bakti house at Kalline Te,ward no-6 |
120000 |
Const. of culvert near Bimal Bakti house at Kalline Te,ward no-61 |
Completed |
-
latitude : 24.98228989,24.9823036
Longitude : 92.57935916,92.57936317
file name : Image_15082021164335217.png
|
2021-08-15 16:43:35.30694 |
25 |
12604862 |
Const. of boundary wall at Horibasar community hall at Jita Line at kalline TE,under ward no-4 |
200000 |
Const. of boundary wall at Horibasar community hall at Jita Line at kalline TE,under ward no-41 |
Completed |
-
latitude : 24.98739112
Longitude : 92.58070768
file name : Image_15082021164338798.png
|
2021-08-15 16:43:38.890219 |
26 |
22286150 |
const of Tran Sibir |
200000 |
const of Tran Sibir1 |
Completed |
-
latitude : 25.00113454
Longitude : 92.59993876
file name : Image_29092021183406578.png
|
2021-09-29 18:34:06.672201 |
27 |
45005957 |
Const of guard wall from the house of Himangshu Paul to the shop of Nayan Rajuwar 1920 1st |
500000 |
Const of guard wall from the house of Himangshu Paul to the shop of Nayan Rajuwar 1920 1st1 |
Completed |
-
latitude : 24.98133643,24.981352
Longitude : 92.60130987,92.60131617
file name : Image_18092021094107528.png
|
2021-09-18 09:41:07.669945 |
28 |
45005957 |
Const of guard wall from the house of Himangshu Paul to the shop of Nayan Rajuwar 1920 1st |
500000 |
Const of guard wall from the house of Himangshu Paul to the shop of Nayan Rajuwar 1920 1st1 |
Completed |
-
latitude : 24.98131799,24.98133263
Longitude : 92.60117371,92.60120408
file name : Image_15082021164359269.png
|
2021-08-15 16:43:59.4777 |
29 |
45005957 |
Const of guard wall from the house of Himangshu Paul to the shop of Nayan Rajuwar 1920 1st |
500000 |
Const of guard wall from the house of Himangshu Paul to the shop of Nayan Rajuwar 1920 1st1 |
Completed |
-
latitude : 24.98153858,24.98154037
Longitude : 92.6015069,92.6015409
file name : Image_15082021164356016.png
|
2021-08-15 16:43:56.105144 |
30 |
45005957 |
Const of guard wall from the house of Himangshu Paul to the shop of Nayan Rajuwar 1920 1st |
500000 |
Const of guard wall from the house of Himangshu Paul to the shop of Nayan Rajuwar 1920 1st1 |
Completed |
-
latitude : 24.98145866,24.98147746
Longitude : 92.60116335,92.60116283
file name : Image_26032021194658309.png
|
2021-03-26 19:46:58.44351 |
31 |
25806664 |
Construction of CC Block starting from the Shop of Sankar Goala to Sukanta Rajwar, 1920 2nd |
200000 |
Construction of CC Block starting from the Shop of Sankar Goala to Sukanta Rajwar, 1920 2nd1 |
WBM |
-
latitude : 24.98742847,24.98742952
Longitude : 92.58041784,92.58042064
file name : Image_29092021183352016.png
|
2021-09-29 18:33:52.110543 |
32 |
53367548 |
Const of Boys Toilet at Boalcherra Mikir Pinjee LP Tied 2020 21 1st |
189300 |
Const of Boys Toilet at Boalcherra Mikir Pinjee LP Tied 2020 21 1st1 |
Completion of work |
-
latitude : 25.00913666666667
Longitude : 92.56042000000001
file name : Image_27042023101404823.png
|
2023-04-27 10:14:04.903511 |
33 |
53367548 |
Const of Boys Toilet at Boalcherra Mikir Pinjee LP Tied 2020 21 1st |
189300 |
Const of Boys Toilet at Boalcherra Mikir Pinjee LP Tied 2020 21 1st1 |
Completion of work |
-
latitude : 25.013965
Longitude : 92.58102333333333
file name : Image_08052022091248067.png
|
2022-05-08 09:12:48.174469 |
34 |
53367473 |
Const Boys Toilet at 857 No Mejenta Colony LP School Tied 2020 21 1st |
189300 |
Const Boys Toilet at 857 No Mejenta Colony LP School Tied 2020 21 1st1 |
Completion of work |
-
latitude : 24.994669999999996
Longitude : 92.57826500000002
file name : Image_08052022094001548.png
|
2022-05-08 09:40:01.691231 |
35 |
53367409 |
Water Reservior Tank at 12 no LP School Tied 2020 21 1st |
60000 |
Water Reservior Tank at 12 no LP School Tied 2020 21 1st1 |
Completion of work |
-
latitude : 24.987213333333337
Longitude : 92.57710333333334
file name : Image_17092022121015002.png
|
2022-09-17 12:10:15.058487 |
36 |
50086876 |
Instl of Solar Light near Sochin Mohali house to Sunil Rajwar house at Kalain TE UT 2020 21 1st |
89600 |
Instl of Solar Light near Sochin Mohali house to Sunil Rajwar house at Kalain TE UT 2020 21 1st1 |
Completion of work |
-
latitude : 24.983458333333335
Longitude : 92.57845833333334
file name : Image_17092022121018409.png
|
2022-09-17 12:10:18.461969 |
37 |
50086614 |
Const CC Road from Surajon Rajwar to Gopinath Munda UT 2020 21 1st |
150000 |
Const CC Road from Surajon Rajwar to Gopinath Munda UT 2020 21 1st1 |
Completion of work |
-
latitude : 24.98276,24.98276333333333,24.982765000000004
Longitude : 92.58002166666665,92.580015,92.57999999999998
file name : Image_08052022094010794.png
|
2022-05-08 09:40:10.898801 |
38 |
50086408 |
Const of CC Road from Nabendu Deb house to Kalain TE Main Road at Sundaura UT 2020 21 1st |
100000 |
Const of CC Road from Nabendu Deb house to Kalain TE Main Road at Sundaura UT 2020 21 1st1 |
Completion of work |
-
latitude : 24.975248333333337,24.97551
Longitude : 92.57497666666669,92.57491999999999
file name : Image_17092022121025802.png
|
2022-09-17 12:10:25.865646 |
39 |
50086168 |
Const of Community Hall near Malibasti at Baikuntapur UT 2020 21 1st |
159269 |
Const of Community Hall near Malibasti at Baikuntapur UT 2020 21 1st1 |
Completion of work |
-
latitude : 24.981615
Longitude : 92.59715
file name : Image_17092022121022405.png
|
2022-09-17 12:10:22.474584 |
40 |
50085951 |
Const of CC Block Road from Lalit Das to Prafulla Das at Sundaura UT 2020 21 1st |
100000 |
Const of CC Block Road from Lalit Das to Prafulla Das at Sundaura UT 2020 21 1st1 |
Completion of work |
-
latitude : 24.9795682,24.9795694
Longitude : 92.5822111,92.5822116
file name : Image_09092022171954339.png
|
2022-09-09 17:19:54.396424 |
41 |
53367345 |
Const of CMSC at Kalibari GP Office 2020 21 Tied 1st |
90000 |
Const of CMSC at Kalibari GP Office 2020 21 Tied 1st1 |
Completion of work |
-
latitude : 24.9795681
Longitude : 92.582211
file name : Image_09092022171733779.png
|
2022-09-09 17:17:33.838412 |
42 |
68362409 |
CONST OF GUARD WALL NEAR LAKHI MANDIR XVFC 2020-21 2ND |
149000 |
CONST OF GUARD WALL NEAR LAKHI MANDIR XVFC 2020-21 2ND1 |
Completion of work |
-
latitude : 24.982619999999997
Longitude : 92.580465
file name : Image_28042023092520439.png
|
2023-04-28 09:25:20.514603 |
43 |
68362409 |
CONST OF GUARD WALL NEAR LAKHI MANDIR XVFC 2020-21 2ND |
149000 |
CONST OF GUARD WALL NEAR LAKHI MANDIR XVFC 2020-21 2ND1 |
Completion of work |
-
latitude : 24.982630000000004
Longitude : 92.58035833333334
file name : Image_27042023104919818.png
|
2023-04-27 10:49:19.921635 |
44 |
68362409 |
CONST OF GUARD WALL NEAR LAKHI MANDIR XVFC 2020-21 2ND |
149000 |
CONST OF GUARD WALL NEAR LAKHI MANDIR XVFC 2020-21 2ND1 |
Completion of work |
-
latitude : 24.98262333333333
Longitude : 92.580405
file name : Image_27042023105236191.png
|
2023-04-27 10:52:36.287414 |
45 |
68362368 |
RENOVATION OF 38 NO MEGENTA AWC XVFC 2020-21 2ND |
150000 |
RENOVATION OF 38 NO MEGENTA AWC XVFC 2020-21 2ND1 |
Completion of work |
-
latitude : 24.99835
Longitude : 92.57207166666667
file name : Image_27042023171932771.png
|
2023-04-27 17:19:32.899306 |
46 |
68362217 |
Construction of toilets in public institutions |
50000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.011256666666668
Longitude : 92.61202166666665
file name : Image_11052023101844938.png
|
2023-05-11 10:18:45.011012 |
47 |
68362334 |
RENOVATION OF 37 NO AWC AT PECHACHARRA XVFC 2020-21 2ND |
150000 |
RENOVATION OF 37 NO AWC AT PECHACHARRA XVFC 2020-21 2ND1 |
Completion of work |
-
latitude : 24.97939
Longitude : 92.57303333333333
file name : Image_27042023103406873.png
|
2023-04-27 10:34:06.95244 |
48 |
68362293 |
RENOVATION OF 36 NO AWC XVFC 2020-21 2ND |
150000 |
RENOVATION OF 36 NO AWC XVFC 2020-21 2ND1 |
Completion of work |
-
latitude : 24.975545000000004
Longitude : 92.580445
file name : Image_27042023111029359.png
|
2023-04-27 11:10:29.438115 |
49 |
68362293 |
RENOVATION OF 36 NO AWC XVFC 2020-21 2ND |
150000 |
RENOVATION OF 36 NO AWC XVFC 2020-21 2ND1 |
Completion of work |
-
latitude : 24.975603333333332
Longitude : 92.58039666666667
file name : Image_27042023111537431.png
|
2023-04-27 11:15:37.555617 |
50 |
68362248 |
Creation of drainage channel for management of grey water |
149500 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.982073333333332
Longitude : 92.57761333333335
file name : Image_03052023094351148.png
|
2023-05-03 09:43:51.222417 |
51 |
68362248 |
Creation of drainage channel for management of grey water |
149500 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.98215
Longitude : 92.57746166666666
file name : Image_03052023094341917.png
|
2023-05-03 09:43:42.119227 |
52 |
68362248 |
Creation of drainage channel for management of grey water |
149500 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.982073333333332
Longitude : 92.57761333333335
file name : Image_03052023094331446.png
|
2023-05-03 09:43:31.52182 |
53 |
68360735 |
Construction of toilets in public institutions |
50000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.984456666666667
Longitude : 92.58425166666666
file name : Image_11052023101831289.png
|
2023-05-11 10:18:31.354479 |
54 |
68360735 |
Construction of toilets in public institutions |
50000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.984429999999996
Longitude : 92.58422999999999
file name : Image_11052023101825364.png
|
2023-05-11 10:18:25.427958 |
55 |
68362171 |
Construction of toilets in public institutions |
50000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.00898833333333
Longitude : 92.56054999999999
file name : Image_11052023101841356.png
|
2023-05-11 10:18:41.428975 |
56 |
68362171 |
Construction of toilets in public institutions |
50000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.008985
Longitude : 92.56048000000001
file name : Image_11052023101836059.png
|
2023-05-11 10:18:36.131717 |
57 |
68464918 |
Operation & maintenance of drinking water supply system |
484920 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.99051833333333
Longitude : 92.560915
file name : Image_25092023194259687.png
|
2023-09-25 19:42:59.749255 |
58 |
53367629 |
Const of Toilet near Recreation Club at Kalain TE Tied 2020 21 1st |
70269 |
Const of Toilet near Recreation Club at Kalain TE Tied 2020 21 1st1 |
Completion of work |
-
latitude : 24.982501666666668
Longitude : 92.57706000000002
file name : Image_17092022121011401.png
|
2022-09-17 12:10:11.46562 |
59 |
68465549 |
CONST OF 139 NO AWC AT JITALINE KALIBARI B XVFC 2021-22 2ND |
319200 |
CONST OF 139 NO AWC AT JITALINE KALIBARI B XVFC 2021-22 2ND1 |
Completion of work |
-
latitude : 24.987593333333333
Longitude : 92.58104666666668
file name : Image_03022024125223522.png
|
2024-02-03 12:52:23.578423 |
60 |
68465393 |
CONST OF CULVERT NEAR BOALCHERRA MIKIRPUNJI LP SCHOOL XVFC 2021-22 1ST |
118600 |
CONST OF CULVERT NEAR BOALCHERRA MIKIRPUNJI LP SCHOOL XVFC 2021-22 1ST1 |
Completion of work |
-
latitude : 25.011718333333338,25.011723333333332,25.011725000000002
Longitude : 92.57981999999998,92.57981833333334,92.57981833333334
file name : Image_03022024124811541.png
|
2024-02-03 12:48:11.609434 |
61 |
68465312 |
CONST OF B WALL OF SINDURA 9 NO MIKIR PUNJI LP SCHOOL XVFC 2021-22 1ST |
200000 |
CONST OF B WALL OF SINDURA 9 NO MIKIR PUNJI LP SCHOOL XVFC 2021-22 1ST1 |
Completion of work |
-
latitude : 25.01124333333333
Longitude : 92.61197500000002
file name : Image_03022024124822848.png
|
2024-02-03 12:48:22.905162 |
62 |
68465468 |
Creation of drainage channel for management of grey water |
239400 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.982111666666665
Longitude : 92.57899666666665
file name : Image_03022024130315517.png
|
2024-02-03 13:03:15.588309 |
63 |
87278439 |
Creation of drainage channel for management of grey water |
9750 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.980196666666664
Longitude : 92.57454333333332
file name : Image_03022024132121520.png
|
2024-02-03 13:21:21.586838 |
64 |
87278455 |
CONST OF CC BLOCK ROAD FROM KALAIN TE MAIN ROAD TO SHIB BARI VIA AKRA 2022-23 1ST |
329650 |
CONST OF CC BLOCK ROAD FROM KALAIN TE MAIN ROAD TO SHIB BARI VIA AKRA 2022-23 1ST1 |
Completion of work |
-
latitude : 24.982385,24.982405000000004
Longitude : 92.57916500000002,92.57912333333334
file name : Image_03022024125918531.png
|
2024-02-03 12:59:18.672611 |
65 |
87278398 |
Operation & maintenance of drinking water supply system |
494951 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.983543333333333
Longitude : 92.58189333333333
file name : Image_05022024130208710.png
|
2024-02-05 13:02:08.814151 |
66 |
68465219 |
Creation of community compost pits for a group of Households |
208800 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 24.9795543
Longitude : 92.5823761
file name : Image_03022024132124789.png
|
2024-02-03 13:21:24.858413 |