1 |
38567086 |
CONST. OF PAVERS BLOCK ROAD FROM PWD TO DEVIDAS HOUSE AT NO.1 D/B , PHASE-I |
1556371 |
CONST. OF PAVERS BLOCK ROAD FROM PWD TO DEVIDAS HOUSE AT NO.1 D/B , PHASE-I1 |
completed |
-
latitude : 26.655985,26.655988333333333
Longitude : 92.27297500000002,92.27297500000002
file name : Image_11112020142722927.png
|
2020-11-11 14:27:26.878492 |
2 |
38567086 |
CONST. OF PAVERS BLOCK ROAD FROM PWD TO DEVIDAS HOUSE AT NO.1 D/B , PHASE-I |
1556371 |
CONST. OF PAVERS BLOCK ROAD FROM PWD TO DEVIDAS HOUSE AT NO.1 D/B , PHASE-I1 |
Earth Work |
-
latitude : 26.65621833333333,26.65623666666667
Longitude : 92.27278499999998,92.27279500000002
file name : Image_10112020122859078.png
|
2020-11-10 12:29:02.517976 |
3 |
38567086 |
CONST. OF PAVERS BLOCK ROAD FROM PWD TO DEVIDAS HOUSE AT NO.1 D/B , PHASE-I |
1556371 |
CONST. OF PAVERS BLOCK ROAD FROM PWD TO DEVIDAS HOUSE AT NO.1 D/B , PHASE-I1 |
Earth Work |
-
latitude : 26.65627833333333,26.656288333333336
Longitude : 92.27273333333332,92.27272999999998
file name : Image_10112020122923280.png
|
2020-11-10 12:29:26.714544 |
4 |
38567086 |
CONST. OF PAVERS BLOCK ROAD FROM PWD TO DEVIDAS HOUSE AT NO.1 D/B , PHASE-I |
1556371 |
CONST. OF PAVERS BLOCK ROAD FROM PWD TO DEVIDAS HOUSE AT NO.1 D/B , PHASE-I1 |
Earth Work |
-
latitude : 26.656186666666667,26.65621666666667
Longitude : 92.27281833333333,92.27283833333334
file name : Image_10112020122827716.png
|
2020-11-10 12:28:31.166857 |
5 |
38567086 |
CONST. OF PAVERS BLOCK ROAD FROM PWD TO DEVIDAS HOUSE AT NO.1 D/B , PHASE-I |
1556371 |
CONST. OF PAVERS BLOCK ROAD FROM PWD TO DEVIDAS HOUSE AT NO.1 D/B , PHASE-I1 |
Earth Work |
-
latitude : 26.654033333333338,26.654031666666665
Longitude : 92.27354500000001,92.273555
file name : Image_10112020122804413.png
|
2020-11-10 12:28:07.855321 |
6 |
38565312 |
CONST. OF BOUNDARY WALL AT NO.1 BARJHAR L.P SCHOOL AT NO.1 BARJHAR |
520000 |
CONST. OF BOUNDARY WALL AT NO.1 BARJHAR L.P SCHOOL AT NO.1 BARJHAR1 |
Completed |
-
latitude : 26.656088333333333
Longitude : 92.27287166666669
file name : Image_25012021165903014.png
|
2021-01-25 16:59:03.21473 |
7 |
38565312 |
CONST. OF BOUNDARY WALL AT NO.1 BARJHAR L.P SCHOOL AT NO.1 BARJHAR |
520000 |
CONST. OF BOUNDARY WALL AT NO.1 BARJHAR L.P SCHOOL AT NO.1 BARJHAR1 |
25% |
-
latitude : 26.656139999999997
Longitude : 92.27275
file name : Image_17112020153853430.png
|
2020-11-17 15:38:53.555299 |
8 |
38565235 |
CONST. OF DRINKING WATER TANK AT NO.1 D/B L.P SCHOOL |
243236 |
CONST. OF DRINKING WATER TANK AT NO.1 D/B L.P SCHOOL1 |
Pipeline Extension |
-
latitude : 26.645863333333335
Longitude : 92.28112333333333
file name : Image_18012021142048840.png
|
2021-01-18 14:20:48.938095 |
9 |
38565277 |
CONST. OF DRINKING WATER TANK AT LILANANDA HIGH SCHOOL AT NO.1 BARJHAR |
240000 |
CONST. OF DRINKING WATER TANK AT LILANANDA HIGH SCHOOL AT NO.1 BARJHAR1 |
Pipeline Extension |
-
latitude : 26.660825
Longitude : 92.26699666666667
file name : Image_16022021113856278.png
|
2021-02-16 11:38:56.459223 |
10 |
38565711 |
CONST. OF BOUNDARY WALL AT BASTU MANDIR COMPOUND AT NO.2 D/B |
340000 |
CONST. OF BOUNDARY WALL AT BASTU MANDIR COMPOUND AT NO.2 D/B1 |
In Progress |
-
latitude : 26.63974166666667
Longitude : 92.28660999999998
file name : Image_17112020153410945.png
|
2020-11-17 15:34:11.045393 |
11 |
38565711 |
CONST. OF BOUNDARY WALL AT BASTU MANDIR COMPOUND AT NO.2 D/B |
340000 |
CONST. OF BOUNDARY WALL AT BASTU MANDIR COMPOUND AT NO.2 D/B1 |
In Progress |
-
latitude : 26.639756666666667
Longitude : 92.28658500000002
file name : Image_17112020153419117.png
|
2020-11-17 15:34:19.21463 |
12 |
38565711 |
CONST. OF BOUNDARY WALL AT BASTU MANDIR COMPOUND AT NO.2 D/B |
340000 |
CONST. OF BOUNDARY WALL AT BASTU MANDIR COMPOUND AT NO.2 D/B1 |
In Progress |
-
latitude : 26.639756666666667
Longitude : 92.28658500000002
file name : Image_17112020153506178.png
|
2020-11-17 15:35:06.286028 |
13 |
38566672 |
CONST. OF PAVERS BLOCK ROAD FROM PWD RTO DEVIDAS HOUSE AT NO.1 D/B , PHASE-III |
815278 |
CONST. OF PAVERS BLOCK ROAD FROM PWD RTO DEVIDAS HOUSE AT NO.1 D/B , PHASE-III1 |
25% |
-
latitude : 26.655373333333333,26.65537
Longitude : 92.27329,92.27328000000001
file name : Image_17112020153606060.png
|
2020-11-17 15:36:06.164353 |
14 |
38566672 |
CONST. OF PAVERS BLOCK ROAD FROM PWD RTO DEVIDAS HOUSE AT NO.1 D/B , PHASE-III |
815278 |
CONST. OF PAVERS BLOCK ROAD FROM PWD RTO DEVIDAS HOUSE AT NO.1 D/B , PHASE-III1 |
25% |
-
latitude : 26.63209,26.656075
Longitude : 92.273945,92.27291666666666
file name : Image_10112020122302866.png
|
2020-11-10 12:23:06.314997 |
15 |
38566672 |
CONST. OF PAVERS BLOCK ROAD FROM PWD RTO DEVIDAS HOUSE AT NO.1 D/B , PHASE-III |
815278 |
CONST. OF PAVERS BLOCK ROAD FROM PWD RTO DEVIDAS HOUSE AT NO.1 D/B , PHASE-III1 |
25% |
-
latitude : 26.656291666666668,26.65633833333333
Longitude : 92.26952333333332,92.26944499999999
file name : Image_11112020142044653.png
|
2020-11-11 14:20:48.59946 |
16 |
38566672 |
CONST. OF PAVERS BLOCK ROAD FROM PWD RTO DEVIDAS HOUSE AT NO.1 D/B , PHASE-III |
815278 |
CONST. OF PAVERS BLOCK ROAD FROM PWD RTO DEVIDAS HOUSE AT NO.1 D/B , PHASE-III1 |
25% |
-
latitude : 26.656331666666667,26.656331666666667,26.656331666666667
Longitude : 92.269345,92.269345,92.26932166666666
file name : Image_11112020142202469.png
|
2020-11-11 14:22:06.454509 |
17 |
38566873 |
CONST. OF PAVERS BLOCK ROAD FROM PWD RTO DEVIDAS HOUSE AT NO.1 D/B , PHASE-II |
815278 |
CONST. OF PAVERS BLOCK ROAD FROM PWD RTO DEVIDAS HOUSE AT NO.1 D/B , PHASE-II1 |
Earth Work |
-
latitude : 26.654061666666667,26.654061666666667
Longitude : 92.27354333333332,92.27353833333333
file name : Image_10112020122334036.png
|
2020-11-10 12:23:37.517936 |
18 |
38566873 |
CONST. OF PAVERS BLOCK ROAD FROM PWD RTO DEVIDAS HOUSE AT NO.1 D/B , PHASE-II |
815278 |
CONST. OF PAVERS BLOCK ROAD FROM PWD RTO DEVIDAS HOUSE AT NO.1 D/B , PHASE-II1 |
Completed |
-
latitude : 26.656096666666667,26.656101666666668
Longitude : 92.27291500000001,92.27291833333332
file name : Image_11112020142559776.png
|
2020-11-11 14:26:03.729789 |
19 |
86990811 |
Repairing of No 2 Barjhar ME School Cycle Stand |
140000 |
Repairing of No 2 Barjhar ME School Cycle Stand1 |
Completion of work |
-
latitude : 26.642683558166027
Longitude : 92.2706554736942
file name : Image_06042024104302892.png
|
2024-04-06 10:43:02.996891 |
20 |
86990746 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.616486003622413
Longitude : 92.28139059618115
file name : Image_06042024142856066.png
|
2024-04-06 14:28:56.166823 |
21 |
86990944 |
Construction of toilets in public institutions |
120000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.625574291683733
Longitude : 92.27175576612353
file name : Image_06042024140127967.png
|
2024-04-06 14:01:28.074394 |
22 |
86991173 |
Repairing of AWC 203 at No 2 Durrang Bahajhar |
133200 |
Repairing of AWC 203 at No 2 Durrang Bahajhar1 |
Completion of work |
-
latitude : 26.633456549607217
Longitude : 92.28461863473058
file name : Image_06042024114544411.png
|
2024-04-06 11:45:44.538033 |
23 |
86991123 |
Const of Agradoot Club Community Hall near Barjhar Grant LP School |
200000 |
Const of Agradoot Club Community Hall near Barjhar Grant LP School1 |
Completion of work |
-
latitude : 26.63307953160256
Longitude : 92.27766215801239
file name : Image_06042024140116135.png
|
2024-04-06 14:01:16.234102 |
24 |
86991496 |
Repairing of Public Cremation Shed near Dibjyoti Club at No 1 Durrang Bahajhar |
100000 |
Repairing of Public Cremation Shed near Dibjyoti Club at No 1 Durrang Bahajhar1 |
Completion of work |
-
latitude : 26.64953618310392
Longitude : 92.27944063022733
file name : Image_06042024110652266.png
|
2024-04-06 11:06:52.375599 |
25 |
64594970 |
Repairing of AWC No 2 at No 1 Barjhar B |
125000 |
Repairing of AWC No 2 at No 1 Barjhar B1 |
Completion of work |
-
latitude : 26.64701561909169
Longitude : 92.27053477428854
file name : Image_15052023124506332.png
|
2023-05-15 12:45:06.43885 |
26 |
64559680 |
Const of Toilet at Public Place near Durga Mandir Field at No 1 Darrang Bahajhar |
90000 |
Const of Toilet at Public Place near Durga Mandir Field at No 1 Darrang Bahajhar1 |
Completion of work |
-
latitude : 26.64900732692331
Longitude : 92.27942143566906
file name : Image_10052023153148557.png
|
2023-05-10 15:31:48.668946 |
27 |
64752984 |
Operation & maintenance of drinking water supply system |
315875 |
Operation & maintenance of drinking water supply system1 |
|
-
latitude : 26.557470951229334
Longitude : 92.19685558229685
file name : Image_07042024225712030.png
|
2024-04-07 22:57:12.103105 |
28 |
64595088 |
Repairing of AWC No 204 at Barjhar Grant |
125000 |
Repairing of AWC No 204 at Barjhar Grant1 |
Roof laid |
-
latitude : 26.55757094733417
Longitude : 92.19696655869484
file name : Image_07042024184922677.png
|
2024-04-07 18:49:22.753551 |
29 |
64595088 |
Repairing of AWC No 204 at Barjhar Grant |
125000 |
Repairing of AWC No 204 at Barjhar Grant1 |
Plinth level |
-
latitude : 26.55751612968743
Longitude : 92.19699203968048
file name : Image_07042024184328212.png
|
2024-04-07 18:43:28.304023 |
30 |
64595088 |
Repairing of AWC No 204 at Barjhar Grant |
125000 |
Repairing of AWC No 204 at Barjhar Grant1 |
Completion of work |
-
latitude : 26.62476967088878
Longitude : 92.27189482189715
file name : Image_24092023152140609.png
|
2023-09-24 15:21:40.715821 |
31 |
64595088 |
Repairing of AWC No 204 at Barjhar Grant |
125000 |
Repairing of AWC No 204 at Barjhar Grant1 |
Completion of work |
-
latitude : 26.624818076379597
Longitude : 92.2719248291105
file name : Image_05052023130556577.png
|
2023-05-05 13:05:56.715234 |
32 |
85170215 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.641397858038545
Longitude : 92.17170165851712
file name : Image_10072023121632424.png
|
2023-07-10 12:16:32.532547 |
33 |
85182548 |
Creation of Shed for segregation and processing of wet and dry waste |
73750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.64133851416409
Longitude : 92.17173124663532
file name : Image_10072023121907176.png
|
2023-07-10 12:19:07.290611 |
34 |
85174449 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.5574087575078
Longitude : 92.1970446780324
file name : Image_15112023204455014.png
|
2023-11-15 20:44:55.086615 |
35 |
85174449 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.655804798938334
Longitude : 92.2697872761637
file name : Image_19092023161229517.png
|
2023-09-19 16:12:29.609138 |
36 |
85174449 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.64135733153671
Longitude : 92.17170023359358
file name : Image_10072023121729432.png
|
2023-07-10 12:17:29.554044 |
37 |
85177019 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.557562020607293
Longitude : 92.19688517041504
file name : Image_15112023223056550.png
|
2023-11-15 22:30:56.646221 |
38 |
85177019 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.55734107363969
Longitude : 92.19696211628616
file name : Image_15112023205642655.png
|
2023-11-15 20:56:42.747295 |
39 |
85177019 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.640928010456264
Longitude : 92.17195102013648
file name : Image_10072023121811670.png
|
2023-07-10 12:18:11.793553 |
40 |
85175879 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.5574087575078
Longitude : 92.1970446780324
file name : Image_15112023205605969.png
|
2023-11-15 20:56:06.058211 |
41 |
85175879 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.64607378654182
Longitude : 92.28311500512064
file name : Image_24092023143608096.png
|
2023-09-24 14:36:08.187505 |
42 |
85175879 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.64607177488506
Longitude : 92.28318952023983
file name : Image_07092023162744279.png
|
2023-09-07 16:27:44.374622 |
43 |
85175879 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.641313997097313
Longitude : 92.17174155637622
file name : Image_10072023121750822.png
|
2023-07-10 12:17:50.93131 |
44 |
85176520 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.55734107363969
Longitude : 92.19696211628616
file name : Image_15112023205651091.png
|
2023-11-15 20:56:51.176588 |
45 |
85176520 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.638118899427354
Longitude : 92.27937424555421
file name : Image_23092023133228632.png
|
2023-09-23 13:32:28.729685 |
46 |
85176520 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.64134358521551
Longitude : 92.17174650169909
file name : Image_10072023121801055.png
|
2023-07-10 12:18:01.152112 |
47 |
85178568 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.557578868232667
Longitude : 92.1969965659082
file name : Image_15112023223053327.png
|
2023-11-15 22:30:53.413917 |
48 |
85178568 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.5574087575078
Longitude : 92.1970446780324
file name : Image_15112023205630510.png
|
2023-11-15 20:56:30.585549 |
49 |
85178568 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.650086413137615
Longitude : 92.27580095641315
file name : Image_07092023155603035.png
|
2023-09-07 15:56:03.141198 |
50 |
85178568 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.641328036785126
Longitude : 92.17170618474483
file name : Image_10072023121832560.png
|
2023-07-10 12:18:32.670818 |
51 |
64752902 |
Const of Additional Building at Darrang Bahajhar LP School |
420000 |
Const of Additional Building at Darrang Bahajhar LP School1 |
Roof laid |
-
latitude : 26.557487128302455
Longitude : 92.19703369773924
file name : Image_15112023230028567.png
|
2023-11-15 23:00:28.639276 |
52 |
64752902 |
Const of Additional Building at Darrang Bahajhar LP School |
420000 |
Const of Additional Building at Darrang Bahajhar LP School1 |
Plinth level |
-
latitude : 26.557559170760214
Longitude : 92.1972502861172
file name : Image_15112023224333585.png
|
2023-11-15 22:43:33.658324 |
53 |
64752902 |
Const of Additional Building at Darrang Bahajhar LP School |
420000 |
Const of Additional Building at Darrang Bahajhar LP School1 |
Completion of work |
-
latitude : 26.64958039764315
Longitude : 92.27589550428092
file name : Image_19092023163144623.png
|
2023-09-19 16:31:44.725746 |
54 |
64752902 |
Const of Additional Building at Darrang Bahajhar LP School |
420000 |
Const of Additional Building at Darrang Bahajhar LP School1 |
Completion of work |
-
latitude : 26.649695271626115
Longitude : 92.27577019482851
file name : Image_01052023134207269.png
|
2023-05-01 13:42:07.482586 |
55 |
64818115 |
Repairing of AWC No 200 at No 2 Barjhar |
140600 |
Repairing of AWC No 200 at No 2 Barjhar1 |
Roof laid |
-
latitude : 26.58361000008881
Longitude : 92.14178647845984
file name : Image_28052024220210898.png
|
2024-05-28 22:02:10.996972 |
56 |
64818115 |
Repairing of AWC No 200 at No 2 Barjhar |
140600 |
Repairing of AWC No 200 at No 2 Barjhar1 |
Roof laid |
-
latitude : 26.557454229332507
Longitude : 92.19700628891587
file name : Image_07042024183337960.png
|
2024-04-07 18:33:38.039817 |
57 |
64818115 |
Repairing of AWC No 200 at No 2 Barjhar |
140600 |
Repairing of AWC No 200 at No 2 Barjhar1 |
Plinth level |
-
latitude : 26.557605522684753
Longitude : 92.19702766276896
file name : Image_07042024154732999.png
|
2024-04-07 15:47:33.086746 |
58 |
64818115 |
Repairing of AWC No 200 at No 2 Barjhar |
140600 |
Repairing of AWC No 200 at No 2 Barjhar1 |
Completion of work |
-
latitude : 26.642545592039824
Longitude : 92.27006245404482
file name : Image_05052023114204083.png
|
2023-05-05 11:42:04.186164 |
59 |
64752844 |
Construction of toilets in public institutions |
105000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.625772397965193
Longitude : 92.27158024907112
file name : Image_05052023131445732.png
|
2023-05-05 13:14:45.850679 |
60 |
64752992 |
Construction of toilets in public institutions |
110000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.654932075180113
Longitude : 92.27693343535066
file name : Image_10052023145528555.png
|
2023-05-10 14:55:28.65911 |
61 |
85178604 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.55734107363969
Longitude : 92.19696211628616
file name : Image_15112023205708273.png
|
2023-11-15 20:57:08.359386 |
62 |
85178604 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.622650055214763
Longitude : 92.27278816513717
file name : Image_27092023132000656.png
|
2023-09-27 13:20:00.751678 |
63 |
85178604 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.622663256712258
Longitude : 92.2728297393769
file name : Image_23092023154418907.png
|
2023-09-23 15:44:18.991894 |
64 |
85178604 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.641284911893308
Longitude : 92.17180240899324
file name : Image_10072023121848038.png
|
2023-07-10 12:18:48.155152 |
65 |
86990693 |
Construction of toilets in public institutions |
144900 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.557620358653367
Longitude : 92.19702548347414
file name : Image_07042024143725716.png
|
2024-04-07 14:37:25.832485 |
66 |
86990693 |
Construction of toilets in public institutions |
144900 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.64531203918159
Longitude : 92.28120116516948
file name : Image_24012024132511444.png
|
2024-01-24 13:25:11.553602 |
67 |
86990865 |
Repairing of Community Hall Building at No 1 Durrang Bahajhar near AWC 247 |
293200 |
Repairing of Community Hall Building at No 1 Durrang Bahajhar near AWC 2471 |
Completion of work |
-
latitude : 26.649875734001398
Longitude : 92.27585443295538
file name : Image_24012024134718569.png
|
2024-01-24 13:47:18.660884 |
68 |
49891675 |
CONST OF TOILET AT NO1 DARRANG BAHAJHAR MASZID CAMPUS NEAR MAHTAB ALI HOUSE |
45000 |
CONST OF TOILET AT NO1 DARRANG BAHAJHAR MASZID CAMPUS NEAR MAHTAB ALI HOUSE1 |
Roof laid |
-
latitude : 26.645707455463707
Longitude : 92.28115590289235
file name : Image_31032022140250835.png
|
2022-03-31 14:02:50.917314 |
69 |
49908032 |
CONST OF DRINKING WATER TANK AWC NO 247 AT NO1 DARRANG BAHAJHAR |
194349 |
CONST OF DRINKING WATER TANK AWC NO 247 AT NO1 DARRANG BAHAJHAR1 |
Roof laid |
-
latitude : 26.5574087575078
Longitude : 92.1970446780324
file name : Image_15112023204153237.png
|
2023-11-15 20:41:53.376742 |
70 |
49908032 |
CONST OF DRINKING WATER TANK AWC NO 247 AT NO1 DARRANG BAHAJHAR |
194349 |
CONST OF DRINKING WATER TANK AWC NO 247 AT NO1 DARRANG BAHAJHAR1 |
Roof laid |
-
latitude : 26.649660863913596
Longitude : 92.27619255892932
file name : Image_31122022133039737.png
|
2022-12-31 13:30:39.916437 |
71 |
49908032 |
CONST OF DRINKING WATER TANK AWC NO 247 AT NO1 DARRANG BAHAJHAR |
194349 |
CONST OF DRINKING WATER TANK AWC NO 247 AT NO1 DARRANG BAHAJHAR1 |
Roof laid |
-
latitude : 26.649660863913596
Longitude : 92.27619255892932
file name : Image_31122022134033091.png
|
2022-12-31 13:40:33.262236 |
72 |
49908032 |
CONST OF DRINKING WATER TANK AWC NO 247 AT NO1 DARRANG BAHAJHAR |
194349 |
CONST OF DRINKING WATER TANK AWC NO 247 AT NO1 DARRANG BAHAJHAR1 |
Completion of work |
-
latitude : 26.64960093330592
Longitude : 92.27607856504619
file name : Image_18082022122120203.png
|
2022-08-18 12:21:20.301514 |
73 |
38049461 |
Construction of Boundary Wall of Anganwadi Center( CenterNo.247) at No1 Darrang Bahajhar -B |
300000 |
Construction of Boundary Wall of Anganwadi Center( CenterNo.247) at No1 Darrang Bahajhar -B1 |
Roof laid |
-
latitude : 26.557535366155207
Longitude : 92.19718599691987
file name : Image_15112023203141931.png
|
2023-11-15 20:31:42.040034 |
74 |
38049461 |
Construction of Boundary Wall of Anganwadi Center( CenterNo.247) at No1 Darrang Bahajhar -B |
300000 |
Construction of Boundary Wall of Anganwadi Center( CenterNo.247) at No1 Darrang Bahajhar -B1 |
Plinth level |
-
latitude : 26.64992418140173
Longitude : 92.27609767578542
file name : Image_13102022112727568.png
|
2022-10-13 11:27:27.682487 |
75 |
38049461 |
Construction of Boundary Wall of Anganwadi Center( CenterNo.247) at No1 Darrang Bahajhar -B |
300000 |
Construction of Boundary Wall of Anganwadi Center( CenterNo.247) at No1 Darrang Bahajhar -B1 |
Roof laid |
-
latitude : 26.650053011253476
Longitude : 92.27624016813934
file name : Image_31122022134024828.png
|
2022-12-31 13:40:24.955711 |
76 |
38049461 |
Construction of Boundary Wall of Anganwadi Center( CenterNo.247) at No1 Darrang Bahajhar -B |
300000 |
Construction of Boundary Wall of Anganwadi Center( CenterNo.247) at No1 Darrang Bahajhar -B1 |
Completion of work |
-
latitude : 26.649923510849476
Longitude : 92.27613547816873
file name : Image_18082022122834030.png
|
2022-08-18 12:28:34.139083 |
77 |
49892109 |
CONST OF TOILET AT AWC NO5 AT NO3 DARRANG BAHAJHAR |
79349 |
CONST OF TOILET AT AWC NO5 AT NO3 DARRANG BAHAJHAR1 |
Roof laid |
-
latitude : 26.55764391180128
Longitude : 92.19709287397563
file name : Image_15112023203443552.png
|
2023-11-15 20:34:43.635069 |
78 |
49892109 |
CONST OF TOILET AT AWC NO5 AT NO3 DARRANG BAHAJHAR |
79349 |
CONST OF TOILET AT AWC NO5 AT NO3 DARRANG BAHAJHAR1 |
Roof laid |
-
latitude : 26.62675400264561
Longitude : 92.28995229117572
file name : Image_19092023163420314.png
|
2023-09-19 16:34:20.423168 |
79 |
49892109 |
CONST OF TOILET AT AWC NO5 AT NO3 DARRANG BAHAJHAR |
79349 |
CONST OF TOILET AT AWC NO5 AT NO3 DARRANG BAHAJHAR1 |
Roof laid |
-
latitude : 26.626696377061307
Longitude : 92.28995212353766
file name : Image_29122022120313735.png
|
2022-12-29 12:03:13.846711 |
80 |
49892109 |
CONST OF TOILET AT AWC NO5 AT NO3 DARRANG BAHAJHAR |
79349 |
CONST OF TOILET AT AWC NO5 AT NO3 DARRANG BAHAJHAR1 |
Completion of work |
-
latitude : 26.62674432154745
Longitude : 92.28991038165987
file name : Image_04092022104941463.png
|
2022-09-04 10:49:41.580435 |
81 |
49976047 |
const of toilet at new maszid campus near Ibrahim Ali house at Barjhar Grant |
90000 |
const of toilet at new maszid campus near Ibrahim Ali house at Barjhar Grant1 |
Roof laid |
-
latitude : 26.5574087575078
Longitude : 92.1970446780324
file name : Image_15112023204305085.png
|
2023-11-15 20:43:05.166922 |
82 |
49976047 |
const of toilet at new maszid campus near Ibrahim Ali house at Barjhar Grant |
90000 |
const of toilet at new maszid campus near Ibrahim Ali house at Barjhar Grant1 |
Plinth level |
-
latitude : 26.622507688589394
Longitude : 92.27809701114893
file name : Image_13102022125530451.png
|
2022-10-13 12:55:30.585673 |
83 |
49976047 |
const of toilet at new maszid campus near Ibrahim Ali house at Barjhar Grant |
90000 |
const of toilet at new maszid campus near Ibrahim Ali house at Barjhar Grant1 |
Completion of work |
-
latitude : 26.622523362748325
Longitude : 92.2781984321773
file name : Image_18082022114621315.png
|
2022-08-18 11:46:21.432653 |
84 |
49906616 |
CONT OF TOILET GP OFFICE CAMPUS |
90000 |
CONT OF TOILET GP OFFICE CAMPUS1 |
Plinth level |
-
latitude : 26.55729627236724
Longitude : 92.19727082177997
file name : Image_15112023203912824.png
|
2023-11-15 20:39:12.901109 |
85 |
49906616 |
CONT OF TOILET GP OFFICE CAMPUS |
90000 |
CONT OF TOILET GP OFFICE CAMPUS1 |
Completion of work |
-
latitude : 26.63513561245054
Longitude : 92.27187386713922
file name : Image_18082022122103563.png
|
2022-08-18 12:21:03.666515 |
86 |
64818122 |
Construction of toilets in public institutions |
95875 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.562210372649133
Longitude : 92.19629609026015
file name : Image_15112023230034677.png
|
2023-11-15 23:00:34.766707 |
87 |
64818122 |
Construction of toilets in public institutions |
95875 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.557440399192274
Longitude : 92.19710754230618
file name : Image_15112023225247413.png
|
2023-11-15 22:52:47.491949 |
88 |
64818122 |
Construction of toilets in public institutions |
95875 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.649899454787374
Longitude : 92.27615408599377
file name : Image_19092023161314758.png
|
2023-09-19 16:13:14.85853 |
89 |
64818122 |
Construction of toilets in public institutions |
95875 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.650008880533278
Longitude : 92.27615106850863
file name : Image_01052023134600926.png
|
2023-05-01 13:46:01.375418 |
90 |
49906851 |
CONST OF TOILET AT AWC NO2 AT NO1 BARJHAR |
90000 |
CONST OF TOILET AT AWC NO2 AT NO1 BARJHAR1 |
Roof laid |
-
latitude : 26.55749425292015
Longitude : 92.19699019566178
file name : Image_15112023222456896.png
|
2023-11-15 22:24:57.041804 |
91 |
49906851 |
CONST OF TOILET AT AWC NO2 AT NO1 BARJHAR |
90000 |
CONST OF TOILET AT AWC NO2 AT NO1 BARJHAR1 |
Plinth level |
-
latitude : 26.5574087575078
Longitude : 92.1970446780324
file name : Image_15112023204035759.png
|
2023-11-15 20:40:35.915209 |
92 |
49906851 |
CONST OF TOILET AT AWC NO2 AT NO1 BARJHAR |
90000 |
CONST OF TOILET AT AWC NO2 AT NO1 BARJHAR1 |
Plinth level |
-
latitude : 26.647069472819567
Longitude : 92.27054567076266
file name : Image_06022023130735192.png
|
2023-02-06 13:07:35.295102 |
93 |
49906851 |
CONST OF TOILET AT AWC NO2 AT NO1 BARJHAR |
90000 |
CONST OF TOILET AT AWC NO2 AT NO1 BARJHAR1 |
Completion of work |
-
latitude : 26.647045542486012
Longitude : 92.27052471600473
file name : Image_25082022085125465.png
|
2022-08-25 08:51:25.58092 |
94 |
85175055 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.5574087575078
Longitude : 92.1970446780324
file name : Image_15112023204644312.png
|
2023-11-15 20:46:44.389698 |
95 |
85175055 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.66104193776846
Longitude : 92.26983287371695
file name : Image_19092023155638039.png
|
2023-09-19 15:56:38.131312 |
96 |
85175055 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.641388051211834
Longitude : 92.17167944647372
file name : Image_10072023121742593.png
|
2023-07-10 12:17:42.696964 |
97 |
49904778 |
CONST OF PAVERS BLOCK ROAD FROM BARJHAR GRANT CHARIALI TO AKALI MANDAL HOUSE VIA MADHAB BISWAS HOUSE |
409828 |
CONST OF PAVERS BLOCK ROAD FROM BARJHAR GRANT CHARIALI TO AKALI MANDAL HOUSE VIA MADHAB BISWAS HOUSE1 |
Roof laid |
-
latitude : 26.55753301922232,26.55753301922232
Longitude : 92.1970549877733,92.1970549877733
file name : Image_15112023222140590.png
|
2023-11-15 22:21:40.70032 |
98 |
49904778 |
CONST OF PAVERS BLOCK ROAD FROM BARJHAR GRANT CHARIALI TO AKALI MANDAL HOUSE VIA MADHAB BISWAS HOUSE |
409828 |
CONST OF PAVERS BLOCK ROAD FROM BARJHAR GRANT CHARIALI TO AKALI MANDAL HOUSE VIA MADHAB BISWAS HOUSE1 |
Roof laid |
-
latitude : 26.55757853295654,26.55756830703467
Longitude : 92.19709287397563,92.1970100607723
file name : Image_15112023202350947.png
|
2023-11-15 20:23:51.084522 |
99 |
49904778 |
CONST OF PAVERS BLOCK ROAD FROM BARJHAR GRANT CHARIALI TO AKALI MANDAL HOUSE VIA MADHAB BISWAS HOUSE |
409828 |
CONST OF PAVERS BLOCK ROAD FROM BARJHAR GRANT CHARIALI TO AKALI MANDAL HOUSE VIA MADHAB BISWAS HOUSE1 |
Plinth level |
-
latitude : 26.625616033561528,26.625577812083066
Longitude : 92.27159039117396,92.27158946916461
file name : Image_18102022121732469.png
|
2022-10-18 12:17:32.580114 |
100 |
49904778 |
CONST OF PAVERS BLOCK ROAD FROM BARJHAR GRANT CHARIALI TO AKALI MANDAL HOUSE VIA MADHAB BISWAS HOUSE |
409828 |
CONST OF PAVERS BLOCK ROAD FROM BARJHAR GRANT CHARIALI TO AKALI MANDAL HOUSE VIA MADHAB BISWAS HOUSE1 |
Roof laid |
-
latitude : 26.62583010736853,26.62562843877822,26.625667540356517
Longitude : 92.27219556458294,92.27152987383306,92.27163657546043
file name : Image_31122022105344590.png
|
2022-12-31 10:53:44.709158 |
101 |
49904778 |
CONST OF PAVERS BLOCK ROAD FROM BARJHAR GRANT CHARIALI TO AKALI MANDAL HOUSE VIA MADHAB BISWAS HOUSE |
409828 |
CONST OF PAVERS BLOCK ROAD FROM BARJHAR GRANT CHARIALI TO AKALI MANDAL HOUSE VIA MADHAB BISWAS HOUSE1 |
Completion of work |
-
latitude : 26.625587912276387,26.625584391877055
Longitude : 92.2716864477843,92.27159005589783
file name : Image_18082022113412531.png
|
2022-08-18 11:34:12.634086 |
102 |
64752915 |
Administrative Expenditure and Other Maintenance |
46700 |
Administrative Expenditure and Other Maintenance1 |
Completion of work |
-
latitude : 26.557564954273403
Longitude : 92.19681518152356
file name : Image_29082022230911759.png
|
2022-08-29 23:09:11.851463 |
103 |
85177988 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.557317730039358
Longitude : 92.19688978046179
file name : Image_31052024230856890.png
|
2024-05-31 23:08:56.95682 |
104 |
85177988 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.61612009163946
Longitude : 92.2815231140703
file name : Image_06092023131819040.png
|
2023-09-06 13:18:19.192139 |
105 |
85177988 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.641327240504324
Longitude : 92.17172093689442
file name : Image_10072023121822222.png
|
2023-07-10 12:18:22.336014 |
106 |
64594802 |
Operation & Maintenance of PWSS of Barjhar GP |
394500 |
Operation & Maintenance of PWSS of Barjhar GP1 |
|
-
latitude : 26.557462569326162
Longitude : 92.19709874130785
file name : Image_07042024225703101.png
|
2024-04-07 22:57:03.208294 |
107 |
64560595 |
Const of CMSC at Birendra Nagar Asram at No 1Barjhar A |
90000 |
Const of CMSC at Birendra Nagar Asram at No 1Barjhar A1 |
Roof laid |
-
latitude : 26.557538844645023
Longitude : 92.19695205800235
file name : Image_31052024002258876.png
|
2024-05-31 00:22:58.962201 |
108 |
64560595 |
Const of CMSC at Birendra Nagar Asram at No 1Barjhar A |
90000 |
Const of CMSC at Birendra Nagar Asram at No 1Barjhar A1 |
Plinth level |
-
latitude : 26.557368775829673
Longitude : 92.19716009683907
file name : Image_30052024222050244.png
|
2024-05-30 22:20:50.331823 |
109 |
64560595 |
Const of CMSC at Birendra Nagar Asram at No 1Barjhar A |
90000 |
Const of CMSC at Birendra Nagar Asram at No 1Barjhar A1 |
Completion of work |
-
latitude : 26.557642319239676
Longitude : 92.19720301218331
file name : Image_30052024220444636.png
|
2024-05-30 22:04:44.729012 |
110 |
64560595 |
Const of CMSC at Birendra Nagar Asram at No 1Barjhar A |
90000 |
Const of CMSC at Birendra Nagar Asram at No 1Barjhar A1 |
Completion of work |
-
latitude : 26.658165771514177
Longitude : 92.26656217128038
file name : Image_10052023120159659.png
|
2023-05-10 12:01:59.91529 |
111 |
64595064 |
Repairing of AWC No 202 at No 1 Durang Bahajhar A |
125000 |
Repairing of AWC No 202 at No 1 Durang Bahajhar A1 |
Roof laid |
-
latitude : 26.557642319239676
Longitude : 92.19720301218331
file name : Image_30052024220621627.png
|
2024-05-30 22:06:21.716926 |
112 |
64595064 |
Repairing of AWC No 202 at No 1 Durang Bahajhar A |
125000 |
Repairing of AWC No 202 at No 1 Durang Bahajhar A1 |
Plinth level |
-
latitude : 26.557478620670736
Longitude : 92.19709195196629
file name : Image_07042024184325095.png
|
2024-04-07 18:43:25.188477 |
113 |
64595064 |
Repairing of AWC No 202 at No 1 Durang Bahajhar A |
125000 |
Repairing of AWC No 202 at No 1 Durang Bahajhar A1 |
Completion of work |
-
latitude : 26.645638891495764
Longitude : 92.281041322276
file name : Image_10052023172328167.png
|
2023-05-10 17:23:28.296695 |
114 |
85171091 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.557421749457717
Longitude : 92.19701995141804
file name : Image_31052024230853841.png
|
2024-05-31 23:08:53.924728 |
115 |
85171091 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.641339980997145
Longitude : 92.17173811979592
file name : Image_10072023121643426.png
|
2023-07-10 12:16:43.541838 |
116 |
64752812 |
Operation & maintenance of drinking water supply system |
315000 |
Operation & maintenance of drinking water supply system1 |
|
-
latitude : 26.557457498274744
Longitude : 92.19713704660535
file name : Image_07042024225707346.png
|
2024-04-07 22:57:07.426291 |
117 |
86990908 |
Operation & maintenance of drinking water supply system |
324900 |
Operation & maintenance of drinking water supply system1 |
|
-
latitude : 26.622640499845147
Longitude : 92.27815484628081
file name : Image_06042024142212274.png
|
2024-04-06 14:22:12.369107 |
118 |
86990633 |
Operation & maintenance of drinking water supply system |
324900 |
Operation & maintenance of drinking water supply system1 |
|
-
latitude : 26.622646283358335
Longitude : 92.27815073914826
file name : Image_06042024142206534.png
|
2024-04-06 14:22:06.748243 |
119 |
86990719 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.646866756491363
Longitude : 92.28361330926418
file name : Image_08042024133855212.png
|
2024-04-08 13:38:55.3023 |
120 |
86990719 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.562390667386353
Longitude : 92.18130765482783
file name : Image_07042024144039427.png
|
2024-04-07 14:40:39.515772 |
121 |
86990719 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.646847813390195
Longitude : 92.28375278413296
file name : Image_24012024131556403.png
|
2024-01-24 13:15:56.496739 |
122 |
64594923 |
Repairing of AWC No 222 at No 1 Barjhar A |
125000 |
Repairing of AWC No 222 at No 1 Barjhar A1 |
Plinth level |
-
latitude : 26.55737162567675
Longitude : 92.19701978377998
file name : Image_31052024101448406.png
|
2024-05-31 10:14:48.493261 |
123 |
64594923 |
Repairing of AWC No 222 at No 1 Barjhar A |
125000 |
Repairing of AWC No 222 at No 1 Barjhar A1 |
Completion of work |
-
latitude : 26.657234374433756
Longitude : 92.26978643797338
file name : Image_15052023114837254.png
|
2023-05-15 11:48:37.352384 |
124 |
64595007 |
Repairing of AWC No 3 at No 2 Barjhar A |
125000 |
Repairing of AWC No 3 at No 2 Barjhar A1 |
Plinth level |
-
latitude : 26.55786871444434
Longitude : 92.19722405076027
file name : Image_31052024000731275.png
|
2024-05-31 00:07:31.357029 |
125 |
64595007 |
Repairing of AWC No 3 at No 2 Barjhar A |
125000 |
Repairing of AWC No 3 at No 2 Barjhar A1 |
Completion of work |
-
latitude : 26.626481381244957
Longitude : 92.27185442112386
file name : Image_13082023002244891.png
|
2023-08-13 00:22:44.98927 |
126 |
49907836 |
CONST OF DRINKING WATER TANK AT AWC NO2 AT NO1 BARJHAR |
200000 |
CONST OF DRINKING WATER TANK AT AWC NO2 AT NO1 BARJHAR1 |
Roof laid |
-
latitude : 26.557824960909784
Longitude : 92.19709740020335
file name : Image_07042024150417261.png
|
2024-04-07 15:04:17.387398 |
127 |
49907836 |
CONST OF DRINKING WATER TANK AT AWC NO2 AT NO1 BARJHAR |
200000 |
CONST OF DRINKING WATER TANK AT AWC NO2 AT NO1 BARJHAR1 |
Plinth level |
-
latitude : 26.55757580883801
Longitude : 92.197125563398
file name : Image_07042024150015605.png
|
2024-04-07 15:00:15.75285 |
128 |
49907836 |
CONST OF DRINKING WATER TANK AT AWC NO2 AT NO1 BARJHAR |
200000 |
CONST OF DRINKING WATER TANK AT AWC NO2 AT NO1 BARJHAR1 |
Plinth level |
-
latitude : 26.637508110143244
Longitude : 92.28673883713782
file name : Image_30122022120140700.png
|
2022-12-30 12:01:40.815032 |
129 |
49907836 |
CONST OF DRINKING WATER TANK AT AWC NO2 AT NO1 BARJHAR |
200000 |
CONST OF DRINKING WATER TANK AT AWC NO2 AT NO1 BARJHAR1 |
Completion of work |
-
latitude : 26.637450945563614
Longitude : 92.28670011274517
file name : Image_22082022104245950.png
|
2022-08-22 10:42:46.078939 |
130 |
64595041 |
Repairing of AWC No 247 at No 1 Durang Bahajhar |
164000 |
Repairing of AWC No 247 at No 1 Durang Bahajhar1 |
Roof laid |
-
latitude : 26.55742141418159
Longitude : 92.1968422550708
file name : Image_07042024190028049.png
|
2024-04-07 19:00:28.137505 |
131 |
64595041 |
Repairing of AWC No 247 at No 1 Durang Bahajhar |
164000 |
Repairing of AWC No 247 at No 1 Durang Bahajhar1 |
Plinth level |
-
latitude : 26.556983711197972
Longitude : 92.19744097441435
file name : Image_07042024185719125.png
|
2024-04-07 18:57:19.216205 |
132 |
64595041 |
Repairing of AWC No 247 at No 1 Durang Bahajhar |
164000 |
Repairing of AWC No 247 at No 1 Durang Bahajhar1 |
Completion of work |
-
latitude : 26.649910393171012
Longitude : 92.27608317509294
file name : Image_19092023161253681.png
|
2023-09-19 16:12:53.77363 |
133 |
64595041 |
Repairing of AWC No 247 at No 1 Durang Bahajhar |
164000 |
Repairing of AWC No 247 at No 1 Durang Bahajhar1 |
Completion of work |
-
latitude : 26.64998679421842
Longitude : 92.27601293474436
file name : Image_01052023134543126.png
|
2023-05-01 13:45:43.255599 |
134 |
64752834 |
Construction of toilets in public institutions |
110000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.557309390045702
Longitude : 92.19719815067947
file name : Image_28052024222559864.png
|
2024-05-28 22:25:59.950693 |
135 |
64752834 |
Construction of toilets in public institutions |
110000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.577358986251056
Longitude : 92.18799540773034
file name : Image_28052024222206560.png
|
2024-05-28 22:22:06.638078 |
136 |
64752834 |
Construction of toilets in public institutions |
110000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.58361000008881
Longitude : 92.14178647845984
file name : Image_28052024220158362.png
|
2024-05-28 22:01:58.454542 |
137 |
64818103 |
Repairing of Barjhar Grant LP School |
140600 |
Repairing of Barjhar Grant LP School 1 |
Roof laid |
-
latitude : 26.58361000008881
Longitude : 92.14178647845984
file name : Image_28052024220207778.png
|
2024-05-28 22:02:07.863036 |
138 |
64818103 |
Repairing of Barjhar Grant LP School |
140600 |
Repairing of Barjhar Grant LP School 1 |
Roof laid |
-
latitude : 26.557507496327162
Longitude : 92.19705783762038
file name : Image_07042024183347469.png
|
2024-04-07 18:33:47.554676 |
139 |
64818103 |
Repairing of Barjhar Grant LP School |
140600 |
Repairing of Barjhar Grant LP School 1 |
Plinth level |
-
latitude : 26.557595506310463
Longitude : 92.19698223285377
file name : Image_07042024154828985.png
|
2024-04-07 15:48:29.073703 |
140 |
64818103 |
Repairing of Barjhar Grant LP School |
140600 |
Repairing of Barjhar Grant LP School 1 |
Completion of work |
-
latitude : 26.62509434390813
Longitude : 92.27160313166678
file name : Image_05052023130654118.png
|
2023-05-05 13:06:54.217905 |
141 |
64752860 |
Construction of toilets in public institutions |
105000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.58361000008881
Longitude : 92.14178647845984
file name : Image_28052024220155364.png
|
2024-05-28 22:01:55.464426 |
142 |
64752860 |
Construction of toilets in public institutions |
105000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.557505317032337
Longitude : 92.19700704328716
file name : Image_07042024183341173.png
|
2024-04-07 18:33:41.296372 |
143 |
64752860 |
Construction of toilets in public institutions |
105000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.55765128787607
Longitude : 92.1969461068511
file name : Image_07042024152507909.png
|
2024-04-07 15:25:08.084061 |
144 |
64752860 |
Construction of toilets in public institutions |
105000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.65004789829254
Longitude : 92.2761232405901
file name : Image_19092023161302337.png
|
2023-09-19 16:13:02.417157 |
145 |
64752860 |
Construction of toilets in public institutions |
105000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.646160036325455
Longitude : 92.28301073424518
file name : Image_10052023171318726.png
|
2023-05-10 17:13:18.837498 |
146 |
64753003 |
Construction of toilets in public institutions |
105000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.58361000008881
Longitude : 92.14178647845984
file name : Image_28052024220201492.png
|
2024-05-28 22:02:01.578069 |
147 |
64753003 |
Construction of toilets in public institutions |
105000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.55767526011914
Longitude : 92.19694468192756
file name : Image_07042024183344302.png
|
2024-04-07 18:33:44.377641 |
148 |
64753003 |
Construction of toilets in public institutions |
105000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.557559086941183
Longitude : 92.19709002412856
file name : Image_07042024154850966.png
|
2024-04-07 15:48:51.04109 |
149 |
64753003 |
Construction of toilets in public institutions |
105000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.639693984761834
Longitude : 92.28664512746036
file name : Image_31052023121358350.png
|
2023-05-31 12:13:58.468591 |
150 |
64753003 |
Construction of toilets in public institutions |
105000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.633310578763485
Longitude : 92.28456021286547
file name : Image_04072023111109919.png
|
2023-07-04 11:11:10.018112 |
151 |
64818097 |
Repairing of No 3 Darrang Bahajhar LP School |
140600 |
Repairing of No 3 Darrang Bahajhar LP School 1 |
Roof laid |
-
latitude : 26.58361000008881
Longitude : 92.14178647845984
file name : Image_28052024220204660.png
|
2024-05-28 22:02:04.752118 |
152 |
64818097 |
Repairing of No 3 Darrang Bahajhar LP School |
140600 |
Repairing of No 3 Darrang Bahajhar LP School 1 |
Roof laid |
-
latitude : 26.55762253794819
Longitude : 92.1970446780324
file name : Image_07042024154911645.png
|
2024-04-07 15:49:11.728189 |
153 |
64818097 |
Repairing of No 3 Darrang Bahajhar LP School |
140600 |
Repairing of No 3 Darrang Bahajhar LP School 1 |
Plinth level |
-
latitude : 26.616246197372675
Longitude : 92.28166971355677
file name : Image_24012024110735881.png
|
2024-01-24 11:07:35.982995 |
154 |
64818097 |
Repairing of No 3 Darrang Bahajhar LP School |
140600 |
Repairing of No 3 Darrang Bahajhar LP School 1 |
Completion of work |
-
latitude : 26.616042307578027
Longitude : 92.28143124841154
file name : Image_05052023175631210.png
|
2023-05-05 17:56:31.32896 |