1 |
5658629 |
Const.of community latrine urinal at No.1 Aparia pub chuba rest plat form near Tarjina House. |
130089 |
Toilet1
|
Up to Plinth level |
-
latitude : 26.30965
Longitude : 91.94806666666666
file name : Image_26072019131745965.png
|
2019-07-26 13:17:46.054481 |
2 |
5658722 |
Const.of community latrine urinal at No.1 Aparia pachim chuba 24 no. Anganawadi Centre. |
130089 |
Toilet1
|
Up to Plinth level |
-
latitude : 26.304655000000004
Longitude : 91.92836666666666
file name : Image_26072019125135968.png
|
2019-07-26 12:51:36.069367 |
3 |
5658819 |
Const.of community latrine urinal at No.2 Aparia Bazar. |
130089 |
Toilet1
|
Up to Plinth level |
-
latitude : 26.30368
Longitude : 91.94678833333334
file name : Image_26072019114600695.png
|
2019-07-26 11:46:00.791137 |
4 |
5659475 |
Const.of community latrine urinal at No.2 Dhariakhaity public field near Saha Ali House. |
130095 |
Toilet1
|
Up to Plinth level |
-
latitude : 26.34555833333333
Longitude : 91.97524666666668
file name : Image_26072019162322327.png
|
2019-07-26 16:23:22.413273 |
5 |
64940805 |
Construction of toilets in public institutions |
77583 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.3121832
Longitude : 91.952376
file name : Image_14102023124914557.png
|
2023-10-14 12:49:14.722108 |
6 |
64288445 |
Const. of Toilet Shed at N C Aparia LP School |
145500 |
Const. of Toilet Shed at N C Aparia LP School1 |
Plinth level |
-
latitude : 26.4347278
Longitude : 92.032794
file name : Image_07062024164704066.png
|
2024-06-07 16:47:03.915276 |
7 |
64288445 |
Const. of Toilet Shed at N C Aparia LP School |
145500 |
Const. of Toilet Shed at N C Aparia LP School1 |
Completion of work |
-
latitude : 26.31231077
Longitude : 91.95385952
file name : Image_31102023134642847.png
|
2023-10-31 13:46:43.210127 |
8 |
64288445 |
Const. of Toilet Shed at N C Aparia LP School |
145500 |
Const. of Toilet Shed at N C Aparia LP School1 |
Completion of work |
-
latitude : 26.31216724
Longitude : 91.95398505
file name : Image_31102023134646772.png
|
2023-10-31 13:46:46.971731 |
9 |
64288445 |
Const. of Toilet Shed at N C Aparia LP School |
145500 |
Const. of Toilet Shed at N C Aparia LP School1 |
Completion of work |
-
latitude : 26.31233758
Longitude : 91.9541281
file name : Image_07072023174748882.png
|
2023-07-07 17:47:49.014274 |
10 |
64288445 |
Const. of Toilet Shed at N C Aparia LP School |
145500 |
Const. of Toilet Shed at N C Aparia LP School1 |
Completion of work |
-
latitude : 26.4364387
Longitude : 92.0349596
file name : Image_13102023173827718.png
|
2023-10-13 17:38:27.828662 |
11 |
64288445 |
Const. of Toilet Shed at N C Aparia LP School |
145500 |
Const. of Toilet Shed at N C Aparia LP School1 |
Completion of work |
-
latitude : 26.31233758
Longitude : 91.9541281
file name : Image_07072023175212698.png
|
2023-07-07 17:52:12.828954 |
12 |
64285536 |
Rep. of Toilet at No. 2 Chaulkhuwa LP School |
25000 |
Rep. of Toilet at No. 2 Chaulkhuwa LP School1 |
Plinth level |
-
latitude : 26.4853539
Longitude : 92.092237
file name : Image_07062024093604861.png
|
2024-06-07 09:36:04.975774 |
13 |
64285536 |
Rep. of Toilet at No. 2 Chaulkhuwa LP School |
25000 |
Rep. of Toilet at No. 2 Chaulkhuwa LP School1 |
Completion of work |
-
latitude : 26.33760771
Longitude : 91.95984337
file name : Image_25062023184823315.png
|
2023-06-25 18:48:23.378285 |
14 |
64939581 |
RENOVATION OF ANGANBADI CENTRE AT NO. 1 APARIA |
120325 |
RENOVATION OF ANGANBADI CENTRE AT NO. 1 APARIA1 |
Completion of work |
-
latitude : 26.31052164
Longitude : 91.95064939
file name : Image_03082023150513279.png
|
2023-08-03 15:05:13.433214 |
15 |
87514306 |
Construction of toilets in public institutions |
145500 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.4364435
Longitude : 92.03492
file name : Image_11062024160639371.png
|
2024-06-11 16:06:39.491148 |
16 |
87514306 |
Construction of toilets in public institutions |
145500 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.37658794
Longitude : 91.99895723
file name : Image_13012024175726285.png
|
2024-01-13 17:57:26.381407 |
17 |
87514306 |
Construction of toilets in public institutions |
145500 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.48635887
Longitude : 92.0913739
file name : Image_19012024095204848.png
|
2024-01-19 09:52:04.948693 |
18 |
87514306 |
Construction of toilets in public institutions |
145500 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.4364322
Longitude : 92.0349531
file name : Image_21092023191209243.png
|
2023-09-21 19:12:09.34508 |
19 |
64939655 |
CONST OF ACR AT NO. 2 CHAULKHOWA CHAR CHUBA LP SCHOOL |
120325 |
CONST OF ACR AT NO. 2 CHAULKHOWA CHAR CHUBA LP SCHOOL1 |
Plinth level |
-
latitude : 26.4364383
Longitude : 92.0349222
file name : Image_21062024132134537.png
|
2024-06-21 13:21:34.420859 |
20 |
64939655 |
CONST OF ACR AT NO. 2 CHAULKHOWA CHAR CHUBA LP SCHOOL |
120325 |
CONST OF ACR AT NO. 2 CHAULKHOWA CHAR CHUBA LP SCHOOL1 |
Completion of work |
-
latitude : 26.32607893
Longitude : 91.98428141
file name : Image_01042024154036218.png
|
2024-04-01 15:40:36.409782 |
21 |
64939655 |
CONST OF ACR AT NO. 2 CHAULKHOWA CHAR CHUBA LP SCHOOL |
120325 |
CONST OF ACR AT NO. 2 CHAULKHOWA CHAR CHUBA LP SCHOOL1 |
Completion of work |
-
latitude : 26.32600985
Longitude : 91.98421742
file name : Image_21112023104355907.png
|
2023-11-21 10:43:56.097071 |
22 |
64939655 |
CONST OF ACR AT NO. 2 CHAULKHOWA CHAR CHUBA LP SCHOOL |
120325 |
CONST OF ACR AT NO. 2 CHAULKHOWA CHAR CHUBA LP SCHOOL1 |
Completion of work |
-
latitude : 26.48680785
Longitude : 92.09902498
file name : Image_03112023134000893.png
|
2023-11-03 13:40:01.009291 |
23 |
64286396 |
Const. of Tailet Shed at No 1 Chaulkhowa Khoiratoli LP School |
140606 |
Const. of Tailet Shed at No 1 Chaulkhowa Khoiratoli LP School1 |
Plinth level |
-
latitude : 26.48638948
Longitude : 92.091502
file name : Image_19062024203719125.png
|
2024-06-19 20:37:19.25163 |
24 |
64286396 |
Const. of Tailet Shed at No 1 Chaulkhowa Khoiratoli LP School |
140606 |
Const. of Tailet Shed at No 1 Chaulkhowa Khoiratoli LP School1 |
Plinth level |
-
latitude : 26.48639456
Longitude : 92.09148884
file name : Image_19062024203131761.png
|
2024-06-19 20:31:31.858894 |
25 |
64286396 |
Const. of Tailet Shed at No 1 Chaulkhowa Khoiratoli LP School |
140606 |
Const. of Tailet Shed at No 1 Chaulkhowa Khoiratoli LP School1 |
Completion of work |
-
latitude : 26.48638838
Longitude : 92.09165888
file name : Image_19062024201132652.png
|
2024-06-19 20:11:32.773205 |
26 |
64286396 |
Const. of Tailet Shed at No 1 Chaulkhowa Khoiratoli LP School |
140606 |
Const. of Tailet Shed at No 1 Chaulkhowa Khoiratoli LP School1 |
Plinth level |
-
latitude : 26.48639375
Longitude : 92.09151302
file name : Image_19062024202333188.png
|
2024-06-19 20:23:33.284296 |
27 |
64286396 |
Const. of Tailet Shed at No 1 Chaulkhowa Khoiratoli LP School |
140606 |
Const. of Tailet Shed at No 1 Chaulkhowa Khoiratoli LP School1 |
Completion of work |
-
latitude : 26.48636223
Longitude : 92.09163366
file name : Image_19062024201129463.png
|
2024-06-19 20:11:29.576417 |
28 |
64286396 |
Const. of Tailet Shed at No 1 Chaulkhowa Khoiratoli LP School |
140606 |
Const. of Tailet Shed at No 1 Chaulkhowa Khoiratoli LP School1 |
Completion of work |
-
latitude : 26.33545624
Longitude : 91.96712941
file name : Image_04022024224437020.png
|
2024-02-04 22:44:37.146383 |
29 |
64286396 |
Const. of Tailet Shed at No 1 Chaulkhowa Khoiratoli LP School |
140606 |
Const. of Tailet Shed at No 1 Chaulkhowa Khoiratoli LP School1 |
Completion of work |
-
latitude : 26.33544197
Longitude : 91.96695783
file name : Image_03082023150541050.png
|
2023-08-03 15:05:41.183796 |
30 |
64289587 |
Reparing of Community Hall at No. 2 Aparia Tilla. |
150000 |
Reparing of Community Hall at No. 2 Aparia Tilla.1 |
Plinth level |
-
latitude : 26.48643316
Longitude : 92.09152101
file name : Image_19062024205734491.png
|
2024-06-19 20:57:34.597017 |
31 |
64289587 |
Reparing of Community Hall at No. 2 Aparia Tilla. |
150000 |
Reparing of Community Hall at No. 2 Aparia Tilla.1 |
Plinth level |
-
latitude : 26.48636793
Longitude : 92.09157745
file name : Image_19062024205731348.png
|
2024-06-19 20:57:31.453123 |
32 |
64289587 |
Reparing of Community Hall at No. 2 Aparia Tilla. |
150000 |
Reparing of Community Hall at No. 2 Aparia Tilla.1 |
Completion of work |
-
latitude : 26.31060051
Longitude : 91.95065326
file name : Image_28012024103441125.png
|
2024-01-28 10:34:41.243514 |
33 |
64289587 |
Reparing of Community Hall at No. 2 Aparia Tilla. |
150000 |
Reparing of Community Hall at No. 2 Aparia Tilla.1 |
Completion of work |
-
latitude : 26.29828374
Longitude : 91.95632153
file name : Image_14102023134622214.png
|
2023-10-14 13:46:22.352473 |
34 |
64289587 |
Reparing of Community Hall at No. 2 Aparia Tilla. |
150000 |
Reparing of Community Hall at No. 2 Aparia Tilla.1 |
Completion of work |
-
latitude : 26.29835033
Longitude : 91.95653939
file name : Image_27032023164350254.png
|
2023-03-27 16:43:50.375296 |
35 |
64289759 |
Const. of Health sub Centre at No. 1 Dhariakhaiti . |
1000000 |
Const. of Health sub Centre at No. 1 Dhariakhaiti .1 |
Plinth level |
-
latitude : 26.4347114
Longitude : 92.0328046
file name : Image_07062024165434980.png
|
2024-06-07 16:54:35.133298 |
36 |
64289759 |
Const. of Health sub Centre at No. 1 Dhariakhaiti . |
1000000 |
Const. of Health sub Centre at No. 1 Dhariakhaiti .1 |
Completion of work |
-
latitude : 26.34621365
Longitude : 91.97034993
file name : Image_01112022094223689.png
|
2022-11-01 09:42:23.794421 |
37 |
64288008 |
Const of Toilet Shed at No. 1 Aparia AWC near Abdul Rashid house . |
145500 |
Const of Toilet Shed at No. 1 Aparia AWC near Abdul Rashid house .1 |
Plinth level |
-
latitude : 26.4348499
Longitude : 92.0328285
file name : Image_06062024104303293.png
|
2024-06-06 10:43:03.403122 |
38 |
64288008 |
Const of Toilet Shed at No. 1 Aparia AWC near Abdul Rashid house . |
145500 |
Const of Toilet Shed at No. 1 Aparia AWC near Abdul Rashid house .1 |
Completion of work |
-
latitude : 26.3079208
Longitude : 91.94093136
file name : Image_25012024120121435.png
|
2024-01-25 12:01:21.575857 |
39 |
64288008 |
Const of Toilet Shed at No. 1 Aparia AWC near Abdul Rashid house . |
145500 |
Const of Toilet Shed at No. 1 Aparia AWC near Abdul Rashid house .1 |
Completion of work |
-
latitude : 26.30782618
Longitude : 91.94089428
file name : Image_03082023135515955.png
|
2023-08-03 13:55:16.1001 |
40 |
64286837 |
Const of Toilet Shed at No. 1 Aparia AWC ( Centre No. 1 ) |
140606 |
Const of Toilet Shed at No. 1 Aparia AWC ( Centre No. 1 )1 |
Plinth level |
-
latitude : 26.48639842
Longitude : 92.09159361
file name : Image_19062024210650277.png
|
2024-06-19 21:06:50.383733 |
41 |
64286837 |
Const of Toilet Shed at No. 1 Aparia AWC ( Centre No. 1 ) |
140606 |
Const of Toilet Shed at No. 1 Aparia AWC ( Centre No. 1 )1 |
Completion of work |
-
latitude : 26.31066541
Longitude : 91.9505737
file name : Image_25012024121825497.png
|
2024-01-25 12:18:25.623677 |
42 |
64286837 |
Const of Toilet Shed at No. 1 Aparia AWC ( Centre No. 1 ) |
140606 |
Const of Toilet Shed at No. 1 Aparia AWC ( Centre No. 1 )1 |
Completion of work |
-
latitude : 26.31057839
Longitude : 91.95055354
file name : Image_27032023150556107.png
|
2023-03-27 15:05:56.199155 |
43 |
64286837 |
Const of Toilet Shed at No. 1 Aparia AWC ( Centre No. 1 ) |
140606 |
Const of Toilet Shed at No. 1 Aparia AWC ( Centre No. 1 )1 |
Completion of work |
-
latitude : 26.31055253
Longitude : 91.95058135
file name : Image_14102023131117887.png
|
2023-10-14 13:11:17.99555 |
44 |
64289166 |
Rennovation of Kitchan atNo. 1Aparia LP School. |
167000 |
Rennovation of Kitchan atNo. 1Aparia LP School.1 |
Completion of work |
-
latitude : 26.31056529
Longitude : 91.95057715
file name : Image_25012024121844797.png
|
2024-01-25 12:18:44.905806 |
45 |
64289166 |
Rennovation of Kitchan atNo. 1Aparia LP School. |
167000 |
Rennovation of Kitchan atNo. 1Aparia LP School.1 |
Completion of work |
-
latitude : 26.3105746
Longitude : 91.95057661
file name : Image_25012024121836069.png
|
2024-01-25 12:18:36.209818 |
46 |
64289166 |
Rennovation of Kitchan atNo. 1Aparia LP School. |
167000 |
Rennovation of Kitchan atNo. 1Aparia LP School.1 |
Completion of work |
-
latitude : 26.31049613
Longitude : 91.95057048
file name : Image_21112023075128099.png
|
2023-11-21 07:51:28.336483 |
47 |
64289166 |
Rennovation of Kitchan atNo. 1Aparia LP School. |
167000 |
Rennovation of Kitchan atNo. 1Aparia LP School.1 |
Completion of work |
-
latitude : 26.31065606
Longitude : 91.95052227
file name : Image_27032023150420976.png
|
2023-03-27 15:04:21.067068 |
48 |
64939540 |
REPAIRING OF NO. 1 APARIA AWC CENTRE NO. 2 |
70000 |
REPAIRING OF NO. 1 APARIA AWC CENTRE NO. 21 |
Completion of work |
-
latitude : 26.4864846
Longitude : 92.09160989
file name : Image_04022024224530479.png
|
2024-02-04 22:45:30.585429 |
49 |
64939540 |
REPAIRING OF NO. 1 APARIA AWC CENTRE NO. 2 |
70000 |
REPAIRING OF NO. 1 APARIA AWC CENTRE NO. 21 |
Completion of work |
-
latitude : 26.4864846
Longitude : 92.09160989
file name : Image_04022024224509607.png
|
2024-02-04 22:45:09.707853 |
50 |
64289280 |
Contruction of Boundary wall at No. 2 Dhariakhaity Kabarsthan near Abdul Sattar house. |
270000 |
Contruction of Boundary wall at No. 2 Dhariakhaity Kabarsthan near Abdul Sattar house.1 |
Completion of work |
-
latitude : 26.34601122
Longitude : 91.96766493
file name : Image_04022024224525660.png
|
2024-02-04 22:45:25.798118 |
51 |
64289280 |
Contruction of Boundary wall at No. 2 Dhariakhaity Kabarsthan near Abdul Sattar house. |
270000 |
Contruction of Boundary wall at No. 2 Dhariakhaity Kabarsthan near Abdul Sattar house.1 |
Completion of work |
-
latitude : 26.34601122
Longitude : 91.96766493
file name : Image_04022024224503522.png
|
2024-02-04 22:45:03.657409 |
52 |
64289060 |
Const of Janaja Ghar at No. 2 Dhariakhaity Kabarsthan. |
104636 |
Const of Janaja Ghar at No. 2 Dhariakhaity Kabarsthan.1 |
Completion of work |
-
latitude : 26.34606673
Longitude : 91.96769512
file name : Image_04022024224520360.png
|
2024-02-04 22:45:20.539679 |
53 |
64289060 |
Const of Janaja Ghar at No. 2 Dhariakhaity Kabarsthan. |
104636 |
Const of Janaja Ghar at No. 2 Dhariakhaity Kabarsthan.1 |
Completion of work |
-
latitude : 26.34606673
Longitude : 91.96769512
file name : Image_04022024224448135.png
|
2024-02-04 22:44:48.362096 |
54 |
64940678 |
Construction of toilets in public institutions |
154800 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.4347498
Longitude : 92.0327
file name : Image_27062024122002910.png
|
2024-06-27 12:20:03.013159 |
55 |
64940678 |
Construction of toilets in public institutions |
154800 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.48650493
Longitude : 92.09162094
file name : Image_04022024225150543.png
|
2024-02-04 22:51:50.65049 |
56 |
64940693 |
Construction of toilets in public institutions |
154800 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.4860828
Longitude : 92.0914174
file name : Image_01102024124726450.png
|
2024-10-01 12:47:26.570064 |
57 |
64940693 |
Construction of toilets in public institutions |
154800 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.48623352
Longitude : 92.09157571
file name : Image_01102024124730120.png
|
2024-10-01 12:47:30.237673 |
58 |
96966763 |
Construction of Community Sanitary Complex |
29750 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.34626827
Longitude : 91.97037086
file name : Image_17052024110420876.png
|
2024-05-17 11:04:21.009431 |
59 |
96980003 |
Renovation of AWC at Chaulkhowa (Centre No 2 (Ph-ii) |
120000 |
Renovation of AWC at Chaulkhowa (Centre No 2 (Ph-ii)1 |
Completion of work |
-
latitude : 26.31336407
Longitude : 91.9596345
file name : Image_01042024151203433.png
|
2024-04-01 15:12:03.550407 |
60 |
96981771 |
Repairing of No 1 Aparia Uttar Chuba LP School (ph-ii) |
70000 |
Repairing of No 1 Aparia Uttar Chuba LP School (ph-ii)1 |
Completion of work |
-
latitude : 26.4364342
Longitude : 92.0349247
file name : Image_13082024133425385.png
|
2024-08-13 13:34:25.488112 |
61 |
96971119 |
Renovaction of No 1 Pub Aparia LP School |
400000 |
Renovaction of No 1 Pub Aparia LP School1 |
Completion of work |
-
latitude : 26.31076807
Longitude : 91.95057473
file name : Image_01042024134418305.png
|
2024-04-01 13:44:18.416309 |
62 |
96982375 |
Renovation of Kitchen at No 2 Dhariakhaity LP School |
219350 |
Renovation of Kitchen at No 2 Dhariakhaity LP School1 |
Completion of work |
-
latitude : 26.3418832
Longitude : 91.97462363
file name : Image_28072024130136622.png
|
2024-07-28 13:01:36.739451 |
63 |
96971914 |
Const of No 1 Aparia AWC |
169350 |
Const of No 1 Aparia AWC1 |
Completion of work |
-
latitude : 26.31057907
Longitude : 91.95064772
file name : Image_01042024134627595.png
|
2024-04-01 13:46:27.742822 |
64 |
96978828 |
Renovation of Additional Class Room at No 2 Aparia ME School (Ph-ii) |
150000 |
Renovation of Additional Class Room at No 2 Aparia ME School (Ph-ii)1 |
Completion of work |
-
latitude : 26.30839328
Longitude : 91.94609625
file name : Image_01042024135616220.png
|
2024-04-01 13:56:16.346931 |
65 |
64285668 |
Const of Toilet at No. 1 Chaulkhowa L P School . |
45000 |
Const of Toilet at No. 1 Chaulkhowa L P School .1 |
Plinth level |
-
latitude : 26.4346912
Longitude : 92.0327896
file name : Image_07062024163528215.png
|
2024-06-07 16:35:28.339216 |
66 |
64285668 |
Const of Toilet at No. 1 Chaulkhowa L P School . |
45000 |
Const of Toilet at No. 1 Chaulkhowa L P School .1 |
Completion of work |
-
latitude : 26.4346903
Longitude : 92.032791
file name : Image_07062024162847327.png
|
2024-06-07 16:28:47.460195 |
67 |
64285668 |
Const of Toilet at No. 1 Chaulkhowa L P School . |
45000 |
Const of Toilet at No. 1 Chaulkhowa L P School .1 |
Completion of work |
-
latitude : 26.32259807
Longitude : 91.98329362
file name : Image_03052023160057336.png
|
2023-05-03 16:00:57.432203 |
68 |
64288134 |
Const of Toilet Shed at No. 2 Chaulkhowa Pub Chuba LP School. |
145500 |
Const of Toilet Shed at No. 2 Chaulkhowa Pub Chuba LP School.1 |
Plinth level |
-
latitude : 26.4346998
Longitude : 92.0327939
file name : Image_05062024165159782.png
|
2024-06-05 16:51:59.881202 |
69 |
64288134 |
Const of Toilet Shed at No. 2 Chaulkhowa Pub Chuba LP School. |
145500 |
Const of Toilet Shed at No. 2 Chaulkhowa Pub Chuba LP School.1 |
Plinth level |
-
latitude : 26.4347006
Longitude : 92.0327931
file name : Image_05062024165156438.png
|
2024-06-05 16:51:56.550374 |
70 |
64288134 |
Const of Toilet Shed at No. 2 Chaulkhowa Pub Chuba LP School. |
145500 |
Const of Toilet Shed at No. 2 Chaulkhowa Pub Chuba LP School.1 |
Completion of work |
-
latitude : 26.48645954
Longitude : 92.09160348
file name : Image_21082023101942765.png
|
2023-08-21 10:19:42.879582 |
71 |
64288134 |
Const of Toilet Shed at No. 2 Chaulkhowa Pub Chuba LP School. |
145500 |
Const of Toilet Shed at No. 2 Chaulkhowa Pub Chuba LP School.1 |
Completion of work |
-
latitude : 26.48645764
Longitude : 92.09158995
file name : Image_21082023102257960.png
|
2023-08-21 10:22:58.072282 |
72 |
64330662 |
Const of Toilet at No. 2 Aparia LP School. |
45000 |
Const of Toilet at No. 2 Aparia LP School.1 |
Plinth level |
-
latitude : 26.4346781
Longitude : 92.0327887
file name : Image_07062024160659276.png
|
2024-06-07 16:06:59.444517 |
73 |
64330662 |
Const of Toilet at No. 2 Aparia LP School. |
45000 |
Const of Toilet at No. 2 Aparia LP School.1 |
Completion of work |
-
latitude : 26.4347257
Longitude : 92.0327246
file name : Image_07062024153451688.png
|
2024-06-07 15:34:51.802258 |
74 |
64330662 |
Const of Toilet at No. 2 Aparia LP School. |
45000 |
Const of Toilet at No. 2 Aparia LP School.1 |
Completion of work |
-
latitude : 26.30821037
Longitude : 91.94612502
file name : Image_27032023150511447.png
|
2023-03-27 15:05:11.534157 |
75 |
64330662 |
Const of Toilet at No. 2 Aparia LP School. |
45000 |
Const of Toilet at No. 2 Aparia LP School.1 |
Completion of work |
-
latitude : 26.30821037
Longitude : 91.94612502
file name : Image_27032023150608161.png
|
2023-03-27 15:06:08.252155 |
76 |
64285864 |
Const of Toilet Shed at No 2 Chaulkhowa Char Chuba LP School |
140607 |
Const of Toilet Shed at No 2 Chaulkhowa Char Chuba LP School1 |
Plinth level |
-
latitude : 26.4364323
Longitude : 92.0349191
file name : Image_20062024164554084.png
|
2024-06-20 16:45:54.232771 |
77 |
64285864 |
Const of Toilet Shed at No 2 Chaulkhowa Char Chuba LP School |
140607 |
Const of Toilet Shed at No 2 Chaulkhowa Char Chuba LP School1 |
Completion of work |
-
latitude : 26.48638251
Longitude : 92.09123539
file name : Image_19012024094841656.png
|
2024-01-19 09:48:41.776416 |
78 |
64285864 |
Const of Toilet Shed at No 2 Chaulkhowa Char Chuba LP School |
140607 |
Const of Toilet Shed at No 2 Chaulkhowa Char Chuba LP School1 |
Completion of work |
-
latitude : 26.37663042
Longitude : 91.99910419
file name : Image_12012024150116631.png
|
2024-01-12 15:01:16.754926 |
79 |
64285864 |
Const of Toilet Shed at No 2 Chaulkhowa Char Chuba LP School |
140607 |
Const of Toilet Shed at No 2 Chaulkhowa Char Chuba LP School1 |
Completion of work |
-
latitude : 26.48643631
Longitude : 92.09157088
file name : Image_21082023101945934.png
|
2023-08-21 10:19:46.054288 |
80 |
64285864 |
Const of Toilet Shed at No 2 Chaulkhowa Char Chuba LP School |
140607 |
Const of Toilet Shed at No 2 Chaulkhowa Char Chuba LP School1 |
Completion of work |
-
latitude : 26.48653462
Longitude : 92.09158494
file name : Image_21082023101933233.png
|
2023-08-21 10:19:33.345143 |
81 |
64286011 |
Const of Toilet at No 1 Aparia L P School . |
45000 |
Const of Toilet at No 1 Aparia L P School .1 |
Plinth level |
-
latitude : 26.48619609
Longitude : 92.09156824
file name : Image_02062024171945687.png
|
2024-06-02 17:19:45.796661 |
82 |
64286011 |
Const of Toilet at No 1 Aparia L P School . |
45000 |
Const of Toilet at No 1 Aparia L P School .1 |
Completion of work |
-
latitude : 26.30701901
Longitude : 91.93489478
file name : Image_27032023150517852.png
|
2023-03-27 15:05:17.938914 |
83 |
64286011 |
Const of Toilet at No 1 Aparia L P School . |
45000 |
Const of Toilet at No 1 Aparia L P School .1 |
Completion of work |
-
latitude : 26.30701901
Longitude : 91.93489478
file name : Image_27032023150614217.png
|
2023-03-27 15:06:14.31512 |
84 |
96968606 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.30844251
Longitude : 91.94590564
file name : Image_01042024135750135.png
|
2024-04-01 13:57:50.26953 |
85 |
96973313 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.31323508
Longitude : 91.95960411
file name : Image_01042024151147813.png
|
2024-04-01 15:11:47.946606 |
86 |
96965368 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48638638
Longitude : 92.09143448
file name : Image_05102024105926206.png
|
2024-10-05 10:59:26.3215 |
87 |
96965368 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48647988
Longitude : 92.09160614
file name : Image_05102024105414519.png
|
2024-10-05 10:54:14.622183 |
88 |
96965368 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48648029
Longitude : 92.09160633
file name : Image_05102024104351491.png
|
2024-10-05 10:43:51.596929 |
89 |
96965368 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48645596
Longitude : 92.0914898
file name : Image_20052024083325734.png
|
2024-05-20 08:33:25.862294 |
90 |
64940649 |
Construction of toilets in public institutions |
154800 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.48626753
Longitude : 92.09160709
file name : Image_20052024084112060.png
|
2024-05-20 08:41:12.197987 |
91 |
64940785 |
Construction of toilets in public institutions |
77583 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.48659551
Longitude : 92.09166664
file name : Image_16092024101001966.png
|
2024-09-16 10:10:02.053731 |
92 |
96975826 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48624192
Longitude : 92.09144857
file name : Image_27072024193610788.png
|
2024-07-27 19:36:10.907487 |
93 |
96975826 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.30832366
Longitude : 91.94186985
file name : Image_01042024140730880.png
|
2024-04-01 14:07:30.98143 |
94 |
96975323 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.4364571
Longitude : 92.0349326
file name : Image_23092024153356433.png
|
2024-09-23 15:33:56.527731 |
95 |
96975323 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.436441
Longitude : 92.0349311
file name : Image_23092024153044423.png
|
2024-09-23 15:30:44.530402 |
96 |
96975323 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48673087
Longitude : 92.09159436
file name : Image_16092024120355116.png
|
2024-09-16 12:03:55.228802 |
97 |
96975323 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48650706
Longitude : 92.09172209
file name : Image_16092024114658045.png
|
2024-09-16 11:46:58.190312 |
98 |
96975323 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48645384
Longitude : 92.0916447
file name : Image_16092024115645904.png
|
2024-09-16 11:56:46.041816 |
99 |
96975323 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48652292
Longitude : 92.09168027
file name : Image_16092024114654534.png
|
2024-09-16 11:46:54.649981 |
100 |
96975323 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48668197
Longitude : 92.09162683
file name : Image_02092024160611822.png
|
2024-09-02 16:06:12.071222 |
101 |
96975323 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.34758278
Longitude : 91.9850418
file name : Image_17052024110432265.png
|
2024-05-17 11:04:32.402153 |
102 |
96972713 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.34600927
Longitude : 91.97964396
file name : Image_16092024100236614.png
|
2024-09-16 10:02:36.725516 |
103 |
96969185 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.32293196
Longitude : 91.98282114
file name : Image_01042024151307066.png
|
2024-04-01 15:13:07.219249 |
104 |
96968025 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.33889319
Longitude : 91.96659578
file name : Image_16092024100240467.png
|
2024-09-16 10:02:40.56465 |
105 |
96967426 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48647505
Longitude : 92.09159144
file name : Image_27072024193557009.png
|
2024-07-27 19:35:57.131706 |
106 |
96967426 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.31138605
Longitude : 91.9514508
file name : Image_01042024141857857.png
|
2024-04-01 14:18:57.974038 |
107 |
64939515 |
RENOVATION OF ANGANBADI CENTRE AT NO. 1 CHAULKHOWA (CENTRE NO. 2) |
120325 |
RENOVATION OF ANGANBADI CENTRE AT NO. 1 CHAULKHOWA (CENTRE NO. 2)1 |
Completion of work |
-
latitude : 26.48640592
Longitude : 92.09164939
file name : Image_07072024141451637.png
|
2024-07-07 14:14:51.735959 |
108 |
64619275 |
CONSTRUCTION OF KHOIRATOLI UTTAR CHUBA AWC AT NO.1 CHAULKHOWA |
164000 |
CONSTRUCTION OF KHOIRATOLI UTTAR CHUBA AWC AT NO.1 CHAULKHOWA1 |
Plinth level |
-
latitude : 26.4364325
Longitude : 92.0349198
file name : Image_20062024170202619.png
|
2024-06-20 17:02:02.740252 |
109 |
64619275 |
CONSTRUCTION OF KHOIRATOLI UTTAR CHUBA AWC AT NO.1 CHAULKHOWA |
164000 |
CONSTRUCTION OF KHOIRATOLI UTTAR CHUBA AWC AT NO.1 CHAULKHOWA1 |
Completion of work |
-
latitude : 26.48630476
Longitude : 92.0916038
file name : Image_19062024204917038.png
|
2024-06-19 20:49:17.13876 |
110 |
64619275 |
CONSTRUCTION OF KHOIRATOLI UTTAR CHUBA AWC AT NO.1 CHAULKHOWA |
164000 |
CONSTRUCTION OF KHOIRATOLI UTTAR CHUBA AWC AT NO.1 CHAULKHOWA1 |
Completion of work |
-
latitude : 26.48599096
Longitude : 92.091909
file name : Image_19062024201558703.png
|
2024-06-19 20:15:58.808093 |
111 |
64619275 |
CONSTRUCTION OF KHOIRATOLI UTTAR CHUBA AWC AT NO.1 CHAULKHOWA |
164000 |
CONSTRUCTION OF KHOIRATOLI UTTAR CHUBA AWC AT NO.1 CHAULKHOWA1 |
Completion of work |
-
latitude : 26.33851652
Longitude : 91.97158365
file name : Image_04022024224515791.png
|
2024-02-04 22:45:15.916631 |
112 |
64619275 |
CONSTRUCTION OF KHOIRATOLI UTTAR CHUBA AWC AT NO.1 CHAULKHOWA |
164000 |
CONSTRUCTION OF KHOIRATOLI UTTAR CHUBA AWC AT NO.1 CHAULKHOWA1 |
Completion of work |
-
latitude : 26.33851652
Longitude : 91.97158365
file name : Image_04022024224442669.png
|
2024-02-04 22:44:42.787957 |
113 |
64619275 |
CONSTRUCTION OF KHOIRATOLI UTTAR CHUBA AWC AT NO.1 CHAULKHOWA |
164000 |
CONSTRUCTION OF KHOIRATOLI UTTAR CHUBA AWC AT NO.1 CHAULKHOWA1 |
Completion of work |
-
latitude : 26.33848447
Longitude : 91.9716624
file name : Image_03082023153218332.png
|
2023-08-03 15:32:18.612968 |
114 |
64939340 |
RENOVATION OF ANGANBADI CENTRE AT NO. 1 CHAULKHOWA |
154800 |
RENOVATION OF ANGANBADI CENTRE AT NO. 1 CHAULKHOWA1 |
Plinth level |
-
latitude : 26.4364183
Longitude : 92.0350937
file name : Image_21062024121045972.png
|
2024-06-21 12:10:46.079007 |
115 |
64939340 |
RENOVATION OF ANGANBADI CENTRE AT NO. 1 CHAULKHOWA |
154800 |
RENOVATION OF ANGANBADI CENTRE AT NO. 1 CHAULKHOWA1 |
Completion of work |
-
latitude : 26.32277422
Longitude : 91.98338857
file name : Image_01042024151612396.png
|
2024-04-01 15:16:12.549061 |
116 |
64939340 |
RENOVATION OF ANGANBADI CENTRE AT NO. 1 CHAULKHOWA |
154800 |
RENOVATION OF ANGANBADI CENTRE AT NO. 1 CHAULKHOWA1 |
Completion of work |
-
latitude : 26.32264713
Longitude : 91.98338719
file name : Image_21112023103409390.png
|
2023-11-21 10:34:09.502479 |
117 |
64939340 |
RENOVATION OF ANGANBADI CENTRE AT NO. 1 CHAULKHOWA |
154800 |
RENOVATION OF ANGANBADI CENTRE AT NO. 1 CHAULKHOWA1 |
Completion of work |
-
latitude : 26.48690518
Longitude : 92.09902971
file name : Image_03112023122404007.png
|
2023-11-03 12:24:04.102476 |
118 |
64939422 |
RENOVATION OF ADDITIONAL CLASS AT NC APARIA LP SCHOOL |
154800 |
RENOVATION OF ADDITIONAL CLASS AT NC APARIA LP SCHOOL1 |
Plinth level |
-
latitude : 26.436438
Longitude : 92.0349185
file name : Image_21062024121932069.png
|
2024-06-21 12:19:32.182079 |
119 |
64939422 |
RENOVATION OF ADDITIONAL CLASS AT NC APARIA LP SCHOOL |
154800 |
RENOVATION OF ADDITIONAL CLASS AT NC APARIA LP SCHOOL1 |
Completion of work |
-
latitude : 26.3121587
Longitude : 91.95399019
file name : Image_31102023134802549.png
|
2023-10-31 13:48:03.111905 |
120 |
64939422 |
RENOVATION OF ADDITIONAL CLASS AT NC APARIA LP SCHOOL |
154800 |
RENOVATION OF ADDITIONAL CLASS AT NC APARIA LP SCHOOL1 |
Completion of work |
-
latitude : 26.31222912
Longitude : 91.95408896
file name : Image_07072023175221277.png
|
2023-07-07 17:52:21.395316 |
121 |
64939362 |
RENOVATION OF ANGANBADI CENTRE AT NO. 2 CHAULKHOWA |
154800 |
RENOVATION OF ANGANBADI CENTRE AT NO. 2 CHAULKHOWA1 |
Roof laid |
-
latitude : 26.4364782
Longitude : 92.0349458
file name : Image_20012024172141800.png
|
2024-01-20 17:21:41.92638 |
122 |
64939362 |
RENOVATION OF ANGANBADI CENTRE AT NO. 2 CHAULKHOWA |
154800 |
RENOVATION OF ANGANBADI CENTRE AT NO. 2 CHAULKHOWA1 |
Plinth level |
-
latitude : 26.4364782
Longitude : 92.0349458
file name : Image_20012024171859159.png
|
2024-01-20 17:18:59.301119 |
123 |
64939362 |
RENOVATION OF ANGANBADI CENTRE AT NO. 2 CHAULKHOWA |
154800 |
RENOVATION OF ANGANBADI CENTRE AT NO. 2 CHAULKHOWA1 |
Completion of work |
-
latitude : 26.48646479
Longitude : 92.09154315
file name : Image_13012024175735497.png
|
2024-01-13 17:57:35.599143 |
124 |
64939362 |
RENOVATION OF ANGANBADI CENTRE AT NO. 2 CHAULKHOWA |
154800 |
RENOVATION OF ANGANBADI CENTRE AT NO. 2 CHAULKHOWA1 |
Completion of work |
-
latitude : 26.48635173
Longitude : 92.09154437
file name : Image_19012024095542829.png
|
2024-01-19 09:55:42.964053 |
125 |
64939362 |
RENOVATION OF ANGANBADI CENTRE AT NO. 2 CHAULKHOWA |
154800 |
RENOVATION OF ANGANBADI CENTRE AT NO. 2 CHAULKHOWA1 |
Completion of work |
-
latitude : 26.48642033
Longitude : 92.09167328
file name : Image_23112023091237825.png
|
2023-11-23 09:12:37.944537 |
126 |
64939362 |
RENOVATION OF ANGANBADI CENTRE AT NO. 2 CHAULKHOWA |
154800 |
RENOVATION OF ANGANBADI CENTRE AT NO. 2 CHAULKHOWA1 |
Completion of work |
-
latitude : 26.48639562
Longitude : 92.0915677
file name : Image_21082023104525536.png
|
2023-08-21 10:45:25.645485 |
127 |
64619055 |
RENOVATION OF ADDITIONAL CLASS ROOM AT NO. 2 APARIA M.E SCHOOL |
355637 |
RENOVATION OF ADDITIONAL CLASS ROOM AT NO. 2 APARIA M.E SCHOOL1 |
Plinth level |
-
latitude : 26.4347476
Longitude : 92.0326997
file name : Image_27062024124836513.png
|
2024-06-27 12:48:36.636038 |
128 |
64619055 |
RENOVATION OF ADDITIONAL CLASS ROOM AT NO. 2 APARIA M.E SCHOOL |
355637 |
RENOVATION OF ADDITIONAL CLASS ROOM AT NO. 2 APARIA M.E SCHOOL1 |
Completion of work |
-
latitude : 26.30834245
Longitude : 91.94605896
file name : Image_25012024114945065.png
|
2024-01-25 11:49:45.204278 |
129 |
64619055 |
RENOVATION OF ADDITIONAL CLASS ROOM AT NO. 2 APARIA M.E SCHOOL |
355637 |
RENOVATION OF ADDITIONAL CLASS ROOM AT NO. 2 APARIA M.E SCHOOL1 |
Completion of work |
-
latitude : 26.30837729
Longitude : 91.94609904
file name : Image_27032023150506188.png
|
2023-03-27 15:05:06.282554 |
130 |
64619055 |
RENOVATION OF ADDITIONAL CLASS ROOM AT NO. 2 APARIA M.E SCHOOL |
355637 |
RENOVATION OF ADDITIONAL CLASS ROOM AT NO. 2 APARIA M.E SCHOOL1 |
Completion of work |
-
latitude : 26.30837729
Longitude : 91.94609904
file name : Image_27032023150602795.png
|
2023-03-27 15:06:02.88043 |
131 |
99155715 |
Water Supply to villages |
959500 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.4364654
Longitude : 92.0349326
file name : Image_23092024150617582.png
|
2024-09-23 15:06:17.692081 |
132 |
99155715 |
Water Supply to villages |
959500 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.4364392
Longitude : 92.0349417
file name : Image_23092024150112904.png
|
2024-09-23 15:01:13.01254 |
133 |
99155715 |
Water Supply to villages |
959500 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.48666868
Longitude : 92.09149384
file name : Image_16092024115833230.png
|
2024-09-16 11:58:33.38412 |
134 |
99155715 |
Water Supply to villages |
959500 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.48659298
Longitude : 92.09146927
file name : Image_16092024114651104.png
|
2024-09-16 11:46:51.202758 |
135 |
64940763 |
Construction of toilets in public institutions |
77583 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.48639074
Longitude : 92.09149636
file name : Image_20052024085301358.png
|
2024-05-20 08:53:01.480537 |
136 |
64940763 |
Construction of toilets in public institutions |
77583 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.34626091
Longitude : 91.97036756
file name : Image_17052024110426318.png
|
2024-05-17 11:04:26.442406 |
137 |
96970157 |
Renovation of Kitchen at No 2 Chaulkhowa LP School |
70000 |
Renovation of Kitchen at No 2 Chaulkhowa LP School1 |
Completion of work |
-
latitude : 26.33980803
Longitude : 91.96606797
file name : Image_17052024110415682.png
|
2024-05-17 11:04:15.808246 |
138 |
96970157 |
Renovation of Kitchen at No 2 Chaulkhowa LP School |
70000 |
Renovation of Kitchen at No 2 Chaulkhowa LP School1 |
Completion of work |
-
latitude : 26.3397885
Longitude : 91.96602537
file name : Image_17052024110410942.png
|
2024-05-17 11:04:11.089544 |
139 |
64940719 |
Construction of toilets in public institutions |
77583 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.4364321
Longitude : 92.0349207
file name : Image_13082024152650295.png
|
2024-08-13 15:26:50.430415 |
140 |
64939702 |
REPAIRING AT NO. 1 APARIA UTTAR CHUBA LPS |
70000 |
REPAIRING AT NO. 1 APARIA UTTAR CHUBA LPS1 |
Plinth level |
-
latitude : 26.4364337
Longitude : 92.0349248
file name : Image_13082024130233960.png
|
2024-08-13 13:02:34.060334 |
141 |
64939702 |
REPAIRING AT NO. 1 APARIA UTTAR CHUBA LPS |
70000 |
REPAIRING AT NO. 1 APARIA UTTAR CHUBA LPS1 |
Completion of work |
-
latitude : 26.48646397
Longitude : 92.09156705
file name : Image_04022024224852052.png
|
2024-02-04 22:48:52.172575 |
142 |
64939398 |
RENOVATION OF ANGANBADI CENTRE AT NO. 2 DHARIAKHAITY CENTRE NO. 3 |
154800 |
RENOVATION OF ANGANBADI CENTRE AT NO. 2 DHARIAKHAITY CENTRE NO. 31 |
Completion of work |
-
latitude : 26.4364327
Longitude : 92.034922
file name : Image_13082024153018066.png
|
2024-08-13 15:30:18.189417 |