1 |
44618803 |
BOUNDARY WALL OF HIRAPARA MASZID |
200000 |
BOUNDARY WALL OF HIRAPARA MASZID1 |
In Progress |
-
latitude : 26.46368597
Longitude : 91.90460292
file name : Image_17112020112700438.png
|
2020-11-17 11:27:00.528251 |
2 |
44569589 |
CONSTRUCTION OF BOUNDARY WALL AT POTAPUKHURI KALITA CHUBURI HARI MANDIR |
240000 |
CONSTRUCTION OF BOUNDARY WALL AT POTAPUKHURI KALITA CHUBURI HARI MANDIR1 |
In Progress |
-
latitude : 26.4874589
Longitude : 91.88904074
file name : Image_11122020133400905.png
|
2020-12-11 13:34:01.017582 |
3 |
44569486 |
CONSTRUCTION OF BOUNDARY WALL AT BURATARI JAME MASZID |
120000 |
CONSTRUCTION OF BOUNDARY WALL AT BURATARI JAME MASZID1 |
In Progress |
-
latitude : 26.46954321
Longitude : 91.88736093
file name : Image_10122020124645727.png
|
2020-12-10 12:46:45.822401 |
4 |
44619003 |
CYCLE STAND AT BARAMPUR MINI PHC |
200000 |
CYCLE STAND AT BARAMPUR MINI PHC1 |
25% |
-
latitude : 26.48662898
Longitude : 91.87715201
file name : Image_16112020153108140.png
|
2020-11-16 15:31:14.398464 |
5 |
44618926 |
SAND GRVLNG AT PATHARIGHAT UHAR CHOWK RD TO PACHIM MUR NANAI EMBANKMENT LINK ROAD |
350000 |
SAND GRVLNG AT PATHARIGHAT UHAR CHOWK RD TO PACHIM MUR NANAI EMBANKMENT LINK ROAD1 |
Earth Work |
-
latitude : 26.50237862,26.50238026
Longitude : 91.87986758,91.87988157
file name : Image_18112020070042630.png
|
2020-11-18 07:00:42.734875 |
6 |
44618953 |
CONST OF BUILDING AT BARAMPUR JANEJA FIELD |
200000 |
CONST OF BUILDING AT BARAMPUR JANEJA FIELD1 |
25% |
-
latitude : 26.48675079
Longitude : 91.87908272
file name : Image_16112020153055004.png
|
2020-11-16 15:31:01.245013 |
7 |
44619100 |
CONST OF HUMEPIPE CULVERT NEAR LATE NAUSAD ALI HOUSE AT ATHKURIA |
200000 |
CONST OF HUMEPIPE CULVERT NEAR LATE NAUSAD ALI HOUSE AT ATHKURIA1 |
Substructure below GL |
-
latitude : 26.4572517,26.45723997,26.45723863
Longitude : 91.90186751,91.90187142,91.90187194
file name : Image_17112020112636148.png
|
2020-11-17 11:26:36.242188 |
8 |
44619031 |
CONST OF BOUNDARY WALL AT PACHIM GHILAKURI KABARSTHAN VIA NAIMUDDIN HOUSE |
300000 |
CONST OF BOUNDARY WALL AT PACHIM GHILAKURI KABARSTHAN VIA NAIMUDDIN HOUSE1 |
In Progress |
-
latitude : 26.47290777
Longitude : 91.88117085
file name : Image_16112020153007895.png
|
2020-11-16 15:30:14.145901 |
9 |
44619031 |
CONST OF BOUNDARY WALL AT PACHIM GHILAKURI KABARSTHAN VIA NAIMUDDIN HOUSE |
300000 |
CONST OF BOUNDARY WALL AT PACHIM GHILAKURI KABARSTHAN VIA NAIMUDDIN HOUSE1 |
In Progress |
-
latitude : 26.47290777
Longitude : 91.88117085
file name : Image_16112020153044537.png
|
2020-11-16 15:30:50.774602 |
10 |
44618725 |
SAND GRAVELING AT PHATIK DEKA HOUSE TO NONOI EMBANKMENT ROAD |
200000 |
SAND GRAVELING AT PHATIK DEKA HOUSE TO NONOI EMBANKMENT ROAD 1 |
Earth Work |
-
latitude : 26.48606634,26.48607939
Longitude : 91.87145148,91.87150178
file name : Image_18112020070048706.png
|
2020-11-18 07:00:48.800696 |
11 |
44618745 |
BOUNDARY WALL AT BARAMPUR HARI MANDIR |
300000 |
BOUNDARY WALL AT BARAMPUR HARI MANDIR1 |
In Progress |
-
latitude : 26.49131749
Longitude : 91.87931938
file name : Image_16112020153020953.png
|
2020-11-16 15:30:27.204659 |
12 |
44618902 |
CONSTRUCTION OF BOUNDARY WALL AT 291 POTA LP SCHOOL |
250000 |
CONSTRUCTION OF BOUNDARY WALL AT 291 POTA LP SCHOOL1 |
In Progress |
-
latitude : 26.49278016
Longitude : 91.88771658
file name : Image_17112020121319549.png
|
2020-11-17 12:13:19.625235 |
13 |
44618832 |
BOUNDARY WALL AT POTA PUKHURI JUMMA MASZID |
200000 |
BOUNDARY WALL AT POTA PUKHURI JUMMA MASZID1 |
In Progress |
-
latitude : 26.48261304
Longitude : 91.89544268
file name : Image_17112020121408599.png
|
2020-11-17 12:14:08.673014 |
14 |
44618832 |
BOUNDARY WALL AT POTA PUKHURI JUMMA MASZID |
200000 |
BOUNDARY WALL AT POTA PUKHURI JUMMA MASZID1 |
In Progress |
-
latitude : 26.49279543
Longitude : 91.88770969
file name : Image_16112020124443179.png
|
2020-11-16 12:44:49.372118 |
15 |
44572562 |
SAND GRAVELLING PF ROAD FROM DEOMORNOI BARAMPUR CONN RD TO TARUN HAZARIKA HOUSE |
250000 |
SAND GRAVELLING PF ROAD FROM DEOMORNOI BARAMPUR CONN RD TO TARUN HAZARIKA HOUSE1 |
Earth Work |
-
latitude : 26.48533327,26.4853093
Longitude : 91.88978873,91.88979344
file name : Image_05122020133248969.png
|
2020-12-05 13:32:49.115245 |
16 |
64330115 |
REPAIRING OF NO 8 AWC AT GHILAKURI |
162000 |
REPAIRING OF NO 8 AWC AT GHILAKURI1 |
Plinth level |
-
latitude : 26.47421427
Longitude : 91.88792465
file name : Image_30072024170044859.png
|
2024-07-30 17:00:44.959323 |
17 |
64330115 |
REPAIRING OF NO 8 AWC AT GHILAKURI |
162000 |
REPAIRING OF NO 8 AWC AT GHILAKURI1 |
Completion of work |
-
latitude : 26.474215000000004
Longitude : 91.88790833333333
file name : Image_21102022140110897.png
|
2022-10-21 14:01:10.987621 |
18 |
64330433 |
COMMUNITY MANAGE SANITARY COMPLEX AT ATHKURIA |
90000 |
COMMUNITY MANAGE SANITARY COMPLEX AT ATHKURIA1 |
Completion of work |
-
latitude : 26.45624833333333
Longitude : 91.90013666666667
file name : Image_09032023173453398.png
|
2023-03-09 17:34:53.49115 |
19 |
64329964 |
COMMUNITY MANAGE SANITATION COMPLEX AT BARAMPUR GP OFFICE |
90000 |
COMMUNITY MANAGE SANITATION COMPLEX AT BARAMPUR GP OFFICE1 |
Completion of work |
-
latitude : 26.481453333333334
Longitude : 91.89074833333333
file name : Image_23032023150635937.png
|
2023-03-23 15:06:36.018475 |
20 |
64329178 |
REPAIRING OF GHILAKURI HIGH SCHOOL |
120000 |
REPAIRING OF GHILAKURI HIGH SCHOOL1 |
Roof laid |
-
latitude : 26.5345799
Longitude : 91.89090759
file name : Image_18062024063649570.png
|
2024-06-18 06:36:49.708667 |
21 |
64329178 |
REPAIRING OF GHILAKURI HIGH SCHOOL |
120000 |
REPAIRING OF GHILAKURI HIGH SCHOOL1 |
Plinth level |
-
latitude : 26.53462755
Longitude : 91.89079632
file name : Image_18062024062741712.png
|
2024-06-18 06:27:41.789789 |
22 |
64329178 |
REPAIRING OF GHILAKURI HIGH SCHOOL |
120000 |
REPAIRING OF GHILAKURI HIGH SCHOOL1 |
Completion of work |
-
latitude : 26.474903333333334
Longitude : 91.89566666666666
file name : Image_06052023151351762.png
|
2023-05-06 15:13:51.885541 |
23 |
66598752 |
REPAIRING OF BANEIKUCHI MAINA BIKASH KENDRA |
100000 |
REPAIRING OF BANEIKUCHI MAINA BIKASH KENDRA1 |
Plinth level |
-
latitude : 26.497674999999997
Longitude : 91.88135833333332
file name : Image_05012024114657380.png
|
2024-01-05 11:46:57.467973 |
24 |
66598752 |
REPAIRING OF BANEIKUCHI MAINA BIKASH KENDRA |
100000 |
REPAIRING OF BANEIKUCHI MAINA BIKASH KENDRA1 |
Plinth level |
-
latitude : 26.497674999999997
Longitude : 91.88135833333332
file name : Image_05012024114648642.png
|
2024-01-05 11:46:48.736349 |
25 |
66598752 |
REPAIRING OF BANEIKUCHI MAINA BIKASH KENDRA |
100000 |
REPAIRING OF BANEIKUCHI MAINA BIKASH KENDRA1 |
Completion of work |
-
latitude : 26.497531666666667
Longitude : 91.88133
file name : Image_19042023114929365.png
|
2023-04-19 11:49:29.475204 |
26 |
66598997 |
REPAIRING OF 248 NO PACHIM GHILAKURI AWC |
118500 |
REPAIRING OF 248 NO PACHIM GHILAKURI AWC1 |
Roof laid |
-
latitude : 26.53456327
Longitude : 91.8908574
file name : Image_28092024152132652.png
|
2024-09-28 15:21:32.727293 |
27 |
66598997 |
REPAIRING OF 248 NO PACHIM GHILAKURI AWC |
118500 |
REPAIRING OF 248 NO PACHIM GHILAKURI AWC1 |
Plinth level |
-
latitude : 26.53453755
Longitude : 91.89076363
file name : Image_28092024151539694.png
|
2024-09-28 15:15:39.773779 |
28 |
66598997 |
REPAIRING OF 248 NO PACHIM GHILAKURI AWC |
118500 |
REPAIRING OF 248 NO PACHIM GHILAKURI AWC1 |
Completion of work |
-
latitude : 26.476116666666666
Longitude : 91.88487500000001
file name : Image_04052023120744683.png
|
2023-05-04 12:07:44.773474 |
29 |
66598997 |
REPAIRING OF 248 NO PACHIM GHILAKURI AWC |
118500 |
REPAIRING OF 248 NO PACHIM GHILAKURI AWC1 |
Completion of work |
-
latitude : 26.47477666666667
Longitude : 91.89607
file name : Image_04052023121753357.png
|
2023-05-04 12:17:53.479777 |
30 |
66598939 |
FLOOD DAMAGE REPAIRING OF ROAD AT POTA PUKHURI VILLAGE |
100000 |
FLOOD DAMAGE REPAIRING OF ROAD AT POTA PUKHURI VILLAGE1 |
Plinth level |
-
latitude : 26.4903112,26.49031714
Longitude : 91.88867003,91.88867028
file name : Image_01072024112013140.png
|
2024-07-01 11:20:13.248749 |
31 |
66598939 |
FLOOD DAMAGE REPAIRING OF ROAD AT POTA PUKHURI VILLAGE |
100000 |
FLOOD DAMAGE REPAIRING OF ROAD AT POTA PUKHURI VILLAGE1 |
Plinth level |
-
latitude : 26.490231666666666,26.490109999999998
Longitude : 91.88872500000001,91.88855166666666
file name : Image_01022024135904498.png
|
2024-02-01 13:59:04.600257 |
32 |
66598939 |
FLOOD DAMAGE REPAIRING OF ROAD AT POTA PUKHURI VILLAGE |
100000 |
FLOOD DAMAGE REPAIRING OF ROAD AT POTA PUKHURI VILLAGE1 |
Completion of work |
-
latitude : 26.49022166666667,26.490261666666665
Longitude : 91.88870833333334,91.88880666666667
file name : Image_03012024161424778.png
|
2024-01-03 16:14:24.869716 |
33 |
64330289 |
COVID 19 SANITIZATION PROGRAMME |
75000 |
COVID 19 SANITIZATION PROGRAMME1 |
Completion of work |
-
latitude : 26.486695
Longitude : 91.87978333333334
file name : Image_08052023110807184.png
|
2023-05-08 11:08:07.289515 |
34 |
64329875 |
CONST OF COMMUNITY MATERIALS COLLECTION UNDER SOLID WASTE MANAGEMENT NEAR BARAMPUR GP OFFICE CAMPUS |
175000 |
CONST OF COMMUNITY MATERIALS COLLECTION UNDER SOLID WASTE MANAGEMENT NEAR BARAMPUR GP OFFICE CAMPUS1 |
Completion of work |
-
latitude : 26.48132333333333
Longitude : 91.88780166666666
file name : Image_05072023133358871.png
|
2023-07-05 13:33:58.96458 |
35 |
66599994 |
Grey water management — treatment and reuse infrastructure |
51400 |
Grey water management — treatment and reuse infrastructure1 |
Completion of work |
-
latitude : 26.488083333333332
Longitude : 91.86657166666667
file name : Image_18102023190418314.png
|
2023-10-18 19:04:18.42899 |
36 |
64329728 |
OPERATIONAL AND MAINTANANCE OF TWO NOS DRINKING WATER SUPPLY AT ATHKURIA AND BANEIKUCHI |
393000 |
OPERATIONAL AND MAINTANANCE OF TWO NOS DRINKING WATER SUPPLY AT ATHKURIA AND BANEIKUCHI1 |
Roof laid |
-
latitude : 26.53454611,26.534538
Longitude : 91.89083703,91.89083052
file name : Image_24062024090100310.png
|
2024-06-24 09:01:00.394322 |
37 |
64329728 |
OPERATIONAL AND MAINTANANCE OF TWO NOS DRINKING WATER SUPPLY AT ATHKURIA AND BANEIKUCHI |
393000 |
OPERATIONAL AND MAINTANANCE OF TWO NOS DRINKING WATER SUPPLY AT ATHKURIA AND BANEIKUCHI1 |
Plinth level |
-
latitude : 26.53452636,26.53452613
Longitude : 91.89084495,91.89084881
file name : Image_24062024085750579.png
|
2024-06-24 08:57:50.661481 |
38 |
64329728 |
OPERATIONAL AND MAINTANANCE OF TWO NOS DRINKING WATER SUPPLY AT ATHKURIA AND BANEIKUCHI |
393000 |
OPERATIONAL AND MAINTANANCE OF TWO NOS DRINKING WATER SUPPLY AT ATHKURIA AND BANEIKUCHI1 |
Completion of work |
-
latitude : 26.486951666666663,26.486726666666662
Longitude : 91.87654833333333,91.87647833333334
file name : Image_19102023105321968.png
|
2023-10-19 10:53:22.072907 |
39 |
64330013 |
COMMUNITY MANAGE SANITATION COMPLEX AT GHILAKURI SUB CENTRE |
90000 |
COMMUNITY MANAGE SANITATION COMPLEX AT GHILAKURI SUB CENTRE1 |
Completion of work |
-
latitude : 26.472896666666664
Longitude : 91.89592666666667
file name : Image_12012024133952824.png
|
2024-01-12 13:39:52.938214 |
40 |
87295664 |
REPAIRING OF MEDA LP SCHOOL |
110000 |
REPAIRING OF MEDA LP SCHOOL1 |
Plinth level |
-
latitude : 26.47719244
Longitude : 91.88359064
file name : Image_01072024111820219.png
|
2024-07-01 11:18:20.317037 |
41 |
87295664 |
REPAIRING OF MEDA LP SCHOOL |
110000 |
REPAIRING OF MEDA LP SCHOOL1 |
Completion of work |
-
latitude : 26.476975
Longitude : 91.88371333333335
file name : Image_03012024160006824.png
|
2024-01-03 16:00:06.921824 |
42 |
66599332 |
MAINTANANCE OF GP OFFICE |
68600 |
MAINTANANCE OF GP OFFICE1 |
Completion of work |
-
latitude : 26.48144666666667
Longitude : 91.89056333333335
file name : Image_19012023131444791.png
|
2023-01-19 13:14:44.871938 |
43 |
66600039 |
Any other operation and maintenance needs related to solid waste management |
51400 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 26.53456098
Longitude : 91.89088979
file name : Image_29082024142018479.png
|
2024-08-29 14:20:18.823502 |
44 |
66600039 |
Any other operation and maintenance needs related to solid waste management |
51400 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 26.53459267
Longitude : 91.89092993
file name : Image_29082024141710458.png
|
2024-08-29 14:17:10.766652 |
45 |
66600039 |
Any other operation and maintenance needs related to solid waste management |
51400 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 26.4834
Longitude : 91.89179
file name : Image_23052023131104368.png
|
2023-05-23 13:11:04.468299 |
46 |
64329239 |
REPAIRING OF BANEIKUCHI HIGH SCHOOL |
100000 |
REPAIRING OF BANEIKUCHI HIGH SCHOOL1 |
Plinth level |
-
latitude : 26.49886493
Longitude : 91.88008498
file name : Image_03052024201853338.png
|
2024-05-03 20:18:53.430657 |
47 |
64329239 |
REPAIRING OF BANEIKUCHI HIGH SCHOOL |
100000 |
REPAIRING OF BANEIKUCHI HIGH SCHOOL1 |
Plinth level |
-
latitude : 26.500096666666664
Longitude : 91.88083
file name : Image_05012024114644567.png
|
2024-01-05 11:46:44.658857 |
48 |
64329239 |
REPAIRING OF BANEIKUCHI HIGH SCHOOL |
100000 |
REPAIRING OF BANEIKUCHI HIGH SCHOOL1 |
Plinth level |
-
latitude : 26.481986666666664
Longitude : 91.86563
file name : Image_05012024113320624.png
|
2024-01-05 11:33:20.74735 |
49 |
64329239 |
REPAIRING OF BANEIKUCHI HIGH SCHOOL |
100000 |
REPAIRING OF BANEIKUCHI HIGH SCHOOL1 |
Completion of work |
-
latitude : 26.498633333333334
Longitude : 91.87989166666667
file name : Image_13042023111242873.png
|
2023-04-13 11:12:42.97939 |
50 |
66598811 |
REPAIRING OF 24 NO NIZ BARAMPUR AWC |
100000 |
REPAIRING OF 24 NO NIZ BARAMPUR AWC1 |
Completion of work |
-
latitude : 26.482216666666666
Longitude : 91.88168333333333
file name : Image_19012024150725557.png
|
2024-01-19 15:07:25.647238 |
51 |
66601322 |
Construction of Community Sanitary Complex |
30000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48102333333333
Longitude : 91.89122
file name : Image_05012024145513044.png
|
2024-01-05 14:55:13.142883 |
52 |
66601322 |
Construction of Community Sanitary Complex |
30000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.487880000000004
Longitude : 91.87803000000001
file name : Image_01112023125337620.png
|
2023-11-01 12:53:37.725985 |
53 |
87295704 |
ADJUSTMENT SCHEME |
50000 |
ADJUSTMENT SCHEME1 |
Completion of work |
-
latitude : 26.48113166666667
Longitude : 91.891005
file name : Image_05012024153626097.png
|
2024-01-05 15:36:26.176759 |
54 |
87295704 |
ADJUSTMENT SCHEME |
50000 |
ADJUSTMENT SCHEME1 |
Completion of work |
-
latitude : 26.48113166666667
Longitude : 91.891005
file name : Image_05012024153617140.png
|
2024-01-05 15:36:17.222213 |
55 |
87295318 |
Construction of toilets in public institutions |
30000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.480913333333334
Longitude : 91.89137833333334
file name : Image_05012024153606672.png
|
2024-01-05 15:36:06.749336 |
56 |
86691843 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.48134296
Longitude : 91.89090945
file name : Image_26072024121631978.png
|
2024-07-26 12:16:32.082871 |
57 |
87295367 |
FLOOD DAMAGE REPAIRING OF BARICHOWKA MAHALIAPARA PWD ROAD TO NOUSAD ALI HOUSE AT THAKURIA |
71300 |
FLOOD DAMAGE REPAIRING OF BARICHOWKA MAHALIAPARA PWD ROAD TO NOUSAD ALI HOUSE AT THAKURIA1 |
Completion of work |
-
latitude : 26.456976666666666,26.45695166666667
Longitude : 91.89724333333334,91.89724
file name : Image_29012024145535589.png
|
2024-01-29 14:55:35.699181 |
58 |
87295747 |
REPAIRING OF ROAD FROM ABHIRAM DEKA HOUSE TO KULEN KALITA HOUSE AT BANEIKUCHI. |
100000 |
REPAIRING OF ROAD FROM ABHIRAM DEKA HOUSE TO KULEN KALITA HOUSE AT BANEIKUCHI.1 |
Completion of work |
-
latitude : 26.50201848,26.50201921
Longitude : 91.87439035,91.87439046
file name : Image_10062024123845972.png
|
2024-06-10 12:38:46.082916 |
59 |
87295747 |
REPAIRING OF ROAD FROM ABHIRAM DEKA HOUSE TO KULEN KALITA HOUSE AT BANEIKUCHI. |
100000 |
REPAIRING OF ROAD FROM ABHIRAM DEKA HOUSE TO KULEN KALITA HOUSE AT BANEIKUCHI.1 |
Completion of work |
-
latitude : 26.50139166666667,26.50133333333333
Longitude : 91.87433166666666,91.87437666666668
file name : Image_29012024155505299.png
|
2024-01-29 15:55:05.401531 |
60 |
87295592 |
REPAIRING OF ROAD FROM KHAGEN SARMA HOUSE TO PRADIP RAJBONGSHI HOUSE SARABARI BARAMPUR |
90000 |
REPAIRING OF ROAD FROM KHAGEN SARMA HOUSE TO PRADIP RAJBONGSHI HOUSE SARABARI BARAMPUR1 |
Completion of work |
-
latitude : 26.48419333333333,26.48420833333333
Longitude : 91.868865,91.86885499999998
file name : Image_29012024164247107.png
|
2024-01-29 16:42:47.192288 |
61 |
87295454 |
FLOOD DAMAGE REPAIRING OF ROAD FROM PUB POTA LP SCHOOL TO BAKUL NATH HOUSE. |
60000 |
FLOOD DAMAGE REPAIRING OF ROAD FROM PUB POTA LP SCHOOL TO BAKUL NATH HOUSE.1 |
Plinth level |
-
latitude : 26.49030903,26.4902798,26.49029453
Longitude : 91.89393351,91.89386116,91.89385918
file name : Image_30072024170000009.png
|
2024-07-30 17:00:00.113046 |
62 |
87295454 |
FLOOD DAMAGE REPAIRING OF ROAD FROM PUB POTA LP SCHOOL TO BAKUL NATH HOUSE. |
60000 |
FLOOD DAMAGE REPAIRING OF ROAD FROM PUB POTA LP SCHOOL TO BAKUL NATH HOUSE.1 |
Completion of work |
-
latitude : 26.490291666666668,26.490216666666665
Longitude : 91.89391833333333,91.89386166666667
file name : Image_01022024135856314.png
|
2024-02-01 13:58:56.411137 |
63 |
86691304 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48122766
Longitude : 91.89066386
file name : Image_04072024112757541.png
|
2024-07-04 11:27:57.63052 |
64 |
86691304 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.488284999999998
Longitude : 91.87898833333333
file name : Image_01022024140736782.png
|
2024-02-01 14:07:36.877346 |
65 |
87295598 |
INFRASTUCTURE DEV OF HIRAPARA LP SCHOOL |
131300 |
INFRASTUCTURE DEV OF HIRAPARA LP SCHOOL1 |
Completion of work |
-
latitude : 26.46326
Longitude : 91.90144000000001
file name : Image_13112023131558961.png
|
2023-11-13 13:15:59.046294 |
66 |
86691735 |
Any other operation and maintenance needs related to solid waste management |
9750 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 26.480216666666667
Longitude : 91.89053333333335
file name : Image_13112023134150658.png
|
2023-11-13 13:41:50.767294 |
67 |
86691645 |
Any other operation and maintenance needs related to solid waste management |
9750 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 26.505845
Longitude : 91.87967666666667
file name : Image_13112023142628647.png
|
2023-11-13 14:26:28.739678 |
68 |
66600105 |
MAINTANANCE OF GP OFFICE |
200000 |
MAINTANANCE OF GP OFFICE1 |
Completion of work |
-
latitude : 26.48128
Longitude : 91.89068
file name : Image_13112023151611930.png
|
2023-11-13 15:16:12.034027 |
69 |
66599067 |
REPAIRING OF 3 NO UTTAR BANEIKUCHI AWC |
110000 |
REPAIRING OF 3 NO UTTAR BANEIKUCHI AWC1 |
Completion of work |
-
latitude : 26.50609833333333
Longitude : 91.87969166666666
file name : Image_13112023142344875.png
|
2023-11-13 14:23:44.961452 |
70 |
66599130 |
REPAIRING OF BARAMPUR HS SCHOOL CAMPUS |
309900 |
REPAIRING OF BARAMPUR HS SCHOOL CAMPUS1 |
Roof laid |
-
latitude : 26.53454014
Longitude : 91.89088057
file name : Image_13062024193744270.png
|
2024-06-13 19:37:44.363674 |
71 |
66599130 |
REPAIRING OF BARAMPUR HS SCHOOL CAMPUS |
309900 |
REPAIRING OF BARAMPUR HS SCHOOL CAMPUS1 |
Plinth level |
-
latitude : 26.489145
Longitude : 91.87976333333333
file name : Image_03022024112058062.png
|
2024-02-03 11:20:58.152702 |
72 |
66599130 |
REPAIRING OF BARAMPUR HS SCHOOL CAMPUS |
309900 |
REPAIRING OF BARAMPUR HS SCHOOL CAMPUS1 |
Completion of work |
-
latitude : 26.490751666666664
Longitude : 91.87964833333332
file name : Image_01112023122502476.png
|
2023-11-01 12:25:02.761825 |
73 |
66599130 |
REPAIRING OF BARAMPUR HS SCHOOL CAMPUS |
309900 |
REPAIRING OF BARAMPUR HS SCHOOL CAMPUS1 |
Completion of work |
-
latitude : 26.49055
Longitude : 91.87940166666667
file name : Image_13072023152937773.png
|
2023-07-13 15:29:37.884122 |
74 |
86691549 |
Creation of drainage channel for management of grey water |
104450 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.48955877
Longitude : 91.87938545
file name : Image_01072024132409669.png
|
2024-07-01 13:24:09.771225 |
75 |
64329804 |
CONST OF COMMUNITY MATERIALS COLLECTION UNDER SOLID WASTE MANAGEMENT AT BANEIKUCHI WEEKLY MARKET |
33000 |
CONST OF COMMUNITY MATERIALS COLLECTION UNDER SOLID WASTE MANAGEMENT AT BANEIKUCHI WEEKLY MARKET1 |
Completion of work |
-
latitude : 26.498694999999998
Longitude : 91.88165499999998
file name : Image_04052023111817420.png
|
2023-05-04 11:18:17.514663 |
76 |
64331597 |
COMMUNITY MATERIAL COLLECTION UNDER SOLID WASTE MANAGEMENT AT SARABARI BARAMPUR |
32500 |
COMMUNITY MATERIAL COLLECTION UNDER SOLID WASTE MANAGEMENT AT SARABARI BARAMPUR1 |
Roof laid |
-
latitude : 26.48131
Longitude : 91.89072499999999
file name : Image_20122023113622492.png
|
2023-12-20 11:36:22.575691 |
77 |
64331597 |
COMMUNITY MATERIAL COLLECTION UNDER SOLID WASTE MANAGEMENT AT SARABARI BARAMPUR |
32500 |
COMMUNITY MATERIAL COLLECTION UNDER SOLID WASTE MANAGEMENT AT SARABARI BARAMPUR1 |
Plinth level |
-
latitude : 26.488386666666663
Longitude : 91.86695833333333
file name : Image_20122023113041185.png
|
2023-12-20 11:30:41.326593 |
78 |
64331597 |
COMMUNITY MATERIAL COLLECTION UNDER SOLID WASTE MANAGEMENT AT SARABARI BARAMPUR |
32500 |
COMMUNITY MATERIAL COLLECTION UNDER SOLID WASTE MANAGEMENT AT SARABARI BARAMPUR1 |
Plinth level |
-
latitude : 26.396079999999998
Longitude : 91.90168
file name : Image_20122023112937276.png
|
2023-12-20 11:29:37.372177 |
79 |
64331597 |
COMMUNITY MATERIAL COLLECTION UNDER SOLID WASTE MANAGEMENT AT SARABARI BARAMPUR |
32500 |
COMMUNITY MATERIAL COLLECTION UNDER SOLID WASTE MANAGEMENT AT SARABARI BARAMPUR1 |
Completion of work |
-
latitude : 26.484008333333335
Longitude : 91.87028333333335
file name : Image_27072023134722605.png
|
2023-07-27 13:47:22.705771 |
80 |
66599569 |
Any other operation and maintenance needs related to solid waste management |
33000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 26.49007333333333
Longitude : 91.89387
file name : Image_23052023150024352.png
|
2023-05-23 15:00:24.459299 |
81 |
66599634 |
Any other operation and maintenance needs related to solid waste management |
33000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 26.4908678
Longitude : 91.8790028
file name : Image_04052023122038740.png
|
2023-05-04 12:20:38.828241 |
82 |
86691222 |
Water Supply to villages |
39800 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.53465899
Longitude : 91.8908535
file name : Image_07052024131731052.png
|
2024-05-07 13:17:31.146341 |
83 |
86691959 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.48891386
Longitude : 91.87561408
file name : Image_13052024124333488.png
|
2024-05-13 12:43:33.589416 |
84 |
87295458 |
CONST OF SOLAR STREET LIGHT AT HIRAPARA KRISHI SAMABAI SAMITTEE AMRIT SAROOVAR |
150000 |
CONST OF SOLAR STREET LIGHT AT HIRAPARA KRISHI SAMABAI SAMITTEE AMRIT SAROOVAR1 |
Roof laid |
-
latitude : 26.53454099
Longitude : 91.89084822
file name : Image_13062024214621764.png
|
2024-06-13 21:46:21.837925 |
85 |
87295458 |
CONST OF SOLAR STREET LIGHT AT HIRAPARA KRISHI SAMABAI SAMITTEE AMRIT SAROOVAR |
150000 |
CONST OF SOLAR STREET LIGHT AT HIRAPARA KRISHI SAMABAI SAMITTEE AMRIT SAROOVAR1 |
Plinth level |
-
latitude : 26.53450181
Longitude : 91.89085646
file name : Image_13062024213905034.png
|
2024-06-13 21:39:05.121655 |
86 |
87295458 |
CONST OF SOLAR STREET LIGHT AT HIRAPARA KRISHI SAMABAI SAMITTEE AMRIT SAROOVAR |
150000 |
CONST OF SOLAR STREET LIGHT AT HIRAPARA KRISHI SAMABAI SAMITTEE AMRIT SAROOVAR1 |
Completion of work |
-
latitude : 26.47183499
Longitude : 91.90283539
file name : Image_04052024141117586.png
|
2024-05-04 14:11:17.75942 |
87 |
64332077 |
MAINTANANCE OF GP OFFICE |
35305 |
MAINTANANCE OF GP OFFICE1 |
Completion of work |
-
latitude : 26.53457726
Longitude : 91.89080528
file name : Image_22072024074324117.png
|
2024-07-22 07:43:24.216749 |
88 |
87295516 |
CONST OF SOLAR STREET LIGHT AT BARAMPUR UNNAYAN PARISHAD AMRIT SAROVAR |
150000 |
CONST OF SOLAR STREET LIGHT AT BARAMPUR UNNAYAN PARISHAD AMRIT SAROVAR1 |
Roof laid |
-
latitude : 26.53458174
Longitude : 91.89083763
file name : Image_13062024215940031.png
|
2024-06-13 21:59:40.113271 |
89 |
87295516 |
CONST OF SOLAR STREET LIGHT AT BARAMPUR UNNAYAN PARISHAD AMRIT SAROVAR |
150000 |
CONST OF SOLAR STREET LIGHT AT BARAMPUR UNNAYAN PARISHAD AMRIT SAROVAR1 |
Plinth level |
-
latitude : 26.53459092
Longitude : 91.89082144
file name : Image_13062024215411936.png
|
2024-06-13 21:54:12.025025 |
90 |
87295516 |
CONST OF SOLAR STREET LIGHT AT BARAMPUR UNNAYAN PARISHAD AMRIT SAROVAR |
150000 |
CONST OF SOLAR STREET LIGHT AT BARAMPUR UNNAYAN PARISHAD AMRIT SAROVAR1 |
Completion of work |
-
latitude : 26.53453127
Longitude : 91.89084329
file name : Image_30052024165629590.png
|
2024-05-30 16:56:29.678116 |
91 |
66599874 |
Water Supply to villages |
382900 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.53454073
Longitude : 91.89086835
file name : Image_25062024081827033.png
|
2024-06-25 08:18:27.134428 |
92 |
66599782 |
Any other operation and maintenance needs related to solid waste management |
33000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 26.53457104
Longitude : 91.89087281
file name : Image_29082024134452269.png
|
2024-08-29 13:44:52.937386 |
93 |
66599782 |
Any other operation and maintenance needs related to solid waste management |
33000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 26.53454078
Longitude : 91.89083739
file name : Image_26062024082724260.png
|
2024-06-26 08:27:24.349989 |
94 |
66599782 |
Any other operation and maintenance needs related to solid waste management |
33000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 26.47703166666667
Longitude : 91.88334833333332
file name : Image_27072023135713822.png
|
2023-07-27 13:57:13.91278 |
95 |
66599829 |
Any other operation and maintenance needs related to solid waste management |
33000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 26.53452101
Longitude : 91.89080669
file name : Image_24072024074223357.png
|
2024-07-24 07:42:23.456187 |
96 |
66599829 |
Any other operation and maintenance needs related to solid waste management |
33000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 26.53457146
Longitude : 91.89096348
file name : Image_24072024074021307.png
|
2024-07-24 07:40:21.397277 |
97 |
66599829 |
Any other operation and maintenance needs related to solid waste management |
33000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 26.464495000000003
Longitude : 91.894615
file name : Image_28072023113559088.png
|
2023-07-28 11:35:59.178386 |
98 |
66599519 |
Any other operation and maintenance needs related to solid waste management |
33000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 26.53452184
Longitude : 91.89086566
file name : Image_29082024135602074.png
|
2024-08-29 13:56:02.894485 |
99 |
66599519 |
Any other operation and maintenance needs related to solid waste management |
33000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 26.53456283
Longitude : 91.89089915
file name : Image_29082024135120381.png
|
2024-08-29 13:51:21.136858 |
100 |
66599519 |
Any other operation and maintenance needs related to solid waste management |
33000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 26.463268333333335
Longitude : 91.90157333333333
file name : Image_28072023115029471.png
|
2023-07-28 11:50:29.564209 |
101 |
66599592 |
Any other operation and maintenance needs related to solid waste management |
33000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 26.48144
Longitude : 91.89108499999999
file name : Image_12012024140637214.png
|
2024-01-12 14:06:37.307707 |
102 |
66599447 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.490258333333333
Longitude : 91.87925666666666
file name : Image_23032023111954223.png
|
2023-03-23 11:19:54.339632 |
103 |
66599400 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.484230000000004
Longitude : 91.87026833333333
file name : Image_23032023110254078.png
|
2023-03-23 11:02:54.184638 |
104 |
64329131 |
REPAIRING OF NAGAON BALAK LP SCHOOL |
200000 |
REPAIRING OF NAGAON BALAK LP SCHOOL1 |
Roof laid |
-
latitude : 26.48201333333333
Longitude : 91.86566333333333
file name : Image_05012024111149163.png
|
2024-01-05 11:11:49.248871 |
105 |
64329131 |
REPAIRING OF NAGAON BALAK LP SCHOOL |
200000 |
REPAIRING OF NAGAON BALAK LP SCHOOL1 |
Plinth level |
-
latitude : 26.482039999999998
Longitude : 91.86572166666669
file name : Image_05012024110712514.png
|
2024-01-05 11:07:12.620272 |
106 |
64329131 |
REPAIRING OF NAGAON BALAK LP SCHOOL |
200000 |
REPAIRING OF NAGAON BALAK LP SCHOOL1 |
Completion of work |
-
latitude : 26.482083333333335
Longitude : 91.86591500000002
file name : Image_17032023105336157.png
|
2023-03-17 10:53:36.273846 |
107 |
64330492 |
COMMUNITY MANAGE SANITARY COMPLEX AT POTAPUKHURI |
90000 |
COMMUNITY MANAGE SANITARY COMPLEX AT POTAPUKHURI1 |
Completion of work |
-
latitude : 26.48006666666667
Longitude : 91.89090499999999
file name : Image_16032023160256994.png
|
2023-03-16 16:02:57.105737 |
108 |
64329422 |
REPAIRING OF BANEIKUCHI MV SCHOOL |
120000 |
REPAIRING OF BANEIKUCHI MV SCHOOL1 |
Roof laid |
-
latitude : 26.4812087
Longitude : 91.89071949
file name : Image_15062024114857409.png
|
2024-06-15 11:48:57.495907 |
109 |
64329422 |
REPAIRING OF BANEIKUCHI MV SCHOOL |
120000 |
REPAIRING OF BANEIKUCHI MV SCHOOL1 |
Plinth level |
-
latitude : 26.4811652
Longitude : 91.89069128
file name : Image_15062024113530203.png
|
2024-06-15 11:35:30.310284 |
110 |
64329422 |
REPAIRING OF BANEIKUCHI MV SCHOOL |
120000 |
REPAIRING OF BANEIKUCHI MV SCHOOL1 |
Completion of work |
-
latitude : 26.500294999999998
Longitude : 91.88068666666668
file name : Image_04052023111338145.png
|
2023-05-04 11:13:38.250363 |
111 |
86691378 |
Any other operation and maintenance needs related to solid waste management |
23950 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 26.48117925
Longitude : 91.89072874
file name : Image_18062024145308884.png
|
2024-06-18 14:53:09.068715 |
112 |
64331695 |
OPERATIONAL AND MAINTANANCE OF DRINKING WATER SUPPLY UNDER BARAMPUR GP AREA |
437316 |
OPERATIONAL AND MAINTANANCE OF DRINKING WATER SUPPLY UNDER BARAMPUR GP AREA1 |
Roof laid |
-
latitude : 26.53451717,26.53451385
Longitude : 91.89083691,91.89083651
file name : Image_24062024085154251.png
|
2024-06-24 08:51:54.34767 |
113 |
64331695 |
OPERATIONAL AND MAINTANANCE OF DRINKING WATER SUPPLY UNDER BARAMPUR GP AREA |
437316 |
OPERATIONAL AND MAINTANANCE OF DRINKING WATER SUPPLY UNDER BARAMPUR GP AREA1 |
Plinth level |
-
latitude : 26.53452886,26.53453178
Longitude : 91.89084729,91.89084771
file name : Image_24062024084938112.png
|
2024-06-24 08:49:38.208528 |
114 |
64331695 |
OPERATIONAL AND MAINTANANCE OF DRINKING WATER SUPPLY UNDER BARAMPUR GP AREA |
437316 |
OPERATIONAL AND MAINTANANCE OF DRINKING WATER SUPPLY UNDER BARAMPUR GP AREA1 |
Completion of work |
-
latitude : 26.465408333333336,26.465433333333333
Longitude : 91.889785,91.88971166666667
file name : Image_03122022113737252.png
|
2022-12-03 11:37:37.386631 |
115 |
64330151 |
REPAIRING OF AWC AT SARABARI BARAMPUR |
150000 |
REPAIRING OF AWC AT SARABARI BARAMPUR1 |
Roof laid |
-
latitude : 26.53453537
Longitude : 91.89083102
file name : Image_24062024090705989.png
|
2024-06-24 09:07:06.074068 |
116 |
64330151 |
REPAIRING OF AWC AT SARABARI BARAMPUR |
150000 |
REPAIRING OF AWC AT SARABARI BARAMPUR1 |
Plinth level |
-
latitude : 26.53450768
Longitude : 91.89085789
file name : Image_24062024083742331.png
|
2024-06-24 08:37:42.423246 |
117 |
64330151 |
REPAIRING OF AWC AT SARABARI BARAMPUR |
150000 |
REPAIRING OF AWC AT SARABARI BARAMPUR1 |
Completion of work |
-
latitude : 26.483979999999995
Longitude : 91.87028000000001
file name : Image_21102022144920671.png
|
2022-10-21 14:49:20.807914 |
118 |
64330212 |
REPAIRING OF BOUNDARY WALL AT BARAMPUR GP OFFICE |
201000 |
REPAIRING OF BOUNDARY WALL AT BARAMPUR GP OFFICE1 |
Roof laid |
-
latitude : 26.53451287
Longitude : 91.89084337
file name : Image_24062024084231997.png
|
2024-06-24 08:42:32.085304 |
119 |
64330212 |
REPAIRING OF BOUNDARY WALL AT BARAMPUR GP OFFICE |
201000 |
REPAIRING OF BOUNDARY WALL AT BARAMPUR GP OFFICE1 |
Plinth level |
-
latitude : 26.53454583
Longitude : 91.89092953
file name : Image_24062024083903537.png
|
2024-06-24 08:39:03.621475 |
120 |
64330212 |
REPAIRING OF BOUNDARY WALL AT BARAMPUR GP OFFICE |
201000 |
REPAIRING OF BOUNDARY WALL AT BARAMPUR GP OFFICE1 |
Completion of work |
-
latitude : 26.481423333333336
Longitude : 91.89070166666667
file name : Image_21102022155803341.png
|
2022-10-21 15:58:03.432086 |
121 |
66599687 |
Water Supply to villages |
315300 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.53447322,26.53447015
Longitude : 91.89090109,91.89089302
file name : Image_25062024073036465.png
|
2024-06-25 07:30:36.547321 |
122 |
66599687 |
Water Supply to villages |
315300 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.53448799,26.53448925
Longitude : 91.89088638,91.89089568
file name : Image_25062024072544326.png
|
2024-06-25 07:25:44.41245 |
123 |
66599687 |
Water Supply to villages |
315300 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.486406666666667,26.486643333333337
Longitude : 91.87655166666667,91.87629666666665
file name : Image_19012024150320039.png
|
2024-01-19 15:03:20.137706 |
124 |
66599749 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.39613775
Longitude : 91.90116021
file name : Image_04102024135054234.png
|
2024-10-04 13:50:54.324749 |
125 |
64329629 |
FLOOD DAMAGE REPAIRING OF ROAD FROM GHILAKURI TO ATHKURIA NONOI KASH |
60000 |
FLOOD DAMAGE REPAIRING OF ROAD FROM GHILAKURI TO ATHKURIA NONOI KASH1 |
Roof laid |
-
latitude : 26.53455445,26.53454925
Longitude : 91.89081976,91.89082012
file name : Image_28062024124818874.png
|
2024-06-28 12:48:19.015486 |
126 |
64329629 |
FLOOD DAMAGE REPAIRING OF ROAD FROM GHILAKURI TO ATHKURIA NONOI KASH |
60000 |
FLOOD DAMAGE REPAIRING OF ROAD FROM GHILAKURI TO ATHKURIA NONOI KASH1 |
Plinth level |
-
latitude : 26.53456176,26.53457027
Longitude : 91.89084028,91.89083447
file name : Image_28062024124355518.png
|
2024-06-28 12:43:55.751779 |
127 |
64329629 |
FLOOD DAMAGE REPAIRING OF ROAD FROM GHILAKURI TO ATHKURIA NONOI KASH |
60000 |
FLOOD DAMAGE REPAIRING OF ROAD FROM GHILAKURI TO ATHKURIA NONOI KASH1 |
Completion of work |
-
latitude : 26.46923,26.469223333333336
Longitude : 91.88526666666667,91.88526500000002
file name : Image_31032023135529394.png
|
2023-03-31 13:55:29.51574 |
128 |
64331518 |
COMMUNITY MATERIAL COLLECTION UNDER SOLID WASTE MANAGEMENT AT GHILAKURI |
99684 |
COMMUNITY MATERIAL COLLECTION UNDER SOLID WASTE MANAGEMENT AT GHILAKURI1 |
Roof laid |
-
latitude : 26.53460104
Longitude : 91.8908252
file name : Image_28062024131134021.png
|
2024-06-28 13:11:34.108061 |
129 |
64331518 |
COMMUNITY MATERIAL COLLECTION UNDER SOLID WASTE MANAGEMENT AT GHILAKURI |
99684 |
COMMUNITY MATERIAL COLLECTION UNDER SOLID WASTE MANAGEMENT AT GHILAKURI1 |
Plinth level |
-
latitude : 26.53455436
Longitude : 91.89079208
file name : Image_28062024130745773.png
|
2024-06-28 13:07:45.859336 |
130 |
64331518 |
COMMUNITY MATERIAL COLLECTION UNDER SOLID WASTE MANAGEMENT AT GHILAKURI |
99684 |
COMMUNITY MATERIAL COLLECTION UNDER SOLID WASTE MANAGEMENT AT GHILAKURI1 |
Completion of work |
-
latitude : 26.47413333333333
Longitude : 91.88784
file name : Image_16032023155402004.png
|
2023-03-16 15:54:02.103495 |
131 |
86691051 |
Water Supply to villages |
583110 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.53468685,26.53468308
Longitude : 91.89089796,91.89089488
file name : Image_02102024061918583.png
|
2024-10-02 06:19:18.67748 |
132 |
64329582 |
FLOOD DAMAGE REPAIRING OF ROAD AT SARABARI BARAMPUR VILLAGE |
120000 |
FLOOD DAMAGE REPAIRING OF ROAD AT SARABARI BARAMPUR VILLAGE1 |
Completion of work |
-
latitude : 26.474745,26.47474833333333
Longitude : 91.87361666666666,91.87362499999999
file name : Image_03052023145216796.png
|
2023-05-03 14:52:16.884226 |
133 |
64329545 |
REPAIRING OF PAVILION OF BARAMPUR HS FIELD |
66000 |
REPAIRING OF PAVILION OF BARAMPUR HS FIELD1 |
Completion of work |
-
latitude : 26.489821666666664
Longitude : 91.87813333333334
file name : Image_17032023111044314.png
|
2023-03-17 11:10:44.427567 |
134 |
64330060 |
REPAIRING OF AWC AT BANEIKUCHI |
162000 |
REPAIRING OF AWC AT BANEIKUCHI1 |
Completion of work |
-
latitude : 26.49872833333333
Longitude : 91.88099833333332
file name : Image_21102022144925268.png
|
2022-10-21 14:49:25.399052 |
135 |
66601189 |
Construction of Community Sanitary Complex |
35050 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48128285
Longitude : 91.89073734
file name : Image_26072024124504188.png
|
2024-07-26 12:45:04.316487 |