1 |
44257287 |
Improv of Road from khalihoi High school Chowk to Saru saharia House at Ekselia (Dulu Das) Phase II |
287366 |
Improv of Road from khalihoi High school Chowk to Saru saharia House at Ekselia (Dulu Das) Phase II1 |
Earth Work |
-
latitude : 26.27406687,26.27406687
Longitude : 91.82814844,91.82814844
file name : Image_01122020141821893.png
|
2020-12-01 14:18:21.974048 |
2 |
44257426 |
Construction of Khalihoi Anchalik United Club |
450000 |
Construction of Khalihoi Anchalik United Club1 |
25% |
-
latitude : 26.2714984
Longitude : 91.8290504
file name : Image_14112020140450474.png
|
2020-11-14 14:04:55.783693 |
3 |
44256313 |
Construction of classroom at No 1 Sukatguri SC ME school |
950000 |
Construction of classroom at No 1 Sukatguri SC ME school1 |
25% |
-
latitude : 26.27381035
Longitude : 91.79093626
file name : Image_16112020134226073.png
|
2020-11-16 13:42:32.28953 |
4 |
44255834 |
Construction of paver block road from TK Grant PWD Road to Purna Chetry House |
600000 |
Construction of paver block road from TK Grant PWD Road to Purna Chetry House1 |
25% |
-
latitude : 26.26866684,26.26866684
Longitude : 91.8074573,91.8074573
file name : Image_14112020131452796.png
|
2020-11-14 13:14:58.07753 |
5 |
44255726 |
Construction of community hall near Naag Sankar Mandir |
500000 |
Construction of community hall near Naag Sankar Mandir1 |
25% |
-
latitude : 26.26581598
Longitude : 91.81014271
file name : Image_14112020134739580.png
|
2020-11-14 13:47:44.911494 |
6 |
44255463 |
improvement cum sand graveling road from Puranjoy Barman shop to Niranjan House |
409408 |
improvement cum sand graveling road from Puranjoy Barman shop to Niranjan House1 |
Earth Work |
-
latitude : 26.26698344,26.26698482
Longitude : 91.79115088,91.79114858
file name : Image_16112020132745078.png
|
2020-11-16 13:27:51.262518 |
7 |
50457233 |
CONST OF DRINKING WATER FACILITY AT GATHIA CHOWK |
276866 |
CONST OF DRINKING WATER FACILITY AT GATHIA CHOWK1 |
Completion of work |
-
latitude : 26.27006496
Longitude : 91.79223587
file name : Image_01062023161742796.png
|
2023-06-01 16:17:42.917033 |
8 |
50457233 |
CONST OF DRINKING WATER FACILITY AT GATHIA CHOWK |
276866 |
CONST OF DRINKING WATER FACILITY AT GATHIA CHOWK1 |
Completion of work |
-
latitude : 26.27829464
Longitude : 91.78948561
file name : Image_10052023114401995.png
|
2023-05-10 11:44:02.103003 |
9 |
63848471 |
REPAIRING OF COMMUNITY HALL AT HIRABARI CHUBA SHIVA MANDIR |
186567 |
REPAIRING OF COMMUNITY HALL AT HIRABARI CHUBA SHIVA MANDIR1 |
Completion of work |
-
latitude : 26.26936089
Longitude : 91.82680642
file name : Image_21032023162253789.png
|
2023-03-21 16:22:53.894975 |
10 |
44311713 |
Construction of HPC at Ekselia road near Jayanta Rajbongshi house |
600000 |
Construction of HPC at Ekselia road near Jayanta Rajbongshi house1 |
Earth Work |
-
latitude : 26.27304507,26.27304507
Longitude : 91.81264348,91.81264348
file name : Image_14112020132113024.png
|
2020-11-14 13:21:18.32734 |
11 |
44311374 |
Improvement of Road ( Sand Graveling) Road from DK PWD Road to Saru Saharia house |
178337 |
Improvement of Road ( Sand Graveling) Road from DK PWD Road to Saru Saharia house1 |
Earth Work |
-
latitude : 26.27325298,26.27325139
Longitude : 91.83000212,91.83000092
file name : Image_14112020155840185.png
|
2020-11-14 15:58:45.549187 |
12 |
44311464 |
Construction of Cannel from PWD Road to paddy field near GP Office |
100000 |
Construction of Cannel from PWD Road to paddy field near GP Office1 |
25% |
-
latitude : 26.26595788,26.26595859
Longitude : 91.82295433,91.82295659
file name : Image_11112020132820699.png
|
2020-11-11 13:28:24.659878 |
13 |
44311514 |
Construction of Pucca canel from Purna Chetry house to Diplinga Beel |
300000 |
Construction of Pucca canel from Purna Chetry house to Diplinga Beel1 |
25% |
-
latitude : 26.27405597,26.27405597
Longitude : 91.80682453,91.80682453
file name : Image_14112020130645347.png
|
2020-11-14 13:06:50.634303 |
14 |
44311579 |
Construction of Janaja Waiting shed ( janaja Ghar) near Suktaguri Anchalik Eidgah |
625000 |
Construction of Janaja Waiting shed ( janaja Ghar) near Suktaguri Anchalik Eidgah1 |
25% |
-
latitude : 26.27998037
Longitude : 91.78726735
file name : Image_16112020140246800.png
|
2020-11-16 14:02:53.000603 |
15 |
44311171 |
Construction of HPC & sand graveling Road from Bornadi Mothauri to Suktaguri Anchalik Eidgaah |
300000 |
Construction of HPC & sand graveling Road from Bornadi Mothauri to Suktaguri Anchalik Eidgaah1 |
Earth Work |
-
latitude : 26.27997568,26.27997568
Longitude : 91.78908596,91.78908596
file name : Image_16112020135951198.png
|
2020-11-16 13:59:57.404057 |
16 |
44311233 |
Infrastructure Development of No 1 Suktaguri Namasudra Chuba LP School |
200000 |
Infrastructure Development of No 1 Suktaguri Namasudra Chuba LP School1 |
25% |
-
latitude : 26.27467733
Longitude : 91.79764676
file name : Image_16112020144928255.png
|
2020-11-16 14:49:34.485829 |
17 |
44311292 |
Infrastructure development of No 2 Suktaguri LP School ( near Mathauri) |
200000 |
Infrastructure development of No 2 Suktaguri LP School ( near Mathauri)1 |
25% |
-
latitude : 26.28370773
Longitude : 91.78946125
file name : Image_16112020143056582.png
|
2020-11-16 14:31:02.795302 |
18 |
44311327 |
Infrastructure development of Amir Islam LP School |
200000 |
Infrastructure development of Amir Islam LP School1 |
25% |
-
latitude : 26.27353231
Longitude : 91.79097549
file name : Image_16112020133814854.png
|
2020-11-16 13:38:21.048946 |
19 |
44311122 |
Infrastructure development of Sankardev Sishu Niketn Ph II |
300000 |
Infrastructure development of Sankardev Sishu Niketn Ph II1 |
25% |
-
latitude : 26.27135258
Longitude : 91.83024113
file name : Image_11112020135134283.png
|
2020-11-11 13:51:38.251197 |
20 |
44311054 |
Bolder protection both side road from Kali Mandir to Bazanapathar Connecting Road |
500000 |
Bolder protection both side road from Kali Mandir to Bazanapathar Connecting Road1 |
Earth Work |
-
latitude : 26.26564386,26.26515998
Longitude : 91.82076623,91.82064365
file name : Image_11112020132257782.png
|
2020-11-11 13:23:01.730772 |
21 |
44311771 |
Construction of road with paver block from DK PWD Road to Bazanapathar village Road |
3670325 |
Construction of road with paver block from DK PWD Road to Bazanapathar village Road1 |
25% |
-
latitude : 26.26310726,26.26310726
Longitude : 91.82353208,91.82353208
file name : Image_26112020124049638.png
|
2020-11-26 12:40:49.731968 |
22 |
44256467 |
Construction of boundary wall near No 1 Suktaguri Purana Maszid Field |
450000 |
Construction of boundary wall near No 1 Suktaguri Purana Maszid Field1 |
In Progress |
-
latitude : 26.27005025
Longitude : 91.79218833
file name : Image_16112020144238955.png
|
2020-11-16 14:42:45.201257 |
23 |
44256402 |
Improvement cum Sand graveling Road from Upendra Biswas house to Bulen Biswas house |
450000 |
Improvement cum Sand graveling Road from Upendra Biswas house to Bulen Biswas house1 |
Earth Work |
-
latitude : 26.27327208,26.27327294
Longitude : 91.7977546,91.79775244
file name : Image_16112020145712709.png
|
2020-11-16 14:57:18.936643 |
24 |
44256170 |
Construction of Boundary Walll at Bazanapathar CHC, PH II |
450000 |
Construction of Boundary Walll at Bazanapathar CHC, PH II1 |
In Progress |
-
latitude : 26.2712811
Longitude : 91.82884802
file name : Image_16112020153225996.png
|
2020-11-16 15:32:32.249614 |
25 |
44256079 |
Construction of boundary wall near Suwalkuchia Chuba Bishnu mandir |
400000 |
Construction of boundary wall near Suwalkuchia Chuba Bishnu mandir1 |
25% |
-
latitude : 26.27698939
Longitude : 91.83324995
file name : Image_16112020154403005.png
|
2020-11-16 15:44:09.255845 |
26 |
44255924 |
Construction of Ringwell at namasudra Chuba near Dhiren Biswas House |
130000 |
Construction of Ringwell at namasudra Chuba near Dhiren Biswas House1 |
In Progress |
-
latitude : 26.27446997
Longitude : 91.79748823
file name : Image_01122020134330729.png
|
2020-12-01 13:43:30.856541 |
27 |
44255640 |
Construction of Ringwell near Niranjan Deka House |
140000 |
Construction of Ringwell near Niranjan Deka House1 |
In Progress |
-
latitude : 26.26649252
Longitude : 91.8190344
file name : Image_14112020135503996.png
|
2020-11-14 13:55:09.296955 |
28 |
45278845 |
CONSTRUCTION OF COMMUNITY CENTRE NEAR MEDICAL CHOWK SHIVA MANDIR |
200000 |
CONSTRUCTION OF COMMUNITY CENTRE NEAR MEDICAL CHOWK SHIVA MANDIR1 |
25% |
-
latitude : 26.27127736
Longitude : 91.82838562
file name : Image_27012021134930026.png
|
2021-01-27 13:49:30.1284 |
29 |
45470404 |
CONSTRUCTION OF AZUKHANA AT GATHIA MASZID |
200000 |
CONSTRUCTION OF AZUKHANA AT GATHIA MASZID1 |
25% |
-
latitude : 26.27822052
Longitude : 91.78955644
file name : Image_02022021131122283.png
|
2021-02-02 13:11:22.381513 |
30 |
45470593 |
CONST OF NAMA SUDRA CHUBA 174 NO ANGANWADI CENTRE AT NO 1 SUKATGURI |
540000 |
CONST OF NAMA SUDRA CHUBA 174 NO ANGANWADI CENTRE AT NO 1 SUKATGURI1 |
25% |
-
latitude : 26.27479855
Longitude : 91.79766707
file name : Image_02022021121357349.png
|
2021-02-02 12:13:57.453583 |
31 |
45308529 |
INFRASTRUCTURE DEVELOPMENT OF TK GRANT LP SCHOOL |
200000 |
INFRASTRUCTURE DEVELOPMENT OF TK GRANT LP SCHOOL1 |
25% |
-
latitude : 26.26659474
Longitude : 91.80682061
file name : Image_27012021134939722.png
|
2021-01-27 13:49:39.846678 |
32 |
45469854 |
CONSTRUCTION OF GERUACHUBA MANDIR BHOGGHAR AT GANDHIAPATHAR |
365000 |
CONSTRUCTION OF GERUACHUBA MANDIR BHOGGHAR AT GANDHIAPATHAR1 |
25% |
-
latitude : 26.27286347
Longitude : 91.83037279
file name : Image_27012021134916949.png
|
2021-01-27 13:49:17.066897 |
33 |
45279436 |
CONSTRUCTION OF WOMAN URINAL TOILET AT GP OFFICE |
250000 |
CONSTRUCTION OF WOMAN URINAL TOILET AT GP OFFICE1 |
25% |
-
latitude : 26.26609014
Longitude : 91.82278406
file name : Image_27012021121412095.png
|
2021-01-27 12:14:12.17752 |
34 |
45279314 |
CONSTRUCTION OF BOUNDARY WALL OF BAZANAPATHAR CHC |
400000 |
CONSTRUCTION OF BOUNDARY WALL OF BAZANAPATHAR CHC1 |
In Progress |
-
latitude : 26.27123796
Longitude : 91.8298748
file name : Image_27012021134925554.png
|
2021-01-27 13:49:25.658086 |
35 |
45308468 |
CONSTRUCTION OF AZUKHANA AND URINAL AT NO 1 SUKTAGURI EIDGAH |
200000 |
CONSTRUCTION OF AZUKHANA AND URINAL AT NO 1 SUKTAGURI EIDGAH1 |
25% |
-
latitude : 26.27006987
Longitude : 91.79225453
file name : Image_02022021122517399.png
|
2021-02-02 12:25:17.49195 |
36 |
45308825 |
SAND GRAVELLING ROAD FROM DK PWD TO MOTHAURI NEAR KHALIHOI HIGH SCHOOL |
202774 |
SAND GRAVELLING ROAD FROM DK PWD TO MOTHAURI NEAR KHALIHOI HIGH SCHOOL 1 |
Earth Work |
-
latitude : 26.27176994,26.27176994
Longitude : 91.83230942,91.83230942
file name : Image_27012021134911001.png
|
2021-01-27 13:49:11.107431 |
37 |
45279556 |
CONSTRUCTION OF TOILET AND IMPROVEMENT OF COMMUNITY HALL NEAR KALI MANDIR |
450000 |
CONSTRUCTION OF TOILET AND IMPROVEMENT OF COMMUNITY HALL NEAR KALI MANDIR1 |
25% |
-
latitude : 26.26624425
Longitude : 91.82181887
file name : Image_27012021122157740.png
|
2021-01-27 12:21:57.840171 |
38 |
45279702 |
CONSTRUCTION OF COMMUNITY HALL NEAR SHIVA MANDIR(DOSOTONICHUBA) |
300000 |
CONSTRUCTION OF COMMUNITY HALL NEAR SHIVA MANDIR(DOSOTONICHUBA)1 |
25% |
-
latitude : 26.27021619
Longitude : 91.80443783
file name : Image_27012021134934314.png
|
2021-01-27 13:49:34.434069 |
39 |
45470227 |
INFRASTRUCTURE DEVELOPMENT OF BAMANJYOTI BIKASH SANGHA |
600000 |
INFRASTRUCTURE DEVELOPMENT OF BAMANJYOTI BIKASH SANGHA1 |
In Progress |
-
latitude : 26.2709764
Longitude : 91.82921329
file name : Image_02022021161856263.png
|
2021-02-02 16:18:56.389712 |
40 |
45470227 |
INFRASTRUCTURE DEVELOPMENT OF BAMANJYOTI BIKASH SANGHA |
600000 |
INFRASTRUCTURE DEVELOPMENT OF BAMANJYOTI BIKASH SANGHA1 |
In Progress |
-
latitude : 26.26600114
Longitude : 91.8208193
file name : Image_27012021134944433.png
|
2021-01-27 13:49:44.546763 |
41 |
45470380 |
IMPROVEMENT OF COMMUNITY HALL AT EKSELIA LAXMI PUJA FIELD |
300000 |
IMPROVEMENT OF COMMUNITY HALL AT EKSELIA LAXMI PUJA FIELD1 |
25% |
-
latitude : 26.27308293
Longitude : 91.81032665
file name : Image_02022021115603870.png
|
2021-02-02 11:56:03.98625 |
42 |
45470477 |
INFRASTRUCTURE DEVELOPMENT OF BAZANAPATHAR BALIKA ME SCHOOL AT BAMANPATHAR |
392464 |
INFRASTRUCTURE DEVELOPMENT OF BAZANAPATHAR BALIKA ME SCHOOL AT BAMANPATHAR1 |
25% |
-
latitude : 26.26635387
Longitude : 91.82094886
file name : Image_27012021134949689.png
|
2021-01-27 13:49:49.794063 |
43 |
45470515 |
CONST OF HPC APPROACH ROAD (SAND GRAVELLING) NEAR JAYANTA RAJBONGSHI HOUSE AT EKSELIA |
249762 |
CONST OF HPC APPROACH ROAD (SAND GRAVELLING) NEAR JAYANTA RAJBONGSHI HOUSE AT EKSELIA1 |
Earth Work |
-
latitude : 26.27175482,26.27175482
Longitude : 91.81062158,91.81062158
file name : Image_02022021120211493.png
|
2021-02-02 12:02:11.574548 |
44 |
45472094 |
INFRASTRUCTURE DEVELOPMENT OF SANKARDEV SISHU NIKETAN AT KHALIHOI |
200000 |
INFRASTRUCTURE DEVELOPMENT OF SANKARDEV SISHU NIKETAN AT KHALIHOI1 |
25% |
-
latitude : 26.27112201
Longitude : 91.830263
file name : Image_27012021134920537.png
|
2021-01-27 13:49:20.644586 |
45 |
45470353 |
INFRASTRUCTURE DEVELOPMENT OF 1/2 SUKTAGURI BURHA MASZID |
500000 |
INFRASTRUCTURE DEVELOPMENT OF 1/2 SUKTAGURI BURHA MASZID1 |
In Progress |
-
latitude : 26.280551
Longitude : 91.78996193
file name : Image_02022021130543539.png
|
2021-02-02 13:05:43.627852 |
46 |
69318287 |
Creation of plastic waste storage unit |
175000 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 26.2657768
Longitude : 91.82122582
file name : Image_20062023234515252.png
|
2023-06-20 23:45:15.359163 |
47 |
78804557 |
REPAIRING OF NO1 SUKTAGURI KURUA CHAPORI LP SCHOOL |
448100 |
REPAIRING OF NO1 SUKTAGURI KURUA CHAPORI LP SCHOOL1 |
Roof laid |
-
latitude : 26.26613307
Longitude : 91.82267071
file name : Image_19062024155034238.png
|
2024-06-19 15:50:34.326185 |
48 |
78804557 |
REPAIRING OF NO1 SUKTAGURI KURUA CHAPORI LP SCHOOL |
448100 |
REPAIRING OF NO1 SUKTAGURI KURUA CHAPORI LP SCHOOL1 |
Plinth level |
-
latitude : 26.26614552
Longitude : 91.82271351
file name : Image_19062024154629309.png
|
2024-06-19 15:46:29.393614 |
49 |
78804557 |
REPAIRING OF NO1 SUKTAGURI KURUA CHAPORI LP SCHOOL |
448100 |
REPAIRING OF NO1 SUKTAGURI KURUA CHAPORI LP SCHOOL1 |
Completion of work |
-
latitude : 26.27770314
Longitude : 91.78963458
file name : Image_20102023164234587.png
|
2023-10-20 16:42:34.675243 |
50 |
63852999 |
Operation and Maintenance of Grant PWSS |
100000 |
Operation and Maintenance of Grant PWSS1 |
Completion of work |
-
latitude : 26.45469431,26.4546935
Longitude : 91.61566895,91.61554716
file name : Image_27032023214558548.png
|
2023-03-27 21:45:58.632845 |
51 |
63852954 |
Operation and Maintenance of Bamanpathar PWSS |
100000 |
Operation and Maintenance of Bamanpathar PWSS1 |
Completion of work |
-
latitude : 26.26997733,26.26997971
Longitude : 91.82726993,91.8272827
file name : Image_13012023134328857.png
|
2023-01-13 13:43:28.956596 |
52 |
78797753 |
Creation of Shed for segregation and processing of wet and dry waste |
33000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.27288839
Longitude : 91.83047406
file name : Image_28082024163756389.png
|
2024-08-28 16:37:56.986797 |
53 |
78797753 |
Creation of Shed for segregation and processing of wet and dry waste |
33000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.27293823
Longitude : 91.83045122
file name : Image_28082024163452447.png
|
2024-08-28 16:34:53.030528 |
54 |
78797753 |
Creation of Shed for segregation and processing of wet and dry waste |
33000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.27286533
Longitude : 91.83033684
file name : Image_25012024163853000.png
|
2024-01-25 16:38:53.090486 |
55 |
63854143 |
COMMUNITY MANAGEMENT SANITARY COMPLEX NAMASUDRA CHUBA LP SCHOOL |
300000 |
COMMUNITY MANAGEMENT SANITARY COMPLEX NAMASUDRA CHUBA LP SCHOOL1 |
Completion of work |
-
latitude : 26.27500037
Longitude : 91.79766547
file name : Image_07022023085349451.png
|
2023-02-07 08:53:49.576969 |
56 |
63854099 |
COMMUNITY MANAGEMENT SANITARY COMPLEX AT KHALIHOI SARBOJONIN DURGA PUJA FIELD |
300000 |
COMMUNITY MANAGEMENT SANITARY COMPLEX AT KHALIHOI SARBOJONIN DURGA PUJA FIELD1 |
Plinth level |
-
latitude : 26.27275606
Longitude : 91.83034101
file name : Image_28082024164101965.png
|
2024-08-28 16:41:02.611669 |
57 |
63854099 |
COMMUNITY MANAGEMENT SANITARY COMPLEX AT KHALIHOI SARBOJONIN DURGA PUJA FIELD |
300000 |
COMMUNITY MANAGEMENT SANITARY COMPLEX AT KHALIHOI SARBOJONIN DURGA PUJA FIELD1 |
Completion of work |
-
latitude : 26.27273749
Longitude : 91.83037431
file name : Image_17022023221542563.png
|
2023-02-17 22:15:42.666325 |
58 |
63853067 |
DRINKING WATER FACILITY AT NO 1 SUKTAGURI NEAR PURANA MASZID |
205400 |
DRINKING WATER FACILITY AT NO 1 SUKTAGURI NEAR PURANA MASZID1 |
Completion of work |
-
latitude : 26.27004125
Longitude : 91.79217774
file name : Image_10012023170036981.png
|
2023-01-10 17:00:37.099846 |
59 |
76530250 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.26688626
Longitude : 91.79168097
file name : Image_01062023162242491.png
|
2023-06-01 16:22:42.650231 |
60 |
76526867 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.27769269
Longitude : 91.83322331
file name : Image_07082023170825400.png
|
2023-08-07 17:08:25.55609 |
61 |
63848624 |
IMPROVEMENT OF GORKHA BHAWAN AT TK GRANT |
400000 |
IMPROVEMENT OF GORKHA BHAWAN AT TK GRANT1 |
Roof laid |
-
latitude : 26.26673422
Longitude : 91.8069575
file name : Image_19072023172541493.png
|
2023-07-19 17:25:41.641722 |
62 |
63848624 |
IMPROVEMENT OF GORKHA BHAWAN AT TK GRANT |
400000 |
IMPROVEMENT OF GORKHA BHAWAN AT TK GRANT1 |
Plinth level |
-
latitude : 26.2667208
Longitude : 91.80687101
file name : Image_31102022161250971.png
|
2022-10-31 16:12:51.116728 |
63 |
63848624 |
IMPROVEMENT OF GORKHA BHAWAN AT TK GRANT |
400000 |
IMPROVEMENT OF GORKHA BHAWAN AT TK GRANT1 |
Completion of work |
-
latitude : 26.26681832
Longitude : 91.80699072
file name : Image_01092022162558550.png
|
2022-09-01 16:25:58.694173 |
64 |
76524426 |
Operation & maintenance of drinking water supply system |
318750 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.2653341,26.26533504
Longitude : 91.81712312,91.81711832
file name : Image_19072023171651696.png
|
2023-07-19 17:16:51.794575 |
65 |
76525443 |
Water Supply to villages |
390000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.26533779,26.26533816
Longitude : 91.81710242,91.81710264
file name : Image_19072023171655865.png
|
2023-07-19 17:16:55.981098 |
66 |
63848777 |
REPAIRING OF GANDHIAPATHAR AWC |
200000 |
REPAIRING OF GANDHIAPATHAR AWC1 |
Roof laid |
-
latitude : 26.27708184
Longitude : 91.83314368
file name : Image_07092023140807702.png
|
2023-09-07 14:08:07.794372 |
67 |
63848777 |
REPAIRING OF GANDHIAPATHAR AWC |
200000 |
REPAIRING OF GANDHIAPATHAR AWC1 |
Roof laid |
-
latitude : 26.27708173
Longitude : 91.833206
file name : Image_07082023170820990.png
|
2023-08-07 17:08:21.108769 |
68 |
63848777 |
REPAIRING OF GANDHIAPATHAR AWC |
200000 |
REPAIRING OF GANDHIAPATHAR AWC1 |
Completion of work |
-
latitude : 26.27709868
Longitude : 91.83324868
file name : Image_05112022201543149.png
|
2022-11-05 20:15:43.264562 |
69 |
63848777 |
REPAIRING OF GANDHIAPATHAR AWC |
200000 |
REPAIRING OF GANDHIAPATHAR AWC1 |
Completion of work |
-
latitude : 26.27707119
Longitude : 91.8331568
file name : Image_20102022161027529.png
|
2022-10-20 16:10:27.623476 |
70 |
79220615 |
Repairing of sand Gravelling from Khalihoi medical chowk to tk grant |
69025 |
Repairing of sand Gravelling from Khalihoi medical chowk to tk grant1 |
Completion of work |
-
latitude : 26.26597763,26.26598914
Longitude : 91.82282946,91.82283179
file name : Image_07082023160347150.png
|
2023-08-07 16:03:47.268403 |
71 |
69307753 |
CONSTRUCTION OF GP BUILDING OF BAZNAPATHAR GP |
995000 |
CONSTRUCTION OF GP BUILDING OF BAZNAPATHAR GP1 |
Plinth level |
-
latitude : 26.26613393
Longitude : 91.82279677
file name : Image_25012024134657594.png
|
2024-01-25 13:46:57.704277 |
72 |
69307753 |
CONSTRUCTION OF GP BUILDING OF BAZNAPATHAR GP |
995000 |
CONSTRUCTION OF GP BUILDING OF BAZNAPATHAR GP1 |
Plinth level |
-
latitude : 26.26610993
Longitude : 91.82280649
file name : Image_22082023131330502.png
|
2023-08-22 13:13:30.609586 |
73 |
69307753 |
CONSTRUCTION OF GP BUILDING OF BAZNAPATHAR GP |
995000 |
CONSTRUCTION OF GP BUILDING OF BAZNAPATHAR GP1 |
Completion of work |
-
latitude : 26.26610743
Longitude : 91.82279264
file name : Image_19052023114206261.png
|
2023-05-19 11:42:06.36439 |
74 |
78803723 |
Construction of toilets in public institutions |
250000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.26812523
Longitude : 91.82911391
file name : Image_05102023165147611.png
|
2023-10-05 16:51:47.699002 |
75 |
87332918 |
REPAIRING OF RANGA MANCH AT JAGADHATRI PUJA FIELD |
150000 |
REPAIRING OF RANGA MANCH AT JAGADHATRI PUJA FIELD1 |
Completion of work |
-
latitude : 26.26657318
Longitude : 91.79131217
file name : Image_05102023171710579.png
|
2023-10-05 17:17:10.703705 |
76 |
87332893 |
Creation of a new source of drinking water |
52470 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.26858162
Longitude : 91.83226806
file name : Image_01122023145036094.png
|
2023-12-01 14:50:36.214315 |
77 |
87128985 |
Const. of Silaphalakam at Khalihoi Anchalik High School |
30000 |
Const. of Silaphalakam at Khalihoi Anchalik High School1 |
Completion of work |
-
latitude : 26.27227559
Longitude : 91.83127234
file name : Image_07092023135206235.png
|
2023-09-07 13:52:06.328079 |
78 |
78801050 |
CONST OF ROAD FROM BAMANPATHAR KALI MANDIR ROAD TO BAZNAPATHAR ROAD |
236250 |
CONST OF ROAD FROM BAMANPATHAR KALI MANDIR ROAD TO BAZNAPATHAR ROAD1 |
Roof laid |
-
latitude : 26.26617598,26.26616746
Longitude : 91.82092636,91.82093254
file name : Image_07092023162502421.png
|
2023-09-07 16:25:02.516259 |
79 |
78801050 |
CONST OF ROAD FROM BAMANPATHAR KALI MANDIR ROAD TO BAZNAPATHAR ROAD |
236250 |
CONST OF ROAD FROM BAMANPATHAR KALI MANDIR ROAD TO BAZNAPATHAR ROAD1 |
Roof laid |
-
latitude : 26.26614525,26.26615302
Longitude : 91.82088967,91.82089205
file name : Image_07092023162325663.png
|
2023-09-07 16:23:25.759449 |
80 |
78801050 |
CONST OF ROAD FROM BAMANPATHAR KALI MANDIR ROAD TO BAZNAPATHAR ROAD |
236250 |
CONST OF ROAD FROM BAMANPATHAR KALI MANDIR ROAD TO BAZNAPATHAR ROAD1 |
Plinth level |
-
latitude : 26.26618924,26.26618867
Longitude : 91.82093149,91.82093187
file name : Image_07092023161638823.png
|
2023-09-07 16:16:38.917966 |
81 |
78801050 |
CONST OF ROAD FROM BAMANPATHAR KALI MANDIR ROAD TO BAZNAPATHAR ROAD |
236250 |
CONST OF ROAD FROM BAMANPATHAR KALI MANDIR ROAD TO BAZNAPATHAR ROAD1 |
Completion of work |
-
latitude : 26.26563577,26.2656519
Longitude : 91.82083201,91.82083816
file name : Image_20062023170944219.png
|
2023-06-20 17:09:44.316457 |
82 |
63848924 |
SANITISATION AT GP AREA DURING COVID 19 |
88766 |
SANITISATION AT GP AREA DURING COVID 191 |
Roof laid |
-
latitude : 26.26609589
Longitude : 91.82288703
file name : Image_15092023151918937.png
|
2023-09-15 15:19:19.035256 |
83 |
63848924 |
SANITISATION AT GP AREA DURING COVID 19 |
88766 |
SANITISATION AT GP AREA DURING COVID 191 |
Plinth level |
-
latitude : 26.26612498
Longitude : 91.82287164
file name : Image_15092023151117747.png
|
2023-09-15 15:11:17.85939 |
84 |
63848924 |
SANITISATION AT GP AREA DURING COVID 19 |
88766 |
SANITISATION AT GP AREA DURING COVID 191 |
Plinth level |
-
latitude : 26.26609067
Longitude : 91.82275872
file name : Image_07092023160058061.png
|
2023-09-07 16:00:58.145814 |
85 |
63848924 |
SANITISATION AT GP AREA DURING COVID 19 |
88766 |
SANITISATION AT GP AREA DURING COVID 191 |
Completion of work |
-
latitude : 26.26605367
Longitude : 91.82279192
file name : Image_20102022161033671.png
|
2022-10-20 16:10:33.733904 |
86 |
69310712 |
CONSTRUCTION OF BAMBOO BRIDGE AT DAURANGA BAHUMUKHI KRISHI PRAKALPA |
160000 |
CONSTRUCTION OF BAMBOO BRIDGE AT DAURANGA BAHUMUKHI KRISHI PRAKALPA1 |
Roof laid |
-
latitude : 26.26617302
Longitude : 91.82286057
file name : Image_15092023164618269.png
|
2023-09-15 16:46:18.356657 |
87 |
69310712 |
CONSTRUCTION OF BAMBOO BRIDGE AT DAURANGA BAHUMUKHI KRISHI PRAKALPA |
160000 |
CONSTRUCTION OF BAMBOO BRIDGE AT DAURANGA BAHUMUKHI KRISHI PRAKALPA1 |
Roof laid |
-
latitude : 26.26619365
Longitude : 91.82287092
file name : Image_15092023160039098.png
|
2023-09-15 16:00:39.195504 |
88 |
69310712 |
CONSTRUCTION OF BAMBOO BRIDGE AT DAURANGA BAHUMUKHI KRISHI PRAKALPA |
160000 |
CONSTRUCTION OF BAMBOO BRIDGE AT DAURANGA BAHUMUKHI KRISHI PRAKALPA1 |
Plinth level |
-
latitude : 26.26610519
Longitude : 91.82280662
file name : Image_11072023133550763.png
|
2023-07-11 13:35:50.85649 |
89 |
69310712 |
CONSTRUCTION OF BAMBOO BRIDGE AT DAURANGA BAHUMUKHI KRISHI PRAKALPA |
160000 |
CONSTRUCTION OF BAMBOO BRIDGE AT DAURANGA BAHUMUKHI KRISHI PRAKALPA1 |
Completion of work |
-
latitude : 26.26616413
Longitude : 91.82285358
file name : Image_27062023153441360.png
|
2023-06-27 15:34:41.451424 |
90 |
78796454 |
Creation of Shed for segregation and processing of wet and dry waste |
175000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.2781379
Longitude : 91.78944261
file name : Image_11102023151627898.png
|
2023-10-11 15:16:27.986897 |
91 |
78796454 |
Creation of Shed for segregation and processing of wet and dry waste |
175000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.27819532
Longitude : 91.78937434
file name : Image_11102023151128455.png
|
2023-10-11 15:11:28.565052 |
92 |
78796454 |
Creation of Shed for segregation and processing of wet and dry waste |
175000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.27814551
Longitude : 91.78933305
file name : Image_01062023160726289.png
|
2023-06-01 16:07:26.3961 |
93 |
78804843 |
REPAIRING OF CHC HOSPITAL AT BAZNAPATHR |
500000 |
REPAIRING OF CHC HOSPITAL AT BAZNAPATHR1 |
Completion of work |
-
latitude : 26.27234558
Longitude : 91.83043197
file name : Image_16102023161129034.png
|
2023-10-16 16:11:29.137578 |
94 |
88502030 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.3963872
Longitude : 91.9010755
file name : Image_15062024164925424.png
|
2024-06-15 16:49:25.498182 |
95 |
88502030 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.3963919
Longitude : 91.9010717
file name : Image_15062024161903436.png
|
2024-06-15 16:19:03.508587 |
96 |
88502030 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.26605777
Longitude : 91.82282133
file name : Image_12012024164354759.png
|
2024-01-12 16:43:54.860169 |
97 |
69309514 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE |
530000 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE1 |
Plinth level |
-
latitude : 26.26615044
Longitude : 91.82282454
file name : Image_25072024163435844.png
|
2024-07-25 16:34:35.956289 |
98 |
69309514 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE |
530000 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE1 |
Completion of work |
-
latitude : 26.26609444
Longitude : 91.82277722
file name : Image_30052024140913903.png
|
2024-05-30 14:09:13.998523 |
99 |
88144668 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE PH II |
225650 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE PH II1 |
Plinth level |
-
latitude : 26.26615101
Longitude : 91.82273841
file name : Image_25072024164706242.png
|
2024-07-25 16:47:06.330705 |
100 |
88144668 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE PH II |
225650 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE PH II1 |
Completion of work |
-
latitude : 26.266057
Longitude : 91.82286091
file name : Image_25012024152721807.png
|
2024-01-25 15:27:21.914228 |
101 |
88145110 |
Construction of toilets in public institutions |
365988 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.26251371
Longitude : 91.80462973
file name : Image_29012024160523387.png
|
2024-01-29 16:05:23.528394 |
102 |
88347091 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.3961312
Longitude : 91.9012194
file name : Image_14082024161820644.png
|
2024-08-14 16:18:20.733743 |
103 |
88347091 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.30351223
Longitude : 91.82208556
file name : Image_14082024143328969.png
|
2024-08-14 14:33:29.076931 |
104 |
88347091 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.27475497
Longitude : 91.79803963
file name : Image_12062024164224487.png
|
2024-06-12 16:42:24.590125 |
105 |
88347183 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.3961314
Longitude : 91.9012194
file name : Image_14082024161816703.png
|
2024-08-14 16:18:16.790277 |
106 |
88347183 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.30351493
Longitude : 91.82209566
file name : Image_14082024143324435.png
|
2024-08-14 14:33:24.534933 |
107 |
88347183 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.27188532
Longitude : 91.83024856
file name : Image_25012024163832280.png
|
2024-01-25 16:38:32.362701 |
108 |
88347157 |
Repair of drainage channel |
365988 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 26.27124119
Longitude : 91.82858878
file name : Image_25012024163915149.png
|
2024-01-25 16:39:15.239052 |
109 |
88502714 |
Water Supply to villages |
731975 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.27008272
Longitude : 91.82724066
file name : Image_06042024135633660.png
|
2024-04-06 13:56:33.767292 |
110 |
88347322 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.39606606
Longitude : 91.90130482
file name : Image_14082024161801541.png
|
2024-08-14 16:18:01.623665 |
111 |
88347322 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.30351678
Longitude : 91.82209843
file name : Image_14082024143315515.png
|
2024-08-14 14:33:15.617062 |
112 |
88347322 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.26683451
Longitude : 91.80696432
file name : Image_29012024160043573.png
|
2024-01-29 16:00:43.669654 |
113 |
76529386 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.26294561
Longitude : 91.82341011
file name : Image_25012024163926091.png
|
2024-01-25 16:39:26.178286 |
114 |
78803258 |
Construction of toilets in public institutions |
250000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.30351861
Longitude : 91.82202186
file name : Image_04102024162408571.png
|
2024-10-04 16:24:08.694777 |
115 |
78804063 |
Construction of toilets in public institutions |
248000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.27157914
Longitude : 91.82896602
file name : Image_25012024155535910.png
|
2024-01-25 15:55:35.984582 |
116 |
88144836 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 5 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 5 AT NO 2 SUKTAGURI1 |
Plinth level |
-
latitude : 26.3961123
Longitude : 91.9010368
file name : Image_15062024155836980.png
|
2024-06-15 15:58:37.052547 |
117 |
88144836 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 5 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 5 AT NO 2 SUKTAGURI1 |
Completion of work |
-
latitude : 26.26612898
Longitude : 91.82284586
file name : Image_30012024181241815.png
|
2024-01-30 18:12:41.894648 |
118 |
88145041 |
Construction of toilets in public institutions |
346487 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.26684722
Longitude : 91.79034443
file name : Image_01122023123501560.png
|
2023-12-01 12:35:01.657747 |
119 |
88347361 |
Construction of toilets in public institutions |
317237 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.27392874
Longitude : 91.79091599
file name : Image_01122023122312202.png
|
2023-12-01 12:23:12.317731 |
120 |
63854278 |
CONST. OF TOILET SHED OF 199 KIRAKARA KV MADARASSA RIGHT |
45000 |
CONST. OF TOILET SHED OF 199 KIRAKARA KV MADARASSA RIGHT1 |
Roof laid |
-
latitude : 26.26610526
Longitude : 91.8227937
file name : Image_14062024143024548.png
|
2024-06-14 14:30:24.691428 |
121 |
63854278 |
CONST. OF TOILET SHED OF 199 KIRAKARA KV MADARASSA RIGHT |
45000 |
CONST. OF TOILET SHED OF 199 KIRAKARA KV MADARASSA RIGHT1 |
Plinth level |
-
latitude : 26.26616634
Longitude : 91.82280424
file name : Image_14062024142324216.png
|
2024-06-14 14:23:24.303329 |
122 |
63854278 |
CONST. OF TOILET SHED OF 199 KIRAKARA KV MADARASSA RIGHT |
45000 |
CONST. OF TOILET SHED OF 199 KIRAKARA KV MADARASSA RIGHT1 |
Completion of work |
-
latitude : 26.26613071
Longitude : 91.82282419
file name : Image_27062023161222036.png
|
2023-06-27 16:12:22.12668 |
123 |
63854278 |
CONST. OF TOILET SHED OF 199 KIRAKARA KV MADARASSA RIGHT |
45000 |
CONST. OF TOILET SHED OF 199 KIRAKARA KV MADARASSA RIGHT1 |
Completion of work |
-
latitude : 26.26613071
Longitude : 91.82282419
file name : Image_27062023161216659.png
|
2023-06-27 16:12:16.850891 |
124 |
78799530 |
Const of GP BUILDING OF BAZNAPATHAR GP PH II |
508750 |
Const of GP BUILDING OF BAZNAPATHAR GP PH II1 |
Roof laid |
-
latitude : 26.26617261
Longitude : 91.82281143
file name : Image_10052024142548663.png
|
2024-05-10 14:25:48.788353 |
125 |
78799530 |
Const of GP BUILDING OF BAZNAPATHAR GP PH II |
508750 |
Const of GP BUILDING OF BAZNAPATHAR GP PH II1 |
Plinth level |
-
latitude : 26.26618393
Longitude : 91.82282521
file name : Image_10052024142121024.png
|
2024-05-10 14:21:21.131434 |
126 |
78799530 |
Const of GP BUILDING OF BAZNAPATHAR GP PH II |
508750 |
Const of GP BUILDING OF BAZNAPATHAR GP PH II1 |
Completion of work |
-
latitude : 26.26619148
Longitude : 91.82276083
file name : Image_25012024134648547.png
|
2024-01-25 13:46:48.649994 |
127 |
69315994 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.2730935
Longitude : 91.81046687
file name : Image_18052024133150677.png
|
2024-05-18 13:31:50.767754 |
128 |
69315994 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.27310509
Longitude : 91.81045133
file name : Image_18052024132923102.png
|
2024-05-18 13:29:23.204104 |
129 |
69315994 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.27301841
Longitude : 91.81042641
file name : Image_05092023142319752.png
|
2023-09-05 14:23:19.850756 |
130 |
63854179 |
CONST OF TOILET SHED AT NO 1 SUKTAGURI NEAR HAFIZIA |
77666 |
CONST OF TOILET SHED AT NO 1 SUKTAGURI NEAR HAFIZIA1 |
Completion of work |
-
latitude : 26.28041377
Longitude : 91.78695798
file name : Image_12062024171750511.png
|
2024-06-12 17:17:50.611346 |
131 |
63854323 |
CONST OF TOILET SHED AT NO 2 SUKTAGURI LP SCHOOL |
120000 |
CONST OF TOILET SHED AT NO 2 SUKTAGURI LP SCHOOL1 |
Completion of work |
-
latitude : 26.26607569
Longitude : 91.82279663
file name : Image_02072024124050362.png
|
2024-07-02 12:40:50.457989 |
132 |
63848283 |
REPAIRING OF KURUA SAPARI REFUJI LP SCHOOL AT BARMANCHUBA |
350000 |
REPAIRING OF KURUA SAPARI REFUJI LP SCHOOL AT BARMANCHUBA1 |
Roof laid |
-
latitude : 26.3961371
Longitude : 91.9012065
file name : Image_15062024153137663.png
|
2024-06-15 15:31:37.766108 |
133 |
63848283 |
REPAIRING OF KURUA SAPARI REFUJI LP SCHOOL AT BARMANCHUBA |
350000 |
REPAIRING OF KURUA SAPARI REFUJI LP SCHOOL AT BARMANCHUBA1 |
Completion of work |
-
latitude : 26.26676333
Longitude : 91.7915596
file name : Image_03092022142534314.png
|
2022-09-03 14:25:34.45504 |
134 |
69308806 |
REPAIRING OF EKSELIA LP SCHOOL PH II |
250000 |
REPAIRING OF EKSELIA LP SCHOOL PH II1 |
Roof laid |
-
latitude : 26.39616959
Longitude : 91.90127239
file name : Image_15062024152540761.png
|
2024-06-15 15:25:40.869127 |
135 |
69308806 |
REPAIRING OF EKSELIA LP SCHOOL PH II |
250000 |
REPAIRING OF EKSELIA LP SCHOOL PH II1 |
Plinth level |
-
latitude : 26.39612931
Longitude : 91.90124041
file name : Image_15062024151529110.png
|
2024-06-15 15:15:29.236482 |
136 |
69308806 |
REPAIRING OF EKSELIA LP SCHOOL PH II |
250000 |
REPAIRING OF EKSELIA LP SCHOOL PH II1 |
Completion of work |
-
latitude : 26.27314313
Longitude : 91.80992046
file name : Image_22062023121621782.png
|
2023-06-22 12:16:21.878939 |
137 |
88144714 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT DAURANGA BAHUMUKHI KRISHI PRAKALPA AT K KURUA UNIT 1 |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT DAURANGA BAHUMUKHI KRISHI PRAKALPA AT K KURUA UNIT 11 |
Roof laid |
-
latitude : 26.39612884
Longitude : 91.90123687
file name : Image_15062024164043086.png
|
2024-06-15 16:40:43.177236 |
138 |
88144714 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT DAURANGA BAHUMUKHI KRISHI PRAKALPA AT K KURUA UNIT 1 |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT DAURANGA BAHUMUKHI KRISHI PRAKALPA AT K KURUA UNIT 11 |
Plinth level |
-
latitude : 26.39614726
Longitude : 91.90123477
file name : Image_15062024160545235.png
|
2024-06-15 16:05:45.320564 |
139 |
88144714 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT DAURANGA BAHUMUKHI KRISHI PRAKALPA AT K KURUA UNIT 1 |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT DAURANGA BAHUMUKHI KRISHI PRAKALPA AT K KURUA UNIT 11 |
Completion of work |
-
latitude : 26.26613591
Longitude : 91.82284305
file name : Image_12012024164159563.png
|
2024-01-12 16:41:59.668904 |
140 |
88144756 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT DAURANGA BAHUMUKHI KRISHI PRAKALPA AT K KURUA UNIT 2 |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT DAURANGA BAHUMUKHI KRISHI PRAKALPA AT K KURUA UNIT 21 |
Roof laid |
-
latitude : 26.39611365
Longitude : 91.90123026
file name : Image_15062024164135384.png
|
2024-06-15 16:41:35.482111 |
141 |
88144756 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT DAURANGA BAHUMUKHI KRISHI PRAKALPA AT K KURUA UNIT 2 |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT DAURANGA BAHUMUKHI KRISHI PRAKALPA AT K KURUA UNIT 21 |
Plinth level |
-
latitude : 26.3962473
Longitude : 91.9009299
file name : Image_15062024160506256.png
|
2024-06-15 16:05:06.326042 |
142 |
88144756 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT DAURANGA BAHUMUKHI KRISHI PRAKALPA AT K KURUA UNIT 2 |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT DAURANGA BAHUMUKHI KRISHI PRAKALPA AT K KURUA UNIT 21 |
Completion of work |
-
latitude : 26.26613773
Longitude : 91.82285909
file name : Image_12012024164155847.png
|
2024-01-12 16:41:55.955888 |
143 |
88144391 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT GANDHIA PATHAR UNIT 1 AT KHALIHOI VILLAGE |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT GANDHIA PATHAR UNIT 1 AT KHALIHOI VILLAGE1 |
Roof laid |
-
latitude : 26.39611403
Longitude : 91.90123042
file name : Image_15062024164554928.png
|
2024-06-15 16:45:55.022753 |
144 |
88144391 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT GANDHIA PATHAR UNIT 1 AT KHALIHOI VILLAGE |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT GANDHIA PATHAR UNIT 1 AT KHALIHOI VILLAGE1 |
Plinth level |
-
latitude : 26.396148
Longitude : 91.90123532
file name : Image_15062024160413835.png
|
2024-06-15 16:04:13.903872 |
145 |
88144391 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT GANDHIA PATHAR UNIT 1 AT KHALIHOI VILLAGE |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT GANDHIA PATHAR UNIT 1 AT KHALIHOI VILLAGE1 |
Completion of work |
-
latitude : 26.26615505
Longitude : 91.82279056
file name : Image_30012024180743989.png
|
2024-01-30 18:07:44.06625 |
146 |
88144430 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO2 SUKTAGURI UNIT 1 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO2 SUKTAGURI UNIT 1 AT NO 2 SUKTAGURI1 |
Roof laid |
-
latitude : 26.39611471
Longitude : 91.90122992
file name : Image_15062024164557971.png
|
2024-06-15 16:45:58.058161 |
147 |
88144430 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO2 SUKTAGURI UNIT 1 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO2 SUKTAGURI UNIT 1 AT NO 2 SUKTAGURI1 |
Plinth level |
-
latitude : 26.39615052
Longitude : 91.90123931
file name : Image_15062024160321633.png
|
2024-06-15 16:03:21.712246 |
148 |
88144430 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO2 SUKTAGURI UNIT 1 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO2 SUKTAGURI UNIT 1 AT NO 2 SUKTAGURI1 |
Completion of work |
-
latitude : 26.26616047
Longitude : 91.8228
file name : Image_30012024180809783.png
|
2024-01-30 18:08:09.862734 |
149 |
88144546 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 2 AT NO2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 2 AT NO2 SUKTAGURI1 |
Roof laid |
-
latitude : 26.3963875
Longitude : 91.9010749
file name : Image_15062024164601456.png
|
2024-06-15 16:46:01.554171 |
150 |
88144546 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 2 AT NO2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 2 AT NO2 SUKTAGURI1 |
Plinth level |
-
latitude : 26.39615086
Longitude : 91.90123819
file name : Image_15062024160202301.png
|
2024-06-15 16:02:02.381398 |
151 |
88144546 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 2 AT NO2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 2 AT NO2 SUKTAGURI1 |
Completion of work |
-
latitude : 26.2661525
Longitude : 91.82280767
file name : Image_30012024180820758.png
|
2024-01-30 18:08:20.831641 |
152 |
88144625 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 4 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 4 AT NO 2 SUKTAGURI1 |
Roof laid |
-
latitude : 26.3963005
Longitude : 91.9009866
file name : Image_15062024165441798.png
|
2024-06-15 16:54:41.874371 |
153 |
88144625 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 4 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 4 AT NO 2 SUKTAGURI1 |
Plinth level |
-
latitude : 26.39611705
Longitude : 91.90123192
file name : Image_15062024164604673.png
|
2024-06-15 16:46:04.762568 |
154 |
88144625 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 4 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 4 AT NO 2 SUKTAGURI1 |
Plinth level |
-
latitude : 26.39615195
Longitude : 91.90122419
file name : Image_15062024160038477.png
|
2024-06-15 16:00:38.559299 |
155 |
88144625 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 4 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 4 AT NO 2 SUKTAGURI1 |
Completion of work |
-
latitude : 26.26611387
Longitude : 91.82282658
file name : Image_30012024182603237.png
|
2024-01-30 18:26:03.32858 |
156 |
88502051 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.3962655
Longitude : 91.9011292
file name : Image_15062024165041249.png
|
2024-06-15 16:50:41.325976 |
157 |
88502051 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.3962439
Longitude : 91.9009248
file name : Image_15062024161941106.png
|
2024-06-15 16:19:41.178815 |
158 |
88502051 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.26614912
Longitude : 91.82277577
file name : Image_30012024180728579.png
|
2024-01-30 18:07:28.654233 |
159 |
63854302 |
CONST OF TOILET SHED OF 200 KIRAKARA KV MADARASA |
45000 |
CONST OF TOILET SHED OF 200 KIRAKARA KV MADARASA1 |
Roof laid |
-
latitude : 26.26610654
Longitude : 91.82271762
file name : Image_14062024144412350.png
|
2024-06-14 14:44:12.425992 |
160 |
63854302 |
CONST OF TOILET SHED OF 200 KIRAKARA KV MADARASA |
45000 |
CONST OF TOILET SHED OF 200 KIRAKARA KV MADARASA1 |
Plinth level |
-
latitude : 26.26616914
Longitude : 91.82283446
file name : Image_14062024143640873.png
|
2024-06-14 14:36:40.949931 |
161 |
63854302 |
CONST OF TOILET SHED OF 200 KIRAKARA KV MADARASA |
45000 |
CONST OF TOILET SHED OF 200 KIRAKARA KV MADARASA1 |
Completion of work |
-
latitude : 26.26612225
Longitude : 91.82284241
file name : Image_27062023161210356.png
|
2023-06-27 16:12:10.475098 |
162 |
76528602 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.27261139
Longitude : 91.79152164
file name : Image_12062024170641152.png
|
2024-06-12 17:06:41.293898 |
163 |
76528602 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.27258679
Longitude : 91.79153492
file name : Image_12062024170251952.png
|
2024-06-12 17:02:52.06036 |
164 |
76528602 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.27265278
Longitude : 91.79157365
file name : Image_22062023121423436.png
|
2023-06-22 12:14:23.541651 |
165 |
63848549 |
REPAIRING OF COMMUNITY HALL NEAR NO 1 SUKTAGURI HAFIJIA MADRASSA |
200000 |
REPAIRING OF COMMUNITY HALL NEAR NO 1 SUKTAGURI HAFIJIA MADRASSA1 |
Roof laid |
-
latitude : 26.266074
Longitude : 91.82280155
file name : Image_14062024160500875.png
|
2024-06-14 16:05:00.969353 |
166 |
63848549 |
REPAIRING OF COMMUNITY HALL NEAR NO 1 SUKTAGURI HAFIJIA MADRASSA |
200000 |
REPAIRING OF COMMUNITY HALL NEAR NO 1 SUKTAGURI HAFIJIA MADRASSA1 |
Plinth level |
-
latitude : 26.28019134
Longitude : 91.78727393
file name : Image_10012023170030848.png
|
2023-01-10 17:00:30.96725 |
167 |
63848549 |
REPAIRING OF COMMUNITY HALL NEAR NO 1 SUKTAGURI HAFIJIA MADRASSA |
200000 |
REPAIRING OF COMMUNITY HALL NEAR NO 1 SUKTAGURI HAFIJIA MADRASSA1 |
Completion of work |
-
latitude : 26.28008284
Longitude : 91.78722613
file name : Image_15112022143246972.png
|
2022-11-15 14:32:47.078369 |
168 |
63848549 |
REPAIRING OF COMMUNITY HALL NEAR NO 1 SUKTAGURI HAFIJIA MADRASSA |
200000 |
REPAIRING OF COMMUNITY HALL NEAR NO 1 SUKTAGURI HAFIJIA MADRASSA1 |
Completion of work |
-
latitude : 26.2801198
Longitude : 91.78723766
file name : Image_15112022143250869.png
|
2022-11-15 14:32:50.973449 |
169 |
63853042 |
DRINKING WATER FACILITY AT BAZNAPATHAR BALIKA ME SCHOOL |
205400 |
DRINKING WATER FACILITY AT BAZNAPATHAR BALIKA ME SCHOOL1 |
Roof laid |
-
latitude : 26.266256
Longitude : 91.82095201
file name : Image_14062024152416858.png
|
2024-06-14 15:24:16.953808 |
170 |
63853042 |
DRINKING WATER FACILITY AT BAZNAPATHAR BALIKA ME SCHOOL |
205400 |
DRINKING WATER FACILITY AT BAZNAPATHAR BALIKA ME SCHOOL1 |
Plinth level |
-
latitude : 26.26627003
Longitude : 91.8209317
file name : Image_14062024150930455.png
|
2024-06-14 15:09:28.035063 |
171 |
63853042 |
DRINKING WATER FACILITY AT BAZNAPATHAR BALIKA ME SCHOOL |
205400 |
DRINKING WATER FACILITY AT BAZNAPATHAR BALIKA ME SCHOOL1 |
Plinth level |
-
latitude : 26.26629608
Longitude : 91.82092433
file name : Image_07092023163615977.png
|
2023-09-07 16:36:17.139526 |
172 |
63853042 |
DRINKING WATER FACILITY AT BAZNAPATHAR BALIKA ME SCHOOL |
205400 |
DRINKING WATER FACILITY AT BAZNAPATHAR BALIKA ME SCHOOL1 |
Completion of work |
-
latitude : 26.26620105
Longitude : 91.820984
file name : Image_01062023151920382.png
|
2023-06-01 15:19:20.547984 |
173 |
63853042 |
DRINKING WATER FACILITY AT BAZNAPATHAR BALIKA ME SCHOOL |
205400 |
DRINKING WATER FACILITY AT BAZNAPATHAR BALIKA ME SCHOOL1 |
Completion of work |
-
latitude : 26.26618631
Longitude : 91.82093739
file name : Image_10012023170043177.png
|
2023-01-10 17:00:43.306189 |
174 |
63848347 |
REPAIRING OF SCHOOL BUILDING AT EKSELIA LP SCHOOL |
350000 |
REPAIRING OF SCHOOL BUILDING AT EKSELIA LP SCHOOL1 |
Roof laid |
-
latitude : 26.26611414
Longitude : 91.82280874
file name : Image_15062024145114332.png
|
2024-06-15 14:51:14.413801 |
175 |
63848347 |
REPAIRING OF SCHOOL BUILDING AT EKSELIA LP SCHOOL |
350000 |
REPAIRING OF SCHOOL BUILDING AT EKSELIA LP SCHOOL1 |
Roof laid |
-
latitude : 26.26610337
Longitude : 91.82280037
file name : Image_15062024145106079.png
|
2024-06-15 14:51:06.170237 |
176 |
63848347 |
REPAIRING OF SCHOOL BUILDING AT EKSELIA LP SCHOOL |
350000 |
REPAIRING OF SCHOOL BUILDING AT EKSELIA LP SCHOOL1 |
Roof laid |
-
latitude : 26.26617012
Longitude : 91.82280904
file name : Image_25012024135444841.png
|
2024-01-25 13:54:44.948015 |
177 |
63848347 |
REPAIRING OF SCHOOL BUILDING AT EKSELIA LP SCHOOL |
350000 |
REPAIRING OF SCHOOL BUILDING AT EKSELIA LP SCHOOL1 |
Roof laid |
-
latitude : 26.2731576
Longitude : 91.80995823
file name : Image_01062023153216123.png
|
2023-06-01 15:32:16.27097 |
178 |
63848347 |
REPAIRING OF SCHOOL BUILDING AT EKSELIA LP SCHOOL |
350000 |
REPAIRING OF SCHOOL BUILDING AT EKSELIA LP SCHOOL1 |
Completion of work |
-
latitude : 26.27311767
Longitude : 91.8100802
file name : Image_10082022144103013.png
|
2022-08-10 14:41:03.11356 |
179 |
78797192 |
Creation of plastic waste storage unit |
33000 |
Creation of plastic waste storage unit 1 |
Roof laid |
-
latitude : 26.26511362
Longitude : 91.82007535
file name : Image_14062024154522472.png
|
2024-06-14 15:45:22.584478 |
180 |
78797192 |
Creation of plastic waste storage unit |
33000 |
Creation of plastic waste storage unit 1 |
Plinth level |
-
latitude : 26.26512438
Longitude : 91.82012456
file name : Image_14062024153742974.png
|
2024-06-14 15:37:43.08447 |
181 |
78797192 |
Creation of plastic waste storage unit |
33000 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 26.26512891
Longitude : 91.82009173
file name : Image_07082023162744922.png
|
2023-08-07 16:27:45.038885 |
182 |
87332938 |
PURCHASE OF OFFICE ACCESSORIES FOR OFFICE USE |
100000 |
PURCHASE OF OFFICE ACCESSORIES FOR OFFICE USE1 |
Roof laid |
-
latitude : 26.26608882
Longitude : 91.82278634
file name : Image_19062024153531100.png
|
2024-06-19 15:35:31.186604 |
183 |
87332938 |
PURCHASE OF OFFICE ACCESSORIES FOR OFFICE USE |
100000 |
PURCHASE OF OFFICE ACCESSORIES FOR OFFICE USE1 |
Roof laid |
-
latitude : 26.26607593
Longitude : 91.82279756
file name : Image_19062024153403026.png
|
2024-06-19 15:34:02.00639 |
184 |
87332938 |
PURCHASE OF OFFICE ACCESSORIES FOR OFFICE USE |
100000 |
PURCHASE OF OFFICE ACCESSORIES FOR OFFICE USE1 |
Plinth level |
-
latitude : 26.26603742
Longitude : 91.82282985
file name : Image_19062024152345280.png
|
2024-06-19 15:23:45.253852 |
185 |
87332938 |
PURCHASE OF OFFICE ACCESSORIES FOR OFFICE USE |
100000 |
PURCHASE OF OFFICE ACCESSORIES FOR OFFICE USE1 |
Completion of work |
-
latitude : 26.26613433
Longitude : 91.82272371
file name : Image_07092023160008980.png
|
2023-09-07 16:00:09.084463 |
186 |
78799966 |
REPAIRING OF GANDHIA PATHAR LP SCHOOL |
200000 |
REPAIRING OF GANDHIA PATHAR LP SCHOOL1 |
Roof laid |
-
latitude : 26.26606251
Longitude : 91.82269629
file name : Image_19062024155655558.png
|
2024-06-19 15:56:55.644122 |
187 |
78799966 |
REPAIRING OF GANDHIA PATHAR LP SCHOOL |
200000 |
REPAIRING OF GANDHIA PATHAR LP SCHOOL1 |
Plinth level |
-
latitude : 26.27729758
Longitude : 91.83309933
file name : Image_07092023140759228.png
|
2023-09-07 14:07:59.325116 |
188 |
78799966 |
REPAIRING OF GANDHIA PATHAR LP SCHOOL |
200000 |
REPAIRING OF GANDHIA PATHAR LP SCHOOL1 |
Completion of work |
-
latitude : 26.27732051
Longitude : 91.83315495
file name : Image_07082023170151039.png
|
2023-08-07 17:01:51.14159 |
189 |
88144874 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 6 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 6 AT NO 2 SUKTAGURI1 |
Roof laid |
-
latitude : 26.30344358
Longitude : 91.82194663
file name : Image_14082024142247616.png
|
2024-08-14 14:22:47.718796 |
190 |
88144874 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 6 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 6 AT NO 2 SUKTAGURI1 |
Plinth level |
-
latitude : 26.3962796
Longitude : 91.9009649
file name : Image_15062024164659034.png
|
2024-06-15 16:46:59.123071 |
191 |
88144874 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 6 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 6 AT NO 2 SUKTAGURI1 |
Completion of work |
-
latitude : 26.26612915
Longitude : 91.82284572
file name : Image_30012024181232419.png
|
2024-01-30 18:12:32.500062 |
192 |
88144902 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 7 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 7 AT NO 2 SUKTAGURI1 |
Roof laid |
-
latitude : 26.30346103
Longitude : 91.82198217
file name : Image_14082024142251648.png
|
2024-08-14 14:22:51.748409 |
193 |
88144902 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 7 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 7 AT NO 2 SUKTAGURI1 |
Plinth level |
-
latitude : 26.3963872
Longitude : 91.9010755
file name : Image_15062024164922277.png
|
2024-06-15 16:49:22.350067 |
194 |
88144902 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 7 AT NO 2 SUKTAGURI |
150000 |
INSTALATION OF SOLAR LIGHT OF AMRIT SAROVAR AT NO 2 SUKTAGURI UNIT 7 AT NO 2 SUKTAGURI1 |
Completion of work |
-
latitude : 26.2661252
Longitude : 91.82283536
file name : Image_30012024181217900.png
|
2024-01-30 18:12:17.981879 |
195 |
88347267 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.39610369
Longitude : 91.90128728
file name : Image_14082024161805644.png
|
2024-08-14 16:18:05.722998 |
196 |
88347267 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.30351933
Longitude : 91.82210397
file name : Image_14082024143311024.png
|
2024-08-14 14:33:11.132762 |
197 |
88347267 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.30352476
Longitude : 91.82210788
file name : Image_14082024143306845.png
|
2024-08-14 14:33:06.964954 |
198 |
88347267 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.28051196
Longitude : 91.7871062
file name : Image_12062024172145247.png
|
2024-06-12 17:21:45.33997 |
199 |
88347267 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.28052738
Longitude : 91.78713988
file name : Image_29012024163646257.png
|
2024-01-29 16:36:46.350105 |
200 |
88347217 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.3961311
Longitude : 91.9012194
file name : Image_14082024161809362.png
|
2024-08-14 16:18:09.46306 |
201 |
88347217 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.30351499
Longitude : 91.82209833
file name : Image_14082024143319877.png
|
2024-08-14 14:33:20.093065 |
202 |
88347217 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.26638314
Longitude : 91.8228191
file name : Image_25012024140121525.png
|
2024-01-25 14:01:21.639525 |
203 |
88145180 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.3961308
Longitude : 91.9012194
file name : Image_14082024161824381.png
|
2024-08-14 16:18:24.473506 |
204 |
88145180 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.30351144
Longitude : 91.8220831
file name : Image_14082024143340906.png
|
2024-08-14 14:33:41.037327 |
205 |
88145180 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.26647594
Longitude : 91.79117481
file name : Image_12062024165410104.png
|
2024-06-12 16:54:10.187464 |