1 |
26466853 |
CONST. OF MARKET SHED NEAR GP OFFICE |
547253 |
Commercial Complexes4 |
25% |
-
latitude : 26.496365
Longitude : 91.92163000000001
file name : Image_05092019124317522.png
|
2019-09-05 12:43:17.632552 |
2 |
26467018 |
CONST. OF INFORMATION BOARD AT GP OFFICE |
55500 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 26.496333333333336
Longitude : 91.92155166666667
file name : Image_05092019124314564.png
|
2019-09-05 12:43:14.675296 |
3 |
44278366 |
Const. of Sand Grevelling Road from Bul Bhatta house to satra Chuburi via Bengnoi khara |
300000 |
Const. of Sand Grevelling Road from Bul Bhatta house to satra Chuburi via Bengnoi khara1 |
25% |
-
latitude : 26.4792548,26.47925485
Longitude : 91.91252192,91.91252179
file name : Image_18112020171139188.png
|
2020-11-18 17:11:39.281256 |
4 |
44278366 |
Const. of Sand Grevelling Road from Bul Bhatta house to satra Chuburi via Bengnoi khara |
300000 |
Const. of Sand Grevelling Road from Bul Bhatta house to satra Chuburi via Bengnoi khara1 |
25% |
-
latitude : 26.4792548,26.47925485
Longitude : 91.91252192,91.91252179
file name : Image_18112020171213394.png
|
2020-11-18 17:12:13.498196 |
5 |
44311028 |
R/c from Dhajyo Sarma house to Ranjan Sarma house |
200000 |
R/c from Dhajyo Sarma house to Ranjan Sarma house 1 |
25% |
-
latitude : 26.47982854,26.47982854
Longitude : 91.91709247,91.91709247
file name : Image_18122020110349297.png
|
2020-12-18 11:03:49.364722 |
6 |
44311078 |
Const of Boundary Wall at Patidarrang LP School, |
200000 |
Const of Boundary Wall at Patidarrang LP School,1 |
In Progress |
-
latitude : 26.47947433
Longitude : 91.9146935
file name : Image_18112020171151554.png
|
2020-11-18 17:11:51.639595 |
7 |
44311078 |
Const of Boundary Wall at Patidarrang LP School, |
200000 |
Const of Boundary Wall at Patidarrang LP School,1 |
In Progress |
-
latitude : 26.47947433
Longitude : 91.9146935
file name : Image_18112020171221885.png
|
2020-11-18 17:12:21.978324 |
8 |
44302729 |
Culvert at Manoranjan Sarma house |
150000 |
Culvert at Manoranjan Sarma house1 |
Substructure below GL |
-
latitude : 26.48723649,26.48723649
Longitude : 91.93049164,91.93049164
file name : Image_11122020140925290.png
|
2020-12-11 14:09:25.357896 |
9 |
44302639 |
Sand Grevelling Road from Kaikara North Chuburi Silikha Tall to Kandrapa Deka House (phaseI) |
216000 |
Sand Grevelling Road from Kaikara North Chuburi Silikha Tall to Kandrapa Deka House (phaseI)1 |
25% |
-
latitude : 26.46987542,26.4698767
Longitude : 91.91796881,91.91796852
file name : Image_08122020141652031.png
|
2020-12-08 14:16:52.127173 |
10 |
44302590 |
Construction of Community Hall at Lozora Majar Chuba Bishnu Mandir |
250000 |
Construction of Community Hall at Lozora Majar Chuba Bishnu Mandir 1 |
25% |
-
latitude : 26.47335717
Longitude : 91.92613341
file name : Image_20012021131250468.png
|
2021-01-20 13:12:50.539065 |
11 |
44302523 |
Repairing of Japmarabori High School |
150000 |
Repairing of Japmarabori High School 1 |
25% |
-
latitude : 26.47989803
Longitude : 91.93280121
file name : Image_18112020171112791.png
|
2020-11-18 17:11:12.874574 |
12 |
44302523 |
Repairing of Japmarabori High School |
150000 |
Repairing of Japmarabori High School 1 |
25% |
-
latitude : 26.47989803
Longitude : 91.93280121
file name : Image_18112020171202003.png
|
2020-11-18 17:12:02.127073 |
13 |
44302169 |
Construction of Rangamancha at Barigaon Kamakhya Dewalay |
250000 |
Construction of Rangamancha at Barigaon Kamakhya Dewalay1 |
25% |
-
latitude : 26.48032372
Longitude : 91.93628099
file name : Image_01122020151826624.png
|
2020-12-01 15:18:26.71445 |
14 |
44302322 |
Const. of Road from ojapara Chowk to Keowt para Bhagabat Mandir Chowk |
200000 |
Const. of Road from ojapara Chowk to Keowt para Bhagabat Mandir Chowk 1 |
25% |
-
latitude : 26.481673,26.481673
Longitude : 91.91463835,91.91463835
file name : Image_18122020112035306.png
|
2020-12-18 11:20:35.377656 |
15 |
44278487 |
Const. of Sand Grevelling Road from Bordoulguri Deomornoi PWD Road to Manindra house via Majar Chuba |
300000 |
Const. of Sand Grevelling Road from Bordoulguri Deomornoi PWD Road to Manindra house via Majar Chuba1 |
25% |
-
latitude : 26.47000392,26.47001089
Longitude : 91.92204554,91.92203995
file name : Image_16112020145809201.png
|
2020-11-16 14:58:15.440228 |
16 |
44280538 |
Const. of Road Side Drain from Kulshik Irrigation Cannel to Kaikara Peddy Field |
180000 |
Const. of Road Side Drain from Kulshik Irrigation Cannel to Kaikara Peddy Field 1 |
25% |
-
latitude : 26.45944777,26.45946943,26.45946804
Longitude : 91.91788383,91.91784394,91.91784203
file name : Image_16112020145752958.png
|
2020-11-16 14:57:59.199674 |
17 |
44280398 |
Sand Grevelling Road from Mangaldai Mazikuchi Road to Jaljali PatherighatConnecting Road via Kumarpa |
250000 |
Sand Grevelling Road from Mangaldai Mazikuchi Road to Jaljali PatherighatConnecting Road via Kumarpa1 |
25% |
-
latitude : 26.48214023,26.48214023
Longitude : 91.92886292,91.92886292
file name : Image_18122020104825954.png
|
2020-12-18 10:48:26.049995 |
18 |
44280230 |
Sand Grevelling Road from Deomornoi Bordoulguri Road to Barigaon Field |
189875 |
Sand Grevelling Road from Deomornoi Bordoulguri Road to Barigaon Field 1 |
25% |
-
latitude : 26.48066102,26.48062591
Longitude : 91.9254805,91.92547531
file name : Image_01122020125947145.png
|
2020-12-01 12:59:47.255878 |
19 |
44280097 |
Repairing of AWC kumarpara Bhumihin Chuburi |
100000 |
Repairing of AWC kumarpara Bhumihin Chuburi1 |
25% |
-
latitude : 26.50213802
Longitude : 91.9303664
file name : Image_12022021154923448.png
|
2021-02-12 15:49:23.531937 |
20 |
44279940 |
Const of Community Hall at Kharkhowapara Teteli Chowk |
200000 |
Const of Community Hall at Kharkhowapara Teteli Chowk1 |
25% |
-
latitude : 26.49636605
Longitude : 91.91292024
file name : Image_16112020113932671.png
|
2020-11-16 11:39:38.867405 |
21 |
44279940 |
Const of Community Hall at Kharkhowapara Teteli Chowk |
200000 |
Const of Community Hall at Kharkhowapara Teteli Chowk1 |
25% |
-
latitude : 26.49633371
Longitude : 91.91291687
file name : Image_16112020114210054.png
|
2020-11-16 11:42:16.244082 |
22 |
44279940 |
Const of Community Hall at Kharkhowapara Teteli Chowk |
200000 |
Const of Community Hall at Kharkhowapara Teteli Chowk1 |
25% |
-
latitude : 26.46467015
Longitude : 91.92954872
file name : Image_16112020120016954.png
|
2020-11-16 12:00:23.177563 |
23 |
44279709 |
Const. of Boundary Wall at Barigaon LP School (II) |
200000 |
Const. of Boundary Wall at Barigaon LP School (II)1 |
In Progress |
-
latitude : 26.48701507
Longitude : 91.92938188
file name : Image_16112020151735382.png
|
2020-11-16 15:17:41.624037 |
24 |
44279636 |
Sand Grevelling Road from Japmarabori High School Chowk to Jaljali Patherighat Connecting Road (phas |
270000 |
Sand Grevelling Road from Japmarabori High School Chowk to Jaljali Patherighat Connecting Road (phas1 |
25% |
-
latitude : 26.47639223,26.47639217
Longitude : 91.92867596,91.92867614
file name : Image_08122020145127426.png
|
2020-12-08 14:51:27.51055 |
25 |
44279523 |
Const. of Boundary Wall at Kaikara LP school |
136275 |
Const. of Boundary Wall at Kaikara LP school1 |
25% |
-
latitude : 26.46547202
Longitude : 91.91884944
file name : Image_05122020144852770.png
|
2020-12-05 14:48:52.877377 |
26 |
44279457 |
Const. of Sand Grevelling road from kaikara Tarun Sangha to Tankeswar Deka house via Kulshik Dong |
300000 |
Const. of Sand Grevelling road from kaikara Tarun Sangha to Tankeswar Deka house via Kulshik Dong 1 |
25% |
-
latitude : 26.46349076,26.46349114
Longitude : 91.91889082,91.91888632
file name : Image_18112020140512545.png
|
2020-11-18 14:05:12.645552 |
27 |
44310956 |
Sand Grevelling Road From Japmarabori Chowk to Paramanda Chowk |
350000 |
Sand Grevelling Road From Japmarabori Chowk to Paramanda Chowk 1 |
25% |
-
latitude : 26.48024007,26.48024007
Longitude : 91.9337293,91.9337293
file name : Image_18122020104818364.png
|
2020-12-18 10:48:18.461027 |
28 |
44310895 |
Const of Boundary wall and Errotion Protection at Kaikara LP school |
300000 |
Const of Boundary wall and Errotion Protection at Kaikara LP school 1 |
In Progress |
-
latitude : 26.46568354
Longitude : 91.91879651
file name : Image_13042021133419358.png
|
2021-04-13 13:34:19.458956 |
29 |
44310812 |
R/C from Barigaon Matia Gosaighar Chowk to Ranjit Sarma house via satra Sarma house |
300000 |
R/C from Barigaon Matia Gosaighar Chowk to Ranjit Sarma house via satra Sarma house 1 |
25% |
-
latitude : 26.4870797,26.48707982
Longitude : 91.92970161,91.92970189
file name : Image_01122020151626898.png
|
2020-12-01 15:16:26.979768 |
30 |
44310353 |
Const of Boundary Wall at Lozora na Gokhani Than |
200000 |
Const of Boundary Wall at Lozora na Gokhani Than 1 |
In Progress |
-
latitude : 26.46836451
Longitude : 91.93025924
file name : Image_20012021131254733.png
|
2021-01-20 13:12:54.808119 |
31 |
44310318 |
Infrastructure Dev at Patidarrang Nabajyoti LP School |
222000 |
Infrastructure Dev at Patidarrang Nabajyoti LP School1 |
25% |
-
latitude : 26.4855268
Longitude : 91.91997756
file name : Image_18122020110340718.png
|
2020-12-18 11:03:40.784421 |
32 |
44302695 |
R/C from Jaljali Patheighat link Road to ranju Deka house via Gunaram Deka house ( Phase I) |
200000 |
R/C from Jaljali Patheighat link Road to ranju Deka house via Gunaram Deka house ( Phase I) 1 |
25% |
-
latitude : 26.46534514,26.46535167
Longitude : 91.91759292,91.91759451
file name : Image_18112020171054358.png
|
2020-11-18 17:10:54.476704 |
33 |
44302081 |
Const. Of Road from Suren Sarma house to Gajen Deka house via Jagat Saharia paduli |
200000 |
Const. Of Road from Suren Sarma house to Gajen Deka house via Jagat Saharia paduli1 |
25% |
-
latitude : 26.49246797,26.49247464
Longitude : 91.9378393,91.93782032
file name : Image_17112020100211513.png
|
2020-11-17 10:02:11.582937 |
34 |
44302766 |
Const of Rangamancha at Lozora Sankardev Namghar Campus |
300000 |
Const of Rangamancha at Lozora Sankardev Namghar Campus1 |
25% |
-
latitude : 26.46594513
Longitude : 91.93264246
file name : Image_17112020121150367.png
|
2020-11-17 12:11:50.447712 |
35 |
44302379 |
R/C from Niranjan Sarma house to Jogesh Kalita house (I) |
250000 |
R/C from Niranjan Sarma house to Jogesh Kalita house (I)1 |
25% |
-
latitude : 26.48186186,26.4818637
Longitude : 91.91462966,91.91463127
file name : Image_01122020130326263.png
|
2020-12-01 13:03:26.35167 |
36 |
65516703 |
Construction of Community Sanitary Complex |
54500 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48723605
Longitude : 91.92957108
file name : Image_28032023133127720.png
|
2023-03-28 13:31:27.819483 |
37 |
65516651 |
AWC reparing at Patidarrang near LP school |
85000 |
AWC reparing at Patidarrang near LP school1 |
Roof laid |
-
latitude : 26.47923115
Longitude : 91.91443641
file name : Image_23052023110311087.png
|
2023-05-23 11:03:11.180487 |
38 |
65516651 |
AWC reparing at Patidarrang near LP school |
85000 |
AWC reparing at Patidarrang near LP school1 |
Plinth level |
-
latitude : 26.47929511
Longitude : 91.9144754
file name : Image_27012023114944372.png
|
2023-01-27 11:49:44.465826 |
39 |
65516651 |
AWC reparing at Patidarrang near LP school |
85000 |
AWC reparing at Patidarrang near LP school1 |
Completion of work |
-
latitude : 26.47915117
Longitude : 91.91442262
file name : Image_15112022122007631.png
|
2022-11-15 12:20:07.710368 |
40 |
65516648 |
AWC Reparing at Kewaliya satra |
85000 |
AWC Reparing at Kewaliya satra1 |
Plinth level |
-
latitude : 26.48314216
Longitude : 91.93324068
file name : Image_24052023113640210.png
|
2023-05-24 11:36:40.297374 |
41 |
65516648 |
AWC Reparing at Kewaliya satra |
85000 |
AWC Reparing at Kewaliya satra1 |
Completion of work |
-
latitude : 26.48317299
Longitude : 91.93327992
file name : Image_27032023141118186.png
|
2023-03-27 14:11:18.266591 |
42 |
74132408 |
Const of Sand Gravelling road from Jaljali Patherighat road to Mahesh Deka |
40000 |
Const of Sand Gravelling road from Jaljali Patherighat road to Mahesh Deka1 |
Completion of work |
-
latitude : 26.46503418,26.46506277
Longitude : 91.91696055,91.91674511
file name : Image_24052023123418894.png
|
2023-05-24 12:34:18.965853 |
43 |
65516659 |
Reparing of Lengerigher krishak High School |
171271 |
Reparing of Lengerigher krishak High School1 |
Plinth level |
-
latitude : 26.4616177
Longitude : 91.92224453
file name : Image_16022023164658373.png
|
2023-02-16 16:46:58.455022 |
44 |
65516659 |
Reparing of Lengerigher krishak High School |
171271 |
Reparing of Lengerigher krishak High School1 |
Completion of work |
-
latitude : 26.46156845
Longitude : 91.92214365
file name : Image_15112022122751545.png
|
2022-11-15 12:27:51.649837 |
45 |
65516656 |
AWC Reparing at Lozora Major Choba |
85000 |
AWC Reparing at Lozora Major Choba1 |
Roof laid |
-
latitude : 26.46888796
Longitude : 91.92962286
file name : Image_05122023080432331.png
|
2023-12-05 08:04:32.397435 |
46 |
65516656 |
AWC Reparing at Lozora Major Choba |
85000 |
AWC Reparing at Lozora Major Choba1 |
Plinth level |
-
latitude : 26.46891148
Longitude : 91.92953263
file name : Image_05122023075259381.png
|
2023-12-05 07:52:59.456446 |
47 |
65516656 |
AWC Reparing at Lozora Major Choba |
85000 |
AWC Reparing at Lozora Major Choba1 |
Plinth level |
-
latitude : 26.47292583
Longitude : 91.92529144
file name : Image_10042023151253836.png
|
2023-04-10 15:12:53.94967 |
48 |
65516656 |
AWC Reparing at Lozora Major Choba |
85000 |
AWC Reparing at Lozora Major Choba1 |
Completion of work |
-
latitude : 26.47290705
Longitude : 91.92529085
file name : Image_20012023161537632.png
|
2023-01-20 16:15:37.713424 |
49 |
74200259 |
Repaing of Rest House at Lengerighar Chowk |
50700 |
Repaing of Rest House at Lengerighar Chowk 1 |
Plinth level |
-
latitude : 26.46165842
Longitude : 91.92123168
file name : Image_28082023122918695.png
|
2023-08-28 12:29:18.760024 |
50 |
74200259 |
Repaing of Rest House at Lengerighar Chowk |
50700 |
Repaing of Rest House at Lengerighar Chowk 1 |
Completion of work |
-
latitude : 26.4620386
Longitude : 91.9213745
file name : Image_06072023114103624.png
|
2023-07-06 11:41:03.694703 |
51 |
65468022 |
Water Supply to villages |
77250 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.53452066
Longitude : 91.89085609
file name : Image_07122023053444051.png
|
2023-12-07 05:34:44.1734 |
52 |
65468022 |
Water Supply to villages |
77250 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.49660642
Longitude : 91.923938
file name : Image_17112023090653950.png
|
2023-11-17 09:06:54.019356 |
53 |
65468022 |
Water Supply to villages |
77250 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.49670276
Longitude : 91.92387749
file name : Image_20102022152009868.png
|
2022-10-20 15:20:09.964909 |
54 |
87829023 |
Water Supply to villages |
85500 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.496535
Longitude : 91.9217575
file name : Image_27092024121850082.png
|
2024-09-27 12:18:50.175494 |
55 |
87829139 |
Solar light at Kaikara Mazid Chowk |
31200 |
Solar light at Kaikara Mazid Chowk1 |
Roof laid |
-
latitude : 26.496556666666667
Longitude : 91.92147666666666
file name : Image_29082024131627755.png
|
2024-08-29 13:16:28.166487 |
56 |
87829139 |
Solar light at Kaikara Mazid Chowk |
31200 |
Solar light at Kaikara Mazid Chowk1 |
Plinth level |
-
latitude : 26.496509999999997
Longitude : 91.92148666666665
file name : Image_29082024130908111.png
|
2024-08-29 13:09:08.310761 |
57 |
87829139 |
Solar light at Kaikara Mazid Chowk |
31200 |
Solar light at Kaikara Mazid Chowk1 |
Completion of work |
-
latitude : 26.46558055
Longitude : 91.92168177
file name : Image_03112023080904093.png
|
2023-11-03 08:09:04.162203 |
58 |
75834331 |
Construction of Sand Gravelling Road from Mukut Sarma Paduli to Tapas Sarma Paduli Via Rajib Sarma P |
100000 |
Construction of Sand Gravelling Road from Mukut Sarma Paduli to Tapas Sarma Paduli Via Rajib Sarma P1 |
Roof laid |
-
latitude : 26.53448655,26.53448644
Longitude : 91.89088374,91.89088405
file name : Image_20032024070931566.png
|
2024-03-20 07:09:31.660995 |
59 |
75834331 |
Construction of Sand Gravelling Road from Mukut Sarma Paduli to Tapas Sarma Paduli Via Rajib Sarma P |
100000 |
Construction of Sand Gravelling Road from Mukut Sarma Paduli to Tapas Sarma Paduli Via Rajib Sarma P1 |
Plinth level |
-
latitude : 26.53448413,26.53448454
Longitude : 91.89089557,91.89089442
file name : Image_19032024100754547.png
|
2024-03-19 10:07:54.647479 |
60 |
75834331 |
Construction of Sand Gravelling Road from Mukut Sarma Paduli to Tapas Sarma Paduli Via Rajib Sarma P |
100000 |
Construction of Sand Gravelling Road from Mukut Sarma Paduli to Tapas Sarma Paduli Via Rajib Sarma P1 |
Completion of work |
-
latitude : 26.48548032,26.48558907
Longitude : 91.93170874,91.93170977
file name : Image_27052023135226105.png
|
2023-05-27 13:52:26.178224 |
61 |
74198965 |
Water Supply to villages |
83006 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.53448314
Longitude : 91.89088823
file name : Image_29122023072939913.png
|
2023-12-29 07:29:39.989369 |
62 |
65516688 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.48697553
Longitude : 91.9302595
file name : Image_26052023175813298.png
|
2023-05-26 17:58:13.378242 |
63 |
65516688 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48706677
Longitude : 91.93030908
file name : Image_01022023171829931.png
|
2023-02-01 17:18:30.000364 |
64 |
74127149 |
Reparing of Patidarrang LP School |
200000 |
Reparing of Patidarrang LP School1 |
Plinth level |
-
latitude : 26.47935016
Longitude : 91.91453014
file name : Image_30062023060234665.png
|
2023-06-30 06:02:34.735444 |
65 |
74127149 |
Reparing of Patidarrang LP School |
200000 |
Reparing of Patidarrang LP School1 |
Completion of work |
-
latitude : 26.47934639
Longitude : 91.91452609
file name : Image_23052023105837050.png
|
2023-05-23 10:58:37.123109 |
66 |
65516731 |
Extention of GP Office Room |
621750 |
Extention of GP Office Room1 |
Plinth level |
-
latitude : 26.49652895
Longitude : 91.92139052
file name : Image_13112023155118577.png
|
2023-11-13 15:51:18.66033 |
67 |
65516731 |
Extention of GP Office Room |
621750 |
Extention of GP Office Room1 |
Completion of work |
-
latitude : 26.4964814
Longitude : 91.9213275
file name : Image_24052023063041775.png
|
2023-05-24 06:30:41.842108 |
68 |
74199843 |
Reparing of Culturel Centre at Kaikara near Siva Mandir |
123000 |
Reparing of Culturel Centre at Kaikara near Siva Mandir 1 |
Plinth level |
-
latitude : 26.46357208
Longitude : 91.91885497
file name : Image_03082023132935883.png
|
2023-08-03 13:29:35.961606 |
69 |
74199843 |
Reparing of Culturel Centre at Kaikara near Siva Mandir |
123000 |
Reparing of Culturel Centre at Kaikara near Siva Mandir 1 |
Completion of work |
-
latitude : 26.4635953
Longitude : 91.91888842
file name : Image_03072023124222775.png
|
2023-07-03 12:42:22.860407 |
70 |
87829182 |
Solar light at Patidarrang Baniyapara Chowk |
31200 |
Solar light at Patidarrang Baniyapara Chowk1 |
Roof laid |
-
latitude : 26.479761666666665
Longitude : 91.93991
file name : Image_01092024072220668.png
|
2024-09-01 07:22:21.080909 |
71 |
87829182 |
Solar light at Patidarrang Baniyapara Chowk |
31200 |
Solar light at Patidarrang Baniyapara Chowk1 |
Plinth level |
-
latitude : 26.479773333333334
Longitude : 91.939995
file name : Image_01092024070708953.png
|
2024-09-01 07:07:09.166859 |
72 |
87829182 |
Solar light at Patidarrang Baniyapara Chowk |
31200 |
Solar light at Patidarrang Baniyapara Chowk1 |
Completion of work |
-
latitude : 26.48013669
Longitude : 91.92002303
file name : Image_13112023131739519.png
|
2023-11-13 13:17:39.593545 |
73 |
87828782 |
Solar light at Lozora Basudev Mandir amrit Sarobar ID 128041 |
150000 |
Solar light at Lozora Basudev Mandir amrit Sarobar ID 1280411 |
Roof laid |
-
latitude : 26.480115
Longitude : 91.93987666666665
file name : Image_01092024084715023.png
|
2024-09-01 08:47:15.730167 |
74 |
87828782 |
Solar light at Lozora Basudev Mandir amrit Sarobar ID 128041 |
150000 |
Solar light at Lozora Basudev Mandir amrit Sarobar ID 1280411 |
Plinth level |
-
latitude : 26.53457435
Longitude : 91.89088723
file name : Image_11012024075043892.png
|
2024-01-11 07:50:43.95224 |
75 |
87828782 |
Solar light at Lozora Basudev Mandir amrit Sarobar ID 128041 |
150000 |
Solar light at Lozora Basudev Mandir amrit Sarobar ID 1280411 |
Completion of work |
-
latitude : 26.53449357
Longitude : 91.89072629
file name : Image_10012024084132541.png
|
2024-01-10 08:41:32.607186 |
76 |
65468164 |
Any other operation and maintenance needs related to solid waste management |
234595 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 26.49706346
Longitude : 91.92120449
file name : Image_28032023135536139.png
|
2023-03-28 13:55:36.227502 |
77 |
74200756 |
Reparing at Rangamancha and culture Centre at Barigaon Near Matiya Gokhaighar |
269000 |
Reparing at Rangamancha and culture Centre at Barigaon Near Matiya Gokhaighar 1 |
Plinth level |
-
latitude : 26.48716378
Longitude : 91.93020923
file name : Image_28092023153544015.png
|
2023-09-28 15:35:44.088649 |
78 |
74200756 |
Reparing at Rangamancha and culture Centre at Barigaon Near Matiya Gokhaighar |
269000 |
Reparing at Rangamancha and culture Centre at Barigaon Near Matiya Gokhaighar 1 |
Completion of work |
-
latitude : 26.48711012
Longitude : 91.93016663
file name : Image_20072023130809353.png
|
2023-07-20 13:08:09.440307 |
79 |
74093046 |
Construction of toilets in public institutions |
51200 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.48908349
Longitude : 91.93705502
file name : Image_17102023142758027.png
|
2023-10-17 14:27:58.109204 |
80 |
74093046 |
Construction of toilets in public institutions |
51200 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.48911223
Longitude : 91.93673542
file name : Image_20072023124625647.png
|
2023-07-20 12:46:25.738192 |
81 |
74127736 |
Hume pipe at Dughdha Sarma Paduli Barigaon |
40000 |
Hume pipe at Dughdha Sarma Paduli Barigaon1 |
Roof laid |
-
latitude : 26.53436865,26.53460452
Longitude : 91.89063677,91.89058506
file name : Image_20032024073329722.png
|
2024-03-20 07:33:29.80015 |
82 |
74127736 |
Hume pipe at Dughdha Sarma Paduli Barigaon |
40000 |
Hume pipe at Dughdha Sarma Paduli Barigaon1 |
Plinth level |
-
latitude : 26.53463275,26.53454907
Longitude : 91.89085335,91.89086775
file name : Image_20032024073043327.png
|
2024-03-20 07:30:43.413436 |
83 |
74127736 |
Hume pipe at Dughdha Sarma Paduli Barigaon |
40000 |
Hume pipe at Dughdha Sarma Paduli Barigaon1 |
Plinth level |
-
latitude : 26.4836348,26.48364097
Longitude : 91.93307888,91.93308125
file name : Image_11092023101702773.png
|
2023-09-11 10:17:02.855934 |
84 |
74127736 |
Hume pipe at Dughdha Sarma Paduli Barigaon |
40000 |
Hume pipe at Dughdha Sarma Paduli Barigaon1 |
Completion of work |
-
latitude : 26.48367894,26.48363055
Longitude : 91.93335256,91.93314159
file name : Image_20072023125708576.png
|
2023-07-20 12:57:08.72385 |
85 |
74092455 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.48695146
Longitude : 91.93035088
file name : Image_11092023101828014.png
|
2023-09-11 10:18:28.091422 |
86 |
74092455 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.48700035
Longitude : 91.9302659
file name : Image_20072023130856332.png
|
2023-07-20 13:08:56.485558 |
87 |
74093775 |
Water Supply to villages |
70450 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.53455146
Longitude : 91.89086913
file name : Image_19122023071454419.png
|
2023-12-19 07:14:54.492682 |
88 |
74093775 |
Water Supply to villages |
70450 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.49669855
Longitude : 91.9239578
file name : Image_17112023091037719.png
|
2023-11-17 09:10:37.786798 |
89 |
74093775 |
Water Supply to villages |
70450 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.49660901
Longitude : 91.92388658
file name : Image_05102023064423473.png
|
2023-10-05 06:44:23.552531 |
90 |
74093775 |
Water Supply to villages |
70450 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.49660901
Longitude : 91.92388658
file name : Image_29092023082101905.png
|
2023-09-29 08:21:01.988026 |
91 |
74094329 |
Water Supply to villages |
70450 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.53455659
Longitude : 91.89086911
file name : Image_19122023071310654.png
|
2023-12-19 07:13:10.729839 |
92 |
74094329 |
Water Supply to villages |
70450 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.4644336
Longitude : 91.90867851
file name : Image_17112023082220993.png
|
2023-11-17 08:22:21.073444 |
93 |
74094329 |
Water Supply to villages |
70450 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.46440869
Longitude : 91.90874701
file name : Image_29092023073258096.png
|
2023-09-29 07:32:58.165029 |
94 |
75788291 |
Water Supply to villages |
70450 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.53450594
Longitude : 91.890851
file name : Image_19122023071002795.png
|
2023-12-19 07:10:02.866696 |
95 |
75788291 |
Water Supply to villages |
70450 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.4749446
Longitude : 91.91646083
file name : Image_17112023084000679.png
|
2023-11-17 08:40:00.747568 |
96 |
75788291 |
Water Supply to villages |
70450 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.47491876
Longitude : 91.91644963
file name : Image_29092023071825969.png
|
2023-09-29 07:18:26.041119 |
97 |
65516736 |
Const of sand Gravelling road from Dinabandhu Club to na Khat Siva Mandir |
41450 |
Const of sand Gravelling road from Dinabandhu Club to na Khat Siva Mandir1 |
Roof laid |
-
latitude : 26.49557222,26.49557186
Longitude : 91.90883806,91.90883921
file name : Image_17112023054632373.png
|
2023-11-17 05:46:32.453161 |
98 |
65516736 |
Const of sand Gravelling road from Dinabandhu Club to na Khat Siva Mandir |
41450 |
Const of sand Gravelling road from Dinabandhu Club to na Khat Siva Mandir1 |
Plinth level |
-
latitude : 26.49558723,26.49557582
Longitude : 91.90883142,91.90886485
file name : Image_05042023105249575.png
|
2023-04-05 10:52:49.651371 |
99 |
65516736 |
Const of sand Gravelling road from Dinabandhu Club to na Khat Siva Mandir |
41450 |
Const of sand Gravelling road from Dinabandhu Club to na Khat Siva Mandir1 |
Completion of work |
-
latitude : 26.49560704,26.49560493,26.49560227
Longitude : 91.90882613,91.90882836,91.90883217
file name : Image_25012023200618217.png
|
2023-01-25 20:06:18.302758 |
100 |
65516733 |
Const of sand gravelling road from Axomi chowk to Garaimari Road |
41450 |
Const of sand gravelling road from Axomi chowk to Garaimari Road1 |
Roof laid |
-
latitude : 26.480026666666664,26.480046666666667
Longitude : 91.93983000000001,91.93983166666666
file name : Image_22082024082646544.png
|
2024-08-22 08:26:46.635952 |
101 |
65516733 |
Const of sand gravelling road from Axomi chowk to Garaimari Road |
41450 |
Const of sand gravelling road from Axomi chowk to Garaimari Road1 |
Plinth level |
-
latitude : 26.480063333333337,26.480076666666665
Longitude : 91.93991499999998,91.93995000000001
file name : Image_22082024082252865.png
|
2024-08-22 08:22:52.946107 |
102 |
65516733 |
Const of sand gravelling road from Axomi chowk to Garaimari Road |
41450 |
Const of sand gravelling road from Axomi chowk to Garaimari Road1 |
Completion of work |
-
latitude : 26.49686698,26.49686694
Longitude : 91.93620296,91.93620266
file name : Image_08022023164543839.png
|
2023-02-08 16:45:43.925494 |
103 |
65516748 |
Const of sand Gravelling Road from Kaikara Dandi Barua Paduli to Jaljali |
41450 |
Const of sand Gravelling Road from Kaikara Dandi Barua Paduli to Jaljali 1 |
Roof laid |
-
latitude : 26.5345097,26.53450973
Longitude : 91.89086026,91.89086026
file name : Image_07122023054457474.png
|
2023-12-07 05:44:57.533991 |
104 |
65516748 |
Const of sand Gravelling Road from Kaikara Dandi Barua Paduli to Jaljali |
41450 |
Const of sand Gravelling Road from Kaikara Dandi Barua Paduli to Jaljali 1 |
Plinth level |
-
latitude : 26.53450966,26.53450964
Longitude : 91.89086004,91.89086003
file name : Image_07122023054156926.png
|
2023-12-07 05:41:56.9886 |
105 |
65516748 |
Const of sand Gravelling Road from Kaikara Dandi Barua Paduli to Jaljali |
41450 |
Const of sand Gravelling Road from Kaikara Dandi Barua Paduli to Jaljali 1 |
Completion of work |
-
latitude : 26.4656501,26.46564635
Longitude : 91.91519255,91.9151915
file name : Image_21022023084355612.png
|
2023-02-21 08:43:55.707266 |
106 |
65516740 |
Const of sand Gravelling Road from Dinendra Barua Paduli To Bishnu Mandir |
41450 |
Const of sand Gravelling Road from Dinendra Barua Paduli To Bishnu Mandir1 |
Plinth level |
-
latitude : 26.470001,26.46892673
Longitude : 91.9323699,91.92951149
file name : Image_05122023063529991.png
|
2023-12-05 06:35:30.076635 |
107 |
65516740 |
Const of sand Gravelling Road from Dinendra Barua Paduli To Bishnu Mandir |
41450 |
Const of sand Gravelling Road from Dinendra Barua Paduli To Bishnu Mandir1 |
Completion of work |
-
latitude : 26.46588828,26.4658857
Longitude : 91.9286711,91.92867312
file name : Image_30012023171818423.png
|
2023-01-30 17:18:18.489468 |
108 |
65509497 |
Cycle Stand at Deomornoi Girls High School Campus |
150000 |
Cycle Stand at Deomornoi Girls High School Campus1 |
Plinth level |
-
latitude : 26.49654467
Longitude : 91.92377943
file name : Image_17102023142902877.png
|
2023-10-17 14:29:02.956821 |
109 |
65509497 |
Cycle Stand at Deomornoi Girls High School Campus |
150000 |
Cycle Stand at Deomornoi Girls High School Campus1 |
Completion of work |
-
latitude : 26.49653219
Longitude : 91.92377009
file name : Image_08052023074652213.png
|
2023-05-08 07:46:52.345024 |
110 |
87828603 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.53450337
Longitude : 91.89081833
file name : Image_28122023081608247.png
|
2023-12-28 08:16:08.319783 |
111 |
87828603 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.47551855
Longitude : 91.93892495
file name : Image_07112023111348499.png
|
2023-11-07 11:13:48.725733 |
112 |
87828641 |
Construction of toilets in public institutions |
72000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.46079163
Longitude : 91.91139954
file name : Image_03112023073537320.png
|
2023-11-03 07:35:37.398976 |
113 |
87828641 |
Construction of toilets in public institutions |
72000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.46078192
Longitude : 91.91126652
file name : Image_16102023125221056.png
|
2023-10-16 12:52:21.136958 |
114 |
74199389 |
Water Supply to villages |
83007 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.53459691
Longitude : 91.89086695
file name : Image_05012024082357250.png
|
2024-01-05 08:23:57.313395 |
115 |
74199174 |
Water Supply to villages |
83006 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.53451344
Longitude : 91.89086576
file name : Image_05012024081505298.png
|
2024-01-05 08:15:05.383084 |
116 |
74197869 |
Water Supply to villages |
83006 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.53459917
Longitude : 91.89087891
file name : Image_05012024082147179.png
|
2024-01-05 08:21:47.246785 |
117 |
87829092 |
Solar Light at Kaushiganga Amrit Sarobar |
150000 |
Solar Light at Kaushiganga Amrit Sarobar1 |
Roof laid |
-
latitude : 26.480165000000003
Longitude : 91.93990833333334
file name : Image_01092024090317302.png
|
2024-09-01 09:03:17.442497 |
118 |
87829092 |
Solar Light at Kaushiganga Amrit Sarobar |
150000 |
Solar Light at Kaushiganga Amrit Sarobar1 |
Plinth level |
-
latitude : 26.48006666666667
Longitude : 91.93998333333333
file name : Image_01092024084836765.png
|
2024-09-01 08:48:37.475483 |
119 |
87829092 |
Solar Light at Kaushiganga Amrit Sarobar |
150000 |
Solar Light at Kaushiganga Amrit Sarobar1 |
Plinth level |
-
latitude : 26.53454303
Longitude : 91.89087518
file name : Image_11012024074843990.png
|
2024-01-11 07:48:44.049177 |
120 |
87829092 |
Solar Light at Kaushiganga Amrit Sarobar |
150000 |
Solar Light at Kaushiganga Amrit Sarobar1 |
Completion of work |
-
latitude : 26.53448735
Longitude : 91.89085044
file name : Image_10012024084322464.png
|
2024-01-10 08:43:22.538282 |
121 |
87828850 |
Solar light at Lozora Amrit sarobar |
150000 |
Solar light at Lozora Amrit sarobar1 |
Roof laid |
-
latitude : 26.480051666666668
Longitude : 91.93986000000001
file name : Image_01092024090144445.png
|
2024-09-01 09:01:44.566339 |
122 |
87828850 |
Solar light at Lozora Amrit sarobar |
150000 |
Solar light at Lozora Amrit sarobar1 |
Plinth level |
-
latitude : 26.53458413
Longitude : 91.89089127
file name : Image_11012024074946048.png
|
2024-01-11 07:49:46.116504 |
123 |
87828850 |
Solar light at Lozora Amrit sarobar |
150000 |
Solar light at Lozora Amrit sarobar1 |
Completion of work |
-
latitude : 26.53448452
Longitude : 91.89084908
file name : Image_10012024084236770.png
|
2024-01-10 08:42:36.836403 |
124 |
87829224 |
Solar light at Deomornoi GP Office Campus |
31200 |
Solar light at Deomornoi GP Office Campus1 |
Completion of work |
-
latitude : 26.5344963
Longitude : 91.89081879
file name : Image_10012024084819883.png
|
2024-01-10 08:48:19.941829 |
125 |
74090622 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.47328761
Longitude : 91.93320117
file name : Image_28122023100835191.png
|
2023-12-28 10:08:35.252573 |
126 |
74090622 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.47326438
Longitude : 91.9332889
file name : Image_13112023130014365.png
|
2023-11-13 13:00:14.43091 |
127 |
73603902 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.48520942
Longitude : 91.91980274
file name : Image_13112023150659192.png
|
2023-11-13 15:06:59.289985 |
128 |
87828622 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.46022735
Longitude : 91.91959341
file name : Image_17112023141955355.png
|
2023-11-17 14:19:55.42011 |
129 |
75986112 |
Any other operation and maintenance needs related to solid waste management |
64644 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 26.49484595
Longitude : 91.92155543
file name : Image_14112023102627134.png
|
2023-11-14 10:26:27.212415 |
130 |
87828936 |
Construction of toilets in public institutions |
114000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.4800226688385
Longitude : 91.9400417804718
file name : Image_21072024080851380.png
|
2024-07-21 08:08:51.456029 |
131 |
87828936 |
Construction of toilets in public institutions |
114000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.46760901
Longitude : 91.91815586
file name : Image_29122023102640937.png
|
2023-12-29 10:26:41.013889 |
132 |
87828936 |
Construction of toilets in public institutions |
114000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.46735312
Longitude : 91.91821863
file name : Image_14112023101141871.png
|
2023-11-14 10:11:41.943092 |
133 |
65516684 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.46469508
Longitude : 91.91883792
file name : Image_10042023151352315.png
|
2023-04-10 15:13:52.423745 |
134 |
65516684 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.4947799
Longitude : 91.9185382
file name : Image_16022023164747306.png
|
2023-02-16 16:47:47.392594 |
135 |
65516684 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.46466544
Longitude : 91.9189648
file name : Image_21022023113044489.png
|
2023-02-21 11:30:44.570496 |
136 |
75802265 |
Reparing of 501 no Pub Barigaon LP School |
121000 |
Reparing of 501 no Pub Barigaon LP School1 |
Plinth level |
-
latitude : 26.479998333333334
Longitude : 91.93993666666665
file name : Image_01082024145354807.png
|
2024-08-01 14:53:54.894387 |
137 |
75802265 |
Reparing of 501 no Pub Barigaon LP School |
121000 |
Reparing of 501 no Pub Barigaon LP School1 |
Plinth level |
-
latitude : 26.480076666666665
Longitude : 91.93989333333333
file name : Image_01082024145339430.png
|
2024-08-01 14:53:39.5351 |
138 |
75802265 |
Reparing of 501 no Pub Barigaon LP School |
121000 |
Reparing of 501 no Pub Barigaon LP School1 |
Completion of work |
-
latitude : 26.48331914
Longitude : 91.93961367
file name : Image_06072023114112486.png
|
2023-07-06 11:41:12.553385 |
139 |
75802265 |
Reparing of 501 no Pub Barigaon LP School |
121000 |
Reparing of 501 no Pub Barigaon LP School1 |
Completion of work |
-
latitude : 26.48331914
Longitude : 91.93961367
file name : Image_06072023114125810.png
|
2023-07-06 11:41:25.875782 |
140 |
65516719 |
Water Supply to villages |
91275 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.53446904
Longitude : 91.89084076
file name : Image_09122023054453486.png
|
2023-12-09 05:44:53.556254 |
141 |
65516719 |
Water Supply to villages |
91275 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.47878056
Longitude : 91.93357868
file name : Image_17112023085556813.png
|
2023-11-17 08:55:56.882858 |
142 |
65516719 |
Water Supply to villages |
91275 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.47879098
Longitude : 91.93353286
file name : Image_13042023100138169.png
|
2023-04-13 10:01:38.239651 |
143 |
65509141 |
Water Supply to villages |
60250 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.53450007
Longitude : 91.89083054
file name : Image_09122023054056389.png
|
2023-12-09 05:40:56.516257 |
144 |
65509141 |
Water Supply to villages |
60250 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.47878141
Longitude : 91.93359603
file name : Image_17112023085441221.png
|
2023-11-17 08:54:41.292255 |
145 |
65509141 |
Water Supply to villages |
60250 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.47883602
Longitude : 91.93355101
file name : Image_20072023130131938.png
|
2023-07-20 13:01:32.052509 |
146 |
65509018 |
Water Supply to villages |
60250 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.53447104
Longitude : 91.89084196
file name : Image_09122023055359628.png
|
2023-12-09 05:53:59.694825 |
147 |
65509018 |
Water Supply to villages |
60250 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.47495317
Longitude : 91.91649903
file name : Image_17112023083742218.png
|
2023-11-17 08:37:42.291264 |
148 |
65509018 |
Water Supply to villages |
60250 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.47501009
Longitude : 91.9165329
file name : Image_20102022112759749.png
|
2022-10-20 11:27:59.866155 |
149 |
65508947 |
Water Supply to villages |
63845 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.53448258
Longitude : 91.8908441
file name : Image_09122023055108976.png
|
2023-12-09 05:51:09.041625 |
150 |
65508947 |
Water Supply to villages |
63845 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.4644189
Longitude : 91.90865427
file name : Image_17112023082342971.png
|
2023-11-17 08:23:43.042021 |
151 |
65508947 |
Water Supply to villages |
63845 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.46446028
Longitude : 91.9087688
file name : Image_18072023174720480.png
|
2023-07-18 17:47:20.575373 |
152 |
65516712 |
Water Supply to villages |
91275 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.53447076
Longitude : 91.89084155
file name : Image_09122023054741505.png
|
2023-12-09 05:47:41.570705 |
153 |
65516712 |
Water Supply to villages |
91275 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.46440726
Longitude : 91.90868091
file name : Image_17112023082120599.png
|
2023-11-17 08:21:20.670907 |
154 |
65516712 |
Water Supply to villages |
91275 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.46443511
Longitude : 91.90870597
file name : Image_21022023114832323.png
|
2023-02-21 11:48:32.399372 |
155 |
65516714 |
Water Supply to villages |
91275 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.53446827
Longitude : 91.89084223
file name : Image_09122023055727630.png
|
2023-12-09 05:57:27.700683 |
156 |
65516714 |
Water Supply to villages |
91275 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.47493935
Longitude : 91.91647754
file name : Image_17112023083857367.png
|
2023-11-17 08:38:57.447349 |
157 |
65516714 |
Water Supply to villages |
91275 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.4749404
Longitude : 91.91643487
file name : Image_15032023100407794.png
|
2023-03-15 10:04:07.863819 |
158 |
65516709 |
Water Supply to villages |
91275 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.53456163
Longitude : 91.89078832
file name : Image_09122023053414330.png
|
2023-12-09 05:34:14.397684 |
159 |
65516709 |
Water Supply to villages |
91275 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.53451638
Longitude : 91.89086277
file name : Image_07122023053815004.png
|
2023-12-07 05:38:15.08071 |
160 |
65516709 |
Water Supply to villages |
91275 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.49667588
Longitude : 91.92392211
file name : Image_17112023090929573.png
|
2023-11-17 09:09:29.674289 |
161 |
65516709 |
Water Supply to villages |
91275 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.49663115
Longitude : 91.92388754
file name : Image_11042023122836208.png
|
2023-04-11 12:28:36.299579 |
162 |
74125871 |
Water Supply to villages |
70450 |
Water Supply to villages1 |
Roof laid |
-
latitude : 26.53455012
Longitude : 91.89086692
file name : Image_19122023071128965.png
|
2023-12-19 07:11:29.039185 |
163 |
74125871 |
Water Supply to villages |
70450 |
Water Supply to villages1 |
Plinth level |
-
latitude : 26.47877383
Longitude : 91.93358202
file name : Image_17112023085650531.png
|
2023-11-17 08:56:50.601134 |
164 |
74125871 |
Water Supply to villages |
70450 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.47868544
Longitude : 91.93358061
file name : Image_29092023074509204.png
|
2023-09-29 07:45:09.271427 |
165 |
87828906 |
Construction of toilets in public institutions |
114000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.49658593
Longitude : 91.92142684
file name : Image_29122023112934722.png
|
2023-12-29 11:29:34.797335 |
166 |
65516725 |
Creation of a new source of drinking water |
49400 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.48906667
Longitude : 91.93711738
file name : Image_21112023123126553.png
|
2023-11-21 12:31:26.630602 |
167 |
65516725 |
Creation of a new source of drinking water |
49400 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.48909959
Longitude : 91.93706552
file name : Image_26052023173048108.png
|
2023-05-26 17:30:48.196855 |
168 |
87829404 |
Sand Gravelling Road Ananta Sarma Paduli Jadav Sarma Paduli |
120000 |
Sand Gravelling Road Ananta Sarma Paduli Jadav Sarma Paduli1 |
Plinth level |
-
latitude : 26.49648849,26.48279206
Longitude : 91.92139488,91.93269623
file name : Image_28112023145130451.png
|
2023-11-28 14:51:30.518621 |
169 |
87829404 |
Sand Gravelling Road Ananta Sarma Paduli Jadav Sarma Paduli |
120000 |
Sand Gravelling Road Ananta Sarma Paduli Jadav Sarma Paduli1 |
Completion of work |
-
latitude : 26.4816002,26.4816002,26.48295621,26.48282884
Longitude : 91.929693,91.929693,91.93290482,91.9327202
file name : Image_22112023115437371.png
|
2023-11-22 11:54:37.441482 |
170 |
65516653 |
AWC Reparing At Lara Chuba |
85000 |
AWC Reparing At Lara Chuba1 |
Plinth level |
-
latitude : 26.48552232
Longitude : 91.92004042
file name : Image_10042023141627051.png
|
2023-04-10 14:16:27.148891 |
171 |
65516653 |
AWC Reparing At Lara Chuba |
85000 |
AWC Reparing At Lara Chuba1 |
Completion of work |
-
latitude : 26.48545001
Longitude : 91.91991981
file name : Image_20012023161403886.png
|
2023-01-20 16:14:03.984216 |
172 |
65516653 |
AWC Reparing At Lara Chuba |
85000 |
AWC Reparing At Lara Chuba1 |
Completion of work |
-
latitude : 26.48545001
Longitude : 91.91991981
file name : Image_20012023161408806.png
|
2023-01-20 16:14:08.877053 |
173 |
65516644 |
AWC Reparing at kumarpara near LP school |
85000 |
AWC Reparing at kumarpara near LP school1 |
Roof laid |
-
latitude : 26.53441019
Longitude : 91.89093103
file name : Image_10012024202958528.png
|
2024-01-10 20:29:58.589392 |
174 |
65516644 |
AWC Reparing at kumarpara near LP school |
85000 |
AWC Reparing at kumarpara near LP school1 |
Plinth level |
-
latitude : 26.49671723
Longitude : 91.93332481
file name : Image_10042023165802289.png
|
2023-04-10 16:58:02.38399 |
175 |
65516644 |
AWC Reparing at kumarpara near LP school |
85000 |
AWC Reparing at kumarpara near LP school1 |
Completion of work |
-
latitude : 26.49666599
Longitude : 91.93336504
file name : Image_07022023083201932.png
|
2023-02-07 08:32:02.118851 |
176 |
65516677 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.46892637
Longitude : 91.92952653
file name : Image_05122023070348998.png
|
2023-12-05 07:03:49.080119 |
177 |
65516677 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.49561779
Longitude : 91.92176917
file name : Image_23112023140453787.png
|
2023-11-23 14:04:53.861439 |
178 |
65516677 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.49478608
Longitude : 91.91845121
file name : Image_25022023135208718.png
|
2023-02-25 13:52:08.790851 |
179 |
65468232 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.53447817
Longitude : 91.89086085
file name : Image_06122023204208283.png
|
2023-12-06 20:42:08.351288 |
180 |
65468232 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.5345415
Longitude : 91.89076846
file name : Image_06122023203708091.png
|
2023-12-06 20:37:08.169825 |
181 |
65468232 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.49765906
Longitude : 91.92613721
file name : Image_25112022125806981.png
|
2022-11-25 12:58:07.074134 |
182 |
64792213 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.534575
Longitude : 91.89082237
file name : Image_06122023202822409.png
|
2023-12-06 20:28:22.485171 |
183 |
64792213 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.53457404
Longitude : 91.89081679
file name : Image_06122023202607345.png
|
2023-12-06 20:26:07.426141 |
184 |
64792213 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.49528635
Longitude : 91.92261397
file name : Image_28032023135529849.png
|
2023-03-28 13:55:29.935474 |
185 |
64792213 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.49528635
Longitude : 91.92261397
file name : Image_28032023135541285.png
|
2023-03-28 13:55:41.373293 |
186 |
65516697 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.53459264
Longitude : 91.8908359
file name : Image_06122023201808078.png
|
2023-12-06 20:18:08.149219 |
187 |
65516697 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.47902313
Longitude : 91.91360301
file name : Image_20012023161358943.png
|
2023-01-20 16:13:59.019732 |
188 |
65516697 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.47900787
Longitude : 91.91354641
file name : Image_04012023111858936.png
|
2023-01-04 11:18:59.027052 |
189 |
74126331 |
Water Supply to villages |
49400 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.49681647
Longitude : 91.9216838
file name : Image_30052023111048264.png
|
2023-05-30 11:10:48.337253 |
190 |
87828879 |
Construction of toilets in public institutions |
114000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.48730655
Longitude : 91.93210413
file name : Image_02022024124040731.png
|
2024-02-02 12:40:40.814466 |
191 |
75851779 |
Construction of toilets in public institutions |
80415 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.46544649
Longitude : 91.91889162
file name : Image_31082023112014576.png
|
2023-08-31 11:20:14.660139 |
192 |
75851779 |
Construction of toilets in public institutions |
80415 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.46553097
Longitude : 91.91892882
file name : Image_12072023120257455.png
|
2023-07-12 12:02:57.532592 |
193 |
75850545 |
Construction of Community Sanitary Complex |
96966 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.46052388
Longitude : 91.9211455
file name : Image_28082023123705396.png
|
2023-08-28 12:37:05.47365 |
194 |
75850545 |
Construction of Community Sanitary Complex |
96966 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.46052501
Longitude : 91.92108674
file name : Image_12072023120109002.png
|
2023-07-12 12:01:09.078408 |
195 |
65516744 |
Const of sand Gravelling Road from Krisak Samabay Club to Peddy Field |
41450 |
Const of sand Gravelling Road from Krisak Samabay Club to Peddy Field1 |
Roof laid |
-
latitude : 26.46890424,26.4689042
Longitude : 91.92952911,91.92952895
file name : Image_05122023072004420.png
|
2023-12-05 07:20:04.496738 |
196 |
65516744 |
Const of sand Gravelling Road from Krisak Samabay Club to Peddy Field |
41450 |
Const of sand Gravelling Road from Krisak Samabay Club to Peddy Field1 |
Plinth level |
-
latitude : 26.46891742,26.46891559
Longitude : 91.92951925,91.92951652
file name : Image_05122023064817128.png
|
2023-12-05 06:48:17.1971 |
197 |
65516744 |
Const of sand Gravelling Road from Krisak Samabay Club to Peddy Field |
41450 |
Const of sand Gravelling Road from Krisak Samabay Club to Peddy Field1 |
Completion of work |
-
latitude : 26.48096736,26.48096839,26.48096839
Longitude : 91.93706797,91.93706305,91.93706305
file name : Image_13022023102315913.png
|
2023-02-13 10:23:15.981324 |
198 |
76119252 |
Cost of Sand gravelling road from kaikara field to Amrit sarobar |
158843 |
Cost of Sand gravelling road from kaikara field to Amrit sarobar1 |
Roof laid |
-
latitude : 26.53457101,26.5345711
Longitude : 91.89089245,91.89089235
file name : Image_20032024071943550.png
|
2024-03-20 07:19:43.624141 |
199 |
76119252 |
Cost of Sand gravelling road from kaikara field to Amrit sarobar |
158843 |
Cost of Sand gravelling road from kaikara field to Amrit sarobar1 |
Plinth level |
-
latitude : 26.53455593,26.53455576
Longitude : 91.89090053,91.89090057
file name : Image_20032024071712870.png
|
2024-03-20 07:17:12.953172 |
200 |
76119252 |
Cost of Sand gravelling road from kaikara field to Amrit sarobar |
158843 |
Cost of Sand gravelling road from kaikara field to Amrit sarobar1 |
Completion of work |
-
latitude : 26.46095961,26.46081403
Longitude : 91.92292996,91.92286214
file name : Image_27052023125909380.png
|
2023-05-27 12:59:09.450228 |
201 |
74131641 |
Hume pipe at Lozora Main Road to Khata Chuburi Connected Road |
40000 |
Hume pipe at Lozora Main Road to Khata Chuburi Connected Road1 |
Plinth level |
-
latitude : 26.47236702,26.47235256
Longitude : 91.92646141,91.92645293
file name : Image_07072023083029846.png
|
2023-07-07 08:30:29.940512 |
202 |
74131641 |
Hume pipe at Lozora Main Road to Khata Chuburi Connected Road |
40000 |
Hume pipe at Lozora Main Road to Khata Chuburi Connected Road1 |
Completion of work |
-
latitude : 26.47232868,26.47231612
Longitude : 91.92647022,91.9264753
file name : Image_31052023094545913.png
|
2023-05-31 09:45:45.987159 |
203 |
87828819 |
Solar light at Kaikara amrit sarobar 118299 |
150000 |
Solar light at Kaikara amrit sarobar 1182991 |
Roof laid |
-
latitude : 26.49648
Longitude : 91.92146166666667
file name : Image_29082024133634981.png
|
2024-08-29 13:36:35.537108 |
204 |
87828819 |
Solar light at Kaikara amrit sarobar 118299 |
150000 |
Solar light at Kaikara amrit sarobar 1182991 |
Plinth level |
-
latitude : 26.496551666666665
Longitude : 91.92132166666667
file name : Image_01082024153223485.png
|
2024-08-01 15:32:23.584063 |
205 |
87828819 |
Solar light at Kaikara amrit sarobar 118299 |
150000 |
Solar light at Kaikara amrit sarobar 1182991 |
Completion of work |
-
latitude : 26.49645666666667
Longitude : 91.92147333333332
file name : Image_03072024134917274.png
|
2024-07-03 13:49:17.356006 |
206 |
87829012 |
Water Supply to villages |
85500 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.43637582
Longitude : 92.03518277
file name : Image_18072024145448676.png
|
2024-07-18 14:54:48.757966 |
207 |
87829050 |
Water Supply to villages |
85500 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.496535
Longitude : 91.9217575
file name : Image_27092024121649466.png
|
2024-09-27 12:16:49.577408 |
208 |
87829050 |
Water Supply to villages |
85500 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.436399221420288
Longitude : 92.03503489494324
file name : Image_18072024145534278.png
|
2024-07-18 14:55:34.432063 |
209 |
87828679 |
Water Supply to villages |
85500 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.4965343
Longitude : 91.921759
file name : Image_27092024121653721.png
|
2024-09-27 12:16:53.804004 |
210 |
87880904 |
Water Supply to villages |
78000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.49646238,26.4964623
Longitude : 91.92141886,91.92141886
file name : Image_17072024123756053.png
|
2024-07-17 12:37:56.124953 |
211 |
87880904 |
Water Supply to villages |
78000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.496453881263733,26.496459245681763
Longitude : 91.92144334316254,91.92142188549042
file name : Image_17072024123352670.png
|
2024-07-17 12:33:52.746184 |
212 |
65509282 |
Creation of a new source of drinking water |
153000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 26.4800226688385
Longitude : 91.93995594978333
file name : Image_21072024080650179.png
|
2024-07-21 08:06:50.251166 |
213 |
65509282 |
Creation of a new source of drinking water |
153000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.48011988
Longitude : 91.94009035
file name : Image_21072024074543800.png
|
2024-07-21 07:45:43.869853 |
214 |
65509282 |
Creation of a new source of drinking water |
153000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.53464783
Longitude : 91.89088753
file name : Image_07052024130416631.png
|
2024-05-07 13:04:16.706072 |
215 |
74195786 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.496525
Longitude : 91.92134
file name : Image_01082024145732669.png
|
2024-08-01 14:57:32.805072 |
216 |
87829252 |
Solar light at Barigaon Gaumor Lakhi Mandir |
31200 |
Solar light at Barigaon Gaumor Lakhi Mandir 1 |
Completion of work |
-
latitude : 26.496503333333333
Longitude : 91.92136833333333
file name : Image_02082024152039500.png
|
2024-08-02 15:20:39.594692 |
217 |
87829252 |
Solar light at Barigaon Gaumor Lakhi Mandir |
31200 |
Solar light at Barigaon Gaumor Lakhi Mandir 1 |
Completion of work |
-
latitude : 26.48730461
Longitude : 91.9321012
file name : Image_02022024124220674.png
|
2024-02-02 12:42:20.750896 |
218 |
87828419 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.496463333333335
Longitude : 91.92140833333333
file name : Image_02082024150816108.png
|
2024-08-02 15:08:16.221819 |