1 |
11300877 |
SOLAR LIGHT AT MAROI GP OFFICE |
55000 |
Street Light1 |
25% |
-
latitude : 26.38281833333333
Longitude : 91.88582333333333
file name : Image_05022019202455822.png
|
2019-02-05 20:24:56.069837 |
2 |
45280238 |
SIDE DRAIN FROM MAJIJUL HOQUE PADULI TO MAROI PADDY FIELD |
122000 |
SIDE DRAIN FROM MAJIJUL HOQUE PADULI TO MAROI PADDY FIELD1 |
Length of Drain executed |
-
latitude : 26.380848333333333,26.380903333333336
Longitude : 91.88580166666667,91.88581500000001
file name : Image_08022021120236089.png
|
2021-02-08 12:02:36.167319 |
3 |
45375343 |
URINAL SET WITH HAND TUBEWELL AT KHANDAJAN CHOWK NEAR PUBLIC LAND |
100000 |
URINAL SET WITH HAND TUBEWELL AT KHANDAJAN CHOWK NEAR PUBLIC LAND1 |
25% |
-
latitude : 26.352085000000002
Longitude : 91.85712
file name : Image_04032021140929485.png
|
2021-03-04 14:09:29.598833 |
4 |
45372221 |
CONST OF CULVERT AT JAYANTA NATH PADULI TO NH 15 NEAR UPEN NATH PADULI |
122000 |
CONST OF CULVERT AT JAYANTA NATH PADULI TO NH 15 NEAR UPEN NATH PADULI1 |
Substructure below GL |
-
latitude : 26.355986666666663,26.356006666666666
Longitude : 91.86428666666667,91.86428499999998
file name : Image_25012021130318056.png
|
2021-01-25 13:03:18.13203 |
5 |
45372223 |
WATER TANK AT SUTIYAKATA MASJID PUBLIC LAND |
150000 |
WATER TANK AT SUTIYAKATA MASJID PUBLIC LAND1 |
Basement |
-
latitude : 26.342296666666666
Longitude : 91.85766833333334
file name : Image_27042021133037407.png
|
2021-04-27 13:30:37.49574 |
6 |
44560588 |
CONST OF BOUNDARY WALL AT ALIKASH PURANA MASJID |
100000 |
CONST OF BOUNDARY WALL AT ALIKASH PURANA MASJID1 |
In Progress |
-
latitude : 26.380115
Longitude : 91.88469166666667
file name : Image_06022021144801183.png
|
2021-02-06 14:48:01.262603 |
7 |
45375384 |
URINAL SET WITH HAND TUBEWELL AT BARUAHPARA HARI MANDIR |
100000 |
URINAL SET WITH HAND TUBEWELL AT BARUAHPARA HARI MANDIR1 |
25% |
-
latitude : 26.368530000000003
Longitude : 91.883165
file name : Image_13042021143214710.png
|
2021-04-13 14:32:14.781525 |
8 |
45375491 |
URINAL SET WITH HAND TUBEWELL AT NO 2 MASZID CHUTIYAKATA |
122000 |
URINAL SET WITH HAND TUBEWELL AT NO 2 MASZID CHUTIYAKATA1 |
25% |
-
latitude : 26.334605000000003
Longitude : 91.855435
file name : Image_27042021150648187.png
|
2021-04-27 15:06:48.253851 |
9 |
45375446 |
CONST OF HUME PIPE WITH SAND GRAVELLING AT PAKARITALL ZIARUDDIN AHMED HOUSE ROAD |
130000 |
CONST OF HUME PIPE WITH SAND GRAVELLING AT PAKARITALL ZIARUDDIN AHMED HOUSE ROAD1 |
Substructure below GL |
-
latitude : 26.388651666666668,26.388651666666668
Longitude : 91.88471,91.88471
file name : Image_27042021150746852.png
|
2021-04-27 15:07:46.917489 |
10 |
45375242 |
UNDER GROUND PIPE LINE FROM NH 15 TO BARUAHPARA BHARGURIPARA ROAD NEAR KHAGEN DAS LAND |
122000 |
UNDER GROUND PIPE LINE FROM NH 15 TO BARUAHPARA BHARGURIPARA ROAD NEAR KHAGEN DAS LAND1 |
25% |
-
latitude : 26.372226666666666,26.372225000000004
Longitude : 91.88088,91.88089999999998
file name : Image_05042021132052912.png
|
2021-04-05 13:20:52.976108 |
11 |
45375019 |
CONST OF BOUNDARY WALL AND GATE AT DAKHIN MAROI MAJU CHUBA JAMA MASJID |
150000 |
CONST OF BOUNDARY WALL AND GATE AT DAKHIN MAROI MAJU CHUBA JAMA MASJID1 |
In Progress |
-
latitude : 26.379126666666668
Longitude : 91.88000166666667
file name : Image_25012021130312221.png
|
2021-01-25 13:03:12.282936 |
12 |
45374973 |
BOUNDARY WALL AT ALIKASH PURANA MAKTAB NORTH SIDE |
150000 |
BOUNDARY WALL AT ALIKASH PURANA MAKTAB NORTH SIDE1 |
In Progress |
-
latitude : 26.38029166666667
Longitude : 91.88480666666668
file name : Image_06022021145014695.png
|
2021-02-06 14:50:14.772626 |
13 |
44560903 |
CONST OF BRAHMAN CHUBA CONNECTING ROAD TO RAJA KHOT VIA DEUL CONNECTING ROAD VIA HEMESWAR NATH HOUSE |
128000 |
CONST OF BRAHMAN CHUBA CONNECTING ROAD TO RAJA KHOT VIA DEUL CONNECTING ROAD VIA HEMESWAR NATH HOUSE1 |
25% |
-
latitude : 26.35787833333333,26.357873333333334
Longitude : 91.86367833333334,91.86366833333335
file name : Image_04032021140938193.png
|
2021-03-04 14:09:38.258904 |
14 |
44560212 |
SAND GRAVELLING ROAD FROM PAKARITAL TO JIARUDDIN PADULI |
178000 |
SAND GRAVELLING ROAD FROM PAKARITAL TO JIARUDDIN PADULI1 |
25% |
-
latitude : 26.388674999999996,26.38866833333333
Longitude : 91.88485833333334,91.88486833333333
file name : Image_27042021151014416.png
|
2021-04-27 15:10:14.517818 |
15 |
44560334 |
SAND GRAVELLING ROAD FROM MAROI MANOIGHAT ROAD TO CHANDEIPARA ROAD VIA HOWDAPARA CHUBA |
178000 |
SAND GRAVELLING ROAD FROM MAROI MANOIGHAT ROAD TO CHANDEIPARA ROAD VIA HOWDAPARA CHUBA1 |
25% |
-
latitude : 26.3827,26.3827
Longitude : 91.88035333333333,91.88035333333333
file name : Image_17022021150556309.png
|
2021-02-17 15:05:56.382787 |
16 |
44560307 |
SIDE DRAIN FROM AIRUDDIN ALI HOUSE TO IKRAMUL ALI PADULI (PH III ) |
128000 |
SIDE DRAIN FROM AIRUDDIN ALI HOUSE TO IKRAMUL ALI PADULI (PH III )1 |
25% |
-
latitude : 26.383773333333338,26.383811666666663
Longitude : 91.88354,91.88353666666666
file name : Image_05012021124808659.png
|
2021-01-05 12:48:08.740485 |
17 |
44333391 |
CONST OF CULVERT AT FAKITIPARA CONNECTING ROAD |
100000 |
CONST OF CULVERT AT FAKITIPARA CONNECTING ROAD 1 |
Substructure below GL |
-
latitude : 26.380995,26.381028333333333
Longitude : 91.88113833333334,91.88119666666668
file name : Image_16032021125330362.png
|
2021-03-16 12:53:30.44671 |
18 |
44333210 |
CONST OF ROAD WITH SAND GRAVELLING FROM MAJIBAR ALI HOUSE TO MAHIBUR ALI HOUSE |
70000 |
CONST OF ROAD WITH SAND GRAVELLING FROM MAJIBAR ALI HOUSE TO MAHIBUR ALI HOUSE1 |
25% |
-
latitude : 26.382178333333332,26.38207333333333
Longitude : 91.88158,91.88174666666667
file name : Image_16032021130234639.png
|
2021-03-16 13:02:34.708384 |
19 |
45374930 |
BOUNDARY WALL AT MAROI HAFIZIA MADRASSA PUBLIC LAND |
150000 |
BOUNDARY WALL AT MAROI HAFIZIA MADRASSA PUBLIC LAND1 |
In Progress |
-
latitude : 26.3826236
Longitude : 91.8859659
file name : Image_12042021124940657.png
|
2021-04-12 12:49:40.744277 |
20 |
45374819 |
GARD WALL AT MAROI MANAIGHAT ROAD TO MAHSAN ALI PADULI NEAR IMRAN ALI PADULI |
150000 |
GARD WALL AT MAROI MANAIGHAT ROAD TO MAHSAN ALI PADULI NEAR IMRAN ALI PADULI1 |
In Progress |
-
latitude : 26.383108333333332
Longitude : 91.87842500000001
file name : Image_17022021151920285.png
|
2021-02-17 15:19:20.357482 |
21 |
45374747 |
URINAL SET WITH HAND TUBEWELL AT CHANDEIPARA HARI MANDIR PUBLIC LAND |
122000 |
URINAL SET WITH HAND TUBEWELL AT CHANDEIPARA HARI MANDIR PUBLIC LAND1 |
25% |
-
latitude : 26.38715
Longitude : 91.88545666666666
file name : Image_02032021123447746.png
|
2021-03-02 12:34:47.826352 |
22 |
44560943 |
SAND GRAVELLING ROAD FROM MAKARA CHUBA PATH TO TANKESWAR NATH PADULI |
128000 |
SAND GRAVELLING ROAD FROM MAKARA CHUBA PATH TO TANKESWAR NATH PADULI1 |
25% |
-
latitude : 26.34896833333333,26.34896833333333
Longitude : 91.85965666666668,91.85964666666665
file name : Image_16112020150707258.png
|
2020-11-16 15:07:13.47123 |
23 |
44555276 |
CONST OF BOUNDARY WALL AT SANDEIPARA LP SCHOOL |
100000 |
CONST OF BOUNDARY WALL AT SANDEIPARA LP SCHOOL1 |
In Progress |
-
latitude : 26.386846666666663
Longitude : 91.88592333333332
file name : Image_17112020143737600.png
|
2020-11-17 14:37:37.682037 |
24 |
44559412 |
SAND GRAVELLING OF ROAD FROM NH 15 TO PAKADALI CONNECTING ROAD VIA MENAGHAR CHUBURI |
240000 |
SAND GRAVELLING OF ROAD FROM NH 15 TO PAKADALI CONNECTING ROAD VIA MENAGHAR CHUBURI1 |
25% |
-
latitude : 26.383226666666662,26.383248333333334
Longitude : 91.88646500000002,91.88645166666666
file name : Image_17112020143129398.png
|
2020-11-17 14:31:29.471411 |
25 |
44560811 |
SAND GRAVELLING FROM MAROI SUWARI SATRA CONNECTING ROAD TO MAIKAN DAS PADULI VIA DAHARANI DAS PADULI |
50000 |
SAND GRAVELLING FROM MAROI SUWARI SATRA CONNECTING ROAD TO MAIKAN DAS PADULI VIA DAHARANI DAS PADULI1 |
25% |
-
latitude : 26.37574833333333,26.37576166666667
Longitude : 91.88003666666667,91.88002499999999
file name : Image_04032021141527402.png
|
2021-03-04 14:15:27.466392 |
26 |
44560525 |
CONST OF CULVERT AT MANDIR ROAD NEAR RAJEN KALITA |
100000 |
CONST OF CULVERT AT MANDIR ROAD NEAR RAJEN KALITA1 |
Substructure below GL |
-
latitude : 26.379524999999997,26.37958
Longitude : 91.88685500000001,91.88687
file name : Image_16112020152422324.png
|
2020-11-16 15:24:28.544813 |
27 |
44559544 |
CONST OF SANITATION WITH HAND TUBEWELL AT SAMAHARA HARI MANDIR |
122348 |
CONST OF SANITATION WITH HAND TUBEWELL AT SAMAHARA HARI MANDIR1 |
25% |
-
latitude : 26.372093333333336
Longitude : 91.88530833333334
file name : Image_17112020140128630.png
|
2020-11-17 14:01:28.714108 |
28 |
44559334 |
SAND GRAVELLING AT ROAD FROM SWAHID NILARAM DAS PATH CONNECTING ROAD TO NAKUL DAS PADULI |
110000 |
SAND GRAVELLING AT ROAD FROM SWAHID NILARAM DAS PATH CONNECTING ROAD TO NAKUL DAS PADULI1 |
25% |
-
latitude : 26.375488333333337,26.375488333333337
Longitude : 91.88347666666665,91.88347666666665
file name : Image_05042021132953147.png
|
2021-04-05 13:29:53.221292 |
29 |
44559334 |
SAND GRAVELLING AT ROAD FROM SWAHID NILARAM DAS PATH CONNECTING ROAD TO NAKUL DAS PADULI |
110000 |
SAND GRAVELLING AT ROAD FROM SWAHID NILARAM DAS PATH CONNECTING ROAD TO NAKUL DAS PADULI1 |
25% |
-
latitude : 26.37546166666667,26.375481666666662
Longitude : 91.88349833333332,91.88351166666668
file name : Image_17112020140040372.png
|
2020-11-17 14:00:40.441901 |
30 |
44331617 |
CONST OF ROAD WITH SAND GRAVELLING FROM SUTIAKATA NANOI MATHAURI TO SIRAJUL ALI PADULI |
155800 |
CONST OF ROAD WITH SAND GRAVELLING FROM SUTIAKATA NANOI MATHAURI TO SIRAJUL ALI PADULI1 |
25% |
-
latitude : 26.33548166666667,26.33548166666667
Longitude : 91.85596666666667,91.85596666666667
file name : Image_27042021150644092.png
|
2021-04-27 15:06:44.162278 |
31 |
44334210 |
CONST OF BOUNDARY WALL AT CHUTIAKATA LP SCHOOL |
150000 |
CONST OF BOUNDARY WALL AT CHUTIAKATA LP SCHOOL1 |
In Progress |
-
latitude : 26.33989166666667
Longitude : 91.85713
file name : Image_27042021150634511.png
|
2021-04-27 15:06:34.579117 |
32 |
44330315 |
CONST OF BOUNDARY WALL OF ONE AND ONLY BURIAL GROUND AT SIPAJHAR (KINAPUKHURI) |
125800 |
CONST OF BOUNDARY WALL OF ONE AND ONLY BURIAL GROUND AT SIPAJHAR (KINAPUKHURI)1 |
In Progress |
-
latitude : 26.393525
Longitude : 91.88392
file name : Image_04022021151608294.png
|
2021-02-04 15:16:08.40093 |
33 |
44331137 |
SAND GRAVELLING AT ROAD FROM ABID ALI TINIALI CHOWK TO ADAM ALI CHUBURI VIA NINGINA PARA CHUBURI |
125800 |
SAND GRAVELLING AT ROAD FROM ABID ALI TINIALI CHOWK TO ADAM ALI CHUBURI VIA NINGINA PARA CHUBURI1 |
25% |
-
latitude : 26.37902,26.379018333333338
Longitude : 91.87809166666666,91.87808500000001
file name : Image_07122020140724369.png
|
2020-12-07 14:07:24.426674 |
34 |
44332101 |
CULVERT AT MERIYAPARA CHUBURI ROAD VIA SHABUDDIN ALI HOUSE |
70000 |
CULVERT AT MERIYAPARA CHUBURI ROAD VIA SHABUDDIN ALI HOUSE1 |
Substructure below GL |
-
latitude : 26.381595,26.381576666666668
Longitude : 91.88152333333333,91.88152999999998
file name : Image_16032021125724048.png
|
2021-03-16 12:57:24.132275 |
35 |
44332895 |
CONST OF CULVERT NEAR ISLAM ALI PADULI |
50000 |
CONST OF CULVERT NEAR ISLAM ALI PADULI1 |
Substructure below GL |
-
latitude : 26.382559999999998,26.382551666666668
Longitude : 91.87736000000001,91.87729833333333
file name : Image_17022021151523667.png
|
2021-02-17 15:15:23.738114 |
36 |
44333749 |
CONST OF ROAD WITH SAND GRAVELLING FROM PULI JAMARTAL CONNECTING ROAD TO FPS SHOP VIA RIYAJ ALI HOUS |
150000 |
CONST OF ROAD WITH SAND GRAVELLING FROM PULI JAMARTAL CONNECTING ROAD TO FPS SHOP VIA RIYAJ ALI HOUS1 |
25% |
-
latitude : 26.379211666666667,26.379223333333336,26.379223333333336
Longitude : 91.88055666666666,91.88055833333334,91.88055833333334
file name : Image_07122020140729624.png
|
2020-12-07 14:07:29.681449 |
37 |
44334124 |
CONST OF ROAD WITH SAND GRAVELLING FROM TANKESWAR SARMA HOUSE TO HEMEN SARMA HOUSE VIA GOPAL NATH HO |
200000 |
CONST OF ROAD WITH SAND GRAVELLING FROM TANKESWAR SARMA HOUSE TO HEMEN SARMA HOUSE VIA GOPAL NATH HO1 |
25% |
-
latitude : 26.356600000000004,26.356600000000004
Longitude : 91.86477833333332,91.86477833333332
file name : Image_04032021140933908.png
|
2021-03-04 14:09:33.974033 |
38 |
44330953 |
R/C WITH SAND GRAVELLING NH 15 CONNECTING ROAD TO JADUPARA CONNECTING ROAD VIA ISLAM ALI PADULI |
218236 |
R/C WITH SAND GRAVELLING NH 15 CONNECTING ROAD TO JADUPARA CONNECTING ROAD VIA ISLAM ALI PADULI1 |
25% |
-
latitude : 26.378356666666665,26.378331666666668
Longitude : 91.884285,91.88425166666666
file name : Image_13042021143210921.png
|
2021-04-13 14:32:10.992267 |
39 |
44559389 |
REPAIRING OF SUTIAKATA LP SCHOOL |
110000 |
REPAIRING OF SUTIAKATA LP SCHOOL1 |
25% |
-
latitude : 26.3398
Longitude : 91.85721166666666
file name : Image_27042021150135122.png
|
2021-04-27 15:01:35.187383 |
40 |
44555246 |
CONST OF REST HOUSE NEAR KINAPUKHURI SAMABAI SAMITTEE |
100000 |
CONST OF REST HOUSE NEAR KINAPUKHURI SAMABAI SAMITTEE1 |
25% |
-
latitude : 26.39350833333333
Longitude : 91.88481833333331
file name : Image_16112020152428400.png
|
2020-11-16 15:24:34.626561 |
41 |
44559434 |
SAND GRAVELLING OF ROAD FROM GANDHI JAYANTI ROAD TO PATHARIGHAT CONNECTING ROAD VIA KHETENGPARA |
240000 |
SAND GRAVELLING OF ROAD FROM GANDHI JAYANTI ROAD TO PATHARIGHAT CONNECTING ROAD VIA KHETENGPARA1 |
25% |
-
latitude : 26.383276666666667,26.383276666666667
Longitude : 91.88570499999999,91.88570499999999
file name : Image_17112020143302401.png
|
2020-11-17 14:33:02.482009 |
42 |
44559521 |
CONST OF CYCLE STAND KINAPUKHURIPAR NEAR SAMABAI SAMITTEE |
100000 |
CONST OF CYCLE STAND KINAPUKHURIPAR NEAR SAMABAI SAMITTEE1 |
25% |
-
latitude : 26.393433333333338
Longitude : 91.88497000000001
file name : Image_17112020095228201.png
|
2020-11-17 09:52:28.297433 |
43 |
44560764 |
SAND GRAVELLING ROAD FROM NH 15 TAPAN DAS PADULI TO KUKESWAR DAS PADULI VIA MANIRAM DAS |
128000 |
SAND GRAVELLING ROAD FROM NH 15 TAPAN DAS PADULI TO KUKESWAR DAS PADULI VIA MANIRAM DAS1 |
25% |
-
latitude : 26.376498333333334,26.376498333333334
Longitude : 91.88228833333332,91.88229166666666
file name : Image_04032021142500236.png
|
2021-03-04 14:25:00.307212 |
44 |
44560713 |
CONST OF CULVERT AT ADAM ALI CHUBURI TINIALI CHOWK |
100000 |
CONST OF CULVERT AT ADAM ALI CHUBURI TINIALI CHOWK1 |
Substructure below GL |
-
latitude : 26.3829551,26.3829551
Longitude : 91.8792507,91.8792507
file name : Image_17112020142304201.png
|
2020-11-17 14:23:04.288397 |
45 |
44560654 |
SAND GRAVELLING FROM NH 15 JADAV DAS HOUSE TO MAROI SUWARI SATRA CONNECTING ROAD VIA RAHMAN ALI HOUS |
128000 |
SAND GRAVELLING FROM NH 15 JADAV DAS HOUSE TO MAROI SUWARI SATRA CONNECTING ROAD VIA RAHMAN ALI HOUS1 |
25% |
-
latitude : 26.37899333333333,26.37900833333333,26.379014999999995
Longitude : 91.883925,91.88393166666668,91.88393333333333
file name : Image_16112020150711177.png
|
2020-11-16 15:07:17.399064 |
46 |
44559260 |
CONST OF BOUNDARY WALL AND GATE AT MADINATUL ULUM HAFIJA MADRASSA |
130000 |
CONST OF BOUNDARY WALL AND GATE AT MADINATUL ULUM HAFIJA MADRASSA1 |
In Progress |
-
latitude : 26.378969999999995
Longitude : 91.87953166666667
file name : Image_25012021130307151.png
|
2021-01-25 13:03:07.215446 |
47 |
44559242 |
CONST OF SIDE DRAIN FROM NH 15 TO KALITAPARA HARI MANDIR |
110000 |
CONST OF SIDE DRAIN FROM NH 15 TO KALITAPARA HARI MANDIR1 |
Length of Drain executed |
-
latitude : 26.379196666666665,26.379216666666668
Longitude : 91.88529166666667,91.88529166666667
file name : Image_01032021121220674.png
|
2021-03-01 12:12:20.737254 |
48 |
44331249 |
SAND GRAVELLING OF ROAD FROM NH 15 TO BHUPEN NATH PADULI |
155800 |
SAND GRAVELLING OF ROAD FROM NH 15 TO BHUPEN NATH PADULI1 |
25% |
-
latitude : 26.36526333333334,26.365270000000002
Longitude : 91.87438333333333,91.87439
file name : Image_21122020134822995.png
|
2020-12-21 13:48:23.108781 |
49 |
44330197 |
CONST OF REPAIRING KHETENGPARA MADRASSA |
200000 |
CONST OF REPAIRING KHETENGPARA MADRASSA1 |
25% |
-
latitude : 26.389961666666668
Longitude : 91.88534833333333
file name : Image_27042021150651637.png
|
2021-04-27 15:06:51.702301 |
50 |
44330197 |
CONST OF REPAIRING KHETENGPARA MADRASSA |
200000 |
CONST OF REPAIRING KHETENGPARA MADRASSA1 |
25% |
-
latitude : 26.389958333333333
Longitude : 91.88526166666666
file name : Image_01122020114613992.png
|
2020-12-01 11:46:14.135144 |
51 |
44330639 |
CONST OF MINI SIDE DRAIN MENAGHAR CHUBURI ROAD NASIRUDDIN AHMED PADULI TO SABED ALI PADULI |
155800 |
CONST OF MINI SIDE DRAIN MENAGHAR CHUBURI ROAD NASIRUDDIN AHMED PADULI TO SABED ALI PADULI1 |
25% |
-
latitude : 26.383485000000004,26.383451666666662
Longitude : 91.88309499999998,91.88324166666668
file name : Image_06032021135720145.png
|
2021-03-06 13:57:20.230206 |
52 |
44330746 |
CONST OF SIDE DRAIN FROM SHOWKAT ALI PADULI TO SUKAPARA CHUBA |
160800 |
CONST OF SIDE DRAIN FROM SHOWKAT ALI PADULI TO SUKAPARA CHUBA1 |
25% |
-
latitude : 26.382805,26.382828333333336
Longitude : 91.88015333333333,91.88016999999999
file name : Image_17022021150809768.png
|
2021-02-17 15:08:09.827138 |
53 |
44331499 |
CONST OF ROAD FROM NH 15 TO NARIKALI PATHARIGHAT CONNECTING ROAD (BAMAN CHUBA WITH PAVER BLOCK ) |
155800 |
CONST OF ROAD FROM NH 15 TO NARIKALI PATHARIGHAT CONNECTING ROAD (BAMAN CHUBA WITH PAVER BLOCK )1 |
Earth Work |
-
latitude : 26.35749333333333,26.35749333333333
Longitude : 91.86364666666665,91.86364666666665
file name : Image_04032021140942595.png
|
2021-03-04 14:09:42.671613 |
54 |
44331786 |
SAND GRAVELLING ROAD FROM JAMARTAL TO MULLAPARA MASJID CONNECTING ROAD |
93070 |
SAND GRAVELLING ROAD FROM JAMARTAL TO MULLAPARA MASJID CONNECTING ROAD1 |
25% |
-
latitude : 26.385416666666668,26.385416666666668
Longitude : 91.88608,91.88608166666667
file name : Image_17022021124314410.png
|
2021-02-17 12:43:14.507702 |
55 |
44331871 |
CONST OF SAND GRAVELLING ROAD FROM GANDHI JAYANTI CONNECTING ROAD TO NAJIR ALI HOUSE WITH 1 NOS CULV |
100000 |
CONST OF SAND GRAVELLING ROAD FROM GANDHI JAYANTI CONNECTING ROAD TO NAJIR ALI HOUSE WITH 1 NOS CULV1 |
25% |
-
latitude : 26.38438833333333,26.384380000000004
Longitude : 91.88287333333334,91.88287333333334
file name : Image_18032021122144235.png
|
2021-03-18 12:21:44.372095 |
56 |
44331932 |
CONST OF SAND GRAVELLING ROAD FROM SAHABUL ALI HOUSE TO BAKUL TALL CHOWK |
100000 |
CONST OF SAND GRAVELLING ROAD FROM SAHABUL ALI HOUSE TO BAKUL TALL CHOWK1 |
25% |
-
latitude : 26.382115,26.382123333333332
Longitude : 91.88110333333334,91.8811
file name : Image_16032021125022214.png
|
2021-03-16 12:50:22.298436 |
57 |
44332619 |
CONST OF BOUNDARY WALL AT KINAPUKHURIPAR KABARSTHAN ( PH-2 ) |
150000 |
CONST OF BOUNDARY WALL AT KINAPUKHURIPAR KABARSTHAN ( PH-2 )1 |
In Progress |
-
latitude : 26.394458333333333
Longitude : 91.88490666666667
file name : Image_04022021152102257.png
|
2021-02-04 15:21:02.327897 |
58 |
44332719 |
CONST OF ROAD WITH SAND GRAVELLING FROM KHETENGPARA JAM E MASJID TO MAHBAT ALI HOUSE |
80000 |
CONST OF ROAD WITH SAND GRAVELLING FROM KHETENGPARA JAM E MASJID TO MAHBAT ALI HOUSE1 |
25% |
-
latitude : 26.389898333333335,26.389884999999996
Longitude : 91.885095,91.88508666666667
file name : Image_01122020114618439.png
|
2020-12-01 11:46:18.52912 |
59 |
44333083 |
CONST OF SIDE DRAIN FROM MATLIB ALI PADULI TO EMAN ALI PADULI |
100000 |
CONST OF SIDE DRAIN FROM MATLIB ALI PADULI TO EMAN ALI PADULI1 |
25% |
-
latitude : 26.384045,26.384036666666663
Longitude : 91.88020666666668,91.88021666666667
file name : Image_17022021151101773.png
|
2021-02-17 15:11:01.834643 |
60 |
44333460 |
CONST OF ROAD WITH SAND GRAVELLING FROM SAIFUDDIN ALI HOUSE TO MAKIBAR ALI PADULI |
150000 |
CONST OF ROAD WITH SAND GRAVELLING FROM SAIFUDDIN ALI HOUSE TO MAKIBAR ALI PADULI1 |
25% |
-
latitude : 26.381611666666664,26.38160833333333
Longitude : 91.879265,91.87926333333334
file name : Image_16032021131416216.png
|
2021-03-16 13:14:16.29373 |
61 |
44333820 |
CONST OF ROAD WITH SAND GRAVELLING FROM NH 15 TO AFAZ ALI CHOWK TO GHAROA SONAPUR CONNECTING ROAD |
100000 |
CONST OF ROAD WITH SAND GRAVELLING FROM NH 15 TO AFAZ ALI CHOWK TO GHAROA SONAPUR CONNECTING ROAD1 |
25% |
-
latitude : 26.379208333333334,26.379206666666665
Longitude : 91.88205666666666,91.88205833333335
file name : Image_16032021125018014.png
|
2021-03-16 12:50:18.105232 |
62 |
44334039 |
CONST OF ROAD WITH SAND GRAVELLING FROM RATUL BORA HOUSE TO BARUAPARA HARI MANDIR CONNECTING ROAD VI |
150000 |
CONST OF ROAD WITH SAND GRAVELLING FROM RATUL BORA HOUSE TO BARUAPARA HARI MANDIR CONNECTING ROAD VI1 |
25% |
-
latitude : 26.370479999999997,26.370479999999997
Longitude : 91.88101499999999,91.88101499999999
file name : Image_18032021122149603.png
|
2021-03-18 12:21:49.739105 |
63 |
44333953 |
CONST OF ROAD WITH SAND GRAVELLING FROM MAROI SUWARI SATRA CONNECTING ROAD TO JITEN DAS PADULI VIA N |
100000 |
CONST OF ROAD WITH SAND GRAVELLING FROM MAROI SUWARI SATRA CONNECTING ROAD TO JITEN DAS PADULI VIA N1 |
25% |
-
latitude : 26.376848333333335,26.376851666666667
Longitude : 91.88006833333333,91.880055
file name : Image_04032021140946904.png
|
2021-03-04 14:09:46.971324 |
64 |
44333882 |
CONST OF ROAD WITH SAND GRAVELLING FROM MAROI SUWARI SATRA CONNECTING ROAD TO THAGIRAM DAS PADULI VI |
150000 |
CONST OF ROAD WITH SAND GRAVELLING FROM MAROI SUWARI SATRA CONNECTING ROAD TO THAGIRAM DAS PADULI VI1 |
25% |
-
latitude : 26.376348333333333,26.376348333333333
Longitude : 91.87995833333335,91.87995833333335
file name : Image_04032021141249418.png
|
2021-03-04 14:12:49.484402 |
65 |
44560431 |
R/C FROM NH 15 HARI MANDIR CONNECTING ROAD TO MANAB ALI PADULI VIA IBRAHIM ALI PADULI |
136000 |
R/C FROM NH 15 HARI MANDIR CONNECTING ROAD TO MANAB ALI PADULI VIA IBRAHIM ALI PADULI1 |
Earth Work |
-
latitude : 26.37845666666666,26.37845666666666
Longitude : 91.88526333333333,91.88526333333333
file name : Image_07122020123623354.png
|
2020-12-07 12:36:23.437632 |
66 |
64999149 |
Operation & maintenance of drinking water supply system |
76166 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 26.38288
Longitude : 91.8858882
file name : Image_14062024143952218.png
|
2024-06-14 14:39:52.268443 |
67 |
64999149 |
Operation & maintenance of drinking water supply system |
76166 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 26.382879
Longitude : 91.8858973
file name : Image_14062024143206705.png
|
2024-06-14 14:32:06.752896 |
68 |
64999149 |
Operation & maintenance of drinking water supply system |
76166 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 26.3828797
Longitude : 91.8858895
file name : Image_14062024141738211.png
|
2024-06-14 14:17:38.259343 |
69 |
64999149 |
Operation & maintenance of drinking water supply system |
76166 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.382833
Longitude : 91.8859096
file name : Image_05042024140636569.png
|
2024-04-05 14:06:36.625035 |
70 |
64999576 |
COVI 19 SANITATION PROGRAMME |
91341 |
COVI 19 SANITATION PROGRAMME1 |
Roof laid |
-
latitude : 26.382879
Longitude : 91.8858941
file name : Image_12062024145040203.png
|
2024-06-12 14:50:40.263387 |
71 |
64999576 |
COVI 19 SANITATION PROGRAMME |
91341 |
COVI 19 SANITATION PROGRAMME1 |
Plinth level |
-
latitude : 26.3828791
Longitude : 91.8858971
file name : Image_12062024144516189.png
|
2024-06-12 14:45:16.245036 |
72 |
64999576 |
COVI 19 SANITATION PROGRAMME |
91341 |
COVI 19 SANITATION PROGRAMME1 |
Completion of work |
-
latitude : 26.383054736070335
Longitude : 91.88587130047381
file name : Image_29102022150124876.png
|
2022-10-29 15:01:24.955483 |
73 |
64999054 |
Operation & maintenance of drinking water supply system |
76166 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.371698011644185
Longitude : 91.88098196871579
file name : Image_07112022135820581.png
|
2022-11-07 13:58:20.650481 |
74 |
66968796 |
REPAIRING OF MAROI KALITAPARA SAMUHIK KENDRA |
150000 |
REPAIRING OF MAROI KALITAPARA SAMUHIK KENDRA1 |
Roof laid |
-
latitude : 26.396138803102076
Longitude : 91.9018404185772
file name : Image_04122023154410765.png
|
2023-12-04 15:44:10.813132 |
75 |
66968796 |
REPAIRING OF MAROI KALITAPARA SAMUHIK KENDRA |
150000 |
REPAIRING OF MAROI KALITAPARA SAMUHIK KENDRA1 |
Plinth level |
-
latitude : 26.39621030073613
Longitude : 91.90171577967703
file name : Image_04122023152827820.png
|
2023-12-04 15:28:27.876044 |
76 |
66968796 |
REPAIRING OF MAROI KALITAPARA SAMUHIK KENDRA |
150000 |
REPAIRING OF MAROI KALITAPARA SAMUHIK KENDRA1 |
Completion of work |
-
latitude : 26.3784431386739
Longitude : 91.88678408972919
file name : Image_22032023124414137.png
|
2023-03-22 12:44:14.196797 |
77 |
64998395 |
Operation & maintenance of drinking water supply system |
24000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 26.3828793
Longitude : 91.8858908
file name : Image_14062024141151824.png
|
2024-06-14 14:11:51.886838 |
78 |
64998395 |
Operation & maintenance of drinking water supply system |
24000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 26.3828784
Longitude : 91.8858891
file name : Image_14062024130657783.png
|
2024-06-14 13:06:57.838027 |
79 |
64998395 |
Operation & maintenance of drinking water supply system |
24000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.37185387313366
Longitude : 91.88099227845669
file name : Image_17042023144059017.png
|
2023-04-17 14:40:59.101322 |
80 |
65003300 |
REPAIRING OF SANDEIPARA LP SCHOOL |
131000 |
REPAIRING OF SANDEIPARA LP SCHOOL1 |
Roof laid |
-
latitude : 26.386939622461796
Longitude : 91.88597020693123
file name : Image_13062024171452413.png
|
2024-06-13 17:14:52.46902 |
81 |
65003300 |
REPAIRING OF SANDEIPARA LP SCHOOL |
131000 |
REPAIRING OF SANDEIPARA LP SCHOOL1 |
Plinth level |
-
latitude : 26.38694243039936
Longitude : 91.88587582670152
file name : Image_30122023111628491.png
|
2023-12-30 11:16:28.55388 |
82 |
65003300 |
REPAIRING OF SANDEIPARA LP SCHOOL |
131000 |
REPAIRING OF SANDEIPARA LP SCHOOL1 |
Completion of work |
-
latitude : 26.387032577767968
Longitude : 91.88592779450119
file name : Image_02012023141647281.png
|
2023-01-02 14:16:47.335829 |
83 |
66638368 |
REPAIRING OF GP OFFICE TOILET WITH WATER SUPPLY DRAINAGE AND EARTH FILLING |
70000 |
REPAIRING OF GP OFFICE TOILET WITH WATER SUPPLY DRAINAGE AND EARTH FILLING 1 |
Roof laid |
-
latitude : 26.3828559
Longitude : 91.8859097
file name : Image_29122023120151010.png
|
2023-12-29 12:01:51.065019 |
84 |
66638368 |
REPAIRING OF GP OFFICE TOILET WITH WATER SUPPLY DRAINAGE AND EARTH FILLING |
70000 |
REPAIRING OF GP OFFICE TOILET WITH WATER SUPPLY DRAINAGE AND EARTH FILLING 1 |
Plinth level |
-
latitude : 26.3828558
Longitude : 91.8859163
file name : Image_29122023115019689.png
|
2023-12-29 11:50:19.822611 |
85 |
66638368 |
REPAIRING OF GP OFFICE TOILET WITH WATER SUPPLY DRAINAGE AND EARTH FILLING |
70000 |
REPAIRING OF GP OFFICE TOILET WITH WATER SUPPLY DRAINAGE AND EARTH FILLING 1 |
Completion of work |
-
latitude : 26.3826107
Longitude : 91.8860923
file name : Image_23012023164740113.png
|
2023-01-23 16:47:40.202384 |
86 |
88593780 |
SAND GRAVELLING OF ROAD FROM MAROI GHARUWA SONAPUR BORDER ROAD TO MAHTAB ALI HOUSE VIA SAYADUR ALI |
100000 |
SAND GRAVELLING OF ROAD FROM MAROI GHARUWA SONAPUR BORDER ROAD TO MAHTAB ALI HOUSE VIA SAYADUR ALI 1 |
Roof laid |
-
latitude : 26.3961295,26.3961295,26.385828559286892
Longitude : 91.9012182,91.9012182,91.8857304006815
file name : Image_31082024140614434.png
|
2024-08-31 14:06:14.552895 |
87 |
88593780 |
SAND GRAVELLING OF ROAD FROM MAROI GHARUWA SONAPUR BORDER ROAD TO MAHTAB ALI HOUSE VIA SAYADUR ALI |
100000 |
SAND GRAVELLING OF ROAD FROM MAROI GHARUWA SONAPUR BORDER ROAD TO MAHTAB ALI HOUSE VIA SAYADUR ALI 1 |
Plinth level |
-
latitude : 26.3961368,26.3961362,26.385828559286892
Longitude : 91.9012164,91.9012169,91.8857304006815
file name : Image_31082024135805429.png
|
2024-08-31 13:58:06.254903 |
88 |
88593780 |
SAND GRAVELLING OF ROAD FROM MAROI GHARUWA SONAPUR BORDER ROAD TO MAHTAB ALI HOUSE VIA SAYADUR ALI |
100000 |
SAND GRAVELLING OF ROAD FROM MAROI GHARUWA SONAPUR BORDER ROAD TO MAHTAB ALI HOUSE VIA SAYADUR ALI 1 |
Plinth level |
-
latitude : 26.3828978,26.3828966
Longitude : 91.8858739,91.8858797
file name : Image_01082024130340320.png
|
2024-08-01 13:03:40.375243 |
89 |
88593780 |
SAND GRAVELLING OF ROAD FROM MAROI GHARUWA SONAPUR BORDER ROAD TO MAHTAB ALI HOUSE VIA SAYADUR ALI |
100000 |
SAND GRAVELLING OF ROAD FROM MAROI GHARUWA SONAPUR BORDER ROAD TO MAHTAB ALI HOUSE VIA SAYADUR ALI 1 |
Completion of work |
-
latitude : 26.382419387809932,26.38244692236185
Longitude : 91.87739945948124,91.87739409506321
file name : Image_25012024132500382.png
|
2024-01-25 13:25:00.445156 |
90 |
64999024 |
Operation & maintenance of drinking water supply system |
76166 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 26.3828793
Longitude : 91.8858908
file name : Image_14062024141454914.png
|
2024-06-14 14:14:54.969966 |
91 |
64999024 |
Operation & maintenance of drinking water supply system |
76166 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 26.3828791
Longitude : 91.885892
file name : Image_14062024130357844.png
|
2024-06-14 13:03:57.914898 |
92 |
64999024 |
Operation & maintenance of drinking water supply system |
76166 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.481147184967995
Longitude : 91.88265533186495
file name : Image_30062023091549497.png
|
2023-06-30 09:15:49.578091 |
93 |
64998930 |
Operation & maintenance of drinking water supply system |
76170 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.3832926
Longitude : 91.8865869
file name : Image_01082023124705450.png
|
2023-08-01 12:47:05.516784 |
94 |
88606696 |
Creation of Small-bore pipe conveyance system |
90000 |
Creation of Small-bore pipe conveyance system1 |
Roof laid |
-
latitude : 26.3828791
Longitude : 91.885892
file name : Image_13062024131719931.png
|
2024-06-13 13:17:19.984117 |
95 |
88606696 |
Creation of Small-bore pipe conveyance system |
90000 |
Creation of Small-bore pipe conveyance system1 |
Plinth level |
-
latitude : 26.367675703950226
Longitude : 91.88215090893209
file name : Image_03022024141220124.png
|
2024-02-03 14:12:20.179944 |
96 |
88606696 |
Creation of Small-bore pipe conveyance system |
90000 |
Creation of Small-bore pipe conveyance system1 |
Completion of work |
-
latitude : 26.367860692553222
Longitude : 91.88224352896214
file name : Image_06012024122742273.png
|
2024-01-06 12:27:42.331758 |
97 |
88943463 |
CONST OF CULVERT IN THE ROAD OF RAMPARA HARI MANDIR TO BARUAPARA CHUBURI (INTEREST FUND20-21TO22-23) |
246384 |
CONST OF CULVERT IN THE ROAD OF RAMPARA HARI MANDIR TO BARUAPARA CHUBURI (INTEREST FUND20-21TO22-23)1 |
Roof laid |
-
latitude : 26.36625446844846,26.366247008554637
Longitude : 91.88032952137291,91.88037805259228
file name : Image_13062024162715439.png
|
2024-06-13 16:27:15.498288 |
98 |
88943463 |
CONST OF CULVERT IN THE ROAD OF RAMPARA HARI MANDIR TO BARUAPARA CHUBURI (INTEREST FUND20-21TO22-23) |
246384 |
CONST OF CULVERT IN THE ROAD OF RAMPARA HARI MANDIR TO BARUAPARA CHUBURI (INTEREST FUND20-21TO22-23)1 |
Plinth level |
-
latitude : 26.366338999941945,26.36629109736532
Longitude : 91.88053973950446,91.88045298680663
file name : Image_24012024134740758.png
|
2024-01-24 13:47:40.815428 |
99 |
88943463 |
CONST OF CULVERT IN THE ROAD OF RAMPARA HARI MANDIR TO BARUAPARA CHUBURI (INTEREST FUND20-21TO22-23) |
246384 |
CONST OF CULVERT IN THE ROAD OF RAMPARA HARI MANDIR TO BARUAPARA CHUBURI (INTEREST FUND20-21TO22-23)1 |
Completion of work |
-
latitude : 26.366282925009727,26.366174295544624
Longitude : 91.88043639063835,91.88049606978893
file name : Image_30122023152907630.png
|
2023-12-30 15:29:07.682854 |
100 |
88606388 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.356161693111062
Longitude : 91.86757704243064
file name : Image_10072024153644172.png
|
2024-07-10 15:36:44.246563 |
101 |
88606388 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.356149958446622
Longitude : 91.86736900359392
file name : Image_29012024151451681.png
|
2024-01-29 15:14:51.745592 |
102 |
65003343 |
REPAIRING OF BIJULIBARI JESMIN CLUB |
121000 |
REPAIRING OF BIJULIBARI JESMIN CLUB1 |
Roof laid |
-
latitude : 26.39629416167736
Longitude : 91.9018039572984
file name : Image_04122023141803064.png
|
2023-12-04 14:18:03.120346 |
103 |
65003343 |
REPAIRING OF BIJULIBARI JESMIN CLUB |
121000 |
REPAIRING OF BIJULIBARI JESMIN CLUB1 |
Plinth level |
-
latitude : 26.396124218590558
Longitude : 91.90164386294782
file name : Image_04122023140452112.png
|
2023-12-04 14:04:52.180253 |
104 |
65003343 |
REPAIRING OF BIJULIBARI JESMIN CLUB |
121000 |
REPAIRING OF BIJULIBARI JESMIN CLUB1 |
Completion of work |
-
latitude : 26.37726669665426
Longitude : 91.8828568328172
file name : Image_31122022143837310.png
|
2022-12-31 14:38:37.375129 |
105 |
66973123 |
Construction of Community Sanitary Complex |
365750 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.35213242843747
Longitude : 91.85667000710964
file name : Image_28122023153937933.png
|
2023-12-28 15:39:38.004697 |
106 |
66973123 |
Construction of Community Sanitary Complex |
365750 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.35217463131994
Longitude : 91.85674410313368
file name : Image_05122023155524282.png
|
2023-12-05 15:55:24.351318 |
107 |
88606408 |
Creation of drainage channel for management of grey water |
286675 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.382204769179225
Longitude : 91.88162351958454
file name : Image_05122023151858874.png
|
2023-12-05 15:18:58.931431 |
108 |
88606333 |
Repair of drainage channel |
186675 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 26.389102153480053
Longitude : 91.88523016870022
file name : Image_05122023161909474.png
|
2023-12-05 16:19:09.531932 |
109 |
88268987 |
Services of Collection & Transportation of waste from household to treatment site |
52500 |
Services of Collection & Transportation of waste from household to treatment site 1 |
Completion of work |
-
latitude : 26.3828549
Longitude : 91.8859388
file name : Image_18122023133553083.png
|
2023-12-18 13:35:53.148724 |
110 |
88606370 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.3783702
Longitude : 91.8835511
file name : Image_20122023130037790.png
|
2023-12-20 13:00:37.845157 |
111 |
88284815 |
Creation of a new source of drinking water |
228708 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 26.3828966
Longitude : 91.8858787
file name : Image_01082024125744771.png
|
2024-08-01 12:57:44.831169 |
112 |
88284815 |
Creation of a new source of drinking water |
228708 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.378944711759686
Longitude : 91.87976349145174
file name : Image_03012024143248312.png
|
2024-01-03 14:32:48.374771 |
113 |
88284815 |
Creation of a new source of drinking water |
228708 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.3770388
Longitude : 91.8804711
file name : Image_12122023145048250.png
|
2023-12-12 14:50:48.326924 |
114 |
88301381 |
EXTENTION OF SAND GRAVELLING ROAD FROM SANDEIPARA CONNECTING ROAD TO MOINOI ROAD VIA ABDUL MANNAN HO |
80000 |
EXTENTION OF SAND GRAVELLING ROAD FROM SANDEIPARA CONNECTING ROAD TO MOINOI ROAD VIA ABDUL MANNAN HO1 |
Roof laid |
-
latitude : 26.3961313,26.3961381
Longitude : 91.9012195,91.9012173
file name : Image_31082024134327987.png
|
2024-08-31 13:43:28.6046 |
115 |
88301381 |
EXTENTION OF SAND GRAVELLING ROAD FROM SANDEIPARA CONNECTING ROAD TO MOINOI ROAD VIA ABDUL MANNAN HO |
80000 |
EXTENTION OF SAND GRAVELLING ROAD FROM SANDEIPARA CONNECTING ROAD TO MOINOI ROAD VIA ABDUL MANNAN HO1 |
Roof laid |
-
latitude : 26.3828968,26.3828968
Longitude : 91.8858815,91.8858815
file name : Image_01082024131039220.png
|
2024-08-01 13:10:39.274593 |
116 |
88301381 |
EXTENTION OF SAND GRAVELLING ROAD FROM SANDEIPARA CONNECTING ROAD TO MOINOI ROAD VIA ABDUL MANNAN HO |
80000 |
EXTENTION OF SAND GRAVELLING ROAD FROM SANDEIPARA CONNECTING ROAD TO MOINOI ROAD VIA ABDUL MANNAN HO1 |
Plinth level |
-
latitude : 26.386539596132934,26.38659072574228
Longitude : 91.87981579452753,91.87989533878863
file name : Image_15062024134947409.png
|
2024-06-15 13:49:47.478054 |
117 |
88301381 |
EXTENTION OF SAND GRAVELLING ROAD FROM SANDEIPARA CONNECTING ROAD TO MOINOI ROAD VIA ABDUL MANNAN HO |
80000 |
EXTENTION OF SAND GRAVELLING ROAD FROM SANDEIPARA CONNECTING ROAD TO MOINOI ROAD VIA ABDUL MANNAN HO1 |
Completion of work |
-
latitude : 26.38657433912158,26.386639466509223
Longitude : 91.87977681867778,91.87978411093354
file name : Image_09012024145005539.png
|
2024-01-09 14:50:05.585984 |
118 |
88301534 |
SAND GRAVELLING OF ROAD FROM SIPAJHAR PATHARIGHAT ROAD TO ENAMUL ALI HOUSE |
80000 |
SAND GRAVELLING OF ROAD FROM SIPAJHAR PATHARIGHAT ROAD TO ENAMUL ALI HOUSE1 |
Roof laid |
-
latitude : 26.3828797,26.3828797,26.3828793
Longitude : 91.8858895,91.8858895,91.8858908
file name : Image_13062024123924464.png
|
2024-06-13 12:39:24.528387 |
119 |
88301534 |
SAND GRAVELLING OF ROAD FROM SIPAJHAR PATHARIGHAT ROAD TO ENAMUL ALI HOUSE |
80000 |
SAND GRAVELLING OF ROAD FROM SIPAJHAR PATHARIGHAT ROAD TO ENAMUL ALI HOUSE1 |
Plinth level |
-
latitude : 26.3828793,26.3828793,26.3828791
Longitude : 91.8858908,91.8858908,91.885892
file name : Image_13062024123145174.png
|
2024-06-13 12:31:45.24969 |
120 |
88301534 |
SAND GRAVELLING OF ROAD FROM SIPAJHAR PATHARIGHAT ROAD TO ENAMUL ALI HOUSE |
80000 |
SAND GRAVELLING OF ROAD FROM SIPAJHAR PATHARIGHAT ROAD TO ENAMUL ALI HOUSE1 |
Completion of work |
-
latitude : 26.395378983579576,26.395350191742182
Longitude : 91.88503311015666,91.88505817204714
file name : Image_19122023163011572.png
|
2023-12-19 16:30:11.668888 |
121 |
88983920 |
CONSTRUCTION OF SILAFALAKAM |
30000 |
CONSTRUCTION OF SILAFALAKAM 1 |
Roof laid |
-
latitude : 26.377445734106004
Longitude : 91.8819331470877
file name : Image_13062024164706935.png
|
2024-06-13 16:47:06.989982 |
122 |
88983920 |
CONSTRUCTION OF SILAFALAKAM |
30000 |
CONSTRUCTION OF SILAFALAKAM 1 |
Plinth level |
-
latitude : 26.38288
Longitude : 91.8858882
file name : Image_13062024145426149.png
|
2024-06-13 14:54:26.212453 |
123 |
88983920 |
CONSTRUCTION OF SILAFALAKAM |
30000 |
CONSTRUCTION OF SILAFALAKAM 1 |
Completion of work |
-
latitude : 26.3774439
Longitude : 91.8820637
file name : Image_22032024130247070.png
|
2024-03-22 13:02:47.131022 |
124 |
64999309 |
Operation & maintenance of drinking water supply system |
76166 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 26.3828802
Longitude : 91.8858874
file name : Image_14062024143328723.png
|
2024-06-14 14:33:28.805139 |
125 |
64999309 |
Operation & maintenance of drinking water supply system |
76166 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 26.3828797
Longitude : 91.8858895
file name : Image_14062024142028299.png
|
2024-06-14 14:20:28.354009 |
126 |
64999309 |
Operation & maintenance of drinking water supply system |
76166 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.336557720787823
Longitude : 91.85636524111032
file name : Image_01082023170449077.png
|
2023-08-01 17:04:49.147328 |
127 |
65003400 |
CONSTRUCTIO OF CYCLE STAND AT KHANDAJAN HIGH SCHOOL |
150000 |
CONSTRUCTIO OF CYCLE STAND AT KHANDAJAN HIGH SCHOOL1 |
Roof laid |
-
latitude : 26.35271966457367
Longitude : 91.85800231061876
file name : Image_14062024150319561.png
|
2024-06-14 15:03:19.624179 |
128 |
65003400 |
CONSTRUCTIO OF CYCLE STAND AT KHANDAJAN HIGH SCHOOL |
150000 |
CONSTRUCTIO OF CYCLE STAND AT KHANDAJAN HIGH SCHOOL1 |
Plinth level |
-
latitude : 26.352593055926263
Longitude : 91.85796274803579
file name : Image_23112023130819445.png
|
2023-11-23 13:08:19.499653 |
129 |
65003400 |
CONSTRUCTIO OF CYCLE STAND AT KHANDAJAN HIGH SCHOOL |
150000 |
CONSTRUCTIO OF CYCLE STAND AT KHANDAJAN HIGH SCHOOL1 |
Completion of work |
-
latitude : 26.352689992636442
Longitude : 91.85812510550022
file name : Image_10042023143449187.png
|
2023-04-10 14:34:49.256599 |
130 |
65003448 |
CONST OF CULVERT NH 15 CONNECTING ROAD TO JADUPARA CONNECTING ROAD VIA ISLAM ALI PADULI |
100000 |
CONST OF CULVERT NH 15 CONNECTING ROAD TO JADUPARA CONNECTING ROAD VIA ISLAM ALI PADULI1 |
Roof laid |
-
latitude : 26.481138970702887,26.481103389523923
Longitude : 91.88267955556512,91.882562963292
file name : Image_13062024200732078.png
|
2024-06-13 20:07:32.140306 |
131 |
65003448 |
CONST OF CULVERT NH 15 CONNECTING ROAD TO JADUPARA CONNECTING ROAD VIA ISLAM ALI PADULI |
100000 |
CONST OF CULVERT NH 15 CONNECTING ROAD TO JADUPARA CONNECTING ROAD VIA ISLAM ALI PADULI1 |
Plinth level |
-
latitude : 26.3778088,26.3778088
Longitude : 91.8840574,91.8840574
file name : Image_13062024165932605.png
|
2024-06-13 16:59:32.689382 |
132 |
65003448 |
CONST OF CULVERT NH 15 CONNECTING ROAD TO JADUPARA CONNECTING ROAD VIA ISLAM ALI PADULI |
100000 |
CONST OF CULVERT NH 15 CONNECTING ROAD TO JADUPARA CONNECTING ROAD VIA ISLAM ALI PADULI1 |
Completion of work |
-
latitude : 26.378327887505293,26.378395655192435
Longitude : 91.88434093259275,91.88428276218474
file name : Image_31122022144221029.png
|
2022-12-31 14:42:21.09422 |
133 |
65003489 |
S/G OF ROAD FROM PAKADALI CONNECTING ROAD TO OWAD ALI HOUSE VIA KAPILA ALI HOUSE |
110419 |
S/G OF ROAD FROM PAKADALI CONNECTING ROAD TO OWAD ALI HOUSE VIA KAPILA ALI HOUSE1 |
Roof laid |
-
latitude : 26.481116842478514,26.481180796399713,26.481209713965654
Longitude : 91.88266455195844,91.88260621391237,91.88259724527597
file name : Image_13062024201800328.png
|
2024-06-13 20:18:00.385373 |
134 |
65003489 |
S/G OF ROAD FROM PAKADALI CONNECTING ROAD TO OWAD ALI HOUSE VIA KAPILA ALI HOUSE |
110419 |
S/G OF ROAD FROM PAKADALI CONNECTING ROAD TO OWAD ALI HOUSE VIA KAPILA ALI HOUSE1 |
Plinth level |
-
latitude : 26.38300461228937,26.382952476851642
Longitude : 91.88588789664209,91.8818237632513
file name : Image_13062024152151449.png
|
2024-06-13 15:21:51.517145 |
135 |
65003489 |
S/G OF ROAD FROM PAKADALI CONNECTING ROAD TO OWAD ALI HOUSE VIA KAPILA ALI HOUSE |
110419 |
S/G OF ROAD FROM PAKADALI CONNECTING ROAD TO OWAD ALI HOUSE VIA KAPILA ALI HOUSE1 |
Completion of work |
-
latitude : 26.383198401890695,26.38302158564329
Longitude : 91.8858495913446,91.8818686902523
file name : Image_03032023114429568.png
|
2023-03-03 11:44:29.636832 |
136 |
88268847 |
Creation of plastic waste storage unit |
87750 |
Creation of plastic waste storage unit 1 |
Roof laid |
-
latitude : 26.3828808
Longitude : 91.8858916
file name : Image_13062024133209926.png
|
2024-06-13 13:32:10.011082 |
137 |
88268847 |
Creation of plastic waste storage unit |
87750 |
Creation of plastic waste storage unit 1 |
Plinth level |
-
latitude : 26.37807781342417
Longitude : 91.88046413473785
file name : Image_19122023153618611.png
|
2023-12-19 15:36:18.657291 |
138 |
88268847 |
Creation of plastic waste storage unit |
87750 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 26.378095750696957
Longitude : 91.88050562515855
file name : Image_30112023145428527.png
|
2023-11-30 14:54:28.581624 |
139 |
64990633 |
Construction of toilets in public institutions |
274200 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.36620044708252
Longitude : 91.8796616513282
file name : Image_13062024162116281.png
|
2024-06-13 16:21:16.334815 |
140 |
64990633 |
Construction of toilets in public institutions |
274200 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.366069144569337
Longitude : 91.8794221803546
file name : Image_03022024140501265.png
|
2024-02-03 14:05:01.328441 |
141 |
64990633 |
Construction of toilets in public institutions |
274200 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.366033479571342
Longitude : 91.87937130220234
file name : Image_06122023155905237.png
|
2023-12-06 15:59:05.293741 |
142 |
65003370 |
REPAIRING OF 126 NO GALEKHAPARA AWC |
180000 |
REPAIRING OF 126 NO GALEKHAPARA AWC1 |
Roof laid |
-
latitude : 26.378081082366407
Longitude : 91.88031426630914
file name : Image_13062024154829636.png
|
2024-06-13 15:48:29.734302 |
143 |
65003370 |
REPAIRING OF 126 NO GALEKHAPARA AWC |
180000 |
REPAIRING OF 126 NO GALEKHAPARA AWC1 |
Plinth level |
-
latitude : 26.37817684561014
Longitude : 91.88035232014954
file name : Image_29122023162321664.png
|
2023-12-29 16:23:21.726276 |
144 |
65003370 |
REPAIRING OF 126 NO GALEKHAPARA AWC |
180000 |
REPAIRING OF 126 NO GALEKHAPARA AWC1 |
Completion of work |
-
latitude : 26.37810522224754
Longitude : 91.88038081862032
file name : Image_31122022142440193.png
|
2022-12-31 14:24:40.249061 |
145 |
88285130 |
Creation of Small-bore pipe conveyance system |
87800 |
Creation of Small-bore pipe conveyance system1 |
Roof laid |
-
latitude : 26.3828969
Longitude : 91.8858681
file name : Image_31082024132954511.png
|
2024-08-31 13:29:54.946141 |
146 |
88285130 |
Creation of Small-bore pipe conveyance system |
87800 |
Creation of Small-bore pipe conveyance system1 |
Roof laid |
-
latitude : 26.3828968
Longitude : 91.885881
file name : Image_01082024125544703.png
|
2024-08-01 12:55:44.756533 |
147 |
88285130 |
Creation of Small-bore pipe conveyance system |
87800 |
Creation of Small-bore pipe conveyance system1 |
Plinth level |
-
latitude : 26.359390737488866
Longitude : 91.87782743945718
file name : Image_05022024122115811.png
|
2024-02-05 12:21:15.891522 |
148 |
88285130 |
Creation of Small-bore pipe conveyance system |
87800 |
Creation of Small-bore pipe conveyance system1 |
Plinth level |
-
latitude : 26.359254238195717
Longitude : 91.87773968093097
file name : Image_03012024144406685.png
|
2024-01-03 14:44:06.740841 |
149 |
88285130 |
Creation of Small-bore pipe conveyance system |
87800 |
Creation of Small-bore pipe conveyance system1 |
Completion of work |
-
latitude : 26.35913219768554
Longitude : 91.87765443697572
file name : Image_12122023144032697.png
|
2023-12-12 14:40:32.752801 |
150 |
64999413 |
REPAIRING OF MAROI BIJULIBARI HIGH SCHOOL |
174075 |
REPAIRING OF MAROI BIJULIBARI HIGH SCHOOL1 |
Roof laid |
-
latitude : 26.481166798621416
Longitude : 91.88257209956646
file name : Image_13062024204510564.png
|
2024-06-13 20:45:10.630029 |
151 |
64999413 |
REPAIRING OF MAROI BIJULIBARI HIGH SCHOOL |
174075 |
REPAIRING OF MAROI BIJULIBARI HIGH SCHOOL1 |
Plinth level |
-
latitude : 26.377459061332047
Longitude : 91.88179744407535
file name : Image_13062024165110178.png
|
2024-06-13 16:51:10.230696 |
152 |
64999413 |
REPAIRING OF MAROI BIJULIBARI HIGH SCHOOL |
174075 |
REPAIRING OF MAROI BIJULIBARI HIGH SCHOOL1 |
Completion of work |
-
latitude : 26.37749615125358
Longitude : 91.88186332583427
file name : Image_17112022125740024.png
|
2022-11-17 12:57:40.119736 |
153 |
64999413 |
REPAIRING OF MAROI BIJULIBARI HIGH SCHOOL |
174075 |
REPAIRING OF MAROI BIJULIBARI HIGH SCHOOL1 |
Completion of work |
-
latitude : 26.377550717443228
Longitude : 91.88182896003127
file name : Image_12122022152425844.png
|
2022-12-12 15:24:25.903476 |
154 |
65003321 |
REPAIRING OF NARIKALI UTTAR CHUBA 288 NO AWC |
121000 |
REPAIRING OF NARIKALI UTTAR CHUBA 288 NO AWC1 |
Roof laid |
-
latitude : 26.481169313192368
Longitude : 91.88274946063757
file name : Image_13062024213350803.png
|
2024-06-13 21:33:50.869469 |
155 |
65003321 |
REPAIRING OF NARIKALI UTTAR CHUBA 288 NO AWC |
121000 |
REPAIRING OF NARIKALI UTTAR CHUBA 288 NO AWC1 |
Roof laid |
-
latitude : 26.357827722094953
Longitude : 91.86330009251833
file name : Image_29122023124407007.png
|
2023-12-29 12:44:07.057261 |
156 |
65003321 |
REPAIRING OF NARIKALI UTTAR CHUBA 288 NO AWC |
121000 |
REPAIRING OF NARIKALI UTTAR CHUBA 288 NO AWC1 |
Plinth level |
-
latitude : 26.357673075981438
Longitude : 91.86284034512937
file name : Image_10112023133228050.png
|
2023-11-10 13:32:28.11663 |
157 |
65003321 |
REPAIRING OF NARIKALI UTTAR CHUBA 288 NO AWC |
121000 |
REPAIRING OF NARIKALI UTTAR CHUBA 288 NO AWC1 |
Completion of work |
-
latitude : 26.357929268851876
Longitude : 91.8634015135467
file name : Image_23032023151329284.png
|
2023-03-23 15:13:29.350605 |
158 |
64998619 |
Operation & maintenance of drinking water supply system |
42000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 26.3828791
Longitude : 91.885892
file name : Image_14062024143546720.png
|
2024-06-14 14:35:46.797476 |
159 |
64998619 |
Operation & maintenance of drinking water supply system |
42000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 26.382879
Longitude : 91.8858932
file name : Image_14062024140959130.png
|
2024-06-14 14:09:59.183934 |
160 |
64998619 |
Operation & maintenance of drinking water supply system |
42000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.35317584965378
Longitude : 91.86194038018584
file name : Image_23032023154309082.png
|
2023-03-23 15:43:09.138913 |
161 |
66971536 |
SAND GRAVELLING OF ROAD FROM RAGHUNATH SUWARI SATRA CONNECTING ROAD TO ABID ALI PADULI VIA LT BADAR |
121500 |
SAND GRAVELLING OF ROAD FROM RAGHUNATH SUWARI SATRA CONNECTING ROAD TO ABID ALI PADULI VIA LT BADAR 1 |
Roof laid |
-
latitude : 26.37841623276472,26.378377843648195
Longitude : 91.88005660660565,91.87990589998662
file name : Image_13062024154513970.png
|
2024-06-13 15:45:14.054588 |
162 |
66971536 |
SAND GRAVELLING OF ROAD FROM RAGHUNATH SUWARI SATRA CONNECTING ROAD TO ABID ALI PADULI VIA LT BADAR |
121500 |
SAND GRAVELLING OF ROAD FROM RAGHUNATH SUWARI SATRA CONNECTING ROAD TO ABID ALI PADULI VIA LT BADAR 1 |
Plinth level |
-
latitude : 26.37830919586122,26.378397038206458
Longitude : 91.8798794131726,91.87990481033921
file name : Image_29122023162021556.png
|
2023-12-29 16:20:21.616561 |
163 |
66971536 |
SAND GRAVELLING OF ROAD FROM RAGHUNATH SUWARI SATRA CONNECTING ROAD TO ABID ALI PADULI VIA LT BADAR |
121500 |
SAND GRAVELLING OF ROAD FROM RAGHUNATH SUWARI SATRA CONNECTING ROAD TO ABID ALI PADULI VIA LT BADAR 1 |
Completion of work |
-
latitude : 26.378371054306626,26.378414346836507
Longitude : 91.87990321777761,91.87991570681334
file name : Image_23032023144442323.png
|
2023-03-23 14:44:42.387 |
164 |
66972816 |
Construction of toilets in public institutions |
364500 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.393467322923243
Longitude : 91.88499229028821
file name : Image_19122023162438000.png
|
2023-12-19 16:24:38.073915 |
165 |
66971818 |
CONST OF PAVERS BLOCK ROAD FROM MAROI PAKADALI CONNECTING ROAD TO SAHABUL ALI HOUSE VIA LT NAUFAT AL |
487350 |
CONST OF PAVERS BLOCK ROAD FROM MAROI PAKADALI CONNECTING ROAD TO SAHABUL ALI HOUSE VIA LT NAUFAT AL1 |
Roof laid |
-
latitude : 26.38298244215548,26.383019406348467
Longitude : 91.88174371607602,91.88173592090607
file name : Image_13062024152436594.png
|
2024-06-13 15:24:36.649121 |
166 |
66971818 |
CONST OF PAVERS BLOCK ROAD FROM MAROI PAKADALI CONNECTING ROAD TO SAHABUL ALI HOUSE VIA LT NAUFAT AL |
487350 |
CONST OF PAVERS BLOCK ROAD FROM MAROI PAKADALI CONNECTING ROAD TO SAHABUL ALI HOUSE VIA LT NAUFAT AL1 |
Plinth level |
-
latitude : 26.38301391620189,26.383030051365495
Longitude : 91.88174455426633,91.88176416791975
file name : Image_30122023155512400.png
|
2023-12-30 15:55:12.448929 |
167 |
66971818 |
CONST OF PAVERS BLOCK ROAD FROM MAROI PAKADALI CONNECTING ROAD TO SAHABUL ALI HOUSE VIA LT NAUFAT AL |
487350 |
CONST OF PAVERS BLOCK ROAD FROM MAROI PAKADALI CONNECTING ROAD TO SAHABUL ALI HOUSE VIA LT NAUFAT AL1 |
Completion of work |
-
latitude : 26.38311709742993,26.383081935346127
Longitude : 91.88576811924577,91.88180574215949
file name : Image_05122023150818524.png
|
2023-12-05 15:08:18.581283 |
168 |
88301158 |
SAND GRAVELLING OF ROAD FROM RAGHUNATH SUWARI SATRA CONNECTING ROAD TO DURLAV DAS HOUSE VIA DIBAKARD |
91600 |
SAND GRAVELLING OF ROAD FROM RAGHUNATH SUWARI SATRA CONNECTING ROAD TO DURLAV DAS HOUSE VIA DIBAKARD1 |
Roof laid |
-
latitude : 26.3961378,26.3961378
Longitude : 91.9012181,91.9012181
file name : Image_31082024134027817.png
|
2024-08-31 13:40:28.442948 |
169 |
88301158 |
SAND GRAVELLING OF ROAD FROM RAGHUNATH SUWARI SATRA CONNECTING ROAD TO DURLAV DAS HOUSE VIA DIBAKARD |
91600 |
SAND GRAVELLING OF ROAD FROM RAGHUNATH SUWARI SATRA CONNECTING ROAD TO DURLAV DAS HOUSE VIA DIBAKARD1 |
Roof laid |
-
latitude : 26.3828966,26.3828966
Longitude : 91.8858797,91.8858797
file name : Image_01082024130648462.png
|
2024-08-01 13:06:48.519139 |
170 |
88301158 |
SAND GRAVELLING OF ROAD FROM RAGHUNATH SUWARI SATRA CONNECTING ROAD TO DURLAV DAS HOUSE VIA DIBAKARD |
91600 |
SAND GRAVELLING OF ROAD FROM RAGHUNATH SUWARI SATRA CONNECTING ROAD TO DURLAV DAS HOUSE VIA DIBAKARD1 |
Plinth level |
-
latitude : 26.37537888251245,26.375315682962537
Longitude : 91.88079203478992,91.88073797151446
file name : Image_13062024160925986.png
|
2024-06-13 16:09:26.041734 |
171 |
88301158 |
SAND GRAVELLING OF ROAD FROM RAGHUNATH SUWARI SATRA CONNECTING ROAD TO DURLAV DAS HOUSE VIA DIBAKARD |
91600 |
SAND GRAVELLING OF ROAD FROM RAGHUNATH SUWARI SATRA CONNECTING ROAD TO DURLAV DAS HOUSE VIA DIBAKARD1 |
Completion of work |
-
latitude : 26.3783702,26.3783702
Longitude : 91.8835511,91.8835511
file name : Image_20122023130329256.png
|
2023-12-20 13:03:29.311705 |
172 |
88301728 |
CONST OF PAVER BLOCK ROAD FROM MAROI PAKADALI CONNECTING ROAD TO SAHABUL ALI HOUSE VIA LT NOUFAT AL2 |
401600 |
CONST OF PAVER BLOCK ROAD FROM MAROI PAKADALI CONNECTING ROAD TO SAHABUL ALI HOUSE VIA LT NOUFAT AL21 |
Roof laid |
-
latitude : 26.38182955328375,26.381788104772568
Longitude : 91.88123828731477,91.88121900893748
file name : Image_13062024152855698.png
|
2024-06-13 15:28:55.762145 |
173 |
88301728 |
CONST OF PAVER BLOCK ROAD FROM MAROI PAKADALI CONNECTING ROAD TO SAHABUL ALI HOUSE VIA LT NOUFAT AL2 |
401600 |
CONST OF PAVER BLOCK ROAD FROM MAROI PAKADALI CONNECTING ROAD TO SAHABUL ALI HOUSE VIA LT NOUFAT AL21 |
Plinth level |
-
latitude : 26.3822705,26.3822705
Longitude : 91.8812765,91.8812765
file name : Image_30122023161156568.png
|
2023-12-30 16:11:56.623733 |
174 |
88301728 |
CONST OF PAVER BLOCK ROAD FROM MAROI PAKADALI CONNECTING ROAD TO SAHABUL ALI HOUSE VIA LT NOUFAT AL2 |
401600 |
CONST OF PAVER BLOCK ROAD FROM MAROI PAKADALI CONNECTING ROAD TO SAHABUL ALI HOUSE VIA LT NOUFAT AL21 |
Completion of work |
-
latitude : 26.381620466709137,26.381651982665062
Longitude : 91.88123241998255,91.88136225566268
file name : Image_05122023152152706.png
|
2023-12-05 15:21:52.762875 |
175 |
64998143 |
Operation & maintenance of drinking water supply system |
60000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 26.3828793
Longitude : 91.8858908
file name : Image_14062024140514877.png
|
2024-06-14 14:05:14.929899 |
176 |
64998143 |
Operation & maintenance of drinking water supply system |
60000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 26.3828797
Longitude : 91.8858878
file name : Image_14062024125917754.png
|
2024-06-14 12:59:17.818267 |
177 |
64998143 |
Operation & maintenance of drinking water supply system |
60000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.353152212686837
Longitude : 91.86205412261188
file name : Image_29102022152109866.png
|
2022-10-29 15:21:09.928331 |
178 |
64886633 |
REPAIRING OF SIPAJHAR SAMABAI SOMITTEE |
162000 |
REPAIRING OF SIPAJHAR SAMABAI SOMITTEE1 |
Roof laid |
-
latitude : 26.38288
Longitude : 91.8858882
file name : Image_13062024142904011.png
|
2024-06-13 14:29:04.081512 |
179 |
64886633 |
REPAIRING OF SIPAJHAR SAMABAI SOMITTEE |
162000 |
REPAIRING OF SIPAJHAR SAMABAI SOMITTEE1 |
Plinth level |
-
latitude : 26.393555626273155
Longitude : 91.88474259339273
file name : Image_30122023110832375.png
|
2023-12-30 11:08:32.436791 |
180 |
64886633 |
REPAIRING OF SIPAJHAR SAMABAI SOMITTEE |
162000 |
REPAIRING OF SIPAJHAR SAMABAI SOMITTEE1 |
Completion of work |
-
latitude : 26.393413259647787
Longitude : 91.88470847904682
file name : Image_02012023140402454.png
|
2023-01-02 14:04:02.506629 |
181 |
64886675 |
REPAIRING OF MAROI PACHIM CHUA LP SCHOOL |
162000 |
REPAIRING OF MAROI PACHIM CHUA LP SCHOOL1 |
Roof laid |
-
latitude : 26.481169774197042
Longitude : 91.88260914757848
file name : Image_13062024203219121.png
|
2024-06-13 20:32:19.192312 |
182 |
64886675 |
REPAIRING OF MAROI PACHIM CHUA LP SCHOOL |
162000 |
REPAIRING OF MAROI PACHIM CHUA LP SCHOOL1 |
Plinth level |
-
latitude : 26.383211645297706
Longitude : 91.87795761041343
file name : Image_13062024153332455.png
|
2024-06-13 15:33:32.520565 |
183 |
64886675 |
REPAIRING OF MAROI PACHIM CHUA LP SCHOOL |
162000 |
REPAIRING OF MAROI PACHIM CHUA LP SCHOOL1 |
Completion of work |
-
latitude : 26.383226397447288
Longitude : 91.87787144444883
file name : Image_15112022120019007.png
|
2022-11-15 12:00:19.08396 |
184 |
64997954 |
Operation & maintenance of drinking water supply system |
60000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 26.3828792
Longitude : 91.8858953
file name : Image_14062024135738841.png
|
2024-06-14 13:57:38.89373 |
185 |
64997954 |
Operation & maintenance of drinking water supply system |
60000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 26.3828784
Longitude : 91.8858891
file name : Image_14062024125219997.png
|
2024-06-14 12:52:20.046045 |
186 |
64997954 |
Operation & maintenance of drinking water supply system |
60000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.38393349479884
Longitude : 91.88576510176063
file name : Image_24032023133242844.png
|
2023-03-24 13:32:42.91272 |
187 |
64999516 |
SAND GREVELLING OF ROAD FROM BARPUKHURI LP SCHOOL TO (BARUAPARA ROAD) HARI BARUA CONNECTING ROAD |
162000 |
SAND GREVELLING OF ROAD FROM BARPUKHURI LP SCHOOL TO (BARUAPARA ROAD) HARI BARUA CONNECTING ROAD1 |
Plinth level |
-
latitude : 26.372226825915277,26.372196106240153
Longitude : 91.88099554739892,91.88098934479058
file name : Image_13062024163944884.png
|
2024-06-13 16:39:44.937293 |
188 |
64999516 |
SAND GREVELLING OF ROAD FROM BARPUKHURI LP SCHOOL TO (BARUAPARA ROAD) HARI BARUA CONNECTING ROAD |
162000 |
SAND GREVELLING OF ROAD FROM BARPUKHURI LP SCHOOL TO (BARUAPARA ROAD) HARI BARUA CONNECTING ROAD1 |
Completion of work |
-
latitude : 26.372206835076213,26.372172804549336
Longitude : 91.88100904226303,91.88101683743298
file name : Image_10112022130432853.png
|
2022-11-10 13:04:32.903043 |
189 |
64998240 |
Operation & maintenance of drinking water supply system |
42000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 26.481185406446457
Longitude : 91.88221167773008
file name : Image_14062024140749778.png
|
2024-06-14 14:07:49.831529 |
190 |
64998240 |
Operation & maintenance of drinking water supply system |
42000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 26.3828791
Longitude : 91.885892
file name : Image_14062024135920874.png
|
2024-06-14 13:59:20.924702 |
191 |
64998240 |
Operation & maintenance of drinking water supply system |
42000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 26.3828764
Longitude : 91.885891
file name : Image_14062024125514899.png
|
2024-06-14 12:55:14.973832 |
192 |
64998240 |
Operation & maintenance of drinking water supply system |
42000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.3832495
Longitude : 91.8865913
file name : Image_24032023133423578.png
|
2023-03-24 13:34:23.640201 |
193 |
64999549 |
REPAIRING OF SUTIAKATA LP SCHOOL |
162000 |
REPAIRING OF SUTIAKATA LP SCHOOL1 |
Roof laid |
-
latitude : 26.481080129742622
Longitude : 91.88254519365728
file name : Image_13062024212025170.png
|
2024-06-13 21:20:25.239115 |
194 |
64999549 |
REPAIRING OF SUTIAKATA LP SCHOOL |
162000 |
REPAIRING OF SUTIAKATA LP SCHOOL1 |
Plinth level |
-
latitude : 26.481058378703892
Longitude : 91.88249993138015
file name : Image_13062024211405676.png
|
2024-06-13 21:14:05.734415 |
195 |
64999549 |
REPAIRING OF SUTIAKATA LP SCHOOL |
162000 |
REPAIRING OF SUTIAKATA LP SCHOOL1 |
Completion of work |
-
latitude : 26.339955157600343
Longitude : 91.85720385052264
file name : Image_23092022134644751.png
|
2022-09-23 13:46:44.81907 |
196 |
64999096 |
Operation & maintenance of drinking water supply system |
76166 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 26.48119902703911
Longitude : 91.8825753685087
file name : Image_14062024201928796.png
|
2024-06-14 20:19:28.854354 |
197 |
64999096 |
Operation & maintenance of drinking water supply system |
76166 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 26.481091822497547
Longitude : 91.88261409290135
file name : Image_14062024201457522.png
|
2024-06-14 20:14:57.584002 |
198 |
64999096 |
Operation & maintenance of drinking water supply system |
76166 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.37954464647919
Longitude : 91.88690311275423
file name : Image_14112023145728178.png
|
2023-11-14 14:57:28.229573 |
199 |
66972702 |
Operation & maintenance of drinking water supply system |
364500 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 26.48128322325647
Longitude : 91.88257151283324
file name : Image_14062024205302889.png
|
2024-06-14 20:53:02.946283 |
200 |
66972702 |
Operation & maintenance of drinking water supply system |
364500 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 26.481052553281188
Longitude : 91.8824749533087
file name : Image_14062024204802327.png
|
2024-06-14 20:48:02.389702 |
201 |
66972702 |
Operation & maintenance of drinking water supply system |
364500 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.3832957
Longitude : 91.8865853
file name : Image_30062023111551565.png
|
2023-06-30 11:15:51.554129 |
202 |
66971235 |
GP INFRASCTURE DEVELOPMENT |
214500 |
GP INFRASCTURE DEVELOPMENT1 |
Roof laid |
-
latitude : 26.3829022
Longitude : 91.885892
file name : Image_29062024141711254.png
|
2024-06-29 14:17:11.310886 |
203 |
66971235 |
GP INFRASCTURE DEVELOPMENT |
214500 |
GP INFRASCTURE DEVELOPMENT1 |
Plinth level |
-
latitude : 26.3829022
Longitude : 91.8858969
file name : Image_29062024141348356.png
|
2024-06-29 14:13:48.416571 |
204 |
66971235 |
GP INFRASCTURE DEVELOPMENT |
214500 |
GP INFRASCTURE DEVELOPMENT1 |
Completion of work |
-
latitude : 26.3826094
Longitude : 91.8860466
file name : Image_30062023112633616.png
|
2023-06-30 11:26:33.68106 |
205 |
88606183 |
CONTINGENCY OR ADMINISTRATIVE EXPENSES |
52800 |
CONTINGENCY OR ADMINISTRATIVE EXPENSES1 |
Roof laid |
-
latitude : 26.3829014
Longitude : 91.8858925
file name : Image_29062024144743998.png
|
2024-06-29 14:47:44.053315 |
206 |
88606183 |
CONTINGENCY OR ADMINISTRATIVE EXPENSES |
52800 |
CONTINGENCY OR ADMINISTRATIVE EXPENSES1 |
Plinth level |
-
latitude : 26.3829023
Longitude : 91.8858953
file name : Image_29062024144451881.png
|
2024-06-29 14:44:51.935346 |
207 |
88606183 |
CONTINGENCY OR ADMINISTRATIVE EXPENSES |
52800 |
CONTINGENCY OR ADMINISTRATIVE EXPENSES1 |
Completion of work |
-
latitude : 26.3827976
Longitude : 91.8859409
file name : Image_06122023144612436.png
|
2023-12-06 14:46:12.485862 |
208 |
88285028 |
Creation of Small-bore pipe conveyance system |
95000 |
Creation of Small-bore pipe conveyance system1 |
Completion of work |
-
latitude : 26.378517695702612
Longitude : 91.88668987713754
file name : Image_24092024132008393.png
|
2024-09-24 13:20:08.454535 |
209 |
88301649 |
REPAIRING OF CULTURAL COMMUNITY HALL NEAR DUBAHATI KRISTI SANGHA |
100000 |
REPAIRING OF CULTURAL COMMUNITY HALL NEAR DUBAHATI KRISTI SANGHA1 |
Roof laid |
-
latitude : 26.3828967
Longitude : 91.8858651
file name : Image_01102024121550936.png
|
2024-10-01 12:15:51.016688 |
210 |
88301649 |
REPAIRING OF CULTURAL COMMUNITY HALL NEAR DUBAHATI KRISTI SANGHA |
100000 |
REPAIRING OF CULTURAL COMMUNITY HALL NEAR DUBAHATI KRISTI SANGHA1 |
Plinth level |
-
latitude : 26.382898
Longitude : 91.8858644
file name : Image_01102024120955270.png
|
2024-10-01 12:09:55.332163 |
211 |
88301649 |
REPAIRING OF CULTURAL COMMUNITY HALL NEAR DUBAHATI KRISTI SANGHA |
100000 |
REPAIRING OF CULTURAL COMMUNITY HALL NEAR DUBAHATI KRISTI SANGHA1 |
Completion of work |
-
latitude : 26.391588896512985
Longitude : 91.88236121088266
file name : Image_20122023134856818.png
|
2023-12-20 13:48:56.869279 |
212 |
66973022 |
Operation & maintenance of drinking water supply system |
365750 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.481014541350305
Longitude : 91.8826129194349
file name : Image_01082024125337148.png
|
2024-08-01 12:53:37.201683 |
213 |
66973022 |
Operation & maintenance of drinking water supply system |
365750 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.481092660687864
Longitude : 91.88257419504225
file name : Image_14072024204219692.png
|
2024-07-14 20:42:19.763318 |
214 |
88269485 |
Creation of drainage channel for management of grey water |
316458 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.359423217363656
Longitude : 91.87777128070593
file name : Image_17012024144710608.png
|
2024-01-17 14:47:10.675914 |
215 |
88619493 |
Construction of toilets in public institutions |
46668 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.3961453
Longitude : 91.9012101
file name : Image_04102024141357892.png
|
2024-10-04 14:13:57.937825 |