1 |
5767154 |
Const of Market Shed at Taranipathar |
300000 |
Market Yards/ Vending Zone1 |
Plinth Level |
-
latitude : 27.60960993
Longitude : 94.66561226
file name : Image_01062019135635519.png
|
2019-06-01 13:56:35.619471 |
2 |
10699035 |
Const. of Sanitary Latrine Urinal at Nilakh Jatya Bidyaloi. |
130000 |
Toilet1 |
25% |
-
latitude : 27.62467459
Longitude : 94.65487682
file name : Image_01062019152216473.png
|
2019-06-01 15:22:16.596799 |
3 |
10699161 |
Const. of Building at Koilashpur Kalyanjyoti Yuvak Shangha |
200000 |
Guest House1
|
25% |
-
latitude : 27.63346771
Longitude : 94.65917712
file name : Image_21062019103313581.png
|
2019-06-21 10:33:16.174683 |
4 |
10699358 |
Const. of Sanitary Latrine Urinal at Kamte Jengrai Tribal M.E. School. |
190000 |
Toilet1 |
25% |
-
latitude : 27.61427474
Longitude : 94.6050082
file name : Image_01062019180557281.png
|
2019-06-01 18:05:57.345621 |
5 |
10699554 |
Repairing of Waiting Shed at Luguti |
38000 |
Sheds1 |
25% |
-
latitude : 27.56291741
Longitude : 94.59488212
file name : Image_03062019102011910.png
|
2019-06-03 10:20:11.994602 |
6 |
10698914 |
Const. of Computer Room at Nilakh G.P. Office |
200000 |
Computer Centre1 |
25% |
-
latitude : 27.60591417
Longitude : 94.64647617
file name : Image_01062019133054525.png
|
2019-06-01 13:30:54.622453 |
7 |
10698736 |
Const. of Sanitary Latrine Urinal at Luguti M.E. School |
240000 |
Toilet1 |
25% |
-
latitude : 27.58292128
Longitude : 94.59751529
file name : Image_03062019101937377.png
|
2019-06-03 10:19:37.467925 |
8 |
10698736 |
Const. of Sanitary Latrine Urinal at Luguti M.E. School |
240000 |
Toilet1 |
25% |
-
latitude : 27.58292473
Longitude : 94.59748874
file name : Image_03062019100751494.png
|
2019-06-03 10:07:51.573021 |
9 |
10698869 |
Const. of Weekly Market Shed at Lakhipur Gohain gaon |
240000 |
Sheds1 |
25% |
-
latitude : 27.59695586
Longitude : 94.58895744
file name : Image_03062019122512879.png
|
2019-06-03 12:25:12.96688 |
10 |
10698988 |
Const. of RCC Culvert at Napam near Napam L.P. School |
200000 |
Culvert1 |
Substructure below GL |
-
latitude : 27.594449,27.59443854
Longitude : 94.59844198,94.59842394
file name : Image_03062019115458313.png
|
2019-06-03 11:54:58.417833 |
11 |
10698988 |
Const. of RCC Culvert at Napam near Napam L.P. School |
200000 |
Culvert1 |
Substructure below GL |
-
latitude : 27.59446401,27.59446541
Longitude : 94.59845822,94.59846289
file name : Image_03062019114758958.png
|
2019-06-03 11:47:59.067062 |
12 |
10873823 |
Cost of Wall Boundary at Nilakh GP Office. |
400000 |
Marriage / Community Hall1 |
25% |
-
latitude : 27.60618833333333
Longitude : 94.64625666666667
file name : Image_14082020144242026.png
|
2020-08-14 14:42:42.749508 |
13 |
33202507 |
Const of Building at Misamari Weekly Market |
417242 |
Const of Building at Misamari Weekly Market1 |
Plinth Level |
-
latitude : 27.615165
Longitude : 94.62635166666665
file name : Image_14082020215922446.png
|
2020-08-14 21:59:23.144504 |
14 |
10911481 |
Cost of Waiting Shed at Napam Tiniali |
200000 |
Cost of Waiting Shed at Napam Tiniali1 |
25% |
-
latitude : 27.595280000000002
Longitude : 94.59609333333334
file name : Image_13082020132013695.png
|
2020-08-13 13:20:14.388551 |
15 |
33201837 |
Reparing of Kailashpur Anganwadi Centre |
150000 |
Reparing of Kailashpur Anganwadi Centre1 |
25% |
-
latitude : 27.631856666666668
Longitude : 94.66016666666668
file name : Image_14112020132428785.png
|
2020-11-14 13:24:34.079592 |
16 |
33202010 |
Const of Building at Tokowani Anganwadi Centre |
200000 |
Const of Building at Tokowani Anganwadi Centre1 |
25% |
-
latitude : 27.621328333333334
Longitude : 94.65094666666667
file name : Image_14082020144854975.png
|
2020-08-14 14:48:55.666401 |
17 |
33201346 |
Reparing of Building at Nilakh Chapori HS School |
350000 |
Reparing of Building at Nilakh Chapori HS School1 |
25% |
-
latitude : 27.60128666666667
Longitude : 94.64186333333333
file name : Image_14112020094801034.png
|
2020-11-14 09:48:06.347898 |
18 |
21144513 |
Construction of boundary wall at Sankarjyoti Namghar |
400000 |
Construction of boundary wall at Sankarjyoti Namghar1 |
25% |
-
latitude : 27.616694999999996
Longitude : 94.66291000000001
file name : Image_14112020133359412.png
|
2020-11-14 13:34:04.72491 |
19 |
21144539 |
Const. of building Sundrapur community hall |
300000 |
Const. of building Sundrapur community hall1 |
25% |
-
latitude : 27.62624166666667
Longitude : 94.63811499999998
file name : Image_10112020232320426.png
|
2020-11-10 23:23:24.107871 |
20 |
21144332 |
Const. Of Building reparing at Napam ME School |
300000 |
Const. Of Building reparing at Napam ME School1 |
25% |
-
latitude : 27.594608333333333
Longitude : 94.59859833333333
file name : Image_16102020212529101.png
|
2020-10-16 21:25:29.181167 |
21 |
10911377 |
Costof Building at Misamari Chapori Anganwadi Centre |
200000 |
Costof Building at Misamari Chapori Anganwadi Centre1 |
25% |
-
latitude : 27.612293333333334
Longitude : 94.626625
file name : Image_14112020133506490.png
|
2020-11-14 13:35:11.831257 |
22 |
21144537 |
Const of boundry wall Udoi Sankar Parthamik Sakha Namghar |
400000 |
Const of boundry wall Udoi Sankar Parthamik Sakha Namghar 1 |
25% |
-
latitude : 27.610305
Longitude : 94.65916999999999
file name : Image_16102020212430213.png
|
2020-10-16 21:24:30.314433 |
23 |
21144308 |
Const. of culvert at lakhipur Gohain to Ashram road near bagadhar saikia House |
500000 |
Const. of culvert at lakhipur Gohain to Ashram road near bagadhar saikia House1 |
Substructure below GL |
-
latitude : 27.59451166666667,27.594496666666668
Longitude : 94.58718500000002,94.58717
file name : Image_16102020212622076.png
|
2020-10-16 21:26:22.157819 |
24 |
33200943 |
Reparing of building at Luguti ME School |
228789 |
Reparing of building at Luguti ME School1 |
25% |
-
latitude : 27.582966666666668
Longitude : 94.59767500000001
file name : Image_13082020114824437.png
|
2020-08-13 11:48:25.215863 |
25 |
33201662 |
Const of Cycle Stand at Nilakh Girls ME School Campus |
200000 |
Const of Cycle Stand at Nilakh Girls ME School Campus1 |
25% |
-
latitude : 27.620608333333333
Longitude : 94.64981833333334
file name : Image_17082020134519038.png
|
2020-08-17 13:45:19.741298 |
26 |
21144359 |
Const of reparing Lakhipur Gohain gaon MV School |
250000 |
Const of reparing Lakhipur Gohain gaon MV School1 |
25% |
-
latitude : 27.594148333333337
Longitude : 94.58886
file name : Image_16102020212700895.png
|
2020-10-16 21:27:00.984596 |
27 |
21144616 |
Construction of building Nilakh Jatiya Bidyalaya |
400000 |
Construction of building Nilakh Jatiya Bidyalaya 1 |
25% |
-
latitude : 27.624498333333335
Longitude : 94.65498166666666
file name : Image_17082020133038279.png
|
2020-08-17 13:30:39.020907 |
28 |
21144423 |
Const.building Sankardev sanskriti Kendra at Tokowani |
200000 |
Const.building Sankardev sanskriti Kendra at Tokowani1 |
25% |
-
latitude : 27.616619999999998
Longitude : 94.65569666666667
file name : Image_17082020162952950.png
|
2020-08-17 16:29:53.651119 |
29 |
33202321 |
Const of Building at Lakhipur Weekly Market |
520000 |
Const of Building at Lakhipur Weekly Market1 |
Plinth Level |
-
latitude : 27.59693333333333
Longitude : 94.58889833333333
file name : Image_16102020212725455.png
|
2020-10-16 21:27:25.538354 |
30 |
33201225 |
Const of Building at Ujani Nilakhpur LP School |
300000 |
Const of Building at Ujani Nilakhpur LP School1 |
25% |
-
latitude : 27.634486666666664
Longitude : 94.65186666666665
file name : Image_16102020212751029.png
|
2020-10-16 21:27:51.114492 |
31 |
10911530 |
Cost of Drinking Water at Santipur Jengrai |
200000 |
Cost of Drinking Water at Santipur Jengrai1 |
In Progress |
-
latitude : 27.60829833333333,27.608303333333332
Longitude : 94.61247499999999,94.61247666666668
file name : Image_14112020133511299.png
|
2020-11-14 13:35:16.598143 |
32 |
21144462 |
Construction of Approach road Kailashpur to Balijan tinilai road |
400000 |
Construction of Approach road Kailashpur to Balijan tinilai road1 |
Earth Work |
-
latitude : 27.625053333333334,27.625023333333335
Longitude : 94.65678666666666,94.65679333333334
file name : Image_14112020132448674.png
|
2020-11-14 13:24:53.969847 |
33 |
21144377 |
Construction of School boundry at Sundarpur Border lp School |
300000 |
Construction of School boundry at Sundarpur Border lp School1 |
25% |
-
latitude : 27.631851666666662
Longitude : 94.64409333333333
file name : Image_10112020092348812.png
|
2020-11-10 09:23:52.424266 |
34 |
29629641 |
Const of Community hall at Lakhipur Gohain gaon bihu moncha |
530899 |
Const of Community hall at Lakhipur Gohain gaon bihu moncha1 |
25% |
-
latitude : 27.598153333333336
Longitude : 94.58843666666668
file name : Image_24112020180025567.png
|
2020-11-24 18:00:25.656839 |
35 |
29627226 |
Const of house Building youth club at Ujani Nilakhpur |
500000 |
Const of house Building youth club at Ujani Nilakhpur1 |
25% |
-
latitude : 27.630515
Longitude : 94.65062666666667
file name : Image_07082021141057040.png
|
2021-08-07 14:10:57.107832 |
36 |
29627226 |
Const of house Building youth club at Ujani Nilakhpur |
500000 |
Const of house Building youth club at Ujani Nilakhpur1 |
25% |
-
latitude : 27.63049
Longitude : 94.65083833333334
file name : Image_14112020132351714.png
|
2020-11-14 13:23:57.016723 |
37 |
21144470 |
Const. of building Urinal and Toilet at Panchim Nilakh anganwadi Centre |
219500 |
Const. of building Urinal and Toilet at Panchim Nilakh anganwadi Centre1 |
25% |
-
latitude : 27.61840833333333
Longitude : 94.64512666666666
file name : Image_17082020162924095.png
|
2020-08-17 16:29:24.816444 |
38 |
29627793 |
Const of Building l at Misamari Community hall near Mr Kumud Gogoi house |
400000 |
Const of Building l at Misamari Community hall near Mr Kumud Gogoi house1 |
25% |
-
latitude : 27.612086666666663
Longitude : 94.6271
file name : Image_14112020133153465.png
|
2020-11-14 13:31:58.783737 |
39 |
29643147 |
Const of building at Nilakh Nagaon Community hall |
250000 |
Const of building at Nilakh Nagaon Community hall1 |
25% |
-
latitude : 27.607066666666665
Longitude : 94.64735833333334
file name : Image_14112020094808748.png
|
2020-11-14 09:48:14.001092 |
40 |
29629280 |
Const of building at Simolguri Jengrai community hall |
500000 |
Const of building at Simolguri Jengrai community hall1 |
25% |
-
latitude : 27.608530000000005
Longitude : 94.58893666666667
file name : Image_24112020180032374.png
|
2020-11-24 18:00:32.437673 |
41 |
26579041 |
Const. of Community hall at Sundarpur Madhab Prathamik |
300000 |
Const. of Community hall at Sundarpur Madhab Prathamik1 |
25% |
-
latitude : 27.625423333333334
Longitude : 94.63552833333333
file name : Image_28112020204219476.png
|
2020-11-28 20:42:19.584309 |
42 |
29630589 |
Const of Water tank facility at ICDS Centre Koilashpur |
200000 |
Const of Water tank facility at ICDS Centre Koilashpur1 |
Basement |
-
latitude : 27.624664999999997
Longitude : 94.65760666666665
file name : Image_14112020132511384.png
|
2020-11-14 13:25:16.687322 |
43 |
29643294 |
Const of Community hall at Nilakh Balijan Jansebok Puthi Bharal |
417774 |
Const of Community hall at Nilakh Balijan Jansebok Puthi Bharal1 |
25% |
-
latitude : 27.616801666666667
Longitude : 94.66310333333334
file name : Image_14112020133142047.png
|
2020-11-14 13:31:47.388782 |
44 |
29643490 |
Const of building at napam community hall |
350000 |
Const of building at napam community hall1 |
25% |
-
latitude : 27.594336666666663
Longitude : 94.59855166666667
file name : Image_24112020180017318.png
|
2020-11-24 18:00:17.392633 |
45 |
29644443 |
Const of Community hall at Namdharma Parthomik |
303436 |
Const of Community hall at Namdharma Parthomik1 |
25% |
-
latitude : 27.629863333333333
Longitude : 94.65076333333333
file name : Image_24112020180007288.png
|
2020-11-24 18:00:07.514798 |
46 |
29644531 |
Const of Foot Bridge from Ujani Nilakh Tiniali to Political road |
1300000 |
Const of Foot Bridge from Ujani Nilakh Tiniali to Political road1 |
Substructure below GL |
-
latitude : 27.638561666666668
Longitude : 94.65185666666666
file name : Image_14112020132413429.png
|
2020-11-14 13:24:18.744953 |
47 |
33201502 |
Const of Building at Misamari Sankardev ME School |
300000 |
Const of Building at Misamari Sankardev ME School1 |
25% |
-
latitude : 27.61245333333333
Longitude : 94.626595
file name : Image_07082021141051160.png
|
2021-08-07 14:10:51.217639 |
48 |
36401529 |
CONST. OF BUILDING AT UJANI NILAKHPUR COMMUNITY HALL |
253970 |
CONST. OF BUILDING AT UJANI NILAKHPUR COMMUNITY HALL1 |
Completion of work |
-
latitude : 27.63434666666667
Longitude : 94.65173000000001
file name : Image_16092021212408698.png
|
2021-09-16 21:24:08.769878 |
49 |
42006592 |
REPARING OF BUILDING AT LAKHIPUR High School |
250000 |
REPARING OF BUILDING AT LAKHIPUR High School1 |
Completion of work |
-
latitude : 27.599585
Longitude : 94.58585
file name : Image_01102021135019249.png
|
2021-10-01 13:50:19.326648 |
50 |
42043514 |
Drnking water tank facility at lakhipur achram |
250000 |
Drnking water tank facility at lakhipur achram1 |
Completion of work |
-
latitude : 27.595305
Longitude : 94.58439166666668
file name : Image_01102021135013776.png
|
2021-10-01 13:50:13.854245 |
51 |
42053318 |
Drnking water and sanitation facility at nilakh balijan hari mandir |
90000 |
Drnking water and sanitation facility at nilakh balijan hari mandir1 |
Completion of work |
-
latitude : 27.58681
Longitude : 94.71613333333335
file name : Image_21052022110701700.png
|
2022-05-21 11:07:01.814852 |
52 |
64307817 |
Repairing of Kailashpur LP school |
200000 |
Repairing of Kailashpur LP school1 |
Completion of work |
-
latitude : 27.63190556
Longitude : 94.65969025
file name : Image_04062024175617133.png
|
2024-06-04 17:56:17.237259 |
53 |
64365406 |
Const of 6 nos Dustbin at Nilakh Panchayat |
192000 |
Const of 6 nos Dustbin at Nilakh Panchayat1 |
Completion of work |
-
latitude : 27.59828166666667
Longitude : 94.58913333333334
file name : Image_23082022124856825.png
|
2022-08-23 12:48:56.990719 |
54 |
64308136 |
Const of Latrine and Urinal at Nilakh Chapari High School |
192000 |
Const of Latrine and Urinal at Nilakh Chapari High School1 |
Completion of work |
-
latitude : 27.6021414
Longitude : 94.64146239
file name : Image_05062024082945003.png
|
2024-06-05 08:29:45.098119 |
55 |
64308136 |
Const of Latrine and Urinal at Nilakh Chapari High School |
192000 |
Const of Latrine and Urinal at Nilakh Chapari High School1 |
Plinth level |
-
latitude : 27.60215798
Longitude : 94.64142212
file name : Image_05062024083346653.png
|
2024-06-05 08:33:46.758685 |
56 |
64308136 |
Const of Latrine and Urinal at Nilakh Chapari High School |
192000 |
Const of Latrine and Urinal at Nilakh Chapari High School1 |
Completion of work |
-
latitude : 27.602070000000005
Longitude : 94.64154500000001
file name : Image_23082022143158426.png
|
2022-08-23 14:31:58.560581 |
57 |
65078445 |
Construction of Community Sanitary Complex |
198166 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.610726666666665
Longitude : 94.66115999999998
file name : Image_30092022074409810.png
|
2022-09-30 07:44:09.893558 |
58 |
64307701 |
Const of building at Sundarpur LP School |
400000 |
Const of building at Sundarpur LP School1 |
Completion of work |
-
latitude : 27.6254
Longitude : 94.63365333333334
file name : Image_19092022170524903.png
|
2022-09-19 17:05:25.073246 |
59 |
65078542 |
Construction of toilets in public institutions |
198166 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.61751
Longitude : 94.626905
file name : Image_26092022152150401.png
|
2022-09-26 15:21:50.502798 |
60 |
64308035 |
Const of Latrine and Urinal at Lakhipur Weekly market shet |
192000 |
Const of Latrine and Urinal at Lakhipur Weekly market shet1 |
Completion of work |
-
latitude : 27.596811666666667
Longitude : 94.58885666666666
file name : Image_30092022081401358.png
|
2022-09-30 08:14:01.433093 |
61 |
64307852 |
Repairing of Michamari Sanker Dev ME School |
306000 |
Repairing of Michamari Sanker Dev ME School1 |
Completion of work |
-
latitude : 27.61236333333333
Longitude : 94.62652333333332
file name : Image_30092022085721914.png
|
2022-09-30 08:57:22.05056 |
62 |
64307787 |
Const of building at Misamari Nilakh Nabajyoti LP School |
300000 |
Const of building at Misamari Nilakh Nabajyoti LP School1 |
Completion of work |
-
latitude : 27.61060166666667
Longitude : 94.63656999999999
file name : Image_03012023162216437.png
|
2023-01-03 16:22:16.522814 |
63 |
64307787 |
Const of building at Misamari Nilakh Nabajyoti LP School |
300000 |
Const of building at Misamari Nilakh Nabajyoti LP School1 |
Completion of work |
-
latitude : 27.610624999999995
Longitude : 94.63655333333332
file name : Image_03012023162452794.png
|
2023-01-03 16:24:52.878589 |
64 |
64365309 |
Extension of Ujani Nilakhpur LP School |
170000 |
Extension of Ujani Nilakhpur LP School1 |
Completion of work |
-
latitude : 27.634458333333335
Longitude : 94.65190833333332
file name : Image_19052023172732274.png
|
2023-05-19 17:27:32.363218 |
65 |
65079554 |
Repairing of Nilakhpur Aganwadi Centre |
214400 |
Repairing of Nilakhpur Aganwadi Centre1 |
Roof laid |
-
latitude : 27.627548333333333
Longitude : 94.65014500000001
file name : Image_30082023161957271.png
|
2023-08-30 16:19:57.361259 |
66 |
65079554 |
Repairing of Nilakhpur Aganwadi Centre |
214400 |
Repairing of Nilakhpur Aganwadi Centre1 |
Plinth level |
-
latitude : 27.627564999999997
Longitude : 94.65015999999999
file name : Image_30082023161548724.png
|
2023-08-30 16:15:48.824081 |
67 |
65079554 |
Repairing of Nilakhpur Aganwadi Centre |
214400 |
Repairing of Nilakhpur Aganwadi Centre1 |
Completion of work |
-
latitude : 27.627538333333337
Longitude : 94.65006333333334
file name : Image_23022023123645481.png
|
2023-02-23 12:36:45.584124 |
68 |
65079554 |
Repairing of Nilakhpur Aganwadi Centre |
214400 |
Repairing of Nilakhpur Aganwadi Centre1 |
Completion of work |
-
latitude : 27.62754
Longitude : 94.650095
file name : Image_23022023123648568.png
|
2023-02-23 12:36:48.662951 |
69 |
64364921 |
GP office Repairing |
134000 |
GP office Repairing1 |
Roof laid |
-
latitude : 27.6060188
Longitude : 94.6464668
file name : Image_04062024161734877.png
|
2024-06-04 16:17:34.968882 |
70 |
64364921 |
GP office Repairing |
134000 |
GP office Repairing1 |
Plinth level |
-
latitude : 27.6060232
Longitude : 94.6464666
file name : Image_04062024161135388.png
|
2024-06-04 16:11:35.484968 |
71 |
64364921 |
GP office Repairing |
134000 |
GP office Repairing1 |
Completion of work |
-
latitude : 27.60614
Longitude : 94.6464325
file name : Image_11042023141605316.png
|
2023-04-11 14:16:05.412947 |
72 |
42052891 |
Drnking water facility nilakh gp office |
250000 |
Drnking water facility nilakh gp office 1 |
Plinth level |
-
latitude : 27.6048471
Longitude : 94.6449035
file name : Image_29092023144757265.png
|
2023-09-29 14:47:57.373732 |
73 |
42052891 |
Drnking water facility nilakh gp office |
250000 |
Drnking water facility nilakh gp office 1 |
Completion of work |
-
latitude : 27.6059983
Longitude : 94.6465541
file name : Image_01102021135030546.png
|
2021-10-01 13:50:30.640584 |
74 |
65079708 |
Extension of office Conference Hall |
200000 |
Extension of office Conference Hall1 |
Roof laid |
-
latitude : 27.6048488
Longitude : 94.6448426
file name : Image_30082023141126360.png
|
2023-08-30 14:11:26.453075 |
75 |
65079708 |
Extension of office Conference Hall |
200000 |
Extension of office Conference Hall1 |
Plinth level |
-
latitude : 27.6048488
Longitude : 94.6448431
file name : Image_30082023140347064.png
|
2023-08-30 14:03:47.190463 |
76 |
65079708 |
Extension of office Conference Hall |
200000 |
Extension of office Conference Hall1 |
Completion of work |
-
latitude : 27.6061394
Longitude : 94.6464431
file name : Image_29032023144851872.png
|
2023-03-29 14:48:51.969931 |
77 |
65079708 |
Extension of office Conference Hall |
200000 |
Extension of office Conference Hall1 |
Completion of work |
-
latitude : 27.6048485
Longitude : 94.6448431
file name : Image_30082023133354757.png
|
2023-08-30 13:33:54.852915 |
78 |
65079759 |
Repairing of kangali Bharal at Nilakh GP office |
64000 |
Repairing of kangali Bharal at Nilakh GP office1 |
Roof laid |
-
latitude : 27.6048491
Longitude : 94.6448432
file name : Image_30082023143015689.png
|
2023-08-30 14:30:15.79806 |
79 |
65079759 |
Repairing of kangali Bharal at Nilakh GP office |
64000 |
Repairing of kangali Bharal at Nilakh GP office1 |
Plinth level |
-
latitude : 27.604849
Longitude : 94.6448431
file name : Image_30082023142422764.png
|
2023-08-30 14:24:22.862295 |
80 |
65079759 |
Repairing of kangali Bharal at Nilakh GP office |
64000 |
Repairing of kangali Bharal at Nilakh GP office1 |
Completion of work |
-
latitude : 27.605845
Longitude : 94.64663999999999
file name : Image_22032023150031949.png
|
2023-03-22 15:00:32.044236 |
81 |
42011365 |
DRINKING WATER AND SANITATION FACILITY AT TAKOWANI SUB-CENTER |
373397 |
DRINKING WATER AND SANITATION FACILITY AT TAKOWANI SUB-CENTER1 |
Roof laid |
-
latitude : 27.62039768
Longitude : 94.64879303
file name : Image_04062024165257734.png
|
2024-06-04 16:52:57.831171 |
82 |
42011365 |
DRINKING WATER AND SANITATION FACILITY AT TAKOWANI SUB-CENTER |
373397 |
DRINKING WATER AND SANITATION FACILITY AT TAKOWANI SUB-CENTER1 |
Plinth level |
-
latitude : 27.62041895
Longitude : 94.64882179
file name : Image_04062024164932171.png
|
2024-06-04 16:49:32.268173 |
83 |
42011365 |
DRINKING WATER AND SANITATION FACILITY AT TAKOWANI SUB-CENTER |
373397 |
DRINKING WATER AND SANITATION FACILITY AT TAKOWANI SUB-CENTER1 |
Completion of work |
-
latitude : 27.62042148
Longitude : 94.64883998
file name : Image_04062024164530938.png
|
2024-06-04 16:45:31.057515 |
84 |
42011365 |
DRINKING WATER AND SANITATION FACILITY AT TAKOWANI SUB-CENTER |
373397 |
DRINKING WATER AND SANITATION FACILITY AT TAKOWANI SUB-CENTER1 |
Completion of work |
-
latitude : 27.620299999999997
Longitude : 94.648805
file name : Image_16112021155035428.png
|
2021-11-16 15:50:35.523652 |
85 |
38066469 |
CONST. OF FENCHING BOUNDRY WALL AT NILAKH ANCHALIC KRISTEE BIKASH SANGHA |
369088 |
CONST. OF FENCHING BOUNDRY WALL AT NILAKH ANCHALIC KRISTEE BIKASH SANGHA1 |
Roof laid |
-
latitude : 27.62233024
Longitude : 94.65137698
file name : Image_04062024173511641.png
|
2024-06-04 17:35:11.729181 |
86 |
38066469 |
CONST. OF FENCHING BOUNDRY WALL AT NILAKH ANCHALIC KRISTEE BIKASH SANGHA |
369088 |
CONST. OF FENCHING BOUNDRY WALL AT NILAKH ANCHALIC KRISTEE BIKASH SANGHA1 |
Plinth level |
-
latitude : 27.62233143
Longitude : 94.65135923
file name : Image_04062024172202271.png
|
2024-06-04 17:22:02.361665 |
87 |
38066469 |
CONST. OF FENCHING BOUNDRY WALL AT NILAKH ANCHALIC KRISTEE BIKASH SANGHA |
369088 |
CONST. OF FENCHING BOUNDRY WALL AT NILAKH ANCHALIC KRISTEE BIKASH SANGHA1 |
Completion of work |
-
latitude : 27.62234926
Longitude : 94.65138363
file name : Image_04062024170436209.png
|
2024-06-04 17:04:36.297189 |
88 |
38066469 |
CONST. OF FENCHING BOUNDRY WALL AT NILAKH ANCHALIC KRISTEE BIKASH SANGHA |
369088 |
CONST. OF FENCHING BOUNDRY WALL AT NILAKH ANCHALIC KRISTEE BIKASH SANGHA1 |
Completion of work |
-
latitude : 27.62235409
Longitude : 94.65139372
file name : Image_04062024170302845.png
|
2024-06-04 17:03:02.938639 |
89 |
42048423 |
Drnking water facility a tNilakh kailashpur yubak sangha |
250000 |
Drnking water facility a tNilakh kailashpur yubak sangha1 |
Roof laid |
-
latitude : 27.63358637
Longitude : 94.65928179
file name : Image_04062024175244999.png
|
2024-06-04 17:52:45.09527 |
90 |
42048423 |
Drnking water facility a tNilakh kailashpur yubak sangha |
250000 |
Drnking water facility a tNilakh kailashpur yubak sangha1 |
Plinth level |
-
latitude : 27.63359016
Longitude : 94.65929009
file name : Image_04062024174812560.png
|
2024-06-04 17:48:12.635804 |
91 |
42048423 |
Drnking water facility a tNilakh kailashpur yubak sangha |
250000 |
Drnking water facility a tNilakh kailashpur yubak sangha1 |
Completion of work |
-
latitude : 27.63359797
Longitude : 94.65929149
file name : Image_04062024174336305.png
|
2024-06-04 17:43:36.395468 |
92 |
42048423 |
Drnking water facility a tNilakh kailashpur yubak sangha |
250000 |
Drnking water facility a tNilakh kailashpur yubak sangha1 |
Completion of work |
-
latitude : 27.633500000000005
Longitude : 94.65933833333332
file name : Image_01102021135036612.png
|
2021-10-01 13:50:36.699596 |
93 |
65076621 |
Const of GP office conference hall |
500000 |
Const of GP office conference hall1 |
Roof laid |
-
latitude : 27.6048485
Longitude : 94.6448431
file name : Image_30082023140219857.png
|
2023-08-30 14:02:19.959078 |
94 |
65076621 |
Const of GP office conference hall |
500000 |
Const of GP office conference hall1 |
Plinth level |
-
latitude : 27.604849
Longitude : 94.6448433
file name : Image_30082023135243924.png
|
2023-08-30 13:52:44.015183 |
95 |
65076621 |
Const of GP office conference hall |
500000 |
Const of GP office conference hall1 |
Completion of work |
-
latitude : 27.6048491
Longitude : 94.6448434
file name : Image_30082023134321654.png
|
2023-08-30 13:43:21.750402 |
96 |
65076621 |
Const of GP office conference hall |
500000 |
Const of GP office conference hall1 |
Completion of work |
-
latitude : 27.6061159
Longitude : 94.6464629
file name : Image_14092022133630541.png
|
2022-09-14 13:36:30.664704 |
97 |
53414518 |
SANITIZATION AT NILAKH GP AREAR 10 PERCENT |
130339 |
SANITIZATION AT NILAKH GP AREAR 10 PERCENT1 |
Completion of work |
-
latitude : 27.6059991
Longitude : 94.6465538
file name : Image_30092021080608192.png
|
2021-09-30 08:06:08.264278 |
98 |
65078928 |
Const of School Building Misamari Srimanta Sankerdev |
300000 |
Const of School Building Misamari Srimanta Sankerdev1 |
Completion of work |
-
latitude : 27.608633333333334
Longitude : 94.63679833333332
file name : Image_12012023131010204.png
|
2023-01-12 13:10:10.287895 |
99 |
65078928 |
Const of School Building Misamari Srimanta Sankerdev |
300000 |
Const of School Building Misamari Srimanta Sankerdev1 |
Plinth level |
-
latitude : 27.60854104
Longitude : 94.63681618
file name : Image_05062024085200647.png
|
2024-06-05 08:52:00.76065 |
100 |
65078928 |
Const of School Building Misamari Srimanta Sankerdev |
300000 |
Const of School Building Misamari Srimanta Sankerdev1 |
Completion of work |
-
latitude : 27.60855765
Longitude : 94.63681982
file name : Image_05062024084755802.png
|
2024-06-05 08:47:55.898566 |
101 |
37857652 |
CONST. OF FENCHING BOUNDRY WALL AT MAJGAON HARI MANDIR |
300000 |
CONST. OF FENCHING BOUNDRY WALL AT MAJGAON HARI MANDIR1 |
Completion of work |
-
latitude : 27.61018
Longitude : 94.63133166666667
file name : Image_04102021132032619.png
|
2021-10-04 13:20:32.677299 |
102 |
37857652 |
CONST. OF FENCHING BOUNDRY WALL AT MAJGAON HARI MANDIR |
300000 |
CONST. OF FENCHING BOUNDRY WALL AT MAJGAON HARI MANDIR1 |
Plinth level |
-
latitude : 27.61008506
Longitude : 94.63127334
file name : Image_05062024091551568.png
|
2024-06-05 09:15:51.661668 |
103 |
37857652 |
CONST. OF FENCHING BOUNDRY WALL AT MAJGAON HARI MANDIR |
300000 |
CONST. OF FENCHING BOUNDRY WALL AT MAJGAON HARI MANDIR1 |
Completion of work |
-
latitude : 27.6100633
Longitude : 94.63128208
file name : Image_05062024091026795.png
|
2024-06-05 09:10:26.960449 |
104 |
68235315 |
Construction of Community Sanitary Complex |
192000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.60853971
Longitude : 94.65034349
file name : Image_05062024093640233.png
|
2024-06-05 09:36:40.332544 |
105 |
68235315 |
Construction of Community Sanitary Complex |
192000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.60854442
Longitude : 94.65028649
file name : Image_05062024093228339.png
|
2024-06-05 09:32:28.439913 |
106 |
64308164 |
Drinking water tank and Sanitation facility at Nilakh Bor Namgahar |
380000 |
Drinking water tank and Sanitation facility at Nilakh Bor Namgahar1 |
Roof laid |
-
latitude : 27.62152936
Longitude : 94.65180734
file name : Image_05062024101352359.png
|
2024-06-05 10:13:52.450955 |
107 |
64308164 |
Drinking water tank and Sanitation facility at Nilakh Bor Namgahar |
380000 |
Drinking water tank and Sanitation facility at Nilakh Bor Namgahar1 |
Plinth level |
-
latitude : 27.62151496
Longitude : 94.65178496
file name : Image_05062024100438756.png
|
2024-06-05 10:04:38.850194 |
108 |
64308164 |
Drinking water tank and Sanitation facility at Nilakh Bor Namgahar |
380000 |
Drinking water tank and Sanitation facility at Nilakh Bor Namgahar1 |
Completion of work |
-
latitude : 27.62162287
Longitude : 94.65177961
file name : Image_05062024094931547.png
|
2024-06-05 09:49:31.649492 |
109 |
64308164 |
Drinking water tank and Sanitation facility at Nilakh Bor Namgahar |
380000 |
Drinking water tank and Sanitation facility at Nilakh Bor Namgahar1 |
Completion of work |
-
latitude : 27.621646666666667
Longitude : 94.65180333333335
file name : Image_15072022184506587.png
|
2022-07-15 18:45:06.695984 |