1 |
10443884 |
Imp of waiting shade at chakoipather tinali |
150000 |
CSC (Common Service Centre)1
|
Completed |
-
latitude : 27.256108268572245
Longitude : 94.77330866105108
file name : Image_17072019175819055.png
|
2019-07-17 17:58:19.111647 |
2 |
32910069 |
IMPROVEMENT OF KALAKHOWA GP OFFICE |
250000 |
Office Building1 |
25% |
-
latitude : 27.4773582
Longitude : 94.9284477
file name : Image_05122019172941385.png
|
2019-12-05 17:29:42.201823 |
3 |
11758694 |
Const. of boundary wall gate at kalakhowa GP office with toilet |
250000 |
Boundary wall / Side Wall / Retaining Wall1
|
Completed |
-
latitude : 27.27655216352906
Longitude : 94.79350433963306
file name : Image_17072019160519090.png
|
2019-07-17 16:05:19.117505 |
4 |
10443822 |
Imp (Gravelling) of E D Dyke Singori to itakhuli |
200000 |
Unmetalled / Kachcha Road1
|
Completed |
-
latitude : 27.246762680531443,27.246762680531443,27.24676008499474
Longitude : 94.76846644376283,94.76846644376283,94.76845255177227
file name : Image_17072019181925046.png
|
2019-07-17 18:19:25.083266 |
5 |
10443618 |
Imp of community hall at sesughat banchbari |
200000 |
Cultural Stage1
|
Completed |
-
latitude : 27.25654328465543
Longitude : 94.79111912250238
file name : Image_17072019162140883.png
|
2019-07-17 16:21:40.916767 |
6 |
32910109 |
EXTENSION AND EARTH FILLING OF KALAKHOWA GP AUDITORIUM WITH SHELTER HOUSE |
800000 |
Shelter Home1 |
25% |
-
latitude : 27.4773582
Longitude : 94.9284477
file name : Image_05122019155505695.png
|
2019-12-05 15:55:06.359794 |
7 |
32910234 |
INSTALLATION OF HAND TUBEWELL FOR 50 NUMBERS OF BENEFICIARIES |
500000 |
Borewell1
|
In Progress |
-
latitude : 27.26693996
Longitude : 94.78228216
file name : Image_26122019143603908.png
|
2019-12-26 14:36:03.98024 |
8 |
32910234 |
INSTALLATION OF HAND TUBEWELL FOR 50 NUMBERS OF BENEFICIARIES |
500000 |
Borewell2
|
In Progress |
-
latitude : 27.26497976
Longitude : 94.78065928
file name : Image_26122019144009285.png
|
2019-12-26 14:40:09.338407 |
9 |
32910234 |
INSTALLATION OF HAND TUBEWELL FOR 50 NUMBERS OF BENEFICIARIES |
500000 |
Borewell3
|
In Progress |
-
latitude : 27.26840877
Longitude : 94.78336182
file name : Image_26122019144718776.png
|
2019-12-26 14:47:18.818403 |
10 |
66937825 |
Operation & maintenance of drinking water supply system |
509500 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.28826859
Longitude : 94.79986093
file name : Image_24032023162505558.png
|
2023-03-24 16:25:05.674316 |
11 |
64899139 |
CONST. OF DIGHALIYA SAHPANICHUK A.W.C. |
249000 |
CONST. OF DIGHALIYA SAHPANICHUK A.W.C.1 |
Roof laid |
-
latitude : 27.29563416
Longitude : 94.80137551
file name : Image_09112022141905396.png
|
2022-11-09 14:19:05.468092 |
12 |
64899139 |
CONST. OF DIGHALIYA SAHPANICHUK A.W.C. |
249000 |
CONST. OF DIGHALIYA SAHPANICHUK A.W.C.1 |
Plinth level |
-
latitude : 27.29562604
Longitude : 94.80139944
file name : Image_13102022115205024.png
|
2022-10-13 11:52:05.192572 |
13 |
64899139 |
CONST. OF DIGHALIYA SAHPANICHUK A.W.C. |
249000 |
CONST. OF DIGHALIYA SAHPANICHUK A.W.C.1 |
Completion of work |
-
latitude : 27.29566987
Longitude : 94.80132889
file name : Image_06092022162055091.png
|
2022-09-06 16:20:55.195616 |
14 |
66937942 |
INFRASTRUCTURE DEVELOPMENT OF KHANAJAN M.E. SCHOOL |
260000 |
INFRASTRUCTURE DEVELOPMENT OF KHANAJAN M.E. SCHOOL1 |
Roof laid |
-
latitude : 27.29557333333333
Longitude : 94.80088499999998
file name : Image_03012024160422811.png
|
2024-01-03 16:04:22.914313 |
15 |
66937942 |
INFRASTRUCTURE DEVELOPMENT OF KHANAJAN M.E. SCHOOL |
260000 |
INFRASTRUCTURE DEVELOPMENT OF KHANAJAN M.E. SCHOOL1 |
Plinth level |
-
latitude : 27.29554475
Longitude : 94.80086513
file name : Image_19052023162738726.png
|
2023-05-19 16:27:38.82157 |
16 |
66937942 |
INFRASTRUCTURE DEVELOPMENT OF KHANAJAN M.E. SCHOOL |
260000 |
INFRASTRUCTURE DEVELOPMENT OF KHANAJAN M.E. SCHOOL1 |
Plinth level |
-
latitude : 27.29560333333333
Longitude : 94.80085499999998
file name : Image_07082023135730597.png
|
2023-08-07 13:57:30.709371 |
17 |
66937942 |
INFRASTRUCTURE DEVELOPMENT OF KHANAJAN M.E. SCHOOL |
260000 |
INFRASTRUCTURE DEVELOPMENT OF KHANAJAN M.E. SCHOOL1 |
Completion of work |
-
latitude : 27.29560897
Longitude : 94.8009083
file name : Image_03052023162232993.png
|
2023-05-03 16:22:33.130571 |
18 |
66937992 |
INFRASTRUCTURE DEVELOPMENT OF ITAKHULI NORU CULTURAL CENTRE |
171100 |
INFRASTRUCTURE DEVELOPMENT OF ITAKHULI NORU CULTURAL CENTRE1 |
Roof laid |
-
latitude : 27.247839999999997
Longitude : 94.76819333333333
file name : Image_05012024164813912.png
|
2024-01-05 16:48:14.004816 |
19 |
66937992 |
INFRASTRUCTURE DEVELOPMENT OF ITAKHULI NORU CULTURAL CENTRE |
171100 |
INFRASTRUCTURE DEVELOPMENT OF ITAKHULI NORU CULTURAL CENTRE1 |
Plinth level |
-
latitude : 27.247835000000002
Longitude : 94.76823666666665
file name : Image_19062023211613064.png
|
2023-06-19 21:16:13.175816 |
20 |
66937992 |
INFRASTRUCTURE DEVELOPMENT OF ITAKHULI NORU CULTURAL CENTRE |
171100 |
INFRASTRUCTURE DEVELOPMENT OF ITAKHULI NORU CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.24790638
Longitude : 94.76809807
file name : Image_08042023134946848.png
|
2023-04-08 13:49:46.934358 |
21 |
64899011 |
Creation of a new source of drinking water |
92500 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 27.27667166666667
Longitude : 94.79336166666666
file name : Image_17082023175228518.png
|
2023-08-17 17:52:28.635148 |
22 |
85584079 |
INFRASTRUCTURE DEVELOPMENT OF CHAW SENG RENG AT BORDOIBAM MAJGAON |
150000 |
INFRASTRUCTURE DEVELOPMENT OF CHAW SENG RENG AT BORDOIBAM MAJGAON1 |
Roof laid |
-
latitude : 27.30882166666667
Longitude : 94.79210666666668
file name : Image_03012024154722273.png
|
2024-01-03 15:47:22.365804 |
23 |
85584079 |
INFRASTRUCTURE DEVELOPMENT OF CHAW SENG RENG AT BORDOIBAM MAJGAON |
150000 |
INFRASTRUCTURE DEVELOPMENT OF CHAW SENG RENG AT BORDOIBAM MAJGAON1 |
Plinth level |
-
latitude : 27.308975
Longitude : 94.79213499999999
file name : Image_03012024154146080.png
|
2024-01-03 15:41:46.160244 |
24 |
85584079 |
INFRASTRUCTURE DEVELOPMENT OF CHAW SENG RENG AT BORDOIBAM MAJGAON |
150000 |
INFRASTRUCTURE DEVELOPMENT OF CHAW SENG RENG AT BORDOIBAM MAJGAON1 |
Completion of work |
-
latitude : 27.308798333333336
Longitude : 94.79226500000001
file name : Image_26072023174205766.png
|
2023-07-26 17:42:05.86946 |
25 |
87693885 |
Creation of a new source of drinking water |
234500 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 27.276639999999997
Longitude : 94.793265
file name : Image_05012024140332882.png
|
2024-01-05 14:03:32.960658 |
26 |
87693885 |
Creation of a new source of drinking water |
234500 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 27.276564999999998
Longitude : 94.79328666666667
file name : Image_05012024135925597.png
|
2024-01-05 13:59:25.679616 |
27 |
87693885 |
Creation of a new source of drinking water |
234500 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 27.276515000000003
Longitude : 94.79337333333334
file name : Image_03102023183404284.png
|
2023-10-03 18:34:04.431658 |
28 |
85585927 |
RENOVATION OF KALAKHOWA G. P. OFFICE |
132700 |
RENOVATION OF KALAKHOWA G. P. OFFICE1 |
Roof laid |
-
latitude : 27.276549999999997
Longitude : 94.79330833333333
file name : Image_05012024135109770.png
|
2024-01-05 13:51:09.852733 |
29 |
85585927 |
RENOVATION OF KALAKHOWA G. P. OFFICE |
132700 |
RENOVATION OF KALAKHOWA G. P. OFFICE1 |
Plinth level |
-
latitude : 27.27661666666667
Longitude : 94.79331500000002
file name : Image_05012024134750673.png
|
2024-01-05 13:47:50.754867 |
30 |
85585927 |
RENOVATION OF KALAKHOWA G. P. OFFICE |
132700 |
RENOVATION OF KALAKHOWA G. P. OFFICE1 |
Completion of work |
-
latitude : 27.27661833333333
Longitude : 94.79339166666665
file name : Image_14082023154559874.png
|
2023-08-14 15:45:59.960387 |
31 |
85585609 |
RENOVATION OF WAITING SHED AT CHARAIBAHI TINIALI |
150000 |
RENOVATION OF WAITING SHED AT CHARAIBAHI TINIALI1 |
Roof laid |
-
latitude : 27.263060000000003
Longitude : 94.77967166666667
file name : Image_03012024165556818.png
|
2024-01-03 16:55:56.894026 |
32 |
85585609 |
RENOVATION OF WAITING SHED AT CHARAIBAHI TINIALI |
150000 |
RENOVATION OF WAITING SHED AT CHARAIBAHI TINIALI1 |
Plinth level |
-
latitude : 27.262945
Longitude : 94.77920999999999
file name : Image_03012024164928297.png
|
2024-01-03 16:49:28.381632 |
33 |
85585609 |
RENOVATION OF WAITING SHED AT CHARAIBAHI TINIALI |
150000 |
RENOVATION OF WAITING SHED AT CHARAIBAHI TINIALI1 |
Completion of work |
-
latitude : 27.263101666666664
Longitude : 94.77971333333335
file name : Image_14082023170242698.png
|
2023-08-14 17:02:42.804873 |
34 |
52801366 |
CONST OF TOILET AND DRINKING WATER FACILITY AT SANMILITA JANATA HIGH SCHOOL |
400000 |
CONST OF TOILET AND DRINKING WATER FACILITY AT SANMILITA JANATA HIGH SCHOOL1 |
Completion of work |
-
latitude : 27.26476103
Longitude : 94.77931363
file name : Image_06102021153544862.png
|
2021-10-06 15:35:44.974326 |
35 |
85586393 |
RENOVATION OF REST HOUSE AT PANIMIRI GAON BURIAL GROUND |
175000 |
RENOVATION OF REST HOUSE AT PANIMIRI GAON BURIAL GROUND1 |
Roof laid |
-
latitude : 27.286434999999997
Longitude : 94.79961666666668
file name : Image_05012024132830712.png
|
2024-01-05 13:28:30.811327 |
36 |
85586393 |
RENOVATION OF REST HOUSE AT PANIMIRI GAON BURIAL GROUND |
175000 |
RENOVATION OF REST HOUSE AT PANIMIRI GAON BURIAL GROUND1 |
Plinth level |
-
latitude : 27.286434999999997
Longitude : 94.79967
file name : Image_05012024131950166.png
|
2024-01-05 13:19:49.740367 |
37 |
85586393 |
RENOVATION OF REST HOUSE AT PANIMIRI GAON BURIAL GROUND |
175000 |
RENOVATION OF REST HOUSE AT PANIMIRI GAON BURIAL GROUND1 |
Completion of work |
-
latitude : 27.286445000000004
Longitude : 94.79973333333334
file name : Image_17072023160014759.png
|
2023-07-17 16:00:14.562254 |
38 |
52801476 |
GRAVELLING OF CHARAIBAHI ROAD |
270000 |
GRAVELLING OF CHARAIBAHI ROAD1 |
Roof laid |
-
latitude : 27.26649824,27.26652715
Longitude : 94.7822213,94.78220198
file name : Image_11102022133329117.png
|
2022-10-11 13:33:29.214447 |
39 |
52801476 |
GRAVELLING OF CHARAIBAHI ROAD |
270000 |
GRAVELLING OF CHARAIBAHI ROAD1 |
Plinth level |
-
latitude : 27.26655572,27.26655573
Longitude : 94.78225597,94.78225596
file name : Image_07092022141125849.png
|
2022-09-07 14:11:25.954391 |
40 |
52801476 |
GRAVELLING OF CHARAIBAHI ROAD |
270000 |
GRAVELLING OF CHARAIBAHI ROAD1 |
Completion of work |
-
latitude : 27.2665379,27.26653787
Longitude : 94.7822721,94.78227212
file name : Image_15072022163635188.png
|
2022-07-15 16:36:35.290766 |
41 |
52801340 |
CONST OF TOILET AND DRINKING WATER FACILITY AT KOLAKHOWA CHARILI MV SCHOOL |
400000 |
CONST OF TOILET AND DRINKING WATER FACILITY AT KOLAKHOWA CHARILI MV SCHOOL1 |
Roof laid |
-
latitude : 27.27852237
Longitude : 94.79367195
file name : Image_01112021155214615.png
|
2021-11-01 15:52:14.722242 |
42 |
52801340 |
CONST OF TOILET AND DRINKING WATER FACILITY AT KOLAKHOWA CHARILI MV SCHOOL |
400000 |
CONST OF TOILET AND DRINKING WATER FACILITY AT KOLAKHOWA CHARILI MV SCHOOL1 |
Plinth level |
-
latitude : 27.2785268
Longitude : 94.79371147
file name : Image_07102021125440301.png
|
2021-10-07 12:54:40.410337 |
43 |
52801340 |
CONST OF TOILET AND DRINKING WATER FACILITY AT KOLAKHOWA CHARILI MV SCHOOL |
400000 |
CONST OF TOILET AND DRINKING WATER FACILITY AT KOLAKHOWA CHARILI MV SCHOOL1 |
Completion of work |
-
latitude : 27.27852276
Longitude : 94.79355834
file name : Image_20092021145600826.png
|
2021-09-20 14:56:00.935599 |
44 |
52801492 |
IMP OF RAIDONGIA KRISHI PATH |
180000 |
IMP OF RAIDONGIA KRISHI PATH1 |
Roof laid |
-
latitude : 27.31996461,27.31996813
Longitude : 94.79623678,94.79624264
file name : Image_11112021133037018.png
|
2021-11-11 13:30:37.128383 |
45 |
52801492 |
IMP OF RAIDONGIA KRISHI PATH |
180000 |
IMP OF RAIDONGIA KRISHI PATH1 |
Completion of work |
-
latitude : 27.31989155,27.3199168
Longitude : 94.79621534,94.79621734
file name : Image_13092021152033310.png
|
2021-09-13 15:20:33.400799 |
46 |
52801522 |
CONST OF SHIVA MANDIR CULTURAL CENTRE AT ITAKHULI SINGORI |
180000 |
CONST OF SHIVA MANDIR CULTURAL CENTRE AT ITAKHULI SINGORI1 |
Roof laid |
-
latitude : 27.24561528
Longitude : 94.77025288
file name : Image_18082022131322103.png
|
2022-08-18 13:13:22.196382 |
47 |
52801522 |
CONST OF SHIVA MANDIR CULTURAL CENTRE AT ITAKHULI SINGORI |
180000 |
CONST OF SHIVA MANDIR CULTURAL CENTRE AT ITAKHULI SINGORI1 |
Plinth level |
-
latitude : 27.24548233
Longitude : 94.7703089
file name : Image_13052022121309510.png
|
2022-05-13 12:13:09.627961 |
48 |
52801522 |
CONST OF SHIVA MANDIR CULTURAL CENTRE AT ITAKHULI SINGORI |
180000 |
CONST OF SHIVA MANDIR CULTURAL CENTRE AT ITAKHULI SINGORI1 |
Completion of work |
-
latitude : 27.24560164
Longitude : 94.77023646
file name : Image_14122021114621048.png
|
2021-12-14 11:46:21.176127 |
49 |
52801538 |
CONST OF CHAKOIPATHER COMMUNITY HALL |
270000 |
CONST OF CHAKOIPATHER COMMUNITY HALL1 |
Roof laid |
-
latitude : 27.26050452
Longitude : 94.76281051
file name : Image_13062022112220873.png
|
2022-06-13 11:22:20.994163 |
50 |
52801538 |
CONST OF CHAKOIPATHER COMMUNITY HALL |
270000 |
CONST OF CHAKOIPATHER COMMUNITY HALL1 |
Plinth level |
-
latitude : 27.26033535
Longitude : 94.76263458
file name : Image_13052022131040024.png
|
2022-05-13 13:10:40.16214 |
51 |
52801538 |
CONST OF CHAKOIPATHER COMMUNITY HALL |
270000 |
CONST OF CHAKOIPATHER COMMUNITY HALL1 |
Completion of work |
-
latitude : 27.26035663
Longitude : 94.76265635
file name : Image_05012022124905240.png
|
2022-01-05 12:49:05.38499 |
52 |
52801555 |
GRAVELLING FROM JANJIMUKH TO RIVER SIDE PATH |
133736 |
GRAVELLING FROM JANJIMUKH TO RIVER SIDE PATH1 |
Roof laid |
-
latitude : 27.27759383,27.2775885
Longitude : 94.79771537,94.79769309
file name : Image_01112021154610729.png
|
2021-11-01 15:46:10.847866 |
53 |
52801555 |
GRAVELLING FROM JANJIMUKH TO RIVER SIDE PATH |
133736 |
GRAVELLING FROM JANJIMUKH TO RIVER SIDE PATH1 |
Plinth level |
-
latitude : 27.48176773,27.27765855
Longitude : 94.92621966,94.79777958
file name : Image_07102021125021740.png
|
2021-10-07 12:50:21.850668 |
54 |
52801555 |
GRAVELLING FROM JANJIMUKH TO RIVER SIDE PATH |
133736 |
GRAVELLING FROM JANJIMUKH TO RIVER SIDE PATH1 |
Completion of work |
-
latitude : 27.27757934,27.27757227
Longitude : 94.79776154,94.79775744
file name : Image_20092021150117397.png
|
2021-09-20 15:01:17.49689 |
55 |
52801388 |
CONST OF URINAL WITH WATER SUPPLY AT DIGHOLIA BOR NAMGHAR |
168595 |
CONST OF URINAL WITH WATER SUPPLY AT DIGHOLIA BOR NAMGHAR1 |
Roof laid |
-
latitude : 27.29873145
Longitude : 94.80169934
file name : Image_18082022120123780.png
|
2022-08-18 12:01:23.904104 |
56 |
52801388 |
CONST OF URINAL WITH WATER SUPPLY AT DIGHOLIA BOR NAMGHAR |
168595 |
CONST OF URINAL WITH WATER SUPPLY AT DIGHOLIA BOR NAMGHAR1 |
Plinth level |
-
latitude : 27.298867
Longitude : 94.80060395
file name : Image_15072022163631073.png
|
2022-07-15 16:36:31.179973 |
57 |
52801388 |
CONST OF URINAL WITH WATER SUPPLY AT DIGHOLIA BOR NAMGHAR |
168595 |
CONST OF URINAL WITH WATER SUPPLY AT DIGHOLIA BOR NAMGHAR1 |
Completion of work |
-
latitude : 27.29898304
Longitude : 94.80071463
file name : Image_10062022114857156.png
|
2022-06-10 11:48:57.259941 |
58 |
64898643 |
Construction of toilets in public institutions |
190000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.29050822
Longitude : 94.80242348
file name : Image_07122022133525551.png
|
2022-12-07 13:35:25.666193 |
59 |
64898643 |
Construction of toilets in public institutions |
190000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.29043941
Longitude : 94.80242099
file name : Image_28102022140255307.png
|
2022-10-28 14:02:55.420919 |
60 |
64898643 |
Construction of toilets in public institutions |
190000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.29057533
Longitude : 94.80240779
file name : Image_06092022161127502.png
|
2022-09-06 16:11:27.609091 |
61 |
64898643 |
Construction of toilets in public institutions |
190000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.29057533
Longitude : 94.80240779
file name : Image_06092022160856563.png
|
2022-09-06 16:08:56.681043 |
62 |
85583290 |
INFRASTRUCTURE DEVELOPMENT OF JANJIMUKH CULTURAL CENTRE (MURONG GHAR) |
200000 |
INFRASTRUCTURE DEVELOPMENT OF JANJIMUKH CULTURAL CENTRE (MURONG GHAR)1 |
Roof laid |
-
latitude : 27.277253333333338
Longitude : 94.79549666666665
file name : Image_03012024162422522.png
|
2024-01-03 16:24:22.623804 |
63 |
85583290 |
INFRASTRUCTURE DEVELOPMENT OF JANJIMUKH CULTURAL CENTRE (MURONG GHAR) |
200000 |
INFRASTRUCTURE DEVELOPMENT OF JANJIMUKH CULTURAL CENTRE (MURONG GHAR)1 |
Plinth level |
-
latitude : 27.277261666666664
Longitude : 94.79556333333333
file name : Image_03012024161904320.png
|
2024-01-03 16:19:04.43618 |
64 |
85583290 |
INFRASTRUCTURE DEVELOPMENT OF JANJIMUKH CULTURAL CENTRE (MURONG GHAR) |
200000 |
INFRASTRUCTURE DEVELOPMENT OF JANJIMUKH CULTURAL CENTRE (MURONG GHAR)1 |
Completion of work |
-
latitude : 27.277156666666663
Longitude : 94.79556666666667
file name : Image_17072023142552485.png
|
2023-07-17 14:25:52.65385 |
65 |
85583290 |
INFRASTRUCTURE DEVELOPMENT OF JANJIMUKH CULTURAL CENTRE (MURONG GHAR) |
200000 |
INFRASTRUCTURE DEVELOPMENT OF JANJIMUKH CULTURAL CENTRE (MURONG GHAR)1 |
Completion of work |
-
latitude : 27.277203333333333
Longitude : 94.79563333333333
file name : Image_14082023155516158.png
|
2023-08-14 15:55:16.249619 |
66 |
64898847 |
Creation of a new source of drinking water |
190000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 27.320803333333334
Longitude : 94.79644833333332
file name : Image_03012024150053309.png
|
2024-01-03 15:00:53.394556 |
67 |
64898847 |
Creation of a new source of drinking water |
190000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 27.32073883
Longitude : 94.79640998
file name : Image_13102022110120280.png
|
2022-10-13 11:01:20.398943 |
68 |
64898847 |
Creation of a new source of drinking water |
190000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 27.32076654
Longitude : 94.79644875
file name : Image_10092022103742626.png
|
2022-09-10 10:37:42.729569 |
69 |
64970084 |
CONST. OF PANI MIRI GAON EAST SIDE DRAIN (PHASE 2) |
300000 |
CONST. OF PANI MIRI GAON EAST SIDE DRAIN (PHASE 2)1 |
Roof laid |
-
latitude : 27.29045111,27.29044681
Longitude : 94.80136387,94.80138045
file name : Image_09112022142019575.png
|
2022-11-09 14:20:19.651827 |
70 |
64970084 |
CONST. OF PANI MIRI GAON EAST SIDE DRAIN (PHASE 2) |
300000 |
CONST. OF PANI MIRI GAON EAST SIDE DRAIN (PHASE 2)1 |
Plinth level |
-
latitude : 27.29032471,27.29033334
Longitude : 94.80161315,94.80155284
file name : Image_28102022140811268.png
|
2022-10-28 14:08:11.389556 |
71 |
64970084 |
CONST. OF PANI MIRI GAON EAST SIDE DRAIN (PHASE 2) |
300000 |
CONST. OF PANI MIRI GAON EAST SIDE DRAIN (PHASE 2)1 |
Completion of work |
-
latitude : 27.29041343,27.29041318
Longitude : 94.80151193,94.8015124
file name : Image_06092022161234582.png
|
2022-09-06 16:12:34.677196 |
72 |
64970084 |
CONST. OF PANI MIRI GAON EAST SIDE DRAIN (PHASE 2) |
300000 |
CONST. OF PANI MIRI GAON EAST SIDE DRAIN (PHASE 2)1 |
Completion of work |
-
latitude : 27.29041343,27.29041318
Longitude : 94.80151193,94.8015124
file name : Image_06092022161215827.png
|
2022-09-06 16:12:15.923002 |
73 |
64898964 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.25554833333333
Longitude : 94.76779499999999
file name : Image_05012024161647741.png
|
2024-01-05 16:16:47.8461 |
74 |
64898964 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.25569653
Longitude : 94.76791588
file name : Image_25112022072814079.png
|
2022-11-25 07:28:14.166884 |
75 |
64898964 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.25558454
Longitude : 94.76784645
file name : Image_08092022143046241.png
|
2022-09-08 14:30:46.345223 |
76 |
64898964 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.25558454
Longitude : 94.76784645
file name : Image_08092022142938273.png
|
2022-09-08 14:29:38.369408 |
77 |
64898789 |
Creation of a new source of drinking water |
194500 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 27.25217951
Longitude : 94.75429671
file name : Image_07122022115237534.png
|
2022-12-07 11:52:37.661583 |
78 |
64898789 |
Creation of a new source of drinking water |
194500 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 27.25223371
Longitude : 94.75434067
file name : Image_03112022124440973.png
|
2022-11-03 12:44:41.075115 |
79 |
64898789 |
Creation of a new source of drinking water |
194500 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 27.25232716
Longitude : 94.75426506
file name : Image_06092022151319311.png
|
2022-09-06 15:13:19.401995 |
80 |
64899227 |
CONST. OF MOINA MISSING GAON MURONG GHAR |
400000 |
CONST. OF MOINA MISSING GAON MURONG GHAR1 |
Roof laid |
-
latitude : 27.30917953
Longitude : 94.779818
file name : Image_22122022155641047.png
|
2022-12-22 15:56:41.145332 |
81 |
64899227 |
CONST. OF MOINA MISSING GAON MURONG GHAR |
400000 |
CONST. OF MOINA MISSING GAON MURONG GHAR1 |
Plinth level |
-
latitude : 27.30922783
Longitude : 94.77996433
file name : Image_18102022134748614.png
|
2022-10-18 13:47:48.726756 |
82 |
64899227 |
CONST. OF MOINA MISSING GAON MURONG GHAR |
400000 |
CONST. OF MOINA MISSING GAON MURONG GHAR1 |
Completion of work |
-
latitude : 27.30925686
Longitude : 94.77972932
file name : Image_06092022165903830.png
|
2022-09-06 16:59:03.947668 |
83 |
64898537 |
Construction of toilets in public institutions |
190000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.25639833333333
Longitude : 94.79023833333333
file name : Image_05012024150648051.png
|
2024-01-05 15:06:48.163208 |
84 |
64898537 |
Construction of toilets in public institutions |
190000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.25633297
Longitude : 94.79026238
file name : Image_03112022101016579.png
|
2022-11-03 10:10:16.67 |
85 |
64898537 |
Construction of toilets in public institutions |
190000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.25636145
Longitude : 94.79027889
file name : Image_08092022144953927.png
|
2022-09-08 14:49:54.043933 |
86 |
66944960 |
INFRASTRUCTURE DEVELOPMENT OF KOLAKHOWA GOZAI GAON L.P. SCHOOL |
200000 |
INFRASTRUCTURE DEVELOPMENT OF KOLAKHOWA GOZAI GAON L.P. SCHOOL1 |
Roof laid |
-
latitude : 27.275478333333332
Longitude : 94.778545
file name : Image_17062023144221825.png
|
2023-06-17 14:42:21.931795 |
87 |
66944960 |
INFRASTRUCTURE DEVELOPMENT OF KOLAKHOWA GOZAI GAON L.P. SCHOOL |
200000 |
INFRASTRUCTURE DEVELOPMENT OF KOLAKHOWA GOZAI GAON L.P. SCHOOL1 |
Plinth level |
-
latitude : 27.275531
Longitude : 94.77848989
file name : Image_27042023175929077.png
|
2023-04-27 17:59:29.15797 |
88 |
66944960 |
INFRASTRUCTURE DEVELOPMENT OF KOLAKHOWA GOZAI GAON L.P. SCHOOL |
200000 |
INFRASTRUCTURE DEVELOPMENT OF KOLAKHOWA GOZAI GAON L.P. SCHOOL1 |
Completion of work |
-
latitude : 27.27557093
Longitude : 94.77866936
file name : Image_15032023144727594.png
|
2023-03-15 14:47:27.685522 |
89 |
66937698 |
Construction of toilets in public institutions |
179500 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.27743795
Longitude : 94.79565875
file name : Image_22052023162751783.png
|
2023-05-22 16:27:51.871608 |
90 |
66937698 |
Construction of toilets in public institutions |
179500 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.27734982
Longitude : 94.79554258
file name : Image_12042023142333205.png
|
2023-04-12 14:23:33.285317 |
91 |
66937698 |
Construction of toilets in public institutions |
179500 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.27728371
Longitude : 94.79561508
file name : Image_15032023135637987.png
|
2023-03-15 13:56:38.095279 |
92 |
66937720 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.273703333333334
Longitude : 94.77297333333333
file name : Image_17062023145016338.png
|
2023-06-17 14:50:16.445314 |
93 |
66937720 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.27370395
Longitude : 94.77294792
file name : Image_27042023174833890.png
|
2023-04-27 17:48:33.98751 |
94 |
66937720 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.27371834
Longitude : 94.77299767
file name : Image_15032023150522314.png
|
2023-03-15 15:05:22.426329 |
95 |
66937882 |
Construction of toilets in public institutions |
228500 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.26003932
Longitude : 94.78016873
file name : Image_11052023175314034.png
|
2023-05-11 17:53:14.134487 |
96 |
66945101 |
INFRASTRUCTURE DEVELOPMENT OF KOLAKHOWA G.P. OFFICE |
100000 |
INFRASTRUCTURE DEVELOPMENT OF KOLAKHOWA G.P. OFFICE1 |
Roof laid |
-
latitude : 27.27666
Longitude : 94.79331166666667
file name : Image_05012024135635806.png
|
2024-01-05 13:56:35.885323 |
97 |
66945101 |
INFRASTRUCTURE DEVELOPMENT OF KOLAKHOWA G.P. OFFICE |
100000 |
INFRASTRUCTURE DEVELOPMENT OF KOLAKHOWA G.P. OFFICE1 |
Plinth level |
-
latitude : 27.27661833333333
Longitude : 94.79330499999999
file name : Image_05012024135337539.png
|
2024-01-05 13:53:37.61608 |
98 |
66945101 |
INFRASTRUCTURE DEVELOPMENT OF KOLAKHOWA G.P. OFFICE |
100000 |
INFRASTRUCTURE DEVELOPMENT OF KOLAKHOWA G.P. OFFICE1 |
Completion of work |
-
latitude : 27.276371666666666
Longitude : 94.79350000000001
file name : Image_14082023154907754.png
|
2023-08-14 15:49:07.847728 |
99 |
66937782 |
Construction of toilets in public institutions |
180000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.266151666666662
Longitude : 94.78122833333333
file name : Image_05012024154913905.png
|
2024-01-05 15:49:13.993367 |
100 |
66937782 |
Construction of toilets in public institutions |
180000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.4741796
Longitude : 94.9138998
file name : Image_29052023183607640.png
|
2023-05-29 18:36:07.720227 |
101 |
66937782 |
Construction of toilets in public institutions |
180000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.26624636
Longitude : 94.78141517
file name : Image_21042023124320035.png
|
2023-04-21 12:43:20.132514 |
102 |
66937908 |
Construction of toilets in public institutions |
230000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.315406666666664
Longitude : 94.78890833333335
file name : Image_03012024151302619.png
|
2024-01-03 15:13:02.712797 |
103 |
66937908 |
Construction of toilets in public institutions |
230000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.31538128
Longitude : 94.78890785
file name : Image_19052023142543953.png
|
2023-05-19 14:25:44.05084 |
104 |
66937908 |
Construction of toilets in public institutions |
230000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.31534435
Longitude : 94.78898961
file name : Image_01052023130757323.png
|
2023-05-01 13:07:57.426589 |
105 |
85574766 |
Creation of community compost pits for a group of Households |
87269 |
Creation of community compost pits for a group of Households1 |
Roof laid |
-
latitude : 27.256195
Longitude : 94.77310833333334
file name : Image_05012024163248104.png
|
2024-01-05 16:32:48.19867 |
106 |
85574766 |
Creation of community compost pits for a group of Households |
87269 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 27.25619166666667
Longitude : 94.77313166666666
file name : Image_05012024162552700.png
|
2024-01-05 16:25:52.790505 |
107 |
85574766 |
Creation of community compost pits for a group of Households |
87269 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 27.256186666666668
Longitude : 94.77316166666667
file name : Image_14082023163539042.png
|
2023-08-14 16:35:39.156167 |
108 |
85580122 |
Creation of community soak pits for group of Households |
55500 |
Creation of community soak pits for group of Households1 |
Roof laid |
-
latitude : 27.264615000000003
Longitude : 94.77918999999999
file name : Image_05012024160420023.png
|
2024-01-05 16:04:20.126204 |
109 |
85580122 |
Creation of community soak pits for group of Households |
55500 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 27.264513333333337
Longitude : 94.77917166666666
file name : Image_05012024155957581.png
|
2024-01-05 15:59:57.688515 |
110 |
85580122 |
Creation of community soak pits for group of Households |
55500 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 27.264685
Longitude : 94.77911166666667
file name : Image_14082023171045344.png
|
2023-08-14 17:10:45.440663 |
111 |
85581145 |
Construction of toilets in public institutions |
176854 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.244763333333335
Longitude : 94.77200666666667
file name : Image_05012024165749422.png
|
2024-01-05 16:57:49.512098 |
112 |
85581145 |
Construction of toilets in public institutions |
176854 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.244773333333335
Longitude : 94.77199166666666
file name : Image_05012024165403469.png
|
2024-01-05 16:54:03.561839 |
113 |
85581145 |
Construction of toilets in public institutions |
176854 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.244831666666663
Longitude : 94.77196166666666
file name : Image_22072023155438600.png
|
2023-07-22 15:54:38.769079 |
114 |
85581145 |
Construction of toilets in public institutions |
176854 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.244726666666665
Longitude : 94.77196
file name : Image_12102023173337497.png
|
2023-10-12 17:33:37.602807 |
115 |
85582649 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.260413333333336
Longitude : 94.76256333333335
file name : Image_05012024164215559.png
|
2024-01-05 16:42:15.652239 |
116 |
85582649 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.26045166666667
Longitude : 94.76253333333334
file name : Image_05012024163704475.png
|
2024-01-05 16:37:04.573944 |
117 |
85582649 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.260343333333335
Longitude : 94.76249666666666
file name : Image_14082023165014680.png
|
2023-08-14 16:50:14.783143 |
118 |
85579124 |
Creation of community compost pits for a group of Households |
52500 |
Creation of community compost pits for a group of Households1 |
Roof laid |
-
latitude : 27.309221666666666
Longitude : 94.77945333333334
file name : Image_03012024152602325.png
|
2024-01-03 15:26:02.414756 |
119 |
85579124 |
Creation of community compost pits for a group of Households |
52500 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 27.30929666666667
Longitude : 94.77945333333334
file name : Image_03012024152004938.png
|
2024-01-03 15:20:05.024436 |
120 |
85579124 |
Creation of community compost pits for a group of Households |
52500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 27.30910833333333
Longitude : 94.77930833333333
file name : Image_17072023164218536.png
|
2023-07-17 16:42:18.792853 |
121 |
85583708 |
INFRASTRUCTURE DEVELOPMENT OF 1 NO. BANCHBARI SANSKRITIK SANGHA |
132700 |
INFRASTRUCTURE DEVELOPMENT OF 1 NO. BANCHBARI SANSKRITIK SANGHA1 |
Roof laid |
-
latitude : 27.256829999999997
Longitude : 94.79115500000002
file name : Image_05012024150152157.png
|
2024-01-05 15:01:52.240911 |
122 |
85583708 |
INFRASTRUCTURE DEVELOPMENT OF 1 NO. BANCHBARI SANSKRITIK SANGHA |
132700 |
INFRASTRUCTURE DEVELOPMENT OF 1 NO. BANCHBARI SANSKRITIK SANGHA1 |
Plinth level |
-
latitude : 27.256705000000004
Longitude : 94.79100333333332
file name : Image_05012024144839777.png
|
2024-01-05 14:48:39.854779 |
123 |
85583708 |
INFRASTRUCTURE DEVELOPMENT OF 1 NO. BANCHBARI SANSKRITIK SANGHA |
132700 |
INFRASTRUCTURE DEVELOPMENT OF 1 NO. BANCHBARI SANSKRITIK SANGHA1 |
Plinth level |
-
latitude : 27.256705000000004
Longitude : 94.79100333333332
file name : Image_05012024144732091.png
|
2024-01-05 14:47:32.188082 |
124 |
85583708 |
INFRASTRUCTURE DEVELOPMENT OF 1 NO. BANCHBARI SANSKRITIK SANGHA |
132700 |
INFRASTRUCTURE DEVELOPMENT OF 1 NO. BANCHBARI SANSKRITIK SANGHA1 |
Completion of work |
-
latitude : 27.256618333333336
Longitude : 94.79107166666667
file name : Image_17082023144329189.png
|
2023-08-17 14:43:29.284129 |
125 |
85585013 |
RENOVATION OF KALAKHOWA GOZAI GAON L. P. SCHOOL |
175000 |
RENOVATION OF KALAKHOWA GOZAI GAON L. P. SCHOOL1 |
Roof laid |
-
latitude : 27.275828333333333
Longitude : 94.77859166666667
file name : Image_05012024153250601.png
|
2024-01-05 15:32:50.700313 |
126 |
85585013 |
RENOVATION OF KALAKHOWA GOZAI GAON L. P. SCHOOL |
175000 |
RENOVATION OF KALAKHOWA GOZAI GAON L. P. SCHOOL1 |
Plinth level |
-
latitude : 27.275803333333336
Longitude : 94.77846833333334
file name : Image_05012024152917659.png
|
2024-01-05 15:29:17.758125 |
127 |
85585013 |
RENOVATION OF KALAKHOWA GOZAI GAON L. P. SCHOOL |
175000 |
RENOVATION OF KALAKHOWA GOZAI GAON L. P. SCHOOL1 |
Completion of work |
-
latitude : 27.27595666666667
Longitude : 94.77849666666667
file name : Image_17082023152136041.png
|
2023-08-17 15:21:36.157443 |
128 |
85585013 |
RENOVATION OF KALAKHOWA GOZAI GAON L. P. SCHOOL |
175000 |
RENOVATION OF KALAKHOWA GOZAI GAON L. P. SCHOOL1 |
Completion of work |
-
latitude : 27.275678333333335
Longitude : 94.77836833333335
file name : Image_17072023145436528.png
|
2023-07-17 14:54:36.619557 |
129 |
85585013 |
RENOVATION OF KALAKHOWA GOZAI GAON L. P. SCHOOL |
175000 |
RENOVATION OF KALAKHOWA GOZAI GAON L. P. SCHOOL1 |
Completion of work |
-
latitude : 27.275851666666668
Longitude : 94.77849166666668
file name : Image_14082023160622347.png
|
2023-08-14 16:06:22.438071 |
130 |
66944883 |
INFRASTRUCTURE DEVELOPMENT OF BAM KOLAKHOWA CULTURAL CENTRE |
280500 |
INFRASTRUCTURE DEVELOPMENT OF BAM KOLAKHOWA CULTURAL CENTRE1 |
Roof laid |
-
latitude : 27.26626666666667
Longitude : 94.78143166666665
file name : Image_05012024155426235.png
|
2024-01-05 15:54:26.327599 |
131 |
66944883 |
INFRASTRUCTURE DEVELOPMENT OF BAM KOLAKHOWA CULTURAL CENTRE |
280500 |
INFRASTRUCTURE DEVELOPMENT OF BAM KOLAKHOWA CULTURAL CENTRE1 |
Plinth level |
-
latitude : 27.4741796
Longitude : 94.9138998
file name : Image_29052023184035530.png
|
2023-05-29 18:40:35.612484 |
132 |
66944883 |
INFRASTRUCTURE DEVELOPMENT OF BAM KOLAKHOWA CULTURAL CENTRE |
280500 |
INFRASTRUCTURE DEVELOPMENT OF BAM KOLAKHOWA CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.26583878
Longitude : 94.78139165
file name : Image_21042023150827490.png
|
2023-04-21 15:08:27.59327 |
133 |
64899470 |
INFRASTRUCTURE DEVELOPMENT OF BANCHBARI YUBAK SANGHA |
200000 |
INFRASTRUCTURE DEVELOPMENT OF BANCHBARI YUBAK SANGHA1 |
Roof laid |
-
latitude : 27.265424999999997
Longitude : 94.796065
file name : Image_21122023115508860.png
|
2023-12-21 11:55:08.973877 |
134 |
64899470 |
INFRASTRUCTURE DEVELOPMENT OF BANCHBARI YUBAK SANGHA |
200000 |
INFRASTRUCTURE DEVELOPMENT OF BANCHBARI YUBAK SANGHA1 |
Plinth level |
-
latitude : 27.26553568
Longitude : 94.79594982
file name : Image_13102022135607450.png
|
2022-10-13 13:56:07.570006 |
135 |
64899470 |
INFRASTRUCTURE DEVELOPMENT OF BANCHBARI YUBAK SANGHA |
200000 |
INFRASTRUCTURE DEVELOPMENT OF BANCHBARI YUBAK SANGHA1 |
Completion of work |
-
latitude : 27.26543637
Longitude : 94.79603366
file name : Image_08092022145838244.png
|
2022-09-08 14:58:38.358433 |
136 |
52801573 |
COVID 19 EXPENSES |
114859 |
COVID 19 EXPENSES1 |
Roof laid |
-
latitude : 27.4740241
Longitude : 94.9138213
file name : Image_03052024090942735.png
|
2024-05-03 09:09:43.576735 |
137 |
52801573 |
COVID 19 EXPENSES |
114859 |
COVID 19 EXPENSES1 |
Plinth level |
-
latitude : 27.4740239
Longitude : 94.913821
file name : Image_03052024090719547.png
|
2024-05-03 09:07:20.431104 |
138 |
52801573 |
COVID 19 EXPENSES |
114859 |
COVID 19 EXPENSES1 |
Completion of work |
-
latitude : 27.27653812
Longitude : 94.79343199
file name : Image_22082022144723236.png
|
2022-08-22 14:47:23.339488 |
139 |
66937962 |
RENOVATION OF RONGAGORAH CULTURAL CENTRE |
180000 |
RENOVATION OF RONGAGORAH CULTURAL CENTRE1 |
Roof laid |
-
latitude : 27.4740238
Longitude : 94.9138215
file name : Image_03052024093936196.png
|
2024-05-03 09:39:36.289409 |
140 |
66937962 |
RENOVATION OF RONGAGORAH CULTURAL CENTRE |
180000 |
RENOVATION OF RONGAGORAH CULTURAL CENTRE1 |
Plinth level |
-
latitude : 27.272276666666667
Longitude : 94.75315666666665
file name : Image_22022024160725138.png
|
2024-02-22 16:07:25.310831 |
141 |
66937962 |
RENOVATION OF RONGAGORAH CULTURAL CENTRE |
180000 |
RENOVATION OF RONGAGORAH CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.27188231
Longitude : 94.75294124
file name : Image_11052023135600733.png
|
2023-05-11 13:56:00.859962 |
142 |
85579734 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
78300 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
Roof laid |
-
latitude : 27.4740238
Longitude : 94.9138217
file name : Image_03052024095401961.png
|
2024-05-03 09:54:02.661387 |
143 |
85579734 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
78300 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
Plinth level |
-
latitude : 27.4740238
Longitude : 94.9138215
file name : Image_03052024095150786.png
|
2024-05-03 09:51:51.505535 |
144 |
85579734 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
78300 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 27.4742072
Longitude : 94.9138438
file name : Image_29112023200952199.png
|
2023-11-29 20:09:52.939498 |