1 |
10510709 |
Pavers Block Road from NH 37 To Sepon Chakalia PHC Connecting Road |
340000 |
Unmetalled / Kachcha Road1
|
Completed |
-
latitude : 27.13803636,27.13795896
Longitude : 94.81770023,94.81772925
file name : Image_13072019095346201.png
|
2019-07-13 09:53:46.281753 |
2 |
4206787 |
1 NO CHAKALIA BURIAL GROUND COMMUNITY HALL |
310893 |
Boundary wall / Side Wall / Retaining Wall1
|
In Progress |
-
latitude : 27.12984156
Longitude : 94.81640795
file name : Image_12022019145621288.png
|
2019-02-12 14:56:21.09762 |
3 |
10511210 |
Maintenance Road From Thowra 12 No Line L.P. To 12 No Line Church |
100000 |
Unmetalled / Kachcha Road1
|
Completed |
-
latitude : 27.11778905,27.11782879,27.11783472
Longitude : 94.80745484,94.80744414,94.80744128
file name : Image_13072019093006938.png
|
2019-07-13 09:30:07.031781 |
4 |
10510643 |
Maintenance at Dehingia Gaon Sukafa Roads |
100000 |
Unmetalled / Kachcha Road1
|
Completed |
-
latitude : 27.16422808,27.16421483
Longitude : 94.81466736,94.81466033
file name : Image_13072019120101158.png
|
2019-07-13 12:01:01.240923 |
5 |
4207138 |
BOUNDARY WALL AT 1 NO RONGAGORAH VETERINARY HOSPITAL |
310893 |
Boundary wall / Side Wall / Retaining Wall1 |
Completed |
-
latitude : 27.152402
Longitude : 94.84939777
file name : Image_12022019142943575.png
|
2019-02-12 14:29:43.558417 |
6 |
4207138 |
BOUNDARY WALL AT 1 NO RONGAGORAH VETERINARY HOSPITAL |
310893 |
Boundary wall / Side Wall / Retaining Wall1 |
Completed |
-
latitude : 27.15230275
Longitude : 94.84950021
file name : Image_15062019125652528.png
|
2019-06-15 12:56:52.647916 |
7 |
10510487 |
Maintenance of Road From Jhallam to 1 No Rangagarah Road |
120000 |
Unmetalled / Kachcha Road1
|
Completed |
-
latitude : 27.13400398,27.13401378,27.1340149
Longitude : 94.86683376,94.86682618,94.86682802
file name : Image_13072019082000038.png
|
2019-07-13 08:20:00.144664 |
8 |
10510915 |
Construction Moran Daily Bazar Market Shed |
200000 |
Commercial Complexes1
|
Completed |
-
latitude : 27.1803258
Longitude : 94.9115065
file name : Image_17072019134453089.png
|
2019-07-17 13:44:53.185163 |
9 |
10510915 |
Construction Moran Daily Bazar Market Shed |
200000 |
Commercial Complexes1
|
Completed |
-
latitude : 27.1802327
Longitude : 94.9116481
file name : Image_17072019134449774.png
|
2019-07-17 13:44:49.881026 |
10 |
32514923 |
Improvement of road from rangali chapori to old moran road |
200000 |
Approach Road1
|
GSB |
-
latitude : 27.16546957,27.16545771
Longitude : 94.82122352,94.82123648
file name : Image_24112019132559290.png
|
2019-11-24 13:25:59.380671 |
11 |
12146432 |
Pavers Block Road NH 37 to Koiri Kathani Connecting Phase II |
673310 |
Pavement1 |
Completed |
-
latitude : 27.12540212,27.12540934,27.12541279
Longitude : 94.81343893,94.81344302,94.81344633
file name : Image_11082020120006383.png
|
2020-08-11 12:00:07.024637 |
12 |
12146432 |
Pavers Block Road NH 37 to Koiri Kathani Connecting Phase II |
673310 |
Pavement1 |
GSB |
-
latitude : 27.12538004,27.12539083
Longitude : 94.81346708,94.81348091
file name : Image_28022020132331625.png
|
2020-02-28 13:23:31.690052 |
13 |
12145579 |
Construction of Boundary Wall at Kamaldoi L.P. M.E. School (Phase II) |
300000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 27.15486232
Longitude : 94.83029421
file name : Image_20112019134206402.png
|
2019-11-20 13:42:06.506817 |
14 |
20400017 |
Imp. of Cultural Centre (K.M.) at Thowra 12 No. Line |
198046 |
Cultural Stage1 |
Completed |
-
latitude : 27.12006588
Longitude : 94.80725398
file name : Image_12082020121313795.png
|
2020-08-12 12:13:14.443655 |
15 |
12145560 |
Construction of Toilet and Urinal with Running Water at Pathalibam High School |
250000 |
Construction of Toilet and Urinal with Running Water at Pathalibam High School1 |
25% |
-
latitude : 27.17463125
Longitude : 94.82967016
file name : Image_12082020114545327.png
|
2020-08-12 11:45:46.047632 |
16 |
30415273 |
IMPROVEMENT OF NAHARANI KAMALDOI ROAD TO NAHARANI SITAPUR CONNECTING WITH 1 NO CULVERT |
400000 |
IMPROVEMENT OF NAHARANI KAMALDOI ROAD TO NAHARANI SITAPUR CONNECTING WITH 1 NO CULVERT1 |
25% |
-
latitude : 27.15199391,27.15198304
Longitude : 94.81852694,94.81855159
file name : Image_29082020144836862.png
|
2020-08-29 14:48:37.513346 |
17 |
30418761 |
CONSTRUCTION OF 4 NOS SLAB CULVERT AT CHAKALIA HINGRIJAN |
564000 |
CONSTRUCTION OF 4 NOS SLAB CULVERT AT CHAKALIA HINGRIJAN1 |
25% |
-
latitude : 27.12461589,27.12459545,27.12461173
Longitude : 94.81752708,94.8175189,94.81752257
file name : Image_28082020163903985.png
|
2020-08-28 16:39:04.620463 |
18 |
20400109 |
Imp. of Da-Basti Road at Naharani Village |
300000 |
Imp. of Da-Basti Road at Naharani Village1 |
25% |
-
latitude : 27.15472328,27.15472961
Longitude : 94.81985856,94.81987154
file name : Image_29082020144340728.png
|
2020-08-29 14:43:41.362672 |
19 |
20383753 |
Imp. of Jholom to Moria Ali connecting Road |
290000 |
Imp. of Jholom to Moria Ali connecting Road1 |
GSB |
-
latitude : 27.13835603,27.13830924
Longitude : 94.84353317,94.84350654
file name : Image_11082020125902771.png
|
2020-08-11 12:59:03.395933 |
20 |
30414937 |
CONSTRUCTION OF BOUNDARY WALL WALL AT GP OFFICE COMPOUND WITH IRON GATE |
374649 |
CONSTRUCTION OF BOUNDARY WALL WALL AT GP OFFICE COMPOUND WITH IRON GATE1 |
In Progress |
-
latitude : 27.15056149
Longitude : 94.81793899
file name : Image_12082020084909047.png
|
2020-08-12 08:49:09.742376 |
21 |
30417736 |
IMPROVEMENT OF ROAD AT JAYA ALI TO GARIALI CHUK CONNECTING |
200000 |
IMPROVEMENT OF ROAD AT JAYA ALI TO GARIALI CHUK CONNECTING1 |
25% |
-
latitude : 27.18137952,27.18134502,27.18135152
Longitude : 94.83103037,94.8310362,94.83098373
file name : Image_11092020153609330.png
|
2020-09-11 15:36:09.395716 |
22 |
20399473 |
Imp. of Kamar Basti Road from Kamaldoi Thakurbari to Moria Ali connecting |
369500 |
Imp. of Kamar Basti Road from Kamaldoi Thakurbari to Moria Ali connecting 1 |
GSB |
-
latitude : 27.14585643,27.14576958
Longitude : 94.83571429,94.83593295
file name : Image_11082020124553443.png
|
2020-08-11 12:45:54.156503 |
23 |
44050280 |
Construction of Market shed at Kuligaon |
324306 |
Construction of Market shed at Kuligaon1 |
Plinth Level |
-
latitude : 27.16859965
Longitude : 94.83488341
file name : Image_14092020143000722.png
|
2020-09-14 14:30:00.787776 |
24 |
12146416 |
Maintainance of Road From Kamaldoi Gaon to NH 37 |
300000 |
Approach Road1 |
Completed |
-
latitude : 27.13505908,27.13505597
Longitude : 94.82313232,94.8231278
file name : Image_11082020123123942.png
|
2020-08-11 12:31:24.549878 |
25 |
12146416 |
Maintainance of Road From Kamaldoi Gaon to NH 37 |
300000 |
Approach Road1 |
Earth Work |
-
latitude : 27.1350532,27.13505521
Longitude : 94.82318529,94.82318519
file name : Image_03112019210128257.png
|
2019-11-03 21:01:28.336993 |
26 |
30416887 |
CONSTRUCTION OF COMMUNITY HALL 2 NO RONGAGORAH FIELD NEAR GORKHA BHAWAN |
400000 |
CONSTRUCTION OF COMMUNITY HALL 2 NO RONGAGORAH FIELD NEAR GORKHA BHAWAN1 |
50% |
-
latitude : 27.14341902
Longitude : 94.85656233
file name : Image_11082020132524012.png
|
2020-08-11 13:25:24.656082 |
27 |
20383723 |
Const. of Cultural Centre (L.M.) at Bokpora Urang Basti |
237500 |
Const. of Cultural Centre (L.M.) at Bokpora Urang Basti1 |
25% |
-
latitude : 27.15483347
Longitude : 94.82142282
file name : Image_29082020141853164.png
|
2020-08-29 14:18:53.774256 |
28 |
20399056 |
Imp. of Ranga Garah to Gorkha Bhawan connecting Road |
231500 |
Imp. of Ranga Garah to Gorkha Bhawan connecting Road1 |
25% |
-
latitude : 27.1482577,27.14824181
Longitude : 94.85762078,94.8576255
file name : Image_29082020133408025.png
|
2020-08-29 13:34:08.685218 |
29 |
20182338 |
Construction of Boundary Wall at Naharani Bangali Block LP School |
321000 |
Construction of Boundary Wall at Naharani Bangali Block LP School1 |
In Progress |
-
latitude : 27.14305106
Longitude : 94.81594896
file name : Image_12082020123430710.png
|
2020-08-12 12:34:31.363131 |
30 |
30417086 |
IMPROVEMENT OF 1 NO RONGAGORAH MAZHI ALI TO INDIRA ALI PATH |
500000 |
IMPROVEMENT OF 1 NO RONGAGORAH MAZHI ALI TO INDIRA ALI PATH1 |
25% |
-
latitude : 27.14826589,27.14827088
Longitude : 94.85774467,94.85767494
file name : Image_29082020133640731.png
|
2020-08-29 13:36:41.416891 |
31 |
64509639 |
LATIN AND URINAL AT PATHALIBAM GAON PANCHAYAT CAMPUS |
95529 |
LATIN AND URINAL AT PATHALIBAM GAON PANCHAYAT CAMPUS1 |
Roof laid |
-
latitude : 27.15049595
Longitude : 94.81804999
file name : Image_16102023112501149.png
|
2023-10-16 11:25:01.239988 |
32 |
64509639 |
LATIN AND URINAL AT PATHALIBAM GAON PANCHAYAT CAMPUS |
95529 |
LATIN AND URINAL AT PATHALIBAM GAON PANCHAYAT CAMPUS1 |
Plinth level |
-
latitude : 27.15045539
Longitude : 94.81810343
file name : Image_15102023154849656.png
|
2023-10-15 15:48:49.739641 |
33 |
64509639 |
LATIN AND URINAL AT PATHALIBAM GAON PANCHAYAT CAMPUS |
95529 |
LATIN AND URINAL AT PATHALIBAM GAON PANCHAYAT CAMPUS1 |
Completion of work |
-
latitude : 27.150518333333334
Longitude : 94.81816333333333
file name : Image_20012023201510751.png
|
2023-01-20 20:15:10.812673 |
34 |
64509639 |
LATIN AND URINAL AT PATHALIBAM GAON PANCHAYAT CAMPUS |
95529 |
LATIN AND URINAL AT PATHALIBAM GAON PANCHAYAT CAMPUS1 |
Completion of work |
-
latitude : 27.150401666666667
Longitude : 94.81820333333332
file name : Image_20012023113533326.png
|
2023-01-20 11:35:33.448208 |
35 |
64509523 |
MAINTAINCE OF JJM SCHEMES |
412500 |
MAINTAINCE OF JJM SCHEMES1 |
Plinth level |
-
latitude : 27.15341141
Longitude : 94.81929408
file name : Image_05012024104210958.png
|
2024-01-05 10:42:11.068549 |
36 |
64509523 |
MAINTAINCE OF JJM SCHEMES |
412500 |
MAINTAINCE OF JJM SCHEMES1 |
Completion of work |
-
latitude : 27.153538333333337
Longitude : 94.81918833333333
file name : Image_25012023211841734.png
|
2023-01-25 21:18:41.841248 |
37 |
64510454 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT SATH GHAT |
105657 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT SATH GHAT1 |
Roof laid |
-
latitude : 27.13416181
Longitude : 94.82342072
file name : Image_16102023150033870.png
|
2023-10-16 15:00:33.991777 |
38 |
64510454 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT SATH GHAT |
105657 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT SATH GHAT1 |
Plinth level |
-
latitude : 27.13420005
Longitude : 94.82372473
file name : Image_15102023160402575.png
|
2023-10-15 16:04:02.670219 |
39 |
64510454 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT SATH GHAT |
105657 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT SATH GHAT1 |
Completion of work |
-
latitude : 27.13426118
Longitude : 94.82392064
file name : Image_23092022085846917.png
|
2022-09-23 08:58:47.030917 |
40 |
64506362 |
LATIN AND URINAL AT JHOLLOM SUB CENTRE |
95529 |
LATIN AND URINAL AT JHOLLOM SUB CENTRE1 |
Roof laid |
-
latitude : 27.150498333333335
Longitude : 94.85385666666667
file name : Image_25012023211607582.png
|
2023-01-25 21:16:07.681279 |
41 |
64506362 |
LATIN AND URINAL AT JHOLLOM SUB CENTRE |
95529 |
LATIN AND URINAL AT JHOLLOM SUB CENTRE1 |
Completion of work |
-
latitude : 27.150425000000002
Longitude : 94.85383666666667
file name : Image_16122022133457707.png
|
2022-12-16 13:34:57.818129 |
42 |
64506118 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT 2 NO RANGAGORAH GURKHA BHAWAN |
105657 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT 2 NO RANGAGORAH GURKHA BHAWAN1 |
Roof laid |
-
latitude : 27.143318333333333
Longitude : 94.85624000000001
file name : Image_25012023212050453.png
|
2023-01-25 21:20:50.5627 |
43 |
64506118 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT 2 NO RANGAGORAH GURKHA BHAWAN |
105657 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT 2 NO RANGAGORAH GURKHA BHAWAN1 |
Completion of work |
-
latitude : 27.143343333333338
Longitude : 94.85629333333333
file name : Image_30112022144453258.png
|
2022-11-30 14:44:53.369828 |
44 |
64506118 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT 2 NO RANGAGORAH GURKHA BHAWAN |
105657 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT 2 NO RANGAGORAH GURKHA BHAWAN1 |
Completion of work |
-
latitude : 27.143314999999998
Longitude : 94.85629499999999
file name : Image_30112022144503606.png
|
2022-11-30 14:45:03.713429 |
45 |
64922267 |
RENOVATION AT 1 NO CHAKALIA HIGH SCHOOL |
465000 |
RENOVATION AT 1 NO CHAKALIA HIGH SCHOOL1 |
Roof laid |
-
latitude : 27.13799917
Longitude : 94.81728342
file name : Image_19122023140045215.png
|
2023-12-19 14:00:45.304854 |
46 |
64922267 |
RENOVATION AT 1 NO CHAKALIA HIGH SCHOOL |
465000 |
RENOVATION AT 1 NO CHAKALIA HIGH SCHOOL1 |
Completion of work |
-
latitude : 27.12801038
Longitude : 94.82261753
file name : Image_09092022141231689.png
|
2022-09-09 14:12:31.789178 |
47 |
49688133 |
Maintainance of Jhollom to Telkhat Connecting Road |
200000 |
Maintainance of Jhollom to Telkhat Connecting Road1 |
Roof laid |
-
latitude : 27.13532604,27.13534666
Longitude : 94.85993877,94.85994823
file name : Image_16102023192239080.png
|
2023-10-16 19:22:39.170963 |
48 |
49688133 |
Maintainance of Jhollom to Telkhat Connecting Road |
200000 |
Maintainance of Jhollom to Telkhat Connecting Road1 |
Completion of work |
-
latitude : 27.13530146,27.1352816
Longitude : 94.85997785,94.85993327
file name : Image_04092022155805467.png
|
2022-09-04 15:58:05.562858 |
49 |
49688133 |
Maintainance of Jhollom to Telkhat Connecting Road |
200000 |
Maintainance of Jhollom to Telkhat Connecting Road1 |
Completion of work |
-
latitude : 27.13530747,27.13530237
Longitude : 94.85992201,94.85991807
file name : Image_12032022204131485.png
|
2022-03-12 20:41:31.61828 |
50 |
49688133 |
Maintainance of Jhollom to Telkhat Connecting Road |
200000 |
Maintainance of Jhollom to Telkhat Connecting Road1 |
Completion of work |
-
latitude : 27.13533049,27.13533357
Longitude : 94.85991381,94.85990274
file name : Image_12032022204156725.png
|
2022-03-12 20:41:56.812603 |
51 |
49688133 |
Maintainance of Jhollom to Telkhat Connecting Road |
200000 |
Maintainance of Jhollom to Telkhat Connecting Road1 |
Completion of work |
-
latitude : 27.135275,27.13528833333333
Longitude : 94.86002166666667,94.86001666666668
file name : Image_04102021131004630.png
|
2021-10-04 13:10:04.725653 |
52 |
64509605 |
CONST OF COMMUNITY MANAGED COMPLEX (CMSC) AT GARIHALI CHUCK BOR NAMGHAR |
105657 |
CONST OF COMMUNITY MANAGED COMPLEX (CMSC) AT GARIHALI CHUCK BOR NAMGHAR1 |
Roof laid |
-
latitude : 27.18459361
Longitude : 94.82254524
file name : Image_15102023132044461.png
|
2023-10-15 13:20:44.553593 |
53 |
64509605 |
CONST OF COMMUNITY MANAGED COMPLEX (CMSC) AT GARIHALI CHUCK BOR NAMGHAR |
105657 |
CONST OF COMMUNITY MANAGED COMPLEX (CMSC) AT GARIHALI CHUCK BOR NAMGHAR1 |
Roof laid |
-
latitude : 27.184381666666663
Longitude : 94.82222333333333
file name : Image_25012023211531615.png
|
2023-01-25 21:15:31.716631 |
54 |
64509605 |
CONST OF COMMUNITY MANAGED COMPLEX (CMSC) AT GARIHALI CHUCK BOR NAMGHAR |
105657 |
CONST OF COMMUNITY MANAGED COMPLEX (CMSC) AT GARIHALI CHUCK BOR NAMGHAR1 |
Completion of work |
-
latitude : 27.17117117117117
Longitude : 94.80435852131144
file name : Image_30112022122114696.png
|
2022-11-30 12:21:14.797974 |
55 |
64597684 |
Const of Urinal & Latin at Gohain Gaon Baliori Bornamghar |
232500 |
Const of Urinal & Latin at Gohain Gaon Baliori Bornamghar1 |
Roof laid |
-
latitude : 27.175952
Longitude : 94.81106827
file name : Image_12102023161053059.png
|
2023-10-12 16:10:53.15565 |
56 |
64597684 |
Const of Urinal & Latin at Gohain Gaon Baliori Bornamghar |
232500 |
Const of Urinal & Latin at Gohain Gaon Baliori Bornamghar1 |
Roof laid |
-
latitude : 27.17596166
Longitude : 94.81106091
file name : Image_12102023161047291.png
|
2023-10-12 16:10:47.382935 |
57 |
64597684 |
Const of Urinal & Latin at Gohain Gaon Baliori Bornamghar |
232500 |
Const of Urinal & Latin at Gohain Gaon Baliori Bornamghar1 |
Roof laid |
-
latitude : 27.17594166666667
Longitude : 94.81107166666668
file name : Image_25012023211502896.png
|
2023-01-25 21:15:02.993291 |
58 |
64597684 |
Const of Urinal & Latin at Gohain Gaon Baliori Bornamghar |
232500 |
Const of Urinal & Latin at Gohain Gaon Baliori Bornamghar1 |
Completion of work |
-
latitude : 27.17594768
Longitude : 94.81119778
file name : Image_09092022141300947.png
|
2022-09-09 14:13:01.048056 |
59 |
64922442 |
SLAB CULVERT AT DA BOSTI TO DHULJAN |
165000 |
SLAB CULVERT AT DA BOSTI TO DHULJAN1 |
Roof laid |
-
latitude : 26.1166879,26.1166879,26.1166879
Longitude : 91.8336079,91.8336079,91.8336079
file name : Image_20122023191924404.png
|
2023-12-20 19:19:24.492055 |
60 |
64922442 |
SLAB CULVERT AT DA BOSTI TO DHULJAN |
165000 |
SLAB CULVERT AT DA BOSTI TO DHULJAN1 |
Plinth level |
-
latitude : 26.1167139,26.1168442,26.1168442
Longitude : 91.8336192,91.8335787,91.8335787
file name : Image_20122023191518470.png
|
2023-12-20 19:15:18.562262 |
61 |
64922442 |
SLAB CULVERT AT DA BOSTI TO DHULJAN |
165000 |
SLAB CULVERT AT DA BOSTI TO DHULJAN1 |
Completion of work |
-
latitude : 27.155326666666664,27.155268333333332
Longitude : 94.81266666666667,94.81267833333335
file name : Image_03032023133504881.png
|
2023-03-03 13:35:04.982768 |
62 |
64816479 |
CONST OF SLAB CULVERT AT KOMOLDOI 1 NO CHUCK TO DEHINGIA GAON CONNECTING ROAD |
165000 |
CONST OF SLAB CULVERT AT KOMOLDOI 1 NO CHUCK TO DEHINGIA GAON CONNECTING ROAD1 |
Plinth level |
-
latitude : 27.15666936,27.15666564
Longitude : 94.82429539,94.82429376
file name : Image_28122023202952622.png
|
2023-12-28 20:29:52.711443 |
63 |
64816479 |
CONST OF SLAB CULVERT AT KOMOLDOI 1 NO CHUCK TO DEHINGIA GAON CONNECTING ROAD |
165000 |
CONST OF SLAB CULVERT AT KOMOLDOI 1 NO CHUCK TO DEHINGIA GAON CONNECTING ROAD1 |
Completion of work |
-
latitude : 27.15675166,27.15671265
Longitude : 94.82459904,94.82438121
file name : Image_15102023145058797.png
|
2023-10-15 14:50:58.889473 |
64 |
64816479 |
CONST OF SLAB CULVERT AT KOMOLDOI 1 NO CHUCK TO DEHINGIA GAON CONNECTING ROAD |
165000 |
CONST OF SLAB CULVERT AT KOMOLDOI 1 NO CHUCK TO DEHINGIA GAON CONNECTING ROAD1 |
Completion of work |
-
latitude : 27.156625000000002,27.156664999999997
Longitude : 94.82436833333334,94.82439833333335
file name : Image_30112022141733736.png
|
2022-11-30 14:17:33.84615 |
65 |
67182235 |
Construction of Community Sanitary Complex |
86604 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.174068333333334
Longitude : 94.82049
file name : Image_08072024122304665.png
|
2024-07-08 12:23:04.749944 |
66 |
67182235 |
Construction of Community Sanitary Complex |
86604 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.17367264
Longitude : 94.82046612
file name : Image_06052024135057922.png
|
2024-05-06 13:50:58.024915 |
67 |
64922414 |
RENOVATION AT NAHARANI ANGANWADI CENTRE |
75000 |
RENOVATION AT NAHARANI ANGANWADI CENTRE1 |
Roof laid |
-
latitude : 27.14913281
Longitude : 94.81299802
file name : Image_09122023103718704.png
|
2023-12-09 10:37:18.837614 |
68 |
64922414 |
RENOVATION AT NAHARANI ANGANWADI CENTRE |
75000 |
RENOVATION AT NAHARANI ANGANWADI CENTRE1 |
Roof laid |
-
latitude : 27.14638877
Longitude : 94.81607965
file name : Image_09122023103530068.png
|
2023-12-09 10:35:30.170989 |
69 |
64922414 |
RENOVATION AT NAHARANI ANGANWADI CENTRE |
75000 |
RENOVATION AT NAHARANI ANGANWADI CENTRE1 |
Plinth level |
-
latitude : 27.14918857
Longitude : 94.81302633
file name : Image_22112023095502785.png
|
2023-11-22 09:55:02.870952 |
70 |
64922414 |
RENOVATION AT NAHARANI ANGANWADI CENTRE |
75000 |
RENOVATION AT NAHARANI ANGANWADI CENTRE1 |
Completion of work |
-
latitude : 27.14913311
Longitude : 94.81304122
file name : Image_27102023113927624.png
|
2023-10-27 11:39:27.74022 |
71 |
64922414 |
RENOVATION AT NAHARANI ANGANWADI CENTRE |
75000 |
RENOVATION AT NAHARANI ANGANWADI CENTRE1 |
Completion of work |
-
latitude : 27.149103333333333
Longitude : 94.81298333333334
file name : Image_07052023113957290.png
|
2023-05-07 11:39:57.412246 |
72 |
67182419 |
CONST OF 1 NO RANGAGORAH CULTURAL CENTRE |
171000 |
CONST OF 1 NO RANGAGORAH CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.13548789,27.13549522
Longitude : 94.85126058,94.85126483
file name : Image_16122023150114983.png
|
2023-12-16 15:01:15.083525 |
73 |
67182419 |
CONST OF 1 NO RANGAGORAH CULTURAL CENTRE |
171000 |
CONST OF 1 NO RANGAGORAH CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.25689288,27.25689382
Longitude : 94.88911557,94.88911578
file name : Image_06122023131829975.png
|
2023-12-06 13:18:30.064244 |
74 |
67182419 |
CONST OF 1 NO RANGAGORAH CULTURAL CENTRE |
171000 |
CONST OF 1 NO RANGAGORAH CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.135455,27.13560166666667
Longitude : 94.85125166666667,94.85116166666667
file name : Image_07052023135636946.png
|
2023-05-07 13:56:37.113551 |
75 |
49689953 |
Solid Waste Management Treatment Plant under Pathalibam GP |
180000 |
Solid Waste Management Treatment Plant under Pathalibam GP1 |
Plinth level |
-
latitude : 27.13870252
Longitude : 94.81383278
file name : Image_12102023161038328.png
|
2023-10-12 16:10:38.423076 |
76 |
49689953 |
Solid Waste Management Treatment Plant under Pathalibam GP |
180000 |
Solid Waste Management Treatment Plant under Pathalibam GP1 |
Completion of work |
-
latitude : 27.138704999999998
Longitude : 94.813455
file name : Image_16062023192404694.png
|
2023-06-16 19:24:04.784358 |
77 |
49689953 |
Solid Waste Management Treatment Plant under Pathalibam GP |
180000 |
Solid Waste Management Treatment Plant under Pathalibam GP1 |
Completion of work |
-
latitude : 27.223213333333334
Longitude : 94.89153666666668
file name : Image_16062023192418168.png
|
2023-06-16 19:24:18.255509 |
78 |
86981555 |
RENOVATION OF DEHINGIA GAON M V SCHOOL |
300000 |
RENOVATION OF DEHINGIA GAON M V SCHOOL 1 |
Plinth level |
-
latitude : 27.16348808
Longitude : 94.81146758
file name : Image_29092023123503664.png
|
2023-09-29 12:35:03.780487 |
79 |
86981555 |
RENOVATION OF DEHINGIA GAON M V SCHOOL |
300000 |
RENOVATION OF DEHINGIA GAON M V SCHOOL 1 |
Plinth level |
-
latitude : 27.17514228
Longitude : 94.81661145
file name : Image_27092023140450964.png
|
2023-09-27 14:04:51.054305 |
80 |
86981555 |
RENOVATION OF DEHINGIA GAON M V SCHOOL |
300000 |
RENOVATION OF DEHINGIA GAON M V SCHOOL 1 |
Completion of work |
-
latitude : 27.16341163
Longitude : 94.81176039
file name : Image_12092023105002790.png
|
2023-09-12 10:50:03.069612 |
81 |
67181607 |
Any other operation and maintenance needs related to solid waste management |
87269 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.12088402
Longitude : 94.82224588
file name : Image_12092023154411061.png
|
2023-09-12 15:44:11.158941 |
82 |
67181607 |
Any other operation and maintenance needs related to solid waste management |
87269 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.15447
Longitude : 94.84282333333334
file name : Image_15062023100845081.png
|
2023-06-15 10:08:45.174864 |
83 |
67181607 |
Any other operation and maintenance needs related to solid waste management |
87269 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.138695
Longitude : 94.81349666666668
file name : Image_15062023100849005.png
|
2023-06-15 10:08:49.100646 |
84 |
64597987 |
Drinking water facility at Naharani Bazar |
67500 |
Drinking water facility at Naharani Bazar1 |
Roof laid |
-
latitude : 26.1169089
Longitude : 91.8336469
file name : Image_20122023193529559.png
|
2023-12-20 19:35:29.662891 |
85 |
64597987 |
Drinking water facility at Naharani Bazar |
67500 |
Drinking water facility at Naharani Bazar1 |
Plinth level |
-
latitude : 26.1168517
Longitude : 91.8335876
file name : Image_20122023192159173.png
|
2023-12-20 19:21:59.27717 |
86 |
64597987 |
Drinking water facility at Naharani Bazar |
67500 |
Drinking water facility at Naharani Bazar1 |
Plinth level |
-
latitude : 27.13858067
Longitude : 94.81301462
file name : Image_16122023102409059.png
|
2023-12-16 10:24:09.154467 |
87 |
64597987 |
Drinking water facility at Naharani Bazar |
67500 |
Drinking water facility at Naharani Bazar1 |
Plinth level |
-
latitude : 27.13859791
Longitude : 94.8129665
file name : Image_09122023100238254.png
|
2023-12-09 10:02:38.348274 |
88 |
64597987 |
Drinking water facility at Naharani Bazar |
67500 |
Drinking water facility at Naharani Bazar1 |
Completion of work |
-
latitude : 27.13859711
Longitude : 94.81294924
file name : Image_10112023102813266.png
|
2023-11-10 10:28:13.365439 |
89 |
64597987 |
Drinking water facility at Naharani Bazar |
67500 |
Drinking water facility at Naharani Bazar1 |
Completion of work |
-
latitude : 27.13854948
Longitude : 94.81312168
file name : Image_16102023122529392.png
|
2023-10-16 12:25:29.48998 |
90 |
64597987 |
Drinking water facility at Naharani Bazar |
67500 |
Drinking water facility at Naharani Bazar1 |
Completion of work |
-
latitude : 27.13860975
Longitude : 94.81300091
file name : Image_11092023193116926.png
|
2023-09-11 19:31:17.01753 |
91 |
64597987 |
Drinking water facility at Naharani Bazar |
67500 |
Drinking water facility at Naharani Bazar1 |
Completion of work |
-
latitude : 27.1386093
Longitude : 94.81300107
file name : Image_11092023153528425.png
|
2023-09-11 15:35:28.530761 |
92 |
64597987 |
Drinking water facility at Naharani Bazar |
67500 |
Drinking water facility at Naharani Bazar1 |
Completion of work |
-
latitude : 27.15046179
Longitude : 94.81814369
file name : Image_11092023152710660.png
|
2023-09-11 15:27:10.756891 |
93 |
64597849 |
Const of Latin at Naharani Bazar |
232500 |
Const of Latin at Naharani Bazar1 |
Roof laid |
-
latitude : 27.13864501
Longitude : 94.81316493
file name : Image_02112023153944151.png
|
2023-11-02 15:39:44.455482 |
94 |
64597849 |
Const of Latin at Naharani Bazar |
232500 |
Const of Latin at Naharani Bazar1 |
Plinth level |
-
latitude : 27.1387495
Longitude : 94.81344287
file name : Image_12102023150855692.png
|
2023-10-12 15:08:55.786446 |
95 |
64597849 |
Const of Latin at Naharani Bazar |
232500 |
Const of Latin at Naharani Bazar1 |
Completion of work |
-
latitude : 27.138643333333334
Longitude : 94.81367166666665
file name : Image_08032023160436552.png
|
2023-03-08 16:04:36.646645 |
96 |
64922386 |
EARTH FILLING AT KULIGAON L.P.SCHOOL |
150000 |
EARTH FILLING AT KULIGAON L.P.SCHOOL1 |
Roof laid |
-
latitude : 27.16486962,27.16487171
Longitude : 94.83395182,94.83395313
file name : Image_09122023093635715.png
|
2023-12-09 09:36:35.807823 |
97 |
64922386 |
EARTH FILLING AT KULIGAON L.P.SCHOOL |
150000 |
EARTH FILLING AT KULIGAON L.P.SCHOOL1 |
Plinth level |
-
latitude : 27.16492337,27.16492354
Longitude : 94.83405983,94.83399094
file name : Image_27102023113739144.png
|
2023-10-27 11:37:39.251099 |
98 |
64922386 |
EARTH FILLING AT KULIGAON L.P.SCHOOL |
150000 |
EARTH FILLING AT KULIGAON L.P.SCHOOL1 |
Plinth level |
-
latitude : 27.16485644,27.16485958
Longitude : 94.83394085,94.83393395
file name : Image_16102023110606301.png
|
2023-10-16 11:06:06.399289 |
99 |
64922386 |
EARTH FILLING AT KULIGAON L.P.SCHOOL |
150000 |
EARTH FILLING AT KULIGAON L.P.SCHOOL1 |
Completion of work |
-
latitude : 27.164908333333333,27.164911666666665
Longitude : 94.83381166666668,94.83384166666669
file name : Image_08032023160636138.png
|
2023-03-08 16:06:36.224702 |
100 |
64597748 |
Drinking water facility at Komoldoi Bongali Lakhimondir |
232500 |
Drinking water facility at Komoldoi Bongali Lakhimondir1 |
Roof laid |
-
latitude : 27.15662497
Longitude : 94.83788788
file name : Image_16102023091930964.png
|
2023-10-16 09:19:31.058087 |
101 |
64597748 |
Drinking water facility at Komoldoi Bongali Lakhimondir |
232500 |
Drinking water facility at Komoldoi Bongali Lakhimondir1 |
Plinth level |
-
latitude : 27.1566669
Longitude : 94.83775201
file name : Image_15102023141018540.png
|
2023-10-15 14:10:18.613618 |
102 |
64597748 |
Drinking water facility at Komoldoi Bongali Lakhimondir |
232500 |
Drinking water facility at Komoldoi Bongali Lakhimondir1 |
Completion of work |
-
latitude : 27.156706666666665
Longitude : 94.83781833333333
file name : Image_25012023212021378.png
|
2023-01-25 21:20:21.484494 |
103 |
49689704 |
Construction of Public Toilet near Pathalibam Jatiya Vidyalaya |
350292 |
Construction of Public Toilet near Pathalibam Jatiya Vidyalaya1 |
Roof laid |
-
latitude : 27.17126515
Longitude : 94.83303307
file name : Image_21012024213735952.png
|
2024-01-21 21:37:36.040367 |
104 |
49689704 |
Construction of Public Toilet near Pathalibam Jatiya Vidyalaya |
350292 |
Construction of Public Toilet near Pathalibam Jatiya Vidyalaya1 |
Plinth level |
-
latitude : 27.17184493
Longitude : 94.83277267
file name : Image_16102023104733855.png
|
2023-10-16 10:47:33.943105 |
105 |
49689704 |
Construction of Public Toilet near Pathalibam Jatiya Vidyalaya |
350292 |
Construction of Public Toilet near Pathalibam Jatiya Vidyalaya1 |
Completion of work |
-
latitude : 27.17117617
Longitude : 94.83366816
file name : Image_26082022213006240.png
|
2022-08-26 21:30:06.34187 |
106 |
49689704 |
Construction of Public Toilet near Pathalibam Jatiya Vidyalaya |
350292 |
Construction of Public Toilet near Pathalibam Jatiya Vidyalaya1 |
Completion of work |
-
latitude : 27.17112412
Longitude : 94.83370695
file name : Image_29032022111104640.png
|
2022-03-29 11:11:04.723677 |
107 |
49689704 |
Construction of Public Toilet near Pathalibam Jatiya Vidyalaya |
350292 |
Construction of Public Toilet near Pathalibam Jatiya Vidyalaya1 |
Completion of work |
-
latitude : 27.17113006
Longitude : 94.83372439
file name : Image_29032022111108937.png
|
2022-03-29 11:11:09.008037 |
108 |
49689366 |
CONSTRUCTION OF RCC DRAIN AT 1 NO KULIGAON TO 9 NO DEHINGIA GAON JAAN CONNECTING ROAD |
247000 |
CONSTRUCTION OF RCC DRAIN AT 1 NO KULIGAON TO 9 NO DEHINGIA GAON JAAN CONNECTING ROAD1 |
Roof laid |
-
latitude : 27.16379364
Longitude : 94.83084706
file name : Image_09122023093946263.png
|
2023-12-09 09:39:46.365112 |
109 |
49689366 |
CONSTRUCTION OF RCC DRAIN AT 1 NO KULIGAON TO 9 NO DEHINGIA GAON JAAN CONNECTING ROAD |
247000 |
CONSTRUCTION OF RCC DRAIN AT 1 NO KULIGAON TO 9 NO DEHINGIA GAON JAAN CONNECTING ROAD1 |
Roof laid |
-
latitude : 27.16383747
Longitude : 94.83080961
file name : Image_30112023190842318.png
|
2023-11-30 19:08:42.403374 |
110 |
49689366 |
CONSTRUCTION OF RCC DRAIN AT 1 NO KULIGAON TO 9 NO DEHINGIA GAON JAAN CONNECTING ROAD |
247000 |
CONSTRUCTION OF RCC DRAIN AT 1 NO KULIGAON TO 9 NO DEHINGIA GAON JAAN CONNECTING ROAD1 |
Roof laid |
-
latitude : 27.16384479
Longitude : 94.83082326
file name : Image_30112023190824211.png
|
2023-11-30 19:08:24.292899 |
111 |
49689366 |
CONSTRUCTION OF RCC DRAIN AT 1 NO KULIGAON TO 9 NO DEHINGIA GAON JAAN CONNECTING ROAD |
247000 |
CONSTRUCTION OF RCC DRAIN AT 1 NO KULIGAON TO 9 NO DEHINGIA GAON JAAN CONNECTING ROAD1 |
Roof laid |
-
latitude : 27.16383747
Longitude : 94.83080961
file name : Image_30112023190814008.png
|
2023-11-30 19:08:14.099324 |
112 |
49689366 |
CONSTRUCTION OF RCC DRAIN AT 1 NO KULIGAON TO 9 NO DEHINGIA GAON JAAN CONNECTING ROAD |
247000 |
CONSTRUCTION OF RCC DRAIN AT 1 NO KULIGAON TO 9 NO DEHINGIA GAON JAAN CONNECTING ROAD1 |
Completion of work |
-
latitude : 27.16372239
Longitude : 94.82838902
file name : Image_26082022213035574.png
|
2022-08-26 21:30:35.68828 |
113 |
49689366 |
CONSTRUCTION OF RCC DRAIN AT 1 NO KULIGAON TO 9 NO DEHINGIA GAON JAAN CONNECTING ROAD |
247000 |
CONSTRUCTION OF RCC DRAIN AT 1 NO KULIGAON TO 9 NO DEHINGIA GAON JAAN CONNECTING ROAD1 |
Completion of work |
-
latitude : 27.16371698
Longitude : 94.82840232
file name : Image_29032022111117989.png
|
2022-03-29 11:11:18.05636 |
114 |
49689366 |
CONSTRUCTION OF RCC DRAIN AT 1 NO KULIGAON TO 9 NO DEHINGIA GAON JAAN CONNECTING ROAD |
247000 |
CONSTRUCTION OF RCC DRAIN AT 1 NO KULIGAON TO 9 NO DEHINGIA GAON JAAN CONNECTING ROAD1 |
Completion of work |
-
latitude : 27.16368997
Longitude : 94.82839309
file name : Image_29032022111112868.png
|
2022-03-29 11:11:12.934514 |
115 |
52911616 |
RUNNING WATER SUPPLY FACILITY AT SRI SRI BAISNAV NAMGHAR |
153000 |
RUNNING WATER SUPPLY FACILITY AT SRI SRI BAISNAV NAMGHAR1 |
Plinth level |
-
latitude : 27.130793333333333
Longitude : 94.82268833333335
file name : Image_07102021152809412.png
|
2021-10-07 15:28:09.520698 |
116 |
52911616 |
RUNNING WATER SUPPLY FACILITY AT SRI SRI BAISNAV NAMGHAR |
153000 |
RUNNING WATER SUPPLY FACILITY AT SRI SRI BAISNAV NAMGHAR1 |
Roof laid |
-
latitude : 27.13104333333333
Longitude : 94.82239
file name : Image_07102021152955533.png
|
2021-10-07 15:29:55.633774 |
117 |
52911616 |
RUNNING WATER SUPPLY FACILITY AT SRI SRI BAISNAV NAMGHAR |
153000 |
RUNNING WATER SUPPLY FACILITY AT SRI SRI BAISNAV NAMGHAR1 |
Completion of work |
-
latitude : 27.130929999999996
Longitude : 94.82262333333334
file name : Image_21092021152647641.png
|
2021-09-21 15:26:47.737868 |
118 |
67182169 |
Operation & maintenance of community compost pits |
55500 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 27.15241871
Longitude : 94.81838479
file name : Image_01092023184755428.png
|
2023-09-01 18:47:55.517367 |
119 |
86998269 |
Const.of SILA-PHALAKAM at Chakalia High School |
30000 |
Const.of SILA-PHALAKAM at Chakalia High School1 |
Roof laid |
-
latitude : 27.13790589
Longitude : 94.81704154
file name : Image_06052024153513361.png
|
2024-05-06 15:35:13.44815 |
120 |
86998269 |
Const.of SILA-PHALAKAM at Chakalia High School |
30000 |
Const.of SILA-PHALAKAM at Chakalia High School1 |
Plinth level |
-
latitude : 27.1379583
Longitude : 94.8169994
file name : Image_05012024102449692.png
|
2024-01-05 10:24:49.802846 |
121 |
86998269 |
Const.of SILA-PHALAKAM at Chakalia High School |
30000 |
Const.of SILA-PHALAKAM at Chakalia High School1 |
Completion of work |
-
latitude : 27.222548
Longitude : 94.8919473
file name : Image_04012024111403782.png
|
2024-01-04 11:14:03.871197 |
122 |
86998269 |
Const.of SILA-PHALAKAM at Chakalia High School |
30000 |
Const.of SILA-PHALAKAM at Chakalia High School1 |
Completion of work |
-
latitude : 27.137901666666668
Longitude : 94.81708833333332
file name : Image_19082023163022151.png
|
2023-08-19 16:30:22.250881 |
123 |
64597915 |
Drinking water facility at Chakalia Sub Centre |
165000 |
Drinking water facility at Chakalia Sub Centre1 |
Roof laid |
-
latitude : 27.1379605
Longitude : 94.8169338
file name : Image_09122023100913171.png
|
2023-12-09 10:09:13.261782 |
124 |
64597915 |
Drinking water facility at Chakalia Sub Centre |
165000 |
Drinking water facility at Chakalia Sub Centre1 |
Roof laid |
-
latitude : 27.13862576
Longitude : 94.81311873
file name : Image_09122023100834183.png
|
2023-12-09 10:08:34.270114 |
125 |
64597915 |
Drinking water facility at Chakalia Sub Centre |
165000 |
Drinking water facility at Chakalia Sub Centre1 |
Roof laid |
-
latitude : 27.27484746
Longitude : 94.91984192
file name : Image_07122023065301312.png
|
2023-12-07 06:53:01.42545 |
126 |
64597915 |
Drinking water facility at Chakalia Sub Centre |
165000 |
Drinking water facility at Chakalia Sub Centre1 |
Roof laid |
-
latitude : 27.1388717
Longitude : 94.81766078
file name : Image_04122023083832651.png
|
2023-12-04 08:38:32.772797 |
127 |
64597915 |
Drinking water facility at Chakalia Sub Centre |
165000 |
Drinking water facility at Chakalia Sub Centre1 |
Plinth level |
-
latitude : 27.13911097
Longitude : 94.81783824
file name : Image_16102023130257544.png
|
2023-10-16 13:02:57.63438 |
128 |
64597915 |
Drinking water facility at Chakalia Sub Centre |
165000 |
Drinking water facility at Chakalia Sub Centre1 |
Completion of work |
-
latitude : 27.13847333333333
Longitude : 94.81303000000001
file name : Image_24082023132857970.png
|
2023-08-24 13:28:58.479192 |
129 |
64597915 |
Drinking water facility at Chakalia Sub Centre |
165000 |
Drinking water facility at Chakalia Sub Centre1 |
Completion of work |
-
latitude : 27.138556666666666
Longitude : 94.81295
file name : Image_24082023132844878.png
|
2023-08-24 13:28:45.835546 |
130 |
64597915 |
Drinking water facility at Chakalia Sub Centre |
165000 |
Drinking water facility at Chakalia Sub Centre1 |
Completion of work |
-
latitude : 27.138941666666664
Longitude : 94.81769666666666
file name : Image_03032023133523613.png
|
2023-03-03 13:35:23.732684 |
131 |
64922486 |
EARTH FILLING AT PATHALIBAM GAON PANCHAYAT |
75000 |
EARTH FILLING AT PATHALIBAM GAON PANCHAYAT1 |
Roof laid |
-
latitude : 27.150508,27.15050939
Longitude : 94.81797421,94.81797271
file name : Image_04122023083857979.png
|
2023-12-04 08:38:58.055021 |
132 |
64922486 |
EARTH FILLING AT PATHALIBAM GAON PANCHAYAT |
75000 |
EARTH FILLING AT PATHALIBAM GAON PANCHAYAT1 |
Roof laid |
-
latitude : 27.15049168,27.15048956
Longitude : 94.81810359,94.81808508
file name : Image_04122023083843014.png
|
2023-12-04 08:38:43.109862 |
133 |
64922486 |
EARTH FILLING AT PATHALIBAM GAON PANCHAYAT |
75000 |
EARTH FILLING AT PATHALIBAM GAON PANCHAYAT1 |
Roof laid |
-
latitude : 27.15047227,27.1504973
Longitude : 94.81810218,94.81806321
file name : Image_22112023095525179.png
|
2023-11-22 09:55:25.27164 |
134 |
64922486 |
EARTH FILLING AT PATHALIBAM GAON PANCHAYAT |
75000 |
EARTH FILLING AT PATHALIBAM GAON PANCHAYAT1 |
Plinth level |
-
latitude : 27.1504818,27.15050182
Longitude : 94.81809019,94.81808711
file name : Image_18102023144910229.png
|
2023-10-18 14:49:10.321374 |
135 |
64922486 |
EARTH FILLING AT PATHALIBAM GAON PANCHAYAT |
75000 |
EARTH FILLING AT PATHALIBAM GAON PANCHAYAT1 |
Plinth level |
-
latitude : 27.15052294,27.1505245
Longitude : 94.81800949,94.81801085
file name : Image_16102023110939624.png
|
2023-10-16 11:09:39.748495 |
136 |
64922486 |
EARTH FILLING AT PATHALIBAM GAON PANCHAYAT |
75000 |
EARTH FILLING AT PATHALIBAM GAON PANCHAYAT1 |
Completion of work |
-
latitude : 27.15050023,27.15050371
Longitude : 94.8180567,94.8180611
file name : Image_15102023145356706.png
|
2023-10-15 14:53:56.821109 |
137 |
64922486 |
EARTH FILLING AT PATHALIBAM GAON PANCHAYAT |
75000 |
EARTH FILLING AT PATHALIBAM GAON PANCHAYAT1 |
Completion of work |
-
latitude : 27.15044833333333,27.150436666666664
Longitude : 94.81818333333334,94.81822333333334
file name : Image_25012023211956497.png
|
2023-01-25 21:19:56.605653 |
138 |
49687801 |
Maintainance of Pavers Block road at 1 No Chakalia Bhuyan Chuk |
250000 |
Maintainance of Pavers Block road at 1 No Chakalia Bhuyan Chuk1 |
Roof laid |
-
latitude : 26.1168108,26.1167175,26.1167175
Longitude : 91.8336222,91.8335586,91.8335586
file name : Image_20122023193659948.png
|
2023-12-20 19:37:00.040314 |
139 |
49687801 |
Maintainance of Pavers Block road at 1 No Chakalia Bhuyan Chuk |
250000 |
Maintainance of Pavers Block road at 1 No Chakalia Bhuyan Chuk1 |
Plinth level |
-
latitude : 27.13458215,27.13466031
Longitude : 94.81752633,94.8174804
file name : Image_11122023210946792.png
|
2023-12-11 21:09:46.919108 |
140 |
49687801 |
Maintainance of Pavers Block road at 1 No Chakalia Bhuyan Chuk |
250000 |
Maintainance of Pavers Block road at 1 No Chakalia Bhuyan Chuk1 |
Completion of work |
-
latitude : 27.134470000000004,27.134459999999997
Longitude : 94.81761,94.81759666666667
file name : Image_02092021132904401.png
|
2021-09-02 13:29:04.536589 |
141 |
49688470 |
Maintainance of road EF at 2 No Chakalia LP School |
150000 |
Maintainance of road EF at 2 No Chakalia LP School1 |
Roof laid |
-
latitude : 27.27483735,27.2748317
Longitude : 94.91982397,94.91982884
file name : Image_07122023065338870.png
|
2023-12-07 06:53:38.963778 |
142 |
49688470 |
Maintainance of road EF at 2 No Chakalia LP School |
150000 |
Maintainance of road EF at 2 No Chakalia LP School1 |
Roof laid |
-
latitude : 27.13639264,27.13639373
Longitude : 94.82517868,94.82518349
file name : Image_04122023083825745.png
|
2023-12-04 08:38:25.847472 |
143 |
49688470 |
Maintainance of road EF at 2 No Chakalia LP School |
150000 |
Maintainance of road EF at 2 No Chakalia LP School1 |
Roof laid |
-
latitude : 27.13636467,27.13637733
Longitude : 94.82520675,94.8252265
file name : Image_01122023111844761.png
|
2023-12-01 11:18:44.867011 |
144 |
49688470 |
Maintainance of road EF at 2 No Chakalia LP School |
150000 |
Maintainance of road EF at 2 No Chakalia LP School1 |
Roof laid |
-
latitude : 27.13641733,27.13644652
Longitude : 94.82517898,94.82511883
file name : Image_22112023095449891.png
|
2023-11-22 09:54:49.9764 |
145 |
49688470 |
Maintainance of road EF at 2 No Chakalia LP School |
150000 |
Maintainance of road EF at 2 No Chakalia LP School1 |
Plinth level |
-
latitude : 27.13648337,27.13648505
Longitude : 94.82519945,94.82517644
file name : Image_02112023153937860.png
|
2023-11-02 15:39:37.983504 |
146 |
49688470 |
Maintainance of road EF at 2 No Chakalia LP School |
150000 |
Maintainance of road EF at 2 No Chakalia LP School1 |
Completion of work |
-
latitude : 27.13638618,27.1363757
Longitude : 94.82507975,94.82512547
file name : Image_26032022175743649.png
|
2022-03-26 17:57:43.771117 |
147 |
49688470 |
Maintainance of road EF at 2 No Chakalia LP School |
150000 |
Maintainance of road EF at 2 No Chakalia LP School1 |
Completion of work |
-
latitude : 27.13639543,27.13645686
Longitude : 94.82512844,94.82513931
file name : Image_26032022175806969.png
|
2022-03-26 17:58:07.072898 |
148 |
49688470 |
Maintainance of road EF at 2 No Chakalia LP School |
150000 |
Maintainance of road EF at 2 No Chakalia LP School1 |
Completion of work |
-
latitude : 27.136374,27.13636635
Longitude : 94.82518152,94.82517465
file name : Image_27122021125805545.png
|
2021-12-27 12:58:05.650221 |
149 |
49688968 |
Maintainance of Rongagorah Moinamoti School road |
237262 |
Maintainance of Rongagorah Moinamoti School road1 |
Roof laid |
-
latitude : 27.13301958,27.13301729
Longitude : 94.85021506,94.85021522
file name : Image_22112023095436907.png
|
2023-11-22 09:54:36.999648 |
150 |
49688968 |
Maintainance of Rongagorah Moinamoti School road |
237262 |
Maintainance of Rongagorah Moinamoti School road1 |
Roof laid |
-
latitude : 27.132529999999996,27.132544999999997
Longitude : 94.85246333333335,94.85244333333334
file name : Image_16122022140155902.png
|
2022-12-16 14:01:55.982597 |
151 |
49688968 |
Maintainance of Rongagorah Moinamoti School road |
237262 |
Maintainance of Rongagorah Moinamoti School road1 |
Completion of work |
-
latitude : 27.13306016,27.1330768
Longitude : 94.85021096,94.85018477
file name : Image_12032022204142832.png
|
2022-03-12 20:41:42.919638 |
152 |
49688968 |
Maintainance of Rongagorah Moinamoti School road |
237262 |
Maintainance of Rongagorah Moinamoti School road1 |
Completion of work |
-
latitude : 27.13252,27.13252166666667
Longitude : 94.85247166666667,94.85250833333333
file name : Image_04102021120612161.png
|
2021-10-04 12:06:12.269214 |
153 |
64510413 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT 1 NO RANGAGORAH SUB CENTRE |
105657 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT 1 NO RANGAGORAH SUB CENTRE1 |
Roof laid |
-
latitude : 26.1166861
Longitude : 91.8336099
file name : Image_20122023194634566.png
|
2023-12-20 19:46:34.64714 |
154 |
64510413 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT 1 NO RANGAGORAH SUB CENTRE |
105657 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT 1 NO RANGAGORAH SUB CENTRE1 |
Plinth level |
-
latitude : 27.1505465
Longitude : 94.85387091
file name : Image_14112023111830012.png
|
2023-11-14 11:18:30.118125 |
155 |
64510413 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT 1 NO RANGAGORAH SUB CENTRE |
105657 |
CONST OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT 1 NO RANGAGORAH SUB CENTRE1 |
Completion of work |
-
latitude : 27.150534999999998
Longitude : 94.85387166666666
file name : Image_03022023202442963.png
|
2023-02-03 20:24:43.059542 |
156 |
64816667 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA |
495000 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA1 |
Roof laid |
-
latitude : 27.15586158
Longitude : 94.83047911
file name : Image_15122023133241222.png
|
2023-12-15 13:32:41.332174 |
157 |
64816667 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA |
495000 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA1 |
Roof laid |
-
latitude : 27.15590341
Longitude : 94.83054219
file name : Image_15122023113540061.png
|
2023-12-15 11:35:40.16206 |
158 |
64816667 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA |
495000 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA1 |
Roof laid |
-
latitude : 27.15583729
Longitude : 94.83039254
file name : Image_09122023100035133.png
|
2023-12-09 10:00:35.224074 |
159 |
64816667 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA |
495000 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA1 |
Roof laid |
-
latitude : 27.15590153
Longitude : 94.83037233
file name : Image_30112023150211523.png
|
2023-11-30 15:02:11.628227 |
160 |
64816667 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA |
495000 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA1 |
Roof laid |
-
latitude : 27.15588977
Longitude : 94.83023421
file name : Image_30112023150200066.png
|
2023-11-30 15:02:00.191063 |
161 |
64816667 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA |
495000 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA1 |
Roof laid |
-
latitude : 27.15583039
Longitude : 94.83039232
file name : Image_23112023113525895.png
|
2023-11-23 11:35:26.003109 |
162 |
64816667 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA |
495000 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA1 |
Roof laid |
-
latitude : 27.15578421
Longitude : 94.83048359
file name : Image_23112023113514541.png
|
2023-11-23 11:35:14.673462 |
163 |
64816667 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA |
495000 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA1 |
Plinth level |
-
latitude : 27.15581737
Longitude : 94.83047589
file name : Image_15102023142235310.png
|
2023-10-15 14:22:35.387121 |
164 |
64816667 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA |
495000 |
RENOVATION OF KOMOLDOI YOUBAK SANGHA NEAR PRAKHAGRIHA1 |
Completion of work |
-
latitude : 27.15578954
Longitude : 94.83045354
file name : Image_23092022120438845.png
|
2022-09-23 12:04:38.949336 |
165 |
64816543 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN |
165000 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN1 |
Roof laid |
-
latitude : 26.1166817,26.1166817
Longitude : 91.8335813,91.8335813
file name : Image_20122023195507194.png
|
2023-12-20 19:55:07.288036 |
166 |
64816543 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN |
165000 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN1 |
Roof laid |
-
latitude : 27.2097778,27.15834063
Longitude : 94.809462,94.83883445
file name : Image_10122023062404543.png
|
2023-12-10 06:24:04.660782 |
167 |
64816543 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN |
165000 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN1 |
Roof laid |
-
latitude : 27.2732759,27.27484597
Longitude : 94.9128639,94.91977432
file name : Image_07122023064914746.png
|
2023-12-07 06:49:14.832279 |
168 |
64816543 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN |
165000 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN1 |
Roof laid |
-
latitude : 27.15826437,27.15825804
Longitude : 94.83885452,94.83884112
file name : Image_04122023083932508.png
|
2023-12-04 08:39:32.583938 |
169 |
64816543 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN |
165000 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN1 |
Roof laid |
-
latitude : 27.1650459,27.15827864,27.15827907
Longitude : 94.8415316,94.83882554,94.83882608
file name : Image_27112023192334951.png
|
2023-11-27 19:23:35.029922 |
170 |
64816543 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN |
165000 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN1 |
Roof laid |
-
latitude : 27.15829387,27.1583039
Longitude : 94.83892542,94.8388758
file name : Image_26112023085739647.png
|
2023-11-26 08:57:39.76543 |
171 |
64816543 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN |
165000 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN1 |
Plinth level |
-
latitude : 27.15683756,27.1583403
Longitude : 94.8394354,94.83879226
file name : Image_18102023102422451.png
|
2023-10-18 10:24:22.543104 |
172 |
64816543 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN |
165000 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN1 |
Plinth level |
-
latitude : 27.1583236,27.15832574
Longitude : 94.8387508,94.83876127
file name : Image_15102023132829971.png
|
2023-10-15 13:28:30.058583 |
173 |
64816543 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN |
165000 |
CONST OF SLAB CULVERT AT KOMOLDOI BONGALI TO KULI GAON JAN1 |
Completion of work |
-
latitude : 27.158260000000002,27.158261666666665
Longitude : 94.83882666666665,94.83882
file name : Image_30112022142913116.png
|
2022-11-30 14:29:13.21794 |
174 |
64816509 |
CONST OF SLAB CULVERT AT KOMOLDOI 1 NO SOLOGURI BORJAN |
165000 |
CONST OF SLAB CULVERT AT KOMOLDOI 1 NO SOLOGURI BORJAN1 |
Plinth level |
-
latitude : 27.17939033,27.17938794
Longitude : 94.83043382,94.83038013
file name : Image_06012024140547428.png
|
2024-01-06 14:05:47.523273 |
175 |
64816509 |
CONST OF SLAB CULVERT AT KOMOLDOI 1 NO SOLOGURI BORJAN |
165000 |
CONST OF SLAB CULVERT AT KOMOLDOI 1 NO SOLOGURI BORJAN1 |
Completion of work |
-
latitude : 27.17935333333333,27.179328333333334
Longitude : 94.83037833333334,94.830445
file name : Image_03032023133453015.png
|
2023-03-03 13:34:53.10377 |
176 |
86998301 |
Renovation of Block Conference Hall |
40000 |
Renovation of Block Conference Hall1 |
Plinth level |
-
latitude : 27.2233506
Longitude : 94.89146066
file name : Image_05012024081902579.png
|
2024-01-05 08:19:02.673785 |
177 |
86998301 |
Renovation of Block Conference Hall |
40000 |
Renovation of Block Conference Hall1 |
Completion of work |
-
latitude : 27.2233174
Longitude : 94.8917722
file name : Image_15122023113521412.png
|
2023-12-15 11:35:21.53062 |
178 |
67182480 |
CONST OF KAMALDOI BETBARI CULTURAL CENTRE(KAMALDOI BETBARI) |
171000 |
CONST OF KAMALDOI BETBARI CULTURAL CENTRE(KAMALDOI BETBARI)1 |
Completion of work |
-
latitude : 27.147315000000003,27.147328333333334
Longitude : 94.84057333333334,94.84057166666668
file name : Image_07052023152834892.png
|
2023-05-07 15:28:35.025236 |
179 |
67181691 |
Construction of Community Sanitary Complex |
24102 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.12093552
Longitude : 94.82230517
file name : Image_12092023154520576.png
|
2023-09-12 15:45:20.970229 |
180 |
64505698 |
CONST.OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT KOMOLDOI CULTURAL CENTRE |
105657 |
CONST.OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT KOMOLDOI CULTURAL CENTRE1 |
Roof laid |
-
latitude : 27.155095
Longitude : 94.82956333333335
file name : Image_04072024211725383.png
|
2024-07-04 21:17:25.499777 |
181 |
64505698 |
CONST.OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT KOMOLDOI CULTURAL CENTRE |
105657 |
CONST.OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT KOMOLDOI CULTURAL CENTRE1 |
Roof laid |
-
latitude : 27.155079999999998
Longitude : 94.82956333333335
file name : Image_11062024211759356.png
|
2024-06-11 21:17:59.444189 |
182 |
64505698 |
CONST.OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT KOMOLDOI CULTURAL CENTRE |
105657 |
CONST.OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT KOMOLDOI CULTURAL CENTRE1 |
Plinth level |
-
latitude : 27.273049999999998
Longitude : 94.91172999999999
file name : Image_17052024194417696.png
|
2024-05-17 19:44:17.77423 |
183 |
64505698 |
CONST.OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT KOMOLDOI CULTURAL CENTRE |
105657 |
CONST.OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT KOMOLDOI CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.1506223
Longitude : 94.8180342
file name : Image_25012024150601211.png
|
2024-01-25 15:06:01.309665 |
184 |
64505698 |
CONST.OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT KOMOLDOI CULTURAL CENTRE |
105657 |
CONST.OF COMMUNITY MANAGED SANITARY COMPLEX (CMSC) AT KOMOLDOI CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.1506223
Longitude : 94.8180342
file name : Image_25012024150553352.png
|
2024-01-25 15:05:53.455131 |
185 |
86981062 |
RENOVATION OF THOWRA 12 NO LINE YUVAK COMMUNITY HALL |
213000 |
RENOVATION OF THOWRA 12 NO LINE YUVAK COMMUNITY HALL1 |
Plinth level |
-
latitude : 27.123806666666663
Longitude : 94.80733166666666
file name : Image_17052024192758529.png
|
2024-05-17 19:27:58.616029 |
186 |
86981062 |
RENOVATION OF THOWRA 12 NO LINE YUVAK COMMUNITY HALL |
213000 |
RENOVATION OF THOWRA 12 NO LINE YUVAK COMMUNITY HALL1 |
Plinth level |
-
latitude : 27.12349592
Longitude : 94.80750765
file name : Image_04012024192247303.png
|
2024-01-04 19:22:47.384307 |
187 |
86981062 |
RENOVATION OF THOWRA 12 NO LINE YUVAK COMMUNITY HALL |
213000 |
RENOVATION OF THOWRA 12 NO LINE YUVAK COMMUNITY HALL1 |
Completion of work |
-
latitude : 27.12356226
Longitude : 94.80749566
file name : Image_27092023135743021.png
|
2023-09-27 13:57:43.118347 |
188 |
86981062 |
RENOVATION OF THOWRA 12 NO LINE YUVAK COMMUNITY HALL |
213000 |
RENOVATION OF THOWRA 12 NO LINE YUVAK COMMUNITY HALL1 |
Completion of work |
-
latitude : 27.12356068
Longitude : 94.80746468
file name : Image_12102023134812493.png
|
2023-10-12 13:48:12.585161 |
189 |
67182382 |
SLAB CULVERT AT GARIHALI CHUCK TO LUCKLO CONNECTING JAN (GARIHALI CHUCK) |
171000 |
SLAB CULVERT AT GARIHALI CHUCK TO LUCKLO CONNECTING JAN (GARIHALI CHUCK)1 |
Plinth level |
-
latitude : 27.18263858,27.18263975
Longitude : 94.81473129,94.81472672
file name : Image_06052024111104158.png
|
2024-05-06 11:11:04.25839 |
190 |
67182382 |
SLAB CULVERT AT GARIHALI CHUCK TO LUCKLO CONNECTING JAN (GARIHALI CHUCK) |
171000 |
SLAB CULVERT AT GARIHALI CHUCK TO LUCKLO CONNECTING JAN (GARIHALI CHUCK)1 |
Completion of work |
-
latitude : 27.18279586,27.18279304
Longitude : 94.8147977,94.81479561
file name : Image_03052024204412690.png
|
2024-05-03 20:44:12.821427 |
191 |
67182382 |
SLAB CULVERT AT GARIHALI CHUCK TO LUCKLO CONNECTING JAN (GARIHALI CHUCK) |
171000 |
SLAB CULVERT AT GARIHALI CHUCK TO LUCKLO CONNECTING JAN (GARIHALI CHUCK)1 |
Completion of work |
-
latitude : 27.25689993,27.25689981
Longitude : 94.88911586,94.88911573
file name : Image_06122023131144774.png
|
2023-12-06 13:11:44.870799 |
192 |
67182382 |
SLAB CULVERT AT GARIHALI CHUCK TO LUCKLO CONNECTING JAN (GARIHALI CHUCK) |
171000 |
SLAB CULVERT AT GARIHALI CHUCK TO LUCKLO CONNECTING JAN (GARIHALI CHUCK)1 |
Completion of work |
-
latitude : 27.182990000000004,27.182991666666666
Longitude : 94.81433999999999,94.81436666666666
file name : Image_15052023095245816.png
|
2023-05-15 09:52:45.941397 |
193 |
64506095 |
MAINTAINCE OF JJM SCHEMES |
412500 |
MAINTAINCE OF JJM SCHEMES 1 |
Completion of work |
-
latitude : 27.153419999999997
Longitude : 94.81937
file name : Image_08072024122329029.png
|
2024-07-08 12:23:29.125698 |
194 |
64506095 |
MAINTAINCE OF JJM SCHEMES |
412500 |
MAINTAINCE OF JJM SCHEMES 1 |
Completion of work |
-
latitude : 27.153419999999997
Longitude : 94.81937
file name : Image_08072024122310739.png
|
2024-07-08 12:23:10.827765 |