1 |
11257252 |
IMPROVEMENT OF CHIRINGHULLA G.P. OFFICE |
152862 |
Office Building1
|
50% |
-
latitude : 27.41765588
Longitude : 95.07832445
file name : Image_07082020133629038.png
|
2020-08-07 13:36:29.834045 |
2 |
11257252 |
IMPROVEMENT OF CHIRINGHULLA G.P. OFFICE |
152862 |
Office Building1
|
25% |
-
latitude : 27.41755429
Longitude : 95.07819773
file name : Image_04112019121040223.png
|
2019-11-04 12:10:40.298298 |
3 |
11257252 |
IMPROVEMENT OF CHIRINGHULLA G.P. OFFICE |
152862 |
Office Building1
|
50% |
-
latitude : 27.41764012
Longitude : 95.07821316
file name : Image_04112019122518245.png
|
2019-11-04 12:25:18.341372 |
4 |
11256467 |
CONSTRUCTION OF LATRINE AND TOILET AT CHIRINGHULLA GAON PANCHAYAT OFFICE |
250000 |
Toilet1
|
50% |
-
latitude : 27.41754968
Longitude : 95.07837944
file name : Image_04112019120913374.png
|
2019-11-04 12:09:13.459944 |
5 |
11256467 |
CONSTRUCTION OF LATRINE AND TOILET AT CHIRINGHULLA GAON PANCHAYAT OFFICE |
250000 |
Toilet1
|
25% |
-
latitude : 27.4161074
Longitude : 95.0779258
file name : Image_25102019150917466.png
|
2019-10-25 15:09:17.539778 |
6 |
11256467 |
CONSTRUCTION OF LATRINE AND TOILET AT CHIRINGHULLA GAON PANCHAYAT OFFICE |
250000 |
Toilet1
|
25% |
-
latitude : 27.41758179
Longitude : 95.0781854
file name : Image_04112019120641696.png
|
2019-11-04 12:06:41.776194 |
7 |
12016137 |
CONSTRUCTION OF BOUNDARY WALL AT NAHARSAKU CREMATION REST HOUSE PH-2 |
500000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 27.39351654
Longitude : 95.06920247
file name : Image_12112019154152265.png
|
2019-11-12 15:41:52.352694 |
8 |
43683790 |
Const. of Paver Block road at Bochapather Majo chuk Path |
500000 |
Const. of Paver Block road at Bochapather Majo chuk Path 1 |
Earth Work |
-
latitude : 27.41890972,27.41891022
Longitude : 95.09100816,95.09100716
file name : Image_07082020123132067.png
|
2020-08-07 12:09:52.931053 |
9 |
20223163 |
CONSTRUCTION OF BOUNDARY WALL AT TEPORCHALI NAAMGHAR |
150000 |
CONSTRUCTION OF BOUNDARY WALL AT TEPORCHALI NAAMGHAR1 |
In Progress |
-
latitude : 27.37703725
Longitude : 95.07787629
file name : Image_14082020150309998.png
|
2020-08-14 15:03:10.706307 |
10 |
12016580 |
CONSTRUCTION OF PAVERS BLOCK ROAD FROM JOYPUR ALI TO NOGACHAPORI PH-2 |
750000 |
Rural Road CC1 |
Earth Work |
-
latitude : 27.42772833,27.42773345
Longitude : 95.06573064,95.06573299
file name : Image_14082020120833352.png
|
2020-08-14 12:08:34.063473 |
11 |
12016743 |
CONSTRUCTION OF PAVERS BLOCK ROAD AT NIZ-MODERKHAT NORTH GOBATH |
500000 |
CONSTRUCTION OF PAVERS BLOCK ROAD AT NIZ-MODERKHAT NORTH GOBATH1 |
Earth Work |
-
latitude : 27.42819322,27.42818885
Longitude : 95.05818284,95.05818103
file name : Image_24082020162343054.png
|
2020-08-24 16:23:43.740755 |
12 |
37968601 |
CONSTRUCTION OF BOUNDARY WALL AT 1 NO. CHIRINGHULLA CULTURE CENTRE |
231443 |
CONSTRUCTION OF BOUNDARY WALL AT 1 NO. CHIRINGHULLA CULTURE CENTRE 1 |
In Progress |
-
latitude : 27.398986
Longitude : 95.07533015
file name : Image_07082020133438825.png
|
2020-08-07 13:12:59.79099 |
13 |
29792554 |
Const. of Latrine Toilet at Bapuji jyuba sangha |
134368 |
Const. of Latrine Toilet at Bapuji jyuba sangha1 |
25% |
-
latitude : 27.39543929
Longitude : 95.08302693
file name : Image_01092020125436392.png
|
2020-09-01 12:54:37.089523 |
14 |
20244768 |
CONSTRUCTION OF PAVER BLOCK ROAD AT NIZ-MODERKHAT TOKOWBAAM ROAD, PH-1 |
800000 |
CONSTRUCTION OF PAVER BLOCK ROAD AT NIZ-MODERKHAT TOKOWBAAM ROAD, PH-1 1 |
25% |
-
latitude : 27.42875126,27.42874281
Longitude : 95.05659206,95.05658841
file name : Image_24082020163235924.png
|
2020-08-24 16:32:36.601393 |
15 |
20244892 |
CONSTRUCTION OF KONWARIPATHER GRAM THAAN |
150000 |
CONSTRUCTION OF KONWARIPATHER GRAM THAAN1 |
25% |
-
latitude : 27.36571201
Longitude : 95.05712624
file name : Image_10072020131820389.png
|
2020-07-10 13:18:21.108263 |
16 |
20244962 |
REPARING COMPUTER ROOM AT CHIRINGHULLA GP OFFICE |
300000 |
REPARING COMPUTER ROOM AT CHIRINGHULLA GP OFFICE1 |
25% |
-
latitude : 27.41760273
Longitude : 95.07827397
file name : Image_07082020134814043.png
|
2020-08-07 13:48:14.769945 |
17 |
38830554 |
CONSTRUCTION OF VEHICLE STAND INFRONT OF CHIRINGHULLA GP OFFICE |
56850 |
CONSTRUCTION OF VEHICLE STAND INFRONT OF CHIRINGHULLA GP OFFICE1 |
In Progress |
-
latitude : 27.41769013
Longitude : 95.07825506
file name : Image_07082020133756635.png
|
2020-08-07 13:37:57.330878 |
18 |
38830690 |
CONSTRUCTION OF BOUNDARY WALL AT KONWARIPATHER CULTURAL CENTRE |
217045 |
CONSTRUCTION OF BOUNDARY WALL AT KONWARIPATHER CULTURAL CENTRE1 |
In Progress |
-
latitude : 27.3673412
Longitude : 95.04751849
file name : Image_10072020125833404.png
|
2020-07-10 12:58:34.090223 |
19 |
12016832 |
CONSTRUCTION OF 2 NO. BOCHAPATHAR ANGANBADI CENTRE |
300000 |
CONSTRUCTION OF 2 NO. BOCHAPATHAR ANGANBADI CENTRE1 |
25% |
-
latitude : 27.41156189
Longitude : 95.09321764
file name : Image_07082020123211645.png
|
2020-08-07 12:32:12.352488 |
20 |
20223183 |
REPAIRING OF ALIMUR NAAMGHAR |
200000 |
REPAIRING OF ALIMUR NAAMGHAR1 |
In Progress |
-
latitude : 27.42782748
Longitude : 95.06455497
file name : Image_14082020121424006.png
|
2020-08-14 12:14:24.693533 |
21 |
20223123 |
CONSTRUCTION OF DUSTBIN AT BOCHAPATHER PLAY FIELD |
50000 |
CONSTRUCTION OF DUSTBIN AT BOCHAPATHER PLAY FIELD1 |
25% |
-
latitude : 27.42522265
Longitude : 95.07904655
file name : Image_07082020122157231.png
|
2020-08-07 12:00:18.184309 |
22 |
20244562 |
CONSTRUCTION OF PAVER BLOCK ROAD AT BAPUJI SANGHA GUBAT , PH-1 |
800000 |
CONSTRUCTION OF PAVER BLOCK ROAD AT BAPUJI SANGHA GUBAT , PH-1 1 |
25% |
-
latitude : 27.39538381,27.39539181
Longitude : 95.08310272,95.08308932
file name : Image_07082020130934732.png
|
2020-08-07 12:47:55.678653 |
23 |
43654808 |
Improvement of Teporchali Church |
200000 |
Improvement of Teporchali Church1 |
In Progress |
-
latitude : 27.37601683
Longitude : 95.07311618
file name : Image_16082020225007823.png
|
2020-08-16 22:50:08.52174 |
24 |
43656357 |
Improvement of 1 No. Chiringhulla Namghar |
200000 |
Improvement of 1 No. Chiringhulla Namghar1 |
In Progress |
-
latitude : 27.3990236
Longitude : 95.07529169
file name : Image_07082020131505031.png
|
2020-08-07 13:15:05.650984 |
25 |
43652784 |
Improvement of Alimur Culture centre |
200000 |
Improvement of Alimur Culture centre1 |
In Progress |
-
latitude : 27.4277455
Longitude : 95.06479463
file name : Image_14082020115806428.png
|
2020-08-14 11:58:07.18802 |
26 |
43683631 |
Const. of paver block road NRC office to kungabari |
550000 |
Const. of paver block road NRC office to kungabari1 |
Earth Work |
-
latitude : 27.42736945,27.4273696
Longitude : 95.07397597,95.07397818
file name : Image_14082020121724936.png
|
2020-08-14 12:17:25.577719 |
27 |
43683717 |
Const. of paver block road Niz moderkhat to Naamghar LP school |
450000 |
Const. of paver block road Niz moderkhat to Naamghar LP school 1 |
Earth Work |
-
latitude : 27.42656506,27.4265617
Longitude : 95.06210955,95.0621112
file name : Image_24082020161032409.png
|
2020-08-24 16:10:33.125572 |
28 |
43654524 |
Improvement of Teporchali naamghar |
200000 |
Improvement of Teporchali naamghar1 |
In Progress |
-
latitude : 27.38274714
Longitude : 95.07428858
file name : Image_14082020143620382.png
|
2020-08-14 14:36:21.077169 |
29 |
43684572 |
Const. of paver block road at 1 No. Chiringhulla PHC . |
450000 |
Const. of paver block road at 1 No. Chiringhulla PHC .1 |
Earth Work |
-
latitude : 27.39954644,27.39955569
Longitude : 95.07552349,95.07550718
file name : Image_14082020133704333.png
|
2020-08-14 13:37:05.030134 |
30 |
64572093 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT NIZ MODERKHAT |
280000 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT NIZ MODERKHAT1 |
Roof laid |
-
latitude : 27.423418333333334
Longitude : 95.05538333333334
file name : Image_19102023131428095.png
|
2023-10-19 13:14:28.177748 |
31 |
64572093 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT NIZ MODERKHAT |
280000 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT NIZ MODERKHAT1 |
Plinth level |
-
latitude : 27.423381666666668
Longitude : 95.05540333333332
file name : Image_19102023130653985.png
|
2023-10-19 13:06:54.125201 |
32 |
64572093 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT NIZ MODERKHAT |
280000 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT NIZ MODERKHAT1 |
Completion of work |
-
latitude : 27.423405000000002
Longitude : 95.05536166666667
file name : Image_19102023125835453.png
|
2023-10-19 12:58:35.570908 |
33 |
64572093 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT NIZ MODERKHAT |
280000 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT NIZ MODERKHAT1 |
Completion of work |
-
latitude : 27.42334
Longitude : 95.05539833333333
file name : Image_06082022091547355.png
|
2022-08-06 09:15:47.440818 |
34 |
65599509 |
Construction of Community Sanitary Complex |
198000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.4001403
Longitude : 94.8792514
file name : Image_06092023141059332.png
|
2023-09-06 14:10:59.308691 |
35 |
65602383 |
Construction of Community Sanitary Complex |
150000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.37213166666667
Longitude : 95.05798833333334
file name : Image_23112022154415704.png
|
2022-11-23 15:44:15.823311 |
36 |
107257239 |
Construction of Building |
423200 |
Construction of Building1 |
Plinth level |
-
latitude : 27.378358333333335
Longitude : 95.05452333333332
file name : Image_05112024124450042.png
|
2024-11-05 12:44:50.176878 |
37 |
107257239 |
Construction of Building |
423200 |
Construction of Building1 |
Completion of work |
-
latitude : 27.37848166666667
Longitude : 95.05453333333335
file name : Image_31082024125840596.png
|
2024-08-31 12:58:41.467544 |
38 |
65599537 |
Construction of Community Sanitary Complex |
248500 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.41519
Longitude : 95.085765
file name : Image_13122023120730155.png
|
2023-12-13 12:07:30.239873 |
39 |
65599537 |
Construction of Community Sanitary Complex |
248500 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.415308333333336
Longitude : 95.08575833333335
file name : Image_19102023140323975.png
|
2023-10-19 14:03:24.0732 |
40 |
65599537 |
Construction of Community Sanitary Complex |
248500 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.415276666666667
Longitude : 95.08576333333333
file name : Image_19102023140133709.png
|
2023-10-19 14:01:33.805146 |
41 |
65599537 |
Construction of Community Sanitary Complex |
248500 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.415451666666666
Longitude : 95.08571833333332
file name : Image_09022023132203226.png
|
2023-02-09 13:22:03.32312 |
42 |
49662330 |
Running drinking water facility at Alimur Tiniali community Toilet |
90000 |
Running drinking water facility at Alimur Tiniali community Toilet 1 |
Roof laid |
-
latitude : 27.4263451
Longitude : 95.076078
file name : Image_11012024120709625.png
|
2024-01-11 12:07:09.734366 |
43 |
49662330 |
Running drinking water facility at Alimur Tiniali community Toilet |
90000 |
Running drinking water facility at Alimur Tiniali community Toilet 1 |
Plinth level |
-
latitude : 27.4263451
Longitude : 95.076078
file name : Image_11012024120326367.png
|
2024-01-11 12:03:26.458316 |
44 |
49662330 |
Running drinking water facility at Alimur Tiniali community Toilet |
90000 |
Running drinking water facility at Alimur Tiniali community Toilet 1 |
Completion of work |
-
latitude : 27.4263103
Longitude : 95.0760724
file name : Image_10092021164323616.png
|
2021-09-10 16:43:23.724027 |
45 |
64572250 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT SANKAR SANGHA PUB TEPORCHALI |
280000 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT SANKAR SANGHA PUB TEPORCHALI1 |
Roof laid |
-
latitude : 27.379790000000003
Longitude : 95.07804833333333
file name : Image_11012024124151855.png
|
2024-01-11 12:41:51.977529 |
46 |
64572250 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT SANKAR SANGHA PUB TEPORCHALI |
280000 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT SANKAR SANGHA PUB TEPORCHALI1 |
Plinth level |
-
latitude : 27.37972666666667
Longitude : 95.07809166666667
file name : Image_11012024123459533.png
|
2024-01-11 12:34:59.643666 |
47 |
64572250 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT SANKAR SANGHA PUB TEPORCHALI |
280000 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT SANKAR SANGHA PUB TEPORCHALI1 |
Plinth level |
-
latitude : 27.379751666666667
Longitude : 95.07803333333335
file name : Image_11012024123455326.png
|
2024-01-11 12:34:55.424763 |
48 |
64572250 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT SANKAR SANGHA PUB TEPORCHALI |
280000 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT SANKAR SANGHA PUB TEPORCHALI1 |
Completion of work |
-
latitude : 27.379755
Longitude : 95.07802166666667
file name : Image_05092022091916386.png
|
2022-09-05 09:19:16.525653 |
49 |
65602547 |
IMPROVEMENT OF TEPORSALI SANKAR SANGHA CULTURAL CENTRE |
195800 |
IMPROVEMENT OF TEPORSALI SANKAR SANGHA CULTURAL CENTRE1 |
Roof laid |
-
latitude : 27.379581666666663
Longitude : 95.07809833333334
file name : Image_11012024130746348.png
|
2024-01-11 13:07:46.462479 |
50 |
65602547 |
IMPROVEMENT OF TEPORSALI SANKAR SANGHA CULTURAL CENTRE |
195800 |
IMPROVEMENT OF TEPORSALI SANKAR SANGHA CULTURAL CENTRE1 |
Plinth level |
-
latitude : 27.37966333333333
Longitude : 95.07822833333333
file name : Image_11012024125858816.png
|
2024-01-11 12:58:58.915462 |
51 |
65602547 |
IMPROVEMENT OF TEPORSALI SANKAR SANGHA CULTURAL CENTRE |
195800 |
IMPROVEMENT OF TEPORSALI SANKAR SANGHA CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.37966333333333
Longitude : 95.078245
file name : Image_11012024124347365.png
|
2024-01-11 12:43:47.484896 |
52 |
65602547 |
IMPROVEMENT OF TEPORSALI SANKAR SANGHA CULTURAL CENTRE |
195800 |
IMPROVEMENT OF TEPORSALI SANKAR SANGHA CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.379734999999997
Longitude : 95.07799333333332
file name : Image_03032023130605540.png
|
2023-03-03 13:06:05.64965 |
53 |
64572756 |
IMPROVEMENT OF LACHIT BOR PHUKAN YUBA SANGHA AT NAHARSAKU |
260000 |
IMPROVEMENT OF LACHIT BOR PHUKAN YUBA SANGHA AT NAHARSAKU1 |
Roof laid |
-
latitude : 27.392906666666665
Longitude : 95.07017333333333
file name : Image_11012024132335462.png
|
2024-01-11 13:23:35.548765 |
54 |
64572756 |
IMPROVEMENT OF LACHIT BOR PHUKAN YUBA SANGHA AT NAHARSAKU |
260000 |
IMPROVEMENT OF LACHIT BOR PHUKAN YUBA SANGHA AT NAHARSAKU1 |
Plinth level |
-
latitude : 27.392893333333337
Longitude : 95.07018000000001
file name : Image_11012024132028612.png
|
2024-01-11 13:20:28.697074 |
55 |
64572756 |
IMPROVEMENT OF LACHIT BOR PHUKAN YUBA SANGHA AT NAHARSAKU |
260000 |
IMPROVEMENT OF LACHIT BOR PHUKAN YUBA SANGHA AT NAHARSAKU1 |
Completion of work |
-
latitude : 27.392870000000002
Longitude : 95.07019833333334
file name : Image_11012024131749507.png
|
2024-01-11 13:17:49.604348 |
56 |
64572756 |
IMPROVEMENT OF LACHIT BOR PHUKAN YUBA SANGHA AT NAHARSAKU |
260000 |
IMPROVEMENT OF LACHIT BOR PHUKAN YUBA SANGHA AT NAHARSAKU1 |
Completion of work |
-
latitude : 27.392830000000004
Longitude : 95.07030166666667
file name : Image_20082022122012517.png
|
2022-08-20 12:20:12.63034 |
57 |
49662572 |
Const of Drain at Romai Bongali Gaon |
549658 |
Const of Drain at Romai Bongali Gaon1 |
Roof laid |
-
latitude : 27.405021666666666,27.40502333333333,27.40502333333333,27.405026666666664
Longitude : 95.05479666666666,95.05481,95.05481,95.05481499999999
file name : Image_09012024144434600.png
|
2024-01-09 14:44:34.704457 |
58 |
49662572 |
Const of Drain at Romai Bongali Gaon |
549658 |
Const of Drain at Romai Bongali Gaon1 |
Plinth level |
-
latitude : 27.40493666666667,27.404929999999997,27.404929999999997,27.404941666666666,27.404941666666666
Longitude : 95.05480833333334,95.05481,95.05481,95.05481666666668,95.05481666666668
file name : Image_09012024144102438.png
|
2024-01-09 14:41:02.527769 |
59 |
49662572 |
Const of Drain at Romai Bongali Gaon |
549658 |
Const of Drain at Romai Bongali Gaon1 |
Completion of work |
-
latitude : 27.404915,27.404913333333337
Longitude : 95.05507166666666,95.05509500000001
file name : Image_29072022172627959.png
|
2022-07-29 17:26:28.065235 |
60 |
65602440 |
Construction of Community Sanitary Complex |
196500 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.388098333333332
Longitude : 95.06604999999999
file name : Image_09012024153012920.png
|
2024-01-09 15:30:13.006575 |
61 |
65602440 |
Construction of Community Sanitary Complex |
196500 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.38808333333333
Longitude : 95.06605499999999
file name : Image_09012024152532006.png
|
2024-01-09 15:25:32.095192 |
62 |
65602440 |
Construction of Community Sanitary Complex |
196500 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.388090000000002
Longitude : 95.066075
file name : Image_09012024152526844.png
|
2024-01-09 15:25:26.915317 |
63 |
65602440 |
Construction of Community Sanitary Complex |
196500 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.42656
Longitude : 94.8947869
file name : Image_02092023123104578.png
|
2023-09-02 12:31:04.684311 |
64 |
87405647 |
CONST OF 1NO OF SILAPHALAKAM |
30000 |
CONST OF 1NO OF SILAPHALAKAM1 |
Completion of work |
-
latitude : 27.4176714
Longitude : 95.0783117
file name : Image_24112023131735232.png
|
2023-11-24 13:17:35.318547 |
65 |
49660846 |
Const of Latrine and Toillet at Alimur Culture Centre |
150000 |
Const of Latrine and Toillet at Alimur Culture Centre1 |
Roof laid |
-
latitude : 27.427813333333333
Longitude : 95.06484
file name : Image_19102023124556859.png
|
2023-10-19 12:45:56.960094 |
66 |
49660846 |
Const of Latrine and Toillet at Alimur Culture Centre |
150000 |
Const of Latrine and Toillet at Alimur Culture Centre1 |
Roof laid |
-
latitude : 27.427903333333333
Longitude : 95.06479666666668
file name : Image_19102023124432713.png
|
2023-10-19 12:44:32.800682 |
67 |
49660846 |
Const of Latrine and Toillet at Alimur Culture Centre |
150000 |
Const of Latrine and Toillet at Alimur Culture Centre1 |
Plinth level |
-
latitude : 27.427833333333336
Longitude : 95.06479333333333
file name : Image_19102023123615680.png
|
2023-10-19 12:36:15.779495 |
68 |
49660846 |
Const of Latrine and Toillet at Alimur Culture Centre |
150000 |
Const of Latrine and Toillet at Alimur Culture Centre1 |
Completion of work |
-
latitude : 27.427858333333333
Longitude : 95.06482
file name : Image_28072022160030146.png
|
2022-07-28 16:00:30.24691 |
69 |
49662691 |
Running drinking water facility at Gorukhunda Tiniali community toilet |
90000 |
Running drinking water facility at Gorukhunda Tiniali community toilet1 |
Roof laid |
-
latitude : 27.372085000000002
Longitude : 95.06283166666665
file name : Image_09012024164116913.png
|
2024-01-09 16:41:16.995154 |
70 |
49662691 |
Running drinking water facility at Gorukhunda Tiniali community toilet |
90000 |
Running drinking water facility at Gorukhunda Tiniali community toilet1 |
Plinth level |
-
latitude : 27.372081666666666
Longitude : 95.06288333333332
file name : Image_09012024163858262.png
|
2024-01-09 16:38:58.349372 |
71 |
49662691 |
Running drinking water facility at Gorukhunda Tiniali community toilet |
90000 |
Running drinking water facility at Gorukhunda Tiniali community toilet1 |
Completion of work |
-
latitude : 27.37206667
Longitude : 95.06278262
file name : Image_10092021171449425.png
|
2021-09-10 17:14:49.511167 |
72 |
49663049 |
Maintenance of Gram Thaan at 2 No Chiringhulla Hemrom Chuk |
200000 |
Maintenance of Gram Thaan at 2 No Chiringhulla Hemrom Chuk1 |
Roof laid |
-
latitude : 27.410368333333334
Longitude : 95.06423166666667
file name : Image_02122023141350537.png
|
2023-12-02 14:13:50.639917 |
73 |
49663049 |
Maintenance of Gram Thaan at 2 No Chiringhulla Hemrom Chuk |
200000 |
Maintenance of Gram Thaan at 2 No Chiringhulla Hemrom Chuk1 |
Plinth level |
-
latitude : 27.410395
Longitude : 95.064245
file name : Image_23082022141818013.png
|
2022-08-23 14:18:18.116537 |
74 |
49663049 |
Maintenance of Gram Thaan at 2 No Chiringhulla Hemrom Chuk |
200000 |
Maintenance of Gram Thaan at 2 No Chiringhulla Hemrom Chuk1 |
Completion of work |
-
latitude : 27.410306666666663
Longitude : 95.06427166666666
file name : Image_28072022160041769.png
|
2022-07-28 16:00:41.877095 |
75 |
64572468 |
IMPROVEMENT OF BOCAPATHER LP SCHOOL |
200000 |
IMPROVEMENT OF BOCAPATHER LP SCHOOL1 |
Roof laid |
-
latitude : 27.4176352
Longitude : 95.0783404
file name : Image_02122023122654509.png
|
2023-12-02 12:26:54.618129 |
76 |
64572468 |
IMPROVEMENT OF BOCAPATHER LP SCHOOL |
200000 |
IMPROVEMENT OF BOCAPATHER LP SCHOOL1 |
Plinth level |
-
latitude : 27.48478
Longitude : 95.05463666666668
file name : Image_02122023121504254.png
|
2023-12-02 12:15:04.36446 |
77 |
64572468 |
IMPROVEMENT OF BOCAPATHER LP SCHOOL |
200000 |
IMPROVEMENT OF BOCAPATHER LP SCHOOL1 |
Completion of work |
-
latitude : 27.417871666666663
Longitude : 95.07769833333332
file name : Image_01082022133918770.png
|
2022-08-01 13:39:18.880003 |
78 |
64572699 |
IMPROVEMENT OF ALIMUR CREMEATION GROUND |
260000 |
IMPROVEMENT OF ALIMUR CREMEATION GROUND1 |
Roof laid |
-
latitude : 27.418770000000002
Longitude : 95.07871166666668
file name : Image_02122023123049907.png
|
2023-12-02 12:30:50.449625 |
79 |
64572699 |
IMPROVEMENT OF ALIMUR CREMEATION GROUND |
260000 |
IMPROVEMENT OF ALIMUR CREMEATION GROUND1 |
Plinth level |
-
latitude : 27.418834999999998
Longitude : 95.07875833333334
file name : Image_18122022102037453.png
|
2022-12-18 10:20:37.58025 |
80 |
64572699 |
IMPROVEMENT OF ALIMUR CREMEATION GROUND |
260000 |
IMPROVEMENT OF ALIMUR CREMEATION GROUND1 |
Completion of work |
-
latitude : 27.41871
Longitude : 95.07873999999998
file name : Image_19102022184044808.png
|
2022-10-19 18:40:44.918905 |
81 |
49663287 |
Maintenance of paver block road from Jonota sorompath to Kurkani Ph 2 |
403862 |
Maintenance of paver block road from Jonota sorompath to Kurkani Ph 21 |
Roof laid |
-
latitude : 27.41514666666667,27.415133333333333
Longitude : 95.07802666666666,95.07801333333333
file name : Image_02122023131130046.png
|
2023-12-02 13:11:30.171351 |
82 |
49663287 |
Maintenance of paver block road from Jonota sorompath to Kurkani Ph 2 |
403862 |
Maintenance of paver block road from Jonota sorompath to Kurkani Ph 21 |
Plinth level |
-
latitude : 27.415139999999997,27.415143333333337
Longitude : 95.07805166666667,95.07805333333333
file name : Image_02122023125752370.png
|
2023-12-02 12:57:52.459745 |
83 |
49663287 |
Maintenance of paver block road from Jonota sorompath to Kurkani Ph 2 |
403862 |
Maintenance of paver block road from Jonota sorompath to Kurkani Ph 21 |
Plinth level |
-
latitude : 27.415183333333335,27.415188333333337
Longitude : 95.07802500000001,95.07802333333332
file name : Image_02122023125745994.png
|
2023-12-02 12:57:46.081075 |
84 |
49663287 |
Maintenance of paver block road from Jonota sorompath to Kurkani Ph 2 |
403862 |
Maintenance of paver block road from Jonota sorompath to Kurkani Ph 21 |
Completion of work |
-
latitude : 27.41520166666667,27.415183333333335
Longitude : 95.07827833333334,95.07826833333333
file name : Image_27072022144324402.png
|
2022-07-27 14:43:24.52045 |
85 |
65602646 |
IMPROVEMENT AT ALIMUR CULTURAL CENTRE |
200000 |
IMPROVEMENT AT ALIMUR CULTURAL CENTRE1 |
Roof laid |
-
latitude : 27.414184999999996
Longitude : 95.07342166666668
file name : Image_02122023133437746.png
|
2023-12-02 13:34:37.837549 |
86 |
65602646 |
IMPROVEMENT AT ALIMUR CULTURAL CENTRE |
200000 |
IMPROVEMENT AT ALIMUR CULTURAL CENTRE1 |
Plinth level |
-
latitude : 27.414081666666668
Longitude : 95.07359833333334
file name : Image_02122023132649904.png
|
2023-12-02 13:26:49.999852 |
87 |
65602646 |
IMPROVEMENT AT ALIMUR CULTURAL CENTRE |
200000 |
IMPROVEMENT AT ALIMUR CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.414088333333332
Longitude : 95.07360833333333
file name : Image_02122023131715658.png
|
2023-12-02 13:17:15.779125 |
88 |
65602646 |
IMPROVEMENT AT ALIMUR CULTURAL CENTRE |
200000 |
IMPROVEMENT AT ALIMUR CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.4265101
Longitude : 94.8944122
file name : Image_02092023123150134.png
|
2023-09-02 12:31:50.2393 |
89 |
65602016 |
REPAIRING OF 2NO CHIRINGHULLA ANGANWADI CENTRE |
200000 |
REPAIRING OF 2NO CHIRINGHULLA ANGANWADI CENTRE1 |
Roof laid |
-
latitude : 27.4051
Longitude : 95.06001999999998
file name : Image_02122023141753376.png
|
2023-12-02 14:17:53.469904 |
90 |
65602016 |
REPAIRING OF 2NO CHIRINGHULLA ANGANWADI CENTRE |
200000 |
REPAIRING OF 2NO CHIRINGHULLA ANGANWADI CENTRE1 |
Plinth level |
-
latitude : 27.405136666666667
Longitude : 95.06004
file name : Image_02122023141500621.png
|
2023-12-02 14:15:00.738145 |
91 |
65602016 |
REPAIRING OF 2NO CHIRINGHULLA ANGANWADI CENTRE |
200000 |
REPAIRING OF 2NO CHIRINGHULLA ANGANWADI CENTRE1 |
Completion of work |
-
latitude : 27.405148333333333
Longitude : 95.06000999999999
file name : Image_06032023150131454.png
|
2023-03-06 15:01:31.562015 |
92 |
65599606 |
IMPROVEMENT OF NABAJYOTI YUBA SANGHA AT KONWARIPATHER |
200000 |
IMPROVEMENT OF NABAJYOTI YUBA SANGHA AT KONWARIPATHER1 |
Roof laid |
-
latitude : 27.362575
Longitude : 95.05667166666666
file name : Image_02122023144723847.png
|
2023-12-02 14:47:23.955844 |
93 |
65599606 |
IMPROVEMENT OF NABAJYOTI YUBA SANGHA AT KONWARIPATHER |
200000 |
IMPROVEMENT OF NABAJYOTI YUBA SANGHA AT KONWARIPATHER1 |
Plinth level |
-
latitude : 27.36256
Longitude : 95.0567
file name : Image_02122023144235718.png
|
2023-12-02 14:42:35.816812 |
94 |
65599606 |
IMPROVEMENT OF NABAJYOTI YUBA SANGHA AT KONWARIPATHER |
200000 |
IMPROVEMENT OF NABAJYOTI YUBA SANGHA AT KONWARIPATHER1 |
Completion of work |
-
latitude : 27.36257666666667
Longitude : 95.05667999999999
file name : Image_02122023143538133.png
|
2023-12-02 14:35:38.220792 |
95 |
65599606 |
IMPROVEMENT OF NABAJYOTI YUBA SANGHA AT KONWARIPATHER |
200000 |
IMPROVEMENT OF NABAJYOTI YUBA SANGHA AT KONWARIPATHER1 |
Completion of work |
-
latitude : 27.4266471
Longitude : 94.8946631
file name : Image_02092023123027471.png
|
2023-09-02 12:30:27.611976 |
96 |
64572191 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT KONWARIPATHER SC CULTURAL CENTRE |
280000 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT KONWARIPATHER SC CULTURAL CENTRE1 |
Roof laid |
-
latitude : 27.367174999999996
Longitude : 95.04734833333332
file name : Image_02122023145505529.png
|
2023-12-02 14:55:05.624664 |
97 |
64572191 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT KONWARIPATHER SC CULTURAL CENTRE |
280000 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT KONWARIPATHER SC CULTURAL CENTRE1 |
Roof laid |
-
latitude : 27.367231666666665
Longitude : 95.04731500000001
file name : Image_12122022130721432.png
|
2022-12-12 13:07:21.53588 |
98 |
64572191 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT KONWARIPATHER SC CULTURAL CENTRE |
280000 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT KONWARIPATHER SC CULTURAL CENTRE1 |
Plinth level |
-
latitude : 27.367171666666664
Longitude : 95.04733499999999
file name : Image_13102022161636961.png
|
2022-10-13 16:16:37.083386 |
99 |
64572191 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT KONWARIPATHER SC CULTURAL CENTRE |
280000 |
CONST OF RUNING WATER WITH LATRINE AND TOILET AT KONWARIPATHER SC CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.36724
Longitude : 95.04774333333334
file name : Image_29082022090821155.png
|
2022-08-29 09:08:21.308811 |
100 |
51569568 |
Const of Toilet at Konwaripather CNI Culture Centre |
200000 |
Const of Toilet at Konwaripather CNI Culture Centre1 |
Roof laid |
-
latitude : 27.36562333333333
Longitude : 95.05487666666667
file name : Image_02122023151324177.png
|
2023-12-02 15:13:24.275732 |
101 |
51569568 |
Const of Toilet at Konwaripather CNI Culture Centre |
200000 |
Const of Toilet at Konwaripather CNI Culture Centre1 |
Plinth level |
-
latitude : 27.365586666666665
Longitude : 95.05490666666668
file name : Image_02122023150710105.png
|
2023-12-02 15:07:10.206865 |
102 |
51569568 |
Const of Toilet at Konwaripather CNI Culture Centre |
200000 |
Const of Toilet at Konwaripather CNI Culture Centre1 |
Completion of work |
-
latitude : 27.365595
Longitude : 95.05490666666668
file name : Image_02122023150602145.png
|
2023-12-02 15:06:02.245323 |
103 |
51569568 |
Const of Toilet at Konwaripather CNI Culture Centre |
200000 |
Const of Toilet at Konwaripather CNI Culture Centre1 |
Completion of work |
-
latitude : 27.365655
Longitude : 95.05496166666666
file name : Image_18122022185648341.png
|
2022-12-18 18:56:48.446622 |
104 |
49663484 |
Maintenance of paver block road at Bochapather Hatiali Chuk |
403863 |
Maintenance of paver block road at Bochapather Hatiali Chuk 1 |
Plinth level |
-
latitude : 27.417080000000002,27.41707
Longitude : 95.09009499999999,95.09008833333334
file name : Image_13122023123027428.png
|
2023-12-13 12:30:27.526043 |
105 |
49663484 |
Maintenance of paver block road at Bochapather Hatiali Chuk |
403863 |
Maintenance of paver block road at Bochapather Hatiali Chuk 1 |
Completion of work |
-
latitude : 27.41789833333333,27.417860000000005
Longitude : 95.09050833333335,95.09045833333333
file name : Image_27072022153555813.png
|
2022-07-27 15:35:55.937702 |
106 |
64572559 |
CONST OF ANGANWADI CENTRE AT 1NO CHIRINGHULLA |
200000 |
CONST OF ANGANWADI CENTRE AT 1NO CHIRINGHULLA1 |
Plinth level |
-
latitude : 27.39629166666667
Longitude : 95.08203166666665
file name : Image_13122023132818256.png
|
2023-12-13 13:28:18.355377 |
107 |
64572559 |
CONST OF ANGANWADI CENTRE AT 1NO CHIRINGHULLA |
200000 |
CONST OF ANGANWADI CENTRE AT 1NO CHIRINGHULLA1 |
Completion of work |
-
latitude : 27.396271666666667
Longitude : 95.08212166666665
file name : Image_13122023132346052.png
|
2023-12-13 13:23:46.174433 |
108 |
64572559 |
CONST OF ANGANWADI CENTRE AT 1NO CHIRINGHULLA |
200000 |
CONST OF ANGANWADI CENTRE AT 1NO CHIRINGHULLA1 |
Completion of work |
-
latitude : 27.396283333333333
Longitude : 95.08210499999998
file name : Image_05082022144900737.png
|
2022-08-05 14:49:00.838915 |
109 |
64572600 |
REPAIRING BALURAM KONWAR L.P SCHOOL AT 1NO CHIRINGHULLA |
200000 |
REPAIRING BALURAM KONWAR L.P SCHOOL AT 1NO CHIRINGHULLA1 |
Plinth level |
-
latitude : 27.395629999999997
Longitude : 95.08294666666667
file name : Image_13122023134333423.png
|
2023-12-13 13:43:33.513227 |
110 |
64572600 |
REPAIRING BALURAM KONWAR L.P SCHOOL AT 1NO CHIRINGHULLA |
200000 |
REPAIRING BALURAM KONWAR L.P SCHOOL AT 1NO CHIRINGHULLA1 |
Completion of work |
-
latitude : 27.395635000000002
Longitude : 95.08294833333333
file name : Image_13122023133633891.png
|
2023-12-13 13:36:33.984884 |
111 |
64572600 |
REPAIRING BALURAM KONWAR L.P SCHOOL AT 1NO CHIRINGHULLA |
200000 |
REPAIRING BALURAM KONWAR L.P SCHOOL AT 1NO CHIRINGHULLA1 |
Completion of work |
-
latitude : 27.39556166666667
Longitude : 95.08283333333333
file name : Image_20092022143603981.png
|
2022-09-20 14:36:04.101078 |
112 |
64572301 |
CONST OF RUNING WATER LATRINE AND TOILET AT 1NO CHIRINGHULLA CULTURAL CENTRE |
280000 |
CONST OF RUNING WATER LATRINE AND TOILET AT 1NO CHIRINGHULLA CULTURAL CENTRE1 |
Plinth level |
-
latitude : 27.399115
Longitude : 95.07547000000001
file name : Image_13122023141517263.png
|
2023-12-13 14:15:17.354572 |
113 |
64572301 |
CONST OF RUNING WATER LATRINE AND TOILET AT 1NO CHIRINGHULLA CULTURAL CENTRE |
280000 |
CONST OF RUNING WATER LATRINE AND TOILET AT 1NO CHIRINGHULLA CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.399166666666662
Longitude : 95.07547166666667
file name : Image_13122023141248582.png
|
2023-12-13 14:12:48.680514 |
114 |
64572301 |
CONST OF RUNING WATER LATRINE AND TOILET AT 1NO CHIRINGHULLA CULTURAL CENTRE |
280000 |
CONST OF RUNING WATER LATRINE AND TOILET AT 1NO CHIRINGHULLA CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.39905666666667
Longitude : 95.075535
file name : Image_23082022142618636.png
|
2022-08-23 14:26:18.743217 |
115 |
65602495 |
Operation & maintenance of drinking water supply system |
496500 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 27.4177894
Longitude : 95.0779159
file name : Image_22082024124802157.png
|
2024-08-22 12:48:02.258788 |
116 |
65602495 |
Operation & maintenance of drinking water supply system |
496500 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.40482666666667
Longitude : 94.87984499999999
file name : Image_06042023090208918.png
|
2023-04-06 09:02:09.01758 |
117 |
65602123 |
IMPROVEMENT OF GANJUTOLI CULTURAL CENTRE |
200000 |
IMPROVEMENT OF GANJUTOLI CULTURAL CENTRE1 |
Roof laid |
-
latitude : 27.379966666666665
Longitude : 95.05559999999998
file name : Image_23042024151634675.png
|
2024-04-23 15:16:34.765154 |
118 |
65602123 |
IMPROVEMENT OF GANJUTOLI CULTURAL CENTRE |
200000 |
IMPROVEMENT OF GANJUTOLI CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.37995
Longitude : 95.05563666666667
file name : Image_23042024150917758.png
|
2024-04-23 15:09:17.850931 |
119 |
65602123 |
IMPROVEMENT OF GANJUTOLI CULTURAL CENTRE |
200000 |
IMPROVEMENT OF GANJUTOLI CULTURAL CENTRE1 |
Plinth level |
-
latitude : 27.379995
Longitude : 95.05561166666666
file name : Image_23042024151122126.png
|
2024-04-23 15:11:22.226279 |
120 |
65602123 |
IMPROVEMENT OF GANJUTOLI CULTURAL CENTRE |
200000 |
IMPROVEMENT OF GANJUTOLI CULTURAL CENTRE1 |
Completion of work |
-
latitude : 27.379905
Longitude : 95.05571166666665
file name : Image_09122022140230682.png
|
2022-12-09 14:02:30.774531 |
121 |
87405537 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.375961666666665
Longitude : 95.07297166666667
file name : Image_27012024151533582.png
|
2024-01-27 15:15:33.669996 |
122 |
87405537 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.37602
Longitude : 95.07291333333333
file name : Image_27012024151047212.png
|
2024-01-27 15:10:47.309137 |
123 |
87405537 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.376028333333338
Longitude : 95.07282833333332
file name : Image_27012024145656799.png
|
2024-01-27 14:56:56.90409 |
124 |
87405537 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.417563333333337
Longitude : 95.07838166666667
file name : Image_24112023132545623.png
|
2023-11-24 13:25:45.716946 |
125 |
88355761 |
RENOVATION OF GOGOI CULTURAL CENTRE AT NAHARSAHU |
205516 |
RENOVATION OF GOGOI CULTURAL CENTRE AT NAHARSAHU1 |
Completion of work |
-
latitude : 27.393438333333332
Longitude : 95.07433
file name : Image_06072024183258952.png
|
2024-07-06 18:32:59.035995 |
126 |
87405713 |
IMPROVEMENT OF SHASTRIJI H.S SCHOOL AT GARUKHUNDA |
200000 |
IMPROVEMENT OF SHASTRIJI H.S SCHOOL AT GARUKHUNDA1 |
Plinth level |
-
latitude : 27.372868333333333
Longitude : 95.061985
file name : Image_05112024133855562.png
|
2024-11-05 13:38:55.696036 |
127 |
87405713 |
IMPROVEMENT OF SHASTRIJI H.S SCHOOL AT GARUKHUNDA |
200000 |
IMPROVEMENT OF SHASTRIJI H.S SCHOOL AT GARUKHUNDA1 |
Plinth level |
-
latitude : 27.372813333333337
Longitude : 95.06199333333333
file name : Image_05112024133848739.png
|
2024-11-05 13:38:48.837689 |
128 |
87405713 |
IMPROVEMENT OF SHASTRIJI H.S SCHOOL AT GARUKHUNDA |
200000 |
IMPROVEMENT OF SHASTRIJI H.S SCHOOL AT GARUKHUNDA1 |
Completion of work |
-
latitude : 27.37284833333333
Longitude : 95.06190999999998
file name : Image_05112024133310042.png
|
2024-11-05 13:33:10.133399 |
129 |
88355814 |
RENOVATION OF BASMOTIA CULTURAL CENTRE AT TEPORCHALI. |
205518 |
RENOVATION OF BASMOTIA CULTURAL CENTRE AT TEPORCHALI.1 |
Completion of work |
-
latitude : 27.360951666666665
Longitude : 95.06188500000002
file name : Image_06072024181338092.png
|
2024-07-06 18:13:38.168202 |
130 |
87405805 |
IMPROVEMENT OF MANIPURI LINE CULTURAL CENTRE AT TEPORCHALI |
200000 |
IMPROVEMENT OF MANIPURI LINE CULTURAL CENTRE AT TEPORCHALI1 |
Completion of work |
-
latitude : 27.378895000000004
Longitude : 95.06446166666667
file name : Image_06072024182100173.png
|
2024-07-06 18:21:00.24834 |
131 |
87405000 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
78300 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
|
-
latitude : 27.41886
Longitude : 95.0780582
file name : Image_29062024135801754.png
|
2024-06-29 13:58:01.84106 |
132 |
65602591 |
REPAIRING OF CULTURAL CENTRE AT ALIMUR KUNGABARI |
200000 |
REPAIRING OF CULTURAL CENTRE AT ALIMUR KUNGABARI1 |
Roof laid |
-
latitude : 27.42286166666667
Longitude : 95.07206999999998
file name : Image_10092024151815323.png
|
2024-09-10 15:18:18.844401 |
133 |
65602591 |
REPAIRING OF CULTURAL CENTRE AT ALIMUR KUNGABARI |
200000 |
REPAIRING OF CULTURAL CENTRE AT ALIMUR KUNGABARI1 |
Plinth level |
-
latitude : 27.422878333333333
Longitude : 95.07203333333334
file name : Image_10092024151129436.png
|
2024-09-10 15:11:32.947507 |
134 |
65602591 |
REPAIRING OF CULTURAL CENTRE AT ALIMUR KUNGABARI |
200000 |
REPAIRING OF CULTURAL CENTRE AT ALIMUR KUNGABARI1 |
Completion of work |
-
latitude : 27.422883333333335
Longitude : 95.07215333333333
file name : Image_10092024150247083.png
|
2024-09-10 15:04:51.116034 |
135 |
65602591 |
REPAIRING OF CULTURAL CENTRE AT ALIMUR KUNGABARI |
200000 |
REPAIRING OF CULTURAL CENTRE AT ALIMUR KUNGABARI1 |
Completion of work |
-
latitude : 27.4856445
Longitude : 94.9080351
file name : Image_31072023133616654.png
|
2023-07-31 13:36:16.768204 |
136 |
87405277 |
Construction of Community Sanitary Complex |
265961 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.370796666666667
Longitude : 95.05402166666666
file name : Image_05112024131125461.png
|
2024-11-05 13:11:25.546828 |
137 |
87405277 |
Construction of Community Sanitary Complex |
265961 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.37078166666667
Longitude : 95.05394333333334
file name : Image_05112024130435297.png
|
2024-11-05 13:04:35.383155 |
138 |
107257260 |
Construction of Building |
200000 |
Construction of Building1 |
Plinth level |
-
latitude : 27.379138333333337
Longitude : 95.07483166666667
file name : Image_02102024111912373.png
|
2024-10-02 11:19:12.459594 |
139 |
107257260 |
Construction of Building |
200000 |
Construction of Building1 |
Completion of work |
-
latitude : 27.37911166666667
Longitude : 95.074675
file name : Image_05092024133720098.png
|
2024-09-05 13:37:20.37268 |
140 |
107257260 |
Construction of Building |
200000 |
Construction of Building1 |
Completion of work |
-
latitude : 27.37911
Longitude : 95.074765
file name : Image_05092024133716464.png
|
2024-09-05 13:37:16.568897 |
141 |
107257260 |
Construction of Building |
200000 |
Construction of Building1 |
Completion of work |
-
latitude : 27.379088333333335
Longitude : 95.07470333333335
file name : Image_05092024133727199.png
|
2024-09-05 13:37:27.306589 |
142 |
65599475 |
Operation & maintenance of drinking water supply system |
496500 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.4177905
Longitude : 95.0779161
file name : Image_22082024124753850.png
|
2024-08-22 12:47:53.939433 |
143 |
87405071 |
Creation of community compost pits for a group of Households |
55500 |
Creation of community compost pits for a group of Households1 |
Roof laid |
-
latitude : 27.417626666666667
Longitude : 95.07835333333333
file name : Image_19102024134337810.png
|
2024-10-19 13:43:37.895179 |
144 |
87405071 |
Creation of community compost pits for a group of Households |
55500 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 27.4177894
Longitude : 95.0779156
file name : Image_19102024133341339.png
|
2024-10-19 13:33:41.443127 |
145 |
87405071 |
Creation of community compost pits for a group of Households |
55500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 27.4188606
Longitude : 95.0780582
file name : Image_29062024135934012.png
|
2024-06-29 13:59:34.19187 |
146 |
87404933 |
Creation of Shed for segregation and processing of wet and dry waste |
24102 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.417651666666664
Longitude : 95.07851833333334
file name : Image_19102024133739433.png
|
2024-10-19 13:37:39.558918 |
147 |
87404933 |
Creation of Shed for segregation and processing of wet and dry waste |
24102 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.4177179
Longitude : 95.0782521
file name : Image_19102024132154304.png
|
2024-10-19 13:21:54.456533 |
148 |
87404933 |
Creation of Shed for segregation and processing of wet and dry waste |
24102 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.42646666666667
Longitude : 95.056065
file name : Image_03092024124401710.png
|
2024-09-03 12:44:02.376542 |
149 |
87404779 |
Any other operation and maintenance needs related to solid waste management |
38787 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 27.4177885
Longitude : 95.077909
file name : Image_19102024133903978.png
|
2024-10-19 13:39:04.085244 |
150 |
87404779 |
Any other operation and maintenance needs related to solid waste management |
38787 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 27.4177153
Longitude : 95.0782615
file name : Image_19102024132051453.png
|
2024-10-19 13:20:51.550073 |
151 |
87404779 |
Any other operation and maintenance needs related to solid waste management |
38787 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.42640666666667
Longitude : 95.05603500000001
file name : Image_03092024124524154.png
|
2024-09-03 12:45:24.840883 |
152 |
88355709 |
RENOVATION OF ANGANWADI CENTRE AT GARUKHUNDA |
205516 |
RENOVATION OF ANGANWADI CENTRE AT GARUKHUNDA1 |
Plinth level |
-
latitude : 27.373526666666667
Longitude : 95.05927333333332
file name : Image_05112024132624291.png
|
2024-11-05 13:26:24.378957 |
153 |
88355709 |
RENOVATION OF ANGANWADI CENTRE AT GARUKHUNDA |
205516 |
RENOVATION OF ANGANWADI CENTRE AT GARUKHUNDA1 |
Completion of work |
-
latitude : 27.373508333333334
Longitude : 95.05927500000001
file name : Image_05112024132309496.png
|
2024-11-05 13:23:09.612458 |