1 |
11248912 |
Rep. of Chignagittim AWC, Bakhrapur |
40000 |
Schools1 |
25% |
-
latitude : 25.95302364
Longitude : 90.77245567
file name : Image_27052019114726190.png
|
2019-05-27 11:47:26.296024 |
2 |
11248912 |
Rep. of Chignagittim AWC, Bakhrapur |
40000 |
Schools1 |
25% |
-
latitude : 25.95296377
Longitude : 90.77246338
file name : Image_30052019142903905.png
|
2019-05-30 14:29:03.993612 |
3 |
11289742 |
Repairing of damra bazar community hall. |
400000 |
Marriage / Community Hall1
|
Plinth Level |
-
latitude : 25.93364442
Longitude : 90.77320118
file name : Image_03072019170934012.png
|
2019-07-03 17:09:34.093202 |
4 |
11289742 |
Repairing of damra bazar community hall. |
400000 |
Marriage / Community Hall1
|
Completed |
-
latitude : 25.9337678
Longitude : 90.772641
file name : Image_28022020130408726.png
|
2020-02-28 13:04:08.813466 |
5 |
12147786 |
Repairing of community hall at Bakhrapur. |
121167 |
Sheds1 |
25% |
-
latitude : 25.94668839
Longitude : 90.76969022
file name : Image_30052019135044533.png
|
2019-05-30 13:50:44.634958 |
6 |
12147683 |
Repairing of Damra mahilla comittee hall. |
200000 |
Mahila Mandals1 |
25% |
-
latitude : 25.93637595
Longitude : 90.77342828
file name : Image_30052019093101818.png
|
2019-05-30 09:31:01.903775 |
7 |
6835247 |
Repairing of Community Hall at Damra G.P office |
350000 |
Office Building1 |
25% |
-
latitude : 25.92860963
Longitude : 90.76511509
file name : Image_27052019095928589.png
|
2019-05-27 09:59:28.695604 |
8 |
12148104 |
Repairing of Community hall at Kamalpara. |
100000 |
Marriage / Community Hall1
|
25% |
-
latitude : 25.95359738
Longitude : 90.75203736
file name : Image_30052019133409735.png
|
2019-05-30 13:34:09.824601 |
9 |
11290387 |
Repairing of community hall at Kasomari. |
200000 |
Marriage / Community Hall1
|
25% |
-
latitude : 25.91456189
Longitude : 90.77786041
file name : Image_03072019170936901.png
|
2019-07-03 17:09:36.994932 |
10 |
11290387 |
Repairing of community hall at Kasomari. |
200000 |
Marriage / Community Hall1
|
Completed |
-
latitude : 25.91461542
Longitude : 90.77777955
file name : Image_28022020130412634.png
|
2020-02-28 13:04:12.713943 |
11 |
11290113 |
Repairing of community hall at sonaram meeting hall. |
250000 |
Marriage / Community Hall1
|
Plinth Level |
-
latitude : 25.9508848
Longitude : 90.76767438
file name : Image_25062019152054612.png
|
2019-06-25 15:20:54.694144 |
12 |
11290113 |
Repairing of community hall at sonaram meeting hall. |
250000 |
Marriage / Community Hall1
|
Completed |
-
latitude : 25.95093108
Longitude : 90.76765922
file name : Image_26102019095336410.png
|
2019-10-26 09:53:36.502364 |
13 |
12147640 |
Repairing of Moamari AWC. |
60000 |
Aanganwadi1 |
25% |
-
latitude : 25.92171234
Longitude : 90.75087507
file name : Image_30052019125326939.png
|
2019-05-30 12:53:27.038937 |
14 |
11291407 |
Repairing of Udaypur L.P school. |
350000 |
Schools1
|
Completed |
-
latitude : 25.96813948
Longitude : 90.7844497
file name : Image_28022020130416591.png
|
2020-02-28 13:04:16.688853 |
15 |
11291407 |
Repairing of Udaypur L.P school. |
350000 |
Schools1
|
25% |
-
latitude : 25.96810306
Longitude : 90.78445451
file name : Image_11072019092149815.png
|
2019-07-11 09:21:49.89 |
16 |
11291407 |
Repairing of Udaypur L.P school. |
350000 |
Schools1
|
25% |
-
latitude : 25.96814869
Longitude : 90.7844563
file name : Image_04072019140550056.png
|
2019-07-04 14:05:50.124318 |
17 |
12147728 |
Repairing of Chigna gittim AWC bakhrapur. |
100000 |
Aanganwadi1 |
25% |
-
latitude : 25.95303914
Longitude : 90.77249958
file name : Image_30052019142949686.png
|
2019-05-30 14:29:49.773676 |
18 |
12147989 |
Repairing of Laskerpara Pre-primary school. |
100000 |
Schools1
|
25% |
-
latitude : 25.93417688
Longitude : 90.75934716
file name : Image_30052019095000684.png
|
2019-05-30 09:50:00.772203 |
19 |
11311501 |
Repairing of AWC centre koronchakona with 1 nos. of sanitation. |
150000 |
Aanganwadi1 |
25% |
-
latitude : 25.93151049
Longitude : 90.74607038
file name : Image_21032020120255228.png
|
2020-03-21 12:02:55.276184 |
20 |
11311501 |
Repairing of AWC centre koronchakona with 1 nos. of sanitation. |
150000 |
Aanganwadi1 |
25% |
-
latitude : 25.93151049
Longitude : 90.74607038
file name : Image_21032020120252081.png
|
2020-03-21 12:02:52.164015 |
21 |
11311348 |
Land dev. at Calzoni school. |
250000 |
Wasteland1 |
Completed |
-
latitude : 25.94602677,25.94602692,25.94602692,25.94602835
Longitude : 90.77380856,90.77380798,90.77380798,90.77380659
file name : Image_07102020100125325.png
|
2020-10-07 10:01:25.421611 |
22 |
11311348 |
Land dev. at Calzoni school. |
250000 |
Wasteland1 |
25% |
-
latitude : 25.94602541,25.94602506,25.94602166,25.94602166,25.94602166
Longitude : 90.77373136,90.7737342,90.77373664,90.77373664,90.77373664
file name : Image_19032020142807415.png
|
2020-03-19 14:28:07.508425 |
23 |
11311442 |
Repairing of AWC no. 97 kochpara. |
150000 |
Aanganwadi1 |
25% |
-
latitude : 25.94775833
Longitude : 90.78204502
file name : Image_21032020123904555.png
|
2020-03-21 12:39:04.620166 |
24 |
11311527 |
Repairing of AWC at mowamari. |
150000 |
Aanganwadi1 |
25% |
-
latitude : 25.92166113
Longitude : 90.75078558
file name : Image_17032020121743203.png
|
2020-03-17 12:17:43.285131 |
25 |
11310499 |
Repairing of playground at Majuborgum. |
300000 |
Grassland1 |
Completed |
-
latitude : 25.95621613,25.95624975,25.95625986
Longitude : 90.77299162,90.77299382,90.77300072
file name : Image_30092020115959114.png
|
2020-09-30 11:59:59.280875 |
26 |
11310499 |
Repairing of playground at Majuborgum. |
300000 |
Grassland1 |
25% |
-
latitude : 25.95629014,25.9562937,25.9562937,25.95628922,25.95628903
Longitude : 90.77302503,90.77301814,90.77301814,90.7730235,90.7730234
file name : Image_18032020113008040.png
|
2020-03-18 11:30:08.124269 |
27 |
11291317 |
Repairing of Laskerpara AWC. |
150000 |
Aanganwadi1 |
25% |
-
latitude : 25.93437898
Longitude : 90.75950248
file name : Image_18032020125457828.png
|
2020-03-18 12:54:57.924139 |
28 |
11311427 |
Repairing of Baghmara L.P school. |
300000 |
Schools1 |
25% |
-
latitude : 25.95714424
Longitude : 90.78843736
file name : Image_21032020123907877.png
|
2020-03-21 12:39:07.987567 |
29 |
11310698 |
Repairing of community hall at daglapara. |
266743 |
Marriage / Community Hall1 |
25% |
-
latitude : 25.91854084
Longitude : 90.77717183
file name : Image_05102020114035908.png
|
2020-10-05 11:40:36.016555 |
30 |
11310698 |
Repairing of community hall at daglapara. |
266743 |
Marriage / Community Hall1 |
Completed |
-
latitude : 25.9185773
Longitude : 90.77719622
file name : Image_05102020163356155.png
|
2020-10-05 16:33:56.260607 |
31 |
11310698 |
Repairing of community hall at daglapara. |
266743 |
Marriage / Community Hall1 |
25% |
-
latitude : 25.91864253
Longitude : 90.77714978
file name : Image_19032020135414344.png
|
2020-03-19 13:54:14.453849 |
32 |
21021489 |
Paver Block Pitching At Gp Office Road |
325000 |
Paver Block Pitching At Gp Office Road1 |
Earth Work |
-
latitude : 25.92858608,25.92858819,25.92858819,25.92858537,25.92858621,25.92858621
Longitude : 90.76504148,90.7650416,90.7650416,90.76504515,90.76504768,90.76504768
file name : Image_22122020135503607.png
|
2020-12-22 13:55:03.734934 |
33 |
21057307 |
Reconstruction Of Damra Rabha Somaj Melghor, Damra Rabhapara |
195669 |
Reconstruction Of Damra Rabha Somaj Melghor, Damra Rabhapara1 |
Completed |
-
latitude : 25.93612221
Longitude : 90.77108908
file name : Image_27042021115928281.png
|
2021-04-27 11:59:28.43288 |
34 |
21043799 |
Const. Of Boundary Wall (One Side) Of Udaipur Lp School |
300000 |
Const. Of Boundary Wall (One Side) Of Udaipur Lp School1 |
In Progress |
-
latitude : 25.96831946
Longitude : 90.78433866
file name : Image_14122020133122843.png
|
2020-12-14 13:31:23.089871 |
35 |
21043782 |
Repairing Of Khungkhrajani Lps Building |
350000 |
Repairing Of Khungkhrajani Lps Building1 |
In Progress |
-
latitude : 25.94669766
Longitude : 90.7919931
file name : Image_30012021134755966.png
|
2021-01-30 13:47:56.121933 |
36 |
27860790 |
Dumping Pitch at Nishangram |
200000 |
Dumping Pitch at Nishangram1 |
Length of Drain executed |
-
latitude : 25.92791998,25.92792002,25.92792002,25.92792001
Longitude : 90.75730333,90.75730358,90.75730358,90.75730371
file name : Image_06012021125120498.png
|
2021-01-06 12:51:20.63004 |
37 |
21056481 |
Boundary Wall At Habanggiri Gyansri Youth Club, Habanggiri |
300000 |
Boundary Wall At Habanggiri Gyansri Youth Club, Habanggiri1 |
In Progress |
-
latitude : 25.94101013
Longitude : 90.74804831
file name : Image_01032021125902757.png
|
2021-03-01 12:59:02.862862 |
38 |
21056940 |
Community Hall At Upper Nishangram |
403926 |
Community Hall At Upper Nishangram1 |
25% |
-
latitude : 25.917145
Longitude : 90.76544743
file name : Image_12122020114940064.png
|
2020-12-12 11:49:40.14458 |
39 |
21043960 |
Const Of Community Hall At Pub Patpara Muslimpara Meeting Place |
350000 |
Const Of Community Hall At Pub Patpara Muslimpara Meeting Place1 |
25% |
-
latitude : 25.9322911
Longitude : 90.77738413
file name : Image_06012021134058160.png
|
2021-01-06 13:40:58.400886 |
40 |
21043960 |
Const Of Community Hall At Pub Patpara Muslimpara Meeting Place |
350000 |
Const Of Community Hall At Pub Patpara Muslimpara Meeting Place1 |
25% |
-
latitude : 25.9322911
Longitude : 90.77738413
file name : Image_06012021134104746.png
|
2021-01-06 13:41:05.067775 |
41 |
27859865 |
Repairing of ME School at Damra salbari |
200000 |
Repairing of ME School at Damra salbari1 |
25% |
-
latitude : 25.95054194
Longitude : 90.77673812
file name : Image_24012021203319150.png
|
2021-01-24 20:33:19.228759 |
42 |
27858405 |
Constriction of Boundary wall at Maju Baegum Jubak Sangha |
200000 |
Constriction of Boundary wall at Maju Baegum Jubak Sangha1 |
In Progress |
-
latitude : 25.95348222
Longitude : 90.77646366
file name : Image_06012021141346359.png
|
2021-01-06 14:13:46.508257 |
43 |
27855807 |
Repairing of AWC at Pubpatpara |
150000 |
Repairing of AWC at Pubpatpara1 |
25% |
-
latitude : 25.93502465
Longitude : 90.77706599
file name : Image_24012021203312316.png
|
2021-01-24 20:33:12.414646 |
44 |
27859759 |
Protection of heavy Boulder Pitching at opposite of Army camp DAMRA |
300000 |
Protection of heavy Boulder Pitching at opposite of Army camp DAMRA1 |
Grounding |
-
latitude : 25.9472085,25.9472085,25.9472085,25.9472085,25.9472085
Longitude : 90.77347698,90.77347698,90.77347698,90.77347698,90.77347698
file name : Image_25012021141254551.png
|
2021-01-25 14:12:54.652516 |
45 |
27862005 |
Construction of Toilet and Rep. at AWC Bakhrakhuti |
150000 |
Construction of Toilet and Rep. at AWC Bakhrakhuti1 |
25% |
-
latitude : 25.95653175
Longitude : 90.7781414
file name : Image_30012021131206769.png
|
2021-01-30 13:12:06.870346 |
46 |
27861534 |
Repairing of Damra GP Office |
207616 |
Repairing of Damra GP Office1 |
25% |
-
latitude : 25.92866911,25.92866911,25.92866911,25.92866911,25.92866911,25.92866904
Longitude : 90.76514955,90.76514955,90.76514955,90.76514955,90.76514955,90.76514963
file name : Image_24012021203315771.png
|
2021-01-24 20:33:15.851295 |
47 |
27857955 |
Constriction of back side Boundary wall at Damra Govt JBS |
200000 |
Constriction of back side Boundary wall at Damra Govt JBS1 |
In Progress |
-
latitude : 25.93974617
Longitude : 90.77367858
file name : Image_24012021203308586.png
|
2021-01-24 20:33:08.706358 |
48 |
27862444 |
Cycle parking at Habanggiri ME School |
200000 |
Cycle parking at Habanggiri ME School1 |
Plinth Level |
-
latitude : 25.93832826
Longitude : 90.74939512
file name : Image_21012021153602715.png
|
2021-01-21 15:36:02.817416 |
49 |
27861798 |
Construction of waiting shed at kasumari grave yeard |
381854 |
Construction of waiting shed at kasumari grave yeard1 |
25% |
-
latitude : 25.90909705
Longitude : 90.76932378
file name : Image_08032021114512106.png
|
2021-03-08 11:45:12.26315 |
50 |
38110388 |
CONST OF ROAD FROM ARMY CAMP TO DAMRA SAMSAN GHAT WITH SG |
300000 |
CONST OF ROAD FROM ARMY CAMP TO DAMRA SAMSAN GHAT WITH SG1 |
25% |
-
latitude : 25.94713912,25.94714114,25.94714114,25.94714114,25.94714114
Longitude : 90.77390726,90.77390911,90.77390911,90.77390911,90.77390911
file name : Image_01032021125855199.png
|
2021-03-01 12:58:55.294886 |
51 |
27850088 |
Boundary wall of Habanggiri Sub Center |
250000 |
Boundary wall of Habanggiri Sub Center1 |
In Progress |
-
latitude : 25.93428722
Longitude : 90.75559328
file name : Image_21012021154053717.png
|
2021-01-21 15:40:53.820267 |
52 |
27860155 |
Construction of Boundary wall at Khungkhajani pre primary school |
250000 |
Construction of Boundary wall at Khungkhajani pre primary school1 |
In Progress |
-
latitude : 25.94670852
Longitude : 90.7918021
file name : Image_30012021134510251.png
|
2021-01-30 13:45:10.407119 |
53 |
27852523 |
Box culvert at Karanchakona |
200000 |
Box culvert at Karanchakona1 |
Substructure below GL |
-
latitude : 25.93647221,25.93647237,25.93647237,25.93647152,25.93647152
Longitude : 90.742505,90.74250354,90.74250354,90.74250341,90.74250341
file name : Image_21012021150825340.png
|
2021-01-21 15:08:25.464447 |
54 |
37204045 |
CONST OF PAVER BLOCK RD FROM PRESS MOMIN HOUSE TO JANGSENG MOMIN HOUSE |
500000 |
CONST OF PAVER BLOCK RD FROM PRESS MOMIN HOUSE TO JANGSENG MOMIN HOUSE1 |
Earth Work |
-
latitude : 25.95250566,25.95250566,25.95250566,25.95250566,25.95250677,25.95250677
Longitude : 90.76716968,90.76716968,90.76716968,90.76716968,90.7671702,90.7671702
file name : Image_20012021160713424.png
|
2021-01-20 16:07:13.511077 |
55 |
27857434 |
Constriction of Heavy Box Culvert at Khalikhapara |
300000 |
Constriction of Heavy Box Culvert at Khalikhapara1 |
Substructure below GL |
-
latitude : 25.92718385,25.92718385,25.92718385,25.92718421,25.92718421,25.92718421
Longitude : 90.77334839,90.77334839,90.77334839,90.77334775,90.77334775,90.77334775
file name : Image_22022021123650478.png
|
2021-02-22 12:36:50.598803 |
56 |
27857605 |
Repairing of Maju Borgum AWC |
150000 |
Repairing of Maju Borgum AWC1 |
25% |
-
latitude : 25.95866131
Longitude : 90.77455743
file name : Image_27042021115932490.png
|
2021-04-27 11:59:32.631102 |
57 |
27861385 |
Construction of paper Block road Nishangram tiniali to Christian Hospital |
500000 |
Construction of paper Block road Nishangram tiniali to Christian Hospital1 |
Earth Work |
-
latitude : 25.91882405,25.91882615,25.91882615,25.91882615,25.91882615,25.91882587
Longitude : 90.76328095,90.76328199,90.76328199,90.76328199,90.76328199,90.76327395
file name : Image_08032021125951135.png
|
2021-03-08 12:59:51.273917 |
58 |
27862048 |
Construction of Boundary wall one side of Udaipur LP School |
250000 |
Construction of Boundary wall one side of Udaipur LP School1 |
25% |
-
latitude : 25.96811229
Longitude : 90.7844759
file name : Image_09062021134711204.png
|
2021-06-09 13:47:11.317566 |
59 |
21021736 |
Box Culvert At Karancha Kona |
200000 |
Box Culvert At Karancha Kona1 |
Substructure below GL |
-
latitude : 25.93429442,25.93429499,25.93429499,25.93429512
Longitude : 90.74668273,90.74667975,90.74667975,90.74667742
file name : Image_21012021151555085.png
|
2021-01-21 15:15:55.172512 |
60 |
21043776 |
Boundary Wall At Chitukona Jbs |
225000 |
Boundary Wall At Chitukona Jbs1 |
In Progress |
-
latitude : 25.91529767
Longitude : 90.74164804
file name : Image_20012021155046961.png
|
2021-01-20 15:50:47.072987 |
61 |
21043831 |
Const Of Boundary Wall At Dagalapara L.P School |
300000 |
Const Of Boundary Wall At Dagalapara L.P School1 |
In Progress |
-
latitude : 25.91962769
Longitude : 90.77915559
file name : Image_12122020113843838.png
|
2020-12-12 11:38:43.927047 |
62 |
21043904 |
Boundary Wall At P.H.C Bakrapara Nishangram |
325000 |
Boundary Wall At P.H.C Bakrapara Nishangram1 |
In Progress |
-
latitude : 25.91234573
Longitude : 90.76458278
file name : Image_22122020142527513.png
|
2020-12-22 14:25:27.647697 |
63 |
21056229 |
Const Of Boundary Wall At Maju Bargum Jubak Sangha |
300000 |
Const Of Boundary Wall At Maju Bargum Jubak Sangha1 |
In Progress |
-
latitude : 25.95348997
Longitude : 90.77643825
file name : Image_06012021101320509.png
|
2021-01-06 10:13:20.621917 |
64 |
21056916 |
Repairing Of Community Hall At Nokmakundi |
225000 |
Repairing Of Community Hall At Nokmakundi1 |
25% |
-
latitude : 25.91189341
Longitude : 90.77341149
file name : Image_22122020143237150.png
|
2020-12-22 14:32:37.27713 |
65 |
21057084 |
Const. Of Community Hall At Kalikapara |
350000 |
Const. Of Community Hall At Kalikapara1 |
25% |
-
latitude : 25.92899191
Longitude : 90.77472151
file name : Image_12122020120753764.png
|
2020-12-12 12:07:53.80815 |
66 |
21057265 |
Community Hall At Bakhrapur ( C ) |
350000 |
Community Hall At Bakhrapur ( C )1 |
25% |
-
latitude : 25.95318562
Longitude : 90.77250054
file name : Image_06012021134052457.png
|
2021-01-06 13:40:52.67892 |
67 |
21043914 |
Boundary Wall At Habanggiri Sub Centre |
325000 |
Boundary Wall At Habanggiri Sub Centre1 |
In Progress |
-
latitude : 25.93406188
Longitude : 90.75577033
file name : Image_22122020135456217.png
|
2020-12-22 13:54:56.351037 |
68 |
21021783 |
Const Of Box Culvert At Nishangram Union Grave Yard Rd. |
200000 |
Const Of Box Culvert At Nishangram Union Grave Yard Rd.1 |
Substructure below GL |
-
latitude : 25.9278649,25.92786559,25.92786559,25.92786559,25.92786535
Longitude : 90.75984726,90.7598485,90.7598485,90.7598485,90.75985082
file name : Image_22122020141437249.png
|
2020-12-22 14:14:37.346021 |
69 |
21043842 |
Repairing Of Habanggiri Anchalik High School. |
300000 |
Repairing Of Habanggiri Anchalik High School.1 |
25% |
-
latitude : 25.93846035
Longitude : 90.74896453
file name : Image_21012021153259724.png
|
2021-01-21 15:32:59.827856 |
70 |
21043854 |
Beautification Of Children Park At Nishangram |
400000 |
Beautification Of Children Park At Nishangram1 |
25% |
-
latitude : 25.9249998
Longitude : 90.76219777
file name : Image_22122020140520064.png
|
2020-12-22 14:05:20.148838 |
71 |
27861450 |
Construction of Boundary wall at BN Union LP School Nishangram |
200000 |
Construction of Boundary wall at BN Union LP School Nishangram1 |
25% |
-
latitude : 25.92215356
Longitude : 90.76147229
file name : Image_20012021155055757.png
|
2021-01-20 15:50:55.885567 |
72 |
27861450 |
Construction of Boundary wall at BN Union LP School Nishangram |
200000 |
Construction of Boundary wall at BN Union LP School Nishangram1 |
25% |
-
latitude : 25.92215356
Longitude : 90.76147229
file name : Image_20012021155105032.png
|
2021-01-20 15:51:05.148244 |
73 |
38110622 |
CONST OF ROAD FROM PHILLIPS PATTA HOUSE TO SHYAMAL HOUSE |
300000 |
CONST OF ROAD FROM PHILLIPS PATTA HOUSE TO SHYAMAL HOUSE1 |
25% |
-
latitude : 25.95180494,25.95180378,25.95180378,25.95180378,25.95180378
Longitude : 90.77452621,90.77452564,90.77452564,90.77452564,90.77452564
file name : Image_25012021141633511.png
|
2021-01-25 14:16:33.608398 |
74 |
38111057 |
CONST OF RING WELL AT HATIMURA BHIHU FIELD |
130000 |
CONST OF RING WELL AT HATIMURA BHIHU FIELD 1 |
In Progress |
-
latitude : 25.94306873
Longitude : 90.75412864
file name : Image_20012021155050787.png
|
2021-01-20 15:50:50.90604 |
75 |
38111057 |
CONST OF RING WELL AT HATIMURA BHIHU FIELD |
130000 |
CONST OF RING WELL AT HATIMURA BHIHU FIELD 1 |
In Progress |
-
latitude : 25.94306873
Longitude : 90.75412864
file name : Image_20012021155100112.png
|
2021-01-20 15:51:00.229218 |
76 |
50167562 |
REPAIRING OF AWC AT UPPER NISHANGRAM |
150000 |
REPAIRING OF AWC AT UPPER NISHANGRAM1 |
Completion of work |
-
latitude : 25.91803771
Longitude : 90.76247668
file name : Image_19112022163126247.png
|
2022-11-19 16:31:26.385959 |
77 |
50167562 |
REPAIRING OF AWC AT UPPER NISHANGRAM |
150000 |
REPAIRING OF AWC AT UPPER NISHANGRAM1 |
Completion of work |
-
latitude : 25.91814252
Longitude : 90.76242052
file name : Image_21102022170825767.png
|
2022-10-21 17:08:25.844948 |
78 |
50167562 |
REPAIRING OF AWC AT UPPER NISHANGRAM |
150000 |
REPAIRING OF AWC AT UPPER NISHANGRAM1 |
Completion of work |
-
latitude : 25.9256164
Longitude : 90.7631851
file name : Image_18092022173325434.png
|
2022-09-18 17:33:25.542427 |
79 |
65329559 |
Sanitization Covid 19 at Damra GP |
144333 |
Sanitization Covid 19 at Damra GP1 |
Roof laid |
-
latitude : 25.92863291
Longitude : 90.76515653
file name : Image_30092022163217761.png
|
2022-09-30 16:32:17.873303 |
80 |
65329559 |
Sanitization Covid 19 at Damra GP |
144333 |
Sanitization Covid 19 at Damra GP1 |
Completion of work |
-
latitude : 26.1730656
Longitude : 90.6244182
file name : Image_29092022163029027.png
|
2022-09-29 16:30:29.128892 |
81 |
65328478 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 25.9253285
Longitude : 90.76275339
file name : Image_23052024152958441.png
|
2024-05-23 15:29:58.525436 |
82 |
65328478 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 25.92531248
Longitude : 90.7627593
file name : Image_23052024152533418.png
|
2024-05-23 15:25:33.505255 |
83 |
65328478 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.9252213
Longitude : 90.7627832
file name : Image_30092022165844442.png
|
2022-09-30 16:58:44.543686 |
84 |
50092413 |
CONST OF SANITATION FACILITY AT LASKARPARA LP SCHOOL |
45000 |
CONST OF SANITATION FACILITY AT LASKARPARA LP SCHOOL1 |
Roof laid |
-
latitude : 25.93437839
Longitude : 90.75957009
file name : Image_17122022122127211.png
|
2022-12-17 12:21:27.299293 |
85 |
65328060 |
Operation & maintenance of drinking water supply system |
721500 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 25.95913911,25.95914161
Longitude : 90.77478475,90.77476295
file name : Image_23012023154900721.png
|
2023-01-23 15:49:00.838492 |
86 |
65328375 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 25.94076698
Longitude : 90.74777012
file name : Image_08022023165655459.png
|
2023-02-08 16:56:55.567401 |
87 |
68112910 |
Installation of Solar Street Light at Damra GP office |
160993 |
Installation of Solar Street Light at Damra GP office1 |
Completion of work |
-
latitude : 25.92876653
Longitude : 90.7651025
file name : Image_09052023142954526.png
|
2023-05-09 14:29:54.607045 |
88 |
67263656 |
Renovation of Latrine and Urinal at upper Nishangram |
154090 |
Renovation of Latrine and Urinal at upper Nishangram1 |
Completion of work |
-
latitude : 25.91374142
Longitude : 90.76089426
file name : Image_20012024105920309.png
|
2024-01-20 10:59:20.402928 |
89 |
67263834 |
Renovation of 123 no AWC at NakmaKundi |
154090 |
Renovation of 123 no AWC at NakmaKundi1 |
Roof laid |
-
latitude : 25.91171801
Longitude : 90.77322073
file name : Image_23052024144228404.png
|
2024-05-23 14:42:28.504137 |
90 |
67263834 |
Renovation of 123 no AWC at NakmaKundi |
154090 |
Renovation of 123 no AWC at NakmaKundi1 |
Plinth level |
-
latitude : 25.91172842
Longitude : 90.77324642
file name : Image_23052024144003887.png
|
2024-05-23 14:40:03.974292 |
91 |
67263834 |
Renovation of 123 no AWC at NakmaKundi |
154090 |
Renovation of 123 no AWC at NakmaKundi1 |
Completion of work |
-
latitude : 25.91172258
Longitude : 90.77310556
file name : Image_27082023170155685.png
|
2023-08-27 17:01:55.783701 |
92 |
50093666 |
CONST OF DRAIN FROM CRPF CAMP TO BASISTA RABHA LAND |
300000 |
CONST OF DRAIN FROM CRPF CAMP TO BASISTA RABHA LAND1 |
Roof laid |
-
latitude : 25.96913708,25.96911298
Longitude : 90.78367406,90.78366497
file name : Image_31012023114304889.png
|
2023-01-31 11:43:05.007514 |
93 |
50093666 |
CONST OF DRAIN FROM CRPF CAMP TO BASISTA RABHA LAND |
300000 |
CONST OF DRAIN FROM CRPF CAMP TO BASISTA RABHA LAND1 |
Completion of work |
-
latitude : 25.96912014,25.96913343
Longitude : 90.78368375,90.7836223
file name : Image_17122022113349623.png
|
2022-12-17 11:33:49.741113 |
94 |
50093666 |
CONST OF DRAIN FROM CRPF CAMP TO BASISTA RABHA LAND |
300000 |
CONST OF DRAIN FROM CRPF CAMP TO BASISTA RABHA LAND1 |
Completion of work |
-
latitude : 25.96958825,25.96916156
Longitude : 91.22481182,90.78361313
file name : Image_13122022113152163.png
|
2022-12-13 11:31:52.273521 |
95 |
87214124 |
Rep of Road at Bakharakhuti |
400000 |
Rep of Road at Bakharakhuti 1 |
Completion of work |
-
latitude : 25.9592386,25.9589969
Longitude : 90.778285,90.7787694
file name : Image_12012024164728329.png
|
2024-01-12 16:47:28.418217 |
96 |
87214062 |
Upgradation of Borgum Mahila Committee Campus with sanitary facility |
193000 |
Upgradation of Borgum Mahila Committee Campus with sanitary facility1 |
Roof laid |
-
latitude : 25.95811453
Longitude : 90.77501792
file name : Image_23052024135550613.png
|
2024-05-23 13:55:50.713222 |
97 |
87214062 |
Upgradation of Borgum Mahila Committee Campus with sanitary facility |
193000 |
Upgradation of Borgum Mahila Committee Campus with sanitary facility1 |
Plinth level |
-
latitude : 25.95812383
Longitude : 90.7750118
file name : Image_23052024135228615.png
|
2024-05-23 13:52:28.717493 |
98 |
87214062 |
Upgradation of Borgum Mahila Committee Campus with sanitary facility |
193000 |
Upgradation of Borgum Mahila Committee Campus with sanitary facility1 |
Completion of work |
-
latitude : 25.95816253
Longitude : 90.77508075
file name : Image_20122023144015349.png
|
2023-12-20 14:40:15.439813 |
99 |
87214109 |
Construction of Sanitary facility at khungkhranjani Mahila Committee campus |
350000 |
Construction of Sanitary facility at khungkhranjani Mahila Committee campus1 |
Roof laid |
-
latitude : 25.94789409
Longitude : 90.79217053
file name : Image_23052024165737731.png
|
2024-05-23 16:57:37.817866 |
100 |
87214109 |
Construction of Sanitary facility at khungkhranjani Mahila Committee campus |
350000 |
Construction of Sanitary facility at khungkhranjani Mahila Committee campus1 |
Plinth level |
-
latitude : 25.94786737
Longitude : 90.79213195
file name : Image_23052024165341320.png
|
2024-05-23 16:53:41.414031 |
101 |
87214109 |
Construction of Sanitary facility at khungkhranjani Mahila Committee campus |
350000 |
Construction of Sanitary facility at khungkhranjani Mahila Committee campus1 |
Completion of work |
-
latitude : 25.94806409
Longitude : 90.79212986
file name : Image_21122023134339412.png
|
2023-12-21 13:43:39.512719 |
102 |
67262783 |
Construction of Community Sanitary Complex |
359599 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 25.95349129
Longitude : 90.7521096
file name : Image_31082023151708233.png
|
2023-08-31 15:17:08.341117 |
103 |
67262783 |
Construction of Community Sanitary Complex |
359599 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.95349256
Longitude : 90.75209113
file name : Image_27062023171454886.png
|
2023-06-27 17:14:54.975972 |
104 |
67256965 |
Renovation of 272 no AWC at Hatimura |
153600 |
Renovation of 272 no AWC at Hatimura1 |
Roof laid |
-
latitude : 25.9439083
Longitude : 90.75487891
file name : Image_07102023104003555.png
|
2023-10-07 10:40:03.659304 |
105 |
67256965 |
Renovation of 272 no AWC at Hatimura |
153600 |
Renovation of 272 no AWC at Hatimura1 |
Plinth level |
-
latitude : 25.94384523
Longitude : 90.7548569
file name : Image_07102023103328629.png
|
2023-10-07 10:33:28.72286 |
106 |
67256965 |
Renovation of 272 no AWC at Hatimura |
153600 |
Renovation of 272 no AWC at Hatimura1 |
Completion of work |
-
latitude : 25.94388028
Longitude : 90.75492443
file name : Image_27062023152902451.png
|
2023-06-27 15:29:02.546624 |
107 |
67257131 |
Renovation of 98 no AWC no AWC at Khalikapara |
153600 |
Renovation of 98 no AWC no AWC at Khalikapara1 |
Completion of work |
-
latitude : 25.92828703
Longitude : 90.77572951
file name : Image_08062023171406876.png
|
2023-06-08 17:14:06.982293 |
108 |
67256927 |
Rennovation of 4 no AWC at Habanggiri |
153600 |
Rennovation of 4 no AWC at Habanggiri1 |
Roof laid |
-
latitude : 25.9412582
Longitude : 90.74618781
file name : Image_21092023122745545.png
|
2023-09-21 12:27:45.636862 |
109 |
67256927 |
Rennovation of 4 no AWC at Habanggiri |
153600 |
Rennovation of 4 no AWC at Habanggiri1 |
Plinth level |
-
latitude : 25.94123755
Longitude : 90.74615883
file name : Image_11092023155528498.png
|
2023-09-11 15:55:28.705715 |
110 |
67256927 |
Rennovation of 4 no AWC at Habanggiri |
153600 |
Rennovation of 4 no AWC at Habanggiri1 |
Completion of work |
-
latitude : 25.94118507
Longitude : 90.74607772
file name : Image_08062023165834169.png
|
2023-06-08 16:58:34.276786 |
111 |
87213988 |
CONST OF WAITING SHEED AT DAMRA BAZAR |
300000 |
CONST OF WAITING SHEED AT DAMRA BAZAR1 |
Completion of work |
-
latitude : 25.9336324
Longitude : 90.7726124
file name : Image_01022024120803395.png
|
2024-02-01 12:08:03.514022 |
112 |
87213939 |
Operation & maintenance of community sanitary complex |
31300 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 25.9627307
Longitude : 90.7792174
file name : Image_12012024170402654.png
|
2024-01-12 17:04:02.75246 |
113 |
87213850 |
Creation of plastic waste storage unit |
162048 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 25.98238023
Longitude : 90.78585627
file name : Image_12012024164725237.png
|
2024-01-12 16:47:25.34792 |
114 |
87213838 |
Construction of toilets in public institutions |
245402 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 25.91411669
Longitude : 90.78034741
file name : Image_23052024141712433.png
|
2024-05-23 14:17:12.537319 |
115 |
87213838 |
Construction of toilets in public institutions |
245402 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 25.91409865
Longitude : 90.78027841
file name : Image_23052024141407369.png
|
2024-05-23 14:14:07.465927 |
116 |
87213838 |
Construction of toilets in public institutions |
245402 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.91415339
Longitude : 90.78035969
file name : Image_12122023110851819.png
|
2023-12-12 11:08:51.921194 |
117 |
87213913 |
Construction of toilets in public institutions |
194700 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 25.94375836
Longitude : 90.75051008
file name : Image_23052024162552808.png
|
2024-05-23 16:25:52.887818 |
118 |
87213913 |
Construction of toilets in public institutions |
194700 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 25.94390981
Longitude : 90.75060987
file name : Image_23052024161837806.png
|
2024-05-23 16:18:37.88621 |
119 |
87213913 |
Construction of toilets in public institutions |
194700 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.94383977
Longitude : 90.75047013
file name : Image_20122023144035267.png
|
2023-12-20 14:40:35.356381 |
120 |
67262886 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 25.91053848
Longitude : 90.76501027
file name : Image_23052024145803992.png
|
2024-05-23 14:58:04.079757 |
121 |
67262886 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 25.91053822
Longitude : 90.76502765
file name : Image_23052024145334258.png
|
2024-05-23 14:53:34.35023 |
122 |
67262886 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.91063626
Longitude : 90.76506707
file name : Image_30082023174152025.png
|
2023-08-30 17:41:52.14082 |
123 |
67262886 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.91063626
Longitude : 90.76506707
file name : Image_30082023174044857.png
|
2023-08-30 17:40:44.98242 |
124 |
87212851 |
Construction of toilets in public institutions |
224133 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.93652138
Longitude : 90.77384774
file name : Image_01022024120806976.png
|
2024-02-01 12:08:07.099138 |
125 |
87212835 |
Construction of toilets in public institutions |
118476 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.9365317
Longitude : 90.77379125
file name : Image_01022024120811518.png
|
2024-02-01 12:08:11.619809 |
126 |
87214190 |
Creation of a new source of drinking water |
109876 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 25.92872616
Longitude : 90.76508437
file name : Image_05102023122235962.png
|
2023-10-05 12:22:36.099404 |
127 |
87214172 |
Upgrading of PRI Members Room with office utilities |
276244 |
Upgrading of PRI Members Room with office utilities1 |
Completion of work |
-
latitude : 25.92869201
Longitude : 90.76503817
file name : Image_05102023121653252.png
|
2023-10-05 12:16:53.343475 |
128 |
87214091 |
Const of Garage at GP office campus ph ii |
70250 |
Const of Garage at GP office campus ph ii1 |
Completion of work |
-
latitude : 25.92872192
Longitude : 90.76511126
file name : Image_21012024173045130.png
|
2024-01-21 17:30:45.226015 |
129 |
67257040 |
Renovation of fencing of 56 no AWC at Laskarpara |
153600 |
Renovation of fencing of 56 no AWC at Laskarpara1 |
Completion of work |
-
latitude : 25.9344062
Longitude : 90.75948983
file name : Image_11072023125305826.png
|
2023-07-11 12:53:05.934908 |
130 |
67263978 |
Renovation of 274 no AWC at Balasara |
154090 |
Renovation of 274 no AWC at Balasara1 |
Roof laid |
-
latitude : 25.96352
Longitude : 90.78030194
file name : Image_31082023115023804.png
|
2023-08-31 11:50:23.931399 |
131 |
67263978 |
Renovation of 274 no AWC at Balasara |
154090 |
Renovation of 274 no AWC at Balasara1 |
Plinth level |
-
latitude : 25.96353293
Longitude : 90.78034922
file name : Image_31082023114438976.png
|
2023-08-31 11:44:39.095972 |
132 |
67263978 |
Renovation of 274 no AWC at Balasara |
154090 |
Renovation of 274 no AWC at Balasara1 |
Completion of work |
-
latitude : 25.96354238
Longitude : 90.78032914
file name : Image_08062023150918772.png
|
2023-06-08 15:09:18.869221 |
133 |
65329153 |
Const. of AWC Centre at Nokmakundi near C Hall |
453000 |
Const. of AWC Centre at Nokmakundi near C Hall1 |
Roof laid |
-
latitude : 25.9132078
Longitude : 90.76768476
file name : Image_23052024144801053.png
|
2024-05-23 14:48:01.145355 |
134 |
65329153 |
Const. of AWC Centre at Nokmakundi near C Hall |
453000 |
Const. of AWC Centre at Nokmakundi near C Hall1 |
Plinth level |
-
latitude : 25.91318169
Longitude : 90.76770303
file name : Image_30082023180228709.png
|
2023-08-30 18:02:28.797365 |
135 |
65329153 |
Const. of AWC Centre at Nokmakundi near C Hall |
453000 |
Const. of AWC Centre at Nokmakundi near C Hall1 |
Completion of work |
-
latitude : 25.91316565
Longitude : 90.7676754
file name : Image_16062023164619337.png
|
2023-06-16 16:46:19.420914 |
136 |
67257172 |
Renovation of 376 no AWC at Bakhrapur |
153600 |
Renovation of 376 no AWC at Bakhrapur1 |
Roof laid |
-
latitude : 25.95384343
Longitude : 90.76852617
file name : Image_31082023151505731.png
|
2023-08-31 15:15:05.83167 |
137 |
67257172 |
Renovation of 376 no AWC at Bakhrapur |
153600 |
Renovation of 376 no AWC at Bakhrapur1 |
Plinth level |
-
latitude : 25.95382535
Longitude : 90.76853319
file name : Image_31082023150104085.png
|
2023-08-31 15:01:04.183915 |
138 |
67257172 |
Renovation of 376 no AWC at Bakhrapur |
153600 |
Renovation of 376 no AWC at Bakhrapur1 |
Completion of work |
-
latitude : 25.95382613
Longitude : 90.76851474
file name : Image_12072023142457466.png
|
2023-07-12 14:24:57.58464 |
139 |
65329074 |
Const. of C Hall at 72 No Damra Gaon Panchayat |
990000 |
Const. of C Hall at 72 No Damra Gaon Panchayat1 |
Roof laid |
-
latitude : 25.92879368
Longitude : 90.76508619
file name : Image_20122023151411039.png
|
2023-12-20 15:14:11.147715 |
140 |
65329074 |
Const. of C Hall at 72 No Damra Gaon Panchayat |
990000 |
Const. of C Hall at 72 No Damra Gaon Panchayat1 |
Plinth level |
-
latitude : 25.92878627
Longitude : 90.76512463
file name : Image_11092023135045786.png
|
2023-09-11 13:50:45.892034 |
141 |
65329074 |
Const. of C Hall at 72 No Damra Gaon Panchayat |
990000 |
Const. of C Hall at 72 No Damra Gaon Panchayat1 |
Completion of work |
-
latitude : 25.92879485
Longitude : 90.76501782
file name : Image_09052023142950784.png
|
2023-05-09 14:29:50.92736 |
142 |
50093134 |
CONST OF TOILET AND URINAL AT HABANGGIRI MOHILA COMMITTEE HALL |
300000 |
CONST OF TOILET AND URINAL AT HABANGGIRI MOHILA COMMITTEE HALL1 |
Roof laid |
-
latitude : 25.94141874
Longitude : 90.74600841
file name : Image_01042023121021504.png
|
2023-04-01 12:10:21.625784 |
143 |
50093134 |
CONST OF TOILET AND URINAL AT HABANGGIRI MOHILA COMMITTEE HALL |
300000 |
CONST OF TOILET AND URINAL AT HABANGGIRI MOHILA COMMITTEE HALL1 |
Plinth level |
-
latitude : 25.94144445
Longitude : 90.74600381
file name : Image_31012023120514682.png
|
2023-01-31 12:05:14.798113 |
144 |
50093134 |
CONST OF TOILET AND URINAL AT HABANGGIRI MOHILA COMMITTEE HALL |
300000 |
CONST OF TOILET AND URINAL AT HABANGGIRI MOHILA COMMITTEE HALL1 |
Completion of work |
-
latitude : 25.94136208
Longitude : 90.74604003
file name : Image_23112022154936663.png
|
2022-11-23 15:49:36.778214 |
145 |
50093534 |
CONST OF TOILET AND URINAL AND HANDPUMP AT BOXIAL COMMUNITY HALL |
300000 |
CONST OF TOILET AND URINAL AND HANDPUMP AT BOXIAL COMMUNITY HALL1 |
Roof laid |
-
latitude : 25.92559474
Longitude : 90.76195483
file name : Image_30052023114801242.png
|
2023-05-30 11:48:01.358419 |
146 |
50093534 |
CONST OF TOILET AND URINAL AND HANDPUMP AT BOXIAL COMMUNITY HALL |
300000 |
CONST OF TOILET AND URINAL AND HANDPUMP AT BOXIAL COMMUNITY HALL1 |
Plinth level |
-
latitude : 25.9255932
Longitude : 90.7633098
file name : Image_08022023172136099.png
|
2023-02-08 17:21:36.198667 |
147 |
50093534 |
CONST OF TOILET AND URINAL AND HANDPUMP AT BOXIAL COMMUNITY HALL |
300000 |
CONST OF TOILET AND URINAL AND HANDPUMP AT BOXIAL COMMUNITY HALL1 |
Completion of work |
-
latitude : 25.92558667
Longitude : 90.76218612
file name : Image_13122022135636289.png
|
2022-12-13 13:56:36.407051 |
148 |
67262498 |
Operation & maintenance of drinking water supply system |
578075 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 25.95911927
Longitude : 90.77472693
file name : Image_20122023134335817.png
|
2023-12-20 13:43:35.916013 |
149 |
87214076 |
Const of B Wall at Mowamari LP School |
230000 |
Const of B Wall at Mowamari LP School1 |
Roof laid |
-
latitude : 25.91988683
Longitude : 90.7474764
file name : Image_26062024143046703.png
|
2024-06-26 14:30:45.227916 |
150 |
87214076 |
Const of B Wall at Mowamari LP School |
230000 |
Const of B Wall at Mowamari LP School1 |
Plinth level |
-
latitude : 25.91989626
Longitude : 90.74753066
file name : Image_26062024142803207.png
|
2024-06-26 14:28:03.310997 |
151 |
87214076 |
Const of B Wall at Mowamari LP School |
230000 |
Const of B Wall at Mowamari LP School1 |
Completion of work |
-
latitude : 25.91967446
Longitude : 90.74701287
file name : Image_01022024115337304.png
|
2024-02-01 11:53:37.385197 |
152 |
50167251 |
REPAIRING OF KHUNKHRAJANI AWC |
150000 |
REPAIRING OF KHUNKHRAJANI AWC1 |
Plinth level |
-
latitude : 25.94675781
Longitude : 90.79185148
file name : Image_21102022170548510.png
|
2022-10-21 17:05:48.595751 |
153 |
50167251 |
REPAIRING OF KHUNKHRAJANI AWC |
150000 |
REPAIRING OF KHUNKHRAJANI AWC1 |
Plinth level |
-
latitude : 25.94674581
Longitude : 90.79185839
file name : Image_21102022123142800.png
|
2022-10-21 12:31:42.933733 |
154 |
50167251 |
REPAIRING OF KHUNKHRAJANI AWC |
150000 |
REPAIRING OF KHUNKHRAJANI AWC1 |
Completion of work |
-
latitude : 25.94668052
Longitude : 90.79194245
file name : Image_19092022164127910.png
|
2022-09-19 16:41:28.017611 |
155 |
50167251 |
REPAIRING OF KHUNKHRAJANI AWC |
150000 |
REPAIRING OF KHUNKHRAJANI AWC1 |
Completion of work |
-
latitude : 25.94669759
Longitude : 90.79190903
file name : Image_28072022162322791.png
|
2022-07-28 16:23:22.903845 |
156 |
50092845 |
CONST OF SANITATION FACILITY AT NAKMAKUNDI LP SCHOOL |
45000 |
CONST OF SANITATION FACILITY AT NAKMAKUNDI LP SCHOOL1 |
Roof laid |
-
latitude : 25.9120973
Longitude : 90.77384304
file name : Image_17122022122325286.png
|
2022-12-17 12:23:25.428059 |
157 |
50093022 |
CONST OF SANITATION FACILITY AT UDAYPUR LP SCHOOL |
45000 |
CONST OF SANITATION FACILITY AT UDAYPUR LP SCHOOL1 |
Roof laid |
-
latitude : 25.96822307
Longitude : 90.78422594
file name : Image_17122022113516909.png
|
2022-12-17 11:35:17.035913 |
158 |
50093386 |
CONST OF TOILET AND URINAL AT LASKARPARA COMMUNITY HALL |
300000 |
CONST OF TOILET AND URINAL AT LASKARPARA COMMUNITY HALL1 |
Roof laid |
-
latitude : 25.93453365
Longitude : 90.75934938
file name : Image_28022023174632738.png
|
2023-02-28 17:46:32.818964 |
159 |
50093386 |
CONST OF TOILET AND URINAL AT LASKARPARA COMMUNITY HALL |
300000 |
CONST OF TOILET AND URINAL AT LASKARPARA COMMUNITY HALL1 |
Completion of work |
-
latitude : 25.93454925
Longitude : 90.75931401
file name : Image_17122022120938420.png
|
2022-12-17 12:09:38.495686 |
160 |
50093386 |
CONST OF TOILET AND URINAL AT LASKARPARA COMMUNITY HALL |
300000 |
CONST OF TOILET AND URINAL AT LASKARPARA COMMUNITY HALL1 |
Completion of work |
-
latitude : 25.93457161
Longitude : 90.75927473
file name : Image_17122022115821814.png
|
2022-12-17 11:58:21.927615 |
161 |
50093865 |
REPAIRING OF AWC AND RUNNING WATER FACILITY AT DAMRA PATPARA CENTER |
108331 |
REPAIRING OF AWC AND RUNNING WATER FACILITY AT DAMRA PATPARA CENTER1 |
Roof laid |
-
latitude : 25.93601814
Longitude : 90.77092949
file name : Image_01042023124533827.png
|
2023-04-01 12:45:33.936725 |
162 |
50093865 |
REPAIRING OF AWC AND RUNNING WATER FACILITY AT DAMRA PATPARA CENTER |
108331 |
REPAIRING OF AWC AND RUNNING WATER FACILITY AT DAMRA PATPARA CENTER1 |
Completion of work |
-
latitude : 25.93589341
Longitude : 90.77099229
file name : Image_23112022154946648.png
|
2022-11-23 15:49:46.752406 |
163 |
50093865 |
REPAIRING OF AWC AND RUNNING WATER FACILITY AT DAMRA PATPARA CENTER |
108331 |
REPAIRING OF AWC AND RUNNING WATER FACILITY AT DAMRA PATPARA CENTER1 |
Completion of work |
-
latitude : 25.93603354
Longitude : 90.77097143
file name : Image_23112022160408866.png
|
2022-11-23 16:04:08.955134 |
164 |
50166643 |
CONST OF RCC CHECK DAM WITH BRICK CANNAL AT DAMRA PUB PATPARA |
350000 |
CONST OF RCC CHECK DAM WITH BRICK CANNAL AT DAMRA PUB PATPARA1 |
Completion of work |
-
latitude : 25.93230689,25.93229279
Longitude : 90.77442157,90.7744241
file name : Image_17122022123859108.png
|
2022-12-17 12:38:59.209443 |
165 |
50166643 |
CONST OF RCC CHECK DAM WITH BRICK CANNAL AT DAMRA PUB PATPARA |
350000 |
CONST OF RCC CHECK DAM WITH BRICK CANNAL AT DAMRA PUB PATPARA1 |
Completion of work |
-
latitude : 25.93229977,25.93227825
Longitude : 90.77445468,90.77447041
file name : Image_13102022165701340.png
|
2022-10-13 16:57:01.508922 |
166 |
50166643 |
CONST OF RCC CHECK DAM WITH BRICK CANNAL AT DAMRA PUB PATPARA |
350000 |
CONST OF RCC CHECK DAM WITH BRICK CANNAL AT DAMRA PUB PATPARA1 |
Completion of work |
-
latitude : 25.93225852,25.93226653
Longitude : 90.774491,90.77448339
file name : Image_25072022154308426.png
|
2022-07-25 15:43:08.550869 |
167 |
50166643 |
CONST OF RCC CHECK DAM WITH BRICK CANNAL AT DAMRA PUB PATPARA |
350000 |
CONST OF RCC CHECK DAM WITH BRICK CANNAL AT DAMRA PUB PATPARA1 |
Completion of work |
-
latitude : 25.93216733,25.93224938
Longitude : 90.77452171,90.77450367
file name : Image_28072022162319171.png
|
2022-07-28 16:23:19.290474 |
168 |
65328250 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 25.96357299
Longitude : 90.78022748
file name : Image_23052024134642653.png
|
2024-05-23 13:46:42.760418 |
169 |
65328250 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 25.9635726
Longitude : 90.78023659
file name : Image_23052024134411418.png
|
2024-05-23 13:44:11.563468 |
170 |
65328250 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.96364187
Longitude : 90.78016343
file name : Image_01102022164508008.png
|
2022-10-01 16:45:08.139439 |
171 |
65328290 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 25.91537189
Longitude : 90.74169441
file name : Image_23052024155945201.png
|
2024-05-23 15:59:45.292144 |
172 |
65328290 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 25.9155277
Longitude : 90.74188309
file name : Image_23052024155444953.png
|
2024-05-23 15:54:45.037952 |
173 |
65328290 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.92641573
Longitude : 90.75257812
file name : Image_02112022170625493.png
|
2022-11-02 17:06:25.592017 |
174 |
65328335 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 25.93971609
Longitude : 90.77444444
file name : Image_23052024140447249.png
|
2024-05-23 14:04:47.365082 |
175 |
65328335 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 25.93970261
Longitude : 90.77443442
file name : Image_23052024140205345.png
|
2024-05-23 14:02:05.445925 |
176 |
65328335 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.93961971
Longitude : 90.7744218
file name : Image_12102022155823710.png
|
2022-10-12 15:58:23.844687 |
177 |
65328431 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 25.91175347
Longitude : 90.77333235
file name : Image_23052024143820541.png
|
2024-05-23 14:38:20.629735 |
178 |
65328431 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 25.91173012
Longitude : 90.77337365
file name : Image_23052024143617319.png
|
2024-05-23 14:36:17.414265 |
179 |
65328431 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.9116764
Longitude : 90.77320708
file name : Image_30092022172622805.png
|
2022-09-30 17:26:22.897406 |
180 |
65328989 |
Construction of toilets in public institutions |
181000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 25.93638203
Longitude : 90.77102612
file name : Image_23052024170924191.png
|
2024-05-23 17:09:24.291804 |
181 |
65328989 |
Construction of toilets in public institutions |
181000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 25.93637821
Longitude : 90.77103786
file name : Image_23052024170553606.png
|
2024-05-23 17:05:53.690837 |
182 |
65328989 |
Construction of toilets in public institutions |
181000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.9363798
Longitude : 90.77109258
file name : Image_08062023152340188.png
|
2023-06-08 15:23:40.278053 |
183 |
65329360 |
Repairing of GP office Electricity Bill Maintenance of office |
231316 |
Repairing of GP office Electricity Bill Maintenance of office1 |
Plinth level |
-
latitude : 25.92863657
Longitude : 90.76506455
file name : Image_26062024153149950.png
|
2024-06-26 15:31:50.047599 |
184 |
65329360 |
Repairing of GP office Electricity Bill Maintenance of office |
231316 |
Repairing of GP office Electricity Bill Maintenance of office1 |
Plinth level |
-
latitude : 25.92863235
Longitude : 90.76497899
file name : Image_26062024144733851.png
|
2024-06-26 14:47:33.936684 |
185 |
65329360 |
Repairing of GP office Electricity Bill Maintenance of office |
231316 |
Repairing of GP office Electricity Bill Maintenance of office1 |
Completion of work |
-
latitude : 25.92872004
Longitude : 90.76513997
file name : Image_30092022155703904.png
|
2022-09-30 15:57:04.016428 |
186 |
67256874 |
Construction of toilets in public institutions |
352317 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 25.94390362
Longitude : 90.75492632
file name : Image_07102023103137150.png
|
2023-10-07 10:31:37.249645 |
187 |
67256874 |
Construction of toilets in public institutions |
352317 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 25.94393751
Longitude : 90.75500005
file name : Image_07102023102309235.png
|
2023-10-07 10:23:09.326692 |
188 |
67256874 |
Construction of toilets in public institutions |
352317 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.94394144
Longitude : 90.75511365
file name : Image_27062023152858199.png
|
2023-06-27 15:28:58.314706 |
189 |
67263266 |
Renovation of 276 no AWC at Kochpara |
154090 |
Renovation of 276 no AWC at Kochpara1 |
Plinth level |
-
latitude : 25.95024914
Longitude : 90.7840333
file name : Image_30082023140047080.png
|
2023-08-30 14:00:47.183267 |
190 |
67263266 |
Renovation of 276 no AWC at Kochpara |
154090 |
Renovation of 276 no AWC at Kochpara1 |
Completion of work |
-
latitude : 25.95031241
Longitude : 90.78404692
file name : Image_08062023175522385.png
|
2023-06-08 17:55:22.491709 |
191 |
67263410 |
Renovation of 17 no AWC at Lower Nishangram Nakol |
154090 |
Renovation of 17 no AWC at Lower Nishangram Nakol1 |
Roof laid |
-
latitude : 25.92208642
Longitude : 90.76155679
file name : Image_23052024152312081.png
|
2024-05-23 15:23:12.173482 |
192 |
67263410 |
Renovation of 17 no AWC at Lower Nishangram Nakol |
154090 |
Renovation of 17 no AWC at Lower Nishangram Nakol1 |
Roof laid |
-
latitude : 25.92200403
Longitude : 90.76162968
file name : Image_23052024151458927.png
|
2024-05-23 15:14:59.010087 |
193 |
67263410 |
Renovation of 17 no AWC at Lower Nishangram Nakol |
154090 |
Renovation of 17 no AWC at Lower Nishangram Nakol1 |
Plinth level |
-
latitude : 25.92197191
Longitude : 90.76154709
file name : Image_11092023134803173.png
|
2023-09-11 13:48:03.264755 |
194 |
67263410 |
Renovation of 17 no AWC at Lower Nishangram Nakol |
154090 |
Renovation of 17 no AWC at Lower Nishangram Nakol1 |
Completion of work |
-
latitude : 25.92204424
Longitude : 90.76149725
file name : Image_08062023165838283.png
|
2023-06-08 16:58:38.439807 |
195 |
87213898 |
Construction of toilets in public institutions |
400000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.93435739
Longitude : 90.75961659
file name : Image_05122023163009362.png
|
2023-12-05 16:30:09.486675 |
196 |
50167877 |
CONST OF WAITING SHED AT NOKMAKUNDI |
350000 |
CONST OF WAITING SHED AT NOKMAKUNDI1 |
Roof laid |
-
latitude : 25.90854443
Longitude : 90.76831695
file name : Image_23052024142903136.png
|
2024-05-23 14:29:03.234347 |
197 |
50167877 |
CONST OF WAITING SHED AT NOKMAKUNDI |
350000 |
CONST OF WAITING SHED AT NOKMAKUNDI1 |
Plinth level |
-
latitude : 25.9085398
Longitude : 90.76830045
file name : Image_23052024142640518.png
|
2024-05-23 14:26:40.630643 |
198 |
50167877 |
CONST OF WAITING SHED AT NOKMAKUNDI |
350000 |
CONST OF WAITING SHED AT NOKMAKUNDI1 |
Completion of work |
-
latitude : 25.90879395
Longitude : 90.76843119
file name : Image_19112022163136238.png
|
2022-11-19 16:31:36.35972 |
199 |
50167877 |
CONST OF WAITING SHED AT NOKMAKUNDI |
350000 |
CONST OF WAITING SHED AT NOKMAKUNDI1 |
Completion of work |
-
latitude : 25.90888746
Longitude : 90.76844582
file name : Image_13102022165351761.png
|
2022-10-13 16:53:51.887318 |
200 |
50167877 |
CONST OF WAITING SHED AT NOKMAKUNDI |
350000 |
CONST OF WAITING SHED AT NOKMAKUNDI1 |
Completion of work |
-
latitude : 25.90882778
Longitude : 90.76837598
file name : Image_25072022153912165.png
|
2022-07-25 15:39:12.275514 |
201 |
87214140 |
Const of Garage at GP office Ph i |
43250 |
Const of Garage at GP office Ph i1 |
Roof laid |
-
latitude : 25.92877692
Longitude : 90.76514481
file name : Image_23052024153949324.png
|
2024-05-23 15:39:49.41305 |
202 |
87214140 |
Const of Garage at GP office Ph i |
43250 |
Const of Garage at GP office Ph i1 |
Plinth level |
-
latitude : 25.92879555
Longitude : 90.7651019
file name : Image_23052024153512016.png
|
2024-05-23 15:35:12.10357 |
203 |
87214140 |
Const of Garage at GP office Ph i |
43250 |
Const of Garage at GP office Ph i1 |
Completion of work |
-
latitude : 25.9287711
Longitude : 90.76511388
file name : Image_20122023144050268.png
|
2023-12-20 14:40:50.357569 |
204 |
50166083 |
CONST OF WAITING SHED AT 2NO HATIMURA GRAVEYEARD |
300000 |
CONST OF WAITING SHED AT 2NO HATIMURA GRAVEYEARD 1 |
Roof laid |
-
latitude : 25.94516048
Longitude : 90.75798922
file name : Image_23052024163916030.png
|
2024-05-23 16:39:16.126155 |
205 |
50166083 |
CONST OF WAITING SHED AT 2NO HATIMURA GRAVEYEARD |
300000 |
CONST OF WAITING SHED AT 2NO HATIMURA GRAVEYEARD 1 |
Plinth level |
-
latitude : 25.94515513
Longitude : 90.75797771
file name : Image_23052024163410997.png
|
2024-05-23 16:34:11.104804 |
206 |
50166083 |
CONST OF WAITING SHED AT 2NO HATIMURA GRAVEYEARD |
300000 |
CONST OF WAITING SHED AT 2NO HATIMURA GRAVEYEARD 1 |
Completion of work |
-
latitude : 25.94493558
Longitude : 90.7589312
file name : Image_23112022154941683.png
|
2022-11-23 15:49:41.811985 |
207 |
50166083 |
CONST OF WAITING SHED AT 2NO HATIMURA GRAVEYEARD |
300000 |
CONST OF WAITING SHED AT 2NO HATIMURA GRAVEYEARD 1 |
Completion of work |
-
latitude : 25.94489052
Longitude : 90.75890249
file name : Image_19092022173029577.png
|
2022-09-19 17:30:29.678917 |
208 |
50166083 |
CONST OF WAITING SHED AT 2NO HATIMURA GRAVEYEARD |
300000 |
CONST OF WAITING SHED AT 2NO HATIMURA GRAVEYEARD 1 |
Completion of work |
-
latitude : 25.94495766
Longitude : 90.75893898
file name : Image_25072022153906492.png
|
2022-07-25 15:39:06.609937 |
209 |
87213821 |
Creation of plastic waste storage unit |
218550 |
Creation of plastic waste storage unit 1 |
Roof laid |
-
latitude : 25.96365499
Longitude : 90.77982507
file name : Image_26062024120108041.png
|
2024-06-26 12:01:08.151163 |
210 |
87213821 |
Creation of plastic waste storage unit |
218550 |
Creation of plastic waste storage unit 1 |
Plinth level |
-
latitude : 25.96366095
Longitude : 90.77982346
file name : Image_26062024115805826.png
|
2024-06-26 11:58:05.922077 |
211 |
87213821 |
Creation of plastic waste storage unit |
218550 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 25.96370013
Longitude : 90.77968349
file name : Image_12122023111401040.png
|
2023-12-12 11:14:01.183432 |