1 |
10646668 |
Reparing of Kaliapani GP Office Building with Toilet Block |
300000 |
Bharat Nirman Rajiv Gandhi Seva Kendra1 |
Completed |
-
latitude : 26.53096711
Longitude : 94.0717996
file name : Image_19052019142434107.png
|
2019-05-19 14:24:34.19223 |
2 |
58931590 |
OPERATIONAL MANTANANCE PWSS HAND OVER BY PHE DEPTT. |
548150 |
OPERATIONAL MANTANANCE PWSS HAND OVER BY PHE DEPTT.1 |
Completion of work |
-
latitude : 26.4318862
Longitude : 94.030879
file name : Image_06052024072255277.png
|
2024-05-06 07:22:55.364911 |
3 |
66600861 |
Water Supply to villages |
274550 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.49998504
Longitude : 93.98327792
file name : Image_21012023144025861.png
|
2023-01-21 14:40:25.985572 |
4 |
63801635 |
CONSTRUCTION OF MARKET SHED AT DUINOI MUKH KUMAR GAON MARKET PLACE |
342634 |
CONSTRUCTION OF MARKET SHED AT DUINOI MUKH KUMAR GAON MARKET PLACE1 |
Roof laid |
-
latitude : 26.4313458
Longitude : 94.0308211
file name : Image_09102023103019584.png
|
2023-10-09 10:30:19.671325 |
5 |
63801635 |
CONSTRUCTION OF MARKET SHED AT DUINOI MUKH KUMAR GAON MARKET PLACE |
342634 |
CONSTRUCTION OF MARKET SHED AT DUINOI MUKH KUMAR GAON MARKET PLACE1 |
Plinth level |
-
latitude : 26.4313458
Longitude : 94.0308211
file name : Image_09102023100901797.png
|
2023-10-09 10:09:01.892073 |
6 |
63801635 |
CONSTRUCTION OF MARKET SHED AT DUINOI MUKH KUMAR GAON MARKET PLACE |
342634 |
CONSTRUCTION OF MARKET SHED AT DUINOI MUKH KUMAR GAON MARKET PLACE1 |
Completion of work |
-
latitude : 26.4296948
Longitude : 94.03214
file name : Image_06022023112106395.png
|
2023-02-06 11:21:06.550587 |
7 |
63801635 |
CONSTRUCTION OF MARKET SHED AT DUINOI MUKH KUMAR GAON MARKET PLACE |
342634 |
CONSTRUCTION OF MARKET SHED AT DUINOI MUKH KUMAR GAON MARKET PLACE1 |
Completion of work |
-
latitude : 26.4296948
Longitude : 94.03214
file name : Image_06022023111933961.png
|
2023-02-06 11:19:34.129321 |
8 |
63796218 |
SWM PROJECT AT BOKOLAI TINI ALI KALIPANI GP |
180000 |
SWM PROJECT AT BOKOLAI TINI ALI KALIPANI GP1 |
Completion of work |
-
latitude : 26.53474833333333
Longitude : 94.08144666666666
file name : Image_30082024142617098.png
|
2024-08-30 14:26:17.554617 |
9 |
63796153 |
CONST OF CMSC WITH RUNNING WATER FACILITY AT DUI NOI MUKH SARBAJANIN SHIV MANDIR |
90000 |
CONST OF CMSC WITH RUNNING WATER FACILITY AT DUI NOI MUKH SARBAJANIN SHIV MANDIR1 |
Plinth level |
-
latitude : 26.5302093
Longitude : 94.0819338
file name : Image_21092024165522639.png
|
2024-09-21 16:55:22.747495 |
10 |
63796153 |
CONST OF CMSC WITH RUNNING WATER FACILITY AT DUI NOI MUKH SARBAJANIN SHIV MANDIR |
90000 |
CONST OF CMSC WITH RUNNING WATER FACILITY AT DUI NOI MUKH SARBAJANIN SHIV MANDIR1 |
Completion of work |
-
latitude : 26.4308786
Longitude : 94.0310576
file name : Image_30082024133702090.png
|
2024-08-30 13:37:02.666133 |
11 |
87070508 |
Construction of Community Sanitary Complex |
93600 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.4324972
Longitude : 94.0299368
file name : Image_02102024143341294.png
|
2024-10-02 14:33:41.385927 |
12 |
87070508 |
Construction of Community Sanitary Complex |
93600 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.533045
Longitude : 94.0743994
file name : Image_30082024150845391.png
|
2024-08-30 15:08:45.578434 |
13 |
87070726 |
Construction of Community Sanitary Complex |
34550 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.4308786
Longitude : 94.0310576
file name : Image_30082024141007272.png
|
2024-08-30 14:10:07.501178 |
14 |
87070401 |
Construction of Community Sanitary Complex |
180000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.431544999999996
Longitude : 94.03035833333334
file name : Image_14112024095325294.png
|
2024-11-14 09:53:25.384564 |
15 |
87070401 |
Construction of Community Sanitary Complex |
180000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.5302093
Longitude : 94.0819338
file name : Image_21092024165811072.png
|
2024-09-21 16:58:11.180229 |
16 |
87070401 |
Construction of Community Sanitary Complex |
180000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.4308786
Longitude : 94.0310576
file name : Image_30082024132745408.png
|
2024-08-30 13:27:45.879791 |
17 |
87070401 |
Construction of Community Sanitary Complex |
180000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.4308786
Longitude : 94.0310576
file name : Image_30082024132728674.png
|
2024-08-30 13:27:29.140949 |
18 |
87061296 |
Water Supply to villages |
342634 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.53096833333333
Longitude : 94.07156333333333
file name : Image_30082024153227207.png
|
2024-08-30 15:32:27.709798 |
19 |
66613214 |
Operation & maintenance of drinking water supply system |
273600 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.4309599
Longitude : 94.0305951
file name : Image_13082023210603538.png
|
2023-08-13 21:06:03.641529 |
20 |
65563943 |
CREATION OF COVID CARE CENTRE AND SANITIZATION AT GP AREA |
68531 |
CREATION OF COVID CARE CENTRE AND SANITIZATION AT GP AREA1 |
Roof laid |
-
latitude : 26.4314798
Longitude : 94.0306988
file name : Image_10102023130536203.png
|
2023-10-10 13:05:36.290137 |
21 |
65563943 |
CREATION OF COVID CARE CENTRE AND SANITIZATION AT GP AREA |
68531 |
CREATION OF COVID CARE CENTRE AND SANITIZATION AT GP AREA1 |
Plinth level |
-
latitude : 26.4315247
Longitude : 94.0306461
file name : Image_10102023123844953.png
|
2023-10-10 12:38:45.075766 |
22 |
65563943 |
CREATION OF COVID CARE CENTRE AND SANITIZATION AT GP AREA |
68531 |
CREATION OF COVID CARE CENTRE AND SANITIZATION AT GP AREA1 |
Plinth level |
-
latitude : 26.4313743
Longitude : 94.0308259
file name : Image_10102023103558825.png
|
2023-10-10 10:35:58.94245 |
23 |
65563943 |
CREATION OF COVID CARE CENTRE AND SANITIZATION AT GP AREA |
68531 |
CREATION OF COVID CARE CENTRE AND SANITIZATION AT GP AREA1 |
Completion of work |
-
latitude : 26.5613126
Longitude : 93.9747
file name : Image_17102022150051258.png
|
2022-10-17 15:00:51.41972 |
24 |
65344217 |
REPAIRING OF BOKOLAI SUB CENTER PHE |
140000 |
REPAIRING OF BOKOLAI SUB CENTER PHE1 |
Roof laid |
-
latitude : 26.4313458
Longitude : 94.0308211
file name : Image_09102023112641749.png
|
2023-10-09 11:26:41.963803 |
25 |
65344217 |
REPAIRING OF BOKOLAI SUB CENTER PHE |
140000 |
REPAIRING OF BOKOLAI SUB CENTER PHE1 |
Plinth level |
-
latitude : 26.4313458
Longitude : 94.0308211
file name : Image_09102023111847455.png
|
2023-10-09 11:18:47.547745 |
26 |
65344217 |
REPAIRING OF BOKOLAI SUB CENTER PHE |
140000 |
REPAIRING OF BOKOLAI SUB CENTER PHE1 |
Completion of work |
-
latitude : 26.52629295
Longitude : 94.09005784
file name : Image_15122022143026082.png
|
2022-12-15 14:30:26.219223 |
27 |
65344217 |
REPAIRING OF BOKOLAI SUB CENTER PHE |
140000 |
REPAIRING OF BOKOLAI SUB CENTER PHE1 |
Completion of work |
-
latitude : 26.52623723
Longitude : 94.09009269
file name : Image_15122022144818092.png
|
2022-12-15 14:48:18.235611 |
28 |
65344362 |
REPAIRING OF 0513 NO AWC AT 2ND KUMAR GAON |
50000 |
REPAIRING OF 0513 NO AWC AT 2ND KUMAR GAON1 |
Roof laid |
-
latitude : 26.4313458
Longitude : 94.0308211
file name : Image_09102023105853936.png
|
2023-10-09 10:58:54.033182 |
29 |
65344362 |
REPAIRING OF 0513 NO AWC AT 2ND KUMAR GAON |
50000 |
REPAIRING OF 0513 NO AWC AT 2ND KUMAR GAON1 |
Plinth level |
-
latitude : 26.4313458
Longitude : 94.0308211
file name : Image_09102023105046986.png
|
2023-10-09 10:50:47.101804 |
30 |
65344362 |
REPAIRING OF 0513 NO AWC AT 2ND KUMAR GAON |
50000 |
REPAIRING OF 0513 NO AWC AT 2ND KUMAR GAON1 |
Completion of work |
-
latitude : 26.49912551
Longitude : 94.09268808
file name : Image_15122022142414084.png
|
2022-12-15 14:24:14.212054 |
31 |
65344362 |
REPAIRING OF 0513 NO AWC AT 2ND KUMAR GAON |
50000 |
REPAIRING OF 0513 NO AWC AT 2ND KUMAR GAON1 |
Completion of work |
-
latitude : 26.49909669
Longitude : 94.09268368
file name : Image_15122022142450489.png
|
2022-12-15 14:24:50.604837 |
32 |
65344362 |
REPAIRING OF 0513 NO AWC AT 2ND KUMAR GAON |
50000 |
REPAIRING OF 0513 NO AWC AT 2ND KUMAR GAON1 |
Completion of work |
-
latitude : 26.49914672
Longitude : 94.09273233
file name : Image_15122022143523243.png
|
2022-12-15 14:35:23.382886 |
33 |
65344362 |
REPAIRING OF 0513 NO AWC AT 2ND KUMAR GAON |
50000 |
REPAIRING OF 0513 NO AWC AT 2ND KUMAR GAON1 |
Completion of work |
-
latitude : 26.49912551
Longitude : 94.09268808
file name : Image_15122022143552812.png
|
2022-12-15 14:35:52.938646 |
34 |
65344362 |
REPAIRING OF 0513 NO AWC AT 2ND KUMAR GAON |
50000 |
REPAIRING OF 0513 NO AWC AT 2ND KUMAR GAON1 |
Completion of work |
-
latitude : 26.49909669
Longitude : 94.09268368
file name : Image_15122022143558353.png
|
2022-12-15 14:35:58.472405 |
35 |
65344500 |
REPARING OF KHATUWAL AWC WARD NO 5 |
50000 |
REPARING OF KHATUWAL AWC WARD NO 51 |
Roof laid |
-
latitude : 26.52211666666667
Longitude : 94.084915
file name : Image_12102023123707075.png
|
2023-10-12 12:37:07.170247 |
36 |
65344500 |
REPARING OF KHATUWAL AWC WARD NO 5 |
50000 |
REPARING OF KHATUWAL AWC WARD NO 51 |
Roof laid |
-
latitude : 26.521914999999996
Longitude : 94.08468833333333
file name : Image_12102023123346246.png
|
2023-10-12 12:33:46.340296 |
37 |
65344500 |
REPARING OF KHATUWAL AWC WARD NO 5 |
50000 |
REPARING OF KHATUWAL AWC WARD NO 51 |
Plinth level |
-
latitude : 26.4313458
Longitude : 94.0308211
file name : Image_09102023131412828.png
|
2023-10-09 13:14:13.030815 |
38 |
65344500 |
REPARING OF KHATUWAL AWC WARD NO 5 |
50000 |
REPARING OF KHATUWAL AWC WARD NO 51 |
Plinth level |
-
latitude : 26.4313458
Longitude : 94.0308211
file name : Image_09102023131326049.png
|
2023-10-09 13:13:26.216559 |
39 |
65344500 |
REPARING OF KHATUWAL AWC WARD NO 5 |
50000 |
REPARING OF KHATUWAL AWC WARD NO 51 |
Plinth level |
-
latitude : 26.4313458
Longitude : 94.0308211
file name : Image_09102023131300869.png
|
2023-10-09 13:13:00.972913 |
40 |
65344500 |
REPARING OF KHATUWAL AWC WARD NO 5 |
50000 |
REPARING OF KHATUWAL AWC WARD NO 51 |
Completion of work |
-
latitude : 26.52214129
Longitude : 94.08498051
file name : Image_19122022161840300.png
|
2022-12-19 16:18:40.422376 |
41 |
65344500 |
REPARING OF KHATUWAL AWC WARD NO 5 |
50000 |
REPARING OF KHATUWAL AWC WARD NO 51 |
Completion of work |
-
latitude : 26.52213915
Longitude : 94.08497932
file name : Image_19122022161843869.png
|
2022-12-19 16:18:43.996021 |
42 |
63796382 |
DRINKING WATER FACILITY AT MAJULI CHUK |
185268 |
DRINKING WATER FACILITY AT MAJULI CHUK1 |
Roof laid |
-
latitude : 26.5308332,26.5308332
Longitude : 94.0716025,94.0716025
file name : Image_12102023154205169.png
|
2023-10-12 15:42:05.265707 |
43 |
63796382 |
DRINKING WATER FACILITY AT MAJULI CHUK |
185268 |
DRINKING WATER FACILITY AT MAJULI CHUK1 |
Roof laid |
-
latitude : 26.5308332,26.5308332
Longitude : 94.0716025,94.0716025
file name : Image_12102023154156893.png
|
2023-10-12 15:41:57.010376 |
44 |
63796382 |
DRINKING WATER FACILITY AT MAJULI CHUK |
185268 |
DRINKING WATER FACILITY AT MAJULI CHUK1 |
Roof laid |
-
latitude : 26.5308332,26.5308332
Longitude : 94.0716025,94.0716025
file name : Image_12102023154210467.png
|
2023-10-12 15:42:10.575094 |
45 |
63796382 |
DRINKING WATER FACILITY AT MAJULI CHUK |
185268 |
DRINKING WATER FACILITY AT MAJULI CHUK1 |
Plinth level |
-
latitude : 26.513751666666668,26.513773333333333
Longitude : 94.08393333333333,94.08391666666667
file name : Image_12102023113218341.png
|
2023-10-12 11:32:18.433954 |
46 |
63796382 |
DRINKING WATER FACILITY AT MAJULI CHUK |
185268 |
DRINKING WATER FACILITY AT MAJULI CHUK1 |
Completion of work |
-
latitude : 26.51390183,26.51391892
Longitude : 94.08397046,94.08395069
file name : Image_26032023132218866.png
|
2023-03-26 13:22:18.987989 |
47 |
65344452 |
REPAIRING OF KOPOHATING NA PAMUA LP SCHOOL WARD 7 |
326741 |
REPAIRING OF KOPOHATING NA PAMUA LP SCHOOL WARD 71 |
Roof laid |
-
latitude : 26.4313458
Longitude : 94.0308211
file name : Image_09102023115144560.png
|
2023-10-09 11:51:44.689051 |
48 |
65344452 |
REPAIRING OF KOPOHATING NA PAMUA LP SCHOOL WARD 7 |
326741 |
REPAIRING OF KOPOHATING NA PAMUA LP SCHOOL WARD 71 |
Plinth level |
-
latitude : 26.4313458
Longitude : 94.0308211
file name : Image_09102023114455172.png
|
2023-10-09 11:44:55.449743 |
49 |
65344452 |
REPAIRING OF KOPOHATING NA PAMUA LP SCHOOL WARD 7 |
326741 |
REPAIRING OF KOPOHATING NA PAMUA LP SCHOOL WARD 71 |
Completion of work |
-
latitude : 26.52999288
Longitude : 94.10466123
file name : Image_15122022144825624.png
|
2022-12-15 14:48:25.765832 |
50 |
63801642 |
CONSTRUCTION OF WAITING SHED AT TETELICHUK BURIAL GROUND |
342634 |
CONSTRUCTION OF WAITING SHED AT TETELICHUK BURIAL GROUND1 |
Roof laid |
-
latitude : 26.4313458
Longitude : 94.0308211
file name : Image_09102023125252788.png
|
2023-10-09 12:52:52.900488 |
51 |
63801642 |
CONSTRUCTION OF WAITING SHED AT TETELICHUK BURIAL GROUND |
342634 |
CONSTRUCTION OF WAITING SHED AT TETELICHUK BURIAL GROUND1 |
Plinth level |
-
latitude : 26.4313458
Longitude : 94.0308211
file name : Image_09102023123705219.png
|
2023-10-09 12:37:05.321664 |
52 |
63801642 |
CONSTRUCTION OF WAITING SHED AT TETELICHUK BURIAL GROUND |
342634 |
CONSTRUCTION OF WAITING SHED AT TETELICHUK BURIAL GROUND1 |
Completion of work |
-
latitude : 26.51962724
Longitude : 94.08916979
file name : Image_27012023143109430.png
|
2023-01-27 14:31:09.596367 |
53 |
65344295 |
REPAIRING OF AWC AT MOUT GAON KAKOTI CHUK WARD 2 |
50000 |
REPAIRING OF AWC AT MOUT GAON KAKOTI CHUK WARD 21 |
Roof laid |
-
latitude : 26.5308344
Longitude : 94.0716032
file name : Image_09102023152315234.png
|
2023-10-09 15:23:15.35758 |
54 |
65344295 |
REPAIRING OF AWC AT MOUT GAON KAKOTI CHUK WARD 2 |
50000 |
REPAIRING OF AWC AT MOUT GAON KAKOTI CHUK WARD 21 |
Plinth level |
-
latitude : 26.5308344
Longitude : 94.0716032
file name : Image_09102023150912435.png
|
2023-10-09 15:09:12.561659 |
55 |
65344295 |
REPAIRING OF AWC AT MOUT GAON KAKOTI CHUK WARD 2 |
50000 |
REPAIRING OF AWC AT MOUT GAON KAKOTI CHUK WARD 21 |
Completion of work |
-
latitude : 26.52222744
Longitude : 94.07736739
file name : Image_15122022144835687.png
|
2022-12-15 14:48:35.842659 |
56 |
63796308 |
DRINKING WATER FACILITY AT KALIAPANI GAON PANCHAYAT OFFICE |
230000 |
DRINKING WATER FACILITY AT KALIAPANI GAON PANCHAYAT OFFICE1 |
Roof laid |
-
latitude : 26.5308333
Longitude : 94.0716025
file name : Image_09102023134338277.png
|
2023-10-09 13:43:38.38849 |
57 |
63796308 |
DRINKING WATER FACILITY AT KALIAPANI GAON PANCHAYAT OFFICE |
230000 |
DRINKING WATER FACILITY AT KALIAPANI GAON PANCHAYAT OFFICE1 |
Plinth level |
-
latitude : 26.5308328
Longitude : 94.0716003
file name : Image_09102023133702861.png
|
2023-10-09 13:37:03.034747 |
58 |
63796308 |
DRINKING WATER FACILITY AT KALIAPANI GAON PANCHAYAT OFFICE |
230000 |
DRINKING WATER FACILITY AT KALIAPANI GAON PANCHAYAT OFFICE1 |
Completion of work |
-
latitude : 26.53098643
Longitude : 94.07147033
file name : Image_26032023141311947.png
|
2023-03-26 14:13:12.063055 |
59 |
63796308 |
DRINKING WATER FACILITY AT KALIAPANI GAON PANCHAYAT OFFICE |
230000 |
DRINKING WATER FACILITY AT KALIAPANI GAON PANCHAYAT OFFICE1 |
Completion of work |
-
latitude : 26.53101584
Longitude : 94.07147297
file name : Image_26032023141335487.png
|
2023-03-26 14:13:35.606478 |
60 |
87061714 |
Construction of Community Sanitary Complex |
111317 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.4316823
Longitude : 94.0304471
file name : Image_05112024214308037.png
|
2024-11-05 21:43:08.134603 |
61 |
87061714 |
Construction of Community Sanitary Complex |
111317 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.52385333333333
Longitude : 94.08008333333333
file name : Image_25072024112532003.png
|
2024-07-25 11:25:32.08722 |
62 |
87061714 |
Construction of Community Sanitary Complex |
111317 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.523900000000005
Longitude : 94.08010166666666
file name : Image_25072024110542207.png
|
2024-07-25 11:05:42.299516 |
63 |
87061714 |
Construction of Community Sanitary Complex |
111317 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.523565
Longitude : 94.07988833333333
file name : Image_04122023134707476.png
|
2023-12-04 13:47:07.611215 |
64 |
87061587 |
Construction of Community Sanitary Complex |
111317 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.431738333333335
Longitude : 94.03042666666667
file name : Image_18022024173129008.png
|
2024-02-18 17:31:29.106721 |
65 |
87061587 |
Construction of Community Sanitary Complex |
111317 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.431733333333334
Longitude : 94.03040833333334
file name : Image_18022024122351195.png
|
2024-02-18 12:23:51.284757 |
66 |
87061587 |
Construction of Community Sanitary Complex |
111317 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.529701666666664
Longitude : 94.10505833333333
file name : Image_04122023152422448.png
|
2023-12-04 15:24:22.551492 |
67 |
66600902 |
DEV. OF MOUT GAON BORNAMGHAR PATH CC BLOCK |
365750 |
DEV. OF MOUT GAON BORNAMGHAR PATH CC BLOCK1 |
Roof laid |
-
latitude : 26.528208333333335,26.52823
Longitude : 94.08218166666666,94.08203333333334
file name : Image_02072024140958330.png
|
2024-07-02 14:09:58.424233 |
68 |
66600902 |
DEV. OF MOUT GAON BORNAMGHAR PATH CC BLOCK |
365750 |
DEV. OF MOUT GAON BORNAMGHAR PATH CC BLOCK1 |
Plinth level |
-
latitude : 26.528205000000003,26.52821666666667
Longitude : 94.08214500000001,94.08213666666667
file name : Image_26062024143014615.png
|
2024-06-26 14:30:14.759713 |
69 |
66600902 |
DEV. OF MOUT GAON BORNAMGHAR PATH CC BLOCK |
365750 |
DEV. OF MOUT GAON BORNAMGHAR PATH CC BLOCK1 |
Completion of work |
-
latitude : 26.52818166666667,26.528194999999997,26.528209999999998
Longitude : 94.08181,94.08211666666666,94.08203166666665
file name : Image_04122023123720044.png
|
2023-12-04 12:37:20.145258 |
70 |
87070605 |
Construction of Community Sanitary Complex |
120000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.5309243
Longitude : 94.0716394
file name : Image_10012024135452753.png
|
2024-01-10 13:54:52.866898 |
71 |
87070605 |
Construction of Community Sanitary Complex |
120000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.525818333333337
Longitude : 94.09336
file name : Image_06012024141343624.png
|
2024-01-06 14:13:43.728574 |
72 |
87070605 |
Construction of Community Sanitary Complex |
120000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.525825
Longitude : 94.09345166666665
file name : Image_04122023120628155.png
|
2023-12-04 12:06:28.245481 |
73 |
87070567 |
Construction of Community Sanitary Complex |
120000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.431486666666668
Longitude : 94.02991666666667
file name : Image_18022024110845606.png
|
2024-02-18 11:08:45.696032 |
74 |
87070567 |
Construction of Community Sanitary Complex |
120000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.512676666666668
Longitude : 94.09717
file name : Image_06012024143033094.png
|
2024-01-06 14:30:33.220515 |
75 |
87070567 |
Construction of Community Sanitary Complex |
120000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.512700000000002
Longitude : 94.09706499999999
file name : Image_04122023145154060.png
|
2023-12-04 14:51:54.367649 |
76 |
87070567 |
Construction of Community Sanitary Complex |
120000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.512635
Longitude : 94.09699166666665
file name : Image_04122023145634532.png
|
2023-12-04 14:56:34.63578 |
77 |
66600759 |
DEV. OF MOUT GAON BORTUCHUK PATH FROM LT GUNARAM HOUSE CC BLOCK |
364500 |
DEV. OF MOUT GAON BORTUCHUK PATH FROM LT GUNARAM HOUSE CC BLOCK1 |
Plinth level |
-
latitude : 26.4314009,26.4314009
Longitude : 94.0308347,94.0308347
file name : Image_27062024140023815.png
|
2024-06-27 14:00:23.92136 |
78 |
66600759 |
DEV. OF MOUT GAON BORTUCHUK PATH FROM LT GUNARAM HOUSE CC BLOCK |
364500 |
DEV. OF MOUT GAON BORTUCHUK PATH FROM LT GUNARAM HOUSE CC BLOCK1 |
Completion of work |
-
latitude : 26.522276666666667,26.522316666666665,26.522316666666665
Longitude : 94.07273333333333,94.07275166666668,94.07275
file name : Image_04122023132341128.png
|
2023-12-04 13:23:41.222539 |
79 |
87061458 |
Construction of Community Sanitary Complex |
120000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.4313706
Longitude : 94.030817
file name : Image_11062024223222915.png
|
2024-06-11 22:32:22.994579 |
80 |
87061458 |
Construction of Community Sanitary Complex |
120000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.431581666666663
Longitude : 94.03047666666667
file name : Image_11062024222534901.png
|
2024-06-11 22:25:34.978163 |
81 |
87061458 |
Construction of Community Sanitary Complex |
120000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.519866666666665
Longitude : 94.07203666666668
file name : Image_04122023131708591.png
|
2023-12-04 13:17:08.68496 |
82 |
88806666 |
Repair of drainage channel |
142625 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 26.517026666666666
Longitude : 94.08567166666666
file name : Image_02072024150004724.png
|
2024-07-02 15:00:04.831091 |
83 |
88806247 |
INSTALLATION OF SOLAR STREET LIGHT AT AMRIT SARUBOR |
56000 |
INSTALLATION OF SOLAR STREET LIGHT AT AMRIT SARUBOR1 |
Completion of work |
-
latitude : 26.493278333333333
Longitude : 94.09449166666667
file name : Image_02072024132152337.png
|
2024-07-02 13:21:52.482503 |
84 |
88806943 |
INSTALLATION OF SOLAR STREET LIGHT AT AMRIT SARUBAR |
84000 |
INSTALLATION OF SOLAR STREET LIGHT AT AMRIT SARUBAR1 |
Completion of work |
-
latitude : 26.491795000000003
Longitude : 94.09414833333334
file name : Image_02072024131641322.png
|
2024-07-02 13:16:41.423777 |
85 |
88806570 |
Construction of toilets in public institutions |
70000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.5302093
Longitude : 94.0819338
file name : Image_21092024171029850.png
|
2024-09-21 17:10:29.933393 |
86 |
88806570 |
Construction of toilets in public institutions |
70000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.520629999999997
Longitude : 94.09694666666668
file name : Image_02072024144550877.png
|
2024-07-02 14:45:50.991038 |
87 |
88806570 |
Construction of toilets in public institutions |
70000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.520680000000002
Longitude : 94.09698166666666
file name : Image_02072024144430006.png
|
2024-07-02 14:44:30.122413 |
88 |
88806570 |
Construction of toilets in public institutions |
70000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.48691666666667
Longitude : 94.08312499999998
file name : Image_02072024134035163.png
|
2024-07-02 13:40:35.27599 |
89 |
88805444 |
Construction of toilets in public institutions |
119537 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.5302093
Longitude : 94.0819338
file name : Image_21092024163347456.png
|
2024-09-21 16:33:47.544328 |
90 |
88805444 |
Construction of toilets in public institutions |
119537 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.5422034
Longitude : 94.093631
file name : Image_02072024154633617.png
|
2024-07-02 15:46:33.707796 |
91 |
88806130 |
REPAIRING OF JYOTI RUPA YUBA SANGHA |
60000 |
REPAIRING OF JYOTI RUPA YUBA SANGHA1 |
Completion of work |
-
latitude : 26.517021666666665
Longitude : 94.08102
file name : Image_02072024151051061.png
|
2024-07-02 15:10:51.14538 |
92 |
88806880 |
DEVELOPMENT OF RAJKHUWA CHUK PATH WITH SAND GRAVEL AND PAVERS BLOCK |
293150 |
DEVELOPMENT OF RAJKHUWA CHUK PATH WITH SAND GRAVEL AND PAVERS BLOCK1 |
Roof laid |
-
latitude : 26.5299373,26.5299373,26.5299373,26.5299373
Longitude : 94.0542844,94.0542844,94.0542844,94.0542844
file name : Image_21092024160136217.png
|
2024-09-21 16:01:36.305081 |
93 |
88806880 |
DEVELOPMENT OF RAJKHUWA CHUK PATH WITH SAND GRAVEL AND PAVERS BLOCK |
293150 |
DEVELOPMENT OF RAJKHUWA CHUK PATH WITH SAND GRAVEL AND PAVERS BLOCK1 |
Plinth level |
-
latitude : 26.5308215,26.5308215,26.5308215
Longitude : 94.0716279,94.0716279,94.0716279
file name : Image_22082024161104352.png
|
2024-08-22 16:11:04.469338 |
94 |
88806880 |
DEVELOPMENT OF RAJKHUWA CHUK PATH WITH SAND GRAVEL AND PAVERS BLOCK |
293150 |
DEVELOPMENT OF RAJKHUWA CHUK PATH WITH SAND GRAVEL AND PAVERS BLOCK1 |
Completion of work |
-
latitude : 26.52623,26.526225
Longitude : 94.08995000000002,94.09013333333333
file name : Image_02072024142626183.png
|
2024-07-02 14:26:26.310855 |
95 |
88806029 |
EARTH FILLING AT DUINOIMUKH MARKET PLACE |
261150 |
EARTH FILLING AT DUINOIMUKH MARKET PLACE1 |
Completion of work |
-
latitude : 26.493413333333333,26.493335000000002
Longitude : 94.09461166666667,94.09463
file name : Image_02072024132528704.png
|
2024-07-02 13:25:28.814792 |
96 |
88806502 |
Construction of toilets in public institutions |
70000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.5299373
Longitude : 94.0542844
file name : Image_21092024161055903.png
|
2024-09-21 16:10:55.999354 |
97 |
88806502 |
Construction of toilets in public institutions |
70000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.4311475
Longitude : 94.0309594
file name : Image_16072024180011081.png
|
2024-07-16 18:00:11.184063 |
98 |
88805530 |
Construction of toilets in public institutions |
119538 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.52827166666667
Longitude : 94.08311833333333
file name : Image_23082024143828362.png
|
2024-08-23 14:38:28.500756 |
99 |
88805530 |
Construction of toilets in public institutions |
119538 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.528209999999998
Longitude : 94.08284666666665
file name : Image_02072024141634384.png
|
2024-07-02 14:16:34.269854 |
100 |
88805678 |
Creation of community compost pits for a group of Households |
43550 |
Creation of community compost pits for a group of Households1 |
Roof laid |
-
latitude : 26.5308239
Longitude : 94.0716289
file name : Image_25072024141826203.png
|
2024-07-25 14:18:26.297562 |
101 |
88805678 |
Creation of community compost pits for a group of Households |
43550 |
Creation of community compost pits for a group of Households1 |
Roof laid |
-
latitude : 26.5308239
Longitude : 94.0716289
file name : Image_25072024141746655.png
|
2024-07-25 14:17:46.772397 |
102 |
88805678 |
Creation of community compost pits for a group of Households |
43550 |
Creation of community compost pits for a group of Households1 |
Roof laid |
-
latitude : 26.5308248
Longitude : 94.0716324
file name : Image_25072024141732007.png
|
2024-07-25 14:17:32.109608 |
103 |
88805678 |
Creation of community compost pits for a group of Households |
43550 |
Creation of community compost pits for a group of Households1 |
Roof laid |
-
latitude : 26.5308248
Longitude : 94.0716324
file name : Image_25072024141756213.png
|
2024-07-25 14:17:56.317098 |
104 |
88805678 |
Creation of community compost pits for a group of Households |
43550 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 26.5308233
Longitude : 94.0716334
file name : Image_25072024115924801.png
|
2024-07-25 11:59:24.943118 |
105 |
88805678 |
Creation of community compost pits for a group of Households |
43550 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 26.4313674
Longitude : 94.0308339
file name : Image_19072024215531546.png
|
2024-07-19 21:55:31.643037 |