1 |
10527039 |
Repairing of G.P office (Phase 2) |
10000 |
Office Building1 |
25% |
-
latitude : 26.70723783
Longitude : 94.23635066
file name : Image_30052019140343083.png
|
2019-05-30 14:03:43.172355 |
2 |
10526869 |
Repairing of G.P office |
215000 |
Office Building1 |
25% |
-
latitude : 26.70725375
Longitude : 94.236502
file name : Image_30052019140303313.png
|
2019-05-30 14:03:03.39644 |
3 |
10399557 |
Provision of roof truss and G.I sheet of Napamuwa Rangamancha |
370000 |
Cultural Stage1 |
25% |
-
latitude : 26.69328835
Longitude : 94.26275138
file name : Image_30052019140346687.png
|
2019-05-30 14:03:46.76488 |
4 |
5812351 |
REPAIRING OF BHALIRAM ANGANBADI KENDRA |
40000 |
Government Sponsored Houses1 |
25% |
-
latitude : 26.69147731
Longitude : 94.23567609
file name : Image_07062019130954017.png
|
2019-06-07 13:09:54.110914 |
5 |
21042186 |
Repairing/ Renovation of Puberun Binudan kendra |
171000 |
Cultural Stage1 |
25% |
-
latitude : 26.69089799
Longitude : 94.25960276
file name : Image_30052019144052475.png
|
2019-05-30 14:40:52.568712 |
6 |
35294053 |
DEV OF PUBERUN PATH PRATHAMIK VIDYALAY TO KUSHAL KONWAR LP SCHOOL |
435101 |
DEV OF PUBERUN PATH PRATHAMIK VIDYALAY TO KUSHAL KONWAR LP SCHOOL1 |
Earth Work |
-
latitude : 26.69036285,26.69038166
Longitude : 94.25962057,94.25960594
file name : Image_23082020134102943.png
|
2020-08-23 13:41:03.641925 |
7 |
36869991 |
EARTH FILLING AT KATONI GAON BHUYAN ROAD |
228322 |
EARTH FILLING AT KATONI GAON BHUYAN ROAD1 |
25% |
-
latitude : 26.70801572,26.70808407
Longitude : 94.24003646,94.24001438
file name : Image_24082020162927737.png
|
2020-08-24 16:29:28.420661 |
8 |
36869991 |
EARTH FILLING AT KATONI GAON BHUYAN ROAD |
228322 |
EARTH FILLING AT KATONI GAON BHUYAN ROAD1 |
25% |
-
latitude : 26.70801572,26.70808407
Longitude : 94.24003646,94.24001438
file name : Image_24082020162942731.png
|
2020-08-24 16:29:43.395963 |
9 |
36873344 |
DEV OF KATONI GAON BOR CHUCK PATH WITH CC BLOCK PH-1 |
1591476 |
DEV OF KATONI GAON BOR CHUCK PATH WITH CC BLOCK PH-11 |
Earth Work |
-
latitude : 26.69609511,26.69608253
Longitude : 94.25003527,94.25003117
file name : Image_24082020160141744.png
|
2020-08-24 16:01:42.416196 |
10 |
36874546 |
CONST. OF BOUNDARYWALL AT 570 NO. KATHKOTIA PRATHAMIK VIDYALAY |
70000 |
CONST. OF BOUNDARYWALL AT 570 NO. KATHKOTIA PRATHAMIK VIDYALAY1 |
In Progress |
-
latitude : 26.68681454
Longitude : 94.27304535
file name : Image_24082020153314545.png
|
2020-08-24 15:33:15.237818 |
11 |
36871958 |
DEV OF TULON GOGOI PATH WITH CC BLOCK PH-II |
885980 |
DEV OF TULON GOGOI PATH WITH CC BLOCK PH-II1 |
Earth Work |
-
latitude : 26.7011046,26.70110458,26.70111087,26.70115448,26.70115921
Longitude : 94.25212668,94.25212671,94.25212083,94.2521258,94.25212815
file name : Image_24082020153954992.png
|
2020-08-24 15:39:55.745778 |
12 |
43857630 |
SLAB OVER CULVERT NEAR PROBIN GOGOI RESIDENCE KATONI GAON |
50000 |
SLAB OVER CULVERT NEAR PROBIN GOGOI RESIDENCE KATONI GAON1 |
Substructure below GL |
-
latitude : 26.70519,26.70533938
Longitude : 94.2466694,94.24674693
file name : Image_13112020155230066.png
|
2020-11-13 15:52:34.955805 |
13 |
43857695 |
CONSTRUCTION OF UJANI HAZARI GAON NAMGHAR BOUNDARY WALL |
237927 |
CONSTRUCTION OF UJANI HAZARI GAON NAMGHAR BOUNDARY WALL1 |
In Progress |
-
latitude : 26.68084388
Longitude : 94.25627505
file name : Image_14112020145002297.png
|
2020-11-14 14:50:07.634973 |
14 |
43857416 |
DEV. OF HAZARI GAON BORNAMGHAR PATH WITH CC BLOCK PAVEMENT |
642000 |
DEV. OF HAZARI GAON BORNAMGHAR PATH WITH CC BLOCK PAVEMENT 1 |
Earth Work |
-
latitude : 26.67906415,26.67903813
Longitude : 94.24952982,94.24957222
file name : Image_14112020145529884.png
|
2020-11-14 14:55:35.220973 |
15 |
43857479 |
DEV. OF PUBERUN PATH PRATHAMIK BIDYALAYA TO KUSHAL KONWAR L.P. SCHOOL PH-II WITH CC BLOCK |
422852 |
DEV. OF PUBERUN PATH PRATHAMIK BIDYALAYA TO KUSHAL KONWAR L.P. SCHOOL PH-II WITH CC BLOCK1 |
Earth Work |
-
latitude : 26.68637999,26.68637095
Longitude : 94.25530897,94.25533249
file name : Image_14112020142831819.png
|
2020-11-14 14:28:37.138818 |
16 |
43857349 |
DEV. OF COLLEGE ROAD WITH INTERLOCKING CC BLOCK PAVEMENT |
678000 |
DEV. OF COLLEGE ROAD WITH INTERLOCKING CC BLOCK PAVEMENT 1 |
Earth Work |
-
latitude : 26.70738456,26.70738828,26.70739626
Longitude : 94.24563737,94.24564941,94.24565933
file name : Image_13112020155457119.png
|
2020-11-13 15:55:01.999819 |
17 |
43857585 |
DEV. OF NAPAMUWA GAON PATH PH-II WITH CC BLOCK PAVEMENT |
942000 |
DEV. OF NAPAMUWA GAON PATH PH-II WITH CC BLOCK PAVEMENT 1 |
Earth Work |
-
latitude : 26.69522357,26.69522354,26.6952268
Longitude : 94.26102233,94.26102238,94.26103999
file name : Image_13112020163448152.png
|
2020-11-13 16:34:53.060549 |
18 |
34156517 |
DEVELOPMENT OF HEZARIGAON ERA BARI PATH WITH INTERLOCKING CEMENT CONCRETE BLOCK |
1149792 |
DEVELOPMENT OF HEZARIGAON ERA BARI PATH WITH INTERLOCKING CEMENT CONCRETE BLOCK1 |
Earth Work |
-
latitude : 26.67827673,26.67825847
Longitude : 94.24707193,94.24707252
file name : Image_23082020135047981.png
|
2020-08-23 13:50:49.004965 |
19 |
34154099 |
DEVELOPMENT OF TULON GOGOI PATH WITH INTERLOCKING CEMENT CONCRETE BLOCK (PH-1) |
129992 |
DEVELOPMENT OF TULON GOGOI PATH WITH INTERLOCKING CEMENT CONCRETE BLOCK (PH-1)1 |
Earth Work |
-
latitude : 26.70190966,26.70200219
Longitude : 94.25211648,94.25211057
file name : Image_24082020153643518.png
|
2020-08-24 15:36:44.237255 |
20 |
34154970 |
EARTHFILLING AT DEURAM BORA L.P SCHOOL |
80320 |
EARTHFILLING AT DEURAM BORA L.P SCHOOL1 |
25% |
-
latitude : 26.69765876
Longitude : 94.24973577
file name : Image_24082020162921200.png
|
2020-08-24 16:29:21.861616 |
21 |
36854798 |
SLAB OVER CULVERT NEAR PROBIN GOGOI RESIDENCE AT KATONI GAON |
29000 |
SLAB OVER CULVERT NEAR PROBIN GOGOI RESIDENCE AT KATONI GAON 1 |
Substructure below GL |
-
latitude : 26.70532186,26.70530838
Longitude : 94.24674671,94.24675187
file name : Image_24082020153319084.png
|
2020-08-24 15:33:19.75107 |
22 |
43857544 |
DEV. OF LOKHESWAR PATH WITH CC BLOCK PAVEMENT |
596000 |
DEV. OF LOKHESWAR PATH WITH CC BLOCK PAVEMENT1 |
Earth Work |
-
latitude : 26.68914844,26.68916887
Longitude : 94.24274137,94.24275155
file name : Image_14112020141826451.png
|
2020-11-14 14:18:31.762651 |
23 |
50137627 |
REPAIRING OF BHALIRAM ANGANWADI CENTRE AT KAMAR HAZARIKA GAON |
100000 |
REPAIRING OF BHALIRAM ANGANWADI CENTRE AT KAMAR HAZARIKA GAON1 |
Roof laid |
-
latitude : 26.6912755
Longitude : 94.2353811
file name : Image_08062023113906059.png
|
2023-06-08 11:39:06.135081 |
24 |
50137627 |
REPAIRING OF BHALIRAM ANGANWADI CENTRE AT KAMAR HAZARIKA GAON |
100000 |
REPAIRING OF BHALIRAM ANGANWADI CENTRE AT KAMAR HAZARIKA GAON1 |
Completion of work |
-
latitude : 26.692175
Longitude : 94.2312528
file name : Image_20042022131356992.png
|
2022-04-20 13:13:57.079138 |
25 |
52042021 |
SANITIZATION AT GP AREA OF KARANGA GAON PANCHAYAT |
71017 |
SANITIZATION AT GP AREA OF KARANGA GAON PANCHAYAT1 |
Plinth level |
-
latitude : 26.7072626
Longitude : 94.2364453
file name : Image_21062021132717763.png
|
2021-06-21 13:27:17.858153 |
26 |
50136822 |
DEV OF NAPAMUWA PATH PHASE III |
539157 |
DEV OF NAPAMUWA PATH PHASE III1 |
Completion of work |
-
latitude : 26.6224374,26.6224374
Longitude : 94.1063724,94.1063724
file name : Image_19042022112704225.png
|
2022-04-19 11:27:04.322285 |
27 |
50135877 |
RUNNING WATER SYSTEM WITH RESERVOIR AT 55 NO KARANGA GP |
420174 |
RUNNING WATER SYSTEM WITH RESERVOIR AT 55 NO KARANGA GP1 |
Roof laid |
-
latitude : 26.7075062
Longitude : 94.2363651
file name : Image_26082023104324159.png
|
2023-08-26 10:43:24.218311 |
28 |
50135877 |
RUNNING WATER SYSTEM WITH RESERVOIR AT 55 NO KARANGA GP |
420174 |
RUNNING WATER SYSTEM WITH RESERVOIR AT 55 NO KARANGA GP1 |
Completion of work |
-
latitude : 26.70024816
Longitude : 94.26240541
file name : Image_12042022132609583.png
|
2022-04-12 13:26:09.656407 |
29 |
65457368 |
PROVISION FOR ELECTRICITY BILL FOR GP OFFICE |
25000 |
PROVISION FOR ELECTRICITY BILL FOR GP OFFICE1 |
Completion of work |
-
latitude : 26.7072256
Longitude : 94.236525
file name : Image_16112022111900691.png
|
2022-11-16 11:19:00.757243 |
30 |
65456232 |
REPAIRING OF 59 NO KATHKOTIA ANGANWADI CENTRE |
150000 |
REPAIRING OF 59 NO KATHKOTIA ANGANWADI CENTRE1 |
Completion of work |
-
latitude : 26.71683917
Longitude : 94.21197909
file name : Image_11112022113505995.png
|
2022-11-11 11:35:06.103025 |
31 |
65455540 |
REPAIRING OF 58 NO HAZARI GAON ANGANWADI CENTRE |
144500 |
REPAIRING OF 58 NO HAZARI GAON ANGANWADI CENTRE1 |
Completion of work |
-
latitude : 26.71683917
Longitude : 94.21197909
file name : Image_11112022112558264.png
|
2022-11-11 11:25:58.363607 |
32 |
65455398 |
REPAIRING OF 60 NO RAIDANG KOMAR GAON ANGANWADI CENTRE |
144500 |
REPAIRING OF 60 NO RAIDANG KOMAR GAON ANGANWADI CENTRE1 |
Completion of work |
-
latitude : 26.71683917
Longitude : 94.21197909
file name : Image_11112022114419698.png
|
2022-11-11 11:44:19.808514 |
33 |
65457222 |
REPAIRING OF GP OFFICE |
68643 |
REPAIRING OF GP OFFICE1 |
Completion of work |
-
latitude : 26.7072257
Longitude : 94.2365246
file name : Image_16112022111954232.png
|
2022-11-16 11:19:54.306313 |
34 |
66785839 |
REPAIRING OF BHALIRAM HAZARIKA LP SCHOOL |
189000 |
REPAIRING OF BHALIRAM HAZARIKA LP SCHOOL1 |
Plinth level |
-
latitude : 26.707504
Longitude : 94.236357
file name : Image_28082023123913464.png
|
2023-08-28 12:39:13.524842 |
35 |
66785839 |
REPAIRING OF BHALIRAM HAZARIKA LP SCHOOL |
189000 |
REPAIRING OF BHALIRAM HAZARIKA LP SCHOOL1 |
Completion of work |
-
latitude : 26.6912758
Longitude : 94.235382
file name : Image_08062023114039435.png
|
2023-06-08 11:40:39.503392 |
36 |
66786949 |
Repair of drainage channel |
184525 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 26.707504
Longitude : 94.236357
file name : Image_28082023114701387.png
|
2023-08-28 11:47:01.446002 |
37 |
66786949 |
Repair of drainage channel |
184525 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 26.7018793
Longitude : 94.2511207
file name : Image_06062023111451033.png
|
2023-06-06 11:14:51.089624 |
38 |
65456306 |
REPAIRING OF NAPAMUA LP SCHOOL |
155843 |
REPAIRING OF NAPAMUA LP SCHOOL1 |
Plinth level |
-
latitude : 26.7007003
Longitude : 94.2553624
file name : Image_29082023115829898.png
|
2023-08-29 11:58:29.981113 |
39 |
65456306 |
REPAIRING OF NAPAMUA LP SCHOOL |
155843 |
REPAIRING OF NAPAMUA LP SCHOOL1 |
Completion of work |
-
latitude : 26.698750698366275
Longitude : 94.2492830619387
file name : Image_11112022120437097.png
|
2022-11-11 12:04:37.176735 |
40 |
65456442 |
Repair of drainage channel |
195000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 26.707504
Longitude : 94.236357
file name : Image_28082023114307948.png
|
2023-08-28 11:43:08.024338 |
41 |
65456442 |
Repair of drainage channel |
195000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 26.698875380292666
Longitude : 94.2492829683316
file name : Image_11112022115657553.png
|
2022-11-11 11:56:57.673112 |
42 |
66786907 |
Repair of drainage channel |
100000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 26.6942089
Longitude : 94.234006
file name : Image_24092024144120968.png
|
2024-09-24 14:41:21.037193 |
43 |
66786907 |
Repair of drainage channel |
100000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 26.6940941
Longitude : 94.2339723
file name : Image_08062023113529062.png
|
2023-06-08 11:35:29.13226 |
44 |
65455821 |
REPAIRING OF 55 NO NAPAMUA ANGANWADI CENTRE |
115157 |
REPAIRING OF 55 NO NAPAMUA ANGANWADI CENTRE1 |
Plinth level |
-
latitude : 26.7006993
Longitude : 94.2553595
file name : Image_29082023115717612.png
|
2023-08-29 11:57:17.68572 |
45 |
65455821 |
REPAIRING OF 55 NO NAPAMUA ANGANWADI CENTRE |
115157 |
REPAIRING OF 55 NO NAPAMUA ANGANWADI CENTRE1 |
Completion of work |
-
latitude : 26.698750698366275
Longitude : 94.2492830619387
file name : Image_11112022120305599.png
|
2022-11-11 12:03:05.643388 |
46 |
65456683 |
Repair of drainage channel |
110000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 26.7052309
Longitude : 94.2467993
file name : Image_29082023121547224.png
|
2023-08-29 12:15:47.291578 |
47 |
65456683 |
Repair of drainage channel |
110000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 26.70578276
Longitude : 94.24754564
file name : Image_11112022121116229.png
|
2022-11-11 12:11:16.275423 |
48 |
66786045 |
REPAIRING OF DEWRAM BORA LP SCHOOL |
210000 |
REPAIRING OF DEWRAM BORA LP SCHOOL1 |
Plinth level |
-
latitude : 26.7007003
Longitude : 94.2553624
file name : Image_29082023121103737.png
|
2023-08-29 12:11:03.836448 |
49 |
66786045 |
REPAIRING OF DEWRAM BORA LP SCHOOL |
210000 |
REPAIRING OF DEWRAM BORA LP SCHOOL1 |
Completion of work |
-
latitude : 26.69786273
Longitude : 94.25002892
file name : Image_06062023111904636.png
|
2023-06-06 11:19:04.70241 |
50 |
66786727 |
Repair of drainage channel |
179250 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 26.7007003
Longitude : 94.2553624
file name : Image_29082023120359393.png
|
2023-08-29 12:03:59.445698 |
51 |
66786727 |
Repair of drainage channel |
179250 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 26.6960057
Longitude : 94.2508002
file name : Image_06062023112550091.png
|
2023-06-06 11:25:50.146257 |
52 |
50134733 |
CONST OF DOUBLE SEATED TOILET AT NAPAMUWA LP SCHOOL |
200000 |
CONST OF DOUBLE SEATED TOILET AT NAPAMUWA LP SCHOOL 1 |
Plinth level |
-
latitude : 26.7006992
Longitude : 94.2553572
file name : Image_28082023134000370.png
|
2023-08-28 13:40:00.450012 |
53 |
50134733 |
CONST OF DOUBLE SEATED TOILET AT NAPAMUWA LP SCHOOL |
200000 |
CONST OF DOUBLE SEATED TOILET AT NAPAMUWA LP SCHOOL 1 |
Completion of work |
-
latitude : 26.6224374
Longitude : 94.1063724
file name : Image_19042022112032336.png
|
2022-04-19 11:20:32.407695 |
54 |
65457634 |
Repair of drainage channel |
51572 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 26.707504
Longitude : 94.236357
file name : Image_28082023114504725.png
|
2023-08-28 11:45:04.804806 |
55 |
65457634 |
Repair of drainage channel |
51572 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 26.7072365
Longitude : 94.2365224
file name : Image_27122022134319556.png
|
2022-12-27 13:43:19.645488 |
56 |
87503740 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.7068012
Longitude : 94.236629
file name : Image_26042024115447061.png
|
2024-04-26 11:54:47.134436 |
57 |
50135312 |
CONST OF COMMUNITY TOILET AT NAPAMUWA RANGAMANCHA |
90000 |
CONST OF COMMUNITY TOILET AT NAPAMUWA RANGAMANCHA 1 |
Roof laid |
-
latitude : 26.71631664
Longitude : 94.20688257
file name : Image_21112023124453651.png
|
2023-11-21 12:44:53.717949 |
58 |
50135312 |
CONST OF COMMUNITY TOILET AT NAPAMUWA RANGAMANCHA |
90000 |
CONST OF COMMUNITY TOILET AT NAPAMUWA RANGAMANCHA 1 |
Plinth level |
-
latitude : 26.707504
Longitude : 94.236357
file name : Image_28082023114149708.png
|
2023-08-28 11:41:49.77532 |
59 |
50135312 |
CONST OF COMMUNITY TOILET AT NAPAMUWA RANGAMANCHA |
90000 |
CONST OF COMMUNITY TOILET AT NAPAMUWA RANGAMANCHA 1 |
Completion of work |
-
latitude : 26.6224386
Longitude : 94.1063797
file name : Image_18052022124937854.png
|
2022-05-18 12:49:37.999952 |
60 |
66786499 |
CONSTRUCTION OF BOUNDARY WALL AT DEURAM BORA LP SCHOOL |
179050 |
CONSTRUCTION OF BOUNDARY WALL AT DEURAM BORA LP SCHOOL1 |
Roof laid |
-
latitude : 26.71631664
Longitude : 94.20688257
file name : Image_21112023125155966.png
|
2023-11-21 12:51:56.037944 |
61 |
66786499 |
CONSTRUCTION OF BOUNDARY WALL AT DEURAM BORA LP SCHOOL |
179050 |
CONSTRUCTION OF BOUNDARY WALL AT DEURAM BORA LP SCHOOL1 |
Plinth level |
-
latitude : 26.7007003
Longitude : 94.2553624
file name : Image_29082023121202908.png
|
2023-08-29 12:12:02.971264 |
62 |
66786499 |
CONSTRUCTION OF BOUNDARY WALL AT DEURAM BORA LP SCHOOL |
179050 |
CONSTRUCTION OF BOUNDARY WALL AT DEURAM BORA LP SCHOOL1 |
Completion of work |
-
latitude : 26.69786273
Longitude : 94.25002892
file name : Image_06062023111731152.png
|
2023-06-06 11:17:31.21259 |
63 |
66786829 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.69401825
Longitude : 94.2507897
file name : Image_12042023103746390.png
|
2023-04-12 10:37:46.460662 |
64 |
65456760 |
Creation of drainage channel for management of grey water |
50000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.71668656
Longitude : 94.21166976
file name : Image_23112023112658986.png
|
2023-11-23 11:26:59.064048 |
65 |
65456760 |
Creation of drainage channel for management of grey water |
50000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.71683917
Longitude : 94.21197909
file name : Image_11112022112450677.png
|
2022-11-11 11:24:50.769162 |
66 |
87503109 |
CONSTRUCTION OF DUSTBIN REQUIRED FOR PUBLIC PLACES IN ALL VILLAGES FOR MCF |
120000 |
CONSTRUCTION OF DUSTBIN REQUIRED FOR PUBLIC PLACES IN ALL VILLAGES FOR MCF1 |
Completion of work |
-
latitude : 26.7074877
Longitude : 94.2364279
file name : Image_04022024103543166.png
|
2024-02-04 10:35:43.225174 |
67 |
87502999 |
REPAIRING OF UJANI KARANGA JONIA KALAKRISHTI KENDRA |
120000 |
REPAIRING OF UJANI KARANGA JONIA KALAKRISHTI KENDRA1 |
Plinth level |
-
latitude : 26.7079836
Longitude : 94.2328663
file name : Image_29012024113349280.png
|
2024-01-29 11:33:49.366965 |
68 |
87502999 |
REPAIRING OF UJANI KARANGA JONIA KALAKRISHTI KENDRA |
120000 |
REPAIRING OF UJANI KARANGA JONIA KALAKRISHTI KENDRA1 |
Completion of work |
-
latitude : 26.68896544
Longitude : 94.24491506
file name : Image_31102023103225634.png
|
2023-10-31 10:32:25.707091 |
69 |
95260371 |
EARTHWORK AND GRAVELLING AT LATE BORDEBESWAR BORA |
55000 |
EARTHWORK AND GRAVELLING AT LATE BORDEBESWAR BORA1 |
Completion of work |
-
latitude : 26.7074055,26.7074055
Longitude : 94.2364826,94.2364826
file name : Image_26042024144953939.png
|
2024-04-26 14:49:54.01103 |
70 |
95258322 |
CONSTRUCTION OF 02 NOS SILAPHALAKAN AT 55 NO KARANGA GP |
55000 |
CONSTRUCTION OF 02 NOS SILAPHALAKAN AT 55 NO KARANGA GP1 |
Plinth level |
-
latitude : 26.7074264
Longitude : 94.2364568
file name : Image_25052024114639511.png
|
2024-05-25 11:46:39.572253 |
71 |
95258322 |
CONSTRUCTION OF 02 NOS SILAPHALAKAN AT 55 NO KARANGA GP |
55000 |
CONSTRUCTION OF 02 NOS SILAPHALAKAN AT 55 NO KARANGA GP1 |
Completion of work |
-
latitude : 26.7074223
Longitude : 94.2364733
file name : Image_26042024131957141.png
|
2024-04-26 13:19:57.209676 |
72 |
66786780 |
Construction of toilets in public institutions |
30000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.7080266
Longitude : 94.2326194
file name : Image_06052024132402857.png
|
2024-05-06 13:24:02.923806 |
73 |
66786780 |
Construction of toilets in public institutions |
30000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.70606963
Longitude : 94.24089824
file name : Image_01082023135626398.png
|
2023-08-01 13:56:26.476094 |
74 |
87503409 |
CONSTRUCTION OF BOUNDARY WALL AT RAIDANG KUMAR GAON ME SCHOOL |
120000 |
CONSTRUCTION OF BOUNDARY WALL AT RAIDANG KUMAR GAON ME SCHOOL1 |
Plinth level |
-
latitude : 26.7074548
Longitude : 94.2364515
file name : Image_25042024161356943.png
|
2024-04-25 16:13:57.010885 |
75 |
87503409 |
CONSTRUCTION OF BOUNDARY WALL AT RAIDANG KUMAR GAON ME SCHOOL |
120000 |
CONSTRUCTION OF BOUNDARY WALL AT RAIDANG KUMAR GAON ME SCHOOL1 |
Completion of work |
-
latitude : 26.6909506
Longitude : 94.2601535
file name : Image_23112023115153550.png
|
2023-11-23 11:51:53.623568 |
76 |
87503528 |
REPARING OF NAPAMUA LP SCHOOL(PH-2) |
126400 |
REPARING OF NAPAMUA LP SCHOOL(PH-2)1 |
Plinth level |
-
latitude : 26.7605877
Longitude : 94.2120501
file name : Image_25052024104043099.png
|
2024-05-25 10:40:43.157762 |
77 |
87503528 |
REPARING OF NAPAMUA LP SCHOOL(PH-2) |
126400 |
REPARING OF NAPAMUA LP SCHOOL(PH-2)1 |
Completion of work |
-
latitude : 26.70103777
Longitude : 94.25463787
file name : Image_25012024144625581.png
|
2024-01-25 14:46:25.645863 |
78 |
95259370 |
PROVISION FOR ELECTRICITY BILL FOR GP OFFICE AND ADMIN |
31129 |
PROVISION FOR ELECTRICITY BILL FOR GP OFFICE AND ADMIN1 |
Plinth level |
-
latitude : 26.7074258
Longitude : 94.236457
file name : Image_25052024114712667.png
|
2024-05-25 11:47:12.741084 |
79 |
95259370 |
PROVISION FOR ELECTRICITY BILL FOR GP OFFICE AND ADMIN |
31129 |
PROVISION FOR ELECTRICITY BILL FOR GP OFFICE AND ADMIN1 |
Completion of work |
-
latitude : 26.7072685
Longitude : 94.2366579
file name : Image_26042024132025016.png
|
2024-04-26 13:20:25.103736 |
80 |
87503049 |
LAND DEVELOPMENT AT PUB KARANGA ME SCHOOL |
151400 |
LAND DEVELOPMENT AT PUB KARANGA ME SCHOOL1 |
Plinth level |
-
latitude : 26.7605877,26.7605877
Longitude : 94.2120501,94.2120501
file name : Image_25052024112536067.png
|
2024-05-25 11:25:36.135728 |
81 |
87503049 |
LAND DEVELOPMENT AT PUB KARANGA ME SCHOOL |
151400 |
LAND DEVELOPMENT AT PUB KARANGA ME SCHOOL1 |
Completion of work |
-
latitude : 26.70746,26.70746
Longitude : 94.2364491,94.2364491
file name : Image_26122023143232651.png
|
2023-12-26 14:32:32.720474 |
82 |
87503255 |
REPAIRING OF NAPAMUA COMMUNITY HALL |
75000 |
REPAIRING OF NAPAMUA COMMUNITY HALL1 |
Plinth level |
-
latitude : 26.7605877
Longitude : 94.2120501
file name : Image_25052024112027313.png
|
2024-05-25 11:20:27.378382 |
83 |
87503255 |
REPAIRING OF NAPAMUA COMMUNITY HALL |
75000 |
REPAIRING OF NAPAMUA COMMUNITY HALL1 |
Completion of work |
-
latitude : 26.7241713
Longitude : 94.21267949
file name : Image_10112023120400456.png
|
2023-11-10 12:04:00.515041 |
84 |
87503701 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.7073546
Longitude : 94.2365031
file name : Image_28062024142013491.png
|
2024-06-28 14:20:13.568088 |
85 |
87503701 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.7074668
Longitude : 94.2364415
file name : Image_12012024125522885.png
|
2024-01-12 12:55:22.949139 |
86 |
66786431 |
CONSTRUCTION OF AGRIBUNDH CULVERT AT ALL GP |
200000 |
CONSTRUCTION OF AGRIBUNDH CULVERT AT ALL GP1 |
Plinth level |
-
latitude : 26.71930865,26.71930865
Longitude : 94.20789033,94.20789033
file name : Image_24092024133934981.png
|
2024-09-24 13:39:35.050041 |
87 |
66786431 |
CONSTRUCTION OF AGRIBUNDH CULVERT AT ALL GP |
200000 |
CONSTRUCTION OF AGRIBUNDH CULVERT AT ALL GP1 |
Completion of work |
-
latitude : 26.68168893,26.68168893
Longitude : 94.26520685,94.26520685
file name : Image_01082023140654802.png
|
2023-08-01 14:06:54.869964 |
88 |
87503152 |
REPAIRING OF UJANI KEBANG GAON KALAKRISHTI KENDRA |
70000 |
REPAIRING OF UJANI KEBANG GAON KALAKRISHTI KENDRA1 |
Plinth level |
-
latitude : 26.70264711
Longitude : 94.23586129
file name : Image_24092024143358520.png
|
2024-09-24 14:33:58.580014 |
89 |
87503152 |
REPAIRING OF UJANI KEBANG GAON KALAKRISHTI KENDRA |
70000 |
REPAIRING OF UJANI KEBANG GAON KALAKRISHTI KENDRA1 |
Completion of work |
-
latitude : 26.70122779
Longitude : 94.25454421
file name : Image_25012024145850326.png
|
2024-01-25 14:58:50.399227 |