1 |
10510946 |
Construction of Cycle Stand at Gp office |
150000 |
Sheds1 |
25% |
-
latitude : 26.71144964
Longitude : 94.11520919
file name : Image_03012019114459462.png
|
2019-01-03 11:44:59.743101 |
2 |
21055526 |
CONSTRUCTION OF WEAVING CENTRE AT GP OFFICE |
550000 |
Mahila Mandals1 |
25% |
-
latitude : 26.71159762
Longitude : 94.11484124
file name : Image_12022019112058877.png
|
2019-02-12 11:20:58.936204 |
3 |
5718925 |
Construction of Running water at Gp Office |
100000 |
Borewell1 |
In Progress |
-
latitude : 26.71133216
Longitude : 94.11515771
file name : Image_03012019114453504.png
|
2019-01-03 11:44:53.796275 |
4 |
10510263 |
Construction of Boundary wall of community hall at Gp office |
200000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 26.71129558
Longitude : 94.11494381
file name : Image_03012019114503567.png
|
2019-01-03 11:45:03.845722 |
5 |
32805367 |
REPAIRING OF SANITATION AND RUNNING WATER SYSTEM OF GAON PANCHAYAT OFFICE |
210000 |
Toilet1 |
25% |
-
latitude : 26.71127558
Longitude : 94.11515964
file name : Image_28072020143901990.png
|
2020-07-28 14:39:02.637418 |
6 |
43834561 |
CONSTRUCTION OF ROAD FROM AJAN AMLOKHI TOLOR TO CHALIKHOWA CONNECTING PATH(PH-I) |
496603 |
CONSTRUCTION OF ROAD FROM AJAN AMLOKHI TOLOR TO CHALIKHOWA CONNECTING PATH(PH-I)1 |
Earth Work |
-
latitude : 26.71149725,26.71149725
Longitude : 94.11531712,94.11531712
file name : Image_13112020133853416.png
|
2020-11-13 13:38:58.254654 |
7 |
43834614 |
CONSTRUCTION OF WATER RESERVIOUR AT DOHOTIA GIRLS HIGH SCHOOL |
140000 |
CONSTRUCTION OF WATER RESERVIOUR AT DOHOTIA GIRLS HIGH SCHOOL1 |
In Progress |
-
latitude : 26.71149725
Longitude : 94.11531712
file name : Image_13112020134645789.png
|
2020-11-13 13:46:50.615105 |
8 |
43834694 |
REPAIRING OF AJAN GAON SANJUKTA YUBA SANGHA |
150000 |
REPAIRING OF AJAN GAON SANJUKTA YUBA SANGHA1 |
25% |
-
latitude : 26.71149725
Longitude : 94.11531712
file name : Image_13112020155951568.png
|
2020-11-13 15:59:56.41984 |
9 |
43761572 |
CONSTRUCTION OF ROAD FROM PANICHAKUA TURON TO GP OFFICE CONNECTING PATH (PHASE-II) |
200000 |
CONSTRUCTION OF ROAD FROM PANICHAKUA TURON TO GP OFFICE CONNECTING PATH (PHASE-II)1 |
Earth Work |
-
latitude : 26.71149725,26.71149725
Longitude : 94.11531712,94.11531712
file name : Image_13112020114828957.png
|
2020-11-13 11:48:33.765793 |
10 |
43762223 |
CONSTRUCTION OF FEVER BLOCK AT LOHPOHIA TO SATOICHUK CONNECTING PATH |
500000 |
CONSTRUCTION OF FEVER BLOCK AT LOHPOHIA TO SATOICHUK CONNECTING PATH1 |
Earth Work |
-
latitude : 26.72151062,26.72151062
Longitude : 94.1229559,94.1229559
file name : Image_09122020141832622.png
|
2020-12-09 14:18:32.682211 |
11 |
43762134 |
CONSTRUCTION OF CULVERT AT HAZARIKA CHUK PATH |
90000 |
CONSTRUCTION OF CULVERT AT HAZARIKA CHUK PATH1 |
Substructure below GL |
-
latitude : 26.72119668,26.72119668
Longitude : 94.1219997,94.1219997
file name : Image_09122020140414168.png
|
2020-12-09 14:04:14.215643 |
12 |
43713342 |
CONSTRUCTION OF ROAD WITH FEBER BLOCK AT AMTOL PATH(Gaon Burah Path) |
800000 |
CONSTRUCTION OF ROAD WITH FEBER BLOCK AT AMTOL PATH(Gaon Burah Path)1 |
Earth Work |
-
latitude : 26.71822652,26.71822652
Longitude : 94.11434786,94.11434786
file name : Image_09122020135912385.png
|
2020-12-09 13:59:12.46513 |
13 |
43761615 |
CONSTRUCTION OF BOUNDARY WALL AND LAND DEVELOPMENT OF SURUJMUKHI KALAKRISTI KENDRA |
175507 |
CONSTRUCTION OF BOUNDARY WALL AND LAND DEVELOPMENT OF SURUJMUKHI KALAKRISTI KENDRA1 |
In Progress |
-
latitude : 26.719216
Longitude : 94.20807679
file name : Image_09122020134921877.png
|
2020-12-09 13:49:21.961922 |
14 |
43631513 |
CONSTRUCTION OF ROAD FROM NH37 TO MURABHOGA CONNECTING PATH WITH FEVER BLOCK (PHASE-I) |
460000 |
CONSTRUCTION OF ROAD FROM NH37 TO MURABHOGA CONNECTING PATH WITH FEVER BLOCK (PHASE-I)1 |
Earth Work |
-
latitude : 26.7130054,26.7130054
Longitude : 94.1038553,94.1038553
file name : Image_09122020135423805.png
|
2020-12-09 13:54:23.885916 |
15 |
43631363 |
CONSTRUCTION OF ROAD FROM NH37 TO JOGAGHAT CONNECTING PATH WITH FEVER BLOCK (PHASE-I) |
487157 |
CONSTRUCTION OF ROAD FROM NH37 TO JOGAGHAT CONNECTING PATH WITH FEVER BLOCK (PHASE-I)1 |
Earth Work |
-
latitude : 26.71149725,26.71149725
Longitude : 94.11531712,94.11531712
file name : Image_13112020130321723.png
|
2020-11-13 13:03:26.535703 |
16 |
43834257 |
REPAIRING OF CHORACHOWA OLD SABHAGHAR (GERELA NAMGHAR) |
150000 |
REPAIRING OF CHORACHOWA OLD SABHAGHAR (GERELA NAMGHAR)1 |
25% |
-
latitude : 26.71149725
Longitude : 94.11531712
file name : Image_13112020132227796.png
|
2020-11-13 13:22:32.619743 |
17 |
43834481 |
CONSTRUCTION OF TILIKIAM SOMONNOI PATH WITH FEVER BLOCK (PHASE-I) |
470000 |
CONSTRUCTION OF TILIKIAM SOMONNOI PATH WITH FEVER BLOCK (PHASE-I)1 |
Earth Work |
-
latitude : 26.72384268,26.72384083
Longitude : 94.13138694,94.13139393
file name : Image_13112020110635287.png
|
2020-11-13 11:06:40.08063 |
18 |
43834350 |
CONSTRUCTION OF PANICHAKUA ANGANWADI CENTRE NEAR BALIPUKHURI(PHASE-I) |
150000 |
CONSTRUCTION OF PANICHAKUA ANGANWADI CENTRE NEAR BALIPUKHURI(PHASE-I)1 |
25% |
-
latitude : 26.71149725
Longitude : 94.11531712
file name : Image_13112020125813489.png
|
2020-11-13 12:58:18.289941 |
19 |
50299484 |
CONSTRUCTION OF ROAD AT SARUHOOZ HEMKANTA BARUAH CHUK PATH |
258180 |
CONSTRUCTION OF ROAD AT SARUHOOZ HEMKANTA BARUAH CHUK PATH1 |
Roof laid |
-
latitude : 26.72205048,26.72205046
Longitude : 94.12473602,94.12473599
file name : Image_19102022110101352.png
|
2022-10-19 11:01:01.461716 |
20 |
50299484 |
CONSTRUCTION OF ROAD AT SARUHOOZ HEMKANTA BARUAH CHUK PATH |
258180 |
CONSTRUCTION OF ROAD AT SARUHOOZ HEMKANTA BARUAH CHUK PATH1 |
Plinth level |
-
latitude : 26.7244143,26.7220512
Longitude : 94.1224332,94.12479829
file name : Image_13092022115919185.png
|
2022-09-13 11:59:19.26885 |
21 |
50299484 |
CONSTRUCTION OF ROAD AT SARUHOOZ HEMKANTA BARUAH CHUK PATH |
258180 |
CONSTRUCTION OF ROAD AT SARUHOOZ HEMKANTA BARUAH CHUK PATH1 |
Completion of work |
-
latitude : 26.72195261,26.72200135
Longitude : 94.12467508,94.12470146
file name : Image_30082022110347595.png
|
2022-08-30 11:03:47.661901 |
22 |
50298112 |
CONSTRUCTION OF TOILET AND DRINKING WATER SYSTEM AT SANJUKTA YUBA SANGHA |
218189 |
CONSTRUCTION OF TOILET AND DRINKING WATER SYSTEM AT SANJUKTA YUBA SANGHA1 |
Roof laid |
-
latitude : 26.72559626
Longitude : 94.13686447
file name : Image_31122022141931152.png
|
2022-12-31 14:19:31.253442 |
23 |
50298112 |
CONSTRUCTION OF TOILET AND DRINKING WATER SYSTEM AT SANJUKTA YUBA SANGHA |
218189 |
CONSTRUCTION OF TOILET AND DRINKING WATER SYSTEM AT SANJUKTA YUBA SANGHA1 |
Plinth level |
-
latitude : 26.72552285
Longitude : 94.13686726
file name : Image_06102022113351235.png
|
2022-10-06 11:33:51.327456 |
24 |
50298112 |
CONSTRUCTION OF TOILET AND DRINKING WATER SYSTEM AT SANJUKTA YUBA SANGHA |
218189 |
CONSTRUCTION OF TOILET AND DRINKING WATER SYSTEM AT SANJUKTA YUBA SANGHA1 |
Completion of work |
-
latitude : 26.7254375
Longitude : 94.13688746
file name : Image_13072022144442393.png
|
2022-07-13 14:44:42.488852 |
25 |
65445828 |
REPAIRING OF AJAN CHALIKHOWA AWC |
50000 |
REPAIRING OF AJAN CHALIKHOWA AWC1 |
Roof laid |
-
latitude : 26.71984249
Longitude : 94.13647187
file name : Image_01022023111207841.png
|
2023-02-01 11:12:07.97163 |
26 |
65445828 |
REPAIRING OF AJAN CHALIKHOWA AWC |
50000 |
REPAIRING OF AJAN CHALIKHOWA AWC1 |
Plinth level |
-
latitude : 26.71985832
Longitude : 94.13642648
file name : Image_27122022112107993.png
|
2022-12-27 11:21:08.086989 |
27 |
65445828 |
REPAIRING OF AJAN CHALIKHOWA AWC |
50000 |
REPAIRING OF AJAN CHALIKHOWA AWC1 |
Completion of work |
-
latitude : 26.7198944
Longitude : 94.13624855
file name : Image_07122022125353196.png
|
2022-12-07 12:53:53.293166 |
28 |
65445658 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.7138479
Longitude : 94.12543838
file name : Image_13012023121010433.png
|
2023-01-13 12:10:10.559863 |
29 |
65445658 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.71396034
Longitude : 94.12497741
file name : Image_31122022135125086.png
|
2022-12-31 13:51:25.214231 |
30 |
65445658 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.71388504
Longitude : 94.1254652
file name : Image_07122022125617226.png
|
2022-12-07 12:56:17.309318 |
31 |
50310774 |
REPAIRING OF SANITATION AND TOILET AT 150 NO CHARINGIA LP SCHOOL |
45000 |
REPAIRING OF SANITATION AND TOILET AT 150 NO CHARINGIA LP SCHOOL1 |
Roof laid |
-
latitude : 26.72862822
Longitude : 94.14275506
file name : Image_08092022155049633.png
|
2022-09-08 15:50:49.730161 |
32 |
50310774 |
REPAIRING OF SANITATION AND TOILET AT 150 NO CHARINGIA LP SCHOOL |
45000 |
REPAIRING OF SANITATION AND TOILET AT 150 NO CHARINGIA LP SCHOOL1 |
Plinth level |
-
latitude : 26.72909256
Longitude : 94.14276553
file name : Image_11072022173000307.png
|
2022-07-11 17:30:00.386626 |
33 |
50310774 |
REPAIRING OF SANITATION AND TOILET AT 150 NO CHARINGIA LP SCHOOL |
45000 |
REPAIRING OF SANITATION AND TOILET AT 150 NO CHARINGIA LP SCHOOL1 |
Completion of work |
-
latitude : 26.72896098
Longitude : 94.14272675
file name : Image_05052022130704441.png
|
2022-05-05 13:07:04.543982 |
34 |
50298584 |
CONSTRUCTION OF DRIKING WATER SYSTEM AT DOHOTIA DURGA MANDIR |
90000 |
CONSTRUCTION OF DRIKING WATER SYSTEM AT DOHOTIA DURGA MANDIR1 |
Roof laid |
-
latitude : 26.71463306
Longitude : 94.12621264
file name : Image_14102022123803315.png
|
2022-10-14 12:38:03.450911 |
35 |
50298584 |
CONSTRUCTION OF DRIKING WATER SYSTEM AT DOHOTIA DURGA MANDIR |
90000 |
CONSTRUCTION OF DRIKING WATER SYSTEM AT DOHOTIA DURGA MANDIR1 |
Plinth level |
-
latitude : 26.71496764
Longitude : 94.12615721
file name : Image_13092022151147215.png
|
2022-09-13 15:11:47.303105 |
36 |
50298584 |
CONSTRUCTION OF DRIKING WATER SYSTEM AT DOHOTIA DURGA MANDIR |
90000 |
CONSTRUCTION OF DRIKING WATER SYSTEM AT DOHOTIA DURGA MANDIR1 |
Completion of work |
-
latitude : 26.71490094
Longitude : 94.12598644
file name : Image_13062022110600448.png
|
2022-06-13 11:06:00.522196 |
37 |
50311798 |
CONSTRUCTION OF DRINKING WATER SYSTEM AT TILIKIAM BRAHMIN GAON NEWSABHAGHAR |
155000 |
CONSTRUCTION OF DRINKING WATER SYSTEM AT TILIKIAM BRAHMIN GAON NEWSABHAGHAR 1 |
Roof laid |
-
latitude : 26.72072985
Longitude : 94.13101349
file name : Image_01022023113210047.png
|
2023-02-01 11:32:10.166956 |
38 |
50311798 |
CONSTRUCTION OF DRINKING WATER SYSTEM AT TILIKIAM BRAHMIN GAON NEWSABHAGHAR |
155000 |
CONSTRUCTION OF DRINKING WATER SYSTEM AT TILIKIAM BRAHMIN GAON NEWSABHAGHAR 1 |
Plinth level |
-
latitude : 26.72083808
Longitude : 94.13093736
file name : Image_23092022112245437.png
|
2022-09-23 11:22:45.520014 |
39 |
50311798 |
CONSTRUCTION OF DRINKING WATER SYSTEM AT TILIKIAM BRAHMIN GAON NEWSABHAGHAR |
155000 |
CONSTRUCTION OF DRINKING WATER SYSTEM AT TILIKIAM BRAHMIN GAON NEWSABHAGHAR 1 |
Completion of work |
-
latitude : 26.72075948
Longitude : 94.13091522
file name : Image_11072022171434508.png
|
2022-07-11 17:14:34.581209 |
40 |
50300967 |
REPAIRING OF 67 NO PANICHAKUA GP OFFICE phase 1 |
199191 |
REPAIRING OF 67 NO PANICHAKUA GP OFFICE phase 11 |
Roof laid |
-
latitude : 26.71156616
Longitude : 94.11526247
file name : Image_14102022125056294.png
|
2022-10-14 12:50:56.4111 |
41 |
50300967 |
REPAIRING OF 67 NO PANICHAKUA GP OFFICE phase 1 |
199191 |
REPAIRING OF 67 NO PANICHAKUA GP OFFICE phase 11 |
Plinth level |
-
latitude : 26.71159792
Longitude : 94.11521388
file name : Image_13092022124051001.png
|
2022-09-13 12:40:51.085597 |
42 |
50300967 |
REPAIRING OF 67 NO PANICHAKUA GP OFFICE phase 1 |
199191 |
REPAIRING OF 67 NO PANICHAKUA GP OFFICE phase 11 |
Completion of work |
-
latitude : 26.71151953
Longitude : 94.11535922
file name : Image_21062022171633455.png
|
2022-06-21 17:16:33.546755 |
43 |
65445906 |
DEVELOPMENT OF G.P OFFICE |
101580 |
DEVELOPMENT OF G.P OFFICE 1 |
Roof laid |
-
latitude : 26.71146035
Longitude : 94.11511579
file name : Image_07072023173537412.png
|
2023-07-07 17:35:37.522503 |
44 |
65445906 |
DEVELOPMENT OF G.P OFFICE |
101580 |
DEVELOPMENT OF G.P OFFICE 1 |
Plinth level |
-
latitude : 26.7114174
Longitude : 94.1151352
file name : Image_19042023150850278.png
|
2023-04-19 15:08:50.386806 |
45 |
65445906 |
DEVELOPMENT OF G.P OFFICE |
101580 |
DEVELOPMENT OF G.P OFFICE 1 |
Completion of work |
-
latitude : 26.7096063
Longitude : 94.113162
file name : Image_07122022142933577.png
|
2022-12-07 14:29:33.660176 |
46 |
65445776 |
REPAIRING OF SARUHOOJ LP SCHOOL |
188000 |
REPAIRING OF SARUHOOJ LP SCHOOL1 |
Roof laid |
-
latitude : 26.71958491
Longitude : 94.12230716
file name : Image_01062023121727960.png
|
2023-06-01 12:17:28.068704 |
47 |
65445776 |
REPAIRING OF SARUHOOJ LP SCHOOL |
188000 |
REPAIRING OF SARUHOOJ LP SCHOOL1 |
Plinth level |
-
latitude : 26.71964224
Longitude : 94.12237091
file name : Image_01022023141548586.png
|
2023-02-01 14:15:48.687695 |
48 |
65445776 |
REPAIRING OF SARUHOOJ LP SCHOOL |
188000 |
REPAIRING OF SARUHOOJ LP SCHOOL1 |
Completion of work |
-
latitude : 26.71965176
Longitude : 94.12243286
file name : Image_02012023163926669.png
|
2023-01-02 16:39:26.790497 |
49 |
65445878 |
CONST OF CHILDREN PARK AT PULUNGABARI FIELD |
220000 |
CONST OF CHILDREN PARK AT PULUNGABARI FIELD1 |
Roof laid |
-
latitude : 26.71262452
Longitude : 94.1156052
file name : Image_07072023174251181.png
|
2023-07-07 17:42:51.284189 |
50 |
65445878 |
CONST OF CHILDREN PARK AT PULUNGABARI FIELD |
220000 |
CONST OF CHILDREN PARK AT PULUNGABARI FIELD1 |
Plinth level |
-
latitude : 26.71393391
Longitude : 94.1162985
file name : Image_22032023113438237.png
|
2023-03-22 11:34:38.329283 |
51 |
65445878 |
CONST OF CHILDREN PARK AT PULUNGABARI FIELD |
220000 |
CONST OF CHILDREN PARK AT PULUNGABARI FIELD1 |
Completion of work |
-
latitude : 26.71262331
Longitude : 94.11545184
file name : Image_09012023155721934.png
|
2023-01-09 15:57:22.060635 |
52 |
65445998 |
Construction of toilets in public institutions |
37153 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.7150463
Longitude : 94.1258963
file name : Image_01062023120648984.png
|
2023-06-01 12:06:49.128608 |
53 |
65445998 |
Construction of toilets in public institutions |
37153 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.7150243
Longitude : 94.1258957
file name : Image_22032023112828797.png
|
2023-03-22 11:28:28.898645 |
54 |
65445998 |
Construction of toilets in public institutions |
37153 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.71487009
Longitude : 94.12587867
file name : Image_03022023105704351.png
|
2023-02-03 10:57:04.498558 |
55 |
66786165 |
Construction of toilets in public institutions |
124225 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.718818333333335
Longitude : 94.119985
file name : Image_11012024120833548.png
|
2024-01-11 12:08:33.650491 |
56 |
66786165 |
Construction of toilets in public institutions |
124225 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.71891333333333
Longitude : 94.12031666666665
file name : Image_27102023162935807.png
|
2023-10-27 16:29:35.917993 |
57 |
66786165 |
Construction of toilets in public institutions |
124225 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.71880666666667
Longitude : 94.12035333333333
file name : Image_04082023162412852.png
|
2023-08-04 16:24:12.94579 |
58 |
65446084 |
PROVISION FOR ELECTRICITY BILL AND ADMIN EXPN |
30000 |
PROVISION FOR ELECTRICITY BILL AND ADMIN EXPN1 |
Roof laid |
-
latitude : 26.711220000000004
Longitude : 94.11474333333332
file name : Image_26082023113038022.png
|
2023-08-26 11:30:38.111861 |
59 |
65446084 |
PROVISION FOR ELECTRICITY BILL AND ADMIN EXPN |
30000 |
PROVISION FOR ELECTRICITY BILL AND ADMIN EXPN1 |
Plinth level |
-
latitude : 26.711460000000002
Longitude : 94.11511833333334
file name : Image_26082023111631028.png
|
2023-08-26 11:16:31.113298 |
60 |
65446084 |
PROVISION FOR ELECTRICITY BILL AND ADMIN EXPN |
30000 |
PROVISION FOR ELECTRICITY BILL AND ADMIN EXPN1 |
Completion of work |
-
latitude : 26.71153975
Longitude : 94.11529523
file name : Image_22112022125038067.png
|
2022-11-22 12:50:38.150703 |
61 |
65445802 |
REPAIRING OF PANICHAKUA AWC |
50000 |
REPAIRING OF PANICHAKUA AWC1 |
Roof laid |
-
latitude : 26.71296
Longitude : 94.105795
file name : Image_17102023130118453.png
|
2023-10-17 13:01:18.547845 |
62 |
65445802 |
REPAIRING OF PANICHAKUA AWC |
50000 |
REPAIRING OF PANICHAKUA AWC1 |
Plinth level |
-
latitude : 26.713025000000002
Longitude : 94.10570833333334
file name : Image_17102023123436932.png
|
2023-10-17 12:34:37.030243 |
63 |
65445802 |
REPAIRING OF PANICHAKUA AWC |
50000 |
REPAIRING OF PANICHAKUA AWC1 |
Completion of work |
-
latitude : 26.71295635
Longitude : 94.10571831
file name : Image_07122022145426725.png
|
2022-12-07 14:54:26.846263 |
64 |
65445606 |
Construction of toilets in public institutions |
154000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.718951666666666
Longitude : 94.11867
file name : Image_26082023141630158.png
|
2023-08-26 14:16:30.240951 |
65 |
65445606 |
Construction of toilets in public institutions |
154000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.71906058
Longitude : 94.11863989
file name : Image_01062023131725095.png
|
2023-06-01 13:17:25.200483 |
66 |
65445606 |
Construction of toilets in public institutions |
154000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.71902869
Longitude : 94.11879433
file name : Image_14022023152514165.png
|
2023-02-14 15:25:14.260693 |
67 |
66786602 |
REPAIRING OF DAHOTIA MV SCHOOL |
271700 |
REPAIRING OF DAHOTIA MV SCHOOL1 |
Roof laid |
-
latitude : 26.714139999999997
Longitude : 94.12562166666666
file name : Image_28082023134938496.png
|
2023-08-28 13:49:38.598438 |
68 |
66786602 |
REPAIRING OF DAHOTIA MV SCHOOL |
271700 |
REPAIRING OF DAHOTIA MV SCHOOL1 |
Plinth level |
-
latitude : 26.714000000000002
Longitude : 94.12559666666667
file name : Image_03082023201933080.png
|
2023-08-03 20:19:33.174325 |
69 |
66786602 |
REPAIRING OF DAHOTIA MV SCHOOL |
271700 |
REPAIRING OF DAHOTIA MV SCHOOL1 |
Completion of work |
-
latitude : 26.71406212
Longitude : 94.12561339
file name : Image_19052023152420242.png
|
2023-05-19 15:24:20.349619 |
70 |
87436214 |
REPAIRING OF SARUHOOJ AWC |
50000 |
REPAIRING OF SARUHOOJ AWC1 |
Roof laid |
-
latitude : 26.719659999999998
Longitude : 94.12249333333332
file name : Image_18112023134343308.png
|
2023-11-18 13:43:43.259272 |
71 |
87436214 |
REPAIRING OF SARUHOOJ AWC |
50000 |
REPAIRING OF SARUHOOJ AWC1 |
Plinth level |
-
latitude : 26.719620000000003
Longitude : 94.12238666666666
file name : Image_27102023141633698.png
|
2023-10-27 14:16:33.793428 |
72 |
87436214 |
REPAIRING OF SARUHOOJ AWC |
50000 |
REPAIRING OF SARUHOOJ AWC1 |
Completion of work |
-
latitude : 26.719651666666664
Longitude : 94.12244666666666
file name : Image_17102023111833166.png
|
2023-10-17 11:18:33.267534 |
73 |
66786309 |
Construction of toilets in public institutions |
203300 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.71977
Longitude : 94.13495833333333
file name : Image_11012024115435908.png
|
2024-01-11 11:54:35.980002 |
74 |
66786309 |
Construction of toilets in public institutions |
203300 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.719836666666666
Longitude : 94.13516999999999
file name : Image_27102023162939609.png
|
2023-10-27 16:29:39.722618 |
75 |
66786309 |
Construction of toilets in public institutions |
203300 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.71951558
Longitude : 94.13522221
file name : Image_03062023132537498.png
|
2023-06-03 13:25:37.595617 |
76 |
66787232 |
ADJUSTMENT PLAN OF UNTIED GRANT |
292000 |
ADJUSTMENT PLAN OF UNTIED GRANT1 |
Completion of work |
-
latitude : 26.714201666666668
Longitude : 94.125515
file name : Image_12012024123432451.png
|
2024-01-12 12:34:32.555939 |
77 |
66786062 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.713348333333336
Longitude : 94.100835
file name : Image_18122023143615907.png
|
2023-12-18 14:36:22.096295 |
78 |
66786062 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.71345615
Longitude : 94.10068063
file name : Image_18042023161020139.png
|
2023-04-18 16:10:20.243159 |
79 |
66786497 |
REPAIRING OF GP OFFICE AUDITORIUM |
285950 |
REPAIRING OF GP OFFICE AUDITORIUM1 |
Roof laid |
-
latitude : 26.711403333333337
Longitude : 94.11512833333333
file name : Image_10012024163020298.png
|
2024-01-10 16:30:20.424167 |
80 |
66786497 |
REPAIRING OF GP OFFICE AUDITORIUM |
285950 |
REPAIRING OF GP OFFICE AUDITORIUM1 |
Plinth level |
-
latitude : 26.711413333333333
Longitude : 94.115055
file name : Image_18112023123707833.png
|
2023-11-18 12:37:07.937048 |
81 |
66786497 |
REPAIRING OF GP OFFICE AUDITORIUM |
285950 |
REPAIRING OF GP OFFICE AUDITORIUM1 |
Completion of work |
-
latitude : 26.711460000000002
Longitude : 94.11489166666667
file name : Image_03082023113635975.png
|
2023-08-03 11:36:36.08057 |
82 |
87435962 |
CONST OF CHILDREN PARK AT DAHOTIA MV SCHOOL |
230250 |
CONST OF CHILDREN PARK AT DAHOTIA MV SCHOOL1 |
Roof laid |
-
latitude : 26.71435166666667,26.714345
Longitude : 94.12557,94.12558166666668
file name : Image_08032024114834361.png
|
2024-03-08 11:48:34.49387 |
83 |
87435962 |
CONST OF CHILDREN PARK AT DAHOTIA MV SCHOOL |
230250 |
CONST OF CHILDREN PARK AT DAHOTIA MV SCHOOL1 |
Plinth level |
-
latitude : 26.714198333333336,26.714258333333337
Longitude : 94.12555166666668,94.12563999999999
file name : Image_10012024120807977.png
|
2024-01-10 12:08:08.090817 |
84 |
87435962 |
CONST OF CHILDREN PARK AT DAHOTIA MV SCHOOL |
230250 |
CONST OF CHILDREN PARK AT DAHOTIA MV SCHOOL1 |
Completion of work |
-
latitude : 26.71390333333333,26.714121666666664
Longitude : 94.12548666666667,94.12544833333335
file name : Image_11122023121320108.png
|
2023-12-11 12:13:20.204515 |
85 |
87434804 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.71907666666667
Longitude : 94.11877166666666
file name : Image_18122023154350639.png
|
2023-12-18 15:43:50.757638 |
86 |
87434804 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.719081666666664
Longitude : 94.11887
file name : Image_18122023114702584.png
|
2023-12-18 11:47:02.680375 |
87 |
87434804 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.719224999999998
Longitude : 94.11892666666667
file name : Image_31102023105510591.png
|
2023-10-31 10:55:10.682161 |
88 |
87436138 |
CONST OF CHILDREN PARK AT AJAN BAMUN GAON |
280250 |
CONST OF CHILDREN PARK AT AJAN BAMUN GAON1 |
Plinth level |
-
latitude : 26.719518333333333,26.719545
Longitude : 94.13655666666666,94.13647
file name : Image_13112024105526381.png
|
2024-11-13 10:55:26.473955 |
89 |
87436138 |
CONST OF CHILDREN PARK AT AJAN BAMUN GAON |
280250 |
CONST OF CHILDREN PARK AT AJAN BAMUN GAON1 |
Completion of work |
-
latitude : 26.719591666666663,26.719648333333332
Longitude : 94.13655833333333,94.13652666666667
file name : Image_08072024140825149.png
|
2024-07-08 14:08:25.243377 |
90 |
108068126 |
Construction of roads |
566200 |
Construction of roads1 |
Completion of work |
-
latitude : 26.711461666666665,26.711479999999998
Longitude : 94.11541000000001,94.11539666666667
file name : Image_26122024162407119.png
|
2024-12-26 16:24:07.206165 |