1 |
10520148 |
CONST OF BOUNDARY WALL AT GP OFFICE |
80000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 26.8042948
Longitude : 94.3389782
file name : Image_29012019112752244.png
|
2019-01-29 11:27:52.442256 |
2 |
5765346 |
CONSTRACTION OF BOUNDARY WALL AT DAKUKURACHARA HARI MANDIR |
70000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 26.83717655
Longitude : 94.34831301
file name : Image_29012019121156019.png
|
2019-01-29 12:11:56.114483 |
3 |
5765346 |
CONSTRACTION OF BOUNDARY WALL AT DAKUKURACHARA HARI MANDIR |
70000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 26.83725023
Longitude : 94.34828838
file name : Image_03062019133359122.png
|
2019-06-03 13:33:59.210219 |
4 |
44104785 |
Installation of 5 nos Street Light at Kakajan Kabarstan |
129000 |
Installation of 5 nos Street Light at Kakajan Kabarstan1 |
25% |
-
latitude : 26.8100103
Longitude : 94.35924163
file name : Image_17112020111307508.png
|
2020-11-17 11:13:07.587036 |
5 |
44104785 |
Installation of 5 nos Street Light at Kakajan Kabarstan |
129000 |
Installation of 5 nos Street Light at Kakajan Kabarstan2 |
25% |
-
latitude : 26.81001401
Longitude : 94.35920247
file name : Image_17112020111357456.png
|
2020-11-17 11:13:57.529765 |
6 |
44104785 |
Installation of 5 nos Street Light at Kakajan Kabarstan |
129000 |
Installation of 5 nos Street Light at Kakajan Kabarstan3 |
25% |
-
latitude : 26.81001393
Longitude : 94.35920043
file name : Image_17112020111512590.png
|
2020-11-17 11:15:12.669039 |
7 |
44104785 |
Installation of 5 nos Street Light at Kakajan Kabarstan |
129000 |
Installation of 5 nos Street Light at Kakajan Kabarstan4 |
25% |
-
latitude : 26.80999408
Longitude : 94.35918643
file name : Image_17112020111607144.png
|
2020-11-17 11:16:07.220801 |
8 |
44103410 |
Construction of Bongaon Major Chuk Path by Pavers Block |
603500 |
Construction of Bongaon Major Chuk Path by Pavers Block1 |
Earth Work |
-
latitude : 26.82816781,26.82816837
Longitude : 94.34868503,94.34868495
file name : Image_17112020132139376.png
|
2020-11-17 13:21:39.478644 |
9 |
44103410 |
Construction of Bongaon Major Chuk Path by Pavers Block |
603500 |
Construction of Bongaon Major Chuk Path by Pavers Block1 |
Earth Work |
-
latitude : 26.82816781,26.82816837
Longitude : 94.34868503,94.34868495
file name : Image_17112020132143334.png
|
2020-11-17 13:21:43.416584 |
10 |
44104765 |
Construction of Bongaon Club PH-II |
150000 |
Construction of Bongaon Club PH-II1 |
25% |
-
latitude : 26.82624565
Longitude : 94.34941828
file name : Image_17112020122849251.png
|
2020-11-17 12:28:49.332689 |
11 |
44103483 |
Construction of Boundary Wall at Bamkukurachara Harimondir |
228700 |
Construction of Boundary Wall at Bamkukurachara Harimondir1 |
In Progress |
-
latitude : 26.8113297
Longitude : 94.34505076
file name : Image_12112020145415123.png
|
2020-11-12 14:54:19.552707 |
12 |
44328538 |
Construction of Monaipul Mazid boundary wall |
200000 |
Construction of Monaipul Mazid boundary wall1 |
In Progress |
-
latitude : 26.81287664
Longitude : 94.37167259
file name : Image_17112020114443519.png
|
2020-11-17 11:44:43.629849 |
13 |
44328573 |
Construction of Puroni Gaon Rajohua Pukhuri Boundary wall |
242000 |
Construction of Puroni Gaon Rajohua Pukhuri Boundary wall1 |
In Progress |
-
latitude : 26.8133329
Longitude : 94.3639316
file name : Image_17112020114939556.png
|
2020-11-17 11:49:39.649098 |
14 |
44328924 |
Construction of Anganwadi Kendra Building at 8 no Ward |
300000 |
Construction of Anganwadi Kendra Building at 8 no Ward1 |
25% |
-
latitude : 26.81527668
Longitude : 94.36708452
file name : Image_17112020113131856.png
|
2020-11-17 11:31:31.939739 |
15 |
44103457 |
Construction of Gaon Burha Path at 5No Ward by Pavers block |
494000 |
Construction of Gaon Burha Path at 5No Ward by Pavers block1 |
Earth Work |
-
latitude : 26.83723474,26.83719596
Longitude : 94.34741171,94.34742891
file name : Image_17112020123959527.png
|
2020-11-17 12:39:59.61099 |
16 |
44104785 |
Installation of 5 nos Street Light at Kakajan Kabarstan |
129000 |
Installation of 5 nos Street Light at Kakajan Kabarstan5 |
25% |
-
latitude : 26.81003656
Longitude : 94.35919969
file name : Image_17112020111716565.png
|
2020-11-17 11:17:16.644547 |
17 |
44104750 |
Construction of RCC Pavers Block at Dagaon Photik Chuck Path |
204500 |
Construction of RCC Pavers Block at Dagaon Photik Chuck Path1 |
Earth Work |
-
latitude : 26.814883,26.81487661
Longitude : 94.36712081,94.36710139
file name : Image_17112020112904902.png
|
2020-11-17 11:29:04.984571 |
18 |
44104714 |
Construction of RCC Pavers Block Path at Bamkukurachara Saranmedhi Path |
640000 |
Construction of RCC Pavers Block Path at Bamkukurachara Saranmedhi Path1 |
Earth Work |
-
latitude : 26.80557497,26.80557522,26.80557544,26.80559032
Longitude : 94.34675686,94.34675677,94.34675677,94.34677632
file name : Image_12112020150348189.png
|
2020-11-12 15:03:52.63414 |
19 |
44103497 |
Construction of RCC Pavers Block path at 37No. NH to Natun Bongaon Path |
604000 |
Construction of RCC Pavers Block path at 37No. NH to Natun Bongaon Path1 |
Earth Work |
-
latitude : 26.80772219,26.80774251
Longitude : 94.3512154,94.35122166
file name : Image_17112020121558838.png
|
2020-11-17 12:15:58.906991 |
20 |
44103497 |
Construction of RCC Pavers Block path at 37No. NH to Natun Bongaon Path |
604000 |
Construction of RCC Pavers Block path at 37No. NH to Natun Bongaon Path1 |
Earth Work |
-
latitude : 26.80769602,26.80771205
Longitude : 94.35118998,94.35118697
file name : Image_17112020121617278.png
|
2020-11-17 12:16:17.354461 |
21 |
44328991 |
Construction of Boundary Wall at Komar Gaom Natun Masjid |
121570 |
Construction of Boundary Wall at Komar Gaom Natun Masjid 1 |
In Progress |
-
latitude : 26.82103893
Longitude : 94.36216614
file name : Image_17112020115816775.png
|
2020-11-17 11:58:16.872022 |
22 |
44328312 |
Construction of Boundary wall at 5 no ward Somsan |
230000 |
Construction of Boundary wall at 5 no ward Somsan1 |
In Progress |
-
latitude : 26.83411516
Longitude : 94.34974773
file name : Image_17112020124917734.png
|
2020-11-17 12:49:17.843164 |
23 |
44328874 |
Construction Of Medhi Sonarichuk Path by Pavers Block |
650000 |
Construction Of Medhi Sonarichuk Path by Pavers Block1 |
Earth Work |
-
latitude : 26.81709398,26.81709233,26.81709042
Longitude : 94.36287983,94.36288026,94.36288127
file name : Image_17112020115215541.png
|
2020-11-17 11:52:15.638271 |
24 |
44328720 |
Construction of Water Reserver and Drinking water facility at 4 no Ward Nmaghar |
160810 |
Construction of Water Reserver and Drinking water facility at 4 no Ward Nmaghar1 |
In Progress |
-
latitude : 26.83471022
Longitude : 94.34767492
file name : Image_17112020132110085.png
|
2020-11-17 13:21:10.183895 |
25 |
44328807 |
Construction of Goria Ghoria Path of 10 no ward |
259580 |
Construction of Goria Ghoria Path of 10 no ward1 |
Earth Work |
-
latitude : 26.82194019,26.82194103
Longitude : 94.35063484,94.35063535
file name : Image_17112020132431285.png
|
2020-11-17 13:24:31.366679 |
26 |
52046633 |
GP AREA SENITIZATION |
87583 |
GP AREA SENITIZATION1 |
Completion of work |
-
latitude : 26.8045244
Longitude : 94.3391443
file name : Image_16072021104954832.png
|
2021-07-16 10:49:54.939325 |
27 |
68193604 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.81824
Longitude : 94.37444666666667
file name : Image_03082023152218919.png
|
2023-08-03 15:22:19.140634 |
28 |
68193604 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.818888333333334
Longitude : 94.37478833333334
file name : Image_03082023152147277.png
|
2023-08-03 15:21:47.3646 |
29 |
66756102 |
REPAIRING OF ANGANWARI CENTRE AT 2NO WARD |
120000 |
REPAIRING OF ANGANWARI CENTRE AT 2NO WARD1 |
Roof laid |
-
latitude : 26.808903333333333
Longitude : 94.34569666666667
file name : Image_28082023113442946.png
|
2023-08-28 11:34:43.033555 |
30 |
66756102 |
REPAIRING OF ANGANWARI CENTRE AT 2NO WARD |
120000 |
REPAIRING OF ANGANWARI CENTRE AT 2NO WARD1 |
Plinth level |
-
latitude : 26.8089
Longitude : 94.34558
file name : Image_25082023160251799.png
|
2023-08-25 16:02:51.904315 |
31 |
66756102 |
REPAIRING OF ANGANWARI CENTRE AT 2NO WARD |
120000 |
REPAIRING OF ANGANWARI CENTRE AT 2NO WARD1 |
Completion of work |
-
latitude : 26.808843333333336
Longitude : 94.34569666666667
file name : Image_15062023110624027.png
|
2023-06-15 11:06:24.119054 |
32 |
51260670 |
CONSTRUCTION OF LATRIN AND BATHROOM AT BAMKUKURACHARA HARIMANDIR |
200000 |
CONSTRUCTION OF LATRIN AND BATHROOM AT BAMKUKURACHARA HARIMANDIR1 |
Roof laid |
-
latitude : 26.81344166666667
Longitude : 94.34367166666668
file name : Image_06012024122738175.png
|
2024-01-06 12:27:38.255375 |
33 |
51260670 |
CONSTRUCTION OF LATRIN AND BATHROOM AT BAMKUKURACHARA HARIMANDIR |
200000 |
CONSTRUCTION OF LATRIN AND BATHROOM AT BAMKUKURACHARA HARIMANDIR1 |
Plinth level |
-
latitude : 26.813438333333337
Longitude : 94.34368333333332
file name : Image_06012024122526425.png
|
2024-01-06 12:25:26.503375 |
34 |
51260670 |
CONSTRUCTION OF LATRIN AND BATHROOM AT BAMKUKURACHARA HARIMANDIR |
200000 |
CONSTRUCTION OF LATRIN AND BATHROOM AT BAMKUKURACHARA HARIMANDIR1 |
Completion of work |
-
latitude : 26.813496666666666
Longitude : 94.34372333333334
file name : Image_28062023114616579.png
|
2023-06-28 11:46:16.680305 |
35 |
51260670 |
CONSTRUCTION OF LATRIN AND BATHROOM AT BAMKUKURACHARA HARIMANDIR |
200000 |
CONSTRUCTION OF LATRIN AND BATHROOM AT BAMKUKURACHARA HARIMANDIR1 |
Completion of work |
-
latitude : 26.814061666666664
Longitude : 94.34384333333334
file name : Image_15062023112056943.png
|
2023-06-15 11:20:57.552056 |
36 |
62549242 |
CONST OF LATRIN AND BATHROOM AT CHANGMAI NAMGHOR |
206000 |
CONST OF LATRIN AND BATHROOM AT CHANGMAI NAMGHOR1 |
Plinth level |
-
latitude : 26.80471
Longitude : 94.33895499999998
file name : Image_06012024130823977.png
|
2024-01-06 13:08:24.065789 |
37 |
62549242 |
CONST OF LATRIN AND BATHROOM AT CHANGMAI NAMGHOR |
206000 |
CONST OF LATRIN AND BATHROOM AT CHANGMAI NAMGHOR1 |
Completion of work |
-
latitude : 26.872761666666666
Longitude : 94.34029833333334
file name : Image_18012023114250759.png
|
2023-01-18 11:42:50.867832 |
38 |
51260430 |
CONSTRUCTION OF UJUKHANA AT KOMAR GAON MASJID AT 7 NO WARD |
182484 |
CONSTRUCTION OF UJUKHANA AT KOMAR GAON MASJID AT 7 NO WARD1 |
Roof laid |
-
latitude : 26.81877666666667
Longitude : 94.36277166666666
file name : Image_09022023104805747.png
|
2023-02-09 10:48:05.869913 |
39 |
51260430 |
CONSTRUCTION OF UJUKHANA AT KOMAR GAON MASJID AT 7 NO WARD |
182484 |
CONSTRUCTION OF UJUKHANA AT KOMAR GAON MASJID AT 7 NO WARD1 |
Plinth level |
-
latitude : 26.818894999999998
Longitude : 94.36276500000001
file name : Image_15102022170825142.png
|
2022-10-15 17:08:25.220962 |
40 |
51260430 |
CONSTRUCTION OF UJUKHANA AT KOMAR GAON MASJID AT 7 NO WARD |
182484 |
CONSTRUCTION OF UJUKHANA AT KOMAR GAON MASJID AT 7 NO WARD1 |
Plinth level |
-
latitude : 26.81877666666667
Longitude : 94.36279166666667
file name : Image_15102022170858377.png
|
2022-10-15 17:08:58.474652 |
41 |
51260430 |
CONSTRUCTION OF UJUKHANA AT KOMAR GAON MASJID AT 7 NO WARD |
182484 |
CONSTRUCTION OF UJUKHANA AT KOMAR GAON MASJID AT 7 NO WARD1 |
Completion of work |
-
latitude : 26.818714999999997
Longitude : 94.36281333333334
file name : Image_18082022111614043.png
|
2022-08-18 11:16:14.127185 |
42 |
62549644 |
CONST OF UJUKHANA AT MONAIPUL MASJID OF 6NO WARD |
158318 |
CONST OF UJUKHANA AT MONAIPUL MASJID OF 6NO WARD1 |
Plinth level |
-
latitude : 26.81293833333333
Longitude : 94.37162166666667
file name : Image_08122022112048525.png
|
2022-12-08 11:20:48.615529 |
43 |
62549644 |
CONST OF UJUKHANA AT MONAIPUL MASJID OF 6NO WARD |
158318 |
CONST OF UJUKHANA AT MONAIPUL MASJID OF 6NO WARD1 |
Completion of work |
-
latitude : 26.812845
Longitude : 94.37163000000001
file name : Image_07112022160123103.png
|
2022-11-07 16:01:23.203055 |
44 |
66756143 |
REPAIRING OF ANGANWARI CENTRE AT 6NO WARD |
120000 |
REPAIRING OF ANGANWARI CENTRE AT 6NO WARD1 |
Roof laid |
-
latitude : 26.8233828
Longitude : 94.3742035
file name : Image_25082023110436349.png
|
2023-08-25 11:04:36.445398 |
45 |
66756143 |
REPAIRING OF ANGANWARI CENTRE AT 6NO WARD |
120000 |
REPAIRING OF ANGANWARI CENTRE AT 6NO WARD1 |
Plinth level |
-
latitude : 26.824381666666667
Longitude : 94.37502
file name : Image_25082023105507442.png
|
2023-08-25 10:55:07.559053 |
46 |
66756143 |
REPAIRING OF ANGANWARI CENTRE AT 6NO WARD |
120000 |
REPAIRING OF ANGANWARI CENTRE AT 6NO WARD1 |
Completion of work |
-
latitude : 26.82349166666667
Longitude : 94.37462500000001
file name : Image_03082023155746820.png
|
2023-08-03 15:57:46.952926 |
47 |
66756143 |
REPAIRING OF ANGANWARI CENTRE AT 6NO WARD |
120000 |
REPAIRING OF ANGANWARI CENTRE AT 6NO WARD1 |
Completion of work |
-
latitude : 26.8124289
Longitude : 94.363418
file name : Image_13072023152950615.png
|
2023-07-13 15:29:50.696686 |
48 |
66756117 |
REPAIRING AT JUNAKI LP SCHOOL AT 8NO WARD |
156000 |
REPAIRING AT JUNAKI LP SCHOOL AT 8NO WARD1 |
Roof laid |
-
latitude : 26.81695666666667
Longitude : 94.36631833333334
file name : Image_25082023114800550.png
|
2023-08-25 11:48:00.63203 |
49 |
66756117 |
REPAIRING AT JUNAKI LP SCHOOL AT 8NO WARD |
156000 |
REPAIRING AT JUNAKI LP SCHOOL AT 8NO WARD1 |
Plinth level |
-
latitude : 26.816961666666664
Longitude : 94.366295
file name : Image_25082023114451513.png
|
2023-08-25 11:44:51.594671 |
50 |
66756117 |
REPAIRING AT JUNAKI LP SCHOOL AT 8NO WARD |
156000 |
REPAIRING AT JUNAKI LP SCHOOL AT 8NO WARD1 |
Completion of work |
-
latitude : 26.816966666666666
Longitude : 94.36631833333334
file name : Image_25082023114034343.png
|
2023-08-25 11:40:34.439341 |
51 |
51260468 |
CONSTRUCTION OF BOUNDARY WALL AT JONAKI LP SCHOOL |
182484 |
CONSTRUCTION OF BOUNDARY WALL AT JONAKI LP SCHOOL1 |
Roof laid |
-
latitude : 26.816948333333336
Longitude : 94.36628
file name : Image_25082023113931552.png
|
2023-08-25 11:39:31.654206 |
52 |
51260468 |
CONSTRUCTION OF BOUNDARY WALL AT JONAKI LP SCHOOL |
182484 |
CONSTRUCTION OF BOUNDARY WALL AT JONAKI LP SCHOOL1 |
Plinth level |
-
latitude : 26.81703166666667
Longitude : 94.36617999999999
file name : Image_19102022152157149.png
|
2022-10-19 15:21:57.257469 |
53 |
51260468 |
CONSTRUCTION OF BOUNDARY WALL AT JONAKI LP SCHOOL |
182484 |
CONSTRUCTION OF BOUNDARY WALL AT JONAKI LP SCHOOL1 |
Completion of work |
-
latitude : 26.817041666666668
Longitude : 94.36626999999999
file name : Image_11082022174456056.png
|
2022-08-11 17:44:56.152873 |
54 |
68196494 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.83798
Longitude : 94.34189166666665
file name : Image_29082023143531850.png
|
2023-08-29 14:35:31.937706 |
55 |
51260830 |
INSTALLATION OF MARK 3 TUBEL AT 8 NO WARD |
75000 |
INSTALLATION OF MARK 3 TUBEL AT 8 NO WARD1 |
Plinth level |
-
latitude : 26.81792833333333
Longitude : 94.36458166666668
file name : Image_25072022165020208.png
|
2022-07-25 16:50:20.307906 |
56 |
51260830 |
INSTALLATION OF MARK 3 TUBEL AT 8 NO WARD |
75000 |
INSTALLATION OF MARK 3 TUBEL AT 8 NO WARD1 |
Plinth level |
-
latitude : 26.81783833333333
Longitude : 94.36391166666665
file name : Image_25072022164933903.png
|
2022-07-25 16:49:34.002912 |
57 |
51260830 |
INSTALLATION OF MARK 3 TUBEL AT 8 NO WARD |
75000 |
INSTALLATION OF MARK 3 TUBEL AT 8 NO WARD1 |
Completion of work |
-
latitude : 26.817954999999998
Longitude : 94.36459333333332
file name : Image_23062022171547951.png
|
2022-06-23 17:15:48.036564 |
58 |
68198292 |
Repairing at 157no Bum Kukurachara LP School |
100000 |
Repairing at 157no Bum Kukurachara LP School1 |
Plinth level |
-
latitude : 26.809035
Longitude : 94.345725
file name : Image_28082023113557680.png
|
2023-08-28 11:35:57.774511 |
59 |
68198292 |
Repairing at 157no Bum Kukurachara LP School |
100000 |
Repairing at 157no Bum Kukurachara LP School1 |
Completion of work |
-
latitude : 26.808943333333332
Longitude : 94.345555
file name : Image_25082023160413089.png
|
2023-08-25 16:04:13.191309 |
60 |
66756088 |
REPAIRING AT GAROWAL CHUNGI LP SCHOOL |
156000 |
REPAIRING AT GAROWAL CHUNGI LP SCHOOL1 |
Roof laid |
-
latitude : 26.837044999999996
Longitude : 94.34639166666666
file name : Image_29082023145005278.png
|
2023-08-29 14:50:05.365425 |
61 |
66756088 |
REPAIRING AT GAROWAL CHUNGI LP SCHOOL |
156000 |
REPAIRING AT GAROWAL CHUNGI LP SCHOOL1 |
Plinth level |
-
latitude : 26.836996666666664
Longitude : 94.34638166666667
file name : Image_29082023144318974.png
|
2023-08-29 14:43:19.068339 |
62 |
66756088 |
REPAIRING AT GAROWAL CHUNGI LP SCHOOL |
156000 |
REPAIRING AT GAROWAL CHUNGI LP SCHOOL1 |
Completion of work |
-
latitude : 26.836948333333332
Longitude : 94.34643499999999
file name : Image_10082023111953719.png
|
2023-08-10 11:19:53.82474 |
63 |
68197820 |
Repairing at 413no Adarsha Kakojan Maktab LP School |
170200 |
Repairing at 413no Adarsha Kakojan Maktab LP School1 |
Plinth level |
-
latitude : 26.807655
Longitude : 94.35170333333332
file name : Image_05092023165428309.png
|
2023-09-05 16:54:28.398519 |
64 |
68197820 |
Repairing at 413no Adarsha Kakojan Maktab LP School |
170200 |
Repairing at 413no Adarsha Kakojan Maktab LP School1 |
Completion of work |
-
latitude : 26.807634999999998
Longitude : 94.35175166666667
file name : Image_05092023164809927.png
|
2023-09-05 16:48:10.116619 |
65 |
68198439 |
Repairing at 8no Bongaon LP School |
120000 |
Repairing at 8no Bongaon LP School1 |
Completion of work |
-
latitude : 26.82835
Longitude : 94.34849833333334
file name : Image_30092023161202721.png
|
2023-09-30 16:12:02.798197 |
66 |
68198439 |
Repairing at 8no Bongaon LP School |
120000 |
Repairing at 8no Bongaon LP School1 |
Plinth level |
-
latitude : 26.82833333333333
Longitude : 94.34853999999999
file name : Image_30092023163020665.png
|
2023-09-30 16:30:20.772917 |
67 |
68198439 |
Repairing at 8no Bongaon LP School |
120000 |
Repairing at 8no Bongaon LP School1 |
Completion of work |
-
latitude : 26.828365
Longitude : 94.34846333333334
file name : Image_30092023160955808.png
|
2023-09-30 16:09:55.8859 |
68 |
68198013 |
Repairing at Anganwari Centre at no ward |
100000 |
Repairing at Anganwari Centre at no ward1 |
Roof laid |
-
latitude : 26.821481666666667
Longitude : 94.35182666666667
file name : Image_24102024143830516.png
|
2024-10-24 14:38:30.68273 |
69 |
68198013 |
Repairing at Anganwari Centre at no ward |
100000 |
Repairing at Anganwari Centre at no ward1 |
Plinth level |
-
latitude : 26.821461666666664
Longitude : 94.35188500000001
file name : Image_24102024143249026.png
|
2024-10-24 14:32:49.100975 |
70 |
68198013 |
Repairing at Anganwari Centre at no ward |
100000 |
Repairing at Anganwari Centre at no ward1 |
Completion of work |
-
latitude : 26.821449999999995
Longitude : 94.35193666666667
file name : Image_05102023153528549.png
|
2023-10-05 15:35:28.639767 |
71 |
68199527 |
Repairing of Kamar Gaon Masjid Community Hall |
230500 |
Repairing of Kamar Gaon Masjid Community Hall1 |
Plinth level |
-
latitude : 26.818731666666668
Longitude : 94.36263833333332
file name : Image_06092024111855092.png
|
2024-09-06 11:19:39.356257 |
72 |
68199527 |
Repairing of Kamar Gaon Masjid Community Hall |
230500 |
Repairing of Kamar Gaon Masjid Community Hall1 |
Plinth level |
-
latitude : 26.818738333333332
Longitude : 94.36270166666667
file name : Image_06092024112010044.png
|
2024-09-06 11:20:54.314706 |
73 |
68199527 |
Repairing of Kamar Gaon Masjid Community Hall |
230500 |
Repairing of Kamar Gaon Masjid Community Hall1 |
Completion of work |
-
latitude : 26.818863333333336
Longitude : 94.36270833333334
file name : Image_11062024105938534.png
|
2024-06-11 10:59:38.611683 |
74 |
68193416 |
Construction of toilets in public institutions |
130000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.837341666666664
Longitude : 94.34632000000002
file name : Image_05102023142204199.png
|
2023-10-05 14:22:04.283986 |
75 |
68193416 |
Construction of toilets in public institutions |
130000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.837386666666664
Longitude : 94.34631666666668
file name : Image_05102023141405140.png
|
2023-10-05 14:14:05.254079 |
76 |
68199348 |
Repairing of Kakojan Boys School |
235000 |
Repairing of Kakojan Boys School1 |
Plinth level |
-
latitude : 26.8068727
Longitude : 94.3507159
file name : Image_07102024153227259.png
|
2024-10-07 15:32:27.347028 |
77 |
68199348 |
Repairing of Kakojan Boys School |
235000 |
Repairing of Kakojan Boys School1 |
Completion of work |
-
latitude : 26.80786666666667
Longitude : 94.35088499999999
file name : Image_17082023155758151.png
|
2023-08-17 15:57:58.270653 |
78 |
68194205 |
Construction of toilets in public institutions |
147650 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.812505
Longitude : 94.35367
file name : Image_11012024134404557.png
|
2024-01-11 13:44:04.642439 |
79 |
68194205 |
Construction of toilets in public institutions |
147650 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.812586666666668
Longitude : 94.35385
file name : Image_11012024133902373.png
|
2024-01-11 13:39:02.470658 |
80 |
62549354 |
CONST OF DRINKING WATER FACILITIES AT UPPAR BONGAON NAMGHOR |
210837 |
CONST OF DRINKING WATER FACILITIES AT UPPAR BONGAON NAMGHOR1 |
Plinth level |
-
latitude : 26.820223333333335
Longitude : 94.35419666666667
file name : Image_06012024111408539.png
|
2024-01-06 11:14:08.628229 |
81 |
62549354 |
CONST OF DRINKING WATER FACILITIES AT UPPAR BONGAON NAMGHOR |
210837 |
CONST OF DRINKING WATER FACILITIES AT UPPAR BONGAON NAMGHOR1 |
Completion of work |
-
latitude : 26.820025
Longitude : 94.35389166666667
file name : Image_06012024110838179.png
|
2024-01-06 11:08:38.311699 |
82 |
51260767 |
CONSTRUCTION OF LATRIN AND BATHROOM AT KAKOJAN MADARASA |
90000 |
CONSTRUCTION OF LATRIN AND BATHROOM AT KAKOJAN MADARASA1 |
Roof laid |
-
latitude : 26.810378333333333
Longitude : 94.36036666666665
file name : Image_06012024105504828.png
|
2024-01-06 10:55:04.909502 |
83 |
51260767 |
CONSTRUCTION OF LATRIN AND BATHROOM AT KAKOJAN MADARASA |
90000 |
CONSTRUCTION OF LATRIN AND BATHROOM AT KAKOJAN MADARASA1 |
Plinth level |
-
latitude : 26.81045166666667
Longitude : 94.36034166666668
file name : Image_06012024105048055.png
|
2024-01-06 10:50:48.147189 |
84 |
51260767 |
CONSTRUCTION OF LATRIN AND BATHROOM AT KAKOJAN MADARASA |
90000 |
CONSTRUCTION OF LATRIN AND BATHROOM AT KAKOJAN MADARASA1 |
Completion of work |
-
latitude : 26.8105
Longitude : 94.36037666666668
file name : Image_14122022161155949.png
|
2022-12-14 16:11:56.034302 |
85 |
66755996 |
Construction of toilets in public institutions |
130000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.813983333333333
Longitude : 94.352675
file name : Image_06012024121501656.png
|
2024-01-06 12:15:01.770269 |
86 |
66755996 |
Construction of toilets in public institutions |
130000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.814185
Longitude : 94.35285333333334
file name : Image_06012024121012529.png
|
2024-01-06 12:10:12.619691 |
87 |
66755996 |
Construction of toilets in public institutions |
130000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.81414333333333
Longitude : 94.35283333333334
file name : Image_19102023144709617.png
|
2023-10-19 14:47:09.694185 |
88 |
68194376 |
Construction of toilets in public institutions |
259125 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.8080606
Longitude : 94.3511792
file name : Image_07062024151230790.png
|
2024-06-07 15:12:30.867732 |
89 |
68194376 |
Construction of toilets in public institutions |
259125 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.8080583
Longitude : 94.3511775
file name : Image_07062024150650606.png
|
2024-06-07 15:06:50.682008 |
90 |
66756042 |
REPAIRING AT KAKOJAN COLLEGE |
200000 |
REPAIRING AT KAKOJAN COLLEGE1 |
Roof laid |
-
latitude : 26.8066357
Longitude : 94.350707
file name : Image_28082023165740032.png
|
2023-08-28 16:57:40.112253 |
91 |
66756042 |
REPAIRING AT KAKOJAN COLLEGE |
200000 |
REPAIRING AT KAKOJAN COLLEGE1 |
Plinth level |
-
latitude : 26.806787
Longitude : 94.35073
file name : Image_28082023165232253.png
|
2023-08-28 16:52:32.345723 |
92 |
66756042 |
REPAIRING AT KAKOJAN COLLEGE |
200000 |
REPAIRING AT KAKOJAN COLLEGE1 |
Completion of work |
-
latitude : 26.8068627
Longitude : 94.3505983
file name : Image_24052023155153849.png
|
2023-05-24 15:51:53.943859 |
93 |
62549559 |
CONST OF DHARIGAON NAMGHOR BORPUKHURI BOUNDARY WALL |
82484 |
CONST OF DHARIGAON NAMGHOR BORPUKHURI BOUNDARY WALL1 |
Roof laid |
-
latitude : 26.834931666666662
Longitude : 94.34438833333334
file name : Image_29082023143057247.png
|
2023-08-29 14:30:57.366612 |
94 |
62549559 |
CONST OF DHARIGAON NAMGHOR BORPUKHURI BOUNDARY WALL |
82484 |
CONST OF DHARIGAON NAMGHOR BORPUKHURI BOUNDARY WALL1 |
Plinth level |
-
latitude : 26.835269999999998
Longitude : 94.3442
file name : Image_25082023164327952.png
|
2023-08-25 16:43:28.051051 |
95 |
62549559 |
CONST OF DHARIGAON NAMGHOR BORPUKHURI BOUNDARY WALL |
82484 |
CONST OF DHARIGAON NAMGHOR BORPUKHURI BOUNDARY WALL1 |
Completion of work |
-
latitude : 26.835105
Longitude : 94.344525
file name : Image_21122022115817847.png
|
2022-12-21 11:58:17.955758 |
96 |
62549486 |
CONST OF RING BANDH AT 9NO WARD |
178484 |
CONST OF RING BANDH AT 9NO WARD1 |
Completion of work |
-
latitude : 26.81884,26.818834999999996
Longitude : 94.35618500000001,94.35618666666666
file name : Image_10042023162835487.png
|
2023-04-10 16:28:35.557264 |
97 |
62549486 |
CONST OF RING BANDH AT 9NO WARD |
178484 |
CONST OF RING BANDH AT 9NO WARD1 |
Completion of work |
-
latitude : 26.818491666666667,26.818491666666667
Longitude : 94.35596166666667,94.35596166666667
file name : Image_10042023162714191.png
|
2023-04-10 16:27:14.295941 |
98 |
62549486 |
CONST OF RING BANDH AT 9NO WARD |
178484 |
CONST OF RING BANDH AT 9NO WARD1 |
Completion of work |
-
latitude : 26.818496666666668,26.818485000000003,26.818489999999997
Longitude : 94.35594999999999,94.35594999999999,94.35594666666665
file name : Image_15032023153253685.png
|
2023-03-15 15:32:53.812249 |
99 |
62549066 |
CONST OF LATRIN AND BATHROOM AT MEDHI SONARICHUK NAMGHOR |
90000 |
CONST OF LATRIN AND BATHROOM AT MEDHI SONARICHUK NAMGHOR1 |
Roof laid |
-
latitude : 26.816381666666665
Longitude : 94.36152666666666
file name : Image_28082023112238260.png
|
2023-08-28 11:22:38.361995 |
100 |
62549066 |
CONST OF LATRIN AND BATHROOM AT MEDHI SONARICHUK NAMGHOR |
90000 |
CONST OF LATRIN AND BATHROOM AT MEDHI SONARICHUK NAMGHOR1 |
Plinth level |
-
latitude : 26.81637333333333
Longitude : 94.36152166666668
file name : Image_28082023111817694.png
|
2023-08-28 11:18:17.798525 |
101 |
62549066 |
CONST OF LATRIN AND BATHROOM AT MEDHI SONARICHUK NAMGHOR |
90000 |
CONST OF LATRIN AND BATHROOM AT MEDHI SONARICHUK NAMGHOR1 |
Completion of work |
-
latitude : 26.816489999999998
Longitude : 94.36160333333333
file name : Image_08052023162112221.png
|
2023-05-08 16:21:12.316078 |
102 |
66756130 |
REPAIRING OF ANGANWARI CENTRE AT 10NO WARD |
120000 |
REPAIRING OF ANGANWARI CENTRE AT 10NO WARD1 |
Plinth level |
-
latitude : 26.82826
Longitude : 94.34865833333333
file name : Image_05102023150604925.png
|
2023-10-05 15:06:05.029559 |
103 |
66756130 |
REPAIRING OF ANGANWARI CENTRE AT 10NO WARD |
120000 |
REPAIRING OF ANGANWARI CENTRE AT 10NO WARD1 |
Completion of work |
-
latitude : 26.828281666666665
Longitude : 94.34865833333333
file name : Image_05102023145047704.png
|
2023-10-05 14:50:47.825781 |
104 |
66755937 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.8066515
Longitude : 94.3505541
file name : Image_07062024145713846.png
|
2024-06-07 14:57:13.921172 |
105 |
66755937 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.8069377
Longitude : 94.3504865
file name : Image_07062024145210941.png
|
2024-06-07 14:52:11.022954 |
106 |
66755937 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.806881666666662
Longitude : 94.35006833333334
file name : Image_01122023120430514.png
|
2023-12-01 12:04:30.611466 |
107 |
66755957 |
Operation & maintenance of community sanitary complex |
53000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 26.81619166666667
Longitude : 94.36157166666665
file name : Image_14052024105407166.png
|
2024-05-14 10:54:07.256793 |
108 |
88591815 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.8043018
Longitude : 94.3390449
file name : Image_09072024155811666.png
|
2024-07-09 15:58:11.824033 |
109 |
88591815 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.8042993
Longitude : 94.3390414
file name : Image_26062024134000410.png
|
2024-06-26 13:40:00.502547 |
110 |
88591815 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.826126666666664
Longitude : 94.34958333333334
file name : Image_11012024142810560.png
|
2024-01-11 14:28:10.646743 |
111 |
66755976 |
Operation & maintenance of community sanitary complex |
53000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 26.810403333333337
Longitude : 94.36044833333332
file name : Image_14052024110449609.png
|
2024-05-14 11:04:49.696493 |
112 |
88592313 |
Repairing of 73no Bhoraluwa Lp school |
130700 |
Repairing of 73no Bhoraluwa Lp school1 |
Plinth level |
-
latitude : 26.823731666666664
Longitude : 94.37424666666666
file name : Image_23102024111226884.png
|
2024-10-23 11:12:26.97193 |
113 |
88592313 |
Repairing of 73no Bhoraluwa Lp school |
130700 |
Repairing of 73no Bhoraluwa Lp school1 |
Completion of work |
-
latitude : 26.823888333333336
Longitude : 94.37394833333335
file name : Image_25092024112757456.png
|
2024-09-25 11:27:57.527975 |
114 |
88592273 |
Repairing of Sorbudoi LP School |
170000 |
Repairing of Sorbudoi LP School1 |
Plinth level |
-
latitude : 26.817101666666666
Longitude : 94.36297833333334
file name : Image_21102024104743326.png
|
2024-10-21 10:47:43.393626 |
115 |
88592273 |
Repairing of Sorbudoi LP School |
170000 |
Repairing of Sorbudoi LP School1 |
Completion of work |
-
latitude : 26.81709166666667
Longitude : 94.36304
file name : Image_21102024104342422.png
|
2024-10-21 10:43:42.500196 |