1 |
6271606 |
Construction of Tea Garden boundary wall/Fencing at G.P.Campus |
150000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 26.776141666666664
Longitude : 94.39379833333332
file name : Image_21012019103856953.png
|
2019-01-21 10:38:57.206899 |
2 |
6271606 |
Construction of Tea Garden boundary wall/Fencing at G.P.Campus |
150000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 26.77592666666667
Longitude : 94.39377833333334
file name : Image_17012019133426626.png
|
2019-01-17 13:34:26.837574 |
3 |
6203682 |
Tea plantation at GP Campus |
50000 |
Other Commercial Plantation1
|
25% |
-
latitude : 26.775994999999998
Longitude : 94.39386166666667
file name : Image_28052019071336326.png
|
2019-05-28 07:13:36.379318 |
4 |
11293952 |
Earth filling at G.P. Office |
100000 |
Office Building1 |
25% |
-
latitude : 26.7761576
Longitude : 94.3935631
file name : Image_01022019104829161.png
|
2019-02-01 10:48:29.472945 |
5 |
10770998 |
Electirce wiring at G.P. office |
45000 |
Office Building1 |
25% |
-
latitude : 26.7761576
Longitude : 94.3935631
file name : Image_01022019104419047.png
|
2019-02-01 10:44:19.327394 |
6 |
11294090 |
Const of Water Filling tank at G.P. campus |
200000 |
Water Tank1 |
Basement |
-
latitude : 26.7761576
Longitude : 94.3935631
file name : Image_01022019105042183.png
|
2019-02-01 10:50:42.505501 |
7 |
11294050 |
Const of Shop Building at Umabari (GP office) |
244400 |
Shops1 |
25% |
-
latitude : 26.7761576
Longitude : 94.3935631
file name : Image_01022019105225787.png
|
2019-02-01 10:52:26.122149 |
8 |
20858551 |
Const of Boundary wall at 1no Bailung Gaon L.P School |
200000 |
Const of Boundary wall at 1no Bailung Gaon L.P School1 |
In Progress |
-
latitude : 26.784296666666666
Longitude : 94.39445499999998
file name : Image_12112020143357561.png
|
2020-11-12 14:34:01.98864 |
9 |
20858505 |
Const of Urinal at Pirakota sangeet Vidyalaya |
120000 |
Const of Urinal at Pirakota sangeet Vidyalaya1 |
25% |
-
latitude : 26.78211666666667
Longitude : 94.39354
file name : Image_12112020142833514.png
|
2020-11-12 14:28:37.926232 |
10 |
38314122 |
Const of Pirakata Janakalyan youth Club House |
298000 |
Const of Pirakata Janakalyan youth Club House1 |
25% |
-
latitude : 26.789348333333336
Longitude : 94.38517666666667
file name : Image_04082020153227279.png
|
2020-08-04 15:32:27.937336 |
11 |
38314122 |
Const of Pirakata Janakalyan youth Club House |
298000 |
Const of Pirakata Janakalyan youth Club House1 |
25% |
-
latitude : 26.789424999999998
Longitude : 94.38520833333332
file name : Image_07072020102855855.png
|
2020-07-07 10:28:56.836408 |
12 |
38314122 |
Const of Pirakata Janakalyan youth Club House |
298000 |
Const of Pirakata Janakalyan youth Club House1 |
25% |
-
latitude : 26.7894
Longitude : 94.38507
file name : Image_03082020103954019.png
|
2020-08-03 10:39:54.694014 |
13 |
38314156 |
Const of Samshan Stand with Boundary wall at 10no ward |
400000 |
Const of Samshan Stand with Boundary wall at 10no ward1 |
25% |
-
latitude : 26.7661846
Longitude : 94.3733758
file name : Image_10092020131419569.png
|
2020-09-10 13:14:19.70073 |
14 |
20858515 |
Const of Boundary wall at Sundarpur L.P School |
200000 |
Const of Boundary wall at Sundarpur L.P School1 |
In Progress |
-
latitude : 26.75931666666667
Longitude : 94.39505166666667
file name : Image_12112020130251270.png
|
2020-11-12 13:02:55.654663 |
15 |
20858476 |
Extension of Pirakota Anchalik Cultural Centre |
237400 |
Extension of Pirakota Anchalik Cultural Centre1 |
In Progress |
-
latitude : 26.78156333333333
Longitude : 94.39284666666666
file name : Image_12112020142455376.png
|
2020-11-12 14:24:59.803985 |
16 |
11294280 |
Const of Samshan Stand with Boundary wall at 5 No Ward |
300000 |
Const of Samshan Stand with Boundary wall at 5 No Ward1 |
25% |
-
latitude : 26.763193333333334
Longitude : 94.37890833333334
file name : Image_12112020123412096.png
|
2020-11-12 12:34:16.487167 |
17 |
11294239 |
Const of Culvert at Duarah Gaon Path |
150000 |
Const of Culvert at Duarah Gaon Path 1 |
Substructure below GL |
-
latitude : 26.77806666666667,26.778028333333335
Longitude : 94.41463,94.41463
file name : Image_21112020123619941.png
|
2020-11-21 12:36:20.060259 |
18 |
38333509 |
Const of Box Culvert at Tepojan |
349353 |
Const of Box Culvert at Tepojan1 |
Substructure below GL |
-
latitude : 26.78594333333333,26.785953333333335
Longitude : 94.39816666666665,94.39816833333335
file name : Image_12112020144118976.png
|
2020-11-12 14:41:23.388935 |
19 |
11294430 |
Const of Urinal Cum Latrin at G.P. Office |
358000 |
Const of Urinal Cum Latrin at G.P. Office1 |
Completed |
-
latitude : 26.776058333333335
Longitude : 94.39368833333334
file name : Image_18112020125946689.png
|
2020-11-18 12:59:46.812002 |
20 |
11294430 |
Const of Urinal Cum Latrin at G.P. Office |
358000 |
Const of Urinal Cum Latrin at G.P. Office1 |
50% |
-
latitude : 26.776036666666663
Longitude : 94.39375
file name : Image_17112020132241304.png
|
2020-11-17 13:22:41.381678 |
21 |
11294430 |
Const of Urinal Cum Latrin at G.P. Office |
358000 |
Const of Urinal Cum Latrin at G.P. Office1 |
25% |
-
latitude : 26.776071666666667
Longitude : 94.39370833333332
file name : Image_04082020153715986.png
|
2020-08-04 15:37:16.625529 |
22 |
11294321 |
Const of Boundary wall at Kalithan Mondir |
200161 |
Const of Boundary wall at Kalithan Mondir1 |
Completed |
-
latitude : 26.727629999999998
Longitude : 94.39393333333334
file name : Image_27112020131201620.png
|
2020-11-27 13:12:01.71003 |
23 |
11294321 |
Const of Boundary wall at Kalithan Mondir |
200161 |
Const of Boundary wall at Kalithan Mondir1 |
In Progress |
-
latitude : 26.727711666666664
Longitude : 94.39379166666667
file name : Image_10082020143815497.png
|
2020-08-10 14:38:16.156303 |
24 |
38314256 |
Installation of Tub-well with Filter at 7no ward |
125000 |
Installation of Tub-well with Filter at 7no ward1 |
Ground work |
-
latitude : 26.736773333333336
Longitude : 94.40089833333334
file name : Image_10082020152934539.png
|
2020-08-10 15:29:35.274106 |
25 |
38314101 |
Const of Anganwari Centre at Sundarpur |
300000 |
Const of Anganwari Centre at Sundarpur1 |
25% |
-
latitude : 26.76833
Longitude : 94.39936166666666
file name : Image_03092020124045968.png
|
2020-09-03 12:40:46.718712 |
26 |
11294310 |
Const of Urinal at Kushaltal Namghar |
98000 |
Const of Urinal at Kushaltal Namghar1 |
25% |
-
latitude : 26.736461666666667
Longitude : 94.40839499999998
file name : Image_04082020153525947.png
|
2020-08-04 15:35:26.593504 |
27 |
38333219 |
Const of Waiting shed at Kakojan T.E Play Ground |
300000 |
Const of Waiting shed at Kakojan T.E Play Ground1 |
25% |
-
latitude : 26.73712833333333
Longitude : 94.391705
file name : Image_10082020152742386.png
|
2020-08-10 15:27:43.13409 |
28 |
38314329 |
Const of Boundary wall at Dakhinpat gaon Community hall |
250000 |
Const of Boundary wall at Dakhinpat gaon Community hall1 |
In Progress |
-
latitude : 26.761283333333335
Longitude : 94.38431666666665
file name : Image_12112020124444638.png
|
2020-11-12 12:44:49.012316 |
29 |
20858451 |
Const of pavers block road from Umabari PHC to Pirakota Moran Gaon |
640500 |
Const of pavers block road from Umabari PHC to Pirakota Moran Gaon1 |
Earth Work |
-
latitude : 26.776263333333336,26.776275000000002
Longitude : 94.39200666666666,94.39201333333334
file name : Image_18112020111306216.png
|
2020-11-18 11:13:06.301716 |
30 |
20858562 |
Const of Boundary Wall & Earth Filing at Sundarpur Sub Centre |
300000 |
Const of Boundary Wall & Earth Filing at Sundarpur Sub Centre 1 |
In Progress |
-
latitude : 26.759201666666666
Longitude : 94.38768666666668
file name : Image_03122020132913563.png
|
2020-12-03 13:29:13.665783 |
31 |
38314213 |
Installation of 2nos Tub-well with filter at 6no ward |
250000 |
Installation of 2nos Tub-well with filter at 6no ward1 |
Ground work |
-
latitude : 26.732120000000002
Longitude : 94.39689833333333
file name : Image_10082020160330638.png
|
2020-08-10 16:03:31.326385 |
32 |
38314279 |
Installation of Tub-well with Filter at 8no ward |
125000 |
Installation of Tub-well with Filter at 8no ward1 |
Ground work |
-
latitude : 26.736433333333334
Longitude : 94.39511666666667
file name : Image_10082020153754354.png
|
2020-08-10 15:37:55.093601 |
33 |
20858597 |
Const of Pevers Block Rd at Diha naginijan Line path |
500000 |
Const of Pevers Block Rd at Diha naginijan Line path1 |
Substructure below GL |
-
latitude : 26.760548333333336,26.760534999999997
Longitude : 94.361745,94.36181
file name : Image_01122020142625815.png
|
2020-12-01 14:26:25.924804 |
34 |
20858610 |
Const of Pavers Block Road at Abiram Tanti Line Path |
400000 |
Const of Pavers Block Road at Abiram Tanti Line Path1 |
Earth Work |
-
latitude : 26.731021666666667,26.731031666666663,26.731043333333332
Longitude : 94.39352500000001,94.39351166666665,94.39350166666667
file name : Image_18062021135626242.png
|
2021-06-18 13:56:26.342852 |
35 |
20858470 |
Const of Samshan stand at Kakojan 8no ward |
300000 |
Const of Samshan stand at Kakojan 8no ward 1 |
25% |
-
latitude : 26.737913333333335
Longitude : 94.40011666666666
file name : Image_27112020125600794.png
|
2020-11-27 12:56:00.918632 |
36 |
20858491 |
Const of Community Holl at 3no ward Gajpuria |
403635 |
Const of Community Holl at 3no ward Gajpuria1 |
25% |
-
latitude : 26.777628333333336
Longitude : 94.40356333333332
file name : Image_27112020113121942.png
|
2020-11-27 11:31:22.031089 |
37 |
20858578 |
Const of Community Holl at Gp Office |
560580 |
Const of Community Holl at Gp Office1 |
25% |
-
latitude : 26.776101666666666
Longitude : 94.39381833333333
file name : Image_12112020141554668.png
|
2020-11-12 14:15:59.083805 |
38 |
44156156 |
Const of Pavers Block Rd at Ashibad Line Path |
350000 |
Const of Pavers Block Rd at Ashibad Line Path1 |
Earth Work |
-
latitude : 26.7299124,26.7299136
Longitude : 94.3923027,94.392303
file name : Image_11022021145510654.png
|
2021-02-11 14:55:10.751435 |
39 |
44151142 |
Const of Pavers block Rd at Brishnu Mondira 9no ward |
350000 |
Const of Pavers block Rd at Brishnu Mondira 9no ward1 |
Earth Work |
-
latitude : 26.734691666666663,26.734680000000004
Longitude : 94.39248,94.39243166666665
file name : Image_11022021144329318.png
|
2021-02-11 14:43:29.406744 |
40 |
66151107 |
Renovation of Old GP Office Building |
150856 |
Renovation of Old GP Office Building 1 |
Completion of work |
-
latitude : 26.77620772
Longitude : 94.39370264
file name : Image_23082024124835459.png
|
2024-08-23 12:48:35.588132 |
41 |
52044240 |
Gp Area Sanitization Programme |
89597 |
Gp Area Sanitization Programme1 |
Completion of work |
-
latitude : 26.77568666666667
Longitude : 94.39255
file name : Image_13082021120750222.png
|
2021-08-13 12:07:50.32669 |
42 |
66151129 |
GPDP (Yr 2022-23) preparation and electricity expensess |
50000 |
GPDP (Yr 2022-23) preparation and electricity expensess1 |
Completion of work |
-
latitude : 26.77623036
Longitude : 94.3937201
file name : Image_08122022131757981.png
|
2022-12-08 13:17:58.071561 |
43 |
51167765 |
CONST OF BOUNDARY WALL AT DUWARAH GAON LP SCHOOL |
160000 |
CONST OF BOUNDARY WALL AT DUWARAH GAON LP SCHOOL1 |
Completion of work |
-
latitude : 26.7772891
Longitude : 94.41474848
file name : Image_09082022152922197.png
|
2022-08-09 15:29:22.29528 |
44 |
66151049 |
Construction of water cannel HP Culvertin front of GP Office Campus |
11587 |
Construction of water cannel HP Culvertin front of GP Office Campus1 |
Completion of work |
-
latitude : 26.78168323,26.78168323
Longitude : 94.39243796,94.39243796
file name : Image_23082024124915134.png
|
2024-08-23 12:49:15.285673 |
45 |
66151049 |
Construction of water cannel HP Culvertin front of GP Office Campus |
11587 |
Construction of water cannel HP Culvertin front of GP Office Campus1 |
Completion of work |
-
latitude : 26.78168323,26.78168323
Longitude : 94.39243796,94.39243796
file name : Image_23082024124647737.png
|
2024-08-23 12:46:47.854764 |
46 |
66150186 |
Repairing of 1 No Kakojan Bagan LP School |
186400 |
Repairing of 1 No Kakojan Bagan LP School1 |
Completion of work |
-
latitude : 26.73298163
Longitude : 94.38948632
file name : Image_11092023140037342.png
|
2023-09-11 14:00:37.447003 |
47 |
66150308 |
Repairing of Purona Gojpuria Anganwadi Centre |
93200 |
Repairing of Purona Gojpuria Anganwadi Centre1 |
Completion of work |
-
latitude : 26.77279389
Longitude : 94.40390056
file name : Image_18072023154543221.png
|
2023-07-18 15:45:43.443543 |
48 |
66104933 |
Const of Kheroni Cultural Centre |
230000 |
Const of Kheroni Cultural Centre1 |
Completion of work |
-
latitude : 26.76805194
Longitude : 94.39018209
file name : Image_05072023160954523.png
|
2023-07-05 16:09:54.620311 |
49 |
66150600 |
Repairing of Kakojan Bagan Staff Line Anganwadi Centre |
93200 |
Repairing of Kakojan Bagan Staff Line Anganwadi Centre1 |
Completion of work |
-
latitude : 26.73292984
Longitude : 94.38949767
file name : Image_11092023140101838.png
|
2023-09-11 14:01:02.028834 |
50 |
66150714 |
Repairing of 1 No Bailung Gaon LP School |
100000 |
Repairing of 1 No Bailung Gaon LP School1 |
Completion of work |
-
latitude : 26.78424271
Longitude : 94.39457012
file name : Image_06072023115140968.png
|
2023-07-06 11:51:41.07325 |
51 |
66150852 |
Repairing of Deha Naginijan LP School |
100000 |
Repairing of Deha Naginijan LP School1 |
Plinth level |
-
latitude : 26.77622714
Longitude : 94.39369369
file name : Image_20112023141136889.png
|
2023-11-20 14:11:37.016645 |
52 |
66150852 |
Repairing of Deha Naginijan LP School |
100000 |
Repairing of Deha Naginijan LP School1 |
Completion of work |
-
latitude : 26.76239852
Longitude : 94.36056304
file name : Image_25082023154522016.png
|
2023-08-25 15:45:22.124532 |
53 |
66151014 |
Creation of drainage channel for management of grey water |
70478 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.7762695
Longitude : 94.3923835
file name : Image_23082024124606897.png
|
2024-08-23 12:46:07.019316 |
54 |
66151072 |
Renovation of water tank and Construction of a dustbin at GP Office campus |
30000 |
Renovation of water tank and Construction of a dustbin at GP Office campus 1 |
Completion of work |
-
latitude : 26.7762686,26.7762686
Longitude : 94.3923833,94.3923833
file name : Image_23082024124953524.png
|
2024-08-23 12:49:53.650901 |
55 |
66151072 |
Renovation of water tank and Construction of a dustbin at GP Office campus |
30000 |
Renovation of water tank and Construction of a dustbin at GP Office campus 1 |
Completion of work |
-
latitude : 26.7762686,26.7762686
Longitude : 94.3923833,94.3923833
file name : Image_23082024124716454.png
|
2024-08-23 12:47:16.563787 |
56 |
68169221 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.72741658
Longitude : 94.39501058
file name : Image_26072023152914657.png
|
2023-07-26 15:29:14.748926 |
57 |
68190273 |
Repairing of Kushaltal anganwadi centre |
100000 |
Repairing of Kushaltal anganwadi centre1 |
Completion of work |
-
latitude : 26.7367713
Longitude : 94.40754869
file name : Image_11092023140130005.png
|
2023-09-11 14:01:30.15069 |
58 |
68191478 |
Repairing of Kushaltal LP/ME School |
100000 |
Repairing of Kushaltal LP/ME School1 |
Completion of work |
-
latitude : 26.73680165
Longitude : 94.40767502
file name : Image_11092023140005237.png
|
2023-09-11 14:00:05.340098 |
59 |
66104722 |
Creation of drainage channel for management of grey water |
268000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.77632545
Longitude : 94.39365953
file name : Image_20112023143845174.png
|
2023-11-20 14:38:45.271136 |
60 |
66104722 |
Creation of drainage channel for management of grey water |
268000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.77626488
Longitude : 94.39370917
file name : Image_12092023130726534.png
|
2023-09-12 13:07:26.682204 |
61 |
66104722 |
Creation of drainage channel for management of grey water |
268000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.76007833
Longitude : 94.38586237
file name : Image_12062023160223534.png
|
2023-06-12 16:02:23.635862 |
62 |
51168338 |
CONST OF PUBLIC TOILET AT PIRAKOTA MORAN GAON CULTURAL CENTRE |
90000 |
CONST OF PUBLIC TOILET AT PIRAKOTA MORAN GAON CULTURAL CENTRE1 |
Plinth level |
-
latitude : 26.77615573
Longitude : 94.39372104
file name : Image_20112023124741610.png
|
2023-11-20 12:47:41.696505 |
63 |
51168338 |
CONST OF PUBLIC TOILET AT PIRAKOTA MORAN GAON CULTURAL CENTRE |
90000 |
CONST OF PUBLIC TOILET AT PIRAKOTA MORAN GAON CULTURAL CENTRE1 |
Completion of work |
-
latitude : 26.782091
Longitude : 94.39326535
file name : Image_28082023134426176.png
|
2023-08-28 13:44:26.269474 |
64 |
51168338 |
CONST OF PUBLIC TOILET AT PIRAKOTA MORAN GAON CULTURAL CENTRE |
90000 |
CONST OF PUBLIC TOILET AT PIRAKOTA MORAN GAON CULTURAL CENTRE1 |
Completion of work |
-
latitude : 26.78195613
Longitude : 94.39309463
file name : Image_08082022115530791.png
|
2022-08-08 11:55:30.928368 |
65 |
51167904 |
CONST OF BOUNDARY WALL AT 299NO PIRAKOTA NIMNA BUNIYADI VIDYALAY |
166377 |
CONST OF BOUNDARY WALL AT 299NO PIRAKOTA NIMNA BUNIYADI VIDYALAY1 |
Plinth level |
-
latitude : 26.77622024
Longitude : 94.39364664
file name : Image_20112023125906618.png
|
2023-11-20 12:59:06.704691 |
66 |
51167904 |
CONST OF BOUNDARY WALL AT 299NO PIRAKOTA NIMNA BUNIYADI VIDYALAY |
166377 |
CONST OF BOUNDARY WALL AT 299NO PIRAKOTA NIMNA BUNIYADI VIDYALAY1 |
Completion of work |
-
latitude : 26.78868017
Longitude : 94.38467372
file name : Image_28082023114828646.png
|
2023-08-28 11:48:28.761774 |
67 |
51167904 |
CONST OF BOUNDARY WALL AT 299NO PIRAKOTA NIMNA BUNIYADI VIDYALAY |
166377 |
CONST OF BOUNDARY WALL AT 299NO PIRAKOTA NIMNA BUNIYADI VIDYALAY1 |
Completion of work |
-
latitude : 26.78865034
Longitude : 94.38470252
file name : Image_28082023113500304.png
|
2023-08-28 11:35:00.424744 |
68 |
51167904 |
CONST OF BOUNDARY WALL AT 299NO PIRAKOTA NIMNA BUNIYADI VIDYALAY |
166377 |
CONST OF BOUNDARY WALL AT 299NO PIRAKOTA NIMNA BUNIYADI VIDYALAY1 |
Completion of work |
-
latitude : 26.78869042
Longitude : 94.38495073
file name : Image_31072022121531307.png
|
2022-07-31 12:15:31.408771 |
69 |
51167665 |
CONST OF BOUNDARY WALL AT DAKHIN BRAHMIN GAON ANGANWARI CENTRE |
160000 |
CONST OF BOUNDARY WALL AT DAKHIN BRAHMIN GAON ANGANWARI CENTRE1 |
Plinth level |
-
latitude : 26.77625445
Longitude : 94.39367947
file name : Image_20112023131017894.png
|
2023-11-20 13:10:17.975434 |
70 |
51167665 |
CONST OF BOUNDARY WALL AT DAKHIN BRAHMIN GAON ANGANWARI CENTRE |
160000 |
CONST OF BOUNDARY WALL AT DAKHIN BRAHMIN GAON ANGANWARI CENTRE1 |
Completion of work |
-
latitude : 26.78806572
Longitude : 94.38797476
file name : Image_28082023120213253.png
|
2023-08-28 12:02:13.413855 |
71 |
51167665 |
CONST OF BOUNDARY WALL AT DAKHIN BRAHMIN GAON ANGANWARI CENTRE |
160000 |
CONST OF BOUNDARY WALL AT DAKHIN BRAHMIN GAON ANGANWARI CENTRE1 |
Completion of work |
-
latitude : 26.78821028
Longitude : 94.38824256
file name : Image_30072022150334452.png
|
2022-07-30 15:03:34.54803 |
72 |
36369118 |
Const of Urinal Cum Latrin at Sundarpur L.P School/Anganwari Centre |
200000 |
Const of Urinal Cum Latrin at Sundarpur L.P School/Anganwari Centre1 |
Plinth level |
-
latitude : 26.77625594
Longitude : 94.39366814
file name : Image_20112023132613738.png
|
2023-11-20 13:26:13.833244 |
73 |
36369118 |
Const of Urinal Cum Latrin at Sundarpur L.P School/Anganwari Centre |
200000 |
Const of Urinal Cum Latrin at Sundarpur L.P School/Anganwari Centre1 |
Completion of work |
-
latitude : 26.75936406
Longitude : 94.39475251
file name : Image_28082023131635106.png
|
2023-08-28 13:16:35.221665 |
74 |
36369118 |
Const of Urinal Cum Latrin at Sundarpur L.P School/Anganwari Centre |
200000 |
Const of Urinal Cum Latrin at Sundarpur L.P School/Anganwari Centre1 |
Completion of work |
-
latitude : 26.75926772
Longitude : 94.39481034
file name : Image_16082022120911491.png
|
2022-08-16 12:09:11.588165 |
75 |
36386702 |
Installation of Tube Wall with Filter at Simaluguri Bosti |
125000 |
Installation of Tube Wall with Filter at Simaluguri Bosti1 |
Plinth level |
-
latitude : 26.77626175
Longitude : 94.39365206
file name : Image_20112023133726661.png
|
2023-11-20 13:37:26.76361 |
76 |
36386702 |
Installation of Tube Wall with Filter at Simaluguri Bosti |
125000 |
Installation of Tube Wall with Filter at Simaluguri Bosti1 |
Completion of work |
-
latitude : 26.76751606
Longitude : 94.38256175
file name : Image_16082022120936923.png
|
2022-08-16 12:09:37.02459 |
77 |
36387242 |
Installation of Mark III Tub well with Filter at Nagadhara Kalithan Cultuiral Centre |
125000 |
Installation of Mark III Tub well with Filter at Nagadhara Kalithan Cultuiral Centre1 |
Plinth level |
-
latitude : 26.77622736
Longitude : 94.39353864
file name : Image_20112023135116659.png
|
2023-11-20 13:51:16.756888 |
78 |
36387242 |
Installation of Mark III Tub well with Filter at Nagadhara Kalithan Cultuiral Centre |
125000 |
Installation of Mark III Tub well with Filter at Nagadhara Kalithan Cultuiral Centre1 |
Plinth level |
-
latitude : 26.77624078
Longitude : 94.39374203
file name : Image_20112023134237575.png
|
2023-11-20 13:42:37.676616 |
79 |
36387242 |
Installation of Mark III Tub well with Filter at Nagadhara Kalithan Cultuiral Centre |
125000 |
Installation of Mark III Tub well with Filter at Nagadhara Kalithan Cultuiral Centre1 |
Completion of work |
-
latitude : 26.73270913
Longitude : 94.39518386
file name : Image_16082022120852113.png
|
2022-08-16 12:08:52.212872 |
80 |
43448716 |
Const of Urinal with Water Facilities at Bailungaon Cultural Centre |
220974 |
Const of Urinal with Water Facilities at Bailungaon Cultural Centre1 |
Plinth level |
-
latitude : 26.77626531
Longitude : 94.39367999
file name : Image_20112023135605714.png
|
2023-11-20 13:56:05.812965 |
81 |
43448716 |
Const of Urinal with Water Facilities at Bailungaon Cultural Centre |
220974 |
Const of Urinal with Water Facilities at Bailungaon Cultural Centre1 |
Completion of work |
-
latitude : 26.78595804
Longitude : 94.39720389
file name : Image_28082023134848058.png
|
2023-08-28 13:48:48.167786 |
82 |
43448716 |
Const of Urinal with Water Facilities at Bailungaon Cultural Centre |
220974 |
Const of Urinal with Water Facilities at Bailungaon Cultural Centre1 |
Completion of work |
-
latitude : 26.78592662
Longitude : 94.397158
file name : Image_08082022115520432.png
|
2022-08-08 11:55:20.572871 |
83 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site1 |
Plinth level |
-
latitude : 26.77644177
Longitude : 94.39377091
file name : Image_20112023145002767.png
|
2023-11-20 14:50:02.947054 |
84 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site1 |
Completion of work |
-
latitude : 26.77828714
Longitude : 94.39386297
file name : Image_08092023134232874.png
|
2023-09-08 13:42:33.033913 |
85 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site2 |
Plinth level |
-
latitude : 26.77644365
Longitude : 94.39378354
file name : Image_20112023145205483.png
|
2023-11-20 14:52:05.652983 |
86 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site2 |
Plinth level |
-
latitude : 26.77644365
Longitude : 94.39378354
file name : Image_20112023145028129.png
|
2023-11-20 14:50:28.295343 |
87 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site2 |
Completion of work |
-
latitude : 26.77828471
Longitude : 94.3938544
file name : Image_08092023134407945.png
|
2023-09-08 13:44:08.03911 |
88 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site3 |
Plinth level |
-
latitude : 26.77644004
Longitude : 94.39379895
file name : Image_20112023145232054.png
|
2023-11-20 14:52:32.181236 |
89 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site3 |
Plinth level |
-
latitude : 26.77644004
Longitude : 94.39379895
file name : Image_20112023145053581.png
|
2023-11-20 14:50:53.695832 |
90 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site3 |
Completion of work |
-
latitude : 26.77828144
Longitude : 94.39391997
file name : Image_08092023134411569.png
|
2023-09-08 13:44:11.692375 |
91 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site4 |
Plinth level |
-
latitude : 26.77645473
Longitude : 94.39379663
file name : Image_20112023145254454.png
|
2023-11-20 14:52:54.57949 |
92 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site4 |
Plinth level |
-
latitude : 26.77645473
Longitude : 94.39379663
file name : Image_20112023145119210.png
|
2023-11-20 14:51:19.33113 |
93 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site4 |
Completion of work |
-
latitude : 26.77818538
Longitude : 94.39396775
file name : Image_08092023134543099.png
|
2023-09-08 13:45:43.20889 |
94 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site5 |
Plinth level |
-
latitude : 26.77639281
Longitude : 94.39372667
file name : Image_20112023145315261.png
|
2023-11-20 14:53:15.384069 |
95 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site5 |
Plinth level |
-
latitude : 26.77639281
Longitude : 94.39372667
file name : Image_20112023145144254.png
|
2023-11-20 14:51:44.400206 |
96 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site5 |
Completion of work |
-
latitude : 26.77792357
Longitude : 94.39418454
file name : Image_08092023134555258.png
|
2023-09-08 13:45:55.374365 |
97 |
68191907 |
Installation of solar light at Amrit Sarovar Site |
150000 |
Installation of solar light at Amrit Sarovar Site5 |
Completion of work |
-
latitude : 26.77792357
Longitude : 94.39418454
file name : Image_08092023134606342.png
|
2023-09-08 13:46:06.461696 |
98 |
68190859 |
Repairing of Sundarpur Lahing anganwadi centre |
100000 |
Repairing of Sundarpur Lahing anganwadi centre1 |
Plinth level |
-
latitude : 26.77626855
Longitude : 94.39352571
file name : Image_20112023150235742.png
|
2023-11-20 15:02:35.826124 |
99 |
68190859 |
Repairing of Sundarpur Lahing anganwadi centre |
100000 |
Repairing of Sundarpur Lahing anganwadi centre1 |
Completion of work |
-
latitude : 26.77634047
Longitude : 94.393606
file name : Image_20112023145746934.png
|
2023-11-20 14:57:47.019589 |
100 |
68190859 |
Repairing of Sundarpur Lahing anganwadi centre |
100000 |
Repairing of Sundarpur Lahing anganwadi centre1 |
Completion of work |
-
latitude : 26.75928164
Longitude : 94.38817202
file name : Image_25082023153005032.png
|
2023-08-25 15:30:05.140962 |
101 |
68194813 |
Water Supply to villages |
736250 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.76045753
Longitude : 94.3852753
file name : Image_05022024125207944.png
|
2024-02-05 12:52:08.053155 |
102 |
68169848 |
Repairing of Sundarpur LP School |
103500 |
Repairing of Sundarpur LP School1 |
Completion of work |
-
latitude : 26.77621347
Longitude : 94.39369253
file name : Image_04122023124552190.png
|
2023-12-04 12:45:52.328143 |
103 |
88574601 |
Creation of plastic waste storage unit |
218550 |
Creation of plastic waste storage unit 1 |
Roof laid |
-
latitude : 26.776267
Longitude : 94.3923844
file name : Image_09072024134547128.png
|
2024-07-09 13:45:47.23605 |
104 |
88574601 |
Creation of plastic waste storage unit |
218550 |
Creation of plastic waste storage unit 1 |
Plinth level |
-
latitude : 26.78169132
Longitude : 94.39252096
file name : Image_15122023193300063.png
|
2023-12-15 19:33:00.277237 |
105 |
88574601 |
Creation of plastic waste storage unit |
218550 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 26.78170815
Longitude : 94.392405
file name : Image_15122023185826385.png
|
2023-12-15 18:58:26.457867 |
106 |
51168671 |
CONST OF PUBLIC TOILET AT KAKOJAN BAGAN BAZAR FILED |
90000 |
CONST OF PUBLIC TOILET AT KAKOJAN BAGAN BAZAR FILED1 |
Plinth level |
-
latitude : 26.776281
Longitude : 94.3919614
file name : Image_29052024141859026.png
|
2024-05-29 14:18:59.115542 |
107 |
51168671 |
CONST OF PUBLIC TOILET AT KAKOJAN BAGAN BAZAR FILED |
90000 |
CONST OF PUBLIC TOILET AT KAKOJAN BAGAN BAZAR FILED1 |
Completion of work |
-
latitude : 26.73555529
Longitude : 94.39192279
file name : Image_09082022164034603.png
|
2022-08-09 16:40:34.730812 |
108 |
66104614 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.7762776
Longitude : 94.3919628
file name : Image_29052024141913479.png
|
2024-05-29 14:19:13.581094 |
109 |
66104614 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.78935888
Longitude : 94.38530958
file name : Image_12062023160218865.png
|
2023-06-12 16:02:18.981375 |
110 |
66104668 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.7762787
Longitude : 94.391963
file name : Image_29052024141930323.png
|
2024-05-29 14:19:30.422138 |
111 |
66104668 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.78933081
Longitude : 94.38528103
file name : Image_11072023115143750.png
|
2023-07-11 11:51:43.843549 |
112 |
51168878 |
CONST OF TOILET AT TISHIRA LP SCHOOL |
45000 |
CONST OF TOILET AT TISHIRA LP SCHOOL1 |
Plinth level |
-
latitude : 26.7762801
Longitude : 94.3919612
file name : Image_29052024141826497.png
|
2024-05-29 14:18:26.602936 |
113 |
51168878 |
CONST OF TOILET AT TISHIRA LP SCHOOL |
45000 |
CONST OF TOILET AT TISHIRA LP SCHOOL1 |
Completion of work |
-
latitude : 26.77554904
Longitude : 94.39184632
file name : Image_28082023125930637.png
|
2023-08-28 12:59:30.739721 |
114 |
51168878 |
CONST OF TOILET AT TISHIRA LP SCHOOL |
45000 |
CONST OF TOILET AT TISHIRA LP SCHOOL1 |
Completion of work |
-
latitude : 26.77556866
Longitude : 94.39183848
file name : Image_28082023125856435.png
|
2023-08-28 12:58:56.545514 |
115 |
51168878 |
CONST OF TOILET AT TISHIRA LP SCHOOL |
45000 |
CONST OF TOILET AT TISHIRA LP SCHOOL1 |
Completion of work |
-
latitude : 26.775488333333335
Longitude : 94.39190833333332
file name : Image_28032022154411401.png
|
2022-03-28 15:44:11.507715 |
116 |
51168878 |
CONST OF TOILET AT TISHIRA LP SCHOOL |
45000 |
CONST OF TOILET AT TISHIRA LP SCHOOL1 |
Completion of work |
-
latitude : 26.775455000000004
Longitude : 94.39182666666666
file name : Image_28032022154317288.png
|
2022-03-28 15:43:17.412212 |
117 |
51167527 |
CONST OF PAVERS BLOCK RD AT DIHA NAGINIJAN LINE PATH PH2 |
320000 |
CONST OF PAVERS BLOCK RD AT DIHA NAGINIJAN LINE PATH PH21 |
Plinth level |
-
latitude : 26.7762807,26.7762807
Longitude : 94.3919606,94.3919606
file name : Image_29052024141846481.png
|
2024-05-29 14:18:46.589494 |
118 |
51167527 |
CONST OF PAVERS BLOCK RD AT DIHA NAGINIJAN LINE PATH PH2 |
320000 |
CONST OF PAVERS BLOCK RD AT DIHA NAGINIJAN LINE PATH PH21 |
Completion of work |
-
latitude : 26.76086481,26.76088604
Longitude : 94.36191608,94.36195124
file name : Image_18082022140441137.png
|
2022-08-18 14:04:41.230236 |
119 |
68192079 |
Construction of Community Sanitary Complex |
49407 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.7762814
Longitude : 94.3919211
file name : Image_07062024132910663.png
|
2024-06-07 13:29:10.751314 |
120 |
68193097 |
Construction of Community Sanitary Complex |
50000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.7762816
Longitude : 94.3919209
file name : Image_07062024133120024.png
|
2024-06-07 13:31:20.118054 |
121 |
68192861 |
Construction of Community Sanitary Complex |
50000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.7762666
Longitude : 94.3923847
file name : Image_18092024125656039.png
|
2024-09-18 12:56:56.144387 |
122 |
68192861 |
Construction of Community Sanitary Complex |
50000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.7762794
Longitude : 94.3919228
file name : Image_07062024133543923.png
|
2024-06-07 13:35:44.013327 |
123 |
68192861 |
Construction of Community Sanitary Complex |
50000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.7762794
Longitude : 94.3919228
file name : Image_07062024133049450.png
|
2024-06-07 13:30:49.545831 |
124 |
68192546 |
Construction of Community Sanitary Complex |
49406 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.7762814
Longitude : 94.3919211
file name : Image_07062024133530370.png
|
2024-06-07 13:35:30.461556 |
125 |
68192546 |
Construction of Community Sanitary Complex |
49406 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.7762814
Longitude : 94.3919211
file name : Image_07062024133026201.png
|
2024-06-07 13:30:26.51612 |
126 |
68192395 |
Construction of Community Sanitary Complex |
49406 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.7762821
Longitude : 94.3919209
file name : Image_07062024133415914.png
|
2024-06-07 13:34:16.001602 |
127 |
68192395 |
Construction of Community Sanitary Complex |
49406 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.7762821
Longitude : 94.3919209
file name : Image_07062024133002814.png
|
2024-06-07 13:30:02.907005 |
128 |
68192192 |
Construction of Community Sanitary Complex |
49406 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.77628
Longitude : 94.3919228
file name : Image_07062024133348785.png
|
2024-06-07 13:33:48.884875 |
129 |
68192192 |
Construction of Community Sanitary Complex |
49406 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.77628
Longitude : 94.3919228
file name : Image_07062024132945321.png
|
2024-06-07 13:29:45.413144 |
130 |
68169172 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.7762643
Longitude : 94.3923796
file name : Image_18092024125628779.png
|
2024-09-18 12:56:28.886083 |
131 |
68193652 |
Adjustment entry for untied fund |
516000 |
Adjustment entry for untied fund1 |
Completion of work |
-
latitude : 26.7762679,26.7762679
Longitude : 94.3923828,94.3923828
file name : Image_21082024130325239.png
|
2024-08-21 13:03:25.347376 |
132 |
88575883 |
Operation & maintenance of drinking water supply system |
741000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.776268
Longitude : 94.3923828
file name : Image_23082024130546691.png
|
2024-08-23 13:05:46.863723 |
133 |
88575120 |
Renovation of Kheroni LP School |
150000 |
Renovation of Kheroni LP School1 |
Completion of work |
-
latitude : 26.77634896
Longitude : 94.39371123
file name : Image_04112024150940282.png
|
2024-11-04 15:09:40.37291 |
134 |
66158919 |
Adjustment |
70458 |
Adjustment 1 |
Completion of work |
-
latitude : 26.78163841
Longitude : 94.39241179
file name : Image_04112024150819101.png
|
2024-11-04 15:08:19.220015 |
135 |
88575334 |
Const of Boundary wall Pulinahoroni PHC |
494000 |
Const of Boundary wall Pulinahoroni PHC1 |
Completion of work |
-
latitude : 26.78167945
Longitude : 94.39242502
file name : Image_18112024134917531.png
|
2024-11-18 13:49:17.62367 |