1 |
5778040 |
Installation of Tubewell at GP Office with motor (Phase-I) |
50000 |
Hand pump1 |
Ground work |
-
latitude : 26.6619166
Longitude : 94.3885018
file name : Image_13062019132503602.png
|
2019-06-13 13:25:03.679307 |
2 |
5778140 |
Constn. of Market Complex at GP Office (Phase-I) |
185433 |
Market Yards/ Vending Zone1 |
Plinth Level |
-
latitude : 26.6619166
Longitude : 94.3885018
file name : Image_13062019132408990.png
|
2019-06-13 13:24:09.07103 |
3 |
10947510 |
Constn. of drainage with brick Masonary work nearby sewa kendra |
110483 |
Bridge1 |
In Progress |
-
latitude : 26.68762411,26.68762399
Longitude : 94.40206667,94.40206618
file name : Image_27052019095538021.png
|
2019-05-27 09:55:38.133617 |
4 |
10946281 |
Improvement of 15 No. Maddhya Nakachari GP Community hall |
60000 |
Cultural Stage1 |
25% |
-
latitude : 26.6619166
Longitude : 94.3885018
file name : Image_13062019132637767.png
|
2019-06-13 13:26:37.845494 |
5 |
44140482 |
Installation of H.P. culvert on Debarapar Grant Mahendra path |
120000 |
Installation of H.P. culvert on Debarapar Grant Mahendra path1 |
Substructure below GL |
-
latitude : 26.67755443,26.67757601
Longitude : 94.41265025,94.41274966
file name : Image_17122020180807204.png
|
2020-12-17 18:08:07.293154 |
6 |
43880729 |
Improvement of Nimati Gaon Path with Pavers Block (Phase-II) |
600000 |
Improvement of Nimati Gaon Path with Pavers Block (Phase-II)1 |
Earth Work |
-
latitude : 26.68294927,26.68295028,26.68294833
Longitude : 94.38288596,94.38288832,94.38288171
file name : Image_04012021114644309.png
|
2021-01-04 11:46:44.400558 |
7 |
43880782 |
Construction of Bhuben gogoi path with pavers block |
300000 |
Construction of Bhuben gogoi path with pavers block1 |
Earth Work |
-
latitude : 26.67280356,26.67281768
Longitude : 94.39311009,94.39316056
file name : Image_06022021113538060.png
|
2021-02-06 11:35:38.165499 |
8 |
43880782 |
Construction of Bhuben gogoi path with pavers block |
300000 |
Construction of Bhuben gogoi path with pavers block1 |
Earth Work |
-
latitude : 26.67344476,26.673442
Longitude : 94.39358831,94.39351361
file name : Image_17022021134030577.png
|
2021-02-17 13:40:30.681468 |
9 |
43880982 |
Construction of Morongial sub-way with Pavers block |
400000 |
Construction of Morongial sub-way with Pavers block1 |
Earth Work |
-
latitude : 26.67126403,26.67188607,26.67191148
Longitude : 94.40715369,94.40841188,94.40837976
file name : Image_06012021120741746.png
|
2021-01-06 12:07:41.842579 |
10 |
44140079 |
Improvement of Ratanpur Muslim Gaon link Road with Pavers Block |
600000 |
Improvement of Ratanpur Muslim Gaon link Road with Pavers Block1 |
Earth Work |
-
latitude : 26.68198891,26.68199774
Longitude : 94.38119766,94.38119431
file name : Image_05012021122306971.png
|
2021-01-05 12:23:07.059331 |
11 |
44140571 |
Const. of Kitchen and Waiting Room of Nangal Namghar |
250000 |
Const. of Kitchen and Waiting Room of Nangal Namghar1 |
25% |
-
latitude : 26.6730653
Longitude : 94.39203611
file name : Image_07122020134815103.png
|
2020-12-07 13:48:15.20519 |
12 |
44140571 |
Const. of Kitchen and Waiting Room of Nangal Namghar |
250000 |
Const. of Kitchen and Waiting Room of Nangal Namghar1 |
25% |
-
latitude : 26.6730653
Longitude : 94.39203611
file name : Image_07122020134800608.png
|
2020-12-07 13:48:00.72217 |
13 |
44140606 |
Const. of a Toilet at Holonguri Namghar |
150000 |
Const. of a Toilet at Holonguri Namghar1 |
25% |
-
latitude : 26.67301182
Longitude : 94.39687948
file name : Image_07122020133547493.png
|
2020-12-07 13:35:47.610469 |
14 |
44140606 |
Const. of a Toilet at Holonguri Namghar |
150000 |
Const. of a Toilet at Holonguri Namghar1 |
25% |
-
latitude : 26.67301182
Longitude : 94.39687948
file name : Image_07122020133436295.png
|
2020-12-07 13:34:36.41136 |
15 |
44141090 |
Const. of Lalit Borpujari path with Pavers Block |
457892 |
Const. of Lalit Borpujari path with Pavers Block1 |
Earth Work |
-
latitude : 26.68777112,26.68777246
Longitude : 94.40266089,94.40267202
file name : Image_07122020133403299.png
|
2020-12-07 13:34:03.42229 |
16 |
44140371 |
Installation of H.P. culvert on Dihingia Potharchuk Path |
120000 |
Installation of H.P. culvert on Dihingia Potharchuk Path1 |
Substructure below GL |
-
latitude : 26.66384805,26.66384192
Longitude : 94.38714714,94.38715691
file name : Image_09022021123858494.png
|
2021-02-09 12:38:58.594708 |
17 |
44140371 |
Installation of H.P. culvert on Dihingia Potharchuk Path |
120000 |
Installation of H.P. culvert on Dihingia Potharchuk Path1 |
Substructure below GL |
-
latitude : 26.66384805,26.66384192
Longitude : 94.38714714,94.38715691
file name : Image_09022021123903252.png
|
2021-02-09 12:39:03.36771 |
18 |
44140371 |
Installation of H.P. culvert on Dihingia Potharchuk Path |
120000 |
Installation of H.P. culvert on Dihingia Potharchuk Path1 |
Substructure below GL |
-
latitude : 26.66384805,26.66384192
Longitude : 94.38714714,94.38715691
file name : Image_09022021123907610.png
|
2021-02-09 12:39:07.703477 |
19 |
44140705 |
Installation of H.P. culvert on Deberapar Parijan Maji Path |
120000 |
Installation of H.P. culvert on Deberapar Parijan Maji Path1 |
Earth Work |
-
latitude : 26.67844094,26.6784575
Longitude : 94.41246366,94.41254866
file name : Image_17122020180708128.png
|
2020-12-17 18:07:08.201113 |
20 |
44140832 |
Improvement of Cinatoli Moutjuli link road with Pavers Block |
400000 |
Improvement of Cinatoli Moutjuli link road with Pavers Block1 |
Earth Work |
-
latitude : 26.67071616,26.67071345
Longitude : 94.39588037,94.39587243
file name : Image_07122020134751655.png
|
2020-12-07 13:47:51.757929 |
21 |
44140628 |
Improvement of Nangal Suk Path with Pavers Block |
300000 |
Improvement of Nangal Suk Path with Pavers Block1 |
Earth Work |
-
latitude : 26.673477,26.67347785
Longitude : 94.39217288,94.39217351
file name : Image_07122020134829530.png
|
2020-12-07 13:48:29.640963 |
22 |
44140628 |
Improvement of Nangal Suk Path with Pavers Block |
300000 |
Improvement of Nangal Suk Path with Pavers Block1 |
Earth Work |
-
latitude : 26.673477,26.67347785
Longitude : 94.39217288,94.39217351
file name : Image_07122020134807174.png
|
2020-12-07 13:48:07.289063 |
23 |
43880935 |
Construction of Sukafa Namghar sub-way to Sukafa Nagar main road with pavers block |
900000 |
Construction of Sukafa Namghar sub-way to Sukafa Nagar main road with pavers block1 |
Earth Work |
-
latitude : 26.68271349,26.68271565
Longitude : 94.39411612,94.39412158
file name : Image_04022021115322194.png
|
2021-02-04 11:53:22.327889 |
24 |
43880935 |
Construction of Sukafa Namghar sub-way to Sukafa Nagar main road with pavers block |
900000 |
Construction of Sukafa Namghar sub-way to Sukafa Nagar main road with pavers block1 |
Earth Work |
-
latitude : 26.68271349,26.68271565
Longitude : 94.39411612,94.39412158
file name : Image_04022021115326139.png
|
2021-02-04 11:53:26.257708 |
25 |
43880935 |
Construction of Sukafa Namghar sub-way to Sukafa Nagar main road with pavers block |
900000 |
Construction of Sukafa Namghar sub-way to Sukafa Nagar main road with pavers block1 |
Earth Work |
-
latitude : 26.68271349,26.68271565
Longitude : 94.39411612,94.39412158
file name : Image_04022021115329906.png
|
2021-02-04 11:53:30.023554 |
26 |
43880747 |
Const. of RCC slab over drain near Homobai Kendra |
353000 |
Const. of RCC slab over drain near Homobai Kendra1 |
Substructure below GL |
-
latitude : 26.68830281
Longitude : 94.40185644
file name : Image_07122020133351785.png
|
2020-12-07 13:33:51.921659 |
27 |
43880799 |
Improvement of 3 No ward path with 3 Culvert |
270000 |
Improvement of 3 No ward path with 3 Culvert1 |
Substructure below GL |
-
latitude : 26.66936675,26.66942436
Longitude : 94.40187239,94.40159
file name : Image_09022021114424650.png
|
2021-02-09 11:44:24.757705 |
28 |
43886604 |
Construction of Drain in front of GP office with RCC slab |
575000 |
Construction of Drain in front of GP office with RCC slab1 |
25% |
-
latitude : 26.68820545,26.68810882
Longitude : 94.40231944,94.40258302
file name : Image_18012021123552589.png
|
2021-01-18 12:35:52.705511 |
29 |
43881299 |
Improvement of Chinatoli sub-way with Pavers block |
500000 |
Improvement of Chinatoli sub-way with Pavers block1 |
Earth Work |
-
latitude : 26.66640618,26.66634312
Longitude : 94.39945299,94.39943769
file name : Image_06022021113941067.png
|
2021-02-06 11:39:41.159202 |
30 |
43881285 |
Improvement of 8no ward Somua Mazhi path with Pavers block |
300000 |
Improvement of 8no ward Somua Mazhi path with Pavers block1 |
Earth Work |
-
latitude : 26.67902223,26.67901721
Longitude : 94.41319195,94.41319454
file name : Image_17122020180746528.png
|
2020-12-17 18:07:46.627058 |
31 |
43881285 |
Improvement of 8no ward Somua Mazhi path with Pavers block |
300000 |
Improvement of 8no ward Somua Mazhi path with Pavers block1 |
Earth Work |
-
latitude : 26.67902223,26.67901721
Longitude : 94.41319195,94.41319454
file name : Image_17122020180819019.png
|
2020-12-17 18:08:19.116885 |
32 |
43881326 |
Development of Sukafa nagar Hipini sangha |
200000 |
Development of Sukafa nagar Hipini sangha1 |
25% |
-
latitude : 26.68264802
Longitude : 94.39480465
file name : Image_04022021112325568.png
|
2021-02-04 11:23:25.671597 |
33 |
43881326 |
Development of Sukafa nagar Hipini sangha |
200000 |
Development of Sukafa nagar Hipini sangha1 |
25% |
-
latitude : 26.68264621
Longitude : 94.39482745
file name : Image_12032021112535207.png
|
2021-03-12 11:25:35.306697 |
34 |
43886503 |
Construction of Ratanpur Muslim gaon link road with pavers block along with 1 Culvert |
800000 |
Construction of Ratanpur Muslim gaon link road with pavers block along with 1 Culvert1 |
Earth Work |
-
latitude : 26.67867853,26.67868129
Longitude : 94.38329308,94.38329349
file name : Image_01032021103106277.png
|
2021-03-01 10:31:06.365995 |
35 |
43886525 |
Construction of 1 no Kalia gaon road with pavers block |
700000 |
Construction of 1 no Kalia gaon road with pavers block1 |
Earth Work |
-
latitude : 26.68050036,26.68049219
Longitude : 94.37373481,94.37371129
file name : Image_09022021114434509.png
|
2021-02-09 11:44:34.613981 |
36 |
43886525 |
Construction of 1 no Kalia gaon road with pavers block |
700000 |
Construction of 1 no Kalia gaon road with pavers block1 |
Earth Work |
-
latitude : 26.68037372,26.68036973
Longitude : 94.37347165,94.37344357
file name : Image_04022021105526383.png
|
2021-02-04 10:55:26.492851 |
37 |
43886525 |
Construction of 1 no Kalia gaon road with pavers block |
700000 |
Construction of 1 no Kalia gaon road with pavers block1 |
Earth Work |
-
latitude : 26.68050036,26.68049219
Longitude : 94.37373481,94.37371129
file name : Image_09022021114428943.png
|
2021-02-09 11:44:29.058348 |
38 |
43886565 |
Const. of Lalit Borpujari path with Pavers Block along with 1 culvert (Ph-II) |
400000 |
Const. of Lalit Borpujari path with Pavers Block along with 1 culvert (Ph-II)1 |
Earth Work |
-
latitude : 26.68653595,26.68657803
Longitude : 94.40270659,94.4026953
file name : Image_17122020180750922.png
|
2020-12-17 18:07:51.011319 |
39 |
43886565 |
Const. of Lalit Borpujari path with Pavers Block along with 1 culvert (Ph-II) |
400000 |
Const. of Lalit Borpujari path with Pavers Block along with 1 culvert (Ph-II)1 |
Earth Work |
-
latitude : 26.68653595,26.68657803
Longitude : 94.40270659,94.4026953
file name : Image_17122020180800787.png
|
2020-12-17 18:08:00.878086 |
40 |
43886565 |
Const. of Lalit Borpujari path with Pavers Block along with 1 culvert (Ph-II) |
400000 |
Const. of Lalit Borpujari path with Pavers Block along with 1 culvert (Ph-II)1 |
Earth Work |
-
latitude : 26.68653595,26.68657803
Longitude : 94.40270659,94.4026953
file name : Image_17122020180831602.png
|
2020-12-17 18:08:31.690087 |
41 |
43886565 |
Const. of Lalit Borpujari path with Pavers Block along with 1 culvert (Ph-II) |
400000 |
Const. of Lalit Borpujari path with Pavers Block along with 1 culvert (Ph-II)1 |
Earth Work |
-
latitude : 26.68653595,26.68657803
Longitude : 94.40270659,94.4026953
file name : Image_17122020180836481.png
|
2020-12-17 18:08:36.570362 |
42 |
43886623 |
Development of 10 no ward Radha Krishna Mandir |
300000 |
Development of 10 no ward Radha Krishna Mandir1 |
25% |
-
latitude : 26.66397894
Longitude : 94.38619393
file name : Image_15122020185744987.png
|
2020-12-15 18:57:45.10665 |
43 |
43886623 |
Development of 10 no ward Radha Krishna Mandir |
300000 |
Development of 10 no ward Radha Krishna Mandir1 |
25% |
-
latitude : 26.66397894
Longitude : 94.38619393
file name : Image_15122020185833724.png
|
2020-12-15 18:58:33.827662 |
44 |
43886639 |
Development of 8 no ward Mahila Samitte office |
300000 |
Development of 8 no ward Mahila Samitte office1 |
25% |
-
latitude : 26.67886875
Longitude : 94.412327
file name : Image_17122020180741083.png
|
2020-12-17 18:07:41.178408 |
45 |
43886639 |
Development of 8 no ward Mahila Samitte office |
300000 |
Development of 8 no ward Mahila Samitte office1 |
25% |
-
latitude : 26.67886875
Longitude : 94.412327
file name : Image_17122020180812851.png
|
2020-12-17 18:08:12.94548 |
46 |
43881390 |
Construction of Boundry wall of Dihingia LP School |
500000 |
Construction of Boundry wall of Dihingia LP School1 |
25% |
-
latitude : 26.67439364
Longitude : 94.38625075
file name : Image_09022021114443935.png
|
2021-02-09 11:44:44.05947 |
47 |
43881390 |
Construction of Boundry wall of Dihingia LP School |
500000 |
Construction of Boundry wall of Dihingia LP School1 |
25% |
-
latitude : 26.67448816
Longitude : 94.38629545
file name : Image_15122020185845339.png
|
2020-12-15 18:58:45.438503 |
48 |
43881390 |
Construction of Boundry wall of Dihingia LP School |
500000 |
Construction of Boundry wall of Dihingia LP School1 |
25% |
-
latitude : 26.67448816
Longitude : 94.38629545
file name : Image_15122020185804826.png
|
2020-12-15 18:58:04.942961 |
49 |
66024425 |
Any other operation and maintenance needs related to solid waste management |
77170 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 26.6880525
Longitude : 94.4023173
file name : Image_04042024145207230.png
|
2024-04-04 14:52:07.395001 |
50 |
52034301 |
Improvement of Sanitary System at GP Office |
116316 |
Improvement of Sanitary System at GP Office1 |
Roof laid |
-
latitude : 26.6880713
Longitude : 94.4023966
file name : Image_28082023111431865.png
|
2023-08-28 11:14:31.987537 |
51 |
52034301 |
Improvement of Sanitary System at GP Office |
116316 |
Improvement of Sanitary System at GP Office1 |
Completion of work |
-
latitude : 26.687973
Longitude : 94.4025126
file name : Image_19042022123004687.png
|
2022-04-19 12:30:04.806715 |
52 |
52034655 |
Construction of Ranga Mancha at 10 No ward |
189000 |
Construction of Ranga Mancha at 10 No ward1 |
Completion of work |
-
latitude : 26.66432129
Longitude : 94.3874019
file name : Image_19042022140950891.png
|
2022-04-19 14:09:51.031651 |
53 |
52034590 |
Improvement Aphalamukh rajahuwa kendra |
189000 |
Improvement Aphalamukh rajahuwa kendra1 |
Completion of work |
-
latitude : 26.68491419
Longitude : 94.38178857
file name : Image_19042022143726188.png
|
2022-04-19 14:37:26.332608 |
54 |
52034614 |
Construction of Tirual bheta Morongial link road phase ii |
189000 |
Construction of Tirual bheta Morongial link road phase ii1 |
Completion of work |
-
latitude : 26.68544637,26.68544583
Longitude : 94.39818464,94.39818522
file name : Image_19042022135149273.png
|
2022-04-19 13:51:49.403964 |
55 |
52034137 |
Construction of Toilet at Karatipar Rajahuwa kendra |
150000 |
Construction of Toilet at Karatipar Rajahuwa kendra1 |
Completion of work |
-
latitude : 26.67670576
Longitude : 94.37593951
file name : Image_19042022144917097.png
|
2022-04-19 14:49:17.259189 |
56 |
52034137 |
Construction of Toilet at Karatipar Rajahuwa kendra |
150000 |
Construction of Toilet at Karatipar Rajahuwa kendra1 |
Completion of work |
-
latitude : 26.67670576
Longitude : 94.37593951
file name : Image_19042022150413412.png
|
2022-04-19 15:04:13.493404 |
57 |
52034166 |
Construction of Drain culvert at Khatisona 2 nos |
190000 |
Construction of Drain culvert at Khatisona 2 nos1 |
Completion of work |
-
latitude : 26.68084311,26.68083126
Longitude : 94.39039033,94.39038747
file name : Image_19042022140833465.png
|
2022-04-19 14:08:33.594254 |
58 |
66623849 |
Dev. of Commercial cum Educational Centre at GP Office Campus |
488050 |
DEV. OF COMMERCIAL CUM EDUCATIONAL CENTRE AT G.P OFFICE CAMPUS |
Plinth level |
-
latitude : 26.68797109
Longitude : 94.40253199
file name : Image_17102023114733356.png
|
2023-10-17 11:47:33.692738 |
59 |
66623849 |
Dev. of Commercial cum Educational Centre at GP Office Campus |
488050 |
DEV. OF COMMERCIAL CUM EDUCATIONAL CENTRE AT G.P OFFICE CAMPUS |
Completion of work |
-
latitude : 26.68790976
Longitude : 94.40251414
file name : Image_22052023153732651.png
|
2023-05-22 15:37:32.751638 |
60 |
52034333 |
Construction of Drain including 1 Culvert at Lalit Borpujari Path |
190000 |
Construction of Drain including 1 Culvert at Lalit Borpujari Path1 |
Plinth level |
-
latitude : 26.68813163
Longitude : 94.40267584
file name : Image_28082023134046258.png
|
2023-08-28 13:40:46.364322 |
61 |
52034333 |
Construction of Drain including 1 Culvert at Lalit Borpujari Path |
190000 |
Construction of Drain including 1 Culvert at Lalit Borpujari Path1 |
Plinth level |
-
latitude : 26.68812077
Longitude : 94.40271809
file name : Image_28082023123324124.png
|
2023-08-28 12:33:24.231818 |
62 |
52034333 |
Construction of Drain including 1 Culvert at Lalit Borpujari Path |
190000 |
Construction of Drain including 1 Culvert at Lalit Borpujari Path1 |
Plinth level |
-
latitude : 26.68812077
Longitude : 94.40271809
file name : Image_28082023123312741.png
|
2023-08-28 12:33:12.856394 |
63 |
52034333 |
Construction of Drain including 1 Culvert at Lalit Borpujari Path |
190000 |
Construction of Drain including 1 Culvert at Lalit Borpujari Path1 |
Completion of work |
-
latitude : 26.68813287
Longitude : 94.40277311
file name : Image_11042022131750568.png
|
2022-04-11 13:17:50.675011 |
64 |
52034255 |
Construction of Toilet at Morongial kola krishti sangha |
150000 |
Construction of Toilet at Morongial kola krishti sangha1 |
Roof laid |
-
latitude : 26.66581383
Longitude : 94.40869553
file name : Image_31082023141216754.png
|
2023-08-31 14:12:16.844607 |
65 |
52034255 |
Construction of Toilet at Morongial kola krishti sangha |
150000 |
Construction of Toilet at Morongial kola krishti sangha1 |
Completion of work |
-
latitude : 26.66593815
Longitude : 94.40867617
file name : Image_19042022150521121.png
|
2022-04-19 15:05:21.215038 |
66 |
52034633 |
Construction of Mazhi Than at 8 No ward |
189000 |
Construction of Mazhi Than at 8 No ward1 |
Roof laid |
-
latitude : 26.67763049
Longitude : 94.41071814
file name : Image_23032023135650897.png
|
2023-03-23 13:56:50.99565 |
67 |
52034633 |
Construction of Mazhi Than at 8 No ward |
189000 |
Construction of Mazhi Than at 8 No ward1 |
Completion of work |
-
latitude : 26.6776
Longitude : 94.41082865
file name : Image_19042022151713633.png
|
2022-04-19 15:17:13.743475 |
68 |
52034697 |
Construction of Tirual bheta natun path phase ii |
189000 |
Construction of Tirual bheta natun path phase ii1 |
Completion of work |
-
latitude : 26.68562334,26.6856209
Longitude : 94.39594041,94.39593707
file name : Image_26042022145245534.png
|
2022-04-26 14:52:45.649753 |
69 |
64628417 |
Renovation of GP Office Community Hall |
1046319 |
Renovation of GP Office Community Hall1 |
Completion of work |
-
latitude : 26.6880699
Longitude : 94.4023886
file name : Image_28082023111435742.png
|
2023-08-28 11:14:35.846375 |
70 |
64628417 |
Renovation of GP Office Community Hall |
1046319 |
Renovation of GP Office Community Hall1 |
Completion of work |
-
latitude : 26.6881669
Longitude : 94.40270129
file name : Image_19112022110038491.png
|
2022-11-19 11:00:38.58495 |
71 |
64628801 |
CMSC at Deberapar Chariali |
90000 |
CMSC at Deberapar Chariali 1 |
Plinth level |
-
latitude : 26.68809356
Longitude : 94.40266226
file name : Image_28082023134103335.png
|
2023-08-28 13:41:03.422289 |
72 |
64628801 |
CMSC at Deberapar Chariali |
90000 |
CMSC at Deberapar Chariali 1 |
Plinth level |
-
latitude : 26.68809356
Longitude : 94.40266226
file name : Image_28082023134050124.png
|
2023-08-28 13:40:50.212087 |
73 |
64628801 |
CMSC at Deberapar Chariali |
90000 |
CMSC at Deberapar Chariali 1 |
Completion of work |
-
latitude : 26.68801424
Longitude : 94.40269105
file name : Image_28082023123306941.png
|
2023-08-28 12:33:07.061371 |
74 |
64628801 |
CMSC at Deberapar Chariali |
90000 |
CMSC at Deberapar Chariali 1 |
Completion of work |
-
latitude : 26.6881131
Longitude : 94.4024751
file name : Image_15022023111801269.png
|
2023-02-15 11:18:01.404856 |
75 |
66024628 |
Const. of flag hoisting platform at GP office Campus |
170000 |
Const. of flag hoisting platform at GP office Campus1 |
Plinth level |
-
latitude : 26.68803212
Longitude : 94.40256937
file name : Image_28082023134112616.png
|
2023-08-28 13:41:12.707673 |
76 |
66024628 |
Const. of flag hoisting platform at GP office Campus |
170000 |
Const. of flag hoisting platform at GP office Campus1 |
Plinth level |
-
latitude : 26.68803212
Longitude : 94.40256937
file name : Image_28082023134059127.png
|
2023-08-28 13:40:59.225256 |
77 |
66024628 |
Const. of flag hoisting platform at GP office Campus |
170000 |
Const. of flag hoisting platform at GP office Campus1 |
Completion of work |
-
latitude : 26.6879525
Longitude : 94.40251412
file name : Image_28082023132507768.png
|
2023-08-28 13:25:07.875376 |
78 |
66024628 |
Const. of flag hoisting platform at GP office Campus |
170000 |
Const. of flag hoisting platform at GP office Campus1 |
Completion of work |
-
latitude : 26.68798353
Longitude : 94.40256352
file name : Image_28082023125821430.png
|
2023-08-28 12:58:21.532899 |
79 |
66024628 |
Const. of flag hoisting platform at GP office Campus |
170000 |
Const. of flag hoisting platform at GP office Campus1 |
Completion of work |
-
latitude : 26.68799219
Longitude : 94.40257836
file name : Image_28082023123318155.png
|
2023-08-28 12:33:18.29092 |
80 |
66024628 |
Const. of flag hoisting platform at GP office Campus |
170000 |
Const. of flag hoisting platform at GP office Campus1 |
Completion of work |
-
latitude : 26.6880848
Longitude : 94.40257325
file name : Image_15022023111900587.png
|
2023-02-15 11:19:00.697382 |
81 |
64628922 |
Construction of Pucca Drain with slab at Balijan Road in front of GP Office |
343000 |
Construction of Pucca Drain with slab at Balijan Road in front of GP Office1 |
Plinth level |
-
latitude : 26.68826496,26.68823714
Longitude : 94.40247885,94.40253053
file name : Image_28082023134107685.png
|
2023-08-28 13:41:07.77961 |
82 |
64628922 |
Construction of Pucca Drain with slab at Balijan Road in front of GP Office |
343000 |
Construction of Pucca Drain with slab at Balijan Road in front of GP Office1 |
Plinth level |
-
latitude : 26.68826496,26.68823714
Longitude : 94.40247885,94.40253053
file name : Image_28082023134054496.png
|
2023-08-28 13:40:54.589641 |
83 |
64628922 |
Construction of Pucca Drain with slab at Balijan Road in front of GP Office |
343000 |
Construction of Pucca Drain with slab at Balijan Road in front of GP Office1 |
Completion of work |
-
latitude : 26.68839236,26.68835921
Longitude : 94.40195149,94.40198639
file name : Image_25112022110022820.png
|
2022-11-25 11:00:22.936693 |
84 |
64628922 |
Construction of Pucca Drain with slab at Balijan Road in front of GP Office |
343000 |
Construction of Pucca Drain with slab at Balijan Road in front of GP Office1 |
Completion of work |
-
latitude : 26.68839236,26.68835921
Longitude : 94.40195149,94.40198639
file name : Image_25112022112655216.png
|
2022-11-25 11:26:55.32134 |
85 |
64628677 |
CMSC at 1 No Ward Rangamancha |
90000 |
CMSC at 1 No Ward Rangamancha1 |
Plinth level |
-
latitude : 26.67575103
Longitude : 94.37696525
file name : Image_31082023141428630.png
|
2023-08-31 14:14:28.726726 |
86 |
64628677 |
CMSC at 1 No Ward Rangamancha |
90000 |
CMSC at 1 No Ward Rangamancha1 |
Completion of work |
-
latitude : 26.67567464
Longitude : 94.37701071
file name : Image_25112022112749136.png
|
2022-11-25 11:27:49.247535 |
87 |
66624738 |
Creation of drainage channel for management of grey water |
240450 |
CONST.OF DRAIN WITH SLAB OF BALIJAN ROAD INFORNT OF GP OFFICE PHASE II |
Plinth level |
-
latitude : 26.68827265
Longitude : 94.40242628
file name : Image_17102023114631305.png
|
2023-10-17 11:46:32.49973 |
88 |
66624738 |
Creation of drainage channel for management of grey water |
240450 |
CONST.OF DRAIN WITH SLAB OF BALIJAN ROAD INFORNT OF GP OFFICE PHASE II |
Completion of work |
-
latitude : 26.68825208
Longitude : 94.40244313
file name : Image_22052023153554294.png
|
2023-05-22 15:35:54.387362 |
89 |
66624972 |
Construction of toilets in public institutions |
175400 |
CONST. OF Urinal with DRINKING WATER FACILITY AT 3 NO WARD RAJ SANSKRITI SANGHA |
Plinth level |
-
latitude : 26.67302357
Longitude : 94.39687023
file name : Image_29112023141626282.png
|
2023-11-29 14:16:26.370149 |
90 |
66624972 |
Construction of toilets in public institutions |
175400 |
CONST. OF Urinal with DRINKING WATER FACILITY AT 3 NO WARD RAJ SANSKRITI SANGHA |
Completion of work |
-
latitude : 26.67311271
Longitude : 94.39692409
file name : Image_17102023132703237.png
|
2023-10-17 13:27:03.332351 |
91 |
66624972 |
Construction of toilets in public institutions |
175400 |
CONST. OF Urinal with DRINKING WATER FACILITY AT 3 NO WARD RAJ SANSKRITI SANGHA |
Completion of work |
-
latitude : 26.67279326
Longitude : 94.39700244
file name : Image_22052023153755148.png
|
2023-05-22 15:37:55.239908 |
92 |
66625028 |
Construction of toilets in public institutions |
175400 |
CONST. OF Urinal with DRINKING WATER FACILITY AT APHALAMUKH RAJAHUWA KENDRA |
Roof laid |
-
latitude : 26.68525971
Longitude : 94.38204806
file name : Image_20112023141149406.png
|
2023-11-20 14:11:49.498168 |
93 |
66625028 |
Construction of toilets in public institutions |
175400 |
CONST. OF Urinal with DRINKING WATER FACILITY AT APHALAMUKH RAJAHUWA KENDRA |
Plinth level |
-
latitude : 26.68530263
Longitude : 94.38200621
file name : Image_17102023151034617.png
|
2023-10-17 15:10:34.757549 |
94 |
66625028 |
Construction of toilets in public institutions |
175400 |
CONST. OF Urinal with DRINKING WATER FACILITY AT APHALAMUKH RAJAHUWA KENDRA |
Completion of work |
-
latitude : 26.68512846
Longitude : 94.38205529
file name : Image_29052023161112512.png
|
2023-05-29 16:11:12.61318 |
95 |
66623721 |
Dev.of Community pond at 10 ward Chhath Puja Ghat |
100000 |
DEVELOPMENT OF COMMUNITY POND AT 10 NO WARD (CHHATH PUJA GHAT) |
Plinth level |
-
latitude : 26.66210435
Longitude : 94.38847486
file name : Image_17102023144329923.png
|
2023-10-17 14:43:30.013883 |
96 |
66623721 |
Dev.of Community pond at 10 ward Chhath Puja Ghat |
100000 |
DEVELOPMENT OF COMMUNITY POND AT 10 NO WARD (CHHATH PUJA GHAT) |
Completion of work |
-
latitude : 26.66222569
Longitude : 94.38854384
file name : Image_22052023153743391.png
|
2023-05-22 15:37:43.487159 |
97 |
66625075 |
Construction of Community Sanitary Complex |
90000 |
CMSC TOILET AT KHATISONA |
Plinth level |
-
latitude : 26.68150304
Longitude : 94.38793369
file name : Image_17102023131348780.png
|
2023-10-17 13:13:48.870595 |
98 |
66625075 |
Construction of Community Sanitary Complex |
90000 |
CMSC TOILET AT KHATISONA |
Completion of work |
-
latitude : 26.68143164
Longitude : 94.38790669
file name : Image_18042023141032210.png
|
2023-04-18 14:10:32.293659 |
99 |
66624308 |
Adjustment Plan |
603000 |
Adjustment Plan1 |
Completion of work |
-
latitude : 26.68798756
Longitude : 94.40233608
file name : Image_24012024141324817.png
|
2024-01-24 14:13:24.906735 |
100 |
52034758 |
Expenses under COVID 19 Pendemic |
101316 |
Expenses under COVID 19 Pendemic1 |
Plinth level |
-
latitude : 26.68800769
Longitude : 94.4022732
file name : Image_23112023151459156.png
|
2023-11-23 15:14:59.275566 |
101 |
52034758 |
Expenses under COVID 19 Pendemic |
101316 |
Expenses under COVID 19 Pendemic1 |
Completion of work |
-
latitude : 26.68800644
Longitude : 94.40245135
file name : Image_23112023150516899.png
|
2023-11-23 15:05:16.989133 |
102 |
52034758 |
Expenses under COVID 19 Pendemic |
101316 |
Expenses under COVID 19 Pendemic1 |
Completion of work |
-
latitude : 26.68774655
Longitude : 94.40229082
file name : Image_07072021104323192.png
|
2021-07-07 10:43:23.288802 |
103 |
52034758 |
Expenses under COVID 19 Pendemic |
101316 |
Expenses under COVID 19 Pendemic1 |
Completion of work |
-
latitude : 26.68774655
Longitude : 94.40229082
file name : Image_07072021104331166.png
|
2021-07-07 10:43:31.262003 |
104 |
66624840 |
Construction of toilets in public institutions |
178500 |
Const. OF Urinal with DRINKING WATER Facility AT 1NO CHINATOLI KALA KRISTI SANGHA |
Plinth level |
-
latitude : 26.67316076
Longitude : 94.39211244
file name : Image_29112023140902608.png
|
2023-11-29 14:09:02.693173 |
105 |
66624840 |
Construction of toilets in public institutions |
178500 |
Const. OF Urinal with DRINKING WATER Facility AT 1NO CHINATOLI KALA KRISTI SANGHA |
Completion of work |
-
latitude : 26.67318385
Longitude : 94.39217554
file name : Image_17102023131947313.png
|
2023-10-17 13:19:47.432165 |
106 |
66624840 |
Construction of toilets in public institutions |
178500 |
Const. OF Urinal with DRINKING WATER Facility AT 1NO CHINATOLI KALA KRISTI SANGHA |
Completion of work |
-
latitude : 26.67345221
Longitude : 94.39224099
file name : Image_22052023153805993.png
|
2023-05-22 15:38:06.094368 |
107 |
66623928 |
Dev. of Commercial Cum Educational Centre at GP Office Campu Phase ii |
558600 |
Dev. of Commercial Cum Educational Centre at GP Office Campu Phase ii1 |
Plinth level |
-
latitude : 26.6881192
Longitude : 94.4022745
file name : Image_20052024125952923.png
|
2024-05-20 12:59:53.018759 |
108 |
66623928 |
Dev. of Commercial Cum Educational Centre at GP Office Campu Phase ii |
558600 |
Dev. of Commercial Cum Educational Centre at GP Office Campu Phase ii1 |
Completion of work |
-
latitude : 26.6880686
Longitude : 94.4022508
file name : Image_03042024144708610.png
|
2024-04-03 14:47:08.8079 |
109 |
66623928 |
Dev. of Commercial Cum Educational Centre at GP Office Campu Phase ii |
558600 |
Dev. of Commercial Cum Educational Centre at GP Office Campu Phase ii1 |
Completion of work |
-
latitude : 26.68787656
Longitude : 94.40268494
file name : Image_24012024133036483.png
|
2024-01-24 13:30:36.578069 |
110 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.6765695
Longitude : 94.41360002
file name : Image_20052024151346167.png
|
2024-05-20 15:13:46.261868 |
111 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.67670097
Longitude : 94.4136074
file name : Image_05122023122600884.png
|
2023-12-05 12:26:00.967575 |
112 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.67864193
Longitude : 94.38780215
file name : Image_22052024151912922.png
|
2024-05-22 15:19:13.010732 |
113 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.6881222
Longitude : 94.4022762
file name : Image_20052024163316674.png
|
2024-05-20 16:33:16.831255 |
114 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.6881222
Longitude : 94.4022814
file name : Image_20052024162803488.png
|
2024-05-20 16:28:03.677798 |
115 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.67659041
Longitude : 94.41358474
file name : Image_20052024151507270.png
|
2024-05-20 15:15:07.39995 |
116 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.68142178
Longitude : 94.37359506
file name : Image_05122023132636647.png
|
2023-12-05 13:26:36.738545 |
117 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.68142178
Longitude : 94.37359506
file name : Image_05122023132603411.png
|
2023-12-05 13:26:03.500585 |
118 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste2 |
Roof laid |
-
latitude : 26.67867436
Longitude : 94.38779932
file name : Image_22052024151926613.png
|
2024-05-22 15:19:26.744385 |
119 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste2 |
Plinth level |
-
latitude : 26.6881207
Longitude : 94.4022865
file name : Image_20052024162807057.png
|
2024-05-20 16:28:07.151108 |
120 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste2 |
Plinth level |
-
latitude : 26.67658315
Longitude : 94.41358756
file name : Image_20052024151503065.png
|
2024-05-20 15:15:03.162509 |
121 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste2 |
Plinth level |
-
latitude : 26.67658315
Longitude : 94.41358756
file name : Image_20052024151424403.png
|
2024-05-20 15:14:24.500193 |
122 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste2 |
Completion of work |
-
latitude : 26.67315895
Longitude : 94.37068709
file name : Image_05122023132632639.png
|
2023-12-05 13:26:32.750695 |
123 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste2 |
Completion of work |
-
latitude : 26.67315895
Longitude : 94.37068709
file name : Image_05122023132559652.png
|
2023-12-05 13:25:59.74352 |
124 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.67658294
Longitude : 94.41358775
file name : Image_20052024151458462.png
|
2024-05-20 15:14:58.568951 |
125 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.67658294
Longitude : 94.41358775
file name : Image_20052024151419332.png
|
2024-05-20 15:14:19.430523 |
126 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.67893484
Longitude : 94.38498266
file name : Image_05122023132628720.png
|
2023-12-05 13:26:28.810691 |
127 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.67893484
Longitude : 94.38498266
file name : Image_05122023132555630.png
|
2023-12-05 13:25:55.730921 |
128 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste2 |
Plinth level |
-
latitude : 26.6765833
Longitude : 94.41358789
file name : Image_20052024151452524.png
|
2024-05-20 15:14:52.619569 |
129 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste2 |
Plinth level |
-
latitude : 26.6765833
Longitude : 94.41358789
file name : Image_20052024151415319.png
|
2024-05-20 15:14:15.417948 |
130 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste2 |
Completion of work |
-
latitude : 26.66344974
Longitude : 94.38574412
file name : Image_05122023132624064.png
|
2023-12-05 13:26:24.163645 |
131 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste2 |
Completion of work |
-
latitude : 26.66344974
Longitude : 94.38574412
file name : Image_05122023132550843.png
|
2023-12-05 13:25:50.952089 |
132 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste3 |
Plinth level |
-
latitude : 26.67658334
Longitude : 94.4135883
file name : Image_20052024151448408.png
|
2024-05-20 15:14:48.521062 |
133 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste3 |
Plinth level |
-
latitude : 26.67658334
Longitude : 94.4135883
file name : Image_20052024151411178.png
|
2024-05-20 15:14:11.306395 |
134 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste3 |
Completion of work |
-
latitude : 26.6795449
Longitude : 94.3870788
file name : Image_05122023132620017.png
|
2023-12-05 13:26:20.126746 |
135 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste3 |
Completion of work |
-
latitude : 26.6795449
Longitude : 94.3870788
file name : Image_05122023132546394.png
|
2023-12-05 13:25:46.488744 |
136 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste4 |
Plinth level |
-
latitude : 26.67658286
Longitude : 94.41358843
file name : Image_20052024151444535.png
|
2024-05-20 15:14:44.631308 |
137 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste4 |
Plinth level |
-
latitude : 26.67658286
Longitude : 94.41358843
file name : Image_20052024151407081.png
|
2024-05-20 15:14:07.17711 |
138 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste4 |
Completion of work |
-
latitude : 26.68283594
Longitude : 94.39537348
file name : Image_05122023132615733.png
|
2023-12-05 13:26:15.998414 |
139 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste4 |
Completion of work |
-
latitude : 26.68283594
Longitude : 94.39537348
file name : Image_05122023132541689.png
|
2023-12-05 13:25:41.785343 |
140 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.67658337
Longitude : 94.41358862
file name : Image_20052024151440609.png
|
2024-05-20 15:14:40.708112 |
141 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.67658348
Longitude : 94.41358918
file name : Image_20052024151436644.png
|
2024-05-20 15:14:36.740528 |
142 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.67658337
Longitude : 94.41358862
file name : Image_20052024151403024.png
|
2024-05-20 15:14:03.122348 |
143 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.67658348
Longitude : 94.41358918
file name : Image_20052024151358849.png
|
2024-05-20 15:13:58.946511 |
144 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.68380436
Longitude : 94.399779
file name : Image_05122023132611650.png
|
2023-12-05 13:26:11.747701 |
145 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.68380436
Longitude : 94.399779
file name : Image_05122023132537347.png
|
2023-12-05 13:25:37.446274 |
146 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste2 |
Plinth level |
-
latitude : 26.67658092
Longitude : 94.41358918
file name : Image_20052024151432507.png
|
2024-05-20 15:14:32.613381 |
147 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste2 |
Plinth level |
-
latitude : 26.67658092
Longitude : 94.41358918
file name : Image_20052024151354377.png
|
2024-05-20 15:13:54.490328 |
148 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste2 |
Completion of work |
-
latitude : 26.67670917
Longitude : 94.40534249
file name : Image_05122023132607708.png
|
2023-12-05 13:26:07.807583 |
149 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste2 |
Completion of work |
-
latitude : 26.67670917
Longitude : 94.40534249
file name : Image_05122023132533365.png
|
2023-12-05 13:25:33.466227 |
150 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste3 |
Plinth level |
-
latitude : 26.67659052
Longitude : 94.41359806
file name : Image_20052024151428447.png
|
2024-05-20 15:14:28.551613 |
151 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste3 |
Plinth level |
-
latitude : 26.67659052
Longitude : 94.41359806
file name : Image_20052024151350322.png
|
2024-05-20 15:13:50.440309 |
152 |
87650834 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste3 |
Completion of work |
-
latitude : 26.66838179
Longitude : 94.41200736
file name : Image_05122023132528742.png
|
2023-12-05 13:25:28.836231 |
153 |
87651170 |
Repairing of GP Shops infront of GP office |
576650 |
Repairing of GP Shops infront of GP office1 |
Plinth level |
-
latitude : 26.6879768
Longitude : 94.4024359
file name : Image_26092024144205649.png
|
2024-09-26 14:42:07.322519 |
154 |
87651170 |
Repairing of GP Shops infront of GP office |
576650 |
Repairing of GP Shops infront of GP office1 |
Completion of work |
-
latitude : 26.6881486
Longitude : 94.40256156
file name : Image_03042024152157291.png
|
2024-04-03 15:21:57.389676 |
155 |
87651249 |
Const. of water bottling plant at GP office |
576650 |
Const. of water bottling plant at GP office1 |
Plinth level |
-
latitude : 26.6879768
Longitude : 94.4024359
file name : Image_26092024144215998.png
|
2024-09-26 14:42:17.382579 |
156 |
87651249 |
Const. of water bottling plant at GP office |
576650 |
Const. of water bottling plant at GP office1 |
Completion of work |
-
latitude : 26.68808735
Longitude : 94.40255636
file name : Image_14062024155551704.png
|
2024-06-14 15:55:51.802625 |
157 |
52034276 |
Construction of Water facility at Khatisona |
100000 |
Construction of Water facility at Khatisona1 |
Plinth level |
-
latitude : 26.6802784
Longitude : 94.3871817
file name : Image_31082023141317947.png
|
2023-08-31 14:13:18.043391 |
158 |
52034276 |
Construction of Water facility at Khatisona |
100000 |
Construction of Water facility at Khatisona1 |
Completion of work |
-
latitude : 26.68000699
Longitude : 94.38713044
file name : Image_19042022143217851.png
|
2022-04-19 14:32:18.00358 |
159 |
52034213 |
Construction of Water facility at Tripali basti LP school |
150000 |
Construction of Water facility at Tripali basti LP school1 |
Plinth level |
-
latitude : 26.66451021
Longitude : 94.39997097
file name : Image_31082023141349442.png
|
2023-08-31 14:13:49.535499 |
160 |
52034213 |
Construction of Water facility at Tripali basti LP school |
150000 |
Construction of Water facility at Tripali basti LP school1 |
Completion of work |
-
latitude : 26.66451257
Longitude : 94.40014487
file name : Image_19042022142413287.png
|
2022-04-19 14:24:13.414751 |