1 |
10529941 |
REPAIRING OF RAJIB GANDHI SEWA KENDRA |
200000 |
Bharat Nirman Rajiv Gandhi Seva Kendra1 |
25% |
-
latitude : 26.89315425
Longitude : 94.35067801
file name : Image_28052019144737390.png
|
2019-05-28 14:47:37.48535 |
2 |
10529754 |
CONST.OF MARKETING SHED AT SOGUNPARA PHASE II |
100000 |
Market Yards/ Vending Zone1 |
Plinth Level |
-
latitude : 26.91329369
Longitude : 94.38389688
file name : Image_14062019130112532.png
|
2019-06-14 13:01:12.593644 |
3 |
44111645 |
Repairing of Tinighoria Morong Ghar |
200989 |
Repairing of Tinighoria Morong Ghar1 |
25% |
-
latitude : 26.91273589
Longitude : 94.37139085
file name : Image_09112020115627269.png
|
2020-11-09 11:56:30.239137 |
4 |
44111728 |
Land Development of GP office Campus |
400000 |
Land Development of GP office Campus1 |
25% |
-
latitude : 26.8909045,26.89332907
Longitude : 94.3484555,94.35062014
file name : Image_18112020141402774.png
|
2020-11-18 14:14:02.866005 |
5 |
44111790 |
Repairing of Major Chapori Morong Ghar |
250000 |
Repairing of Major Chapori Morong Ghar1 |
25% |
-
latitude : 26.85832364
Longitude : 94.29953352
file name : Image_17122020115148497.png
|
2020-12-17 11:51:48.60537 |
6 |
44111790 |
Repairing of Major Chapori Morong Ghar |
250000 |
Repairing of Major Chapori Morong Ghar1 |
25% |
-
latitude : 26.85833311
Longitude : 94.29956028
file name : Image_23112020121616718.png
|
2020-11-23 12:16:16.80145 |
7 |
44111898 |
Palisade at Bhekurachiga |
150638 |
Palisade at Bhekurachiga1 |
Earth Work |
-
latitude : 26.89473413,26.89471109
Longitude : 94.34725083,94.34726672
file name : Image_22112020091048548.png
|
2020-11-22 09:10:48.662148 |
8 |
44111904 |
Installation of 4 nos of Flood Control Hand Pump 10 no ward |
250000 |
Installation of 4 nos of Flood Control Hand Pump 10 no ward1 |
Ground work |
-
latitude : 26.90549359
Longitude : 94.3603288
file name : Image_01122020133303674.png
|
2020-12-01 13:33:03.800028 |
9 |
44111904 |
Installation of 4 nos of Flood Control Hand Pump 10 no ward |
250000 |
Installation of 4 nos of Flood Control Hand Pump 10 no ward2 |
Ground work |
-
latitude : 26.90192872
Longitude : 94.35505677
file name : Image_01122020141735415.png
|
2020-12-01 14:17:35.495409 |
10 |
44111671 |
Const. of Major Chapori Morong Ghar |
470000 |
Const. of Major Chapori Morong Ghar1 |
25% |
-
latitude : 26.87293307
Longitude : 94.30761566
file name : Image_09112020123151856.png
|
2020-11-09 12:31:54.843119 |
11 |
44111763 |
Waiting Shed at Jhanjimukh Parghat |
250000 |
Waiting Shed at Jhanjimukh Parghat1 |
25% |
-
latitude : 26.89873081
Longitude : 94.35183386
file name : Image_19112020115211910.png
|
2020-11-19 11:52:12.030545 |
12 |
44111829 |
Const. of Boundary Wall at Ghogoramukh Hari Mondir |
200000 |
Const. of Boundary Wall at Ghogoramukh Hari Mondir1 |
In Progress |
-
latitude : 26.90253961
Longitude : 94.38144187
file name : Image_28122020150515280.png
|
2020-12-28 15:05:15.41009 |
13 |
29573413 |
Const. of Boundary wall at Koibartagarh Masjid. |
200000 |
Const. of Boundary wall at Koibartagarh Masjid.1 |
In Progress |
-
latitude : 26.89331251
Longitude : 94.34532602
file name : Image_30112020122133700.png
|
2020-11-30 12:21:33.817978 |
14 |
44111601 |
Const. of Mohila Samittee Griho at Kumar Gaon |
445000 |
Const. of Mohila Samittee Griho at Kumar Gaon1 |
25% |
-
latitude : 26.89237452
Longitude : 94.35580813
file name : Image_18112020141408820.png
|
2020-11-18 14:14:08.921841 |
15 |
44111627 |
Cycle stand at Luit poria High School |
235000 |
Cycle stand at Luit poria High School1 |
Plinth Level |
-
latitude : 26.93772834
Longitude : 94.39144463
file name : Image_24122020124652248.png
|
2020-12-24 12:46:52.34752 |
16 |
44111627 |
Cycle stand at Luit poria High School |
235000 |
Cycle stand at Luit poria High School1 |
Plinth Level |
-
latitude : 26.93781925
Longitude : 94.39139645
file name : Image_01122020125606867.png
|
2020-12-01 12:56:06.978739 |
17 |
44111807 |
Construction of Alimur Mala Gaon Anganwadi Centre |
250000 |
Construction of Alimur Mala Gaon Anganwadi Centre1 |
25% |
-
latitude : 26.942283
Longitude : 94.39063017
file name : Image_01122020124332593.png
|
2020-12-01 12:43:32.688905 |
18 |
35630211 |
Const. of connecting road from Kumolia Chapori Road to LP School. |
150000 |
Approach Road1 |
Earth Work |
-
latitude : 26.86754757,26.86754747
Longitude : 94.36383567,94.36383566
file name : Image_30112020121723768.png
|
2020-11-30 12:17:23.86363 |
19 |
44111699 |
Installation of Flood Control Hand Pump at Hatisal Ward |
320000 |
Installation of Flood Control Hand Pump at Hatisal Ward1 |
Ground work |
-
latitude : 26.874377
Longitude : 94.30928845
file name : Image_01122020141741936.png
|
2020-12-01 14:17:42.020612 |
20 |
44388434 |
Const. of Boundary wall at Jopong gaon Hari mondir |
170000 |
Const. of Boundary wall at Jopong gaon Hari mondir1 |
In Progress |
-
latitude : 26.90424519
Longitude : 94.35969046
file name : Image_24122020113647802.png
|
2020-12-24 11:36:47.886686 |
21 |
44387907 |
Const. of Boundary wall at Kumar gaon Church |
200000 |
Const. of Boundary wall at Kumar gaon Church1 |
In Progress |
-
latitude : 26.89300547
Longitude : 94.35069198
file name : Image_30112020121750108.png
|
2020-11-30 12:17:50.21214 |
22 |
44387907 |
Const. of Boundary wall at Kumar gaon Church |
200000 |
Const. of Boundary wall at Kumar gaon Church1 |
In Progress |
-
latitude : 26.89300547
Longitude : 94.35069198
file name : Image_30112020121853051.png
|
2020-11-30 12:18:53.139182 |
23 |
44388999 |
Const. of Ronga Muncha at Susabat |
300000 |
Const. of Ronga Muncha at Susabat1 |
25% |
-
latitude : 26.91399762
Longitude : 94.3909545
file name : Image_24122020133455434.png
|
2020-12-24 13:34:55.546625 |
24 |
44389161 |
Boundary Wall of Ujoni Bormothauri Hari Mondir |
245493 |
Boundary Wall of Ujoni Bormothauri Hari Mondir1 |
In Progress |
-
latitude : 26.93554861
Longitude : 94.39106024
file name : Image_01122020125624082.png
|
2020-12-01 12:56:24.213495 |
25 |
44388875 |
Const. of Bejorchiga Mohila Samitee Griho |
400000 |
Const. of Bejorchiga Mohila Samitee Griho1 |
25% |
-
latitude : 26.88535299
Longitude : 94.32989267
file name : Image_23112020161749271.png
|
2020-11-23 16:17:49.360208 |
26 |
44388875 |
Const. of Bejorchiga Mohila Samitee Griho |
400000 |
Const. of Bejorchiga Mohila Samitee Griho1 |
25% |
-
latitude : 26.88535299
Longitude : 94.32989267
file name : Image_23112020161842771.png
|
2020-11-23 16:18:42.858439 |
27 |
44388794 |
Const. of Boundary Wall at GP Office Campus |
300000 |
Const. of Boundary Wall at GP Office Campus1 |
Stage 1 |
-
latitude : 26.8909053
Longitude : 94.348455
file name : Image_30112020121745038.png
|
2020-11-30 12:17:45.1275 |
28 |
44388794 |
Const. of Boundary Wall at GP Office Campus |
300000 |
Const. of Boundary Wall at GP Office Campus1 |
Stage 1 |
-
latitude : 26.8909053
Longitude : 94.348455
file name : Image_30112020121848220.png
|
2020-11-30 12:18:48.310816 |
29 |
44388630 |
Const. of Anganwari Centre at Tinighoria |
500000 |
Const. of Anganwari Centre at Tinighoria1 |
25% |
-
latitude : 26.90909708
Longitude : 94.3739528
file name : Image_24122020131958477.png
|
2020-12-24 13:19:58.672651 |
30 |
44388748 |
Const. of Risong chulk Anganwari Centre |
350000 |
Const. of Risong chulk Anganwari Centre 1 |
25% |
-
latitude : 26.95095904
Longitude : 94.39758336
file name : Image_01122020112727560.png
|
2020-12-01 11:27:27.642586 |
31 |
66961699 |
COMMUNITY POND AT 2 NO MAJOR CHAPORI GAON |
181425 |
COMMUNITY POND AT 2 NO MAJOR CHAPORI GAON1 |
Completion of work |
-
latitude : 26.8874305
Longitude : 94.3260104
file name : Image_24052023110712286.png
|
2023-05-24 11:07:12.498436 |
32 |
50395824 |
PUBLIC TOILET WITH HAND PUMP AT DESUALI GAON |
90000 |
PUBLIC TOILET WITH HAND PUMP AT DESUALI GAON1 |
Roof laid |
-
latitude : 26.89314034
Longitude : 94.35077969
file name : Image_24092024132459893.png
|
2024-09-24 13:25:00.024271 |
33 |
50395824 |
PUBLIC TOILET WITH HAND PUMP AT DESUALI GAON |
90000 |
PUBLIC TOILET WITH HAND PUMP AT DESUALI GAON1 |
Plinth level |
-
latitude : 26.89321145
Longitude : 94.35072715
file name : Image_24092024124218199.png
|
2024-09-24 12:42:18.323821 |
34 |
50395824 |
PUBLIC TOILET WITH HAND PUMP AT DESUALI GAON |
90000 |
PUBLIC TOILET WITH HAND PUMP AT DESUALI GAON1 |
Completion of work |
-
latitude : 26.86853737
Longitude : 94.29710423
file name : Image_20102022125112727.png
|
2022-10-20 12:51:12.899015 |
35 |
50396270 |
3 NOS OF FC HAND PUMP AT 1 NO WARD |
230000 |
3 NOS OF FC HAND PUMP AT 1 NO WARD1 |
Completion of work |
-
latitude : 26.88917433
Longitude : 94.33932186
file name : Image_20102022164208183.png
|
2022-10-20 16:42:08.312403 |
36 |
66143208 |
Operation & maintenance of drinking water supply system |
340500 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.83827053
Longitude : 94.38743688
file name : Image_06122022125444164.png
|
2022-12-06 12:54:44.279329 |
37 |
50395119 |
CONST OF CULVERT AT ALIMUR |
200000 |
CONST OF CULVERT AT ALIMUR1 |
Plinth level |
-
latitude : 26.93959429,26.93959363
Longitude : 94.39482309,94.39482044
file name : Image_29082023113444692.png
|
2023-08-29 11:34:44.822372 |
38 |
50395119 |
CONST OF CULVERT AT ALIMUR |
200000 |
CONST OF CULVERT AT ALIMUR1 |
Plinth level |
-
latitude : 26.93964122,26.93957822
Longitude : 94.39476978,94.3948515
file name : Image_26082023134525578.png
|
2023-08-26 13:45:25.710352 |
39 |
50395119 |
CONST OF CULVERT AT ALIMUR |
200000 |
CONST OF CULVERT AT ALIMUR1 |
Completion of work |
-
latitude : 26.9395861,26.93966096
Longitude : 94.39492213,94.39493823
file name : Image_31102022101040675.png
|
2022-10-31 10:10:40.767847 |
40 |
50395647 |
TOILET AT SAGUNPARA PS |
50300 |
TOILET AT SAGUNPARA PS1 |
Plinth level |
-
latitude : 26.91279325
Longitude : 94.37192357
file name : Image_26082023165323406.png
|
2023-08-26 16:53:23.581512 |
41 |
50395647 |
TOILET AT SAGUNPARA PS |
50300 |
TOILET AT SAGUNPARA PS1 |
Completion of work |
-
latitude : 26.91265342
Longitude : 94.37181165
file name : Image_20062021125210219.png
|
2021-06-20 12:52:10.335065 |
42 |
66143136 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.8645438
Longitude : 94.36502956
file name : Image_13012023141722404.png
|
2023-01-13 14:17:22.506732 |
43 |
66961727 |
LUITPORIA HIGH SCHOOL PLAYGROUND DEVELOPMENT |
182425 |
LUITPORIA HIGH SCHOOL PLAYGROUND DEVELOPMENT1 |
Completion of work |
-
latitude : 26.93780402,26.93781577
Longitude : 94.39176787,94.39176231
file name : Image_23022023135220100.png
|
2023-02-23 13:52:20.210511 |
44 |
66143420 |
RENOVATION OF LUIT PORIA HIGH SCHOOL |
340500 |
RENOVATION OF LUIT PORIA HIGH SCHOOL1 |
Completion of work |
-
latitude : 26.93790025
Longitude : 94.39179717
file name : Image_23022023135046268.png
|
2023-02-23 13:50:46.391017 |
45 |
66961185 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.89789873
Longitude : 94.35023663
file name : Image_11052023125822050.png
|
2023-05-11 12:58:22.192526 |
46 |
66961352 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.8700784
Longitude : 94.36537227
file name : Image_11052023133440253.png
|
2023-05-11 13:34:40.428488 |
47 |
66143265 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.94719535
Longitude : 94.39402819
file name : Image_01112023133421674.png
|
2023-11-01 13:34:21.807037 |
48 |
66961409 |
Construction of toilets in public institutions |
132650 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.89315036
Longitude : 94.35078173
file name : Image_24092024133516867.png
|
2024-09-24 13:35:16.981041 |
49 |
66961409 |
Construction of toilets in public institutions |
132650 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.89314646
Longitude : 94.35076635
file name : Image_24092024125351114.png
|
2024-09-24 12:53:51.23088 |
50 |
66961409 |
Construction of toilets in public institutions |
132650 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.850654
Longitude : 94.38687
file name : Image_01012024103744542.png
|
2024-01-01 10:37:44.666191 |
51 |
88244978 |
STREET LIGHT FACILITY AT PHUKONBARI AMRIT SAROVAR |
150000 |
STREET LIGHT FACILITY AT PHUKONBARI AMRIT SAROVAR1 |
Roof laid |
-
latitude : 26.8514358
Longitude : 94.3901897
file name : Image_09102024112724297.png
|
2024-10-09 11:27:24.415665 |
52 |
88244978 |
STREET LIGHT FACILITY AT PHUKONBARI AMRIT SAROVAR |
150000 |
STREET LIGHT FACILITY AT PHUKONBARI AMRIT SAROVAR1 |
Plinth level |
-
latitude : 26.85145008
Longitude : 94.39037093
file name : Image_09102024103748278.png
|
2024-10-09 10:37:48.379006 |
53 |
88244978 |
STREET LIGHT FACILITY AT PHUKONBARI AMRIT SAROVAR |
150000 |
STREET LIGHT FACILITY AT PHUKONBARI AMRIT SAROVAR1 |
Completion of work |
-
latitude : 26.85152088
Longitude : 94.39041595
file name : Image_06112023211903557.png
|
2023-11-06 21:19:03.686556 |
54 |
66143344 |
CONST OF 1 NO MAJOR CHAPORI LP SCHOOL BOUNDARY WALL |
170000 |
CONST OF 1 NO MAJOR CHAPORI LP SCHOOL BOUNDARY WALL1 |
Roof laid |
-
latitude : 26.85153214
Longitude : 94.39018559
file name : Image_06012024110322346.png
|
2024-01-06 11:03:22.473312 |
55 |
66143344 |
CONST OF 1 NO MAJOR CHAPORI LP SCHOOL BOUNDARY WALL |
170000 |
CONST OF 1 NO MAJOR CHAPORI LP SCHOOL BOUNDARY WALL1 |
Plinth level |
-
latitude : 26.85148217
Longitude : 94.39033501
file name : Image_06012024095506673.png
|
2024-01-06 09:55:06.813395 |
56 |
66143344 |
CONST OF 1 NO MAJOR CHAPORI LP SCHOOL BOUNDARY WALL |
170000 |
CONST OF 1 NO MAJOR CHAPORI LP SCHOOL BOUNDARY WALL1 |
Completion of work |
-
latitude : 26.88688947
Longitude : 94.33016043
file name : Image_07042023113135746.png
|
2023-04-07 11:31:35.855084 |
57 |
88787186 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.85144551
Longitude : 94.3902449
file name : Image_23052024105842376.png
|
2024-05-23 10:58:42.505791 |
58 |
88787186 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.85150311
Longitude : 94.39027054
file name : Image_23052024104716760.png
|
2024-05-23 10:47:16.88285 |
59 |
88787186 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.85152873
Longitude : 94.39024631
file name : Image_08012024104053098.png
|
2024-01-08 10:40:53.258608 |
60 |
88787186 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.85151632
Longitude : 94.39024593
file name : Image_08012024104327514.png
|
2024-01-08 10:43:27.656893 |
61 |
50395482 |
DEV OF JHANJIMUKH STATE DISPENSERY ROAD RAMP |
102802 |
DEV OF JHANJIMUKH STATE DISPENSERY ROAD RAMP1 |
Roof laid |
-
latitude : 26.8514316,26.85142748
Longitude : 94.39029893,94.39030572
file name : Image_18112023100510398.png
|
2023-11-18 10:05:10.491594 |
62 |
50395482 |
DEV OF JHANJIMUKH STATE DISPENSERY ROAD RAMP |
102802 |
DEV OF JHANJIMUKH STATE DISPENSERY ROAD RAMP1 |
Plinth level |
-
latitude : 26.89043719,26.89043254
Longitude : 94.35682043,94.35682148
file name : Image_25082023173331104.png
|
2023-08-25 17:33:31.221822 |
63 |
50395482 |
DEV OF JHANJIMUKH STATE DISPENSERY ROAD RAMP |
102802 |
DEV OF JHANJIMUKH STATE DISPENSERY ROAD RAMP1 |
Completion of work |
-
latitude : 26.89036861,26.8903961
Longitude : 94.35677239,94.35674148
file name : Image_20102022114417688.png
|
2022-10-20 11:44:17.822317 |
64 |
66961498 |
CONST OF BOUNDARY WALL AT SANKARDEV HIGH SCHOOL |
191000 |
CONST OF BOUNDARY WALL AT SANKARDEV HIGH SCHOOL1 |
Roof laid |
-
latitude : 26.85149448
Longitude : 94.39026413
file name : Image_18112023120630637.png
|
2023-11-18 12:06:30.965771 |
65 |
66961498 |
CONST OF BOUNDARY WALL AT SANKARDEV HIGH SCHOOL |
191000 |
CONST OF BOUNDARY WALL AT SANKARDEV HIGH SCHOOL1 |
Roof laid |
-
latitude : 26.85154584
Longitude : 94.39040651
file name : Image_18112023120728588.png
|
2023-11-18 12:07:28.719074 |
66 |
66961498 |
CONST OF BOUNDARY WALL AT SANKARDEV HIGH SCHOOL |
191000 |
CONST OF BOUNDARY WALL AT SANKARDEV HIGH SCHOOL1 |
Plinth level |
-
latitude : 26.85149847
Longitude : 94.39031979
file name : Image_18112023114957704.png
|
2023-11-18 11:49:57.957841 |
67 |
66961498 |
CONST OF BOUNDARY WALL AT SANKARDEV HIGH SCHOOL |
191000 |
CONST OF BOUNDARY WALL AT SANKARDEV HIGH SCHOOL1 |
Completion of work |
-
latitude : 26.8766005
Longitude : 94.3118352
file name : Image_07042023111845283.png
|
2023-04-07 11:18:45.375825 |
68 |
66961669 |
REPAIRING OF MITHAI CHAPORI KRISTRI KENDRA |
191850 |
REPAIRING OF MITHAI CHAPORI KRISTRI KENDRA1 |
Plinth level |
-
latitude : 26.8514627
Longitude : 94.39035904
file name : Image_18112023115113754.png
|
2023-11-18 11:51:14.142041 |
69 |
66961669 |
REPAIRING OF MITHAI CHAPORI KRISTRI KENDRA |
191850 |
REPAIRING OF MITHAI CHAPORI KRISTRI KENDRA1 |
Completion of work |
-
latitude : 26.864195
Longitude : 94.30988467
file name : Image_07042023115252955.png
|
2023-04-07 11:52:53.048408 |
70 |
50394420 |
REPAIRING OF BOYON GRIHO AT KUMAR GAON |
110000 |
REPAIRING OF BOYON GRIHO AT KUMAR GAON1 |
Roof laid |
-
latitude : 26.85146601
Longitude : 94.39024345
file name : Image_18112023124406138.png
|
2023-11-18 12:44:06.28461 |
71 |
50394420 |
REPAIRING OF BOYON GRIHO AT KUMAR GAON |
110000 |
REPAIRING OF BOYON GRIHO AT KUMAR GAON1 |
Plinth level |
-
latitude : 26.85143214
Longitude : 94.39026167
file name : Image_18112023123947403.png
|
2023-11-18 12:39:48.371178 |
72 |
50394420 |
REPAIRING OF BOYON GRIHO AT KUMAR GAON |
110000 |
REPAIRING OF BOYON GRIHO AT KUMAR GAON1 |
Completion of work |
-
latitude : 26.89614672
Longitude : 94.35208774
file name : Image_20102022115117348.png
|
2022-10-20 11:51:17.477151 |
73 |
66143383 |
CONST OF BORMOTHAURI BASIC SCHOOL BOUNDARY WALL |
170500 |
CONST OF BORMOTHAURI BASIC SCHOOL BOUNDARY WALL1 |
Roof laid |
-
latitude : 26.85141063
Longitude : 94.39024352
file name : Image_18112023124455242.png
|
2023-11-18 12:44:55.408989 |
74 |
66143383 |
CONST OF BORMOTHAURI BASIC SCHOOL BOUNDARY WALL |
170500 |
CONST OF BORMOTHAURI BASIC SCHOOL BOUNDARY WALL1 |
Plinth level |
-
latitude : 26.85158213
Longitude : 94.39026303
file name : Image_18112023124041223.png
|
2023-11-18 12:40:42.20294 |
75 |
66143383 |
CONST OF BORMOTHAURI BASIC SCHOOL BOUNDARY WALL |
170500 |
CONST OF BORMOTHAURI BASIC SCHOOL BOUNDARY WALL1 |
Completion of work |
-
latitude : 26.83837525
Longitude : 94.38765621
file name : Image_12042023134910661.png
|
2023-04-12 13:49:10.826979 |
76 |
88787200 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.85145012
Longitude : 94.3902472
file name : Image_23052024105937914.png
|
2024-05-23 10:59:38.039985 |
77 |
88787200 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.85150371
Longitude : 94.39027101
file name : Image_23052024104455166.png
|
2024-05-23 10:44:55.292147 |
78 |
88787200 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.8498696
Longitude : 94.3884766
file name : Image_08012024104435830.png
|
2024-01-08 10:44:35.962425 |
79 |
88787222 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.85144977
Longitude : 94.39024638
file name : Image_23052024110114960.png
|
2024-05-23 11:01:15.07901 |
80 |
88787222 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.85150334
Longitude : 94.39027076
file name : Image_23052024104552374.png
|
2024-05-23 10:45:52.505488 |
81 |
88787222 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.85150329
Longitude : 94.39017863
file name : Image_08012024104537047.png
|
2024-01-08 10:45:37.204699 |
82 |
88787156 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.85142103
Longitude : 94.39024345
file name : Image_23052024105658691.png
|
2024-05-23 10:56:58.813336 |
83 |
88787156 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.85150409
Longitude : 94.39029593
file name : Image_23052024104234600.png
|
2024-05-23 10:42:34.730707 |
84 |
88787156 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.85150336
Longitude : 94.39034058
file name : Image_08012024103829471.png
|
2024-01-08 10:38:29.602551 |
85 |
88787173 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.85144006
Longitude : 94.3902482
file name : Image_23052024105750484.png
|
2024-05-23 10:57:50.612119 |
86 |
88787173 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.85150394
Longitude : 94.39027221
file name : Image_23052024104343988.png
|
2024-05-23 10:43:44.12459 |
87 |
88787173 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.85150336
Longitude : 94.39034058
file name : Image_08012024103954375.png
|
2024-01-08 10:39:54.504455 |
88 |
88778272 |
Creation of community compost pits for a group of Households |
52500 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 26.89322467
Longitude : 94.35073421
file name : Image_24092024143936529.png
|
2024-09-24 14:39:36.641185 |
89 |
88778272 |
Creation of community compost pits for a group of Households |
52500 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 26.89317136
Longitude : 94.35076587
file name : Image_24092024141259591.png
|
2024-09-24 14:12:59.723761 |
90 |
88778272 |
Creation of community compost pits for a group of Households |
52500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 26.85151976
Longitude : 94.3902095
file name : Image_01042024172725384.png
|
2024-04-01 17:27:25.537394 |
91 |
88248775 |
ELECTRIFICATION AT HOLLY BORUAH PUBLIC HALL |
75200 |
ELECTRIFICATION AT HOLLY BORUAH PUBLIC HALL1 |
Roof laid |
-
latitude : 26.85153328
Longitude : 94.3903115
file name : Image_09102024113244757.png
|
2024-10-09 11:32:44.944842 |
92 |
88248775 |
ELECTRIFICATION AT HOLLY BORUAH PUBLIC HALL |
75200 |
ELECTRIFICATION AT HOLLY BORUAH PUBLIC HALL1 |
Plinth level |
-
latitude : 26.85146615
Longitude : 94.39035861
file name : Image_09102024103334194.png
|
2024-10-09 10:33:34.317193 |
93 |
88248775 |
ELECTRIFICATION AT HOLLY BORUAH PUBLIC HALL |
75200 |
ELECTRIFICATION AT HOLLY BORUAH PUBLIC HALL1 |
Completion of work |
-
latitude : 26.85150604
Longitude : 94.39022779
file name : Image_01042024173013802.png
|
2024-04-01 17:30:13.917372 |
94 |
88249200 |
RENOVATION OF BEZORCHIGA AWC |
225250 |
RENOVATION OF BEZORCHIGA AWC1 |
Plinth level |
-
latitude : 26.89324849
Longitude : 94.35070539
file name : Image_24092024143818674.png
|
2024-09-24 14:38:18.809213 |
95 |
88249200 |
RENOVATION OF BEZORCHIGA AWC |
225250 |
RENOVATION OF BEZORCHIGA AWC1 |
Plinth level |
-
latitude : 26.89316978
Longitude : 94.35076567
file name : Image_24092024141211566.png
|
2024-09-24 14:12:11.701577 |
96 |
88249200 |
RENOVATION OF BEZORCHIGA AWC |
225250 |
RENOVATION OF BEZORCHIGA AWC1 |
Completion of work |
-
latitude : 26.85151386
Longitude : 94.39021892
file name : Image_01042024172839793.png
|
2024-04-01 17:28:39.948167 |
97 |
66961331 |
Water Supply to villages |
272650 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.89319766
Longitude : 94.3506548
file name : Image_05072024143813694.png
|
2024-07-05 14:38:13.807163 |
98 |
50395295 |
EXTENSION OF ROOM AT KAMAN GAON LP SCHOOL |
200000 |
EXTENSION OF ROOM AT KAMAN GAON LP SCHOOL1 |
Roof laid |
-
latitude : 26.89319405
Longitude : 94.35080559
file name : Image_24092024140515267.png
|
2024-09-24 14:05:15.407746 |
99 |
50395295 |
EXTENSION OF ROOM AT KAMAN GAON LP SCHOOL |
200000 |
EXTENSION OF ROOM AT KAMAN GAON LP SCHOOL1 |
Plinth level |
-
latitude : 26.89318578
Longitude : 94.3507416
file name : Image_24092024140034432.png
|
2024-09-24 14:00:34.573909 |
100 |
50395295 |
EXTENSION OF ROOM AT KAMAN GAON LP SCHOOL |
200000 |
EXTENSION OF ROOM AT KAMAN GAON LP SCHOOL1 |
Completion of work |
-
latitude : 26.89136881
Longitude : 94.3430327
file name : Image_20102022122215439.png
|
2022-10-20 12:22:15.569814 |
101 |
50396067 |
PUBLIC TOILET WITH HAND PUMP AT GHOGORAMUKH |
90000 |
PUBLIC TOILET WITH HAND PUMP AT GHOGORAMUKH1 |
Roof laid |
-
latitude : 26.89319866
Longitude : 94.35076611
file name : Image_24092024133000834.png
|
2024-09-24 13:30:00.962586 |
102 |
50396067 |
PUBLIC TOILET WITH HAND PUMP AT GHOGORAMUKH |
90000 |
PUBLIC TOILET WITH HAND PUMP AT GHOGORAMUKH1 |
Plinth level |
-
latitude : 26.89320687
Longitude : 94.35073105
file name : Image_24092024124336026.png
|
2024-09-24 12:43:36.157504 |
103 |
50396067 |
PUBLIC TOILET WITH HAND PUMP AT GHOGORAMUKH |
90000 |
PUBLIC TOILET WITH HAND PUMP AT GHOGORAMUKH1 |
Completion of work |
-
latitude : 26.90120328
Longitude : 94.3803957
file name : Image_21102022144711910.png
|
2022-10-21 14:47:12.044865 |
104 |
66961303 |
Construction of toilets in public institutions |
146900 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.89315053
Longitude : 94.35078168
file name : Image_24092024133430098.png
|
2024-09-24 13:34:30.233599 |
105 |
66961303 |
Construction of toilets in public institutions |
146900 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.8931399
Longitude : 94.35071167
file name : Image_24092024132018672.png
|
2024-09-24 13:20:18.790757 |
106 |
66961303 |
Construction of toilets in public institutions |
146900 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.89320278
Longitude : 94.35073609
file name : Image_24092024124731741.png
|
2024-09-24 12:47:31.87242 |
107 |
52038050 |
DRINKING WATER FACILITY AT 519 NO SAGUNPARA LP SCHOOL |
220591 |
DRINKING WATER FACILITY AT 519 NO SAGUNPARA LP SCHOOL1 |
Roof laid |
-
latitude : 26.89315494
Longitude : 94.35077255
file name : Image_24092024133241179.png
|
2024-09-24 13:32:41.337229 |
108 |
52038050 |
DRINKING WATER FACILITY AT 519 NO SAGUNPARA LP SCHOOL |
220591 |
DRINKING WATER FACILITY AT 519 NO SAGUNPARA LP SCHOOL1 |
Plinth level |
-
latitude : 26.89320306
Longitude : 94.35073368
file name : Image_24092024124516789.png
|
2024-09-24 12:45:16.945338 |
109 |
52038050 |
DRINKING WATER FACILITY AT 519 NO SAGUNPARA LP SCHOOL |
220591 |
DRINKING WATER FACILITY AT 519 NO SAGUNPARA LP SCHOOL1 |
Completion of work |
-
latitude : 26.90619717
Longitude : 94.36192267
file name : Image_04122023155703874.png
|
2023-12-04 15:57:03.991605 |
110 |
88787245 |
Creation of community compost pits for a group of Households |
18450 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 26.846494
Longitude : 94.38934122
file name : Image_18072024142757266.png
|
2024-07-18 14:27:57.42345 |
111 |
88787245 |
Creation of community compost pits for a group of Households |
18450 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 26.85148317
Longitude : 94.39017743
file name : Image_14072024111354141.png
|
2024-07-14 11:13:54.26597 |
112 |
88787272 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.85152814
Longitude : 94.39022313
file name : Image_18072024142909954.png
|
2024-07-18 14:29:10.086949 |
113 |
88787272 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.85147797
Longitude : 94.39019285
file name : Image_14072024111600680.png
|
2024-07-14 11:16:00.810431 |
114 |
88787287 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.89315058
Longitude : 94.35074336
file name : Image_19072024124426956.png
|
2024-07-19 12:44:27.074972 |
115 |
88787287 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.85142882
Longitude : 94.39038608
file name : Image_18072024143716635.png
|
2024-07-18 14:37:16.776346 |
116 |
88787287 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.85147292
Longitude : 94.39018628
file name : Image_14072024111655925.png
|
2024-07-14 11:16:56.057699 |
117 |
88787308 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.85149398
Longitude : 94.39032469
file name : Image_23072024100235100.png
|
2024-07-23 10:02:35.240622 |
118 |
88787308 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.8514985
Longitude : 94.39032761
file name : Image_23072024100016227.png
|
2024-07-23 10:00:16.392408 |
119 |
88787308 |
Creation of Shed for segregation and processing of wet and dry waste |
18450 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.85146731
Longitude : 94.39019244
file name : Image_14072024111753631.png
|
2024-07-14 11:17:53.745001 |
120 |
88251672 |
Operation & maintenance of community sanitary complex |
80000 |
Operation & maintenance of community sanitary complex1 |
Roof laid |
-
latitude : 26.85156744
Longitude : 94.39029163
file name : Image_09102024113110253.png
|
2024-10-09 11:31:10.362811 |
121 |
88251672 |
Operation & maintenance of community sanitary complex |
80000 |
Operation & maintenance of community sanitary complex1 |
Plinth level |
-
latitude : 26.85160215
Longitude : 94.39026338
file name : Image_09102024104538369.png
|
2024-10-09 10:45:38.505504 |
122 |
88251672 |
Operation & maintenance of community sanitary complex |
80000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 26.85148277
Longitude : 94.39031931
file name : Image_04102024103350003.png
|
2024-10-04 10:33:50.134418 |
123 |
88248387 |
STREET LIGHT FACILITY AT CHANGMAIGARH 1 AMRIT SAROVAR |
150000 |
STREET LIGHT FACILITY AT CHANGMAIGARH 1 AMRIT SAROVAR1 |
Roof laid |
-
latitude : 26.85151234
Longitude : 94.39030038
file name : Image_09102024112810006.png
|
2024-10-09 11:28:10.134457 |
124 |
88248387 |
STREET LIGHT FACILITY AT CHANGMAIGARH 1 AMRIT SAROVAR |
150000 |
STREET LIGHT FACILITY AT CHANGMAIGARH 1 AMRIT SAROVAR1 |
Plinth level |
-
latitude : 26.85145784
Longitude : 94.39039777
file name : Image_09102024103937751.png
|
2024-10-09 10:39:37.939981 |
125 |
88248387 |
STREET LIGHT FACILITY AT CHANGMAIGARH 1 AMRIT SAROVAR |
150000 |
STREET LIGHT FACILITY AT CHANGMAIGARH 1 AMRIT SAROVAR1 |
Completion of work |
-
latitude : 26.85138954
Longitude : 94.39032374
file name : Image_06112023212030084.png
|
2023-11-06 21:20:30.21578 |
126 |
88248919 |
STREET LIGHT FACILITY AT CHANGMAIGARH 2 AMRIT SAROVAR |
150000 |
STREET LIGHT FACILITY AT CHANGMAIGARH 2 AMRIT SAROVAR1 |
Roof laid |
-
latitude : 26.85156335
Longitude : 94.39029712
file name : Image_09102024113010046.png
|
2024-10-09 11:30:10.303674 |
127 |
88248919 |
STREET LIGHT FACILITY AT CHANGMAIGARH 2 AMRIT SAROVAR |
150000 |
STREET LIGHT FACILITY AT CHANGMAIGARH 2 AMRIT SAROVAR1 |
Plinth level |
-
latitude : 26.85155887
Longitude : 94.39026026
file name : Image_09102024104315160.png
|
2024-10-09 10:43:15.315876 |
128 |
88248919 |
STREET LIGHT FACILITY AT CHANGMAIGARH 2 AMRIT SAROVAR |
150000 |
STREET LIGHT FACILITY AT CHANGMAIGARH 2 AMRIT SAROVAR1 |
Completion of work |
-
latitude : 26.851377
Longitude : 94.39034
file name : Image_06112023212506167.png
|
2023-11-06 21:25:06.276406 |