1 |
44117112 |
CONST. OF BOUNDARY WALL AT CHAPORICHUK PUBLIC POND PH - II |
295470 |
CONST. OF BOUNDARY WALL AT CHAPORICHUK PUBLIC POND PH - II1 |
In Progress |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_07122020144719951.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_07122020144719951.png)
latitude : 26.60808881
Longitude : 94.14721726
file name : Image_07122020144719951.png
|
2020-12-07 14:47:20.067577 |
2 |
44117341 |
CONST. OF BOUNDARY WALL OF 2 NO. MEZENGA SUNALI GAON KALA KRISTI BIKASH KENDRA |
250000 |
CONST. OF BOUNDARY WALL OF 2 NO. MEZENGA SUNALI GAON KALA KRISTI BIKASH KENDRA1 |
In Progress |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020162443170.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020162443170.png)
latitude : 26.5971535
Longitude : 94.16570116
file name : Image_24092020162443170.png
|
2020-09-24 16:24:43.275058 |
3 |
44117341 |
CONST. OF BOUNDARY WALL OF 2 NO. MEZENGA SUNALI GAON KALA KRISTI BIKASH KENDRA |
250000 |
CONST. OF BOUNDARY WALL OF 2 NO. MEZENGA SUNALI GAON KALA KRISTI BIKASH KENDRA1 |
In Progress |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020163404367.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020163404367.png)
latitude : 26.59719364
Longitude : 94.16575828
file name : Image_24092020163404367.png
|
2020-09-24 16:34:04.470483 |
4 |
44117341 |
CONST. OF BOUNDARY WALL OF 2 NO. MEZENGA SUNALI GAON KALA KRISTI BIKASH KENDRA |
250000 |
CONST. OF BOUNDARY WALL OF 2 NO. MEZENGA SUNALI GAON KALA KRISTI BIKASH KENDRA1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020165417017.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020165417017.png)
latitude : 26.59716702
Longitude : 94.16571884
file name : Image_24092020165417017.png
|
2020-09-24 16:54:17.10936 |
5 |
32628540 |
CONST. OF BOUNDARY WALL OF DEOGHARIA KALA KRISTI BIKASH KENDRA |
220000 |
CONST. OF BOUNDARY WALL OF DEOGHARIA KALA KRISTI BIKASH KENDRA1 |
In Progress |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_07122020134855699.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_07122020134855699.png)
latitude : 26.57514896
Longitude : 94.19453228
file name : Image_07122020134855699.png
|
2020-12-07 13:48:55.801456 |
6 |
44116955 |
CONST. OF MARKET SHED AT DEOGHARIA GAR ALI ROAD SIDE |
308500 |
CONST. OF MARKET SHED AT DEOGHARIA GAR ALI ROAD SIDE1 |
25% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_07122020124507901.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_07122020124507901.png)
latitude : 26.56308303
Longitude : 94.20789523
file name : Image_07122020124507901.png
|
2020-12-07 12:45:07.996788 |
7 |
44117640 |
CONST. OF BOUNDARY WALL AT PORJA LINE KALA KRISTI BIKASH KENDRA |
200000 |
CONST. OF BOUNDARY WALL AT PORJA LINE KALA KRISTI BIKASH KENDRA1 |
In Progress |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_07122020150322805.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_07122020150322805.png)
latitude : 26.61012882
Longitude : 94.15266336
file name : Image_07122020150322805.png
|
2020-12-07 15:03:22.900482 |
8 |
32628170 |
DEV. OF BABUL KOLITA HOUSE PATH |
232700 |
DEV. OF BABUL KOLITA HOUSE PATH1 |
Earth Work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_07122020143042214.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_07122020143042214.png)
latitude : 26.59037886,26.59037864
Longitude : 94.16136879,94.16136723
file name : Image_07122020143042214.png
|
2020-12-07 14:30:42.31885 |
9 |
50448271 |
INSTALLATION OF RING WELL AT WARD NO 7 04 NOS |
320000 |
INSTALLATION OF RING WELL AT WARD NO 7 04 NOS1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25032022151506448.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25032022151506448.png)
latitude : 26.59463916
Longitude : 94.16388568
file name : Image_25032022151506448.png
|
2022-03-25 15:15:06.554394 |
10 |
50448271 |
INSTALLATION OF RING WELL AT WARD NO 7 04 NOS |
320000 |
INSTALLATION OF RING WELL AT WARD NO 7 04 NOS2 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25032022153900687.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25032022153900687.png)
latitude : 26.59625961
Longitude : 94.1667744
file name : Image_25032022153900687.png
|
2022-03-25 15:39:00.79635 |
11 |
50448271 |
INSTALLATION OF RING WELL AT WARD NO 7 04 NOS |
320000 |
INSTALLATION OF RING WELL AT WARD NO 7 04 NOS4 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25032022155054002.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25032022155054002.png)
latitude : 26.60928711
Longitude : 94.17409034
file name : Image_25032022155054002.png
|
2022-03-25 15:50:54.11766 |
12 |
87364367 |
REP OF KAIBARTA CHUK CREMATION GROUND |
170000 |
REP OF KAIBARTA CHUK CREMATION GROUND1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_08042024105115112.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_08042024105115112.png)
latitude : 26.614966666666668
Longitude : 94.18145166666666
file name : Image_08042024105115112.png
|
2024-04-08 10:51:15.216539 |
13 |
66112825 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_05032023163416755.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_05032023163416755.png)
latitude : 26.596438333333335
Longitude : 94.20116666666667
file name : Image_05032023163416755.png
|
2023-03-05 16:34:16.861072 |
14 |
66112865 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_05032023163812110.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_05032023163812110.png)
latitude : 26.59634
Longitude : 94.20118166666667
file name : Image_05032023163812110.png
|
2023-03-05 16:38:12.211004 |
15 |
66128065 |
Operation & maintenance of drinking water supply system |
44689 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_07022023195650789.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_07022023195650789.png)
latitude : 26.5955232
Longitude : 94.2037066
file name : Image_07022023195650789.png
|
2023-02-07 19:56:50.926751 |
16 |
66127301 |
UPGRADATION OF GP OFFICE CAMPUS |
139959 |
UPGRADATION OF GP OFFICE CAMPUS1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_28082023121436406.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_28082023121436406.png)
latitude : 26.588520000000003
Longitude : 94.16639666666667
file name : Image_28082023121436406.png
|
2023-08-28 12:14:36.549266 |
17 |
66127301 |
UPGRADATION OF GP OFFICE CAMPUS |
139959 |
UPGRADATION OF GP OFFICE CAMPUS1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_07022023192613234.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_07022023192613234.png)
latitude : 26.59696
Longitude : 94.20335500000002
file name : Image_07022023192613234.png
|
2023-02-07 19:26:13.394333 |
18 |
52071259 |
NATURAL DISASTER MANAGEMENT |
61942 |
NATURAL DISASTER MANAGEMENT1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_28082023121344124.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_28082023121344124.png)
latitude : 26.591003333333333
Longitude : 94.18459666666668
file name : Image_28082023121344124.png
|
2023-08-28 12:13:44.218295 |
19 |
52071259 |
NATURAL DISASTER MANAGEMENT |
61942 |
NATURAL DISASTER MANAGEMENT1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_28062021120455867.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_28062021120455867.png)
latitude : 26.5883179
Longitude : 94.1665291
file name : Image_28062021120455867.png
|
2021-06-28 12:04:55.961637 |
20 |
50448755 |
CONST OF BOUNDARY WALL AT BORERA MAJDOOR CREMATION GROUND |
557484 |
CONST OF BOUNDARY WALL AT BORERA MAJDOOR CREMATION GROUND1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_28082023115318692.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_28082023115318692.png)
latitude : 26.617735
Longitude : 94.19449333333333
file name : Image_28082023115318692.png
|
2023-08-28 11:53:18.811525 |
21 |
50448755 |
CONST OF BOUNDARY WALL AT BORERA MAJDOOR CREMATION GROUND |
557484 |
CONST OF BOUNDARY WALL AT BORERA MAJDOOR CREMATION GROUND1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_30032022134822935.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_30032022134822935.png)
latitude : 26.61751344
Longitude : 94.1946636
file name : Image_30032022134822935.png
|
2022-03-30 13:48:23.035802 |
22 |
50447227 |
CONST OF TOILET WITH WATER SUPPLY AT DEOGHARIA CHAWDUNG KALA KRISTI BIKASH KENDRA |
299426 |
CONST OF TOILET WITH WATER SUPPLY AT DEOGHARIA CHAWDUNG KALA KRISTI BIKASH KENDRA1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_28082023123126349.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_28082023123126349.png)
latitude : 26.57447833333333
Longitude : 94.190735
file name : Image_28082023123126349.png
|
2023-08-28 12:31:26.451264 |
23 |
50447227 |
CONST OF TOILET WITH WATER SUPPLY AT DEOGHARIA CHAWDUNG KALA KRISTI BIKASH KENDRA |
299426 |
CONST OF TOILET WITH WATER SUPPLY AT DEOGHARIA CHAWDUNG KALA KRISTI BIKASH KENDRA1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25032022145954109.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25032022145954109.png)
latitude : 26.57438555
Longitude : 94.19077512
file name : Image_25032022145954109.png
|
2022-03-25 14:59:54.238199 |
24 |
87364273 |
REP.OF BORERA AWC |
170525 |
REP.OF BORERA AWC1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_14112023171339974.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_14112023171339974.png)
latitude : 26.614586666666664
Longitude : 94.19663
file name : Image_14112023171339974.png
|
2023-11-14 17:13:40.069786 |
25 |
87364306 |
REP OF DEOGHARIA LEKHERAJ AWC |
170525 |
REP OF DEOGHARIA LEKHERAJ AWC1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_14112023171331722.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_14112023171331722.png)
latitude : 26.565054999999997
Longitude : 94.19978833333334
file name : Image_14112023171331722.png
|
2023-11-14 17:13:31.798868 |
26 |
66179946 |
repairing of mezenga lp school at ward no 6 |
165300 |
repairing of mezenga lp school at ward no 61 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29112023114002982.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29112023114002982.png)
latitude : 26.60206333333333
Longitude : 94.16226
file name : Image_29112023114002982.png
|
2023-11-29 11:40:03.072301 |
27 |
66179946 |
repairing of mezenga lp school at ward no 6 |
165300 |
repairing of mezenga lp school at ward no 61 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29112023113232508.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29112023113232508.png)
latitude : 26.602043333333334
Longitude : 94.16241666666669
file name : Image_29112023113232508.png
|
2023-11-29 11:32:32.594419 |
28 |
66179946 |
repairing of mezenga lp school at ward no 6 |
165300 |
repairing of mezenga lp school at ward no 61 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_11022023104238716.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_11022023104238716.png)
latitude : 26.602005000000002
Longitude : 94.16253333333334
file name : Image_11022023104238716.png
|
2023-02-11 10:42:38.825415 |
29 |
66130061 |
Operation & maintenance of drinking water supply system |
309500 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_13102023105200574.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_13102023105200574.png)
latitude : 26.595158333333334
Longitude : 94.20231166666666
file name : Image_13102023105200574.png
|
2023-10-13 10:52:00.679497 |
30 |
87955680 |
Operation & maintenance of drinking water supply system |
28262 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_18102023074345407.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_18102023074345407.png)
latitude : 26.588656666666665
Longitude : 94.16644166666669
file name : Image_18102023074345407.png
|
2023-10-18 07:43:45.497253 |
31 |
87955098 |
SILAFALAKAM |
40000 |
SILAFALAKAM1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29112023111723093.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29112023111723093.png)
latitude : 26.617878333333337
Longitude : 94.142635
file name : Image_29112023111723093.png
|
2023-11-29 11:17:23.184 |
32 |
87955098 |
SILAFALAKAM |
40000 |
SILAFALAKAM1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29112023110850991.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29112023110850991.png)
latitude : 26.61786833333333
Longitude : 94.14270333333334
file name : Image_29112023110850991.png
|
2023-11-29 11:08:51.086957 |
33 |
87955098 |
SILAFALAKAM |
40000 |
SILAFALAKAM1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_18102023071829831.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_18102023071829831.png)
latitude : 26.617830000000005
Longitude : 94.14271666666667
file name : Image_18102023071829831.png
|
2023-10-18 07:18:29.916804 |
34 |
66105941 |
RENOVATION OF BIKI DEVI HIGH SCHOOL UNDER 15TH FC 20-21 |
500000 |
RENOVATION OF BIKI DEVI HIGH SCHOOL UNDER 15TH FC 20-211 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29112023111831581.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29112023111831581.png)
latitude : 26.617841666666664
Longitude : 94.14215166666666
file name : Image_29112023111831581.png
|
2023-11-29 11:18:31.732354 |
35 |
66105941 |
RENOVATION OF BIKI DEVI HIGH SCHOOL UNDER 15TH FC 20-21 |
500000 |
RENOVATION OF BIKI DEVI HIGH SCHOOL UNDER 15TH FC 20-211 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29112023110907905.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29112023110907905.png)
latitude : 26.617863333333336
Longitude : 94.14207333333334
file name : Image_29112023110907905.png
|
2023-11-29 11:09:07.991679 |
36 |
66105941 |
RENOVATION OF BIKI DEVI HIGH SCHOOL UNDER 15TH FC 20-21 |
500000 |
RENOVATION OF BIKI DEVI HIGH SCHOOL UNDER 15TH FC 20-211 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_05122022135402060.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_05122022135402060.png)
latitude : 26.617756666666665
Longitude : 94.14210166666665
file name : Image_05122022135402060.png
|
2022-12-05 13:54:02.186621 |
37 |
66112786 |
RENOVATION/ REPAIRING OF EXISTING GP OFFICE BUILDING |
119000 |
RENOVATION/ REPAIRING OF EXISTING GP OFFICE BUILDING1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29112023120423610.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29112023120423610.png)
latitude : 26.588649999999998
Longitude : 94.16650833333333
file name : Image_29112023120423610.png
|
2023-11-29 12:04:23.71156 |
38 |
66112786 |
RENOVATION/ REPAIRING OF EXISTING GP OFFICE BUILDING |
119000 |
RENOVATION/ REPAIRING OF EXISTING GP OFFICE BUILDING1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29112023115420807.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29112023115420807.png)
latitude : 26.588616666666667
Longitude : 94.16646333333334
file name : Image_29112023115420807.png
|
2023-11-29 11:54:20.898953 |
39 |
66112786 |
RENOVATION/ REPAIRING OF EXISTING GP OFFICE BUILDING |
119000 |
RENOVATION/ REPAIRING OF EXISTING GP OFFICE BUILDING1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_05032023161756224.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_05032023161756224.png)
latitude : 26.596310000000003
Longitude : 94.20122833333335
file name : Image_05032023161756224.png
|
2023-03-05 16:17:56.319999 |
40 |
66179545 |
renovation / repairing of anganwadi centre at ward no 10 |
347700 |
renovation / repairing of anganwadi centre at ward no 101 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29112023124149238.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29112023124149238.png)
latitude : 26.608355
Longitude : 94.20032833333335
file name : Image_29112023124149238.png
|
2023-11-29 12:41:49.337723 |
41 |
66179545 |
renovation / repairing of anganwadi centre at ward no 10 |
347700 |
renovation / repairing of anganwadi centre at ward no 101 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29112023123046265.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29112023123046265.png)
latitude : 26.608423333333334
Longitude : 94.200305
file name : Image_29112023123046265.png
|
2023-11-29 12:30:46.377804 |
42 |
66179545 |
renovation / repairing of anganwadi centre at ward no 10 |
347700 |
renovation / repairing of anganwadi centre at ward no 101 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_18022023124727549.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_18022023124727549.png)
latitude : 26.608398333333337
Longitude : 94.200425
file name : Image_18022023124727549.png
|
2023-02-18 12:47:27.660213 |
43 |
87364739 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_24062024151530836.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_24062024151530836.png)
latitude : 26.61742166666667
Longitude : 94.19474
file name : Image_24062024151530836.png
|
2024-06-24 15:15:30.926555 |
44 |
87364739 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_24062024150929885.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_24062024150929885.png)
latitude : 26.617413333333335
Longitude : 94.19472499999999
file name : Image_24062024150929885.png
|
2024-06-24 15:09:29.985693 |
45 |
87364739 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_24062024145658092.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_24062024145658092.png)
latitude : 26.617353333333334
Longitude : 94.19469833333332
file name : Image_24062024145658092.png
|
2024-06-24 14:56:58.187331 |
46 |
87364739 |
Creation of Shed for segregation and processing of wet and dry waste |
218550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_14112023171335950.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_14112023171335950.png)
latitude : 26.617413333333335
Longitude : 94.19470833333335
file name : Image_14112023171335950.png
|
2023-11-14 17:13:36.037459 |