1 |
6042310 |
Installation of Tara Pump at Duttapur GP Office |
35000 |
Hand pump1 |
Ground work |
-
latitude : 24.81624765
Longitude : 92.48739223
file name : Image_17012019221156297.png
|
2019-01-17 22:11:56.390009 |
2 |
36653241 |
Rural connectivity at Ward No. 7 |
401790 |
Rural connectivity at Ward No. 71 |
Earth Work |
-
latitude : 24.78147853,24.78155524
Longitude : 92.52080979,92.52079252
file name : Image_30112020161301743.png
|
2020-11-30 16:13:01.814966 |
3 |
36655615 |
Rural connectivity at Ward No. 7 |
900000 |
Rural connectivity at Ward No. 71 |
Earth Work |
-
latitude : 24.78256908,24.78254927
Longitude : 92.51952643,92.51947411
file name : Image_30112020161244626.png
|
2020-11-30 16:12:44.696984 |
4 |
36652471 |
Rural connectivity at Ward No. 10 |
500000 |
Rural connectivity at Ward No. 101 |
Earth Work |
-
latitude : 24.74913895,24.74913898
Longitude : 92.51417655,92.51417658
file name : Image_19122020155936808.png
|
2020-12-19 15:59:36.928546 |
5 |
36655332 |
Rural connectivity at Ward No. 6 |
200000 |
Rural connectivity at Ward No. 61 |
Substructure below GL |
-
latitude : 24.77080587,24.77080671
Longitude : 92.51085765,92.51085743
file name : Image_19122020154035401.png
|
2020-12-19 15:40:35.506133 |
6 |
36655332 |
Rural connectivity at Ward No. 6 |
200000 |
Rural connectivity at Ward No. 61 |
Substructure below GL |
-
latitude : 24.77076925,24.77076924
Longitude : 92.51088695,92.51088695
file name : Image_19122020155932522.png
|
2020-12-19 15:59:32.637575 |
7 |
36655710 |
Const. Of Toilet at Ward No. 5 |
150000 |
Const. Of Toilet at Ward No. 51 |
25% |
-
latitude : 24.77942143
Longitude : 92.52156114
file name : Image_19122020144920165.png
|
2020-12-19 14:49:20.278685 |
8 |
36655710 |
Const. Of Toilet at Ward No. 5 |
150000 |
Const. Of Toilet at Ward No. 51 |
25% |
-
latitude : 24.77925559
Longitude : 92.52160466
file name : Image_19122020144927368.png
|
2020-12-19 14:49:27.481342 |
9 |
66610208 |
Operation & maintenance of drinking water supply system |
742838 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.78808368
Longitude : 92.51591659
file name : Image_23012023135743501.png
|
2023-01-23 13:57:43.611426 |
10 |
64765138 |
Installation of Solar Street Light infront of AGVB Duttapur Branch. |
44800 |
Installation of Solar Street Light infront of AGVB Duttapur Branch.1 |
Roof laid |
-
latitude : 24.81608201
Longitude : 92.48631582
file name : Image_25012024132407182.png
|
2024-01-25 13:24:07.274974 |
11 |
64765138 |
Installation of Solar Street Light infront of AGVB Duttapur Branch. |
44800 |
Installation of Solar Street Light infront of AGVB Duttapur Branch.1 |
Plinth level |
-
latitude : 24.8159965
Longitude : 92.48634204
file name : Image_17102023120910951.png
|
2023-10-17 12:09:11.05362 |
12 |
64765138 |
Installation of Solar Street Light infront of AGVB Duttapur Branch. |
44800 |
Installation of Solar Street Light infront of AGVB Duttapur Branch.1 |
Completion of work |
-
latitude : 24.81605974
Longitude : 92.48638128
file name : Image_11072023114636642.png
|
2023-07-11 11:46:36.777673 |
13 |
64765693 |
Repairing of AWC at Adorkuna W. No.10 |
47538 |
Repairing of AWC at Adorkuna W. No.101 |
Plinth level |
-
latitude : 24.75588406
Longitude : 92.51859453
file name : Image_28012024132711888.png
|
2024-01-28 13:27:12.00559 |
14 |
64765693 |
Repairing of AWC at Adorkuna W. No.10 |
47538 |
Repairing of AWC at Adorkuna W. No.101 |
Completion of work |
-
latitude : 24.75594674
Longitude : 92.51856588
file name : Image_04112023144943854.png
|
2023-11-04 14:49:43.954161 |
15 |
64765710 |
Installation of Solar Street Light at Bhupen Hazarika Open Monch |
44800 |
Installation of Solar Street Light at Bhupen Hazarika Open Monch1 |
Roof laid |
-
latitude : 24.75559409
Longitude : 92.51858058
file name : Image_28012024132103539.png
|
2024-01-28 13:21:03.631981 |
16 |
64765710 |
Installation of Solar Street Light at Bhupen Hazarika Open Monch |
44800 |
Installation of Solar Street Light at Bhupen Hazarika Open Monch1 |
Plinth level |
-
latitude : 24.75554156
Longitude : 92.51851829
file name : Image_17102023150253252.png
|
2023-10-17 15:02:53.363655 |
17 |
64765710 |
Installation of Solar Street Light at Bhupen Hazarika Open Monch |
44800 |
Installation of Solar Street Light at Bhupen Hazarika Open Monch1 |
Completion of work |
-
latitude : 24.75556317
Longitude : 92.51856871
file name : Image_03072023150339020.png
|
2023-07-03 15:03:39.116362 |
18 |
74642317 |
Repairing of 30 No. Anganwadi Centre at pingargool |
300000 |
Repairing of 30 No. Anganwadi Centre at pingargool1 |
Roof laid |
-
latitude : 24.77482824
Longitude : 92.51937899
file name : Image_08112023143030702.png
|
2023-11-08 14:30:31.185143 |
19 |
74642317 |
Repairing of 30 No. Anganwadi Centre at pingargool |
300000 |
Repairing of 30 No. Anganwadi Centre at pingargool1 |
Plinth level |
-
latitude : 24.77480485
Longitude : 92.51945006
file name : Image_15092023144453111.png
|
2023-09-15 14:44:53.201541 |
20 |
74642317 |
Repairing of 30 No. Anganwadi Centre at pingargool |
300000 |
Repairing of 30 No. Anganwadi Centre at pingargool1 |
Completion of work |
-
latitude : 24.77471151
Longitude : 92.51935074
file name : Image_19052023132843848.png
|
2023-05-19 13:28:43.950201 |
21 |
74642892 |
Repairing of Ratanpur L.P. School at Duttapur |
250000 |
Repairing of Ratanpur L.P. School at Duttapur1 |
Roof laid |
-
latitude : 24.81375603
Longitude : 92.48874506
file name : Image_16112023145145082.png
|
2023-11-16 14:51:45.173053 |
22 |
74642892 |
Repairing of Ratanpur L.P. School at Duttapur |
250000 |
Repairing of Ratanpur L.P. School at Duttapur1 |
Plinth level |
-
latitude : 24.81368765
Longitude : 92.48879398
file name : Image_08112023165922347.png
|
2023-11-08 16:59:22.530901 |
23 |
74642892 |
Repairing of Ratanpur L.P. School at Duttapur |
250000 |
Repairing of Ratanpur L.P. School at Duttapur1 |
Completion of work |
-
latitude : 24.81366262
Longitude : 92.48880497
file name : Image_03072023102459409.png
|
2023-07-03 10:24:59.504715 |
24 |
74131842 |
Installation of Solar Street Light at the point of Hifjur Rahman Rd infront of Nayabari at Majlispur |
44800 |
Installation of Solar Street Light at the point of Hifjur Rahman Rd infront of Nayabari at Majlispur1 |
Plinth level |
-
latitude : 24.81188273
Longitude : 92.49598674
file name : Image_31012024155228305.png
|
2024-01-31 15:52:28.396125 |
25 |
74131842 |
Installation of Solar Street Light at the point of Hifjur Rahman Rd infront of Nayabari at Majlispur |
44800 |
Installation of Solar Street Light at the point of Hifjur Rahman Rd infront of Nayabari at Majlispur1 |
Completion of work |
-
latitude : 24.8118299
Longitude : 92.49590359
file name : Image_11072023115805078.png
|
2023-07-11 11:58:05.174332 |
26 |
74135393 |
Infrastructure of Baniargool Sub-Centre at Baniargool |
450000 |
Infrastructure of Baniargool Sub-Centre at Baniargool1 |
Plinth level |
-
latitude : 24.78709237
Longitude : 92.48791498
file name : Image_28012024151210035.png
|
2024-01-28 15:12:10.133928 |
27 |
74135393 |
Infrastructure of Baniargool Sub-Centre at Baniargool |
450000 |
Infrastructure of Baniargool Sub-Centre at Baniargool1 |
Completion of work |
-
latitude : 24.78702588
Longitude : 92.48789933
file name : Image_14062023123609140.png
|
2023-06-14 12:36:09.231885 |
28 |
74137879 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.7674247
Longitude : 92.5219686
file name : Image_08112023162744041.png
|
2023-11-08 16:27:44.225349 |
29 |
74137879 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.7674231
Longitude : 92.5219643
file name : Image_08112023145424195.png
|
2023-11-08 14:54:24.382173 |
30 |
74137879 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.77416482
Longitude : 92.52127034
file name : Image_15092023152454386.png
|
2023-09-15 15:24:54.484105 |
31 |
66611450 |
Const. of Culvert at Pingargool near the house of Abdul Khalik |
192100 |
Const. of Culvert at Pingargool near the house of Abdul Khalik1 |
Roof laid |
-
latitude : 24.7703029,24.77030362
Longitude : 92.51933945,92.51933831
file name : Image_17102023112119679.png
|
2023-10-17 11:21:19.770114 |
32 |
66611450 |
Const. of Culvert at Pingargool near the house of Abdul Khalik |
192100 |
Const. of Culvert at Pingargool near the house of Abdul Khalik1 |
Plinth level |
-
latitude : 24.77031992,24.77030559
Longitude : 92.51928289,92.51928663
file name : Image_30092023131826305.png
|
2023-09-30 13:18:26.389345 |
33 |
66611450 |
Const. of Culvert at Pingargool near the house of Abdul Khalik |
192100 |
Const. of Culvert at Pingargool near the house of Abdul Khalik1 |
Plinth level |
-
latitude : 24.77035307,24.77035907
Longitude : 92.5192988,92.51931009
file name : Image_07092023151814015.png
|
2023-09-07 15:18:14.108525 |
34 |
66611450 |
Const. of Culvert at Pingargool near the house of Abdul Khalik |
192100 |
Const. of Culvert at Pingargool near the house of Abdul Khalik1 |
Completion of work |
-
latitude : 24.77034556,24.77034556
Longitude : 92.519336,92.519336
file name : Image_02092023161023835.png
|
2023-09-02 16:10:23.924676 |
35 |
66611450 |
Const. of Culvert at Pingargool near the house of Abdul Khalik |
192100 |
Const. of Culvert at Pingargool near the house of Abdul Khalik1 |
Completion of work |
-
latitude : 24.77036789,24.77037106
Longitude : 92.51932677,92.51931561
file name : Image_23012023122455175.png
|
2023-01-23 12:24:55.286987 |
36 |
64764124 |
Augmentation of the existing source of drinking water |
371419 |
Augmentation of the existing source of drinking water1 |
Roof laid |
-
latitude : 24.78852102,24.78852631
Longitude : 92.51543409,92.51544091
file name : Image_07092023133607763.png
|
2023-09-07 13:36:07.859087 |
37 |
64764124 |
Augmentation of the existing source of drinking water |
371419 |
Augmentation of the existing source of drinking water1 |
Plinth level |
-
latitude : 24.7885386,24.78854357
Longitude : 92.51546546,92.51546463
file name : Image_06092023121317897.png
|
2023-09-06 12:13:18.044707 |
38 |
64764124 |
Augmentation of the existing source of drinking water |
371419 |
Augmentation of the existing source of drinking water1 |
Plinth level |
-
latitude : 24.78792027,24.78793761
Longitude : 92.51640527,92.51642137
file name : Image_06092023120608570.png
|
2023-09-06 12:06:08.689285 |
39 |
64764124 |
Augmentation of the existing source of drinking water |
371419 |
Augmentation of the existing source of drinking water1 |
Completion of work |
-
latitude : 24.78858247,24.7885953
Longitude : 92.51548538,92.51545481
file name : Image_07112022145405418.png
|
2022-11-07 14:54:05.519895 |
40 |
64768788 |
Creation of drainage channel for management of grey water |
93219 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.77354458,24.77354144
Longitude : 92.51684575,92.51684763
file name : Image_07092023143658911.png
|
2023-09-07 14:36:58.813222 |
41 |
64768788 |
Creation of drainage channel for management of grey water |
93219 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.77352207,24.77352051
Longitude : 92.51687162,92.51687727
file name : Image_06092023131852991.png
|
2023-09-06 13:18:53.095931 |
42 |
64768788 |
Creation of drainage channel for management of grey water |
93219 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.77352207,24.77352051
Longitude : 92.51687162,92.51687727
file name : Image_06092023131822924.png
|
2023-09-06 13:18:23.043532 |
43 |
64768788 |
Creation of drainage channel for management of grey water |
93219 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.77354302,24.7735097,24.7735097
Longitude : 92.51685714,92.51684459,92.51684459
file name : Image_02092023151543521.png
|
2023-09-02 15:15:43.629311 |
44 |
64768788 |
Creation of drainage channel for management of grey water |
93219 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.77355191,24.773552
Longitude : 92.51689534,92.51689528
file name : Image_23092022135554467.png
|
2022-09-23 13:55:54.578824 |
45 |
64770346 |
Construction of C.C. Road starting from B.A. Road to Abdul Motin house (Earth & Sand Gravelling) |
150000 |
Construction of C.C. Road starting from B.A. Road to Abdul Motin house (Earth & Sand Gravelling)1 |
Roof laid |
-
latitude : 24.7717765,24.7717816
Longitude : 92.52155866,92.52155628
file name : Image_07092023151224274.png
|
2023-09-07 15:12:24.398761 |
46 |
64770346 |
Construction of C.C. Road starting from B.A. Road to Abdul Motin house (Earth & Sand Gravelling) |
150000 |
Construction of C.C. Road starting from B.A. Road to Abdul Motin house (Earth & Sand Gravelling)1 |
Plinth level |
-
latitude : 24.7717487,24.77174555
Longitude : 92.52161557,92.52162701
file name : Image_06092023133349199.png
|
2023-09-06 13:33:49.308742 |
47 |
64770346 |
Construction of C.C. Road starting from B.A. Road to Abdul Motin house (Earth & Sand Gravelling) |
150000 |
Construction of C.C. Road starting from B.A. Road to Abdul Motin house (Earth & Sand Gravelling)1 |
Completion of work |
-
latitude : 24.77175637,24.77175485
Longitude : 92.5215928,92.52159158
file name : Image_02092023152348516.png
|
2023-09-02 15:23:48.614396 |
48 |
64770346 |
Construction of C.C. Road starting from B.A. Road to Abdul Motin house (Earth & Sand Gravelling) |
150000 |
Construction of C.C. Road starting from B.A. Road to Abdul Motin house (Earth & Sand Gravelling)1 |
Completion of work |
-
latitude : 24.77168123,24.77168168
Longitude : 92.52157246,92.52157241
file name : Image_12092022153402184.png
|
2022-09-12 15:34:02.281357 |
49 |
66612108 |
Repairing of Moharani Sadhani L.P. School at Barthal |
267076 |
Repairing of Moharani Sadhani L.P. School at Barthal1 |
Roof laid |
-
latitude : 24.76752836
Longitude : 92.5241737
file name : Image_04112023150702227.png
|
2023-11-04 15:07:02.372206 |
50 |
66612108 |
Repairing of Moharani Sadhani L.P. School at Barthal |
267076 |
Repairing of Moharani Sadhani L.P. School at Barthal1 |
Plinth level |
-
latitude : 24.76756448
Longitude : 92.52418377
file name : Image_06092023140432840.png
|
2023-09-06 14:04:32.942123 |
51 |
66612108 |
Repairing of Moharani Sadhani L.P. School at Barthal |
267076 |
Repairing of Moharani Sadhani L.P. School at Barthal1 |
Completion of work |
-
latitude : 24.76749531
Longitude : 92.52424364
file name : Image_04092023092823192.png
|
2023-09-04 09:40:31.470269 |
52 |
66612108 |
Repairing of Moharani Sadhani L.P. School at Barthal |
267076 |
Repairing of Moharani Sadhani L.P. School at Barthal1 |
Completion of work |
-
latitude : 24.76752078
Longitude : 92.5242288
file name : Image_19052023131001015.png
|
2023-05-19 13:10:01.136963 |
53 |
66611780 |
Construction of Road starting from Hemarmukh P.W.D road at Abdur Rahim house via Amir Uddin |
550000 |
Construction of Road starting from Hemarmukh P.W.D road at Abdur Rahim house via Amir Uddin1 |
Roof laid |
-
latitude : 24.7657069,24.76569746
Longitude : 92.52892988,92.52893253
file name : Image_07092023154833246.png
|
2023-09-07 15:48:33.343743 |
54 |
66611780 |
Construction of Road starting from Hemarmukh P.W.D road at Abdur Rahim house via Amir Uddin |
550000 |
Construction of Road starting from Hemarmukh P.W.D road at Abdur Rahim house via Amir Uddin1 |
Plinth level |
-
latitude : 24.76569502,24.76569864
Longitude : 92.5289143,92.52891448
file name : Image_06092023141204776.png
|
2023-09-06 14:12:04.874979 |
55 |
66611780 |
Construction of Road starting from Hemarmukh P.W.D road at Abdur Rahim house via Amir Uddin |
550000 |
Construction of Road starting from Hemarmukh P.W.D road at Abdur Rahim house via Amir Uddin1 |
Completion of work |
-
latitude : 24.76569864,24.76569921
Longitude : 92.52892411,92.52892465
file name : Image_02092023154608863.png
|
2023-09-02 15:46:08.968031 |
56 |
66611780 |
Construction of Road starting from Hemarmukh P.W.D road at Abdur Rahim house via Amir Uddin |
550000 |
Construction of Road starting from Hemarmukh P.W.D road at Abdur Rahim house via Amir Uddin1 |
Completion of work |
-
latitude : 24.76562947,24.76562417
Longitude : 92.52888122,92.52888943
file name : Image_23012023124743075.png
|
2023-01-23 12:47:43.189424 |
57 |
66611550 |
Repairing of road starting from Taher Uddin culvert Achiya Begom House |
192100 |
Repairing of road starting from Taher Uddin culvert Achiya Begom House1 |
Roof laid |
-
latitude : 24.7851073,24.78510791
Longitude : 92.52363399,92.52363675
file name : Image_07092023140550305.png
|
2023-09-07 14:05:50.410596 |
58 |
66611550 |
Repairing of road starting from Taher Uddin culvert Achiya Begom House |
192100 |
Repairing of road starting from Taher Uddin culvert Achiya Begom House1 |
Plinth level |
-
latitude : 24.78514669,24.78514787
Longitude : 92.52360888,92.52361225
file name : Image_06092023124437489.png
|
2023-09-06 12:44:37.580073 |
59 |
66611550 |
Repairing of road starting from Taher Uddin culvert Achiya Begom House |
192100 |
Repairing of road starting from Taher Uddin culvert Achiya Begom House1 |
Completion of work |
-
latitude : 24.78516759,24.78517073
Longitude : 92.52364951,92.52367471
file name : Image_02092023142914774.png
|
2023-09-02 14:29:14.876031 |
60 |
66611550 |
Repairing of road starting from Taher Uddin culvert Achiya Begom House |
192100 |
Repairing of road starting from Taher Uddin culvert Achiya Begom House1 |
Completion of work |
-
latitude : 24.785227,24.78522676
Longitude : 92.52364154,92.52364182
file name : Image_23012023133455562.png
|
2023-01-23 13:34:55.652082 |
61 |
87138937 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 24.80955764
Longitude : 92.49339361
file name : Image_31012024154312337.png
|
2024-01-31 15:43:12.427078 |
62 |
87138937 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 24.80954609
Longitude : 92.49336285
file name : Image_04112023121934681.png
|
2023-11-04 12:19:34.786969 |
63 |
87138977 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 24.79420167
Longitude : 92.50222722
file name : Image_04112023123114524.png
|
2023-11-04 12:31:14.626408 |
64 |
87158609 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 24.79002009
Longitude : 92.48828986
file name : Image_28012024155157538.png
|
2024-01-28 15:51:57.640382 |
65 |
87159138 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 24.75635583
Longitude : 92.51898114
file name : Image_29012024095705660.png
|
2024-01-29 09:57:05.757077 |
66 |
87162292 |
2223 1st UTF2 Road from Amin Uddin house to Abdul Sattar house at Barthal |
600000 |
2223 1st UTF2 Road from Amin Uddin house to Abdul Sattar house at Barthal 1 |
Roof laid |
-
latitude : 24.77081447,24.77081447
Longitude : 92.52074583,92.52074583
file name : Image_31012024131344573.png
|
2024-01-31 13:13:44.673602 |
67 |
87162292 |
2223 1st UTF2 Road from Amin Uddin house to Abdul Sattar house at Barthal |
600000 |
2223 1st UTF2 Road from Amin Uddin house to Abdul Sattar house at Barthal 1 |
Plinth level |
-
latitude : 24.77084196,24.77084196
Longitude : 92.52078421,92.52078421
file name : Image_28012024121507407.png
|
2024-01-28 12:15:07.484136 |
68 |
87162292 |
2223 1st UTF2 Road from Amin Uddin house to Abdul Sattar house at Barthal |
600000 |
2223 1st UTF2 Road from Amin Uddin house to Abdul Sattar house at Barthal 1 |
Completion of work |
-
latitude : 24.77083863,24.77083904
Longitude : 92.5207455,92.5207537
file name : Image_06092023134012129.png
|
2023-09-06 13:40:12.244409 |
69 |
87218736 |
2223 2nd UTF1 AWC at Murgapur ward no.3 |
200000 |
2223 2nd UTF1 AWC at Murgapur ward no.31 |
Completion of work |
-
latitude : 24.79789984
Longitude : 92.50401813
file name : Image_30092023124815038.png
|
2023-09-30 12:48:15.128552 |
70 |
87218773 |
2223 2nd UTF2 Road near Dipak Borah house at Adarkuna |
100000 |
2223 2nd UTF2 Road near Dipak Borah house at Adarkuna1 |
Plinth level |
-
latitude : 24.76526286,24.76526286
Longitude : 92.51916598,92.51916598
file name : Image_31012024130215794.png
|
2024-01-31 13:02:15.936523 |
71 |
87218773 |
2223 2nd UTF2 Road near Dipak Borah house at Adarkuna |
100000 |
2223 2nd UTF2 Road near Dipak Borah house at Adarkuna1 |
Completion of work |
-
latitude : 24.76521496,24.76519798,24.76519798
Longitude : 92.51916755,92.51915052,92.51915052
file name : Image_04112023144932409.png
|
2023-11-04 14:49:32.602718 |
72 |
87218832 |
2223 2nd UTF4 Women volley ball ground at Adarkuna ME Scholl |
25000 |
2223 2nd UTF4 Women volley ball ground at Adarkuna ME Scholl1 |
Completion of work |
-
latitude : 24.76565743,24.76567051
Longitude : 92.52126015,92.52125815
file name : Image_25012024150506886.png
|
2024-01-25 15:05:06.982732 |
73 |
87162074 |
2223 1st UTF1 Road from Terai Mia house to Asia Bibi house at Bnedargool |
350000 |
2223 1st UTF1 Road from Terai Mia house to Asia Bibi house at Bnedargool1 |
Roof laid |
-
latitude : 24.7841641,24.78416281
Longitude : 92.52391985,92.5239204
file name : Image_31012024144601160.png
|
2024-01-31 14:46:01.250895 |
74 |
87162074 |
2223 1st UTF1 Road from Terai Mia house to Asia Bibi house at Bnedargool |
350000 |
2223 1st UTF1 Road from Terai Mia house to Asia Bibi house at Bnedargool1 |
Plinth level |
-
latitude : 24.78415849,24.78415849
Longitude : 92.52392414,92.52392414
file name : Image_28012024140912468.png
|
2024-01-28 14:09:12.570538 |
75 |
87162074 |
2223 1st UTF1 Road from Terai Mia house to Asia Bibi house at Bnedargool |
350000 |
2223 1st UTF1 Road from Terai Mia house to Asia Bibi house at Bnedargool1 |
Completion of work |
-
latitude : 24.78406517,24.78406348
Longitude : 92.52390942,92.52391073
file name : Image_09092023151336124.png
|
2023-09-09 15:13:36.291012 |
76 |
66610655 |
Creation of plastic waste storage unit |
161419 |
Creation of plastic waste storage unit 1 |
Roof laid |
-
latitude : 24.77047534
Longitude : 92.52153268
file name : Image_07092023153942655.png
|
2023-09-07 15:39:42.792818 |
77 |
66610655 |
Creation of plastic waste storage unit |
161419 |
Creation of plastic waste storage unit 1 |
Roof laid |
-
latitude : 24.77047534
Longitude : 92.52153268
file name : Image_07092023153931038.png
|
2023-09-07 15:39:31.148967 |
78 |
66610655 |
Creation of plastic waste storage unit |
161419 |
Creation of plastic waste storage unit 1 |
Roof laid |
-
latitude : 24.770453
Longitude : 92.52152813
file name : Image_07092023153924484.png
|
2023-09-07 15:39:24.575204 |
79 |
66610655 |
Creation of plastic waste storage unit |
161419 |
Creation of plastic waste storage unit 1 |
Plinth level |
-
latitude : 24.7704149
Longitude : 92.52153556
file name : Image_06092023135813354.png
|
2023-09-06 13:58:13.469437 |
80 |
66610655 |
Creation of plastic waste storage unit |
161419 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 24.77040432
Longitude : 92.52157572
file name : Image_02092023152900895.png
|
2023-09-02 15:29:01.061103 |
81 |
66610655 |
Creation of plastic waste storage unit |
161419 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 24.77038571
Longitude : 92.52159857
file name : Image_23012023121339075.png
|
2023-01-23 12:13:39.163643 |
82 |
66610405 |
Construction of Community Sanitary Complex |
110000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.77237686
Longitude : 92.51606336
file name : Image_07092023145721552.png
|
2023-09-07 14:57:21.648841 |
83 |
66610405 |
Construction of Community Sanitary Complex |
110000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.77235432
Longitude : 92.51610836
file name : Image_06092023132355547.png
|
2023-09-06 13:23:55.654677 |
84 |
66610405 |
Construction of Community Sanitary Complex |
110000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.77235559
Longitude : 92.51608912
file name : Image_03092023185634578.png
|
2023-09-03 19:08:43.313538 |
85 |
66610405 |
Construction of Community Sanitary Complex |
110000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.77230104
Longitude : 92.51606893
file name : Image_23012023131840866.png
|
2023-01-23 13:18:40.954545 |
86 |
66610282 |
Construction of Community Sanitary Complex |
373319 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.78379223
Longitude : 92.51779321
file name : Image_07092023135356071.png
|
2023-09-07 13:53:55.663781 |
87 |
66610282 |
Construction of Community Sanitary Complex |
373319 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.78374387
Longitude : 92.51782894
file name : Image_06092023123226810.png
|
2023-09-06 12:32:26.929197 |
88 |
66610282 |
Construction of Community Sanitary Complex |
373319 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.78376307
Longitude : 92.51782788
file name : Image_02092023140130052.png
|
2023-09-02 14:01:30.161944 |
89 |
66610282 |
Construction of Community Sanitary Complex |
373319 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.78373114
Longitude : 92.51781787
file name : Image_23012023134821706.png
|
2023-01-23 13:48:21.807688 |
90 |
64765387 |
Construction of Community Hall near the house of Abdul Basit Tapadar at Majlishpur |
250000 |
Construction of Community Hall near the house of Abdul Basit Tapadar at Majlishpur1 |
Roof laid |
-
latitude : 24.80958835
Longitude : 92.49289696
file name : Image_07092023124950900.png
|
2023-09-07 12:49:51.014873 |
91 |
64765387 |
Construction of Community Hall near the house of Abdul Basit Tapadar at Majlishpur |
250000 |
Construction of Community Hall near the house of Abdul Basit Tapadar at Majlishpur1 |
Plinth level |
-
latitude : 24.80953144
Longitude : 92.49289471
file name : Image_06092023113820552.png
|
2023-09-06 11:38:20.750267 |
92 |
64765387 |
Construction of Community Hall near the house of Abdul Basit Tapadar at Majlishpur |
250000 |
Construction of Community Hall near the house of Abdul Basit Tapadar at Majlishpur1 |
Completion of work |
-
latitude : 24.80963953
Longitude : 92.49290239
file name : Image_02092023133916020.png
|
2023-09-02 13:39:16.111892 |
93 |
64765387 |
Construction of Community Hall near the house of Abdul Basit Tapadar at Majlishpur |
250000 |
Construction of Community Hall near the house of Abdul Basit Tapadar at Majlishpur1 |
Completion of work |
-
latitude : 24.80963953
Longitude : 92.49290239
file name : Image_02092023133903021.png
|
2023-09-02 13:39:03.119691 |
94 |
64765387 |
Construction of Community Hall near the house of Abdul Basit Tapadar at Majlishpur |
250000 |
Construction of Community Hall near the house of Abdul Basit Tapadar at Majlishpur1 |
Completion of work |
-
latitude : 24.80960057
Longitude : 92.49292918
file name : Image_02092023133856152.png
|
2023-09-02 13:38:56.328133 |
95 |
64765387 |
Construction of Community Hall near the house of Abdul Basit Tapadar at Majlishpur |
250000 |
Construction of Community Hall near the house of Abdul Basit Tapadar at Majlishpur1 |
Completion of work |
-
latitude : 24.80956517
Longitude : 92.49285576
file name : Image_07112022152651664.png
|
2022-11-07 15:26:51.778499 |
96 |
64770247 |
Construction of C.C. Road starting from PMGY Road to Pingargool Old Jame Masjid via Siraj Uddin |
192100 |
Construction of C.C. Road starting from PMGY Road to Pingargool Old Jame Masjid via Siraj Uddin1 |
Roof laid |
-
latitude : 24.77393075,24.7739343
Longitude : 92.51647122,92.51647137
file name : Image_07092023144425985.png
|
2023-09-07 14:44:26.077477 |
97 |
64770247 |
Construction of C.C. Road starting from PMGY Road to Pingargool Old Jame Masjid via Siraj Uddin |
192100 |
Construction of C.C. Road starting from PMGY Road to Pingargool Old Jame Masjid via Siraj Uddin1 |
Plinth level |
-
latitude : 24.77397138,24.77396229
Longitude : 92.51651587,92.51651547
file name : Image_06092023131743615.png
|
2023-09-06 13:17:43.744532 |
98 |
64770247 |
Construction of C.C. Road starting from PMGY Road to Pingargool Old Jame Masjid via Siraj Uddin |
192100 |
Construction of C.C. Road starting from PMGY Road to Pingargool Old Jame Masjid via Siraj Uddin1 |
Completion of work |
-
latitude : 24.7739707,24.77398498
Longitude : 92.51650661,92.51651892
file name : Image_02092023150900910.png
|
2023-09-02 15:09:01.024012 |
99 |
64770247 |
Construction of C.C. Road starting from PMGY Road to Pingargool Old Jame Masjid via Siraj Uddin |
192100 |
Construction of C.C. Road starting from PMGY Road to Pingargool Old Jame Masjid via Siraj Uddin1 |
Completion of work |
-
latitude : 24.77389357,24.77390203
Longitude : 92.51652633,92.5165187
file name : Image_12092022154354563.png
|
2022-09-12 15:43:54.660923 |
100 |
64769398 |
Creation of drainage channel for management of grey water |
273319 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.77363385,24.77363712
Longitude : 92.51650314,92.5165014
file name : Image_07092023144812239.png
|
2023-09-07 14:48:12.331743 |
101 |
64769398 |
Creation of drainage channel for management of grey water |
273319 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.77365242,24.77371071
Longitude : 92.51655295,92.51657012
file name : Image_06092023131837654.png
|
2023-09-06 13:18:37.772586 |
102 |
64769398 |
Creation of drainage channel for management of grey water |
273319 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.77365242,24.77371071
Longitude : 92.51655295,92.51657012
file name : Image_06092023131800316.png
|
2023-09-06 13:18:00.435971 |
103 |
64769398 |
Creation of drainage channel for management of grey water |
273319 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.77360618,24.77359928
Longitude : 92.51656277,92.51656631
file name : Image_02092023151144857.png
|
2023-09-02 15:11:44.946213 |
104 |
64769398 |
Creation of drainage channel for management of grey water |
273319 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.77354913,24.77354912
Longitude : 92.51657476,92.51657465
file name : Image_12092022155749880.png
|
2022-09-12 15:57:49.987735 |
105 |
64769168 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.76491753
Longitude : 92.53131324
file name : Image_17102023143211529.png
|
2023-10-17 14:32:11.646135 |
106 |
64769168 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.76494717
Longitude : 92.53130144
file name : Image_06092023141805572.png
|
2023-09-06 14:18:05.732302 |
107 |
64769168 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.76493599
Longitude : 92.5313453
file name : Image_02092023155659214.png
|
2023-09-02 15:56:59.32905 |
108 |
64769168 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.76493994
Longitude : 92.53131028
file name : Image_07112022140835739.png
|
2022-11-07 14:08:35.822663 |
109 |
64764171 |
Creation of plastic waste storage unit |
180104 |
Creation of plastic waste storage unit 1 |
Roof laid |
-
latitude : 24.77925169
Longitude : 92.52174481
file name : Image_07092023141400829.png
|
2023-09-07 14:14:00.922752 |
110 |
64764171 |
Creation of plastic waste storage unit |
180104 |
Creation of plastic waste storage unit 1 |
Plinth level |
-
latitude : 24.77934845
Longitude : 92.52171737
file name : Image_06092023125412778.png
|
2023-09-06 12:54:12.884572 |
111 |
64764171 |
Creation of plastic waste storage unit |
180104 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 24.77933331
Longitude : 92.52181943
file name : Image_02092023143833988.png
|
2023-09-02 14:38:34.080353 |
112 |
64764171 |
Creation of plastic waste storage unit |
180104 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 24.77931255
Longitude : 92.52173365
file name : Image_10022023145738647.png
|
2023-02-10 14:57:38.75613 |
113 |
64769486 |
Creation of a new source of drinking water |
371419 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.78790822
Longitude : 92.51643144
file name : Image_07092023132626867.png
|
2023-09-07 13:26:26.95824 |
114 |
64769486 |
Creation of a new source of drinking water |
371419 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.78794949
Longitude : 92.51644461
file name : Image_06092023121957430.png
|
2023-09-06 12:19:57.567039 |
115 |
64769486 |
Creation of a new source of drinking water |
371419 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.78798
Longitude : 92.51631067
file name : Image_07112022144259836.png
|
2022-11-07 14:42:59.94073 |
116 |
74641458 |
Improvement of CC Rd from B.A. PWD rd to Aklis Uddin house |
400000 |
Improvement of CC Rd from B.A. PWD rd to Aklis Uddin house1 |
Roof laid |
-
latitude : 24.76709496,24.76707653
Longitude : 92.5221297,92.52213887
file name : Image_08112023145430992.png
|
2023-11-08 14:54:31.122891 |
117 |
74641458 |
Improvement of CC Rd from B.A. PWD rd to Aklis Uddin house |
400000 |
Improvement of CC Rd from B.A. PWD rd to Aklis Uddin house1 |
Roof laid |
-
latitude : 24.76709496,24.76707653
Longitude : 92.5221297,92.52213887
file name : Image_08112023145449581.png
|
2023-11-08 14:54:49.998812 |
118 |
74641458 |
Improvement of CC Rd from B.A. PWD rd to Aklis Uddin house |
400000 |
Improvement of CC Rd from B.A. PWD rd to Aklis Uddin house1 |
Plinth level |
-
latitude : 24.76711547,24.7671092
Longitude : 92.52222824,92.52222455
file name : Image_15092023153110504.png
|
2023-09-15 15:31:10.707862 |
119 |
74641458 |
Improvement of CC Rd from B.A. PWD rd to Aklis Uddin house |
400000 |
Improvement of CC Rd from B.A. PWD rd to Aklis Uddin house1 |
Completion of work |
-
latitude : 24.7670417,24.76703561
Longitude : 92.52213564,92.52214475
file name : Image_19052023123111820.png
|
2023-05-19 12:31:11.916199 |
120 |
74639557 |
Construction of toilets in public institutions |
141400 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 24.77150992
Longitude : 92.51132724
file name : Image_08112023141607324.png
|
2023-11-08 14:16:07.415555 |
121 |
74639557 |
Construction of toilets in public institutions |
141400 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 24.77150196
Longitude : 92.51147851
file name : Image_15092023145818578.png
|
2023-09-15 14:58:18.666579 |
122 |
74639557 |
Construction of toilets in public institutions |
141400 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.7713838
Longitude : 92.51141872
file name : Image_19052023134154562.png
|
2023-05-19 13:41:54.672593 |
123 |
74139246 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 24.77592709
Longitude : 92.53785999
file name : Image_31012024120852831.png
|
2024-01-31 12:08:52.93472 |
124 |
74139246 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.77590203
Longitude : 92.53791265
file name : Image_19052023145613194.png
|
2023-05-19 14:56:13.302481 |
125 |
66611702 |
Repairing of Guard Wall at Kuchilargool L.P. School at Kuchilargool |
150000 |
Repairing of Guard Wall at Kuchilargool L.P. School at Kuchilargool1 |
Roof laid |
-
latitude : 24.78980761
Longitude : 92.49451548
file name : Image_17102023161230183.png
|
2023-10-17 16:12:30.280682 |
126 |
66611702 |
Repairing of Guard Wall at Kuchilargool L.P. School at Kuchilargool |
150000 |
Repairing of Guard Wall at Kuchilargool L.P. School at Kuchilargool1 |
Plinth level |
-
latitude : 24.78989391
Longitude : 92.494548
file name : Image_07092023165909716.png
|
2023-09-07 16:59:09.818183 |
127 |
66611702 |
Repairing of Guard Wall at Kuchilargool L.P. School at Kuchilargool |
150000 |
Repairing of Guard Wall at Kuchilargool L.P. School at Kuchilargool1 |
Completion of work |
-
latitude : 24.78984986
Longitude : 92.49455668
file name : Image_03092023185656572.png
|
2023-09-03 19:09:05.28882 |
128 |
66611702 |
Repairing of Guard Wall at Kuchilargool L.P. School at Kuchilargool |
150000 |
Repairing of Guard Wall at Kuchilargool L.P. School at Kuchilargool1 |
Completion of work |
-
latitude : 24.78984986
Longitude : 92.49455668
file name : Image_03092023185647696.png
|
2023-09-03 19:08:56.519809 |
129 |
66611702 |
Repairing of Guard Wall at Kuchilargool L.P. School at Kuchilargool |
150000 |
Repairing of Guard Wall at Kuchilargool L.P. School at Kuchilargool1 |
Completion of work |
-
latitude : 24.78994313
Longitude : 92.49448609
file name : Image_23012023143753002.png
|
2023-01-23 14:37:53.140556 |
130 |
64764137 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.7954693
Longitude : 92.50847376
file name : Image_17102023123209393.png
|
2023-10-17 12:32:09.515494 |
131 |
64764137 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.79550899
Longitude : 92.50847047
file name : Image_06092023120602445.png
|
2023-09-06 12:06:02.551548 |
132 |
64764137 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.79548987
Longitude : 92.50850538
file name : Image_02092023133927125.png
|
2023-09-02 13:39:27.224989 |
133 |
64764137 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.79548987
Longitude : 92.50850538
file name : Image_02092023133908167.png
|
2023-09-02 13:39:08.280384 |
134 |
64764137 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.79549705
Longitude : 92.50846477
file name : Image_07112022150815323.png
|
2022-11-07 15:08:15.421901 |
135 |
64765437 |
Construction of Community Hall near Kuchlargool Kali Mandir at Baniargool |
300000 |
Construction of Community Hall near Kuchlargool Kali Mandir at Baniargool1 |
Roof laid |
-
latitude : 24.78525814
Longitude : 92.49546223
file name : Image_17102023162758553.png
|
2023-10-17 16:27:58.66086 |
136 |
64765437 |
Construction of Community Hall near Kuchlargool Kali Mandir at Baniargool |
300000 |
Construction of Community Hall near Kuchlargool Kali Mandir at Baniargool1 |
Plinth level |
-
latitude : 24.7852487
Longitude : 92.49539605
file name : Image_07092023165904691.png
|
2023-09-07 16:59:04.785298 |
137 |
64765437 |
Construction of Community Hall near Kuchlargool Kali Mandir at Baniargool |
300000 |
Construction of Community Hall near Kuchlargool Kali Mandir at Baniargool1 |
Completion of work |
-
latitude : 24.78525339
Longitude : 92.49545846
file name : Image_03092023185652169.png
|
2023-09-03 19:09:00.891412 |
138 |
64765437 |
Construction of Community Hall near Kuchlargool Kali Mandir at Baniargool |
300000 |
Construction of Community Hall near Kuchlargool Kali Mandir at Baniargool1 |
Completion of work |
-
latitude : 24.78525339
Longitude : 92.49545846
file name : Image_03092023185643344.png
|
2023-09-03 19:08:52.040212 |
139 |
64765437 |
Construction of Community Hall near Kuchlargool Kali Mandir at Baniargool |
300000 |
Construction of Community Hall near Kuchlargool Kali Mandir at Baniargool1 |
Completion of work |
-
latitude : 24.78525345
Longitude : 92.49547137
file name : Image_03092023185638816.png
|
2023-09-03 19:08:47.521394 |
140 |
64765437 |
Construction of Community Hall near Kuchlargool Kali Mandir at Baniargool |
300000 |
Construction of Community Hall near Kuchlargool Kali Mandir at Baniargool1 |
Completion of work |
-
latitude : 24.78527128
Longitude : 92.49543269
file name : Image_23012023142657903.png
|
2023-01-23 14:26:58.005351 |
141 |
66611186 |
Installation of solat street light at Mukkargool Jame Masjid |
44800 |
Installation of solat street light at Mukkargool Jame Masjid1 |
Completion of work |
-
latitude : 24.76796085
Longitude : 92.54033113
file name : Image_11072023164929662.png
|
2023-07-11 16:49:29.776903 |
142 |
66610901 |
Installation of Solar Street Light near the house of Abdul Jabbar at Majlishpur |
44800 |
Installation of Solar Street Light near the house of Abdul Jabbar at Majlishpur1 |
Plinth level |
-
latitude : 24.80669942
Longitude : 92.49093635
file name : Image_31012024152627916.png
|
2024-01-31 15:26:28.029998 |
143 |
66610901 |
Installation of Solar Street Light near the house of Abdul Jabbar at Majlishpur |
44800 |
Installation of Solar Street Light near the house of Abdul Jabbar at Majlishpur1 |
Completion of work |
-
latitude : 24.80663639
Longitude : 92.49093048
file name : Image_11072023124636632.png
|
2023-07-11 12:46:36.746885 |
144 |
64769563 |
Installation of Solar Street Light in the PMGY Road near Ahad Uddin Shop at Pingargool |
44800 |
Installation of Solar Street Light in the PMGY Road near Ahad Uddin Shop at Pingargool1 |
Roof laid |
-
latitude : 24.77161461
Longitude : 92.50991466
file name : Image_28012024115752466.png
|
2024-01-28 11:57:52.56468 |
145 |
64769563 |
Installation of Solar Street Light in the PMGY Road near Ahad Uddin Shop at Pingargool |
44800 |
Installation of Solar Street Light in the PMGY Road near Ahad Uddin Shop at Pingargool1 |
Plinth level |
-
latitude : 24.77151512
Longitude : 92.50979681
file name : Image_17102023134254108.png
|
2023-10-17 13:42:54.214596 |
146 |
64769563 |
Installation of Solar Street Light in the PMGY Road near Ahad Uddin Shop at Pingargool |
44800 |
Installation of Solar Street Light in the PMGY Road near Ahad Uddin Shop at Pingargool1 |
Completion of work |
-
latitude : 24.77155882
Longitude : 92.50982493
file name : Image_10022023161320343.png
|
2023-02-10 16:13:20.445489 |
147 |
64769786 |
Installation of Solar Street Light at Barthal Graveyard at Barthal |
44800 |
Installation of Solar Street Light at Barthal Graveyard at Barthal1 |
Roof laid |
-
latitude : 24.76944518
Longitude : 92.52201838
file name : Image_28012024122016905.png
|
2024-01-28 12:20:16.991911 |
148 |
64769786 |
Installation of Solar Street Light at Barthal Graveyard at Barthal |
44800 |
Installation of Solar Street Light at Barthal Graveyard at Barthal1 |
Plinth level |
-
latitude : 24.76940947
Longitude : 92.52207351
file name : Image_17102023134557406.png
|
2023-10-17 13:45:57.498175 |
149 |
64769786 |
Installation of Solar Street Light at Barthal Graveyard at Barthal |
44800 |
Installation of Solar Street Light at Barthal Graveyard at Barthal1 |
Completion of work |
-
latitude : 24.76943773
Longitude : 92.52193141
file name : Image_10022023155810553.png
|
2023-02-10 15:58:10.685725 |
150 |
74644029 |
Repairing of 27 no. Anganwadi Centre at Majlispur |
100000 |
Repairing of 27 no. Anganwadi Centre at Majlispur1 |
Roof laid |
-
latitude : 24.81121744
Longitude : 92.49204844
file name : Image_27112023165442939.png
|
2023-11-27 16:54:43.032589 |
151 |
74644029 |
Repairing of 27 no. Anganwadi Centre at Majlispur |
100000 |
Repairing of 27 no. Anganwadi Centre at Majlispur1 |
Plinth level |
-
latitude : 24.81112776
Longitude : 92.49211048
file name : Image_16112023145845749.png
|
2023-11-16 14:58:45.843183 |
152 |
74644029 |
Repairing of 27 no. Anganwadi Centre at Majlispur |
100000 |
Repairing of 27 no. Anganwadi Centre at Majlispur1 |
Completion of work |
-
latitude : 24.81119427
Longitude : 92.49218604
file name : Image_15092023134534192.png
|
2023-09-15 13:45:34.294707 |
153 |
74643549 |
Repairing of Stare at 986 No. Santipur L.P. School at Bendargool |
158250 |
Repairing of Stare at 986 No. Santipur L.P. School at Bendargool1 |
Roof laid |
-
latitude : 24.78509553
Longitude : 92.517895
file name : Image_08112023141536144.png
|
2023-11-08 14:15:36.228227 |
154 |
74643549 |
Repairing of Stare at 986 No. Santipur L.P. School at Bendargool |
158250 |
Repairing of Stare at 986 No. Santipur L.P. School at Bendargool1 |
Plinth level |
-
latitude : 24.78503059
Longitude : 92.51807709
file name : Image_15092023143249056.png
|
2023-09-15 14:32:49.150412 |
155 |
74643549 |
Repairing of Stare at 986 No. Santipur L.P. School at Bendargool |
158250 |
Repairing of Stare at 986 No. Santipur L.P. School at Bendargool1 |
Completion of work |
-
latitude : 24.7850671
Longitude : 92.51798757
file name : Image_19052023135615109.png
|
2023-05-19 13:56:15.213567 |
156 |
74141005 |
Construction of toilets in public institutions |
141400 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 24.77920507
Longitude : 92.51861388
file name : Image_08112023145419044.png
|
2023-11-08 14:54:19.173315 |
157 |
74141005 |
Construction of toilets in public institutions |
141400 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 24.77926331
Longitude : 92.51868524
file name : Image_15092023151654461.png
|
2023-09-15 15:16:54.55997 |
158 |
74141005 |
Construction of toilets in public institutions |
141400 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.77920388
Longitude : 92.51865908
file name : Image_19052023141327292.png
|
2023-05-19 14:13:27.386624 |
159 |
74136107 |
Repairing of No. 28 Anganwadi Centre at Bendargool |
344800 |
Repairing of No. 28 Anganwadi Centre at Bendargool1 |
Roof laid |
-
latitude : 24.78578406
Longitude : 92.51781155
file name : Image_08112023122653375.png
|
2023-11-08 12:26:53.494734 |
160 |
74136107 |
Repairing of No. 28 Anganwadi Centre at Bendargool |
344800 |
Repairing of No. 28 Anganwadi Centre at Bendargool1 |
Plinth level |
-
latitude : 24.78571954
Longitude : 92.51790911
file name : Image_15092023142841334.png
|
2023-09-15 14:28:41.484359 |
161 |
74136107 |
Repairing of No. 28 Anganwadi Centre at Bendargool |
344800 |
Repairing of No. 28 Anganwadi Centre at Bendargool1 |
Completion of work |
-
latitude : 24.7857532
Longitude : 92.51787902
file name : Image_19052023140248686.png
|
2023-05-19 14:02:48.775522 |
162 |
74134065 |
Repairing of Road with CC Culvert at Mugrapur PWD rd to Abdul Sattar House |
347500 |
Repairing of Road with CC Culvert at Mugrapur PWD rd to Abdul Sattar House1 |
Roof laid |
-
latitude : 24.79826712,24.79826395
Longitude : 92.50147586,92.50144943
file name : Image_08112023164549731.png
|
2023-11-08 16:45:49.924734 |
163 |
74134065 |
Repairing of Road with CC Culvert at Mugrapur PWD rd to Abdul Sattar House |
347500 |
Repairing of Road with CC Culvert at Mugrapur PWD rd to Abdul Sattar House1 |
Plinth level |
-
latitude : 24.79828974,24.79827929
Longitude : 92.50139943,92.50142443
file name : Image_08112023120005645.png
|
2023-11-08 12:00:05.747867 |
164 |
74134065 |
Repairing of Road with CC Culvert at Mugrapur PWD rd to Abdul Sattar House |
347500 |
Repairing of Road with CC Culvert at Mugrapur PWD rd to Abdul Sattar House1 |
Completion of work |
-
latitude : 24.79833477,24.79833464
Longitude : 92.50153297,92.50153392
file name : Image_15092023141426560.png
|
2023-09-15 14:14:26.646645 |
165 |
66610358 |
Construction of Community Sanitary Complex |
98104 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.78923466
Longitude : 92.48836418
file name : Image_28012024152501875.png
|
2024-01-28 15:25:01.960902 |
166 |
66610358 |
Construction of Community Sanitary Complex |
98104 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.78930547
Longitude : 92.48825834
file name : Image_05072023165947025.png
|
2023-07-05 16:59:47.119406 |
167 |
64770195 |
Construction of C.C. Road starting from Tajir Uddin culvert to Late Dalu Mia house via Hussain Ahmed |
192100 |
Construction of C.C. Road starting from Tajir Uddin culvert to Late Dalu Mia house via Hussain Ahmed1 |
Roof laid |
-
latitude : 24.78544445,24.78544445
Longitude : 92.52371315,92.52371315
file name : Image_07092023140315941.png
|
2023-09-07 14:03:16.039395 |
168 |
64770195 |
Construction of C.C. Road starting from Tajir Uddin culvert to Late Dalu Mia house via Hussain Ahmed |
192100 |
Construction of C.C. Road starting from Tajir Uddin culvert to Late Dalu Mia house via Hussain Ahmed1 |
Plinth level |
-
latitude : 24.78545901,24.78546071
Longitude : 92.52366283,92.52366096
file name : Image_06092023124214823.png
|
2023-09-06 12:42:14.91825 |
169 |
64770195 |
Construction of C.C. Road starting from Tajir Uddin culvert to Late Dalu Mia house via Hussain Ahmed |
192100 |
Construction of C.C. Road starting from Tajir Uddin culvert to Late Dalu Mia house via Hussain Ahmed1 |
Completion of work |
-
latitude : 24.78548164,24.78548232
Longitude : 92.52365623,92.52365693
file name : Image_02092023142617752.png
|
2023-09-02 14:26:17.845101 |
170 |
64770195 |
Construction of C.C. Road starting from Tajir Uddin culvert to Late Dalu Mia house via Hussain Ahmed |
192100 |
Construction of C.C. Road starting from Tajir Uddin culvert to Late Dalu Mia house via Hussain Ahmed1 |
Completion of work |
-
latitude : 24.78542153,24.78542151
Longitude : 92.5236375,92.52363749
file name : Image_12092022161605285.png
|
2022-09-12 16:16:05.37102 |
171 |
87158973 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 24.7678653
Longitude : 92.52426497
file name : Image_04112023132035711.png
|
2023-11-04 13:20:35.814471 |
172 |
64770127 |
Installation of Solar Street Light at B.A. Road near the land of Abul Hussain and others at barthal |
44800 |
Installation of Solar Street Light at B.A. Road near the land of Abul Hussain and others at barthal1 |
Roof laid |
-
latitude : 24.77176146
Longitude : 92.52157013
file name : Image_28012024121014996.png
|
2024-01-28 12:10:15.080768 |
173 |
64770127 |
Installation of Solar Street Light at B.A. Road near the land of Abul Hussain and others at barthal |
44800 |
Installation of Solar Street Light at B.A. Road near the land of Abul Hussain and others at barthal1 |
Plinth level |
-
latitude : 24.77168649
Longitude : 92.52155201
file name : Image_17102023134311535.png
|
2023-10-17 13:43:11.617493 |
174 |
64770127 |
Installation of Solar Street Light at B.A. Road near the land of Abul Hussain and others at barthal |
44800 |
Installation of Solar Street Light at B.A. Road near the land of Abul Hussain and others at barthal1 |
Completion of work |
-
latitude : 24.7717528
Longitude : 92.52154661
file name : Image_10022023154816399.png
|
2023-02-10 15:48:16.512271 |
175 |
74638872 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.78521954
Longitude : 92.4895058
file name : Image_28012024151655790.png
|
2024-01-28 15:16:55.882431 |
176 |
74638872 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.78526091
Longitude : 92.48953537
file name : Image_05072023165118274.png
|
2023-07-05 16:51:18.384527 |
177 |
87158874 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 24.78276841
Longitude : 92.51929806
file name : Image_31012024150429471.png
|
2024-01-31 15:04:29.566085 |
178 |
87158874 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 24.78275254
Longitude : 92.51932478
file name : Image_28012024114038277.png
|
2024-01-28 11:40:38.373843 |
179 |
87158874 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 24.78279381
Longitude : 92.51931671
file name : Image_06092023155437107.png
|
2023-09-06 15:54:37.222682 |
180 |
74640333 |
Installation of Solar Street Light near the Uttar Panergool Graveyard near PWD Rd at Bendargool |
44800 |
Installation of Solar Street Light near the Uttar Panergool Graveyard near PWD Rd at Bendargool1 |
Roof laid |
-
latitude : 24.78155244
Longitude : 92.520871
file name : Image_28012024114406833.png
|
2024-01-28 11:44:06.932753 |
181 |
74640333 |
Installation of Solar Street Light near the Uttar Panergool Graveyard near PWD Rd at Bendargool |
44800 |
Installation of Solar Street Light near the Uttar Panergool Graveyard near PWD Rd at Bendargool1 |
Plinth level |
-
latitude : 24.78148169
Longitude : 92.52080024
file name : Image_17102023125001239.png
|
2023-10-17 12:50:01.365246 |
182 |
74640333 |
Installation of Solar Street Light near the Uttar Panergool Graveyard near PWD Rd at Bendargool |
44800 |
Installation of Solar Street Light near the Uttar Panergool Graveyard near PWD Rd at Bendargool1 |
Completion of work |
-
latitude : 24.78158176
Longitude : 92.52085179
file name : Image_03072023135519324.png
|
2023-07-03 13:55:19.434893 |
183 |
87158716 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 24.79649537
Longitude : 92.50681065
file name : Image_31012024151424074.png
|
2024-01-31 15:14:24.182734 |
184 |
87158716 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 24.79650516
Longitude : 92.50680219
file name : Image_28012024112840258.png
|
2024-01-28 11:28:40.349398 |
185 |
87158716 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 24.79645431
Longitude : 92.50679227
file name : Image_04112023132026473.png
|
2023-11-04 13:20:26.571063 |
186 |
87297529 |
Creation of Shed for segregation and processing of wet and dry waste |
130800 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 24.81222057
Longitude : 92.49188329
file name : Image_25012024135000642.png
|
2024-01-25 13:50:00.740432 |
187 |
87297529 |
Creation of Shed for segregation and processing of wet and dry waste |
130800 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 24.81269619
Longitude : 92.49142585
file name : Image_07092023124238549.png
|
2023-09-07 12:42:38.658856 |
188 |
74639216 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 24.78873676
Longitude : 92.53466236
file name : Image_31012024122904210.png
|
2024-01-31 12:29:04.53647 |
189 |
74639216 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.78865248
Longitude : 92.5346754
file name : Image_19052023152236826.png
|
2023-05-19 15:22:36.934149 |
190 |
87218800 |
2223 2nd UTF3 road near Abdul Rahim house at Adarkuna Part-III LP School |
470400 |
2223 2nd UTF3 road near Abdul Rahim house at Adarkuna Part-III LP School1 |
Roof laid |
-
latitude : 24.76486726,24.76486655
Longitude : 92.52918423,92.52918625
file name : Image_31012024124041307.png
|
2024-01-31 12:40:41.409223 |
191 |
87218800 |
2223 2nd UTF3 road near Abdul Rahim house at Adarkuna Part-III LP School |
470400 |
2223 2nd UTF3 road near Abdul Rahim house at Adarkuna Part-III LP School1 |
Plinth level |
-
latitude : 24.76488117,24.76487951
Longitude : 92.52924296,92.52924284
file name : Image_28012024122826434.png
|
2024-01-28 12:28:26.517309 |
192 |
87218800 |
2223 2nd UTF3 road near Abdul Rahim house at Adarkuna Part-III LP School |
470400 |
2223 2nd UTF3 road near Abdul Rahim house at Adarkuna Part-III LP School1 |
Completion of work |
-
latitude : 24.76487079,24.76487189
Longitude : 92.5291743,92.52917621
file name : Image_06092023152243329.png
|
2023-09-06 15:22:43.510331 |
193 |
66610967 |
Installation of solar street light at Nibash Tantubai house at Adarkuna |
44800 |
Installation of solar street light at Nibash Tantubai house at Adarkuna1 |
Plinth level |
-
latitude : 24.7435855
Longitude : 92.50936053
file name : Image_28012024134525302.png
|
2024-01-28 13:45:25.398638 |
194 |
66610967 |
Installation of solar street light at Nibash Tantubai house at Adarkuna |
44800 |
Installation of solar street light at Nibash Tantubai house at Adarkuna1 |
Completion of work |
-
latitude : 24.74359448
Longitude : 92.5093355
file name : Image_03072023151629209.png
|
2023-07-03 15:16:29.4129 |
195 |
87158787 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 24.7736302
Longitude : 92.51388868
file name : Image_31012024132249359.png
|
2024-01-31 13:22:49.461249 |
196 |
87158787 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 24.77364751
Longitude : 92.51392926
file name : Image_28012024142333061.png
|
2024-01-28 14:23:33.149522 |
197 |
87158787 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 24.77364045
Longitude : 92.51393405
file name : Image_04112023130532001.png
|
2023-11-04 13:05:32.104811 |