1 |
21085171 |
Installation of of 14 nos of Tube Well at w/no-2,3,4,7,8 and 9. |
280000 |
Hand pump1 |
Ground work |
-
latitude : 24.54427812
Longitude : 92.42046338
file name : Image_15072019170309527.png
|
2019-07-15 17:03:09.631071 |
2 |
21085171 |
Installation of of 14 nos of Tube Well at w/no-2,3,4,7,8 and 9. |
280000 |
Hand pump2 |
Ground work |
-
latitude : 24.54427719
Longitude : 92.42046314
file name : Image_15072019170350720.png
|
2019-07-15 17:03:50.810352 |
3 |
21085171 |
Installation of of 14 nos of Tube Well at w/no-2,3,4,7,8 and 9. |
280000 |
Hand pump4 |
Ground work |
-
latitude : 24.54427821
Longitude : 92.42046479
file name : Image_15072019170512605.png
|
2019-07-15 17:05:12.700561 |
4 |
21085171 |
Installation of of 14 nos of Tube Well at w/no-2,3,4,7,8 and 9. |
280000 |
Hand pump5 |
Ground work |
-
latitude : 24.54415962
Longitude : 92.42189038
file name : Image_15072019171009311.png
|
2019-07-15 17:10:09.41844 |
5 |
21085171 |
Installation of of 14 nos of Tube Well at w/no-2,3,4,7,8 and 9. |
280000 |
Hand pump6 |
Ground work |
-
latitude : 24.54415998
Longitude : 92.42188791
file name : Image_15072019171130320.png
|
2019-07-15 17:11:30.420206 |
6 |
21085171 |
Installation of of 14 nos of Tube Well at w/no-2,3,4,7,8 and 9. |
280000 |
Hand pump7 |
Ground work |
-
latitude : 24.54417788
Longitude : 92.42186463
file name : Image_15072019171250239.png
|
2019-07-15 17:12:50.338944 |
7 |
21085171 |
Installation of of 14 nos of Tube Well at w/no-2,3,4,7,8 and 9. |
280000 |
Hand pump8 |
Ground work |
-
latitude : 24.54420536
Longitude : 92.42182442
file name : Image_15072019171334333.png
|
2019-07-15 17:13:34.430843 |
8 |
21085171 |
Installation of of 14 nos of Tube Well at w/no-2,3,4,7,8 and 9. |
280000 |
Hand pump9 |
Ground work |
-
latitude : 24.54421795
Longitude : 92.42183426
file name : Image_15072019171456521.png
|
2019-07-15 17:14:56.6277 |
9 |
21085171 |
Installation of of 14 nos of Tube Well at w/no-2,3,4,7,8 and 9. |
280000 |
Hand pump10 |
Ground work |
-
latitude : 24.5434668
Longitude : 92.42067542
file name : Image_15072019173829090.png
|
2019-07-15 17:38:29.208893 |
10 |
21085171 |
Installation of of 14 nos of Tube Well at w/no-2,3,4,7,8 and 9. |
280000 |
Hand pump11 |
Ground work |
-
latitude : 24.54340129
Longitude : 92.4207051
file name : Image_15072019173914685.png
|
2019-07-15 17:39:14.794726 |
11 |
21085171 |
Installation of of 14 nos of Tube Well at w/no-2,3,4,7,8 and 9. |
280000 |
Hand pump12 |
Ground work |
-
latitude : 24.543419
Longitude : 92.42071011
file name : Image_15072019174104219.png
|
2019-07-15 17:41:04.323412 |
12 |
21085171 |
Installation of of 14 nos of Tube Well at w/no-2,3,4,7,8 and 9. |
280000 |
Hand pump12 |
Ground work |
-
latitude : 24.54341862
Longitude : 92.42070905
file name : Image_15072019174002594.png
|
2019-07-15 17:40:02.703756 |
13 |
21392261 |
Const. of Boundary Wall at Choumanihat Zame Masjit W/no-2, |
200000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 24.46468088
Longitude : 92.46642301
file name : Image_15072019121639425.png
|
2019-07-15 12:16:39.526282 |
14 |
21392261 |
Const. of Boundary Wall at Choumanihat Zame Masjit W/no-2, |
200000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 24.46468088
Longitude : 92.46642301
file name : Image_15072019121547043.png
|
2019-07-15 12:15:47.16266 |
15 |
21392261 |
Const. of Boundary Wall at Choumanihat Zame Masjit W/no-2, |
200000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 24.46476337
Longitude : 92.46646088
file name : Image_15072019121544163.png
|
2019-07-15 12:15:44.273871 |
16 |
21392261 |
Const. of Boundary Wall at Choumanihat Zame Masjit W/no-2, |
200000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 24.46460727
Longitude : 92.4659142
file name : Image_15072019124553302.png
|
2019-07-15 12:45:53.416031 |
17 |
21388464 |
Const. of Boundary Wall with Iron gate at w/no-8 |
100000 |
Boundary wall / Side Wall / Retaining Wall1 |
25% |
-
latitude : 24.46461184
Longitude : 92.46587357
file name : Image_15072019124431238.png
|
2019-07-15 12:44:31.362157 |
18 |
21388464 |
Const. of Boundary Wall with Iron gate at w/no-8 |
100000 |
Boundary wall / Side Wall / Retaining Wall1 |
25% |
-
latitude : 24.55044972
Longitude : 92.41543601
file name : Image_15072019165159359.png
|
2019-07-15 16:51:59.479702 |
19 |
65482470 |
Creation of a new source of drinking water |
80000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.54293598
Longitude : 92.43350731
file name : Image_10112022102013902.png
|
2022-11-10 10:20:14.001428 |
20 |
65482462 |
Creation of a new source of drinking water |
80000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.54001997
Longitude : 92.43888631
file name : Image_26012023124139527.png
|
2023-01-26 12:41:39.661469 |
21 |
65482462 |
Creation of a new source of drinking water |
80000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.54007824
Longitude : 92.43894381
file name : Image_10112022124655689.png
|
2022-11-10 12:46:55.800853 |
22 |
65482480 |
Creation of a new source of drinking water |
90000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.5625327
Longitude : 92.4343372
file name : Image_26012023131005387.png
|
2023-01-26 13:10:05.475294 |
23 |
65482480 |
Creation of a new source of drinking water |
90000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.5707396
Longitude : 92.46332443
file name : Image_17112022111200002.png
|
2022-11-17 11:12:00.109148 |
24 |
65482443 |
Creation of a new source of drinking water |
90000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.55437245
Longitude : 92.43180749
file name : Image_26012023134043526.png
|
2023-01-26 13:40:43.649244 |
25 |
65482443 |
Creation of a new source of drinking water |
90000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.55442378
Longitude : 92.43177621
file name : Image_10112022120208731.png
|
2022-11-10 12:02:08.815436 |
26 |
65482523 |
UT4 B WALL AT SAITRISHAL MAZARKHANA WARD NO 5 |
100000 |
UT4 B WALL AT SAITRISHAL MAZARKHANA WARD NO 5 1 |
Completion of work |
-
latitude : 24.54942006
Longitude : 92.42245308
file name : Image_19122022123914459.png
|
2022-12-19 12:39:14.592032 |
27 |
66667750 |
Creation of a new source of drinking water |
516100 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.5467816
Longitude : 92.4243659
file name : Image_26012023105108118.png
|
2023-01-26 10:51:08.211946 |
28 |
65482517 |
UT3 B WALL AT WEST HARINAGAR RADHAGOVINDA MANDIR WARD NO 9 |
100000 |
UT3 B WALL AT WEST HARINAGAR RADHAGOVINDA MANDIR WARD NO 91 |
Roof laid |
-
latitude : 24.54758091
Longitude : 92.43924292
file name : Image_12112023113202300.png
|
2023-11-12 11:32:02.396903 |
29 |
65482517 |
UT3 B WALL AT WEST HARINAGAR RADHAGOVINDA MANDIR WARD NO 9 |
100000 |
UT3 B WALL AT WEST HARINAGAR RADHAGOVINDA MANDIR WARD NO 91 |
Completion of work |
-
latitude : 24.54759979
Longitude : 92.43928718
file name : Image_09112022163835785.png
|
2022-11-09 16:38:35.87418 |
30 |
65482517 |
UT3 B WALL AT WEST HARINAGAR RADHAGOVINDA MANDIR WARD NO 9 |
100000 |
UT3 B WALL AT WEST HARINAGAR RADHAGOVINDA MANDIR WARD NO 91 |
Plinth level |
-
latitude : 24.47446483
Longitude : 92.4437559
file name : Image_13022023110559293.png
|
2023-02-13 11:05:59.381047 |
31 |
87828150 |
Operation & maintenance of drinking water supply system |
435100 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.54684205
Longitude : 92.42436372
file name : Image_16102023130133796.png
|
2023-10-16 13:01:33.885723 |
32 |
87828175 |
Operation & maintenance of drinking water supply system |
413550 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.57781415
Longitude : 92.46494589
file name : Image_16102023123751264.png
|
2023-10-16 12:37:51.43916 |
33 |
66668386 |
REPAIRING OF HULASHNAGAR LPS 2020 21 2ND INSTL. |
130000 |
REPAIRING OF HULASHNAGAR LPS 2020 21 2ND INSTL.1 |
Completion of work |
-
latitude : 24.54135081
Longitude : 92.42249243
file name : Image_08102023110029888.png
|
2023-10-08 11:00:29.996614 |
34 |
66668205 |
REPAIRING OF GANDARAJBARI M.V SCHOOL W NO 3 2020 21 2ND INSTL |
124200 |
REPAIRING OF GANDARAJBARI M.V SCHOOL W NO 3 2020 21 2ND INSTL1 |
Completion of work |
-
latitude : 24.55539814
Longitude : 92.4144354
file name : Image_08102023111451064.png
|
2023-10-08 11:14:51.154783 |
35 |
66667809 |
CONST OF CC ROAD FROM ANIPUR PWD TO AIAM VIA. G.P 2020 21 2ND INSTL |
108000 |
CONST OF CC ROAD FROM ANIPUR PWD TO AIAM VIA. G.P 2020 21 2ND INSTL1 |
Completion of work |
-
latitude : 24.5472831,24.54727933
Longitude : 92.42434793,92.42435065
file name : Image_08102023104758317.png
|
2023-10-08 10:47:58.405007 |
36 |
66667648 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.54767862
Longitude : 92.43039196
file name : Image_06112023121950959.png
|
2023-11-06 12:19:51.051904 |
37 |
66668045 |
REPAIRING OF 37 HALL AWC AT W NO 5 SAITRISH HALL 2020 21 2ND INSTL |
130000 |
REPAIRING OF 37 HALL AWC AT W NO 5 SAITRISH HALL 2020 21 2ND INSTL1 |
Completion of work |
-
latitude : 24.55323007
Longitude : 92.42321942
file name : Image_08102023121956259.png
|
2023-10-08 12:19:56.339143 |
38 |
87828156 |
Const of CC road near the house of Moin Uddin to near the house of Hafiz Muijul Hoque W No-02 |
310000 |
Const of CC road near the house of Moin Uddin to near the house of Hafiz Muijul Hoque W No-021 |
Completion of work |
-
latitude : 24.55247974,24.55246946
Longitude : 92.41743923,92.41749369
file name : Image_12112023100641652.png
|
2023-11-12 10:06:41.735865 |
39 |
87828173 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.56082977
Longitude : 92.41829167
file name : Image_12112023093249076.png
|
2023-11-12 09:32:49.165047 |
40 |
87828166 |
Creation of drainage channel for management of grey water |
217250 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.54391008
Longitude : 92.4216499
file name : Image_12112023104050453.png
|
2023-11-12 10:40:50.543293 |
41 |
87828166 |
Creation of drainage channel for management of grey water |
217250 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.54858811
Longitude : 92.42609719
file name : Image_12112023105634664.png
|
2023-11-12 10:56:34.745113 |
42 |
87828160 |
Const of road from E&D to South Beratuk L P School W No -04 |
241000 |
Const of road from E&D to South Beratuk L P School W No -041 |
Completion of work |
-
latitude : 24.53960295,24.53960165
Longitude : 92.43618455,92.43618393
file name : Image_12112023085757840.png
|
2023-11-12 08:57:57.926041 |
43 |
87828145 |
Creation of drainage channel for management of grey water |
116400 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.56132792
Longitude : 92.43463035
file name : Image_12112023121306173.png
|
2023-11-12 12:13:06.255393 |
44 |
87828141 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.55361391
Longitude : 92.43820153
file name : Image_12112023115655456.png
|
2023-11-12 11:56:55.533412 |
45 |
87828128 |
Const of CC road from Pittakhauri to near the house of Aynul Haque W No -01 |
230000 |
Const of CC road from Pittakhauri to near the house of Aynul Haque W No -011 |
Completion of work |
-
latitude : 24.55848619,24.5600509
Longitude : 92.4219828,92.420408
file name : Image_12112023092047252.png
|
2023-11-12 09:20:47.330513 |
46 |
87828121 |
Const of CC road from near PWD road to near the house of Abdul Salam W No - 03 |
250450 |
Const of CC road from near PWD road to near the house of Abdul Salam W No - 031 |
Completion of work |
-
latitude : 24.55800941,24.55802435
Longitude : 92.41346405,92.41346345
file name : Image_12112023094947741.png
|
2023-11-12 09:49:47.831591 |
47 |
65482367 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.53942708
Longitude : 92.43928371
file name : Image_10112022125207169.png
|
2022-11-10 12:52:07.281768 |
48 |
65482387 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.5483105
Longitude : 92.4314339
file name : Image_10112022115950518.png
|
2022-11-10 11:59:50.630619 |
49 |
65482381 |
Creation of plastic waste storage unit |
175000 |
Creation of plastic waste storage unit 1 |
Plinth level |
-
latitude : 24.5467617
Longitude : 92.4242782
file name : Image_06112023114449236.png
|
2023-11-06 11:44:49.356043 |
50 |
65482381 |
Creation of plastic waste storage unit |
175000 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 24.5467377
Longitude : 92.4243358
file name : Image_28112022110508854.png
|
2022-11-28 11:05:08.941113 |
51 |
65482503 |
`UT1 B WALL AT BADSHABARI WARD NO 3 GANDHARAJBARI |
100000 |
`UT1 B WALL AT BADSHABARI WARD NO 3 GANDHARAJBARI1 |
Completion of work |
-
latitude : 24.55598643
Longitude : 92.41556216
file name : Image_10112022111051465.png
|
2022-11-10 11:10:51.55575 |
52 |
65482509 |
UT2 B WALL AT AMARKHAL SHIV MANDIR WARD NO 10 |
100000 |
UT2 B WALL AT AMARKHAL SHIV MANDIR WARD NO 10 1 |
Plinth level |
-
latitude : 24.55157797
Longitude : 92.43432764
file name : Image_26012023132448447.png
|
2023-01-26 13:24:48.542512 |
53 |
65482509 |
UT2 B WALL AT AMARKHAL SHIV MANDIR WARD NO 10 |
100000 |
UT2 B WALL AT AMARKHAL SHIV MANDIR WARD NO 10 1 |
Completion of work |
-
latitude : 24.55168115
Longitude : 92.43431869
file name : Image_10112022101620211.png
|
2022-11-10 10:16:20.300987 |
54 |
65482548 |
UT8 IMP ROAD FROM PWD TO FAIJUR RAHMAN WARD NO 8 HULASHNAGAR |
100000 |
UT8 IMP ROAD FROM PWD TO FAIJUR RAHMAN WARD NO 8 HULASHNAGAR1 |
Plinth level |
-
latitude : 24.54897523,24.54898352
Longitude : 92.4168815,92.41682597
file name : Image_26012023114238756.png
|
2023-01-26 11:42:38.860747 |
55 |
65482548 |
UT8 IMP ROAD FROM PWD TO FAIJUR RAHMAN WARD NO 8 HULASHNAGAR |
100000 |
UT8 IMP ROAD FROM PWD TO FAIJUR RAHMAN WARD NO 8 HULASHNAGAR1 |
Completion of work |
-
latitude : 24.54900727,24.54904751
Longitude : 92.41691185,92.41694963
file name : Image_10112022112031756.png
|
2022-11-10 11:20:31.846534 |
56 |
65482399 |
Creation of drainage channel for management of grey water |
144950 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.57774021,24.54718891
Longitude : 92.46477414,92.42441032
file name : Image_26012023104739034.png
|
2023-01-26 10:47:39.135508 |
57 |
65482399 |
Creation of drainage channel for management of grey water |
144950 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.5472861,24.57786742
Longitude : 92.4246967,92.46474575
file name : Image_20112022133945061.png
|
2022-11-20 13:39:45.158095 |
58 |
87828148 |
Creation of drainage channel for management of grey water |
220600 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.5486363
Longitude : 92.42575692
file name : Image_11122023090201244.png
|
2023-12-11 09:02:01.341098 |
59 |
87828131 |
Const of boundary wall near Gour Nitai Mandap at West Harinagar W No -09 |
100000 |
Const of boundary wall near Gour Nitai Mandap at West Harinagar W No -091 |
Completion of work |
-
latitude : 24.54670152
Longitude : 92.43722861
file name : Image_12112023112426693.png
|
2023-11-12 11:24:26.771141 |
60 |
66664819 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.54618109
Longitude : 92.42439097
file name : Image_06112023120335736.png
|
2023-11-06 12:03:35.827608 |
61 |
66668174 |
REPAIRING OF 94 NO BERATUK AWC W NO 4 2020 21 2ND INSTL. |
130000 |
REPAIRING OF 94 NO BERATUK AWC W NO 4 2020 21 2ND INSTL.1 |
Completion of work |
-
latitude : 24.55114166
Longitude : 92.43063762
file name : Image_08102023122132859.png
|
2023-10-08 12:21:32.943402 |
62 |
66667694 |
Creation of drainage channel for management of grey water |
144900 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.54673343
Longitude : 92.42459507
file name : Image_08102023124830927.png
|
2023-10-08 12:48:31.013765 |
63 |
65482535 |
UT6 B WALL AT 152 NO SAITRISHHAL L.P SCHOOL |
100000 |
UT6 B WALL AT 152 NO SAITRISHHAL L.P SCHOOL 1 |
Plinth level |
-
latitude : 24.54918878
Longitude : 92.4237561
file name : Image_26012023112330200.png
|
2023-01-26 11:23:30.284784 |
64 |
65482535 |
UT6 B WALL AT 152 NO SAITRISHHAL L.P SCHOOL |
100000 |
UT6 B WALL AT 152 NO SAITRISHHAL L.P SCHOOL 1 |
Completion of work |
-
latitude : 24.54921712
Longitude : 92.42374387
file name : Image_10112022104135637.png
|
2022-11-10 10:41:35.744148 |
65 |
66664740 |
Creation of community compost pits for a group of Households |
175000 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 24.56044876
Longitude : 92.41294789
file name : Image_08102023130608067.png
|
2023-10-08 13:06:08.158907 |
66 |
66668241 |
REPAIRING OF CHANNI GHAT AWC CENTRE W NO 9 2020 21 2ND INSTL. |
110000 |
REPAIRING OF CHANNI GHAT AWC CENTRE W NO 9 2020 21 2ND INSTL.1 |
Completion of work |
-
latitude : 24.53851072
Longitude : 92.43986286
file name : Image_16102023133748636.png
|
2023-10-16 13:37:43.607675 |
67 |
66667847 |
CC ROAD FROM CHANNI GHAT PWD TO 1227 NO LPS W NO9 2020 21 2ND INSTL. |
150000 |
CC ROAD FROM CHANNI GHAT PWD TO 1227 NO LPS W NO9 2020 21 2ND INSTL.1 |
Completion of work |
-
latitude : 24.53859377,24.53859155
Longitude : 92.43978413,92.43981375
file name : Image_16102023134700185.png
|
2023-10-16 13:47:00.288798 |
68 |
66667951 |
B WALL AT NARAYAN NATH H.S.S SOUTH SIDE AT BERATUK 2020 21 2ND INSTL. |
150000 |
B WALL AT NARAYAN NATH H.S.S SOUTH SIDE AT BERATUK 2020 21 2ND INSTL.1 |
Plinth level |
-
latitude : 24.5476599
Longitude : 92.4288651
file name : Image_23012024131018524.png
|
2024-01-23 13:10:18.618043 |
69 |
66667951 |
B WALL AT NARAYAN NATH H.S.S SOUTH SIDE AT BERATUK 2020 21 2ND INSTL. |
150000 |
B WALL AT NARAYAN NATH H.S.S SOUTH SIDE AT BERATUK 2020 21 2ND INSTL.1 |
Completion of work |
-
latitude : 24.54716906
Longitude : 92.42783714
file name : Image_08102023123406240.png
|
2023-10-08 12:34:06.333943 |
70 |
65482544 |
UT7 CULVERT NEAR AINUL HOQUE HOUSE WARD NO 1 NITAINAGAR |
100000 |
UT7 CULVERT NEAR AINUL HOQUE HOUSE WARD NO 1 NITAINAGAR1 |
Roof laid |
-
latitude : 24.55957932,24.55955241
Longitude : 92.42027526,92.42027386
file name : Image_12112023092419053.png
|
2023-11-12 09:24:19.138939 |
71 |
65482544 |
UT7 CULVERT NEAR AINUL HOQUE HOUSE WARD NO 1 NITAINAGAR |
100000 |
UT7 CULVERT NEAR AINUL HOQUE HOUSE WARD NO 1 NITAINAGAR1 |
Plinth level |
-
latitude : 24.55953393,24.55954681
Longitude : 92.4202343,92.42023586
file name : Image_26012023120244615.png
|
2023-01-26 12:02:44.714271 |
72 |
65482544 |
UT7 CULVERT NEAR AINUL HOQUE HOUSE WARD NO 1 NITAINAGAR |
100000 |
UT7 CULVERT NEAR AINUL HOQUE HOUSE WARD NO 1 NITAINAGAR1 |
Completion of work |
-
latitude : 24.55961285,24.55961852,24.55961684
Longitude : 92.42025925,92.42025783,92.4202555
file name : Image_10112022110815687.png
|
2022-11-10 11:08:15.770095 |