1 |
31548806 |
2 nos of Ring well at w/no-1 (2016-17-ph-ll) |
130000 |
2 nos of Ring well at w/no-1 (2016-17-ph-ll)1 |
In Progress |
-
latitude : 24.548943783156574
Longitude : 92.4657123349607
file name : Image_12092020135609114.png
|
2020-09-12 13:56:09.247402 |
2 |
31548806 |
2 nos of Ring well at w/no-1 (2016-17-ph-ll) |
130000 |
2 nos of Ring well at w/no-1 (2016-17-ph-ll)1 |
In Progress |
-
latitude : 24.546033376827836
Longitude : 92.469820138067
file name : Image_12092020135618585.png
|
2020-09-12 13:56:18.69508 |
3 |
31570023 |
Const. of Boundary wall at w/no-9,vill-Rupagram (2nd instl.) |
150000 |
Const. of Boundary wall at w/no-9,vill-Rupagram (2nd instl.)1 |
In Progress |
-
latitude : 24.515248532406986
Longitude : 92.43669393472373
file name : Image_21092020115943764.png
|
2020-09-21 11:59:43.906976 |
4 |
31358728 |
construction of open community at w/no-4,vill-rupagram pt-1 (2nd instl.) |
210000 |
construction of open community at w/no-4,vill-rupagram pt-1 (2nd instl.)1 |
25% |
-
latitude : 24.52622488606721
Longitude : 92.43909744545817
file name : Image_12092020120749870.png
|
2020-09-12 12:07:49.962873 |
5 |
31569998 |
Const. of Drain at w/no-3,vill-bidyanagar pt-ll |
120000 |
Const. of Drain at w/no-3,vill-bidyanagar pt-ll1 |
Length of Drain executed |
-
latitude : 24.524412509053946,24.524412509053946,24.524412509053946,24.524412509053946
Longitude : 92.44917199015617,92.44917199015617,92.44917199015617,92.44917199015617
file name : Image_12092020125553141.png
|
2020-09-12 12:55:53.24888 |
6 |
31548807 |
Boundary wall at w/no-8, vill-mukamborbond |
150000 |
Boundary wall at w/no-8, vill-mukamborbond1 |
In Progress |
-
latitude : 24.533092975616455
Longitude : 92.43804836645722
file name : Image_10102020103143714.png
|
2020-10-10 10:31:46.096047 |
7 |
31570028 |
Const. of Boundary wall at w/no-10,vill |
100000 |
Const. of Boundary wall at w/no-10,vill1 |
In Progress |
-
latitude : 24.513406567275524
Longitude : 92.45020296424627
file name : Image_21092020111536247.png
|
2020-09-21 11:15:36.428381 |
8 |
31570012 |
1 nos tubewell at w/no-3,vill-bidyanagar ph-ll (2nd instl.) |
20000 |
1 nos tubewell at w/no-3,vill-bidyanagar ph-ll (2nd instl.)1 |
Ground work |
-
latitude : 24.525574911385775
Longitude : 92.44892086833715
file name : Image_12092020124002781.png
|
2020-09-12 12:40:02.884926 |
9 |
31570051 |
const. of ring well at w/no-5,vill-Bidyanagar-pt-ll |
65000 |
const. of ring well at w/no-5,vill-Bidyanagar-pt-ll1 |
In Progress |
-
latitude : 24.530337257310748
Longitude : 92.45041653513908
file name : Image_12092020130227329.png
|
2020-09-12 13:02:27.399287 |
10 |
31570060 |
Const. of Culvert at w/no-2,vill-chunatigool (2nd instl.) |
70020 |
Const. of Culvert at w/no-2,vill-chunatigool (2nd instl.)1 |
Substructure below GL |
-
latitude : 24.53231144696474,24.53231144696474,24.53231144696474,24.53231144696474
Longitude : 92.45032492093742,92.45032492093742,92.45032492093742,92.45032492093742
file name : Image_12092020130906097.png
|
2020-09-12 13:09:06.177904 |
11 |
31570017 |
Const. of Culvert at w/no-5,vill-Bidyanagar pt-ll,(2nd instl.) |
140000 |
Const. of Culvert at w/no-5,vill-Bidyanagar pt-ll,(2nd instl.)1 |
Substructure below GL |
-
latitude : 24.52172841411084,24.52172841411084,24.52172841411084,24.52172841411084
Longitude : 92.44617403484881,92.44617403484881,92.44617403484881,92.44617403484881
file name : Image_12092020145237207.png
|
2020-09-12 14:52:37.332112 |
12 |
44518543 |
Const of Community Hall near Bidyanagar Jame Masjid at Bidyanagar Ward No 4 |
200000 |
Const of Community Hall near Bidyanagar Jame Masjid at Bidyanagar Ward No 41 |
25% |
-
latitude : 24.524820749647915
Longitude : 92.43531066924334
file name : Image_07112020114614808.png
|
2020-11-07 11:46:16.822353 |
13 |
44518273 |
Const of drain at Bidyanagar TE Lane 1 from near Kalimandir to the house of Munna Lal Bin |
250000 |
Const of drain at Bidyanagar TE Lane 1 from near Kalimandir to the house of Munna Lal Bin1 |
Length of Drain executed |
-
latitude : 24.524598252028227,24.524598252028227,24.524598252028227,24.524598252028227
Longitude : 92.4478820990771,92.4478820990771,92.4478820990771,92.4478820990771
file name : Image_28092020141923933.png
|
2020-09-28 14:19:24.051364 |
14 |
37559617 |
Construction of culvert at Bidyanagar T.E, lane -1 |
132460 |
Construction of culvert at Bidyanagar T.E, lane -11 |
Substructure below GL |
-
latitude : 24.524571471847594,24.524571471847594,24.524571471847594,24.524571471847594
Longitude : 92.4465540703386,92.4465540703386,92.4465540703386,92.4465540703386
file name : Image_07112020213203949.png
|
2020-11-07 21:32:06.168083 |
15 |
37559433 |
2 TUBE WELL AT RS.20000 EACH AT BIDYANAGAR T.E. |
40000 |
2 TUBE WELL AT RS.20000 EACH AT BIDYANAGAR T.E.2 |
Ground work |
-
latitude : 24.53654225450009
Longitude : 92.45013708248734
file name : Image_18112020122354722.png
|
2020-11-18 12:23:54.818821 |
16 |
31589057 |
7 Nos Tube Well at w/no-1,3,4,6 and 10 . |
140000 |
7 Nos Tube Well at w/no-1,3,4,6 and 10 .1 |
Ground work |
-
latitude : 24.519800408743322
Longitude : 92.44260753504932
file name : Image_21092020104906316.png
|
2020-09-21 10:49:06.459625 |
17 |
31589057 |
7 Nos Tube Well at w/no-1,3,4,6 and 10 . |
140000 |
7 Nos Tube Well at w/no-1,3,4,6 and 10 .1 |
Ground work |
-
latitude : 24.536428009159863
Longitude : 92.45076555758715
file name : Image_10102020111109128.png
|
2020-10-10 11:11:10.96159 |
18 |
31663211 |
Const. (Extension) of new Room at G.P Office, w/no-4 |
275000 |
Const. (Extension) of new Room at G.P Office, w/no-41 |
25% |
-
latitude : 24.5209396
Longitude : 92.4439701
file name : Image_21092020123927327.png
|
2020-09-21 12:39:27.47207 |
19 |
31589083 |
Const. of community Hall at w/no-2,vill-chunaitigool. |
100000 |
Const. of community Hall at w/no-2,vill-chunaitigool.1 |
25% |
-
latitude : 24.536876063793898
Longitude : 92.44328755885363
file name : Image_07112020112918612.png
|
2020-11-07 11:29:20.633324 |
20 |
31643175 |
Const. of Guard wall and Drain at w/no-5 |
175000 |
Const. of Guard wall and Drain at w/no-51 |
25% |
-
latitude : 24.52035294380039
Longitude : 92.44629674591124
file name : Image_21092020122411112.png
|
2020-09-21 12:24:11.246918 |
21 |
31663223 |
Const. of Culvert at w/no-10 |
150000 |
Const. of Culvert at w/no-101 |
Substructure below GL |
-
latitude : 24.51329479459673,24.51329479459673,24.51329479459673
Longitude : 92.44786734692752,92.44786734692752,92.44786734692752
file name : Image_21092020112215890.png
|
2020-09-21 11:22:16.021492 |
22 |
31663145 |
Const. of Boundary Wall at w/no-8 |
150000 |
Const. of Boundary Wall at w/no-81 |
In Progress |
-
latitude : 24.530748641118407
Longitude : 92.43644557893276
file name : Image_10102020110856499.png
|
2020-10-10 11:08:58.329253 |
23 |
31663165 |
Const. of Drain at w/no-3 |
234443 |
Const. of Drain at w/no-31 |
Length of Drain executed |
-
latitude : 24.524796358309686,24.524796358309686,24.524796358309686,24.524796358309686
Longitude : 92.44783281348646,92.44783281348646,92.44783281348646,92.44783281348646
file name : Image_21092020125345033.png
|
2020-09-21 12:53:45.168057 |
24 |
44518328 |
Const of boundary wall near Balutilla Jame Masjid, Bidyanagar Ward No 5 |
140000 |
Const of boundary wall near Balutilla Jame Masjid, Bidyanagar Ward No 51 |
25% |
-
latitude : 24.518934222869575
Longitude : 92.44537607766688
file name : Image_28092020121225209.png
|
2020-09-28 12:12:25.324093 |
25 |
44518286 |
Const of Community Hallnear Shiv Mandir infront of Bidyanagar TE Factory |
200000 |
Const of Community Hallnear Shiv Mandir infront of Bidyanagar TE Factory1 |
25% |
-
latitude : 24.524051626212895
Longitude : 92.44578125886619
file name : Image_28092020123230812.png
|
2020-09-28 12:32:30.940828 |
26 |
38852760 |
9 no’s of tube well at Balitilla,Bidyanagar T.E PERFORMANCE GRT |
180000 |
9 no’s of tube well at Balitilla,Bidyanagar T.E PERFORMANCE GRT1 |
Ground work |
-
latitude : 24.520884649828076
Longitude : 92.44506871327758
file name : Image_07112020213130570.png
|
2020-11-07 21:31:32.773597 |
27 |
38852760 |
9 no’s of tube well at Balitilla,Bidyanagar T.E PERFORMANCE GRT |
180000 |
9 no’s of tube well at Balitilla,Bidyanagar T.E PERFORMANCE GRT2 |
Ground work |
-
latitude : 24.519392168149352
Longitude : 92.44605962187052
file name : Image_07112020213147524.png
|
2020-11-07 21:31:49.722383 |
28 |
38852760 |
9 no’s of tube well at Balitilla,Bidyanagar T.E PERFORMANCE GRT |
180000 |
9 no’s of tube well at Balitilla,Bidyanagar T.E PERFORMANCE GRT3 |
Ground work |
-
latitude : 24.524030587635934
Longitude : 92.44597127661109
file name : Image_07112020213153794.png
|
2020-11-07 21:31:55.978098 |
29 |
38852760 |
9 no’s of tube well at Balitilla,Bidyanagar T.E PERFORMANCE GRT |
180000 |
9 no’s of tube well at Balitilla,Bidyanagar T.E PERFORMANCE GRT4 |
Ground work |
-
latitude : 24.523558476939797
Longitude : 92.44729243218899
file name : Image_07112020213159401.png
|
2020-11-07 21:32:01.585798 |
30 |
38852760 |
9 no’s of tube well at Balitilla,Bidyanagar T.E PERFORMANCE GRT |
180000 |
9 no’s of tube well at Balitilla,Bidyanagar T.E PERFORMANCE GRT5 |
Ground work |
-
latitude : 24.521402902901173
Longitude : 92.44585837237537
file name : Image_18112020122102289.png
|
2020-11-18 12:21:02.381195 |
31 |
44518536 |
Const of Community Hall near Hindustani Kali Mandir at Bidyanagar Ward No 10 |
200000 |
Const of Community Hall near Hindustani Kali Mandir at Bidyanagar Ward No 101 |
25% |
-
latitude : 24.5124968374148
Longitude : 92.44657183997333
file name : Image_12102020075806028.png
|
2020-10-12 07:58:10.114229 |
32 |
44518311 |
Const of Community Hall at Samshan Ghat at Bidyanagar Ward No 5 |
200000 |
Const of Community Hall at Samshan Ghat at Bidyanagar Ward No 51 |
25% |
-
latitude : 24.514456233009696
Longitude : 92.44924449361861
file name : Image_28092020120056457.png
|
2020-09-28 12:00:56.574168 |
33 |
44518292 |
Const of boundary wall near Kunagram graveyard, Bidyanagar Ward No 10 |
170000 |
Const of boundary wall near Kunagram graveyard, Bidyanagar Ward No 101 |
In Progress |
-
latitude : 24.513519094325602
Longitude : 92.44289436377585
file name : Image_28092020112920266.png
|
2020-09-28 11:29:20.39784 |
34 |
44518349 |
Const of boundary wall near Ramnagar Shibasram, Bidyanagar Ward No 5 |
200000 |
Const of boundary wall near Ramnagar Shibasram, Bidyanagar Ward No 51 |
In Progress |
-
latitude : 24.51895580627024
Longitude : 92.45544877834618
file name : Image_28092020122127584.png
|
2020-09-28 12:21:27.707881 |
35 |
38864312 |
7 no’s of tube well at WEST Bidyanagar PERFC GRT |
140000 |
7 no’s of tube well at WEST Bidyanagar PERFC GRT1 |
Ground work |
-
latitude : 24.524746485985816
Longitude : 92.43547587655485
file name : Image_07112020115053075.png
|
2020-11-07 11:50:55.093338 |
36 |
38864312 |
7 no’s of tube well at WEST Bidyanagar PERFC GRT |
140000 |
7 no’s of tube well at WEST Bidyanagar PERFC GRT2 |
Ground work |
-
latitude : 24.52510074712336
Longitude : 92.43558760732412
file name : Image_07112020213046297.png
|
2020-11-07 21:30:48.525823 |
37 |
38864312 |
7 no’s of tube well at WEST Bidyanagar PERFC GRT |
140000 |
7 no’s of tube well at WEST Bidyanagar PERFC GRT3 |
Ground work |
-
latitude : 24.52555420808494
Longitude : 92.43605590425432
file name : Image_07112020213054028.png
|
2020-11-07 21:30:56.22294 |
38 |
38864312 |
7 no’s of tube well at WEST Bidyanagar PERFC GRT |
140000 |
7 no’s of tube well at WEST Bidyanagar PERFC GRT4 |
Ground work |
-
latitude : 24.528018948622048
Longitude : 92.43661841377616
file name : Image_07112020213105989.png
|
2020-11-07 21:31:08.172173 |
39 |
38864312 |
7 no’s of tube well at WEST Bidyanagar PERFC GRT |
140000 |
7 no’s of tube well at WEST Bidyanagar PERFC GRT5 |
Ground work |
-
latitude : 24.525916473940015
Longitude : 92.43951167911291
file name : Image_07112020213112419.png
|
2020-11-07 21:31:14.619045 |
40 |
38864312 |
7 no’s of tube well at WEST Bidyanagar PERFC GRT |
140000 |
7 no’s of tube well at WEST Bidyanagar PERFC GRT6 |
Ground work |
-
latitude : 24.52530421782285
Longitude : 92.44267123751342
file name : Image_07112020213117299.png
|
2020-11-07 21:31:19.501388 |
41 |
38864312 |
7 no’s of tube well at WEST Bidyanagar PERFC GRT |
140000 |
7 no’s of tube well at WEST Bidyanagar PERFC GRT7 |
Ground work |
-
latitude : 24.528708904981613
Longitude : 92.43581911548972
file name : Image_17112020134917420.png
|
2020-11-17 13:49:17.541029 |
42 |
38852851 |
2 no’s of tube well at SANTINAGAR AND KUNAGRAM PRFC GRT |
40000 |
2 no’s of tube well at SANTINAGAR AND KUNAGRAM PRFC GRT1 |
Ground work |
-
latitude : 24.53682635910809
Longitude : 92.44408945553005
file name : Image_07112020213228083.png
|
2020-11-07 21:32:30.284142 |
43 |
38852851 |
2 no’s of tube well at SANTINAGAR AND KUNAGRAM PRFC GRT |
40000 |
2 no’s of tube well at SANTINAGAR AND KUNAGRAM PRFC GRT1 |
Ground work |
-
latitude : 24.514354686252773
Longitude : 92.45128272101283
file name : Image_17112020124157614.png
|
2020-11-17 12:41:57.71067 |
44 |
38852819 |
2 no’s of tube well at Bidyanagar PRFC GRT |
40000 |
2 no’s of tube well at Bidyanagar PRFC GRT1 |
Ground work |
-
latitude : 24.52209730166942
Longitude : 92.44293317198753
file name : Image_07112020213124672.png
|
2020-11-07 21:31:26.899264 |
45 |
44518505 |
Const of boundary wall near Mukamerbond Dalai Jame Masid Bidyanagar, Ward No 8 |
182908 |
Const of boundary wall near Mukamerbond Dalai Jame Masid Bidyanagar, Ward No 81 |
In Progress |
-
latitude : 24.533436633646488
Longitude : 92.43789933621883
file name : Image_10102020105909615.png
|
2020-10-10 10:59:11.47224 |
46 |
44518550 |
Const of Community Hall near Manipurbasti Samshanghat at Bidyanagar Ward No 4 |
200000 |
Const of Community Hall near Manipurbasti Samshanghat at Bidyanagar Ward No 41 |
25% |
-
latitude : 24.51746219303459
Longitude : 92.4417723622173
file name : Image_28092020115009306.png
|
2020-09-28 11:50:09.434306 |
47 |
44518212 |
Const of Floor & Boundary wall of 3 no Kalimandir, Bidyanagar Lane No 3 Ward No 1 |
200000 |
Const of Floor & Boundary wall of 3 no Kalimandir, Bidyanagar Lane No 3 Ward No 11 |
In Progress |
-
latitude : 24.535818519070745
Longitude : 92.45025786571205
file name : Image_07112020213210426.png
|
2020-11-07 21:32:12.629456 |
48 |
44518234 |
Const of Culvert near the house of Mostokin Ali |
80000 |
Const of Culvert near the house of Mostokin Ali1 |
Substructure below GL |
-
latitude : 24.536147634498775,24.536147634498775,24.536147634498775,24.536147634498775
Longitude : 92.44612282142043,92.44612282142043,92.44612282142043,92.44612282142043
file name : Image_10102020110004345.png
|
2020-10-10 11:00:06.167455 |
49 |
44518556 |
Const of boundary wall of Kalimandir of Lane No 1 Bidyanagar Ward No 3 |
150000 |
Const of boundary wall of Kalimandir of Lane No 1 Bidyanagar Ward No 31 |
In Progress |
-
latitude : 24.524767859838903
Longitude : 92.44814411737025
file name : Image_28092020150358434.png
|
2020-09-28 15:03:58.552603 |
50 |
37559924 |
Construction of Culvert near the house of Taslim Uddin at Rupagram |
110000 |
Construction of Culvert near the house of Taslim Uddin at Rupagram1 |
Substructure below GL |
-
latitude : 24.51349776238203,24.513502162881196,24.513502162881196,24.513502162881196
Longitude : 92.43240642361343,92.43240315467119,92.43240315467119,92.43240315467119
file name : Image_12102020075822771.png
|
2020-10-12 07:58:26.840309 |
51 |
37559937 |
Installation of TeraFill near the house of Kamrul Hoque S/O Rafik Uddin of Kunagram W/NO-10 |
100000 |
Installation of TeraFill near the house of Kamrul Hoque S/O Rafik Uddin of Kunagram W/NO-101 |
In Progress |
-
latitude : 24.511356647126377
Longitude : 92.44994128122926
file name : Image_12102020075813201.png
|
2020-10-12 07:58:17.28327 |
52 |
37559946 |
Construction of culvert near the house of Dulal Nath at Purbo Kunagram AT W/NO-10 |
50000 |
Construction of culvert near the house of Dulal Nath at Purbo Kunagram AT W/NO-101 |
Substructure below GL |
-
latitude : 24.509825608693063,24.509825608693063,24.509825608693063,24.509825608693063
Longitude : 92.45659198611975,92.45659198611975,92.45659198611975,92.45659198611975
file name : Image_17112020124227020.png
|
2020-11-17 12:42:27.115404 |
53 |
37559958 |
1 TUBE WELL AT KUNAGRAM ,W/NO-10 |
20000 |
1 TUBE WELL AT KUNAGRAM ,W/NO-101 |
Ground work |
-
latitude : 24.513936680741608
Longitude : 92.4421753641218
file name : Image_17112020132158952.png
|
2020-11-17 13:21:59.02447 |
54 |
38272204 |
Construction of culvert at Mukamerbond |
70000 |
Construction of culvert at Mukamerbond 1 |
Substructure below GL |
-
latitude : 24.530692733824253,24.530692733824253,24.530692733824253,24.530692733824253
Longitude : 92.4372485652566,92.4372485652566,92.4372485652566,92.4372485652566
file name : Image_10102020110037536.png
|
2020-10-10 11:00:39.359473 |
55 |
37559917 |
3 NOS TUBE WELL AT RS.20000 EACH AT W/NO-9 |
60000 |
3 NOS TUBE WELL AT RS.20000 EACH AT W/NO-91 |
Ground work |
-
latitude : 24.512259755283594
Longitude : 92.43508125655353
file name : Image_17112020114847028.png
|
2020-11-17 11:48:47.142025 |
56 |
37559917 |
3 NOS TUBE WELL AT RS.20000 EACH AT W/NO-9 |
60000 |
3 NOS TUBE WELL AT RS.20000 EACH AT W/NO-92 |
Ground work |
-
latitude : 24.512458071112633
Longitude : 92.43356614373624
file name : Image_17112020114851626.png
|
2020-11-17 11:48:51.711492 |
57 |
37559917 |
3 NOS TUBE WELL AT RS.20000 EACH AT W/NO-9 |
60000 |
3 NOS TUBE WELL AT RS.20000 EACH AT W/NO-93 |
Ground work |
-
latitude : 24.51506618410349
Longitude : 92.43131359107792
file name : Image_17112020114857925.png
|
2020-11-17 11:48:58.0205 |
58 |
37559400 |
Renovation of Traditional inland Water (Spring) along with bathroom |
100000 |
Renovation of Traditional inland Water (Spring) along with bathroom1 |
25% |
-
latitude : 24.536091475747526
Longitude : 92.45350333862007
file name : Image_18112020122141025.png
|
2020-11-18 12:21:41.127993 |
59 |
37559433 |
2 TUBE WELL AT RS.20000 EACH AT BIDYANAGAR T.E. |
40000 |
2 TUBE WELL AT RS.20000 EACH AT BIDYANAGAR T.E.1 |
Ground work |
-
latitude : 24.537282334640622
Longitude : 92.4530977383256
file name : Image_18112020122232661.png
|
2020-11-18 12:22:32.754615 |
60 |
44518529 |
Const of guard wall of both sides of road starting from CNP High School to near the house of Moin Ud |
300000 |
Const of guard wall of both sides of road starting from CNP High School to near the house of Moin Ud1 |
In Progress |
-
latitude : 24.514035084284842
Longitude : 92.43925611488521
file name : Image_17112020121649311.png
|
2020-11-17 12:16:49.384939 |
61 |
44672098 |
Installation of Tarafill at Village Purba Kunagram Ward No 10 |
100000 |
Installation of Tarafill at Village Purba Kunagram Ward No 101 |
In Progress |
-
latitude : 24.511530990712345
Longitude : 92.44891189970076
file name : Image_17112020124122308.png
|
2020-11-17 12:41:22.400465 |
62 |
44672098 |
Installation of Tarafill at Village Purba Kunagram Ward No 10 |
100000 |
Installation of Tarafill at Village Purba Kunagram Ward No 101 |
In Progress |
-
latitude : 24.511524788103998
Longitude : 92.44887753389776
file name : Image_17112020124242897.png
|
2020-11-17 12:42:42.985441 |
63 |
44672074 |
Const of boundary wall near Rupagram Jame Masjid Ward No 9 |
180000 |
Const of boundary wall near Rupagram Jame Masjid Ward No 91 |
In Progress |
-
latitude : 24.512789910659194
Longitude : 92.43629495613277
file name : Image_17112020114839797.png
|
2020-11-17 11:48:39.888696 |
64 |
37235622 |
Installation of Tara pump at Bidyanagar T.E(2nd) |
30000 |
Installation of Tara pump at Bidyanagar T.E(2nd)1 |
Ground work |
-
latitude : 24.537280909717083
Longitude : 92.45149252004921
file name : Image_18112020122318053.png
|
2020-11-18 12:23:18.148289 |
65 |
44671817 |
Const of Ring Well near the house of Ranjit Gour at Ramnagar Ward No 5 |
60000 |
Const of Ring Well near the house of Ranjit Gour at Ramnagar Ward No 51 |
In Progress |
-
latitude : 24.51683975290507
Longitude : 92.45283035561442
file name : Image_07112020213142690.png
|
2020-11-07 21:31:44.883237 |
66 |
44671567 |
Const of Ring Well near the house of Jyoti Mohan Kurmi at Balutilla Ward No 5 |
60000 |
Const of Ring Well near the house of Jyoti Mohan Kurmi at Balutilla Ward No 51 |
In Progress |
-
latitude : 24.517343547195196
Longitude : 92.45139889419079
file name : Image_07112020213136710.png
|
2020-11-07 21:31:38.91705 |
67 |
44671548 |
Const of boundary wall near West Bidyanagar Jame Masjid near house of Akram Ali |
240000 |
Const of boundary wall near West Bidyanagar Jame Masjid near house of Akram Ali1 |
25% |
-
latitude : 24.527801480144262
Longitude : 92.43618029169738
file name : Image_07112020213059942.png
|
2020-11-07 21:31:02.158236 |
68 |
44671534 |
Const of Community Hall near Bidyanagar Basti Shiv Mandir Ward No4 |
240000 |
Const of Community Hall near Bidyanagar Basti Shiv Mandir Ward No41 |
25% |
-
latitude : 24.521454996429384
Longitude : 92.44386591017246
file name : Image_07112020114452977.png
|
2020-11-07 11:44:54.999008 |
69 |
44671500 |
Const of Open Community Hall near Jama Masjid of Lane No 1 Bidyanagar T.E |
180000 |
Const of Open Community Hall near Jama Masjid of Lane No 1 Bidyanagar T.E1 |
25% |
-
latitude : 24.52440253458917
Longitude : 92.44892011396587
file name : Image_07112020113015154.png
|
2020-11-07 11:30:17.171798 |
70 |
44671491 |
Const of boundary wall near Dih Baba lane No 1 |
140000 |
Const of boundary wall near Dih Baba lane No 11 |
In Progress |
-
latitude : 24.52503448817879
Longitude : 92.44840580038726
file name : Image_07112020113004742.png
|
2020-11-07 11:30:06.770887 |
71 |
44671478 |
Const of Open Community Hall near Shantinagar Jame Masjid |
280000 |
Const of Open Community Hall near Shantinagar Jame Masjid1 |
25% |
-
latitude : 24.536904897540808
Longitude : 92.44312763214111
file name : Image_07112020112841936.png
|
2020-11-07 11:28:43.96015 |
72 |
44671469 |
Const of Ring Well near Adhawatilla Pinda Daan Sthal at Bidyanagar Line No 5 Ward No 3 |
65000 |
Const of Ring Well near Adhawatilla Pinda Daan Sthal at Bidyanagar Line No 5 Ward No 31 |
In Progress |
-
latitude : 24.52891451306641
Longitude : 92.45173316448927
file name : Image_07112020112953121.png
|
2020-11-07 11:29:55.133817 |
73 |
44671460 |
Const of Open Community Hall near Bidyanagar 5 no Kalimandir Ward No 2 |
200000 |
Const of Open Community Hall near Bidyanagar 5 no Kalimandir Ward No 21 |
25% |
-
latitude : 24.530607741326094
Longitude : 92.44976559653878
file name : Image_07112020112939241.png
|
2020-11-07 11:29:41.258766 |
74 |
44671447 |
Const of Community Hall near Jangali Vir Baba at Natun Tilla Ward No 1 |
240000 |
Const of Community Hall near Jangali Vir Baba at Natun Tilla Ward No 11 |
25% |
-
latitude : 24.53604944050312
Longitude : 92.46589304879308
file name : Image_07112020213222195.png
|
2020-11-07 21:32:24.39247 |
75 |
44672066 |
Const of boundary wall near Kapnarpar Malikbari at Rupagram Ward No 9 |
100000 |
Const of boundary wall near Kapnarpar Malikbari at Rupagram Ward No 91 |
In Progress |
-
latitude : 24.51431839261204
Longitude : 92.4315875954926
file name : Image_17112020120107178.png
|
2020-11-17 12:01:07.263809 |
76 |
37559735 |
Construction of Culvert at Balutilla, Bidyanagar T.E. |
140000 |
Construction of Culvert at Balutilla, Bidyanagar T.E. 1 |
Substructure below GL |
-
latitude : 24.521723720245063,24.521723720245063,24.521723720245063,24.52172740828246
Longitude : 92.44613924995065,92.44613924995065,92.44613924995065,92.44614603929222
file name : Image_18112020122022388.png
|
2020-11-18 12:20:22.480646 |
77 |
37559656 |
6 NOS TUBE WELL FOR RS.20000 EACH AT W/NO-4 |
120000 |
6 NOS TUBE WELL FOR RS.20000 EACH AT W/NO-41 |
Ground work |
-
latitude : 24.526013829745352
Longitude : 92.44043067097664
file name : Image_17112020134610393.png
|
2020-11-17 13:46:10.491985 |
78 |
37559656 |
6 NOS TUBE WELL FOR RS.20000 EACH AT W/NO-4 |
120000 |
6 NOS TUBE WELL FOR RS.20000 EACH AT W/NO-42 |
Ground work |
-
latitude : 24.526131176389754
Longitude : 92.4400576762855
file name : Image_17112020134702983.png
|
2020-11-17 13:47:03.093306 |
79 |
37559656 |
6 NOS TUBE WELL FOR RS.20000 EACH AT W/NO-4 |
120000 |
6 NOS TUBE WELL FOR RS.20000 EACH AT W/NO-43 |
Ground work |
-
latitude : 24.526327145285904
Longitude : 92.43960262276232
file name : Image_17112020134751139.png
|
2020-11-17 13:47:51.234847 |
80 |
37559656 |
6 NOS TUBE WELL FOR RS.20000 EACH AT W/NO-4 |
120000 |
6 NOS TUBE WELL FOR RS.20000 EACH AT W/NO-44 |
Ground work |
-
latitude : 24.525902685709298
Longitude : 92.43569992482662
file name : Image_17112020134835748.png
|
2020-11-17 13:48:35.855809 |
81 |
37559656 |
6 NOS TUBE WELL FOR RS.20000 EACH AT W/NO-4 |
120000 |
6 NOS TUBE WELL FOR RS.20000 EACH AT W/NO-45 |
Ground work |
-
latitude : 24.527362855151296
Longitude : 92.43592824786901
file name : Image_17112020134853075.png
|
2020-11-17 13:48:53.193408 |
82 |
37559656 |
6 NOS TUBE WELL FOR RS.20000 EACH AT W/NO-4 |
120000 |
6 NOS TUBE WELL FOR RS.20000 EACH AT W/NO-46 |
Ground work |
-
latitude : 24.5291594741866
Longitude : 92.43585515767336
file name : Image_17112020134934676.png
|
2020-11-17 13:49:34.781985 |
83 |
63939200 |
water tank |
100000 |
water tank1 |
Completion of work |
-
latitude : 24.548054999999998
Longitude : 92.46865000000001
file name : Image_17122022120725659.png
|
2022-12-17 12:07:25.754394 |
84 |
63938881 |
community managed sanitary complex |
98101 |
community managed sanitary complex1 |
Completion of work |
-
latitude : 24.524679999999996
Longitude : 92.43538666666667
file name : Image_13032023161504152.png
|
2023-03-13 16:15:04.244471 |
85 |
63938881 |
community managed sanitary complex |
98101 |
community managed sanitary complex1 |
Completion of work |
-
latitude : 24.536038333333334
Longitude : 92.45381833333334
file name : Image_17122022122700690.png
|
2022-12-17 12:27:00.802644 |
86 |
63939468 |
Distribution of face mask,dettol soap |
101975 |
Distribution of face mask,dettol soap1 |
Completion of work |
-
latitude : 24.868774
Longitude : 92.3558165
file name : Image_11082023163825159.png
|
2023-08-11 16:38:25.3128 |
87 |
85737005 |
Operation & maintenance of drinking water supply system |
429875 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.687395
Longitude : 92.37360666666667
file name : Image_30072023214854339.png
|
2023-07-30 21:48:54.452464 |
88 |
66617143 |
Repairing of 1219 no lalbalu khasia punji l.P school |
120000 |
Repairing of 1219 no lalbalu khasia punji l.P school1 |
Completion of work |
-
latitude : 24.532244999999996
Longitude : 92.48016666666666
file name : Image_15032023140706761.png
|
2023-03-15 14:07:06.862307 |
89 |
66617143 |
Repairing of 1219 no lalbalu khasia punji l.P school |
120000 |
Repairing of 1219 no lalbalu khasia punji l.P school1 |
Completion of work |
-
latitude : 24.532244999999996
Longitude : 92.48016666666666
file name : Image_15032023140729317.png
|
2023-03-15 14:07:29.4129 |
90 |
66617226 |
Repairing of 104 no Mukamerbond Anganwadi center |
100000 |
Repairing of 104 no Mukamerbond Anganwadi center1 |
Completion of work |
-
latitude : 24.524630000000002
Longitude : 92.43532333333333
file name : Image_22052023164826435.png
|
2023-05-22 16:48:26.544564 |
91 |
66617226 |
Repairing of 104 no Mukamerbond Anganwadi center |
100000 |
Repairing of 104 no Mukamerbond Anganwadi center1 |
Completion of work |
-
latitude : 24.530401666666663
Longitude : 92.43645999999998
file name : Image_13032023161513137.png
|
2023-03-13 16:15:13.229464 |
92 |
66617374 |
construction of boundary wall near kajaldhara LP schoo |
130235 |
construction of boundary wall near kajaldhara LP schoo1 |
Completion of work |
-
latitude : 24.535306666666663
Longitude : 92.45504333333335
file name : Image_09042023123538346.png
|
2023-04-09 12:35:38.450775 |
93 |
66617290 |
construction of boundary wall near west bidyanagar LP school |
300000 |
construction of boundary wall near west bidyanagar LP school1 |
Completion of work |
-
latitude : 24.525541666666662
Longitude : 92.435195
file name : Image_22052023163232595.png
|
2023-05-22 16:32:32.687438 |
94 |
66617290 |
construction of boundary wall near west bidyanagar LP school |
300000 |
construction of boundary wall near west bidyanagar LP school1 |
Completion of work |
-
latitude : 24.52546333333333
Longitude : 92.43539000000001
file name : Image_09042023111843697.png
|
2023-04-09 11:18:43.795838 |
95 |
66617290 |
construction of boundary wall near west bidyanagar LP school |
300000 |
construction of boundary wall near west bidyanagar LP school1 |
Completion of work |
-
latitude : 24.525541666666662
Longitude : 92.435195
file name : Image_22052023163221231.png
|
2023-05-22 16:32:21.32458 |
96 |
66617340 |
installation of streetlight near fakiragram Majar Khana |
49500 |
installation of streetlight near fakiragram Majar Khana1 |
Completion of work |
-
latitude : 24.522258333333337
Longitude : 92.43277000000002
file name : Image_09042023120305093.png
|
2023-04-09 12:03:05.195096 |
97 |
66617412 |
Repairing of Purba Kunagram LP school |
100000 |
Repairing of Purba Kunagram LP school1 |
Completion of work |
-
latitude : 24.509633333333333
Longitude : 92.45008000000001
file name : Image_09042023113959139.png
|
2023-04-09 11:39:59.247513 |
98 |
66616992 |
Repairing of katanala upgraded |
120000 |
Repairing of katanala upgraded 1 |
Completion of work |
-
latitude : 24.525895
Longitude : 92.48937333333333
file name : Image_15032023140711722.png
|
2023-03-15 14:07:11.817692 |
99 |
66616992 |
Repairing of katanala upgraded |
120000 |
Repairing of katanala upgraded 1 |
Completion of work |
-
latitude : 24.525895
Longitude : 92.48937333333333
file name : Image_15032023140735312.png
|
2023-03-15 14:07:35.412177 |
100 |
66727055 |
Greywater management system |
174000 |
Greywater management system1 |
Completion of work |
-
latitude : 24.526665
Longitude : 92.48866333333332
file name : Image_15032023140717443.png
|
2023-03-15 14:07:17.553457 |
101 |
66727055 |
Greywater management system |
174000 |
Greywater management system1 |
Completion of work |
-
latitude : 24.526665
Longitude : 92.48866333333332
file name : Image_15032023140742573.png
|
2023-03-15 14:07:42.681158 |
102 |
64470046 |
construction of boundary wall |
100000 |
construction of boundary wall1 |
Completion of work |
-
latitude : 24.51914
Longitude : 92.42995833333335
file name : Image_22052023172802841.png
|
2023-05-22 17:28:02.944469 |
103 |
64470046 |
construction of boundary wall |
100000 |
construction of boundary wall1 |
Completion of work |
-
latitude : 24.5256
Longitude : 92.43523833333332
file name : Image_13032023161456198.png
|
2023-03-13 16:14:56.297451 |
104 |
64470046 |
construction of boundary wall |
100000 |
construction of boundary wall1 |
Completion of work |
-
latitude : 24.51882666666667
Longitude : 92.42999999999999
file name : Image_21112022160528501.png
|
2022-11-21 16:05:28.614532 |
105 |
66727152 |
Greywater management system |
139667 |
Greywater management system1 |
Completion of work |
-
latitude : 24.53160833333333
Longitude : 92.43762
file name : Image_22052023165408285.png
|
2023-05-22 16:54:08.372891 |
106 |
66727152 |
Greywater management system |
139667 |
Greywater management system1 |
Completion of work |
-
latitude : 24.531780000000005
Longitude : 92.43731833333335
file name : Image_15032023140701417.png
|
2023-03-15 14:07:01.52647 |
107 |
66617177 |
Repairing of 399 no mukamerbond LP school |
100000 |
Repairing of 399 no mukamerbond LP school1 |
Completion of work |
-
latitude : 24.53035333333333
Longitude : 92.43649333333333
file name : Image_22052023164958579.png
|
2023-05-22 16:49:58.667236 |
108 |
66617177 |
Repairing of 399 no mukamerbond LP school |
100000 |
Repairing of 399 no mukamerbond LP school1 |
Completion of work |
-
latitude : 24.530343333333334
Longitude : 92.43642666666668
file name : Image_15032023140655333.png
|
2023-03-15 14:06:55.442751 |
109 |
66616412 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.512790000000003
Longitude : 92.47229999999999
file name : Image_15042023132546750.png
|
2023-04-15 13:25:46.876152 |
110 |
66616573 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.524678333333334
Longitude : 92.43535833333333
file name : Image_22052023163847851.png
|
2023-05-22 16:38:47.947875 |
111 |
66616573 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.52479333333333
Longitude : 92.43528166666668
file name : Image_09042023111529733.png
|
2023-04-09 11:15:29.828164 |
112 |
66615842 |
Water Supply to villages |
509868 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.4744676
Longitude : 92.4436296
file name : Image_01022023170954027.png
|
2023-02-01 17:09:54.149735 |
113 |
64470144 |
construction of cc road |
168760 |
construction of cc road 1 |
Completion of work |
-
latitude : 24.526165,24.526194999999998
Longitude : 92.43929166666666,92.43927166666666
file name : Image_19102022105308053.png
|
2022-10-19 10:53:08.167507 |
114 |
63939122 |
community toilet |
54667 |
community toilet1 |
Completion of work |
-
latitude : 24.52437166666667
Longitude : 92.46739000000001
file name : Image_04112022183751773.png
|
2022-11-04 18:37:51.867348 |
115 |
63939122 |
community toilet |
54667 |
community toilet1 |
Completion of work |
-
latitude : 24.52437166666667
Longitude : 92.46739000000001
file name : Image_04112022183831283.png
|
2022-11-04 18:38:31.384913 |
116 |
63939088 |
construction of community soak pits |
84000 |
construction of community soak pits1 |
Completion of work |
-
latitude : 24.531288333333336
Longitude : 92.43676666666667
file name : Image_04112022183729729.png
|
2022-11-04 18:37:29.829967 |
117 |
63938901 |
community managed sanitary complex |
98100 |
community managed sanitary complex1 |
Completion of work |
-
latitude : 24.51275666666667
Longitude : 92.47260166666668
file name : Image_15032023140722783.png
|
2023-03-15 14:07:22.916707 |
118 |
63938901 |
community managed sanitary complex |
98100 |
community managed sanitary complex1 |
Completion of work |
-
latitude : 24.51275666666667
Longitude : 92.47260166666668
file name : Image_15032023140748813.png
|
2023-03-15 14:07:48.953958 |
119 |
63938901 |
community managed sanitary complex |
98100 |
community managed sanitary complex1 |
Completion of work |
-
latitude : 24.521953333333332
Longitude : 92.44777500000001
file name : Image_04112022183743281.png
|
2022-11-04 18:37:43.374643 |
120 |
63938901 |
community managed sanitary complex |
98100 |
community managed sanitary complex1 |
Completion of work |
-
latitude : 24.521953333333332
Longitude : 92.44777500000001
file name : Image_04112022183822923.png
|
2022-11-04 18:38:23.019267 |
121 |
63939423 |
streetlight installation |
49500 |
streetlight installation 1 |
Completion of work |
-
latitude : 24.531721666666666
Longitude : 92.43713166666666
file name : Image_19102022105312023.png
|
2022-10-19 10:53:12.160053 |
122 |
63938844 |
construction of material cllection facilities |
175000 |
construction of material cllection facilities1 |
Completion of work |
-
latitude : 24.52278666666667
Longitude : 92.44484499999999
file name : Image_04112022183738844.png
|
2022-11-04 18:37:38.943764 |
123 |
63938844 |
construction of material cllection facilities |
175000 |
construction of material cllection facilities1 |
Completion of work |
-
latitude : 24.52278666666667
Longitude : 92.44484499999999
file name : Image_04112022183819533.png
|
2022-11-04 18:38:19.635959 |
124 |
63939153 |
water tank |
100000 |
water tank 1 |
Completion of work |
-
latitude : 24.51921666666666
Longitude : 92.45149166666667
file name : Image_29122022132957236.png
|
2022-12-29 13:29:57.335973 |
125 |
63939188 |
water tank |
309867 |
water tank 1 |
Completion of work |
-
latitude : 24.515555000000003
Longitude : 92.44199166666667
file name : Image_04112022183747534.png
|
2022-11-04 18:37:47.632159 |
126 |
63939188 |
water tank |
309867 |
water tank 1 |
Completion of work |
-
latitude : 24.515555000000003
Longitude : 92.44199166666667
file name : Image_04112022183827284.png
|
2022-11-04 18:38:27.37699 |
127 |
63939317 |
community hall |
430000 |
community hall 1 |
Completion of work |
-
latitude : 24.529311666666665
Longitude : 92.45690333333332
file name : Image_04112022183756032.png
|
2022-11-04 18:37:56.122331 |
128 |
63939317 |
community hall |
430000 |
community hall 1 |
Completion of work |
-
latitude : 24.529311666666665
Longitude : 92.45690333333332
file name : Image_04112022183835251.png
|
2022-11-04 18:38:35.345197 |
129 |
63939257 |
streetlight installation |
49500 |
streetlight installation1 |
Completion of work |
-
latitude : 24.51883666666667
Longitude : 92.48837333333334
file name : Image_18012023162407143.png
|
2023-01-18 16:24:07.284002 |
130 |
64470097 |
construction of culvert |
120000 |
construction of culvert1 |
Completion of work |
-
latitude : 24.520236666666666,24.520236666666666
Longitude : 92.450215,92.450215
file name : Image_04112022183734319.png
|
2022-11-04 18:37:34.421718 |