1 |
14592185 |
2)Sl 2 DSR 2Const ofRoad from, Bagai Dutta to Abdul Manik one culvert W2 |
200000 |
2)Sl 2 DSR 2Const ofRoad from, Bagai Dutta to Abdul Manik one culvert W21 |
Earth Work |
-
latitude : 24.83499443,24.83499531
Longitude : 92.26133957,92.26134232
file name : Image_16092020180222681.png
|
2020-09-16 18:02:22.779118 |
2 |
14592164 |
2)Sl 1 DSR 4 Const of Community Sanitation with earh Filling at 1347 No Chalihadi LP School w 1 |
200000 |
2)Sl 1 DSR 4 Const of Community Sanitation with earh Filling at 1347 No Chalihadi LP School w 11 |
25% |
-
latitude : 24.84662708
Longitude : 92.26267478
file name : Image_16092020180659610.png
|
2020-09-16 18:06:59.698609 |
3 |
37266284 |
Const of Road Soiyad Fakrul Islam to tHuson Ali Latu W/No 5 |
200000 |
Const of Road Soiyad Fakrul Islam to tHuson Ali Latu W/No 51 |
Earth Work |
-
latitude : 24.84146119,24.84146119
Longitude : 92.25902493,92.25902493
file name : Image_01092020144228901.png
|
2020-09-01 14:42:29.628831 |
4 |
37266754 |
Construction of Culvert near the house of Kamal Mia and Abdul Quddus at Sajpur Ward No 9 |
120000 |
Construction of Culvert near the house of Kamal Mia and Abdul Quddus at Sajpur Ward No 91 |
Substructure below GL |
-
latitude : 24.85424573,24.85424565
Longitude : 92.29354469,92.29354461
file name : Image_24112020153143404.png
|
2020-11-24 15:31:43.494921 |
5 |
37267246 |
Construction of Bricks Boundary wall of Shahabad M.E School, at Sajpur 10 |
150000 |
Construction of Bricks Boundary wall of Shahabad M.E School, at Sajpur 101 |
In Progress |
-
latitude : 24.84925497
Longitude : 92.29169289
file name : Image_18092020181546577.png
|
2020-09-18 18:15:46.666645 |
6 |
37263761 |
Renovation of Panchayat Dighi with Guard wall at Balidara W/No 3 |
200000 |
Renovation of Panchayat Dighi with Guard wall at Balidara W/No 31 |
In Progress |
-
latitude : 24.8411768
Longitude : 92.27220096
file name : Image_12012021135754435.png
|
2021-01-12 13:57:54.547235 |
7 |
37263761 |
Renovation of Panchayat Dighi with Guard wall at Balidara W/No 3 |
200000 |
Renovation of Panchayat Dighi with Guard wall at Balidara W/No 31 |
In Progress |
-
latitude : 24.8411768
Longitude : 92.27220096
file name : Image_12012021135921330.png
|
2021-01-12 13:59:21.443652 |
8 |
14672964 |
2 Sl 5 DSR 6 Repairing of Culvert At Latu Bazar Road near the Shop of Tuktuk Asthapati W 5 |
210000 |
2 Sl 5 DSR 6 Repairing of Culvert At Latu Bazar Road near the Shop of Tuktuk Asthapati W 51 |
Substructure below GL |
-
latitude : 24.84076532,24.84077562,24.84078062
Longitude : 92.2623017,92.26229605,92.26228381
file name : Image_16092020180045188.png
|
2020-09-16 18:00:45.319291 |
9 |
38425032 |
1 sl Instl of Tara pump near Symolendu Chakraborty at Latu 5 |
45000 |
1 sl Instl of Tara pump near Symolendu Chakraborty at Latu 51 |
Ground work |
-
latitude : 24.84191592
Longitude : 92.2609494
file name : Image_16092020180649012.png
|
2020-09-16 18:06:49.137054 |
10 |
14673009 |
2 Sl 17 Const of Road Start from Tamajul Ali Shop to Boder Road via Latu Bazar Mosjid With |
210000 |
2 Sl 17 Const of Road Start from Tamajul Ali Shop to Boder Road via Latu Bazar Mosjid With 1 |
Earth Work |
-
latitude : 24.84080193,24.84078211
Longitude : 92.25644814,92.25646271
file name : Image_16092020180632555.png
|
2020-09-16 18:06:32.626286 |
11 |
20772248 |
11 1st ConstOf Road Starting from Sajpur M.E Madrassa to Narasingha Culvert Via Khulu Mia House. |
200000 |
11 1st ConstOf Road Starting from Sajpur M.E Madrassa to Narasingha Culvert Via Khulu Mia House.1 |
Earth Work |
-
latitude : 24.85600716,24.85601641
Longitude : 92.29260158,92.29259317
file name : Image_19022021115311443.png
|
2021-02-19 11:53:11.569941 |
12 |
20771991 |
Sl 14 Construction Of a Community Hall At Latu School Palyground |
200000 |
Sl 14 Construction Of a Community Hall At Latu School Palyground1 |
25% |
-
latitude : 24.84232871
Longitude : 92.2574296
file name : Image_18112020215413545.png
|
2020-11-18 21:54:13.67353 |
13 |
30002342 |
133 1st Instl of 1 No Tara Pump Antu Bhattacharjee at W/No3 Balidra ,Latu |
45000 |
133 1st Instl of 1 No Tara Pump Antu Bhattacharjee at W/No3 Balidra ,Latu 1 |
Ground work |
-
latitude : 24.83689974
Longitude : 92.2743677
file name : Image_12012021125347934.png
|
2021-01-12 12:53:48.057048 |
14 |
44286987 |
1st Install 15Nos Tube well at Chalihadi , Near the house of..Mentiond Below.. |
330000 |
1st Install 15Nos Tube well at Chalihadi , Near the house of..Mentiond Below..1 |
Plinth Level |
-
latitude : 24.84843666
Longitude : 92.25901469
file name : Image_12012021125308892.png
|
2021-01-12 12:53:08.999185 |
15 |
44286987 |
1st Install 15Nos Tube well at Chalihadi , Near the house of..Mentiond Below.. |
330000 |
1st Install 15Nos Tube well at Chalihadi , Near the house of..Mentiond Below..2 |
Plinth Level |
-
latitude : 24.84784474
Longitude : 92.26137115
file name : Image_12012021125317737.png
|
2021-01-12 12:53:17.85476 |
16 |
44286987 |
1st Install 15Nos Tube well at Chalihadi , Near the house of..Mentiond Below.. |
330000 |
1st Install 15Nos Tube well at Chalihadi , Near the house of..Mentiond Below..3 |
Plinth Level |
-
latitude : 24.84758264
Longitude : 92.26569375
file name : Image_12012021125323933.png
|
2021-01-12 12:53:24.054874 |
17 |
44286987 |
1st Install 15Nos Tube well at Chalihadi , Near the house of..Mentiond Below.. |
330000 |
1st Install 15Nos Tube well at Chalihadi , Near the house of..Mentiond Below..4 |
Plinth Level |
-
latitude : 24.84791689
Longitude : 92.26545792
file name : Image_12012021125329906.png
|
2021-01-12 12:53:30.000969 |
18 |
44286987 |
1st Install 15Nos Tube well at Chalihadi , Near the house of..Mentiond Below.. |
330000 |
1st Install 15Nos Tube well at Chalihadi , Near the house of..Mentiond Below..5 |
Plinth Level |
-
latitude : 24.84778639
Longitude : 92.26527227
file name : Image_12012021125336644.png
|
2021-01-12 12:53:36.746457 |
19 |
29947349 |
const of road start from PWD rd to Kanak Kanti chakraborty via Panchayat Dighi at Chalia |
200000 |
const of road start from PWD rd to Kanak Kanti chakraborty via Panchayat Dighi at Chalia1 |
Earth Work |
-
latitude : 24.84429591,24.84429587
Longitude : 92.26486572,92.26486578
file name : Image_12012021125245827.png
|
2021-01-12 12:52:45.920859 |
20 |
29946961 |
2 const of road stat from N.R.P rd to Belal Uddin house via Abdul Haque at Latu Kandi |
240000 |
2 const of road stat from N.R.P rd to Belal Uddin house via Abdul Haque at Latu Kandi1 |
Earth Work |
-
latitude : 24.83499906,24.83499953,24.83499953
Longitude : 92.26159315,92.26159255,92.26159255
file name : Image_12012021135951001.png
|
2021-01-12 13:59:51.104497 |
21 |
29946961 |
2 const of road stat from N.R.P rd to Belal Uddin house via Abdul Haque at Latu Kandi |
240000 |
2 const of road stat from N.R.P rd to Belal Uddin house via Abdul Haque at Latu Kandi1 |
Earth Work |
-
latitude : 24.83499906,24.83499953,24.83499953
Longitude : 92.26159315,92.26159255,92.26159255
file name : Image_12012021135819779.png
|
2021-01-12 13:58:19.879041 |
22 |
20771568 |
Sl 5,Construction of RCC Foot Steps at Balidara Mahapravu Akhra |
300000 |
Sl 5,Construction of RCC Foot Steps at Balidara Mahapravu Akhra1 |
Substructure below GL |
-
latitude : 24.83842377
Longitude : 92.27489901
file name : Image_01092020165237806.png
|
2020-09-01 16:52:38.51311 |
23 |
20771655 |
Sl 6 Construction of Rd Starting from Pradip Das House to Balidara Mahapravu Akhra Via Bhairab Bari |
300000 |
Sl 6 Construction of Rd Starting from Pradip Das House to Balidara Mahapravu Akhra Via Bhairab Bari1 |
Earth Work |
-
latitude : 24.83580851,24.83580851
Longitude : 92.27391631,92.27391631
file name : Image_01092020144247943.png
|
2020-09-01 14:42:48.712695 |
24 |
20771265 |
Sl 2 ,Construction of Bricks Wall for protection of Earth filling at Joy Kali Bari. |
300000 |
Sl 2 ,Construction of Bricks Wall for protection of Earth filling at Joy Kali Bari.1 |
25% |
-
latitude : 24.84353429,24.84353552
Longitude : 92.2641821,92.26418253
file name : Image_01092020144221558.png
|
2020-09-01 14:42:22.329792 |
25 |
20772330 |
11Construction of Boundary Wall Renovation Of Latu Sajpur Gp Office Building at Dasgram |
200000 |
11Construction of Boundary Wall Renovation Of Latu Sajpur Gp Office Building at Dasgram1 |
In Progress |
-
latitude : 24.8534948
Longitude : 92.27674314
file name : Image_01092020165244484.png
|
2020-09-01 16:52:45.25057 |
26 |
20772299 |
12 Construction of Building of Sajpur Hafizia Madrassa at Sajpur ph2 |
352094 |
12 Construction of Building of Sajpur Hafizia Madrassa at Sajpur ph21 |
25% |
-
latitude : 24.84849923
Longitude : 92.28963391
file name : Image_01092020165322975.png
|
2020-09-01 16:53:23.713855 |
27 |
20771679 |
Sl 7 Construction Of Road Starting from Pirerchak L.P School to Malegarh Mukam. |
250000 |
Sl 7 Construction Of Road Starting from Pirerchak L.P School to Malegarh Mukam.1 |
Earth Work |
-
latitude : 24.83652907,24.83652907,24.83652907,24.83652907
Longitude : 92.25590865,92.25590865,92.25590865,92.25590865
file name : Image_16092020180151161.png
|
2020-09-16 18:01:51.27489 |
28 |
20771775 |
7 1st Const Of Rd Starting from Samiran Malakar shop to Latu Co Operative |
300000 |
7 1st Const Of Rd Starting from Samiran Malakar shop to Latu Co Operative1 |
Earth Work |
-
latitude : 24.83873522,24.83873532
Longitude : 92.2609468,92.26094678
file name : Image_16092020180527614.png
|
2020-09-16 18:05:27.711711 |
29 |
20771221 |
SL 1,Construction of Bricks Boundary of new Sasan Ghat near Latu Joy Kalibari |
111247 |
SL 1,Construction of Bricks Boundary of new Sasan Ghat near Latu Joy Kalibari1 |
25% |
-
latitude : 24.84371058
Longitude : 92.26445332
file name : Image_16092020112606351.png
|
2020-09-16 11:26:06.486995 |
30 |
20772318 |
10 Construction of a Community Hall at Latu Joy Kali Bari |
350000 |
10 Construction of a Community Hall at Latu Joy Kali Bari1 |
25% |
-
latitude : 24.84389805
Longitude : 92.26361626
file name : Image_01092020144214903.png
|
2020-09-01 14:42:15.647505 |
31 |
20771889 |
8 Construction of Boundary Wall along with Approach Road from Latu Bus Stand To Durga Mandop |
300000 |
8 Construction of Boundary Wall along with Approach Road from Latu Bus Stand To Durga Mandop1 |
25% |
-
latitude : 24.84058308
Longitude : 92.26357917
file name : Image_16092020180505374.png
|
2020-09-16 18:05:05.486977 |
32 |
14673295 |
2 Sl 7 Const of Community Sanitation near Layu Sajpur Gp Office at W 7 |
210000 |
2 Sl 7 Const of Community Sanitation near Layu Sajpur Gp Office at W 71 |
25% |
-
latitude : 24.8534548
Longitude : 92.2771074
file name : Image_16092020180738122.png
|
2020-09-16 18:07:38.212287 |
33 |
14599027 |
2)Sl 4 DSR 10 Imp of Road Starting from Sonuhar Ali House to Mukam Road via Tahir Ali House W 4 |
200000 |
2)Sl 4 DSR 10 Imp of Road Starting from Sonuhar Ali House to Mukam Road via Tahir Ali House W 41 |
Earth Work |
-
latitude : 24.83831684,24.83831614,24.83831614
Longitude : 92.25760351,92.25760341,92.25760341
file name : Image_16092020180126804.png
|
2020-09-16 18:01:26.942324 |
34 |
37266588 |
Construction of Building of Hafizia Madrassa , at Sajpur W/No 10 |
335188 |
Construction of Building of Hafizia Madrassa , at Sajpur W/No 101 |
25% |
-
latitude : 24.84860645
Longitude : 92.28960194
file name : Image_18092020181538018.png
|
2020-09-18 18:15:38.094954 |
35 |
14643406 |
Const of Bricks boundary Wall of 978 No Rahatpur LP School W 8 |
200000 |
Const of Bricks boundary Wall of 978 No Rahatpur LP School W 81 |
25% |
-
latitude : 24.85042316
Longitude : 92.28433768
file name : Image_01092020165251862.png
|
2020-09-01 16:52:52.624983 |
36 |
37212878 |
Const. of Bricks Guard Wall sunai Uddin to Jalal Uddin at Latu 5 |
200000 |
Const. of Bricks Guard Wall sunai Uddin to Jalal Uddin at Latu 51 |
In Progress |
-
latitude : 24.84340056
Longitude : 92.26760776
file name : Image_16092020180416009.png
|
2020-09-16 18:04:16.119583 |
37 |
38424999 |
1 Sl Const of Gp office toilet and Approach Rd at Gp Office w/7 |
127884 |
1 Sl Const of Gp office toilet and Approach Rd at Gp Office w/71 |
Earth Work |
-
latitude : 24.85353378,24.85353237
Longitude : 92.27680539,92.27679903
file name : Image_16092020180729838.png
|
2020-09-16 18:07:29.909643 |
38 |
14673305 |
2 Sl 8 Const of Road from Dasgram Mini PHC to Rahatpur Masjid With Earth Filling Ward no 8 |
210000 |
2 Sl 8 Const of Road from Dasgram Mini PHC to Rahatpur Masjid With Earth Filling Ward no 81 |
Earth Work |
-
latitude : 24.849886,24.84987523,24.84988062
Longitude : 92.2812914,92.28125555,92.28125607
file name : Image_18092020181519487.png
|
2020-09-18 18:15:19.577846 |
39 |
14673404 |
1 Sl 9 Const of Rest house near old Gudara Ghat W 9 Sajpur I |
220000 |
1 Sl 9 Const of Rest house near old Gudara Ghat W 9 Sajpur I1 |
25% |
-
latitude : 24.85644496
Longitude : 92.29330369
file name : Image_24112020153153296.png
|
2020-11-24 15:31:53.430708 |
40 |
14672924 |
Sl 4 Const of Drainage Start from Jame Masjid to Pwd Road ,W4 |
230000 |
Sl 4 Const of Drainage Start from Jame Masjid to Pwd Road ,W41 |
Length of Drain executed |
-
latitude : 24.83650213,24.83650213
Longitude : 92.25852455,92.25852455
file name : Image_16092020180204182.png
|
2020-09-16 18:02:04.26398 |
41 |
14672770 |
Sl 1 Dsr 3 const of culvert at Panchayat road near house of Tabarak Ali W 1 |
210000 |
Sl 1 Dsr 3 const of culvert at Panchayat road near house of Tabarak Ali W 11 |
25% |
-
latitude : 24.84671489,24.84671489
Longitude : 92.2620393,92.26203929
file name : Image_16092020180712879.png
|
2020-09-16 18:07:12.967529 |
42 |
14673072 |
1 Sl 6 Const of Approch Road from PWD to Latu Mini PHC W6 |
300000 |
1 Sl 6 Const of Approch Road from PWD to Latu Mini PHC W61 |
Earth Work |
-
latitude : 24.84106192,24.84106179,24.84106179
Longitude : 92.2576834,92.25768336,92.25768336
file name : Image_16092020180056974.png
|
2020-09-16 18:00:57.075211 |
43 |
14672822 |
Sl 2 Const of Road Startimg from Mastakin Ali to Akib Ali Earth filling W 2 |
210000 |
Sl 2 Const of Road Startimg from Mastakin Ali to Akib Ali Earth filling W 21 |
Earth Work |
-
latitude : 24.83469905,24.83469905,24.83469903
Longitude : 92.26292076,92.26292076,92.26292065
file name : Image_16092020180300675.png
|
2020-09-16 18:03:00.769535 |
44 |
14672899 |
Sl 3 DSR 3 Instl of Streetlight Starting from F.N Road to Bhairav Bari Via Antu Thakhur ,W 3 |
210000 |
Sl 3 DSR 3 Instl of Streetlight Starting from F.N Road to Bhairav Bari Via Antu Thakhur ,W 32 |
25% |
-
latitude : 24.83728436
Longitude : 92.27384676
file name : Image_12012021125354279.png
|
2021-01-12 12:53:54.440463 |
45 |
14673000 |
1 Sl 5 Street Light at Latu Bus Stand to MangshiTilla Jame Masjid W 5 |
220000 |
1 Sl 5 Street Light at Latu Bus Stand to MangshiTilla Jame Masjid W 51 |
25% |
-
latitude : 24.84326532
Longitude : 92.26750903
file name : Image_16092020180437882.png
|
2020-09-16 18:04:37.971773 |
46 |
14672759 |
1 Sl 1 D6 Const of Road Start from Tabarak Ali House to Rawab Ali House Via Khalil Uddin ,Earth Fi |
270000 |
1 Sl 1 D6 Const of Road Start from Tabarak Ali House to Rawab Ali House Via Khalil Uddin ,Earth Fi1 |
Earth Work |
-
latitude : 24.84766249,24.84766249
Longitude : 92.26051759,92.26051759
file name : Image_16092020180721057.png
|
2020-09-16 18:07:21.13203 |
47 |
38425333 |
P 1 Const of Guard wall at MAlegarh Mukam Rd Near Samsul Islam LAtu w/4 |
400000 |
P 1 Const of Guard wall at MAlegarh Mukam Rd Near Samsul Islam LAtu w/4 1 |
In Progress |
-
latitude : 24.83611924
Longitude : 92.25530366
file name : Image_16092020180139511.png
|
2020-09-16 18:01:39.605365 |
48 |
38425210 |
1 Sl 12 Instl of Tara Pump near Latu Bazar w6 |
45000 |
1 Sl 12 Instl of Tara Pump near Latu Bazar w61 |
Ground work |
-
latitude : 24.8406824
Longitude : 92.25623934
file name : Image_16092020180615247.png
|
2020-09-16 18:06:15.320848 |
49 |
38424960 |
1 Sl Const of culvert near BAlidara LAl Ghar w3 |
220000 |
1 Sl Const of culvert near BAlidara LAl Ghar w31 |
Substructure below GL |
-
latitude : 24.83933693,24.83933694
Longitude : 92.26868478,92.26868477
file name : Image_16092020180348646.png
|
2020-09-16 18:03:48.753092 |
50 |
14673422 |
2 Sl 10 Const of Drain, Guard Wall Start From Ijjad Ali to Sunari Khal via Tera Mia W |
210000 |
2 Sl 10 Const of Drain, Guard Wall Start From Ijjad Ali to Sunari Khal via Tera Mia W1 |
25% |
-
latitude : 24.85047796,24.85047796
Longitude : 92.29343325,92.29343325
file name : Image_18092020181553041.png
|
2020-09-18 18:15:53.117798 |
51 |
14673113 |
2 Sl 11 Repairing of three Nos of Market Shed At Latu BAzarW 6 |
351983 |
2 Sl 11 Repairing of three Nos of Market Shed At Latu BAzarW 61 |
Plinth level |
-
latitude : 24.84071118
Longitude : 92.25620318
file name : Image_16092020180639656.png
|
2020-09-16 18:06:39.752078 |
52 |
14672912 |
Sl 4 Const of Road Culvert from Border Road to Malegarh Tilla ,Pirer |
220000 |
Sl 4 Const of Road Culvert from Border Road to Malegarh Tilla ,Pirer1 |
Earth Work |
-
latitude : 24.83885599,24.83886001
Longitude : 92.25673563,92.25674855
file name : Image_16092020180111655.png
|
2020-09-16 18:01:11.757455 |
53 |
14672845 |
2 Sl 2 Const of Boundary Wall At Latu Kandi Kabristhan At Latu Kandi W 2 |
220000 |
2 Sl 2 Const of Boundary Wall At Latu Kandi Kabristhan At Latu Kandi W 21 |
In Progress |
-
latitude : 24.83274589
Longitude : 92.26249275
file name : Image_16092020180333991.png
|
2020-09-16 18:03:34.087229 |
54 |
14673282 |
1 Sl 7 Const of Boundary Wall of Latu Sajpur Gp Office w7 |
220000 |
1 Sl 7 Const of Boundary Wall of Latu Sajpur Gp Office w71 |
In Progress |
-
latitude : 24.85362731
Longitude : 92.27711773
file name : Image_15092020205854905.png
|
2020-09-15 20:58:55.037153 |
55 |
20772108 |
Sl 18Const Of Road Starting from Rahatpur P.W.D Road to Lalotilla Panchayat Road via Basir Uddin |
200000 |
Sl 18Const Of Road Starting from Rahatpur P.W.D Road to Lalotilla Panchayat Road via Basir Uddin 1 |
Earth Work |
-
latitude : 24.84984853,24.84984846
Longitude : 92.28094792,92.28094815
file name : Image_18092020181525235.png
|
2020-09-18 18:15:25.329094 |
56 |
44267256 |
7 Construction of Bricks Boundary Wall of Grave Yard near Dasgram IDGAH |
200000 |
7 Construction of Bricks Boundary Wall of Grave Yard near Dasgram IDGAH1 |
In Progress |
-
latitude : 24.85250563
Longitude : 92.27901793
file name : Image_15122020180854635.png
|
2020-12-15 18:08:54.707242 |
57 |
44267256 |
7 Construction of Bricks Boundary Wall of Grave Yard near Dasgram IDGAH |
200000 |
7 Construction of Bricks Boundary Wall of Grave Yard near Dasgram IDGAH1 |
In Progress |
-
latitude : 24.85250563
Longitude : 92.27901793
file name : Image_15122020180905427.png
|
2020-12-15 18:09:05.50408 |
58 |
44267256 |
7 Construction of Bricks Boundary Wall of Grave Yard near Dasgram IDGAH |
200000 |
7 Construction of Bricks Boundary Wall of Grave Yard near Dasgram IDGAH1 |
In Progress |
-
latitude : 24.85253745
Longitude : 92.27898221
file name : Image_15122020180900240.png
|
2020-12-15 18:09:00.313817 |
59 |
44261983 |
Sl 13 1 Const of Community HAlla Near MADHAYA LATU Durga MAndap |
452440 |
Sl 13 1 Const of Community HAlla Near MADHAYA LATU Durga MAndap1 |
25% |
-
latitude : 24.84125116
Longitude : 92.25990492
file name : Image_12012021125238551.png
|
2021-01-12 12:52:38.658821 |
60 |
20771339 |
Sl 3 Construction Of Building grant 66 No Anganwari Centre at Kandi |
300000 |
Sl 3 Construction Of Building grant 66 No Anganwari Centre at Kandi1 |
25% |
-
latitude : 24.83633601
Longitude : 92.25949996
file name : Image_12012021135942496.png
|
2021-01-12 13:59:42.601061 |
61 |
20771339 |
Sl 3 Construction Of Building grant 66 No Anganwari Centre at Kandi |
300000 |
Sl 3 Construction Of Building grant 66 No Anganwari Centre at Kandi1 |
25% |
-
latitude : 24.83633601
Longitude : 92.25949996
file name : Image_12012021135814424.png
|
2021-01-12 13:58:14.53272 |
62 |
20771516 |
1.Construction Of Road at Latu I(Kandi) |
200000 |
1.Construction Of Road at Latu I(Kandi)1 |
Earth Work |
-
latitude : 24.83479774,24.83479774
Longitude : 92.26257096,92.26257096
file name : Image_16092020180315895.png
|
2020-09-16 18:03:15.969484 |
63 |
20771824 |
4 Installation of a Tara Pump near Durga Madop at Latu Bus Stand |
45000 |
4 Installation of a Tara Pump near Durga Madop at Latu Bus Stand1 |
Ground work |
-
latitude : 24.84067451
Longitude : 92.2635096
file name : Image_12012021135809510.png
|
2021-01-12 13:58:09.623531 |
64 |
20771824 |
4 Installation of a Tara Pump near Durga Madop at Latu Bus Stand |
45000 |
4 Installation of a Tara Pump near Durga Madop at Latu Bus Stand1 |
Ground work |
-
latitude : 24.84067451
Longitude : 92.2635096
file name : Image_12012021135935837.png
|
2021-01-12 13:59:35.936664 |
65 |
44287053 |
1st Instl 14Nos Tube well at LAtu KAndi Verious Place ,Near the...Datails Below |
308000 |
1st Instl 14Nos Tube well at LAtu KAndi Verious Place ,Near the...Datails Below1 |
Ground work |
-
latitude : 24.83615302
Longitude : 92.26236716
file name : Image_12012021135959020.png
|
2021-01-12 13:59:59.129371 |
66 |
44287053 |
1st Instl 14Nos Tube well at LAtu KAndi Verious Place ,Near the...Datails Below |
308000 |
1st Instl 14Nos Tube well at LAtu KAndi Verious Place ,Near the...Datails Below1 |
Ground work |
-
latitude : 24.83615302
Longitude : 92.26236716
file name : Image_12012021135826031.png
|
2021-01-12 13:58:26.146463 |
67 |
44287053 |
1st Instl 14Nos Tube well at LAtu KAndi Verious Place ,Near the...Datails Below |
308000 |
1st Instl 14Nos Tube well at LAtu KAndi Verious Place ,Near the...Datails Below2 |
Ground work |
-
latitude : 24.83652759
Longitude : 92.25867799
file name : Image_12012021140006659.png
|
2021-01-12 14:00:06.760631 |
68 |
44287053 |
1st Instl 14Nos Tube well at LAtu KAndi Verious Place ,Near the...Datails Below |
308000 |
1st Instl 14Nos Tube well at LAtu KAndi Verious Place ,Near the...Datails Below2 |
Ground work |
-
latitude : 24.83652759
Longitude : 92.25867799
file name : Image_12012021135833134.png
|
2021-01-12 13:58:33.238531 |
69 |
44286697 |
1st Install 7 Nos Tara Pump Sajpur 10 |
315000 |
1st Install 7 Nos Tara Pump Sajpur 101 |
Ground work |
-
latitude : 24.84589876
Longitude : 92.29646904
file name : Image_17122020144540490.png
|
2020-12-17 14:45:40.596751 |
70 |
44286697 |
1st Install 7 Nos Tara Pump Sajpur 10 |
315000 |
1st Install 7 Nos Tara Pump Sajpur 101 |
Ground work |
-
latitude : 24.84832044
Longitude : 92.29791693
file name : Image_18092020181559360.png
|
2020-09-18 18:15:59.454325 |
71 |
29947334 |
Const of Road Start from Panchayat Road to Arunadoy Swami at Chalidadi |
200000 |
Const of Road Start from Panchayat Road to Arunadoy Swami at Chalidadi 1 |
Earth Work |
-
latitude : 24.844788,24.844788
Longitude : 92.25909759,92.25909759
file name : Image_12012021170057732.png
|
2021-01-12 17:00:57.821786 |
72 |
30001536 |
Instl of 9 Nos Tube well at W/No 6 LATU |
198000 |
Instl of 9 Nos Tube well at W/No 6 LATU 1 |
Ground work |
-
latitude : 24.83948815
Longitude : 92.26059033
file name : Image_12012021140012514.png
|
2021-01-12 14:00:12.615771 |
73 |
30001536 |
Instl of 9 Nos Tube well at W/No 6 LATU |
198000 |
Instl of 9 Nos Tube well at W/No 6 LATU 1 |
Ground work |
-
latitude : 24.83948815
Longitude : 92.26059033
file name : Image_12012021135840440.png
|
2021-01-12 13:58:40.553498 |
74 |
29998983 |
Instl of 21 nos Tube well At Balidara W/no 3 |
462000 |
Instl of 21 nos Tube well At Balidara W/no 31 |
Ground work |
-
latitude : 24.84043535
Longitude : 92.27086107
file name : Image_12012021135728326.png
|
2021-01-12 13:57:28.440125 |
75 |
29998983 |
Instl of 21 nos Tube well At Balidara W/no 3 |
462000 |
Instl of 21 nos Tube well At Balidara W/no 33 |
Ground work |
-
latitude : 24.84087045
Longitude : 92.27158684
file name : Image_12012021135739471.png
|
2021-01-12 13:57:39.571234 |
76 |
29998983 |
Instl of 21 nos Tube well At Balidara W/no 3 |
462000 |
Instl of 21 nos Tube well At Balidara W/no 33 |
Ground work |
-
latitude : 24.84007853
Longitude : 92.27126111
file name : Image_12012021135734265.png
|
2021-01-12 13:57:34.367013 |
77 |
29998983 |
Instl of 21 nos Tube well At Balidara W/no 3 |
462000 |
Instl of 21 nos Tube well At Balidara W/no 33 |
Ground work |
-
latitude : 24.84007853
Longitude : 92.27126111
file name : Image_12012021135855008.png
|
2021-01-12 13:58:55.10719 |
78 |
29998983 |
Instl of 21 nos Tube well At Balidara W/no 3 |
462000 |
Instl of 21 nos Tube well At Balidara W/no 33 |
Ground work |
-
latitude : 24.84087045
Longitude : 92.27158684
file name : Image_12012021135903088.png
|
2021-01-12 13:59:03.188859 |
79 |
29998983 |
Instl of 21 nos Tube well At Balidara W/no 3 |
462000 |
Instl of 21 nos Tube well At Balidara W/no 35 |
Ground work |
-
latitude : 24.84069704
Longitude : 92.27210752
file name : Image_12012021135744456.png
|
2021-01-12 13:57:44.56418 |
80 |
29998983 |
Instl of 21 nos Tube well At Balidara W/no 3 |
462000 |
Instl of 21 nos Tube well At Balidara W/no 35 |
Ground work |
-
latitude : 24.84069704
Longitude : 92.27210752
file name : Image_12012021135909904.png
|
2021-01-12 13:59:10.014866 |
81 |
29998983 |
Instl of 21 nos Tube well At Balidara W/no 3 |
462000 |
Instl of 21 nos Tube well At Balidara W/no 36 |
Ground work |
-
latitude : 24.84084567
Longitude : 92.27274209
file name : Image_12012021135749409.png
|
2021-01-12 13:57:49.511009 |
82 |
29998983 |
Instl of 21 nos Tube well At Balidara W/no 3 |
462000 |
Instl of 21 nos Tube well At Balidara W/no 36 |
Ground work |
-
latitude : 24.84084567
Longitude : 92.27274209
file name : Image_12012021135915449.png
|
2021-01-12 13:59:15.554521 |
83 |
29947156 |
Const of Road start from PWD road to the Bank of the River Longai Via Dasgram M.E School |
240000 |
Const of Road start from PWD road to the Bank of the River Longai Via Dasgram M.E School 1 |
25% |
-
latitude : 24.85348513,24.85348587
Longitude : 92.27676204,92.27676245
file name : Image_18112020215404534.png
|
2020-11-18 21:54:04.659264 |
84 |
29946892 |
Sl 1 w1 const of road stat from Khali uddin house to Ashik Ali house via niyaj Ali chalihadi |
240000 |
Sl 1 w1 const of road stat from Khali uddin house to Ashik Ali house via niyaj Ali chalihadi1 |
Earth Work |
-
latitude : 24.8482,24.8482
Longitude : 92.26054203,92.26054203
file name : Image_12012021125256420.png
|
2021-01-12 12:52:56.520679 |
85 |
30002195 |
53 117 1st Instl of 2Nos Tara Pump at W/No6 Latu |
90000 |
53 117 1st Instl of 2Nos Tara Pump at W/No6 Latu 1 |
Ground work |
-
latitude : 24.83951118
Longitude : 92.267003
file name : Image_12012021135759453.png
|
2021-01-12 13:57:59.573406 |
86 |
30002195 |
53 117 1st Instl of 2Nos Tara Pump at W/No6 Latu |
90000 |
53 117 1st Instl of 2Nos Tara Pump at W/No6 Latu 1 |
Ground work |
-
latitude : 24.83951118
Longitude : 92.267003
file name : Image_12012021135926571.png
|
2021-01-12 13:59:26.669116 |
87 |
29947300 |
13 Repairing Of Anganwari Building Grant Near the School of 1287 No. Madhya Sajpur LP School ,W/No |
120000 |
13 Repairing Of Anganwari Building Grant Near the School of 1287 No. Madhya Sajpur LP School ,W/No1 |
25% |
-
latitude : 24.85063961
Longitude : 92.29331967
file name : Image_24112020153100249.png
|
2020-11-24 15:31:00.344941 |
88 |
44286445 |
Instl Tube well Near MAkhan NAmasudra LAtu 5 |
22000 |
Instl Tube well Near MAkhan NAmasudra LAtu 51 |
Ground work |
-
latitude : 24.84401808
Longitude : 92.25809842
file name : Image_12012021135847962.png
|
2021-01-12 13:58:48.09353 |
89 |
44286445 |
Instl Tube well Near MAkhan NAmasudra LAtu 5 |
22000 |
Instl Tube well Near MAkhan NAmasudra LAtu 51 |
Ground work |
-
latitude : 24.84401808
Longitude : 92.25809842
file name : Image_12012021140019262.png
|
2021-01-12 14:00:19.35872 |
90 |
29947015 |
const of road stat from Ashutosh Dhar Shop toSunai MIA house with Guard wall ,Balidara w-3 |
240000 |
const of road stat from Ashutosh Dhar Shop toSunai MIA house with Guard wall ,Balidara w-31 |
25% |
-
latitude : 24.83284299,24.83283481
Longitude : 92.27536048,92.27535495
file name : Image_12012021125342167.png
|
2021-01-12 12:53:42.274323 |
91 |
29947131 |
const of Road start from P.W.D rd to Paritosh Das house,with RCC Drain both side at Latu |
327000 |
const of Road start from P.W.D rd to Paritosh Das house,with RCC Drain both side at Latu 1 |
Earth Work |
-
latitude : 24.84030724,24.84030724,24.84036084,24.84032885
Longitude : 92.26683434,92.26683434,92.26457877,92.26453409
file name : Image_12012021135931277.png
|
2021-01-12 13:59:31.36999 |
92 |
29947131 |
const of Road start from P.W.D rd to Paritosh Das house,with RCC Drain both side at Latu |
327000 |
const of Road start from P.W.D rd to Paritosh Das house,with RCC Drain both side at Latu 1 |
Earth Work |
-
latitude : 24.84030724,24.84030724,24.84036084,24.84032885
Longitude : 92.26683434,92.26683434,92.26457877,92.26453409
file name : Image_12012021135804653.png
|
2021-01-12 13:58:04.769033 |
93 |
75562259 |
UT22 B wall Balidara LP school ward 03 |
160000 |
UT22 B wall Balidara LP school ward 031 |
Plinth level |
-
latitude : 24.839793333333333
Longitude : 92.27061166666665
file name : Image_05102023222015207.png
|
2023-10-05 22:20:15.335477 |
94 |
75562259 |
UT22 B wall Balidara LP school ward 03 |
160000 |
UT22 B wall Balidara LP school ward 031 |
Plinth level |
-
latitude : 24.839793333333333
Longitude : 92.27061166666665
file name : Image_05102023221736651.png
|
2023-10-05 22:17:36.776342 |
95 |
75562259 |
UT22 B wall Balidara LP school ward 03 |
160000 |
UT22 B wall Balidara LP school ward 031 |
Completion of work |
-
latitude : 24.839706666666665
Longitude : 92.27056833333333
file name : Image_05062023144502963.png
|
2023-06-05 14:45:03.071496 |
96 |
66001045 |
Operation & maintenance of drinking water supply system |
700250 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.851013333333338
Longitude : 92.25134833333335
file name : Image_17032023124833169.png
|
2023-03-17 12:48:33.262194 |
97 |
63884070 |
B7 CC rd PWD to River Longai w7 Via Dasgram ME |
100000 |
B7 CC rd PWD to River Longai w7 Via Dasgram ME 1 |
Roof laid |
-
latitude : 24.85342166666667,24.853425
Longitude : 92.27727833333331,92.27728333333334
file name : Image_12122022164944588.png
|
2022-12-12 16:49:44.710432 |
98 |
63884070 |
B7 CC rd PWD to River Longai w7 Via Dasgram ME |
100000 |
B7 CC rd PWD to River Longai w7 Via Dasgram ME 1 |
Plinth level |
-
latitude : 24.853388333333335,24.853388333333335
Longitude : 92.27728499999999,92.27728499999999
file name : Image_01112022134003145.png
|
2022-11-01 13:40:03.266287 |
99 |
63884070 |
B7 CC rd PWD to River Longai w7 Via Dasgram ME |
100000 |
B7 CC rd PWD to River Longai w7 Via Dasgram ME 1 |
Completion of work |
-
latitude : 24.853445000000004,24.853445000000004
Longitude : 92.27720833333333,92.27720833333333
file name : Image_13072022152112508.png
|
2022-07-13 15:21:12.605238 |
100 |
63884213 |
B16 office expenses Un |
70056 |
B16 office expenses Un1 |
Completion of work |
-
latitude : 24.853636666666663
Longitude : 92.276935
file name : Image_11012023155005167.png
|
2023-01-11 15:50:05.357654 |
101 |
63882267 |
A6 Water Tank Pipe Con Latu Kalibari W1 |
230000 |
A6 Water Tank Pipe Con Latu Kalibari W11 |
Roof laid |
-
latitude : 24.843815000000003
Longitude : 92.263615
file name : Image_11022023085829643.png
|
2023-02-11 08:58:29.754686 |
102 |
63882267 |
A6 Water Tank Pipe Con Latu Kalibari W1 |
230000 |
A6 Water Tank Pipe Con Latu Kalibari W11 |
Plinth level |
-
latitude : 24.84380833333333
Longitude : 92.26367166666665
file name : Image_11012023155000438.png
|
2023-01-11 15:50:00.545058 |
103 |
63882267 |
A6 Water Tank Pipe Con Latu Kalibari W1 |
230000 |
A6 Water Tank Pipe Con Latu Kalibari W11 |
Completion of work |
-
latitude : 24.84391333333333
Longitude : 92.26356499999999
file name : Image_28112022143848581.png
|
2022-11-28 14:38:48.697727 |
104 |
66000976 |
Creation of drainage channel for management of grey water |
190000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.854243333333336
Longitude : 92.29349833333332
file name : Image_07112023201653850.png
|
2023-11-07 20:16:53.942942 |
105 |
66000976 |
Creation of drainage channel for management of grey water |
190000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.854229999999998
Longitude : 92.29354333333335
file name : Image_23052023141315811.png
|
2023-05-23 14:13:15.897818 |
106 |
66001215 |
UT1 20 21 2nd Boundary Wall at Chalihadi LP School W1 |
206644 |
UT1 20 21 2nd Boundary Wall at Chalihadi LP School W11 |
Roof laid |
-
latitude : 24.84689166666667
Longitude : 92.26283
file name : Image_07112023201929338.png
|
2023-11-07 20:19:29.496554 |
107 |
66001215 |
UT1 20 21 2nd Boundary Wall at Chalihadi LP School W1 |
206644 |
UT1 20 21 2nd Boundary Wall at Chalihadi LP School W11 |
Plinth level |
-
latitude : 24.846896666666666
Longitude : 92.26264666666665
file name : Image_05102023221241396.png
|
2023-10-05 22:12:41.488447 |
108 |
66001215 |
UT1 20 21 2nd Boundary Wall at Chalihadi LP School W1 |
206644 |
UT1 20 21 2nd Boundary Wall at Chalihadi LP School W11 |
Completion of work |
-
latitude : 24.846766666666667
Longitude : 92.26254166666668
file name : Image_23052023134409155.png
|
2023-05-23 13:44:09.259003 |
109 |
66002480 |
UT6 20 21 2nd Solar Light Balidara Kalimandir Ward3 |
44800 |
UT6 20 21 2nd Solar Light Balidara Kalimandir Ward31 |
Completion of work |
-
latitude : 24.84346833333333
Longitude : 92.27196166666666
file name : Image_23052023133021006.png
|
2023-05-23 13:30:21.166439 |
110 |
66002493 |
UT8 20 21 2nd Solar Light Latu Mini PHC latu6 |
44800 |
UT8 20 21 2nd Solar Light Latu Mini PHC latu61 |
Plinth level |
-
latitude : 24.84107
Longitude : 92.25768000000001
file name : Image_05102023222026495.png
|
2023-10-05 22:20:26.478744 |
111 |
66002493 |
UT8 20 21 2nd Solar Light Latu Mini PHC latu6 |
44800 |
UT8 20 21 2nd Solar Light Latu Mini PHC latu61 |
Plinth level |
-
latitude : 24.84107
Longitude : 92.25768000000001
file name : Image_05102023221750505.png
|
2023-10-05 22:17:50.608006 |
112 |
66002493 |
UT8 20 21 2nd Solar Light Latu Mini PHC latu6 |
44800 |
UT8 20 21 2nd Solar Light Latu Mini PHC latu61 |
Completion of work |
-
latitude : 24.840511666666664
Longitude : 92.25752666666668
file name : Image_23052023124923249.png
|
2023-05-23 12:49:23.369225 |
113 |
63882157 |
A1 Comunity Material Collection Lal Bhaturi w7 |
180000 |
A1 Comunity Material Collection Lal Bhaturi w71 |
Roof laid |
-
latitude : 24.846839999999997
Longitude : 92.26862666666666
file name : Image_05102023221039175.png
|
2023-10-05 22:10:39.275521 |
114 |
63882157 |
A1 Comunity Material Collection Lal Bhaturi w7 |
180000 |
A1 Comunity Material Collection Lal Bhaturi w71 |
Plinth level |
-
latitude : 24.851148333333338
Longitude : 92.25115499999998
file name : Image_04102023203548635.png
|
2023-10-04 20:35:48.725624 |
115 |
63882157 |
A1 Comunity Material Collection Lal Bhaturi w7 |
180000 |
A1 Comunity Material Collection Lal Bhaturi w71 |
Completion of work |
-
latitude : 24.846940000000004
Longitude : 92.26881999999999
file name : Image_23052023134836223.png
|
2023-05-23 13:48:36.350443 |
116 |
65979408 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.83995333333333
Longitude : 92.25737499999998
file name : Image_12022024160034799.png
|
2024-02-12 16:00:34.918539 |
117 |
65979408 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.839851666666664
Longitude : 92.25729000000001
file name : Image_15052023145731279.png
|
2023-05-15 14:57:31.380711 |
118 |
63882170 |
A2 Sanitation Kandi Malegarh Hafijia Masjid w2 |
98100 |
A2 Sanitation Kandi Malegarh Hafijia Masjid w21 |
Plinth level |
-
latitude : 24.836283333333334
Longitude : 92.25430999999999
file name : Image_20022024000123526.png
|
2024-02-20 00:01:23.675877 |
119 |
63882170 |
A2 Sanitation Kandi Malegarh Hafijia Masjid w2 |
98100 |
A2 Sanitation Kandi Malegarh Hafijia Masjid w21 |
Completion of work |
-
latitude : 24.83635
Longitude : 92.254175
file name : Image_15052023160122473.png
|
2023-05-15 16:01:22.562803 |
120 |
66001252 |
UT2 20 21 2nd Const of Boundary Wall at 1347 No. Abdul Hamid Memorial LP School Latu Kandi Ward 2 |
150000 |
UT2 20 21 2nd Const of Boundary Wall at 1347 No. Abdul Hamid Memorial LP School Latu Kandi Ward 21 |
Plinth level |
-
latitude : 24.8358534
Longitude : 92.2601159
file name : Image_05102023221351373.png
|
2023-10-05 22:13:51.478085 |
121 |
66001252 |
UT2 20 21 2nd Const of Boundary Wall at 1347 No. Abdul Hamid Memorial LP School Latu Kandi Ward 2 |
150000 |
UT2 20 21 2nd Const of Boundary Wall at 1347 No. Abdul Hamid Memorial LP School Latu Kandi Ward 21 |
Completion of work |
-
latitude : 24.836520000000004
Longitude : 92.25951833333332
file name : Image_23052023132424048.png
|
2023-05-23 13:24:24.14282 |
122 |
75574528 |
Greywater management system |
200000 |
Greywater management system1 |
Plinth level |
-
latitude : 24.834833333333336
Longitude : 92.26327833333335
file name : Image_05102023221401137.png
|
2023-10-05 22:14:01.235668 |
123 |
75574528 |
Greywater management system |
200000 |
Greywater management system1 |
Completion of work |
-
latitude : 24.834843333333332
Longitude : 92.26320499999999
file name : Image_17072023142213532.png
|
2023-07-17 14:22:13.62278 |
124 |
75574528 |
Greywater management system |
200000 |
Greywater management system1 |
Completion of work |
-
latitude : 24.835006666666665
Longitude : 92.26256
file name : Image_05062023135223745.png
|
2023-06-05 13:52:23.863347 |
125 |
75574808 |
UT30 Rd Panchayat Rd to Arunaday Swami w1 |
164200 |
UT30 Rd Panchayat Rd to Arunaday Swami w11 |
Plinth level |
-
latitude : 24.844864999999995,24.844864999999995
Longitude : 92.258795,92.258795
file name : Image_05102023221257589.png
|
2023-10-05 22:12:57.679906 |
126 |
75574808 |
UT30 Rd Panchayat Rd to Arunaday Swami w1 |
164200 |
UT30 Rd Panchayat Rd to Arunaday Swami w11 |
Completion of work |
-
latitude : 24.844821666666668,24.844821666666668
Longitude : 92.25857833333333,92.25857833333333
file name : Image_05062023135102747.png
|
2023-06-05 13:51:02.857786 |
127 |
75575029 |
UT34 A Install Solar st Light Balidara Point W3 |
44800 |
UT34 A Install Solar st Light Balidara Point W31 |
Plinth level |
-
latitude : 24.835053333333335
Longitude : 92.27333500000002
file name : Image_05102023221821989.png
|
2023-10-05 22:18:22.107732 |
128 |
75575029 |
UT34 A Install Solar st Light Balidara Point W3 |
44800 |
UT34 A Install Solar st Light Balidara Point W31 |
Completion of work |
-
latitude : 24.835040000000003
Longitude : 92.273405
file name : Image_05062023144448868.png
|
2023-06-05 14:44:48.97713 |
129 |
75575084 |
UT34 B Install Solar St Light Rahatpur w9 |
44800 |
UT34 B Install Solar St Light Rahatpur w91 |
Roof laid |
-
latitude : 24.85009
Longitude : 92.283225
file name : Image_07112023201757440.png
|
2023-11-07 20:17:57.658363 |
130 |
75575084 |
UT34 B Install Solar St Light Rahatpur w9 |
44800 |
UT34 B Install Solar St Light Rahatpur w91 |
Plinth level |
-
latitude : 24.85015166666667
Longitude : 92.28310166666667
file name : Image_05102023221014679.png
|
2023-10-05 22:10:14.860401 |
131 |
75575084 |
UT34 B Install Solar St Light Rahatpur w9 |
44800 |
UT34 B Install Solar St Light Rahatpur w91 |
Completion of work |
-
latitude : 24.850009999999997
Longitude : 92.28294833333332
file name : Image_05062023144531051.png
|
2023-06-05 14:45:31.14236 |
132 |
75574873 |
UT31 Renv 69 AwC Building Latu Girls Lp W6 |
150000 |
UT31 Renv 69 AwC Building Latu Girls Lp W61 |
Plinth level |
-
latitude : 24.841504999999998
Longitude : 92.259745
file name : Image_05102023221314778.png
|
2023-10-05 22:13:14.855819 |
133 |
75574873 |
UT31 Renv 69 AwC Building Latu Girls Lp W6 |
150000 |
UT31 Renv 69 AwC Building Latu Girls Lp W61 |
Completion of work |
-
latitude : 24.841424999999997
Longitude : 92.25975833333332
file name : Image_05062023135413114.png
|
2023-06-05 13:54:13.250362 |
134 |
66001276 |
UT3 20 21 2nd Renovation Latu Police Out Post Ward 5 |
300000 |
UT3 20 21 2nd Renovation Latu Police Out Post Ward 51 |
Plinth level |
-
latitude : 24.839331666666666
Longitude : 92.26153500000001
file name : Image_05102023221332936.png
|
2023-10-05 22:13:33.046624 |
135 |
66001276 |
UT3 20 21 2nd Renovation Latu Police Out Post Ward 5 |
300000 |
UT3 20 21 2nd Renovation Latu Police Out Post Ward 51 |
Completion of work |
-
latitude : 24.839336666666668
Longitude : 92.26148666666668
file name : Image_23052023132418905.png
|
2023-05-23 13:24:19.035799 |
136 |
75562120 |
UT21 road Pacahayat rd to Indrajit Das w1 |
173150 |
UT21 road Pacahayat rd to Indrajit Das w11 |
Completion of work |
-
latitude : 24.845103333333334,24.845103333333334
Longitude : 92.25938,92.25938
file name : Image_05102023221249682.png
|
2023-10-05 22:12:49.857648 |
137 |
75562120 |
UT21 road Pacahayat rd to Indrajit Das w1 |
173150 |
UT21 road Pacahayat rd to Indrajit Das w11 |
Completion of work |
-
latitude : 24.84520166666667,24.84520166666667
Longitude : 92.25943333333335,92.25943333333335
file name : Image_05062023135055272.png
|
2023-06-05 13:50:56.699236 |
138 |
75574918 |
UT32 Rep Renv Dasgram AWC W7 |
150000 |
UT32 Rep Renv Dasgram AWC W71 |
Roof laid |
-
latitude : 24.853658333333335
Longitude : 92.27660166666668
file name : Image_30102023155515138.png
|
2023-10-30 15:55:15.50963 |
139 |
75574918 |
UT32 Rep Renv Dasgram AWC W7 |
150000 |
UT32 Rep Renv Dasgram AWC W71 |
Plinth level |
-
latitude : 24.853743333333334
Longitude : 92.27659999999999
file name : Image_05102023221001080.png
|
2023-10-05 22:10:01.224977 |
140 |
75574918 |
UT32 Rep Renv Dasgram AWC W7 |
150000 |
UT32 Rep Renv Dasgram AWC W71 |
Completion of work |
-
latitude : 24.853616666666667
Longitude : 92.27675666666667
file name : Image_05062023144516706.png
|
2023-06-05 14:45:16.843939 |
141 |
79721392 |
Operation & maintenance of drinking water supply system |
621500 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.85773,24.85773
Longitude : 92.27662000000001,92.27662000000001
file name : Image_04022024230335860.png
|
2024-02-04 23:03:35.971894 |
142 |
66001347 |
UT5 20 21 2nd RD & Guard Wall near 978 No. Sajpur LP School ward 10 |
250000 |
UT5 20 21 2nd RD & Guard Wall near 978 No. Sajpur LP School ward 101 |
Plinth level |
-
latitude : 24.85052333333333,24.85052333333333
Longitude : 92.29376166666667,92.29376166666667
file name : Image_07112023201722841.png
|
2023-11-07 20:17:22.982575 |
143 |
66001347 |
UT5 20 21 2nd RD & Guard Wall near 978 No. Sajpur LP School ward 10 |
250000 |
UT5 20 21 2nd RD & Guard Wall near 978 No. Sajpur LP School ward 101 |
Completion of work |
-
latitude : 24.850468333333332,24.850468333333332
Longitude : 92.29377166666667,92.29377166666667
file name : Image_23052023140639577.png
|
2023-05-23 14:06:39.670907 |
144 |
75562359 |
UT23 Rd PWD to Latu Model H S Schl w4 |
160000 |
UT23 Rd PWD to Latu Model H S Schl w41 |
Roof laid |
-
latitude : 24.8407098,24.8407098
Longitude : 92.2576542,92.2576542
file name : Image_10112023133735764.png
|
2023-11-10 13:37:35.876256 |
145 |
75562359 |
UT23 Rd PWD to Latu Model H S Schl w4 |
160000 |
UT23 Rd PWD to Latu Model H S Schl w41 |
Plinth level |
-
latitude : 24.84077333333333,24.84077333333333
Longitude : 92.25857666666667,92.25857666666667
file name : Image_10112023133307287.png
|
2023-11-10 13:33:07.399452 |
146 |
75562359 |
UT23 Rd PWD to Latu Model H S Schl w4 |
160000 |
UT23 Rd PWD to Latu Model H S Schl w41 |
Completion of work |
-
latitude : 24.840783333333334,24.840783333333334
Longitude : 92.25846166666666,92.25846166666666
file name : Image_05062023135111415.png
|
2023-06-05 13:51:11.523691 |
147 |
75562817 |
UT25 a Install Solar Street latu Mini PHC W6 |
44800 |
UT25 a Install Solar Street latu Mini PHC W61 |
Plinth level |
-
latitude : 24.84045833333333
Longitude : 92.25744333333333
file name : Image_05102023222131844.png
|
2023-10-05 22:21:31.956536 |
148 |
75562817 |
UT25 a Install Solar Street latu Mini PHC W6 |
44800 |
UT25 a Install Solar Street latu Mini PHC W61 |
Plinth level |
-
latitude : 24.84045833333333
Longitude : 92.25744333333333
file name : Image_05102023221800972.png
|
2023-10-05 22:18:01.078854 |
149 |
75562817 |
UT25 a Install Solar Street latu Mini PHC W6 |
44800 |
UT25 a Install Solar Street latu Mini PHC W61 |
Completion of work |
-
latitude : 24.841096666666665
Longitude : 92.25760666666665
file name : Image_05062023134958053.png
|
2023-06-05 13:49:58.170551 |
150 |
66000938 |
Creation of drainage channel for management of grey water |
134050 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.841135
Longitude : 92.25994833333334
file name : Image_05102023221323610.png
|
2023-10-05 22:13:23.698242 |
151 |
66000938 |
Creation of drainage channel for management of grey water |
134050 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.84108833333333
Longitude : 92.260125
file name : Image_23052023132414189.png
|
2023-05-23 13:24:14.293356 |
152 |
75574392 |
UT25 B Inastall Solar Light Dasgram Hospital w7 |
44800 |
UT25 B Inastall Solar Light Dasgram Hospital w71 |
Roof laid |
-
latitude : 24.851423333333333
Longitude : 92.27867499999999
file name : Image_07112023201838214.png
|
2023-11-07 20:18:38.319079 |
153 |
75574392 |
UT25 B Inastall Solar Light Dasgram Hospital w7 |
44800 |
UT25 B Inastall Solar Light Dasgram Hospital w71 |
Plinth level |
-
latitude : 24.851470000000003
Longitude : 92.27863
file name : Image_05102023221022133.png
|
2023-10-05 22:10:22.248212 |
154 |
75574392 |
UT25 B Inastall Solar Light Dasgram Hospital w7 |
44800 |
UT25 B Inastall Solar Light Dasgram Hospital w71 |
Completion of work |
-
latitude : 24.851294999999997
Longitude : 92.27848333333334
file name : Image_05062023144523840.png
|
2023-06-05 14:45:23.928513 |
155 |
75574710 |
Greywater management system |
233350 |
Greywater management system1 |
Plinth level |
-
latitude : 24.841516666666667
Longitude : 92.25912000000001
file name : Image_05102023221307354.png
|
2023-10-05 22:13:07.445836 |
156 |
75574710 |
Greywater management system |
233350 |
Greywater management system1 |
Completion of work |
-
latitude : 24.841486666666665
Longitude : 92.25911166666668
file name : Image_05062023135210429.png
|
2023-06-05 13:52:10.634093 |
157 |
88158997 |
Creation of drainage channel for management of grey water |
192000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.84107
Longitude : 92.25981333333333
file name : Image_02022024110527638.png
|
2024-02-02 11:05:27.72979 |
158 |
88158997 |
Creation of drainage channel for management of grey water |
192000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.841068333333336
Longitude : 92.25987833333332
file name : Image_13112023145951959.png
|
2023-11-13 14:59:52.042473 |
159 |
88159017 |
Creation of drainage channel for management of grey water |
297375 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.836281666666665
Longitude : 92.25487
file name : Image_05022024144328272.png
|
2024-02-05 14:43:28.372468 |
160 |
88159017 |
Creation of drainage channel for management of grey water |
297375 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.8366642
Longitude : 92.2555004
file name : Image_13112023145944139.png
|
2023-11-13 14:59:44.210925 |
161 |
88159042 |
UT55 Const community Modan Mohan Bari w5 |
269500 |
UT55 Const community Modan Mohan Bari w51 |
Plinth level |
-
latitude : 24.83828
Longitude : 92.26110833333333
file name : Image_20022024000108419.png
|
2024-02-20 00:01:08.590346 |
162 |
88159042 |
UT55 Const community Modan Mohan Bari w5 |
269500 |
UT55 Const community Modan Mohan Bari w51 |
Completion of work |
-
latitude : 24.838198333333334
Longitude : 92.26117666666666
file name : Image_13112023145931726.png
|
2023-11-13 14:59:31.810881 |
163 |
88159098 |
UT56 B wall Fatepur LP W7 |
200000 |
UT56 B wall Fatepur LP W71 |
Plinth level |
-
latitude : 24.850686666666668
Longitude : 92.27011833333333
file name : Image_01022024153800714.png
|
2024-02-01 15:38:00.811973 |
164 |
88159098 |
UT56 B wall Fatepur LP W7 |
200000 |
UT56 B wall Fatepur LP W71 |
Completion of work |
-
latitude : 24.850500000000004
Longitude : 92.27008333333333
file name : Image_13112023145837938.png
|
2023-11-13 14:58:38.026008 |
165 |
88159136 |
UT57 Const Kitchen 978 Rahatpur LP W8 |
155200 |
UT57 Const Kitchen 978 Rahatpur LP W81 |
Plinth level |
-
latitude : 24.85052
Longitude : 92.28412666666667
file name : Image_20022024000052249.png
|
2024-02-20 00:00:52.342498 |
166 |
88159136 |
UT57 Const Kitchen 978 Rahatpur LP W8 |
155200 |
UT57 Const Kitchen 978 Rahatpur LP W81 |
Completion of work |
-
latitude : 24.850410000000004
Longitude : 92.28423
file name : Image_13112023145909061.png
|
2023-11-13 14:59:09.187088 |
167 |
88159169 |
UT58 Rd Start Panchayat rd to Abdul Manaf w8 |
100000 |
UT58 Rd Start Panchayat rd to Abdul Manaf w81 |
Completion of work |
-
latitude : 24.850814999999997,24.850814999999997
Longitude : 92.28481833333332,92.28481833333332
file name : Image_13112023145859951.png
|
2023-11-13 14:59:00.035139 |
168 |
88159449 |
Creation of drainage channel for management of grey water |
450000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.84393166666667
Longitude : 92.26402666666667
file name : Image_12022024160147751.png
|
2024-02-12 16:01:47.851348 |
169 |
88159449 |
Creation of drainage channel for management of grey water |
450000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.843881666666668
Longitude : 92.26454166666666
file name : Image_13112023145918419.png
|
2023-11-13 14:59:18.50102 |
170 |
88159484 |
Creation of drainage channel for management of grey water |
127125 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.840183333333336
Longitude : 92.25717000000002
file name : Image_12022024160051182.png
|
2024-02-12 16:00:51.2582 |
171 |
88159484 |
Creation of drainage channel for management of grey water |
127125 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.840439999999997
Longitude : 92.25716166666668
file name : Image_13112023145956242.png
|
2023-11-13 14:59:56.359738 |
172 |
88159601 |
UT63 REpair Chalihadi AWC Chalihadi w1 PhII |
170800 |
UT63 REpair Chalihadi AWC Chalihadi w1 PhII1 |
Plinth level |
-
latitude : 24.846641666666663
Longitude : 92.26231333333332
file name : Image_12022024160017520.png
|
2024-02-12 16:00:17.614682 |
173 |
88159601 |
UT63 REpair Chalihadi AWC Chalihadi w1 PhII |
170800 |
UT63 REpair Chalihadi AWC Chalihadi w1 PhII1 |
Completion of work |
-
latitude : 24.846625000000003
Longitude : 92.26261833333335
file name : Image_13112023145833708.png
|
2023-11-13 14:58:33.803976 |
174 |
88159631 |
UT64 Rd Panchayat rd to Indrajit Das w1 PH 2 |
169500 |
UT64 Rd Panchayat rd to Indrajit Das w1 PH 21 |
Completion of work |
-
latitude : 24.84485666666667,24.84485666666667
Longitude : 92.259645,92.259645
file name : Image_13112023145829291.png
|
2023-11-13 14:58:29.379787 |
175 |
88159418 |
5 nos Install Solar street Latu |
224000 |
5 nos Install Solar street Latu 1 |
Plinth level |
-
latitude : 24.849024999999997
Longitude : 92.29498166666666
file name : Image_20022024000040382.png
|
2024-02-20 00:00:40.498204 |
176 |
88159418 |
5 nos Install Solar street Latu |
224000 |
5 nos Install Solar street Latu 1 |
Completion of work |
-
latitude : 24.849113333333335
Longitude : 92.29512333333332
file name : Image_13112023145850930.png
|
2023-11-13 14:58:51.012509 |
177 |
88159418 |
5 nos Install Solar street Latu |
224000 |
5 nos Install Solar street Latu 2 |
Plinth level |
-
latitude : 24.841158333333336
Longitude : 92.25714166666667
file name : Image_20022024000114078.png
|
2024-02-20 00:01:14.174118 |
178 |
88159418 |
5 nos Install Solar street Latu |
224000 |
5 nos Install Solar street Latu 2 |
Completion of work |
-
latitude : 24.841111666666666
Longitude : 92.257085
file name : Image_13112023150004858.png
|
2023-11-13 15:00:04.935988 |
179 |
66002528 |
UT11 20 21 2nd Vollyball Playground Latu High School |
31500 |
UT11 20 21 2nd Vollyball Playground Latu High School1 |
Roof laid |
-
latitude : 24.842200000000002,24.842200000000002
Longitude : 92.257665,92.257665
file name : Image_05062023151611442.png
|
2023-06-05 15:16:11.543055 |
180 |
66002528 |
UT11 20 21 2nd Vollyball Playground Latu High School |
31500 |
UT11 20 21 2nd Vollyball Playground Latu High School1 |
Completion of work |
-
latitude : 24.842188333333336,24.842188333333336
Longitude : 92.25764833333332,92.25764833333332
file name : Image_23052023124910600.png
|
2023-05-23 12:49:10.728948 |
181 |
63882245 |
A5 Drain Soiyad Mataur Rahman to Ajoy Mlkr Latu 5 |
190000 |
A5 Drain Soiyad Mataur Rahman to Ajoy Mlkr Latu 51 |
Roof laid |
-
latitude : 24.841511666666666,24.84152
Longitude : 92.25902666666667,92.25902333333333
file name : Image_20032023125534851.png
|
2023-03-20 12:55:34.94946 |
182 |
63882245 |
A5 Drain Soiyad Mataur Rahman to Ajoy Mlkr Latu 5 |
190000 |
A5 Drain Soiyad Mataur Rahman to Ajoy Mlkr Latu 51 |
Plinth level |
-
latitude : 24.84152333333333,24.84152333333333
Longitude : 92.25907166666666,92.25907166666666
file name : Image_17022023151936861.png
|
2023-02-17 15:19:36.949867 |
183 |
63882245 |
A5 Drain Soiyad Mataur Rahman to Ajoy Mlkr Latu 5 |
190000 |
A5 Drain Soiyad Mataur Rahman to Ajoy Mlkr Latu 51 |
Completion of work |
-
latitude : 24.841383333333336,24.841383333333336
Longitude : 92.25942166666667,92.25942166666667
file name : Image_28112022141627976.png
|
2022-11-28 14:16:28.070458 |
184 |
63882303 |
A7 Water tank Pipe Collection Latu Mini PHC W6 |
230000 |
A7 Water tank Pipe Collection Latu Mini PHC W61 |
Roof laid |
-
latitude : 24.840154999999996
Longitude : 92.25713166666668
file name : Image_08052023144657141.png
|
2023-05-08 14:46:57.30834 |
185 |
63882303 |
A7 Water tank Pipe Collection Latu Mini PHC W6 |
230000 |
A7 Water tank Pipe Collection Latu Mini PHC W61 |
Plinth level |
-
latitude : 24.840196666666664
Longitude : 92.25712833333334
file name : Image_17022023144403488.png
|
2023-02-17 14:44:03.621949 |
186 |
63882303 |
A7 Water tank Pipe Collection Latu Mini PHC W6 |
230000 |
A7 Water tank Pipe Collection Latu Mini PHC W61 |
Completion of work |
-
latitude : 24.840145
Longitude : 92.25715833333334
file name : Image_28112022141226627.png
|
2022-11-28 14:12:26.727684 |
187 |
63882325 |
B1 CC rd Khalil Uddin to Asik Ali w1 |
111690 |
B1 CC rd Khalil Uddin to Asik Ali w11 |
Roof laid |
-
latitude : 24.848124999999996,24.848124999999996
Longitude : 92.260515,92.260515
file name : Image_16122022160427372.png
|
2022-12-16 16:04:27.612324 |
188 |
63882325 |
B1 CC rd Khalil Uddin to Asik Ali w1 |
111690 |
B1 CC rd Khalil Uddin to Asik Ali w11 |
Plinth level |
-
latitude : 24.84826666666667,24.84826666666667
Longitude : 92.26076666666668,92.26076666666668
file name : Image_01112022144916408.png
|
2022-11-01 14:49:16.531635 |
189 |
63882325 |
B1 CC rd Khalil Uddin to Asik Ali w1 |
111690 |
B1 CC rd Khalil Uddin to Asik Ali w11 |
Completion of work |
-
latitude : 24.848139999999997,24.848139999999997
Longitude : 92.26053333333333,92.26053333333333
file name : Image_13072022152052463.png
|
2022-07-13 15:20:52.558709 |
190 |
63882342 |
B2 CC rd NRP to Belal Uddin Kandi |
100000 |
B2 CC rd NRP to Belal Uddin Kandi1 |
Roof laid |
-
latitude : 24.834819999999997,24.834819999999997
Longitude : 92.26249166666666,92.26249166666666
file name : Image_04012023114452806.png
|
2023-01-04 11:44:52.911771 |
191 |
63882342 |
B2 CC rd NRP to Belal Uddin Kandi |
100000 |
B2 CC rd NRP to Belal Uddin Kandi1 |
Completion of work |
-
latitude : 24.834830000000004,24.834830000000004
Longitude : 92.26256666666669,92.26256666666669
file name : Image_01112022133857460.png
|
2022-11-01 13:38:57.587313 |
192 |
63882342 |
B2 CC rd NRP to Belal Uddin Kandi |
100000 |
B2 CC rd NRP to Belal Uddin Kandi1 |
Completion of work |
-
latitude : 24.83488,24.83488
Longitude : 92.26265333333335,92.26265333333335
file name : Image_13072022152043977.png
|
2022-07-13 15:20:44.078446 |
193 |
63884087 |
B8 CC rd PWD to 978 Rahatpur LP W8 |
100000 |
B8 CC rd PWD to 978 Rahatpur LP W81 |
Roof laid |
-
latitude : 24.85001333333333,24.85001333333333
Longitude : 92.28419166666666,92.28419166666666
file name : Image_12122022165423972.png
|
2022-12-12 16:54:24.100626 |
194 |
63884087 |
B8 CC rd PWD to 978 Rahatpur LP W8 |
100000 |
B8 CC rd PWD to 978 Rahatpur LP W81 |
Plinth level |
-
latitude : 24.850020000000004,24.850020000000004
Longitude : 92.28417166666668,92.28417166666668
file name : Image_01112022134023827.png
|
2022-11-01 13:40:23.944481 |
195 |
63884087 |
B8 CC rd PWD to 978 Rahatpur LP W8 |
100000 |
B8 CC rd PWD to 978 Rahatpur LP W81 |
Completion of work |
-
latitude : 24.85013666666667,24.85013666666667
Longitude : 92.284195,92.284195
file name : Image_15072022145916305.png
|
2022-07-15 14:59:16.427338 |
196 |
63884024 |
B3 CC rd Pachayat Rd to Abdul Matin Balidara |
100000 |
B3 CC rd Pachayat Rd to Abdul Matin Balidara1 |
Roof laid |
-
latitude : 24.84605333333333,24.846049999999998
Longitude : 92.27342333333333,92.27342833333333
file name : Image_12122022131239398.png
|
2022-12-12 13:12:39.52142 |
197 |
63884024 |
B3 CC rd Pachayat Rd to Abdul Matin Balidara |
100000 |
B3 CC rd Pachayat Rd to Abdul Matin Balidara1 |
Plinth level |
-
latitude : 24.84588666666667,24.84588666666667
Longitude : 92.27346666666666,92.27346666666666
file name : Image_01112022133925129.png
|
2022-11-01 13:39:25.238553 |
198 |
63884024 |
B3 CC rd Pachayat Rd to Abdul Matin Balidara |
100000 |
B3 CC rd Pachayat Rd to Abdul Matin Balidara1 |
Completion of work |
-
latitude : 24.845863333333334,24.845863333333334
Longitude : 92.27349000000001,92.27349000000001
file name : Image_22082022140658848.png
|
2022-08-22 14:06:58.96225 |
199 |
63884036 |
B4 CC rd Mukam Rd to Kutub Ali W4 |
100000 |
B4 CC rd Mukam Rd to Kutub Ali W41 |
Roof laid |
-
latitude : 24.83600666666667,24.83600666666667
Longitude : 92.25388666666667,92.25388666666667
file name : Image_12122022123333673.png
|
2022-12-12 12:33:33.773182 |
200 |
63884036 |
B4 CC rd Mukam Rd to Kutub Ali W4 |
100000 |
B4 CC rd Mukam Rd to Kutub Ali W41 |
Plinth level |
-
latitude : 24.83601833333333,24.83601833333333
Longitude : 92.253955,92.253955
file name : Image_01112022120847037.png
|
2022-11-01 12:08:47.131426 |
201 |
63884036 |
B4 CC rd Mukam Rd to Kutub Ali W4 |
100000 |
B4 CC rd Mukam Rd to Kutub Ali W41 |
Completion of work |
-
latitude : 24.836059999999996,24.836059999999996
Longitude : 92.25394666666668,92.25394666666668
file name : Image_13072022171302170.png
|
2022-07-13 17:13:02.279466 |
202 |
63884051 |
B5 CC rd Panchayat Rd to Mahapravu to Sankar Malakar Latu 5 |
100000 |
B5 CC rd Panchayat Rd to Mahapravu to Sankar Malakar Latu 51 |
Roof laid |
-
latitude : 24.841330000000003,24.841330000000003
Longitude : 92.25952333333335,92.25952333333335
file name : Image_12122022133944000.png
|
2022-12-12 13:39:44.125362 |
203 |
63884051 |
B5 CC rd Panchayat Rd to Mahapravu to Sankar Malakar Latu 5 |
100000 |
B5 CC rd Panchayat Rd to Mahapravu to Sankar Malakar Latu 51 |
Plinth level |
-
latitude : 24.84139,24.84139
Longitude : 92.25956333333333,92.25956333333333
file name : Image_01112022150455382.png
|
2022-11-01 15:04:55.490993 |
204 |
63884051 |
B5 CC rd Panchayat Rd to Mahapravu to Sankar Malakar Latu 5 |
100000 |
B5 CC rd Panchayat Rd to Mahapravu to Sankar Malakar Latu 51 |
Completion of work |
-
latitude : 24.841261666666664,24.841261666666664
Longitude : 92.25961000000001,92.25961000000001
file name : Image_13072022152056584.png
|
2022-07-13 15:20:56.680767 |
205 |
63884063 |
B6 CC rd Panchyat Rd to Telibari Mukam Latu6 |
100000 |
B6 CC rd Panchyat Rd to Telibari Mukam Latu61 |
Roof laid |
-
latitude : 24.83551,24.83551
Longitude : 92.25936333333333,92.25936333333333
file name : Image_12122022124431878.png
|
2022-12-12 12:44:31.971286 |
206 |
63884063 |
B6 CC rd Panchyat Rd to Telibari Mukam Latu6 |
100000 |
B6 CC rd Panchyat Rd to Telibari Mukam Latu61 |
Plinth level |
-
latitude : 24.83546666666667,24.83546666666667
Longitude : 92.25937166666667,92.25937166666667
file name : Image_01112022121651585.png
|
2022-11-01 12:16:51.678929 |
207 |
63884063 |
B6 CC rd Panchyat Rd to Telibari Mukam Latu6 |
100000 |
B6 CC rd Panchyat Rd to Telibari Mukam Latu61 |
Completion of work |
-
latitude : 24.835465,24.835465
Longitude : 92.25934000000001,92.25934000000001
file name : Image_13072022152038965.png
|
2022-07-13 15:20:39.065158 |
208 |
63884094 |
B9 Cuvert near Sahin Ahmed Sajpur w9 |
100000 |
B9 Cuvert near Sahin Ahmed Sajpur w91 |
Roof laid |
-
latitude : 24.8695939,24.8695939
Longitude : 92.3651208,92.3651208
file name : Image_22022023140946978.png
|
2023-02-22 14:09:47.088743 |
209 |
63884094 |
B9 Cuvert near Sahin Ahmed Sajpur w9 |
100000 |
B9 Cuvert near Sahin Ahmed Sajpur w91 |
Plinth level |
-
latitude : 24.854134999999996,24.854134999999996
Longitude : 92.28859333333334,92.28859333333334
file name : Image_01112022141512826.png
|
2022-11-01 14:15:12.919051 |
210 |
63884094 |
B9 Cuvert near Sahin Ahmed Sajpur w9 |
100000 |
B9 Cuvert near Sahin Ahmed Sajpur w91 |
Completion of work |
-
latitude : 24.85408,24.85408
Longitude : 92.28844499999998,92.28844499999998
file name : Image_13072022161404731.png
|
2022-07-13 16:14:04.827081 |
211 |
63884101 |
B10 Guard Wall PWD rd to Abdul Habib sajpur II w10 |
100000 |
B10 Guard Wall PWD rd to Abdul Habib sajpur II w101 |
Roof laid |
-
latitude : 24.846198333333337
Longitude : 92.29775666666667
file name : Image_07112023153546614.png
|
2023-11-07 15:35:46.760535 |
212 |
63884101 |
B10 Guard Wall PWD rd to Abdul Habib sajpur II w10 |
100000 |
B10 Guard Wall PWD rd to Abdul Habib sajpur II w101 |
Plinth level |
-
latitude : 24.8494
Longitude : 92.29308999999999
file name : Image_01112022135220726.png
|
2022-11-01 13:52:20.839429 |
213 |
63884101 |
B10 Guard Wall PWD rd to Abdul Habib sajpur II w10 |
100000 |
B10 Guard Wall PWD rd to Abdul Habib sajpur II w101 |
Completion of work |
-
latitude : 24.849426666666666
Longitude : 92.29315833333334
file name : Image_13072022154112134.png
|
2022-07-13 15:41:12.247229 |
214 |
63884165 |
B11 B12 B13 B14 4nos Solar Light |
179200 |
B11 B12 B13 B14 4nos Solar Light 1 |
Roof laid |
-
latitude : 24.849376666666664
Longitude : 92.29222833333333
file name : Image_17022023142621873.png
|
2023-02-17 14:26:21.975534 |
215 |
63884165 |
B11 B12 B13 B14 4nos Solar Light |
179200 |
B11 B12 B13 B14 4nos Solar Light 1 |
Plinth level |
-
latitude : 24.849276666666665
Longitude : 92.29228499999999
file name : Image_01112022135210606.png
|
2022-11-01 13:52:10.731476 |
216 |
63884165 |
B11 B12 B13 B14 4nos Solar Light |
179200 |
B11 B12 B13 B14 4nos Solar Light 1 |
Completion of work |
-
latitude : 24.849339999999998
Longitude : 92.29226500000001
file name : Image_13072022153255166.png
|
2022-07-13 15:32:55.269197 |
217 |
63884165 |
B11 B12 B13 B14 4nos Solar Light |
179200 |
B11 B12 B13 B14 4nos Solar Light 1 |
Roof laid |
-
latitude : 24.841115
Longitude : 92.25677333333333
file name : Image_17022023142642504.png
|
2023-02-17 14:26:42.690493 |
218 |
63884165 |
B11 B12 B13 B14 4nos Solar Light |
179200 |
B11 B12 B13 B14 4nos Solar Light 1 |
Roof laid |
-
latitude : 24.840468333333334
Longitude : 92.26338
file name : Image_17022023142633656.png
|
2023-02-17 14:26:33.791665 |
219 |
63884165 |
B11 B12 B13 B14 4nos Solar Light |
179200 |
B11 B12 B13 B14 4nos Solar Light 1 |
Plinth level |
-
latitude : 24.841011666666667
Longitude : 92.25681333333333
file name : Image_01112022150943135.png
|
2022-11-01 15:09:43.232358 |
220 |
63884165 |
B11 B12 B13 B14 4nos Solar Light |
179200 |
B11 B12 B13 B14 4nos Solar Light 1 |
Completion of work |
-
latitude : 24.852686
Longitude : 92.2768778
file name : Image_13072022152107785.png
|
2022-07-13 15:21:07.877267 |
221 |
63884165 |
B11 B12 B13 B14 4nos Solar Light |
179200 |
B11 B12 B13 B14 4nos Solar Light 2 |
Roof laid |
-
latitude : 24.853613333333335
Longitude : 92.27672499999998
file name : Image_17022023142627820.png
|
2023-02-17 14:26:27.927934 |
222 |
63884165 |
B11 B12 B13 B14 4nos Solar Light |
179200 |
B11 B12 B13 B14 4nos Solar Light 2 |
Plinth level |
-
latitude : 24.840475
Longitude : 92.26335666666667
file name : Image_01112022145844139.png
|
2022-11-01 14:58:44.257302 |
223 |
63884165 |
B11 B12 B13 B14 4nos Solar Light |
179200 |
B11 B12 B13 B14 4nos Solar Light 2 |
Completion of work |
-
latitude : 24.840316666666663
Longitude : 92.26373666666665
file name : Image_13072022152101238.png
|
2022-07-13 15:21:01.352089 |
224 |
63884165 |
B11 B12 B13 B14 4nos Solar Light |
179200 |
B11 B12 B13 B14 4nos Solar Light 3 |
Roof laid |
-
latitude : 24.84113333333333
Longitude : 92.25664666666668
file name : Image_17022023151927780.png
|
2023-02-17 15:19:27.906395 |
225 |
63884165 |
B11 B12 B13 B14 4nos Solar Light |
179200 |
B11 B12 B13 B14 4nos Solar Light 3 |
Plinth level |
-
latitude : 24.85349833333333
Longitude : 92.27669333333333
file name : Image_01112022133950279.png
|
2022-11-01 13:39:50.38952 |
226 |
63884165 |
B11 B12 B13 B14 4nos Solar Light |
179200 |
B11 B12 B13 B14 4nos Solar Light 3 |
Completion of work |
-
latitude : 24.8409402
Longitude : 92.2570296
file name : Image_13072022170830979.png
|
2022-07-13 17:08:31.087481 |
227 |
75574967 |
UT33 Const 73 no AWC nr 428 Sahabad Lp w9 |
150000 |
UT33 Const 73 no AWC nr 428 Sahabad Lp w91 |
Plinth level |
-
latitude : 24.85598333333333
Longitude : 92.29259666666667
file name : Image_07112023201626132.png
|
2023-11-07 20:16:26.264529 |
228 |
75574967 |
UT33 Const 73 no AWC nr 428 Sahabad Lp w9 |
150000 |
UT33 Const 73 no AWC nr 428 Sahabad Lp w91 |
Completion of work |
-
latitude : 24.85608333333333
Longitude : 92.29256666666667
file name : Image_05062023144544957.png
|
2023-06-05 14:45:45.112298 |
229 |
75574757 |
Greywater management system |
200000 |
Greywater management system1 |
Plinth level |
-
latitude : 24.854224999999996
Longitude : 92.29353166666667
file name : Image_07112023201641713.png
|
2023-11-07 20:16:41.799193 |
230 |
75574757 |
Greywater management system |
200000 |
Greywater management system1 |
Completion of work |
-
latitude : 24.854413333333333
Longitude : 92.29355166666667
file name : Image_05062023144537972.png
|
2023-06-05 14:45:38.063946 |
231 |
65975892 |
Creation of plastic waste storage unit |
180000 |
Creation of plastic waste storage unit 1 |
Plinth level |
-
latitude : 24.84042833333333
Longitude : 92.25514333333334
file name : Image_07102023164930071.png
|
2023-10-07 16:49:30.159581 |
232 |
65975892 |
Creation of plastic waste storage unit |
180000 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 24.840408333333336
Longitude : 92.25517999999998
file name : Image_23052023144041987.png
|
2023-05-23 14:40:42.085659 |
233 |
66002504 |
UT9 20 21 2nd Solar Light Malegarh BOP |
44800 |
UT9 20 21 2nd Solar Light Malegarh BOP1 |
Plinth level |
-
latitude : 24.835863333333336
Longitude : 92.25643333333333
file name : Image_05102023221342727.png
|
2023-10-05 22:13:42.818844 |
234 |
66002504 |
UT9 20 21 2nd Solar Light Malegarh BOP |
44800 |
UT9 20 21 2nd Solar Light Malegarh BOP1 |
Completion of work |
-
latitude : 24.835774999999998
Longitude : 92.25629833333332
file name : Image_23052023132429651.png
|
2023-05-23 13:24:29.751497 |
235 |
66002484 |
UT7 20 21 2nd Solar Light Dasgram Hospital Ward 7 |
44800 |
UT7 20 21 2nd Solar Light Dasgram Hospital Ward 71 |
Plinth level |
-
latitude : 24.851369999999996
Longitude : 92.27865333333332
file name : Image_05102023221031014.png
|
2023-10-05 22:10:31.141179 |
236 |
66002484 |
UT7 20 21 2nd Solar Light Dasgram Hospital Ward 7 |
44800 |
UT7 20 21 2nd Solar Light Dasgram Hospital Ward 71 |
Completion of work |
-
latitude : 24.851549999999996
Longitude : 92.27868500000001
file name : Image_23052023135829298.png
|
2023-05-23 13:58:29.411775 |
237 |
65976395 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.84393
Longitude : 92.263615
file name : Image_07102023162811396.png
|
2023-10-07 16:28:11.479033 |
238 |
65976395 |
Construction of Community Sanitary Complex |
98100 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.843815000000003
Longitude : 92.26359333333333
file name : Image_15052023150830529.png
|
2023-05-15 15:08:30.633439 |
239 |
75562541 |
UT24 B wall 77 Latu Boys LP schol w6 |
160000 |
UT24 B wall 77 Latu Boys LP schol w61 |
Plinth level |
-
latitude : 24.840486666666667
Longitude : 92.25672833333334
file name : Image_07102023164926334.png
|
2023-10-07 16:49:26.420623 |
240 |
75562541 |
UT24 B wall 77 Latu Boys LP schol w6 |
160000 |
UT24 B wall 77 Latu Boys LP schol w61 |
Completion of work |
-
latitude : 24.840365
Longitude : 92.25696666666666
file name : Image_05062023132130666.png
|
2023-06-05 13:21:30.768031 |
241 |
75575132 |
UT34 C Install Solar St Light Balidara Boirab Bari w3 |
44800 |
UT34 C Install Solar St Light Balidara Boirab Bari w31 |
Plinth level |
-
latitude : 24.837884999999996
Longitude : 92.27569
file name : Image_07102023143544721.png
|
2023-10-07 14:35:44.804838 |
242 |
75575132 |
UT34 C Install Solar St Light Balidara Boirab Bari w3 |
44800 |
UT34 C Install Solar St Light Balidara Boirab Bari w31 |
Completion of work |
-
latitude : 24.837905
Longitude : 92.27550666666666
file name : Image_05062023144455685.png
|
2023-06-05 14:44:55.782796 |
243 |
75574437 |
UT25 C Install Solar Light Latu Joy Kalibari w1 |
44800 |
UT25 C Install Solar Light Latu Joy Kalibari w11 |
Plinth level |
-
latitude : 24.843861666666665
Longitude : 92.26367499999999
file name : Image_07102023162807816.png
|
2023-10-07 16:28:07.935047 |
244 |
75574437 |
UT25 C Install Solar Light Latu Joy Kalibari w1 |
44800 |
UT25 C Install Solar Light Latu Joy Kalibari w11 |
Completion of work |
-
latitude : 24.843771666666665
Longitude : 92.26372166666667
file name : Image_05062023144510582.png
|
2023-06-05 14:45:10.691853 |
245 |
75574565 |
Greywater management system |
359350 |
Greywater management system1 |
Roof laid |
-
latitude : 24.841165
Longitude : 92.25657333333332
file name : Image_10112023132759828.png
|
2023-11-10 13:27:59.934467 |
246 |
75574565 |
Greywater management system |
359350 |
Greywater management system1 |
Plinth level |
-
latitude : 24.841189999999997
Longitude : 92.25659499999999
file name : Image_10112023132149334.png
|
2023-11-10 13:21:49.424025 |
247 |
75574565 |
Greywater management system |
359350 |
Greywater management system1 |
Completion of work |
-
latitude : 24.841099999999997
Longitude : 92.25672000000002
file name : Image_05062023134951266.png
|
2023-06-05 13:49:51.371769 |
248 |
66001322 |
UT4 20 21 2nd Dasgram ME School ward 7 |
150000 |
UT4 20 21 2nd Dasgram ME School ward 71 |
Completion of work |
-
latitude : 24.853481666666667
Longitude : 92.27778000000002
file name : Image_06012024164137822.png
|
2024-01-06 16:41:37.69615 |
249 |
63882192 |
A4 Drain Chalihadi PHE to Jukchara w1 |
134323 |
A4 Drain Chalihadi PHE to Jukchara w11 |
Plinth level |
-
latitude : 24.845430000000004,24.845430000000004
Longitude : 92.25968166666668,92.25968166666668
file name : Image_12022024160022036.png
|
2024-02-12 16:00:22.134318 |
250 |
63882192 |
A4 Drain Chalihadi PHE to Jukchara w1 |
134323 |
A4 Drain Chalihadi PHE to Jukchara w11 |
Completion of work |
-
latitude : 24.845756666666663,24.845756666666663
Longitude : 92.25998999999999,92.25998999999999
file name : Image_06012024163131473.png
|
2024-01-06 16:31:31.6264 |
251 |
88159529 |
Ut62 B wall sAJPUR ME W10 |
250000 |
Ut62 B wall sAJPUR ME W101 |
Completion of work |
-
latitude : 24.84932666666667
Longitude : 92.29193166666667
file name : Image_13112023145855469.png
|
2023-11-13 14:58:55.566118 |
252 |
63882183 |
A3 Sanitation Balidara new Jame Masjid W3 |
98100 |
A3 Sanitation Balidara new Jame Masjid W31 |
Plinth level |
-
latitude : 24.83306333333333
Longitude : 92.27169333333335
file name : Image_05102023221408830.png
|
2023-10-05 22:14:08.99106 |
253 |
63882183 |
A3 Sanitation Balidara new Jame Masjid W3 |
98100 |
A3 Sanitation Balidara new Jame Masjid W31 |
Completion of work |
-
latitude : 24.83303166666667
Longitude : 92.27179666666667
file name : Image_15052023152305711.png
|
2023-05-15 15:23:05.812252 |
254 |
79722999 |
Operation & maintenance of drinking water supply system |
590500 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.85773
Longitude : 92.27662000000001
file name : Image_04022024230344612.png
|
2024-02-04 23:03:44.712338 |
255 |
88159418 |
5 nos Install Solar street Latu |
224000 |
5 nos Install Solar street Latu 3 |
Plinth level |
-
latitude : 24.838273333333337
Longitude : 92.26122500000001
file name : Image_20022024000102869.png
|
2024-02-20 00:01:02.980447 |
256 |
88159418 |
5 nos Install Solar street Latu |
224000 |
5 nos Install Solar street Latu 3 |
Completion of work |
-
latitude : 24.838358333333336
Longitude : 92.26115166666665
file name : Image_13112023145935913.png
|
2023-11-13 14:59:36.024047 |
257 |
88159418 |
5 nos Install Solar street Latu |
224000 |
5 nos Install Solar street Latu 4 |
Plinth level |
-
latitude : 24.841318333333334
Longitude : 92.25974166666668
file name : Image_20022024000118789.png
|
2024-02-20 00:01:18.899809 |
258 |
88159418 |
5 nos Install Solar street Latu |
224000 |
5 nos Install Solar street Latu 4 |
Completion of work |
-
latitude : 24.841215000000002
Longitude : 92.25980333333334
file name : Image_13112023145948148.png
|
2023-11-13 14:59:48.223359 |
259 |
88159418 |
5 nos Install Solar street Latu |
224000 |
5 nos Install Solar street Latu 5 |
Plinth level |
-
latitude : 24.838355
Longitude : 92.26567833333333
file name : Image_20022024000058081.png
|
2024-02-20 00:00:58.192642 |
260 |
88159418 |
5 nos Install Solar street Latu |
224000 |
5 nos Install Solar street Latu 5 |
Completion of work |
-
latitude : 24.83830833333333
Longitude : 92.26565666666666
file name : Image_13112023145927362.png
|
2023-11-13 14:59:27.448845 |
261 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 2 |
Plinth level |
-
latitude : 24.84477
Longitude : 92.25868333333334
file name : Image_12022024160026423.png
|
2024-02-12 16:00:26.532153 |
262 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 2 |
Completion of work |
-
latitude : 24.84472
Longitude : 92.258595
file name : Image_13112023145824720.png
|
2023-11-13 14:58:24.807907 |
263 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 3 |
Plinth level |
-
latitude : 24.85613
Longitude : 92.29262166666668
file name : Image_01022024153827793.png
|
2024-02-01 15:38:27.942142 |
264 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 3 |
Completion of work |
-
latitude : 24.856108333333335
Longitude : 92.29254
file name : Image_13112023145842232.png
|
2023-11-13 14:58:42.319194 |
265 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 4 |
Plinth level |
-
latitude : 24.851111666666664
Longitude : 92.251225
file name : Image_20062024162733437.png
|
2024-06-20 16:27:33.518679 |
266 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 4 |
Completion of work |
-
latitude : 24.849775
Longitude : 92.29604666666667
file name : Image_13112023145846389.png
|
2023-11-13 14:58:46.46495 |
267 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 5 |
Plinth level |
-
latitude : 24.850366666666666
Longitude : 92.28417666666668
file name : Image_20022024000045467.png
|
2024-02-20 00:00:45.566738 |
268 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 5 |
Completion of work |
-
latitude : 24.85034333333333
Longitude : 92.28421000000002
file name : Image_13112023145904508.png
|
2023-11-13 14:59:04.594239 |
269 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 6 |
Plinth level |
-
latitude : 24.853468333333332
Longitude : 92.27656166666665
file name : Image_05022024144305966.png
|
2024-02-05 14:43:06.069928 |
270 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 6 |
Completion of work |
-
latitude : 24.853476666666666
Longitude : 92.27653666666666
file name : Image_13112023145913785.png
|
2023-11-13 14:59:13.869878 |
271 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 7 |
Plinth level |
-
latitude : 24.837568333333333
Longitude : 92.27084500000001
file name : Image_01022024153804795.png
|
2024-02-01 15:38:04.913591 |
272 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 7 |
Completion of work |
-
latitude : 24.837538333333335
Longitude : 92.27081666666666
file name : Image_13112023145923011.png
|
2023-11-13 14:59:23.101084 |
273 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 8 |
Plinth level |
-
latitude : 24.851108333333332
Longitude : 92.25130499999999
file name : Image_20062024162738015.png
|
2024-06-20 16:27:38.093772 |
274 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 8 |
Plinth level |
-
latitude : 24.836335000000002
Longitude : 92.254495
file name : Image_05022024144357689.png
|
2024-02-05 14:43:57.783506 |
275 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 8 |
Completion of work |
-
latitude : 24.836395
Longitude : 92.25452333333332
file name : Image_13112023145940218.png
|
2023-11-13 14:59:40.293162 |
276 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 9 |
Plinth level |
-
latitude : 24.84036833333333
Longitude : 92.25757166666666
file name : Image_12022024160129966.png
|
2024-02-12 16:01:30.05624 |
277 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 9 |
Completion of work |
-
latitude : 24.84045
Longitude : 92.25746333333333
file name : Image_13112023150000634.png
|
2023-11-13 15:00:00.724825 |
278 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 1 |
Plinth level |
-
latitude : 24.844295000000002
Longitude : 92.25885666666666
file name : Image_12022024163659143.png
|
2024-02-12 16:36:59.235101 |
279 |
88159232 |
Services of Collection & Transportation of waste from household to treatment site |
87750 |
Services of Collection & Transportation of waste from household to treatment site 1 |
Completion of work |
-
latitude : 24.844248333333333
Longitude : 92.25879833333332
file name : Image_13112023145820013.png
|
2023-11-13 14:58:20.110014 |