1 |
6432142 |
Urinal at Thekerguri Sensowa Bangali Anganwadi Center |
50000 |
Toilet1
|
Complete |
-
latitude : 27.422325
Longitude : 94.26165
file name : Image_18052019143208116.png
|
2019-05-18 14:32:08.205109 |
2 |
6432121 |
Ring Well at Natun Na ali Mising Gaon |
50000 |
Well1
|
Completed |
-
latitude : 27.436148333333335
Longitude : 94.26448166666665
file name : Image_29052019100146834.png
|
2019-05-29 10:01:46.893755 |
3 |
6432155 |
Urinal Shed at Uriamguri Heath Sub-Centre |
50000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.420521666666666
Longitude : 94.29802999999998
file name : Image_19052019161542460.png
|
2019-05-19 16:15:42.541515 |
4 |
6432148 |
Urinal at Thekeraguri Natun Parthamik |
50000 |
Toilet1
|
Up to Plinth level |
-
latitude : 27.434201666666663
Longitude : 94.26011500000001
file name : Image_18052019135714001.png
|
2019-05-18 13:57:14.108743 |
5 |
6432148 |
Urinal at Thekeraguri Natun Parthamik |
50000 |
Toilet1
|
Up to Plinth level |
-
latitude : 27.43429833333333
Longitude : 94.26012166666666
file name : Image_18052019141226750.png
|
2019-05-18 14:12:26.831869 |
6 |
6432135 |
Urinal Shed at Thekeraguri Boro Gaon |
50000 |
Toilet1
|
Complete |
-
latitude : 27.428335
Longitude : 94.26273166666667
file name : Image_18052019152414578.png
|
2019-05-18 15:24:14.667109 |
7 |
6432135 |
Urinal Shed at Thekeraguri Boro Gaon |
50000 |
Toilet1
|
Complete |
-
latitude : 27.428386666666665
Longitude : 94.26272166666668
file name : Image_18052019151426726.png
|
2019-05-18 15:14:26.804142 |
8 |
6432135 |
Urinal Shed at Thekeraguri Boro Gaon |
50000 |
Toilet1
|
Complete |
-
latitude : 27.428343333333334
Longitude : 94.26279500000001
file name : Image_18052019151416925.png
|
2019-05-18 15:14:17.00166 |
9 |
6432130 |
Urinal shed at Rupohi Line Community Centre |
50000 |
Toilet1
|
Up to Plinth level |
-
latitude : 27.47827333333333
Longitude : 94.23682
file name : Image_19052019120201489.png
|
2019-05-19 12:02:01.567842 |
10 |
6432116 |
Ring Well at 2 No Dokhin Rupohi |
50000 |
Well1
|
Completed |
-
latitude : 27.446303333333336
Longitude : 94.24715166666668
file name : Image_29052019101150494.png
|
2019-05-29 10:11:50.56792 |
11 |
6432195 |
Repairing of road from Katorichapori PWD to Dhanpur Ananda Bagan Connecting Road via Dhanpur Kalita |
200000 |
Approach Road1
|
Earth Work |
-
latitude : 27.421833333333332,27.421848333333333,27.421850000000003
Longitude : 94.22555166666668,94.22551666666668,94.22551666666668
file name : Image_19052019131823846.png
|
2019-05-19 13:18:23.933548 |
12 |
43706849 |
Const. of Anganwadi Cenjter at Balijan Jaipur |
200000 |
Const. of Anganwadi Cenjter at Balijan Jaipur1 |
25% |
-
latitude : 27.43904
Longitude : 94.27211666666666
file name : Image_24082020114708345.png
|
2020-08-24 11:47:09.046002 |
13 |
43592237 |
Const. of Cultural Center at Ananda TE Rupahi Line |
200000 |
Const. of Cultural Center at Ananda TE Rupahi Line1 |
25% |
-
latitude : 27.478041666666666
Longitude : 94.23704833333335
file name : Image_24082020133011146.png
|
2020-08-24 13:30:11.860502 |
14 |
43707220 |
Renovation of adibashi Cultural center at kheria Basti with toilet & Urinal facalities |
200000 |
Renovation of adibashi Cultural center at kheria Basti with toilet & Urinal facalities1 |
25% |
-
latitude : 27.44067
Longitude : 94.23761833333334
file name : Image_21082020141807189.png
|
2020-08-21 14:18:07.903232 |
15 |
43707249 |
Renovation of Sankari Kala Kristri Kendra at Konch Gaon |
200000 |
Renovation of Sankari Kala Kristri Kendra at Konch Gaon1 |
25% |
-
latitude : 27.410058333333335
Longitude : 94.22548333333334
file name : Image_21082020134224869.png
|
2020-08-21 13:42:25.589905 |
16 |
43707296 |
Const. of Anganwadi Center at Gargaria |
200000 |
Const. of Anganwadi Center at Gargaria1 |
25% |
-
latitude : 27.436044999999996
Longitude : 94.27115
file name : Image_24082020124357436.png
|
2020-08-24 12:43:58.132542 |
17 |
43707447 |
Renovation of Uriamguri LP School |
200000 |
Renovation of Uriamguri LP School1 |
25% |
-
latitude : 27.42117166666667
Longitude : 94.29831833333334
file name : Image_24082020122048098.png
|
2020-08-24 12:20:48.775545 |
18 |
43707515 |
Const of Subansiri Sonapur ME School at Sonapur |
500000 |
Const of Subansiri Sonapur ME School at Sonapur1 |
25% |
-
latitude : 27.450701666666667
Longitude : 94.27330833333332
file name : Image_27082020112936170.png
|
2020-08-27 11:29:37.267047 |
19 |
43731152 |
Renovation of Jaikishan LP School at Gohain Gaon |
300000 |
Renovation of Jaikishan LP School at Gohain Gaon1 |
25% |
-
latitude : 27.43373166666667
Longitude : 94.28827166666666
file name : Image_24082020115954633.png
|
2020-08-24 11:59:55.325269 |
20 |
43731959 |
Const. Of RCC Culvert RD. Form Basantipur Tiniali to Dhanpur Tiniali |
200000 |
Const. Of RCC Culvert RD. Form Basantipur Tiniali to Dhanpur Tiniali1 |
Substructure below GL |
-
latitude : 27.421389999999995,27.421419999999998
Longitude : 94.22246666666666,94.22245166666669
file name : Image_21082020130339737.png
|
2020-08-21 13:03:40.428219 |
21 |
43732156 |
Const. of Running water facility at Na-ali Bihari Gaon Culture Center |
200000 |
Const. of Running water facility at Na-ali Bihari Gaon Culture Center1 |
Basement |
-
latitude : 27.439985
Longitude : 94.26485499999998
file name : Image_24082020125022489.png
|
2020-08-24 12:50:23.206926 |
22 |
43732499 |
Const. of HP Culvert at road from Katori Chapori PWD to Dakhin Rupahi near Bhuwa House |
472540 |
Const. of HP Culvert at road from Katori Chapori PWD to Dakhin Rupahi near Bhuwa House1 |
Substructure below GL |
-
latitude : 27.44137,27.441346666666664
Longitude : 94.23781166666667,94.23780333333335
file name : Image_21082020142132116.png
|
2020-08-21 14:21:32.718747 |
23 |
43732645 |
Renovation of Khudram Krishti Vikash kendra, Joypur |
100000 |
Renovation of Khudram Krishti Vikash kendra, Joypur1 |
25% |
-
latitude : 27.43949
Longitude : 94.26800166666665
file name : Image_27082020122951392.png
|
2020-08-27 12:29:52.017484 |
24 |
43840362 |
Const. of Market Shed at Ananda Weekly Market |
700000 |
Const. of Market Shed at Ananda Weekly Market1 |
25% |
-
latitude : 27.446863333333333
Longitude : 94.23748500000002
file name : Image_24082020125936367.png
|
2020-08-24 12:59:37.034374 |
25 |
43840280 |
Const. of Market Shed at Na-ali in front GP office |
676518 |
Const. of Market Shed at Na-ali in front GP office1 |
25% |
-
latitude : 27.444014999999997
Longitude : 94.26307333333334
file name : Image_19082020100725870.png
|
2020-08-19 10:07:26.540961 |
26 |
43706907 |
Renovation oif Uttar Rupahi adibashi LP School |
200000 |
Renovation oif Uttar Rupahi adibashi LP School1 |
25% |
-
latitude : 27.46092833333333
Longitude : 94.24348166666665
file name : Image_19082020131411353.png
|
2020-08-19 13:14:12.28694 |
27 |
43707178 |
Const. of anganwadi Center at 2 No. Dakhin Rupahi |
200000 |
Const. of anganwadi Center at 2 No. Dakhin Rupahi1 |
25% |
-
latitude : 27.44116
Longitude : 94.243755
file name : Image_21082020145902570.png
|
2020-08-21 14:59:03.199346 |
28 |
43707326 |
Renovation of Rupahi LP School |
200000 |
Renovation of Rupahi LP School1 |
25% |
-
latitude : 27.42218666666667
Longitude : 94.27403833333334
file name : Image_21082020151721936.png
|
2020-08-21 15:17:22.553541 |
29 |
43707378 |
Const. of Anganwadi center at Dakhin Hazong |
200000 |
Const. of Anganwadi center at Dakhin Hazong 1 |
25% |
-
latitude : 27.401155000000003
Longitude : 94.22549499999998
file name : Image_21082020122925585.png
|
2020-08-21 12:29:26.226281 |
30 |
43707475 |
Const. of Adibashi LP School 27 no. Line |
400000 |
Const. of Adibashi LP School 27 no. Line1 |
25% |
-
latitude : 27.46293166666667
Longitude : 94.23623333333335
file name : Image_19082020141730658.png
|
2020-08-19 14:17:31.318223 |
31 |
43731172 |
Renovation of khageswar Pagag LP School at Borbali |
326413 |
Renovation of khageswar Pagag LP School at Borbali1 |
25% |
-
latitude : 27.429536666666664
Longitude : 94.22024833333334
file name : Image_21082020131817171.png
|
2020-08-21 13:18:17.774789 |
32 |
43731191 |
Renovation of Sankardev Sangha Kala kristi Bikash Kendra at Nagaon Pathamik Sakha Milanpur |
200000 |
Renovation of Sankardev Sangha Kala kristi Bikash Kendra at Nagaon Pathamik Sakha Milanpur1 |
25% |
-
latitude : 27.43786
Longitude : 94.29830333333332
file name : Image_27082020111235595.png
|
2020-08-27 11:12:36.651189 |
33 |
43731245 |
Renovation of Rupahi LP School |
200000 |
Renovation of Rupahi LP School1 |
25% |
-
latitude : 27.477216666666664
Longitude : 94.23667166666668
file name : Image_24082020132541875.png
|
2020-08-24 13:25:42.579723 |
34 |
43731321 |
Renovation of Dhalbosti P.H.E |
200000 |
Renovation of Dhalbosti P.H.E1 |
25% |
-
latitude : 27.462103333333335
Longitude : 94.24923166666667
file name : Image_24082020135527010.png
|
2020-08-24 13:55:27.688386 |
35 |
43731294 |
Renovation of Anchalik Kala Kistri Kendra at Jaipur |
200000 |
Renovation of Anchalik Kala Kistri Kendra at Jaipur1 |
25% |
-
latitude : 27.438493333333334
Longitude : 94.27428666666668
file name : Image_24082020115321512.png
|
2020-08-24 11:53:22.265551 |
36 |
43731824 |
Conkst. Of 2 No. Dakhin Rupahi Anchalik Sankari Kala Kristi Vikash kendra |
200000 |
Conkst. Of 2 No. Dakhin Rupahi Anchalik Sankari Kala Kristi Vikash kendra1 |
25% |
-
latitude : 27.447002
Longitude : 94.2462625
file name : Image_21082020145646334.png
|
2020-08-21 14:56:46.966503 |
37 |
43731870 |
Const. of Floor at Rupahi Chapori LP School |
200000 |
Const. of Floor at Rupahi Chapori LP School1 |
25% |
-
latitude : 27.43633333333333
Longitude : 94.22672833333333
file name : Image_21082020140826770.png
|
2020-08-21 14:08:27.405006 |
38 |
43732221 |
Const. of Thekeraguri Bongali Bosti LP School |
200000 |
Const. of Thekeraguri Bongali Bosti LP School1 |
25% |
-
latitude : 27.42217333333333
Longitude : 94.26174333333331
file name : Image_19082020115735911.png
|
2020-08-19 11:57:36.652148 |
39 |
43732281 |
Const. of Cultural center at Hajong Gaon |
200000 |
Const. of Cultural center at Hajong Gaon1 |
25% |
-
latitude : 27.40284
Longitude : 94.22597499999999
file name : Image_21082020123725874.png
|
2020-08-21 12:37:26.531601 |
40 |
43732357 |
Const. of Urinal & Running water facility at Gohain Gaon K.V.K. |
200000 |
Const. of Urinal & Running water facility at Gohain Gaon K.V.K.1 |
25% |
-
latitude : 27.43322333333333
Longitude : 94.28813
file name : Image_24082020123356769.png
|
2020-08-24 12:33:57.717704 |
41 |
43732435 |
Const. of RCC Culvert road from 2 No. Na-Pam Kunch Gaon |
800000 |
Const. of RCC Culvert road from 2 No. Na-Pam Kunch Gaon1 |
Substructure below GL |
-
latitude : 27.409921666666666,27.409933333333335
Longitude : 94.22332166666665,94.22332
file name : Image_21082020135208635.png
|
2020-08-21 13:52:09.436469 |
42 |
43732573 |
Const. of RCC Culvert road form Milijuli to Budhboriya Baza |
450000 |
Const. of RCC Culvert road form Milijuli to Budhboriya Baza1 |
Substructure below GL |
-
latitude : 27.420023333333333,27.420025000000003
Longitude : 94.25637,94.25627666666666
file name : Image_19082020104208133.png
|
2020-08-19 10:42:08.806538 |
43 |
43732573 |
Const. of RCC Culvert road form Milijuli to Budhboriya Baza |
450000 |
Const. of RCC Culvert road form Milijuli to Budhboriya Baza1 |
Substructure below GL |
-
latitude : 27.42002,27.420035
Longitude : 94.256365,94.25631333333334
file name : Image_19082020104604402.png
|
2020-08-19 10:46:05.047554 |
44 |
44228688 |
Const. of Anganwadi center at Adarsha Gaon |
200000 |
Const. of Anganwadi center at Adarsha Gaon1 |
25% |
-
latitude : 27.443114999999995
Longitude : 94.27320166666665
file name : Image_13112020162320399.png
|
2020-11-13 16:23:25.263565 |
45 |
44230121 |
Const. of Drinking water and toilet facility at Sirumoni Saikia Srimantapur |
200000 |
Const. of Drinking water and toilet facility at Sirumoni Saikia Srimantapur1 |
Basement |
-
latitude : 27.427474999999998
Longitude : 94.29365666666666
file name : Image_17112020102917371.png
|
2020-11-17 10:29:17.431494 |
46 |
44229298 |
Const. of AWC at 2no. Uriamguri |
200000 |
Const. of AWC at 2no. Uriamguri1 |
25% |
-
latitude : 27.417616666666664
Longitude : 94.29860833333332
file name : Image_17112020102409644.png
|
2020-11-17 10:24:09.698575 |
47 |
44230205 |
Const. of Market shed at Ananda weekly Market |
1200000 |
Const. of Market shed at Ananda weekly Market1 |
25% |
-
latitude : 27.447047
Longitude : 94.2377985
file name : Image_13112020120944516.png
|
2020-11-13 12:09:49.293685 |
48 |
44229261 |
Const. of AWC at Katori Chapori Hajong |
200000 |
Const. of AWC at Katori Chapori Hajong1 |
25% |
-
latitude : 27.407754999999998
Longitude : 94.22940166666667
file name : Image_13112020142152741.png
|
2020-11-13 14:21:57.571617 |
49 |
44229092 |
Const. of Cultural Stage at Na-ali Thekeraguri |
300000 |
Const. of Cultural Stage at Na-ali Thekeraguri1 |
25% |
-
latitude : 27.443626666666667
Longitude : 94.26236833333333
file name : Image_13112020112411070.png
|
2020-11-13 11:24:15.866569 |
50 |
44228881 |
Const. of HP culvert road from jorital to Gahagar Mohani Bill |
200000 |
Const. of HP culvert road from jorital to Gahagar Mohani Bill1 |
Substructure below GL |
-
latitude : 27.429166666666667,27.429209999999998
Longitude : 94.21825333333332,94.21827499999999
file name : Image_17112020111319543.png
|
2020-11-17 11:13:19.601136 |
51 |
44228834 |
Const. of Angandadi center at Rupahipm |
200000 |
Const. of Angandadi center at Rupahipm1 |
25% |
-
latitude : 27.42232333333333
Longitude : 94.27353833333333
file name : Image_13112020153844588.png
|
2020-11-13 15:38:49.429414 |
52 |
44230075 |
Const. of Drinkind water and Toilet facility at Hajong Cultural center Milijuli |
200000 |
Const. of Drinkind water and Toilet facility at Hajong Cultural center Milijuli1 |
Basement |
-
latitude : 27.418054999999995
Longitude : 94.26360666666666
file name : Image_13112020152845059.png
|
2020-11-13 15:28:49.904291 |
53 |
44229415 |
Const. of Urinal shed with Hand pump Faciliality at Chauldhowa Center |
100000 |
Const. of Urinal shed with Hand pump Faciliality at Chauldhowa Center1 |
25% |
-
latitude : 27.44115
Longitude : 94.24240166666665
file name : Image_13112020145639796.png
|
2020-11-13 14:56:44.634443 |
54 |
44229895 |
Const. of Drinking water and toilet facility at Na-ali Namoni Missing Gaon Cultural center |
200000 |
Const. of Drinking water and toilet facility at Na-ali Namoni Missing Gaon Cultural center1 |
Basement |
-
latitude : 27.43596
Longitude : 94.26481333333335
file name : Image_13112020155604751.png
|
2020-11-13 15:56:09.612046 |
55 |
44228726 |
Const. of Urinal shed with hand pump faciliality at 2 no. Dakhin rupahi |
100000 |
Const. of Urinal shed with hand pump faciliality at 2 no. Dakhin rupahi1 |
25% |
-
latitude : 27.444158333333334
Longitude : 94.244895
file name : Image_13112020113037287.png
|
2020-11-13 11:30:42.092976 |
56 |
44228652 |
Const. of Adibashi Cultural center at pathalipam |
200000 |
Const. of Adibashi Cultural center at pathalipam1 |
25% |
-
latitude : 27.477728333333335
Longitude : 94.25029
file name : Image_13112020130645805.png
|
2020-11-13 13:06:50.61748 |
57 |
44229991 |
Const. of Boundary wall at Da-mati Sonapur Cremation Ground(phase II) |
400000 |
Const. of Boundary wall at Da-mati Sonapur Cremation Ground(phase II)1 |
In Progress |
-
latitude : 27.45038833333333
Longitude : 94.26159333333332
file name : Image_17112020113810057.png
|
2020-11-17 11:38:10.127077 |
58 |
44229929 |
Const. of subansiri Sangeet Vidyalay at Katori Chapori |
200000 |
Const. of subansiri Sangeet Vidyalay at Katori Chapori1 |
25% |
-
latitude : 27.42192
Longitude : 94.22816166666668
file name : Image_13112020133021375.png
|
2020-11-13 13:30:26.200727 |
59 |
44228792 |
Const. of Anchalik Rongamancha at Dhanpur |
300000 |
Const. of Anchalik Rongamancha at Dhanpur1 |
25% |
-
latitude : 27.422643333333333
Longitude : 94.22222333333333
file name : Image_13112020133632291.png
|
2020-11-13 13:36:37.105406 |
60 |
44229848 |
Const. of Cultural center at Uttar Rupahi (Bishnu Mandir) |
200000 |
Const. of Cultural center at Uttar Rupahi (Bishnu Mandir)1 |
25% |
-
latitude : 27.4481
Longitude : 94.24304500000001
file name : Image_13112020122503635.png
|
2020-11-13 12:25:08.465851 |
61 |
44230161 |
Const. of Drinking water and toilet facility at Balijan jaipur cultural center |
200000 |
Const. of Drinking water and toilet facility at Balijan jaipur cultural center1 |
Basement |
-
latitude : 27.44329
Longitude : 94.27319666666666
file name : Image_17112020114351428.png
|
2020-11-17 11:43:51.496766 |
62 |
44229801 |
Const. of Boundary Wall at GP Office |
1310786 |
Const. of Boundary Wall at GP Office1 |
In Progress |
-
latitude : 27.443053333333335
Longitude : 94.26328166666666
file name : Image_13112020112309680.png
|
2020-11-13 11:23:14.46272 |
63 |
44229522 |
Const. of RCC Culvert at Dhalbosti to Silimpur Road |
414659 |
Const. of RCC Culvert at Dhalbosti to Silimpur Road1 |
Substructure below GL |
-
latitude : 27.468203333333335,27.468204999999998
Longitude : 94.255255,94.25524166666668
file name : Image_13112020125832127.png
|
2020-11-13 12:58:36.931119 |
64 |
44229468 |
Const. of RCC Culvert road from Gohain gaon to Jorital via Sarukan Beel |
500000 |
Const. of RCC Culvert road from Gohain gaon to Jorital via Sarukan Beel1 |
Substructure below GL |
-
latitude : 27.429386666666666,27.429371666666665
Longitude : 94.28728666666666,94.28728333333332
file name : Image_17112020103306904.png
|
2020-11-17 10:33:06.968288 |
65 |
44229360 |
Const. of Additional Classroom at Thekeraguri ME School |
300000 |
Const. of Additional Classroom at Thekeraguri ME School1 |
25% |
-
latitude : 27.434393333333333
Longitude : 94.25928333333334
file name : Image_13112020152307555.png
|
2020-11-13 15:23:12.397401 |
66 |
44229212 |
Const. of Missing Cultural center at Namoni Rupahi |
200000 |
Const. of Missing Cultural center at Namoni Rupahi1 |
25% |
-
latitude : 27.41617666666667
Longitude : 94.27618333333334
file name : Image_13112020160601889.png
|
2020-11-13 16:06:06.744059 |
67 |
44229023 |
Const. of HP Culvert at road from NH-15 to Kharia Bosti near Romen Saikia House |
200000 |
Const. of HP Culvert at road from NH-15 to Kharia Bosti near Romen Saikia House1 |
Substructure below GL |
-
latitude : 27.4424,27.44244666666667
Longitude : 94.23802833333333,94.23797333333331
file name : Image_13112020144024883.png
|
2020-11-13 14:40:29.718733 |
68 |
44228936 |
Const. of Bihu Mancha at 2 No Dakhi Rupahi |
300000 |
Const. of Bihu Mancha at 2 No Dakhi Rupahi1 |
25% |
-
latitude : 27.447006666666667
Longitude : 94.24553666666667
file name : Image_13112020144940318.png
|
2020-11-13 14:49:45.167413 |
69 |
65258715 |
Operation & maintenance of drinking water supply system |
805932 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.44383667
Longitude : 94.26304424
file name : Image_12012023160620998.png
|
2023-01-12 16:06:21.09803 |
70 |
86845145 |
Construction of toilets in public institutions |
170000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.4441755
Longitude : 94.2624202
file name : Image_18062024120013201.png
|
2024-06-18 12:00:13.305041 |
71 |
64888152 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.44837571
Longitude : 94.27473354
file name : Image_07022023145720983.png
|
2023-02-07 14:57:21.113409 |
72 |
64888145 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.42565567
Longitude : 94.29465314
file name : Image_19062024131814309.png
|
2024-06-19 13:18:14.415721 |
73 |
64888145 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.42568371
Longitude : 94.29474043
file name : Image_20122022112914646.png
|
2022-12-20 11:29:14.768561 |
74 |
64889660 |
Construction of toilets in public institutions |
206000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.44508327
Longitude : 94.26024764
file name : Image_02072024141122317.png
|
2024-07-02 14:11:22.40849 |
75 |
64889660 |
Construction of toilets in public institutions |
206000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.4440997
Longitude : 94.2623926
file name : Image_18012023131012412.png
|
2023-01-18 13:10:12.510173 |
76 |
64889660 |
Construction of toilets in public institutions |
206000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.4440997
Longitude : 94.2623926
file name : Image_18012023131152817.png
|
2023-01-18 13:11:52.931987 |
77 |
65258843 |
Construction of Community Sanitary Complex |
174139 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.4437936
Longitude : 94.2417631
file name : Image_15072024133449974.png
|
2024-07-15 13:34:50.07939 |
78 |
65258843 |
Construction of Community Sanitary Complex |
174139 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.4437936
Longitude : 94.2417631
file name : Image_15072024133028492.png
|
2024-07-15 13:30:28.616691 |
79 |
65258843 |
Construction of Community Sanitary Complex |
174139 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.4437936
Longitude : 94.2417631
file name : Image_15072024132425578.png
|
2024-07-15 13:24:25.686702 |
80 |
65258843 |
Construction of Community Sanitary Complex |
174139 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.41918061
Longitude : 94.26374195
file name : Image_18012023122547716.png
|
2023-01-18 12:25:47.823341 |
81 |
65258975 |
Construction of toilets in public institutions |
174140 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.43045015
Longitude : 94.29910549
file name : Image_20122022114548231.png
|
2022-12-20 11:45:48.359369 |
82 |
65258905 |
Operation & maintenance of community compost pits |
139165 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 27.44405647
Longitude : 94.26213647
file name : Image_05012023143109664.png
|
2023-01-05 14:31:09.788267 |
83 |
65258809 |
Construction of toilets in public institutions |
174139 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.42929368
Longitude : 94.22042813
file name : Image_24122022182045389.png
|
2022-12-24 18:20:45.466464 |
84 |
65259147 |
RENOVATION OF URIAMGURI LP SCHOOL |
381000 |
RENOVATION OF URIAMGURI LP SCHOOL1 |
Completion of work |
-
latitude : 27.42134723
Longitude : 94.29821172
file name : Image_20122022111829282.png
|
2022-12-20 11:18:29.383901 |
85 |
65259336 |
RENOVATION OF CHOULDHOWA OUT POST |
250000 |
RENOVATION OF CHOULDHOWA OUT POST1 |
Roof laid |
-
latitude : 27.44785372
Longitude : 94.24625952
file name : Image_18062024163100811.png
|
2024-06-18 16:31:00.922054 |
86 |
65259336 |
RENOVATION OF CHOULDHOWA OUT POST |
250000 |
RENOVATION OF CHOULDHOWA OUT POST1 |
Roof laid |
-
latitude : 27.44786045
Longitude : 94.24613536
file name : Image_07112023180305640.png
|
2023-11-07 18:03:05.756299 |
87 |
65259336 |
RENOVATION OF CHOULDHOWA OUT POST |
250000 |
RENOVATION OF CHOULDHOWA OUT POST1 |
Plinth level |
-
latitude : 27.44785922
Longitude : 94.24613867
file name : Image_07112023175854558.png
|
2023-11-07 17:58:54.715172 |
88 |
65259336 |
RENOVATION OF CHOULDHOWA OUT POST |
250000 |
RENOVATION OF CHOULDHOWA OUT POST1 |
Completion of work |
-
latitude : 27.44782941
Longitude : 94.24608975
file name : Image_24122022182112177.png
|
2022-12-24 18:21:12.250153 |
89 |
65258484 |
Construction of Community Sanitary Complex |
103700 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.4478409
Longitude : 94.2462827
file name : Image_24122022182107464.png
|
2022-12-24 18:21:07.559032 |
90 |
65259179 |
RENOVATION OF KHAGORUAN LP SCHOOL |
381500 |
RENOVATION OF KHAGORUAN LP SCHOOL1 |
Completion of work |
-
latitude : 27.4120972
Longitude : 94.27586472
file name : Image_21012023133641192.png
|
2023-01-21 13:36:41.302939 |
91 |
65259377 |
VOLLEYBALL COURT AT SWAHID GAUTAM MILI HS |
19500 |
VOLLEYBALL COURT AT SWAHID GAUTAM MILI HS1 |
Roof laid |
-
latitude : 27.43593733
Longitude : 94.27033554
file name : Image_19062024163829411.png
|
2024-06-19 16:38:29.50801 |
92 |
65259377 |
VOLLEYBALL COURT AT SWAHID GAUTAM MILI HS |
19500 |
VOLLEYBALL COURT AT SWAHID GAUTAM MILI HS1 |
Roof laid |
-
latitude : 27.43593733
Longitude : 94.27033554
file name : Image_19062024163821871.png
|
2024-06-19 16:38:21.97443 |
93 |
65259377 |
VOLLEYBALL COURT AT SWAHID GAUTAM MILI HS |
19500 |
VOLLEYBALL COURT AT SWAHID GAUTAM MILI HS1 |
Roof laid |
-
latitude : 27.43590822
Longitude : 94.27029872
file name : Image_19062024151418043.png
|
2024-06-19 15:14:18.149656 |
94 |
65259377 |
VOLLEYBALL COURT AT SWAHID GAUTAM MILI HS |
19500 |
VOLLEYBALL COURT AT SWAHID GAUTAM MILI HS1 |
Roof laid |
-
latitude : 27.43593787
Longitude : 94.27010686
file name : Image_04112023130414021.png
|
2023-11-04 13:04:14.123558 |
95 |
65259377 |
VOLLEYBALL COURT AT SWAHID GAUTAM MILI HS |
19500 |
VOLLEYBALL COURT AT SWAHID GAUTAM MILI HS1 |
Plinth level |
-
latitude : 27.4359681
Longitude : 94.27004241
file name : Image_04112023125423152.png
|
2023-11-04 12:54:23.260546 |
96 |
65259377 |
VOLLEYBALL COURT AT SWAHID GAUTAM MILI HS |
19500 |
VOLLEYBALL COURT AT SWAHID GAUTAM MILI HS1 |
Completion of work |
-
latitude : 27.43582432
Longitude : 94.27007327
file name : Image_18012023131000393.png
|
2023-01-18 13:10:00.492084 |
97 |
65258407 |
Construction of Community Sanitary Complex |
175000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.41567168
Longitude : 94.30041884
file name : Image_15032023174638506.png
|
2023-03-15 17:46:38.59273 |
98 |
65258761 |
Services of Collection & Transportation of waste from household to treatment site |
144350 |
Services of Collection & Transportation of waste from household to treatment site 1 |
Completion of work |
-
latitude : 27.44753328
Longitude : 94.24550319
file name : Image_20032023181750032.png
|
2023-03-20 18:17:50.124927 |
99 |
64888157 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.42117319
Longitude : 94.22756683
file name : Image_19062024172033793.png
|
2024-06-19 17:20:33.951477 |
100 |
64888157 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.4211386
Longitude : 94.22758407
file name : Image_19062024171811973.png
|
2024-06-19 17:18:12.055579 |
101 |
64888157 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.42125391
Longitude : 94.22759808
file name : Image_16032023174448579.png
|
2023-03-16 17:44:48.700442 |
102 |
64888157 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.42125391
Longitude : 94.22759808
file name : Image_17032023080618978.png
|
2023-03-17 08:06:19.07072 |
103 |
64873379 |
VOLLEYALL COURT AT THEKERAGURI MES |
19500 |
VOLLEYALL COURT AT THEKERAGURI MES1 |
Roof laid |
-
latitude : 27.44673512
Longitude : 94.24239837
file name : Image_23062024134226652.png
|
2024-06-23 13:42:26.749407 |
104 |
64873379 |
VOLLEYALL COURT AT THEKERAGURI MES |
19500 |
VOLLEYALL COURT AT THEKERAGURI MES1 |
Plinth level |
-
latitude : 27.44676045
Longitude : 94.24228588
file name : Image_23062024133949379.png
|
2024-06-23 13:39:49.48893 |
105 |
64873379 |
VOLLEYALL COURT AT THEKERAGURI MES |
19500 |
VOLLEYALL COURT AT THEKERAGURI MES1 |
Completion of work |
-
latitude : 27.43425488
Longitude : 94.25912025
file name : Image_19012023102818274.png
|
2023-01-19 10:28:18.380616 |
106 |
64873797 |
RENOVATION OF HINDU GOHAIN GAON LP SCHOOL |
475625 |
RENOVATION OF HINDU GOHAIN GAON LP SCHOOL1 |
Completion of work |
-
latitude : 27.43432153
Longitude : 94.28165673
file name : Image_10012023133424359.png
|
2023-01-10 13:34:24.45438 |
107 |
64873873 |
RENOVATION OF MILAPUR LP SCHOOL |
487625 |
RENOVATION OF MILAPUR LP SCHOOL1 |
Roof laid |
-
latitude : 27.43844166666667
Longitude : 94.29231833333333
file name : Image_13092024155137254.png
|
2024-09-13 15:51:37.309278 |
108 |
64873873 |
RENOVATION OF MILAPUR LP SCHOOL |
487625 |
RENOVATION OF MILAPUR LP SCHOOL1 |
Plinth level |
-
latitude : 27.43861365
Longitude : 94.29233433
file name : Image_23072024173404804.png
|
2024-07-23 17:34:04.890432 |
109 |
64873873 |
RENOVATION OF MILAPUR LP SCHOOL |
487625 |
RENOVATION OF MILAPUR LP SCHOOL1 |
Completion of work |
-
latitude : 27.43820447
Longitude : 94.29224815
file name : Image_24122022181919419.png
|
2022-12-24 18:19:19.523156 |
110 |
64874025 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.44312347
Longitude : 94.27339213
file name : Image_24012023165231896.png
|
2023-01-24 16:52:32.017618 |
111 |
64874054 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.45170149
Longitude : 94.24222716
file name : Image_19062024163926405.png
|
2024-06-19 16:39:26.500904 |
112 |
64874054 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.45178672
Longitude : 94.24222368
file name : Image_07112023173946709.png
|
2023-11-07 17:39:46.87921 |
113 |
64874054 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.45178302
Longitude : 94.24222795
file name : Image_07112023173658226.png
|
2023-11-07 17:36:58.414978 |
114 |
64874054 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.45168854
Longitude : 94.24220162
file name : Image_10012023133037186.png
|
2023-01-10 13:30:37.285821 |
115 |
64888155 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.42469286
Longitude : 94.23252256
file name : Image_19062024170152781.png
|
2024-06-19 17:01:52.887122 |
116 |
64888155 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.42463673
Longitude : 94.23255106
file name : Image_19062024165851313.png
|
2024-06-19 16:58:51.403797 |
117 |
64888155 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.42467277
Longitude : 94.23250066
file name : Image_12092023103913972.png
|
2023-09-12 10:39:14.083902 |
118 |
64888155 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.42478042
Longitude : 94.23255131
file name : Image_01042023115846537.png
|
2023-04-01 11:58:46.624256 |
119 |
65260490 |
VOLLEYBALL COURT AT THEKERAGURI MES |
19500 |
VOLLEYBALL COURT AT THEKERAGURI MES1 |
Roof laid |
-
latitude : 27.44670852
Longitude : 94.24232823
file name : Image_23062024141104853.png
|
2024-06-23 14:11:04.95507 |
120 |
65260490 |
VOLLEYBALL COURT AT THEKERAGURI MES |
19500 |
VOLLEYBALL COURT AT THEKERAGURI MES1 |
Plinth level |
-
latitude : 27.4467169
Longitude : 94.24231101
file name : Image_23062024140816254.png
|
2024-06-23 14:08:16.354033 |
121 |
65260490 |
VOLLEYBALL COURT AT THEKERAGURI MES |
19500 |
VOLLEYBALL COURT AT THEKERAGURI MES1 |
Completion of work |
-
latitude : 27.44667534
Longitude : 94.24233317
file name : Image_23062024140423885.png
|
2024-06-23 14:04:23.982947 |
122 |
65260490 |
VOLLEYBALL COURT AT THEKERAGURI MES |
19500 |
VOLLEYBALL COURT AT THEKERAGURI MES1 |
Completion of work |
-
latitude : 27.42786778
Longitude : 94.2982731
file name : Image_13112023105555573.png
|
2023-11-13 10:55:55.66118 |
123 |
65258213 |
Operation & maintenance of drinking water supply system |
803700 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.44295619
Longitude : 94.24262081
file name : Image_30032024161216612.png
|
2024-03-30 16:12:16.718821 |
124 |
64888121 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.4365601
Longitude : 94.3013776
file name : Image_23072024172359779.png
|
2024-07-23 17:23:59.868222 |
125 |
64888121 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.43844995
Longitude : 94.29639938
file name : Image_14122022124917815.png
|
2022-12-14 12:49:17.930424 |
126 |
64888149 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.42266786
Longitude : 94.22183572
file name : Image_22072024123339633.png
|
2024-07-22 12:33:39.73467 |
127 |
64888149 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.42266382
Longitude : 94.2217783
file name : Image_22072024123313977.png
|
2024-07-22 12:33:14.076961 |
128 |
64888149 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.42271155
Longitude : 94.22177229
file name : Image_17032023080624887.png
|
2023-03-17 08:06:24.982764 |
129 |
64888149 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.42271155
Longitude : 94.22177229
file name : Image_17032023080630870.png
|
2023-03-17 08:06:30.966728 |
130 |
65259408 |
VOLLEYBALL COURT AT KATORICHAPORI MADHABDEV ME |
19500 |
VOLLEYBALL COURT AT KATORICHAPORI MADHABDEV ME1 |
Roof laid |
-
latitude : 27.44672637
Longitude : 94.24232831
file name : Image_23062024135703278.png
|
2024-06-23 13:57:03.372631 |
131 |
65259408 |
VOLLEYBALL COURT AT KATORICHAPORI MADHABDEV ME |
19500 |
VOLLEYBALL COURT AT KATORICHAPORI MADHABDEV ME1 |
Plinth level |
-
latitude : 27.44667201
Longitude : 94.24231953
file name : Image_23062024135329892.png
|
2024-06-23 13:53:29.982364 |
132 |
65259408 |
VOLLEYBALL COURT AT KATORICHAPORI MADHABDEV ME |
19500 |
VOLLEYBALL COURT AT KATORICHAPORI MADHABDEV ME1 |
Completion of work |
-
latitude : 27.42239296
Longitude : 94.22221088
file name : Image_19012023144151605.png
|
2023-01-19 14:41:51.735942 |
133 |
65259962 |
RENOVATION OF BHARATPUR LPS |
394862 |
RENOVATION OF BHARATPUR LPS1 |
Roof laid |
-
latitude : 27.42421038
Longitude : 94.23232528
file name : Image_19062024170647262.png
|
2024-06-19 17:06:47.369107 |
134 |
65259962 |
RENOVATION OF BHARATPUR LPS |
394862 |
RENOVATION OF BHARATPUR LPS1 |
Plinth level |
-
latitude : 27.42420046
Longitude : 94.23228895
file name : Image_19062024170406861.png
|
2024-06-19 17:04:06.967365 |
135 |
65259962 |
RENOVATION OF BHARATPUR LPS |
394862 |
RENOVATION OF BHARATPUR LPS1 |
Plinth level |
-
latitude : 27.42427843
Longitude : 94.23219351
file name : Image_08112023100912015.png
|
2023-11-08 10:09:12.14883 |
136 |
65259962 |
RENOVATION OF BHARATPUR LPS |
394862 |
RENOVATION OF BHARATPUR LPS1 |
Completion of work |
-
latitude : 27.42438223
Longitude : 94.23231141
file name : Image_24122022181934196.png
|
2022-12-24 18:19:34.290675 |
137 |
65259962 |
RENOVATION OF BHARATPUR LPS |
394862 |
RENOVATION OF BHARATPUR LPS1 |
Completion of work |
-
latitude : 27.42438223
Longitude : 94.23231141
file name : Image_24122022182120646.png
|
2022-12-24 18:21:20.737469 |
138 |
64888135 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.44806742
Longitude : 94.24647113
file name : Image_07112023175221830.png
|
2023-11-07 17:52:21.936506 |
139 |
64888135 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.44803756
Longitude : 94.24638063
file name : Image_07112023174826270.png
|
2023-11-07 17:48:26.373455 |
140 |
64888135 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.44782546
Longitude : 94.24597458
file name : Image_24122022182116366.png
|
2022-12-24 18:21:16.450703 |
141 |
64874101 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.41051665
Longitude : 94.26112045
file name : Image_23072024154230595.png
|
2024-07-23 15:42:30.679935 |
142 |
64874101 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.40614423
Longitude : 94.26818332
file name : Image_18012023123404508.png
|
2023-01-18 12:34:04.633364 |
143 |
64873436 |
VOLLEYALL COURT AT RUPAHI HIGH SCHOOL |
19500 |
VOLLEYALL COURT AT RUPAHI HIGH SCHOOL1 |
Roof laid |
-
latitude : 27.44740839
Longitude : 94.2480268
file name : Image_07112023181534278.png
|
2023-11-07 18:15:34.423138 |
144 |
64873436 |
VOLLEYALL COURT AT RUPAHI HIGH SCHOOL |
19500 |
VOLLEYALL COURT AT RUPAHI HIGH SCHOOL1 |
Plinth level |
-
latitude : 27.44742793
Longitude : 94.24806529
file name : Image_07112023181146145.png
|
2023-11-07 18:11:46.27212 |
145 |
64873436 |
VOLLEYALL COURT AT RUPAHI HIGH SCHOOL |
19500 |
VOLLEYALL COURT AT RUPAHI HIGH SCHOOL1 |
Completion of work |
-
latitude : 27.4479741
Longitude : 94.2480966
file name : Image_19012023105327811.png
|
2023-01-19 10:53:27.928401 |
146 |
64873352 |
VOLLEYBALL COURT AT RUPAHI GIRLS MES |
19500 |
VOLLEYBALL COURT AT RUPAHI GIRLS MES1 |
Roof laid |
-
latitude : 27.44677283
Longitude : 94.24236148
file name : Image_07112023183019168.png
|
2023-11-07 18:30:19.339052 |
147 |
64873352 |
VOLLEYBALL COURT AT RUPAHI GIRLS MES |
19500 |
VOLLEYBALL COURT AT RUPAHI GIRLS MES1 |
Plinth level |
-
latitude : 27.44677728
Longitude : 94.24236136
file name : Image_07112023182604013.png
|
2023-11-07 18:26:04.189621 |
148 |
64873352 |
VOLLEYBALL COURT AT RUPAHI GIRLS MES |
19500 |
VOLLEYBALL COURT AT RUPAHI GIRLS MES1 |
Completion of work |
-
latitude : 27.44656978
Longitude : 94.24230209
file name : Image_19012023105618279.png
|
2023-01-19 10:56:18.401249 |
149 |
87904540 |
Renovation of Sonapur LP School |
400000 |
Renovation of Sonapur LP School1 |
Plinth level |
-
latitude : 27.4509305
Longitude : 94.27326503
file name : Image_01102024135401570.png
|
2024-10-01 13:54:01.669731 |
150 |
87904540 |
Renovation of Sonapur LP School |
400000 |
Renovation of Sonapur LP School1 |
Plinth level |
-
latitude : 27.45087645
Longitude : 94.27316759
file name : Image_12072024142856082.png
|
2024-07-12 14:28:56.190212 |
151 |
87904540 |
Renovation of Sonapur LP School |
400000 |
Renovation of Sonapur LP School1 |
Completion of work |
-
latitude : 27.450859
Longitude : 94.27316048
file name : Image_11012024115848459.png
|
2024-01-11 11:58:48.549261 |
152 |
87904725 |
RENOVATION OF BRANCHPUR JANAJATI |
407700 |
RENOVATION OF BRANCHPUR JANAJATI1 |
Roof laid |
-
latitude : 27.40428713
Longitude : 94.21908716
file name : Image_22072024124356145.png
|
2024-07-22 12:43:56.247095 |
153 |
87904725 |
RENOVATION OF BRANCHPUR JANAJATI |
407700 |
RENOVATION OF BRANCHPUR JANAJATI1 |
Plinth level |
-
latitude : 27.40427412
Longitude : 94.21906064
file name : Image_22072024124050562.png
|
2024-07-22 12:40:50.657746 |
154 |
87904725 |
RENOVATION OF BRANCHPUR JANAJATI |
407700 |
RENOVATION OF BRANCHPUR JANAJATI1 |
Completion of work |
-
latitude : 27.40429155
Longitude : 94.21906157
file name : Image_22072024123400809.png
|
2024-07-22 12:34:00.92145 |
155 |
87904725 |
RENOVATION OF BRANCHPUR JANAJATI |
407700 |
RENOVATION OF BRANCHPUR JANAJATI1 |
Completion of work |
-
latitude : 27.404421
Longitude : 94.21879603
file name : Image_18112023122256408.png
|
2023-11-18 12:22:56.495595 |
156 |
86845936 |
RENNOVATION OF CHAOULDHUWA GP CAMPUS |
485000 |
RENNOVATION OF CHAOULDHUWA GP CAMPUS1 |
Completion of work |
-
latitude : 27.44381883
Longitude : 94.2637078
file name : Image_06122023134326601.png
|
2023-12-06 13:43:26.768495 |
157 |
86868688 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.4468784
Longitude : 94.24194129
file name : Image_11122023113213662.png
|
2023-12-11 11:32:13.75544 |
158 |
86868688 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.4468784
Longitude : 94.24194129
file name : Image_11122023113209951.png
|
2023-12-11 11:32:10.041826 |
159 |
86868734 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.44382844
Longitude : 94.26312789
file name : Image_11122023105310245.png
|
2023-12-11 10:53:10.334077 |
160 |
86868969 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.44332559
Longitude : 94.26361868
file name : Image_11122023105839879.png
|
2023-12-11 10:58:39.967609 |
161 |
86869158 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.45045167
Longitude : 94.24890508
file name : Image_11122023111831252.png
|
2023-12-11 11:18:31.347531 |
162 |
86869216 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.45042188
Longitude : 94.24880755
file name : Image_11122023111816351.png
|
2023-12-11 11:18:16.444886 |
163 |
86869258 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.44371335
Longitude : 94.26309562
file name : Image_11122023105323139.png
|
2023-12-11 10:53:23.222265 |
164 |
86869258 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.44371335
Longitude : 94.26309562
file name : Image_11122023105318896.png
|
2023-12-11 10:53:18.980602 |
165 |
86869377 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.44682614
Longitude : 94.24210473
file name : Image_11122023113206430.png
|
2023-12-11 11:32:06.531371 |
166 |
88130498 |
Operation & maintenance of community sanitary complex |
52500 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 27.44341437
Longitude : 94.26355374
file name : Image_06122023150519241.png
|
2023-12-06 15:05:19.343386 |
167 |
88134596 |
Operation & maintenance of drinking water supply system |
830300 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.4438002
Longitude : 94.26301933
file name : Image_17052024145315142.png
|
2024-05-17 14:53:15.243282 |
168 |
50992815 |
portable drinking water tank at chauldhuwa GP office |
217349 |
portable drinking water tank at chauldhuwa GP office1 |
Roof laid |
-
latitude : 27.443936
Longitude : 94.26284184
file name : Image_18062024120022592.png
|
2024-06-18 12:00:22.682952 |
169 |
50992815 |
portable drinking water tank at chauldhuwa GP office |
217349 |
portable drinking water tank at chauldhuwa GP office1 |
Plinth level |
-
latitude : 27.44375481
Longitude : 94.26302714
file name : Image_17052024151512556.png
|
2024-05-17 15:15:12.669313 |
170 |
50992815 |
portable drinking water tank at chauldhuwa GP office |
217349 |
portable drinking water tank at chauldhuwa GP office1 |
Completion of work |
-
latitude : 27.44379186
Longitude : 94.2629615
file name : Image_17052024145504890.png
|
2024-05-17 14:55:04.980005 |
171 |
65259996 |
CONTRIBUTION TO ZILLA PARISHAD NEW BUILDING |
50000 |
CONTRIBUTION TO ZILLA PARISHAD NEW BUILDING1 |
Roof laid |
-
latitude : 27.44381022
Longitude : 94.26288678
file name : Image_18062024120017552.png
|
2024-06-18 12:00:17.648062 |
172 |
65259996 |
CONTRIBUTION TO ZILLA PARISHAD NEW BUILDING |
50000 |
CONTRIBUTION TO ZILLA PARISHAD NEW BUILDING1 |
Plinth level |
-
latitude : 27.4438863
Longitude : 94.26309263
file name : Image_14062024124732584.png
|
2024-06-14 12:47:32.677774 |
173 |
65259996 |
CONTRIBUTION TO ZILLA PARISHAD NEW BUILDING |
50000 |
CONTRIBUTION TO ZILLA PARISHAD NEW BUILDING1 |
Completion of work |
-
latitude : 27.44385918
Longitude : 94.26303302
file name : Image_14112022145802520.png
|
2022-11-14 14:58:02.693968 |
174 |
87904621 |
RENOVATION OF KAIBATRA SONAPUR LP SCHOOL |
300000 |
RENOVATION OF KAIBATRA SONAPUR LP SCHOOL1 |
Plinth level |
-
latitude : 27.443794
Longitude : 94.2417543
file name : Image_17072024141643268.png
|
2024-07-17 14:16:43.344351 |
175 |
87904621 |
RENOVATION OF KAIBATRA SONAPUR LP SCHOOL |
300000 |
RENOVATION OF KAIBATRA SONAPUR LP SCHOOL1 |
Completion of work |
-
latitude : 27.44306453
Longitude : 94.27595111
file name : Image_14062024122920610.png
|
2024-06-14 12:29:20.70677 |
176 |
86845588 |
Construction of Community Sanitary Complex |
107582 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.4386878
Longitude : 94.2625178
file name : Image_18062024122318897.png
|
2024-06-18 12:23:19.006545 |
177 |
65260468 |
VOLLEYBALL COURT AT KATARI CHAPORI HS |
19500 |
VOLLEYBALL COURT AT KATARI CHAPORI HS1 |
Roof laid |
-
latitude : 27.4437936
Longitude : 94.2417631
file name : Image_15072024150319575.png
|
2024-07-15 15:03:19.755463 |
178 |
65260468 |
VOLLEYBALL COURT AT KATARI CHAPORI HS |
19500 |
VOLLEYBALL COURT AT KATARI CHAPORI HS1 |
Roof laid |
-
latitude : 27.44672255
Longitude : 94.24236639
file name : Image_23062024140316614.png
|
2024-06-23 14:03:16.709069 |
179 |
65260468 |
VOLLEYBALL COURT AT KATARI CHAPORI HS |
19500 |
VOLLEYBALL COURT AT KATARI CHAPORI HS1 |
Plinth level |
-
latitude : 27.44674705
Longitude : 94.24231777
file name : Image_23062024135744203.png
|
2024-06-23 13:57:44.314587 |
180 |
65260468 |
VOLLEYBALL COURT AT KATARI CHAPORI HS |
19500 |
VOLLEYBALL COURT AT KATARI CHAPORI HS1 |
Completion of work |
-
latitude : 27.4343535
Longitude : 94.2818816
file name : Image_13112023105540768.png
|
2023-11-13 10:55:40.88945 |
181 |
64873994 |
Operation & maintenance of drinking water supply system |
1006000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 27.443765
Longitude : 94.26314499999998
file name : Image_13092024153047618.png
|
2024-09-13 15:30:47.690405 |
182 |
64873994 |
Operation & maintenance of drinking water supply system |
1006000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.44381166666667
Longitude : 94.26308833333333
file name : Image_13092024152724745.png
|
2024-09-13 15:27:24.799881 |
183 |
64873994 |
Operation & maintenance of drinking water supply system |
1006000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.40435511
Longitude : 94.2175977
file name : Image_13112023122133608.png
|
2023-11-13 12:21:33.698317 |
184 |
64873825 |
REOVATION OF CHOULDHOWA PHC |
475625 |
REOVATION OF CHOULDHOWA PHC1 |
Roof laid |
-
latitude : 27.4506298
Longitude : 94.24869706
file name : Image_18062024161747007.png
|
2024-06-18 16:17:47.09752 |
185 |
64873825 |
REOVATION OF CHOULDHOWA PHC |
475625 |
REOVATION OF CHOULDHOWA PHC1 |
Plinth level |
-
latitude : 27.45063009
Longitude : 94.24874047
file name : Image_18062024161014355.png
|
2024-06-18 16:10:14.437338 |
186 |
64873825 |
REOVATION OF CHOULDHOWA PHC |
475625 |
REOVATION OF CHOULDHOWA PHC1 |
Completion of work |
-
latitude : 27.450518
Longitude : 94.24866609
file name : Image_03062023172645230.png
|
2023-06-03 17:26:45.325398 |
187 |
50994443 |
construction of subansiri sakha sahitya sabha bhaban at chauldhuwa |
450000 |
construction of subansiri sakha sahitya sabha bhaban at chauldhuwa 1 |
Roof laid |
-
latitude : 27.44711825
Longitude : 94.24549452
file name : Image_18062024165953033.png
|
2024-06-18 16:59:53.12517 |
188 |
50994443 |
construction of subansiri sakha sahitya sabha bhaban at chauldhuwa |
450000 |
construction of subansiri sakha sahitya sabha bhaban at chauldhuwa 1 |
Plinth level |
-
latitude : 27.44713703
Longitude : 94.24547829
file name : Image_18062024165733560.png
|
2024-06-18 16:57:33.652733 |
189 |
50994443 |
construction of subansiri sakha sahitya sabha bhaban at chauldhuwa |
450000 |
construction of subansiri sakha sahitya sabha bhaban at chauldhuwa 1 |
Completion of work |
-
latitude : 27.44714477
Longitude : 94.24541248
file name : Image_18062024164922982.png
|
2024-06-18 16:49:23.070905 |
190 |
65260512 |
VOLLEYBALL COURT AT JOYKISHAN MES |
19500 |
VOLLEYBALL COURT AT JOYKISHAN MES1 |
Roof laid |
-
latitude : 27.43588255
Longitude : 94.27028161
file name : Image_19062024152338665.png
|
2024-06-19 15:23:38.764064 |
191 |
65260512 |
VOLLEYBALL COURT AT JOYKISHAN MES |
19500 |
VOLLEYBALL COURT AT JOYKISHAN MES1 |
Plinth level |
-
latitude : 27.43588861
Longitude : 94.27026992
file name : Image_19062024151951963.png
|
2024-06-19 15:19:52.068157 |
192 |
65260512 |
VOLLEYBALL COURT AT JOYKISHAN MES |
19500 |
VOLLEYBALL COURT AT JOYKISHAN MES1 |
Completion of work |
-
latitude : 27.43593238
Longitude : 94.27030152
file name : Image_19062024151503929.png
|
2024-06-19 15:15:04.018353 |
193 |
65260512 |
VOLLEYBALL COURT AT JOYKISHAN MES |
19500 |
VOLLEYBALL COURT AT JOYKISHAN MES1 |
Completion of work |
-
latitude : 27.43871556
Longitude : 94.2966233
file name : Image_13112023105607594.png
|
2023-11-13 10:56:07.714409 |
194 |
50994569 |
renovation of bhujpuri cultural centre at gergeria |
225000 |
renovation of bhujpuri cultural centre at gergeria1 |
Roof laid |
-
latitude : 27.4316802
Longitude : 94.27051231
file name : Image_19062024153648503.png
|
2024-06-19 15:36:45.935386 |
195 |
50994569 |
renovation of bhujpuri cultural centre at gergeria |
225000 |
renovation of bhujpuri cultural centre at gergeria1 |
Plinth level |
-
latitude : 27.43169091
Longitude : 94.27051522
file name : Image_19062024153309032.png
|
2024-06-19 15:33:09.123759 |
196 |
50994569 |
renovation of bhujpuri cultural centre at gergeria |
225000 |
renovation of bhujpuri cultural centre at gergeria1 |
Plinth level |
-
latitude : 27.43165337
Longitude : 94.27051426
file name : Image_19062024153140406.png
|
2024-06-19 15:31:40.502008 |
197 |
50994569 |
renovation of bhujpuri cultural centre at gergeria |
225000 |
renovation of bhujpuri cultural centre at gergeria1 |
Completion of work |
-
latitude : 27.43164656
Longitude : 94.27052553
file name : Image_19062024152916223.png
|
2024-06-19 15:29:16.312405 |
198 |
50994639 |
construction of gergeria sankari cultural center at na ali |
225000 |
construction of gergeria sankari cultural center at na ali1 |
Roof laid |
-
latitude : 27.43456972
Longitude : 94.26426181
file name : Image_19062024160143934.png
|
2024-06-19 16:01:44.049072 |
199 |
50994639 |
construction of gergeria sankari cultural center at na ali |
225000 |
construction of gergeria sankari cultural center at na ali1 |
Plinth level |
-
latitude : 27.43455771
Longitude : 94.26426804
file name : Image_19062024155810874.png
|
2024-06-19 15:58:10.987027 |
200 |
50994639 |
construction of gergeria sankari cultural center at na ali |
225000 |
construction of gergeria sankari cultural center at na ali1 |
Completion of work |
-
latitude : 27.43456144
Longitude : 94.2642447
file name : Image_19062024155025233.png
|
2024-06-19 15:50:25.342382 |
201 |
65258604 |
Construction of Community Sanitary Complex |
175000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.43153613
Longitude : 94.23765419
file name : Image_19062024165408316.png
|
2024-06-19 16:54:08.40793 |
202 |
65258604 |
Construction of Community Sanitary Complex |
175000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.4315261
Longitude : 94.23764655
file name : Image_19062024165149235.png
|
2024-06-19 16:51:49.330845 |
203 |
65258604 |
Construction of Community Sanitary Complex |
175000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.43153873
Longitude : 94.23773649
file name : Image_19062024164850079.png
|
2024-06-19 16:48:50.195403 |
204 |
65258604 |
Construction of Community Sanitary Complex |
175000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.4313592
Longitude : 94.23760067
file name : Image_19012023110219030.png
|
2023-01-19 11:02:19.130156 |
205 |
65258558 |
Construction of Community Sanitary Complex |
175000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.42431448
Longitude : 94.2320609
file name : Image_19062024171407111.png
|
2024-06-19 17:14:07.218356 |
206 |
65258558 |
Construction of Community Sanitary Complex |
175000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.42432144
Longitude : 94.23201371
file name : Image_19062024171145359.png
|
2024-06-19 17:11:45.457785 |
207 |
65258558 |
Construction of Community Sanitary Complex |
175000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.42428907
Longitude : 94.23203937
file name : Image_19062024170905394.png
|
2024-06-19 17:09:05.496211 |
208 |
65258558 |
Construction of Community Sanitary Complex |
175000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.42433143
Longitude : 94.2319954
file name : Image_19012023144144195.png
|
2023-01-19 14:41:44.309295 |
209 |
61108056 |
Const. of CC block paver block road basantipur tiniali to dhanpur tiniali |
450000 |
Const. of CC block paver block road basantipur tiniali to dhanpur tiniali1 |
Roof laid |
-
latitude : 27.42155607,27.42155535
Longitude : 94.22246326,94.2224621
file name : Image_19062024173750797.png
|
2024-06-19 17:37:50.893508 |
210 |
61108056 |
Const. of CC block paver block road basantipur tiniali to dhanpur tiniali |
450000 |
Const. of CC block paver block road basantipur tiniali to dhanpur tiniali1 |
Plinth level |
-
latitude : 27.42155483,27.421548
Longitude : 94.22247063,94.22246198
file name : Image_19062024173448958.png
|
2024-06-19 17:34:49.051586 |
211 |
61108056 |
Const. of CC block paver block road basantipur tiniali to dhanpur tiniali |
450000 |
Const. of CC block paver block road basantipur tiniali to dhanpur tiniali1 |
Completion of work |
-
latitude : 27.4312101,27.4312101
Longitude : 94.2033864,94.2033864
file name : Image_19062024173024405.png
|
2024-06-19 17:30:24.496145 |
212 |
106686703 |
RENOVATION OF PRESIDENT ROOM AT CHAULDHOWA GAON PANCHAYAT |
250000 |
RENOVATION OF PRESIDENT ROOM AT CHAULDHOWA GAON PANCHAYAT1 |
Completion of work |
-
latitude : 27.44376151
Longitude : 94.26303709
file name : Image_27062024160852521.png
|
2024-06-27 16:08:52.621834 |
213 |
65260043 |
VOLLEYBALL COURT AT RUPOHI GIRL'S MES |
19500 |
VOLLEYBALL COURT AT RUPOHI GIRL'S MES1 |
Roof laid |
-
latitude : 27.4466697
Longitude : 94.24236073
file name : Image_23062024115003058.png
|
2024-06-23 11:50:03.151916 |
214 |
65260043 |
VOLLEYBALL COURT AT RUPOHI GIRL'S MES |
19500 |
VOLLEYBALL COURT AT RUPOHI GIRL'S MES1 |
Roof laid |
-
latitude : 27.4466697
Longitude : 94.24236073
file name : Image_23062024115023884.png
|
2024-06-23 11:50:23.978926 |
215 |
65260043 |
VOLLEYBALL COURT AT RUPOHI GIRL'S MES |
19500 |
VOLLEYBALL COURT AT RUPOHI GIRL'S MES1 |
Plinth level |
-
latitude : 27.44381332
Longitude : 94.24185642
file name : Image_22062024165646404.png
|
2024-06-22 16:56:46.495411 |
216 |
65260043 |
VOLLEYBALL COURT AT RUPOHI GIRL'S MES |
19500 |
VOLLEYBALL COURT AT RUPOHI GIRL'S MES1 |
Completion of work |
-
latitude : 27.44373511
Longitude : 94.24178951
file name : Image_22062024164833863.png
|
2024-06-22 16:48:33.962566 |
217 |
65260043 |
VOLLEYBALL COURT AT RUPOHI GIRL'S MES |
19500 |
VOLLEYBALL COURT AT RUPOHI GIRL'S MES1 |
Completion of work |
-
latitude : 27.4260265
Longitude : 94.233235
file name : Image_08112023163114059.png
|
2023-11-08 16:31:14.173216 |
218 |
64873368 |
VOLLEYALL COURT AT KATORI CHAPORI HS |
19500 |
VOLLEYALL COURT AT KATORI CHAPORI HS1 |
Roof laid |
-
latitude : 27.4467717
Longitude : 94.24228775
file name : Image_23062024133853960.png
|
2024-06-23 13:38:54.069357 |
219 |
64873368 |
VOLLEYALL COURT AT KATORI CHAPORI HS |
19500 |
VOLLEYALL COURT AT KATORI CHAPORI HS1 |
Plinth level |
-
latitude : 27.44674292
Longitude : 94.2422836
file name : Image_23062024133554121.png
|
2024-06-23 13:35:54.243693 |
220 |
64873368 |
VOLLEYALL COURT AT KATORI CHAPORI HS |
19500 |
VOLLEYALL COURT AT KATORI CHAPORI HS1 |
Completion of work |
-
latitude : 27.4077088
Longitude : 94.2293305
file name : Image_19012023145930067.png
|
2023-01-19 14:59:30.187816 |
221 |
64873392 |
VOLLEYALL COURT AT JOYKISHA MES |
19500 |
VOLLEYALL COURT AT JOYKISHA MES1 |
Roof laid |
-
latitude : 27.4467227
Longitude : 94.24228764
file name : Image_23062024134909707.png
|
2024-06-23 13:49:09.808579 |
222 |
64873392 |
VOLLEYALL COURT AT JOYKISHA MES |
19500 |
VOLLEYALL COURT AT JOYKISHA MES1 |
Plinth level |
-
latitude : 27.44676003
Longitude : 94.24231564
file name : Image_23062024134605778.png
|
2024-06-23 13:46:05.888842 |
223 |
64873392 |
VOLLEYALL COURT AT JOYKISHA MES |
19500 |
VOLLEYALL COURT AT JOYKISHA MES1 |
Completion of work |
-
latitude : 27.44674457
Longitude : 94.24230782
file name : Image_23062024134306131.png
|
2024-06-23 13:43:06.237367 |
224 |
64873392 |
VOLLEYALL COURT AT JOYKISHA MES |
19500 |
VOLLEYALL COURT AT JOYKISHA MES1 |
Completion of work |
-
latitude : 27.43587383
Longitude : 94.27029969
file name : Image_19062024163816394.png
|
2024-06-19 16:38:16.485601 |
225 |
64873392 |
VOLLEYALL COURT AT JOYKISHA MES |
19500 |
VOLLEYALL COURT AT JOYKISHA MES1 |
Completion of work |
-
latitude : 27.4328809
Longitude : 94.28836281
file name : Image_18012023131005510.png
|
2023-01-18 13:10:05.625075 |
226 |
64873392 |
VOLLEYALL COURT AT JOYKISHA MES |
19500 |
VOLLEYALL COURT AT JOYKISHA MES1 |
Completion of work |
-
latitude : 27.4328809
Longitude : 94.28836281
file name : Image_18012023131050605.png
|
2023-01-18 13:10:50.713496 |
227 |
65260532 |
VOLLEYBALL COURT AT RUPOHI HIGH SCHOOL |
19500 |
VOLLEYBALL COURT AT RUPOHI HIGH SCHOOL1 |
Roof laid |
-
latitude : 27.44673106
Longitude : 94.24222619
file name : Image_23062024141748600.png
|
2024-06-23 14:17:48.691444 |
228 |
65260532 |
VOLLEYBALL COURT AT RUPOHI HIGH SCHOOL |
19500 |
VOLLEYBALL COURT AT RUPOHI HIGH SCHOOL1 |
Plinth level |
-
latitude : 27.44672316
Longitude : 94.24228939
file name : Image_23062024141500013.png
|
2024-06-23 14:15:00.114881 |
229 |
65260532 |
VOLLEYBALL COURT AT RUPOHI HIGH SCHOOL |
19500 |
VOLLEYBALL COURT AT RUPOHI HIGH SCHOOL1 |
Completion of work |
-
latitude : 27.44669847
Longitude : 94.24233767
file name : Image_23062024141209711.png
|
2024-06-23 14:12:09.812362 |
230 |
65260532 |
VOLLEYBALL COURT AT RUPOHI HIGH SCHOOL |
19500 |
VOLLEYBALL COURT AT RUPOHI HIGH SCHOOL1 |
Completion of work |
-
latitude : 27.43898381
Longitude : 94.29732022
file name : Image_13112023105610845.png
|
2023-11-13 10:56:11.04075 |
231 |
61106047 |
10 % expenditure for preparedness on covid 19 |
201235 |
10 % expenditure for preparedness on covid 191 |
Roof laid |
-
latitude : 27.44381597
Longitude : 94.26309066
file name : Image_01072024124021697.png
|
2024-07-01 12:40:21.803255 |
232 |
61106047 |
10 % expenditure for preparedness on covid 19 |
201235 |
10 % expenditure for preparedness on covid 191 |
Plinth level |
-
latitude : 27.44370941
Longitude : 94.26299682
file name : Image_01072024123643171.png
|
2024-07-01 12:36:43.271188 |
233 |
61106047 |
10 % expenditure for preparedness on covid 19 |
201235 |
10 % expenditure for preparedness on covid 191 |
Completion of work |
-
latitude : 27.44368421
Longitude : 94.26302265
file name : Image_01072024123010015.png
|
2024-07-01 12:30:10.190771 |
234 |
61106047 |
10 % expenditure for preparedness on covid 19 |
201235 |
10 % expenditure for preparedness on covid 191 |
Completion of work |
-
latitude : 27.44378349
Longitude : 94.26302906
file name : Image_16022023155048645.png
|
2023-02-16 15:50:48.752992 |
235 |
50994742 |
construction and infrasructure developmemt at karokaoni sankardev LP school |
461114 |
construction and infrasructure developmemt at karokaoni sankardev LP school1 |
Roof laid |
-
latitude : 27.40559218
Longitude : 94.24845166
file name : Image_02072024142741646.png
|
2024-07-02 14:27:41.757965 |
236 |
50994742 |
construction and infrasructure developmemt at karokaoni sankardev LP school |
461114 |
construction and infrasructure developmemt at karokaoni sankardev LP school1 |
Plinth level |
-
latitude : 27.40559875
Longitude : 94.24850049
file name : Image_02072024142409248.png
|
2024-07-02 14:24:09.376588 |
237 |
50994742 |
construction and infrasructure developmemt at karokaoni sankardev LP school |
461114 |
construction and infrasructure developmemt at karokaoni sankardev LP school1 |
Completion of work |
-
latitude : 27.40557428
Longitude : 94.24843614
file name : Image_02072024141509605.png
|
2024-07-02 14:15:09.714689 |
238 |
50981469 |
deep tubewell at pathalipam rashi line |
250000 |
deep tubewell at pathalipam rashi line1 |
Plinth level |
-
latitude : 27.46719977
Longitude : 94.25358407
file name : Image_01102024141939805.png
|
2024-10-01 14:19:39.912218 |
239 |
50981469 |
deep tubewell at pathalipam rashi line |
250000 |
deep tubewell at pathalipam rashi line1 |
Completion of work |
-
latitude : 27.47776958
Longitude : 94.23779606
file name : Image_04082023115902807.png
|
2023-08-04 11:59:02.990308 |
240 |
86846126 |
RENOVATION OF ROOF TRUSS OF THEKERAGURI ME SCHOOL |
242700 |
RENOVATION OF ROOF TRUSS OF THEKERAGURI ME SCHOOL1 |
Plinth level |
-
latitude : 27.4342329
Longitude : 94.25917616
file name : Image_22112023133848705.png
|
2023-11-22 13:38:48.787133 |
241 |
86846126 |
RENOVATION OF ROOF TRUSS OF THEKERAGURI ME SCHOOL |
242700 |
RENOVATION OF ROOF TRUSS OF THEKERAGURI ME SCHOOL1 |
Completion of work |
-
latitude : 27.43421435
Longitude : 94.25900789
file name : Image_03112023130453848.png
|
2023-11-03 13:04:53.98434 |
242 |
64888039 |
Construction of toilets in public institutions |
55000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.4437936
Longitude : 94.2417631
file name : Image_15072024145012549.png
|
2024-07-15 14:50:12.648657 |
243 |
64888039 |
Construction of toilets in public institutions |
55000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.4437936
Longitude : 94.2417631
file name : Image_15072024144737734.png
|
2024-07-15 14:47:37.835783 |
244 |
64888039 |
Construction of toilets in public institutions |
55000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.4437936
Longitude : 94.2417631
file name : Image_15072024144047173.png
|
2024-07-15 14:40:47.299632 |
245 |
65262660 |
VOLLEYBALL COURT AT BRANCHPUR JANAJATI MES |
19500 |
VOLLEYBALL COURT AT BRANCHPUR JANAJATI MES1 |
Roof laid |
-
latitude : 27.4437936
Longitude : 94.2417631
file name : Image_15072024150817288.png
|
2024-07-15 15:08:17.387369 |
246 |
65262660 |
VOLLEYBALL COURT AT BRANCHPUR JANAJATI MES |
19500 |
VOLLEYBALL COURT AT BRANCHPUR JANAJATI MES1 |
Plinth level |
-
latitude : 27.4437936
Longitude : 94.2417631
file name : Image_15072024150507086.png
|
2024-07-15 15:05:07.174054 |
247 |
65262660 |
VOLLEYBALL COURT AT BRANCHPUR JANAJATI MES |
19500 |
VOLLEYBALL COURT AT BRANCHPUR JANAJATI MES1 |
Completion of work |
-
latitude : 27.40415851
Longitude : 94.21887334
file name : Image_19012023144256576.png
|
2023-01-19 14:42:56.700404 |
248 |
64873843 |
RENOVATION OF GHAGOR LP SCHOOL |
475625 |
RENOVATION OF GHAGOR LP SCHOOL1 |
Plinth level |
-
latitude : 27.44660936
Longitude : 94.22672339
file name : Image_22072024110218641.png
|
2024-07-22 11:02:18.740506 |
249 |
64873843 |
RENOVATION OF GHAGOR LP SCHOOL |
475625 |
RENOVATION OF GHAGOR LP SCHOOL1 |
Completion of work |
-
latitude : 27.44664493
Longitude : 94.22244626
file name : Image_24122022182057534.png
|
2022-12-24 18:20:57.622245 |
250 |
64874075 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.41474433
Longitude : 94.21807609
file name : Image_22072024125711996.png
|
2024-07-22 12:57:12.086677 |
251 |
64874075 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.4147405
Longitude : 94.21807486
file name : Image_22072024125301278.png
|
2024-07-22 12:53:01.396993 |
252 |
64874075 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.41475898
Longitude : 94.21808991
file name : Image_20052023120639360.png
|
2023-05-20 12:06:39.467527 |
253 |
64874075 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.41474887
Longitude : 94.21806566
file name : Image_24122022182126244.png
|
2022-12-24 18:21:26.341065 |
254 |
65259906 |
RENOVATION OF KATHOI CHAPORI MADHABDEV ME SCHOOL |
532088 |
RENOVATION OF KATHOI CHAPORI MADHABDEV ME SCHOOL1 |
Roof laid |
-
latitude : 27.42258477
Longitude : 94.22253214
file name : Image_22072024131316813.png
|
2024-07-22 13:13:16.897662 |
255 |
65259906 |
RENOVATION OF KATHOI CHAPORI MADHABDEV ME SCHOOL |
532088 |
RENOVATION OF KATHOI CHAPORI MADHABDEV ME SCHOOL1 |
Plinth level |
-
latitude : 27.42263165
Longitude : 94.22245374
file name : Image_22072024130550223.png
|
2024-07-22 13:05:50.327924 |
256 |
65259906 |
RENOVATION OF KATHOI CHAPORI MADHABDEV ME SCHOOL |
532088 |
RENOVATION OF KATHOI CHAPORI MADHABDEV ME SCHOOL1 |
Completion of work |
-
latitude : 27.4223556
Longitude : 94.22212155
file name : Image_24122022182039150.png
|
2022-12-24 18:20:39.232783 |
257 |
65258583 |
Construction of Community Sanitary Complex |
175000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.43892333
Longitude : 94.2341174
file name : Image_22072024133111538.png
|
2024-07-22 13:31:11.638031 |
258 |
65258583 |
Construction of Community Sanitary Complex |
175000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.43893034
Longitude : 94.23411436
file name : Image_22072024132856472.png
|
2024-07-22 13:28:56.56415 |
259 |
65258583 |
Construction of Community Sanitary Complex |
175000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.43894917
Longitude : 94.2341457
file name : Image_22072024132520714.png
|
2024-07-22 13:25:20.809538 |
260 |
65258583 |
Construction of Community Sanitary Complex |
175000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.43634207
Longitude : 94.2264116
file name : Image_16012023124609995.png
|
2023-01-16 12:46:10.120983 |
261 |
86846023 |
RENOVATION OF GERGERIA BALIJAN LP SCHOOL |
380000 |
RENOVATION OF GERGERIA BALIJAN LP SCHOOL1 |
Completion of work |
-
latitude : 27.44671642
Longitude : 94.2422175
file name : Image_22082024123336722.png
|
2024-08-22 12:33:36.821136 |
262 |
86869321 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.42220555
Longitude : 94.23070744
file name : Image_11122023114127657.png
|
2023-12-11 11:41:27.74669 |
263 |
86868790 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.4471256
Longitude : 94.2449269
file name : Image_25072024111843420.png
|
2024-07-25 11:18:43.523466 |