1 |
6480650 |
RING WELL AT TANGA BASTI CHAUDHURI CHUBURI |
20000 |
Well1 |
In Progress |
-
latitude : 27.30179173
Longitude : 94.14610206
file name : Image_24052019114858222.png
|
2019-05-24 11:48:58.327619 |
2 |
6432502 |
Const. of Urinal Shed at Kokoi Chariali |
20000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.30160109
Longitude : 94.15592286
file name : Image_19012019141210927.png
|
2019-01-19 14:12:11.014748 |
3 |
6432502 |
Const. of Urinal Shed at Kokoi Chariali |
20000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.30156943
Longitude : 94.1558289
file name : Image_19052019180540206.png
|
2019-05-19 18:05:40.278173 |
4 |
6480551 |
E/F at 2 no Lai Mekuri C Hall |
40000 |
Agricultural Centres1 |
25% |
-
latitude : 27.29585417
Longitude : 94.15257449
file name : Image_24012019143528965.png
|
2019-01-24 14:35:29.204622 |
5 |
6432506 |
Earth Filling at 1 No Laimekuri Community Hall |
40000 |
Wasteland1 |
25% |
-
latitude : 27.29951122
Longitude : 94.15894911
file name : Image_20052019125407964.png
|
2019-05-20 12:54:08.061817 |
6 |
6480624 |
RING WELL ATA HINDU NAM GHAR PATAK CHUK |
20000 |
Well1 |
In Progress |
-
latitude : 27.30166563
Longitude : 94.14615094
file name : Image_24052019114521391.png
|
2019-05-24 11:45:21.511785 |
7 |
6480619 |
RING WELL AT SAMARA URANG |
20000 |
Well1 |
In Progress |
-
latitude : 27.30177474
Longitude : 94.14614527
file name : Image_24052019114356548.png
|
2019-05-24 11:43:56.662674 |
8 |
6480557 |
const of urinal shed at kakoi weekly |
20000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.29869113
Longitude : 94.15327808
file name : Image_24012019131458852.png
|
2019-01-24 13:14:58.966565 |
9 |
6480557 |
const of urinal shed at kakoi weekly |
20000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.2985999
Longitude : 94.15322046
file name : Image_20052019123459516.png
|
2019-05-20 12:34:59.668828 |
10 |
6432523 |
Const. of Latrine at Kadam Sub Centre |
70000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.29542036
Longitude : 94.151216
file name : Image_24012019123713418.png
|
2019-01-24 12:37:13.669291 |
11 |
6432294 |
Agril Bundh at Bahbari Pather |
80000 |
Minor Irrigation Structures1 |
25% |
-
latitude : 27.32369672
Longitude : 94.12632759
file name : Image_17012019155923678.png
|
2019-01-17 15:59:24.071965 |
12 |
6480635 |
C HALL AT TANGA BASTI 2 NO ADIBASI NEAR NH 52 |
60000 |
Agricultural Centres1 |
25% |
-
latitude : 27.31582823
Longitude : 94.15758714
file name : Image_24052019125054441.png
|
2019-05-24 12:50:54.538973 |
13 |
6432289 |
Const. of Rest House at Na-ali Moromi Tineali |
110000 |
Shelter Home1 |
25% |
-
latitude : 27.30137626
Longitude : 94.1320158
file name : Image_19012019161625375.png
|
2019-01-19 16:16:25.499915 |
14 |
6432490 |
Goat proof Fancing at Namoni Chubari Community Hall |
120000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 27.29585586
Longitude : 94.15256712
file name : Image_24052019122039377.png
|
2019-05-24 12:20:39.463665 |
15 |
6432511 |
Earth Filling at Gogiula Missing LP School |
80000 |
Grassland1 |
25% |
-
latitude : 27.31020369
Longitude : 94.16429031
file name : Image_21012019125447020.png
|
2019-01-21 12:54:47.38794 |
16 |
6480561 |
Agri Band at Baligaon to Simoludanga Pather |
197055 |
Minor Irrigation Structures1 |
25% |
-
latitude : 27.30180014
Longitude : 94.14611522
file name : Image_24052019115650360.png
|
2019-05-24 11:56:50.46356 |
17 |
6432298 |
Const. of Bahbari Adibasi LP School |
100000 |
Schools1 |
|
-
latitude : 27.32448575
Longitude : 94.1193744
file name : Image_17012019154049581.png
|
2019-01-17 15:40:49.861399 |
18 |
6480646 |
RING WELL AT TANGA BASTI SINAD ALI CHUBURI |
20000 |
Well1 |
In Progress |
-
latitude : 27.30177826
Longitude : 94.14611415
file name : Image_24052019115311423.png
|
2019-05-24 11:53:11.538014 |
19 |
6480586 |
RING WELL AT KAKOI RAJGARH COMMUNITY HALL |
20000 |
Well1 |
In Progress |
-
latitude : 27.34201031
Longitude : 94.08417615
file name : Image_22012019123053412.png
|
2019-01-22 12:30:53.629029 |
20 |
6480586 |
RING WELL AT KAKOI RAJGARH COMMUNITY HALL |
20000 |
Well1 |
In Progress |
-
latitude : 27.34476978
Longitude : 94.06939285
file name : Image_26012019143930902.png
|
2019-01-26 14:39:31.168652 |
21 |
6480586 |
RING WELL AT KAKOI RAJGARH COMMUNITY HALL |
20000 |
Well1 |
In Progress |
-
latitude : 27.30174466
Longitude : 94.14614726
file name : Image_24052019114058002.png
|
2019-05-24 11:40:58.1221 |
22 |
6480566 |
rING WELL AT KAKOI rAJGARH bAHBARI bIRBOL cHUK |
20000 |
Well1 |
In Progress |
-
latitude : 27.3016348
Longitude : 94.14614736
file name : Image_24052019113802826.png
|
2019-05-24 11:38:02.924458 |
23 |
6432495 |
Boundary Wall at Kadam Gohain LP School |
280000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 27.3011309
Longitude : 94.15614685
file name : Image_17012019121740441.png
|
2019-01-17 12:17:40.570312 |
24 |
6432495 |
Boundary Wall at Kadam Gohain LP School |
280000 |
Boundary wall / Side Wall / Retaining Wall1 |
In Progress |
-
latitude : 27.30118065
Longitude : 94.15609851
file name : Image_17052019120859871.png
|
2019-05-17 12:08:59.94819 |
25 |
6480601 |
RING WELL AT JUSHUA HARO CHUK |
20000 |
Well1 |
In Progress |
-
latitude : 27.30175562
Longitude : 94.14605329
file name : Image_24052019114220349.png
|
2019-05-24 11:42:20.462279 |
26 |
6432528 |
Const. of Urinal Shed at Na-Bhangia Namghar |
20000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.31419863
Longitude : 94.15757289
file name : Image_24052019130101101.png
|
2019-05-24 13:01:01.166953 |
27 |
6480627 |
RING WELL AT KOKIYAL GIRJA GHAR |
20000 |
Well1 |
In Progress |
-
latitude : 27.30168732
Longitude : 94.14612981
file name : Image_24052019114703471.png
|
2019-05-24 11:47:03.577555 |
28 |
6480627 |
RING WELL AT KOKIYAL GIRJA GHAR |
20000 |
Well1 |
In Progress |
-
latitude : 27.30176771
Longitude : 94.14612818
file name : Image_24052019113619749.png
|
2019-05-24 11:36:19.853832 |
29 |
6480627 |
RING WELL AT KOKIYAL GIRJA GHAR |
20000 |
Well1 |
In Progress |
-
latitude : 27.29946065
Longitude : 94.15902584
file name : Image_20052019125601644.png
|
2019-05-20 12:56:01.75072 |
30 |
6432517 |
Community Hall at Na-Bhangia Hazong Gaon |
100000 |
Cultural Stage1 |
25% |
-
latitude : 27.31324694
Longitude : 94.15791001
file name : Image_24052019123643863.png
|
2019-05-24 12:36:43.958048 |
31 |
6480612 |
RING WELL AT KADAM MISSING GAON C HALL |
20000 |
Well1 |
In Progress |
-
latitude : 27.31378788
Longitude : 94.15775029
file name : Image_17012019162712833.png
|
2019-01-17 16:27:13.020241 |
32 |
6480612 |
RING WELL AT KADAM MISSING GAON C HALL |
20000 |
Well1 |
In Progress |
-
latitude : 27.31385717
Longitude : 94.15785582
file name : Image_20052019130727669.png
|
2019-05-20 13:07:27.746554 |
33 |
44505289 |
CONST. OF COMMUNITY HALL AT KADAM GOHAIN GAON |
400000 |
CONST. OF COMMUNITY HALL AT KADAM GOHAIN GAON1 |
25% |
-
latitude : 27.31248786
Longitude : 94.1470571
file name : Image_06022021142232386.png
|
2021-02-06 14:22:32.4701 |
34 |
44505349 |
CONST. OF COMMUNITY HALL AT KADAM BAGAN GAON |
400000 |
CONST. OF COMMUNITY HALL AT KADAM BAGAN GAON1 |
25% |
-
latitude : 27.31253553
Longitude : 94.1471615
file name : Image_06022021142050050.png
|
2021-02-06 14:20:50.151744 |
35 |
44505231 |
CONSTRUCTION OF SIMOLUDANGA LP SCHOOL |
413683 |
CONSTRUCTION OF SIMOLUDANGA LP SCHOOL1 |
25% |
-
latitude : 27.31007624
Longitude : 94.14854565
file name : Image_06022021143159038.png
|
2021-02-06 14:31:59.12827 |
36 |
44458951 |
CONST. OF CULTURAL CENTRE AT BALIJAN GAON |
300000 |
CONST. OF CULTURAL CENTRE AT BALIJAN GAON1 |
25% |
-
latitude : 27.31248788
Longitude : 94.14707979
file name : Image_06022021142407267.png
|
2021-02-06 14:24:07.350511 |
37 |
44215047 |
REPAIRING OF BUILDING AT NO.2 KAKOI RAJGARH DHEKIAJULI LP SCHPPL |
350000 |
REPAIRING OF BUILDING AT NO.2 KAKOI RAJGARH DHEKIAJULI LP SCHPPL1 |
25% |
-
latitude : 27.34180561
Longitude : 94.08022043
file name : Image_17112020111252797.png
|
2020-11-17 11:12:52.874636 |
38 |
44215254 |
REPAIRING OF BUILDING AT KADAM BAGAN GAON L.P SCHOOL |
300000 |
REPAIRING OF BUILDING AT KADAM BAGAN GAON L.P SCHOOL1 |
25% |
-
latitude : 27.31016206
Longitude : 94.14858611
file name : Image_17112020140832275.png
|
2020-11-17 14:08:32.336721 |
39 |
44216178 |
BOUNDARY WALL AT KADAM GOJIHULA LP SCHOOL ALONG WITH URINAL & TOILET FACILITIES |
450000 |
BOUNDARY WALL AT KADAM GOJIHULA LP SCHOOL ALONG WITH URINAL & TOILET FACILITIES1 |
25% |
-
latitude : 27.31044668
Longitude : 94.16429321
file name : Image_25082020120659848.png
|
2020-08-25 12:07:00.769026 |
40 |
44215162 |
REPAIRING OF BUILDING AT LILABARI BALIJAN M.E SCHOOL |
400000 |
REPAIRING OF BUILDING AT LILABARI BALIJAN M.E SCHOOL1 |
25% |
-
latitude : 27.3174958
Longitude : 94.09566261
file name : Image_17112020105455866.png
|
2020-11-17 10:54:55.952394 |
41 |
44216789 |
RENOVATION OF STAFF QUARTER AT BOGINADI DEV. BLOCK H.Q |
200000 |
RENOVATION OF STAFF QUARTER AT BOGINADI DEV. BLOCK H.Q1 |
25% |
-
latitude : 27.3645431
Longitude : 94.1825693
file name : Image_23112020142426584.png
|
2020-11-23 14:24:26.64994 |
42 |
44216265 |
CONST. OF BOUNDARY WALL AT BODO L.P SCHOOL AND PROVIDING DESK AND BENCHES |
400000 |
CONST. OF BOUNDARY WALL AT BODO L.P SCHOOL AND PROVIDING DESK AND BENCHES1 |
25% |
-
latitude : 27.29965913
Longitude : 94.1648966
file name : Image_17112020133059283.png
|
2020-11-17 13:30:59.426673 |
43 |
44215474 |
REPAIRING OF BUILDING AT KAKOIYAL L.P SCHOOL |
350000 |
REPAIRING OF BUILDING AT KAKOIYAL L.P SCHOOL1 |
25% |
-
latitude : 27.30104548
Longitude : 94.14004962
file name : Image_11112020133936037.png
|
2020-11-11 13:39:39.963941 |
44 |
44215544 |
CONST. OF BUILDING AT GOHAIN GAON JOYA L.P SCHOOL |
400000 |
CONST. OF BUILDING AT GOHAIN GAON JOYA L.P SCHOOL1 |
25% |
-
latitude : 27.30211205
Longitude : 94.14843256
file name : Image_17112020130615456.png
|
2020-11-17 13:06:15.51879 |
45 |
44215617 |
CONST. OF BUILDING AT KADAM MILONPUR JANAJATI L.P SCHOOL |
400000 |
CONST. OF BUILDING AT KADAM MILONPUR JANAJATI L.P SCHOOL1 |
25% |
-
latitude : 27.30775912
Longitude : 94.17147344
file name : Image_17112020134959055.png
|
2020-11-17 13:49:59.143074 |
46 |
44216340 |
CONST. OF SCHOOL BUILIDING AT KAKOIYAL M.E SCHOOL |
450000 |
CONST. OF SCHOOL BUILIDING AT KAKOIYAL M.E SCHOOL1 |
25% |
-
latitude : 27.30456846
Longitude : 94.14705287
file name : Image_17112020131221781.png
|
2020-11-17 13:12:21.849295 |
47 |
44231255 |
REPAIRING OF BUILDING AND KITCHEN HOUSE AT GOHAIN LP SCHOOL |
400000 |
REPAIRING OF BUILDING AND KITCHEN HOUSE AT GOHAIN LP SCHOOL1 |
25% |
-
latitude : 27.30108653
Longitude : 94.15613592
file name : Image_23112020135405956.png
|
2020-11-23 13:54:06.050837 |
48 |
44230927 |
CONST. OF BOUNDARY WALL AT KADAM HEALTH SUB CENTRE |
500000 |
CONST. OF BOUNDARY WALL AT KADAM HEALTH SUB CENTRE1 |
In Progress |
-
latitude : 27.11553459
Longitude : 94.14181629
file name : Image_30112020111802953.png
|
2020-11-30 11:18:03.023542 |
49 |
44231775 |
REPAIRING WORKS AT KADAM MV SCHOOL |
420000 |
REPAIRING WORKS AT KADAM MV SCHOOL1 |
25% |
-
latitude : 27.31195622
Longitude : 94.15782148
file name : Image_23112020140458781.png
|
2020-11-23 14:04:58.841403 |
50 |
44473235 |
CONST. OF KITCHEN HOUSE AT KADAM HAJONG ME SCHOOL |
250000 |
CONST. OF KITCHEN HOUSE AT KADAM HAJONG ME SCHOOL1 |
25% |
-
latitude : 27.31005354
Longitude : 94.14850932
file name : Image_06022021143408466.png
|
2021-02-06 14:34:08.558134 |
51 |
44505416 |
CONST. OF BOUNDARY WALL AT KADAM GP OFFICE |
550000 |
CONST. OF BOUNDARY WALL AT KADAM GP OFFICE1 |
25% |
-
latitude : 27.23093504
Longitude : 94.10289793
file name : Image_06022021114657923.png
|
2021-02-06 11:46:58.020801 |
52 |
44505482 |
CONST. OF BOUNDARY WALL AT PUTHIMARI HINDU SASHAN HALL |
400000 |
CONST. OF BOUNDARY WALL AT PUTHIMARI HINDU SASHAN HALL1 |
In Progress |
-
latitude : 27.29610411
Longitude : 94.15219359
file name : Image_06022021115407280.png
|
2021-02-06 11:54:07.37424 |
53 |
44505921 |
INSTALLATION OF STANDALONE SOLAR LIGHT AT KADAM GP ARREAR 10% |
100000 |
INSTALLATION OF STANDALONE SOLAR LIGHT AT KADAM GP ARREAR 10%1 |
25% |
-
latitude : 27.31804841
Longitude : 94.14372026
file name : Image_06022021145008457.png
|
2021-02-06 14:50:08.575301 |
54 |
44506130 |
CONST . OF CMSC AT KADAM BAGAN ADIBASHI HORIMANDIR |
90000 |
CONST . OF CMSC AT KADAM BAGAN ADIBASHI HORIMANDIR1 |
25% |
-
latitude : 27.31805391
Longitude : 94.14372291
file name : Image_06022021144733754.png
|
2021-02-06 14:47:33.864695 |
55 |
44506197 |
CONST. OF CMSC AT GOJIHULA HORIMANDIR |
90000 |
CONST. OF CMSC AT GOJIHULA HORIMANDIR1 |
25% |
-
latitude : 27.31802706
Longitude : 94.14380913
file name : Image_06022021144559330.png
|
2021-02-06 14:46:36.151111 |
56 |
44473860 |
CONST. OF CULTURAL CENTRE AT NABHANGANIA MISING GAON |
300000 |
CONST. OF CULTURAL CENTRE AT NABHANGANIA MISING GAON1 |
25% |
-
latitude : 27.31248239
Longitude : 94.14715673
file name : Image_06022021142514502.png
|
2021-02-06 14:25:14.598936 |
57 |
44505972 |
CONST. OF CMSC AT KACHARI YUBAK SANGHA |
90000 |
CONST. OF CMSC AT KACHARI YUBAK SANGHA1 |
25% |
-
latitude : 27.31805628
Longitude : 94.14372243
file name : Image_06022021144843968.png
|
2021-02-06 14:48:44.082859 |
58 |
44458524 |
RENOVATION OF KAKOI GOHAIN LP SCHOOL |
350000 |
RENOVATION OF KAKOI GOHAIN LP SCHOOL1 |
25% |
-
latitude : 27.31010664
Longitude : 94.14850905
file name : Image_06022021143050537.png
|
2021-02-06 14:30:50.628914 |
59 |
44216067 |
REPAIRING OF JANAJATI HIGH SCHOOL BUILDING |
450000 |
REPAIRING OF JANAJATI HIGH SCHOOL BUILDING1 |
25% |
-
latitude : 27.29657969
Longitude : 94.15184268
file name : Image_11112020133336855.png
|
2020-11-11 13:33:40.795961 |
60 |
44215719 |
CONST. OF LATRIN & URINAL AT KADAM M.V SCHOOL |
230043 |
CONST. OF LATRIN & URINAL AT KADAM M.V SCHOOL1 |
25% |
-
latitude : 27.31226765
Longitude : 94.15788918
file name : Image_17112020105432280.png
|
2020-11-17 10:54:32.350736 |
61 |
44230658 |
CONST. OF COMMUNITY HALL AT KAKOI RAJGARH |
500000 |
CONST. OF COMMUNITY HALL AT KAKOI RAJGARH1 |
25% |
-
latitude : 27.34128066
Longitude : 94.0818705
file name : Image_23112020104749270.png
|
2020-11-23 10:47:49.352804 |
62 |
44230873 |
CONST. OF BOUNDARY WALL & JANAJA HOUSE AT KADAM TENGABOSTI KABARSTHAN |
500000 |
CONST. OF BOUNDARY WALL & JANAJA HOUSE AT KADAM TENGABOSTI KABARSTHAN1 |
In Progress |
-
latitude : 27.31572492
Longitude : 94.15764572
file name : Image_03122020145517287.png
|
2020-12-03 14:55:17.376664 |
63 |
44231348 |
URINAL SHED AT KAKOI CHARIALI KRISHTI VIKASH KENDRA |
200000 |
URINAL SHED AT KAKOI CHARIALI KRISHTI VIKASH KENDRA1 |
25% |
-
latitude : 27.29957258
Longitude : 94.15425806
file name : Image_23112020134402743.png
|
2020-11-23 13:44:02.839202 |
64 |
44232113 |
CONST. OF AWC KITCHEN HOUSE AT LAIMEKURI HAJONG |
250000 |
CONST. OF AWC KITCHEN HOUSE AT LAIMEKURI HAJONG1 |
25% |
-
latitude : 27.29455344
Longitude : 94.16401534
file name : Image_23112020135432386.png
|
2020-11-23 13:54:32.472382 |
65 |
44231146 |
CONST. OF DRINKING WATER AND TOILET FACILITY AT BOITHEL BAPTIST CHURCH |
243654 |
CONST. OF DRINKING WATER AND TOILET FACILITY AT BOITHEL BAPTIST CHURCH1 |
25% |
-
latitude : 27.31042071
Longitude : 94.11781456
file name : Image_03122020145525661.png
|
2020-12-03 14:55:25.745876 |
66 |
44231146 |
CONST. OF DRINKING WATER AND TOILET FACILITY AT BOITHEL BAPTIST CHURCH |
243654 |
CONST. OF DRINKING WATER AND TOILET FACILITY AT BOITHEL BAPTIST CHURCH1 |
25% |
-
latitude : 27.31042071
Longitude : 94.11781456
file name : Image_03122020145534539.png
|
2020-12-03 14:55:34.638745 |
67 |
44230717 |
CONST. OF URINAL SHED AT BEHERABASTI SUB CENRE |
200000 |
CONST. OF URINAL SHED AT BEHERABASTI SUB CENRE1 |
25% |
-
latitude : 27.3184516
Longitude : 94.09433
file name : Image_23112020110255143.png
|
2020-11-23 11:02:55.204099 |
68 |
44231405 |
RENOVATION OF 2NO LAIMEKURI CULTURAL CENTER |
281245 |
RENOVATION OF 2NO LAIMEKURI CULTURAL CENTER1 |
25% |
-
latitude : 27.29592165
Longitude : 94.15257583
file name : Image_03122020145521426.png
|
2020-12-03 14:55:21.517081 |
69 |
44231405 |
RENOVATION OF 2NO LAIMEKURI CULTURAL CENTER |
281245 |
RENOVATION OF 2NO LAIMEKURI CULTURAL CENTER1 |
25% |
-
latitude : 27.29592165
Longitude : 94.15257583
file name : Image_03122020145530373.png
|
2020-12-03 14:55:30.454494 |
70 |
44231695 |
REPAIRING WORKS AT NA- ALI MAJ GAON LP SCHOOL |
400000 |
REPAIRING WORKS AT NA- ALI MAJ GAON LP SCHOOL1 |
50% |
-
latitude : 27.30148475
Longitude : 94.13172244
file name : Image_23112020114549796.png
|
2020-11-23 11:45:49.873487 |
71 |
44232374 |
REPAIRING WORKS AT KAKOI BALIJAN LP SCHOOL |
430000 |
REPAIRING WORKS AT KAKOI BALIJAN LP SCHOOL1 |
25% |
-
latitude : 27.31647257
Longitude : 94.1145481
file name : Image_23112020111429001.png
|
2020-11-23 11:14:29.060251 |
72 |
44231848 |
REPAIRING WORKS AT LAMBIT GOGOI SCHOOL |
420000 |
REPAIRING WORKS AT LAMBIT GOGOI SCHOOL1 |
25% |
-
latitude : 27.31625748
Longitude : 94.12923664
file name : Image_23112020112129847.png
|
2020-11-23 11:21:29.91902 |
73 |
44236045 |
Const of Boundary Fencing at Kadam Hajang Culcural Centre |
312465 |
Const of Boundary Fencing at Kadam Hajang Culcural Centre 1 |
In Progress |
-
latitude : 27.29474243
Longitude : 94.16383343
file name : Image_23112020135900676.png
|
2020-11-23 13:59:00.764957 |
74 |
44232447 |
CONST. OF BUILDING AT BAHBARI ADIBASHI LP SCHOOL |
400000 |
CONST. OF BUILDING AT BAHBARI ADIBASHI LP SCHOOL1 |
25% |
-
latitude : 27.31193511
Longitude : 94.15778823
file name : Image_23112020140707593.png
|
2020-11-23 14:07:07.650825 |
75 |
51504893 |
CONST OF LATRIN AND URINAL AT KADAM BALIJAN COMMUNITY HALL |
180000 |
CONST OF LATRIN AND URINAL AT KADAM BALIJAN COMMUNITY HALL1 |
Roof laid |
-
latitude : 27.317961666666665
Longitude : 94.14596833333331
file name : Image_21062024132243163.png
|
2024-06-21 13:22:43.2614 |
76 |
51504893 |
CONST OF LATRIN AND URINAL AT KADAM BALIJAN COMMUNITY HALL |
180000 |
CONST OF LATRIN AND URINAL AT KADAM BALIJAN COMMUNITY HALL1 |
Plinth level |
-
latitude : 27.317885
Longitude : 94.14596833333331
file name : Image_21062024124649321.png
|
2024-06-21 12:46:49.4388 |
77 |
51504893 |
CONST OF LATRIN AND URINAL AT KADAM BALIJAN COMMUNITY HALL |
180000 |
CONST OF LATRIN AND URINAL AT KADAM BALIJAN COMMUNITY HALL1 |
Completion of work |
-
latitude : 27.31753701
Longitude : 94.15466959
file name : Image_01112021135943366.png
|
2021-11-01 13:59:43.481353 |
78 |
51504834 |
CONST OF LATRIN AND URINAL AT KADAM MORIYA GAON COMMUNITY HALL |
148289 |
CONST OF LATRIN AND URINAL AT KADAM MORIYA GAON COMMUNITY HALL1 |
Completion of work |
-
latitude : 27.31740666666667
Longitude : 94.15768166666666
file name : Image_03012022143114607.png
|
2022-01-03 14:31:14.745639 |
79 |
62232926 |
CONST OF LATRINE AND URINAL AT NAGAON CHUBURI COMMUNITY HALL |
180000 |
CONST OF LATRINE AND URINAL AT NAGAON CHUBURI COMMUNITY HALL1 |
Completion of work |
-
latitude : 27.29007166666667
Longitude : 94.14876000000001
file name : Image_06042022124328820.png
|
2022-04-06 12:43:28.887458 |
80 |
62046778 |
CONST OF KITCHEN HOUSE AT GOJIHULA MISSING LP SCHOOL |
180000 |
CONST OF KITCHEN HOUSE AT GOJIHULA MISSING LP SCHOOL1 |
Roof laid |
-
latitude : 27.31036333333333
Longitude : 94.16475833333334
file name : Image_28062024131143046.png
|
2024-06-28 13:11:43.133677 |
81 |
62046778 |
CONST OF KITCHEN HOUSE AT GOJIHULA MISSING LP SCHOOL |
180000 |
CONST OF KITCHEN HOUSE AT GOJIHULA MISSING LP SCHOOL1 |
Plinth level |
-
latitude : 27.310366666666663
Longitude : 94.16471000000001
file name : Image_28062024123038888.png
|
2024-06-28 12:30:38.994751 |
82 |
62046778 |
CONST OF KITCHEN HOUSE AT GOJIHULA MISSING LP SCHOOL |
180000 |
CONST OF KITCHEN HOUSE AT GOJIHULA MISSING LP SCHOOL1 |
Completion of work |
-
latitude : 27.310398333333335
Longitude : 94.16470833333332
file name : Image_04042022153926522.png
|
2022-04-04 15:39:26.588013 |
83 |
62046129 |
RENOVATION OF KADAM GP OFFICE BUILDING |
630000 |
RENOVATION OF KADAM GP OFFICE BUILDING1 |
Completion of work |
-
latitude : 27.295988333333337
Longitude : 94.15218166666666
file name : Image_04042022130403543.png
|
2022-04-04 13:04:03.620152 |
84 |
62035714 |
REPAIRING OF LATRIN AND URINAL AT NAGAON L.P SCHOOL |
25000 |
REPAIRING OF LATRIN AND URINAL AT NAGAON L.P SCHOOL1 |
Completion of work |
-
latitude : 27.307513333333336
Longitude : 94.10956666666668
file name : Image_04042022132849891.png
|
2022-04-04 13:28:49.958225 |
85 |
62233125 |
CONST OF LATRINE AND URINAL AT NA BHANGANIA HAJONG DURGA MANDIR |
180000 |
CONST OF LATRINE AND URINAL AT NA BHANGANIA HAJONG DURGA MANDIR1 |
Completion of work |
-
latitude : 27.294001666666666
Longitude : 94.16753166666668
file name : Image_06042022120840844.png
|
2022-04-06 12:08:40.923716 |
86 |
62230934 |
REPAIRING OF LATRINE AND URINAL AT NO.2 KAKOI RAJHGARH LP SCHOOL |
25000 |
REPAIRING OF LATRINE AND URINAL AT NO.2 KAKOI RAJHGARH LP SCHOOL1 |
Completion of work |
-
latitude : 27.34195833333333
Longitude : 94.08040333333332
file name : Image_04042022142843304.png
|
2022-04-04 14:28:43.379872 |
87 |
62036677 |
CONSTRUCTION OF LATRIN AND URINAL WITH RUNNING WATER FACILITY AT KAKOIYAL LP |
90000 |
CONSTRUCTION OF LATRIN AND URINAL WITH RUNNING WATER FACILITY AT KAKOIYAL LP 1 |
Completion of work |
-
latitude : 27.30088
Longitude : 94.14039166666667
file name : Image_10082023131100550.png
|
2023-08-10 13:11:00.65661 |
88 |
66067852 |
Construction of Community Sanitary Complex |
203400 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.30941833333333
Longitude : 94.119585
file name : Image_27062024123436793.png
|
2024-06-27 12:34:36.889034 |
89 |
66067852 |
Construction of Community Sanitary Complex |
203400 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.309396666666665
Longitude : 94.11961333333332
file name : Image_27062024122320500.png
|
2024-06-27 12:23:20.600063 |
90 |
66067852 |
Construction of Community Sanitary Complex |
203400 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.309531666666665
Longitude : 94.11956666666669
file name : Image_17012023145439544.png
|
2023-01-17 14:54:39.635043 |
91 |
66067916 |
Const of Volleyball court at Kadam MV School |
19500 |
Const of Volleyball court at Kadam MV School1 |
Roof laid |
-
latitude : 27.288751666666666,27.288886666666667
Longitude : 94.14499833333333,94.14511666666667
file name : Image_24062024140007560.png
|
2024-06-24 14:00:07.668606 |
92 |
66067916 |
Const of Volleyball court at Kadam MV School |
19500 |
Const of Volleyball court at Kadam MV School1 |
Plinth level |
-
latitude : 27.28865,27.288905
Longitude : 94.14477000000001,94.14510666666665
file name : Image_24062024134256954.png
|
2024-06-24 13:42:57.09989 |
93 |
66067916 |
Const of Volleyball court at Kadam MV School |
19500 |
Const of Volleyball court at Kadam MV School1 |
Plinth level |
-
latitude : 27.28865,27.288905
Longitude : 94.14477000000001,94.14510666666665
file name : Image_24062024134238066.png
|
2024-06-24 13:42:37.367385 |
94 |
66067916 |
Const of Volleyball court at Kadam MV School |
19500 |
Const of Volleyball court at Kadam MV School1 |
Plinth level |
-
latitude : 27.312215,27.312138333333337
Longitude : 94.158195,94.15816833333335
file name : Image_24062024124712504.png
|
2024-06-24 12:47:12.696551 |
95 |
66067916 |
Const of Volleyball court at Kadam MV School |
19500 |
Const of Volleyball court at Kadam MV School1 |
Completion of work |
-
latitude : 27.31223333333333,27.3122
Longitude : 94.15816166666667,94.158175
file name : Image_03012023163339346.png
|
2023-01-03 16:33:39.433815 |
96 |
66002031 |
Renovation of Kadam Gohain Joya LP School |
350000 |
Renovation of Kadam Gohain Joya LP School1 |
Completion of work |
-
latitude : 27.302220000000002
Longitude : 94.14840000000001
file name : Image_18012023163543155.png
|
2023-01-18 16:35:43.25793 |
97 |
66067892 |
Renovation of Kadam Kachari LP School |
250000 |
Renovation of Kadam Kachari LP School1 |
Completion of work |
-
latitude : 27.288845
Longitude : 94.14525166666665
file name : Image_28122022143929897.png
|
2022-12-28 14:39:29.981507 |
98 |
66068068 |
Construction of Community Sanitary Complex |
190000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.307798333333334
Longitude : 94.15746499999999
file name : Image_24062024131728021.png
|
2024-06-24 13:17:28.096005 |
99 |
66068068 |
Construction of Community Sanitary Complex |
190000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.307785
Longitude : 94.15743666666667
file name : Image_24062024125326240.png
|
2024-06-24 12:53:26.325748 |
100 |
66068068 |
Construction of Community Sanitary Complex |
190000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.30783333333333
Longitude : 94.15720333333333
file name : Image_13012023125129777.png
|
2023-01-13 12:51:29.895146 |
101 |
66068032 |
Renovation of KakoiyalLP School |
300000 |
Renovation of KakoiyalLP School1 |
Completion of work |
-
latitude : 27.301024999999996
Longitude : 94.14005
file name : Image_03012023131154778.png
|
2023-01-03 13:11:54.830131 |
102 |
66002045 |
Renovation of Kadam Gajihula LP School |
300000 |
Renovation of Kadam Gajihula LP School1 |
Completion of work |
-
latitude : 27.310326666666665
Longitude : 94.16442
file name : Image_12012023150210793.png
|
2023-01-12 15:02:10.889197 |
103 |
66070567 |
Renovation of Balijan LP School |
174600 |
Renovation of Balijan LP School1 |
Completion of work |
-
latitude : 27.31658
Longitude : 94.11446499999998
file name : Image_03012023133114775.png
|
2023-01-03 13:31:14.851999 |
104 |
66067876 |
Operation & maintenance of drinking water supply system |
610200 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.288761666666666
Longitude : 94.15096333333334
file name : Image_07012023154845895.png
|
2023-01-07 15:48:45.977636 |
105 |
66068509 |
Renovation of Building at Gohain LP School |
235000 |
Renovation of Building at Gohain LP School1 |
Completion of work |
-
latitude : 27.300994999999997
Longitude : 94.15607666666668
file name : Image_13012023144432411.png
|
2023-01-13 14:44:32.523016 |
106 |
66068503 |
Renovation of Building at Simoludunga ME School |
240067 |
Renovation of Building at Simoludunga ME School1 |
Completion of work |
-
latitude : 27.310593333333333
Longitude : 94.12748666666667
file name : Image_17012023151231342.png
|
2023-01-17 15:12:31.404377 |
107 |
66002113 |
Construction of Community Sanitary Complex |
191000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.33931
Longitude : 94.08269666666665
file name : Image_27062024141609401.png
|
2024-06-27 14:16:09.493316 |
108 |
66002113 |
Construction of Community Sanitary Complex |
191000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.339283333333334
Longitude : 94.08270166666668
file name : Image_27062024135828644.png
|
2024-06-27 13:58:28.739368 |
109 |
66002113 |
Construction of Community Sanitary Complex |
191000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.339199999999998
Longitude : 94.08240333333333
file name : Image_18012023151824542.png
|
2023-01-18 15:18:24.605049 |
110 |
66002087 |
Construction of Community Sanitary Complex |
191000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.313550000000003
Longitude : 94.16494833333333
file name : Image_28062024133409795.png
|
2024-06-28 13:34:10.214094 |
111 |
66002087 |
Construction of Community Sanitary Complex |
191000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.313550000000003
Longitude : 94.16493999999999
file name : Image_28062024132056559.png
|
2024-06-28 13:20:56.654634 |
112 |
66002087 |
Construction of Community Sanitary Complex |
191000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.313368333333333
Longitude : 94.16507000000001
file name : Image_12012023145253628.png
|
2023-01-12 14:52:53.742 |
113 |
66002011 |
Renovation of Nabhagania Boro LP School |
300000 |
Renovation of Nabhagania Boro LP School1 |
Completion of work |
-
latitude : 27.299651666666666
Longitude : 94.16491166666668
file name : Image_11012023135938389.png
|
2023-01-11 13:59:38.517826 |
114 |
66002066 |
Renovation and Extension of Kadam Gaon Panchayat Building |
578000 |
Renovation and Extension of Kadam Gaon Panchayat Building1 |
Completion of work |
-
latitude : 27.295689999999997
Longitude : 94.152385
file name : Image_11012023154917814.png
|
2023-01-11 15:49:17.92519 |
115 |
66068489 |
Renovation of boundary wall at Kadam GP office |
300000 |
Renovation of boundary wall at Kadam GP office1 |
Completion of work |
-
latitude : 27.295696666666664
Longitude : 94.152315
file name : Image_09022023134358021.png
|
2023-02-09 13:43:58.097777 |
116 |
86877704 |
Renovation kadam Janajati High School |
440750 |
Renovation kadam Janajati High School1 |
Plinth level |
-
latitude : 27.296628333333334
Longitude : 94.151795
file name : Image_06112023142601610.png
|
2023-11-06 14:26:01.738586 |
117 |
86877704 |
Renovation kadam Janajati High School |
440750 |
Renovation kadam Janajati High School1 |
Completion of work |
-
latitude : 27.296613333333333
Longitude : 94.15185166666667
file name : Image_15092023115937923.png
|
2023-09-15 11:59:38.394418 |
118 |
86877704 |
Renovation kadam Janajati High School |
440750 |
Renovation kadam Janajati High School1 |
Completion of work |
-
latitude : 27.296703333333333
Longitude : 94.15176833333335
file name : Image_11102023145653145.png
|
2023-10-11 14:56:53.250591 |
119 |
86877436 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.31589333333333
Longitude : 94.15723000000001
file name : Image_02072024124139332.png
|
2024-07-02 12:41:39.419398 |
120 |
86877436 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.315888333333337
Longitude : 94.15724999999999
file name : Image_02072024123535494.png
|
2024-07-02 12:35:35.588355 |
121 |
86877436 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.31599833333333
Longitude : 94.15721666666668
file name : Image_03102023153105330.png
|
2023-10-03 15:31:05.486742 |
122 |
86877436 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.31599833333333
Longitude : 94.15721666666668
file name : Image_03102023153047586.png
|
2023-10-03 15:30:47.765174 |
123 |
86877548 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.312884999999998
Longitude : 94.158115
file name : Image_02072024130346095.png
|
2024-07-02 13:03:46.220729 |
124 |
86877548 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.312868333333334
Longitude : 94.15812166666667
file name : Image_02072024125911605.png
|
2024-07-02 12:59:11.717667 |
125 |
86877548 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.312906666666663
Longitude : 94.15811166666666
file name : Image_11102023140236566.png
|
2023-10-11 14:02:36.663623 |
126 |
86877461 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.318021666666663
Longitude : 94.14384166666666
file name : Image_02072024122719542.png
|
2024-07-02 12:27:19.704423 |
127 |
86877461 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.318050000000003
Longitude : 94.14375166666666
file name : Image_02072024122327094.png
|
2024-07-02 12:23:27.200484 |
128 |
86877461 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.318088333333336
Longitude : 94.14383333333332
file name : Image_11102023140226994.png
|
2023-10-11 14:02:27.084237 |
129 |
86877450 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.296343333333333
Longitude : 94.13321666666667
file name : Image_02072024142828661.png
|
2024-07-02 14:28:28.765001 |
130 |
86877450 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.296364999999998
Longitude : 94.13320666666665
file name : Image_02072024142018653.png
|
2024-07-02 14:20:18.745025 |
131 |
86877450 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.296343333333333
Longitude : 94.13315166666668
file name : Image_29092023152741345.png
|
2023-09-29 15:27:41.501432 |
132 |
86877419 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.316033333333333
Longitude : 94.11380333333334
file name : Image_02072024150718329.png
|
2024-07-02 15:07:18.429297 |
133 |
86877419 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.31601
Longitude : 94.11380666666668
file name : Image_02072024150147132.png
|
2024-07-02 15:01:47.223537 |
134 |
86877419 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.315991666666665
Longitude : 94.11376
file name : Image_29092023150754999.png
|
2023-09-29 15:07:55.243729 |
135 |
86877379 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.330715
Longitude : 94.08618333333334
file name : Image_02072024152918954.png
|
2024-07-02 15:29:19.045922 |
136 |
86877379 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.330523333333336
Longitude : 94.08640666666666
file name : Image_02072024152420352.png
|
2024-07-02 15:24:20.43708 |
137 |
86877379 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.330715
Longitude : 94.08621
file name : Image_12102023113120148.png
|
2023-10-12 11:31:20.271913 |
138 |
86877579 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.3142115
Longitude : 94.1574348
file name : Image_02072024125109287.png
|
2024-07-02 12:51:09.393335 |
139 |
86877579 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.3142106
Longitude : 94.1574334
file name : Image_02072024124547839.png
|
2024-07-02 12:45:47.919003 |
140 |
86877579 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.314386666666664
Longitude : 94.15745666666665
file name : Image_03102023153057749.png
|
2023-10-03 15:30:57.908422 |
141 |
86877528 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.308895
Longitude : 94.13986833333333
file name : Image_02072024133144728.png
|
2024-07-02 13:31:44.810807 |
142 |
86877528 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.308805
Longitude : 94.13986666666666
file name : Image_02072024131905665.png
|
2024-07-02 13:19:05.746703 |
143 |
86877528 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.308775
Longitude : 94.1399
file name : Image_02102023142343808.png
|
2023-10-02 14:23:43.893027 |
144 |
86877528 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.308775
Longitude : 94.1399
file name : Image_02102023142322740.png
|
2023-10-02 14:23:22.83225 |
145 |
86877503 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.28886
Longitude : 94.14490499999998
file name : Image_02072024141057240.png
|
2024-07-02 14:10:57.32895 |
146 |
86877503 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.28887666666667
Longitude : 94.14484666666667
file name : Image_02072024140457101.png
|
2024-07-02 14:04:57.17597 |
147 |
86877503 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.288808333333336
Longitude : 94.14484499999999
file name : Image_02102023142333387.png
|
2023-10-02 14:23:33.48725 |
148 |
86877682 |
Renovation of Kadam GP Office Building |
400000 |
Renovation of Kadam GP Office Building1 |
Completion of work |
-
latitude : 27.29599333333333
Longitude : 94.15222999999999
file name : Image_13102023105708616.png
|
2023-10-13 10:57:08.713663 |
149 |
87289568 |
Renovation of GP Office Building (Ph-II) |
300750 |
Renovation of GP Office Building (Ph-II)1 |
Completion of work |
-
latitude : 27.295711666666662
Longitude : 94.15235166666668
file name : Image_16112023114720097.png
|
2023-11-16 11:47:20.198351 |
150 |
87289539 |
Renovation of Halikipara LP School |
290000 |
Renovation of Halikipara LP School1 |
Plinth level |
-
latitude : 27.307756666666666
Longitude : 94.17152166666668
file name : Image_07052024124834620.png
|
2024-05-07 12:48:34.711475 |
151 |
87289539 |
Renovation of Halikipara LP School |
290000 |
Renovation of Halikipara LP School1 |
Completion of work |
-
latitude : 27.307795000000002
Longitude : 94.17144000000002
file name : Image_29122023131856755.png
|
2023-12-29 13:18:56.846982 |
152 |
87289539 |
Renovation of Halikipara LP School |
290000 |
Renovation of Halikipara LP School1 |
Completion of work |
-
latitude : 27.307766666666666
Longitude : 94.17158833333333
file name : Image_13112023151623525.png
|
2023-11-13 15:16:23.6702 |
153 |
87047156 |
Renovation of Balijan LP School |
250000 |
Renovation of Balijan LP School1 |
Plinth level |
-
latitude : 27.318216666666665
Longitude : 94.14594000000001
file name : Image_22042024121934984.png
|
2024-04-22 12:19:35.071783 |
154 |
87047156 |
Renovation of Balijan LP School |
250000 |
Renovation of Balijan LP School1 |
Plinth level |
-
latitude : 27.31822833333333
Longitude : 94.14599166666667
file name : Image_05122023123347740.png
|
2023-12-05 12:33:47.855685 |
155 |
87047156 |
Renovation of Balijan LP School |
250000 |
Renovation of Balijan LP School1 |
Completion of work |
-
latitude : 27.318249999999995
Longitude : 94.14599333333332
file name : Image_14112023133358793.png
|
2023-11-14 13:33:58.891915 |
156 |
87884970 |
Purchasing of Office Equipment & Furniture at Kadam GP |
450000 |
Purchasing of Office Equipment & Furniture at Kadam GP1 |
Roof laid |
-
latitude : 27.295801666666662
Longitude : 94.15232666666667
file name : Image_19062024151921547.png
|
2024-06-19 15:19:21.641383 |
157 |
87884970 |
Purchasing of Office Equipment & Furniture at Kadam GP |
450000 |
Purchasing of Office Equipment & Furniture at Kadam GP1 |
Plinth level |
-
latitude : 27.295838333333336
Longitude : 94.15239833333332
file name : Image_19062024130124311.png
|
2024-06-19 13:01:24.394028 |
158 |
87884970 |
Purchasing of Office Equipment & Furniture at Kadam GP |
450000 |
Purchasing of Office Equipment & Furniture at Kadam GP1 |
Completion of work |
-
latitude : 27.29578333333333
Longitude : 94.15241333333333
file name : Image_07052024122631268.png
|
2024-05-07 12:26:31.360719 |
159 |
87884970 |
Purchasing of Office Equipment & Furniture at Kadam GP |
450000 |
Purchasing of Office Equipment & Furniture at Kadam GP1 |
Completion of work |
-
latitude : 27.29588833333333
Longitude : 94.15239166666667
file name : Image_13102023131304071.png
|
2023-10-13 13:13:04.174616 |
160 |
87886343 |
Contribution towards Const of Rest House of Lakhimpur Zilla Parishad campus (PH-II) |
25000 |
Contribution towards Const of Rest House of Lakhimpur Zilla Parishad campus (PH-II)1 |
Roof laid |
-
latitude : 27.27761333333334
Longitude : 94.10814166666665
file name : Image_27062024115824287.png
|
2024-06-27 11:58:24.368198 |
161 |
87886343 |
Contribution towards Const of Rest House of Lakhimpur Zilla Parishad campus (PH-II) |
25000 |
Contribution towards Const of Rest House of Lakhimpur Zilla Parishad campus (PH-II)1 |
Plinth level |
-
latitude : 27.277548333333336
Longitude : 94.10838166666666
file name : Image_27062024114810296.png
|
2024-06-27 11:48:10.384874 |
162 |
87886343 |
Contribution towards Const of Rest House of Lakhimpur Zilla Parishad campus (PH-II) |
25000 |
Contribution towards Const of Rest House of Lakhimpur Zilla Parishad campus (PH-II)1 |
Completion of work |
-
latitude : 27.277581666666666
Longitude : 94.10817833333334
file name : Image_14102023110012410.png
|
2023-10-14 11:00:12.490371 |
163 |
87886194 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.295685000000002
Longitude : 94.15216333333335
file name : Image_26062024130936661.png
|
2024-06-26 13:09:36.743854 |
164 |
87886194 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.295725
Longitude : 94.15219833333335
file name : Image_26062024125355756.png
|
2024-06-26 12:53:55.841599 |
165 |
87886194 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.29582833333333
Longitude : 94.1521
file name : Image_16112023114251199.png
|
2023-11-16 11:42:51.314925 |
166 |
87886194 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.295893333333332
Longitude : 94.15212666666666
file name : Image_13102023131326920.png
|
2023-10-13 13:13:27.004583 |
167 |
51505256 |
CONST OF LATRIN AND URINAL WITH RUNNING FACILITY AT KADAM GP OFFICE |
400000 |
CONST OF LATRIN AND URINAL WITH RUNNING FACILITY AT KADAM GP OFFICE1 |
Roof laid |
-
latitude : 27.295796666666668
Longitude : 94.15219499999999
file name : Image_20062024134223898.png
|
2024-06-20 13:42:24.003792 |
168 |
51505256 |
CONST OF LATRIN AND URINAL WITH RUNNING FACILITY AT KADAM GP OFFICE |
400000 |
CONST OF LATRIN AND URINAL WITH RUNNING FACILITY AT KADAM GP OFFICE1 |
Plinth level |
-
latitude : 27.295846666666662
Longitude : 94.152205
file name : Image_20062024133509378.png
|
2024-06-20 13:35:09.503448 |
169 |
51505256 |
CONST OF LATRIN AND URINAL WITH RUNNING FACILITY AT KADAM GP OFFICE |
400000 |
CONST OF LATRIN AND URINAL WITH RUNNING FACILITY AT KADAM GP OFFICE1 |
Completion of work |
-
latitude : 27.29583843
Longitude : 94.15232301
file name : Image_28102021113928596.png
|
2021-10-28 11:39:28.833504 |
170 |
86766917 |
Construction of toilets in public institutions |
394550 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.294743333333333
Longitude : 94.15068833333335
file name : Image_20062024140916880.png
|
2024-06-20 14:09:16.99105 |
171 |
86766917 |
Construction of toilets in public institutions |
394550 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.294753333333333
Longitude : 94.15084833333334
file name : Image_06112023142111861.png
|
2023-11-06 14:21:11.944625 |
172 |
86766917 |
Construction of toilets in public institutions |
394550 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.294744999999995
Longitude : 94.15062166666667
file name : Image_08092023121913827.png
|
2023-09-08 12:19:13.903565 |
173 |
86766917 |
Construction of toilets in public institutions |
394550 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.294838333333338
Longitude : 94.15066333333334
file name : Image_11102023145524324.png
|
2023-10-11 14:55:24.420442 |
174 |
66002096 |
Construction of toilets in public institutions |
191000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.295651666666664
Longitude : 94.14153499999999
file name : Image_20062024150559758.png
|
2024-06-20 15:05:59.907835 |
175 |
66002096 |
Construction of toilets in public institutions |
191000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.29568
Longitude : 94.14146833333334
file name : Image_20062024145809494.png
|
2024-06-20 14:58:09.600984 |
176 |
66002096 |
Construction of toilets in public institutions |
191000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.29585666666667
Longitude : 94.14169666666666
file name : Image_19012023130351003.png
|
2023-01-19 13:03:51.064901 |
177 |
51505174 |
CONST OF LATRIN AND URINAL AT NA BHAGANIA HAJONG DURGA MANDIR |
180000 |
CONST OF LATRIN AND URINAL AT NA BHAGANIA HAJONG DURGA MANDIR1 |
Roof laid |
-
latitude : 27.293975
Longitude : 94.16762333333332
file name : Image_21062024140146843.png
|
2024-06-21 14:01:46.954097 |
178 |
51505174 |
CONST OF LATRIN AND URINAL AT NA BHAGANIA HAJONG DURGA MANDIR |
180000 |
CONST OF LATRIN AND URINAL AT NA BHAGANIA HAJONG DURGA MANDIR1 |
Plinth level |
-
latitude : 27.29407666666667
Longitude : 94.16757000000001
file name : Image_21062024134443474.png
|
2024-06-21 13:44:43.580164 |
179 |
51505174 |
CONST OF LATRIN AND URINAL AT NA BHAGANIA HAJONG DURGA MANDIR |
180000 |
CONST OF LATRIN AND URINAL AT NA BHAGANIA HAJONG DURGA MANDIR1 |
Completion of work |
-
latitude : 27.293909999999997
Longitude : 94.16758
file name : Image_03012022150754779.png
|
2022-01-03 15:07:54.884151 |
180 |
62046006 |
CONSTRUCTION OF COMMUNITY HALL AT KAKOI CHARIALI AHOM COMMUNITY HALL |
385407 |
CONSTRUCTION OF COMMUNITY HALL AT KAKOI CHARIALI AHOM COMMUNITY HALL1 |
Roof laid |
-
latitude : 27.300573333333332
Longitude : 94.15332166666667
file name : Image_21062024121856799.png
|
2024-06-21 12:18:56.922749 |
181 |
62046006 |
CONSTRUCTION OF COMMUNITY HALL AT KAKOI CHARIALI AHOM COMMUNITY HALL |
385407 |
CONSTRUCTION OF COMMUNITY HALL AT KAKOI CHARIALI AHOM COMMUNITY HALL1 |
Plinth level |
-
latitude : 27.300560000000004
Longitude : 94.15334333333334
file name : Image_21062024120151012.png
|
2024-06-21 12:01:51.119955 |
182 |
62046006 |
CONSTRUCTION OF COMMUNITY HALL AT KAKOI CHARIALI AHOM COMMUNITY HALL |
385407 |
CONSTRUCTION OF COMMUNITY HALL AT KAKOI CHARIALI AHOM COMMUNITY HALL1 |
Completion of work |
-
latitude : 27.300653333333337
Longitude : 94.15332500000001
file name : Image_04042022151308591.png
|
2022-04-04 15:13:08.642468 |
183 |
62046365 |
CONST OF COMMUNITY HALL AT NA ALI MAJGAON SHIVA MANDIR |
180000 |
CONST OF COMMUNITY HALL AT NA ALI MAJGAON SHIVA MANDIR1 |
Roof laid |
-
latitude : 27.302115000000004
Longitude : 94.1277
file name : Image_21062024144010100.png
|
2024-06-21 14:40:10.221335 |
184 |
62046365 |
CONST OF COMMUNITY HALL AT NA ALI MAJGAON SHIVA MANDIR |
180000 |
CONST OF COMMUNITY HALL AT NA ALI MAJGAON SHIVA MANDIR1 |
Plinth level |
-
latitude : 27.30204
Longitude : 94.12771666666667
file name : Image_21062024143137482.png
|
2024-06-21 14:31:37.638372 |
185 |
62046365 |
CONST OF COMMUNITY HALL AT NA ALI MAJGAON SHIVA MANDIR |
180000 |
CONST OF COMMUNITY HALL AT NA ALI MAJGAON SHIVA MANDIR1 |
Completion of work |
-
latitude : 27.302005
Longitude : 94.12772333333332
file name : Image_04042022132023949.png
|
2022-04-04 13:20:24.009868 |
186 |
51505088 |
CONST OF LATRIN AND URINAL WITH RUNNING WATER FACILITY AT KADAMIYAL LP AND ME SCHOOL |
300000 |
CONST OF LATRIN AND URINAL WITH RUNNING WATER FACILITY AT KADAMIYAL LP AND ME SCHOOL1 |
Roof laid |
-
latitude : 27.316233333333336
Longitude : 94.12944999999999
file name : Image_26062024133833301.png
|
2024-06-26 13:38:33.385416 |
187 |
51505088 |
CONST OF LATRIN AND URINAL WITH RUNNING WATER FACILITY AT KADAMIYAL LP AND ME SCHOOL |
300000 |
CONST OF LATRIN AND URINAL WITH RUNNING WATER FACILITY AT KADAMIYAL LP AND ME SCHOOL1 |
Plinth level |
-
latitude : 27.316235
Longitude : 94.12942999999999
file name : Image_25062024143602349.png
|
2024-06-25 14:36:02.4329 |
188 |
51505088 |
CONST OF LATRIN AND URINAL WITH RUNNING WATER FACILITY AT KADAMIYAL LP AND ME SCHOOL |
300000 |
CONST OF LATRIN AND URINAL WITH RUNNING WATER FACILITY AT KADAMIYAL LP AND ME SCHOOL1 |
Completion of work |
-
latitude : 27.31623356
Longitude : 94.12937253
file name : Image_27102021131617313.png
|
2021-10-27 13:16:17.405564 |
189 |
66002120 |
Construction of Community Sanitary Complex |
191000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.284053333333336
Longitude : 94.14999333333331
file name : Image_13012023142921336.png
|
2023-01-13 14:29:21.44478 |
190 |
66067845 |
Construction of Community Sanitary Complex |
203400 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.314888333333336
Longitude : 94.10227166666667
file name : Image_27062024132930672.png
|
2024-06-27 13:29:30.772006 |
191 |
66067845 |
Construction of Community Sanitary Complex |
203400 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.31489333333333
Longitude : 94.10232833333333
file name : Image_27062024132332204.png
|
2024-06-27 13:23:32.301097 |
192 |
66067845 |
Construction of Community Sanitary Complex |
203400 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.314925000000002
Longitude : 94.10206833333335
file name : Image_03012023134520436.png
|
2023-01-03 13:45:20.513328 |
193 |
66067864 |
Construction of Community Sanitary Complex |
203400 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.299519999999998
Longitude : 94.15904
file name : Image_24062024134251637.png
|
2024-06-24 13:42:51.740068 |
194 |
66067864 |
Construction of Community Sanitary Complex |
203400 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.299439999999997
Longitude : 94.15895333333334
file name : Image_24062024131736900.png
|
2024-06-24 13:17:36.977164 |
195 |
66067864 |
Construction of Community Sanitary Complex |
203400 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.299556666666664
Longitude : 94.15890499999999
file name : Image_02012023155407324.png
|
2023-01-02 15:54:07.410939 |
196 |
66068053 |
Construction of Community Sanitary Complex |
190000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.31869
Longitude : 94.148435
file name : Image_05072024124349582.png
|
2024-07-05 12:43:49.799946 |
197 |
66068053 |
Construction of Community Sanitary Complex |
190000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.318698333333334
Longitude : 94.14850333333334
file name : Image_05072024123701996.png
|
2024-07-05 12:37:02.092636 |
198 |
66068053 |
Construction of Community Sanitary Complex |
190000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.318695
Longitude : 94.14839333333333
file name : Image_12012023131348824.png
|
2023-01-12 13:13:48.935913 |
199 |
66067924 |
Const of Volleyball court at Kadam Kachari Adarsha ME School |
19500 |
Const of Volleyball court at Kadam Kachari Adarsha ME School1 |
Roof laid |
-
latitude : 27.28890333333333,27.288976666666667
Longitude : 94.14521500000001,94.14522833333334
file name : Image_24062024145145119.png
|
2024-06-24 14:51:45.221478 |
200 |
66067924 |
Const of Volleyball court at Kadam Kachari Adarsha ME School |
19500 |
Const of Volleyball court at Kadam Kachari Adarsha ME School1 |
Plinth level |
-
latitude : 27.289088333333332,27.28909833333333
Longitude : 94.14516499999999,94.14511833333333
file name : Image_24062024142426401.png
|
2024-06-24 14:24:26.528767 |
201 |
66067924 |
Const of Volleyball court at Kadam Kachari Adarsha ME School |
19500 |
Const of Volleyball court at Kadam Kachari Adarsha ME School1 |
Completion of work |
-
latitude : 27.289109999999997,27.289125
Longitude : 94.14506666666666,94.1451
file name : Image_28122022144604450.png
|
2022-12-28 14:46:04.534061 |
202 |
66068046 |
Contribution towards const of Rest house at Lakhimpur Zilla Parishad |
50000 |
Contribution towards const of Rest house at Lakhimpur Zilla Parishad1 |
Roof laid |
-
latitude : 27.277641666666668
Longitude : 94.10869666666667
file name : Image_27062024115707471.png
|
2024-06-27 11:57:07.555729 |
203 |
66068046 |
Contribution towards const of Rest house at Lakhimpur Zilla Parishad |
50000 |
Contribution towards const of Rest house at Lakhimpur Zilla Parishad1 |
Plinth level |
-
latitude : 27.27752333333334
Longitude : 94.10804666666667
file name : Image_27062024114657739.png
|
2024-06-27 11:46:57.837254 |
204 |
66068046 |
Contribution towards const of Rest house at Lakhimpur Zilla Parishad |
50000 |
Contribution towards const of Rest house at Lakhimpur Zilla Parishad1 |
Completion of work |
-
latitude : 27.364463333333333
Longitude : 94.18321333333333
file name : Image_18012023130103372.png
|
2023-01-18 13:01:03.437407 |
205 |
66068059 |
Construction of Community Sanitary Complex |
190000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.314649999999997
Longitude : 94.14600833333334
file name : Image_26062024142756718.png
|
2024-06-26 14:27:56.811773 |
206 |
66068059 |
Construction of Community Sanitary Complex |
190000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.314641666666663
Longitude : 94.14604833333333
file name : Image_26062024140525936.png
|
2024-06-26 14:05:26.184885 |
207 |
66068059 |
Construction of Community Sanitary Complex |
190000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.314574999999998
Longitude : 94.146
file name : Image_25062024140100063.png
|
2024-06-25 14:01:00.133359 |
208 |
66068059 |
Construction of Community Sanitary Complex |
190000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.31449
Longitude : 94.14578166666666
file name : Image_02012023155645552.png
|
2023-01-02 15:56:45.64103 |
209 |
86877475 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.292920000000002
Longitude : 94.143775
file name : Image_02072024135911659.png
|
2024-07-02 13:59:11.74359 |
210 |
86877475 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.292848333333335
Longitude : 94.14381833333333
file name : Image_02072024134936088.png
|
2024-07-02 13:49:36.173885 |
211 |
86877475 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.29282166666667
Longitude : 94.14383000000001
file name : Image_16112023110943112.png
|
2023-11-16 11:09:43.241992 |
212 |
62232431 |
CONST OF LATRINE AND URINAL AT KADAM MORIYA GAON COMMUNITY HALL |
148289 |
CONST OF LATRINE AND URINAL AT KADAM MORIYA GAON COMMUNITY HALL1 |
Roof laid |
-
latitude : 27.317453333333333
Longitude : 94.15760166666665
file name : Image_08072024135933058.png
|
2024-07-08 13:59:32.488168 |
213 |
62232431 |
CONST OF LATRINE AND URINAL AT KADAM MORIYA GAON COMMUNITY HALL |
148289 |
CONST OF LATRINE AND URINAL AT KADAM MORIYA GAON COMMUNITY HALL1 |
Plinth level |
-
latitude : 27.31753
Longitude : 94.157635
file name : Image_08072024132155978.png
|
2024-07-08 13:21:56.091766 |
214 |
62232431 |
CONST OF LATRINE AND URINAL AT KADAM MORIYA GAON COMMUNITY HALL |
148289 |
CONST OF LATRINE AND URINAL AT KADAM MORIYA GAON COMMUNITY HALL1 |
Completion of work |
-
latitude : 27.31745
Longitude : 94.157605
file name : Image_06042022123023224.png
|
2022-04-06 12:30:23.28735 |
215 |
66068074 |
Operation & maintenance of drinking water supply system |
570000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.287856666666666
Longitude : 94.14329833333335
file name : Image_08072024124517549.png
|
2024-07-08 12:45:17.65293 |
216 |
51505026 |
CONST OF LATRIN AND URINAL AT NAMONI CHUBURI COMMUNITY HALL |
180000 |
CONST OF LATRIN AND URINAL AT NAMONI CHUBURI COMMUNITY HALL1 |
Roof laid |
-
latitude : 27.29029166666667
Longitude : 94.14908166666667
file name : Image_08072024131049707.png
|
2024-07-08 13:10:49.79381 |
217 |
51505026 |
CONST OF LATRIN AND URINAL AT NAMONI CHUBURI COMMUNITY HALL |
180000 |
CONST OF LATRIN AND URINAL AT NAMONI CHUBURI COMMUNITY HALL1 |
Roof laid |
-
latitude : 27.290323333333337
Longitude : 94.14909833333334
file name : Image_08072024130017125.png
|
2024-07-08 13:00:17.212352 |
218 |
51505026 |
CONST OF LATRIN AND URINAL AT NAMONI CHUBURI COMMUNITY HALL |
180000 |
CONST OF LATRIN AND URINAL AT NAMONI CHUBURI COMMUNITY HALL1 |
Plinth level |
-
latitude : 27.290253333333332
Longitude : 94.14904833333334
file name : Image_08072024125408220.png
|
2024-07-08 12:54:08.318814 |
219 |
51505026 |
CONST OF LATRIN AND URINAL AT NAMONI CHUBURI COMMUNITY HALL |
180000 |
CONST OF LATRIN AND URINAL AT NAMONI CHUBURI COMMUNITY HALL1 |
Completion of work |
-
latitude : 27.290084999999998
Longitude : 94.14885000000001
file name : Image_03012022152137426.png
|
2022-01-03 15:21:37.549098 |