1 |
6421467 |
Const. of 5 Nos Urinal at 5 Nos Ward |
250000 |
Toilet1
|
25% |
-
latitude : 27.05855485
Longitude : 93.86495495
file name : Image_22052019150929912.png
|
2019-05-22 15:09:29.989271 |
2 |
6421467 |
Const. of 5 Nos Urinal at 5 Nos Ward |
250000 |
Toilet2
|
25% |
-
latitude : 27.05273043
Longitude : 93.85230586
file name : Image_22052019154656819.png
|
2019-05-22 15:46:56.880519 |
3 |
6421467 |
Const. of 5 Nos Urinal at 5 Nos Ward |
250000 |
Toilet3
|
Completed |
-
latitude : 27.01208044
Longitude : 93.8498103
file name : Image_24052019130453872.png
|
2019-05-24 13:04:53.943324 |
4 |
6421467 |
Const. of 5 Nos Urinal at 5 Nos Ward |
250000 |
Toilet4
|
Up to Plinth level |
-
latitude : 27.02433551
Longitude : 93.87270506
file name : Image_24052019143005210.png
|
2019-05-24 14:30:05.341761 |
5 |
6421471 |
Const. of 5 Nos RCC Ring Well at 5 NOs Ward |
150000 |
Well1
|
In Progress |
-
latitude : 27.04537383
Longitude : 93.85742059
file name : Image_22052019150021987.png
|
2019-05-22 15:00:22.096457 |
6 |
6421471 |
Const. of 5 Nos RCC Ring Well at 5 NOs Ward |
150000 |
Well2
|
In Progress |
-
latitude : 27.05735553
Longitude : 93.8481848
file name : Image_22052019154651628.png
|
2019-05-22 15:46:51.736732 |
7 |
6421491 |
Const. of Urinal at Borbali Chariali RCC Drain |
150000 |
Toilet1
|
25% |
-
latitude : 27.04337548
Longitude : 93.85874138
file name : Image_22052019125129577.png
|
2019-05-22 12:51:29.69799 |
8 |
44489039 |
Stand Alone Street Light in GP Area |
100000 |
Stand Alone Street Light in GP Area1 |
25% |
-
latitude : 27.043029069900513
Longitude : 93.85852932929993
file name : Image_29122020144257187.png
|
2020-12-29 14:42:57.307386 |
9 |
44468299 |
Renovation ,Repairing , sanitation and Maintainnace of Polytechnic Collage & Hostel Qurantine Centre |
1110000 |
Renovation ,Repairing , sanitation and Maintainnace of Polytechnic Collage & Hostel Qurantine Centre1 |
25% |
-
latitude : 27.01118713
Longitude : 93.84891161
file name : Image_30122020092840162.png
|
2020-12-30 09:28:40.265823 |
10 |
44488983 |
Const of market shed at Borbali GP campus |
950500 |
Const of market shed at Borbali GP campus1 |
Plinth Level |
-
latitude : 27.04313683
Longitude : 93.85878994
file name : Image_29122020144315660.png
|
2020-12-29 14:43:15.773707 |
11 |
44488983 |
Const of market shed at Borbali GP campus |
950500 |
Const of market shed at Borbali GP campus1 |
Plinth Level |
-
latitude : 27.04313683
Longitude : 93.85878994
file name : Image_29122020144303189.png
|
2020-12-29 14:43:03.302711 |
12 |
44489279 |
Const of Boundary fancying at na Ali Lp School |
300000 |
Const of Boundary fancying at na Ali Lp School1 |
In Progress |
-
latitude : 27.04981441
Longitude : 93.87456617
file name : Image_29122020151810768.png
|
2020-12-29 15:18:10.862971 |
13 |
44490744 |
Const of Junali mahila samiti Building |
400000 |
Const of Junali mahila samiti Building1 |
25% |
-
latitude : 27.01361004
Longitude : 93.86416126
file name : Image_30122020092834599.png
|
2020-12-30 09:28:34.71956 |
14 |
44490691 |
Cost of Solid waste management Pit at Borbali gp area |
215000 |
Cost of Solid waste management Pit at Borbali gp area1 |
25% |
-
latitude : 27.021190524101257,27.02140235
Longitude : 93.86292815208435,93.86306876
file name : Image_28052021121510911.png
|
2021-05-28 12:15:11.009557 |
15 |
44490691 |
Cost of Solid waste management Pit at Borbali gp area |
215000 |
Cost of Solid waste management Pit at Borbali gp area1 |
25% |
-
latitude : 27.021190524101257,27.02140235
Longitude : 93.86292815208435,93.86306876
file name : Image_28052021121546185.png
|
2021-05-28 12:15:46.273214 |
16 |
44489321 |
Const of Comunity development centre at borbali Motia |
500000 |
Const of Comunity development centre at borbali Motia 1 |
25% |
-
latitude : 27.06569458
Longitude : 93.86164326
file name : Image_28052021121504346.png
|
2021-05-28 12:15:04.450084 |
17 |
44489180 |
30% of Share for Const of 2 Nos ( Two Nos ) of CMSC. |
180000 |
30% of Share for Const of 2 Nos ( Two Nos ) of CMSC.1 |
25% |
-
latitude : 27.0235311
Longitude : 93.86438841
file name : Image_30122020092829115.png
|
2020-12-30 09:28:29.233358 |
18 |
44489180 |
30% of Share for Const of 2 Nos ( Two Nos ) of CMSC. |
180000 |
30% of Share for Const of 2 Nos ( Two Nos ) of CMSC.1 |
25% |
-
latitude : 27.0433042
Longitude : 93.8588524
file name : Image_29122020144321514.png
|
2020-12-29 14:43:21.63988 |
19 |
44489180 |
30% of Share for Const of 2 Nos ( Two Nos ) of CMSC. |
180000 |
30% of Share for Const of 2 Nos ( Two Nos ) of CMSC.1 |
25% |
-
latitude : 27.0433042
Longitude : 93.8588524
file name : Image_29122020144309072.png
|
2020-12-29 14:43:09.180337 |
20 |
44235915 |
Const of Anganabadi Kendra at Krishna Kanta handique Lp school |
200000 |
Const of Anganabadi Kendra at Krishna Kanta handique Lp school1 |
25% |
-
latitude : 27.069755
Longitude : 93.86571166666666
file name : Image_10112020135039449.png
|
2020-11-10 13:50:42.894228 |
21 |
44236016 |
Const Of sanitary Toilet & Fiting and Fixing of Tiles at madhabdev Janmastan Letekupukhuri |
500000 |
Const Of sanitary Toilet & Fiting and Fixing of Tiles at madhabdev Janmastan Letekupukhuri1 |
25% |
-
latitude : 27.021821666666664
Longitude : 93.863695
file name : Image_10112020125003310.png
|
2020-11-10 12:50:06.730879 |
22 |
44235842 |
Const of c dc at banikanta Yubak sangha |
500000 |
Const of c dc at banikanta Yubak sangha1 |
50% |
-
latitude : 27.013908333333333
Longitude : 93.87019000000001
file name : Image_10112020124953251.png
|
2020-11-10 12:49:56.681825 |
23 |
44236054 |
Const of Waiting Room at Borbali Medical sub centre |
200000 |
Const of Waiting Room at Borbali Medical sub centre1 |
50% |
-
latitude : 27.045385000000003
Longitude : 93.85754833333334
file name : Image_10112020141403468.png
|
2020-11-10 14:14:06.918529 |
24 |
44235960 |
Const of boundary wall at gossaibari medical sub centre |
300000 |
Const of boundary wall at gossaibari medical sub centre1 |
50% |
-
latitude : 27.011626666666665
Longitude : 93.84976833333333
file name : Image_10112020123115041.png
|
2020-11-10 12:31:18.458199 |
25 |
43594124 |
Extension Class Room at Borkhet Motia High school |
200000 |
Extension Class Room at Borkhet Motia High school1 |
50% |
-
latitude : 27.059766666666665
Longitude : 93.86815999999999
file name : Image_10112020140747736.png
|
2020-11-10 14:07:51.175947 |
26 |
43593994 |
Renoivation of 2 No Motia Sanmilito Comunity Development Centre |
400000 |
Renoivation of 2 No Motia Sanmilito Comunity Development Centre1 |
25% |
-
latitude : 27.065591666666666
Longitude : 93.86157999999999
file name : Image_10112020135034980.png
|
2020-11-10 13:50:37.345905 |
27 |
43593631 |
Const of HP Culvert at Urang gaon Daffalapathar |
150000 |
Const of HP Culvert at Urang gaon Daffalapathar1 |
Substructure below GL |
-
latitude : 27.04627833333333,27.046251666666663,27.04626166666667
Longitude : 93.871905,93.87188833333333,93.87181166666666
file name : Image_10112020143326235.png
|
2020-11-10 14:33:29.690784 |
28 |
43593376 |
Const of 2 nos Hp Culvert at 2 No Morisuti L/R |
300000 |
Const of 2 nos Hp Culvert at 2 No Morisuti L/R1 |
Substructure below GL |
-
latitude : 27.072443333333332,27.072445000000002
Longitude : 93.86500833333334,93.86503166666668
file name : Image_10112020135330000.png
|
2020-11-10 13:53:33.447492 |
29 |
43593270 |
Const of HP Culvert at Purabil To Rangajaan L/R |
300000 |
Const of HP Culvert at Purabil To Rangajaan L/R1 |
Substructure below GL |
-
latitude : 27.031913333333332,27.031903333333336,27.031901666666666
Longitude : 93.86951166666668,93.86950833333334,93.86950999999999
file name : Image_10112020150601334.png
|
2020-11-10 15:06:04.803137 |
30 |
43594175 |
Const of Nabarupa Moina parijat Building at 2 No Morisuti |
400000 |
Const of Nabarupa Moina parijat Building at 2 No Morisuti1 |
Completed |
-
latitude : 27.072528333333334
Longitude : 93.86519000000001
file name : Image_10112020135426684.png
|
2020-11-10 13:54:30.129611 |
31 |
43593456 |
Const of RCC Box Culvert at 1 No Motia Hamara Deuri Chuburi |
500000 |
Const of RCC Box Culvert at 1 No Motia Hamara Deuri Chuburi1 |
25% |
-
latitude : 27.046321666666667,27.046316666666666
Longitude : 93.84626666666666,93.846275
file name : Image_10112020142109211.png
|
2020-11-10 14:21:12.662822 |
32 |
43593921 |
Const of Borbali Sub Post Office |
150000 |
Const of Borbali Sub Post Office1 |
25% |
-
latitude : 27.077506666666668
Longitude : 93.84319500000001
file name : Image_07112020151050250.png
|
2020-11-07 15:10:52.294392 |
33 |
43594052 |
Const Of Lukeswar Kakati LP School Borbali Chariali |
500000 |
Const Of Lukeswar Kakati LP School Borbali Chariali1 |
25% |
-
latitude : 26.9541238
Longitude : 93.8581366
file name : Image_07112020150749281.png
|
2020-11-07 15:07:51.341226 |
34 |
11325837 |
HP culvert at Baba Bhuyan chuburi |
100000 |
HP culvert at Baba Bhuyan chuburi1 |
25% |
-
latitude : 27.042416666666668,27.042399999999997
Longitude : 93.85977833333332,93.85981500000001
file name : Image_10112020132810836.png
|
2020-11-10 13:28:14.272693 |
35 |
43866416 |
Const of market shed at Borbali GP campus |
833480 |
Const of market shed at Borbali GP campus1 |
Plinth Level |
-
latitude : 26.9541238
Longitude : 93.8581366
file name : Image_07112020150601547.png
|
2020-11-07 15:06:03.604396 |
36 |
43594234 |
Const of Bijaypur LP School Boundary Fancying |
400000 |
Const of Bijaypur LP School Boundary Fancying1 |
In Progress |
-
latitude : 27.066613333333333
Longitude : 93.85801666666666
file name : Image_10112020140019307.png
|
2020-11-10 14:00:22.779427 |
37 |
87223676 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.04569314
Longitude : 93.85717258
file name : Image_17102023143950581.png
|
2023-10-17 14:39:50.675012 |
38 |
55051938 |
DRINKING WATER FACILITY AT BORBALI GP OFFICE CAMPUS |
180000 |
DRINKING WATER FACILITY AT BORBALI GP OFFICE CAMPUS1 |
Plinth level |
-
latitude : 27.04330996
Longitude : 93.85885093
file name : Image_31122021144805958.png
|
2021-12-31 14:48:06.069219 |
39 |
55051938 |
DRINKING WATER FACILITY AT BORBALI GP OFFICE CAMPUS |
180000 |
DRINKING WATER FACILITY AT BORBALI GP OFFICE CAMPUS1 |
Completion of work |
-
latitude : 27.04318515
Longitude : 93.8587661
file name : Image_25112021142515701.png
|
2021-11-25 14:25:15.821758 |
40 |
51236380 |
CONST OF HP CULVERT AT CHAMUAH DAFALAPATHAR JAWAHARJYOTI ROAD TO DAFALAPATHAR AHOM CHUBURI CONNECTIN |
210000 |
CONST OF HP CULVERT AT CHAMUAH DAFALAPATHAR JAWAHARJYOTI ROAD TO DAFALAPATHAR AHOM CHUBURI CONNECTIN1 |
Roof laid |
-
latitude : 27.04976047,27.04975965
Longitude : 93.87485416,93.87486179
file name : Image_27052022103510911.png
|
2022-05-27 10:35:11.047415 |
41 |
51236380 |
CONST OF HP CULVERT AT CHAMUAH DAFALAPATHAR JAWAHARJYOTI ROAD TO DAFALAPATHAR AHOM CHUBURI CONNECTIN |
210000 |
CONST OF HP CULVERT AT CHAMUAH DAFALAPATHAR JAWAHARJYOTI ROAD TO DAFALAPATHAR AHOM CHUBURI CONNECTIN1 |
Plinth level |
-
latitude : 27.04978632,27.04977818
Longitude : 93.8748368,93.87483381
file name : Image_21032022212609869.png
|
2022-03-21 21:26:09.961095 |
42 |
51236380 |
CONST OF HP CULVERT AT CHAMUAH DAFALAPATHAR JAWAHARJYOTI ROAD TO DAFALAPATHAR AHOM CHUBURI CONNECTIN |
210000 |
CONST OF HP CULVERT AT CHAMUAH DAFALAPATHAR JAWAHARJYOTI ROAD TO DAFALAPATHAR AHOM CHUBURI CONNECTIN1 |
Completion of work |
-
latitude : 27.04972672,27.04972037
Longitude : 93.87490749,93.87490109
file name : Image_25112021141650534.png
|
2021-11-25 14:16:50.654881 |
43 |
51236076 |
RUNNING WATER AT NO 2 RANGAJAN KBK |
151383 |
RUNNING WATER AT NO 2 RANGAJAN KBK1 |
Roof laid |
-
latitude : 27.02192523
Longitude : 93.86950588
file name : Image_07072022165527540.png
|
2022-07-07 16:55:27.652853 |
44 |
51236076 |
RUNNING WATER AT NO 2 RANGAJAN KBK |
151383 |
RUNNING WATER AT NO 2 RANGAJAN KBK1 |
Plinth level |
-
latitude : 27.02201306
Longitude : 93.86958654
file name : Image_21032022212613105.png
|
2022-03-21 21:26:13.184671 |
45 |
51236076 |
RUNNING WATER AT NO 2 RANGAJAN KBK |
151383 |
RUNNING WATER AT NO 2 RANGAJAN KBK1 |
Completion of work |
-
latitude : 27.02195564
Longitude : 93.86951548
file name : Image_25112021142816460.png
|
2021-11-25 14:28:16.561062 |
46 |
87694894 |
CONST OF RCC GATE AND CEMENT CONCREATE BRICKS FLOOR AT BORBALI GP CAMPUS |
539600 |
CONST OF RCC GATE AND CEMENT CONCREATE BRICKS FLOOR AT BORBALI GP CAMPUS1 |
Completion of work |
-
latitude : 27.04312519
Longitude : 93.85869997
file name : Image_10112023160007995.png
|
2023-11-10 16:00:08.096626 |
47 |
66380422 |
CONSTRUCTION OF BOUNDARY WALL AT BORBALI GP |
170000 |
CONSTRUCTION OF BOUNDARY WALL AT BORBALI GP1 |
Completion of work |
-
latitude : 27.02078786
Longitude : 93.90962782
file name : Image_28042023224411966.png
|
2023-04-28 22:44:12.29623 |
48 |
65706696 |
Construction of toilets in public institutions |
391950 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.0207537
Longitude : 93.9096406
file name : Image_11032023221728554.png
|
2023-03-11 22:17:29.259712 |
49 |
65706696 |
Construction of toilets in public institutions |
391950 |
Construction of toilets in public institutions2 |
Completion of work |
-
latitude : 27.07746003
Longitude : 93.86320106
file name : Image_17102023143405364.png
|
2023-10-17 14:34:05.463434 |
50 |
65373326 |
Operation & maintenance of drinking water supply system |
490500 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.0207538
Longitude : 93.9096782
file name : Image_22112022182551417.png
|
2022-11-22 18:25:51.669569 |
51 |
65373326 |
Operation & maintenance of drinking water supply system |
490500 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.020753
Longitude : 93.9096808
file name : Image_22112022182554249.png
|
2022-11-22 18:25:54.473265 |
52 |
65373326 |
Operation & maintenance of drinking water supply system |
490500 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.020753
Longitude : 93.9096808
file name : Image_22112022182558599.png
|
2022-11-22 18:25:58.792264 |
53 |
51236333 |
RENOVATION OF BORBALI ORANG GAON KRISTI KENDRA |
140000 |
RENOVATION OF BORBALI ORANG GAON KRISTI KENDRA1 |
Plinth level |
-
latitude : 27.05005182
Longitude : 93.86202901
file name : Image_11052022143852596.png
|
2022-05-11 14:38:52.72365 |
54 |
51236333 |
RENOVATION OF BORBALI ORANG GAON KRISTI KENDRA |
140000 |
RENOVATION OF BORBALI ORANG GAON KRISTI KENDRA1 |
Completion of work |
-
latitude : 27.04997504
Longitude : 93.86207434
file name : Image_25112021143129256.png
|
2021-11-25 14:31:29.361925 |
55 |
51236333 |
RENOVATION OF BORBALI ORANG GAON KRISTI KENDRA |
140000 |
RENOVATION OF BORBALI ORANG GAON KRISTI KENDRA1 |
Completion of work |
-
latitude : 27.04997504
Longitude : 93.86207434
file name : Image_25112021142629237.png
|
2021-11-25 14:26:29.352125 |
56 |
51236099 |
RUNNING WATER AT PURABIL GAON KBK |
130000 |
RUNNING WATER AT PURABIL GAON KBK1 |
Plinth level |
-
latitude : 27.02906959
Longitude : 93.86269687
file name : Image_06042022162214775.png
|
2022-04-06 16:22:14.897116 |
57 |
51236099 |
RUNNING WATER AT PURABIL GAON KBK |
130000 |
RUNNING WATER AT PURABIL GAON KBK1 |
Completion of work |
-
latitude : 27.02904552
Longitude : 93.8625758
file name : Image_25112021142740937.png
|
2021-11-25 14:27:41.05065 |
58 |
65656408 |
EXISTING OFFICE MAINTANANCE 2 |
32000 |
EXISTING OFFICE MAINTANANCE 21 |
Plinth level |
-
latitude : 27.02076
Longitude : 93.9096608
file name : Image_14112023092245476.png
|
2023-11-14 09:22:46.101041 |
59 |
65558841 |
CONST OF REST HOUSE AT BORBALI CHARIALI |
200000 |
CONST OF REST HOUSE AT BORBALI CHARIALI1 |
Completion of work |
-
latitude : 27.0207538
Longitude : 93.9096414
file name : Image_11032023221732214.png
|
2023-03-11 22:17:32.482894 |
60 |
51236143 |
RUNNING WATER AT NO 1 CHAMUAH GAON KBK |
130000 |
RUNNING WATER AT NO 1 CHAMUAH GAON KBK1 |
Roof laid |
-
latitude : 27.04094238
Longitude : 93.87654834
file name : Image_30052022160429194.png
|
2022-05-30 16:04:29.286194 |
61 |
51236143 |
RUNNING WATER AT NO 1 CHAMUAH GAON KBK |
130000 |
RUNNING WATER AT NO 1 CHAMUAH GAON KBK1 |
Completion of work |
-
latitude : 27.04090449
Longitude : 93.87656782
file name : Image_25112021141727118.png
|
2021-11-25 14:17:27.224296 |
62 |
51236489 |
RENOVATION OF SRIBHUYAN NEPALI GAON KRISTI KENDRA |
123245 |
RENOVATION OF SRIBHUYAN NEPALI GAON KRISTI KENDRA1 |
Completion of work |
-
latitude : 27.01278895
Longitude : 93.87878655
file name : Image_11072022170309815.png
|
2022-07-11 17:03:09.914556 |
63 |
51236489 |
RENOVATION OF SRIBHUYAN NEPALI GAON KRISTI KENDRA |
123245 |
RENOVATION OF SRIBHUYAN NEPALI GAON KRISTI KENDRA1 |
Completion of work |
-
latitude : 27.01266875
Longitude : 93.87877773
file name : Image_25112021142853080.png
|
2021-11-25 14:28:53.189937 |
64 |
51236031 |
CONST OF RUNNING WATER AT GEL B GIRJA BORKHET BANGALI |
130000 |
CONST OF RUNNING WATER AT GEL B GIRJA BORKHET BANGALI1 |
Roof laid |
-
latitude : 27.0555751
Longitude : 93.87800151
file name : Image_30062022175307423.png
|
2022-06-30 17:53:07.542113 |
65 |
51236031 |
CONST OF RUNNING WATER AT GEL B GIRJA BORKHET BANGALI |
130000 |
CONST OF RUNNING WATER AT GEL B GIRJA BORKHET BANGALI1 |
Plinth level |
-
latitude : 27.05564361
Longitude : 93.87804762
file name : Image_21032022212606315.png
|
2022-03-21 21:26:06.41317 |
66 |
51236031 |
CONST OF RUNNING WATER AT GEL B GIRJA BORKHET BANGALI |
130000 |
CONST OF RUNNING WATER AT GEL B GIRJA BORKHET BANGALI1 |
Completion of work |
-
latitude : 27.05561688
Longitude : 93.87796587
file name : Image_25112021142552410.png
|
2021-11-25 14:25:52.52894 |
67 |
51236031 |
CONST OF RUNNING WATER AT GEL B GIRJA BORKHET BANGALI |
130000 |
CONST OF RUNNING WATER AT GEL B GIRJA BORKHET BANGALI1 |
Completion of work |
-
latitude : 27.05561688
Longitude : 93.87796587
file name : Image_25112021143040261.png
|
2021-11-25 14:30:40.357834 |
68 |
65706665 |
CONST OF SAMBHURAM BORAH LP SCHOOL BUILDING |
522900 |
CONST OF SAMBHURAM BORAH LP SCHOOL BUILDING1 |
Plinth level |
-
latitude : 27.07638532
Longitude : 93.86341479
file name : Image_17102023143412256.png
|
2023-10-17 14:34:12.353492 |
69 |
65706665 |
CONST OF SAMBHURAM BORAH LP SCHOOL BUILDING |
522900 |
CONST OF SAMBHURAM BORAH LP SCHOOL BUILDING1 |
Plinth level |
-
latitude : 27.07638532
Longitude : 93.86341479
file name : Image_17102023143408874.png
|
2023-10-17 14:34:08.971502 |
70 |
65706665 |
CONST OF SAMBHURAM BORAH LP SCHOOL BUILDING |
522900 |
CONST OF SAMBHURAM BORAH LP SCHOOL BUILDING1 |
Completion of work |
-
latitude : 27.0207545
Longitude : 93.9096433
file name : Image_10022023223345184.png
|
2023-02-10 22:33:45.499222 |
71 |
65706665 |
CONST OF SAMBHURAM BORAH LP SCHOOL BUILDING |
522900 |
CONST OF SAMBHURAM BORAH LP SCHOOL BUILDING1 |
Completion of work |
-
latitude : 27.07621055
Longitude : 93.86336286
file name : Image_04042023121708244.png
|
2023-04-04 12:17:08.348727 |
72 |
65706674 |
CONST OF PURABIL ARUNODAY RANGA MANCHA |
551633 |
CONST OF PURABIL ARUNODAY RANGA MANCHA1 |
Completion of work |
-
latitude : 27.0207555
Longitude : 93.9096438
file name : Image_10022023223348312.png
|
2023-02-10 22:33:48.633045 |
73 |
65706708 |
Construction of toilets in public institutions |
393039 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.02056618
Longitude : 93.86479448
file name : Image_10042023172119125.png
|
2023-04-10 17:21:19.272127 |
74 |
65706708 |
Construction of toilets in public institutions |
393039 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.02044204
Longitude : 93.86489279
file name : Image_18022023111709822.png
|
2023-02-18 11:17:09.917994 |
75 |
65706708 |
Construction of toilets in public institutions |
393039 |
Construction of toilets in public institutions2 |
Completion of work |
-
latitude : 27.020754
Longitude : 93.9096429
file name : Image_10022023223351495.png
|
2023-02-10 22:33:51.829147 |
76 |
65706708 |
Construction of toilets in public institutions |
393039 |
Construction of toilets in public institutions2 |
Completion of work |
-
latitude : 27.03786145
Longitude : 93.85474875
file name : Image_05042023171126454.png
|
2023-04-05 17:11:26.571124 |
77 |
87223531 |
Construction of toilets in public institutions |
220000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.0197632
Longitude : 93.85258597
file name : Image_10112023154812085.png
|
2023-11-10 15:48:12.188916 |
78 |
87223531 |
Construction of toilets in public institutions |
220000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.01970614
Longitude : 93.85245794
file name : Image_03102023145709680.png
|
2023-10-03 14:57:09.772677 |
79 |
87223475 |
Creation of Shed for segregation and processing of wet and dry waste |
235175 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.04579616
Longitude : 93.85721707
file name : Image_03102023142125702.png
|
2023-10-03 14:21:25.780671 |
80 |
87694829 |
EXTENSION OF MARKET SHED AT BORBALI GP OFFICE |
139600 |
EXTENSION OF MARKET SHED AT BORBALI GP OFFICE1 |
Completion of work |
-
latitude : 27.0427894
Longitude : 93.8587943
file name : Image_03102023141219133.png
|
2023-10-03 14:12:19.237286 |
81 |
51236457 |
CONST OF HP CUVERT AT SRI BHUYAN PATHAK CHUBURI |
140000 |
CONST OF HP CUVERT AT SRI BHUYAN PATHAK CHUBURI1 |
Plinth level |
-
latitude : 27.00733186,27.00733617
Longitude : 93.85958803,93.8595921
file name : Image_24022022145918889.png
|
2022-02-24 14:59:19.042894 |
82 |
51236457 |
CONST OF HP CUVERT AT SRI BHUYAN PATHAK CHUBURI |
140000 |
CONST OF HP CUVERT AT SRI BHUYAN PATHAK CHUBURI1 |
Completion of work |
-
latitude : 27.00733531,27.00732972
Longitude : 93.85954745,93.85954051
file name : Image_25112021142929098.png
|
2021-11-25 14:29:29.22012 |
83 |
65373348 |
Construction of toilets in public institutions |
490500 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.0207538
Longitude : 93.9096414
file name : Image_10022023223342090.png
|
2023-02-10 22:33:42.423654 |
84 |
51236420 |
CONST OF RCC CULVERT AT NO 2 MORISUTI TO NO 4 PITHAGURI CONNECTION ROAD |
270000 |
CONST OF RCC CULVERT AT NO 2 MORISUTI TO NO 4 PITHAGURI CONNECTION ROAD1 |
Roof laid |
-
latitude : 27.07145892,27.07146073
Longitude : 93.86633833,93.86632866
file name : Image_27012022155237266.png
|
2022-01-27 15:52:37.416412 |
85 |
51236420 |
CONST OF RCC CULVERT AT NO 2 MORISUTI TO NO 4 PITHAGURI CONNECTION ROAD |
270000 |
CONST OF RCC CULVERT AT NO 2 MORISUTI TO NO 4 PITHAGURI CONNECTION ROAD1 |
Plinth level |
-
latitude : 27.07142264,27.07143369
Longitude : 93.86626219,93.86627297
file name : Image_31122021144815168.png
|
2021-12-31 14:48:15.270803 |
86 |
51236420 |
CONST OF RCC CULVERT AT NO 2 MORISUTI TO NO 4 PITHAGURI CONNECTION ROAD |
270000 |
CONST OF RCC CULVERT AT NO 2 MORISUTI TO NO 4 PITHAGURI CONNECTION ROAD1 |
Completion of work |
-
latitude : 27.07149845,27.07146728
Longitude : 93.86628274,93.86630829
file name : Image_25112021143004796.png
|
2021-11-25 14:30:05.009093 |
87 |
51236046 |
RUNNING WATER AT ROUMORIA KBK |
130000 |
RUNNING WATER AT ROUMORIA KBK1 |
Completion of work |
-
latitude : 27.04651914
Longitude : 93.85602958
file name : Image_16032022103205771.png
|
2022-03-16 10:32:05.867736 |
88 |
51236046 |
RUNNING WATER AT ROUMORIA KBK |
130000 |
RUNNING WATER AT ROUMORIA KBK1 |
Completion of work |
-
latitude : 27.04632054
Longitude : 93.85578076
file name : Image_25112021142704980.png
|
2021-11-25 14:27:05.109648 |
89 |
65558816 |
RENOVATION OF BORIGAON CHAMAGURI LP SCHOOL BUILDING |
325000 |
RENOVATION OF BORIGAON CHAMAGURI LP SCHOOL BUILDING1 |
Roof laid |
-
latitude : 27.01959621
Longitude : 93.8523196
file name : Image_03102023145813850.png
|
2023-10-03 14:58:13.953952 |
90 |
65558816 |
RENOVATION OF BORIGAON CHAMAGURI LP SCHOOL BUILDING |
325000 |
RENOVATION OF BORIGAON CHAMAGURI LP SCHOOL BUILDING1 |
Completion of work |
-
latitude : 27.01958063
Longitude : 93.8522388
file name : Image_30112022105651071.png
|
2022-11-30 10:56:51.179372 |
91 |
65656366 |
CONST OF POOL AND REFERY STAND AT BIJOYPUR HSS VOLLEYBALL FIELD |
25000 |
CONST OF POOL AND REFERY STAND AT BIJOYPUR HSS VOLLEYBALL FIELD1 |
Completion of work |
-
latitude : 26.9712786
Longitude : 93.94441303
file name : Image_11032023225056909.png
|
2023-03-11 22:50:57.007739 |
92 |
65656360 |
CONST OF POOL AND REFERY STAND AT BORBALI HSS VOLLEYBALL FIELD |
25000 |
CONST OF POOL AND REFERY STAND AT BORBALI HSS VOLLEYBALL FIELD1 |
Completion of work |
-
latitude : 27.04407637
Longitude : 93.85867758
file name : Image_09022023233521449.png
|
2023-02-09 23:35:21.573229 |
93 |
55051990 |
EXPENDITURE FOR COVID CARE |
98138 |
EXPENDITURE FOR COVID CARE1 |
Completion of work |
-
latitude : 27.0215308
Longitude : 93.9105893
file name : Image_08062022230217585.png
|
2022-06-08 23:02:17.727625 |
94 |
51236164 |
RUNNING WATER AT NO1 BORBALI KBK |
130000 |
RUNNING WATER AT NO1 BORBALI KBK1 |
Completion of work |
-
latitude : 27.05569243
Longitude : 93.86494635
file name : Image_25112021141803812.png
|
2021-11-25 14:18:03.928081 |
95 |
65532632 |
CONTRIBUTION FOR CONST OF CEO RESIDENCE |
50000 |
CONTRIBUTION FOR CONST OF CEO RESIDENCE1 |
Plinth level |
-
latitude : 27.0207539
Longitude : 93.9096633
file name : Image_07112023233333780.png
|
2023-11-07 23:33:34.298734 |
96 |
65532632 |
CONTRIBUTION FOR CONST OF CEO RESIDENCE |
50000 |
CONTRIBUTION FOR CONST OF CEO RESIDENCE1 |
Completion of work |
-
latitude : 27.0207538
Longitude : 93.9096782
file name : Image_22112022182700929.png
|
2022-11-22 18:27:01.163721 |
97 |
65558798 |
CONST OF CLASSROOM AT CHAMUAH ME SCHOOL |
325000 |
CONST OF CLASSROOM AT CHAMUAH ME SCHOOL1 |
Roof laid |
-
latitude : 27.04187413
Longitude : 93.87565354
file name : Image_12102023111905758.png
|
2023-10-12 11:19:05.851166 |
98 |
65558798 |
CONST OF CLASSROOM AT CHAMUAH ME SCHOOL |
325000 |
CONST OF CLASSROOM AT CHAMUAH ME SCHOOL1 |
Completion of work |
-
latitude : 27.04191674
Longitude : 93.87573794
file name : Image_10042023172007054.png
|
2023-04-10 17:20:07.165874 |
99 |
65558798 |
CONST OF CLASSROOM AT CHAMUAH ME SCHOOL |
325000 |
CONST OF CLASSROOM AT CHAMUAH ME SCHOOL1 |
Completion of work |
-
latitude : 27.04195152
Longitude : 93.87581898
file name : Image_30112022122803659.png
|
2022-11-30 12:28:03.76226 |
100 |
87694777 |
CONST OF OPEN STAGE AT SRIBHUYAN MAJGAON |
400000 |
CONST OF OPEN STAGE AT SRIBHUYAN MAJGAON1 |
Completion of work |
-
latitude : 27.01000402
Longitude : 93.86566649
file name : Image_17102023151110792.png
|
2023-10-17 15:11:11.244546 |
101 |
87223746 |
Construction of toilets in public institutions |
154700 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.02696541
Longitude : 93.85600736
file name : Image_07112023233237748.png
|
2023-11-07 23:32:37.834997 |
102 |
87223400 |
Operation & maintenance of drinking water supply system |
404700 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.04512833333333
Longitude : 93.85884333333334
file name : Image_15042024165519588.png
|
2024-04-15 16:55:19.739863 |