1 |
30036571 |
CONST. OF REPAIRING AT GP OFFICE |
500000 |
CONST. OF REPAIRING AT GP OFFICE1 |
Completed |
-
latitude : 26.919610239565372
Longitude : 93.77822357229888
file name : Image_08082020170642072.png
|
2020-08-08 17:06:42.811978 |
2 |
11321595 |
Const of a urinal at 1 No. Ganakdoloni tiniali |
130000 |
Const of a urinal at 1 No. Ganakdoloni tiniali1 |
Completed |
-
latitude : 26.926608164794743
Longitude : 93.78371933475137
file name : Image_05082020155038692.png
|
2020-08-05 15:50:39.387824 |
3 |
11321381 |
Solar system light faciality at 1 No. Ganakdoloni Tiniali |
55000 |
Solar system light faciality at 1 No. Ganakdoloni Tiniali1 |
Completed |
-
latitude : 26.926493919454515
Longitude : 93.78376308828592
file name : Image_09082020203926171.png
|
2020-08-09 20:39:27.284209 |
4 |
11321616 |
Drinking water facility at Uttarkathani LP/ME & High School campus |
130000 |
Drinking water facility at Uttarkathani LP/ME & High School campus1 |
Completed |
-
latitude : 26.938219447620213
Longitude : 93.79707807675004
file name : Image_09082020203949648.png
|
2020-08-09 20:39:50.816141 |
5 |
43557907 |
Drinking water facility at 2 No. Ruptali chuburi |
130000 |
Drinking water facility at 2 No. Ruptali chuburi1 |
Completed |
-
latitude : 26.921012825332582
Longitude : 93.7710184045136
file name : Image_09082020203959218.png
|
2020-08-09 20:40:00.407475 |
6 |
6421568 |
Agril Bandh from Bhitardalani to Santipur Kinaram Chuburi |
50000 |
Minor Irrigation Structures1 |
completed |
-
latitude : 26.919669999999996
Longitude : 93.77830166666666
file name : Image_20032019122353215.png
|
2019-03-20 12:23:53.362859 |
7 |
6421563 |
Const. of Market Shed at Ganakdalani GP Campus |
240000 |
Shops1 |
Completed |
-
latitude : 26.919643333333337
Longitude : 93.77812666666665
file name : Image_20032019121935633.png
|
2019-03-20 12:19:35.725179 |
8 |
6421556 |
Const. of Road cum Bandh from GP Road Saruman Chuburi |
50000 |
Approach Road1 |
Completed |
-
latitude : 26.924495,26.924498333333336
Longitude : 93.77591,93.77590666666669
file name : Image_20032019120858855.png
|
2019-03-20 12:08:58.940118 |
9 |
6421573 |
Const. of RCC Box Culvert at Pub Bhatmow L/R |
150000 |
Culvert1 |
Completed |
-
latitude : 26.922581666666662,26.92259
Longitude : 93.77364166666666,93.77366500000001
file name : Image_20032019120546690.png
|
2019-03-20 12:05:46.824282 |
10 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump1 |
Complete |
-
latitude : 26.919188333333334
Longitude : 93.77798833333333
file name : Image_20032019123039217.png
|
2019-03-20 12:30:39.324546 |
11 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump2 |
Complete |
-
latitude : 26.919188333333334
Longitude : 93.77798833333333
file name : Image_20032019123112138.png
|
2019-03-20 12:31:12.297347 |
12 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump3 |
Complete |
-
latitude : 26.91919833333333
Longitude : 93.77799333333333
file name : Image_20032019123147174.png
|
2019-03-20 12:31:47.310385 |
13 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump4 |
Complete |
-
latitude : 26.91919833333333
Longitude : 93.77799333333333
file name : Image_20032019123226865.png
|
2019-03-20 12:32:26.973101 |
14 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump5 |
Complete |
-
latitude : 26.919208333333337
Longitude : 93.77798666666668
file name : Image_20032019123302717.png
|
2019-03-20 12:33:02.846888 |
15 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump6 |
Complete |
-
latitude : 26.919215
Longitude : 93.77798833333333
file name : Image_20032019123350569.png
|
2019-03-20 12:33:50.704944 |
16 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump7 |
Complete |
-
latitude : 26.91921333333333
Longitude : 93.77799166666667
file name : Image_20032019123423428.png
|
2019-03-20 12:34:23.533239 |
17 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump8 |
Complete |
-
latitude : 26.91921333333333
Longitude : 93.77799166666667
file name : Image_20032019123454676.png
|
2019-03-20 12:34:54.825623 |
18 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump9 |
Complete |
-
latitude : 26.919206666666664
Longitude : 93.77801833333334
file name : Image_20032019123532315.png
|
2019-03-20 12:35:32.439103 |
19 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump10 |
Complete |
-
latitude : 26.919188333333334
Longitude : 93.77797000000001
file name : Image_20032019123600170.png
|
2019-03-20 12:36:00.295194 |
20 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump11 |
Complete |
-
latitude : 26.919188333333334
Longitude : 93.77797000000001
file name : Image_20032019123636949.png
|
2019-03-20 12:36:37.055786 |
21 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump12 |
Complete |
-
latitude : 26.919224999999997
Longitude : 93.77797166666666
file name : Image_20032019123705152.png
|
2019-03-20 12:37:05.27725 |
22 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump13 |
Complete |
-
latitude : 26.919235000000004
Longitude : 93.777975
file name : Image_20032019123733715.png
|
2019-03-20 12:37:33.832077 |
23 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump14 |
Complete |
-
latitude : 26.919241666666668
Longitude : 93.77798333333334
file name : Image_20032019123802185.png
|
2019-03-20 12:38:02.294637 |
24 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump15 |
Complete |
-
latitude : 26.919241666666668
Longitude : 93.77798333333334
file name : Image_20032019123830233.png
|
2019-03-20 12:38:30.340489 |
25 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump16 |
Complete |
-
latitude : 26.919241666666668
Longitude : 93.77798333333334
file name : Image_20032019123856084.png
|
2019-03-20 12:38:56.193523 |
26 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump17 |
Complete |
-
latitude : 26.919216666666664
Longitude : 93.77797333333335
file name : Image_20032019123923653.png
|
2019-03-20 12:39:23.770778 |
27 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump18 |
Complete |
-
latitude : 26.919216666666664
Longitude : 93.77797333333335
file name : Image_20032019123947614.png
|
2019-03-20 12:39:47.765339 |
28 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump19 |
Complete |
-
latitude : 26.919216666666664
Longitude : 93.77797333333335
file name : Image_20032019124011622.png
|
2019-03-20 12:40:11.733337 |
29 |
6421566 |
20 Nos Hand Tubel at GP Arrea |
58175 |
Hand pump20 |
Complete |
-
latitude : 26.919216666666664
Longitude : 93.77797333333335
file name : Image_20032019124035128.png
|
2019-03-20 12:40:35.240806 |
30 |
6421561 |
Road Dev. From Geleki Deka Chuburi L/R |
70000 |
Approach Road1 |
Completed |
-
latitude : 26.92441666666667,26.924411666666668
Longitude : 93.78026833333334,93.78022666666666
file name : Image_20032019121411981.png
|
2019-03-20 12:14:12.082355 |
31 |
6421559 |
Road from Chutia Gaon Dimbeswar Bora Chuburi L/R |
50000 |
Approach Road1 |
Completed |
-
latitude : 26.924445,26.924428333333335
Longitude : 93.78027833333333,93.78024833333332
file name : Image_20032019121255394.png
|
2019-03-20 12:12:55.506914 |
32 |
6421569 |
Dev. of Agril Bandh at Sessa River |
50000 |
Minor Irrigation Structures1 |
completed |
-
latitude : 26.919579999999996
Longitude : 93.778215
file name : Image_20032019122447743.png
|
2019-03-20 12:24:47.842075 |
33 |
6421554 |
Const. of RCC Culvert at Singarajan Ruptali Gaon |
290000 |
Culvert1 |
Completed |
-
latitude : 26.938356666666664,26.92259333333333,26.922604999999997
Longitude : 93.83792,93.77365333333334,93.77365499999999
file name : Image_20032019120406762.png
|
2019-03-20 12:04:06.857456 |
34 |
6421571 |
Road Dev. from Borthekerabari to Umeswar Saikia Chuburi |
50000 |
Approach Road1 |
Completed |
-
latitude : 26.919581666666666,26.919598333333337
Longitude : 93.77820833333332,93.778215
file name : Image_20032019122544540.png
|
2019-03-20 12:25:44.688753 |
35 |
10660220 |
Runnig water faciality and Urinal at Ganakdoloni gp campus |
196040 |
Water Tank1
|
Completed |
-
latitude : 26.919640037231147
Longitude : 93.77816087566316
file name : Image_27052019152849968.png
|
2019-05-27 15:28:50.058723 |
36 |
30015424 |
CONST. OF MARKET SHED AT G.P. CAMPUS |
268724 |
Market Yards/ Vending Zone1
|
Completed |
-
latitude : 26.91968056373298
Longitude : 93.77824637107551
file name : Image_27052019152852882.png
|
2019-05-27 15:28:52.964087 |
37 |
30036144 |
2 NO. GANAKDOLONI BAGHARGAON HARIMANDIR OF DRINKING WATER SOURCE AND SANITATION FACILITY |
300000 |
2 NO. GANAKDOLONI BAGHARGAON HARIMANDIR OF DRINKING WATER SOURCE AND SANITATION FACILITY1 |
completed |
-
latitude : 26.926838792860508
Longitude : 93.77698204480112
file name : Image_17082020182418356.png
|
2020-08-17 18:24:18.973529 |
38 |
11321419 |
Solar system light faciality in front of GP office |
55000 |
Solar system light faciality in front of GP office1 |
Completed |
-
latitude : 26.919665350578725
Longitude : 93.77832155674696
file name : Image_09082020203916185.png
|
2020-08-09 20:39:17.405795 |
39 |
11321559 |
CC Block road of GP office road |
764898 |
CC Block road of GP office road1 |
Completed |
-
latitude : 26.92563167307526,26.925638420507312
Longitude : 93.78022550605237,93.78018259070814
file name : Image_17082020151932670.png
|
2020-08-17 15:19:33.382205 |
40 |
11321569 |
Solar system light faciality at centre of Arapathar |
55000 |
Solar system light faciality at centre of Arapathar1 |
Completed |
-
latitude : 26.9261865131557
Longitude : 93.7885598000139
file name : Image_09082020203937591.png
|
2020-08-09 20:39:38.846635 |
41 |
11321436 |
Const. of a market shed at 1 No. Ganakdoloni railway crossing |
233325 |
Const. of a market shed at 1 No. Ganakdoloni railway crossing1 |
Completed |
-
latitude : 26.93248157389462
Longitude : 93.78326788544655
file name : Image_12112020165436929.png
|
2020-11-12 16:54:41.415979 |
42 |
11321358 |
Const. of a market shed at Phutabhug |
300000 |
Const. of a market shed at Phutabhug1 |
Completed |
-
latitude : 26.93288729991764
Longitude : 93.75612242147326
file name : Image_12112020165458096.png
|
2020-11-12 16:55:02.557462 |
43 |
11321344 |
Drinking water facility at Majardoloni village |
130000 |
Drinking water facility at Majardoloni village1 |
Completed |
-
latitude : 26.910913176834583
Longitude : 93.75089387409389
file name : Image_12112020165518082.png
|
2020-11-12 16:55:22.553401 |
44 |
11321545 |
Small Industry of Handloom textiles at Ganakdoloni GP Office campus |
500000 |
Small Industry of Handloom textiles at Ganakdoloni GP Office campus1 |
50% |
-
latitude : 26.91960885655135
Longitude : 93.77804897725582
file name : Image_18112020174543330.png
|
2020-11-18 17:45:43.479896 |
45 |
11321608 |
Const. of Boundary wall at Phutabhog Health Sub-centre |
320000 |
Const. of Boundary wall at Phutabhog Health Sub-centre1 |
50% |
-
latitude : 26.926060910336673
Longitude : 93.75893429853022
file name : Image_12112020165512459.png
|
2020-11-12 16:55:16.927541 |
46 |
11321535 |
Running water facility at Bhitardoloni Harimandir and LP School |
130000 |
Running water facility at Bhitardoloni Harimandir and LP School1 |
Creation of Source |
-
latitude : 26.926042051054537
Longitude : 93.80924030207098
file name : Image_13112020221515521.png
|
2020-11-13 22:15:20.525984 |
47 |
11321333 |
Infrastructure development of Nidanchua ME School building |
310000 |
Infrastructure development of Nidanchua ME School building1 |
Completed |
-
latitude : 26.92295692395419
Longitude : 93.77952327020466
file name : Image_17082020151936749.png
|
2020-08-17 15:19:37.491482 |
48 |
11321551 |
Running water facility at Baghorgaon LP School |
130000 |
Running water facility at Baghorgaon LP School1 |
Completed |
-
latitude : 26.923736734315753
Longitude : 93.77772660925984
file name : Image_12112020165448366.png
|
2020-11-12 16:54:52.876338 |
49 |
11321551 |
Running water facility at Baghorgaon LP School |
130000 |
Running water facility at Baghorgaon LP School1 |
Pipeline Extension |
-
latitude : 26.92381556611508
Longitude : 93.7777354940772
file name : Image_17082020151940676.png
|
2020-08-17 15:19:41.368108 |
50 |
11321583 |
Repairing of 2 No. Baghargaon Cultural Development centre |
318042 |
Repairing of 2 No. Baghargaon Cultural Development centre1 |
50% |
-
latitude : 26.924337674863636
Longitude : 93.77535461448133
file name : Image_17082020182407956.png
|
2020-08-17 18:24:08.637259 |
51 |
11321577 |
Repairing of Phutabhog Shiva mandir |
150000 |
Repairing of Phutabhog Shiva mandir1 |
Completed |
-
latitude : 26.9267037184909
Longitude : 93.75888182781637
file name : Image_12112020165506498.png
|
2020-11-12 16:55:10.990327 |
52 |
30037170 |
CONST. OF REPAIRING OF HARIJAN CHUBURI SHIVA MANDIR (BHITARDOLONI) |
100000 |
CONST. OF REPAIRING OF HARIJAN CHUBURI SHIVA MANDIR (BHITARDOLONI)1 |
Completed |
-
latitude : 26.93008556496352
Longitude : 93.81067478097975
file name : Image_13112020221507946.png
|
2020-11-13 22:15:13.001089 |
53 |
43559106 |
Infrastructure development of Khalihamari ME School building |
250000 |
Infrastructure development of Khalihamari ME School building1 |
Completed |
-
latitude : 26.913861050270498
Longitude : 93.76689576543868
file name : Image_12112020165526044.png
|
2020-11-12 16:55:30.523877 |
54 |
21331340 |
Drinking water facility at Ganakdoloni LP School campus |
130000 |
Drinking water facility at Ganakdoloni LP School campus1 |
Completed |
-
latitude : 26.927906228229403
Longitude : 93.7843027152121
file name : Image_05082020101245078.png
|
2020-08-05 10:12:45.811221 |
55 |
43558896 |
Const. of CC Block approach road at Nidanchua LP School |
300000 |
Const. of CC Block approach road at Nidanchua LP School1 |
WBM |
-
latitude : 26.918668490834534,26.916597532108426
Longitude : 93.77802953124046,93.7780293636024
file name : Image_18112020174608840.png
|
2020-11-18 17:46:08.968483 |
56 |
43559228 |
Const. of Boundary wall at Borthekerabari Health Sub-centre |
300000 |
Const. of Boundary wall at Borthekerabari Health Sub-centre1 |
Completed |
-
latitude : 26.890968773514032
Longitude : 93.76456081867218
file name : Image_12112020165541506.png
|
2020-11-12 16:55:45.989068 |
57 |
43559331 |
Const. of Bhatmow Anganwadi Centre |
179398 |
Const. of Bhatmow Anganwadi Centre1 |
Completed |
-
latitude : 26.90440567675978
Longitude : 93.75227604992688
file name : Image_12112020165534651.png
|
2020-11-12 16:55:39.114399 |
58 |
43559416 |
Renovation at 1 No. Ruptali LP School |
300000 |
Renovation at 1 No. Ruptali LP School1 |
50% |
-
latitude : 26.92709322553128
Longitude : 93.76956473104656
file name : Image_17082020182357217.png
|
2020-08-17 18:23:57.934791 |
59 |
43558050 |
Drinking water facility at Arapathar Gaon |
130000 |
Drinking water facility at Arapathar Gaon1 |
Completed |
-
latitude : 26.934207323938608
Longitude : 93.78617565147579
file name : Image_18112020174622872.png
|
2020-11-18 17:46:23.032987 |
60 |
54542580 |
Const of Drinking water and Sanitation Facility at Goda chuburi |
240000 |
Const of Drinking water and Sanitation Facility at Goda chuburi1 |
Completion of work |
-
latitude : 26.92165089
Longitude : 93.78080519
file name : Image_06102021121921208.png
|
2021-10-06 12:19:21.308853 |
61 |
52696854 |
Const of RCC Box Culvert at Phutabhug Rongajan road |
354775 |
Const of RCC Box Culvert at Phutabhug Rongajan road1 |
Completion of work |
-
latitude : 26.92784092,26.92784028
Longitude : 93.75273911,93.75274095
file name : Image_06102021123308467.png
|
2021-10-06 12:33:08.635369 |
62 |
52696740 |
Const of HP Culvert at Dribual Raja Chuburi |
104483 |
Const of HP Culvert at Dribual Raja Chuburi1 |
Roof laid |
-
latitude : 26.93401999,26.93402264
Longitude : 93.80457242,93.80457173
file name : Image_21022022161038695.png
|
2022-02-21 16:10:38.783642 |
63 |
52696740 |
Const of HP Culvert at Dribual Raja Chuburi |
104483 |
Const of HP Culvert at Dribual Raja Chuburi1 |
Plinth level |
-
latitude : 26.93404851,26.93405155
Longitude : 93.80445172,93.80453419
file name : Image_29122021115642401.png
|
2021-12-29 11:56:42.53261 |
64 |
52696740 |
Const of HP Culvert at Dribual Raja Chuburi |
104483 |
Const of HP Culvert at Dribual Raja Chuburi1 |
Completion of work |
-
latitude : 26.93403912,26.9340391
Longitude : 93.80453648,93.8045369
file name : Image_06102021114256642.png
|
2021-10-06 11:42:56.759102 |
65 |
65155901 |
Operation & maintenance of drinking water supply system |
452000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.95164285,26.95164285
Longitude : 93.85570932,93.85570932
file name : Image_13012023222941849.png
|
2023-01-13 22:29:41.944059 |
66 |
65315478 |
Creation of community compost pits for a group of Households |
218000 |
Creation of community compost pits for a group of Households1 |
Roof laid |
-
latitude : 26.92650664
Longitude : 93.78955041
file name : Image_21122022134704494.png
|
2022-12-21 13:47:04.600064 |
67 |
65315478 |
Creation of community compost pits for a group of Households |
218000 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 26.92621876
Longitude : 93.78947616
file name : Image_22112022153826202.png
|
2022-11-22 15:38:26.315238 |
68 |
65315478 |
Creation of community compost pits for a group of Households |
218000 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 26.92605491
Longitude : 93.78947635
file name : Image_11102022103815260.png
|
2022-10-11 10:38:15.371786 |
69 |
52697104 |
10 percent Expenditure for Covid 19 |
90450 |
10 percent Expenditure for Covid 19 1 |
Plinth level |
-
latitude : 26.91968596
Longitude : 93.77810025
file name : Image_21022022125433637.png
|
2022-02-21 12:54:33.761397 |
70 |
52697104 |
10 percent Expenditure for Covid 19 |
90450 |
10 percent Expenditure for Covid 19 1 |
Completion of work |
-
latitude : 26.9196639
Longitude : 93.77828139
file name : Image_06102021115949141.png
|
2021-10-06 11:59:49.284114 |
71 |
65317096 |
Construction of toilets in public institutions |
120000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.91653635
Longitude : 93.77732514
file name : Image_08112022140147633.png
|
2022-11-08 14:01:47.84878 |
72 |
65316890 |
Construction of toilets in public institutions |
121350 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.91145012
Longitude : 93.75803781
file name : Image_08112022145439890.png
|
2022-11-08 14:54:40.006 |
73 |
65315646 |
Const. of Kitchen Shed at Baghorgaon L.P School |
350000 |
Const. of Kitchen Shed at Baghorgaon L.P School1 |
Completion of work |
-
latitude : 26.92377022
Longitude : 93.77769358
file name : Image_17102022145517516.png
|
2022-10-17 14:55:17.637662 |
74 |
54742606 |
Const of Drinking Water and Sanitation Facility at Majordoloni |
240000 |
Const of Drinking Water and Sanitation Facility at Majordoloni1 |
Roof laid |
-
latitude : 26.91060658
Longitude : 93.75545552
file name : Image_13032023152112786.png
|
2023-03-13 15:21:12.952842 |
75 |
54742606 |
Const of Drinking Water and Sanitation Facility at Majordoloni |
240000 |
Const of Drinking Water and Sanitation Facility at Majordoloni1 |
Plinth level |
-
latitude : 26.91068234
Longitude : 93.75539924
file name : Image_19122022135754023.png
|
2022-12-19 13:57:54.152429 |
76 |
54742606 |
Const of Drinking Water and Sanitation Facility at Majordoloni |
240000 |
Const of Drinking Water and Sanitation Facility at Majordoloni1 |
Completion of work |
-
latitude : 26.91072214
Longitude : 93.75527414
file name : Image_06102021124608787.png
|
2021-10-06 12:46:08.883765 |
77 |
54542212 |
Const of Community Sanitation Facility at Phutabhug Sub Centre |
180000 |
Const of Community Sanitation Facility at Phutabhug Sub Centre1 |
Roof laid |
-
latitude : 26.92623884
Longitude : 93.75885305
file name : Image_13032023153641152.png
|
2023-03-13 15:36:41.288596 |
78 |
54542212 |
Const of Community Sanitation Facility at Phutabhug Sub Centre |
180000 |
Const of Community Sanitation Facility at Phutabhug Sub Centre1 |
Plinth level |
-
latitude : 26.92608485
Longitude : 93.75877664
file name : Image_09032022132114159.png
|
2022-03-09 13:21:14.262827 |
79 |
54542212 |
Const of Community Sanitation Facility at Phutabhug Sub Centre |
180000 |
Const of Community Sanitation Facility at Phutabhug Sub Centre1 |
Completion of work |
-
latitude : 26.92609021
Longitude : 93.75881114
file name : Image_06102021122828777.png
|
2021-10-06 12:28:28.901762 |
80 |
65317252 |
Repairing of Futabhug L.P School |
183139 |
Repairing of Futabhug L.P School1 |
Roof laid |
-
latitude : 26.9287454
Longitude : 93.75816908
file name : Image_13032023153332746.png
|
2023-03-13 15:33:32.842351 |
81 |
65317252 |
Repairing of Futabhug L.P School |
183139 |
Repairing of Futabhug L.P School1 |
Plinth level |
-
latitude : 26.92875904
Longitude : 93.75810782
file name : Image_30112022162540062.png
|
2022-11-30 16:25:40.153132 |
82 |
65317252 |
Repairing of Futabhug L.P School |
183139 |
Repairing of Futabhug L.P School1 |
Completion of work |
-
latitude : 26.92879263
Longitude : 93.75810045
file name : Image_08112022150739721.png
|
2022-11-08 15:07:39.809316 |
83 |
65317078 |
Construction of toilets in public institutions |
122354 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.93112185
Longitude : 93.78508353
file name : Image_15032023144257348.png
|
2023-03-15 14:42:57.429752 |
84 |
65317078 |
Construction of toilets in public institutions |
122354 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.93118312
Longitude : 93.78507161
file name : Image_01122022154642217.png
|
2022-12-01 15:46:42.332201 |
85 |
65317078 |
Construction of toilets in public institutions |
122354 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.93123103
Longitude : 93.7849734
file name : Image_08112022135057720.png
|
2022-11-08 13:51:05.3421 |
86 |
65315629 |
Const. of Kitchen Shed at Ruptali L.P School |
350000 |
Const. of Kitchen Shed at Ruptali L.P School1 |
Roof laid |
-
latitude : 26.92695275
Longitude : 93.76966773
file name : Image_13032023161007133.png
|
2023-03-13 16:10:07.223864 |
87 |
65315629 |
Const. of Kitchen Shed at Ruptali L.P School |
350000 |
Const. of Kitchen Shed at Ruptali L.P School1 |
Plinth level |
-
latitude : 26.92691624
Longitude : 93.7697117
file name : Image_17112022164040469.png
|
2022-11-17 16:40:40.566417 |
88 |
65315629 |
Const. of Kitchen Shed at Ruptali L.P School |
350000 |
Const. of Kitchen Shed at Ruptali L.P School1 |
Completion of work |
-
latitude : 26.92690888
Longitude : 93.7697574
file name : Image_11102022115640212.png
|
2022-10-11 11:56:40.317122 |
89 |
65317109 |
Construction of toilets in public institutions |
120000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.92718306
Longitude : 93.76970449
file name : Image_13032023160937700.png
|
2023-03-13 16:09:37.780899 |
90 |
65317109 |
Construction of toilets in public institutions |
120000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.92685652
Longitude : 93.76963344
file name : Image_17112022164324596.png
|
2022-11-17 16:43:24.695115 |
91 |
65317109 |
Construction of toilets in public institutions |
120000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.92691428
Longitude : 93.7697248
file name : Image_08112022152334631.png
|
2022-11-08 15:23:34.723069 |
92 |
65316987 |
Renovation of No. 2 Baghorgaon Cultural Centre |
431500 |
Renovation of No. 2 Baghorgaon Cultural Centre1 |
Plinth level |
-
latitude : 26.92687506
Longitude : 93.7768365
file name : Image_21032023145029086.png
|
2023-03-21 14:50:29.170261 |
93 |
65316987 |
Renovation of No. 2 Baghorgaon Cultural Centre |
431500 |
Renovation of No. 2 Baghorgaon Cultural Centre1 |
Completion of work |
-
latitude : 26.92698866
Longitude : 93.7768362
file name : Image_08112022141510552.png
|
2022-11-08 14:15:10.648347 |
94 |
65316829 |
Construction of toilets in public institutions |
120000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.92674993
Longitude : 93.78423649
file name : Image_21032023152724493.png
|
2023-03-21 15:27:24.585799 |
95 |
65316829 |
Construction of toilets in public institutions |
120000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.92666763
Longitude : 93.78415107
file name : Image_21122022134343711.png
|
2022-12-21 13:43:43.800109 |
96 |
65316829 |
Construction of toilets in public institutions |
120000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.92671162
Longitude : 93.7840895
file name : Image_08112022135509064.png
|
2022-11-08 13:55:09.26682 |
97 |
65316916 |
Construction of toilets in public institutions |
120000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.93138053
Longitude : 93.79983648
file name : Image_12012023155335049.png
|
2023-01-12 15:53:35.149994 |
98 |
65316916 |
Construction of toilets in public institutions |
120000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.93137986
Longitude : 93.79987633
file name : Image_12012023154632591.png
|
2023-01-12 15:46:32.692596 |
99 |
65316916 |
Construction of toilets in public institutions |
120000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.93134829
Longitude : 93.7998054
file name : Image_22112022123451020.png
|
2022-11-22 12:34:51.512442 |
100 |
65316916 |
Construction of toilets in public institutions |
120000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.93950805
Longitude : 93.83653858
file name : Image_08112022133439814.png
|
2022-11-08 13:34:39.916219 |
101 |
65315527 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.93698834
Longitude : 93.7920874
file name : Image_05112022133818921.png
|
2022-11-05 13:38:19.016119 |
102 |
65315527 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.93702462
Longitude : 93.79210326
file name : Image_20102022140735721.png
|
2022-10-20 14:07:35.834774 |
103 |
65315527 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.93693213
Longitude : 93.79202496
file name : Image_11102022112533141.png
|
2022-10-11 11:25:33.263853 |
104 |
65315553 |
Construction of toilets in public institutions |
134000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.92240529
Longitude : 93.81061873
file name : Image_12012023160709785.png
|
2023-01-12 16:07:09.865097 |
105 |
65315553 |
Construction of toilets in public institutions |
134000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.92235606
Longitude : 93.81056278
file name : Image_22112022120914400.png
|
2022-11-22 12:09:14.868268 |
106 |
65315553 |
Construction of toilets in public institutions |
134000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.92222029
Longitude : 93.8104989
file name : Image_11102022102934712.png
|
2022-10-11 10:29:34.85675 |
107 |
54742641 |
Const of Drinking Water and Sanitation Facility at Jorhatia Jaji Olia Community Centre |
244483 |
Const of Drinking Water and Sanitation Facility at Jorhatia Jaji Olia Community Centre1 |
Plinth level |
-
latitude : 26.93361518
Longitude : 93.79301073
file name : Image_24042023172534927.png
|
2023-04-24 17:25:35.023826 |
108 |
54742641 |
Const of Drinking Water and Sanitation Facility at Jorhatia Jaji Olia Community Centre |
244483 |
Const of Drinking Water and Sanitation Facility at Jorhatia Jaji Olia Community Centre1 |
Roof laid |
-
latitude : 26.93361189
Longitude : 93.79307085
file name : Image_24042023172825355.png
|
2023-04-24 17:28:25.454826 |
109 |
54742641 |
Const of Drinking Water and Sanitation Facility at Jorhatia Jaji Olia Community Centre |
244483 |
Const of Drinking Water and Sanitation Facility at Jorhatia Jaji Olia Community Centre1 |
Completion of work |
-
latitude : 26.93357833
Longitude : 93.79282263
file name : Image_06102021115227385.png
|
2021-10-06 11:52:27.501996 |
110 |
65317274 |
Const. of AWC at Godachuburi |
300000 |
Const. of AWC at Godachuburi1 |
Plinth level |
-
latitude : 26.92160312
Longitude : 93.78005829
file name : Image_21032023150402530.png
|
2023-03-21 15:04:02.624492 |
111 |
65317274 |
Const. of AWC at Godachuburi |
300000 |
Const. of AWC at Godachuburi1 |
Completion of work |
-
latitude : 26.92165591
Longitude : 93.78010713
file name : Image_08112022140801418.png
|
2022-11-08 14:08:01.528726 |
112 |
87611052 |
Const of Open Stage at Jorhatia Rainbow Youth Club Premises |
497800 |
Const of Open Stage at Jorhatia Rainbow Youth Club Premises1 |
Completion of work |
-
latitude : 26.93842033
Longitude : 93.79898727
file name : Image_27102023132350210.png
|
2023-10-27 13:23:50.309161 |
113 |
87611089 |
Renovation of GP Office |
70000 |
Renovation of GP Office 1 |
Completion of work |
-
latitude : 26.91974195
Longitude : 93.77813514
file name : Image_11102023115113925.png
|
2023-10-11 11:51:14.022984 |
114 |
87611262 |
Creation of Shed for segregation and processing of wet and dry waste |
292500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.9342989
Longitude : 93.79010866
file name : Image_27102023133524478.png
|
2023-10-27 13:35:24.58109 |
115 |
87611262 |
Creation of Shed for segregation and processing of wet and dry waste |
292500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.94103244
Longitude : 93.80741386
file name : Image_27102023130508729.png
|
2023-10-27 13:05:08.846606 |
116 |
87611262 |
Creation of Shed for segregation and processing of wet and dry waste |
292500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.93837127
Longitude : 93.79677031
file name : Image_27102023132730856.png
|
2023-10-27 13:27:30.959215 |
117 |
87611262 |
Creation of Shed for segregation and processing of wet and dry waste |
292500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.93379854
Longitude : 93.80494433
file name : Image_27102023131705011.png
|
2023-10-27 13:17:05.106936 |
118 |
87611262 |
Creation of Shed for segregation and processing of wet and dry waste |
292500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.9282082
Longitude : 93.78446458
file name : Image_27102023140330491.png
|
2023-10-27 14:03:30.579214 |
119 |
87610853 |
Construction of toilets in public institutions |
80850 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.92603
Longitude : 93.7882541
file name : Image_17112023143000900.png
|
2023-11-17 14:30:01.00001 |
120 |
87610893 |
Const. of Open Stage at Dibrual Village |
497800 |
Const. of Open Stage at Dibrual Village1 |
Completion of work |
-
latitude : 26.93398001
Longitude : 93.80552372
file name : Image_27102023124942672.png
|
2023-10-27 12:49:42.77722 |
121 |
87611017 |
Creation of Shed for segregation and processing of wet and dry waste |
234000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.92309148
Longitude : 93.77945845
file name : Image_10112023120811766.png
|
2023-11-10 12:08:11.889689 |
122 |
66438996 |
Infrastructure Development at Ganakdoloni GP Office |
162731 |
Infrastructure Development at Ganakdoloni GP Office1 |
Roof laid |
-
latitude : 26.91974687
Longitude : 93.77820785
file name : Image_20112023135615497.png
|
2023-11-20 13:56:15.57319 |
123 |
66438996 |
Infrastructure Development at Ganakdoloni GP Office |
162731 |
Infrastructure Development at Ganakdoloni GP Office1 |
Plinth level |
-
latitude : 26.92603
Longitude : 93.7882541
file name : Image_18112023134551049.png
|
2023-11-18 13:45:51.217434 |
124 |
66438996 |
Infrastructure Development at Ganakdoloni GP Office |
162731 |
Infrastructure Development at Ganakdoloni GP Office1 |
Completion of work |
-
latitude : 26.9197958
Longitude : 93.77826827
file name : Image_12012023141350271.png
|
2023-01-12 14:13:50.362928 |
125 |
66285976 |
Improvement of road from Ganakdoloni Boruah Chuburi to GP Office |
168320 |
Improvement of road from Ganakdoloni Boruah Chuburi to GP Office1 |
Roof laid |
-
latitude : 26.91975037,26.91976347
Longitude : 93.77818002,93.77816654
file name : Image_20112023135541309.png
|
2023-11-20 13:55:41.38946 |
126 |
66285976 |
Improvement of road from Ganakdoloni Boruah Chuburi to GP Office |
168320 |
Improvement of road from Ganakdoloni Boruah Chuburi to GP Office1 |
Plinth level |
-
latitude : 26.92603,26.92603
Longitude : 93.7882541,93.7882541
file name : Image_18112023134354271.png
|
2023-11-18 13:43:54.362161 |
127 |
66285976 |
Improvement of road from Ganakdoloni Boruah Chuburi to GP Office |
168320 |
Improvement of road from Ganakdoloni Boruah Chuburi to GP Office1 |
Completion of work |
-
latitude : 26.91978208,26.91978092
Longitude : 93.77831151,93.77832457
file name : Image_12012023141143600.png
|
2023-01-12 14:11:43.683397 |
128 |
52696943 |
Const of RCC Box Culvert at Pachim Nidanchua road |
354775 |
Const of RCC Box Culvert at Pachim Nidanchua road1 |
Roof laid |
-
latitude : 26.92603,26.92603
Longitude : 93.7882541,93.7882541
file name : Image_18112023124419764.png
|
2023-11-18 12:44:19.972795 |
129 |
52696943 |
Const of RCC Box Culvert at Pachim Nidanchua road |
354775 |
Const of RCC Box Culvert at Pachim Nidanchua road1 |
Plinth level |
-
latitude : 26.92603,26.92603
Longitude : 93.7882541,93.7882541
file name : Image_18112023123950534.png
|
2023-11-18 12:39:50.62886 |
130 |
52696943 |
Const of RCC Box Culvert at Pachim Nidanchua road |
354775 |
Const of RCC Box Culvert at Pachim Nidanchua road1 |
Completion of work |
-
latitude : 26.91871906,26.91871883
Longitude : 93.78083532,93.7808347
file name : Image_06102021121306316.png
|
2021-10-06 12:13:06.412836 |
131 |
65317007 |
Const. of Residence of Chief Executive OfficerLakhimpur |
50000 |
Const. of Residence of Chief Executive OfficerLakhimpur1 |
Roof laid |
-
latitude : 26.91972856
Longitude : 93.77802963
file name : Image_20112023135511884.png
|
2023-11-20 13:55:11.966295 |
132 |
65317007 |
Const. of Residence of Chief Executive OfficerLakhimpur |
50000 |
Const. of Residence of Chief Executive OfficerLakhimpur1 |
Plinth level |
-
latitude : 26.92603
Longitude : 93.7882541
file name : Image_18112023134557702.png
|
2023-11-18 13:45:57.792213 |
133 |
65317007 |
Const. of Residence of Chief Executive OfficerLakhimpur |
50000 |
Const. of Residence of Chief Executive OfficerLakhimpur1 |
Completion of work |
-
latitude : 26.91974759
Longitude : 93.77828567
file name : Image_08112022140422895.png
|
2022-11-08 14:04:23.325154 |
134 |
65315595 |
Repairing of Kitchen Shed at Nidanchua L.P School |
204000 |
Repairing of Kitchen Shed at Nidanchua L.P School1 |
Completion of work |
-
latitude : 26.9165074
Longitude : 93.77735727
file name : Image_11102022135730586.png
|
2022-10-11 13:57:30.713868 |