1 |
6424233 |
Const. of Road from Simaluguri Centre to Gobindapur Village via Sankardev Sishu Niketan |
200000 |
Approach Road1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_10012019101740908.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_10012019101740908.png)
latitude : 26.9701967,26.9701967
Longitude : 93.7488155,93.7488155
file name : Image_10012019101740908.png
|
2019-01-10 10:17:41.023559 |
2 |
6424303 |
Const. of H/P Culvert at Road from Dhalpur Simaluguri PWD to Nagu ganak Chuburi |
100000 |
Culvert1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_03012019162027990.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_03012019162027990.png)
latitude : 26.96243049,26.96242992,26.96238231
Longitude : 93.7618799,93.76187967,93.76183972
file name : Image_03012019162027990.png
|
2019-01-03 16:20:28.129216 |
3 |
6424449 |
Dev. of road from Rangati Arimara PWD to Padmeswar Kunwar chuburi at Dambaru Handique Chuk |
100000 |
Approach Road1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_10012019095333870.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_10012019095333870.png)
latitude : 26.97392285,26.9739288
Longitude : 93.75367528,93.75366296
file name : Image_10012019095333870.png
|
2019-01-10 09:53:34.227556 |
4 |
6424427 |
Dev. of Road with S/G from Chomdhara to Bhupen Gogoi Chuburi |
50000 |
Approach Road1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_11012019100302001.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_11012019100302001.png)
latitude : 26.95598985,26.95598972
Longitude : 93.78547839,93.78547782
file name : Image_11012019100302001.png
|
2019-01-11 10:03:02.310957 |
5 |
6424253 |
Const. of Road from Pani Gaon Hiteswar Phukan to Khageswar Chuburi with 1 no RCC Culvert |
300000 |
Approach Road1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_11012019121651484.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_11012019121651484.png)
latitude : 26.95312352,26.95310282
Longitude : 93.74390277,93.74388644
file name : Image_11012019121651484.png
|
2019-01-11 12:16:51.603585 |
6 |
6424283 |
Const. of Road from Chomdhara to Gokhani Pukhuri L/R via Dumar Chuck |
100000 |
Approach Road1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_11012019100950508.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_11012019100950508.png)
latitude : 26.95059452,26.95060916
Longitude : 93.78813609,93.78813692
file name : Image_11012019100950508.png
|
2019-01-11 10:09:50.65633 |
7 |
6424283 |
Const. of Road from Chomdhara to Gokhani Pukhuri L/R via Dumar Chuck |
100000 |
Approach Road1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_11012019101200132.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_11012019101200132.png)
latitude : 26.95064373,26.9506286
Longitude : 93.78809333,93.78815122
file name : Image_11012019101200132.png
|
2019-01-11 10:12:00.229819 |
8 |
10845610 |
Renovation Of Simaluguri G.P office building |
138234 |
Office Building1
|
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_02082019130223298.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_02082019130223298.png)
latitude : 26.96590283
Longitude : 93.74992956
file name : Image_02082019130223298.png
|
2019-08-02 13:02:23.360015 |
9 |
6424369 |
Sand Gravalling at Road from Nowghuli Tiniali to Nowghuli Bridge |
141428 |
Approach Road1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_19012019123039799.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_19012019123039799.png)
latitude : 26.9304746,26.93931358
Longitude : 93.7706525,93.76472378
file name : Image_19012019123039799.png
|
2019-01-19 12:30:40.006259 |
10 |
6424390 |
Dev. of Road from Bikrompur Tiniali to Tinikunia L/R |
100000 |
Approach Road1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_11012019132336272.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_11012019132336272.png)
latitude : 26.96947919,26.96952007
Longitude : 93.73417602,93.73421693
file name : Image_11012019132336272.png
|
2019-01-11 13:23:36.436673 |
11 |
11327133 |
Market shed at 6 No. Ward (Daily Market) |
598468 |
Market shed at 6 No. Ward (Daily Market)1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221544105.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221544105.png)
latitude : 26.96918856818229
Longitude : 93.75008191913366
file name : Image_17122020221544105.png
|
2020-12-17 22:15:44.208548 |
12 |
11327082 |
Const. Of Satianaguri KBK |
130000 |
Const. Of Satianaguri KBK1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221345802.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221345802.png)
latitude : 26.98366327676922
Longitude : 93.74370303936303
file name : Image_17122020221345802.png
|
2020-12-17 22:13:45.878885 |
13 |
11327115 |
Const. Of Mahamoti Sewa Ashram Gate |
150000 |
Const. Of Mahamoti Sewa Ashram Gate1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221556647.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221556647.png)
latitude : 26.971919685602188
Longitude : 93.75001134350896
file name : Image_17122020221556647.png
|
2020-12-17 22:15:56.752605 |
14 |
11360802 |
Const. Of Bikrompur AWC |
400000 |
Const. Of Bikrompur AWC1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221357792.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221357792.png)
latitude : 26.969475857913494
Longitude : 93.73529548756778
file name : Image_17122020221357792.png
|
2020-12-17 22:13:57.882455 |
15 |
11327153 |
Const. Of Marketshed at Simaluguri Post Office Campus |
575909 |
Const. Of Marketshed at Simaluguri Post Office Campus1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221324542.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221324542.png)
latitude : 26.970491409301758
Longitude : 93.74929519370198
file name : Image_17122020221324542.png
|
2020-12-17 22:13:24.670626 |
16 |
11327292 |
Const. Of Marketshed at Simaluguri GP Campus |
240837 |
Const. Of Marketshed at Simaluguri GP Campus1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221422858.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221422858.png)
latitude : 26.965720471926033
Longitude : 93.74968545511365
file name : Image_17122020221422858.png
|
2020-12-17 22:14:22.949743 |
17 |
11327163 |
Const. Of RCC culvert at Simaluguri-Kamalpur PWD to Rangati-Arimara PWD link road (near Numal Basuma |
600000 |
Const. Of RCC culvert at Simaluguri-Kamalpur PWD to Rangati-Arimara PWD link road (near Numal Basuma1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221338907.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221338907.png)
latitude : 26.977114789187908,26.977088344283402
Longitude : 93.74777019023895,93.74780841171741
file name : Image_17122020221338907.png
|
2020-12-17 22:13:39.011629 |
18 |
11327277 |
Const. Of Marketshed at 10 No. Ward |
176019 |
Const. Of Marketshed at 10 No. Ward1 |
25% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221454312.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221454312.png)
latitude : 26.939371707849205
Longitude : 93.7656616140157
file name : Image_17122020221454312.png
|
2020-12-17 22:14:54.473681 |
19 |
11326968 |
Drinking water facility at Sessa Missing AWC at the middle point of 9 no. Ward |
110000 |
Drinking water facility at Sessa Missing AWC at the middle point of 9 no. Ward1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221442148.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221442148.png)
latitude : 26.94577661342919
Longitude : 93.75319018028677
file name : Image_17122020221442148.png
|
2020-12-17 22:14:42.289963 |
20 |
11326949 |
Drinking water facility at (Water supply) at 3 no. Nimuri Christian gaon ward (Arunudai KBK) |
110000 |
Drinking water facility at (Water supply) at 3 no. Nimuri Christian gaon ward (Arunudai KBK)1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221520032.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221520032.png)
latitude : 26.958173657767475
Longitude : 93.7607380002737
file name : Image_17122020221520032.png
|
2020-12-17 22:15:20.147896 |
21 |
11327176 |
Drinking water facility at Da-dhara ward (Amguri LP School) |
110000 |
Drinking water facility at Da-dhara ward (Amguri LP School)1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221526367.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221526367.png)
latitude : 26.948232972063124
Longitude : 93.78154129721224
file name : Image_17122020221526367.png
|
2020-12-17 22:15:26.477978 |
22 |
11327008 |
Drinking water facility at daily market (Siva Mandir) |
110000 |
Drinking water facility at daily market (Siva Mandir)1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221351560.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221351560.png)
latitude : 26.96862098760903
Longitude : 93.7492545414716
file name : Image_17122020221351560.png
|
2020-12-17 22:13:51.650479 |
23 |
11326978 |
Drinking water facility at Natun Da-dhara KBK |
110000 |
Drinking water facility at Natun Da-dhara KBK1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221435986.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221435986.png)
latitude : 26.964010479860008
Longitude : 93.74552316963673
file name : Image_17122020221435986.png
|
2020-12-17 22:14:36.106288 |
24 |
11326954 |
Drinking water facility at 1 No. Bachapukhuri (Milanjyoti) KBK |
110000 |
Drinking water facility at 1 No. Bachapukhuri (Milanjyoti) KBK1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221532034.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221532034.png)
latitude : 26.95776738692075
Longitude : 93.77397403120995
file name : Image_17122020221532034.png
|
2020-12-17 22:15:32.151125 |
25 |
11327057 |
Drinking water facility at Bathow Namghar |
110000 |
Drinking water facility at Bathow Namghar1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221331208.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221331208.png)
latitude : 26.976428772322834
Longitude : 93.74603723175824
file name : Image_17122020221331208.png
|
2020-12-17 22:13:31.315807 |
26 |
11327102 |
Const. Of Batiporia KBK |
130000 |
Const. Of Batiporia KBK1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221507388.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020221507388.png)
latitude : 26.94311016239226
Longitude : 93.76427181065083
file name : Image_17122020221507388.png
|
2020-12-17 22:15:07.527512 |
27 |
44268468 |
Const. of Sessa AWC |
341678 |
Const. of Sessa AWC1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221448738.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221448738.png)
latitude : 26.939521157182753
Longitude : 93.75417203642428
file name : Image_17122020221448738.png
|
2020-12-17 22:14:48.870753 |
28 |
23282596 |
Const. of Approach road at Simaluguri G.P. Office |
300000 |
Const. of Approach road at Simaluguri G.P. Office1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221416549.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221416549.png)
latitude : 26.965733631514013,26.96572788991034
Longitude : 93.74960054643452,93.74963851645589
file name : Image_17122020221416549.png
|
2020-12-17 22:14:16.676306 |
29 |
23282415 |
Const. of Sanitation and drinking water facility at Mohesh Das chuburi |
300000 |
Const. of Sanitation and drinking water facility at Mohesh Das chuburi1 |
25% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221538727.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221538727.png)
latitude : 26.967838327400386
Longitude : 93.7524045445025
file name : Image_17122020221538727.png
|
2020-12-17 22:15:38.81931 |
30 |
23283082 |
Approach road at Bashapukhuri LP School |
500000 |
Approach road at Bashapukhuri LP School1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221318443.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221318443.png)
latitude : 26.95275215897709,26.95287872571498
Longitude : 93.77362919971347,93.77368141897023
file name : Image_17122020221318443.png
|
2020-12-17 22:13:18.578413 |
31 |
44268704 |
Public Health Renovation at Nowghuli Bahupathar |
100000 |
Public Health Renovation at Nowghuli Bahupathar1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221513454.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221513454.png)
latitude : 26.952566080726683
Longitude : 93.7578229419887
file name : Image_17122020221513454.png
|
2020-12-17 22:15:13.567059 |
32 |
44268540 |
Approach road at Simaluguri Out Post |
300000 |
Approach road at Simaluguri Out Post1 |
completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221550599.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221550599.png)
latitude : 26.972569366917014,26.972561781294644
Longitude : 93.75142939388752,93.7514356803149
file name : Image_17122020221550599.png
|
2020-12-17 22:15:50.700966 |
33 |
44268679 |
D.W.F. at Nowghuli KBK |
120000 |
D.W.F. at Nowghuli KBK1 |
Pipeline Extension |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221500514.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221500514.png)
latitude : 26.939319572411478
Longitude : 93.76595615409315
file name : Image_17122020221500514.png
|
2020-12-17 22:15:00.653668 |
34 |
44268665 |
D.W.F. at Baptish KBK |
120000 |
D.W.F. at Baptish KBK1 |
Basement |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_29122020155046587.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_29122020155046587.png)
latitude : 26.962839611805975
Longitude : 93.74982375651598
file name : Image_29122020155046587.png
|
2020-12-29 15:50:46.702165 |
35 |
23282876 |
Const. of RCC culvert at Natun Dadhara link road via Bhalu chuburi |
500000 |
Const. of RCC culvert at Natun Dadhara link road via Bhalu chuburi1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221428976.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221428976.png)
latitude : 26.963805961422622,26.963808392174542
Longitude : 93.74771989881992,93.74769877642393
file name : Image_17122020221428976.png
|
2020-12-17 22:14:29.072868 |
36 |
44268643 |
D.W.F. at Kamal Basumatary chuburi KBK |
120000 |
D.W.F. at Kamal Basumatary chuburi KBK1 |
Creation of Source |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221403867.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221403867.png)
latitude : 26.971529256552458
Longitude : 93.73341819271445
file name : Image_17122020221403867.png
|
2020-12-17 22:14:03.960711 |
37 |
44268568 |
Sanitary Toilet at Kathalguri Chuburi K.B.K. |
114230 |
Sanitary Toilet at Kathalguri Chuburi K.B.K.1 |
25% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_29122020155050740.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_29122020155050740.png)
latitude : 26.972247711382806
Longitude : 93.75572117976844
file name : Image_29122020155050740.png
|
2020-12-29 15:50:50.899309 |
38 |
44268589 |
D.W.F. at No. 1 Bachapukhuri KBK |
120000 |
D.W.F. at No. 1 Bachapukhuri KBK1 |
Creation of Source |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221312013.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_17122020221312013.png)
latitude : 26.952008474618196
Longitude : 93.77546651288867
file name : Image_17122020221312013.png
|
2020-12-17 22:13:12.132619 |
39 |
44268497 |
Cont. of AWC at No. 1 Simaluguri |
400000 |
Cont. of AWC at No. 1 Simaluguri1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_29122020155042152.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_29122020155042152.png)
latitude : 26.976513010449708
Longitude : 93.73865948058665
file name : Image_29122020155042152.png
|
2020-12-29 15:50:42.262981 |
40 |
55090178 |
CONST OF SANITATION AT BODO SAHITYA BHABAN |
145000 |
CONST OF SANITATION AT BODO SAHITYA BHABAN1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09112021095325981.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09112021095325981.png)
latitude : 26.97221133
Longitude : 93.74939331
file name : Image_09112021095325981.png
|
2021-11-09 09:53:26.103085 |
41 |
55089958 |
CONST OF DRINKING WATER FACILITY AT UJJANI BAHUPATHER TIE REN |
139614 |
CONST OF DRINKING WATER FACILITY AT UJJANI BAHUPATHER TIE REN1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09112021095346606.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09112021095346606.png)
latitude : 26.94832435
Longitude : 93.77028151
file name : Image_09112021095346606.png
|
2021-11-09 09:53:46.717663 |
42 |
55089783 |
10 PERCENT EARNMARK FOR COVID CONTROL |
95514 |
10 PERCENT EARNMARK FOR COVID CONTROL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_06122021172632059.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_06122021172632059.png)
latitude : 26.94508291
Longitude : 93.83853359
file name : Image_06122021172632059.png
|
2021-12-06 17:26:32.194343 |
43 |
55090386 |
CONST OF URINAL AT SESSA MARKET |
90000 |
CONST OF URINAL AT SESSA MARKET1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09112021095342754.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09112021095342754.png)
latitude : 26.93810169
Longitude : 93.75451922
file name : Image_09112021095342754.png
|
2021-11-09 09:53:42.883197 |
44 |
55090303 |
CONST OF SANITATION SYSTEM NEAR SESSA BRIDGE |
145000 |
CONST OF SANITATION SYSTEM NEAR SESSA BRIDGE1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09112021095350954.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09112021095350954.png)
latitude : 26.96820804
Longitude : 93.72897936
file name : Image_09112021095350954.png
|
2021-11-09 09:53:51.070371 |
45 |
55090981 |
CONST OF DRINKING WATER FACILITY AT KUKCHABARI |
90000 |
CONST OF DRINKING WATER FACILITY AT KUKCHABARI1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09112021095354938.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09112021095354938.png)
latitude : 26.98066814
Longitude : 93.73645291
file name : Image_09112021095354938.png
|
2021-11-09 09:53:55.03498 |
46 |
55089527 |
CONST OF RCC CULVERT AT RANGATI ARIMORA PWD TO SIMALUGURI KAMALPUR PWD LR NEAR BIPIN GOGOI CHUBURI |
854100 |
CONST OF RCC CULVERT AT RANGATI ARIMORA PWD TO SIMALUGURI KAMALPUR PWD LR NEAR BIPIN GOGOI CHUBURI1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09112021095314220.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09112021095314220.png)
latitude : 26.97445173,26.97445018
Longitude : 93.75235364,93.7523535
file name : Image_09112021095314220.png
|
2021-11-09 09:53:14.335078 |
47 |
55090079 |
CONST OF SANITATION WITH RUNNING WATER FACILITY AT GP OFFICE CAMPUS |
340000 |
CONST OF SANITATION WITH RUNNING WATER FACILITY AT GP OFFICE CAMPUS1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09112021095338388.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09112021095338388.png)
latitude : 26.96558711
Longitude : 93.74992943
file name : Image_09112021095338388.png
|
2021-11-09 09:53:38.511841 |
48 |
65535657 |
REPAIRING OFCLASSROOM OF DEEPJYOTI LP SCHOOL |
275000 |
REPAIRING OFCLASSROOM OF DEEPJYOTI LP SCHOOL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022131437694.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022131437694.png)
latitude : 26.96589333333333
Longitude : 93.773885
file name : Image_29102022131437694.png
|
2022-10-29 13:14:37.802137 |
49 |
65535657 |
REPAIRING OFCLASSROOM OF DEEPJYOTI LP SCHOOL |
275000 |
REPAIRING OFCLASSROOM OF DEEPJYOTI LP SCHOOL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022131347556.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022131347556.png)
latitude : 26.965891666666668
Longitude : 93.77383333333334
file name : Image_29102022131347556.png
|
2022-10-29 13:13:47.658382 |
50 |
65535657 |
REPAIRING OFCLASSROOM OF DEEPJYOTI LP SCHOOL |
275000 |
REPAIRING OFCLASSROOM OF DEEPJYOTI LP SCHOOL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022131507935.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022131507935.png)
latitude : 26.965876666666666
Longitude : 93.77386333333334
file name : Image_29102022131507935.png
|
2022-10-29 13:15:08.04483 |
51 |
65535714 |
REPAIRING OF KITCHEN AT HABI GAON LP SCHOOL |
100000 |
REPAIRING OF KITCHEN AT HABI GAON LP SCHOOL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_03112022145832824.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_03112022145832824.png)
latitude : 26.95952666666667
Longitude : 93.74171833333334
file name : Image_03112022145832824.png
|
2022-11-03 14:58:32.930171 |
52 |
65536074 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_03112022150414160.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_03112022150414160.png)
latitude : 26.956865
Longitude : 93.74428333333331
file name : Image_03112022150414160.png
|
2022-11-03 15:04:14.253119 |
53 |
65536014 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022132452629.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022132452629.png)
latitude : 26.9528659
Longitude : 93.7736394
file name : Image_29102022132452629.png
|
2022-10-29 13:24:52.751447 |
54 |
65535773 |
CONSTRUCTION OF POLE AND REFERY STAND AT SIMALUGURI HS SCHOOL AND DEEPJYOTI HIGH SCHOOL |
50000 |
CONSTRUCTION OF POLE AND REFERY STAND AT SIMALUGURI HS SCHOOL AND DEEPJYOTI HIGH SCHOOL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_03112022144520406.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_03112022144520406.png)
latitude : 26.96999333333333
Longitude : 93.74805666666667
file name : Image_03112022144520406.png
|
2022-11-03 14:45:20.503112 |
55 |
65536126 |
Construction of toilets in public institutions |
225000 |
Construction of toilets in public institutions1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022124232581.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022124232581.png)
latitude : 26.965708333333335
Longitude : 93.75002333333332
file name : Image_29102022124232581.png
|
2022-10-29 12:42:32.710527 |
56 |
65535553 |
REPAIRING OF CLASSROOM UJANI BOHUPATHER LP SCHOOL |
250000 |
REPAIRING OF CLASSROOM UJANI BOHUPATHER LP SCHOOL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022133049154.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022133049154.png)
latitude : 26.947913333333336
Longitude : 93.77061833333333
file name : Image_29102022133049154.png
|
2022-10-29 13:30:49.316856 |
57 |
65535607 |
REPAIRING OF CLASSROOM DADHARA AMGURI LP SCHOOL |
275000 |
REPAIRING OF CLASSROOM DADHARA AMGURI LP SCHOOL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022205208794.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022205208794.png)
latitude : 26.948385
Longitude : 93.78133666666666
file name : Image_29102022205208794.png
|
2022-10-29 20:52:08.91703 |
58 |
65535607 |
REPAIRING OF CLASSROOM DADHARA AMGURI LP SCHOOL |
275000 |
REPAIRING OF CLASSROOM DADHARA AMGURI LP SCHOOL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022205212145.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_29102022205212145.png)
latitude : 26.94842833333333
Longitude : 93.78134
file name : Image_29102022205212145.png
|
2022-10-29 20:52:12.264304 |
59 |
65601049 |
Construction of toilets in public institutions |
280403 |
Construction of toilets in public institutions1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29102022125404367.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29102022125404367.png)
latitude : 26.96936333333333
Longitude : 93.74861166666666
file name : Image_29102022125404367.png
|
2022-10-29 12:54:04.519199 |
60 |
65579992 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29102022205218762.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29102022205218762.png)
latitude : 26.93914666666667
Longitude : 93.76597166666667
file name : Image_29102022205218762.png
|
2022-10-29 20:52:18.907515 |
61 |
65579992 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29102022205215502.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29102022205215502.png)
latitude : 26.93936833333333
Longitude : 93.76595666666665
file name : Image_29102022205215502.png
|
2022-10-29 20:52:15.653905 |
62 |
65594411 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03112022151347167.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03112022151347167.png)
latitude : 26.945763333333336
Longitude : 93.75349666666668
file name : Image_03112022151347167.png
|
2022-11-03 15:13:47.281754 |
63 |
65594513 |
Construction of toilets in public institutions |
179350 |
Construction of toilets in public institutions1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29102022125358812.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29102022125358812.png)
latitude : 26.968425000000003
Longitude : 93.74860333333332
file name : Image_29102022125358812.png
|
2022-10-29 12:53:58.983214 |
64 |
65601185 |
Any other operation and maintenance needs related to solid waste management |
100000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03112022152053662.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03112022152053662.png)
latitude : 26.968291666666666
Longitude : 93.74922166666666
file name : Image_03112022152053662.png
|
2022-11-03 15:20:53.773576 |
65 |
65601775 |
IMPROVEMENT OF WAITING SHED |
155636 |
IMPROVEMENT OF WAITING SHED1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29102022124223014.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29102022124223014.png)
latitude : 26.96579166666667
Longitude : 93.74995166666668
file name : Image_29102022124223014.png
|
2022-10-29 12:42:23.155942 |
66 |
65579822 |
REPAIRING OF GP OFFICE |
455800 |
REPAIRING OF GP OFFICE1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29102022124212409.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29102022124212409.png)
latitude : 26.965963333333335
Longitude : 93.74958666666667
file name : Image_29102022124212409.png
|
2022-10-29 12:42:12.529332 |
67 |
65579870 |
CONSTRUCTION OF CEO RESIDENT HOUSE |
50000 |
CONSTRUCTION OF CEO RESIDENT HOUSE1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_01112022160011879.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_01112022160011879.png)
latitude : 26.969423
Longitude : 93.8704638
file name : Image_01112022160011879.png
|
2022-11-01 16:00:12.001449 |
68 |
65599015 |
REPAIRING OF CLASSROOM AT SANKARDEV SHISHU VIDYA NIKETAN |
507205 |
REPAIRING OF CLASSROOM AT SANKARDEV SHISHU VIDYA NIKETAN1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03112022143946824.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03112022143946824.png)
latitude : 26.970678333333332
Longitude : 93.74682333333334
file name : Image_03112022143946824.png
|
2022-11-03 14:39:46.925201 |