1 |
6426784 |
Const. of Urinal at Gosakhat Baligaon SKB Kendra |
54000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.11505931
Longitude : 94.0742639
file name : Image_12012019143812812.png
|
2019-01-12 14:38:13.070986 |
2 |
6426784 |
Const. of Urinal at Gosakhat Baligaon SKB Kendra |
54000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.13557055
Longitude : 94.05876568
file name : Image_08062019165823808.png
|
2019-06-08 16:58:23.916916 |
3 |
6426799 |
Installation of Hand Tube Well at 29 nos pachim Telahi |
232000 |
Hand pump1 |
Ground work |
-
latitude : 27.08239116
Longitude : 94.05904378
file name : Image_19052019174456460.png
|
2019-05-19 17:44:56.554898 |
4 |
6426770 |
Const. of Urinal at Milonpur SKB Kendra |
101000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.10388643
Longitude : 94.09245564
file name : Image_09012019144722573.png
|
2019-01-09 14:47:22.885201 |
5 |
6426794 |
Const. of Urinal at Bhakeli KB Kendra |
54000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.09676012
Longitude : 94.08438963
file name : Image_14012019121549779.png
|
2019-01-14 12:15:49.883371 |
6 |
6426721 |
Const. of Urinal at Pachim Hamukhik Siva Mondir |
101000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.13099048
Longitude : 94.08023408
file name : Image_09012019150113037.png
|
2019-01-09 15:01:13.36992 |
7 |
6426752 |
Const. of Urinal at Little Anjal Public School |
101000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.10982866
Longitude : 94.06667577
file name : Image_12012019151258383.png
|
2019-01-12 15:12:58.469217 |
8 |
6426738 |
Const. of Urinal at Kharketa Khouda mis ME School |
101000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.13860565
Longitude : 94.07186225
file name : Image_12012019160530963.png
|
2019-01-12 16:05:31.227141 |
9 |
6426777 |
Const. of Urinal at Jo |
101000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.07177537
Longitude : 94.07379316
file name : Image_19052019174531481.png
|
2019-05-19 17:45:31.573461 |
10 |
6426777 |
Const. of Urinal at Jo |
101000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.07178472
Longitude : 94.07379033
file name : Image_16052019160012070.png
|
2019-05-16 16:00:12.169928 |
11 |
6426728 |
Const. of Urinal at Borgace KBK |
101000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.13126604
Longitude : 94.06114874
file name : Image_11012019115402029.png
|
2019-01-11 11:54:02.398589 |
12 |
6426762 |
Const. of Urinal at Dakin Barmugoya KB Kendra |
54000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.10194085
Longitude : 94.05924499
file name : Image_11012019121957615.png
|
2019-01-11 12:19:57.755143 |
13 |
6426756 |
Const. of Urinal at Jaipur SKB |
101000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.10885845
Longitude : 94.0849814
file name : Image_09012019140653085.png
|
2019-01-09 14:06:53.307037 |
14 |
6426745 |
Const, of Urinal at Tookia SKB |
54000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.12546349
Longitude : 94.06448366
file name : Image_09012019115059062.png
|
2019-01-09 11:50:59.399956 |
15 |
6426788 |
Const. of Urinal at Gopsar Anganbadi Kendra |
54000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.1058318
Longitude : 94.07069902
file name : Image_12012019142700313.png
|
2019-01-12 14:27:00.48857 |
16 |
6426765 |
Const. of Urinal at Uttar Bormuria KB Kendra |
54000 |
Toilet1 |
Up to Plinth level |
-
latitude : 27.10481386
Longitude : 94.05287579
file name : Image_11012019122854619.png
|
2019-01-11 12:28:54.822644 |
17 |
38340069 |
CONST. OF POKADOL AWC |
450000 |
CONST. OF POKADOL AWC1 |
25% |
-
latitude : 27.12453495
Longitude : 94.0807758
file name : Image_17112020103830228.png
|
2020-11-17 10:38:30.325307 |
18 |
38340069 |
CONST. OF POKADOL AWC |
450000 |
CONST. OF POKADOL AWC1 |
25% |
-
latitude : 27.09766188
Longitude : 94.09532088
file name : Image_19082020142322701.png
|
2020-08-19 14:23:23.408805 |
19 |
43782032 |
CONST. HP CULVERT AT MALUWAL PATH |
950000 |
CONST. HP CULVERT AT MALUWAL PATH1 |
50% |
-
latitude : 27.08337744,27.08337825
Longitude : 94.08915648,94.08915845
file name : Image_16112020145010238.png
|
2020-11-16 14:50:16.459895 |
20 |
43782032 |
CONST. HP CULVERT AT MALUWAL PATH |
950000 |
CONST. HP CULVERT AT MALUWAL PATH1 |
50% |
-
latitude : 27.08337744,27.08337825
Longitude : 94.08915648,94.08915845
file name : Image_16112020145144900.png
|
2020-11-16 14:51:51.127245 |
21 |
43782032 |
CONST. HP CULVERT AT MALUWAL PATH |
950000 |
CONST. HP CULVERT AT MALUWAL PATH1 |
Substructure below GL |
-
latitude : 27.17592276,27.17592188
Longitude : 94.10199578,94.10199542
file name : Image_14112020102151788.png
|
2020-11-14 10:21:57.019466 |
22 |
43782032 |
CONST. HP CULVERT AT MALUWAL PATH |
950000 |
CONST. HP CULVERT AT MALUWAL PATH1 |
Substructure below GL |
-
latitude : 27.08414309,27.08331013
Longitude : 94.08914492,94.08910555
file name : Image_20082020144851944.png
|
2020-08-20 14:48:52.679271 |
23 |
43782136 |
REPAIR OF AZARGURI BALIJAN L P SCHOOL |
150000 |
REPAIR OF AZARGURI BALIJAN L P SCHOOL1 |
25% |
-
latitude : 27.10684019
Longitude : 94.06214156
file name : Image_20082020144624373.png
|
2020-08-20 14:46:25.162345 |
24 |
43779487 |
CONST. OF HP CULVERT AT PRADIP BORA CHUBURI PATH |
235000 |
CONST. OF HP CULVERT AT PRADIP BORA CHUBURI PATH1 |
Substructure below GL |
-
latitude : 27.13557663,27.13557874
Longitude : 94.07586061,94.07585689
file name : Image_17112020101344913.png
|
2020-11-17 10:13:44.996724 |
25 |
43781479 |
AMTALA JAMUGURI GOPALPUR AWC |
650000 |
AMTALA JAMUGURI GOPALPUR AWC1 |
25% |
-
latitude : 27.09676087
Longitude : 94.08911318
file name : Image_17112020112002247.png
|
2020-11-17 11:20:02.324184 |
26 |
38340105 |
PURCHASING MACHINE BOAT FACILITY AT AMTALA JAINPUR |
300000 |
PURCHASING MACHINE BOAT FACILITY AT AMTALA JAINPUR1 |
25% |
-
latitude : 27.11115725
Longitude : 94.08575228
file name : Image_17112020105710912.png
|
2020-11-17 10:57:11.02008 |
27 |
38340105 |
PURCHASING MACHINE BOAT FACILITY AT AMTALA JAINPUR |
300000 |
PURCHASING MACHINE BOAT FACILITY AT AMTALA JAINPUR1 |
25% |
-
latitude : 27.11115155
Longitude : 94.08600626
file name : Image_14112020102017881.png
|
2020-11-14 10:20:23.119182 |
28 |
38361045 |
CONST. OF HP CULVERT AT JONKAP SCHOOL TO TELAHI PATHAR |
220000 |
CONST. OF HP CULVERT AT JONKAP SCHOOL TO TELAHI PATHAR1 |
Substructure below GL |
-
latitude : 27.12498761,27.12495934
Longitude : 94.06405561,94.06406148
file name : Image_17112020113436347.png
|
2020-11-17 11:34:36.435223 |
29 |
38361045 |
CONST. OF HP CULVERT AT JONKAP SCHOOL TO TELAHI PATHAR |
220000 |
CONST. OF HP CULVERT AT JONKAP SCHOOL TO TELAHI PATHAR1 |
Substructure below GL |
-
latitude : 27.08280117,27.08273921
Longitude : 94.05960317,94.05957268
file name : Image_19082020142705193.png
|
2020-08-19 14:27:05.905164 |
30 |
43779701 |
CONST.OF HP CULVERT AT KHARKATI PWD TO BALIGAON HARI MANDIR |
240000 |
CONST.OF HP CULVERT AT KHARKATI PWD TO BALIGAON HARI MANDIR1 |
Substructure below GL |
-
latitude : 27.13560921,27.13561383
Longitude : 94.07592065,94.07591799
file name : Image_17112020101145095.png
|
2020-11-17 10:11:45.166754 |
31 |
43779701 |
CONST.OF HP CULVERT AT KHARKATI PWD TO BALIGAON HARI MANDIR |
240000 |
CONST.OF HP CULVERT AT KHARKATI PWD TO BALIGAON HARI MANDIR1 |
Substructure below GL |
-
latitude : 27.13555365,27.13553101
Longitude : 94.07605117,94.07597606
file name : Image_20082020094941264.png
|
2020-08-20 09:49:41.957637 |
32 |
43779844 |
CONST.OF MARKET SET INFRONT OF GP OFFICE |
275000 |
CONST.OF MARKET SET INFRONT OF GP OFFICE1 |
25% |
-
latitude : 27.10511761
Longitude : 94.05743495
file name : Image_17112020114318772.png
|
2020-11-17 11:43:18.876769 |
33 |
43779844 |
CONST.OF MARKET SET INFRONT OF GP OFFICE |
275000 |
CONST.OF MARKET SET INFRONT OF GP OFFICE1 |
25% |
-
latitude : 27.10502062
Longitude : 94.05736376
file name : Image_18082020162552947.png
|
2020-08-18 16:25:53.673576 |
34 |
43782089 |
CONST.OF MARKET SET AT UPCHAR TINIALI |
783472 |
CONST.OF MARKET SET AT UPCHAR TINIALI1 |
25% |
-
latitude : 27.10585931
Longitude : 94.07043408
file name : Image_20082020144554021.png
|
2020-08-20 14:45:54.733309 |
35 |
43781928 |
CONST.OF HP CULVERT AT KHARKATI HARIMANDIR CHUBURI PATH |
220000 |
CONST.OF HP CULVERT AT KHARKATI HARIMANDIR CHUBURI PATH1 |
Substructure below GL |
-
latitude : 27.08329186,27.08328516,27.08328592
Longitude : 94.08910268,94.08906989,94.08906923
file name : Image_16112020144334031.png
|
2020-11-16 14:43:40.248572 |
36 |
43781928 |
CONST.OF HP CULVERT AT KHARKATI HARIMANDIR CHUBURI PATH |
220000 |
CONST.OF HP CULVERT AT KHARKATI HARIMANDIR CHUBURI PATH1 |
Substructure below GL |
-
latitude : 27.08329186,27.08328516,27.08328592
Longitude : 94.08910268,94.08906989,94.08906923
file name : Image_16112020145020187.png
|
2020-11-16 14:50:26.405212 |
37 |
43781928 |
CONST.OF HP CULVERT AT KHARKATI HARIMANDIR CHUBURI PATH |
220000 |
CONST.OF HP CULVERT AT KHARKATI HARIMANDIR CHUBURI PATH1 |
Substructure below GL |
-
latitude : 27.13995485,27.1398701
Longitude : 94.07136883,94.07182966
file name : Image_20082020145005798.png
|
2020-08-20 14:50:06.558732 |
38 |
43781980 |
CONST.OF BOUNDARY WALL AND REPAIRING OF CLASSROOM AT 716 NO BAMUNGAYA LP SCHOOL |
300000 |
CONST.OF BOUNDARY WALL AND REPAIRING OF CLASSROOM AT 716 NO BAMUNGAYA LP SCHOOL1 |
25% |
-
latitude : 27.102217
Longitude : 94.05762472
file name : Image_20082020144524935.png
|
2020-08-20 14:45:25.614702 |
39 |
43781363 |
CONST OF HP CULVERT AT RANGANADI END TO KATHAL PUKHURI PATH |
220000 |
CONST OF HP CULVERT AT RANGANADI END TO KATHAL PUKHURI PATH1 |
Substructure below GL |
-
latitude : 27.13993221,27.13993203
Longitude : 94.0718947,94.0718944
file name : Image_17112020102359124.png
|
2020-11-17 10:23:59.205853 |
40 |
43780706 |
CONST OF MARKET SET AT JAINPUR INIALI |
935707 |
CONST OF MARKET SET AT JAINPUR INIALI1 |
25% |
-
latitude : 27.11050198
Longitude : 94.08498646
file name : Image_17112020110009295.png
|
2020-11-17 11:00:09.414289 |
41 |
43780706 |
CONST OF MARKET SET AT JAINPUR INIALI |
935707 |
CONST OF MARKET SET AT JAINPUR INIALI1 |
25% |
-
latitude : 27.11092275
Longitude : 94.0850194
file name : Image_14112020102014358.png
|
2020-11-14 10:20:19.601524 |
42 |
43782280 |
CONST.OF DUWARGAON AWC |
450000 |
CONST.OF DUWARGAON AWC1 |
25% |
-
latitude : 27.07692736
Longitude : 94.06647513
file name : Image_20082020144757623.png
|
2020-08-20 14:47:58.358658 |
43 |
43782344 |
CONST. MOTHOUKHUR AWC |
450000 |
CONST. MOTHOUKHUR AWC1 |
25% |
-
latitude : 27.11533275
Longitude : 94.06104976
file name : Image_20082020144728143.png
|
2020-08-20 14:47:28.887184 |
44 |
43782518 |
CONST. OF BALIJAN DAMUCIAL AWC |
450000 |
CONST. OF BALIJAN DAMUCIAL AWC1 |
25% |
-
latitude : 27.12451672
Longitude : 94.08091046
file name : Image_20082020144459620.png
|
2020-08-20 14:45:00.331266 |
45 |
43782689 |
CONST.OF GOSAIKHAT BALIJAN AWC |
180035 |
CONST.OF GOSAIKHAT BALIJAN AWC1 |
25% |
-
latitude : 27.1169961
Longitude : 94.08821944
file name : Image_14112020102021394.png
|
2020-11-14 10:20:26.619316 |
46 |
43779914 |
CONST.OF HP CULVERT AT SAHID BEDI SINGARA TO BAMUNGAYA PATH |
150000 |
CONST.OF HP CULVERT AT SAHID BEDI SINGARA TO BAMUNGAYA PATH1 |
25% |
-
latitude : 27.13994549,27.13996004
Longitude : 94.07198437,94.07194611
file name : Image_17112020102505145.png
|
2020-11-17 10:25:05.22804 |
47 |
38360920 |
CONST. OF HP CULVERT AT GARCHIGA AMTALA PWD TO HAZARIKA CHUBURI |
220000 |
CONST. OF HP CULVERT AT GARCHIGA AMTALA PWD TO HAZARIKA CHUBURI1 |
Substructure below GL |
-
latitude : 27.10561882,27.10564299
Longitude : 94.06115771,94.0610223
file name : Image_17112020133313776.png
|
2020-11-17 13:33:13.891605 |
48 |
38360920 |
CONST. OF HP CULVERT AT GARCHIGA AMTALA PWD TO HAZARIKA CHUBURI |
220000 |
CONST. OF HP CULVERT AT GARCHIGA AMTALA PWD TO HAZARIKA CHUBURI1 |
Substructure below GL |
-
latitude : 27.1056118,27.10558962
Longitude : 94.06093097,94.06096163
file name : Image_14112020102003334.png
|
2020-11-14 10:20:08.572502 |
49 |
38339800 |
CONST. HP CULVERT AT B. R AMBEDKAR ROAD |
230000 |
CONST. HP CULVERT AT B. R AMBEDKAR ROAD1 |
Substructure below GL |
-
latitude : 27.13766942,27.13763256
Longitude : 94.07471239,94.07469595
file name : Image_17112020101720650.png
|
2020-11-17 10:17:20.726631 |
50 |
38339800 |
CONST. HP CULVERT AT B. R AMBEDKAR ROAD |
230000 |
CONST. HP CULVERT AT B. R AMBEDKAR ROAD1 |
Substructure below GL |
-
latitude : 27.13760598,27.1376078
Longitude : 94.0746465,94.07464705
file name : Image_20082020144432098.png
|
2020-08-20 14:44:32.853886 |
51 |
43782626 |
REPAIR OF AMTALA MAJGAON AWC |
238000 |
REPAIR OF AMTALA MAJGAON AWC1 |
25% |
-
latitude : 27.12742814
Longitude : 94.06975678
file name : Image_14112020102010618.png
|
2020-11-14 10:20:15.846444 |
52 |
43782568 |
CONST.OF AMTALA DUWARPAR AWC |
450000 |
CONST.OF AMTALA DUWARPAR AWC1 |
25% |
-
latitude : 27.10500195
Longitude : 94.05741134
file name : Image_14112020102006927.png
|
2020-11-14 10:20:12.152121 |
53 |
38363426 |
REPAIR OF G. P MEETING HALL |
541251 |
REPAIR OF G. P MEETING HALL1 |
Completed |
-
latitude : 27.10516244
Longitude : 94.0573345
file name : Image_17112020114740977.png
|
2020-11-17 11:47:41.113819 |
54 |
38363426 |
REPAIR OF G. P MEETING HALL |
541251 |
REPAIR OF G. P MEETING HALL1 |
25% |
-
latitude : 27.10518574
Longitude : 94.05758468
file name : Image_19082020142351382.png
|
2020-08-19 14:23:52.119978 |
55 |
43781048 |
CONST.OF HP CULVERT AT DAMBUKIAL TO NOWBHONGA PATH |
220000 |
CONST.OF HP CULVERT AT DAMBUKIAL TO NOWBHONGA PATH1 |
Substructure below GL |
-
latitude : 27.12136576,27.12136543
Longitude : 94.07434886,94.0743479
file name : Image_17112020104327017.png
|
2020-11-17 10:43:27.133677 |
56 |
44477701 |
REPAIRING OF PUB KHARKATI AWC |
150000 |
REPAIRING OF PUB KHARKATI AWC1 |
25% |
-
latitude : 27.13818974
Longitude : 94.07152594
file name : Image_30012021111750516.png
|
2021-01-30 11:17:50.612636 |
57 |
44477701 |
REPAIRING OF PUB KHARKATI AWC |
150000 |
REPAIRING OF PUB KHARKATI AWC1 |
25% |
-
latitude : 27.13819329
Longitude : 94.07149818
file name : Image_02122020232352073.png
|
2020-12-02 23:23:52.153169 |
58 |
44477057 |
REPAIRING OF AMTALA HIGH SCHOOL |
400000 |
REPAIRING OF AMTALA HIGH SCHOOL1 |
25% |
-
latitude : 27.10043453
Longitude : 94.08557233
file name : Image_30012021141800563.png
|
2021-01-30 14:18:00.656204 |
59 |
44477057 |
REPAIRING OF AMTALA HIGH SCHOOL |
400000 |
REPAIRING OF AMTALA HIGH SCHOOL1 |
25% |
-
latitude : 27.10052991
Longitude : 94.085594
file name : Image_02122020232407320.png
|
2020-12-02 23:24:07.390216 |
60 |
44477057 |
REPAIRING OF AMTALA HIGH SCHOOL |
400000 |
REPAIRING OF AMTALA HIGH SCHOOL1 |
25% |
-
latitude : 27.13036252
Longitude : 94.06607176
file name : Image_02122020100824122.png
|
2020-12-02 10:08:24.202709 |
61 |
65521136 |
Construction of toilets in public institutions |
140000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.103179
Longitude : 94.0694336
file name : Image_28062024125003881.png
|
2024-06-28 12:50:03.9931 |
62 |
43780103 |
CONST.OF DRINKING WATER AT BAHGURI RANGAMANCHA |
146688 |
CONST.OF DRINKING WATER AT BAHGURI RANGAMANCHA1 |
Basement |
-
latitude : 27.10517571
Longitude : 94.05730452
file name : Image_17112020133300845.png
|
2020-11-17 13:33:00.933202 |
63 |
43780858 |
CONST.OF HP CULVERT AT TEOKIA PACHIM KHARKATI ME SCHOOL PATH |
220000 |
CONST.OF HP CULVERT AT TEOKIA PACHIM KHARKATI ME SCHOOL PATH1 |
25% |
-
latitude : 27.12136514,27.12136519,27.12136519
Longitude : 94.07435593,94.07435766,94.07435766
file name : Image_17112020104433183.png
|
2020-11-17 10:44:33.270944 |
64 |
44478048 |
CONST. OF BOUNDARY WALL BISHNUPUR L P SCHOOL |
400000 |
CONST. OF BOUNDARY WALL BISHNUPUR L P SCHOOL1 |
25% |
-
latitude : 27.08523188
Longitude : 94.0874919
file name : Image_30012021141719672.png
|
2021-01-30 14:17:19.76896 |
65 |
44478048 |
CONST. OF BOUNDARY WALL BISHNUPUR L P SCHOOL |
400000 |
CONST. OF BOUNDARY WALL BISHNUPUR L P SCHOOL1 |
25% |
-
latitude : 27.0851575
Longitude : 94.08744651
file name : Image_02122020232359348.png
|
2020-12-02 23:23:59.424794 |
66 |
44477127 |
30% CONTRIBUTION FOR CONST. OF COMMUNITY MANAGESANITARY COMPLEX AT BAMUNGAYA 716 LP SCHOOL VOTE KEND |
90000 |
30% CONTRIBUTION FOR CONST. OF COMMUNITY MANAGESANITARY COMPLEX AT BAMUNGAYA 716 LP SCHOOL VOTE KEND1 |
25% |
-
latitude : 27.10190784
Longitude : 94.05760179
file name : Image_30012021132907505.png
|
2021-01-30 13:29:07.597691 |
67 |
44476894 |
CONST.MALUWAL AWC |
450000 |
CONST.MALUWAL AWC1 |
25% |
-
latitude : 27.07660883
Longitude : 94.09040165
file name : Image_30012021141647249.png
|
2021-01-30 14:16:47.325936 |
68 |
44476894 |
CONST.MALUWAL AWC |
450000 |
CONST.MALUWAL AWC1 |
25% |
-
latitude : 27.07654091
Longitude : 94.09047531
file name : Image_02122020232403842.png
|
2020-12-02 23:24:03.938764 |
69 |
44477002 |
PURCHASING MACHINE BOAT FACILITY AT AMTALA JAINPUR |
150000 |
PURCHASING MACHINE BOAT FACILITY AT AMTALA JAINPUR1 |
25% |
-
latitude : 27.11136206
Longitude : 94.08601225
file name : Image_30012021143524310.png
|
2021-01-30 14:35:24.409743 |
70 |
44477002 |
PURCHASING MACHINE BOAT FACILITY AT AMTALA JAINPUR |
150000 |
PURCHASING MACHINE BOAT FACILITY AT AMTALA JAINPUR1 |
25% |
-
latitude : 27.11133119
Longitude : 94.08622986
file name : Image_02122020232355595.png
|
2020-12-02 23:23:55.686249 |
71 |
44476950 |
CONST.OF HP CULVERT NAGAR GAON PARGHAT PATH |
220000 |
CONST.OF HP CULVERT NAGAR GAON PARGHAT PATH1 |
Substructure below GL |
-
latitude : 27.11134883,27.11136606
Longitude : 94.0881965,94.08822635
file name : Image_30012021143534031.png
|
2021-01-30 14:35:34.120345 |
72 |
44476580 |
RENOVATION ,REPAIRING AND MAINTANANCE OF SANITATION FACILITIES ,DRINKING WATER INCLUDING PURCHASING |
850000 |
RENOVATION ,REPAIRING AND MAINTANANCE OF SANITATION FACILITIES ,DRINKING WATER INCLUDING PURCHASING 1 |
25% |
-
latitude : 27.13049806
Longitude : 94.06590047
file name : Image_30012021113614395.png
|
2021-01-30 11:36:14.491367 |
73 |
44477947 |
CONST. OF BOUNDARY WALL AT MOTHUKHUR LP SCHOOL |
400000 |
CONST. OF BOUNDARY WALL AT MOTHUKHUR LP SCHOOL1 |
25% |
-
latitude : 27.11522747
Longitude : 94.06121257
file name : Image_30012021114900702.png
|
2021-01-30 11:49:00.818387 |
74 |
44478119 |
CONST. OF MARKET SHED AT AZARGURI BONIA BORAH TINIALI |
782414 |
CONST. OF MARKET SHED AT AZARGURI BONIA BORAH TINIALI1 |
25% |
-
latitude : 27.10641927
Longitude : 94.06819002
file name : Image_30012021115913932.png
|
2021-01-30 11:59:14.05241 |
75 |
44477986 |
CONST. OF JURKHAT DAMUKIAL AWC |
450000 |
CONST. OF JURKHAT DAMUKIAL AWC1 |
25% |
-
latitude : 27.12348292
Longitude : 94.08093548
file name : Image_30012021142325870.png
|
2021-01-30 14:23:25.961236 |
76 |
44476847 |
CONST.OF HP CULVERT AT THOMUS CHUBURI TO SALMARA TINIALI PATH |
220000 |
CONST.OF HP CULVERT AT THOMUS CHUBURI TO SALMARA TINIALI PATH1 |
Substructure below GL |
-
latitude : 27.0759411,27.0759419
Longitude : 94.06870566,94.06870571
file name : Image_30012021141503754.png
|
2021-01-30 14:15:03.838893 |
77 |
44477594 |
10% SHARE OF INSTALATION / TRANSPORTATION STANDLONE 20 NOS SOLAR STREETLIGHT AT KHARKATI TINIALI TIO |
100000 |
10% SHARE OF INSTALATION / TRANSPORTATION STANDLONE 20 NOS SOLAR STREETLIGHT AT KHARKATI TINIALI TIO1 |
25% |
-
latitude : 27.10504499
Longitude : 94.0574067
file name : Image_30012021131434177.png
|
2021-01-30 13:14:34.263383 |
78 |
44477896 |
CONST.OF BOUNDARY WALL AND REPAIRING CLASSROOMS AT 348 O . TIOKIA LP SCHOOL |
800000 |
CONST.OF BOUNDARY WALL AND REPAIRING CLASSROOMS AT 348 O . TIOKIA LP SCHOOL1 |
25% |
-
latitude : 27.12467447
Longitude : 94.0630344
file name : Image_30012021114439891.png
|
2021-01-30 11:44:40.000503 |
79 |
44477822 |
CONST. OF HP CULVERT AT PUB KHUNDU JAN JURI PATH |
200000 |
CONST. OF HP CULVERT AT PUB KHUNDU JAN JURI PATH1 |
Substructure below GL |
-
latitude : 27.14414483,27.14414359
Longitude : 94.06213354,94.06213392
file name : Image_30012021110811438.png
|
2021-01-30 11:08:11.508617 |
80 |
44476690 |
CONST. OF GATE AT G P OFFICE CAMPUS |
140000 |
CONST. OF GATE AT G P OFFICE CAMPUS1 |
25% |
-
latitude : 27.10502921
Longitude : 94.05742587
file name : Image_30012021131223377.png
|
2021-01-30 13:12:23.466045 |
81 |
44476634 |
CONST.OF H.P CULVERT AT DOLGURI THAN PATH |
220000 |
CONST.OF H.P CULVERT AT DOLGURI THAN PATH1 |
Substructure below GL |
-
latitude : 27.13570259,27.13549282,27.13549352
Longitude : 94.06738455,94.06612357,94.06612336
file name : Image_30012021112638854.png
|
2021-01-30 11:26:38.948797 |
82 |
44477355 |
30% CONTRIBUTION FOR CONST.OF COMMUNITY MANAGE SANITARY COMPLEXAT SAMABAY BALIJAN GUBIN PAGAG TINIAL |
90000 |
30% CONTRIBUTION FOR CONST.OF COMMUNITY MANAGE SANITARY COMPLEXAT SAMABAY BALIJAN GUBIN PAGAG TINIAL1 |
25% |
-
latitude : 27.1037629
Longitude : 94.09269682
file name : Image_30012021145203408.png
|
2021-01-30 14:52:03.525709 |
83 |
44477487 |
30% CONTRIBUTION FOR CONST. OF COMMUNITY MANAGE SANITARY COMPLEX AT GOSAIKHAT BALIJAN LP SCHOOL |
90000 |
30% CONTRIBUTION FOR CONST. OF COMMUNITY MANAGE SANITARY COMPLEX AT GOSAIKHAT BALIJAN LP SCHOOL1 |
25% |
-
latitude : 27.11101257
Longitude : 94.07190342
file name : Image_30012021121217659.png
|
2021-01-30 12:12:17.744826 |
84 |
44477764 |
CONST. OF HP CULVERT AT SOLMARA TOMAL CHUBURI PATH |
220000 |
CONST. OF HP CULVERT AT SOLMARA TOMAL CHUBURI PATH1 |
Substructure below GL |
-
latitude : 27.07593774,27.07593878
Longitude : 94.07084518,94.07083848
file name : Image_30012021141522903.png
|
2021-01-30 14:15:22.995866 |
85 |
54670005 |
CONST OF TOILET FACILITY AT SALMORA LP SCHOOL |
45000 |
CONST OF TOILET FACILITY AT SALMORA LP SCHOOL1 |
Completion of work |
-
latitude : 27.0731476
Longitude : 94.06626534
file name : Image_01102021123806613.png
|
2021-10-01 12:38:06.709764 |
86 |
54669670 |
CONST OF RCC CULVERT AT MATHUKHUR TINIALI PATH |
900462 |
CONST OF RCC CULVERT AT MATHUKHUR TINIALI PATH1 |
Plinth level |
-
latitude : 27.10827924,27.10825572
Longitude : 94.07160286,94.07156756
file name : Image_28062024174448605.png
|
2024-06-28 17:44:48.692382 |
87 |
54669670 |
CONST OF RCC CULVERT AT MATHUKHUR TINIALI PATH |
900462 |
CONST OF RCC CULVERT AT MATHUKHUR TINIALI PATH1 |
Plinth level |
-
latitude : 27.10827924,27.10825572
Longitude : 94.07160286,94.07156756
file name : Image_28062024173239894.png
|
2024-06-28 17:32:39.985398 |
88 |
54669670 |
CONST OF RCC CULVERT AT MATHUKHUR TINIALI PATH |
900462 |
CONST OF RCC CULVERT AT MATHUKHUR TINIALI PATH1 |
Plinth level |
-
latitude : 27.10827924,27.10825572
Longitude : 94.07160286,94.07156756
file name : Image_28062024173140278.png
|
2024-06-28 17:31:40.395613 |
89 |
54669670 |
CONST OF RCC CULVERT AT MATHUKHUR TINIALI PATH |
900462 |
CONST OF RCC CULVERT AT MATHUKHUR TINIALI PATH1 |
Completion of work |
-
latitude : 27.1145965,27.11459706
Longitude : 94.06032062,94.06032144
file name : Image_01102021100208609.png
|
2021-10-01 10:02:08.684772 |
90 |
54669795 |
REPAIRING OF BISHNUPUR LP SCHOOL |
275000 |
REPAIRING OF BISHNUPUR LP SCHOOL1 |
Completion of work |
-
latitude : 27.08527321
Longitude : 94.08736951
file name : Image_01102021184552388.png
|
2021-10-01 18:45:52.493085 |
91 |
65521198 |
Construction of toilets in public institutions |
140000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.1031794
Longitude : 94.06943226
file name : Image_28062024125332842.png
|
2024-06-28 12:53:32.946435 |
92 |
65517736 |
renovation & repairing at adk high school |
695000 |
renovation & repairing at adk high school 1 |
Completion of work |
-
latitude : 27.123898333333333
Longitude : 94.08074
file name : Image_10012023140709558.png
|
2023-01-10 14:07:09.636499 |
93 |
65517803 |
renovation & repairing at Pachim telahi gp office |
574000 |
renovation & repairing at Pachim telahi gp office 1 |
Completion of work |
-
latitude : 27.10504
Longitude : 94.05748833333334
file name : Image_26112022131054873.png
|
2022-11-26 13:10:54.96001 |
94 |
65534520 |
Water Supply to villages |
470725 |
Water Supply to villages1 |
Completion of work |
-
latitude : 27.10692837
Longitude : 94.06659776
file name : Image_21112023151735756.png
|
2023-11-21 15:17:35.862338 |
95 |
65514691 |
Water Supply to villages |
587731 |
Water Supply to villages1 |
Completion of work |
-
latitude : 27.12526833333333
Longitude : 94.090955
file name : Image_10012023134851683.png
|
2023-01-10 13:48:51.810549 |
96 |
86360825 |
REN OF KITCHEN OF MDM AT GOKHAINPAM LPS |
132000 |
REN OF KITCHEN OF MDM AT GOKHAINPAM LPS1 |
Completion of work |
-
latitude : 27.10213085
Longitude : 94.07641698
file name : Image_20122023131418646.png
|
2023-12-20 13:14:18.77221 |
97 |
87924375 |
Construction of toilets in public institutions |
133213 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.10583256
Longitude : 94.07060062
file name : Image_10032024073433076.png
|
2024-03-10 07:34:33.163951 |
98 |
87925715 |
Construction of Gym at 2 no Azarguri |
646950 |
Construction of Gym at 2 no Azarguri 1 |
Completion of work |
-
latitude : 27.10991307
Longitude : 94.06704341
file name : Image_10032024071015502.png
|
2024-03-10 07:10:15.592923 |
99 |
87924411 |
Construction of toilets in public institutions |
133212 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.10888056
Longitude : 94.08526154
file name : Image_10032024082355765.png
|
2024-03-10 08:23:55.876453 |
100 |
87924209 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.10645041
Longitude : 94.05523538
file name : Image_12052024135412864.png
|
2024-05-12 13:54:12.952401 |
101 |
87924141 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.07631071
Longitude : 94.08844295
file name : Image_12052024182319251.png
|
2024-05-12 18:23:19.408139 |
102 |
87924105 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.11889814
Longitude : 94.07205506
file name : Image_12052024173126887.png
|
2024-05-12 17:31:26.98277 |
103 |
87924172 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.1242093
Longitude : 94.06388685
file name : Image_12052024133125740.png
|
2024-05-12 13:31:25.843451 |
104 |
87922292 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.11879776
Longitude : 94.07201087
file name : Image_12052024172920000.png
|
2024-05-12 17:29:20.076468 |
105 |
87925940 |
Operation & maintenance of drinking water supply system |
484975 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.10702353
Longitude : 94.06652569
file name : Image_11052024162136894.png
|
2024-05-11 16:21:36.979301 |
106 |
87924320 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.10266239
Longitude : 94.07884714
file name : Image_12052024190141205.png
|
2024-05-12 19:01:41.412516 |
107 |
87924291 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.10659369
Longitude : 94.06829979
file name : Image_11052024185121501.png
|
2024-05-11 18:51:22.197734 |
108 |
87924291 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.10662884
Longitude : 94.06833754
file name : Image_11052024185034018.png
|
2024-05-11 18:50:34.480121 |
109 |
87924291 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.10668989
Longitude : 94.06837224
file name : Image_11052024185017419.png
|
2024-05-11 18:50:17.496402 |
110 |
87924260 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.10971161
Longitude : 94.07184776
file name : Image_11052024185023048.png
|
2024-05-11 18:50:23.124703 |
111 |
87924260 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.10970115
Longitude : 94.07186124
file name : Image_11052024185029607.png
|
2024-05-11 18:50:29.683694 |
112 |
87924260 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.11726015
Longitude : 94.08839011
file name : Image_12052024175046615.png
|
2024-05-12 17:50:46.69927 |
113 |
87924504 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.10883762
Longitude : 94.07171754
file name : Image_12052024172204282.png
|
2024-05-12 17:22:04.358586 |
114 |
87924531 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.10133153
Longitude : 94.05927928
file name : Image_21052024122801459.png
|
2024-05-21 12:28:01.080966 |
115 |
54669932 |
CONST OF TOILET FACILITY AT BALIGAON LP SCHOOL |
45000 |
CONST OF TOILET FACILITY AT BALIGAON LP SCHOOL1 |
Plinth level |
-
latitude : 27.10701137
Longitude : 94.06262877
file name : Image_28062024142533779.png
|
2024-06-28 14:25:33.889601 |
116 |
54669932 |
CONST OF TOILET FACILITY AT BALIGAON LP SCHOOL |
45000 |
CONST OF TOILET FACILITY AT BALIGAON LP SCHOOL1 |
Plinth level |
-
latitude : 27.10701705
Longitude : 94.06266401
file name : Image_28062024142442725.png
|
2024-06-28 14:24:42.81591 |
117 |
54669932 |
CONST OF TOILET FACILITY AT BALIGAON LP SCHOOL |
45000 |
CONST OF TOILET FACILITY AT BALIGAON LP SCHOOL1 |
Completion of work |
-
latitude : 27.12786799
Longitude : 94.08962157
file name : Image_02102021140443717.png
|
2021-10-02 14:04:43.795665 |
118 |
54670062 |
CONST OF TOILET FACILITY AT AMTOLA BISHNUPUR LP SCHOOL |
45000 |
CONST OF TOILET FACILITY AT AMTOLA BISHNUPUR LP SCHOOL1 |
Plinth level |
-
latitude : 27.08549932
Longitude : 94.08751425
file name : Image_28062024174426121.png
|
2024-06-28 17:44:26.211499 |
119 |
54670062 |
CONST OF TOILET FACILITY AT AMTOLA BISHNUPUR LP SCHOOL |
45000 |
CONST OF TOILET FACILITY AT AMTOLA BISHNUPUR LP SCHOOL1 |
Plinth level |
-
latitude : 27.08549932
Longitude : 94.08751425
file name : Image_28062024173124155.png
|
2024-06-28 17:31:24.265193 |
120 |
54670062 |
CONST OF TOILET FACILITY AT AMTOLA BISHNUPUR LP SCHOOL |
45000 |
CONST OF TOILET FACILITY AT AMTOLA BISHNUPUR LP SCHOOL1 |
Completion of work |
-
latitude : 27.08527169
Longitude : 94.0874074
file name : Image_01102021184556763.png
|
2021-10-01 18:45:56.865674 |
121 |
54670091 |
CONST OF TOILET FACILITY AT POKADAL LP SCHOOL |
45000 |
CONST OF TOILET FACILITY AT POKADAL LP SCHOOL1 |
Completion of work |
-
latitude : 27.09820333
Longitude : 94.09417362
file name : Image_02102021142543024.png
|
2021-10-02 14:25:43.128768 |
122 |
54670127 |
CONST OF TOILET FACILITY AT GHESEK LP SCHOOL |
45000 |
CONST OF TOILET FACILITY AT GHESEK LP SCHOOL1 |
Completion of work |
-
latitude : 27.05549427
Longitude : 94.08051423
file name : Image_01102021111704412.png
|
2021-10-01 11:17:04.50799 |
123 |
54670155 |
CONST OF TOILET FACILITY AT AZARGURI BALIJAN LP SCHOOL |
45000 |
CONST OF TOILET FACILITY AT AZARGURI BALIJAN LP SCHOOL1 |
Plinth level |
-
latitude : 27.10702409
Longitude : 94.0626478
file name : Image_28062024142506678.png
|
2024-06-28 14:25:06.771536 |
124 |
54670155 |
CONST OF TOILET FACILITY AT AZARGURI BALIJAN LP SCHOOL |
45000 |
CONST OF TOILET FACILITY AT AZARGURI BALIJAN LP SCHOOL1 |
Completion of work |
-
latitude : 27.10682014
Longitude : 94.06266892
file name : Image_01102021103650445.png
|
2021-10-01 10:36:50.534149 |
125 |
54670256 |
30 PERCENT CONTRIBUTION FOR CMSC AT JURKHAT BONIYAGAON AWC |
90000 |
30 PERCENT CONTRIBUTION FOR CMSC AT JURKHAT BONIYAGAON AWC1 |
Plinth level |
-
latitude : 27.10678901
Longitude : 94.06812972
file name : Image_28062024141030816.png
|
2024-06-28 14:10:30.901004 |
126 |
54670256 |
30 PERCENT CONTRIBUTION FOR CMSC AT JURKHAT BONIYAGAON AWC |
90000 |
30 PERCENT CONTRIBUTION FOR CMSC AT JURKHAT BONIYAGAON AWC1 |
Completion of work |
-
latitude : 27.12690926
Longitude : 94.09033606
file name : Image_30112021123938677.png
|
2021-11-30 12:39:38.788031 |
127 |
54670210 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT BAMUNGAYA TINIALI |
90000 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT BAMUNGAYA TINIALI1 |
Plinth level |
-
latitude : 27.10678325
Longitude : 94.06764928
file name : Image_28062024142425827.png
|
2024-06-28 14:24:25.918591 |
128 |
54670210 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT BAMUNGAYA TINIALI |
90000 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT BAMUNGAYA TINIALI1 |
Completion of work |
-
latitude : 27.10515006
Longitude : 94.05722958
file name : Image_30112021130710088.png
|
2021-11-30 13:07:10.173205 |
129 |
54670301 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT PACHIM TELAHI GP CAMPUS |
90000 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT PACHIM TELAHI GP CAMPUS1 |
Plinth level |
-
latitude : 27.10677577
Longitude : 94.06767149
file name : Image_28062024142413022.png
|
2024-06-28 14:24:13.115376 |
130 |
54670301 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT PACHIM TELAHI GP CAMPUS |
90000 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT PACHIM TELAHI GP CAMPUS1 |
Completion of work |
-
latitude : 27.11151943
Longitude : 94.08894987
file name : Image_30112021152152862.png
|
2021-11-30 15:21:52.981125 |
131 |
54670301 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT PACHIM TELAHI GP CAMPUS |
90000 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT PACHIM TELAHI GP CAMPUS1 |
Completion of work |
-
latitude : 27.10167719
Longitude : 94.05774872
file name : Image_30112021131624237.png
|
2021-11-30 13:16:24.34628 |
132 |
54675096 |
CONST OF DRINKING WATER AT AMTOLA MAZGAON KRISHTRI BIKASH KENDRA |
182731 |
CONST OF DRINKING WATER AT AMTOLA MAZGAON KRISHTRI BIKASH KENDRA1 |
Plinth level |
-
latitude : 27.10703512
Longitude : 94.08008306
file name : Image_28062024173045178.png
|
2024-06-28 17:30:45.269317 |
133 |
54675096 |
CONST OF DRINKING WATER AT AMTOLA MAZGAON KRISHTRI BIKASH KENDRA |
182731 |
CONST OF DRINKING WATER AT AMTOLA MAZGAON KRISHTRI BIKASH KENDRA1 |
Completion of work |
-
latitude : 27.12650417
Longitude : 94.06698303
file name : Image_02102021105831588.png
|
2021-10-02 10:58:31.696594 |
134 |
54670339 |
30 PERCENT CONTRIBUTION FOR CONST OF CMSC AT DUWAPAR BHAGONIYA LP SCHOOL TINIALI |
90000 |
30 PERCENT CONTRIBUTION FOR CONST OF CMSC AT DUWAPAR BHAGONIYA LP SCHOOL TINIALI1 |
Plinth level |
-
latitude : 27.10676174
Longitude : 94.06767239
file name : Image_28062024142356763.png
|
2024-06-28 14:23:56.865456 |
135 |
54670339 |
30 PERCENT CONTRIBUTION FOR CONST OF CMSC AT DUWAPAR BHAGONIYA LP SCHOOL TINIALI |
90000 |
30 PERCENT CONTRIBUTION FOR CONST OF CMSC AT DUWAPAR BHAGONIYA LP SCHOOL TINIALI1 |
Completion of work |
-
latitude : 27.08781266
Longitude : 94.0918823
file name : Image_22122021120021921.png
|
2021-12-22 12:00:22.019752 |
136 |
54674860 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT BONIYA BORAH TINIALI CSP CENTRE |
90000 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT BONIYA BORAH TINIALI CSP CENTRE1 |
Plinth level |
-
latitude : 27.10676165
Longitude : 94.06767216
file name : Image_28062024142335195.png
|
2024-06-28 14:23:35.288028 |
137 |
54674860 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT BONIYA BORAH TINIALI CSP CENTRE |
90000 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT BONIYA BORAH TINIALI CSP CENTRE1 |
Completion of work |
-
latitude : 27.11152438
Longitude : 94.08894353
file name : Image_30112021152157935.png
|
2021-11-30 15:21:58.046069 |
138 |
54674860 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT BONIYA BORAH TINIALI CSP CENTRE |
90000 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT BONIYA BORAH TINIALI CSP CENTRE1 |
Completion of work |
-
latitude : 27.08765922
Longitude : 94.09171256
file name : Image_30112021150551077.png
|
2021-11-30 15:05:51.161275 |
139 |
54674967 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT AMTOLA NAGARGAON KRISTI BIKASH KENDRA |
90000 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT AMTOLA NAGARGAON KRISTI BIKASH KENDRA1 |
Plinth level |
-
latitude : 27.10675946
Longitude : 94.06816581
file name : Image_28062024141035476.png
|
2024-06-28 14:10:35.575743 |
140 |
54674967 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT AMTOLA NAGARGAON KRISTI BIKASH KENDRA |
90000 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT AMTOLA NAGARGAON KRISTI BIKASH KENDRA1 |
Completion of work |
-
latitude : 27.1066847
Longitude : 94.0676796
file name : Image_30112021141003164.png
|
2021-11-30 14:10:03.262099 |
141 |
54674967 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT AMTOLA NAGARGAON KRISTI BIKASH KENDRA |
90000 |
30 PERCENT CONTRIBUTION FOR CONSTRUCTION OF CMSC AT AMTOLA NAGARGAON KRISTI BIKASH KENDRA1 |
Completion of work |
-
latitude : 27.0878439
Longitude : 94.09199116
file name : Image_22122021115915257.png
|
2021-12-22 11:59:15.374563 |
142 |
54675183 |
CONST OF DRINKING WATER AT PACHIM KHARKATI RONGANADI KRISHTRI SANGHA |
182731 |
CONST OF DRINKING WATER AT PACHIM KHARKATI RONGANADI KRISHTRI SANGHA1 |
Plinth level |
-
latitude : 27.10705304
Longitude : 94.08011065
file name : Image_28062024173052328.png
|
2024-06-28 17:30:52.464838 |
143 |
54675183 |
CONST OF DRINKING WATER AT PACHIM KHARKATI RONGANADI KRISHTRI SANGHA |
182731 |
CONST OF DRINKING WATER AT PACHIM KHARKATI RONGANADI KRISHTRI SANGHA1 |
Completion of work |
-
latitude : 27.1339548
Longitude : 94.07210358
file name : Image_02102021140437361.png
|
2021-10-02 14:04:37.447512 |
144 |
65539567 |
RENOVATION AND REPAIRING AT KULAMUWA BALIJAN LP SCHOOL |
399000 |
RENOVATION AND REPAIRING AT KULAMUWA BALIJAN LP SCHOOL1 |
Plinth level |
-
latitude : 27.1092091
Longitude : 94.07184417
file name : Image_28062024173135715.png
|
2024-06-28 17:31:35.82444 |
145 |
65539567 |
RENOVATION AND REPAIRING AT KULAMUWA BALIJAN LP SCHOOL |
399000 |
RENOVATION AND REPAIRING AT KULAMUWA BALIJAN LP SCHOOL1 |
Completion of work |
-
latitude : 27.109146666666668
Longitude : 94.07203333333334
file name : Image_16112022121931104.png
|
2022-11-16 12:19:31.227321 |
146 |
65539620 |
RENOVATION AND REPAIRING AT TIOKIA RANGAMANCHA |
201462 |
RENOVATION AND REPAIRING AT TIOKIA RANGAMANCHA1 |
Completion of work |
-
latitude : 27.12521333333333
Longitude : 94.06397833333334
file name : Image_16112022114232386.png
|
2022-11-16 11:42:32.511482 |
147 |
65539161 |
Construction of Community Sanitary Complex |
170000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.10677055
Longitude : 94.0681341
file name : Image_28062024140953400.png
|
2024-06-28 14:09:53.481309 |
148 |
65539161 |
Construction of Community Sanitary Complex |
170000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.11187
Longitude : 94.05310499999999
file name : Image_17112022131605087.png
|
2022-11-17 13:16:05.190928 |
149 |
86360672 |
REN OF AUDITORIUM HALL AT AMTOLA HS |
160000 |
REN OF AUDITORIUM HALL AT AMTOLA HS1 |
Completion of work |
-
latitude : 27.10039405
Longitude : 94.08566857
file name : Image_20122023132411682.png
|
2023-12-20 13:24:11.653183 |
150 |
65539418 |
Construction of Community Sanitary Complex |
105657 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.120910000000002
Longitude : 94.06092500000001
file name : Image_26112022124925213.png
|
2022-11-26 12:49:25.338648 |
151 |
65539418 |
Construction of Community Sanitary Complex |
105657 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.10883009
Longitude : 94.0850293
file name : Image_22112023152131193.png
|
2023-11-22 15:21:31.280637 |
152 |
65539506 |
Construction of Community Sanitary Complex |
36417 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.1058301
Longitude : 94.0681535
file name : Image_28062024141043067.png
|
2024-06-28 14:10:43.155184 |
153 |
65539506 |
Construction of Community Sanitary Complex |
36417 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.10572516
Longitude : 94.06819105
file name : Image_14112023102403317.png
|
2023-11-14 10:24:03.412521 |
154 |
65513679 |
renovation & reparing amtola high school |
575000 |
renovation & reparing amtola high school 1 |
Plinth level |
-
latitude : 27.10050181
Longitude : 94.0855892
file name : Image_28062024173726101.png
|
2024-06-28 17:37:26.199633 |
155 |
65513679 |
renovation & reparing amtola high school |
575000 |
renovation & reparing amtola high school 1 |
Plinth level |
-
latitude : 27.10050181
Longitude : 94.0855892
file name : Image_28062024173057514.png
|
2024-06-28 17:30:57.610268 |
156 |
65513679 |
renovation & reparing amtola high school |
575000 |
renovation & reparing amtola high school 1 |
Completion of work |
-
latitude : 27.100661666666664
Longitude : 94.08563833333334
file name : Image_16112022120536643.png
|
2022-11-16 12:05:36.779362 |
157 |
65539091 |
Construction of Community Sanitary Complex |
170000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.1020709
Longitude : 94.07658454
file name : Image_28062024173039830.png
|
2024-06-28 17:30:39.923536 |
158 |
65539091 |
Construction of Community Sanitary Complex |
170000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.08917333333333
Longitude : 94.04987833333334
file name : Image_21122022130317300.png
|
2022-12-21 13:03:17.394987 |
159 |
65539365 |
Construction of Community Sanitary Complex |
105657 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.108773333333335
Longitude : 94.08513833333333
file name : Image_18112022111503883.png
|
2022-11-18 11:15:03.984635 |
160 |
65534463 |
Construction of toilets in public institutions |
50725 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.10021787
Longitude : 94.08570735
file name : Image_28062024174413245.png
|
2024-06-28 17:44:13.346313 |
161 |
65534463 |
Construction of toilets in public institutions |
50725 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.10021787
Longitude : 94.08570735
file name : Image_28062024173119645.png
|
2024-06-28 17:31:19.77268 |
162 |
65534463 |
Construction of toilets in public institutions |
50725 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.10984084
Longitude : 94.0666873
file name : Image_21112023144840293.png
|
2023-11-21 14:48:40.386611 |
163 |
65521313 |
Construction of toilets in public institutions |
51350 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.10502163
Longitude : 94.05725379
file name : Image_28062024172926806.png
|
2024-06-28 17:29:26.896066 |
164 |
65521313 |
Construction of toilets in public institutions |
51350 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.1052071
Longitude : 94.0572209
file name : Image_21112023150900001.png
|
2023-11-21 15:09:00.141585 |
165 |
65521620 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.138160000000003
Longitude : 94.07146333333334
file name : Image_21112022101754036.png
|
2022-11-21 10:17:54.139154 |
166 |
65521620 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.07193473
Longitude : 94.09311542
file name : Image_02122023143606919.png
|
2023-12-02 14:36:07.027452 |
167 |
65521620 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.072006666666667
Longitude : 94.09323
file name : Image_21122022130203407.png
|
2022-12-21 13:02:03.498456 |
168 |
65534401 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.10677092
Longitude : 94.06813282
file name : Image_28062024141023184.png
|
2024-06-28 14:10:23.258509 |
169 |
65534401 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.0741193
Longitude : 94.07305827
file name : Image_24112023143626574.png
|
2023-11-24 14:36:26.66732 |
170 |
65521824 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.10675986
Longitude : 94.06817375
file name : Image_28062024140922797.png
|
2024-06-28 14:09:22.894717 |
171 |
65521824 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.073275
Longitude : 94.06639333333332
file name : Image_30012023135149496.png
|
2023-01-30 13:51:49.586048 |
172 |
65521824 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.103211666666667
Longitude : 94.06940000000002
file name : Image_18012023121606558.png
|
2023-01-18 12:16:06.683446 |
173 |
65521824 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.07329501
Longitude : 94.06630487
file name : Image_24112023144214985.png
|
2023-11-24 14:42:15.077876 |
174 |
65521858 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.10320546
Longitude : 94.06936669
file name : Image_28062024173129803.png
|
2024-06-28 17:31:29.940995 |
175 |
65521858 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.074108333333335
Longitude : 94.07305
file name : Image_30012023140653259.png
|
2023-01-30 14:06:53.38503 |
176 |
65521858 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.10317689
Longitude : 94.0694459
file name : Image_21112023143623516.png
|
2023-11-21 14:36:23.61895 |
177 |
65518444 |
const. of volley ball referee stand and volley ball post at tatiamora sdk high school |
26500 |
const. of volley ball referee stand and volley ball post at tatiamora sdk high school1 |
Plinth level |
-
latitude : 27.1004334
Longitude : 94.08564055
file name : Image_28062024173110223.png
|
2024-06-28 17:31:10.312219 |
178 |
65518444 |
const. of volley ball referee stand and volley ball post at tatiamora sdk high school |
26500 |
const. of volley ball referee stand and volley ball post at tatiamora sdk high school1 |
Completion of work |
-
latitude : 27.12398333333333
Longitude : 94.08121833333334
file name : Image_18112022113959590.png
|
2022-11-18 11:39:59.805254 |
179 |
65518378 |
const. of volley ball referee stand and volley ball post at amtola lp school |
26500 |
const. of volley ball referee stand and volley ball post at amtola lp school 1 |
Plinth level |
-
latitude : 27.10032433,27.10042833
Longitude : 94.08569804,94.08573971
file name : Image_28062024173909955.png
|
2024-06-28 17:39:10.058446 |
180 |
65518378 |
const. of volley ball referee stand and volley ball post at amtola lp school |
26500 |
const. of volley ball referee stand and volley ball post at amtola lp school 1 |
Plinth level |
-
latitude : 27.10032433,27.10042833
Longitude : 94.08569804,94.08573971
file name : Image_28062024173103842.png
|
2024-06-28 17:31:03.933105 |
181 |
65518378 |
const. of volley ball referee stand and volley ball post at amtola lp school |
26500 |
const. of volley ball referee stand and volley ball post at amtola lp school 1 |
Completion of work |
-
latitude : 27.10035833333333,27.100353333333334
Longitude : 94.08570999999999,94.08571166666667
file name : Image_18112022112448977.png
|
2022-11-18 11:24:49.088101 |
182 |
65521258 |
Construction of toilets in public institutions |
138000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.10015942
Longitude : 94.08574853
file name : Image_28062024173114908.png
|
2024-06-28 17:31:15.016789 |
183 |
65521258 |
Construction of toilets in public institutions |
138000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.13812746
Longitude : 94.07143721
file name : Image_21062023163756629.png
|
2023-06-21 16:37:56.723802 |