1 |
5410417 |
Construction of Safe Running drinking Water Facility at Kathani G.P |
135000 |
Water Tank1 |
Completed |
-
latitude : 26.43283681
Longitude : 92.32813528
file name : Image_30102018142724556.png
|
2018-10-30 14:27:24.688191 |
2 |
10787266 |
Cons. Of drainage system for water logged area at kathani G.P office campus |
216828 |
Drainage1
|
Length of Drain executed |
-
latitude : 26.4325221,26.4325221
Longitude : 92.3276945,92.3276945
file name : Image_21052019114113008.png
|
2019-05-21 11:41:13.111109 |
3 |
10787266 |
Cons. Of drainage system for water logged area at kathani G.P office campus |
216828 |
Drainage1
|
Completed |
-
latitude : 26.43248476,26.43248492
Longitude : 92.32774337,92.3277328
file name : Image_12072019132130732.png
|
2019-07-12 13:21:30.820595 |
4 |
5874139 |
Construction of Foundation for Women Empowerment Centre at Kathani G.P Campus |
87572 |
Workshop1 |
Completed |
-
latitude : 26.432705
Longitude : 92.32803233
file name : Image_07122018121712493.png
|
2018-12-07 12:17:12.611842 |
5 |
5874139 |
Construction of Foundation for Women Empowerment Centre at Kathani G.P Campus |
87572 |
Workshop1 |
Completed |
-
latitude : 26.43264391
Longitude : 92.32817477
file name : Image_07122018121837672.png
|
2018-12-07 12:18:37.805908 |
6 |
10791878 |
Cons. Of cyclestand at Kathani G.P campus |
100000 |
Cons. Of cyclestand at Kathani G.P campus1 |
25% |
-
latitude : 26.43273671
Longitude : 92.32791029
file name : Image_14072021103608552.png
|
2021-07-14 10:36:08.660691 |
7 |
43473559 |
CONS.OF COMMUNITY HALL AT KATHANI G.P OFFICE CAMPUS |
1000000 |
CONS.OF COMMUNITY HALL AT KATHANI G.P OFFICE CAMPUS1 |
25% |
-
latitude : 26.43280816
Longitude : 92.32804296
file name : Image_14072021103702126.png
|
2021-07-14 10:37:02.227022 |
8 |
51482347 |
CMSC near Kashipuri Coloni LP School |
90000 |
CMSC near Kashipuri Coloni LP School1 |
Completion of work |
-
latitude : 26.429728333333333
Longitude : 92.31905
file name : Image_04042023110408753.png
|
2023-04-04 11:04:08.861632 |
9 |
67783187 |
Installation of solar Street light at kathani Gp area |
328900 |
Installation of solar Street light at kathani Gp area1 |
Completion of work |
-
latitude : 26.43269666666667
Longitude : 92.32790333333332
file name : Image_22052023094034008.png
|
2023-05-22 09:40:34.105139 |
10 |
67783187 |
Installation of solar Street light at kathani Gp area |
328900 |
Installation of solar Street light at kathani Gp area1 |
Completion of work |
-
latitude : 26.432660000000002
Longitude : 92.32791666666665
file name : Image_22052023094040500.png
|
2023-05-22 09:40:40.603486 |
11 |
67191222 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.435344999999998
Longitude : 92.34518833333335
file name : Image_25052023120512450.png
|
2023-05-25 12:05:12.600444 |
12 |
67191312 |
Construction of toilets in public institutions |
120702 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.430619999999998
Longitude : 92.31699833333332
file name : Image_25052023112226446.png
|
2023-05-25 11:22:26.560297 |
13 |
67191281 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.433831666666666
Longitude : 92.34257666666666
file name : Image_25052023120507188.png
|
2023-05-25 12:05:07.330112 |
14 |
67191186 |
Any other operation and maintenance needs related to solid waste management |
194084 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 26.4322363
Longitude : 92.3280288
file name : Image_25052023110158232.png
|
2023-05-25 11:01:58.336032 |
15 |
51480285 |
Constn, of community managed sanitary complex near Kathani high School |
90000 |
Constn, of community managed sanitary complex near Kathani high School1 |
Completion of work |
-
latitude : 26.433463333333332
Longitude : 92.32487833333334
file name : Image_05122022170658536.png
|
2022-12-05 17:06:58.631011 |
16 |
62496507 |
Payment to APDCL For Electricity bill for GP Office |
338839 |
Payment to APDCL For Electricity bill for GP Office1 |
Completion of work |
-
latitude : 26.382244999999998
Longitude : 92.27343
file name : Image_31102022183918618.png
|
2022-10-31 18:39:18.717703 |
17 |
51481863 |
CMSC at kathani near Chenimari Balu char tiniali |
90000 |
CMSC at kathani near Chenimari Balu char tiniali1 |
Completion of work |
-
latitude : 26.429781666666667
Longitude : 92.33731000000002
file name : Image_20022023140340805.png
|
2023-02-20 14:03:40.896928 |
18 |
51481863 |
CMSC at kathani near Chenimari Balu char tiniali |
90000 |
CMSC at kathani near Chenimari Balu char tiniali1 |
Completion of work |
-
latitude : 26.429866666666666
Longitude : 92.33708999999999
file name : Image_19012023145926274.png
|
2023-01-19 14:59:26.398723 |
19 |
51480854 |
Constn, of Community managed sanitary complex near tarabari tiniali new raised platform |
90000 |
Constn, of Community managed sanitary complex near tarabari tiniali new raised platform1 |
Completion of work |
-
latitude : 26.432258333333333
Longitude : 92.32163666666665
file name : Image_19012023154859872.png
|
2023-01-19 15:49:00.003289 |
20 |
67191252 |
Construction of toilets in public institutions |
90000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.43439
Longitude : 92.32234500000001
file name : Image_25052023110901677.png
|
2023-05-25 11:09:01.778754 |
21 |
51480960 |
Constn, of Community managed sanitary complex near Gorukhiyakhuti LP School |
90000 |
Constn, of Community managed sanitary complex near Gorukhiyakhuti LP School1 |
Completion of work |
-
latitude : 26.430653333333332
Longitude : 92.31702333333332
file name : Image_10022023142348734.png
|
2023-02-10 14:23:48.839871 |
22 |
51480786 |
Constn, of Community managed sanitary complex near Kathani Bijfarm |
90000 |
Constn, of Community managed sanitary complex near Kathani Bijfarm1 |
Completion of work |
-
latitude : 26.432258333333333
Longitude : 92.32692999999999
file name : Image_28022023133436905.png
|
2023-02-28 13:34:37.000653 |
23 |
67191142 |
installation of solar street light at kathani gaon panchayat area under 15th finance commission |
101200 |
installation of solar street light at kathani gaon panchayat area under 15th finance commission1 |
Completion of work |
-
latitude : 26.423111666666667
Longitude : 92.31371333333333
file name : Image_26032023133855751.png
|
2023-03-26 13:38:55.846352 |
24 |
67782561 |
Water Supply to villages |
481950 |
Water Supply to villages1 |
Completion of work |
-
latitude : 26.433024999999997
Longitude : 92.32389333333334
file name : Image_06042023122442520.png
|
2023-04-06 12:24:42.725102 |
25 |
67793358 |
Renovation and Construction of Boundary wall at Dakhin Chenimari 312 no AWC |
644100 |
Renovation and Construction of Boundary wall at Dakhin Chenimari 312 no AWC1 |
Roof laid |
-
latitude : 26.439944999999998
Longitude : 92.34261333333333
file name : Image_28102023112352518.png
|
2023-10-28 11:23:52.608358 |
26 |
67793358 |
Renovation and Construction of Boundary wall at Dakhin Chenimari 312 no AWC |
644100 |
Renovation and Construction of Boundary wall at Dakhin Chenimari 312 no AWC1 |
Plinth level |
-
latitude : 26.439895
Longitude : 92.342635
file name : Image_28102023105422327.png
|
2023-10-28 10:54:22.422307 |
27 |
67793358 |
Renovation and Construction of Boundary wall at Dakhin Chenimari 312 no AWC |
644100 |
Renovation and Construction of Boundary wall at Dakhin Chenimari 312 no AWC1 |
Completion of work |
-
latitude : 26.439985
Longitude : 92.34240333333334
file name : Image_04052023141627268.png
|
2023-05-04 14:16:27.355878 |
28 |
67530526 |
Creation of a new source of drinking water |
500000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.440126666666668
Longitude : 92.342845
file name : Image_06062023101157350.png
|
2023-06-06 10:11:57.454547 |
29 |
67783548 |
Construction of Madrassa Ghar at Dakhin Chenimari near Launch Gat |
313700 |
Construction of Madrassa Ghar at Dakhin Chenimari near Launch Gat1 |
Roof laid |
-
latitude : 26.438955000000004
Longitude : 92.335275
file name : Image_27062024124615366.png
|
2024-06-27 12:46:15.064234 |
30 |
67783548 |
Construction of Madrassa Ghar at Dakhin Chenimari near Launch Gat |
313700 |
Construction of Madrassa Ghar at Dakhin Chenimari near Launch Gat1 |
Plinth level |
-
latitude : 26.438971666666664
Longitude : 92.33528499999998
file name : Image_02062024151339966.png
|
2024-06-02 15:13:40.072616 |
31 |
67783548 |
Construction of Madrassa Ghar at Dakhin Chenimari near Launch Gat |
313700 |
Construction of Madrassa Ghar at Dakhin Chenimari near Launch Gat1 |
Completion of work |
-
latitude : 26.438995
Longitude : 92.33521666666665
file name : Image_06062023101326757.png
|
2023-06-06 10:13:26.859471 |
32 |
67779706 |
Construction of Community Sanitary Complex |
140975 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.428841666666667
Longitude : 92.32158833333332
file name : Image_06062023121322784.png
|
2023-06-06 12:13:22.885965 |
33 |
67790209 |
Construction of Community Sanitary Complex |
241538 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.43537666666667
Longitude : 92.33439833333333
file name : Image_06062023102839294.png
|
2023-06-06 10:28:39.389078 |
34 |
67530148 |
Creation of a new source of drinking water |
103510 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.43269666666667
Longitude : 92.32777333333334
file name : Image_08102023114343627.png
|
2023-10-08 11:43:43.716298 |
35 |
51482194 |
Repairing of GP Office Latrine |
63512 |
Repairing of GP Office Latrine1 |
Roof laid |
-
latitude : 26.433041666666668
Longitude : 92.32812833333334
file name : Image_31102023120004864.png
|
2023-10-31 12:00:05.29087 |
36 |
51482194 |
Repairing of GP Office Latrine |
63512 |
Repairing of GP Office Latrine1 |
Plinth level |
-
latitude : 26.433023333333335
Longitude : 92.32814666666667
file name : Image_31102023111050104.png
|
2023-10-31 11:10:50.488941 |
37 |
51482194 |
Repairing of GP Office Latrine |
63512 |
Repairing of GP Office Latrine1 |
Completion of work |
-
latitude : 26.432735
Longitude : 92.32827
file name : Image_10022023133607778.png
|
2023-02-10 13:36:07.891086 |
38 |
87396423 |
Renovation of Kathani Gaon Panchayat Old Building |
663100 |
Renovation of Kathani Gaon Panchayat Old Building1 |
Completion of work |
-
latitude : 26.432714999999998
Longitude : 92.32817500000002
file name : Image_14102023132129854.png
|
2023-10-14 13:21:29.95789 |
39 |
67787268 |
Construction of Community Sanitary Complex |
240975 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.43989
Longitude : 92.34070333333332
file name : Image_01102023115820574.png
|
2023-10-01 11:58:20.68419 |
40 |
87396707 |
Const. of Building at Pub Mikirgaon Health Sub Centre |
363100 |
Const. of Building at Pub Mikirgaon Health Sub Centre1 |
Completion of work |
-
latitude : 26.43456833333333
Longitude : 92.32729166666668
file name : Image_14102023143214341.png
|
2023-10-14 14:32:14.438083 |
41 |
88177190 |
Supply of Furniture at Kathani Shg Training centre |
300000 |
Supply of Furniture at Kathani Shg Training centre1 |
|
-
latitude : 26.432616666666664
Longitude : 92.32786833333333
file name : Image_14112023094108731.png
|
2023-11-14 09:41:08.822984 |
42 |
67530070 |
Construction of toilets in public institutions |
139427 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.430693333333338
Longitude : 92.31718000000001
file name : Image_28112023110059613.png
|
2023-11-28 11:00:59.725229 |
43 |
87411445 |
Creation of community compost pits for a group of Households |
15193 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 26.432203333333337
Longitude : 92.32819166666668
file name : Image_06122023154649794.png
|
2023-12-06 15:46:49.877233 |
44 |
87411465 |
Creation of community compost pits for a group of Households |
15193 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 26.439295
Longitude : 92.335695
file name : Image_06122023151646376.png
|
2023-12-06 15:16:46.461795 |
45 |
87411477 |
Creation of community compost pits for a group of Households |
15193 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 26.432991666666666
Longitude : 92.34150833333334
file name : Image_06122023145541877.png
|
2023-12-06 14:55:41.962556 |
46 |
87411511 |
Creation of community compost pits for a group of Households |
15193 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 26.436708333333332
Longitude : 92.33409666666667
file name : Image_06122023151007081.png
|
2023-12-06 15:10:07.167988 |
47 |
87411523 |
Creation of community compost pits for a group of Households |
15193 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 26.438985000000002
Longitude : 92.34299166666666
file name : Image_06122023150353533.png
|
2023-12-06 15:03:53.633181 |
48 |
87411612 |
Creation of community compost pits for a group of Households |
15193 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 26.433844999999998
Longitude : 92.32699333333333
file name : Image_06122023152952672.png
|
2023-12-06 15:29:52.76591 |
49 |
87411454 |
Creation of community compost pits for a group of Households |
15193 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 26.431019999999997
Longitude : 92.31919
file name : Image_06122023160928718.png
|
2023-12-06 16:09:28.805442 |
50 |
87411488 |
Creation of community compost pits for a group of Households |
15193 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 26.429728333333333
Longitude : 92.33728666666666
file name : Image_06122023144738591.png
|
2023-12-06 14:47:38.670856 |
51 |
87411501 |
Creation of community compost pits for a group of Households |
15193 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 26.43256333333333
Longitude : 92.32701666666665
file name : Image_06122023154958810.png
|
2023-12-06 15:49:58.879715 |
52 |
88251633 |
Construction of Community Sanitary Complex |
293013 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.4210645
Longitude : 92.344203
file name : Image_04122023114624574.png
|
2023-12-04 11:46:24.668907 |
53 |
88251015 |
Augmentation of the existing source of drinking water |
293013 |
Augmentation of the existing source of drinking water1 |
Completion of work |
-
latitude : 26.4210645
Longitude : 92.344203
file name : Image_04122023114445392.png
|
2023-12-04 11:44:45.485386 |
54 |
88251015 |
Augmentation of the existing source of drinking water |
293013 |
Augmentation of the existing source of drinking water1 |
Completion of work |
-
latitude : 26.4210645
Longitude : 92.344203
file name : Image_04122023114627557.png
|
2023-12-04 11:46:27.641674 |
55 |
67789269 |
Construction of Community Sanitary Complex |
241537 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.4322613
Longitude : 92.3277757
file name : Image_14122023124215272.png
|
2023-12-14 12:42:15.370798 |
56 |
88178071 |
Electricity bill |
90684 |
Electricity bill1 |
Completion of work |
-
latitude : 26.432885000000002
Longitude : 92.32821333333335
file name : Image_20122023110754416.png
|
2023-12-20 11:07:54.606281 |
57 |
51482005 |
Renevation of Kathani GP Rajib Gandi Seva Kendra |
800000 |
Renevation of Kathani GP Rajib Gandi Seva Kendra1 |
Roof laid |
-
latitude : 26.432793333333333
Longitude : 92.32819166666668
file name : Image_28102023120416849.png
|
2023-10-28 12:04:16.943191 |
58 |
51482005 |
Renevation of Kathani GP Rajib Gandi Seva Kendra |
800000 |
Renevation of Kathani GP Rajib Gandi Seva Kendra1 |
Plinth level |
-
latitude : 26.43277666666667
Longitude : 92.32816833333332
file name : Image_28102023115727248.png
|
2023-10-28 11:57:27.349123 |
59 |
51482005 |
Renevation of Kathani GP Rajib Gandi Seva Kendra |
800000 |
Renevation of Kathani GP Rajib Gandi Seva Kendra1 |
Completion of work |
-
latitude : 26.432756666666666
Longitude : 92.328285
file name : Image_05122022170648330.png
|
2022-12-05 17:06:48.424883 |
60 |
67191444 |
construction of boundary wall with concertina wire fencing at kathani gp |
886319 |
construction of boundary wall with concertina wire fencing at kathani gp1 |
Roof laid |
-
latitude : 26.432664999999997
Longitude : 92.32830666666665
file name : Image_31102023115951420.png
|
2023-10-31 11:59:51.791286 |
61 |
67191444 |
construction of boundary wall with concertina wire fencing at kathani gp |
886319 |
construction of boundary wall with concertina wire fencing at kathani gp1 |
Plinth level |
-
latitude : 26.4323484
Longitude : 92.327828
file name : Image_31102023111057061.png
|
2023-10-31 11:10:58.037946 |
62 |
67191444 |
construction of boundary wall with concertina wire fencing at kathani gp |
886319 |
construction of boundary wall with concertina wire fencing at kathani gp1 |
Completion of work |
-
latitude : 26.433045
Longitude : 92.32818833333334
file name : Image_04052023141617904.png
|
2023-05-04 14:16:18.010185 |
63 |
51481404 |
Renevation of Kathani SHG Training Centre |
286323 |
Renevation of Kathani SHG Training Centre1 |
Roof laid |
-
latitude : 26.432574999999996
Longitude : 92.32791166666667
file name : Image_15112023100346435.png
|
2023-11-15 10:03:46.523187 |
64 |
51481404 |
Renevation of Kathani SHG Training Centre |
286323 |
Renevation of Kathani SHG Training Centre1 |
Roof laid |
-
latitude : 26.43263833333333
Longitude : 92.32787000000002
file name : Image_31102023120000964.png
|
2023-10-31 12:00:01.339793 |
65 |
51481404 |
Renevation of Kathani SHG Training Centre |
286323 |
Renevation of Kathani SHG Training Centre1 |
Plinth level |
-
latitude : 26.43261
Longitude : 92.32789666666667
file name : Image_31102023111102504.png
|
2023-10-31 11:11:03.67547 |
66 |
51481404 |
Renevation of Kathani SHG Training Centre |
286323 |
Renevation of Kathani SHG Training Centre1 |
Completion of work |
-
latitude : 26.432589999999998
Longitude : 92.32778666666667
file name : Image_19012023154316924.png
|
2023-01-19 15:43:17.045254 |
67 |
51481253 |
Distribution of Mask and Sanitization at Kathani GP Area |
120702 |
Distribution of Mask and Sanitization at Kathani GP Area1 |
Roof laid |
-
latitude : 26.4325249
Longitude : 92.3281755
file name : Image_01062024122349890.png
|
2024-06-01 12:23:49.981721 |
68 |
51481253 |
Distribution of Mask and Sanitization at Kathani GP Area |
120702 |
Distribution of Mask and Sanitization at Kathani GP Area1 |
Roof laid |
-
latitude : 26.4325249
Longitude : 92.3281756
file name : Image_01062024121434960.png
|
2024-06-01 12:14:35.057923 |
69 |
51481253 |
Distribution of Mask and Sanitization at Kathani GP Area |
120702 |
Distribution of Mask and Sanitization at Kathani GP Area1 |
Roof laid |
-
latitude : 26.2949193
Longitude : 92.32035025
file name : Image_26032022142557619.png
|
2022-03-26 14:25:57.721107 |
70 |
67191497 |
infrastructure development of kathani gaon panchyat community hall |
320702 |
infrastructure development of kathani gaon panchyat community hall1 |
Completion of work |
-
latitude : 26.3842672
Longitude : 92.2839117
file name : Image_26032023133735477.png
|
2023-03-26 13:37:35.569127 |
71 |
51480162 |
Construction of Drinking water Facility near Dakhin Chenimari Nurani Jame majjid |
300000 |
Construction of Drinking water Facility near Dakhin Chenimari Nurani Jame majjid1 |
Completion of work |
-
latitude : 26.435219999999997
Longitude : 92.33643666666667
file name : Image_10022023135217024.png
|
2023-02-10 13:52:17.147398 |
72 |
51479303 |
Construction of drinking water facility near Dakhin chenemari Ayesha Siddika Jame majjid |
303513 |
Construction of drinking water facility near Dakhin chenemari Ayesha Siddika Jame majjid1 |
Roof laid |
-
latitude : 26.43896666666667
Longitude : 92.33525999999999
file name : Image_02062024153131195.png
|
2024-06-02 15:31:31.288962 |
73 |
51479303 |
Construction of drinking water facility near Dakhin chenemari Ayesha Siddika Jame majjid |
303513 |
Construction of drinking water facility near Dakhin chenemari Ayesha Siddika Jame majjid1 |
Plinth level |
-
latitude : 26.438961666666668
Longitude : 92.33524833333334
file name : Image_02062024152024367.png
|
2024-06-02 15:20:24.463384 |
74 |
51479303 |
Construction of drinking water facility near Dakhin chenemari Ayesha Siddika Jame majjid |
303513 |
Construction of drinking water facility near Dakhin chenemari Ayesha Siddika Jame majjid1 |
Completion of work |
-
latitude : 26.438991666666666
Longitude : 92.33519499999998
file name : Image_10022023134736011.png
|
2023-02-10 13:47:36.136775 |
75 |
87411430 |
Creation of Shed for segregation and processing of wet and dry waste |
81813 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.4325013
Longitude : 92.3281841
file name : Image_27062024111919391.png
|
2024-06-27 11:19:19.478196 |
76 |
87411430 |
Creation of Shed for segregation and processing of wet and dry waste |
81813 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.432745
Longitude : 92.32787833333332
file name : Image_27062024111324415.png
|
2024-06-27 11:13:24.503532 |
77 |
87411430 |
Creation of Shed for segregation and processing of wet and dry waste |
81813 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.432810000000003
Longitude : 92.32789499999998
file name : Image_06122023154646347.png
|
2023-12-06 15:46:46.433597 |
78 |
87396732 |
Const. of Community Hall at Dakhin Chenimari near Lunch Ghat |
300000 |
Const. of Community Hall at Dakhin Chenimari near Lunch Ghat1 |
Roof laid |
-
latitude : 26.439004999999998
Longitude : 92.33523833333332
file name : Image_27062024132313322.png
|
2024-06-27 13:23:13.415143 |
79 |
87396732 |
Const. of Community Hall at Dakhin Chenimari near Lunch Ghat |
300000 |
Const. of Community Hall at Dakhin Chenimari near Lunch Ghat1 |
Plinth level |
-
latitude : 26.43901
Longitude : 92.33523833333332
file name : Image_27062024124806980.png
|
2024-06-27 12:48:07.079664 |
80 |
87396732 |
Const. of Community Hall at Dakhin Chenimari near Lunch Ghat |
300000 |
Const. of Community Hall at Dakhin Chenimari near Lunch Ghat1 |
Plinth level |
-
latitude : 26.43901
Longitude : 92.33523833333332
file name : Image_27062024125023630.png
|
2024-06-27 12:50:23.719957 |
81 |
87396732 |
Const. of Community Hall at Dakhin Chenimari near Lunch Ghat |
300000 |
Const. of Community Hall at Dakhin Chenimari near Lunch Ghat1 |
Completion of work |
-
latitude : 26.439043333333334
Longitude : 92.33525666666668
file name : Image_14102023142140210.png
|
2023-10-14 14:21:40.29961 |