1 |
54488052 |
Construction of toilet at Middle Uttar sarkeybasti LP School |
45000 |
Construction of toilet at Middle Uttar sarkeybasti LP School1 |
Roof laid |
-
latitude : 25.89954526
Longitude : 93.15987256
file name : Image_11102023111720471.png
|
2023-10-11 11:17:20.559881 |
2 |
54488052 |
Construction of toilet at Middle Uttar sarkeybasti LP School |
45000 |
Construction of toilet at Middle Uttar sarkeybasti LP School1 |
Plinth level |
-
latitude : 25.89955647
Longitude : 93.15988558
file name : Image_23092023221642237.png
|
2023-09-23 22:16:42.322035 |
3 |
54488052 |
Construction of toilet at Middle Uttar sarkeybasti LP School |
45000 |
Construction of toilet at Middle Uttar sarkeybasti LP School1 |
Completion of work |
-
latitude : 25.89952335
Longitude : 93.15985651
file name : Image_11092022153416855.png
|
2022-09-11 15:34:16.955958 |
4 |
54487782 |
Installation of Solar street light in Chakma and Garo Basti ward no 6 and 7 10nos |
450000 |
Installation of Solar street light in Chakma and Garo Basti ward no 6 and 7 10nos1 |
Plinth level |
-
latitude : 25.90076608
Longitude : 93.14453604
file name : Image_10012024143802940.png
|
2024-01-10 14:38:03.021472 |
5 |
54487782 |
Installation of Solar street light in Chakma and Garo Basti ward no 6 and 7 10nos |
450000 |
Installation of Solar street light in Chakma and Garo Basti ward no 6 and 7 10nos1 |
Plinth level |
-
latitude : 25.90077042
Longitude : 93.14444552
file name : Image_10012024143758825.png
|
2024-01-10 14:37:58.953268 |
6 |
54487782 |
Installation of Solar street light in Chakma and Garo Basti ward no 6 and 7 10nos |
450000 |
Installation of Solar street light in Chakma and Garo Basti ward no 6 and 7 10nos1 |
Completion of work |
-
latitude : 25.90151421
Longitude : 93.14563686
file name : Image_11092022153356840.png
|
2022-09-11 15:33:56.933136 |
7 |
54487833 |
Senitization Programme in Sarkeybasti GP area |
122875 |
Senitization Programme in Sarkeybasti GP area1 |
Completion of work |
-
latitude : 25.9160746
Longitude : 92.9461609
file name : Image_29092022180337687.png
|
2022-09-29 18:03:37.830393 |
8 |
68070479 |
Creation of Shed for segregation and processing of wet and dry waste |
175000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 25.902668
Longitude : 93.145813
file name : Image_12052023110708604.png
|
2023-05-12 11:07:08.706413 |
9 |
68070541 |
Construction of toilets in public institutions |
189561 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 25.91682412
Longitude : 92.94801875
file name : Image_22092023104016724.png
|
2023-09-22 10:40:16.822857 |
10 |
68070541 |
Construction of toilets in public institutions |
189561 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 25.90380162
Longitude : 93.14562022
file name : Image_19092023085553403.png
|
2023-09-19 08:55:53.49627 |
11 |
68070541 |
Construction of toilets in public institutions |
189561 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.90377966
Longitude : 93.14563015
file name : Image_12062023100253241.png
|
2023-06-12 10:02:53.34451 |
12 |
68071507 |
Repairing |
152150 |
Repairing1 |
Plinth level |
-
latitude : 25.90763702
Longitude : 93.14760288
file name : Image_19092023085606483.png
|
2023-09-19 08:56:06.574791 |
13 |
68071507 |
Repairing |
152150 |
Repairing1 |
Completion of work |
-
latitude : 25.90766807
Longitude : 93.14757555
file name : Image_27062023230037487.png
|
2023-06-27 23:00:37.598903 |
14 |
67416890 |
Roads |
299754 |
Roads1 |
Completion of work |
-
latitude : 25.90355765,25.9035596
Longitude : 93.14507827,93.14507442
file name : Image_19092023085559991.png
|
2023-09-19 08:56:00.089559 |
15 |
54487782 |
Installation of Solar street light in Chakma and Garo Basti ward no 6 and 7 10nos |
450000 |
Installation of Solar street light in Chakma and Garo Basti ward no 6 and 7 10nos2 |
Completion of work |
-
latitude : 25.90079274
Longitude : 93.14478746
file name : Image_11092022153400519.png
|
2022-09-11 15:34:00.633305 |
16 |
54487782 |
Installation of Solar street light in Chakma and Garo Basti ward no 6 and 7 10nos |
450000 |
Installation of Solar street light in Chakma and Garo Basti ward no 6 and 7 10nos3 |
Completion of work |
-
latitude : 25.90077786
Longitude : 93.1444854
file name : Image_10012024143807121.png
|
2024-01-10 14:38:07.320149 |
17 |
54487782 |
Installation of Solar street light in Chakma and Garo Basti ward no 6 and 7 10nos |
450000 |
Installation of Solar street light in Chakma and Garo Basti ward no 6 and 7 10nos3 |
Completion of work |
-
latitude : 25.90140927
Longitude : 93.14491586
file name : Image_11092022153404549.png
|
2022-09-11 15:34:04.657032 |
18 |
54487971 |
Construction of toilet at East Uttar Sarkey LP School |
45000 |
Construction of toilet at East Uttar Sarkey LP School1 |
Roof laid |
-
latitude : 25.89955394
Longitude : 93.15987718
file name : Image_11102023111726731.png
|
2023-10-11 11:17:26.869185 |
19 |
54487971 |
Construction of toilet at East Uttar Sarkey LP School |
45000 |
Construction of toilet at East Uttar Sarkey LP School1 |
Plinth level |
-
latitude : 25.89954618
Longitude : 93.15989727
file name : Image_23092023221633666.png
|
2023-09-23 22:16:33.746318 |
20 |
54487971 |
Construction of toilet at East Uttar Sarkey LP School |
45000 |
Construction of toilet at East Uttar Sarkey LP School1 |
Completion of work |
-
latitude : 25.89952412
Longitude : 93.15985638
file name : Image_11092022153412664.png
|
2022-09-11 15:34:12.773001 |
21 |
54488201 |
Construction of toilet at centre Bazar |
90000 |
Construction of toilet at centre Bazar1 |
Roof laid |
-
latitude : 25.88733289
Longitude : 93.1504384
file name : Image_23092023221645991.png
|
2023-09-23 22:16:46.082526 |
22 |
54488201 |
Construction of toilet at centre Bazar |
90000 |
Construction of toilet at centre Bazar1 |
Plinth level |
-
latitude : 25.8873671
Longitude : 93.15038207
file name : Image_19092023085842015.png
|
2023-09-19 08:58:42.130219 |
23 |
54488201 |
Construction of toilet at centre Bazar |
90000 |
Construction of toilet at centre Bazar1 |
Completion of work |
-
latitude : 25.88733219
Longitude : 93.15049615
file name : Image_07092022142253352.png
|
2022-09-07 14:22:53.460702 |
24 |
54488201 |
Construction of toilet at centre Bazar |
90000 |
Construction of toilet at centre Bazar1 |
Completion of work |
-
latitude : 25.88732252
Longitude : 93.15051803
file name : Image_07092022161228473.png
|
2022-09-07 16:12:28.570657 |
25 |
54488201 |
Construction of toilet at centre Bazar |
90000 |
Construction of toilet at centre Bazar1 |
Completion of work |
-
latitude : 25.91677206
Longitude : 92.94805169
file name : Image_21082022131415649.png
|
2022-08-21 13:14:15.74473 |
26 |
54488247 |
Construction of toilet at Janju Bazar |
90000 |
Construction of toilet at Janju Bazar1 |
Roof laid |
-
latitude : 25.87580493
Longitude : 93.16195492
file name : Image_10012024131313422.png
|
2024-01-10 13:13:13.52051 |
27 |
54488247 |
Construction of toilet at Janju Bazar |
90000 |
Construction of toilet at Janju Bazar1 |
Plinth level |
-
latitude : 25.87584046
Longitude : 93.16183326
file name : Image_10012024130715656.png
|
2024-01-10 13:07:15.767901 |
28 |
54488247 |
Construction of toilet at Janju Bazar |
90000 |
Construction of toilet at Janju Bazar1 |
Completion of work |
-
latitude : 25.91676573
Longitude : 92.94808489
file name : Image_21082022131022941.png
|
2022-08-21 13:10:23.038462 |
29 |
54487883 |
Iron Fencing Boundary at GP Office |
115876 |
Iron Fencing Boundary at GP Office1 |
Roof laid |
-
latitude : 25.90352078
Longitude : 93.14526157
file name : Image_10012024144651228.png
|
2024-01-10 14:46:51.342407 |
30 |
54487883 |
Iron Fencing Boundary at GP Office |
115876 |
Iron Fencing Boundary at GP Office1 |
Plinth level |
-
latitude : 25.90352852
Longitude : 93.14562221
file name : Image_10012024143816859.png
|
2024-01-10 14:38:16.95403 |
31 |
54487883 |
Iron Fencing Boundary at GP Office |
115876 |
Iron Fencing Boundary at GP Office1 |
Plinth level |
-
latitude : 25.90344192
Longitude : 93.1453065
file name : Image_19092023085024129.png
|
2023-09-19 08:50:24.222634 |
32 |
54487883 |
Iron Fencing Boundary at GP Office |
115876 |
Iron Fencing Boundary at GP Office1 |
Completion of work |
-
latitude : 25.90345415
Longitude : 93.14536599
file name : Image_11092022153421765.png
|
2022-09-11 15:34:21.874599 |
33 |
54487706 |
Repairing of Road from Centre Bazar to new PHC Sarkeybasti |
540000 |
Repairing of Road from Centre Bazar to new PHC Sarkeybasti1 |
Roof laid |
-
latitude : 25.88744985,25.88745963
Longitude : 93.14917094,93.1491698
file name : Image_19092023085837038.png
|
2023-09-19 08:58:37.134605 |
34 |
54487706 |
Repairing of Road from Centre Bazar to new PHC Sarkeybasti |
540000 |
Repairing of Road from Centre Bazar to new PHC Sarkeybasti1 |
Plinth level |
-
latitude : 25.88742663,25.887413
Longitude : 93.14916272,93.14916467
file name : Image_10052022100804764.png
|
2022-05-10 10:08:04.866823 |
35 |
54487706 |
Repairing of Road from Centre Bazar to new PHC Sarkeybasti |
540000 |
Repairing of Road from Centre Bazar to new PHC Sarkeybasti1 |
Completion of work |
-
latitude : 25.91699841,25.91699942
Longitude : 92.94793241,92.94793283
file name : Image_28042022092712607.png
|
2022-04-28 09:27:12.723941 |
36 |
67416933 |
Repairing |
157250 |
Repairing1 |
Roof laid |
-
latitude : 25.89673809
Longitude : 93.14246319
file name : Image_10012024134024351.png
|
2024-01-10 13:40:24.480333 |
37 |
67416933 |
Repairing |
157250 |
Repairing1 |
Plinth level |
-
latitude : 25.89683701
Longitude : 93.14254101
file name : Image_10012024132900010.png
|
2024-01-10 13:29:00.125243 |
38 |
67416933 |
Repairing |
157250 |
Repairing1 |
Completion of work |
-
latitude : 25.87861416
Longitude : 93.15467263
file name : Image_05052023092520077.png
|
2023-05-05 09:25:20.167207 |
39 |
54488451 |
Construction of RCC Ringwell at Lakhi Ranjan Chakma Ward No 6 Garo Basti Suburi |
116000 |
Construction of RCC Ringwell at Lakhi Ranjan Chakma Ward No 6 Garo Basti Suburi1 |
Roof laid |
-
latitude : 25.89667947
Longitude : 93.14242439
file name : Image_10012024140321567.png
|
2024-01-10 14:03:21.665983 |
40 |
54488451 |
Construction of RCC Ringwell at Lakhi Ranjan Chakma Ward No 6 Garo Basti Suburi |
116000 |
Construction of RCC Ringwell at Lakhi Ranjan Chakma Ward No 6 Garo Basti Suburi1 |
Plinth level |
-
latitude : 25.89673657
Longitude : 93.14238953
file name : Image_10012024135049769.png
|
2024-01-10 13:50:49.905319 |
41 |
54488451 |
Construction of RCC Ringwell at Lakhi Ranjan Chakma Ward No 6 Garo Basti Suburi |
116000 |
Construction of RCC Ringwell at Lakhi Ranjan Chakma Ward No 6 Garo Basti Suburi1 |
Completion of work |
-
latitude : 25.91692705
Longitude : 92.94803583
file name : Image_25022023180856619.png
|
2023-02-25 18:08:56.706429 |
42 |
54488398 |
Construction of RCC Ringwell at Moijul Islam SO Ishab Aki suburi ward no 3 |
115751 |
Construction of RCC Ringwell at Moijul Islam SO Ishab Aki suburi ward no 31 |
Roof laid |
-
latitude : 25.91681653
Longitude : 92.94800414
file name : Image_22092023095000280.png
|
2023-09-22 09:49:59.694131 |
43 |
54488398 |
Construction of RCC Ringwell at Moijul Islam SO Ishab Aki suburi ward no 3 |
115751 |
Construction of RCC Ringwell at Moijul Islam SO Ishab Aki suburi ward no 31 |
Plinth level |
-
latitude : 25.90011924
Longitude : 93.13716182
file name : Image_19092023084720903.png
|
2023-09-19 08:47:21.005394 |
44 |
54488398 |
Construction of RCC Ringwell at Moijul Islam SO Ishab Aki suburi ward no 3 |
115751 |
Construction of RCC Ringwell at Moijul Islam SO Ishab Aki suburi ward no 31 |
Completion of work |
-
latitude : 25.90013395
Longitude : 93.1371325
file name : Image_10052022100559185.png
|
2022-05-10 10:05:59.308662 |
45 |
54488477 |
Construction of RCC Ringwell in Saibur Rahman SO Abdul Khalek Suburi ward no 5 |
116000 |
Construction of RCC Ringwell in Saibur Rahman SO Abdul Khalek Suburi ward no 51 |
Roof laid |
-
latitude : 25.89663952
Longitude : 93.14243474
file name : Image_10012024140300677.png
|
2024-01-10 14:03:00.792469 |
46 |
54488477 |
Construction of RCC Ringwell in Saibur Rahman SO Abdul Khalek Suburi ward no 5 |
116000 |
Construction of RCC Ringwell in Saibur Rahman SO Abdul Khalek Suburi ward no 51 |
Plinth level |
-
latitude : 25.89662209
Longitude : 93.14242917
file name : Image_10012024134439737.png
|
2024-01-10 13:44:39.853901 |
47 |
54488477 |
Construction of RCC Ringwell in Saibur Rahman SO Abdul Khalek Suburi ward no 5 |
116000 |
Construction of RCC Ringwell in Saibur Rahman SO Abdul Khalek Suburi ward no 51 |
Completion of work |
-
latitude : 25.91716781
Longitude : 92.94790182
file name : Image_27062022100022287.png
|
2022-06-27 10:00:22.437578 |
48 |
67416817 |
Construction of toilets in public institutions |
500000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 25.90078357
Longitude : 93.14479666
file name : Image_10012024143754912.png
|
2024-01-10 14:37:55.032338 |
49 |
67416817 |
Construction of toilets in public institutions |
500000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 25.90073651
Longitude : 93.14480643
file name : Image_31102023220215638.png
|
2023-10-31 22:02:15.749827 |
50 |
67416817 |
Construction of toilets in public institutions |
500000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 25.90067955
Longitude : 93.14479833
file name : Image_19092023085627597.png
|
2023-09-19 08:56:27.675171 |
51 |
67416817 |
Construction of toilets in public institutions |
500000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.91676962
Longitude : 92.94802265
file name : Image_16072023161641046.png
|
2023-07-16 16:16:41.144587 |
52 |
54488306 |
Construction of toilet at Ambari Bazar |
90000 |
Construction of toilet at Ambari Bazar1 |
Roof laid |
-
latitude : 25.91679989
Longitude : 92.94799902
file name : Image_22092023100321029.png
|
2023-09-22 10:03:21.122806 |
53 |
54488306 |
Construction of toilet at Ambari Bazar |
90000 |
Construction of toilet at Ambari Bazar1 |
Plinth level |
-
latitude : 25.91680702
Longitude : 92.94799496
file name : Image_22092023100043753.png
|
2023-09-22 10:00:43.846745 |
54 |
54488306 |
Construction of toilet at Ambari Bazar |
90000 |
Construction of toilet at Ambari Bazar1 |
Completion of work |
-
latitude : 25.89126639
Longitude : 93.19055836
file name : Image_07092022133217758.png
|
2022-09-07 13:32:17.867836 |
55 |
54488306 |
Construction of toilet at Ambari Bazar |
90000 |
Construction of toilet at Ambari Bazar1 |
Completion of work |
-
latitude : 25.89129863
Longitude : 93.19062645
file name : Image_07092022133221524.png
|
2022-09-07 13:32:21.625762 |
56 |
54488306 |
Construction of toilet at Ambari Bazar |
90000 |
Construction of toilet at Ambari Bazar1 |
Completion of work |
-
latitude : 25.89129638
Longitude : 93.19059058
file name : Image_07092022133225170.png
|
2022-09-07 13:32:25.278537 |
57 |
54488330 |
Construction of toilet at Sarkebasti Shanti Bazar |
90000 |
Construction of toilet at Sarkebasti Shanti Bazar1 |
Roof laid |
-
latitude : 25.89670049
Longitude : 93.14254941
file name : Image_10012024140316664.png
|
2024-01-10 14:03:16.776987 |
58 |
54488330 |
Construction of toilet at Sarkebasti Shanti Bazar |
90000 |
Construction of toilet at Sarkebasti Shanti Bazar1 |
Plinth level |
-
latitude : 25.89670091
Longitude : 93.14239671
file name : Image_10012024134737761.png
|
2024-01-10 13:47:37.879293 |
59 |
54488330 |
Construction of toilet at Sarkebasti Shanti Bazar |
90000 |
Construction of toilet at Sarkebasti Shanti Bazar1 |
Completion of work |
-
latitude : 25.91703349
Longitude : 92.94789205
file name : Image_28032023221443899.png
|
2023-03-28 22:14:43.99404 |
60 |
67416904 |
Repairing |
300000 |
Repairing1 |
Roof laid |
-
latitude : 25.89947855
Longitude : 93.15995514
file name : Image_11102023111710003.png
|
2023-10-11 11:17:10.092411 |
61 |
67416904 |
Repairing |
300000 |
Repairing1 |
Plinth level |
-
latitude : 25.89944097
Longitude : 93.15995891
file name : Image_23092023221630017.png
|
2023-09-23 22:16:30.113664 |
62 |
67416904 |
Repairing |
300000 |
Repairing1 |
Completion of work |
-
latitude : 25.89945818
Longitude : 93.15993206
file name : Image_05052023092515858.png
|
2023-05-05 09:25:15.954855 |
63 |
67416923 |
Repairing |
157250 |
Repairing1 |
Roof laid |
-
latitude : 25.89681512
Longitude : 93.14256988
file name : Image_10012024134018598.png
|
2024-01-10 13:40:18.699924 |
64 |
67416923 |
Repairing |
157250 |
Repairing1 |
Plinth level |
-
latitude : 25.89678762
Longitude : 93.14255235
file name : Image_10012024132854279.png
|
2024-01-10 13:28:54.436572 |
65 |
67416923 |
Repairing |
157250 |
Repairing1 |
Plinth level |
-
latitude : 25.87870356
Longitude : 93.15470547
file name : Image_19092023085851269.png
|
2023-09-19 08:58:51.377008 |
66 |
67416923 |
Repairing |
157250 |
Repairing1 |
Completion of work |
-
latitude : 25.89659138
Longitude : 93.14255803
file name : Image_25042023121010280.png
|
2023-04-25 12:10:10.407827 |
67 |
67416967 |
Repairing |
157250 |
Repairing1 |
Plinth level |
-
latitude : 25.89676614
Longitude : 93.14256945
file name : Image_10012024132905982.png
|
2024-01-10 13:29:06.079357 |
68 |
67416967 |
Repairing |
157250 |
Repairing1 |
Completion of work |
-
latitude : 25.89663619
Longitude : 93.14249856
file name : Image_19092023085639322.png
|
2023-09-19 08:56:39.436402 |
69 |
67416953 |
Repairing |
157250 |
Repairing1 |
Roof laid |
-
latitude : 25.89942529
Longitude : 93.1378542
file name : Image_10012024145229957.png
|
2024-01-10 14:52:30.059541 |
70 |
67416953 |
Repairing |
157250 |
Repairing1 |
Plinth level |
-
latitude : 25.90374799
Longitude : 93.14538238
file name : Image_31102023112521928.png
|
2023-10-31 11:25:23.929836 |
71 |
67416953 |
Repairing |
157250 |
Repairing1 |
Plinth level |
-
latitude : 25.89938229
Longitude : 93.13770241
file name : Image_19092023085018263.png
|
2023-09-19 08:50:18.359329 |
72 |
67416953 |
Repairing |
157250 |
Repairing1 |
Completion of work |
-
latitude : 25.89941498
Longitude : 93.13771368
file name : Image_25042023121005777.png
|
2023-04-25 12:10:05.880951 |
73 |
68071146 |
Renovation |
390650 |
Renovation1 |
Roof laid |
-
latitude : 25.90374379
Longitude : 93.14544507
file name : Image_22092023121803621.png
|
2023-09-22 12:18:03.713991 |
74 |
68071146 |
Renovation |
390650 |
Renovation1 |
Plinth level |
-
latitude : 25.90368154
Longitude : 93.1455086
file name : Image_19092023085334916.png
|
2023-09-19 08:53:35.009498 |
75 |
68071146 |
Renovation |
390650 |
Renovation1 |
Completion of work |
-
latitude : 25.9035075
Longitude : 93.14508298
file name : Image_12062023100121561.png
|
2023-06-12 10:01:21.659706 |
76 |
68071205 |
Repairing |
100000 |
Repairing1 |
Completion of work |
-
latitude : 25.91678703
Longitude : 92.94802436
file name : Image_19092023104728047.png
|
2023-09-19 10:47:28.138828 |
77 |
68071540 |
Repairing |
152150 |
Repairing1 |
Completion of work |
-
latitude : 25.9169583
Longitude : 92.9475687
file name : Image_26082023124841638.png
|
2023-08-26 12:48:41.742641 |
78 |
68070944 |
Construction of toilets in public institutions |
492100 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 25.90526382
Longitude : 93.14191049
file name : Image_19092023085611706.png
|
2023-09-19 08:56:11.793584 |
79 |
68070944 |
Construction of toilets in public institutions |
492100 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.90518702
Longitude : 93.14186176
file name : Image_12062023094910458.png
|
2023-06-12 09:49:10.555678 |
80 |
84072120 |
Creation of Shed for segregation and processing of wet and dry waste |
21875 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 25.91682347
Longitude : 92.94802004
file name : Image_22092023104022657.png
|
2023-09-22 10:40:22.762096 |
81 |
84072120 |
Creation of Shed for segregation and processing of wet and dry waste |
21875 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 25.90330581
Longitude : 93.14578849
file name : Image_19092023085622461.png
|
2023-09-19 08:56:22.552585 |
82 |
84072120 |
Creation of Shed for segregation and processing of wet and dry waste |
21875 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 25.90332937
Longitude : 93.1457797
file name : Image_08072023133427572.png
|
2023-07-08 13:34:27.660595 |
83 |
68071099 |
Renovation |
200000 |
Renovation1 |
Completion of work |
-
latitude : 25.89661094
Longitude : 93.13840313
file name : Image_31102023112510386.png
|
2023-10-31 11:25:12.260869 |
84 |
54488018 |
Construction of toilet at West Uttar sarkeybasti LP School |
45000 |
Construction of toilet at West Uttar sarkeybasti LP School1 |
Roof laid |
-
latitude : 25.89954062
Longitude : 93.15985759
file name : Image_11102023111715339.png
|
2023-10-11 11:17:15.436637 |
85 |
54488018 |
Construction of toilet at West Uttar sarkeybasti LP School |
45000 |
Construction of toilet at West Uttar sarkeybasti LP School1 |
Plinth level |
-
latitude : 25.8995567
Longitude : 93.1599035
file name : Image_23092023221637327.png
|
2023-09-23 22:16:37.409423 |
86 |
54488018 |
Construction of toilet at West Uttar sarkeybasti LP School |
45000 |
Construction of toilet at West Uttar sarkeybasti LP School1 |
Completion of work |
-
latitude : 25.89952273
Longitude : 93.1598516
file name : Image_11092022153408553.png
|
2022-09-11 15:34:08.658706 |
87 |
54488273 |
Construction of toilet near Dekabasti Masjid |
90000 |
Construction of toilet near Dekabasti Masjid1 |
Roof laid |
-
latitude : 25.91679162
Longitude : 92.94804624
file name : Image_22092023102720476.png
|
2023-09-22 10:27:20.564464 |
88 |
54488273 |
Construction of toilet near Dekabasti Masjid |
90000 |
Construction of toilet near Dekabasti Masjid1 |
Plinth level |
-
latitude : 25.91677595
Longitude : 92.94803397
file name : Image_22092023102439373.png
|
2023-09-22 10:24:39.462106 |
89 |
54488273 |
Construction of toilet near Dekabasti Masjid |
90000 |
Construction of toilet near Dekabasti Masjid1 |
Completion of work |
-
latitude : 25.91703349
Longitude : 92.94789205
file name : Image_28032023221440330.png
|
2023-03-28 22:14:40.42443 |
90 |
84071877 |
Creation of Shed for segregation and processing of wet and dry waste |
21875 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 25.91682099
Longitude : 92.94802105
file name : Image_22092023104845285.png
|
2023-09-22 10:48:45.381066 |
91 |
84071877 |
Creation of Shed for segregation and processing of wet and dry waste |
21875 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 25.9168229
Longitude : 92.94801998
file name : Image_22092023104019644.png
|
2023-09-22 10:40:19.75859 |
92 |
84071877 |
Creation of Shed for segregation and processing of wet and dry waste |
21875 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 25.90327959
Longitude : 93.1458232
file name : Image_19092023085617176.png
|
2023-09-19 08:56:17.270407 |
93 |
84071877 |
Creation of Shed for segregation and processing of wet and dry waste |
21875 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 25.90329941
Longitude : 93.14588174
file name : Image_08072023133423428.png
|
2023-07-08 13:34:23.51873 |
94 |
54488420 |
Construction of RCC Ringwell at Abdul gafur SO Kuti Raja Suburi ward no 4 |
116000 |
Construction of RCC Ringwell at Abdul gafur SO Kuti Raja Suburi ward no 41 |
Roof laid |
-
latitude : 25.89661444
Longitude : 93.1424333
file name : Image_10012024140309101.png
|
2024-01-10 14:03:09.304627 |
95 |
54488420 |
Construction of RCC Ringwell at Abdul gafur SO Kuti Raja Suburi ward no 4 |
116000 |
Construction of RCC Ringwell at Abdul gafur SO Kuti Raja Suburi ward no 41 |
Plinth level |
-
latitude : 25.89661553
Longitude : 93.14240383
file name : Image_10012024134446258.png
|
2024-01-10 13:44:46.385153 |
96 |
54488420 |
Construction of RCC Ringwell at Abdul gafur SO Kuti Raja Suburi ward no 4 |
116000 |
Construction of RCC Ringwell at Abdul gafur SO Kuti Raja Suburi ward no 41 |
Completion of work |
-
latitude : 25.9172376
Longitude : 92.9479198
file name : Image_27062022100028392.png
|
2022-06-27 10:00:28.503458 |
97 |
90618267 |
Operation & maintenance of community compost pits |
970100 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 25.9171952
Longitude : 92.9480485
file name : Image_06022024133444524.png
|
2024-02-06 13:34:44.628224 |
98 |
54488129 |
Construction of toilet at West Choudhury Block LP School |
45000 |
Construction of toilet at West Choudhury Block LP School1 |
Completion of work |
-
latitude : 25.91698637
Longitude : 92.94789492
file name : Image_01022024224854198.png
|
2024-02-01 22:48:54.295379 |
99 |
54488095 |
Construction of toilet at East Choudhury Block LP School |
45000 |
Construction of toilet at East Choudhury Block LP School1 |
Completion of work |
-
latitude : 25.91698581
Longitude : 92.94789441
file name : Image_01022024224848141.png
|
2024-02-01 22:48:48.237154 |
100 |
90555870 |
Solar Light |
500000 |
Solar Light1 |
Completion of work |
-
latitude : 25.9171955
Longitude : 92.9480477
file name : Image_03022024223433476.png
|
2024-02-03 22:34:33.563764 |
101 |
90555870 |
Solar Light |
500000 |
Solar Light2 |
Completion of work |
-
latitude : 25.9171939
Longitude : 92.9480498
file name : Image_03022024223436505.png
|
2024-02-03 22:34:36.602635 |
102 |
90555870 |
Solar Light |
500000 |
Solar Light1 |
Completion of work |
-
latitude : 25.9172988
Longitude : 92.947773
file name : Image_03022024223439483.png
|
2024-02-03 22:34:39.564629 |
103 |
90555870 |
Solar Light |
500000 |
Solar Light2 |
Completion of work |
-
latitude : 25.9172167
Longitude : 92.9479457
file name : Image_03022024223442478.png
|
2024-02-03 22:34:42.571782 |
104 |
90555870 |
Solar Light |
500000 |
Solar Light1 |
Completion of work |
-
latitude : 25.91698481
Longitude : 92.94787812
file name : Image_03022024223445435.png
|
2024-02-03 22:34:45.555658 |
105 |
90555870 |
Solar Light |
500000 |
Solar Light2 |
Completion of work |
-
latitude : 25.9171963
Longitude : 92.9480522
file name : Image_03022024223448745.png
|
2024-02-03 22:34:48.853494 |
106 |
90555870 |
Solar Light |
500000 |
Solar Light1 |
Completion of work |
-
latitude : 25.9171962
Longitude : 92.9480506
file name : Image_03022024223451738.png
|
2024-02-03 22:34:51.94125 |
107 |
90555870 |
Solar Light |
500000 |
Solar Light2 |
Completion of work |
-
latitude : 25.9171962
Longitude : 92.9480506
file name : Image_03022024223455403.png
|
2024-02-03 22:34:55.671715 |
108 |
90555870 |
Solar Light |
500000 |
Solar Light1 |
Completion of work |
-
latitude : 25.9172699
Longitude : 92.9478838
file name : Image_03022024223458735.png
|
2024-02-03 22:34:58.95544 |
109 |
90555870 |
Solar Light |
500000 |
Solar Light2 |
Completion of work |
-
latitude : 25.917262
Longitude : 92.947922
file name : Image_03022024223502075.png
|
2024-02-03 22:35:02.160226 |
110 |
90617006 |
Creation of Shed for segregation and processing of wet and dry waste |
6221 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 25.9171932
Longitude : 92.9480456
file name : Image_06022024133425181.png
|
2024-02-06 13:34:25.285605 |
111 |
90617156 |
Creation of Shed for segregation and processing of wet and dry waste |
6221 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 25.9171955
Longitude : 92.9480477
file name : Image_06022024133428229.png
|
2024-02-06 13:34:28.337065 |
112 |
90617274 |
Creation of Shed for segregation and processing of wet and dry waste |
6222 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 25.9171963
Longitude : 92.9480522
file name : Image_06022024133431345.png
|
2024-02-06 13:34:31.459315 |
113 |
90617391 |
Creation of Shed for segregation and processing of wet and dry waste |
6222 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 25.91712957
Longitude : 92.94798114
file name : Image_06022024133435246.png
|
2024-02-06 13:34:35.340538 |
114 |
90617527 |
Creation of Shed for segregation and processing of wet and dry waste |
6221 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 25.9171963
Longitude : 92.9480522
file name : Image_06022024133438263.png
|
2024-02-06 13:34:38.360134 |
115 |
90617677 |
Creation of Shed for segregation and processing of wet and dry waste |
6221 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 25.91702235
Longitude : 92.9479215
file name : Image_06022024150716115.png
|
2024-02-06 15:07:16.217877 |
116 |
90617824 |
Creation of Shed for segregation and processing of wet and dry waste |
6222 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 25.9170878
Longitude : 92.94796014
file name : Image_06022024133441243.png
|
2024-02-06 13:34:41.352156 |
117 |
67416844 |
Creation of drainage channel for management of grey water |
728754 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.91687741
Longitude : 92.94802215
file name : Image_19092023120454542.png
|
2023-09-19 12:04:54.642861 |
118 |
68071252 |
Repairing |
200000 |
Repairing1 |
Completion of work |
-
latitude : 25.88674819
Longitude : 93.15128069
file name : Image_19092023085846079.png
|
2023-09-19 08:58:46.201128 |
119 |
68071477 |
Repairing |
152150 |
Repairing1 |
Plinth level |
-
latitude : 25.90056345
Longitude : 93.14488292
file name : Image_31102023220201988.png
|
2023-10-31 22:02:02.094374 |
120 |
68071477 |
Repairing |
152150 |
Repairing1 |
Plinth level |
-
latitude : 25.90047236
Longitude : 93.14482197
file name : Image_19092023085632879.png
|
2023-09-19 08:56:32.964187 |
121 |
68071477 |
Repairing |
152150 |
Repairing1 |
Completion of work |
-
latitude : 25.90047524
Longitude : 93.14486063
file name : Image_12062023223057062.png
|
2023-06-12 22:30:57.154034 |