1 |
32170488 |
CONSTRUCTION OF NEW ASSAM TYPE BUILDING AT 12 NO DATARA G.P PHASE II |
299906 |
Panchayat Bhawan1
|
Completed |
-
latitude : 26.39999731
Longitude : 91.50860652
file name : Image_20022020120950257.png
|
2020-02-20 12:09:50.520046 |
2 |
32170488 |
CONSTRUCTION OF NEW ASSAM TYPE BUILDING AT 12 NO DATARA G.P PHASE II |
299906 |
Panchayat Bhawan1
|
Completed |
-
latitude : 26.39999731
Longitude : 91.50860652
file name : Image_20022020120946297.png
|
2020-02-20 12:09:46.594717 |
3 |
32170470 |
CONSTRUCTION OF NEW ASSAM TYPE BUILDING AT 12 NO DATARA G.P |
299906 |
Panchayat Bhawan1
|
Completed |
-
latitude : 26.40001374
Longitude : 91.50857131
file name : Image_20022020120942820.png
|
2020-02-20 12:09:43.079378 |
4 |
43927685 |
Cons of boundary wall at kundargaon public kabarsthan |
299783 |
Cons of boundary wall at kundargaon public kabarsthan1 |
Completed |
-
latitude : 26.41600924
Longitude : 91.51231467
file name : Image_17112020122637500.png
|
2020-11-17 12:26:37.589137 |
5 |
37517371 |
Cons. of Cremation rest house at Silpotabari Smashan |
200000 |
Cons. of Cremation rest house at Silpotabari Smashan1 |
Completed |
-
latitude : 26.42696689
Longitude : 91.49671271
file name : Image_28012021002922714.png
|
2021-01-28 00:29:22.958315 |
6 |
37519847 |
Cons. of rest house irrigation near G.P office |
200000 |
Cons. of rest house irrigation near G.P office1 |
Completed |
-
latitude : 26.40007398
Longitude : 91.50854209
file name : Image_10012021230346541.png
|
2021-01-10 23:03:46.625781 |
7 |
37519847 |
Cons. of rest house irrigation near G.P office |
200000 |
Cons. of rest house irrigation near G.P office1 |
Completed |
-
latitude : 26.40007398
Longitude : 91.50854209
file name : Image_10012021230337982.png
|
2021-01-10 23:03:38.062768 |
8 |
35852071 |
Cons. of Gopal Mandir Sabhaghar at Barigaon (Ojatola suburi) |
450000 |
Cons. of Gopal Mandir Sabhaghar at Barigaon (Ojatola suburi)1 |
Completed |
-
latitude : 26.4134646
Longitude : 91.50084962
file name : Image_29092021121001352.png
|
2021-09-29 12:10:01.451313 |
9 |
37516672 |
Cons. of slab culvert near Sahjahan Ali house at Kundargaon |
90000 |
Cons. of slab culvert near Sahjahan Ali house at Kundargaon1 |
Completed |
-
latitude : 26.42388521,26.42388476
Longitude : 91.51564897,91.51564667
file name : Image_20092020100846069.png
|
2020-09-20 10:08:46.156886 |
10 |
43927645 |
Cons. of boundary wall at gopal mandir guwakuchi village |
300000 |
Cons. of boundary wall at gopal mandir guwakuchi village1 |
Completed |
-
latitude : 26.43406091
Longitude : 91.49577574
file name : Image_21112020144753761.png
|
2020-11-21 14:47:53.854752 |
11 |
37518741 |
Cons. of Slab culvert Anowar Ali house at Vill Guwakuchi |
100000 |
Cons. of Slab culvert Anowar Ali house at Vill Guwakuchi1 |
Completed |
-
latitude : 26.4295655,26.42956448
Longitude : 91.49592696,91.49592711
file name : Image_09122020135209447.png
|
2020-12-09 13:52:09.552183 |
12 |
36002652 |
Completation of floor Hatarbari Gopal mandir |
300000 |
Completation of floor Hatarbari Gopal mandir1 |
Completed |
-
latitude : 26.39689738
Longitude : 91.50854548
file name : Image_18092020143331746.png
|
2020-09-18 14:33:31.846478 |
13 |
36432766 |
Cons. of Dhurkuchi Gopal mandir Sabhaghar |
160000 |
Cons. of Dhurkuchi Gopal mandir Sabhaghar1 |
Completed |
-
latitude : 26.39732638
Longitude : 91.50513253
file name : Image_09112020151012508.png
|
2020-11-09 15:10:15.548027 |
14 |
36433321 |
Cons. of RCC slab culvert near Joynal Ali house (with Approx filling) |
85000 |
Cons. of RCC slab culvert near Joynal Ali house (with Approx filling)1 |
Completed |
-
latitude : 26.42595946,26.42589423
Longitude : 91.49071756,91.49069997
file name : Image_20102020011724863.png
|
2020-10-20 01:17:27.087707 |
15 |
43931597 |
Cons. of boundary wall at Kabarsthan barigaon village(Barbet fancing) |
275000 |
Cons. of boundary wall at Kabarsthan barigaon village(Barbet fancing)1 |
Completed |
-
latitude : 26.41309573
Longitude : 91.50578663
file name : Image_11112020135729341.png
|
2020-11-11 13:57:33.303323 |
16 |
43931606 |
Repairing of Kathora Yuvak Sangha |
230000 |
Repairing of Kathora Yuvak Sangha1 |
Completed |
-
latitude : 26.41615143
Longitude : 91.49824432
file name : Image_10012021230330754.png
|
2021-01-10 23:03:30.840552 |
17 |
43931616 |
Development of club ghar kathora jana sebak sangh |
166045 |
Development of club ghar kathora jana sebak sangh1 |
Completed |
-
latitude : 26.4169075
Longitude : 91.5004423
file name : Image_18092020141618281.png
|
2020-09-18 14:16:18.378511 |
18 |
43031448 |
Cons. of paver block road from Pasanda Kalita house to Angad Kalita house at Barigaon Village |
700000 |
Cons. of paver block road from Pasanda Kalita house to Angad Kalita house at Barigaon Village1 |
Completed |
-
latitude : 26.41418531,26.4144935
Longitude : 91.50076265,91.50074441
file name : Image_29092021115259182.png
|
2021-09-29 11:52:59.317366 |
19 |
43931581 |
Cons. of siva mandir boundary wall at amara |
275000 |
Cons. of siva mandir boundary wall at amara1 |
Completed |
-
latitude : 26.39307845
Longitude : 91.52279208
file name : Image_27072021234059074.png
|
2021-07-27 23:40:59.261481 |
20 |
43031053 |
Cons. of guard wall at Bardhanara public pond near Gopinath mandir |
300000 |
Cons. of guard wall at Bardhanara public pond near Gopinath mandir1 |
Completed |
-
latitude : 26.3974075
Longitude : 91.51594093
file name : Image_27072021002839413.png
|
2021-07-27 00:28:39.576825 |
21 |
43033803 |
Cons of Boundary wall at Narpara Kali Mandir |
162057 |
Cons of Boundary wall at Narpara Kali Mandir1 |
Completed |
-
latitude : 26.35104883
Longitude : 91.46455312
file name : Image_28012021002931997.png
|
2021-01-28 00:29:32.087834 |
22 |
43033803 |
Cons of Boundary wall at Narpara Kali Mandir |
162057 |
Cons of Boundary wall at Narpara Kali Mandir1 |
Completed |
-
latitude : 26.35104883
Longitude : 91.46455312
file name : Image_28012021002927476.png
|
2021-01-28 00:29:27.592105 |
23 |
43931558 |
Cons. of thanpatkuchi eid-gah maidan boundary wall |
275000 |
Cons. of thanpatkuchi eid-gah maidan boundary wall1 |
Completed |
-
latitude : 26.38852971
Longitude : 91.52092259
file name : Image_30092020220309076.png
|
2020-09-30 22:03:09.174546 |
24 |
43931506 |
Cons of boundary wall at dhurkuchi majarbari suburi gopal mandir |
275000 |
Cons of boundary wall at dhurkuchi majarbari suburi gopal mandir1 |
Completed |
-
latitude : 26.38741647
Longitude : 91.51074403
file name : Image_09112020151021269.png
|
2020-11-09 15:10:24.265753 |
25 |
45129990 |
sand gravel roadumesh lahkar house to siva mandir phase 1 |
175000 |
sand gravel roadumesh lahkar house to siva mandir phase 11 |
Completed |
-
latitude : 26.39089505,26.39089512
Longitude : 91.52127077,91.52127071
file name : Image_21112020144628942.png
|
2020-11-21 14:46:29.033851 |
26 |
45129964 |
sand gravel roadumesh lahkar house to siva mandir phase 1 |
175000 |
sand gravel roadumesh lahkar house to siva mandir phase 11 |
Completed |
-
latitude : 26.3909048,26.39090269
Longitude : 91.52126905,91.52127152
file name : Image_21112020144624007.png
|
2020-11-21 14:46:24.09852 |
27 |
43982060 |
Barbet fencing kuwari pukhuri kuwarikuchi |
340000 |
Barbet fencing kuwari pukhuri kuwarikuchi1 |
In Progress |
-
latitude : 26.42220097
Longitude : 91.50260276
file name : Image_11112020143317524.png
|
2020-11-11 14:33:21.475904 |
28 |
43982337 |
Cons. of bhog ghar and boundary wall ojatola suburi at barigaon |
400000 |
Cons. of bhog ghar and boundary wall ojatola suburi at barigaon1 |
Completed |
-
latitude : 26.41345676
Longitude : 91.50095955
file name : Image_29092021121122153.png
|
2021-09-29 12:11:22.256496 |
29 |
43982616 |
Sand gravel road from paresh haloi house to bharati haloi house at datara |
200000 |
Sand gravel road from paresh haloi house to bharati haloi house at datara1 |
25% |
-
latitude : 26.35092006,26.35092006
Longitude : 91.46462655,91.46462655
file name : Image_23122020131912805.png
|
2020-12-23 13:19:12.896866 |
30 |
43982764 |
Boundary wall Dhanara L.P school |
140000 |
Boundary wall Dhanara L.P school1 |
Completed |
-
latitude : 26.3980909
Longitude : 91.51337328
file name : Image_17112020133447571.png
|
2020-11-17 13:34:47.669125 |
31 |
43982141 |
Sand gravel road from Tapser Ali house to Ediris Ali house at Barigaon |
109408 |
Sand gravel road from Tapser Ali house to Ediris Ali house at Barigaon1 |
25% |
-
latitude : 26.41223729,26.41223513
Longitude : 91.5026049,91.50260482
file name : Image_27072021234103979.png
|
2021-07-27 23:41:04.09493 |
32 |
43982141 |
Sand gravel road from Tapser Ali house to Ediris Ali house at Barigaon |
109408 |
Sand gravel road from Tapser Ali house to Ediris Ali house at Barigaon1 |
25% |
-
latitude : 26.41223729,26.41223513
Longitude : 91.5026049,91.50260482
file name : Image_27072021234108459.png
|
2021-07-27 23:41:08.557339 |
33 |
43983012 |
sand gravel road from ramani bujarbaruah house to gopal mandir at dhurkuchi |
162669 |
sand gravel road from ramani bujarbaruah house to gopal mandir at dhurkuchi1 |
25% |
-
latitude : 26.39430423,26.39431228
Longitude : 91.50793111,91.50790785
file name : Image_27072021002831472.png
|
2021-07-27 00:28:31.588374 |
34 |
43982915 |
Repairing of sabhaghar kathora (udaypur suburi) gopal mandir |
331739 |
Repairing of sabhaghar kathora (udaypur suburi) gopal mandir1 |
25% |
-
latitude : 26.41626923
Longitude : 91.49810436
file name : Image_27072021002844009.png
|
2021-07-27 00:28:44.115357 |
35 |
43982867 |
Sand gravel road from lakhi haloi house to bharati haloi house at bari amara suburi |
400000 |
Sand gravel road from lakhi haloi house to bharati haloi house at bari amara suburi1 |
25% |
-
latitude : 26.3990797,26.39901995
Longitude : 91.51214567,91.51216481
file name : Image_27072021002848917.png
|
2021-07-27 00:28:49.021068 |
36 |
43982821 |
Repairing of road from sand gravel bipul mazumdar house to kailash kalita house at kathora |
200000 |
Repairing of road from sand gravel bipul mazumdar house to kailash kalita house at kathora1 |
25% |
-
latitude : 26.3511735,26.3511735
Longitude : 91.46428033,91.46428033
file name : Image_14122020133216807.png
|
2020-12-14 13:32:16.934074 |
37 |
43982671 |
Repairing of bhog ghar padum kuwari durga mandir at Bardhanara |
190000 |
Repairing of bhog ghar padum kuwari durga mandir at Bardhanara1 |
25% |
-
latitude : 26.39929996
Longitude : 91.50894353
file name : Image_09122020135228690.png
|
2020-12-09 13:52:28.795522 |
38 |
43982671 |
Repairing of bhog ghar padum kuwari durga mandir at Bardhanara |
190000 |
Repairing of bhog ghar padum kuwari durga mandir at Bardhanara1 |
25% |
-
latitude : 26.39929996
Longitude : 91.50894353
file name : Image_09122020135249125.png
|
2020-12-09 13:52:49.234279 |
39 |
43982554 |
Repairing of Gopal mandir sabhaghar at Thanpatkuchi |
140000 |
Repairing of Gopal mandir sabhaghar at Thanpatkuchi1 |
25% |
-
latitude : 26.39072308
Longitude : 91.52118213
file name : Image_27072021234054730.png
|
2021-07-27 23:40:55.015664 |
40 |
43982968 |
Cons. of paver block road from Prabhat Sarma house to tarun haloi house |
1000000 |
Cons. of paver block road from Prabhat Sarma house to tarun haloi house1 |
Completed |
-
latitude : 26.40156481,26.40156481
Longitude : 91.50943266,91.50943266
file name : Image_23122020131933980.png
|
2020-12-23 13:19:34.081245 |
41 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42569668
Longitude : 91.49855032
file name : Image_10012023151340786.png
|
2023-01-10 15:13:40.892505 |
42 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42570175
Longitude : 91.49855321
file name : Image_10012023151325264.png
|
2023-01-10 15:13:25.450455 |
43 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42570715
Longitude : 91.49855219
file name : Image_10012023151252066.png
|
2023-01-10 15:12:52.166137 |
44 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42572094
Longitude : 91.49853602
file name : Image_10012023151236175.png
|
2023-01-10 15:12:36.272841 |
45 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42572701
Longitude : 91.49853652
file name : Image_10012023151215999.png
|
2023-01-10 15:12:16.108134 |
46 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42573378
Longitude : 91.49853672
file name : Image_10012023151202315.png
|
2023-01-10 15:12:02.407333 |
47 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42565818
Longitude : 91.49858758
file name : Image_10012023151143403.png
|
2023-01-10 15:11:43.504659 |
48 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42560939
Longitude : 91.49854112
file name : Image_10012023151125413.png
|
2023-01-10 15:11:25.512103 |
49 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42567399
Longitude : 91.49855548
file name : Image_10012023151105538.png
|
2023-01-10 15:11:05.630751 |
50 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42569668
Longitude : 91.49855032
file name : Image_10012023151040096.png
|
2023-01-10 15:10:40.188987 |
51 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42570175
Longitude : 91.49855321
file name : Image_10012023151021776.png
|
2023-01-10 15:10:21.870614 |
52 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42570715
Longitude : 91.49855219
file name : Image_10012023151002334.png
|
2023-01-10 15:10:02.421537 |
53 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42572094
Longitude : 91.49853602
file name : Image_10012023150950611.png
|
2023-01-10 15:09:50.710186 |
54 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Plinth level |
-
latitude : 26.4455095
Longitude : 91.4343094
file name : Image_21072023143130014.png
|
2023-07-21 14:31:30.144495 |
55 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42558716
Longitude : 91.49846958
file name : Image_24012022122937763.png
|
2022-01-24 12:29:37.881623 |
56 |
52515964 |
Cons of latrine at silpotabari gopal mandir at guwakuchi |
497172 |
Cons of latrine at silpotabari gopal mandir at guwakuchi1 |
Completion of work |
-
latitude : 26.42557343
Longitude : 91.49846656
file name : Image_24012022141748233.png
|
2022-01-24 14:17:48.36951 |
57 |
52515295 |
High max light at Narpara bazar chowk at Narpara |
894910 |
High max light at Narpara bazar chowk at Narpara1 |
Plinth level |
-
latitude : 26.4455102
Longitude : 91.4343105
file name : Image_21072023142055943.png
|
2023-07-21 14:20:56.092979 |
58 |
52515295 |
High max light at Narpara bazar chowk at Narpara |
894910 |
High max light at Narpara bazar chowk at Narpara1 |
Completion of work |
-
latitude : 26.40754745
Longitude : 91.51079686
file name : Image_27042022151406872.png
|
2022-04-27 15:14:07.068558 |
59 |
52515295 |
High max light at Narpara bazar chowk at Narpara |
894910 |
High max light at Narpara bazar chowk at Narpara1 |
Completion of work |
-
latitude : 26.40774005
Longitude : 91.51059525
file name : Image_24012022122630673.png
|
2022-01-24 12:26:30.805304 |
60 |
86558745 |
Const. of Bangshi badak yuba Sangha & library at guwakuchi |
214345 |
Const. of Bangshi badak yuba Sangha & library at guwakuchi1 |
Completion of work |
-
latitude : 26.43424991
Longitude : 91.49412679
file name : Image_18082023153530982.png
|
2023-08-18 15:35:31.101354 |
61 |
86558610 |
Construction of Community Sanitary Complex |
248500 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.39340632
Longitude : 91.52256699
file name : Image_03082023132851102.png
|
2023-08-03 13:28:51.201516 |
62 |
86558446 |
Creation of a new source of drinking water |
248500 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 26.450273
Longitude : 91.4416995
file name : Image_19062024165849464.png
|
2024-06-19 16:58:49.558729 |
63 |
86558446 |
Creation of a new source of drinking water |
248500 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.4472507
Longitude : 91.4406801
file name : Image_19062024165348544.png
|
2024-06-19 16:53:48.656738 |
64 |
86558446 |
Creation of a new source of drinking water |
248500 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.44549656
Longitude : 91.43432858
file name : Image_30082023164121538.png
|
2023-08-30 16:41:21.634973 |
65 |
86559279 |
Const of sabhaghar at barigaon Gopal Mandir(ojatola suburi) 2nd phase |
290000 |
Const of sabhaghar at barigaon Gopal Mandir(ojatola suburi) 2nd phase1 |
Completion of work |
-
latitude : 26.41342583
Longitude : 91.50093526
file name : Image_27082023211257296.png
|
2023-08-27 21:12:57.406828 |
66 |
66516314 |
Creation of a new source of drinking water |
396900 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.40399087
Longitude : 91.50471331
file name : Image_16082023140246256.png
|
2023-08-16 14:02:46.351987 |
67 |
87762943 |
Creation of a new source of drinking water |
377100 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.447662
Longitude : 91.4405909
file name : Image_09102023134016958.png
|
2023-10-09 13:40:17.070912 |
68 |
87419509 |
Creation of a new source of drinking water |
124293 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 26.40007902,26.40009653
Longitude : 91.50860026,91.50860998
file name : Image_01012024142510558.png
|
2024-01-01 14:25:10.663283 |
69 |
87419509 |
Creation of a new source of drinking water |
124293 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.40006008,26.40006799
Longitude : 91.50859877,91.50860254
file name : Image_01012024142043119.png
|
2024-01-01 14:20:43.208409 |
70 |
87419509 |
Creation of a new source of drinking water |
124293 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.4454741,26.44545667
Longitude : 91.434287,91.43430644
file name : Image_14092023140300373.png
|
2023-09-14 14:03:00.362632 |
71 |
52515901 |
Mask and sanitation |
99435 |
Mask and sanitation1 |
Roof laid |
-
latitude : 26.40022527
Longitude : 91.50872344
file name : Image_01012024141159125.png
|
2024-01-01 14:11:59.249613 |
72 |
52515901 |
Mask and sanitation |
99435 |
Mask and sanitation1 |
Plinth level |
-
latitude : 26.4000249
Longitude : 91.50859727
file name : Image_01012024135725174.png
|
2024-01-01 13:57:25.277088 |
73 |
52515901 |
Mask and sanitation |
99435 |
Mask and sanitation1 |
Completion of work |
-
latitude : 26.40010488
Longitude : 91.50855786
file name : Image_18082021124256465.png
|
2021-08-18 12:42:56.590797 |
74 |
89478430 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.40003769
Longitude : 91.50845885
file name : Image_19062024142927095.png
|
2024-06-19 14:29:27.193878 |
75 |
89478430 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.40005989
Longitude : 91.50865708
file name : Image_19062024141618681.png
|
2024-06-19 14:16:18.769197 |
76 |
89478430 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.40019507
Longitude : 91.50860698
file name : Image_19012024134324934.png
|
2024-01-19 13:43:25.027934 |
77 |
89478386 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.40015138
Longitude : 91.508582
file name : Image_19012024134334180.png
|
2024-01-19 13:43:34.272952 |
78 |
89478163 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.41647838
Longitude : 91.49979639
file name : Image_19012024133209923.png
|
2024-01-19 13:32:10.01683 |
79 |
89477958 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.39336611
Longitude : 91.5224304
file name : Image_11012024144244377.png
|
2024-01-11 14:42:44.472011 |
80 |
89477854 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.40013925
Longitude : 91.50863282
file name : Image_19062024152018127.png
|
2024-06-19 15:20:18.076606 |
81 |
89477854 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.40011692
Longitude : 91.50863024
file name : Image_19062024150740377.png
|
2024-06-19 15:07:40.475223 |
82 |
89477854 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.40013582
Longitude : 91.50856037
file name : Image_19062024145224855.png
|
2024-06-19 14:52:25.007596 |
83 |
89477854 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.40007624
Longitude : 91.50849242
file name : Image_11012024141855325.png
|
2024-01-11 14:18:55.405801 |
84 |
89477854 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.40003279
Longitude : 91.50849181
file name : Image_11012024144022093.png
|
2024-01-11 14:40:22.179922 |
85 |
86559090 |
Const of slab culvert dhanara deodha suburi near Hangsharam kalita house |
100000 |
Const of slab culvert dhanara deodha suburi near Hangsharam kalita house1 |
Plinth level |
-
latitude : 26.4447359
Longitude : 91.4454226
file name : Image_20022024222933371.png
|
2024-02-20 22:29:33.483037 |
86 |
86559090 |
Const of slab culvert dhanara deodha suburi near Hangsharam kalita house |
100000 |
Const of slab culvert dhanara deodha suburi near Hangsharam kalita house1 |
Completion of work |
-
latitude : 26.4447377
Longitude : 91.4454262
file name : Image_20022024222716184.png
|
2024-02-20 22:27:16.305448 |
87 |
86559090 |
Const of slab culvert dhanara deodha suburi near Hangsharam kalita house |
100000 |
Const of slab culvert dhanara deodha suburi near Hangsharam kalita house1 |
Completion of work |
-
latitude : 26.4447359
Longitude : 91.4454213
file name : Image_20022024222254856.png
|
2024-02-20 22:22:55.011635 |
88 |
86559090 |
Const of slab culvert dhanara deodha suburi near Hangsharam kalita house |
100000 |
Const of slab culvert dhanara deodha suburi near Hangsharam kalita house1 |
Completion of work |
-
latitude : 26.4447373
Longitude : 91.4454266
file name : Image_20022024221841183.png
|
2024-02-20 22:18:41.285952 |
89 |
86559090 |
Const of slab culvert dhanara deodha suburi near Hangsharam kalita house |
100000 |
Const of slab culvert dhanara deodha suburi near Hangsharam kalita house1 |
Completion of work |
-
latitude : 26.39635483
Longitude : 91.51193603
file name : Image_03082023135212202.png
|
2023-08-03 13:52:12.317941 |
90 |
86558640 |
Creation of a new source of drinking water |
248500 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.4447476
Longitude : 91.4454534
file name : Image_20022024221106287.png
|
2024-02-20 22:11:06.42297 |
91 |
86558640 |
Creation of a new source of drinking water |
248500 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.39745433
Longitude : 91.51540688
file name : Image_03082023131226875.png
|
2023-08-03 13:12:26.984155 |
92 |
86559361 |
Const of sabhaghar at kuwarkuchi Gopal mandir 2nd phase |
250000 |
Const of sabhaghar at kuwarkuchi Gopal mandir 2nd phase1 |
Plinth level |
-
latitude : 26.4446663
Longitude : 91.4455195
file name : Image_20022024223522794.png
|
2024-02-20 22:35:22.909356 |
93 |
86559361 |
Const of sabhaghar at kuwarkuchi Gopal mandir 2nd phase |
250000 |
Const of sabhaghar at kuwarkuchi Gopal mandir 2nd phase1 |
Completion of work |
-
latitude : 26.41944699
Longitude : 91.50832964
file name : Image_30082023135315770.png
|
2023-08-30 13:53:15.860223 |
94 |
52515939 |
Water supply system at 12 No Datara GP compound |
497173 |
Water supply system at 12 No Datara GP compound1 |
Plinth level |
-
latitude : 26.4454645
Longitude : 91.4342502
file name : Image_07092023140742521.png
|
2023-09-07 14:07:42.620207 |
95 |
52515939 |
Water supply system at 12 No Datara GP compound |
497173 |
Water supply system at 12 No Datara GP compound1 |
Completion of work |
-
latitude : 26.40003093
Longitude : 91.50876468
file name : Image_27042022151344851.png
|
2022-04-27 15:13:45.03141 |
96 |
52515939 |
Water supply system at 12 No Datara GP compound |
497173 |
Water supply system at 12 No Datara GP compound1 |
Completion of work |
-
latitude : 26.39995004
Longitude : 91.50864874
file name : Image_24012022122650443.png
|
2022-01-24 12:26:50.557443 |
97 |
66516539 |
REPAIRING AT KATHORA SUB CENTRE |
209200 |
REPAIRING AT KATHORA SUB CENTRE1 |
Plinth level |
-
latitude : 26.4475497
Longitude : 91.4407122
file name : Image_20022024182120023.png
|
2024-02-20 18:21:20.129577 |
98 |
66516539 |
REPAIRING AT KATHORA SUB CENTRE |
209200 |
REPAIRING AT KATHORA SUB CENTRE1 |
Completion of work |
-
latitude : 26.41632137
Longitude : 91.50305695
file name : Image_03082023124034298.png
|
2023-08-03 12:40:34.398649 |
99 |
66516378 |
Operation & maintenance of drinking water supply system |
396900 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 26.444737
Longitude : 91.4454256
file name : Image_20022024215739446.png
|
2024-02-20 21:57:39.657926 |
100 |
66516378 |
Operation & maintenance of drinking water supply system |
396900 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 26.4475276
Longitude : 91.440675
file name : Image_20022024183417033.png
|
2024-02-20 18:34:17.148967 |
101 |
66516378 |
Operation & maintenance of drinking water supply system |
396900 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 26.41710135
Longitude : 91.51121203
file name : Image_11012023175853794.png
|
2023-01-11 17:58:53.973554 |
102 |
89477902 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.40003644
Longitude : 91.50846945
file name : Image_19062024142914450.png
|
2024-06-19 14:29:14.540358 |
103 |
89477902 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.40013824
Longitude : 91.50862149
file name : Image_19062024141005377.png
|
2024-06-19 14:10:05.457735 |
104 |
89477902 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.40010949
Longitude : 91.50864151
file name : Image_19012024134348388.png
|
2024-01-19 13:43:48.482314 |
105 |
89478014 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.40002274
Longitude : 91.50847371
file name : Image_19062024143100516.png
|
2024-06-19 14:31:00.605459 |
106 |
89478014 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.40003568
Longitude : 91.50855404
file name : Image_19062024141834085.png
|
2024-06-19 14:18:34.182841 |
107 |
89478014 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.39674645
Longitude : 91.50842021
file name : Image_11012024152325545.png
|
2024-01-11 15:23:25.634295 |
108 |
89478092 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.4481289
Longitude : 91.4402976
file name : Image_04072024195109856.png
|
2024-07-04 19:51:09.967672 |
109 |
89478092 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.39336247
Longitude : 91.52241436
file name : Image_11012024144238764.png
|
2024-01-11 14:42:38.85572 |
110 |
89478243 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.4450893
Longitude : 91.4460514
file name : Image_30062024140713469.png
|
2024-06-30 14:07:13.552051 |
111 |
89478243 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.4449319
Longitude : 91.4459525
file name : Image_30062024140344401.png
|
2024-06-30 14:03:44.484114 |
112 |
89478243 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.41189502
Longitude : 91.50395799
file name : Image_11012024153336471.png
|
2024-01-11 15:33:36.562473 |
113 |
89478334 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.40002722
Longitude : 91.50846738
file name : Image_19062024143008220.png
|
2024-06-19 14:30:08.326479 |
114 |
89478334 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.40010633
Longitude : 91.50864746
file name : Image_19062024141754239.png
|
2024-06-19 14:17:54.329861 |
115 |
89478334 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.40014172
Longitude : 91.50861914
file name : Image_19012024134341775.png
|
2024-01-19 13:43:41.863792 |
116 |
66516597 |
CONS OF BOUNDARY WALL AT DATARA 213 NO LP SCHOOL |
200000 |
CONS OF BOUNDARY WALL AT DATARA 213 NO LP SCHOOL1 |
Roof laid |
-
latitude : 26.40225036
Longitude : 91.50945733
file name : Image_19062024164013495.png
|
2024-06-19 16:40:13.589384 |
117 |
66516597 |
CONS OF BOUNDARY WALL AT DATARA 213 NO LP SCHOOL |
200000 |
CONS OF BOUNDARY WALL AT DATARA 213 NO LP SCHOOL1 |
Plinth level |
-
latitude : 26.40012152
Longitude : 91.50862006
file name : Image_19062024153337535.png
|
2024-06-19 15:33:37.637401 |
118 |
66516597 |
CONS OF BOUNDARY WALL AT DATARA 213 NO LP SCHOOL |
200000 |
CONS OF BOUNDARY WALL AT DATARA 213 NO LP SCHOOL1 |
Completion of work |
-
latitude : 26.40237152
Longitude : 91.50943938
file name : Image_03082023150253628.png
|
2023-08-03 15:02:53.783355 |
119 |
86558976 |
Const of slab culvert near bijan deka house at kundargaon |
140000 |
Const of slab culvert near bijan deka house at kundargaon1 |
Roof laid |
-
latitude : 26.447567
Longitude : 91.4408225
file name : Image_19062024172447246.png
|
2024-06-19 17:24:47.35649 |
120 |
86558976 |
Const of slab culvert near bijan deka house at kundargaon |
140000 |
Const of slab culvert near bijan deka house at kundargaon1 |
Plinth level |
-
latitude : 26.4474163
Longitude : 91.4405615
file name : Image_19062024172102213.png
|
2024-06-19 17:21:02.319075 |
121 |
86558976 |
Const of slab culvert near bijan deka house at kundargaon |
140000 |
Const of slab culvert near bijan deka house at kundargaon1 |
Completion of work |
-
latitude : 26.4195028
Longitude : 91.51049765
file name : Image_30082023161108621.png
|
2023-08-30 16:11:08.714707 |
122 |
66516636 |
CONS OF FENCING WALL AT THANPATKUCHI GOPAL MANDIR |
120000 |
CONS OF FENCING WALL AT THANPATKUCHI GOPAL MANDIR1 |
Roof laid |
-
latitude : 26.40016593
Longitude : 91.50858484
file name : Image_28062024132924289.png
|
2024-06-28 13:29:24.367755 |
123 |
66516636 |
CONS OF FENCING WALL AT THANPATKUCHI GOPAL MANDIR |
120000 |
CONS OF FENCING WALL AT THANPATKUCHI GOPAL MANDIR1 |
Plinth level |
-
latitude : 26.40014017
Longitude : 91.50862974
file name : Image_28062024131840462.png
|
2024-06-28 13:18:40.548783 |
124 |
66516636 |
CONS OF FENCING WALL AT THANPATKUCHI GOPAL MANDIR |
120000 |
CONS OF FENCING WALL AT THANPATKUCHI GOPAL MANDIR1 |
Completion of work |
-
latitude : 26.39094353
Longitude : 91.52126685
file name : Image_12092023123506067.png
|
2023-09-12 12:35:06.172143 |
125 |
86558503 |
Construction of toilets in public institutions |
248500 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 26.40012802
Longitude : 91.50858947
file name : Image_01072024124737639.png
|
2024-07-01 12:47:37.782864 |
126 |
86558503 |
Construction of toilets in public institutions |
248500 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.40010492
Longitude : 91.50860414
file name : Image_01072024124350556.png
|
2024-07-01 12:43:50.845306 |
127 |
86558503 |
Construction of toilets in public institutions |
248500 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 26.4001645
Longitude : 91.50869922
file name : Image_01072024123934643.png
|
2024-07-01 12:39:34.775209 |
128 |
86558503 |
Construction of toilets in public institutions |
248500 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.40399338
Longitude : 91.50448752
file name : Image_03082023150636726.png
|
2023-08-03 15:06:36.854963 |