1 |
38648088 |
CONSTRUCTION OF BOUNDARY WALL INFRONT OF ADITYA NARAYAN L.P SCHOOL |
150000 |
CONSTRUCTION OF BOUNDARY WALL INFRONT OF ADITYA NARAYAN L.P SCHOOL1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_16112020151806153.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_16112020151806153.png)
latitude : 26.38201172
Longitude : 91.29909252
file name : Image_16112020151806153.png
|
2020-11-16 15:18:12.40316 |
2 |
10773804 |
Const of Mini Water Supply Project at Kheluwa LP and ME School Campus |
104800 |
Const of Mini Water Supply Project at Kheluwa LP and ME School Campus1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_21112020125604963.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_21112020125604963.png)
latitude : 26.38432537,26.38431287
Longitude : 91.25676791,91.25675843
file name : Image_21112020125604963.png
|
2020-11-21 12:56:05.091185 |
3 |
10774597 |
Const of Brick Drain Along the PWD road at Ghilazari |
285000 |
Const of Brick Drain Along the PWD road at Ghilazari1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_21112020123231404.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_21112020123231404.png)
latitude : 26.37852435,26.37850949
Longitude : 91.28762005,91.28767974
file name : Image_21112020123231404.png
|
2020-11-21 12:32:31.522249 |
4 |
10774859 |
Const of Urinal at Helacha Mandal Para Chowk |
59600 |
Const of Urinal at Helacha Mandal Para Chowk1 |
25% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_21112020131319686.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_21112020131319686.png)
latitude : 26.36469551
Longitude : 91.26271039
file name : Image_21112020131319686.png
|
2020-11-21 13:13:19.811178 |
5 |
38648054 |
CONSTRUCTION OF SLAB CULVERT NEAR SACHIN RAJBONGSHI SHOP TO NAUSHAD ALI LAND |
222000 |
CONSTRUCTION OF SLAB CULVERT NEAR SACHIN RAJBONGSHI SHOP TO NAUSHAD ALI LAND1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020133019577.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020133019577.png)
latitude : 26.38851155,26.38851267
Longitude : 91.27198786,91.27198688
file name : Image_05102020133019577.png
|
2020-10-05 13:30:19.693505 |
6 |
38647302 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA |
400000 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020115222846.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020115222846.png)
latitude : 26.3832084
Longitude : 91.2673067
file name : Image_17122020115222846.png
|
2020-12-17 11:52:22.99022 |
7 |
38647302 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA |
400000 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA2 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020120842387.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020120842387.png)
latitude : 26.38432578
Longitude : 91.2653512
file name : Image_17122020120842387.png
|
2020-12-17 12:08:42.51137 |
8 |
38647302 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA |
400000 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA3 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020120845791.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020120845791.png)
latitude : 26.38501435
Longitude : 91.25247747
file name : Image_17122020120845791.png
|
2020-12-17 12:08:45.912732 |
9 |
38647302 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA |
400000 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA3 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020120848982.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020120848982.png)
latitude : 26.38501908
Longitude : 91.25253218
file name : Image_17122020120848982.png
|
2020-12-17 12:08:49.102062 |
10 |
38647302 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA |
400000 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA3 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020120852158.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020120852158.png)
latitude : 26.38501435
Longitude : 91.25247747
file name : Image_17122020120852158.png
|
2020-12-17 12:08:52.280315 |
11 |
38647302 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA |
400000 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA3 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020120855818.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020120855818.png)
latitude : 26.38501908
Longitude : 91.25253218
file name : Image_17122020120855818.png
|
2020-12-17 12:08:55.938802 |
12 |
38647302 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA |
400000 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA4 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020123624169.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020123624169.png)
latitude : 26.37411123
Longitude : 91.25773331
file name : Image_17122020123624169.png
|
2020-12-17 12:36:24.305977 |
13 |
38647302 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA |
400000 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA5 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020124755704.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020124755704.png)
latitude : 26.36881212
Longitude : 91.25700468
file name : Image_17122020124755704.png
|
2020-12-17 12:47:55.853403 |
14 |
38647302 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA |
400000 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA6 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020125040034.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020125040034.png)
latitude : 26.36543193
Longitude : 91.25471681
file name : Image_17122020125040034.png
|
2020-12-17 12:50:40.186317 |
15 |
38647302 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA |
400000 |
INSTALLATION OF 50 NOS HTW COMMUNITY PLACE AT 23 NO GP AREA7 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020133644715.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_17122020133644715.png)
latitude : 26.36549363
Longitude : 91.25476816
file name : Image_17122020133644715.png
|
2020-12-17 13:36:44.844632 |
16 |
38648016 |
CONSTRUCTION OF BOUNDARY WALL (SOUTH SIDE) AT 309 NO L.P SCHOOL |
200000 |
CONSTRUCTION OF BOUNDARY WALL (SOUTH SIDE) AT 309 NO L.P SCHOOL1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020135741689.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020135741689.png)
latitude : 26.38415374
Longitude : 91.25651933
file name : Image_05102020135741689.png
|
2020-10-05 13:57:41.805536 |
17 |
38647979 |
CONSTRUCTION OF COMMUNITY HALL NEAR NAPARA SHIVA MANDIR |
300000 |
CONSTRUCTION OF COMMUNITY HALL NEAR NAPARA SHIVA MANDIR 1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_25092020121516690.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_25092020121516690.png)
latitude : 26.38530921
Longitude : 91.24953389
file name : Image_25092020121516690.png
|
2020-09-25 12:15:16.806431 |
18 |
38647979 |
CONSTRUCTION OF COMMUNITY HALL NEAR NAPARA SHIVA MANDIR |
300000 |
CONSTRUCTION OF COMMUNITY HALL NEAR NAPARA SHIVA MANDIR 1 |
25% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020134410947.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020134410947.png)
latitude : 26.38527129
Longitude : 91.24955081
file name : Image_24092020134410947.png
|
2020-09-24 13:44:11.0651 |
19 |
38647380 |
CONSTRUCTION OF SLAB CULVERT FROM SATISH BHARALI CHOWK TO BUNDA DAS LAND |
180000 |
CONSTRUCTION OF SLAB CULVERT FROM SATISH BHARALI CHOWK TO BUNDA DAS LAND1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020150043685.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020150043685.png)
latitude : 26.37460394,26.37460876
Longitude : 91.30766695,91.30766342
file name : Image_05102020150043685.png
|
2020-10-05 15:00:43.789835 |
20 |
38647347 |
CONSTRUCTION OF SLAB CULVERT AT SUNIL DAS LAND TO NATUN KHELUA L.P SCHOOL |
180000 |
CONSTRUCTION OF SLAB CULVERT AT SUNIL DAS LAND TO NATUN KHELUA L.P SCHOOL1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020134311068.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020134311068.png)
latitude : 26.38528084,26.3852766
Longitude : 91.27024159,91.27024143
file name : Image_05102020134311068.png
|
2020-10-05 13:43:11.17476 |
21 |
38647508 |
REPAIRING ROAD WITH SAND GRAVEL NEAR SOLMARA RAJAHUA GOPINATH MANDIR TO SADAGAR DAS LAND |
219801 |
REPAIRING ROAD WITH SAND GRAVEL NEAR SOLMARA RAJAHUA GOPINATH MANDIR TO SADAGAR DAS LAND1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020131548282.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020131548282.png)
latitude : 26.37861761,26.37861613
Longitude : 91.29028393,91.2902835
file name : Image_05102020131548282.png
|
2020-10-05 13:15:48.372777 |
22 |
38647508 |
REPAIRING ROAD WITH SAND GRAVEL NEAR SOLMARA RAJAHUA GOPINATH MANDIR TO SADAGAR DAS LAND |
219801 |
REPAIRING ROAD WITH SAND GRAVEL NEAR SOLMARA RAJAHUA GOPINATH MANDIR TO SADAGAR DAS LAND1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_01102020114602670.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_01102020114602670.png)
latitude : 26.37859252,26.37860018
Longitude : 91.29036271,91.29036821
file name : Image_01102020114602670.png
|
2020-10-01 11:46:02.778937 |
23 |
38647508 |
REPAIRING ROAD WITH SAND GRAVEL NEAR SOLMARA RAJAHUA GOPINATH MANDIR TO SADAGAR DAS LAND |
219801 |
REPAIRING ROAD WITH SAND GRAVEL NEAR SOLMARA RAJAHUA GOPINATH MANDIR TO SADAGAR DAS LAND1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_01102020114925709.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_01102020114925709.png)
latitude : 26.37861941,26.37861264
Longitude : 91.29037803,91.29037981
file name : Image_01102020114925709.png
|
2020-10-01 11:49:25.825771 |
24 |
38647508 |
REPAIRING ROAD WITH SAND GRAVEL NEAR SOLMARA RAJAHUA GOPINATH MANDIR TO SADAGAR DAS LAND |
219801 |
REPAIRING ROAD WITH SAND GRAVEL NEAR SOLMARA RAJAHUA GOPINATH MANDIR TO SADAGAR DAS LAND1 |
25% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020133240628.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020133240628.png)
latitude : 26.37849071,26.37849816
Longitude : 91.29032646,91.29033022
file name : Image_24092020133240628.png
|
2020-09-24 13:32:40.753379 |
25 |
38647415 |
SAND GRAVEL FILLING NEAR P.H.E TO UTSAV DEKA LAND |
250000 |
SAND GRAVEL FILLING NEAR P.H.E TO UTSAV DEKA LAND1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020142047434.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020142047434.png)
latitude : 26.36879357,26.3688068
Longitude : 91.25700959,91.25700177
file name : Image_05102020142047434.png
|
2020-10-05 14:20:47.533387 |
26 |
38647415 |
SAND GRAVEL FILLING NEAR P.H.E TO UTSAV DEKA LAND |
250000 |
SAND GRAVEL FILLING NEAR P.H.E TO UTSAV DEKA LAND1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_01102020114722552.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_01102020114722552.png)
latitude : 26.36880949,26.36880949
Longitude : 91.25704512,91.25704512
file name : Image_01102020114722552.png
|
2020-10-01 11:47:22.663538 |
27 |
38647415 |
SAND GRAVEL FILLING NEAR P.H.E TO UTSAV DEKA LAND |
250000 |
SAND GRAVEL FILLING NEAR P.H.E TO UTSAV DEKA LAND1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_01102020114936173.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_01102020114936173.png)
latitude : 26.36880949,26.36880949
Longitude : 91.25704512,91.25704512
file name : Image_01102020114936173.png
|
2020-10-01 11:49:36.287142 |
28 |
38647415 |
SAND GRAVEL FILLING NEAR P.H.E TO UTSAV DEKA LAND |
250000 |
SAND GRAVEL FILLING NEAR P.H.E TO UTSAV DEKA LAND1 |
25% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020135350450.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020135350450.png)
latitude : 26.36880029,26.36879689
Longitude : 91.2570046,91.25699352
file name : Image_24092020135350450.png
|
2020-09-24 13:53:50.564002 |
29 |
38647445 |
SAND GRAVEL FILLING ROAD NEAR BARBILA RAJAHUA NAMGHAR TO BAINALI DAS LAND |
150000 |
SAND GRAVEL FILLING ROAD NEAR BARBILA RAJAHUA NAMGHAR TO BAINALI DAS LAND1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020140617212.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020140617212.png)
latitude : 26.38525537,26.38526889
Longitude : 91.2483371,91.24831073
file name : Image_05102020140617212.png
|
2020-10-05 14:06:17.313846 |
30 |
38647445 |
SAND GRAVEL FILLING ROAD NEAR BARBILA RAJAHUA NAMGHAR TO BAINALI DAS LAND |
150000 |
SAND GRAVEL FILLING ROAD NEAR BARBILA RAJAHUA NAMGHAR TO BAINALI DAS LAND1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_01102020114550025.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_01102020114550025.png)
latitude : 26.38527813,26.38527813
Longitude : 91.24830593,91.24830593
file name : Image_01102020114550025.png
|
2020-10-01 11:45:50.132279 |
31 |
38647445 |
SAND GRAVEL FILLING ROAD NEAR BARBILA RAJAHUA NAMGHAR TO BAINALI DAS LAND |
150000 |
SAND GRAVEL FILLING ROAD NEAR BARBILA RAJAHUA NAMGHAR TO BAINALI DAS LAND1 |
25% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020134551959.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020134551959.png)
latitude : 26.38527576,26.3852587
Longitude : 91.24827579,91.24828149
file name : Image_24092020134551959.png
|
2020-09-24 13:45:52.061719 |
32 |
44116810 |
CONST OF COMMUNITY HALL AT NEAR HARIDEV SATRA KAIHATI |
200000 |
CONST OF COMMUNITY HALL AT NEAR HARIDEV SATRA KAIHATI1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_09072021131001370.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_09072021131001370.png)
latitude : 26.37639112
Longitude : 91.31125046
file name : Image_09072021131001370.png
|
2021-07-09 13:10:01.4273 |
33 |
43938582 |
Const of Community hall (incomplete portion) near Dhantola Bishnu Mandir |
200000 |
Const of Community hall (incomplete portion) near Dhantola Bishnu Mandir1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_09072021160238540.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_09072021160238540.png)
latitude : 26.3889252
Longitude : 91.30198571
file name : Image_09072021160238540.png
|
2021-07-09 16:02:38.603166 |
34 |
38645625 |
CONSTRUCTION OF CC BLOCK PAVEMENT YARD AT SOLMARA BAZAR |
651600 |
CONSTRUCTION OF CC BLOCK PAVEMENT YARD AT SOLMARA BAZAR1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2016/Image_01102020114718119.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2016/Image_01102020114718119.png)
latitude : 26.37874885,26.37873159
Longitude : 91.2964018,91.29638717
file name : Image_01102020114718119.png
|
2020-10-01 11:47:18.22854 |
35 |
38645625 |
CONSTRUCTION OF CC BLOCK PAVEMENT YARD AT SOLMARA BAZAR |
651600 |
CONSTRUCTION OF CC BLOCK PAVEMENT YARD AT SOLMARA BAZAR1 |
25% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2016/Image_24092020140724335.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2016/Image_24092020140724335.png)
latitude : 26.3783157,26.3783157
Longitude : 91.2960134,91.2960134
file name : Image_24092020140724335.png
|
2020-09-24 14:07:24.451002 |
36 |
10774792 |
Const of Mini Water Supply Project at Natun Kheluwa Mahzid Campus |
104800 |
Const of Mini Water Supply Project at Natun Kheluwa Mahzid Campus1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_21112020124222559.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_21112020124222559.png)
latitude : 26.38588729
Longitude : 91.27066721
file name : Image_21112020124222559.png
|
2020-11-21 12:42:22.681683 |
37 |
10774732 |
Const of CC Block Pavement road from Barbila Main road to Kanak Das house |
183900 |
Const of CC Block Pavement road from Barbila Main road to Kanak Das house1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_21112020130108749.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2015/Image_21112020130108749.png)
latitude : 26.3850963,26.3850927
Longitude : 91.24929772,91.2493001
file name : Image_21112020130108749.png
|
2020-11-21 13:01:08.864826 |
38 |
38647480 |
SAND GRAVEL FILLING ROAD NEAR NABA SARMA HOUSE TO SOLMARA PAKHURA P.W.D ROAD |
120000 |
SAND GRAVEL FILLING ROAD NEAR NABA SARMA HOUSE TO SOLMARA PAKHURA P.W.D ROAD1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020130838704.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020130838704.png)
latitude : 26.38086326,26.38086322
Longitude : 91.29385543,91.29385615
file name : Image_05102020130838704.png
|
2020-10-05 13:08:38.796244 |
39 |
38647480 |
SAND GRAVEL FILLING ROAD NEAR NABA SARMA HOUSE TO SOLMARA PAKHURA P.W.D ROAD |
120000 |
SAND GRAVEL FILLING ROAD NEAR NABA SARMA HOUSE TO SOLMARA PAKHURA P.W.D ROAD1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_01102020114654240.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_01102020114654240.png)
latitude : 26.38117041,26.38117041
Longitude : 91.29344202,91.29344202
file name : Image_01102020114654240.png
|
2020-10-01 11:46:54.355818 |
40 |
38647480 |
SAND GRAVEL FILLING ROAD NEAR NABA SARMA HOUSE TO SOLMARA PAKHURA P.W.D ROAD |
120000 |
SAND GRAVEL FILLING ROAD NEAR NABA SARMA HOUSE TO SOLMARA PAKHURA P.W.D ROAD1 |
25% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020132802292.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_24092020132802292.png)
latitude : 26.38106003,26.38107105
Longitude : 91.29363848,91.29365085
file name : Image_24092020132802292.png
|
2020-09-24 13:28:02.388059 |
41 |
38648205 |
CONSTRUCTION OF HELACHA RAJAHUA MANCHA (PHASE - I) |
182000 |
CONSTRUCTION OF HELACHA RAJAHUA MANCHA (PHASE - I)1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_09072021133530010.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_09072021133530010.png)
latitude : 26.37001482
Longitude : 91.25863879
file name : Image_09072021133530010.png
|
2021-07-09 13:35:30.102504 |
42 |
38648205 |
CONSTRUCTION OF HELACHA RAJAHUA MANCHA (PHASE - I) |
182000 |
CONSTRUCTION OF HELACHA RAJAHUA MANCHA (PHASE - I)1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020141749514.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2017/Image_05102020141749514.png)
latitude : 26.37002915
Longitude : 91.25865805
file name : Image_05102020141749514.png
|
2020-10-05 14:17:49.621228 |
43 |
38648714 |
CONSTRUCTION COMMUNITY HALL NEAR 2 NO SUKEKUCHI MASZID |
200000 |
CONSTRUCTION COMMUNITY HALL NEAR 2 NO SUKEKUCHI MASZID1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_16112020152513800.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_16112020152513800.png)
latitude : 26.38990204
Longitude : 91.29477195
file name : Image_16112020152513800.png
|
2020-11-16 15:25:20.078188 |
44 |
38648906 |
CONSTRUCTION OF GATE INFRONT OF SOLMARA BAZAR LAKSHMI MANDIR |
500000 |
CONSTRUCTION OF GATE INFRONT OF SOLMARA BAZAR LAKSHMI MANDIR1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_09072021120754200.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_09072021120754200.png)
latitude : 26.37870818
Longitude : 91.29690744
file name : Image_09072021120754200.png
|
2021-07-09 12:07:54.264685 |
45 |
38648638 |
CONTRUCTION OF BOUNDARY WALL NEAR NATUN KHELUA KALI MANDIR CAMPUS |
230000 |
CONTRUCTION OF BOUNDARY WALL NEAR NATUN KHELUA KALI MANDIR CAMPUS1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_05102020135147215.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_05102020135147215.png)
latitude : 26.3835845
Longitude : 91.26659016
file name : Image_05102020135147215.png
|
2020-10-05 13:51:47.364471 |
46 |
38648833 |
CONSTRUCTION OF LATRINE AND URINAL NEAR BARO GOPAL THAN |
260000 |
CONSTRUCTION OF LATRINE AND URINAL NEAR BARO GOPAL THAN1 |
25% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_09072021165527151.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_09072021165527151.png)
latitude : 26.3857045
Longitude : 91.28725254
file name : Image_09072021165527151.png
|
2021-07-09 16:55:27.245477 |
47 |
43938630 |
Const of Slab culvert on the rd from Ajit das land to kulen das land at Ghilazari |
180000 |
Const of Slab culvert on the rd from Ajit das land to kulen das land at Ghilazari1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_16112020153815548.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_16112020153815548.png)
latitude : 26.37932786,26.37929606
Longitude : 91.28743588,91.28752714
file name : Image_16112020153815548.png
|
2020-11-16 15:38:21.807359 |
48 |
43938511 |
Const of Boundary wall near Uttar Ghilazari Gopal than |
200000 |
Const of Boundary wall near Uttar Ghilazari Gopal than1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_10112020133458861.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_10112020133458861.png)
latitude : 26.39134658
Longitude : 91.27661316
file name : Image_10112020133458861.png
|
2020-11-10 13:35:02.363939 |
49 |
43938464 |
Const of Bycycle stand near Barbila M.E.School campus |
150000 |
Const of Bycycle stand near Barbila M.E.School campus1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_09072021135227123.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_09072021135227123.png)
latitude : 26.38599431
Longitude : 91.24952165
file name : Image_09072021135227123.png
|
2021-07-09 13:52:27.207482 |
50 |
43938395 |
Const of Community hall Near Bar kaihati Gopal than |
150000 |
Const of Community hall Near Bar kaihati Gopal than1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_09072021131009736.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_09072021131009736.png)
latitude : 26.37284935
Longitude : 91.30035147
file name : Image_09072021131009736.png
|
2021-07-09 13:10:09.796328 |
51 |
43937966 |
Const of Latrine with urinal near Natun Kheluwa Kali Mandir Campus |
160000 |
Const of Latrine with urinal near Natun Kheluwa Kali Mandir Campus1 |
25% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_16112020154955478.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_16112020154955478.png)
latitude : 26.38324564
Longitude : 91.26639628
file name : Image_16112020154955478.png
|
2020-11-16 15:50:01.751735 |
52 |
43937913 |
Const of Boundary wall Near Kheluwa Gopal Than |
180000 |
Const of Boundary wall Near Kheluwa Gopal Than1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_16112020160036155.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2018/Image_16112020160036155.png)
latitude : 26.38876282
Longitude : 91.25679911
file name : Image_16112020160036155.png
|
2020-11-16 16:00:42.433856 |
53 |
44985614 |
CONST. OF WAITING SHEET AT BARBILA PUBLIC SMACHAN |
249000 |
CONST. OF WAITING SHEET AT BARBILA PUBLIC SMACHAN1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021141452162.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021141452162.png)
latitude : 26.38895635
Longitude : 91.24473103
file name : Image_09072021141452162.png
|
2021-07-09 14:14:52.22149 |
54 |
44985487 |
REPEARINGROAD WITH SAND GRAVELNEAR JANARPAR TO PANCHAYAT TNK AT KHELUWA |
195362 |
REPEARINGROAD WITH SAND GRAVELNEAR JANARPAR TO PANCHAYAT TNK AT KHELUWA1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021142257441.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021142257441.png)
latitude : 26.38390447,26.38388016
Longitude : 91.26615611,91.26616196
file name : Image_09072021142257441.png
|
2021-07-09 14:22:57.504382 |
55 |
44985543 |
CONST. OF PUCCA FLOOR PALASARTAL MANDIR AT KAIHATI |
200000 |
CONST. OF PUCCA FLOOR PALASARTAL MANDIR AT KAIHATI1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021123203735.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021123203735.png)
latitude : 26.37807866
Longitude : 91.31086327
file name : Image_09072021123203735.png
|
2021-07-09 12:32:03.816094 |
56 |
44988998 |
CONST. OF GATE INFRONT OF SOLMARA BAZAR LAKSHI MANDIR |
500000 |
CONST. OF GATE INFRONT OF SOLMARA BAZAR LAKSHI MANDIR1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021120613155.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021120613155.png)
latitude : 26.37872885
Longitude : 91.29694356
file name : Image_09072021120613155.png
|
2021-07-09 12:06:13.221002 |
57 |
44985572 |
CONST. OF SLAB CULVERT ON THE ROAD FROM KARUNA BHARALI TO KUMUD GOSWAMI HOUSE AT KAIHATI |
180000 |
CONST. OF SLAB CULVERT ON THE ROAD FROM KARUNA BHARALI TO KUMUD GOSWAMI HOUSE AT KAIHATI1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021131005628.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021131005628.png)
latitude : 26.37509956,26.37510259
Longitude : 91.30862675,91.30862293
file name : Image_09072021131005628.png
|
2021-07-09 13:10:05.685445 |
58 |
44985588 |
REPEARING ROADS WITH SAND GRAVEL FROM BHABIT DEKA HOUSE TO JITEN DEKA HOUE AT HELACHA |
150000 |
REPEARING ROADS WITH SAND GRAVEL FROM BHABIT DEKA HOUSE TO JITEN DEKA HOUE AT HELACHA1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021134131894.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021134131894.png)
latitude : 26.37391935,26.37393788
Longitude : 91.25741356,91.2574253
file name : Image_09072021134131894.png
|
2021-07-09 13:41:31.974336 |
59 |
44985623 |
CONST. OF BOUNDARY WALL AT 1 NO. SUKEKUCHI MASZID |
200000 |
CONST. OF BOUNDARY WALL AT 1 NO. SUKEKUCHI MASZID1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021160726522.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021160726522.png)
latitude : 26.387123
Longitude : 91.30357002
file name : Image_09072021160726522.png
|
2021-07-09 16:07:26.588831 |
60 |
44985644 |
RENNOVATION OF COMMUNITTY HALLNEAR GOPINATH MANDIR AT GHILAZARI |
310000 |
RENNOVATION OF COMMUNITTY HALLNEAR GOPINATH MANDIR AT GHILAZARI1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021170016711.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021170016711.png)
latitude : 26.37863249
Longitude : 91.29003681
file name : Image_09072021170016711.png
|
2021-07-09 17:00:16.786537 |
61 |
44985664 |
CONST. OF WEAVING CENTER NEAR 23 NO. GP OFFICE CAMPUS |
999926 |
CONST. OF WEAVING CENTER NEAR 23 NO. GP OFFICE CAMPUS1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021171112850.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021171112850.png)
latitude : 26.3777664
Longitude : 91.29557943
file name : Image_09072021171112850.png
|
2021-07-09 17:11:12.912852 |
62 |
44985682 |
CONST. OF BOUNDARY WALL AROUND THE DAMODAR MANDIR KHELUWA |
300000 |
CONST. OF BOUNDARY WALL AROUND THE DAMODAR MANDIR KHELUWA1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021141816089.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021141816089.png)
latitude : 26.379953
Longitude : 91.2790231
file name : Image_09072021141816089.png
|
2021-07-09 14:18:16.150313 |
63 |
44985748 |
CONST. OFGAATE IN FRONT OF BARGOPAL TAHN AT GHILAZARI |
300000 |
CONST. OFGAATE IN FRONT OF BARGOPAL TAHN AT GHILAZARI1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021165531988.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021165531988.png)
latitude : 26.38114335
Longitude : 91.29330459
file name : Image_09072021165531988.png
|
2021-07-09 16:55:32.076528 |
64 |
44983082 |
CONST .OF GATE IN FRONT OF 309 NO. LP SCHOOL AT KHELUWA |
200000 |
CONST .OF GATE IN FRONT OF 309 NO. LP SCHOOL AT KHELUWA1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021141455528.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021141455528.png)
latitude : 26.38429404
Longitude : 91.25639245
file name : Image_09072021141455528.png
|
2021-07-09 14:14:55.588771 |
65 |
44985602 |
REPEARING ROADWITH SAND GRAVAL HELACHA P.W.D TO UTPAL TLUKDAR |
150000 |
REPEARING ROADWITH SAND GRAVAL HELACHA P.W.D TO UTPAL TLUKDAR1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021133513284.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021133513284.png)
latitude : 26.36920546,26.36920085
Longitude : 91.26065825,91.26064142
file name : Image_09072021133513284.png
|
2021-07-09 13:35:13.360191 |
66 |
44985735 |
CONST. OF MOKTAB GHAR NEAR NATUN KHELUWA MASZID CAMPUS |
220000 |
CONST. OF MOKTAB GHAR NEAR NATUN KHELUWA MASZID CAMPUS1 |
50% |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021151327823.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021151327823.png)
latitude : 26.38578144
Longitude : 91.27044105
file name : Image_09072021151327823.png
|
2021-07-09 15:13:27.931324 |
67 |
44985759 |
CONST. OF ROAD FROM SOLMARA PWD TO SOLMARA PUBLIC SMACHAN ATGHILAZARI |
300000 |
CONST. OF ROAD FROM SOLMARA PWD TO SOLMARA PUBLIC SMACHAN ATGHILAZARI1 |
Completed |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021170429746.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2019/Image_09072021170429746.png)
latitude : 26.38036044,26.38035521
Longitude : 91.2765683,91.27657521
file name : Image_09072021170429746.png
|
2021-07-09 17:04:29.800153 |
68 |
65777938 |
Operation & maintenance of drinking water supply system |
396000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_10012023121828768.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_10012023121828768.png)
latitude : 26.378445000000003
Longitude : 91.29762000000001
file name : Image_10012023121828768.png
|
2023-01-10 12:18:28.919983 |
69 |
64759282 |
Creation of drainage channel for management of grey water |
467000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25042023121034900.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25042023121034900.png)
latitude : 26.378518333333332
Longitude : 91.296515
file name : Image_25042023121034900.png
|
2023-04-25 12:10:35.054672 |
70 |
64759282 |
Creation of drainage channel for management of grey water |
467000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_10022023133526941.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_10022023133526941.png)
latitude : 26.378331666666668
Longitude : 91.296675
file name : Image_10022023133526941.png
|
2023-02-10 13:35:27.054512 |
71 |
52114384 |
REPAIRING ROAD WITH SAND GRAVEL FROM MADHAB DEKA HOUSE TO BHAGABAN DEKA HOUSE AT HELACHA |
125000 |
REPAIRING ROAD WITH SAND GRAVEL FROM MADHAB DEKA HOUSE TO BHAGABAN DEKA HOUSE AT HELACHA1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_20122021133958733.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_20122021133958733.png)
latitude : 26.37628739,26.37628893
Longitude : 91.25771007,91.25771207
file name : Image_20122021133958733.png
|
2021-12-20 13:39:58.839284 |
72 |
52114384 |
REPAIRING ROAD WITH SAND GRAVEL FROM MADHAB DEKA HOUSE TO BHAGABAN DEKA HOUSE AT HELACHA |
125000 |
REPAIRING ROAD WITH SAND GRAVEL FROM MADHAB DEKA HOUSE TO BHAGABAN DEKA HOUSE AT HELACHA1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_24022022140023278.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_24022022140023278.png)
latitude : 26.3762672,26.37626253
Longitude : 91.25766031,91.25766476
file name : Image_24022022140023278.png
|
2022-02-24 14:00:23.374233 |
73 |
52114112 |
CONSTRUCTION OF ROAD FROM AJIT DAS HOUSE TO PORIKSHIT DAS HOUSE AT GHILAJARI |
231079 |
CONSTRUCTION OF ROAD FROM AJIT DAS HOUSE TO PORIKSHIT DAS HOUSE AT GHILAJARI1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_30112021155159610.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_30112021155159610.png)
latitude : 26.37967418,26.37967404
Longitude : 91.28869064,91.28869045
file name : Image_30112021155159610.png
|
2021-11-30 15:51:59.735162 |
74 |
52114112 |
CONSTRUCTION OF ROAD FROM AJIT DAS HOUSE TO PORIKSHIT DAS HOUSE AT GHILAJARI |
231079 |
CONSTRUCTION OF ROAD FROM AJIT DAS HOUSE TO PORIKSHIT DAS HOUSE AT GHILAJARI1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21022022151744121.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21022022151744121.png)
latitude : 26.37969788,26.37970138
Longitude : 91.28864553,91.28864468
file name : Image_21022022151744121.png
|
2022-02-21 15:17:44.218925 |
75 |
52114112 |
CONSTRUCTION OF ROAD FROM AJIT DAS HOUSE TO PORIKSHIT DAS HOUSE AT GHILAJARI |
231079 |
CONSTRUCTION OF ROAD FROM AJIT DAS HOUSE TO PORIKSHIT DAS HOUSE AT GHILAJARI1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21022022151804622.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21022022151804622.png)
latitude : 26.37969788,26.37970138
Longitude : 91.28864553,91.28864468
file name : Image_21022022151804622.png
|
2022-02-21 15:18:04.724975 |
76 |
52113660 |
CONSTRUCTION OF MINI WATER SUPPLY PROJECT AT NATUN KHELUA KALIMANDIR CAMPUS |
104532 |
CONSTRUCTION OF MINI WATER SUPPLY PROJECT AT NATUN KHELUA KALIMANDIR CAMPUS1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_24012022135353451.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_24012022135353451.png)
latitude : 26.38317657
Longitude : 91.26645122
file name : Image_24012022135353451.png
|
2022-01-24 13:53:53.581299 |
77 |
52113660 |
CONSTRUCTION OF MINI WATER SUPPLY PROJECT AT NATUN KHELUA KALIMANDIR CAMPUS |
104532 |
CONSTRUCTION OF MINI WATER SUPPLY PROJECT AT NATUN KHELUA KALIMANDIR CAMPUS1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_08042022144846572.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_08042022144846572.png)
latitude : 26.38323938
Longitude : 91.26647743
file name : Image_08042022144846572.png
|
2022-04-08 14:48:46.702947 |
78 |
52114540 |
REPAIRING ROAD WITH SAND GRAVEL FROM SATISH BHARALI SHOP TO BUNDO DAS HOUSE AT KAIHATI |
135000 |
REPAIRING ROAD WITH SAND GRAVEL FROM SATISH BHARALI SHOP TO BUNDO DAS HOUSE AT KAIHATI1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_03122021123838199.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_03122021123838199.png)
latitude : 26.37445816,26.37446192
Longitude : 91.3071759,91.30716561
file name : Image_03122021123838199.png
|
2021-12-03 12:38:38.328486 |
79 |
52114540 |
REPAIRING ROAD WITH SAND GRAVEL FROM SATISH BHARALI SHOP TO BUNDO DAS HOUSE AT KAIHATI |
135000 |
REPAIRING ROAD WITH SAND GRAVEL FROM SATISH BHARALI SHOP TO BUNDO DAS HOUSE AT KAIHATI1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_24022022161030651.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_24022022161030651.png)
latitude : 26.37414515,26.37414083
Longitude : 91.3071847,91.30718747
file name : Image_24022022161030651.png
|
2022-02-24 16:10:30.752067 |
80 |
52114540 |
REPAIRING ROAD WITH SAND GRAVEL FROM SATISH BHARALI SHOP TO BUNDO DAS HOUSE AT KAIHATI |
135000 |
REPAIRING ROAD WITH SAND GRAVEL FROM SATISH BHARALI SHOP TO BUNDO DAS HOUSE AT KAIHATI1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25042022130825652.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25042022130825652.png)
latitude : 26.37417728,26.37417035
Longitude : 91.3071316,91.30712967
file name : Image_25042022130825652.png
|
2022-04-25 13:08:25.813774 |
81 |
52113230 |
CONST OF MINI WATER SUPPLY PROJECT SOLMARA MEDICALE CAMPUS |
250000 |
CONST OF MINI WATER SUPPLY PROJECT SOLMARA MEDICALE CAMPUS1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_11012022170300847.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_11012022170300847.png)
latitude : 26.37895325
Longitude : 91.29716696
file name : Image_11012022170300847.png
|
2022-01-11 17:03:00.953856 |
82 |
52113230 |
CONST OF MINI WATER SUPPLY PROJECT SOLMARA MEDICALE CAMPUS |
250000 |
CONST OF MINI WATER SUPPLY PROJECT SOLMARA MEDICALE CAMPUS1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_22022022121737661.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_22022022121737661.png)
latitude : 26.3789499
Longitude : 91.29711875
file name : Image_22022022121737661.png
|
2022-02-22 12:17:37.777298 |
83 |
52112990 |
CONST OF LATRIEN WITH URINAL AT GP OFFICE CAMPUS |
400000 |
CONST OF LATRIEN WITH URINAL AT GP OFFICE CAMPUS1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_23122021113230046.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_23122021113230046.png)
latitude : 26.3776949
Longitude : 91.29575982
file name : Image_23122021113230046.png
|
2021-12-23 11:32:30.183232 |
84 |
52112990 |
CONST OF LATRIEN WITH URINAL AT GP OFFICE CAMPUS |
400000 |
CONST OF LATRIEN WITH URINAL AT GP OFFICE CAMPUS1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21022022144411994.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21022022144411994.png)
latitude : 26.37770999
Longitude : 91.29578266
file name : Image_21022022144411994.png
|
2022-02-21 14:44:12.120755 |
85 |
52113904 |
CONSTRUCTION OF ROAD WITH SAND GRAVEL FROM ACHIR ALI HOUSE TO RACHID BIBI HOUSE AT SUKEKUSHI |
150000 |
CONSTRUCTION OF ROAD WITH SAND GRAVEL FROM ACHIR ALI HOUSE TO RACHID BIBI HOUSE AT SUKEKUSHI1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_30112021134202935.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_30112021134202935.png)
latitude : 26.38913136,26.38912854
Longitude : 91.29353817,91.29354299
file name : Image_30112021134202935.png
|
2021-11-30 13:42:03.040494 |
86 |
52113904 |
CONSTRUCTION OF ROAD WITH SAND GRAVEL FROM ACHIR ALI HOUSE TO RACHID BIBI HOUSE AT SUKEKUSHI |
150000 |
CONSTRUCTION OF ROAD WITH SAND GRAVEL FROM ACHIR ALI HOUSE TO RACHID BIBI HOUSE AT SUKEKUSHI1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21022022151751326.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21022022151751326.png)
latitude : 26.3892608,26.38926166
Longitude : 91.29346511,91.2934645
file name : Image_21022022151751326.png
|
2022-02-21 15:17:51.421921 |
87 |
52113904 |
CONSTRUCTION OF ROAD WITH SAND GRAVEL FROM ACHIR ALI HOUSE TO RACHID BIBI HOUSE AT SUKEKUSHI |
150000 |
CONSTRUCTION OF ROAD WITH SAND GRAVEL FROM ACHIR ALI HOUSE TO RACHID BIBI HOUSE AT SUKEKUSHI1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21022022151839364.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21022022151839364.png)
latitude : 26.3892608,26.38926166
Longitude : 91.29346511,91.2934645
file name : Image_21022022151839364.png
|
2022-02-21 15:18:39.462319 |
88 |
52113904 |
CONSTRUCTION OF ROAD WITH SAND GRAVEL FROM ACHIR ALI HOUSE TO RACHID BIBI HOUSE AT SUKEKUSHI |
150000 |
CONSTRUCTION OF ROAD WITH SAND GRAVEL FROM ACHIR ALI HOUSE TO RACHID BIBI HOUSE AT SUKEKUSHI1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_04072022134314543.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_04072022134314543.png)
latitude : 26.38917142,26.38917085
Longitude : 91.2935135,91.2935142
file name : Image_04072022134314543.png
|
2022-07-04 13:43:14.667236 |
89 |
52114248 |
CONSTRUCTION OF PROTECTION WALL NEAR GOPINATH MANDIR FISHERY AT GHILAJARI |
200000 |
CONSTRUCTION OF PROTECTION WALL NEAR GOPINATH MANDIR FISHERY AT GHILAJARI1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_07122021145016913.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_07122021145016913.png)
latitude : 26.37881906
Longitude : 91.29037926
file name : Image_07122021145016913.png
|
2021-12-07 14:50:17.020797 |
90 |
52114248 |
CONSTRUCTION OF PROTECTION WALL NEAR GOPINATH MANDIR FISHERY AT GHILAJARI |
200000 |
CONSTRUCTION OF PROTECTION WALL NEAR GOPINATH MANDIR FISHERY AT GHILAJARI1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21022022151731481.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21022022151731481.png)
latitude : 26.37882521
Longitude : 91.29035231
file name : Image_21022022151731481.png
|
2022-02-21 15:17:31.574734 |
91 |
52114248 |
CONSTRUCTION OF PROTECTION WALL NEAR GOPINATH MANDIR FISHERY AT GHILAJARI |
200000 |
CONSTRUCTION OF PROTECTION WALL NEAR GOPINATH MANDIR FISHERY AT GHILAJARI1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25042022130818248.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25042022130818248.png)
latitude : 26.37872366
Longitude : 91.29032517
file name : Image_25042022130818248.png
|
2022-04-25 13:08:18.416959 |
92 |
64759094 |
REPAIRING OF 100 NO SOLMARA ANGANWADI CENTRE GHILAZARI VILLAGE |
180000 |
REPAIRING OF 100 NO SOLMARA ANGANWADI CENTRE GHILAZARI VILLAGE1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_06022023123729000.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_06022023123729000.png)
latitude : 26.378753333333332
Longitude : 91.29307833333333
file name : Image_06022023123729000.png
|
2023-02-06 12:37:29.103055 |
93 |
64759094 |
REPAIRING OF 100 NO SOLMARA ANGANWADI CENTRE GHILAZARI VILLAGE |
180000 |
REPAIRING OF 100 NO SOLMARA ANGANWADI CENTRE GHILAZARI VILLAGE1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_17032023140440368.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_17032023140440368.png)
latitude : 26.378758333333334
Longitude : 91.29304166666667
file name : Image_17032023140440368.png
|
2023-03-17 14:04:40.476082 |
94 |
64759094 |
REPAIRING OF 100 NO SOLMARA ANGANWADI CENTRE GHILAZARI VILLAGE |
180000 |
REPAIRING OF 100 NO SOLMARA ANGANWADI CENTRE GHILAZARI VILLAGE1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_15122022122359166.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_15122022122359166.png)
latitude : 26.378836666666665
Longitude : 91.29303
file name : Image_15122022122359166.png
|
2022-12-15 12:23:59.2595 |
95 |
52113508 |
CONSTRUCTION PUBLIC LATRINE NEAR SARUKAIHATI HAREDEV SATRA UNDER SBM SCHEME |
90000 |
CONSTRUCTION PUBLIC LATRINE NEAR SARUKAIHATI HAREDEV SATRA UNDER SBM SCHEME1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21072023135608109.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21072023135608109.png)
latitude : 26.377723333333332
Longitude : 91.295705
file name : Image_21072023135608109.png
|
2023-07-21 13:56:08.196401 |
96 |
52113508 |
CONSTRUCTION PUBLIC LATRINE NEAR SARUKAIHATI HAREDEV SATRA UNDER SBM SCHEME |
90000 |
CONSTRUCTION PUBLIC LATRINE NEAR SARUKAIHATI HAREDEV SATRA UNDER SBM SCHEME1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21072023135038549.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21072023135038549.png)
latitude : 26.37770833333333
Longitude : 91.29571833333333
file name : Image_21072023135038549.png
|
2023-07-21 13:50:38.650944 |
97 |
52113508 |
CONSTRUCTION PUBLIC LATRINE NEAR SARUKAIHATI HAREDEV SATRA UNDER SBM SCHEME |
90000 |
CONSTRUCTION PUBLIC LATRINE NEAR SARUKAIHATI HAREDEV SATRA UNDER SBM SCHEME1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_23032023155157861.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_23032023155157861.png)
latitude : 26.376375
Longitude : 91.31139166666665
file name : Image_23032023155157861.png
|
2023-03-23 15:51:57.935937 |
98 |
51516402 |
CONST OF PUBLIC LATRINE NR DAMODAR MANDIR CAMPUS AT KHELUWA |
90000 |
CONST OF PUBLIC LATRINE NR DAMODAR MANDIR CAMPUS AT KHELUWA 1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21072023140921621.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21072023140921621.png)
latitude : 26.377778333333335
Longitude : 91.29570666666665
file name : Image_21072023140921621.png
|
2023-07-21 14:09:21.76126 |
99 |
51516402 |
CONST OF PUBLIC LATRINE NR DAMODAR MANDIR CAMPUS AT KHELUWA |
90000 |
CONST OF PUBLIC LATRINE NR DAMODAR MANDIR CAMPUS AT KHELUWA 1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21072023140607712.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_21072023140607712.png)
latitude : 26.3778
Longitude : 91.295635
file name : Image_21072023140607712.png
|
2023-07-21 14:06:07.821346 |
100 |
51516402 |
CONST OF PUBLIC LATRINE NR DAMODAR MANDIR CAMPUS AT KHELUWA |
90000 |
CONST OF PUBLIC LATRINE NR DAMODAR MANDIR CAMPUS AT KHELUWA 1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_23032023133825443.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_23032023133825443.png)
latitude : 26.38195166666667
Longitude : 91.25728499999998
file name : Image_23032023133825443.png
|
2023-03-23 13:38:25.649994 |
101 |
65777663 |
Construction of toilets in public institutions |
175050 |
Construction of toilets in public institutions1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_08092023135117670.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_08092023135117670.png)
latitude : 26.36546
Longitude : 91.25425333333332
file name : Image_08092023135117670.png
|
2023-09-08 13:51:17.783743 |
102 |
65777663 |
Construction of toilets in public institutions |
175050 |
Construction of toilets in public institutions1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_23032023132526548.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_23032023132526548.png)
latitude : 26.365388333333332
Longitude : 91.25434833333333
file name : Image_23032023132526548.png
|
2023-03-23 13:25:26.689281 |
103 |
65777663 |
Construction of toilets in public institutions |
175050 |
Construction of toilets in public institutions1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_26122022155758182.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_26122022155758182.png)
latitude : 26.36547666666667
Longitude : 91.25425166666668
file name : Image_26122022155758182.png
|
2022-12-26 15:57:58.305966 |
104 |
65117441 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE |
93500 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_30012023142442116.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_30012023142442116.png)
latitude : 26.377763333333338
Longitude : 91.29574499999998
file name : Image_30012023142442116.png
|
2023-01-30 14:24:42.217458 |
105 |
65117441 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE |
93500 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_10022023165055291.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_10022023165055291.png)
latitude : 26.377819999999996
Longitude : 91.29569666666666
file name : Image_10022023165055291.png
|
2023-02-10 16:50:55.39482 |
106 |
65117441 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE |
93500 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_22032023124635440.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_22032023124635440.png)
latitude : 26.377845
Longitude : 91.29559833333333
file name : Image_22032023124635440.png
|
2023-03-22 12:46:35.542636 |
107 |
83211472 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023150402788.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023150402788.png)
latitude : 26.385181666666668
Longitude : 91.24642
file name : Image_17082023150402788.png
|
2023-08-17 15:04:02.908349 |
108 |
83211114 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023144044008.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023144044008.png)
latitude : 26.370631666666668
Longitude : 91.258435
file name : Image_17082023144044008.png
|
2023-08-17 14:40:44.106446 |
109 |
83351807 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023143149827.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023143149827.png)
latitude : 26.369503333333334
Longitude : 91.25765666666666
file name : Image_17082023143149827.png
|
2023-08-17 14:31:49.920292 |
110 |
83210854 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023155955084.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023155955084.png)
latitude : 26.377251666666666
Longitude : 91.30668333333332
file name : Image_17082023155955084.png
|
2023-08-17 15:59:55.282202 |
111 |
83210244 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023155102293.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023155102293.png)
latitude : 26.376591666666666
Longitude : 91.31139
file name : Image_17082023155102293.png
|
2023-08-17 15:51:02.39622 |
112 |
83209799 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023145357960.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023145357960.png)
latitude : 26.38506
Longitude : 91.25385999999999
file name : Image_17082023145357960.png
|
2023-08-17 14:53:58.053667 |
113 |
86971518 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_18082023163000964.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_18082023163000964.png)
latitude : 26.37933333333334
Longitude : 91.29030833333333
file name : Image_18082023163000964.png
|
2023-08-18 16:30:01.059862 |
114 |
83212536 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023160204559.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023160204559.png)
latitude : 26.37824333333333
Longitude : 91.29566166666667
file name : Image_17082023160204559.png
|
2023-08-17 16:02:04.657405 |
115 |
83212536 |
Creation of Shed for segregation and processing of wet and dry waste |
52500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023160109302.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023160109302.png)
latitude : 26.378236666666666
Longitude : 91.29566166666667
file name : Image_17082023160109302.png
|
2023-08-17 16:01:09.597301 |
116 |
83212159 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023152853828.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023152853828.png)
latitude : 26.378441666666664
Longitude : 91.28751333333334
file name : Image_17082023152853828.png
|
2023-08-17 15:28:53.933276 |
117 |
83350862 |
Creation of Shed for segregation and processing of wet and dry waste |
9750 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023151537647.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_17082023151537647.png)
latitude : 26.383233333333337
Longitude : 91.26629833333332
file name : Image_17082023151537647.png
|
2023-08-17 15:15:37.83245 |
118 |
65778579 |
REPAIRING OF 99 NO ANGANAWADI CENTRE AT KAIHATI |
180000 |
REPAIRING OF 99 NO ANGANAWADI CENTRE AT KAIHATI1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_08092023121012048.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_08092023121012048.png)
latitude : 26.377536666666668
Longitude : 91.30708000000001
file name : Image_08092023121012048.png
|
2023-09-08 12:10:12.162439 |
119 |
65778579 |
REPAIRING OF 99 NO ANGANAWADI CENTRE AT KAIHATI |
180000 |
REPAIRING OF 99 NO ANGANAWADI CENTRE AT KAIHATI1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_28012023111722747.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_28012023111722747.png)
latitude : 26.37753
Longitude : 91.30696000000002
file name : Image_28012023111722747.png
|
2023-01-28 11:17:22.822775 |
120 |
65778579 |
REPAIRING OF 99 NO ANGANAWADI CENTRE AT KAIHATI |
180000 |
REPAIRING OF 99 NO ANGANAWADI CENTRE AT KAIHATI1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_06042023151429718.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_06042023151429718.png)
latitude : 26.377473333333334
Longitude : 91.30692833333333
file name : Image_06042023151429718.png
|
2023-04-06 15:14:29.814597 |
121 |
83199282 |
Installation of 10 Nos stree Light in 2 Nos Amrit sarovar work site under @3 No GP |
300000 |
Installation of 10 Nos stree Light in 2 Nos Amrit sarovar work site under @3 No GP1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_14092023150030410.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_14092023150030410.png)
latitude : 26.385249999999996
Longitude : 91.24636666666666
file name : Image_14092023150030410.png
|
2023-09-14 15:00:30.500998 |
122 |
83199658 |
Const. of GP Office Building at Solamara ( Incomplete portion) |
212050 |
Const. of GP Office Building at Solamara ( Incomplete portion)1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_14092023154101578.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_14092023154101578.png)
latitude : 26.377793333333337
Longitude : 91.29560666666666
file name : Image_14092023154101578.png
|
2023-09-14 15:41:01.76206 |
123 |
83201180 |
Repeairing road from Ananta Baishya house to Helacha Barbila PWD road at Kheluwa |
150000 |
Repeairing road from Ananta Baishya house to Helacha Barbila PWD road at Kheluwa1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_04012024113943701.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_04012024113943701.png)
latitude : 26.377741666666665,26.377756666666663
Longitude : 91.29560166666667,91.29561166666666
file name : Image_04012024113943701.png
|
2024-01-04 11:39:43.801315 |
124 |
83201180 |
Repeairing road from Ananta Baishya house to Helacha Barbila PWD road at Kheluwa |
150000 |
Repeairing road from Ananta Baishya house to Helacha Barbila PWD road at Kheluwa1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_27102023154818377.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_27102023154818377.png)
latitude : 26.380858333333336,26.380808333333334
Longitude : 91.256705,91.25662333333334
file name : Image_27102023154818377.png
|
2023-10-27 15:48:18.505951 |
125 |
83201180 |
Repeairing road from Ananta Baishya house to Helacha Barbila PWD road at Kheluwa |
150000 |
Repeairing road from Ananta Baishya house to Helacha Barbila PWD road at Kheluwa1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_14092023142526324.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_14092023142526324.png)
latitude : 26.380816666666668,26.380781666666667
Longitude : 91.25659833333333,91.25663333333333
file name : Image_14092023142526324.png
|
2023-09-14 14:25:26.465173 |
126 |
83207514 |
Operation & maintenance of drinking water supply system |
384275 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_23092023135024550.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_23092023135024550.png)
latitude : 26.377678333333332
Longitude : 91.29562
file name : Image_23092023135024550.png
|
2023-09-23 13:50:24.64329 |
127 |
65778532 |
CONST OF IRON POST FOR VOLLEYBALL AT HELACHA HIGH SCHOOL |
25000 |
CONST OF IRON POST FOR VOLLEYBALL AT HELACHA HIGH SCHOOL1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29092023133920999.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_29092023133920999.png)
latitude : 26.368981666666667
Longitude : 91.25706666666669
file name : Image_29092023133920999.png
|
2023-09-29 13:39:29.422055 |
128 |
65778532 |
CONST OF IRON POST FOR VOLLEYBALL AT HELACHA HIGH SCHOOL |
25000 |
CONST OF IRON POST FOR VOLLEYBALL AT HELACHA HIGH SCHOOL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_31122022121321552.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_31122022121321552.png)
latitude : 26.36894333333333
Longitude : 91.25709333333334
file name : Image_31122022121321552.png
|
2022-12-31 12:13:21.661603 |
129 |
65777629 |
Construction of toilets in public institutions |
175050 |
Construction of toilets in public institutions1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_04012024125910883.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_04012024125910883.png)
latitude : 26.377771666666664
Longitude : 91.29560666666666
file name : Image_04012024125910883.png
|
2024-01-04 12:59:11.007067 |
130 |
65777629 |
Construction of toilets in public institutions |
175050 |
Construction of toilets in public institutions1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_27102023141853252.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_27102023141853252.png)
latitude : 26.385773333333336
Longitude : 91.24988166666665
file name : Image_27102023141853252.png
|
2023-10-27 14:18:53.345213 |
131 |
65777629 |
Construction of toilets in public institutions |
175050 |
Construction of toilets in public institutions1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_25052023152955255.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_25052023152955255.png)
latitude : 26.385173333333334
Longitude : 91.24601499999999
file name : Image_25052023152955255.png
|
2023-05-25 15:29:55.36415 |
132 |
65778295 |
RENOVATION OF EXISTING GP OFFICE BUILDING AT SOLMARA PHASE-1 |
497700 |
RENOVATION OF EXISTING GP OFFICE BUILDING AT SOLMARA PHASE-11 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03012024161344837.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03012024161344837.png)
latitude : 26.377828333333333
Longitude : 91.29555166666665
file name : Image_03012024161344837.png
|
2024-01-03 16:13:44.975204 |
133 |
65778295 |
RENOVATION OF EXISTING GP OFFICE BUILDING AT SOLMARA PHASE-1 |
497700 |
RENOVATION OF EXISTING GP OFFICE BUILDING AT SOLMARA PHASE-11 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_27072023113721481.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_27072023113721481.png)
latitude : 26.377776666666666
Longitude : 91.29560166666667
file name : Image_27072023113721481.png
|
2023-07-27 11:37:21.613209 |
134 |
65778295 |
RENOVATION OF EXISTING GP OFFICE BUILDING AT SOLMARA PHASE-1 |
497700 |
RENOVATION OF EXISTING GP OFFICE BUILDING AT SOLMARA PHASE-11 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_12012023111032432.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_12012023111032432.png)
latitude : 26.377823333333335
Longitude : 91.29570833333334
file name : Image_12012023111032432.png
|
2023-01-12 11:10:32.555097 |
135 |
65777546 |
Construction of Community Sanitary Complex |
145400 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_08092023124728758.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_08092023124728758.png)
latitude : 26.397779999999997
Longitude : 91.26630500000002
file name : Image_08092023124728758.png
|
2023-09-08 12:47:28.858494 |
136 |
65777546 |
Construction of Community Sanitary Complex |
145400 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_23032023123412239.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_23032023123412239.png)
latitude : 26.397724999999998
Longitude : 91.26630166666668
file name : Image_23032023123412239.png
|
2023-03-23 12:34:12.372302 |
137 |
65777546 |
Construction of Community Sanitary Complex |
145400 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_26122022163613937.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_26122022163613937.png)
latitude : 26.39776
Longitude : 91.26630500000002
file name : Image_26122022163613937.png
|
2022-12-26 16:36:14.04551 |
138 |
64759191 |
RENOVATION OF EXISTING GP OFFICE BUILDING AT SOLMARA PH II |
481500 |
RENOVATION OF EXISTING GP OFFICE BUILDING AT SOLMARA PH II1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_27072023115128389.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_27072023115128389.png)
latitude : 26.37777
Longitude : 91.29556333333333
file name : Image_27072023115128389.png
|
2023-07-27 11:51:28.573976 |
139 |
64759191 |
RENOVATION OF EXISTING GP OFFICE BUILDING AT SOLMARA PH II |
481500 |
RENOVATION OF EXISTING GP OFFICE BUILDING AT SOLMARA PH II1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_06042023130222980.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_06042023130222980.png)
latitude : 26.377821666666666
Longitude : 91.29561166666666
file name : Image_06042023130222980.png
|
2023-04-06 13:02:23.114222 |
140 |
64759191 |
RENOVATION OF EXISTING GP OFFICE BUILDING AT SOLMARA PH II |
481500 |
RENOVATION OF EXISTING GP OFFICE BUILDING AT SOLMARA PH II1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_12012023111151665.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_12012023111151665.png)
latitude : 26.37778166666667
Longitude : 91.29568166666668
file name : Image_12012023111151665.png
|
2023-01-12 11:11:51.782686 |
141 |
64759191 |
RENOVATION OF EXISTING GP OFFICE BUILDING AT SOLMARA PH II |
481500 |
RENOVATION OF EXISTING GP OFFICE BUILDING AT SOLMARA PH II1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_19122022140846681.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_19122022140846681.png)
latitude : 26.37779666666667
Longitude : 91.29577833333333
file name : Image_19122022140846681.png
|
2022-12-19 14:08:46.776103 |
142 |
64759305 |
Water Supply to villages |
467000 |
Water Supply to villages1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_06042023140513932.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_06042023140513932.png)
latitude : 26.384936666666665
Longitude : 91.25295499999999
file name : Image_06042023140513932.png
|
2023-04-06 14:05:14.032479 |
143 |
64759305 |
Water Supply to villages |
467000 |
Water Supply to villages1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25042023150708305.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_25042023150708305.png)
latitude : 26.384946666666664
Longitude : 91.252965
file name : Image_25042023150708305.png
|
2023-04-25 15:07:08.402238 |
144 |
64759305 |
Water Supply to villages |
467000 |
Water Supply to villages1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09022023122710621.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_09022023122710621.png)
latitude : 26.385136666666668
Longitude : 91.25283833333333
file name : Image_09022023122710621.png
|
2023-02-09 12:27:10.728428 |
145 |
52109297 |
covid 19 expenses |
93455 |
covid 19 expenses1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_10102021164819443.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_10102021164819443.png)
latitude : 26.37635729
Longitude : 91.28933247
file name : Image_10102021164819443.png
|
2021-10-10 16:48:19.527354 |
146 |
65777880 |
Operation & maintenance of drinking water supply system |
82900 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03012024160028301.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03012024160028301.png)
latitude : 26.37767666666667
Longitude : 91.29552
file name : Image_03012024160028301.png
|
2024-01-03 16:00:28.414865 |
147 |
65777880 |
Operation & maintenance of drinking water supply system |
82900 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03012024154820147.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03012024154820147.png)
latitude : 26.37764666666667
Longitude : 91.29558666666665
file name : Image_03012024154820147.png
|
2024-01-03 15:48:20.231094 |
148 |
65777880 |
Operation & maintenance of drinking water supply system |
82900 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_28092023141555323.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_28092023141555323.png)
latitude : 26.377656666666667
Longitude : 91.29549166666666
file name : Image_28092023141555323.png
|
2023-09-28 14:15:55.409053 |
149 |
65777911 |
Operation & maintenance of drinking water supply system |
78800 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03012024160749031.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03012024160749031.png)
latitude : 26.377698333333335
Longitude : 91.29545666666667
file name : Image_03012024160749031.png
|
2024-01-03 16:07:49.145596 |
150 |
65777911 |
Operation & maintenance of drinking water supply system |
78800 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03012024160511753.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_03012024160511753.png)
latitude : 26.377591666666664
Longitude : 91.29549666666665
file name : Image_03012024160511753.png
|
2024-01-03 16:05:11.860769 |
151 |
65777911 |
Operation & maintenance of drinking water supply system |
78800 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_28092023141447429.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_28092023141447429.png)
latitude : 26.377718333333338
Longitude : 91.29556166666667
file name : Image_28092023141447429.png
|
2023-09-28 14:14:47.524429 |
152 |
65777498 |
Construction of Community Sanitary Complex |
209200 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_10022023162029710.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_10022023162029710.png)
latitude : 26.37948833333333
Longitude : 91.29450999999999
file name : Image_10022023162029710.png
|
2023-02-10 16:20:29.804055 |
153 |
65777498 |
Construction of Community Sanitary Complex |
209200 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_17032023145759087.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_17032023145759087.png)
latitude : 26.379503333333332
Longitude : 91.29451666666667
file name : Image_17032023145759087.png
|
2023-03-17 14:57:59.181099 |
154 |
65777498 |
Construction of Community Sanitary Complex |
209200 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_11012023152812498.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_11012023152812498.png)
latitude : 26.379503333333332
Longitude : 91.29449166666667
file name : Image_11012023152812498.png
|
2023-01-11 15:28:12.588896 |
155 |
65777584 |
Creation of drainage channel for management of grey water |
354600 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_25042023141815520.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_25042023141815520.png)
latitude : 26.380483333333338,26.38051666666667
Longitude : 91.29476500000001,91.29474166666665
file name : Image_25042023141815520.png
|
2023-04-25 14:18:15.62614 |
156 |
65777584 |
Creation of drainage channel for management of grey water |
354600 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_12072023152606072.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_12072023152606072.png)
latitude : 26.38045833333333,26.38047333333333
Longitude : 91.29467666666666,91.29466499999998
file name : Image_12072023152606072.png
|
2023-07-12 15:26:06.167967 |
157 |
65777584 |
Creation of drainage channel for management of grey water |
354600 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_22122022143301613.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_22122022143301613.png)
latitude : 26.380238333333335,26.380246666666668
Longitude : 91.29499333333334,91.29499833333333
file name : Image_22122022143301613.png
|
2022-12-22 14:33:01.77927 |
158 |
65778612 |
CONST OF PUCCA FLOOR AT 1 NO SUKEKUCHI LP SCHOOL |
267500 |
CONST OF PUCCA FLOOR AT 1 NO SUKEKUCHI LP SCHOOL1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_10022023164013060.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_10022023164013060.png)
latitude : 26.386368333333333
Longitude : 91.30242500000001
file name : Image_10022023164013060.png
|
2023-02-10 16:40:13.166899 |
159 |
65778612 |
CONST OF PUCCA FLOOR AT 1 NO SUKEKUCHI LP SCHOOL |
267500 |
CONST OF PUCCA FLOOR AT 1 NO SUKEKUCHI LP SCHOOL1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_17032023120456016.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_17032023120456016.png)
latitude : 26.38616833333333
Longitude : 91.302465
file name : Image_17032023120456016.png
|
2023-03-17 12:04:56.368195 |
160 |
65778612 |
CONST OF PUCCA FLOOR AT 1 NO SUKEKUCHI LP SCHOOL |
267500 |
CONST OF PUCCA FLOOR AT 1 NO SUKEKUCHI LP SCHOOL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_22122022140553448.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2021/Image_22122022140553448.png)
latitude : 26.386235000000003
Longitude : 91.30243
file name : Image_22122022140553448.png
|
2022-12-22 14:05:53.598689 |
161 |
88867330 |
Repairing road with sand gravel from Solmara Pakhura PWD road to near Sukekuchi PHE Office |
184934 |
Repairing road with sand gravel from Solmara Pakhura PWD road to near Sukekuchi PHE Office 1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_12032024114148049.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_12032024114148049.png)
latitude : 26.381238333333332,26.381208333333333
Longitude : 91.29326166666667,91.293265
file name : Image_12032024114148049.png
|
2024-03-12 11:41:48.138397 |
162 |
88867330 |
Repairing road with sand gravel from Solmara Pakhura PWD road to near Sukekuchi PHE Office |
184934 |
Repairing road with sand gravel from Solmara Pakhura PWD road to near Sukekuchi PHE Office 1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_12032024114133612.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_12032024114133612.png)
latitude : 26.381238333333332,26.381208333333333
Longitude : 91.29326166666667,91.293265
file name : Image_12032024114133612.png
|
2024-03-12 11:41:33.700934 |
163 |
88867330 |
Repairing road with sand gravel from Solmara Pakhura PWD road to near Sukekuchi PHE Office |
184934 |
Repairing road with sand gravel from Solmara Pakhura PWD road to near Sukekuchi PHE Office 1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_05022024113912824.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_05022024113912824.png)
latitude : 26.381106666666664,26.38110166666667
Longitude : 91.29359000000001,91.29357666666668
file name : Image_05022024113912824.png
|
2024-02-05 11:39:12.916789 |
164 |
88867330 |
Repairing road with sand gravel from Solmara Pakhura PWD road to near Sukekuchi PHE Office |
184934 |
Repairing road with sand gravel from Solmara Pakhura PWD road to near Sukekuchi PHE Office 1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_27122023115424845.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_27122023115424845.png)
latitude : 26.380961666666668,26.380996666666668
Longitude : 91.29352166666668,91.29351333333334
file name : Image_27122023115424845.png
|
2023-12-27 11:54:24.934584 |
165 |
83203842 |
Const. of GP Office Building at Solamara (Incomplete Portion) Ph-II |
362050 |
Const. of GP Office Building at Solamara (Incomplete Portion) Ph-II1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_04062024122519632.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_04062024122519632.png)
latitude : 26.378008333333334
Longitude : 91.29542000000001
file name : Image_04062024122519632.png
|
2024-06-04 12:25:19.727579 |
166 |
83203842 |
Const. of GP Office Building at Solamara (Incomplete Portion) Ph-II |
362050 |
Const. of GP Office Building at Solamara (Incomplete Portion) Ph-II1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_12032024114116571.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_12032024114116571.png)
latitude : 26.377876666666666
Longitude : 91.29562
file name : Image_12032024114116571.png
|
2024-03-12 11:41:16.680375 |
167 |
83203842 |
Const. of GP Office Building at Solamara (Incomplete Portion) Ph-II |
362050 |
Const. of GP Office Building at Solamara (Incomplete Portion) Ph-II1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_16102023142203532.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2022/Image_16102023142203532.png)
latitude : 26.377738333333333
Longitude : 91.29551666666666
file name : Image_16102023142203532.png
|
2023-10-16 14:22:03.626181 |
168 |
64759155 |
REAPIRING OF 103 NO NATUN KHELUWA ANGANWADI CENJTRE AT KHELUWA VILLAGE |
180000 |
REAPIRING OF 103 NO NATUN KHELUWA ANGANWADI CENJTRE AT KHELUWA VILLAGE1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_08092023130150651.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_08092023130150651.png)
latitude : 26.38524166666667
Longitude : 91.268695
file name : Image_08092023130150651.png
|
2023-09-08 13:01:50.746716 |
169 |
64759155 |
REAPIRING OF 103 NO NATUN KHELUWA ANGANWADI CENJTRE AT KHELUWA VILLAGE |
180000 |
REAPIRING OF 103 NO NATUN KHELUWA ANGANWADI CENJTRE AT KHELUWA VILLAGE1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_06042023151048752.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_06042023151048752.png)
latitude : 26.385266666666666
Longitude : 91.26874000000001
file name : Image_06042023151048752.png
|
2023-04-06 15:10:48.858972 |
170 |
64759155 |
REAPIRING OF 103 NO NATUN KHELUWA ANGANWADI CENJTRE AT KHELUWA VILLAGE |
180000 |
REAPIRING OF 103 NO NATUN KHELUWA ANGANWADI CENJTRE AT KHELUWA VILLAGE1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_30012023152400536.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/18/2020/Image_30012023152400536.png)
latitude : 26.385294999999996
Longitude : 91.26884666666668
file name : Image_30012023152400536.png
|
2023-01-30 15:24:00.640558 |