1 |
31797285 |
Roads |
239388 |
Culvert1 |
Substructure below GL |
-
latitude : 27.00177621,27.00177775
Longitude : 94.82341391,94.82341269
file name : Image_14082019145526393.png
|
2019-08-14 14:55:26.467914 |
2 |
31797626 |
Const. of IHHL |
212500 |
Toilet1 |
25% |
-
latitude : 27.01850742
Longitude : 94.84756562
file name : Image_19082019145511622.png
|
2019-08-19 14:55:11.714677 |
3 |
31797626 |
Const. of IHHL |
212500 |
Toilet1 |
25% |
-
latitude : 27.01797451
Longitude : 94.84756412
file name : Image_19082019145508780.png
|
2019-08-19 14:55:08.876946 |
4 |
31797626 |
Const. of IHHL |
212500 |
Toilet1 |
25% |
-
latitude : 27.00921378
Longitude : 94.84319664
file name : Image_19082019145505978.png
|
2019-08-19 14:55:06.07895 |
5 |
61073322 |
Construction of Sanitary complex under CMSC at Veloguri Dubi Tiniali |
90000 |
Construction of Sanitary complex under CMSC at Veloguri Dubi Tiniali1 |
Completion of work |
-
latitude : 27.00364448
Longitude : 94.82192587
file name : Image_24122022181114626.png
|
2022-12-24 18:11:14.71632 |
6 |
66685883 |
Operation & maintenance of drinking water supply system |
325000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.0055119
Longitude : 94.8180143
file name : Image_02022024122210011.png
|
2024-02-02 12:22:10.131645 |
7 |
66685883 |
Operation & maintenance of drinking water supply system |
325000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.0680068
Longitude : 94.5623017
file name : Image_28012023113725052.png
|
2023-01-28 11:37:25.157044 |
8 |
61071086 |
Construction of Paver block from Borboruah Moidam Konwar Gaon to Chiring Gaon Sub Health Centre |
585100 |
Construction of Paver block from Borboruah Moidam Konwar Gaon to Chiring Gaon Sub Health Centre1 |
Roof laid |
-
latitude : 26.98801227,26.98804526
Longitude : 94.8001021,94.80011216
file name : Image_26092022123755193.png
|
2022-09-26 12:37:55.307909 |
9 |
61071086 |
Construction of Paver block from Borboruah Moidam Konwar Gaon to Chiring Gaon Sub Health Centre |
585100 |
Construction of Paver block from Borboruah Moidam Konwar Gaon to Chiring Gaon Sub Health Centre1 |
Plinth level |
-
latitude : 26.98812236,26.98812116
Longitude : 94.79959942,94.79956637
file name : Image_04062022113155915.png
|
2022-06-04 11:31:56.01573 |
10 |
61071086 |
Construction of Paver block from Borboruah Moidam Konwar Gaon to Chiring Gaon Sub Health Centre |
585100 |
Construction of Paver block from Borboruah Moidam Konwar Gaon to Chiring Gaon Sub Health Centre1 |
Completion of work |
-
latitude : 26.98808789,26.98814498,26.98815106
Longitude : 94.80031235,94.79966387,94.79965769
file name : Image_04032022154708973.png
|
2022-03-04 15:47:09.0973 |
11 |
90018853 |
Repairing of Lakuwa kanibill L P School |
219220 |
Repairing of Lakuwa kanibill L P School1 |
Completion of work |
-
latitude : 27.03564929
Longitude : 94.89172656
file name : Image_09042024135823762.png
|
2024-04-09 13:58:23.861205 |
12 |
90020450 |
Repairing of Rangagarha ME School |
179057 |
Repairing of Rangagarha ME School1 |
Completion of work |
-
latitude : 27.028326
Longitude : 94.8703073
file name : Image_09042024143208706.png
|
2024-04-09 14:32:08.806012 |
13 |
90020120 |
Repairing of Thanuram Bharali LP School |
179040 |
Repairing of Thanuram Bharali LP School1 |
Completion of work |
-
latitude : 27.02769467
Longitude : 94.86931653
file name : Image_04092024211121586.png
|
2024-09-04 21:11:21.676525 |
14 |
66686016 |
Construction of Community Sanitary Complex |
162500 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 26.98816301
Longitude : 94.80537216
file name : Image_11012024152613124.png
|
2024-01-11 15:26:13.211688 |
15 |
66686016 |
Construction of Community Sanitary Complex |
162500 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 26.9882186
Longitude : 94.80536467
file name : Image_11012024152055269.png
|
2024-01-11 15:20:55.356268 |
16 |
66686016 |
Construction of Community Sanitary Complex |
162500 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.98810554
Longitude : 94.8054092
file name : Image_11072023155000581.png
|
2023-07-11 15:50:00.675587 |
17 |
68284731 |
Repairing of Sukapha L P School |
107655 |
Repairing of Sukapha L P School1 |
Roof laid |
-
latitude : 26.95065288
Longitude : 94.53743798
file name : Image_12032024170311295.png
|
2024-03-12 17:03:11.380536 |
18 |
68284731 |
Repairing of Sukapha L P School |
107655 |
Repairing of Sukapha L P School1 |
Plinth level |
-
latitude : 26.95065313
Longitude : 94.53742907
file name : Image_12032024165842704.png
|
2024-03-12 16:58:42.799855 |
19 |
68284731 |
Repairing of Sukapha L P School |
107655 |
Repairing of Sukapha L P School1 |
Completion of work |
-
latitude : 27.02448967
Longitude : 94.85333094
file name : Image_13112023123232986.png
|
2023-11-13 12:32:33.088743 |
20 |
86968329 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.98763414
Longitude : 94.80341336
file name : Image_11012024151505450.png
|
2024-01-11 15:15:05.541106 |
21 |
86968329 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.98767555
Longitude : 94.80339088
file name : Image_11012024150958571.png
|
2024-01-11 15:09:58.677264 |
22 |
86968329 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.9875559
Longitude : 94.80352716
file name : Image_13092023143255070.png
|
2023-09-13 14:32:55.167718 |
23 |
86968764 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.01230862
Longitude : 94.8336338
file name : Image_28022024121432663.png
|
2024-02-28 12:14:32.763844 |
24 |
86968764 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.01231614
Longitude : 94.83362591
file name : Image_28022024120136035.png
|
2024-02-28 12:01:36.14688 |
25 |
86968764 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.01214145
Longitude : 94.83369412
file name : Image_12092023155219444.png
|
2023-09-12 15:52:19.554904 |
26 |
86968948 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.00380254
Longitude : 94.82253651
file name : Image_02022024143020341.png
|
2024-02-02 14:30:20.530762 |
27 |
86968948 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.00380625
Longitude : 94.82255962
file name : Image_02022024141926481.png
|
2024-02-02 14:19:26.581638 |
28 |
86968948 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.00381737
Longitude : 94.82259813
file name : Image_13092023160927866.png
|
2023-09-13 16:09:28.400818 |
29 |
86969121 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.9506771
Longitude : 94.53744223
file name : Image_12032024175906391.png
|
2024-03-12 17:59:06.477333 |
30 |
86969121 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.95064923
Longitude : 94.53739463
file name : Image_12032024173708235.png
|
2024-03-12 17:37:08.337614 |
31 |
86969121 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.03069424
Longitude : 94.89347845
file name : Image_11092023143025980.png
|
2023-09-11 14:30:26.152025 |
32 |
86970317 |
Repairing of Rajachuk Tipomia LP School |
120000 |
Repairing of Rajachuk Tipomia LP School1 |
Roof laid |
-
latitude : 26.95069609
Longitude : 94.53745992
file name : Image_09032024132437193.png
|
2024-03-09 13:24:37.287601 |
33 |
86970317 |
Repairing of Rajachuk Tipomia LP School |
120000 |
Repairing of Rajachuk Tipomia LP School1 |
Plinth level |
-
latitude : 26.95079652
Longitude : 94.5374123
file name : Image_09032024131721511.png
|
2024-03-09 13:17:21.599258 |
34 |
86970317 |
Repairing of Rajachuk Tipomia LP School |
120000 |
Repairing of Rajachuk Tipomia LP School1 |
Completion of work |
-
latitude : 26.99221036
Longitude : 94.82066795
file name : Image_11092023124956081.png
|
2023-09-11 12:49:56.238324 |
35 |
61072981 |
Installation of Mark III tubewell at Lakuwa Bagan Tiniali |
67259 |
Installation of Mark III tubewell at Lakuwa Bagan Tiniali1 |
Roof laid |
-
latitude : 27.02168884
Longitude : 94.87462045
file name : Image_10102023161840246.png
|
2023-10-10 16:18:40.333904 |
36 |
61072981 |
Installation of Mark III tubewell at Lakuwa Bagan Tiniali |
67259 |
Installation of Mark III tubewell at Lakuwa Bagan Tiniali1 |
Plinth level |
-
latitude : 27.0217121
Longitude : 94.87457627
file name : Image_10102023155606028.png
|
2023-10-10 15:56:06.107702 |
37 |
61072981 |
Installation of Mark III tubewell at Lakuwa Bagan Tiniali |
67259 |
Installation of Mark III tubewell at Lakuwa Bagan Tiniali1 |
Completion of work |
-
latitude : 27.02171774
Longitude : 94.87459741
file name : Image_16122022190413899.png
|
2022-12-16 19:04:13.990587 |
38 |
61072311 |
Construction of Low cost Latrin at GP Area |
247700 |
Construction of Low cost Latrin at GP Area1 |
Roof laid |
-
latitude : 27.0320839
Longitude : 94.6065764
file name : Image_01032024130159626.png
|
2024-03-01 13:01:59.741164 |
39 |
61072311 |
Construction of Low cost Latrin at GP Area |
247700 |
Construction of Low cost Latrin at GP Area1 |
Plinth level |
-
latitude : 27.032084
Longitude : 94.6065769
file name : Image_01032024124005446.png
|
2024-03-01 12:40:05.568369 |
40 |
61072311 |
Construction of Low cost Latrin at GP Area |
247700 |
Construction of Low cost Latrin at GP Area1 |
Completion of work |
-
latitude : 27.00912011
Longitude : 94.82883651
file name : Image_04062022144214453.png
|
2022-06-04 14:42:14.565567 |
41 |
66685666 |
Repairing of Ahom Tekela L.P School |
165000 |
Repairing of Ahom Tekela L.P School1 |
Roof laid |
-
latitude : 26.99690733
Longitude : 94.81238868
file name : Image_10102023123711419.png
|
2023-10-10 12:37:11.543107 |
42 |
66685666 |
Repairing of Ahom Tekela L.P School |
165000 |
Repairing of Ahom Tekela L.P School1 |
Plinth level |
-
latitude : 26.99685923
Longitude : 94.81246382
file name : Image_10102023120546237.png
|
2023-10-10 12:05:46.389968 |
43 |
66685666 |
Repairing of Ahom Tekela L.P School |
165000 |
Repairing of Ahom Tekela L.P School1 |
Plinth level |
-
latitude : 26.99703263
Longitude : 94.81238848
file name : Image_05072023212708384.png
|
2023-07-05 21:27:08.48108 |
44 |
66685666 |
Repairing of Ahom Tekela L.P School |
165000 |
Repairing of Ahom Tekela L.P School1 |
Completion of work |
-
latitude : 26.99683342
Longitude : 94.81240009
file name : Image_23052023210513405.png
|
2023-05-23 21:05:13.513412 |
45 |
68282606 |
Repairing of 613 No. Borboruah Moidam L P School |
120000 |
Repairing of 613 No. Borboruah Moidam L P School1 |
Roof laid |
-
latitude : 26.99025573
Longitude : 94.80735006
file name : Image_10102023120226468.png
|
2023-10-10 12:02:36.107605 |
46 |
68282606 |
Repairing of 613 No. Borboruah Moidam L P School |
120000 |
Repairing of 613 No. Borboruah Moidam L P School1 |
Plinth level |
-
latitude : 26.99020434
Longitude : 94.80740257
file name : Image_10102023114654286.png
|
2023-10-10 11:46:54.377231 |
47 |
68282606 |
Repairing of 613 No. Borboruah Moidam L P School |
120000 |
Repairing of 613 No. Borboruah Moidam L P School1 |
Completion of work |
-
latitude : 26.99021635
Longitude : 94.80737631
file name : Image_11072023155049589.png
|
2023-07-11 15:50:49.680163 |
48 |
68282679 |
Repairing of AWC at Chiring Konwar L P School |
106500 |
Repairing of AWC at Chiring Konwar L P School1 |
Roof laid |
-
latitude : 26.98970476
Longitude : 94.79538414
file name : Image_10102023111605639.png
|
2023-10-10 11:16:05.726295 |
49 |
68282679 |
Repairing of AWC at Chiring Konwar L P School |
106500 |
Repairing of AWC at Chiring Konwar L P School1 |
Plinth level |
-
latitude : 26.98970628
Longitude : 94.79527818
file name : Image_10102023110920499.png
|
2023-10-10 11:09:20.580172 |
50 |
68282679 |
Repairing of AWC at Chiring Konwar L P School |
106500 |
Repairing of AWC at Chiring Konwar L P School1 |
Completion of work |
-
latitude : 26.98971735
Longitude : 94.79533319
file name : Image_21062023145958073.png
|
2023-06-21 14:59:58.156039 |
51 |
66685591 |
Repairing of Arunudoi L.P School |
245000 |
Repairing of Arunudoi L.P School1 |
Roof laid |
-
latitude : 27.00894244
Longitude : 94.82766659
file name : Image_10102023150351902.png
|
2023-10-10 15:03:51.989209 |
52 |
66685591 |
Repairing of Arunudoi L.P School |
245000 |
Repairing of Arunudoi L.P School1 |
Plinth level |
-
latitude : 27.00896089
Longitude : 94.8276759
file name : Image_10102023144623267.png
|
2023-10-10 14:46:23.371385 |
53 |
66685591 |
Repairing of Arunudoi L.P School |
245000 |
Repairing of Arunudoi L.P School1 |
Completion of work |
-
latitude : 27.00912126
Longitude : 94.82761664
file name : Image_09042023171357611.png
|
2023-04-09 17:13:57.685187 |
54 |
61072758 |
Installation of Mark III tubewell with rest house at Kanibil Tiniali Rajgarh Road |
67259 |
Installation of Mark III tubewell with rest house at Kanibil Tiniali Rajgarh Road1 |
Roof laid |
-
latitude : 27.02989642
Longitude : 94.89376658
file name : Image_10102023153626895.png
|
2023-10-10 15:36:26.978701 |
55 |
61072758 |
Installation of Mark III tubewell with rest house at Kanibil Tiniali Rajgarh Road |
67259 |
Installation of Mark III tubewell with rest house at Kanibil Tiniali Rajgarh Road1 |
Plinth level |
-
latitude : 27.02990594
Longitude : 94.89371105
file name : Image_10102023152850270.png
|
2023-10-10 15:28:50.378207 |
56 |
61072758 |
Installation of Mark III tubewell with rest house at Kanibil Tiniali Rajgarh Road |
67259 |
Installation of Mark III tubewell with rest house at Kanibil Tiniali Rajgarh Road1 |
Completion of work |
-
latitude : 27.02992382
Longitude : 94.89377239
file name : Image_26092022123846204.png
|
2022-09-26 12:38:46.321181 |
57 |
68284773 |
Repairing of Rangagarha M E Kitchen Room |
120000 |
Repairing of Rangagarha M E Kitchen Room1 |
Roof laid |
-
latitude : 27.0029616
Longitude : 94.8201402
file name : Image_05062024141538410.png
|
2024-06-05 14:15:38.504073 |
58 |
68284773 |
Repairing of Rangagarha M E Kitchen Room |
120000 |
Repairing of Rangagarha M E Kitchen Room1 |
Plinth level |
-
latitude : 27.0029608
Longitude : 94.8201399
file name : Image_05062024140133961.png
|
2024-06-05 14:01:34.053134 |
59 |
68284773 |
Repairing of Rangagarha M E Kitchen Room |
120000 |
Repairing of Rangagarha M E Kitchen Room1 |
Completion of work |
-
latitude : 27.02822586
Longitude : 94.87021773
file name : Image_20102023114544361.png
|
2023-10-20 11:45:44.458024 |
60 |
68284955 |
Construction of toilets in public institutions |
170210 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.01237235
Longitude : 94.83367149
file name : Image_04012024125735286.png
|
2024-01-04 12:57:35.380682 |
61 |
86969036 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.01560415
Longitude : 94.85223718
file name : Image_04012024140819661.png
|
2024-01-04 14:08:19.430475 |
62 |
86969036 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.01561316
Longitude : 94.85222516
file name : Image_04012024140255166.png
|
2024-01-04 14:02:55.258044 |
63 |
86969036 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.01562618
Longitude : 94.85227202
file name : Image_12092023155210205.png
|
2023-09-12 15:52:10.310544 |
64 |
68284675 |
Repairing of Lakuwa Bagan L P School |
120000 |
Repairing of Lakuwa Bagan L P School1 |
Completion of work |
-
latitude : 27.02341104
Longitude : 94.87361286
file name : Image_26012024135809431.png
|
2024-01-26 13:58:09.513992 |
65 |
86968255 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.95063312
Longitude : 94.53742407
file name : Image_12032024173000503.png
|
2024-03-12 17:30:00.589692 |
66 |
86968255 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.95067519
Longitude : 94.53739952
file name : Image_12032024172200239.png
|
2024-03-12 17:22:00.331348 |
67 |
86968255 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.95067184
Longitude : 94.53738601
file name : Image_12032024171340183.png
|
2024-03-12 17:13:40.275351 |
68 |
86968255 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.99204705
Longitude : 94.82146185
file name : Image_06092023214724870.png
|
2023-09-06 21:47:24.970758 |
69 |
86969487 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.95067745
Longitude : 94.53750978
file name : Image_09032024125424374.png
|
2024-03-09 12:54:24.462706 |
70 |
86969487 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.95050148
Longitude : 94.5375099
file name : Image_09032024124724878.png
|
2024-03-09 12:47:24.981738 |
71 |
86969487 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.02554894
Longitude : 94.87016701
file name : Image_11092023143029847.png
|
2023-09-11 14:30:30.046766 |
72 |
68283235 |
Operation & maintenance of drinking water supply system |
259650 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.00369651
Longitude : 94.82104356
file name : Image_05092024124101269.png
|
2024-09-05 12:41:01.350762 |
73 |
86969415 |
Creation of Shed for segregation and processing of wet and dry waste |
81813 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.03075958
Longitude : 94.87902904
file name : Image_13112023124831980.png
|
2023-11-13 12:48:32.076523 |
74 |
86969415 |
Creation of Shed for segregation and processing of wet and dry waste |
81813 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.03074906
Longitude : 94.8790661
file name : Image_13112023123451524.png
|
2023-11-13 12:34:51.66774 |
75 |
86969415 |
Creation of Shed for segregation and processing of wet and dry waste |
81813 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.03070602
Longitude : 94.87904119
file name : Image_06092023214718215.png
|
2023-09-06 21:47:18.322157 |
76 |
61072066 |
Construction of community sanitry latrin at Rajgarh Tiniali |
175000 |
Construction of community sanitry latrin at Rajgarh Tiniali1 |
Roof laid |
-
latitude : 27.0192406
Longitude : 94.8681083
file name : Image_12122023144126901.png
|
2023-12-12 14:41:26.992973 |
77 |
61072066 |
Construction of community sanitry latrin at Rajgarh Tiniali |
175000 |
Construction of community sanitry latrin at Rajgarh Tiniali1 |
Plinth level |
-
latitude : 27.01964604
Longitude : 94.8686433
file name : Image_12122023143616571.png
|
2023-12-12 14:36:16.673918 |
78 |
61072066 |
Construction of community sanitry latrin at Rajgarh Tiniali |
175000 |
Construction of community sanitry latrin at Rajgarh Tiniali1 |
Completion of work |
-
latitude : 27.01961881
Longitude : 94.86865211
file name : Image_16122022190420272.png
|
2022-12-16 19:04:20.388306 |
79 |
68284881 |
Operation & maintenance of drinking water supply system |
260300 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.0036594
Longitude : 94.821173
file name : Image_05092024132223149.png
|
2024-09-05 13:22:23.234736 |
80 |
86969793 |
Construction of toilets in public institutions |
41100 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.0036371
Longitude : 94.8211721
file name : Image_26072024135915548.png
|
2024-07-26 13:59:15.640433 |
81 |
86969793 |
Construction of toilets in public institutions |
41100 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 27.0036371
Longitude : 94.8211724
file name : Image_26072024130619677.png
|
2024-07-26 13:06:19.766669 |
82 |
86969793 |
Construction of toilets in public institutions |
41100 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 27.003637
Longitude : 94.8211728
file name : Image_26072024125538044.png
|
2024-07-26 12:55:38.144105 |
83 |
86969793 |
Construction of toilets in public institutions |
41100 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 26.99601971
Longitude : 94.81242564
file name : Image_30112023150912489.png
|
2023-11-30 15:09:12.583046 |
84 |
86968482 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.98798435
Longitude : 94.80002255
file name : Image_27022024213906301.png
|
2024-02-27 21:39:06.389565 |
85 |
86968482 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.98798656
Longitude : 94.79999324
file name : Image_20022024121452955.png
|
2024-02-20 12:14:53.124483 |
86 |
86968482 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 26.9881671
Longitude : 94.80007674
file name : Image_13092023160941358.png
|
2023-09-13 16:09:42.470401 |
87 |
66686072 |
Construction of Community Sanitary Complex |
162500 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.0320839
Longitude : 94.6065763
file name : Image_01032024133301756.png
|
2024-03-01 13:33:01.919965 |
88 |
66686072 |
Construction of Community Sanitary Complex |
162500 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.0320839
Longitude : 94.6065764
file name : Image_01032024132106721.png
|
2024-03-01 13:21:06.830895 |
89 |
66686072 |
Construction of Community Sanitary Complex |
162500 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.9894973
Longitude : 94.79518067
file name : Image_19062023201134610.png
|
2023-06-19 20:11:34.726036 |
90 |
86969534 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.95072388
Longitude : 94.5374489
file name : Image_07052024143023659.png
|
2024-05-07 14:30:23.892151 |
91 |
86969534 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 26.95072388
Longitude : 94.5374489
file name : Image_07052024141118380.png
|
2024-05-07 14:11:18.482723 |
92 |
86969534 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 26.95073154
Longitude : 94.53745912
file name : Image_07052024140414345.png
|
2024-05-07 14:04:14.438505 |
93 |
86969534 |
Creation of Shed for segregation and processing of wet and dry waste |
15193 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.02141696
Longitude : 94.8711489
file name : Image_12092023155204649.png
|
2023-09-12 15:52:04.762064 |
94 |
90022334 |
Construction of Community Sanitary Complex |
134085 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.99717496
Longitude : 94.81263184
file name : Image_17052024152913155.png
|
2024-05-17 15:29:12.718652 |
95 |
90020967 |
Construction of Community Sanitary Complex |
134085 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.00469455
Longitude : 94.82250566
file name : Image_22052024122243422.png
|
2024-05-22 12:22:43.520134 |
96 |
90022708 |
Construction of Community Sanitary Complex |
134085 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.02047913
Longitude : 94.85018608
file name : Image_22052024120520407.png
|
2024-05-22 12:05:20.506945 |
97 |
66685729 |
Repairing of Amarjyoti L.P School Kitchen room |
120000 |
Repairing of Amarjyoti L.P School Kitchen room1 |
Roof laid |
-
latitude : 27.00296
Longitude : 94.8201413
file name : Image_05062024125913938.png
|
2024-06-05 12:59:14.01611 |
98 |
66685729 |
Repairing of Amarjyoti L.P School Kitchen room |
120000 |
Repairing of Amarjyoti L.P School Kitchen room1 |
Plinth level |
-
latitude : 27.0029611
Longitude : 94.8201399
file name : Image_05062024122557925.png
|
2024-06-05 12:25:58.037203 |
99 |
66685729 |
Repairing of Amarjyoti L.P School Kitchen room |
120000 |
Repairing of Amarjyoti L.P School Kitchen room1 |
Completion of work |
-
latitude : 27.03107974
Longitude : 94.8791375
file name : Image_06092023214728085.png
|
2023-09-06 21:47:28.193333 |
100 |
66685729 |
Repairing of Amarjyoti L.P School Kitchen room |
120000 |
Repairing of Amarjyoti L.P School Kitchen room1 |
Completion of work |
-
latitude : 27.03107974
Longitude : 94.8791375
file name : Image_06092023214721385.png
|
2023-09-06 21:47:21.491263 |
101 |
106804297 |
Repairing of Ghorachuwa AWC |
120000 |
Repairing of Ghorachuwa AWC1 |
Completion of work |
-
latitude : 26.99031655
Longitude : 94.80735492
file name : Image_19092024135513887.png
|
2024-09-19 13:55:11.223393 |
102 |
106804133 |
Construction of Paver Block approach road to Lakuwa GP |
64981 |
Construction of Paver Block approach road to Lakuwa GP1 |
Completion of work |
-
latitude : 27.0033241,27.0033237
Longitude : 94.8243103,94.8243099
file name : Image_19092024135849284.png
|
2024-09-19 13:58:49.366747 |
103 |
86969820 |
Construction of toilets in public institutions |
87043 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 27.01102995
Longitude : 94.84618498
file name : Image_05092024154521001.png
|
2024-09-05 15:45:21.137732 |