1 |
17940377 |
Const. of Toilet and Sanitary Latrine with running water |
297705 |
Other Sanitation Asset1 |
Completed |
-
latitude : 27.295681
Longitude : 95.7503981
file name : Image_23072019162657541.png
|
2019-07-23 16:26:57.604915 |
2 |
17940212 |
Pure drinking water project (RO) at GP Office Premises (Ph-2) |
1200000 |
Water Purification System1 |
In Progress |
-
latitude : 27.2958118
Longitude : 95.750627
file name : Image_01062019125354741.png
|
2019-06-01 12:53:54.811182 |
3 |
57415614 |
CONST OF DRINKING WATER FACILITY AT ROD GAON LP SCHOOL |
213439 |
CONST OF DRINKING WATER FACILITY AT ROD GAON LP SCHOOL1 |
Roof laid |
-
latitude : 27.30060535
Longitude : 95.74835144
file name : Image_02032024104840719.png
|
2024-03-02 10:48:40.807731 |
4 |
57415614 |
CONST OF DRINKING WATER FACILITY AT ROD GAON LP SCHOOL |
213439 |
CONST OF DRINKING WATER FACILITY AT ROD GAON LP SCHOOL1 |
Plinth level |
-
latitude : 27.30058182
Longitude : 95.74835765
file name : Image_02032024104051041.png
|
2024-03-02 10:40:51.152104 |
5 |
57415614 |
CONST OF DRINKING WATER FACILITY AT ROD GAON LP SCHOOL |
213439 |
CONST OF DRINKING WATER FACILITY AT ROD GAON LP SCHOOL1 |
Completion of work |
-
latitude : 27.30071186
Longitude : 95.74820883
file name : Image_25082022153404354.png
|
2022-08-25 15:34:04.459252 |
6 |
65688570 |
Construction of Community Sanitary Complex |
199000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.29560094
Longitude : 95.75379965
file name : Image_30092023133934613.png
|
2023-09-30 13:39:34.717985 |
7 |
65688662 |
Renovation of Ledo Colliery Hindi LP School |
456000 |
Renovation of Ledo Colliery Hindi LP School1 |
Plinth level |
-
latitude : 27.29574208
Longitude : 95.75032164
file name : Image_03092024141122153.png
|
2024-09-03 14:11:22.381057 |
8 |
65688662 |
Renovation of Ledo Colliery Hindi LP School |
456000 |
Renovation of Ledo Colliery Hindi LP School1 |
Completion of work |
-
latitude : 27.29407729
Longitude : 95.75753324
file name : Image_30092023135733291.png
|
2023-09-30 13:57:33.398683 |
9 |
65688662 |
Renovation of Ledo Colliery Hindi LP School |
456000 |
Renovation of Ledo Colliery Hindi LP School1 |
Completion of work |
-
latitude : 27.29407846
Longitude : 95.75754598
file name : Image_30092023135637049.png
|
2023-09-30 13:56:37.158699 |
10 |
65688662 |
Renovation of Ledo Colliery Hindi LP School |
456000 |
Renovation of Ledo Colliery Hindi LP School1 |
Completion of work |
-
latitude : 27.29407846
Longitude : 95.75754598
file name : Image_30092023135152137.png
|
2023-09-30 13:51:52.239654 |
11 |
57416676 |
PUCCA DRAIN FROM ROD GAON BRIDGE TO SANI MANDIR PASALI VIA BOTH SIDE SHIV MANDIR |
268000 |
PUCCA DRAIN FROM ROD GAON BRIDGE TO SANI MANDIR PASALI VIA BOTH SIDE SHIV MANDIR1 |
Roof laid |
-
latitude : 27.29883303,27.2992988
Longitude : 95.74473276,95.7456788
file name : Image_11042023104538141.png
|
2023-04-11 10:45:38.255867 |
12 |
57416676 |
PUCCA DRAIN FROM ROD GAON BRIDGE TO SANI MANDIR PASALI VIA BOTH SIDE SHIV MANDIR |
268000 |
PUCCA DRAIN FROM ROD GAON BRIDGE TO SANI MANDIR PASALI VIA BOTH SIDE SHIV MANDIR1 |
Completion of work |
-
latitude : 27.29899887,27.29899887,27.29899554,27.29899446,27.29899091
Longitude : 95.74495785,95.74495785,95.74496016,95.74496405,95.74496651
file name : Image_29032022143431553.png
|
2022-03-29 14:34:31.649726 |
13 |
57417496 |
SOLAR STREET LIGHT |
79644 |
SOLAR STREET LIGHT1 |
Roof laid |
-
latitude : 27.31153766
Longitude : 95.79784746
file name : Image_11042023145417673.png
|
2023-04-11 14:54:17.793032 |
14 |
57417496 |
SOLAR STREET LIGHT |
79644 |
SOLAR STREET LIGHT2 |
Roof laid |
-
latitude : 27.31145108
Longitude : 95.79797756
file name : Image_11042023145528992.png
|
2023-04-11 14:55:29.110157 |
15 |
57417496 |
SOLAR STREET LIGHT |
79644 |
SOLAR STREET LIGHT2 |
Completion of work |
-
latitude : 27.31135511
Longitude : 95.79796864
file name : Image_29072022113241367.png
|
2022-07-29 11:32:41.486694 |
16 |
57417496 |
SOLAR STREET LIGHT |
79644 |
SOLAR STREET LIGHT2 |
Completion of work |
-
latitude : 27.31481762
Longitude : 95.78280625
file name : Image_29072022121028846.png
|
2022-07-29 12:10:28.913078 |
17 |
49956199 |
Const of cc road from Bablu Garh house to Dilip Das house PH I |
397151 |
Const of cc road from Bablu Garh house to Dilip Das house PH I1 |
Roof laid |
-
latitude : 27.29776319,27.29775142
Longitude : 95.75034099,95.75030212
file name : Image_10042023154329666.png
|
2023-04-10 15:43:29.774174 |
18 |
49956199 |
Const of cc road from Bablu Garh house to Dilip Das house PH I |
397151 |
Const of cc road from Bablu Garh house to Dilip Das house PH I1 |
Completion of work |
-
latitude : 27.29767498,27.2976756,27.29767493,27.29767539
Longitude : 95.75037757,95.75037433,95.75037189,95.75037178
file name : Image_29032022142746847.png
|
2022-03-29 14:27:46.929699 |
19 |
49950430 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT LEDO TE PATHER LINE SANITATION |
90000 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT LEDO TE PATHER LINE SANITATION1 |
Roof laid |
-
latitude : 27.31390647
Longitude : 95.76649269
file name : Image_11042023151647652.png
|
2023-04-11 15:16:47.800276 |
20 |
49950430 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT LEDO TE PATHER LINE SANITATION |
90000 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT LEDO TE PATHER LINE SANITATION1 |
Completion of work |
-
latitude : 27.3138288
Longitude : 95.76646852
file name : Image_30042022144447237.png
|
2022-04-30 14:44:47.341458 |
21 |
49953640 |
SANITATION AT HARBAJANI LP SCHOOL AXULLIARY |
45000 |
SANITATION AT HARBAJANI LP SCHOOL AXULLIARY1 |
Roof laid |
-
latitude : 27.29647196
Longitude : 95.76525744
file name : Image_11042023143827876.png
|
2023-04-11 14:38:27.972769 |
22 |
49953640 |
SANITATION AT HARBAJANI LP SCHOOL AXULLIARY |
45000 |
SANITATION AT HARBAJANI LP SCHOOL AXULLIARY1 |
Completion of work |
-
latitude : 27.29642051
Longitude : 95.7652736
file name : Image_30042022141403172.png
|
2022-04-30 14:14:03.24892 |
23 |
65688533 |
Construction of Community Sanitary Complex |
199000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.3001221
Longitude : 95.7482601
file name : Image_31082024151133700.png
|
2024-08-31 15:11:33.955962 |
24 |
65688533 |
Construction of Community Sanitary Complex |
199000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.28309091
Longitude : 95.6623983
file name : Image_31082024150839431.png
|
2024-08-31 15:08:39.63356 |
25 |
65688533 |
Construction of Community Sanitary Complex |
199000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.30048896
Longitude : 95.74844541
file name : Image_05102023135254999.png
|
2023-10-05 13:52:55.095418 |
26 |
65688533 |
Construction of Community Sanitary Complex |
199000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.30048896
Longitude : 95.74844541
file name : Image_05102023112301676.png
|
2023-10-05 11:23:03.629465 |
27 |
65688699 |
Renovation of Singri Gaon LP School |
340000 |
Renovation of Singri Gaon LP School1 |
Plinth level |
-
latitude : 27.31488017
Longitude : 95.81418393
file name : Image_02092024141123285.png
|
2024-09-02 14:11:23.525808 |
28 |
65688699 |
Renovation of Singri Gaon LP School |
340000 |
Renovation of Singri Gaon LP School1 |
Completion of work |
-
latitude : 27.31492366
Longitude : 95.81426606
file name : Image_26092023133248400.png
|
2023-09-26 13:32:48.539885 |
29 |
87180107 |
Creation of Shed for segregation and processing of wet and dry waste |
83550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.2961557
Longitude : 95.764654
file name : Image_25072024134036129.png
|
2024-07-25 13:40:36.231134 |
30 |
87180107 |
Creation of Shed for segregation and processing of wet and dry waste |
83550 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.30068568
Longitude : 95.74872936
file name : Image_13092023123747408.png
|
2023-09-13 12:37:47.503764 |
31 |
87180770 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.31852589
Longitude : 95.79813521
file name : Image_07102023134018543.png
|
2023-10-07 13:40:18.642633 |
32 |
87180770 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.31848617
Longitude : 95.79825077
file name : Image_07102023134022500.png
|
2023-10-07 13:40:22.59559 |
33 |
87180694 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.2953902
Longitude : 95.759749
file name : Image_10062024115046504.png
|
2024-06-10 11:50:46.630946 |
34 |
87180694 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.2952846
Longitude : 95.759681
file name : Image_10062024114401261.png
|
2024-06-10 11:44:01.355784 |
35 |
87180694 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.29501691
Longitude : 95.76060498
file name : Image_13092023124237734.png
|
2023-09-13 12:42:37.835434 |
36 |
87180604 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.294154
Longitude : 95.7527849
file name : Image_13092023125114722.png
|
2023-09-13 12:51:14.821697 |
37 |
87180342 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Instalation of Mini MCF near Itakhola Weekly Market |
Roof laid |
-
latitude : 27.2952371
Longitude : 95.7597263
file name : Image_03072024113501080.png
|
2024-07-03 11:35:01.178002 |
38 |
87180342 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Instalation of Mini MCF near Itakhola Weekly Market |
Plinth level |
-
latitude : 27.2950412
Longitude : 95.7596665
file name : Image_03072024113228604.png
|
2024-07-03 11:32:28.720764 |
39 |
87180342 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Instalation of Mini MCF near Itakhola Weekly Market |
Completion of work |
-
latitude : 27.2953721
Longitude : 95.7597625
file name : Image_06062024123007052.png
|
2024-06-06 12:30:07.153401 |
40 |
87180167 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.30635227
Longitude : 95.76746572
file name : Image_06062024122200781.png
|
2024-06-06 12:22:00.912447 |
41 |
87180167 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.3064322
Longitude : 95.767278
file name : Image_06062024121812728.png
|
2024-06-06 12:18:12.825672 |
42 |
87180167 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.30637977
Longitude : 95.76762864
file name : Image_26092023140540843.png
|
2023-09-26 14:05:40.94647 |
43 |
49951823 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT SALIKI NEAR SAMCHAN |
90000 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT SALIKI NEAR SAMCHAN 1 |
Roof laid |
-
latitude : 27.31148796
Longitude : 95.79780289
file name : Image_30082023161846079.png
|
2023-08-30 16:18:46.169419 |
44 |
49951823 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT SALIKI NEAR SAMCHAN |
90000 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT SALIKI NEAR SAMCHAN 1 |
Roof laid |
-
latitude : 27.31137466
Longitude : 95.79781233
file name : Image_30082023161837840.png
|
2023-08-30 16:18:37.929576 |
45 |
49951823 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT SALIKI NEAR SAMCHAN |
90000 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT SALIKI NEAR SAMCHAN 1 |
Roof laid |
-
latitude : 27.31151334
Longitude : 95.79779358
file name : Image_30082023161834106.png
|
2023-08-30 16:18:34.190843 |
46 |
49951823 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT SALIKI NEAR SAMCHAN |
90000 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT SALIKI NEAR SAMCHAN 1 |
Plinth level |
-
latitude : 27.31140922
Longitude : 95.7978242
file name : Image_30082023154830169.png
|
2023-08-30 15:48:30.268744 |
47 |
49951823 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT SALIKI NEAR SAMCHAN |
90000 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT SALIKI NEAR SAMCHAN 1 |
Completion of work |
-
latitude : 27.31150821
Longitude : 95.79816138
file name : Image_30042022141251788.png
|
2022-04-30 14:12:51.892763 |
48 |
89340204 |
Creation of a new source of drinking water |
210000 |
Repairing of Ledo Colliery GP Office Building under Interest Fund 2022 23 Ph I |
Completion of work |
-
latitude : 27.29574352
Longitude : 95.75034515
file name : Image_09012024135042491.png
|
2024-01-09 13:50:42.585678 |
49 |
89340481 |
Operation & maintenance of community sanitary complex |
210000 |
Repairing of Ledo Colliery GP Office Building under Interest Fund 2022 23 Ph II |
Completion of work |
-
latitude : 27.29572488
Longitude : 95.75049397
file name : Image_09012024135053722.png
|
2024-01-09 13:50:53.816203 |
50 |
87179457 |
Construction of Community Sanitary Complex |
100650 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.30229819
Longitude : 95.78015165
file name : Image_20012024130211788.png
|
2024-01-20 13:02:11.865946 |
51 |
87181642 |
Renovation work of Ledo T.E 6 No. Line AWC |
210650 |
Renovation work of Ledo T.E 6 No. Line AWC1 |
Completion of work |
-
latitude : 27.30376328
Longitude : 95.7773983
file name : Image_20012024124944175.png
|
2024-01-20 12:49:44.266063 |
52 |
87181734 |
Renovation Work of Kamba Gaon AWC14 |
107000 |
Renovation Work of Kamba Gaon AWC141 |
Completion of work |
-
latitude : 27.32107841
Longitude : 95.79588463
file name : Image_01022024124529378.png
|
2024-02-01 12:45:29.477826 |
53 |
87181800 |
Renovation work of Pocha Beel AWC 13 |
107000 |
Renovation work of Pocha Beel AWC 131 |
Completion of work |
-
latitude : 27.31668969
Longitude : 95.78106455
file name : Image_01022024125428999.png
|
2024-02-01 12:54:29.129842 |
54 |
87189042 |
Construction of Community Sanitary Complex |
164588 |
Sanitation at Ledo T E near Factory |
Completion of work |
-
latitude : 27.3015748
Longitude : 95.7680132
file name : Image_01022024114648723.png
|
2024-02-01 11:46:48.824619 |
55 |
87188748 |
Construction of Community Sanitary Complex |
164588 |
Sanitation facility at Ledo T E 6 No Line AWC |
Completion of work |
-
latitude : 27.30377487
Longitude : 95.77738822
file name : Image_20012024125431898.png
|
2024-01-20 12:54:31.991006 |
56 |
87188748 |
Construction of Community Sanitary Complex |
164588 |
Sanitation facility at Ledo T E 6 No Line AWC |
Completion of work |
-
latitude : 27.30378443
Longitude : 95.77744086
file name : Image_20012024125719384.png
|
2024-01-20 12:57:19.463329 |
57 |
87188770 |
Renovation of Saliki Gaon AWC |
120000 |
Renovation of Saliki Gaon AWC1 |
Completion of work |
-
latitude : 27.31474568
Longitude : 95.81407327
file name : Image_20012024122513215.png
|
2024-01-20 12:25:13.317214 |
58 |
87189102 |
Renovation of Ledo T.E LP School |
438900 |
Renovation of Ledo T.E LP School1 |
Plinth level |
-
latitude : 27.30902882
Longitude : 95.76330366
file name : Image_02092024143959828.png
|
2024-09-02 14:40:00.445515 |
59 |
87189102 |
Renovation of Ledo T.E LP School |
438900 |
Renovation of Ledo T.E LP School1 |
Completion of work |
-
latitude : 27.30893136
Longitude : 95.76329037
file name : Image_20012024132930845.png
|
2024-01-20 13:29:30.929186 |
60 |
57414888 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT CHAT GHAT SANITATION WITH PHE |
90000 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT CHAT GHAT SANITATION WITH PHE1 |
Roof laid |
-
latitude : 27.29300441
Longitude : 95.75087147
file name : Image_16112023134202741.png
|
2023-11-16 13:42:02.86423 |
61 |
57414888 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT CHAT GHAT SANITATION WITH PHE |
90000 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT CHAT GHAT SANITATION WITH PHE1 |
Plinth level |
-
latitude : 27.29287674
Longitude : 95.75110486
file name : Image_16112023103827998.png
|
2023-11-16 10:38:28.114297 |
62 |
57414888 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT CHAT GHAT SANITATION WITH PHE |
90000 |
CONST OF COMMUNITY MANAGE SANITARY COMPLEX AT CHAT GHAT SANITATION WITH PHE1 |
Completion of work |
-
latitude : 27.29287526
Longitude : 95.75129994
file name : Image_30042022153826349.png
|
2022-04-30 15:38:26.454804 |
63 |
57417144 |
CONST OF ROAD FROM PATHER LINE TO DURGA PUJA MANDAP |
240000 |
CONST OF ROAD FROM PATHER LINE TO DURGA PUJA MANDAP1 |
Roof laid |
-
latitude : 27.29899331,27.29898772
Longitude : 95.74996042,95.74997341
file name : Image_20082024111824883.png
|
2024-08-20 11:18:24.974186 |
64 |
57417144 |
CONST OF ROAD FROM PATHER LINE TO DURGA PUJA MANDAP |
240000 |
CONST OF ROAD FROM PATHER LINE TO DURGA PUJA MANDAP1 |
Plinth level |
-
latitude : 27.29894638,27.29895934
Longitude : 95.74996267,95.74998673
file name : Image_08032024110445650.png
|
2024-03-08 11:04:45.786758 |
65 |
57417144 |
CONST OF ROAD FROM PATHER LINE TO DURGA PUJA MANDAP |
240000 |
CONST OF ROAD FROM PATHER LINE TO DURGA PUJA MANDAP1 |
Completion of work |
-
latitude : 27.31475002,27.31475018
Longitude : 95.76735278,95.76735303
file name : Image_30042022145816108.png
|
2022-04-30 14:58:16.214666 |
66 |
65687717 |
Construction of Community Sanitary Complex |
318150 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.31877264
Longitude : 95.7987344
file name : Image_07102023133430412.png
|
2023-10-07 13:34:30.53213 |
67 |
65687933 |
Renovation of Saliki LP School |
423900 |
Renovation of Saliki LP School1 |
Completion of work |
-
latitude : 27.30809358
Longitude : 95.79088476
file name : Image_26092023131446766.png
|
2023-09-26 13:14:46.855489 |
68 |
87180418 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.2957811
Longitude : 95.754082
file name : Image_10062024113651884.png
|
2024-06-10 11:36:51.975033 |
69 |
87180418 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.29577964
Longitude : 95.75375248
file name : Image_10062024113125462.png
|
2024-06-10 11:31:25.572122 |
70 |
87180418 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.2952822
Longitude : 95.7537496
file name : Image_13092023130336103.png
|
2023-09-13 13:03:36.193066 |
71 |
87180513 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.29886326
Longitude : 95.75000336
file name : Image_29052024112021013.png
|
2024-05-29 11:20:21.094239 |
72 |
87180513 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.29105816
Longitude : 95.72710272
file name : Image_29052024111003071.png
|
2024-05-29 11:10:03.184977 |
73 |
87180513 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.30068677
Longitude : 95.74875144
file name : Image_13092023122644983.png
|
2023-09-13 12:26:45.173335 |
74 |
87180513 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.30067155
Longitude : 95.74872697
file name : Image_13092023122350423.png
|
2023-09-13 12:23:50.53901 |
75 |
87180852 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.3059243
Longitude : 95.7485043
file name : Image_29052024113152986.png
|
2024-05-29 11:31:53.126101 |
76 |
87180852 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.3059226
Longitude : 95.7485019
file name : Image_29052024112627814.png
|
2024-05-29 11:26:27.926648 |
77 |
87180852 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.3060502
Longitude : 95.7483756
file name : Image_13092023120830903.png
|
2023-09-13 12:08:30.989229 |
78 |
87180260 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 27.30388914
Longitude : 95.7769608
file name : Image_06062024120948753.png
|
2024-06-06 12:09:48.854518 |
79 |
87180260 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 27.30386465
Longitude : 95.77696692
file name : Image_06062024120518727.png
|
2024-06-06 12:05:18.824834 |
80 |
87180260 |
Creation of Shed for segregation and processing of wet and dry waste |
15000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 27.30387202
Longitude : 95.77701559
file name : Image_26092023135017396.png
|
2023-09-26 13:50:17.491199 |
81 |
65688471 |
Operation & maintenance of drinking water supply system |
398000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 27.29898178
Longitude : 95.7499757
file name : Image_20082024131552643.png
|
2024-08-20 13:15:52.752547 |
82 |
65688471 |
Operation & maintenance of drinking water supply system |
398000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.2957649
Longitude : 95.7504204
file name : Image_29112022150725901.png
|
2022-11-29 15:07:26.011687 |
83 |
65688471 |
Operation & maintenance of drinking water supply system |
398000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 27.2957638
Longitude : 95.7504197
file name : Image_29112022150729946.png
|
2022-11-29 15:07:30.031241 |
84 |
57420010 |
sanitization |
79644 |
sanitization1 |
Roof laid |
-
latitude : 27.2957229
Longitude : 95.7503447
file name : Image_20082024135821712.png
|
2024-08-20 13:58:21.821036 |
85 |
57420010 |
sanitization |
79644 |
sanitization1 |
Plinth level |
-
latitude : 27.2957173
Longitude : 95.7503617
file name : Image_20082024135156287.png
|
2024-08-20 13:51:56.378507 |
86 |
57420010 |
sanitization |
79644 |
sanitization1 |
Completion of work |
-
latitude : 27.2933672
Longitude : 95.7500618
file name : Image_09012024135241062.png
|
2024-01-09 13:52:41.164923 |