1 |
39579262 |
Construction of Sanitary Toilet at Bhajane Anganwadi Centre. |
100000 |
Construction of Sanitary Toilet at Bhajane Anganwadi Centre.1 |
25% |
-
latitude : 27.77256573
Longitude : 95.69052362
file name : Image_17122020145703258.png
|
2020-12-17 14:57:03.390569 |
2 |
44430538 |
Construction of Community Hall at Jyotipur |
500000 |
Construction of Community Hall at Jyotipur1 |
25% |
-
latitude : 27.72792075
Longitude : 95.7162823
file name : Image_19122020142918250.png
|
2020-12-19 14:29:18.353481 |
3 |
39579993 |
Construction of Retail Shop at Hahkhati T E. |
600000 |
Construction of Retail Shop at Hahkhati T E.1 |
Plinth Level |
-
latitude : 27.71934566
Longitude : 95.6850564
file name : Image_23112020121811946.png
|
2020-11-23 12:18:12.03471 |
4 |
39572816 |
Installation of Hume pipe at Dirak Pagla Huti( 3 Place) |
450000 |
Installation of Hume pipe at Dirak Pagla Huti( 3 Place)1 |
Substructure below GL |
-
latitude : 27.72763435,27.72764475
Longitude : 95.73180402,95.73180543
file name : Image_25122020134633783.png
|
2020-12-25 13:46:33.911087 |
5 |
44432265 |
Construction of open stage at uporlawpani khelpather |
500000 |
Construction of open stage at uporlawpani khelpather1 |
25% |
-
latitude : 27.75314689
Longitude : 95.71208378
file name : Image_14122020114134359.png
|
2020-12-14 11:41:34.453804 |
6 |
32696860 |
Repairing and Renovation of Hahkhati G P Office |
557650 |
Office Building1 |
25% |
-
latitude : 27.72075301
Longitude : 95.7068269
file name : Image_12122020125430373.png
|
2020-12-12 12:54:30.482685 |
7 |
39578625 |
Improvement of road from Kumsung Forest road to Jyotipur Road . |
300000 |
Improvement of road from Kumsung Forest road to Jyotipur Road .1 |
25% |
-
latitude : 27.72007898,27.72007007
Longitude : 95.71982099,95.71981258
file name : Image_02122020145536422.png
|
2020-12-02 14:55:36.542086 |
8 |
44415420 |
Improvement of Road from Mojbari Tiniali to Tengapani Parghat. |
300000 |
Improvement of Road from Mojbari Tiniali to Tengapani Parghat.1 |
25% |
-
latitude : 27.72546022,27.72546036,27.72549703
Longitude : 95.75633546,95.75631991,95.75628079
file name : Image_26112020153145934.png
|
2020-11-26 15:31:46.015688 |
9 |
39574311 |
Improvement of Road from Upor Lawpani Ram Mandir to PWD Road ph I |
276391 |
Improvement of Road from Upor Lawpani Ram Mandir to PWD Road ph I1 |
25% |
-
latitude : 27.75864246,27.75863403
Longitude : 95.6801837,95.68016929
file name : Image_24112020151620766.png
|
2020-11-24 15:16:13.972306 |
10 |
39573011 |
Construction of Nabajyoti Kala Kristi kendra at Hahkhati Bamun Gaon ph II |
200000 |
Construction of Nabajyoti Kala Kristi kendra at Hahkhati Bamun Gaon ph II1 |
25% |
-
latitude : 27.72247318
Longitude : 95.71573339
file name : Image_02122020150324009.png
|
2020-12-02 15:03:24.105307 |
11 |
39573383 |
Extention of Haluapather Open Stage |
500000 |
Extention of Haluapather Open Stage1 |
25% |
-
latitude : 27.73259884
Longitude : 95.70614608
file name : Image_02122020160043930.png
|
2020-12-02 16:00:44.03416 |
12 |
39580620 |
Improvement of road from weekly market to peddy field |
281133 |
Improvement of road from weekly market to peddy field1 |
25% |
-
latitude : 27.72739466,27.72739443
Longitude : 95.70264638,95.70264656
file name : Image_08122020145027959.png
|
2020-12-08 14:50:28.068207 |
13 |
39580620 |
Improvement of road from weekly market to peddy field |
281133 |
Improvement of road from weekly market to peddy field1 |
25% |
-
latitude : 27.72739466,27.72739443
Longitude : 95.70264638,95.70264656
file name : Image_08122020145039512.png
|
2020-12-08 14:50:39.632924 |
14 |
39579809 |
Construction of Open Stage at UparSisini Open Stage. |
500000 |
Construction of Open Stage at UparSisini Open Stage.1 |
25% |
-
latitude : 27.773363
Longitude : 95.66864333
file name : Image_24112020141221211.png
|
2020-11-24 14:12:21.330355 |
15 |
44430889 |
Construction of road with pavers from hahkhati Forest charali to dholla river ph 1 |
500000 |
Construction of road with pavers from hahkhati Forest charali to dholla river ph 11 |
Earth Work |
-
latitude : 27.71901536,27.71900933
Longitude : 95.72017229,95.72019119
file name : Image_02122020144731996.png
|
2020-12-02 14:47:32.103376 |
16 |
39573097 |
Improvement of road from Umesh Dokan Tiniali to PWD Road via Bishnu Mandir. |
300000 |
Improvement of road from Umesh Dokan Tiniali to PWD Road via Bishnu Mandir.1 |
25% |
-
latitude : 27.76637912,27.76635934
Longitude : 95.66253433,95.66250676
file name : Image_24112020150031859.png
|
2020-11-24 15:00:31.95834 |
17 |
39573276 |
Improvement of road from Bogedhar Tiniali to Uporlawpani M E School Ph IV |
300000 |
Improvement of road from Bogedhar Tiniali to Uporlawpani M E School Ph IV1 |
25% |
-
latitude : 27.76058553,27.76055992
Longitude : 95.69063543,95.69065438
file name : Image_24112020153852294.png
|
2020-11-24 15:38:52.390605 |
18 |
44423790 |
Construction of Youth Club at Himanta Tengapani |
300000 |
Construction of Youth Club at Himanta Tengapani1 |
25% |
-
latitude : 27.73076891
Longitude : 95.7751182
file name : Image_21122020142258455.png
|
2020-12-21 14:22:58.546728 |
19 |
44431167 |
Construction of road with pavers from Bagan Gaon Krishna Mandir to END Bundh Ph 1 |
500000 |
Construction of road with pavers from Bagan Gaon Krishna Mandir to END Bundh Ph 11 |
Earth Work |
-
latitude : 27.71943294,27.7194402,27.71947284
Longitude : 95.68506486,95.68507556,95.68512941
file name : Image_26112020124231998.png
|
2020-11-26 12:42:32.101 |
20 |
44431204 |
Upgradation of Puwali pather Shiv Kala krishti kendra |
400000 |
Upgradation of Puwali pather Shiv Kala krishti kendra1 |
25% |
-
latitude : 27.71163416
Longitude : 95.69668362
file name : Image_19122020142241035.png
|
2020-12-19 14:22:41.127371 |
21 |
44423826 |
Construction of waiting shed |
364881 |
Construction of waiting shed 1 |
25% |
-
latitude : 27.72318077
Longitude : 95.67641272
file name : Image_26112020123658419.png
|
2020-11-26 12:36:58.516542 |
22 |
44431363 |
Constuction of road with CC Block Hahkhati Bamun Gaon Tiniali to Giri gaon Chuk |
300000 |
Constuction of road with CC Block Hahkhati Bamun Gaon Tiniali to Giri gaon Chuk1 |
Earth Work |
-
latitude : 27.71904654,27.71904457
Longitude : 95.72013545,95.72013328
file name : Image_26112020134046212.png
|
2020-11-26 13:40:46.298219 |
23 |
44431363 |
Constuction of road with CC Block Hahkhati Bamun Gaon Tiniali to Giri gaon Chuk |
300000 |
Constuction of road with CC Block Hahkhati Bamun Gaon Tiniali to Giri gaon Chuk1 |
Earth Work |
-
latitude : 27.72009024,27.72005796
Longitude : 95.71260914,95.71264579
file name : Image_02122020152407865.png
|
2020-12-02 15:24:07.97523 |
24 |
44423939 |
Construction of Sanitary Toilet |
400000 |
Construction of Sanitary Toilet 1 |
25% |
-
latitude : 27.72090428
Longitude : 95.70710553
file name : Image_12122020124013694.png
|
2020-12-12 12:40:13.803721 |
25 |
44423939 |
Construction of Sanitary Toilet |
400000 |
Construction of Sanitary Toilet 1 |
25% |
-
latitude : 27.72060924
Longitude : 95.70324251
file name : Image_03122020115527064.png
|
2020-12-03 11:55:27.161014 |
26 |
49592153 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P |
450000 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P1 |
Completion of work |
-
latitude : 27.756619
Longitude : 95.69682707
file name : Image_22122021105350391.png
|
2021-12-22 10:53:50.497951 |
27 |
49592153 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P |
450000 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P1 |
Completion of work |
-
latitude : 27.74590682
Longitude : 95.72813836
file name : Image_22122021105353684.png
|
2021-12-22 10:53:53.789593 |
28 |
49592153 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P |
450000 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P2 |
Completion of work |
-
latitude : 27.72597574
Longitude : 95.75682914
file name : Image_22122021105436198.png
|
2021-12-22 10:54:36.320868 |
29 |
49592153 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P |
450000 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P1 |
Completion of work |
-
latitude : 27.70993286
Longitude : 95.75761592
file name : Image_22122021110746737.png
|
2021-12-22 11:07:46.848213 |
30 |
49592153 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P |
450000 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P2 |
Completion of work |
-
latitude : 27.7249306
Longitude : 95.7064568
file name : Image_22122021120211225.png
|
2021-12-22 12:02:11.306468 |
31 |
49592153 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P |
450000 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P1 |
Completion of work |
-
latitude : 27.72696298
Longitude : 95.70572192
file name : Image_22122021120257663.png
|
2021-12-22 12:02:57.76875 |
32 |
49592153 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P |
450000 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P2 |
Completion of work |
-
latitude : 27.71867144
Longitude : 95.71072021
file name : Image_22122021120806441.png
|
2021-12-22 12:08:06.527764 |
33 |
49592153 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P |
450000 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P3 |
Completion of work |
-
latitude : 27.72060778
Longitude : 95.70334932
file name : Image_22122021132418173.png
|
2021-12-22 13:24:18.287709 |
34 |
49592153 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P |
450000 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P4 |
Completion of work |
-
latitude : 27.7203111
Longitude : 95.70328958
file name : Image_22122021132421516.png
|
2021-12-22 13:24:21.613483 |
35 |
49592153 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P |
450000 |
Construction of Sanitary Toilet at Polling Station within Hahkhati G P4 |
Completion of work |
-
latitude : 27.72032981
Longitude : 95.70317549
file name : Image_22122021132424685.png
|
2021-12-22 13:24:24.786366 |
36 |
65757101 |
Water Supply to villages |
676000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 27.71934366
Longitude : 95.6837457
file name : Image_30112022133130660.png
|
2022-11-30 13:31:30.785477 |
37 |
65756990 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.71366841
Longitude : 95.69302442
file name : Image_13122023134319524.png
|
2023-12-13 13:43:19.622993 |
38 |
65756990 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.71965808
Longitude : 95.70192917
file name : Image_17022023151040931.png
|
2023-02-17 15:10:41.018597 |
39 |
64917343 |
Water Supply to villages |
540000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 27.77268201
Longitude : 95.6653279
file name : Image_23082024121039578.png
|
2024-08-23 12:10:39.688745 |
40 |
64917343 |
Water Supply to villages |
540000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 27.71934567
Longitude : 95.68414251
file name : Image_29032023155757759.png
|
2023-03-29 15:57:57.855895 |
41 |
64917542 |
Construction of Community Sanitary Complex |
135000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.72093755
Longitude : 95.70558918
file name : Image_31082024113506834.png
|
2024-08-31 11:35:07.372906 |
42 |
64917542 |
Construction of Community Sanitary Complex |
135000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.7209592
Longitude : 95.7055816
file name : Image_31082024112930854.png
|
2024-08-31 11:29:31.3207 |
43 |
64917542 |
Construction of Community Sanitary Complex |
135000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.74602695
Longitude : 95.72805675
file name : Image_02022023151825602.png
|
2023-02-02 15:18:25.691178 |
44 |
64917542 |
Construction of Community Sanitary Complex |
135000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.74602695
Longitude : 95.72805675
file name : Image_02022023151858725.png
|
2023-02-02 15:18:58.809436 |
45 |
64917542 |
Construction of Community Sanitary Complex |
135000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.74605672
Longitude : 95.72798524
file name : Image_23122023121335471.png
|
2023-12-23 12:13:35.453749 |
46 |
64917977 |
REPAIRING OF MULUK GAON AGANBADI CENTER |
100000 |
REPAIRING OF MULUK GAON AGANBADI CENTER1 |
Plinth level |
-
latitude : 27.7209425
Longitude : 95.7054388
file name : Image_31082024121739672.png
|
2024-08-31 12:17:39.965559 |
47 |
64917977 |
REPAIRING OF MULUK GAON AGANBADI CENTER |
100000 |
REPAIRING OF MULUK GAON AGANBADI CENTER1 |
Completion of work |
-
latitude : 27.72946466
Longitude : 95.68667192
file name : Image_11092023144526856.png
|
2023-09-11 14:45:26.954143 |
48 |
55263946 |
UPGRADATION OF LAKHI KALA KRISHTI KENDRA AT DIRAK BON GAON |
400000 |
UPGRADATION OF LAKHI KALA KRISHTI KENDRA AT DIRAK BON GAON1 |
Plinth level |
-
latitude : 27.7209423
Longitude : 95.7054384
file name : Image_31082024123356304.png
|
2024-08-31 12:33:56.838679 |
49 |
55263946 |
UPGRADATION OF LAKHI KALA KRISHTI KENDRA AT DIRAK BON GAON |
400000 |
UPGRADATION OF LAKHI KALA KRISHTI KENDRA AT DIRAK BON GAON1 |
Completion of work |
-
latitude : 27.72158547
Longitude : 95.74398064
file name : Image_10012022132448575.png
|
2022-01-10 13:24:48.694221 |
50 |
65757050 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.7209421
Longitude : 95.7054312
file name : Image_31082024115848056.png
|
2024-08-31 11:58:48.907541 |
51 |
65757050 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.76626598
Longitude : 95.66665374
file name : Image_08052023121641451.png
|
2023-05-08 12:16:41.568815 |
52 |
65757050 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.76232859
Longitude : 95.67645681
file name : Image_02022023152655276.png
|
2023-02-02 15:26:55.374564 |
53 |
66589677 |
Reparing of Haluwa Pather Anganwadi centre |
200000 |
Reparing of Haluwa Pather Anganwadi centre1 |
Plinth level |
-
latitude : 27.7209415
Longitude : 95.7054337
file name : Image_31082024120728382.png
|
2024-08-31 12:07:28.580863 |
54 |
66589677 |
Reparing of Haluwa Pather Anganwadi centre |
200000 |
Reparing of Haluwa Pather Anganwadi centre1 |
Completion of work |
-
latitude : 27.72724815
Longitude : 95.70575127
file name : Image_02022023141612679.png
|
2023-02-02 14:16:12.772294 |
55 |
64917604 |
Construction of Community Sanitary Complex |
135000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.720937
Longitude : 95.7054343
file name : Image_31082024132932189.png
|
2024-08-31 13:29:32.654173 |
56 |
64917604 |
Construction of Community Sanitary Complex |
135000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.71368478
Longitude : 95.69296908
file name : Image_02022023132236984.png
|
2023-02-02 13:22:37.116756 |
57 |
65756627 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.7209425
Longitude : 95.7054388
file name : Image_31082024130208352.png
|
2024-08-31 13:02:08.451812 |
58 |
65756627 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.7209425
Longitude : 95.7054388
file name : Image_31082024130057872.png
|
2024-08-31 13:00:58.758066 |
59 |
65756627 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.76612719
Longitude : 95.66679572
file name : Image_28092023114340414.png
|
2023-09-28 11:43:40.507991 |
60 |
55263850 |
construction of sanitary toilet |
362182 |
construction of sanitary toilet1 |
Plinth level |
-
latitude : 27.7209435
Longitude : 95.7054393
file name : Image_31082024131054257.png
|
2024-08-31 13:10:54.474564 |
61 |
55263850 |
construction of sanitary toilet |
362182 |
construction of sanitary toilet1 |
Completion of work |
-
latitude : 27.72950658
Longitude : 95.68828239
file name : Image_20072022151317105.png
|
2022-07-20 15:13:17.200762 |
62 |
55263762 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT |
450000 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT1 |
Plinth level |
-
latitude : 27.71010506
Longitude : 95.75530009
file name : Image_03052024113847228.png
|
2024-05-03 11:38:47.325333 |
63 |
55263762 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT |
450000 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT1 |
Completion of work |
-
latitude : 27.71021029
Longitude : 95.75541508
file name : Image_23092022125807675.png
|
2022-09-23 12:58:07.810457 |
64 |
55263762 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT |
450000 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT1 |
Completion of work |
-
latitude : 27.73254772
Longitude : 95.70639714
file name : Image_10062022134111001.png
|
2022-06-10 13:41:11.115394 |
65 |
65755816 |
REPEARING OF HAHKHATI RAI GAON AGANWADI CENTRE |
200000 |
REPEARING OF HAHKHATI RAI GAON AGANWADI CENTRE1 |
Plinth level |
-
latitude : 27.72337233
Longitude : 95.70674241
file name : Image_14122023122638138.png
|
2023-12-14 12:26:38.233433 |
66 |
65755816 |
REPEARING OF HAHKHATI RAI GAON AGANWADI CENTRE |
200000 |
REPEARING OF HAHKHATI RAI GAON AGANWADI CENTRE1 |
Completion of work |
-
latitude : 27.72342498
Longitude : 95.7066564
file name : Image_17022023150636381.png
|
2023-02-17 15:06:36.509532 |
67 |
65758120 |
REPEARING OF HAHKHATI BAMUN GAON AGANWADI CENTRE |
200000 |
REPEARING OF HAHKHATI BAMUN GAON AGANWADI CENTRE1 |
Roof laid |
-
latitude : 27.72414569
Longitude : 95.71591207
file name : Image_23122023121417861.png
|
2023-12-23 12:14:17.961555 |
68 |
65758120 |
REPEARING OF HAHKHATI BAMUN GAON AGANWADI CENTRE |
200000 |
REPEARING OF HAHKHATI BAMUN GAON AGANWADI CENTRE1 |
Plinth level |
-
latitude : 27.72417015
Longitude : 95.71586794
file name : Image_17022023145840604.png
|
2023-02-17 14:58:40.719392 |
69 |
55264013 |
UPGRADATION OF KALI KALA KRISHTI KENDRA AT HAHKHATI T E |
400000 |
UPGRADATION OF KALI KALA KRISHTI KENDRA AT HAHKHATI T E1 |
Roof laid |
-
latitude : 27.720091
Longitude : 95.6800204
file name : Image_07122023130842245.png
|
2023-12-07 13:08:42.3415 |
70 |
55264013 |
UPGRADATION OF KALI KALA KRISHTI KENDRA AT HAHKHATI T E |
400000 |
UPGRADATION OF KALI KALA KRISHTI KENDRA AT HAHKHATI T E1 |
Roof laid |
-
latitude : 27.71998257
Longitude : 95.68007052
file name : Image_30112023102814867.png
|
2023-11-30 10:28:14.967383 |
71 |
55264013 |
UPGRADATION OF KALI KALA KRISHTI KENDRA AT HAHKHATI T E |
400000 |
UPGRADATION OF KALI KALA KRISHTI KENDRA AT HAHKHATI T E1 |
Roof laid |
-
latitude : 27.71999938
Longitude : 95.68013542
file name : Image_17112023105315038.png
|
2023-11-17 10:53:15.147157 |
72 |
55264013 |
UPGRADATION OF KALI KALA KRISHTI KENDRA AT HAHKHATI T E |
400000 |
UPGRADATION OF KALI KALA KRISHTI KENDRA AT HAHKHATI T E1 |
Roof laid |
-
latitude : 27.71993296
Longitude : 95.68008296
file name : Image_09082023104658415.png
|
2023-08-09 10:46:58.520193 |
73 |
55264013 |
UPGRADATION OF KALI KALA KRISHTI KENDRA AT HAHKHATI T E |
400000 |
UPGRADATION OF KALI KALA KRISHTI KENDRA AT HAHKHATI T E1 |
Completion of work |
-
latitude : 27.71977674
Longitude : 95.67992187
file name : Image_10012022152612183.png
|
2022-01-10 15:26:12.319903 |
74 |
65756923 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.71945891
Longitude : 95.68478865
file name : Image_30112023103051175.png
|
2023-11-30 10:30:51.275237 |
75 |
65756923 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.71947816
Longitude : 95.68473451
file name : Image_07122023131125700.png
|
2023-12-07 13:11:25.791093 |
76 |
65756923 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.71971701
Longitude : 95.68476496
file name : Image_09082023105438702.png
|
2023-08-09 10:54:38.791647 |
77 |
65756923 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.71979048
Longitude : 95.68472911
file name : Image_17112023110431146.png
|
2023-11-17 11:04:31.243915 |
78 |
65756923 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.71980827
Longitude : 95.68472453
file name : Image_17022023152808796.png
|
2023-02-17 15:28:08.887897 |
79 |
55263850 |
construction of sanitary toilet |
362182 |
construction of sanitary toilet1 |
Plinth level |
-
latitude : 27.7209435
Longitude : 95.7054393
file name : Image_31082024130938287.png
|
2024-08-31 13:09:38.483213 |
80 |
55263850 |
construction of sanitary toilet |
362182 |
construction of sanitary toilet1 |
Completion of work |
-
latitude : 27.76153351
Longitude : 95.68848771
file name : Image_10012022111402431.png
|
2022-01-10 11:14:02.537565 |
81 |
65756851 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 27.72328381
Longitude : 95.70696308
file name : Image_14122023124351700.png
|
2023-12-14 12:43:51.789761 |
82 |
65756851 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.72336704
Longitude : 95.70672771
file name : Image_14122023122525532.png
|
2023-12-14 12:25:25.618009 |
83 |
65756851 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.76621364
Longitude : 95.66669387
file name : Image_08052023121752210.png
|
2023-05-08 12:17:52.356439 |
84 |
65756851 |
Construction of Community Sanitary Complex |
135200 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.72343203
Longitude : 95.70672511
file name : Image_17022023150728436.png
|
2023-02-17 15:07:28.518618 |
85 |
65755555 |
CONSTRUCTION OF A OPEN STAGE FOR CULTURE ACTIVITY NEAR JESU CHURCH AT BAGAN GAON |
400000 |
CONSTRUCTION OF A OPEN STAGE FOR CULTURE ACTIVITY NEAR JESU CHURCH AT BAGAN GAON1 |
Plinth level |
-
latitude : 27.7209418
Longitude : 95.7054372
file name : Image_31082024115240760.png
|
2024-08-31 11:52:41.572705 |
86 |
65755555 |
CONSTRUCTION OF A OPEN STAGE FOR CULTURE ACTIVITY NEAR JESU CHURCH AT BAGAN GAON |
400000 |
CONSTRUCTION OF A OPEN STAGE FOR CULTURE ACTIVITY NEAR JESU CHURCH AT BAGAN GAON1 |
Plinth level |
-
latitude : 27.71925396
Longitude : 95.68770969
file name : Image_26062024104149509.png
|
2024-06-26 10:41:49.59972 |
87 |
65755555 |
CONSTRUCTION OF A OPEN STAGE FOR CULTURE ACTIVITY NEAR JESU CHURCH AT BAGAN GAON |
400000 |
CONSTRUCTION OF A OPEN STAGE FOR CULTURE ACTIVITY NEAR JESU CHURCH AT BAGAN GAON1 |
Completion of work |
-
latitude : 27.71935377
Longitude : 95.68751646
file name : Image_29032023153939463.png
|
2023-03-29 15:39:39.584306 |
88 |
64917922 |
REPAIRING OF HAHKHATI GIRLS ME SCHOOL |
160000 |
REPAIRING OF HAHKHATI GIRLS ME SCHOOL1 |
Plinth level |
-
latitude : 27.72325963
Longitude : 95.70735368
file name : Image_14122023122956299.png
|
2023-12-14 12:29:56.382168 |
89 |
64917922 |
REPAIRING OF HAHKHATI GIRLS ME SCHOOL |
160000 |
REPAIRING OF HAHKHATI GIRLS ME SCHOOL1 |
Plinth level |
-
latitude : 27.72308775
Longitude : 95.7073679
file name : Image_14122023124243255.png
|
2023-12-14 12:42:43.333042 |
90 |
64917922 |
REPAIRING OF HAHKHATI GIRLS ME SCHOOL |
160000 |
REPAIRING OF HAHKHATI GIRLS ME SCHOOL1 |
Completion of work |
-
latitude : 27.72332927
Longitude : 95.70732083
file name : Image_17022023150512718.png
|
2023-02-17 15:05:12.795284 |
91 |
64917922 |
REPAIRING OF HAHKHATI GIRLS ME SCHOOL |
160000 |
REPAIRING OF HAHKHATI GIRLS ME SCHOOL1 |
Completion of work |
-
latitude : 27.72330448
Longitude : 95.70728419
file name : Image_02022023131913030.png
|
2023-02-02 13:19:13.116912 |
92 |
64917861 |
REPAIRING OF 2 NO HARU DIRAK BONUWA LP SCHOOL |
160000 |
REPAIRING OF 2 NO HARU DIRAK BONUWA LP SCHOOL1 |
Plinth level |
-
latitude : 27.7209415
Longitude : 95.7054349
file name : Image_31082024125016028.png
|
2024-08-31 12:50:16.770375 |
93 |
64917861 |
REPAIRING OF 2 NO HARU DIRAK BONUWA LP SCHOOL |
160000 |
REPAIRING OF 2 NO HARU DIRAK BONUWA LP SCHOOL1 |
Completion of work |
-
latitude : 27.7187206
Longitude : 95.75563032
file name : Image_03022023121546241.png
|
2023-02-03 12:15:46.339648 |
94 |
64917861 |
REPAIRING OF 2 NO HARU DIRAK BONUWA LP SCHOOL |
160000 |
REPAIRING OF 2 NO HARU DIRAK BONUWA LP SCHOOL1 |
Completion of work |
-
latitude : 27.7187206
Longitude : 95.75563032
file name : Image_03022023121553099.png
|
2023-02-03 12:15:53.201853 |
95 |
64917861 |
REPAIRING OF 2 NO HARU DIRAK BONUWA LP SCHOOL |
160000 |
REPAIRING OF 2 NO HARU DIRAK BONUWA LP SCHOOL1 |
Completion of work |
-
latitude : 27.7187075
Longitude : 95.75561463
file name : Image_03022023121549677.png
|
2023-02-03 12:15:49.777839 |
96 |
64917861 |
REPAIRING OF 2 NO HARU DIRAK BONUWA LP SCHOOL |
160000 |
REPAIRING OF 2 NO HARU DIRAK BONUWA LP SCHOOL1 |
Completion of work |
-
latitude : 27.71865787
Longitude : 95.75564623
file name : Image_03022023121542928.png
|
2023-02-03 12:15:43.038444 |
97 |
64917861 |
REPAIRING OF 2 NO HARU DIRAK BONUWA LP SCHOOL |
160000 |
REPAIRING OF 2 NO HARU DIRAK BONUWA LP SCHOOL1 |
Completion of work |
-
latitude : 27.7187075
Longitude : 95.75561463
file name : Image_03022023121556538.png
|
2023-02-03 12:15:56.631771 |
98 |
64917445 |
Construction of Community Sanitary Complex |
270000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.7209425
Longitude : 95.7054388
file name : Image_31082024122925702.png
|
2024-08-31 12:29:26.157772 |
99 |
64917445 |
Construction of Community Sanitary Complex |
270000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.7209425
Longitude : 95.7054388
file name : Image_31082024122558967.png
|
2024-08-31 12:25:59.374113 |
100 |
64918043 |
REPAIRING OF 2 NO MULUK GAON AGANBADI CENTER |
100000 |
REPAIRING OF 2 NO MULUK GAON AGANBADI CENTER1 |
Plinth level |
-
latitude : 27.7209425
Longitude : 95.7054388
file name : Image_31082024122059186.png
|
2024-08-31 12:20:59.540205 |
101 |
64918043 |
REPAIRING OF 2 NO MULUK GAON AGANBADI CENTER |
100000 |
REPAIRING OF 2 NO MULUK GAON AGANBADI CENTER1 |
Completion of work |
-
latitude : 27.73618965
Longitude : 95.68605226
file name : Image_11092023144800651.png
|
2023-09-11 14:48:00.743081 |
102 |
66589896 |
Repairing of Puwali Pathar LP School |
202000 |
Repairing of Puwali Pathar LP School1 |
Plinth level |
-
latitude : 27.71370311
Longitude : 95.69313858
file name : Image_13122023135246443.png
|
2023-12-13 13:52:47.095722 |
103 |
66589896 |
Repairing of Puwali Pathar LP School |
202000 |
Repairing of Puwali Pathar LP School1 |
Plinth level |
-
latitude : 27.7136711
Longitude : 95.69308227
file name : Image_13122023134148271.png
|
2023-12-13 13:41:48.364848 |
104 |
66589896 |
Repairing of Puwali Pathar LP School |
202000 |
Repairing of Puwali Pathar LP School1 |
Completion of work |
-
latitude : 27.71376843
Longitude : 95.69319741
file name : Image_02022023132233200.png
|
2023-02-02 13:22:33.297826 |
105 |
64917767 |
REPAIRING OF BOGARIBARI LP SCHOOL |
200000 |
REPAIRING OF BOGARIBARI LP SCHOOL1 |
Plinth level |
-
latitude : 27.74585354
Longitude : 95.72810057
file name : Image_16122023111230795.png
|
2023-12-16 11:12:30.900364 |
106 |
64917767 |
REPAIRING OF BOGARIBARI LP SCHOOL |
200000 |
REPAIRING OF BOGARIBARI LP SCHOOL1 |
Completion of work |
-
latitude : 27.7458308
Longitude : 95.72811687
file name : Image_02022023151743422.png
|
2023-02-02 15:17:43.503144 |
107 |
87159737 |
Construction of Community Sanitary Complex |
140000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.73287909
Longitude : 95.7060594
file name : Image_03072024114921858.png
|
2024-07-03 11:49:21.945923 |
108 |
87163401 |
REPEARING OF PUWALI PATHAR AWC |
160000 |
REPEARING OF PUWALI PATHAR AWC1 |
Completion of work |
-
latitude : 27.7210087
Longitude : 95.7052862
file name : Image_25092024141738415.png
|
2024-09-25 14:17:38.521147 |
109 |
87163456 |
REPEARING OF GYAN KUHI AWC |
160000 |
REPEARING OF GYAN KUHI AWC1 |
Plinth level |
-
latitude : 27.7209418
Longitude : 95.7054372
file name : Image_31082024135109074.png
|
2024-08-31 13:51:09.81999 |
110 |
87163456 |
REPEARING OF GYAN KUHI AWC |
160000 |
REPEARING OF GYAN KUHI AWC1 |
Completion of work |
-
latitude : 27.7209418
Longitude : 95.7054372
file name : Image_31082024134813423.png
|
2024-08-31 13:48:14.127649 |
111 |
87163456 |
REPEARING OF GYAN KUHI AWC |
160000 |
REPEARING OF GYAN KUHI AWC1 |
Completion of work |
-
latitude : 27.72223186
Longitude : 95.74440539
file name : Image_03072024123208525.png
|
2024-07-03 12:32:08.612844 |
112 |
87163063 |
Water Supply to villages |
558600 |
Water Supply to villages1 |
Completion of work |
-
latitude : 27.77250604
Longitude : 95.66531621
file name : Image_23082024120952616.png
|
2024-08-23 12:09:52.728617 |
113 |
87159848 |
Construction of Community Sanitary Complex |
140000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 27.7209423
Longitude : 95.7054384
file name : Image_31082024134420919.png
|
2024-08-31 13:44:21.576089 |
114 |
87159848 |
Construction of Community Sanitary Complex |
140000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.7209432
Longitude : 95.7054391
file name : Image_31082024134107475.png
|
2024-08-31 13:41:08.096435 |
115 |
87159848 |
Construction of Community Sanitary Complex |
140000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.7222794
Longitude : 95.71588092
file name : Image_03072024123248457.png
|
2024-07-03 12:32:48.544839 |
116 |
87161641 |
REPEARING OF VO MAHILA SAMITI OFFICE |
266800 |
REPEARING OF VO MAHILA SAMITI OFFICE1 |
Completion of work |
-
latitude : 27.72356588
Longitude : 95.70639371
file name : Image_03072024123839819.png
|
2024-07-03 12:38:39.910236 |
117 |
87637428 |
Any other operation and maintenance needs related to solid waste management |
83550 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 27.71195701
Longitude : 95.69662775
file name : Image_10062024150439631.png
|
2024-06-10 15:04:39.72967 |
118 |
87637428 |
Any other operation and maintenance needs related to solid waste management |
83550 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.71200499
Longitude : 95.6968046
file name : Image_03052024123832486.png
|
2024-05-03 12:38:32.578352 |
119 |
87637428 |
Any other operation and maintenance needs related to solid waste management |
83550 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.72481589
Longitude : 95.75311425
file name : Image_03052024114345759.png
|
2024-05-03 11:43:45.86615 |
120 |
87638126 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 27.71185263
Longitude : 95.6967831
file name : Image_10062024145929397.png
|
2024-06-10 14:59:29.521362 |
121 |
87638126 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 27.71991966
Longitude : 95.68746163
file name : Image_07062024113122665.png
|
2024-06-07 11:31:22.756638 |
122 |
87638126 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.75838797
Longitude : 95.68988389
file name : Image_03052024121427240.png
|
2024-05-03 12:14:27.34613 |
123 |
87638528 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 27.7209429
Longitude : 95.705439
file name : Image_31082024133703867.png
|
2024-08-31 13:37:04.422169 |
124 |
87638528 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.7209432
Longitude : 95.7054391
file name : Image_31082024133408806.png
|
2024-08-31 13:34:09.332464 |
125 |
87638528 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.7207724
Longitude : 95.7048155
file name : Image_10062024144729178.png
|
2024-06-10 14:47:29.295049 |
126 |
87638391 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 27.71187483
Longitude : 95.69675139
file name : Image_10062024145813195.png
|
2024-06-10 14:58:13.304481 |
127 |
87638391 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 27.7209382
Longitude : 95.7054377
file name : Image_07062024112209521.png
|
2024-06-07 11:22:09.607983 |
128 |
87638391 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.71188513
Longitude : 95.69668199
file name : Image_03052024123710873.png
|
2024-05-03 12:37:10.965906 |
129 |
87637806 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 27.71990362
Longitude : 95.68743889
file name : Image_10062024151145027.png
|
2024-06-10 15:11:45.135724 |
130 |
87637806 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 27.71980735
Longitude : 95.68741103
file name : Image_07062024112832114.png
|
2024-06-07 11:28:32.20607 |
131 |
87637806 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.7197868
Longitude : 95.68735142
file name : Image_03052024105602398.png
|
2024-05-03 10:56:02.51067 |
132 |
87638010 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 27.7207724
Longitude : 95.7048155
file name : Image_10062024144537862.png
|
2024-06-10 14:45:37.972828 |
133 |
87638010 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.72212786
Longitude : 95.74430812
file name : Image_03052024115124778.png
|
2024-05-03 11:51:24.862586 |
134 |
87637913 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 27.71198679
Longitude : 95.69664964
file name : Image_10062024150059009.png
|
2024-06-10 15:00:59.120498 |
135 |
87637913 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 27.71982764
Longitude : 95.68740787
file name : Image_07062024113014317.png
|
2024-06-07 11:30:14.427489 |
136 |
87637913 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.73257585
Longitude : 95.70600179
file name : Image_03052024120336947.png
|
2024-05-03 12:03:37.048014 |
137 |
87637716 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 27.67571913
Longitude : 95.56816272
file name : Image_10062024144159248.png
|
2024-06-10 14:41:59.353106 |
138 |
87637716 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 27.72078921
Longitude : 95.70487838
file name : Image_07062024113428601.png
|
2024-06-07 11:34:28.700186 |
139 |
87637716 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.7208805
Longitude : 95.7047115
file name : Image_03052024123229375.png
|
2024-05-03 12:32:29.462717 |
140 |
87637632 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 27.71189456
Longitude : 95.69664801
file name : Image_10062024150256846.png
|
2024-06-10 15:02:56.95304 |
141 |
87637632 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 27.7209016
Longitude : 95.7053866
file name : Image_07062024113612907.png
|
2024-06-07 11:36:12.99363 |
142 |
87637632 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.71004659
Longitude : 95.75537724
file name : Image_03052024113629330.png
|
2024-05-03 11:36:29.431809 |
143 |
87637543 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 27.71987008
Longitude : 95.68742498
file name : Image_10062024151034067.png
|
2024-06-10 15:10:34.167583 |
144 |
87637543 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 27.7208631
Longitude : 95.70486407
file name : Image_07062024113516267.png
|
2024-06-07 11:35:16.354344 |
145 |
87637543 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 27.7209395
Longitude : 95.7054334
file name : Image_07062024112046990.png
|
2024-06-07 11:20:47.081283 |
146 |
87637543 |
Any other operation and maintenance needs related to solid waste management |
15000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 27.75841546
Longitude : 95.68989237
file name : Image_03052024121536764.png
|
2024-05-03 12:15:36.856986 |
147 |
66589825 |
Repairing of Uper Lawpani High School |
150000 |
Repairing of Uper Lawpani High School1 |
Plinth level |
-
latitude : 27.7198977
Longitude : 95.7044831
file name : Image_13122023135143478.png
|
2023-12-13 13:51:43.640535 |
148 |
66589825 |
Repairing of Uper Lawpani High School |
150000 |
Repairing of Uper Lawpani High School1 |
Completion of work |
-
latitude : 27.76230383
Longitude : 95.67646276
file name : Image_02022023152759780.png
|
2023-02-02 15:27:59.866888 |
149 |
55263762 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT |
450000 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT1 |
Plinth level |
-
latitude : 27.71010575
Longitude : 95.75531011
file name : Image_03052024113807278.png
|
2024-05-03 11:38:07.386478 |
150 |
55263762 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT |
450000 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT1 |
Completion of work |
-
latitude : 27.71021506
Longitude : 95.75535751
file name : Image_23092022125908715.png
|
2022-09-23 12:59:08.841554 |
151 |
55263762 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT |
450000 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT1 |
Completion of work |
-
latitude : 27.73256991
Longitude : 95.70640923
file name : Image_10062022134431462.png
|
2022-06-10 13:44:31.571903 |
152 |
55263762 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT |
450000 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT1 |
Plinth level |
-
latitude : 27.71009933
Longitude : 95.7553092
file name : Image_03052024113721304.png
|
2024-05-03 11:37:21.411702 |
153 |
55263762 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT |
450000 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT1 |
Completion of work |
-
latitude : 27.7102093
Longitude : 95.75534422
file name : Image_23092022125954539.png
|
2022-09-23 12:59:54.668628 |
154 |
55263762 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT |
450000 |
INSTALLATION OF PURE DRINKING WATER FACILITY AT1 |
Completion of work |
-
latitude : 27.74569735
Longitude : 95.72789265
file name : Image_10062022140057828.png
|
2022-06-10 14:00:57.921375 |
155 |
55264453 |
construction of road with pavers from laopani gaon bidha house to ganesh lai thapa house |
416964 |
construction of road with pavers from laopani gaon bidha house to ganesh lai thapa house1 |
Roof laid |
-
latitude : 27.7208785,27.7208785
Longitude : 95.7054201,95.7054201
file name : Image_31082024124029712.png
|
2024-08-31 12:40:30.334908 |
156 |
55264453 |
construction of road with pavers from laopani gaon bidha house to ganesh lai thapa house |
416964 |
construction of road with pavers from laopani gaon bidha house to ganesh lai thapa house1 |
Roof laid |
-
latitude : 27.76682238,27.76680286
Longitude : 95.65742055,95.65742685
file name : Image_26072024102754056.png
|
2024-07-26 10:27:54.153813 |
157 |
55264453 |
construction of road with pavers from laopani gaon bidha house to ganesh lai thapa house |
416964 |
construction of road with pavers from laopani gaon bidha house to ganesh lai thapa house1 |
Completion of work |
-
latitude : 27.76651532,27.76654566
Longitude : 95.65825728,95.65826896
file name : Image_22022022101440918.png
|
2022-02-22 10:14:41.005788 |
158 |
55264227 |
construction of sanitary Toilet at Hahkhati Girls M E school |
90000 |
construction of sanitary Toilet at Hahkhati Girls M E school1 |
Completion of work |
-
latitude : 27.72950566
Longitude : 95.68830101
file name : Image_20072022151200358.png
|
2022-07-20 15:12:00.455561 |
159 |
55264227 |
construction of sanitary Toilet at Hahkhati Girls M E school |
90000 |
construction of sanitary Toilet at Hahkhati Girls M E school1 |
Completion of work |
-
latitude : 27.72315996
Longitude : 95.70731649
file name : Image_08122021103250801.png
|
2021-12-08 10:32:50.918451 |
160 |
87636129 |
Construction of Community Sanitary Complex |
150000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 27.6754847
Longitude : 95.5680367
file name : Image_26092024134716303.png
|
2024-09-26 13:47:16.37975 |