1 |
35591718 |
Repair Pucca Drain Khagen to Dilip S XV 14th |
350000 |
Repair Pucca Drain Khagen to Dilip S XV 14th1 |
Roof laid |
-
latitude : 22.6665032,22.66656991560012
Longitude : 88.8728156,88.87279420159757
file name : Image_20072024130653623.png
|
2024-07-20 13:06:53.710398 |
2 |
35591718 |
Repair Pucca Drain Khagen to Dilip S XV 14th |
350000 |
Repair Pucca Drain Khagen to Dilip S XV 14th1 |
Roof laid |
-
latitude : 22.671224386431277,22.671201629564166
Longitude : 88.87238608673215,88.87231140397489
file name : Image_17022021123431027.png
|
2021-02-17 12:34:31.123033 |
3 |
35591718 |
Repair Pucca Drain Khagen to Dilip S XV 14th |
350000 |
Repair Pucca Drain Khagen to Dilip S XV 14th1 |
Plinth level |
-
latitude : 22.67118662595749,22.671191110275686
Longitude : 88.87236664071679,88.87233579531312
file name : Image_08022021141139808.png
|
2021-02-08 14:11:39.891898 |
4 |
35591718 |
Repair Pucca Drain Khagen to Dilip S XV 14th |
350000 |
Repair Pucca Drain Khagen to Dilip S XV 14th1 |
Completion of work |
-
latitude : 22.67116852104664,22.67118943389505
Longitude : 88.87235163711011,88.87236362323165
file name : Image_24012021172053826.png
|
2021-01-24 17:20:53.921013 |
5 |
35592500 |
Repair Pucca Drain Afchar to Tapan SXVII 14th |
350000 |
Repair Pucca Drain Afchar to Tapan SXVII 14th1 |
Roof laid |
-
latitude : 22.6664739,22.6664476
Longitude : 88.8728218,88.8728402
file name : Image_20072024130940221.png
|
2024-07-20 13:09:40.305273 |
6 |
35592500 |
Repair Pucca Drain Afchar to Tapan SXVII 14th |
350000 |
Repair Pucca Drain Afchar to Tapan SXVII 14th1 |
Roof laid |
-
latitude : 22.67240556422621,22.672397014684975
Longitude : 88.87859456241131,88.87854611501098
file name : Image_02032021164011288.png
|
2021-03-02 16:40:11.401183 |
7 |
35592500 |
Repair Pucca Drain Afchar to Tapan SXVII 14th |
350000 |
Repair Pucca Drain Afchar to Tapan SXVII 14th1 |
Plinth level |
-
latitude : 22.67237966414541,22.67235539853573
Longitude : 88.8787023536861,88.87846321798861
file name : Image_17022021125456059.png
|
2021-02-17 12:54:56.165222 |
8 |
35592500 |
Repair Pucca Drain Afchar to Tapan SXVII 14th |
350000 |
Repair Pucca Drain Afchar to Tapan SXVII 14th1 |
Completion of work |
-
latitude : 22.67238339409232,22.67237480264157
Longitude : 88.87852918356657,88.87848501093686
file name : Image_04022021133858792.png
|
2021-02-04 13:38:58.895459 |
9 |
35591110 |
Repair Pucca Drain Prasanta to Gireen S XIV 14th |
350000 |
Repair Pucca Drain Prasanta to Gireen S XIV 14th1 |
Roof laid |
-
latitude : 22.666532616131008,22.6664564
Longitude : 88.8727115560323,88.8728344
file name : Image_20072024130502994.png
|
2024-07-20 13:05:03.079973 |
10 |
35591110 |
Repair Pucca Drain Prasanta to Gireen S XIV 14th |
350000 |
Repair Pucca Drain Prasanta to Gireen S XIV 14th1 |
Roof laid |
-
latitude : 22.669758182018995,22.66973668243736
Longitude : 88.86917313560843,88.86917732656002
file name : Image_11022021150432951.png
|
2021-02-11 15:04:33.035764 |
11 |
35591110 |
Repair Pucca Drain Prasanta to Gireen S XIV 14th |
350000 |
Repair Pucca Drain Prasanta to Gireen S XIV 14th1 |
Plinth level |
-
latitude : 22.669751225039363,22.669709902256727
Longitude : 88.86919467709959,88.86918629519641
file name : Image_27012021161228220.png
|
2021-01-27 16:12:28.293535 |
12 |
35591110 |
Repair Pucca Drain Prasanta to Gireen S XIV 14th |
350000 |
Repair Pucca Drain Prasanta to Gireen S XIV 14th1 |
Completion of work |
-
latitude : 22.669759690761566,22.669745860621333
Longitude : 88.86917028576136,88.86916131712496
file name : Image_24012021152814442.png
|
2021-01-24 15:28:14.549726 |
13 |
35589807 |
Repair CCRoad PWD road to Brindaban S XII 14th |
340000 |
Repair CCRoad PWD road to Brindaban S XII 14th1 |
Roof laid |
-
latitude : 22.6665107,22.6665107
Longitude : 88.8728215,88.8728215
file name : Image_20072024125836602.png
|
2024-07-20 12:58:36.703432 |
14 |
35589807 |
Repair CCRoad PWD road to Brindaban S XII 14th |
340000 |
Repair CCRoad PWD road to Brindaban S XII 14th1 |
Roof laid |
-
latitude : 22.6792397,22.6792397
Longitude : 88.8700702,88.8700702
file name : Image_16032021120809244.png
|
2021-03-16 12:08:09.332359 |
15 |
35589807 |
Repair CCRoad PWD road to Brindaban S XII 14th |
340000 |
Repair CCRoad PWD road to Brindaban S XII 14th1 |
Plinth level |
-
latitude : 22.6792438,22.6792438
Longitude : 88.8700831,88.8700831
file name : Image_09032021134418104.png
|
2021-03-09 13:44:18.211009 |
16 |
35589807 |
Repair CCRoad PWD road to Brindaban S XII 14th |
340000 |
Repair CCRoad PWD road to Brindaban S XII 14th1 |
Completion of work |
-
latitude : 22.679290124215186,22.679307726211846
Longitude : 88.87005030177534,88.87000143527985
file name : Image_15022021142652762.png
|
2021-02-15 14:26:52.852448 |
17 |
35588930 |
Repair CCBFSR Susanta to Pushpendu S X 14th |
293000 |
Repair CCBFSR Susanta to Pushpendu S X 14th1 |
Roof laid |
-
latitude : 22.6664917
Longitude : 88.8728188
file name : Image_20072024130044222.png
|
2024-07-20 13:00:44.327994 |
18 |
35588930 |
Repair CCBFSR Susanta to Pushpendu S X 14th |
293000 |
Repair CCBFSR Susanta to Pushpendu S X 14th1 |
Roof laid |
-
latitude : 22.68452789168805
Longitude : 88.89372691512108
file name : Image_17022021160252726.png
|
2021-02-17 16:02:52.81192 |
19 |
35588930 |
Repair CCBFSR Susanta to Pushpendu S X 14th |
293000 |
Repair CCBFSR Susanta to Pushpendu S X 14th1 |
Plinth level |
-
latitude : 22.684464985504746
Longitude : 88.89379053376615
file name : Image_10022021125432888.png
|
2021-02-10 12:54:33.001903 |
20 |
35588930 |
Repair CCBFSR Susanta to Pushpendu S X 14th |
293000 |
Repair CCBFSR Susanta to Pushpendu S X 14th1 |
Completion of work |
-
latitude : 22.68445928581059
Longitude : 88.89384903945029
file name : Image_24012021165515122.png
|
2021-01-24 16:55:15.240646 |
21 |
35586543 |
Repair CCRoad Ranjit to Daspara Kalibari SV14th |
313500 |
Repair CCRoad Ranjit to Daspara Kalibari SV14th1 |
Roof laid |
-
latitude : 22.6665232,22.6665232
Longitude : 88.8728121,88.8728121
file name : Image_20072024125609332.png
|
2024-07-20 12:56:09.418733 |
22 |
35586543 |
Repair CCRoad Ranjit to Daspara Kalibari SV14th |
313500 |
Repair CCRoad Ranjit to Daspara Kalibari SV14th1 |
Roof laid |
-
latitude : 22.687644115649164,22.687622574158013
Longitude : 88.88939036987722,88.88957493938506
file name : Image_08022021134557158.png
|
2021-02-08 13:45:57.262287 |
23 |
35586543 |
Repair CCRoad Ranjit to Daspara Kalibari SV14th |
313500 |
Repair CCRoad Ranjit to Daspara Kalibari SV14th1 |
Plinth level |
-
latitude : 22.687618928030133,22.687615239992738
Longitude : 88.8896575011313,88.88966646976769
file name : Image_06022021123653117.png
|
2021-02-06 12:36:53.215266 |
24 |
35586543 |
Repair CCRoad Ranjit to Daspara Kalibari SV14th |
313500 |
Repair CCRoad Ranjit to Daspara Kalibari SV14th1 |
Completion of work |
-
latitude : 22.687629153952003,22.68761469516903
Longitude : 88.88948500156403,88.88966026715934
file name : Image_25012021152242765.png
|
2021-01-25 15:22:42.851659 |
25 |
35589077 |
Repair CCRoad Rabindra to Manisankar S X 14th |
167000 |
Repair CCRoad Rabindra to Manisankar S X 14th1 |
Roof laid |
-
latitude : 22.66651337966323,22.666485970839858
Longitude : 88.8727826345712,88.8727755099535
file name : Image_20072024125655183.png
|
2024-07-20 12:56:55.284825 |
26 |
35589077 |
Repair CCRoad Rabindra to Manisankar S X 14th |
167000 |
Repair CCRoad Rabindra to Manisankar S X 14th1 |
Roof laid |
-
latitude : 22.683590669184923,22.683620005846024
Longitude : 88.89537521637976,88.8954009488225
file name : Image_27012021133147587.png
|
2021-01-27 13:31:47.704461 |
27 |
35589077 |
Repair CCRoad Rabindra to Manisankar S X 14th |
167000 |
Repair CCRoad Rabindra to Manisankar S X 14th1 |
Plinth level |
-
latitude : 22.683601900935173,22.68362683709711
Longitude : 88.89539902098477,88.8954012002796
file name : Image_26012021130311431.png
|
2021-01-26 13:03:11.522706 |
28 |
35589077 |
Repair CCRoad Rabindra to Manisankar S X 14th |
167000 |
Repair CCRoad Rabindra to Manisankar S X 14th1 |
Completion of work |
-
latitude : 22.683553746901453,22.683607265353203
Longitude : 88.89535183086991,88.89541896991432
file name : Image_24012021164634283.png
|
2021-01-24 16:46:34.391771 |
29 |
35585520 |
Repair CCRoad Rakesh DK to Tarapada SIV 14th |
325000 |
Repair CCRoad Rakesh DK to Tarapada SIV 14th1 |
Roof laid |
-
latitude : 22.6665376,22.6665192
Longitude : 88.8728144,88.8728068
file name : Image_20072024125133328.png
|
2024-07-20 12:51:33.410401 |
30 |
35585520 |
Repair CCRoad Rakesh DK to Tarapada SIV 14th |
325000 |
Repair CCRoad Rakesh DK to Tarapada SIV 14th1 |
Roof laid |
-
latitude : 22.686268519610167,22.686386117711663
Longitude : 88.88035694137216,88.88035618700087
file name : Image_08022021133842229.png
|
2021-02-08 13:38:42.333058 |
31 |
35585520 |
Repair CCRoad Rakesh DK to Tarapada SIV 14th |
325000 |
Repair CCRoad Rakesh DK to Tarapada SIV 14th1 |
Plinth level |
-
latitude : 22.68617569003254,22.686192831024528
Longitude : 88.88032819144428,88.88032810762525
file name : Image_27012021123900244.png
|
2021-01-27 12:39:00.34621 |
32 |
35585520 |
Repair CCRoad Rakesh DK to Tarapada SIV 14th |
325000 |
Repair CCRoad Rakesh DK to Tarapada SIV 14th1 |
Completion of work |
-
latitude : 22.686266382224858,22.686289977282286
Longitude : 88.88033464550972,88.88033556751907
file name : Image_24012021155323454.png
|
2021-01-24 15:53:23.558308 |
33 |
35188263 |
Vector Borne Diseases Purpose under SSGP 14th |
1000000 |
Vector Borne Diseases Purpose under SSGP 14th1 |
Plinth level |
-
latitude : 22.6664408
Longitude : 88.8728459
file name : Image_20072024131058812.png
|
2024-07-20 13:10:58.90186 |
34 |
35188263 |
Vector Borne Diseases Purpose under SSGP 14th |
1000000 |
Vector Borne Diseases Purpose under SSGP 14th1 |
Completion of work |
-
latitude : 22.6665014
Longitude : 88.8728074
file name : Image_12062021134413245.png
|
2021-06-12 13:44:13.359086 |
35 |
69482154 |
Solar Street Lighting Installation |
550000 |
Construction of Solar Light for Community at Sansad V to X |
Plinth level |
-
latitude : 22.679690402001143
Longitude : 88.89394375495613
file name : Image_14102023125629329.png
|
2023-10-14 12:56:29.428347 |
36 |
69482154 |
Solar Street Lighting Installation |
550000 |
Construction of Solar Light for Community at Sansad V to X |
Completion of work |
-
latitude : 22.67173367086798
Longitude : 88.9033030718565
file name : Image_13102023130346958.png
|
2023-10-13 13:03:47.054032 |
37 |
35590305 |
Repair CCRoad Chattar to Mobarek S XIII 14th |
253000 |
Repair CCRoad Chattar to Mobarek S XIII 14th1 |
Roof laid |
-
latitude : 22.6664738
Longitude : 88.8728322
file name : Image_20072024130131991.png
|
2024-07-20 13:01:32.090838 |
38 |
35590305 |
Repair CCRoad Chattar to Mobarek S XIII 14th |
253000 |
Repair CCRoad Chattar to Mobarek S XIII 14th1 |
Roof laid |
-
latitude : 22.666343855671585
Longitude : 88.86861456558108
file name : Image_20122021135410035.png
|
2021-12-20 13:54:10.150021 |
39 |
35590305 |
Repair CCRoad Chattar to Mobarek S XIII 14th |
253000 |
Repair CCRoad Chattar to Mobarek S XIII 14th1 |
Plinth level |
-
latitude : 22.666365983895957
Longitude : 88.86843192391098
file name : Image_12122021133550923.png
|
2021-12-12 13:35:51.042656 |
40 |
35590305 |
Repair CCRoad Chattar to Mobarek S XIII 14th |
253000 |
Repair CCRoad Chattar to Mobarek S XIII 14th1 |
Completion of work |
-
latitude : 22.666342514567077
Longitude : 88.86847986839712
file name : Image_04122021150039636.png
|
2021-12-04 15:00:39.768977 |
41 |
35592366 |
Repair CCR Sabai to Hazi Kuddus SXVII 14th |
337000 |
Repair CCR Sabai to Hazi Kuddus SXVII 14th1 |
Roof laid |
-
latitude : 22.666438
Longitude : 88.872845
file name : Image_20072024130840703.png
|
2024-07-20 13:08:40.808141 |
42 |
35592366 |
Repair CCR Sabai to Hazi Kuddus SXVII 14th |
337000 |
Repair CCR Sabai to Hazi Kuddus SXVII 14th1 |
Roof laid |
-
latitude : 22.67473904415965
Longitude : 88.88161263428628
file name : Image_24122021161618645.png
|
2021-12-24 16:16:18.749079 |
43 |
35592366 |
Repair CCR Sabai to Hazi Kuddus SXVII 14th |
337000 |
Repair CCR Sabai to Hazi Kuddus SXVII 14th1 |
Plinth level |
-
latitude : 22.674729614518583
Longitude : 88.88166007585824
file name : Image_20122021142303646.png
|
2021-12-20 14:23:03.738644 |
44 |
35592366 |
Repair CCR Sabai to Hazi Kuddus SXVII 14th |
337000 |
Repair CCR Sabai to Hazi Kuddus SXVII 14th1 |
Completion of work |
-
latitude : 22.674848260357976
Longitude : 88.88154046609998
file name : Image_29112021163806922.png
|
2021-11-29 16:38:07.051848 |
45 |
35585897 |
Repair CCRoad Safikul to Arijul SIX 14th |
350000 |
Repair CCRoad Safikul to Arijul SIX 14th1 |
Roof laid |
-
latitude : 22.66653835773468,22.6664862
Longitude : 88.87265321798623,88.8728068
file name : Image_20072024125416841.png
|
2024-07-20 12:54:16.934811 |
46 |
35585897 |
Repair CCRoad Safikul to Arijul SIX 14th |
350000 |
Repair CCRoad Safikul to Arijul SIX 14th1 |
Roof laid |
-
latitude : 22.68911622930318,22.68856847193092,22.687631333246827,22.686712718568742
Longitude : 88.89471631497145,88.89466417953372,88.89466560445726,88.89461598359048
file name : Image_11122021163842349.png
|
2021-12-11 16:38:42.453103 |
47 |
35585897 |
Repair CCRoad Safikul to Arijul SIX 14th |
350000 |
Repair CCRoad Safikul to Arijul SIX 14th1 |
Plinth level |
-
latitude : 22.688866616226733,22.688630959019065,22.687627393752337,22.687235791236162,22.68690789118409
Longitude : 88.89465688727796,88.89466124586761,88.89466116204858,88.89458287507296,88.89453786425292
file name : Image_10122021110327571.png
|
2021-12-10 11:03:27.675414 |
48 |
35585897 |
Repair CCRoad Safikul to Arijul SIX 14th |
350000 |
Repair CCRoad Safikul to Arijul SIX 14th1 |
Completion of work |
-
latitude : 22.688935264013708,22.688749940134585,22.688512187451124,22.687575886957347,22.686697212047875
Longitude : 88.89484724029899,88.89466241933405,88.89463660307229,88.89461799524724,88.89462260529399
file name : Image_08122021131709014.png
|
2021-12-08 13:17:09.102954 |
49 |
35586309 |
Repair CCRoad Sadhana to Sakhina SV14th |
350000 |
Repair CCRoad Sadhana to Sakhina SV14th1 |
Roof laid |
-
latitude : 22.6664931,22.6664931
Longitude : 88.8727918,88.8727918
file name : Image_20072024125520520.png
|
2024-07-20 12:55:20.59091 |
50 |
35586309 |
Repair CCRoad Sadhana to Sakhina SV14th |
350000 |
Repair CCRoad Sadhana to Sakhina SV14th1 |
Roof laid |
-
latitude : 22.690640897490084,22.690836950205266,22.690360816195607
Longitude : 88.88287645764649,88.88275550678372,88.88297368772328
file name : Image_08122021123747020.png
|
2021-12-08 12:37:47.119805 |
51 |
35586309 |
Repair CCRoad Sadhana to Sakhina SV14th |
350000 |
Repair CCRoad Sadhana to Sakhina SV14th1 |
Completion of work |
-
latitude : 22.69063729327172,22.690737415105104
Longitude : 88.88287268579006,88.88280780985951
file name : Image_04122021145023428.png
|
2021-12-04 14:50:23.555779 |
52 |
35586309 |
Repair CCRoad Sadhana to Sakhina SV14th |
350000 |
Repair CCRoad Sadhana to Sakhina SV14th1 |
Completion of work |
-
latitude : 22.690638969652355,22.69103157799691,22.691228720359504,22.6914517628029
Longitude : 88.88287017121911,88.88267965056002,88.88251000083983,88.8824438676238
file name : Image_03122021150921607.png
|
2021-12-03 15:09:21.741155 |
53 |
35592086 |
Repair BFSRoad Joyhori to Sunil V Suj S XVI 14th |
132600 |
Repair BFSRoad Joyhori to Sunil V Suj S XVI 14th1 |
Roof laid |
-
latitude : 22.6664543
Longitude : 88.8728375
file name : Image_20072024130753592.png
|
2024-07-20 13:07:53.677314 |
54 |
35592086 |
Repair BFSRoad Joyhori to Sunil V Suj S XVI 14th |
132600 |
Repair BFSRoad Joyhori to Sunil V Suj S XVI 14th1 |
Roof laid |
-
latitude : 22.67586259637028
Longitude : 88.88680664822459
file name : Image_24112021131751546.png
|
2021-11-24 13:17:51.644741 |
55 |
35592086 |
Repair BFSRoad Joyhori to Sunil V Suj S XVI 14th |
132600 |
Repair BFSRoad Joyhori to Sunil V Suj S XVI 14th1 |
Plinth level |
-
latitude : 22.67588363494724
Longitude : 88.88672886416316
file name : Image_17112021150243171.png
|
2021-11-17 15:02:43.257673 |
56 |
35592086 |
Repair BFSRoad Joyhori to Sunil V Suj S XVI 14th |
132600 |
Repair BFSRoad Joyhori to Sunil V Suj S XVI 14th1 |
Completion of work |
-
latitude : 22.675891891121864
Longitude : 88.88674990274012
file name : Image_10112021154021499.png
|
2021-11-10 15:40:21.617705 |
57 |
35589980 |
Repair Pucca Drain Amjed Ali to Jalil S XII 14th |
350000 |
Repair Pucca Drain Amjed Ali to Jalil S XII 14th1 |
Roof laid |
-
latitude : 22.6665081,22.6665192
Longitude : 88.8728175,88.8728214
file name : Image_20072024125957255.png
|
2024-07-20 12:59:57.345003 |
58 |
35589980 |
Repair Pucca Drain Amjed Ali to Jalil S XII 14th |
350000 |
Repair Pucca Drain Amjed Ali to Jalil S XII 14th1 |
Roof laid |
-
latitude : 22.682450395077467,22.682282966561615,22.68273818772286,22.682860689237714,22.682670378126204
Longitude : 88.86725954711437,88.86743104085326,88.86745442636311,88.86755358427763,88.86738074943423
file name : Image_19012022130355589.png
|
2022-01-19 13:03:55.667662 |
59 |
35589980 |
Repair Pucca Drain Amjed Ali to Jalil S XII 14th |
350000 |
Repair Pucca Drain Amjed Ali to Jalil S XII 14th1 |
Plinth level |
-
latitude : 22.682360038161278,22.682531322352588,22.682637185789645,22.6827803067863
Longitude : 88.8675656542182,88.86728276498616,88.86737823486328,88.86747227981687
file name : Image_13012022140900778.png
|
2022-01-13 14:09:00.877209 |
60 |
35589980 |
Repair Pucca Drain Amjed Ali to Jalil S XII 14th |
350000 |
Repair Pucca Drain Amjed Ali to Jalil S XII 14th1 |
Completion of work |
-
latitude : 22.682504332624376,22.682582032866776,22.682672096416354,22.682318673469126
Longitude : 88.86728913523257,88.86739139445126,88.86746406555176,88.8674581144005
file name : Image_07012022133346874.png
|
2022-01-07 13:33:46.971586 |
61 |
35585326 |
Repair Pucca Drain Tarun to Kali Bari SIV 14th |
350000 |
Repair Pucca Drain Tarun to Kali Bari SIV 14th1 |
Roof laid |
-
latitude : 22.6665069,22.6664995
Longitude : 88.8728148,88.8728129
file name : Image_20072024125010831.png
|
2024-07-20 12:50:10.931813 |
62 |
35585326 |
Repair Pucca Drain Tarun to Kali Bari SIV 14th |
350000 |
Repair Pucca Drain Tarun to Kali Bari SIV 14th1 |
Roof laid |
-
latitude : 22.685798755846918,22.6860603
Longitude : 88.87838535010815,88.8780282
file name : Image_24112021135948315.png
|
2021-11-24 13:59:48.437582 |
63 |
35585326 |
Repair Pucca Drain Tarun to Kali Bari SIV 14th |
350000 |
Repair Pucca Drain Tarun to Kali Bari SIV 14th1 |
Plinth level |
-
latitude : 22.685752236284316,22.68585780635476
Longitude : 88.87841250747442,88.87838803231716
file name : Image_16112021134925049.png
|
2021-11-16 13:49:25.172003 |
64 |
35585326 |
Repair Pucca Drain Tarun to Kali Bari SIV 14th |
350000 |
Repair Pucca Drain Tarun to Kali Bari SIV 14th1 |
Completion of work |
-
latitude : 22.68580449745059,22.685904535464942
Longitude : 88.87835911475122,88.87831745669246
file name : Image_09112021125657111.png
|
2021-11-09 12:56:57.254878 |
65 |
35589421 |
Repair CCRoad Sanjib to Tarak Chandra S XI 14th |
350000 |
Repair CCRoad Sanjib to Tarak Chandra S XI 14th1 |
Roof laid |
-
latitude : 22.6664967
Longitude : 88.8728121
file name : Image_20072024125747223.png
|
2024-07-20 12:57:47.321176 |
66 |
35589421 |
Repair CCRoad Sanjib to Tarak Chandra S XI 14th |
350000 |
Repair CCRoad Sanjib to Tarak Chandra S XI 14th1 |
Roof laid |
-
latitude : 22.68622883129865
Longitude : 88.87596574611962
file name : Image_30112021161730445.png
|
2021-11-30 16:17:30.539486 |
67 |
35589421 |
Repair CCRoad Sanjib to Tarak Chandra S XI 14th |
350000 |
Repair CCRoad Sanjib to Tarak Chandra S XI 14th1 |
Plinth level |
-
latitude : 22.68624966032803
Longitude : 88.87599390931427
file name : Image_29112021163650678.png
|
2021-11-29 16:36:50.830192 |
68 |
35589421 |
Repair CCRoad Sanjib to Tarak Chandra S XI 14th |
350000 |
Repair CCRoad Sanjib to Tarak Chandra S XI 14th1 |
Completion of work |
-
latitude : 22.686227238737047
Longitude : 88.87597069144249
file name : Image_16112021134356451.png
|
2021-11-16 13:43:56.56778 |
69 |
35590597 |
Repair Pucca Drain Rustam to Bablu S XIII 14th |
152000 |
Repair Pucca Drain Rustam to Bablu S XIII 14th1 |
Roof laid |
-
latitude : 22.6665021,22.6665021
Longitude : 88.8728152,88.8728152
file name : Image_20072024130221707.png
|
2024-07-20 13:02:21.795728 |
70 |
35590597 |
Repair Pucca Drain Rustam to Bablu S XIII 14th |
152000 |
Repair Pucca Drain Rustam to Bablu S XIII 14th1 |
Roof laid |
-
latitude : 22.6659278,22.6659289,22.6659264
Longitude : 88.865921,88.8659298,88.8659235
file name : Image_21122021145700960.png
|
2021-12-21 14:57:01.090589 |
71 |
35590597 |
Repair Pucca Drain Rustam to Bablu S XIII 14th |
152000 |
Repair Pucca Drain Rustam to Bablu S XIII 14th1 |
Plinth level |
-
latitude : 22.6659179,22.6659171
Longitude : 88.8659311,88.8659301
file name : Image_24112021133100729.png
|
2021-11-24 13:31:00.857961 |
72 |
35590597 |
Repair Pucca Drain Rustam to Bablu S XIII 14th |
152000 |
Repair Pucca Drain Rustam to Bablu S XIII 14th1 |
Completion of work |
-
latitude : 22.6659162,22.6659174
Longitude : 88.8659294,88.8659301
file name : Image_18112021132632530.png
|
2021-11-18 13:26:32.651606 |
73 |
35591539 |
Repair Pucca Drain Sabur TaliFactory S XV 14th |
130000 |
Repair Pucca Drain Sabur TaliFactory S XV 14th1 |
Roof laid |
-
latitude : 22.6664777,22.6664777
Longitude : 88.8728183,88.8728183
file name : Image_20072024130600410.png
|
2024-07-20 13:06:00.491479 |
74 |
35591539 |
Repair Pucca Drain Sabur TaliFactory S XV 14th |
130000 |
Repair Pucca Drain Sabur TaliFactory S XV 14th1 |
Roof laid |
-
latitude : 22.6658025,22.6658041
Longitude : 88.8700366,88.8700353
file name : Image_18112021133558790.png
|
2021-11-18 13:35:58.90422 |
75 |
35591539 |
Repair Pucca Drain Sabur TaliFactory S XV 14th |
130000 |
Repair Pucca Drain Sabur TaliFactory S XV 14th1 |
Plinth level |
-
latitude : 22.6627462,22.6658165
Longitude : 88.8710156,88.8700351
file name : Image_11112021173111153.png
|
2021-11-11 17:31:11.249339 |
76 |
35591539 |
Repair Pucca Drain Sabur TaliFactory S XV 14th |
130000 |
Repair Pucca Drain Sabur TaliFactory S XV 14th1 |
Completion of work |
-
latitude : 22.6657904,22.6628954
Longitude : 88.8700276,88.8698923
file name : Image_10112021152943784.png
|
2021-11-10 15:29:43.897005 |
77 |
47404720 |
Solar Light and Electric city at All Sansad No I to XVII 15 UT |
900000 |
Solar Light and Electric city at All Sansad No I to XVII 15 UT1 |
Roof laid |
-
latitude : 22.6700561
Longitude : 88.8706819
file name : Image_05012022142528042.png
|
2022-01-05 14:25:28.14116 |
78 |
47404720 |
Solar Light and Electric city at All Sansad No I to XVII 15 UT |
900000 |
Solar Light and Electric city at All Sansad No I to XVII 15 UT1 |
Plinth level |
-
latitude : 22.67005335073918
Longitude : 88.87019824236631
file name : Image_04012022171006947.png
|
2022-01-04 17:10:07.182039 |
79 |
47404720 |
Solar Light and Electric city at All Sansad No I to XVII 15 UT |
900000 |
Solar Light and Electric city at All Sansad No I to XVII 15 UT1 |
Completion of work |
-
latitude : 22.6700535
Longitude : 88.8706837
file name : Image_31122021171644673.png
|
2021-12-31 17:16:44.770467 |
80 |
47394838 |
Const of BFS Roadwith CC from Sujit Sardar to Jayanta Sardar SX 15 UT |
125000 |
Const of BFS Roadwith CC from Sujit Sardar to Jayanta Sardar SX 15 UT1 |
Roof laid |
-
latitude : 22.6843863,22.684299484826624,22.6839526,22.684208499267697,22.68417953979224,22.684027450159192
Longitude : 88.8947426,88.89442387036979,88.8942937,88.89442831277847,88.89449545182288,88.89441691339016
file name : Image_03062022163753288.png
|
2022-06-03 16:37:53.39373 |
81 |
47394838 |
Const of BFS Roadwith CC from Sujit Sardar to Jayanta Sardar SX 15 UT |
125000 |
Const of BFS Roadwith CC from Sujit Sardar to Jayanta Sardar SX 15 UT1 |
Plinth level |
-
latitude : 22.6839535,22.684161812067032
Longitude : 88.8943013,88.89446930028498
file name : Image_31052022105949541.png
|
2022-05-31 10:59:49.669417 |
82 |
47394838 |
Const of BFS Roadwith CC from Sujit Sardar to Jayanta Sardar SX 15 UT |
125000 |
Const of BFS Roadwith CC from Sujit Sardar to Jayanta Sardar SX 15 UT1 |
Completion of work |
-
latitude : 22.684042369946837,22.684158752672374,22.68425267189741,22.684401785954833
Longitude : 88.89436712488532,88.89444549567997,88.89442848041654,88.89444331638515
file name : Image_28052022164719946.png
|
2022-05-28 16:47:20.070238 |
83 |
58592443 |
Construction of DBFS Road with Bamboo pilling from Abul Hossain to Basudeb S XVII 15th FC Untied |
280000 |
Construction of DBFS Road with Bamboo pilling from Abul Hossain to Basudeb S XVII 15th FC Untied1 |
Roof laid |
-
latitude : 22.676310651004314,22.676462824456394,22.67679613083601,22.677053580991924,22.67730302643031,22.677184967324138
Longitude : 88.88121843338013,88.88137685135007,88.88166728429496,88.881960734725,88.88237119652331,88.8826222345233
file name : Image_27062022155757874.png
|
2022-06-27 15:57:57.990112 |
84 |
58592443 |
Construction of DBFS Road with Bamboo pilling from Abul Hossain to Basudeb S XVII 15th FC Untied |
280000 |
Construction of DBFS Road with Bamboo pilling from Abul Hossain to Basudeb S XVII 15th FC Untied1 |
Plinth level |
-
latitude : 22.676225574687123,22.676547565497458,22.676844242960215,22.677071602083743,22.677295985631645,22.677233456633985
Longitude : 88.88117300346494,88.88141859322786,88.88168673031032,88.88201429508626,88.88239910826087,88.88253732584417
file name : Image_25062022135839711.png
|
2022-06-25 13:58:39.815186 |
85 |
58592443 |
Construction of DBFS Road with Bamboo pilling from Abul Hossain to Basudeb S XVII 15th FC Untied |
280000 |
Construction of DBFS Road with Bamboo pilling from Abul Hossain to Basudeb S XVII 15th FC Untied1 |
Completion of work |
-
latitude : 22.676293468102813,22.67642359714955
Longitude : 88.88122480362654,88.88132295571268
file name : Image_03062022164910319.png
|
2022-06-03 16:49:10.436137 |
86 |
47329011 |
Prevention of Vector Borne Disease purpose S X 15 T |
150000 |
Prevention of Vector Borne Disease purpose S X 15 T1 |
Plinth level |
-
latitude : 22.66687275376171,22.66685523558408
Longitude : 88.87410990893841,88.87408048845828
file name : Image_22072024120140636.png
|
2024-07-22 12:01:40.728452 |
87 |
47329011 |
Prevention of Vector Borne Disease purpose S X 15 T |
150000 |
Prevention of Vector Borne Disease purpose S X 15 T1 |
Plinth level |
-
latitude : 22.680249391123652,22.6798345,22.680090093053877,22.6798345
Longitude : 88.89340748079121,88.8928075,88.8932697661221,88.8928086
file name : Image_12072022173508544.png
|
2022-07-12 17:35:08.618331 |
88 |
47329011 |
Prevention of Vector Borne Disease purpose S X 15 T |
150000 |
Prevention of Vector Borne Disease purpose S X 15 T1 |
Completion of work |
-
latitude : 22.680220138281584,22.68015442416072,22.679992066696286
Longitude : 88.8932491466403,88.89328652992845,88.89322886243463
file name : Image_09072022164504799.png
|
2022-07-09 16:45:04.911128 |
89 |
47330627 |
Prevention of Vector Borne Disease purpose S XIV 15 T |
98000 |
Prevention of Vector Borne Disease purpose S XIV 15 T1 |
Plinth level |
-
latitude : 22.6671219,22.666790024377406
Longitude : 88.8745259,88.87404922395945
file name : Image_22072024120351477.png
|
2024-07-22 12:03:51.586508 |
90 |
47330627 |
Prevention of Vector Borne Disease purpose S XIV 15 T |
98000 |
Prevention of Vector Borne Disease purpose S XIV 15 T1 |
Completion of work |
-
latitude : 22.67002552282065,22.669937848113477,22.669902560301125
Longitude : 88.87123558670282,88.87124413624406,88.87117674574256
file name : Image_19072022164854310.png
|
2022-07-19 16:48:54.431288 |
91 |
47328906 |
Prevention of Vector Borne Disease purpose S XII 15 T |
98000 |
Prevention of Vector Borne Disease purpose S XII 15 T1 |
Plinth level |
-
latitude : 22.6671211,22.666845261119306
Longitude : 88.8745232,88.87413354590535
file name : Image_22072024120036231.png
|
2024-07-22 12:00:36.324348 |
92 |
47328906 |
Prevention of Vector Borne Disease purpose S XII 15 T |
98000 |
Prevention of Vector Borne Disease purpose S XII 15 T1 |
Completion of work |
-
latitude : 22.68678367137909,22.680602981708944,22.680750000290573
Longitude : 88.89575600624084,88.8682372123003,88.86821039021015
file name : Image_19072022163936960.png
|
2022-07-19 16:39:37.082383 |
93 |
47328528 |
Prevention of Vector Borne Disease purpose SIX 15 T |
98000 |
Prevention of Vector Borne Disease purpose SIX 15 T1 |
Plinth level |
-
latitude : 22.6637818,22.666819989681244
Longitude : 88.8726429,88.87414050288498
file name : Image_22072024115930411.png
|
2024-07-22 11:59:30.504814 |
94 |
47328528 |
Prevention of Vector Borne Disease purpose SIX 15 T |
98000 |
Prevention of Vector Borne Disease purpose SIX 15 T1 |
Completion of work |
-
latitude : 22.686684764921665,22.68666733056307,22.686841213144362
Longitude : 88.89559901319444,88.89572273008525,88.89574728906155
file name : Image_19072022162446414.png
|
2022-07-19 16:24:46.508774 |
95 |
47330570 |
Prevention of Vector Borne Disease purpose S XIII 15 T |
98000 |
Prevention of Vector Borne Disease purpose S XIII 15 T1 |
Plinth level |
-
latitude : 22.66685494221747,22.6668309699744
Longitude : 88.87416858226061,88.8740995991975
file name : Image_22072024120238009.png
|
2024-07-22 12:02:38.12362 |
96 |
47330570 |
Prevention of Vector Borne Disease purpose S XIII 15 T |
98000 |
Prevention of Vector Borne Disease purpose S XIII 15 T1 |
Completion of work |
-
latitude : 22.667838516645133,22.667894843034446,22.667938177473843
Longitude : 88.86566698551178,88.86566748842597,88.86568559333682
file name : Image_19072022172530446.png
|
2022-07-19 17:25:30.545713 |
97 |
58688618 |
Construction of Pucca Drain slab from Rabin Das to Prasanta Chandra vai Sankar at S XIV 15th FC Tie |
350000 |
Construction of Pucca Drain slab from Rabin Das to Prasanta Chandra vai Sankar at S XIV 15th FC Tie1 |
Roof laid |
-
latitude : 22.6723488,22.6723458,22.6723458,22.67183090094477,22.671589963138103,22.671556561253965
Longitude : 88.8705008,88.8703993,88.8703993,88.87009866535664,88.87027342803776,88.87035272084177
file name : Image_07092022171829948.png
|
2022-09-07 17:18:30.045038 |
98 |
58688618 |
Construction of Pucca Drain slab from Rabin Das to Prasanta Chandra vai Sankar at S XIV 15th FC Tie |
350000 |
Construction of Pucca Drain slab from Rabin Das to Prasanta Chandra vai Sankar at S XIV 15th FC Tie1 |
Plinth level |
-
latitude : 22.6724048,22.6725289,22.6725289,22.6725289,22.6722696,22.6722696
Longitude : 88.8704014,88.870466,88.870466,88.870466,88.870227,88.870227
file name : Image_06092022145621837.png
|
2022-09-06 14:56:21.963804 |
99 |
58688618 |
Construction of Pucca Drain slab from Rabin Das to Prasanta Chandra vai Sankar at S XIV 15th FC Tie |
350000 |
Construction of Pucca Drain slab from Rabin Das to Prasanta Chandra vai Sankar at S XIV 15th FC Tie1 |
Completion of work |
-
latitude : 22.6724161,22.6724161,22.6724161,22.6724161,22.671525296755135,22.671541767194867
Longitude : 88.8703135,88.8703135,88.8703135,88.8703135,88.8703078776598,88.87038666754961
file name : Image_05092022153902244.png
|
2022-09-05 15:39:02.354764 |
100 |
57897297 |
Construction of Blacktop Road with pilling from DakshinPara Idgha to Dulal S X 15th FC Untied |
349994 |
Construction of Blacktop Road with pilling from DakshinPara Idgha to Dulal S X 15th FC Untied1 |
Roof laid |
-
latitude : 22.681526080705225,22.681261925026774,22.681124503724277,22.68071584403515,22.680604783818126
Longitude : 88.8953406829387,88.89524772763252,88.89568962156773,88.8957096543163,88.89553614892066
file name : Image_23102022151454031.png
|
2022-10-23 15:14:54.695151 |
101 |
57897297 |
Construction of Blacktop Road with pilling from DakshinPara Idgha to Dulal S X 15th FC Untied |
349994 |
Construction of Blacktop Road with pilling from DakshinPara Idgha to Dulal S X 15th FC Untied1 |
Plinth level |
-
latitude : 22.68120995722711,22.681146799586713,22.68107702024281,22.68067100085318,22.68062569666654
Longitude : 88.89522484503686,88.89550404623151,88.89572465792298,88.8957032840699,88.89556934125721
file name : Image_23092022155409261.png
|
2022-09-23 15:54:09.397643 |
102 |
57897297 |
Construction of Blacktop Road with pilling from DakshinPara Idgha to Dulal S X 15th FC Untied |
349994 |
Construction of Blacktop Road with pilling from DakshinPara Idgha to Dulal S X 15th FC Untied1 |
Completion of work |
-
latitude : 22.68150914926082,22.68138367217034,22.681139465421438,22.68089764751494,22.68068080767989,22.680661068297923
Longitude : 88.89536373317242,88.89528972096741,88.89567294158041,88.89575064182281,88.89563924632967,88.89551586471498
file name : Image_05092022132251440.png
|
2022-09-05 13:22:51.556169 |
103 |
58688018 |
Construction of Pucca Drain from Mostakin Mondal to Kabir Mondal at S XIII 15th FC Tied |
335000 |
Construction of Pucca Drain from Mostakin Mondal to Kabir Mondal at S XIII 15th FC Tied1 |
Roof laid |
-
latitude : 22.67058291938156,22.67047517001629,22.67033322248608
Longitude : 88.86818532831967,88.86815347708762,88.86805809102952
file name : Image_24112022093744007.png
|
2022-11-24 09:37:44.106922 |
104 |
58688018 |
Construction of Pucca Drain from Mostakin Mondal to Kabir Mondal at S XIII 15th FC Tied |
335000 |
Construction of Pucca Drain from Mostakin Mondal to Kabir Mondal at S XIII 15th FC Tied1 |
Plinth level |
-
latitude : 22.670669252984226,22.670527934096754,22.670396883040667
Longitude : 88.868204690516,88.86818842962384,88.86810695752501
file name : Image_28102022152950959.png
|
2022-10-28 15:29:51.06098 |
105 |
58688018 |
Construction of Pucca Drain from Mostakin Mondal to Kabir Mondal at S XIII 15th FC Tied |
335000 |
Construction of Pucca Drain from Mostakin Mondal to Kabir Mondal at S XIII 15th FC Tied1 |
Completion of work |
-
latitude : 22.670586816966534,22.670494532212615,22.670371737331152,22.670300281606615
Longitude : 88.86820293031633,88.86817635968328,88.86812087148428,88.86807912960649
file name : Image_22092022121629768.png
|
2022-09-22 12:16:29.9551 |
106 |
59224643 |
Providing Data Manage for various Government Schemeat Under Sangrampur Shibhati GP 15th FC Tied |
130000 |
Providing Data Manage for various Government Schemeat Under Sangrampur Shibhati GP 15th FC Tied1 |
Plinth level |
-
latitude : 22.6665091
Longitude : 88.8728127
file name : Image_22072024122137436.png
|
2024-07-22 12:21:37.530313 |
107 |
59224643 |
Providing Data Manage for various Government Schemeat Under Sangrampur Shibhati GP 15th FC Tied |
130000 |
Providing Data Manage for various Government Schemeat Under Sangrampur Shibhati GP 15th FC Tied1 |
Plinth level |
-
latitude : 22.6664865
Longitude : 88.8727971
file name : Image_20012023135434134.png
|
2023-01-20 13:54:34.248571 |
108 |
59224643 |
Providing Data Manage for various Government Schemeat Under Sangrampur Shibhati GP 15th FC Tied |
130000 |
Providing Data Manage for various Government Schemeat Under Sangrampur Shibhati GP 15th FC Tied1 |
Completion of work |
-
latitude : 22.6664442
Longitude : 88.8728294
file name : Image_19012023191709853.png
|
2023-01-19 19:17:09.950902 |
109 |
58680336 |
Construction of Pucca Drain with earth work from Tapas to Ananda Mondal at Merudandi S VI 15th FC T |
350000 |
Construction of Pucca Drain with earth work from Tapas to Ananda Mondal at Merudandi S VI 15th FC T1 |
Roof laid |
-
latitude : 22.6899744104594,22.689988911151886,22.689975332468748,22.689784644171596,22.68957568332553
Longitude : 88.88455183245242,88.88468334451318,88.88487520627677,88.8849720172584,88.88503471389413
file name : Image_27022023153908063.png
|
2023-02-27 15:39:08.160524 |
110 |
58680336 |
Construction of Pucca Drain with earth work from Tapas to Ananda Mondal at Merudandi S VI 15th FC T |
350000 |
Construction of Pucca Drain with earth work from Tapas to Ananda Mondal at Merudandi S VI 15th FC T1 |
Plinth level |
-
latitude : 22.689988994970918,22.689991341903806,22.689976254478097,22.68976205494255,22.689608205109835
Longitude : 88.88461369089782,88.8847616314888,88.88492717407644,88.88502306304872,88.8850623741746
file name : Image_20022023124403804.png
|
2023-02-20 12:44:03.908502 |
111 |
58680336 |
Construction of Pucca Drain with earth work from Tapas to Ananda Mondal at Merudandi S VI 15th FC T |
350000 |
Construction of Pucca Drain with earth work from Tapas to Ananda Mondal at Merudandi S VI 15th FC T1 |
Completion of work |
-
latitude : 22.69000173546374,22.69000554922968,22.68997269216925,22.689791517332196
Longitude : 88.88464470393956,88.88481301255524,88.88492164202034,88.88497612439096
file name : Image_10022023132333075.png
|
2023-02-10 13:23:33.204824 |
112 |
69400090 |
Creation of a new source of drinking water |
349904 |
Water Solar ATM Plant at mouza Choura JLNo107 Sansad No II under SSGP 69400090 |
Roof laid |
-
latitude : 22.68609283491969
Longitude : 88.85369963943958
file name : Image_24092024160545154.png
|
2024-09-24 16:05:45.240662 |
113 |
69400090 |
Creation of a new source of drinking water |
349904 |
Water Solar ATM Plant at mouza Choura JLNo107 Sansad No II under SSGP 69400090 |
Plinth level |
-
latitude : 22.686139438301325
Longitude : 88.85372394695878
file name : Image_30082024165645631.png
|
2024-08-30 16:56:46.475777 |
114 |
69400090 |
Creation of a new source of drinking water |
349904 |
Water Solar ATM Plant at mouza Choura JLNo107 Sansad No II under SSGP 69400090 |
Completion of work |
-
latitude : 22.68616215325892
Longitude : 88.85371657088399
file name : Image_30082024163935758.png
|
2024-08-30 16:39:36.388498 |
115 |
57876952 |
Construction of CC Road with earth work from PWD Roadto Rahim Baidya via Jalil driver 15th FC Untied |
350000 |
Construction of CC Road with earth work from PWD Roadto Rahim Baidya via Jalil driver 15th FC Untied1 |
Roof laid |
-
latitude : 22.6864714,22.68593906890601,22.68587997648865,22.68582717049867,22.68572579137981
Longitude : 88.8702001,88.87036847881973,88.87057014741004,88.87084054760635,88.87146189808846
file name : Image_28032023121038003.png
|
2023-03-28 12:10:38.105821 |
116 |
57876952 |
Construction of CC Road with earth work from PWD Roadto Rahim Baidya via Jalil driver 15th FC Untied |
350000 |
Construction of CC Road with earth work from PWD Roadto Rahim Baidya via Jalil driver 15th FC Untied1 |
Plinth level |
-
latitude : 22.68601848743856,22.68595625180751,22.685901853255928,22.685885089449584
Longitude : 88.87019354850054,88.87033637613058,88.87047132477164,88.8707651104778
file name : Image_14032023140328998.png
|
2023-03-14 14:03:29.092378 |
117 |
57876952 |
Construction of CC Road with earth work from PWD Roadto Rahim Baidya via Jalil driver 15th FC Untied |
350000 |
Construction of CC Road with earth work from PWD Roadto Rahim Baidya via Jalil driver 15th FC Untied1 |
Completion of work |
-
latitude : 22.686028378084302,22.685979050584137,22.685946780256927,22.68594170920551
Longitude : 88.87015834450722,88.87038289569318,88.87067827396095,88.87074650265276
file name : Image_20022023131115599.png
|
2023-02-20 13:11:15.721989 |
118 |
58655255 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied |
170000 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied1 |
Roof laid |
-
latitude : 22.6665651
Longitude : 88.8728216
file name : Image_22072024150534526.png
|
2024-07-22 15:05:34.607308 |
119 |
58655255 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied |
170000 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied1 |
Roof laid |
-
latitude : 22.687053652480245
Longitude : 88.8904017303139
file name : Image_08052023161817604.png
|
2023-05-08 16:18:17.694942 |
120 |
58655255 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied |
170000 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied1 |
Plinth level |
-
latitude : 22.68697285093367
Longitude : 88.89039703644812
file name : Image_05052023174348586.png
|
2023-05-05 17:43:48.697583 |
121 |
58655255 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied |
170000 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied1 |
Completion of work |
-
latitude : 22.687050090171397
Longitude : 88.89042670838535
file name : Image_04052023164803519.png
|
2023-05-04 16:48:03.615584 |
122 |
58655255 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied |
170000 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied2 |
Roof laid |
-
latitude : 22.6665293
Longitude : 88.872815
file name : Image_22072024150701966.png
|
2024-07-22 15:07:02.061957 |
123 |
58655255 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied |
170000 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied2 |
Roof laid |
-
latitude : 22.68403130583465
Longitude : 88.89010685496032
file name : Image_08052023161821528.png
|
2023-05-08 16:18:21.621513 |
124 |
58655255 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied |
170000 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied2 |
Roof laid |
-
latitude : 22.68403130583465
Longitude : 88.89010685496032
file name : Image_08052023161826245.png
|
2023-05-08 16:18:26.346848 |
125 |
58655255 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied |
170000 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied2 |
Plinth level |
-
latitude : 22.684070700779557
Longitude : 88.89013359323144
file name : Image_05052023174822192.png
|
2023-05-05 17:48:22.292826 |
126 |
58655255 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied |
170000 |
Repairing of ICDS Centerat All Sansad I to XVII Under Sangrampur Shibhati GP 15th Untied2 |
Completion of work |
-
latitude : 22.68412380013615
Longitude : 88.89012521132827
file name : Image_04052023164806519.png
|
2023-05-04 16:48:06.609196 |
127 |
75644796 |
Construction of Cement Concrete Road with BFS for Community with earth work from Nontu Dhali house t |
288671 |
Construction of Cement Concrete Road with BFS for Community with earth work from Nontu Dhali house t1 |
Roof laid |
-
latitude : 22.6699401,22.6708217,22.6699417,22.6699417
Longitude : 88.8689457,88.8675463,88.8689472,88.8689472
file name : Image_06062023141902086.png
|
2023-06-06 14:19:02.163493 |
128 |
75644796 |
Construction of Cement Concrete Road with BFS for Community with earth work from Nontu Dhali house t |
288671 |
Construction of Cement Concrete Road with BFS for Community with earth work from Nontu Dhali house t1 |
Plinth level |
-
latitude : 22.6699161,22.6699149,22.6699155,22.6699171
Longitude : 88.8687224,88.8687153,88.8687216,88.8687226
file name : Image_30052023161409513.png
|
2023-05-30 16:14:09.601108 |
129 |
75644796 |
Construction of Cement Concrete Road with BFS for Community with earth work from Nontu Dhali house t |
288671 |
Construction of Cement Concrete Road with BFS for Community with earth work from Nontu Dhali house t1 |
Completion of work |
-
latitude : 22.6699154,22.6699161,22.6699161
Longitude : 88.8687216,88.8687224,88.8687224
file name : Image_30052023160338768.png
|
2023-05-30 16:03:38.860434 |
130 |
75643784 |
Construction of Cement Concrete Road with BFS for Community with earth work from Asharul Gazi house |
99515 |
Construction of Cement Concrete Road with BFS for Community with earth work from Asharul Gazi house 1 |
Plinth level |
-
latitude : 22.681186152622104,22.68121058586985,22.6813106238842
Longitude : 88.89529860578477,88.89505201019347,88.89483726583421
file name : Image_01062023172842264.png
|
2023-06-01 17:28:42.367835 |
131 |
75643784 |
Construction of Cement Concrete Road with BFS for Community with earth work from Asharul Gazi house |
99515 |
Construction of Cement Concrete Road with BFS for Community with earth work from Asharul Gazi house 1 |
Completion of work |
-
latitude : 22.681257231161,22.681220225058496,22.68124972935766
Longitude : 88.89526021666825,88.89509291388094,88.89499761164188
file name : Image_01062023171523884.png
|
2023-06-01 17:15:23.986996 |
132 |
47403934 |
Drinking Water Tube well at Sansad No I to XVII 15th Tied |
590000 |
Drinking Water Tube well at Sansad No I to XVII 15th Tied1 |
Roof laid |
-
latitude : 22.6643496
Longitude : 88.875703
file name : Image_22072024120717003.png
|
2024-07-22 12:07:17.119276 |
133 |
47403934 |
Drinking Water Tube well at Sansad No I to XVII 15th Tied |
590000 |
Drinking Water Tube well at Sansad No I to XVII 15th Tied1 |
Plinth level |
-
latitude : 22.6662145
Longitude : 88.8712527
file name : Image_21062023165359289.png
|
2023-06-21 16:53:59.402015 |
134 |
47403934 |
Drinking Water Tube well at Sansad No I to XVII 15th Tied |
590000 |
Drinking Water Tube well at Sansad No I to XVII 15th Tied1 |
Completion of work |
-
latitude : 22.6661611
Longitude : 88.8714349
file name : Image_31052023182332589.png
|
2023-05-31 18:23:32.673428 |
135 |
59222161 |
Awareness Camp providing for various type of Govt services Under Sangrampur Shibhati GP 15th FC Tied |
120000 |
Awareness Camp providing for various type of Govt services Under Sangrampur Shibhati GP 15th FC Tied1 |
Roof laid |
-
latitude : 22.6665103
Longitude : 88.8728138
file name : Image_22072024122315365.png
|
2024-07-22 12:23:15.451984 |
136 |
59222161 |
Awareness Camp providing for various type of Govt services Under Sangrampur Shibhati GP 15th FC Tied |
120000 |
Awareness Camp providing for various type of Govt services Under Sangrampur Shibhati GP 15th FC Tied1 |
Plinth level |
-
latitude : 22.6661689
Longitude : 88.8711357
file name : Image_27062023185647185.png
|
2023-06-27 18:56:47.274304 |
137 |
59222161 |
Awareness Camp providing for various type of Govt services Under Sangrampur Shibhati GP 15th FC Tied |
120000 |
Awareness Camp providing for various type of Govt services Under Sangrampur Shibhati GP 15th FC Tied1 |
Completion of work |
-
latitude : 22.6661676
Longitude : 88.8711363
file name : Image_26062023194938529.png
|
2023-06-26 19:49:38.62286 |
138 |
75645810 |
Creation of drainage channel for management of grey water |
244198 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.6663758
Longitude : 88.8724373
file name : Image_22062023174243712.png
|
2023-06-22 17:42:43.797707 |
139 |
75645810 |
Creation of drainage channel for management of grey water |
244198 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.666489658877254
Longitude : 88.87180781923234
file name : Image_21062023170430423.png
|
2023-06-21 17:04:30.533123 |
140 |
75645532 |
Creation of drainage channel for management of grey water |
332509 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.6784941367805
Longitude : 88.86952316388488
file name : Image_21072023181908829.png
|
2023-07-21 18:19:08.913127 |
141 |
75645532 |
Creation of drainage channel for management of grey water |
332509 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.67843382898718
Longitude : 88.86969063431025
file name : Image_27062023161804683.png
|
2023-06-27 16:18:04.815501 |
142 |
75645532 |
Creation of drainage channel for management of grey water |
332509 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.67876022029668
Longitude : 88.8696120120585
file name : Image_30052023171440898.png
|
2023-05-30 17:14:40.987645 |
143 |
58693524 |
CONSTRUCTION OF WATER ATM PLANT at GP Office Under Sangrampur Shibhati GP 15th FC Tied |
472400 |
CONSTRUCTION OF WATER ATM PLANT at GP Office Under Sangrampur Shibhati GP 15th FC Tied1 |
Plinth level |
-
latitude : 22.6665168
Longitude : 88.8728362
file name : Image_25082023163537236.png
|
2023-08-25 16:35:37.328368 |
144 |
58693524 |
CONSTRUCTION OF WATER ATM PLANT at GP Office Under Sangrampur Shibhati GP 15th FC Tied |
472400 |
CONSTRUCTION OF WATER ATM PLANT at GP Office Under Sangrampur Shibhati GP 15th FC Tied1 |
Completion of work |
-
latitude : 22.6665364
Longitude : 88.8728402
file name : Image_25082023162917283.png
|
2023-08-25 16:29:17.46357 |
145 |
69482940 |
Solar Street Lighting Installation |
550000 |
Construction of Solar Light for Community at Biramnagar at Sansad XI to XIV |
Roof laid |
-
latitude : 22.679396783933043
Longitude : 88.86979926377535
file name : Image_21112023170006613.png
|
2023-11-21 17:00:06.694527 |
146 |
69482940 |
Solar Street Lighting Installation |
550000 |
Construction of Solar Light for Community at Biramnagar at Sansad XI to XIV |
Plinth level |
-
latitude : 22.679427000693977
Longitude : 88.86976137757301
file name : Image_14102023150349156.png
|
2023-10-14 15:03:49.255522 |
147 |
69482940 |
Solar Street Lighting Installation |
550000 |
Construction of Solar Light for Community at Biramnagar at Sansad XI to XIV |
Completion of work |
-
latitude : 22.679430353455245
Longitude : 88.86980328708887
file name : Image_12102023160021712.png
|
2023-10-12 16:00:21.804596 |
148 |
69483280 |
Solar Street Lighting Installation |
550000 |
Construction of Solar Light for Community at Sansad XV to XVII |
Plinth level |
-
latitude : 22.66920045018196
Longitude : 88.87373959645629
file name : Image_14102023153654734.png
|
2023-10-14 15:36:54.823189 |
149 |
69483280 |
Solar Street Lighting Installation |
550000 |
Construction of Solar Light for Community at Sansad XV to XVII |
Completion of work |
-
latitude : 22.669201120734215
Longitude : 88.87375275604427
file name : Image_12102023162410565.png
|
2023-10-12 16:24:10.65302 |
150 |
69432283 |
Drainage Construction |
345473 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.6746778562665
Longitude : 88.88176803477108
file name : Image_25062024114756476.png
|
2024-06-25 11:47:56.578484 |
151 |
69432283 |
Drainage Construction |
345473 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.67473824787885
Longitude : 88.88176778331399
file name : Image_28022024173052977.png
|
2024-02-28 17:30:53.091276 |
152 |
69432283 |
Drainage Construction |
345473 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.674595001153648
Longitude : 88.88200599700212
file name : Image_28022024172432686.png
|
2024-02-28 17:24:32.806412 |
153 |
69421979 |
Creation of a new source of drinking water |
349904 |
Water Solar ATM Plant at mouza Shibhati JL No 113 Sansad No VIII |
Roof laid |
-
latitude : 22.697426634840667
Longitude : 88.89290766790509
file name : Image_25112023155822189.png
|
2023-11-25 15:58:22.279213 |
154 |
69421979 |
Creation of a new source of drinking water |
349904 |
Water Solar ATM Plant at mouza Shibhati JL No 113 Sansad No VIII |
Plinth level |
-
latitude : 22.697470388375223
Longitude : 88.89282820746303
file name : Image_14102023131300391.png
|
2023-10-14 13:13:00.482528 |
155 |
69421979 |
Creation of a new source of drinking water |
349904 |
Water Solar ATM Plant at mouza Shibhati JL No 113 Sansad No VIII |
Completion of work |
-
latitude : 22.697446458041668
Longitude : 88.89287791214883
file name : Image_14102023130749031.png
|
2023-10-14 13:07:49.107621 |
156 |
69422394 |
Creation of a new source of drinking water |
349904 |
Water Solar ATM Plant at mouza Sangrampur JL No 104 Sansad No XV |
Roof laid |
-
latitude : 22.680946765467525
Longitude : 88.85095649398863
file name : Image_25112023154410536.png
|
2023-11-25 15:44:10.625099 |
157 |
69422394 |
Creation of a new source of drinking water |
349904 |
Water Solar ATM Plant at mouza Sangrampur JL No 104 Sansad No XV |
Plinth level |
-
latitude : 22.6662776
Longitude : 88.8723668
file name : Image_14102023151725856.png
|
2023-10-14 15:17:25.95232 |
158 |
69422394 |
Creation of a new source of drinking water |
349904 |
Water Solar ATM Plant at mouza Sangrampur JL No 104 Sansad No XV |
Completion of work |
-
latitude : 22.6662346
Longitude : 88.8708308
file name : Image_14102023151240797.png
|
2023-10-14 15:12:40.908736 |
159 |
69481790 |
Solar Street Lighting Installation |
550000 |
Construction of Solar Light for Community at Sansad I to IV |
Roof laid |
-
latitude : 22.6830191
Longitude : 88.8688133
file name : Image_21112023170242322.png
|
2023-11-21 17:02:42.403725 |
160 |
69481790 |
Solar Street Lighting Installation |
550000 |
Construction of Solar Light for Community at Sansad I to IV |
Plinth level |
-
latitude : 22.68320271279663
Longitude : 88.86885177344084
file name : Image_14102023150647832.png
|
2023-10-14 15:06:47.92241 |
161 |
69481790 |
Solar Street Lighting Installation |
550000 |
Construction of Solar Light for Community at Sansad I to IV |
Completion of work |
-
latitude : 22.6831592945382
Longitude : 88.86887172237039
file name : Image_12102023155148536.png
|
2023-10-12 15:51:48.636815 |
162 |
69399221 |
Creation of a new source of drinking water |
349904 |
Water Solar ATM Plant at mouza Choura Char JL No 107 Sansad No I |
Roof laid |
-
latitude : 22.68348333891481
Longitude : 88.85122119449079
file name : Image_12122024163611668.png
|
2024-12-12 16:36:11.769414 |
163 |
69399221 |
Creation of a new source of drinking water |
349904 |
Water Solar ATM Plant at mouza Choura Char JL No 107 Sansad No I |
Roof laid |
-
latitude : 22.683454882353544
Longitude : 88.85122236795723
file name : Image_25112023152619646.png
|
2023-11-25 15:26:19.7464 |
164 |
69399221 |
Creation of a new source of drinking water |
349904 |
Water Solar ATM Plant at mouza Choura Char JL No 107 Sansad No I |
Plinth level |
-
latitude : 22.683477513492107
Longitude : 88.85116939432919
file name : Image_14102023123453730.png
|
2023-10-14 12:34:53.825761 |
165 |
69399221 |
Creation of a new source of drinking water |
349904 |
Water Solar ATM Plant at mouza Choura Char JL No 107 Sansad No I |
Completion of work |
-
latitude : 22.68350370693952
Longitude : 88.85121951811016
file name : Image_14102023122857658.png
|
2023-10-14 12:28:57.752734 |
166 |
68909674 |
Drainage Construction |
345473 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.687388760969043
Longitude : 88.86461145244539
file name : Image_06032024133659222.png
|
2024-03-06 13:36:59.313789 |
167 |
68909674 |
Drainage Construction |
345473 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.687505688518286
Longitude : 88.86467984877527
file name : Image_17022024101119986.png
|
2024-02-17 10:11:20.078704 |
168 |
68909674 |
Drainage Construction |
345473 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.687554848380387
Longitude : 88.86467389762402
file name : Image_17022024100111610.png
|
2024-02-17 10:01:11.692904 |
169 |
35346874 |
Repair CCroad from Jiyat to Habibar S I 14th |
350000 |
Repair CCroad from Jiyat to Habibar S I 14th1 |
Roof laid |
-
latitude : 22.686640969477594
Longitude : 88.85349662974477
file name : Image_08122021150905903.png
|
2021-12-08 15:09:05.995647 |
170 |
35346874 |
Repair CCroad from Jiyat to Habibar S I 14th |
350000 |
Repair CCroad from Jiyat to Habibar S I 14th1 |
Plinth level |
-
latitude : 22.686459375545382
Longitude : 88.85349336080253
file name : Image_03122021132548847.png
|
2021-12-03 13:25:48.96073 |
171 |
35346874 |
Repair CCroad from Jiyat to Habibar S I 14th |
350000 |
Repair CCroad from Jiyat to Habibar S I 14th1 |
Completion of work |
-
latitude : 22.6665124
Longitude : 88.8728082
file name : Image_01122021192558177.png
|
2021-12-01 19:25:58.291449 |
172 |
35581138 |
Repair CCRoad Habibar to Mahadeb S I 14th |
329000 |
Repair CCRoad Habibar to Mahadeb S I 14th1 |
Roof laid |
-
latitude : 22.68682260531932,22.686804584227502
Longitude : 88.8542079180479,88.85425804182887
file name : Image_05022021170643892.png
|
2021-02-05 17:06:43.977087 |
173 |
35581138 |
Repair CCRoad Habibar to Mahadeb S I 14th |
329000 |
Repair CCRoad Habibar to Mahadeb S I 14th1 |
Plinth level |
-
latitude : 22.686830149032176,22.686829478479922
Longitude : 88.8540823571384,88.85408705100417
file name : Image_01022021144623174.png
|
2021-02-01 14:46:23.287515 |
174 |
35581138 |
Repair CCRoad Habibar to Mahadeb S I 14th |
329000 |
Repair CCRoad Habibar to Mahadeb S I 14th1 |
Completion of work |
-
latitude : 22.68682030029595,22.686792430467904
Longitude : 88.85408319532871,88.85412133298814
file name : Image_28012021161914292.png
|
2021-01-28 16:19:14.385872 |
175 |
35584761 |
Repair CCR Romjan to Mostafa Nachimdin SIII 14th |
383000 |
Repair CCR Romjan to Mostafa Nachimdin SIII 14th1 |
Roof laid |
-
latitude : 22.684653159230947,22.68462461885065
Longitude : 88.86961285024881,88.86970144696534
file name : Image_17022021122119617.png
|
2021-02-17 12:21:19.701727 |
176 |
35584761 |
Repair CCR Romjan to Mostafa Nachimdin SIII 14th |
383000 |
Repair CCR Romjan to Mostafa Nachimdin SIII 14th1 |
Plinth level |
-
latitude : 22.684630402363837,22.684613009914756
Longitude : 88.86965098790824,88.86972634121776
file name : Image_09022021115513930.png
|
2021-02-09 11:55:14.05451 |
177 |
35584761 |
Repair CCR Romjan to Mostafa Nachimdin SIII 14th |
383000 |
Repair CCR Romjan to Mostafa Nachimdin SIII 14th1 |
Completion of work |
-
latitude : 22.6617264,22.661726
Longitude : 88.8493778,88.8493771
file name : Image_24012021154230453.png
|
2021-01-24 15:42:30.554019 |
178 |
35586164 |
Repair CCRoad Hasanur to Old Idhga SIX 14th |
310000 |
Repair CCRoad Hasanur to Old Idhga SIX 14th1 |
Roof laid |
-
latitude : 22.689195312559605,22.689504311420023,22.689616880379617,22.689860248938203,22.689955341629684,22.690190873108804,22.69072178285569,22.690787874162197
Longitude : 88.89473056420684,88.89478932134807,88.89471086673439,88.89476459473372,88.8946495950222,88.89463760890067,88.8946770876646,88.89492225833237
file name : Image_11122021162828940.png
|
2021-12-11 16:28:29.036401 |
179 |
35586164 |
Repair CCRoad Hasanur to Old Idhga SIX 14th |
310000 |
Repair CCRoad Hasanur to Old Idhga SIX 14th1 |
Plinth level |
-
latitude : 22.690071263350546,22.69025637768209,22.69097068347037,22.690812391228974
Longitude : 88.89458547346294,88.89463433995843,88.89457591809332,88.8948776666075
file name : Image_10122021112049977.png
|
2021-12-10 11:20:50.083566 |
180 |
35586164 |
Repair CCRoad Hasanur to Old Idhga SIX 14th |
310000 |
Repair CCRoad Hasanur to Old Idhga SIX 14th1 |
Completion of work |
-
latitude : 22.690291916951537,22.690758453682065
Longitude : 88.89460894279182,88.89463417232037
file name : Image_08122021130640008.png
|
2021-12-08 13:06:40.099014 |
181 |
69429698 |
Drainage Construction |
350000 |
Pucca Drain for Nurislam Mondals house side to Rauf Mondals |
Completion of work |
-
latitude : 22.6854705
Longitude : 88.8697028
file name : Image_15032024173008826.png
|
2024-03-15 17:30:08.922269 |
182 |
69430037 |
Drainage Construction |
350000 |
Pucca Drain from Palash Mondals house to Tarun Mondal house |
Roof laid |
-
latitude : 22.688112119212747
Longitude : 88.87804018333554
file name : Image_16042024155835643.png
|
2024-04-16 15:58:35.725861 |
183 |
69430037 |
Drainage Construction |
350000 |
Pucca Drain from Palash Mondals house to Tarun Mondal house |
Plinth level |
-
latitude : 22.687672320753336
Longitude : 88.87784421443939
file name : Image_16042024154921581.png
|
2024-04-16 15:49:21.661806 |
184 |
69430037 |
Drainage Construction |
350000 |
Pucca Drain from Palash Mondals house to Tarun Mondal house |
Completion of work |
-
latitude : 22.68743653781712
Longitude : 88.87787799350917
file name : Image_15032024172308866.png
|
2024-03-15 17:23:08.957663 |
185 |
69430443 |
Drainage Construction |
350000 |
Pucca Drain from Shibhati Bose Bari Side to Debi Bari Side |
Completion of work |
-
latitude : 22.701212698593736
Longitude : 88.88733873143792
file name : Image_15032024171439435.png
|
2024-03-15 17:14:39.539563 |
186 |
69431800 |
Drainage Construction |
250000 |
Pucca Drain from Taher Biswass house to Rawsan Dhalis |
Completion of work |
-
latitude : 22.66828937921673
Longitude : 88.86687532067299
file name : Image_15032024165631507.png
|
2024-03-15 16:56:31.607306 |
187 |
69486024 |
Construction of roads |
273510 |
Cement Concrete Road from Sukumar Mondals house side to Bikash Halders |
Roof laid |
-
latitude : 22.6770064,22.6772852
Longitude : 88.8700148,88.8699318
file name : Image_12072024181824728.png
|
2024-07-12 18:18:24.813507 |
188 |
69486024 |
Construction of roads |
273510 |
Cement Concrete Road from Sukumar Mondals house side to Bikash Halders |
Plinth level |
-
latitude : 22.677425150759518,22.677390659227967
Longitude : 88.87016446329653,88.87027309276164
file name : Image_12072024181038965.png
|
2024-07-12 18:10:39.059756 |
189 |
69486024 |
Construction of roads |
273510 |
Cement Concrete Road from Sukumar Mondals house side to Bikash Halders |
Completion of work |
-
latitude : 22.6770512,22.67740662675351,22.6769991
Longitude : 88.8700545,88.87031584046781,88.8700664
file name : Image_15032024170346512.png
|
2024-03-15 17:03:46.693605 |
190 |
69489245 |
Infrastructure and training on solid and liquid waste management |
219980 |
Construction of Tri Cycle Shed at the project area of SWM at mouza Merudandi |
Plinth level |
-
latitude : 22.6665262
Longitude : 88.8728096
file name : Image_28032024160443680.png
|
2024-03-28 16:04:43.767725 |
191 |
69489245 |
Infrastructure and training on solid and liquid waste management |
219980 |
Construction of Tri Cycle Shed at the project area of SWM at mouza Merudandi |
Completion of work |
-
latitude : 22.671882449649274
Longitude : 88.90317466109991
file name : Image_28032024155930182.png
|
2024-03-28 15:59:30.276824 |
192 |
69426233 |
Operation and Maintenance of drinking water supply system |
64480 |
Purchase of Materials Operation and Maintenance of drinking water source at mouza Merudandi Shibhati |
Roof laid |
-
latitude : 22.68646700307727
Longitude : 88.88557333499193
file name : Image_18042024175233369.png
|
2024-04-18 17:52:33.455288 |
193 |
69426233 |
Operation and Maintenance of drinking water supply system |
64480 |
Purchase of Materials Operation and Maintenance of drinking water source at mouza Merudandi Shibhati |
Plinth level |
-
latitude : 22.68648833502084
Longitude : 88.88559303246439
file name : Image_08042024175556218.png
|
2024-04-08 17:55:56.3014 |
194 |
69426233 |
Operation and Maintenance of drinking water supply system |
64480 |
Purchase of Materials Operation and Maintenance of drinking water source at mouza Merudandi Shibhati |
Completion of work |
-
latitude : 22.686511930078268
Longitude : 88.88557341881096
file name : Image_08042024174947165.png
|
2024-04-08 17:49:47.251342 |
195 |
69426721 |
Operation and Maintenance of drinking water supply system |
60000 |
Purchase of Materials Operation and Maintenance of drinking water source at mouza Sangrampur |
Roof laid |
-
latitude : 22.6664158
Longitude : 88.8711068
file name : Image_18042024181340671.png
|
2024-04-18 18:13:40.759202 |
196 |
69426721 |
Operation and Maintenance of drinking water supply system |
60000 |
Purchase of Materials Operation and Maintenance of drinking water source at mouza Sangrampur |
Plinth level |
-
latitude : 22.6662778
Longitude : 88.8710767
file name : Image_08042024184139082.png
|
2024-04-08 18:41:39.167133 |
197 |
69426721 |
Operation and Maintenance of drinking water supply system |
60000 |
Purchase of Materials Operation and Maintenance of drinking water source at mouza Sangrampur |
Completion of work |
-
latitude : 22.6661372
Longitude : 88.87095
file name : Image_08042024183713995.png
|
2024-04-08 18:37:14.075354 |
198 |
69427643 |
Operation and Maintenance of drinking water supply system |
60000 |
Purchase of Materials Operation and Maintenance of drinking water source at Amarkati Parnaihati Kamardang |
Roof laid |
-
latitude : 22.6832504
Longitude : 88.8688905
file name : Image_18042024180730855.png
|
2024-04-18 18:07:30.942851 |
199 |
69427643 |
Operation and Maintenance of drinking water supply system |
60000 |
Purchase of Materials Operation and Maintenance of drinking water source at Amarkati Parnaihati Kamardang |
Plinth level |
-
latitude : 22.67827298026532
Longitude : 88.8693255186081
file name : Image_08042024181426387.png
|
2024-04-08 18:14:26.465821 |
200 |
69427643 |
Operation and Maintenance of drinking water supply system |
60000 |
Purchase of Materials Operation and Maintenance of drinking water source at Amarkati Parnaihati Kamardang |
Completion of work |
-
latitude : 22.67825810238719
Longitude : 88.86936189606786
file name : Image_08042024181054300.png
|
2024-04-08 18:10:54.382354 |
201 |
69427025 |
Operation and Maintenance of drinking water supply system |
60000 |
Purchase of Materials Operation and Maintenance of drinking water source at Choura Biramnagar |
Roof laid |
-
latitude : 22.6831826
Longitude : 88.8688671
file name : Image_18042024180031985.png
|
2024-04-18 18:00:32.077623 |
202 |
69427025 |
Operation and Maintenance of drinking water supply system |
60000 |
Purchase of Materials Operation and Maintenance of drinking water source at Choura Biramnagar |
Plinth level |
-
latitude : 22.68321696203202
Longitude : 88.86874951422215
file name : Image_08042024180720864.png
|
2024-04-08 18:07:20.968611 |
203 |
69427025 |
Operation and Maintenance of drinking water supply system |
60000 |
Purchase of Materials Operation and Maintenance of drinking water source at Choura Biramnagar |
Completion of work |
-
latitude : 22.6829545
Longitude : 88.8686292
file name : Image_08042024180320218.png
|
2024-04-08 18:03:20.304936 |
204 |
97753936 |
Drainage Construction |
350000 |
Construction of Pucca Drain for Community with slab work and soak pit from Khalek Sardar shop to Haran Ga |
Plinth level |
-
latitude : 22.68757018726319
Longitude : 88.8709342572838
file name : Image_03122024123051568.png
|
2024-12-03 12:30:51.697755 |
205 |
97753936 |
Drainage Construction |
350000 |
Construction of Pucca Drain for Community with slab work and soak pit from Khalek Sardar shop to Haran Ga |
Completion of work |
-
latitude : 22.687576725147665
Longitude : 88.87110373936594
file name : Image_03122024122013278.png
|
2024-12-03 12:20:13.372475 |
206 |
97688418 |
Construction of roads |
350000 |
from Chaura Masjid to Khalek Gazis house side at mouza Chaura Sansad II |
Roof laid |
-
latitude : 22.68693441990763,22.686892258934677,22.68685500137508,22.68679217901081,22.686774283647537
Longitude : 88.86482929810882,88.86454951018095,88.86420350521803,88.86397501453757,88.86370863765478
file name : Image_04102024160523119.png
|
2024-10-04 16:05:23.229594 |
207 |
97688418 |
Construction of roads |
350000 |
from Chaura Masjid to Khalek Gazis house side at mouza Chaura Sansad II |
Plinth level |
-
latitude : 22.68685935996473,22.68682838883251
Longitude : 88.8647489156574,88.86468613520265
file name : Image_01102024155930143.png
|
2024-10-01 15:59:30.271636 |
208 |
97688418 |
Construction of roads |
350000 |
from Chaura Masjid to Khalek Gazis house side at mouza Chaura Sansad II |
Completion of work |
-
latitude : 22.686870549805462,22.686861245892942
Longitude : 88.86476785875857,88.86479652486742
file name : Image_01102024155031389.png
|
2024-10-01 15:50:31.493949 |
209 |
97687997 |
Construction of roads |
210000 |
Road from Jahangir Gazis house side to Nazrul gazis house side at mouza Merudandi Sansad XI |
Roof laid |
-
latitude : 22.681041145697236,22.6809469,22.681533247232437
Longitude : 88.89556171372533,88.8955579,88.89563078060746
file name : Image_03102024140718923.png
|
2024-10-03 14:07:19.040075 |
210 |
97687997 |
Construction of roads |
210000 |
Road from Jahangir Gazis house side to Nazrul gazis house side at mouza Merudandi Sansad XI |
Plinth level |
-
latitude : 22.681130496785045,22.68123686313629,22.681414098478854
Longitude : 88.89553673565388,88.8956337980926,88.89566908590496
file name : Image_22092024121029630.png
|
2024-09-22 12:10:29.730637 |
211 |
97687997 |
Construction of roads |
210000 |
Road from Jahangir Gazis house side to Nazrul gazis house side at mouza Merudandi Sansad XI |
Completion of work |
-
latitude : 22.6810902,22.681235396303236,22.68135949037969
Longitude : 88.8955128,88.89566724188626,88.89569951221347
file name : Image_22092024120037377.png
|
2024-09-22 12:00:37.470678 |
212 |
97751710 |
Drainage Construction |
345000 |
Drain from Mityunjoy Roy house side to Santo Das house side at Sangrampur Sansad XVI |
Plinth level |
-
latitude : 22.6689402
Longitude : 88.8715809
file name : Image_03122024124528995.png
|
2024-12-03 12:45:29.077641 |
213 |
97751710 |
Drainage Construction |
345000 |
Drain from Mityunjoy Roy house side to Santo Das house side at Sangrampur Sansad XVI |
Completion of work |
-
latitude : 22.6689378
Longitude : 88.8715684
file name : Image_21112024160352753.png
|
2024-11-21 16:03:52.875247 |
214 |
69493328 |
Infrastructure and training on solid and liquid waste management |
145140 |
Infrastructure and training on solid and liquid waste management1 |
Plinth level |
-
latitude : 22.681112559512258,22.681139465421438
Longitude : 88.88813953846693,88.88810399919748
file name : Image_27092024164050784.png
|
2024-09-27 16:40:50.88468 |
215 |
69493328 |
Infrastructure and training on solid and liquid waste management |
145140 |
Infrastructure and training on solid and liquid waste management1 |
Completion of work |
-
latitude : 22.681126222014427,22.68115685787052
Longitude : 88.88807508163154,88.88813249766827
file name : Image_27092024162644858.png
|
2024-09-27 16:26:44.950019 |
216 |
97864655 |
Creation of Small-bore pipe conveyance system |
200000 |
Creation of Small-bore pipe conveyance system1 |
Plinth level |
-
latitude : 22.6676242
Longitude : 88.8711211
file name : Image_01102024162029268.png
|
2024-10-01 16:20:29.351783 |
217 |
97864655 |
Creation of Small-bore pipe conveyance system |
200000 |
Creation of Small-bore pipe conveyance system1 |
Plinth level |
-
latitude : 22.6676242
Longitude : 88.8711211
file name : Image_01102024161509637.png
|
2024-10-01 16:15:09.73837 |
218 |
97864655 |
Creation of Small-bore pipe conveyance system |
200000 |
Creation of Small-bore pipe conveyance system1 |
Completion of work |
-
latitude : 22.6676418
Longitude : 88.8711849
file name : Image_01102024160943343.png
|
2024-10-01 16:09:43.435991 |
219 |
69491213 |
Infrastructure and training on solid and liquid waste management |
236424 |
Infrastructure and training on solid and liquid waste management1 |
Plinth level |
-
latitude : 22.68115534912795
Longitude : 88.88819728977978
file name : Image_27092024164226802.png
|
2024-09-27 16:42:26.893082 |
220 |
69491213 |
Infrastructure and training on solid and liquid waste management |
236424 |
Infrastructure and training on solid and liquid waste management1 |
Completion of work |
-
latitude : 22.681141644716263
Longitude : 88.88818739913404
file name : Image_27092024162905657.png
|
2024-09-27 16:29:05.739056 |
221 |
69491955 |
Infrastructure and training on solid and liquid waste management |
82400 |
Infrastructure and training on solid and liquid waste management1 |
Plinth level |
-
latitude : 22.681150948628783,22.68112215679139
Longitude : 88.88850423507392,88.88855167664587
file name : Image_27092024164650614.png
|
2024-09-27 16:46:50.710839 |
222 |
69491955 |
Infrastructure and training on solid and liquid waste management |
82400 |
Infrastructure and training on solid and liquid waste management1 |
Completion of work |
-
latitude : 22.68113498110324,22.681141099892557
Longitude : 88.88852284289896,88.88863977044821
file name : Image_27092024163120330.png
|
2024-09-27 16:31:20.422505 |
223 |
47324706 |
Const of Pucca Drain with from Jalil Mondal Shop to Nazrul Master Land sideSIII 15th Tied |
350000 |
Const of Pucca Drain with from Jalil Mondal Shop to Nazrul Master Land sideSIII 15th Tied1 |
Roof laid |
-
latitude : 22.68233107868582,22.68232106231153,22.682239338755608
Longitude : 88.86906534433365,88.86922108009458,88.86949433013797
file name : Image_23062022183105653.png
|
2022-06-23 18:31:05.758076 |
224 |
47324706 |
Const of Pucca Drain with from Jalil Mondal Shop to Nazrul Master Land sideSIII 15th Tied |
350000 |
Const of Pucca Drain with from Jalil Mondal Shop to Nazrul Master Land sideSIII 15th Tied1 |
Plinth level |
-
latitude : 22.68438410013914,22.6828257,22.6818752,22.68225186970085
Longitude : 88.89390964061022,88.8693184,88.868942,88.86955258436501
file name : Image_07062022171358048.png
|
2022-06-07 17:13:58.13967 |
225 |
47324706 |
Const of Pucca Drain with from Jalil Mondal Shop to Nazrul Master Land sideSIII 15th Tied |
350000 |
Const of Pucca Drain with from Jalil Mondal Shop to Nazrul Master Land sideSIII 15th Tied1 |
Completion of work |
-
latitude : 22.682342058978975,22.68233564682305
Longitude : 88.8690733909607,88.86920909397304
file name : Image_02062022174955714.png
|
2022-06-02 17:49:55.825352 |
226 |
47326156 |
Const of Pucca Drain from Gobinda Chakraborty to via Baburam Mondal to Gobinda Sardar SX 15 T |
248000 |
Const of Pucca Drain from Gobinda Chakraborty to via Baburam Mondal to Gobinda Sardar SX 15 T1 |
Roof laid |
-
latitude : 22.68439717590809,22.68447730690241,22.684650644659996,22.68488076981157,22.684935084544122
Longitude : 88.8939693197608,88.8940211199224,88.89414114877582,88.89432437717915,88.89453710988164
file name : Image_24062022183751880.png
|
2022-06-24 18:37:51.969705 |
227 |
47326156 |
Const of Pucca Drain from Gobinda Chakraborty to via Baburam Mondal to Gobinda Sardar SX 15 T |
248000 |
Const of Pucca Drain from Gobinda Chakraborty to via Baburam Mondal to Gobinda Sardar SX 15 T1 |
Plinth level |
-
latitude : 22.68500096630305,22.684978377074003,22.684828424826264,22.684711245819926,22.684398223645985
Longitude : 88.89445672743022,88.89425807632506,88.89417937025428,88.89414039440453,88.89396001584828
file name : Image_07062022131707031.png
|
2022-06-07 13:17:07.132647 |
228 |
47326156 |
Const of Pucca Drain from Gobinda Chakraborty to via Baburam Mondal to Gobinda Sardar SX 15 T |
248000 |
Const of Pucca Drain from Gobinda Chakraborty to via Baburam Mondal to Gobinda Sardar SX 15 T1 |
Completion of work |
-
latitude : 22.68439130857587,22.684508739039302,22.684739492833614,22.68496484030038,22.684985543601215
Longitude : 88.89391056261957,88.89396353624761,88.89408381655812,88.89420594088733,88.89442043378949
file name : Image_01062022131204354.png
|
2022-06-01 13:12:04.441069 |
229 |
47327262 |
Const of Pucca Drain with from Ajoy Mondal shop side to Paritosh Bala side SXVI 15 T |
350000 |
Const of Pucca Drain with from Ajoy Mondal shop side to Paritosh Bala side SXVI 15 T1 |
Roof laid |
-
latitude : 22.6705382,22.670805626548827,22.670848751440644,22.67082754522562,22.670623152516782,22.670451407320797
Longitude : 88.8778984,88.87785435654223,88.87796147726476,88.87809726409614,88.8782028760761,88.87832114472985
file name : Image_30062022125030280.png
|
2022-06-30 12:50:30.385035 |
230 |
47327262 |
Const of Pucca Drain with from Ajoy Mondal shop side to Paritosh Bala side SXVI 15 T |
350000 |
Const of Pucca Drain with from Ajoy Mondal shop side to Paritosh Bala side SXVI 15 T1 |
Plinth level |
-
latitude : 22.6705326,22.670815265737474,22.670878926292062,22.670888104476035,22.670667157508433,22.670471649616957
Longitude : 88.8778981,88.8778175599873,88.87801721692085,88.8780871219933,88.87825501151383,88.87834436260164
file name : Image_15062022151028714.png
|
2022-06-15 15:10:28.805931 |
231 |
47327262 |
Const of Pucca Drain with from Ajoy Mondal shop side to Paritosh Bala side SXVI 15 T |
350000 |
Const of Pucca Drain with from Ajoy Mondal shop side to Paritosh Bala side SXVI 15 T1 |
Completion of work |
-
latitude : 22.670749216340482,22.670821761712432
Longitude : 88.87773474678397,88.87783926911652
file name : Image_31052022104602349.png
|
2022-05-31 10:46:02.469557 |
232 |
47330687 |
Prevention of Vector Borne Disease purpose S XV 15 T |
69700 |
Prevention of Vector Borne Disease purpose S XV 15 T1 |
Plinth level |
-
latitude : 22.67209677491337
Longitude : 88.87064172886312
file name : Image_10102023171435165.png
|
2023-10-10 17:14:35.264236 |
233 |
47330687 |
Prevention of Vector Borne Disease purpose S XV 15 T |
69700 |
Prevention of Vector Borne Disease purpose S XV 15 T1 |
Completion of work |
-
latitude : 22.6727418
Longitude : 88.8700763
file name : Image_09102023164503156.png
|
2023-10-09 16:45:03.26219 |
234 |
47391698 |
Const CC Road from Merudandi Goutam Pal to Haripada Sardar S VI 15 UT |
350000 |
Const CC Road from Merudandi Goutam Pal to Haripada Sardar S VI 15 UT1 |
Roof laid |
-
latitude : 22.68468630965799,22.68448367714882,22.684313314966857,22.684122123755515,22.684001550078392,22.68419542349875
Longitude : 88.88764408417046,88.88759387657046,88.88753830455244,88.8879668712616,88.88850088231266,88.888618061319
file name : Image_27062022153905072.png
|
2022-06-27 15:39:05.160151 |
235 |
47391698 |
Const CC Road from Merudandi Goutam Pal to Haripada Sardar S VI 15 UT |
350000 |
Const CC Road from Merudandi Goutam Pal to Haripada Sardar S VI 15 UT1 |
Plinth level |
-
latitude : 22.68472637515515,22.684569004923105,22.684379029087722,22.6851363,22.684146724641323
Longitude : 88.88761843554676,88.88757141306996,88.88747778721154,88.8872335,88.8884862139821
file name : Image_25062022134535302.png
|
2022-06-25 13:45:35.398827 |
236 |
47391698 |
Const CC Road from Merudandi Goutam Pal to Haripada Sardar S VI 15 UT |
350000 |
Const CC Road from Merudandi Goutam Pal to Haripada Sardar S VI 15 UT1 |
Completion of work |
-
latitude : 22.684707641601562,22.68463015090674,22.6851392,22.6851376
Longitude : 88.88760485686362,88.88759563677013,88.8872409,88.8872385
file name : Image_01062022125818248.png
|
2022-06-01 12:58:18.364994 |
237 |
47332733 |
Const CC Road from Nur Mahammad Gazi to Ajihar Gazi via Gaffar Gazi S II 15 UT |
278000 |
Const CC Road from Nur Mahammad Gazi to Ajihar Gazi via Gaffar Gazi S II 15 UT1 |
Roof laid |
-
latitude : 22.6909119,22.685340978205204,22.685550609603524,22.685417169705033,22.685395418666303,22.68551351968199,22.685370021499693,22.685349653474987
Longitude : 88.8648478,88.86533355340362,88.86526415124536,88.8652846030891,88.86514856480062,88.86516273021698,88.8649978581816,88.86474598199129
file name : Image_25062022132814405.png
|
2022-06-25 13:28:14.506081 |
238 |
47332733 |
Const CC Road from Nur Mahammad Gazi to Ajihar Gazi via Gaffar Gazi S II 15 UT |
278000 |
Const CC Road from Nur Mahammad Gazi to Ajihar Gazi via Gaffar Gazi S II 15 UT1 |
Plinth level |
-
latitude : 22.685107584111392,22.685260763391852,22.68542538397014,22.68558585550636,22.685407949611545,22.685394622385502
Longitude : 88.86550177820027,88.86535710655153,88.86530807241797,88.86528544127941,88.86518594808877,88.86476551182568
file name : Image_07062022173048892.png
|
2022-06-07 17:30:48.992918 |
239 |
47332733 |
Const CC Road from Nur Mahammad Gazi to Ajihar Gazi via Gaffar Gazi S II 15 UT |
278000 |
Const CC Road from Nur Mahammad Gazi to Ajihar Gazi via Gaffar Gazi S II 15 UT1 |
Completion of work |
-
latitude : 22.68513876479119,22.68527484498918,22.68544005230069,22.685568295419216
Longitude : 88.86544520035386,88.86539381928742,88.86533816345036,88.86529566720128
file name : Image_01062022123644078.png
|
2022-06-01 12:36:44.181208 |
240 |
47398845 |
Const of CC Road with BFS work from Babla Majumdar to Ashim Mitra via Anup to Lakxhman S XIV 15 UT |
246000 |
Const of CC Road with BFS work from Babla Majumdar to Ashim Mitra via Anup to Lakxhman S XIV 15 UT1 |
Roof laid |
-
latitude : 22.6682833,22.6679562,22.668282
Longitude : 88.8703228,88.8705029,88.8701181
file name : Image_24062022173327519.png
|
2022-06-24 17:33:27.610014 |
241 |
47398845 |
Const of CC Road with BFS work from Babla Majumdar to Ashim Mitra via Anup to Lakxhman S XIV 15 UT |
246000 |
Const of CC Road with BFS work from Babla Majumdar to Ashim Mitra via Anup to Lakxhman S XIV 15 UT1 |
Plinth level |
-
latitude : 22.6682146,22.6680086,22.6682498
Longitude : 88.8704146,88.8704594,88.8703555
file name : Image_06062022122457035.png
|
2022-06-06 12:24:57.137332 |
242 |
47398845 |
Const of CC Road with BFS work from Babla Majumdar to Ashim Mitra via Anup to Lakxhman S XIV 15 UT |
246000 |
Const of CC Road with BFS work from Babla Majumdar to Ashim Mitra via Anup to Lakxhman S XIV 15 UT1 |
Completion of work |
-
latitude : 22.6681973,22.6682126
Longitude : 88.8703431,88.8703922
file name : Image_28052022162655168.png
|
2022-05-28 16:26:55.274312 |
243 |
47395471 |
Const of BFS Roadwith CC from Satyabrata Sardar to Dulal Biswas SX 15 UT |
270700 |
Const of BFS Roadwith CC from Satyabrata Sardar to Dulal Biswas SX 15 UT1 |
Roof laid |
-
latitude : 22.681274246424437,22.681069476529956,22.680782438255847,22.680707001127303,22.680662032216787
Longitude : 88.8966785185039,88.89657961204648,88.89652688987553,88.89615037478507,88.89578199014068
file name : Image_10032023155523311.png
|
2023-03-10 15:55:23.409381 |
244 |
47395471 |
Const of BFS Roadwith CC from Satyabrata Sardar to Dulal Biswas SX 15 UT |
270700 |
Const of BFS Roadwith CC from Satyabrata Sardar to Dulal Biswas SX 15 UT1 |
Plinth level |
-
latitude : 22.681276383809745,22.68104445654899,22.68072623759508,22.680683531798422,22.680707210674882
Longitude : 88.89667206443846,88.8966076914221,88.8965164963156,88.89621659182012,88.89594753272831
file name : Image_04032023141122512.png
|
2023-03-04 14:11:22.599526 |
245 |
47395471 |
Const of BFS Roadwith CC from Satyabrata Sardar to Dulal Biswas SX 15 UT |
270700 |
Const of BFS Roadwith CC from Satyabrata Sardar to Dulal Biswas SX 15 UT1 |
Completion of work |
-
latitude : 22.681248555891216,22.680991692468524,22.68073495477438,22.6806985354051,22.680635419674218
Longitude : 88.89657139778137,88.89651523903012,88.89648464508355,88.8961295876652,88.89572474174201
file name : Image_17022023121921074.png
|
2023-02-17 12:19:21.188164 |
246 |
47396472 |
Const of BFS Roadwith CC from Tarikul Gazi to Safikul Gazi S X 15 UT |
165000 |
Const of BFS Roadwith CC from Tarikul Gazi to Safikul Gazi S X 15 UT1 |
Roof laid |
-
latitude : 22.6816335786134,22.681522769853473,22.681454960256815,22.681643259711564
Longitude : 88.89540949836373,88.8956218957901,88.8959036115557,88.8960119895637
file name : Image_03062022162606321.png
|
2022-06-03 16:26:06.424122 |
247 |
47396472 |
Const of BFS Roadwith CC from Tarikul Gazi to Safikul Gazi S X 15 UT |
165000 |
Const of BFS Roadwith CC from Tarikul Gazi to Safikul Gazi S X 15 UT1 |
Plinth level |
-
latitude : 22.681627543643117,22.68156245816499
Longitude : 88.89532970264554,88.89546196907759
file name : Image_31052022111625601.png
|
2022-05-31 11:16:25.714973 |
248 |
47396472 |
Const of BFS Roadwith CC from Tarikul Gazi to Safikul Gazi S X 15 UT |
165000 |
Const of BFS Roadwith CC from Tarikul Gazi to Safikul Gazi S X 15 UT1 |
Completion of work |
-
latitude : 22.681632488965988,22.68160331994295,22.681511202827096
Longitude : 88.89541234821081,88.89555760659277,88.89579121023417
file name : Image_28052022165134414.png
|
2022-05-28 16:51:34.547425 |
249 |
47398242 |
Const of BFS Road with earth work from Sukurali Gazi to Amarkati Idhga No.SXII 15 UT |
350000 |
Const of BFS Road with earth work from Sukurali Gazi to Amarkati Idhga No.SXII 15 UT1 |
Roof laid |
-
latitude : 22.68341305665672,22.683401280082762,22.683404716663063,22.683392856270075,22.683376888744533,22.683314820751548
Longitude : 88.8645433075726,88.86421138420701,88.86395154520869,88.86366723105311,88.86333715170622,88.86302383616567
file name : Image_30062022135925863.png
|
2022-06-30 13:59:25.980993 |
250 |
47398242 |
Const of BFS Road with earth work from Sukurali Gazi to Amarkati Idhga No.SXII 15 UT |
350000 |
Const of BFS Road with earth work from Sukurali Gazi to Amarkati Idhga No.SXII 15 UT1 |
Plinth level |
-
latitude : 22.6835288,22.6835284
Longitude : 88.8643554,88.8643557
file name : Image_28062022163132169.png
|
2022-06-28 16:31:32.277407 |
251 |
47398242 |
Const of BFS Road with earth work from Sukurali Gazi to Amarkati Idhga No.SXII 15 UT |
350000 |
Const of BFS Road with earth work from Sukurali Gazi to Amarkati Idhga No.SXII 15 UT1 |
Completion of work |
-
latitude : 22.6835287,22.6835286,22.6835224,22.6835295,22.683529,22.683294494636357
Longitude : 88.8643556,88.8643554,88.8643509,88.8643519,88.8643477,88.86299030855298
file name : Image_23062022181833835.png
|
2022-06-23 18:18:33.933571 |
252 |
58672581 |
Construction of Pucca Drain with slab from from Naran Das to Rajesh Biswas Choura S I 15th Tied |
350000 |
Construction of Pucca Drain with slab from from Naran Das to Rajesh Biswas Choura S I 15th Tied1 |
Roof laid |
-
latitude : 22.678328803740442,22.678381064906716,22.678459268063307,22.678526868112385,22.678551049903035
Longitude : 88.8507182803005,88.85075373575091,88.8507185317576,88.85068693198264,88.85063613764942
file name : Image_23102022144404963.png
|
2022-10-23 14:44:05.623383 |
253 |
58672581 |
Construction of Pucca Drain with slab from from Naran Das to Rajesh Biswas Choura S I 15th Tied |
350000 |
Construction of Pucca Drain with slab from from Naran Das to Rajesh Biswas Choura S I 15th Tied1 |
Plinth level |
-
latitude : 22.67832742072642,22.678379975259304
Longitude : 88.85071467608213,88.85075868107378
file name : Image_23102022143757663.png
|
2022-10-23 14:37:58.330052 |
254 |
58672581 |
Construction of Pucca Drain with slab from from Naran Das to Rajesh Biswas Choura S I 15th Tied |
350000 |
Construction of Pucca Drain with slab from from Naran Das to Rajesh Biswas Choura S I 15th Tied1 |
Completion of work |
-
latitude : 22.6787401,22.6787401,22.6787401,22.678627953864634
Longitude : 88.8506525,88.8506525,88.8506525,88.85061006993055
file name : Image_23092022151906626.png
|
2022-09-23 15:19:06.727124 |
255 |
57897956 |
Construction of Blacktop Road with pilling from Partha to Old Satkhira Road S X 15th FC Untied |
349994 |
Construction of Blacktop Road with pilling from Partha to Old Satkhira Road S X 15th FC Untied1 |
Roof laid |
-
latitude : 22.68059715628624,22.680475199595094,22.68016108777374,22.679884107783437,22.679576785303652
Longitude : 88.89547957107425,88.89481279067695,88.8948034029454,88.8943702261895,88.89397703111172
file name : Image_23102022151946421.png
|
2022-10-23 15:19:47.139738 |
256 |
57897956 |
Construction of Blacktop Road with pilling from Partha to Old Satkhira Road S X 15th FC Untied |
349994 |
Construction of Blacktop Road with pilling from Partha to Old Satkhira Road S X 15th FC Untied1 |
Plinth level |
-
latitude : 22.680613920092583,22.68056568223983,22.680509313941002,22.68018061760813,22.679712153039873,22.679603691212833
Longitude : 88.89554696157575,88.89526667073369,88.89483240433037,88.8947793468833,88.8940126542002,88.89400058425963
file name : Image_23092022155858127.png
|
2022-09-23 15:58:58.282056 |
257 |
57897956 |
Construction of Blacktop Road with pilling from Partha to Old Satkhira Road S X 15th FC Untied |
349994 |
Construction of Blacktop Road with pilling from Partha to Old Satkhira Road S X 15th FC Untied1 |
Completion of work |
-
latitude : 22.68060453236103,22.68057599198073,22.680509188212454,22.68014449160546,22.679845676757395,22.679576659575105
Longitude : 88.89546431601048,88.89522937126458,88.89486433938146,88.89480248093605,88.89429428614676,88.89399555511773
file name : Image_05092022130616734.png
|
2022-09-05 13:06:16.829911 |
258 |
58647481 |
Construction of Solar Light from all Sansad under Sangrampur Shibhati GP 15th FC Untied |
1200000 |
Construction of Solar Light from all Sansad under Sangrampur Shibhati GP 15th FC Untied1 |
Roof laid |
-
latitude : 22.670902856625617
Longitude : 88.8705671299249
file name : Image_23032023141312750.png
|
2023-03-23 14:13:12.841451 |
259 |
58647481 |
Construction of Solar Light from all Sansad under Sangrampur Shibhati GP 15th FC Untied |
1200000 |
Construction of Solar Light from all Sansad under Sangrampur Shibhati GP 15th FC Untied1 |
Plinth level |
-
latitude : 22.67093864735216
Longitude : 88.87060820125043
file name : Image_21032023114016666.png
|
2023-03-21 11:40:16.759637 |
260 |
58647481 |
Construction of Solar Light from all Sansad under Sangrampur Shibhati GP 15th FC Untied |
1200000 |
Construction of Solar Light from all Sansad under Sangrampur Shibhati GP 15th FC Untied1 |
Completion of work |
-
latitude : 22.669859644956887
Longitude : 88.87039018794894
file name : Image_02032023172845710.png
|
2023-03-02 17:28:45.806873 |
261 |
58679717 |
Construction of Pucca Drain with repairing from Das Para SSK School to Gobinda Merudandi S V 15th FC |
350000 |
Construction of Pucca Drain with repairing from Das Para SSK School to Gobinda Merudandi S V 15th FC1 |
Roof laid |
-
latitude : 22.6865474274382,22.686741426587105,22.686926582828164,22.68717632163316,22.68732111901045,22.687521991319954
Longitude : 88.8918917812407,88.89197023585439,88.89203812927008,88.8921661209315,88.89226066879928,88.89231389388442
file name : Image_08092022121419008.png
|
2022-09-08 12:14:19.107586 |
262 |
58679717 |
Construction of Pucca Drain with repairing from Das Para SSK School to Gobinda Merudandi S V 15th FC |
350000 |
Construction of Pucca Drain with repairing from Das Para SSK School to Gobinda Merudandi S V 15th FC1 |
Plinth level |
-
latitude : 22.68664738163352,22.6847795,22.6847795,22.6847795,22.6847795
Longitude : 88.89190955087543,88.8933229,88.8933229,88.8933229,88.8933229
file name : Image_05092022124816758.png
|
2022-09-05 12:48:16.869906 |
263 |
58679717 |
Construction of Pucca Drain with repairing from Das Para SSK School to Gobinda Merudandi S V 15th FC |
350000 |
Construction of Pucca Drain with repairing from Das Para SSK School to Gobinda Merudandi S V 15th FC1 |
Completion of work |
-
latitude : 22.68659880850464,22.686801943928003,22.686988315545022,22.68727518618107,22.68752111122012
Longitude : 88.89192773960531,88.89198708347976,88.89206008985639,88.89220316894352,88.89232822693884
file name : Image_02092022113056939.png
|
2022-09-02 11:30:57.069003 |
264 |
58673530 |
Construction of Pucca Drain from Hasanur Jaman Sardar to Alim Biswas at Choura S II 15th FC Tied |
350000 |
Construction of Pucca Drain from Hasanur Jaman Sardar to Alim Biswas at Choura S II 15th FC Tied1 |
Roof laid |
-
latitude : 22.68746063578874,22.68752060830593,22.687483644112945,22.687506736256182,22.687485027126968
Longitude : 88.86515032500029,88.8653329666704,88.86549834161997,88.8657452724874,88.8658660557121
file name : Image_27022023160822926.png
|
2023-02-27 16:08:23.026412 |
265 |
58673530 |
Construction of Pucca Drain from Hasanur Jaman Sardar to Alim Biswas at Choura S II 15th FC Tied |
350000 |
Construction of Pucca Drain from Hasanur Jaman Sardar to Alim Biswas at Choura S II 15th FC Tied1 |
Plinth level |
-
latitude : 22.68745858222246,22.687510047107935,22.687482596375048,22.687477986328304
Longitude : 88.86513993144035,88.86529583483934,88.86555986478925,88.86591156944633
file name : Image_20022023132031322.png
|
2023-02-20 13:20:31.417847 |
266 |
58673530 |
Construction of Pucca Drain from Hasanur Jaman Sardar to Alim Biswas at Choura S II 15th FC Tied |
350000 |
Construction of Pucca Drain from Hasanur Jaman Sardar to Alim Biswas at Choura S II 15th FC Tied1 |
Completion of work |
-
latitude : 22.687453972175717,22.68751595634967,22.687525553628802,22.68749684561044
Longitude : 88.86511805467308,88.86528493836522,88.86548191308975,88.8656368944794
file name : Image_11022023170348471.png
|
2023-02-11 17:03:48.556073 |
267 |
58675467 |
Construction of Pucca Drain from Amitosh Sarkar to Tarun Mondal at Kamardanga S IV 15th FC Tied |
350000 |
Construction of Pucca Drain from Amitosh Sarkar to Tarun Mondal at Kamardanga S IV 15th FC Tied1 |
Roof laid |
-
latitude : 22.68655559979379,22.68674884457141,22.686933875083923,22.68712946679443,22.687303558923304
Longitude : 88.8779610581696,88.87786583974957,88.8778354972601,88.87783859856427,88.87787044979632
file name : Image_16092022145618834.png
|
2022-09-16 14:56:18.963849 |
268 |
58675467 |
Construction of Pucca Drain from Amitosh Sarkar to Tarun Mondal at Kamardanga S IV 15th FC Tied |
350000 |
Construction of Pucca Drain from Amitosh Sarkar to Tarun Mondal at Kamardanga S IV 15th FC Tied1 |
Plinth level |
-
latitude : 22.6860768,22.6860768,22.6860751,22.687186589464545,22.68743259832263
Longitude : 88.8780363,88.8780363,88.8780392,88.8779695238918,88.87795871123672
file name : Image_05092022121718392.png
|
2022-09-05 12:17:18.491764 |
269 |
58675467 |
Construction of Pucca Drain from Amitosh Sarkar to Tarun Mondal at Kamardanga S IV 15th FC Tied |
350000 |
Construction of Pucca Drain from Amitosh Sarkar to Tarun Mondal at Kamardanga S IV 15th FC Tied1 |
Completion of work |
-
latitude : 22.686596042476594,22.6860768,22.687032823450863,22.68723348621279,22.687521362677217
Longitude : 88.87792275287211,88.8780363,88.87782082892954,88.8778320606798,88.87785879895091
file name : Image_02092022111352557.png
|
2022-09-02 11:13:52.681435 |
270 |
58681394 |
Construction of Pucca Drain from Riyajul Gazi to Khatapara ICDS center Shibhati S VIII 15th FC Tied |
350000 |
Construction of Pucca Drain from Riyajul Gazi to Khatapara ICDS center Shibhati S VIII 15th FC Tied1 |
Roof laid |
-
latitude : 22.69695825409144,22.6967876823619,22.696588905528188,22.696404461748898,22.696174294687808
Longitude : 88.89291311614215,88.8928535208106,88.89279199764132,88.8927261158824,88.89268227852881
file name : Image_21092022142434536.png
|
2022-09-21 14:24:34.613063 |
271 |
58681394 |
Construction of Pucca Drain from Riyajul Gazi to Khatapara ICDS center Shibhati S VIII 15th FC Tied |
350000 |
Construction of Pucca Drain from Riyajul Gazi to Khatapara ICDS center Shibhati S VIII 15th FC Tied1 |
Plinth level |
-
latitude : 22.697018939070404,22.6967990398407,22.696604789234698,22.696451442316175,22.696263478137553,22.696198015473783
Longitude : 88.89294320717454,88.89286852441728,88.89283005148172,88.89278713613749,88.8927086815238,88.89269853942096
file name : Image_16092022143108111.png
|
2022-09-16 14:31:08.220514 |
272 |
58681394 |
Construction of Pucca Drain from Riyajul Gazi to Khatapara ICDS center Shibhati S VIII 15th FC Tied |
350000 |
Construction of Pucca Drain from Riyajul Gazi to Khatapara ICDS center Shibhati S VIII 15th FC Tied1 |
Completion of work |
-
latitude : 22.696997984312475,22.696885876357555,22.696717400103807,22.696439498104155,22.696251324377954
Longitude : 88.89294488355517,88.89293105341494,88.89286718331277,88.89278898015618,88.89273600652814
file name : Image_05092022123434764.png
|
2022-09-05 12:34:34.869763 |
273 |
58681686 |
Construction of Pucca Drain from Adhani SSS Sangha to Saratkhali at Shibhati S VIII 15th FC Tied |
350000 |
Construction of Pucca Drain from Adhani SSS Sangha to Saratkhali at Shibhati S VIII 15th FC Tied1 |
Roof laid |
-
latitude : 22.69522102084011,22.695383755490184,22.695521218702197,22.695636050775647,22.695827702991664
Longitude : 88.88527049683034,88.88528265058994,88.88532707467675,88.8853713311255,88.88541902415454
file name : Image_20022023122830976.png
|
2023-02-20 12:28:31.09054 |
274 |
58681686 |
Construction of Pucca Drain from Adhani SSS Sangha to Saratkhali at Shibhati S VIII 15th FC Tied |
350000 |
Construction of Pucca Drain from Adhani SSS Sangha to Saratkhali at Shibhati S VIII 15th FC Tied1 |
Plinth level |
-
latitude : 22.69521452486515,22.695414978079498,22.695608139038086,22.695869612507522
Longitude : 88.88515667058527,88.88518567197025,88.88522389344871,88.88535439968109
file name : Image_15022023123534394.png
|
2023-02-15 12:35:34.513591 |
275 |
58681686 |
Construction of Pucca Drain from Adhani SSS Sangha to Saratkhali at Shibhati S VIII 15th FC Tied |
350000 |
Construction of Pucca Drain from Adhani SSS Sangha to Saratkhali at Shibhati S VIII 15th FC Tied1 |
Completion of work |
-
latitude : 22.695218506269157,22.695464179851115,22.695670751854777,22.69585284870118
Longitude : 88.88523604720831,88.88524644076824,88.88528550043702,88.88535842299461
file name : Image_10022023131214940.png
|
2023-02-10 13:12:15.045981 |
276 |
58683445 |
Construction of Pucca Drain from Amal Sardar to Merudandi Purbapara Kalibari Merudandi S X 15th FC T |
350000 |
Construction of Pucca Drain from Amal Sardar to Merudandi Purbapara Kalibari Merudandi S X 15th FC T1 |
Roof laid |
-
latitude : 22.683979170396924,22.684012362733483,22.683816268108785,22.683883658610284,22.683957586996257
Longitude : 88.89524303376675,88.89513859525323,88.89497498050332,88.89480776153505,88.89464833773673
file name : Image_10032023154956909.png
|
2023-03-10 15:49:57.028933 |
277 |
58683445 |
Construction of Pucca Drain from Amal Sardar to Merudandi Purbapara Kalibari Merudandi S X 15th FC T |
350000 |
Construction of Pucca Drain from Amal Sardar to Merudandi Purbapara Kalibari Merudandi S X 15th FC T1 |
Plinth level |
-
latitude : 22.683995682746172,22.683812915347517,22.68389329779893,22.68395888619125
Longitude : 88.89509668573737,88.89495628885925,88.8947674445808,88.8945906702429
file name : Image_28022023134134035.png
|
2023-02-28 13:41:34.133724 |
278 |
58683445 |
Construction of Pucca Drain from Amal Sardar to Merudandi Purbapara Kalibari Merudandi S X 15th FC T |
350000 |
Construction of Pucca Drain from Amal Sardar to Merudandi Purbapara Kalibari Merudandi S X 15th FC T1 |
Completion of work |
-
latitude : 22.6839640410617,22.68400381319225,22.68381450790912,22.683892752975225
Longitude : 88.89521394856274,88.89510624110699,88.89493868686259,88.89468588866293
file name : Image_17022023121035681.png
|
2023-02-17 12:10:35.78023 |
279 |
58684605 |
Construction of Pucca Drain from Bimal Chandra Pal to Kartick Mondalat Chak Kamardanga S XI 15th FC |
350000 |
Construction of Pucca Drain from Bimal Chandra Pal to Kartick Mondalat Chak Kamardanga S XI 15th FC 1 |
Roof laid |
-
latitude : 22.681321687996387,22.681189463473856,22.681012814864516,22.6807648,22.6807648
Longitude : 88.87236203067005,88.87233965098858,88.87218760326505,88.8722686,88.8722686
file name : Image_28102022154720881.png
|
2022-10-28 15:47:21.03131 |
280 |
58684605 |
Construction of Pucca Drain from Bimal Chandra Pal to Kartick Mondalat Chak Kamardanga S XI 15th FC |
350000 |
Construction of Pucca Drain from Bimal Chandra Pal to Kartick Mondalat Chak Kamardanga S XI 15th FC 1 |
Plinth level |
-
latitude : 22.68120287451893,22.68111679237336,22.680975808762014,22.680867766030133,22.68078625202179
Longitude : 88.8723663892597,88.87226689606905,88.87215298600495,88.87203438207507,88.87192474678159
file name : Image_21092022145142700.png
|
2022-09-21 14:51:42.785025 |
281 |
58684605 |
Construction of Pucca Drain from Bimal Chandra Pal to Kartick Mondalat Chak Kamardanga S XI 15th FC |
350000 |
Construction of Pucca Drain from Bimal Chandra Pal to Kartick Mondalat Chak Kamardanga S XI 15th FC 1 |
Completion of work |
-
latitude : 22.681183177046478,22.68101055175066,22.68087577074766,22.680588732473552,22.680361582897604
Longitude : 88.87231157161295,88.87220051139593,88.87204402126372,88.87175149284303,88.87148176319897
file name : Image_06092022150810799.png
|
2022-09-06 15:08:10.896728 |
282 |
75644069 |
Construction of Black Top Road for Community with earth work from PMGSY Road to Mollarati at mouza S |
339650 |
Construction of Black Top Road for Community with earth work from PMGSY Road to Mollarati at mouza S1 |
Roof laid |
-
latitude : 22.69475892651826,22.69431963097304,22.69411092158407,22.69375783391297
Longitude : 88.89450919814408,88.89436754398048,88.89434264972806,88.89429923146963
file name : Image_09062023140552058.png
|
2023-06-09 14:05:52.171274 |
283 |
75644069 |
Construction of Black Top Road for Community with earth work from PMGSY Road to Mollarati at mouza S |
339650 |
Construction of Black Top Road for Community with earth work from PMGSY Road to Mollarati at mouza S1 |
Plinth level |
-
latitude : 22.693757456727326,22.69412852358073,22.694481946527958,22.69477015826851,22.695180871523917
Longitude : 88.89433133415878,88.8943993113935,88.89448681846261,88.89451104216278,88.8946234434843
file name : Image_08062023180047111.png
|
2023-06-08 18:00:47.209492 |
284 |
75644069 |
Construction of Black Top Road for Community with earth work from PMGSY Road to Mollarati at mouza S |
339650 |
Construction of Black Top Road for Community with earth work from PMGSY Road to Mollarati at mouza S1 |
Completion of work |
-
latitude : 22.693902463652194,22.694189250469208,22.69445512443781,22.694869232364,22.695211716927588
Longitude : 88.894297555089,88.89435329474509,88.89444574713707,88.8945718947798,88.89457792975008
file name : Image_30052023164357891.png
|
2023-05-30 16:43:57.983451 |
285 |
75644402 |
Construction of Black Top Road for Community with earth work from Mollarati Soyed Gazi house to Rija |
339650 |
Construction of Black Top Road for Community with earth work from Mollarati Soyed Gazi house to Rija1 |
Roof laid |
-
latitude : 22.696698708459735,22.696423321031034,22.695925226435065,22.69562854897231,22.695314018055797
Longitude : 88.89493726193905,88.89479049481452,88.89469351619482,88.8946493435651,88.89460600912571
file name : Image_16062023182759099.png
|
2023-06-16 18:27:59.186152 |
286 |
75644402 |
Construction of Black Top Road for Community with earth work from Mollarati Soyed Gazi house to Rija |
339650 |
Construction of Black Top Road for Community with earth work from Mollarati Soyed Gazi house to Rija1 |
Plinth level |
-
latitude : 22.69662934821099,22.69629587419331,22.695924723520875,22.69560587592423,22.695279736071825
Longitude : 88.89492980204523,88.89479946345091,88.89472159557045,88.89465244486928,88.89460600912571
file name : Image_09062023140316050.png
|
2023-06-09 14:03:16.146662 |
287 |
75644402 |
Construction of Black Top Road for Community with earth work from Mollarati Soyed Gazi house to Rija |
339650 |
Construction of Black Top Road for Community with earth work from Mollarati Soyed Gazi house to Rija1 |
Completion of work |
-
latitude : 22.69668399821967,22.696270016022027,22.695945259183645,22.695619370788336,22.695243610069156
Longitude : 88.89488956891,88.89476333744824,88.8947484176606,88.89464079402387,88.89459896832705
file name : Image_30052023165203044.png
|
2023-05-30 16:52:03.13202 |
288 |
75645306 |
Creation of drainage channel for management of grey water |
340742 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.689354526810348
Longitude : 88.89672034420073
file name : Image_16062023182224417.png
|
2023-06-16 18:22:24.503402 |
289 |
75645306 |
Creation of drainage channel for management of grey water |
340742 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.6893707877025
Longitude : 88.89670592732728
file name : Image_09062023135627293.png
|
2023-06-09 13:56:27.399631 |
290 |
75645306 |
Creation of drainage channel for management of grey water |
340742 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.68939882516861
Longitude : 88.89642831869423
file name : Image_01062023171034323.png
|
2023-06-01 17:10:34.430285 |
291 |
58689227 |
Construction of Pucca Drain with slab work from Kamal Hela to Fatema Bibi at S XV 15th FC Tied |
350000 |
Construction of Pucca Drain with slab work from Kamal Hela to Fatema Bibi at S XV 15th FC Tied1 |
Roof laid |
-
latitude : 22.668726914562285,22.668844973668456,22.668912070803344,22.669017389416695,22.66906701028347
Longitude : 88.87257317081094,88.87284365482628,88.8730480056256,88.87335998006165,88.87352208606899
file name : Image_01112022152348209.png
|
2022-11-01 15:23:48.3001 |
292 |
58689227 |
Construction of Pucca Drain with slab work from Kamal Hela to Fatema Bibi at S XV 15th FC Tied |
350000 |
Construction of Pucca Drain with slab work from Kamal Hela to Fatema Bibi at S XV 15th FC Tied1 |
Plinth level |
-
latitude : 22.66881823539734,22.668868275359273,22.668946771882474,22.669029417447746,22.66911516431719
Longitude : 88.8726547267288,88.87277324683964,88.87295345775783,88.87323676608503,88.87351554818451
file name : Image_28102022145621629.png
|
2022-10-28 14:56:21.748266 |
293 |
58689227 |
Construction of Pucca Drain with slab work from Kamal Hela to Fatema Bibi at S XV 15th FC Tied |
350000 |
Construction of Pucca Drain with slab work from Kamal Hela to Fatema Bibi at S XV 15th FC Tied1 |
Completion of work |
-
latitude : 22.66876915935427,22.668831730261445,22.668923512101173,22.668975102715194,22.669014455750585
Longitude : 88.87263477779925,88.87278439477086,88.87302638031542,88.87316225096583,88.87334153987467
file name : Image_06092022151829867.png
|
2022-09-06 15:18:29.970941 |
294 |
58692956 |
CONSTRUCTION OF WATER ATM PLANT AND CHILDREN PARK at S I to XVII Under SS GP 15th FC Tied |
2000000 |
CONSTRUCTION OF WATER ATM PLANT AND CHILDREN PARK at S I to XVII Under SS GP 15th FC Tied1 |
Roof laid |
-
latitude : 22.683404968120158
Longitude : 88.866101000458
file name : Image_17082023164055408.png
|
2023-08-17 16:40:55.509312 |
295 |
58692956 |
CONSTRUCTION OF WATER ATM PLANT AND CHILDREN PARK at S I to XVII Under SS GP 15th FC Tied |
2000000 |
CONSTRUCTION OF WATER ATM PLANT AND CHILDREN PARK at S I to XVII Under SS GP 15th FC Tied1 |
Plinth level |
-
latitude : 22.683432418853045
Longitude : 88.86621935293078
file name : Image_08082023165856897.png
|
2023-08-08 16:58:56.999659 |
296 |
58692956 |
CONSTRUCTION OF WATER ATM PLANT AND CHILDREN PARK at S I to XVII Under SS GP 15th FC Tied |
2000000 |
CONSTRUCTION OF WATER ATM PLANT AND CHILDREN PARK at S I to XVII Under SS GP 15th FC Tied1 |
Completion of work |
-
latitude : 22.683400567620993
Longitude : 88.8661496154964
file name : Image_09062023132832724.png
|
2023-06-09 13:28:32.836542 |
297 |
69430995 |
Drainage Construction |
347691 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.686201338656247
Longitude : 88.89441071078181
file name : Image_22122023123421765.png
|
2023-12-22 12:34:21.84789 |
298 |
69430995 |
Drainage Construction |
347691 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.686246894299984
Longitude : 88.8942211959511
file name : Image_11122023131615208.png
|
2023-12-11 13:16:15.303608 |
299 |
69430995 |
Drainage Construction |
347691 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.686271369457245
Longitude : 88.89429210685194
file name : Image_11122023130920573.png
|
2023-12-11 13:09:20.674232 |
300 |
58693899 |
Water Teastingat all New and Existing Tubewell at Under Sangrampur Shibhati GP 15th FC Tied |
150000 |
Water Teastingat all New and Existing Tubewell at Under Sangrampur Shibhati GP 15th FC Tied1 |
Roof laid |
-
latitude : 22.6665429
Longitude : 88.8728111
file name : Image_22072024151701488.png
|
2024-07-22 15:17:01.565054 |
301 |
58693899 |
Water Teastingat all New and Existing Tubewell at Under Sangrampur Shibhati GP 15th FC Tied |
150000 |
Water Teastingat all New and Existing Tubewell at Under Sangrampur Shibhati GP 15th FC Tied1 |
Plinth level |
-
latitude : 22.6665201
Longitude : 88.8728135
file name : Image_22072024151230103.png
|
2024-07-22 15:12:30.179404 |
302 |
58693899 |
Water Teastingat all New and Existing Tubewell at Under Sangrampur Shibhati GP 15th FC Tied |
150000 |
Water Teastingat all New and Existing Tubewell at Under Sangrampur Shibhati GP 15th FC Tied1 |
Completion of work |
-
latitude : 22.6665524
Longitude : 88.8728176
file name : Image_22072024150359557.png
|
2024-07-22 15:03:59.629938 |
303 |
58693899 |
Water Teastingat all New and Existing Tubewell at Under Sangrampur Shibhati GP 15th FC Tied |
150000 |
Water Teastingat all New and Existing Tubewell at Under Sangrampur Shibhati GP 15th FC Tied1 |
Completion of work |
-
latitude : 22.6663275
Longitude : 88.8710094
file name : Image_28052022160617270.png
|
2022-05-28 16:06:17.357344 |
304 |
35584963 |
Repair Pucca Drain Ajgar to Muchakarim SIII 14th |
350000 |
Repair Pucca Drain Ajgar to Muchakarim SIII 14th1 |
Roof laid |
-
latitude : 22.6664995,22.6665173
Longitude : 88.8728144,88.8728165
file name : Image_20072024131155605.png
|
2024-07-20 13:11:55.694033 |
305 |
35584963 |
Repair Pucca Drain Ajgar to Muchakarim SIII 14th |
350000 |
Repair Pucca Drain Ajgar to Muchakarim SIII 14th1 |
Roof laid |
-
latitude : 22.683640918694437,22.683694646693766
Longitude : 88.86749046854675,88.86738745495677
file name : Image_24112021134821359.png
|
2021-11-24 13:48:21.474277 |
306 |
35584963 |
Repair Pucca Drain Ajgar to Muchakarim SIII 14th |
350000 |
Repair Pucca Drain Ajgar to Muchakarim SIII 14th1 |
Plinth level |
-
latitude : 22.683658562600613,22.68369259312749
Longitude : 88.86745643801987,88.86735233478248
file name : Image_16112021123714571.png
|
2021-11-16 12:37:14.71082 |
307 |
35584963 |
Repair Pucca Drain Ajgar to Muchakarim SIII 14th |
350000 |
Repair Pucca Drain Ajgar to Muchakarim SIII 14th1 |
Completion of work |
-
latitude : 22.683649300597608,22.68370604608208
Longitude : 88.86745434254408,88.86732148937881
file name : Image_09112021131037292.png
|
2021-11-09 13:10:37.409234 |
308 |
69424239 |
Operation and Maintenance of drinking water supply system |
80000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.67047181725502
Longitude : 88.87137439101934
file name : Image_14082024143519846.png
|
2024-08-14 14:35:20.078372 |
309 |
69424239 |
Operation and Maintenance of drinking water supply system |
80000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.670472068712115
Longitude : 88.87124598026276
file name : Image_13082024182351037.png
|
2024-08-13 18:23:51.128197 |
310 |
69424239 |
Operation and Maintenance of drinking water supply system |
80000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.6699386
Longitude : 88.8714696
file name : Image_13082024182059063.png
|
2024-08-13 18:20:59.147177 |
311 |
69424592 |
Operation and Maintenance of drinking water supply system |
80000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.670905496925116
Longitude : 88.87286477722228
file name : Image_14082024143723498.png
|
2024-08-14 14:37:23.608265 |
312 |
69424592 |
Operation and Maintenance of drinking water supply system |
80000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.670849841088057
Longitude : 88.87282035313547
file name : Image_13082024183010597.png
|
2024-08-13 18:30:10.701659 |
313 |
69424592 |
Operation and Maintenance of drinking water supply system |
80000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.6699385
Longitude : 88.8714691
file name : Image_13082024182640237.png
|
2024-08-13 18:26:40.326635 |
314 |
69424978 |
Operation and Maintenance of drinking water supply system |
80000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.6802771
Longitude : 88.8688665
file name : Image_14082024141401847.png
|
2024-08-14 14:14:01.995766 |
315 |
69424978 |
Operation and Maintenance of drinking water supply system |
80000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.68909590318799
Longitude : 88.86963715776801
file name : Image_13082024180255871.png
|
2024-08-13 18:02:55.96443 |
316 |
69424978 |
Operation and Maintenance of drinking water supply system |
80000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.68638846464455
Longitude : 88.88118172064424
file name : Image_13082024175538856.png
|
2024-08-13 17:55:38.946564 |
317 |
69425336 |
Operation and Maintenance of drinking water supply system |
80000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.68024960067123
Longitude : 88.86859151534736
file name : Image_14082024141003369.png
|
2024-08-14 14:10:03.49845 |
318 |
69425336 |
Operation and Maintenance of drinking water supply system |
80000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.680154256522655
Longitude : 88.86857265606523
file name : Image_13082024181031291.png
|
2024-08-13 18:10:31.386192 |
319 |
69425336 |
Operation and Maintenance of drinking water supply system |
80000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.68014600034803
Longitude : 88.86849059723318
file name : Image_13082024180711038.png
|
2024-08-13 18:07:11.121512 |
320 |
97688191 |
Construction of roads |
315000 |
Road from Tapan Biswas house to Santi Biswas via Uday Biswas to Bhola Biswas house side at mouza Sangramp |
Plinth level |
-
latitude : 22.665826,22.6658094
Longitude : 88.8699786,88.8701159
file name : Image_07112024162952125.png
|
2024-11-07 16:29:52.209597 |
321 |
97688191 |
Construction of roads |
315000 |
Road from Tapan Biswas house to Santi Biswas via Uday Biswas to Bhola Biswas house side at mouza Sangramp |
Completion of work |
-
latitude : 22.6658142,22.6665292,22.6665292
Longitude : 88.8701141,88.8702735,88.8702735
file name : Image_04112024124548052.png
|
2024-11-04 12:45:48.136802 |
322 |
98029886 |
Operation and Maintenance of drinking/piped water supply system |
198000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 22.6664451
Longitude : 88.8712365
file name : Image_10122024141556548.png
|
2024-12-10 14:15:56.640001 |
323 |
98029886 |
Operation and Maintenance of drinking/piped water supply system |
198000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 22.66617776826024
Longitude : 88.87212784029543
file name : Image_10122024141133974.png
|
2024-12-10 14:11:34.063451 |
324 |
98030133 |
Operation and Maintenance of drinking/piped water supply system |
198000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 22.697337535209954
Longitude : 88.89289190992713
file name : Image_11122024125116154.png
|
2024-12-11 12:51:16.244525 |
325 |
98030133 |
Operation and Maintenance of drinking/piped water supply system |
198000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 22.69745848607272
Longitude : 88.89283088967204
file name : Image_11122024124817439.png
|
2024-12-11 12:48:17.541786 |
326 |
98030525 |
Operation and Maintenance of drinking/piped water supply system |
198000 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 22.683448595926166
Longitude : 88.85118909180164
file name : Image_12122024163323550.png
|
2024-12-12 16:33:23.643879 |
327 |
98030525 |
Operation and Maintenance of drinking/piped water supply system |
198000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 22.683452367782593
Longitude : 88.85118029080331
file name : Image_12122024163015631.png
|
2024-12-12 16:30:15.736263 |
328 |
98030525 |
Operation and Maintenance of drinking/piped water supply system |
198000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 22.683459450490773
Longitude : 88.8511826377362
file name : Image_12122024162350177.png
|
2024-12-12 16:23:50.269981 |
329 |
98030392 |
Operation and Maintenance of drinking/piped water supply system |
198000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 22.681286525912583
Longitude : 88.8953026290983
file name : Image_09122024155403309.png
|
2024-12-09 15:54:03.392403 |
330 |
98030392 |
Operation and Maintenance of drinking/piped water supply system |
198000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 22.681340547278523
Longitude : 88.89528284780681
file name : Image_09122024154822177.png
|
2024-12-09 15:48:22.265829 |
331 |
98030685 |
Operation and Maintenance of drinking/piped water supply system |
198000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 22.683369554579258
Longitude : 88.86618255637586
file name : Image_11122024131137072.png
|
2024-12-11 13:11:37.16861 |
332 |
98030685 |
Operation and Maintenance of drinking/piped water supply system |
198000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 22.68337672110647
Longitude : 88.86616277508438
file name : Image_11122024130843313.png
|
2024-12-11 13:08:43.404098 |
333 |
97850024 |
Emergency breakdown and up-gradation post disasters/ exigencies |
432400 |
Emergency breakdown and up-gradation post disasters/ exigencies1 |
|
-
latitude : 22.6723236
Longitude : 88.8705437
file name : Image_12122024165720211.png
|
2024-12-12 16:57:20.300471 |