1 |
39091170 |
PCC ROAD FROM BLACK TOP TO H/O ROBIUL, H/0 KETABUL, HO REJUTO H/O NURUDDIN |
200000 |
PCC ROAD FROM BLACK TOP TO H/O ROBIUL, H/0 KETABUL, HO REJUTO H/O NURUDDIN 1 |
Plinth level |
-
latitude : 22.78721403,22.7874946
Longitude : 88.51620308,88.5162894
file name : Image_13012021122330835.png
|
2021-01-13 12:23:30.907455 |
2 |
39091170 |
PCC ROAD FROM BLACK TOP TO H/O ROBIUL, H/0 KETABUL, HO REJUTO H/O NURUDDIN |
200000 |
PCC ROAD FROM BLACK TOP TO H/O ROBIUL, H/0 KETABUL, HO REJUTO H/O NURUDDIN 1 |
Completion of work |
-
latitude : 22.78700777,22.78720073
Longitude : 88.51668938,88.51617826
file name : Image_07012021164416110.png
|
2021-01-07 16:44:16.178065 |
3 |
39090854 |
PCC ROAD FROM NAJRUL SANGHA CLUB TO H/O SIRAJUL MONDAL VIA H/O MUCCHA HAQUE |
447008 |
PCC ROAD FROM NAJRUL SANGHA CLUB TO H/O SIRAJUL MONDAL VIA H/O MUCCHA HAQUE 1 |
Completion of work |
-
latitude : 22.78813336,22.7879781
Longitude : 88.53541608,88.53529125
file name : Image_21022021131753451.png
|
2021-02-21 13:17:53.501319 |
4 |
39086426 |
PUCCA DRAIN BOTH SIDE OF THE ROAD FROM KHALER POLE TO THE HO ALTAF |
1837623 |
PUCCA DRAIN BOTH SIDE OF THE ROAD FROM KHALER POLE TO THE HO ALTAF1 |
Plinth level |
-
latitude : 22.79281033,22.79287357
Longitude : 88.51784399,88.51789523
file name : Image_24022021134239666.png
|
2021-02-24 13:42:37.80847 |
5 |
39086426 |
PUCCA DRAIN BOTH SIDE OF THE ROAD FROM KHALER POLE TO THE HO ALTAF |
1837623 |
PUCCA DRAIN BOTH SIDE OF THE ROAD FROM KHALER POLE TO THE HO ALTAF1 |
Completion of work |
-
latitude : 22.79279917,22.79330511,22.79330728
Longitude : 88.51781622,88.51811557,88.51812234
file name : Image_21022021134618524.png
|
2021-02-21 13:46:18.600547 |
6 |
35142959 |
CONSTRUCTION OF PCC ROAD FROM H/O LIAKAT TO ATIYAR |
431639 |
CONSTRUCTION OF PCC ROAD FROM H/O LIAKAT TO ATIYAR 1 |
Plinth level |
-
latitude : 22.8223326,22.8224537
Longitude : 88.5385941,88.53862304
file name : Image_14072021163735328.png
|
2021-07-14 16:37:35.397101 |
7 |
35142959 |
CONSTRUCTION OF PCC ROAD FROM H/O LIAKAT TO ATIYAR |
431639 |
CONSTRUCTION OF PCC ROAD FROM H/O LIAKAT TO ATIYAR 1 |
Plinth level |
-
latitude : 22.8223326,22.8224537
Longitude : 88.5385941,88.53862304
file name : Image_14072021163746095.png
|
2021-07-14 16:37:46.162932 |
8 |
35142959 |
CONSTRUCTION OF PCC ROAD FROM H/O LIAKAT TO ATIYAR |
431639 |
CONSTRUCTION OF PCC ROAD FROM H/O LIAKAT TO ATIYAR 1 |
Completion of work |
-
latitude : 22.82238807,22.82249247
Longitude : 88.53860276,88.5386206
file name : Image_21022021144143434.png
|
2021-02-21 14:41:43.492298 |
9 |
35157137 |
CONSTRUCTION OF PCC ROAD FROM GARDEN OF AKBAR TO THE POND OF TAPASH |
572688 |
CONSTRUCTION OF PCC ROAD FROM GARDEN OF AKBAR TO THE POND OF TAPASH1 |
Plinth level |
-
latitude : 22.83731622,22.83722934
Longitude : 88.54242791,88.54235191
file name : Image_24022021152151474.png
|
2021-02-24 15:21:51.542669 |
10 |
35157137 |
CONSTRUCTION OF PCC ROAD FROM GARDEN OF AKBAR TO THE POND OF TAPASH |
572688 |
CONSTRUCTION OF PCC ROAD FROM GARDEN OF AKBAR TO THE POND OF TAPASH1 |
Completion of work |
-
latitude : 22.83724763,22.83733176
Longitude : 88.54232164,88.54243039
file name : Image_21022021153714830.png
|
2021-02-21 15:37:14.89069 |
11 |
39087472 |
VBD FOR HELTH SANITATION |
1000000 |
VBD FOR HELTH SANITATION1 |
Plinth level |
-
latitude : 22.8048001
Longitude : 88.5394861
file name : Image_22022022115638428.png
|
2022-02-22 11:56:38.546997 |
12 |
39087472 |
VBD FOR HELTH SANITATION |
1000000 |
VBD FOR HELTH SANITATION2 |
Completion of work |
-
latitude : 22.80477197
Longitude : 88.53981007
file name : Image_22022022115803078.png
|
2022-02-22 11:58:03.197752 |
13 |
39087472 |
VBD FOR HELTH SANITATION |
1000000 |
VBD FOR HELTH SANITATION10 |
Plinth level |
-
latitude : 22.83090419
Longitude : 88.54190545
file name : Image_22022022170332074.png
|
2022-02-22 17:03:32.170115 |
14 |
46307493 |
Construction of PCC road with culvert from RIDF to Suti Khal at Napara |
862154 |
Construction of PCC road with culvert from RIDF to Suti Khal at Napara1 |
Completion of work |
-
latitude : 22.81676842,22.81677149,22.81679427
Longitude : 88.54639905,88.54639741,88.54656414
file name : Image_11032022113302259.png
|
2022-03-11 11:33:02.397097 |
15 |
46307493 |
Construction of PCC road with culvert from RIDF to Suti Khal at Napara |
862154 |
Construction of PCC road with culvert from RIDF to Suti Khal at Napara1 |
Completion of work |
-
latitude : 22.81682515,22.81681464
Longitude : 88.54642997,88.5464645
file name : Image_08032022171454087.png
|
2022-03-08 17:14:54.17879 |
16 |
46312097 |
Street Light Maintainance |
96900 |
Street Light Maintainance1 |
Plinth level |
-
latitude : 22.8041025
Longitude : 88.5409602
file name : Image_21032022161909859.png
|
2022-03-21 16:19:09.967128 |
17 |
46312097 |
Street Light Maintainance |
96900 |
Street Light Maintainance1 |
Completion of work |
-
latitude : 22.8045179
Longitude : 88.54041362
file name : Image_21032022161254395.png
|
2022-03-21 16:12:54.538121 |
18 |
46308976 |
Construction of PCC road with Tally Pilling from Ho Kamrul to Rangri Jame Masjid at Rangri |
798092 |
Construction of PCC road with Tally Pilling from Ho Kamrul to Rangri Jame Masjid at Rangri1 |
Plinth level |
-
latitude : 22.84043963,22.84025596,22.8402602
Longitude : 88.5383067,88.53823125,88.53822767
file name : Image_16062022124900959.png
|
2022-06-16 12:49:01.072647 |
19 |
46308976 |
Construction of PCC road with Tally Pilling from Ho Kamrul to Rangri Jame Masjid at Rangri |
798092 |
Construction of PCC road with Tally Pilling from Ho Kamrul to Rangri Jame Masjid at Rangri1 |
Completion of work |
-
latitude : 22.84036047,22.84043974
Longitude : 88.53825529,88.53826694
file name : Image_10062022122618409.png
|
2022-06-10 12:26:18.507992 |
20 |
46312509 |
Arsenic Free Water System at Karunamoyee Sangha Ground at Malikberia |
894603 |
Arsenic Free Water System at Karunamoyee Sangha Ground at Malikberia1 |
Completion of work |
-
latitude : 22.8302399
Longitude : 88.5420813
file name : Image_10062022123530433.png
|
2022-06-10 12:35:30.540885 |
21 |
46312572 |
Construction of Pucca Drain from ho Sahajan Mondal to Ho Abdar Rahaman at Napara |
320990 |
Construction of Pucca Drain from ho Sahajan Mondal to Ho Abdar Rahaman at Napara 1 |
Plinth level |
-
latitude : 22.81693839,22.81672303
Longitude : 88.54638405,88.54642194
file name : Image_16062022122152946.png
|
2022-06-16 12:21:53.045754 |
22 |
46312572 |
Construction of Pucca Drain from ho Sahajan Mondal to Ho Abdar Rahaman at Napara |
320990 |
Construction of Pucca Drain from ho Sahajan Mondal to Ho Abdar Rahaman at Napara 1 |
Completion of work |
-
latitude : 22.81670923,22.81669892
Longitude : 88.54734356,88.54649633
file name : Image_10062022125725004.png
|
2022-06-10 12:57:25.115902 |
23 |
46309134 |
Constr of PCC Road with Tali Pilling pond of Romjan Kazi with drn frm Ho Nuro to HO Gutkha at Napara |
341448 |
Constr of PCC Road with Tali Pilling pond of Romjan Kazi with drn frm Ho Nuro to HO Gutkha at Napara1 |
Plinth level |
-
latitude : 22.82375476,22.82384844
Longitude : 88.5417018,88.54140925
file name : Image_22062022170511320.png
|
2022-06-22 17:05:11.40789 |
24 |
46309134 |
Constr of PCC Road with Tali Pilling pond of Romjan Kazi with drn frm Ho Nuro to HO Gutkha at Napara |
341448 |
Constr of PCC Road with Tali Pilling pond of Romjan Kazi with drn frm Ho Nuro to HO Gutkha at Napara1 |
Completion of work |
-
latitude : 22.8238223,22.82399559
Longitude : 88.54153851,88.5410535
file name : Image_13062022142515356.png
|
2022-06-13 14:25:15.458419 |
25 |
46312460 |
Construction of pucca drain with PCC road from PMGSY to Ho Rajjak Gazi at Malikberia |
555773 |
Construction of pucca drain with PCC road from PMGSY to Ho Rajjak Gazi at Malikberia1 |
Completion of work |
-
latitude : 22.83199674,22.83222229
Longitude : 88.54066628,88.54033987
file name : Image_16062022124117973.png
|
2022-06-16 12:41:18.08964 |
26 |
58464048 |
STREET LIGHT MAINTAINANCE AND NEW |
676850 |
STREET LIGHT MAINTAINANCE AND NEW1 |
Plinth level |
-
latitude : 22.8068198
Longitude : 88.53296322
file name : Image_28062022165059025.png
|
2022-06-28 16:50:59.144867 |
27 |
58464048 |
STREET LIGHT MAINTAINANCE AND NEW |
676850 |
STREET LIGHT MAINTAINANCE AND NEW1 |
Completion of work |
-
latitude : 22.80686639
Longitude : 88.53298144
file name : Image_27062022142857277.png
|
2022-06-27 14:28:57.397677 |
28 |
58549781 |
DRINKING WATER TESTING PURPOSE |
350000 |
DRINKING WATER TESTING PURPOSE1 |
Completion of work |
-
latitude : 22.8055159
Longitude : 88.5350835
file name : Image_23112022153621931.png
|
2022-11-23 15:36:22.04794 |
29 |
58549781 |
DRINKING WATER TESTING PURPOSE |
350000 |
DRINKING WATER TESTING PURPOSE1 |
Completion of work |
-
latitude : 22.80551818
Longitude : 88.53562835
file name : Image_22112022145927698.png
|
2022-11-22 14:59:28.22972 |
30 |
58534815 |
ARSENIC FREE WATER TREATEMENT PLANT AT RANGRI |
885722 |
ARSENIC FREE WATER TREATEMENT PLANT AT RANGRI1 |
Completion of work |
-
latitude : 22.84033343,22.84030495
Longitude : 88.53843079,88.53841525
file name : Image_21032023105643007.png
|
2023-03-21 10:56:43.098982 |
31 |
58544956 |
CONSTRUCTION OF PUCCA DRAIN FROM HO NAJRUL MOLLA TO HO CHHAMAD MONDAL AT RANDHANGACHA |
600000 |
CONSTRUCTION OF PUCCA DRAIN FROM HO NAJRUL MOLLA TO HO CHHAMAD MONDAL AT RANDHANGACHA1 |
Plinth level |
-
latitude : 22.8044561,22.78491439
Longitude : 88.5325368,88.51154564
file name : Image_17042023170258136.png
|
2023-04-17 17:02:58.228109 |
32 |
58544956 |
CONSTRUCTION OF PUCCA DRAIN FROM HO NAJRUL MOLLA TO HO CHHAMAD MONDAL AT RANDHANGACHA |
600000 |
CONSTRUCTION OF PUCCA DRAIN FROM HO NAJRUL MOLLA TO HO CHHAMAD MONDAL AT RANDHANGACHA1 |
Completion of work |
-
latitude : 22.78487887,22.78526527
Longitude : 88.51184997,88.51020272
file name : Image_08042023122816120.png
|
2023-04-08 12:28:16.231344 |
33 |
67475230 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO JAHANGIR MONDAL AT MALIKBERIA SANSAD |
125215 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO JAHANGIR MONDAL AT MALIKBERIA SANSAD1 |
Plinth level |
-
latitude : 22.83059466,22.83065505
Longitude : 88.54419469,88.54418923
file name : Image_25042023142838864.png
|
2023-04-25 14:28:38.9591 |
34 |
67475230 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO JAHANGIR MONDAL AT MALIKBERIA SANSAD |
125215 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO JAHANGIR MONDAL AT MALIKBERIA SANSAD1 |
Plinth level |
-
latitude : 22.83057309,22.83057303
Longitude : 88.54421069,88.54421074
file name : Image_25042023143008652.png
|
2023-04-25 14:30:08.758556 |
35 |
67475230 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO JAHANGIR MONDAL AT MALIKBERIA SANSAD |
125215 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO JAHANGIR MONDAL AT MALIKBERIA SANSAD1 |
Completion of work |
-
latitude : 22.83057864,22.83065488
Longitude : 88.54420696,88.5442191
file name : Image_25042023141134601.png
|
2023-04-25 14:11:34.696124 |
36 |
67475375 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO MALEK MONDAL AT MALIKBERIA SANSAD |
99443 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO MALEK MONDAL AT MALIKBERIA SANSAD1 |
Plinth level |
-
latitude : 22.83244436,22.83253239
Longitude : 88.54465309,88.54470958
file name : Image_25042023142501716.png
|
2023-04-25 14:25:01.813929 |
37 |
67475375 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO MALEK MONDAL AT MALIKBERIA SANSAD |
99443 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO MALEK MONDAL AT MALIKBERIA SANSAD1 |
Completion of work |
-
latitude : 22.83238312,22.83250965
Longitude : 88.54466593,88.5447166
file name : Image_25042023141544290.png
|
2023-04-25 14:15:44.38753 |
38 |
67475673 |
CONSTRUCTION OF CONCRETE ROAD FROM HO NUR HOSSAIN MONDAL TO HO MOMIN MONDAL VIA POCHAPUKUR AT TANGRA |
149168 |
CONSTRUCTION OF CONCRETE ROAD FROM HO NUR HOSSAIN MONDAL TO HO MOMIN MONDAL VIA POCHAPUKUR AT TANGRA1 |
Completion of work |
-
latitude : 22.8044561,22.8044561
Longitude : 88.5325368,88.5325368
file name : Image_17042023163513775.png
|
2023-04-17 16:35:13.887098 |
39 |
58554193 |
CONSTRUCTION OF PUCCA DRAIN WITH CC ROAD FROM HO KAMARUL ISLAM TO HO EMADUL ISLAM AT KADPUR |
219423 |
CONSTRUCTION OF PUCCA DRAIN WITH CC ROAD FROM HO KAMARUL ISLAM TO HO EMADUL ISLAM AT KADPUR1 |
Completion of work |
-
latitude : 22.8044561,22.8044561
Longitude : 88.5325368,88.5325368
file name : Image_17042023164542876.png
|
2023-04-17 16:45:42.969256 |
40 |
67475548 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM PMGSY ROAD TO HO GIYASUDDIN VIA YUNUS AT TANGRA |
190509 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM PMGSY ROAD TO HO GIYASUDDIN VIA YUNUS AT TANGRA1 |
Plinth level |
-
latitude : 22.80382539,22.80384608
Longitude : 88.53298573,88.53262494
file name : Image_23052023134617447.png
|
2023-05-23 13:46:17.538794 |
41 |
67475548 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM PMGSY ROAD TO HO GIYASUDDIN VIA YUNUS AT TANGRA |
190509 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM PMGSY ROAD TO HO GIYASUDDIN VIA YUNUS AT TANGRA1 |
Completion of work |
-
latitude : 22.80383394,22.8044567
Longitude : 88.53256872,88.5325375
file name : Image_17042023162806938.png
|
2023-04-17 16:28:07.027422 |
42 |
67475548 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM PMGSY ROAD TO HO GIYASUDDIN VIA YUNUS AT TANGRA |
190509 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM PMGSY ROAD TO HO GIYASUDDIN VIA YUNUS AT TANGRA1 |
Completion of work |
-
latitude : 22.80382889,22.80385398
Longitude : 88.53255116,88.5326653
file name : Image_17042023162936312.png
|
2023-04-17 16:29:36.428361 |
43 |
58461109 |
CONSTRUCTION OF CC ROAD FROM HO KENARAM DAS TO HO MANIK RAY VIA GUNANANDA JHA AT DIGHARA |
270292 |
CONSTRUCTION OF CC ROAD FROM HO KENARAM DAS TO HO MANIK RAY VIA GUNANANDA JHA AT DIGHARA1 |
Plinth level |
-
latitude : 22.7802455,22.7805017
Longitude : 88.5283819,88.5273905
file name : Image_17042023172252021.png
|
2023-04-17 17:22:52.116729 |
44 |
58461109 |
CONSTRUCTION OF CC ROAD FROM HO KENARAM DAS TO HO MANIK RAY VIA GUNANANDA JHA AT DIGHARA |
270292 |
CONSTRUCTION OF CC ROAD FROM HO KENARAM DAS TO HO MANIK RAY VIA GUNANANDA JHA AT DIGHARA1 |
Completion of work |
-
latitude : 22.7806723,22.7805432
Longitude : 88.5275851,88.5273563
file name : Image_17042023171737410.png
|
2023-04-17 17:17:37.503586 |
45 |
67474150 |
Greywater management system |
407317 |
Greywater management system1 |
Completion of work |
-
latitude : 22.8202978
Longitude : 88.53465217
file name : Image_01052023074648421.png
|
2023-05-01 07:46:48.52879 |
46 |
68798740 |
CONSTRUCTION OF PCC ROAD FROM H/O MONIRUDDIN BISWAS TO H/O MOTLUBAR BISWAS AT BAGPUL |
99480 |
CONSTRUCTION OF PCC ROAD FROM H/O MONIRUDDIN BISWAS TO H/O MOTLUBAR BISWAS AT BAGPUL1 |
Plinth level |
-
latitude : 22.8240578,22.8240578
Longitude : 88.5359447,88.5359447
file name : Image_26062023181709887.png
|
2023-06-26 18:17:09.987887 |
47 |
68798740 |
CONSTRUCTION OF PCC ROAD FROM H/O MONIRUDDIN BISWAS TO H/O MOTLUBAR BISWAS AT BAGPUL |
99480 |
CONSTRUCTION OF PCC ROAD FROM H/O MONIRUDDIN BISWAS TO H/O MOTLUBAR BISWAS AT BAGPUL1 |
Completion of work |
-
latitude : 22.82365894,22.82364071
Longitude : 88.53523851,88.53530215
file name : Image_10062023103033347.png
|
2023-06-10 10:30:33.459293 |
48 |
68375668 |
Construction of roads |
148053 |
Construction of roads1 |
Roof laid |
-
latitude : 22.8370062,22.837125
Longitude : 88.5409919,88.54114833333333
file name : Image_23072024115735482.png
|
2024-07-23 11:57:35.568549 |
49 |
68375668 |
Construction of roads |
148053 |
Construction of roads1 |
Plinth level |
-
latitude : 22.8370196,22.837131666666664
Longitude : 88.5409968,88.54111499999999
file name : Image_02072024113208982.png
|
2024-07-02 11:32:09.078656 |
50 |
68375668 |
Construction of roads |
148053 |
Construction of roads1 |
Plinth level |
-
latitude : 22.8370196,22.837131666666664
Longitude : 88.5409968,88.54111499999999
file name : Image_02072024113201700.png
|
2024-07-02 11:32:01.7948 |
51 |
68375668 |
Construction of roads |
148053 |
Construction of roads1 |
Completion of work |
-
latitude : 22.8370055,22.836848333333332
Longitude : 88.5414762,88.54103500000001
file name : Image_24062024113810219.png
|
2024-06-24 11:38:10.319573 |
52 |
67474272 |
Greywater management system |
292277 |
Greywater management system1 |
Plinth level |
-
latitude : 22.785566
Longitude : 88.5095372
file name : Image_30112023145637030.png
|
2023-11-30 14:56:37.12617 |
53 |
67474272 |
Greywater management system |
292277 |
Greywater management system1 |
Completion of work |
-
latitude : 22.785293333333335
Longitude : 88.51024833333334
file name : Image_21112023130414636.png
|
2023-11-21 13:04:14.755077 |
54 |
68376163 |
Construction of roads |
506735 |
Construction of roads1 |
Roof laid |
-
latitude : 22.77845333333333,22.7790418
Longitude : 88.52816499999999,88.5283366
file name : Image_27032024123609349.png
|
2024-03-27 12:36:09.616686 |
55 |
68376163 |
Construction of roads |
506735 |
Construction of roads1 |
Plinth level |
-
latitude : 22.7790247,22.7790247
Longitude : 88.5283432,88.5283432
file name : Image_06022024165026917.png
|
2024-02-06 16:50:27.008084 |
56 |
68376163 |
Construction of roads |
506735 |
Construction of roads1 |
Completion of work |
-
latitude : 22.77897666666667,22.77909833333333
Longitude : 88.52842333333335,88.52804833333333
file name : Image_21112023131733550.png
|
2023-11-21 13:17:33.65879 |
57 |
58457028 |
CONSTRUCTION OF CC ROAD FROM HO SAIFUL ISLAM TO HO AZAD ALI MONDAL AT TANGRA |
337504 |
CONSTRUCTION OF CC ROAD FROM HO SAIFUL ISLAM TO HO AZAD ALI MONDAL AT TANGRA1 |
Plinth level |
-
latitude : 22.804885,22.80494666666667
Longitude : 88.52798166666668,88.52771166666668
file name : Image_23112023124124987.png
|
2023-11-23 12:41:25.077538 |
58 |
58457028 |
CONSTRUCTION OF CC ROAD FROM HO SAIFUL ISLAM TO HO AZAD ALI MONDAL AT TANGRA |
337504 |
CONSTRUCTION OF CC ROAD FROM HO SAIFUL ISLAM TO HO AZAD ALI MONDAL AT TANGRA1 |
Completion of work |
-
latitude : 22.804779999999997,22.804953333333334
Longitude : 88.52808666666667,88.527765
file name : Image_21112023122631394.png
|
2023-11-21 12:26:31.482804 |
59 |
58543236 |
CONSTRUCTION OF PUCCA DRAIN FROM HO SAHEB TO HO ABU TO BATTALA TO HO KALPANA AT TALSA |
600000 |
CONSTRUCTION OF PUCCA DRAIN FROM HO SAHEB TO HO ABU TO BATTALA TO HO KALPANA AT TALSA1 |
Plinth level |
-
latitude : 22.8050257,22.8050257
Longitude : 88.5399677,88.5399677
file name : Image_27122023134656484.png
|
2023-12-27 13:46:56.573878 |
60 |
58543236 |
CONSTRUCTION OF PUCCA DRAIN FROM HO SAHEB TO HO ABU TO BATTALA TO HO KALPANA AT TALSA |
600000 |
CONSTRUCTION OF PUCCA DRAIN FROM HO SAHEB TO HO ABU TO BATTALA TO HO KALPANA AT TALSA1 |
Completion of work |
-
latitude : 22.800648333333335,22.8006,22.799406666666663
Longitude : 88.53857166666667,88.53854333333332,88.53809833333335
file name : Image_22122023165747565.png
|
2023-12-22 16:57:47.65584 |
61 |
35143277 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O GOLAM AJUNJI TO SHOP OF MOJEHAR AKUNJI |
335254 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O GOLAM AJUNJI TO SHOP OF MOJEHAR AKUNJI1 |
Plinth level |
-
latitude : 22.82550285,22.82560577
Longitude : 88.53605338,88.53606203
file name : Image_14072021163732774.png
|
2021-07-14 16:37:32.841492 |
62 |
35143277 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O GOLAM AJUNJI TO SHOP OF MOJEHAR AKUNJI |
335254 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O GOLAM AJUNJI TO SHOP OF MOJEHAR AKUNJI1 |
Completion of work |
-
latitude : 22.82571812,22.82550652
Longitude : 88.53607717,88.53607252
file name : Image_21022021144550156.png
|
2021-02-21 14:45:50.219891 |
63 |
68373425 |
Construction of roads |
341398 |
Construction of roads1 |
Roof laid |
-
latitude : 22.821733333333334,22.82177166666667
Longitude : 88.55106499999998,88.55080666666666
file name : Image_06022024125703953.png
|
2024-02-06 12:57:04.056384 |
64 |
68373425 |
Construction of roads |
341398 |
Construction of roads1 |
Plinth level |
-
latitude : 22.821728333333333,22.821773333333333
Longitude : 88.55103499999998,88.55079333333333
file name : Image_06022024125002572.png
|
2024-02-06 12:50:02.658913 |
65 |
68373425 |
Construction of roads |
341398 |
Construction of roads1 |
Completion of work |
-
latitude : 22.821745000000004,22.82177
Longitude : 88.55108,88.55085333333334
file name : Image_29012024160310060.png
|
2024-01-29 16:03:10.17176 |
66 |
68376403 |
Construction of roads |
346755 |
Construction of roads1 |
Roof laid |
-
latitude : 22.788065,22.78819
Longitude : 88.53692500000001,88.53648833333334
file name : Image_09012024123908298.png
|
2024-01-09 12:39:08.391776 |
67 |
68376403 |
Construction of roads |
346755 |
Construction of roads1 |
Plinth level |
-
latitude : 22.78815833333333,22.788075000000003
Longitude : 88.53644833333334,88.53667333333333
file name : Image_27122023140427486.png
|
2023-12-27 14:04:27.59001 |
68 |
68376403 |
Construction of roads |
346755 |
Construction of roads1 |
Completion of work |
-
latitude : 22.78802333333333,22.788176666666665
Longitude : 88.53691833333332,88.53649500000002
file name : Image_27122023135513307.png
|
2023-12-27 13:55:13.409064 |
69 |
39086420 |
PUCCA DRAIN FROM HO SAHABUDDUN TO THE HO ALAUDDIN |
459758 |
PUCCA DRAIN FROM HO SAHABUDDUN TO THE HO ALAUDDIN1 |
Plinth level |
-
latitude : 22.80322864,22.80316248
Longitude : 88.53974682,88.53971857
file name : Image_24022021140307777.png
|
2021-02-24 14:03:07.824908 |
70 |
39086420 |
PUCCA DRAIN FROM HO SAHABUDDUN TO THE HO ALAUDDIN |
459758 |
PUCCA DRAIN FROM HO SAHABUDDUN TO THE HO ALAUDDIN1 |
Completion of work |
-
latitude : 22.80319128,22.80330469
Longitude : 88.53973052,88.53980515
file name : Image_21022021130150892.png
|
2021-02-21 13:01:50.941936 |
71 |
35099427 |
PCC ROAD FROM THE H/O MOMREJ TO THE H/O SAFIK |
777597 |
PCC ROAD FROM THE H/O MOMREJ TO THE H/O SAFIK 1 |
Plinth level |
-
latitude : 22.83040161,22.83012858
Longitude : 88.53866839,88.53882958
file name : Image_13012021131340663.png
|
2021-01-13 13:13:40.716404 |
72 |
35099427 |
PCC ROAD FROM THE H/O MOMREJ TO THE H/O SAFIK |
777597 |
PCC ROAD FROM THE H/O MOMREJ TO THE H/O SAFIK 1 |
Completion of work |
-
latitude : 22.83032136,22.83008421
Longitude : 88.53865183,88.53898541
file name : Image_08012021113021317.png
|
2021-01-08 11:30:21.382599 |
73 |
39086416 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O SAHABUDDIN MONDAL TO H/O SAHEB ALI AT RANGRI |
518266 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O SAHABUDDIN MONDAL TO H/O SAHEB ALI AT RANGRI 1 |
Plinth level |
-
latitude : 22.84023327,22.84024252
Longitude : 88.54065144,88.54078699
file name : Image_24022021152836031.png
|
2021-02-24 15:28:36.097717 |
74 |
39086416 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O SAHABUDDIN MONDAL TO H/O SAHEB ALI AT RANGRI |
518266 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O SAHABUDDIN MONDAL TO H/O SAHEB ALI AT RANGRI 1 |
Completion of work |
-
latitude : 22.84023611,22.84022686
Longitude : 88.54057708,88.54080155
file name : Image_21022021154340810.png
|
2021-02-21 15:43:40.878753 |
75 |
35140996 |
CONSTRUCTION OF PCC ROAD FROM PMGSY ROAD TO THE H/O MASUD MONDAL |
101645 |
CONSTRUCTION OF PCC ROAD FROM PMGSY ROAD TO THE H/O MASUD MONDAL1 |
Plinth level |
-
latitude : 22.83138411,22.83131449
Longitude : 88.54480624,88.54476758
file name : Image_24022021151952078.png
|
2021-02-24 15:19:52.135693 |
76 |
35140996 |
CONSTRUCTION OF PCC ROAD FROM PMGSY ROAD TO THE H/O MASUD MONDAL |
101645 |
CONSTRUCTION OF PCC ROAD FROM PMGSY ROAD TO THE H/O MASUD MONDAL1 |
Completion of work |
-
latitude : 22.83138262,22.83131348
Longitude : 88.5447635,88.54473918
file name : Image_21022021153709179.png
|
2021-02-21 15:37:09.238434 |
77 |
39086404 |
CONSTRUCTION OF PCC ROAD WITH PUCCA DRAIN FROM H/O kartick PAUL TO LAND OF GAGAN PAUL |
349853 |
CONSTRUCTION OF PCC ROAD WITH PUCCA DRAIN FROM H/O kartick PAUL TO LAND OF GAGAN PAUL 1 |
Plinth level |
-
latitude : 22.83607867,22.83614571
Longitude : 88.54055736,88.54053965
file name : Image_31012022153112881.png
|
2022-01-31 15:31:13.003681 |
78 |
39086404 |
CONSTRUCTION OF PCC ROAD WITH PUCCA DRAIN FROM H/O kartick PAUL TO LAND OF GAGAN PAUL |
349853 |
CONSTRUCTION OF PCC ROAD WITH PUCCA DRAIN FROM H/O kartick PAUL TO LAND OF GAGAN PAUL 1 |
Completion of work |
-
latitude : 22.83608944,22.8360958
Longitude : 88.54057953,88.54056537
file name : Image_21012022112747152.png
|
2022-01-21 11:27:47.269341 |
79 |
46311922 |
Construction of Grave Yeard Boundary wall of Abdul Sattar Mondal and ors at Malikberia |
795118 |
Construction of Grave Yeard Boundary wall of Abdul Sattar Mondal and ors at Malikberia1 |
Plinth level |
-
latitude : 22.83143002
Longitude : 88.54373288
file name : Image_02022022112844918.png
|
2022-02-02 11:28:45.0266 |
80 |
46311922 |
Construction of Grave Yeard Boundary wall of Abdul Sattar Mondal and ors at Malikberia |
795118 |
Construction of Grave Yeard Boundary wall of Abdul Sattar Mondal and ors at Malikberia1 |
Completion of work |
-
latitude : 22.83146532
Longitude : 88.54378116
file name : Image_01022022113522705.png
|
2022-02-01 11:35:22.826647 |
81 |
46311922 |
Construction of Grave Yeard Boundary wall of Abdul Sattar Mondal and ors at Malikberia |
795118 |
Construction of Grave Yeard Boundary wall of Abdul Sattar Mondal and ors at Malikberia1 |
Completion of work |
-
latitude : 22.83141332
Longitude : 88.5436857
file name : Image_31012022152508116.png
|
2022-01-31 15:25:08.239489 |
82 |
46311901 |
Construction of Grave yeard Boundary wall near Gyaul Shop at Napara |
795118 |
Construction of Grave yeard Boundary wall near Gyaul Shop at Napara 1 |
Plinth level |
-
latitude : 22.81616636
Longitude : 88.54640313
file name : Image_01022022114530161.png
|
2022-02-01 11:45:30.287285 |
83 |
46311901 |
Construction of Grave yeard Boundary wall near Gyaul Shop at Napara |
795118 |
Construction of Grave yeard Boundary wall near Gyaul Shop at Napara 1 |
Completion of work |
-
latitude : 22.81625941
Longitude : 88.54641339
file name : Image_31012022151409694.png
|
2022-01-31 15:14:09.854248 |
84 |
68376645 |
Construction of roads |
480733 |
Construction of roads1 |
Roof laid |
-
latitude : 22.8054115,22.8054074
Longitude : 88.5351811,88.5351848
file name : Image_27032024121505094.png
|
2024-03-27 12:15:05.189139 |
85 |
68376645 |
Construction of roads |
480733 |
Construction of roads1 |
Plinth level |
-
latitude : 22.8054136,22.805412
Longitude : 88.5351851,88.5351869
file name : Image_27032024121026719.png
|
2024-03-27 12:10:26.80572 |
86 |
68376645 |
Construction of roads |
480733 |
Construction of roads1 |
Completion of work |
-
latitude : 22.8054138,22.8054119
Longitude : 88.5351829,88.5351845
file name : Image_27032024120657048.png
|
2024-03-27 12:06:57.204855 |
87 |
68373668 |
Construction of roads |
237828 |
Construction of roads1 |
Plinth level |
-
latitude : 22.810311666666667,22.81071833333333
Longitude : 88.53007666666666,88.53018833333333
file name : Image_04122023155226120.png
|
2023-12-04 15:52:26.213353 |
88 |
68373668 |
Construction of roads |
237828 |
Construction of roads1 |
Completion of work |
-
latitude : 22.81004833333333,22.81066
Longitude : 88.53011166666666,88.53024833333332
file name : Image_21112023123612789.png
|
2023-11-21 12:36:12.879373 |
89 |
68375051 |
Construction of roads |
474564 |
Construction of roads1 |
Roof laid |
-
latitude : 22.82242833333333,22.822435000000002
Longitude : 88.53837,88.53815000000002
file name : Image_10072024113843406.png
|
2024-07-10 11:38:43.507521 |
90 |
68375051 |
Construction of roads |
474564 |
Construction of roads1 |
Plinth level |
-
latitude : 22.822491666666664,22.82236833333333
Longitude : 88.53839500000001,88.53825833333333
file name : Image_25062024170155291.png
|
2024-06-25 17:01:55.388554 |
91 |
68375051 |
Construction of roads |
474564 |
Construction of roads1 |
Completion of work |
-
latitude : 22.822505,22.82256166666667
Longitude : 88.53814166666668,88.53838833333333
file name : Image_24062024115346726.png
|
2024-06-24 11:53:46.83029 |
92 |
58537536 |
ARSENIC FREE WATER TREATEMENT PLANT AT PASCHIM NARAYANPUR |
885191 |
ARSENIC FREE WATER TREATEMENT PLANT AT PASCHIM NARAYANPUR1 |
Plinth level |
-
latitude : 22.792080000000002,22.792098333333335
Longitude : 88.51835666666666,88.51835333333332
file name : Image_30112023150815769.png
|
2023-11-30 15:08:15.862511 |
93 |
58537536 |
ARSENIC FREE WATER TREATEMENT PLANT AT PASCHIM NARAYANPUR |
885191 |
ARSENIC FREE WATER TREATEMENT PLANT AT PASCHIM NARAYANPUR1 |
Completion of work |
-
latitude : 22.79202,22.79204666666667
Longitude : 88.51841833333334,88.51840333333332
file name : Image_21112023124956179.png
|
2023-11-21 12:49:56.268097 |
94 |
58535918 |
ARSENIC FREE WATER TREATEMENT PLANT AT NAPARA SANSAD |
884836 |
ARSENIC FREE WATER TREATEMENT PLANT AT NAPARA SANSAD1 |
Plinth level |
-
latitude : 22.816703333333333,22.816671666666668
Longitude : 88.54634499999999,88.54636333333335
file name : Image_06102023122202310.png
|
2023-10-06 12:22:02.398942 |
95 |
58535918 |
ARSENIC FREE WATER TREATEMENT PLANT AT NAPARA SANSAD |
884836 |
ARSENIC FREE WATER TREATEMENT PLANT AT NAPARA SANSAD1 |
Completion of work |
-
latitude : 22.8165556,22.8165558
Longitude : 88.5463313,88.5463311
file name : Image_05102023153118441.png
|
2023-10-05 15:31:18.536809 |
96 |
58538099 |
ARSENIC FREE WATER TREATEMENT PLANT AT BAGPUL SANSAD |
881293 |
ARSENIC FREE WATER TREATEMENT PLANT AT BAGPUL SANSAD1 |
Plinth level |
-
latitude : 22.831495000000004,22.831493333333334
Longitude : 88.53701500000001,88.53707000000001
file name : Image_28112023111422873.png
|
2023-11-28 11:14:22.959452 |
97 |
58538099 |
ARSENIC FREE WATER TREATEMENT PLANT AT BAGPUL SANSAD |
881293 |
ARSENIC FREE WATER TREATEMENT PLANT AT BAGPUL SANSAD1 |
Completion of work |
-
latitude : 22.831466666666664,22.83147
Longitude : 88.53705166666666,88.53702999999999
file name : Image_21112023091249972.png
|
2023-11-21 09:12:50.051327 |
98 |
58536945 |
ARSENIC FREE WATER TREATEMENT PLANT AT MALIKBERIA SANSAD |
885722 |
ARSENIC FREE WATER TREATEMENT PLANT AT MALIKBERIA SANSAD1 |
Plinth level |
-
latitude : 22.83623637,22.83621913
Longitude : 88.54010372,88.54013571
file name : Image_08062023095839523.png
|
2023-06-08 09:58:39.620349 |
99 |
58536945 |
ARSENIC FREE WATER TREATEMENT PLANT AT MALIKBERIA SANSAD |
885722 |
ARSENIC FREE WATER TREATEMENT PLANT AT MALIKBERIA SANSAD1 |
Completion of work |
-
latitude : 22.83624032,22.83618871
Longitude : 88.54009828,88.54008236
file name : Image_07062023103750050.png
|
2023-06-07 10:37:50.162178 |
100 |
58461687 |
CONSTRUCTION OF CC ROAD FROM HO ARUN KUNDU TO HO CHANCHAL MUKHERJEE VIA BISHU KARMAKAR AT DIGHARA |
534606 |
CONSTRUCTION OF CC ROAD FROM HO ARUN KUNDU TO HO CHANCHAL MUKHERJEE VIA BISHU KARMAKAR AT DIGHARA1 |
Plinth level |
-
latitude : 22.78242318,22.78208065
Longitude : 88.52612111,88.52598771
file name : Image_28062023135122439.png
|
2023-06-28 13:51:22.536038 |
101 |
58461687 |
CONSTRUCTION OF CC ROAD FROM HO ARUN KUNDU TO HO CHANCHAL MUKHERJEE VIA BISHU KARMAKAR AT DIGHARA |
534606 |
CONSTRUCTION OF CC ROAD FROM HO ARUN KUNDU TO HO CHANCHAL MUKHERJEE VIA BISHU KARMAKAR AT DIGHARA1 |
Completion of work |
-
latitude : 22.78244243,22.78206265
Longitude : 88.52610596,88.52604436
file name : Image_28062023134620357.png
|
2023-06-28 13:46:20.46155 |
102 |
68375484 |
Construction of roads |
121754 |
Construction of roads1 |
Roof laid |
-
latitude : 22.835714999999997,22.83596
Longitude : 88.53931833333333,88.53938166666667
file name : Image_05092024160157936.png
|
2024-09-05 16:02:26.78912 |
103 |
68375484 |
Construction of roads |
121754 |
Construction of roads1 |
Roof laid |
-
latitude : 22.83568833333333,22.83591333333333
Longitude : 88.53928666666667,88.539395
file name : Image_23072024120459899.png
|
2024-07-23 12:05:00.003395 |
104 |
68375484 |
Construction of roads |
121754 |
Construction of roads1 |
Plinth level |
-
latitude : 22.83570333333333,22.835939999999997
Longitude : 88.53932333333333,88.53938166666667
file name : Image_26062024121926452.png
|
2024-06-26 12:19:26.543173 |
105 |
68375484 |
Construction of roads |
121754 |
Construction of roads1 |
Completion of work |
-
latitude : 22.83594666666667,22.835776666666668
Longitude : 88.53939,88.53934
file name : Image_24062024113418928.png
|
2024-06-24 11:34:19.02794 |
106 |
68377899 |
Creation of a new source of drinking water |
884748 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.785324999999997
Longitude : 88.53476
file name : Image_07082024154355621.png
|
2024-08-07 15:43:55.729159 |
107 |
68377899 |
Creation of a new source of drinking water |
884748 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.785305
Longitude : 88.53475833333331
file name : Image_07082024152715985.png
|
2024-08-07 15:27:16.088368 |
108 |
68377899 |
Creation of a new source of drinking water |
884748 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.785428333333336
Longitude : 88.53475833333331
file name : Image_02072024113156572.png
|
2024-07-02 11:31:56.666436 |
109 |
58555177 |
CONSTRUCTION OF PUCCA DRAIN WITH CC ROAD FROM PMGSY TO HO JULFIKKAR MONDAL AT MALIKBERIA |
205212 |
CONSTRUCTION OF PUCCA DRAIN WITH CC ROAD FROM PMGSY TO HO JULFIKKAR MONDAL AT MALIKBERIA1 |
Roof laid |
-
latitude : 22.831135000000003,22.83074
Longitude : 88.54342166666666,88.54331666666667
file name : Image_20082024163846993.png
|
2024-08-20 16:38:47.083667 |
110 |
58555177 |
CONSTRUCTION OF PUCCA DRAIN WITH CC ROAD FROM PMGSY TO HO JULFIKKAR MONDAL AT MALIKBERIA |
205212 |
CONSTRUCTION OF PUCCA DRAIN WITH CC ROAD FROM PMGSY TO HO JULFIKKAR MONDAL AT MALIKBERIA1 |
Plinth level |
-
latitude : 22.83114833333333,22.830803333333332
Longitude : 88.54339,88.54334166666668
file name : Image_20082024162535161.png
|
2024-08-20 16:25:35.248943 |
111 |
58555177 |
CONSTRUCTION OF PUCCA DRAIN WITH CC ROAD FROM PMGSY TO HO JULFIKKAR MONDAL AT MALIKBERIA |
205212 |
CONSTRUCTION OF PUCCA DRAIN WITH CC ROAD FROM PMGSY TO HO JULFIKKAR MONDAL AT MALIKBERIA1 |
Completion of work |
-
latitude : 22.83106833333333,22.830768333333335
Longitude : 88.54334500000002,88.5433
file name : Image_02072024114731347.png
|
2024-07-02 11:47:31.44546 |
112 |
58453183 |
CONSTRUCTION OF CC ROAD WITH TALI PILLING FROM HO ANISUR RAHAMAN TO HO ABDUL KAYEM BISWAS AT TALSA |
600000 |
CONSTRUCTION OF CC ROAD WITH TALI PILLING FROM HO ANISUR RAHAMAN TO HO ABDUL KAYEM BISWAS AT TALSA1 |
Plinth level |
-
latitude : 22.80906,22.809003333333333
Longitude : 88.54028666666666,88.53992833333332
file name : Image_27062024131441938.png
|
2024-06-27 13:14:42.025271 |
113 |
58453183 |
CONSTRUCTION OF CC ROAD WITH TALI PILLING FROM HO ANISUR RAHAMAN TO HO ABDUL KAYEM BISWAS AT TALSA |
600000 |
CONSTRUCTION OF CC ROAD WITH TALI PILLING FROM HO ANISUR RAHAMAN TO HO ABDUL KAYEM BISWAS AT TALSA1 |
Completion of work |
-
latitude : 22.808996666666665,22.808960000000003
Longitude : 88.53999999999999,88.54023833333333
file name : Image_25062024165433277.png
|
2024-06-25 16:54:33.371155 |
114 |
68378904 |
Greywater management system |
349638 |
Greywater management system1 |
Roof laid |
-
latitude : 22.811965
Longitude : 88.54663000000001
file name : Image_08082024163109825.png
|
2024-08-08 16:31:09.910545 |
115 |
68378904 |
Greywater management system |
349638 |
Greywater management system1 |
Plinth level |
-
latitude : 22.812160000000002
Longitude : 88.54667333333333
file name : Image_08082024162519249.png
|
2024-08-08 16:25:19.343542 |
116 |
68378904 |
Greywater management system |
349638 |
Greywater management system1 |
Completion of work |
-
latitude : 22.812070000000002
Longitude : 88.54665166666668
file name : Image_02072024121120022.png
|
2024-07-02 12:11:20.105893 |
117 |
68380059 |
Greywater management system |
446323 |
Greywater management system1 |
Roof laid |
-
latitude : 22.7819999
Longitude : 88.5303157
file name : Image_17092024154121285.png
|
2024-09-17 15:41:21.366214 |
118 |
68380059 |
Greywater management system |
446323 |
Greywater management system1 |
Plinth level |
-
latitude : 22.7820013
Longitude : 88.5303198
file name : Image_17092024153052550.png
|
2024-09-17 15:30:52.634094 |
119 |
68380059 |
Greywater management system |
446323 |
Greywater management system1 |
Completion of work |
-
latitude : 22.7820167
Longitude : 88.5303305
file name : Image_27062024140544270.png
|
2024-06-27 14:05:44.367986 |
120 |
68379261 |
Greywater management system |
622051 |
Greywater management system1 |
Roof laid |
-
latitude : 22.788659999999997
Longitude : 88.51692999999999
file name : Image_21122023164846383.png
|
2023-12-21 16:48:46.728359 |
121 |
68379261 |
Greywater management system |
622051 |
Greywater management system1 |
Plinth level |
-
latitude : 22.788509999999995
Longitude : 88.51684333333333
file name : Image_30112023144627823.png
|
2023-11-30 14:46:27.918151 |
122 |
68379261 |
Greywater management system |
622051 |
Greywater management system1 |
Completion of work |
-
latitude : 22.78743833333333
Longitude : 88.51629333333334
file name : Image_21112023125645389.png
|
2023-11-21 12:56:45.474865 |
123 |
68375954 |
Construction of roads |
428553 |
Construction of roads1 |
Roof laid |
-
latitude : 22.782645000000002,22.7821861
Longitude : 88.52962833333335,88.5300676
file name : Image_08112024143515792.png
|
2024-11-08 14:35:15.881319 |
124 |
68375954 |
Construction of roads |
428553 |
Construction of roads1 |
Plinth level |
-
latitude : 22.7821293,22.7821271
Longitude : 88.5301269,88.5300921
file name : Image_21102024141847039.png
|
2024-10-21 14:18:47.125893 |
125 |
68375954 |
Construction of roads |
428553 |
Construction of roads1 |
Completion of work |
-
latitude : 22.7821279,22.782775
Longitude : 88.5300956,88.53004666666666
file name : Image_21102024141555708.png
|
2024-10-21 14:15:55.855425 |
126 |
68378769 |
Greywater management system |
305366 |
Greywater management system1 |
Roof laid |
-
latitude : 22.836746666666667
Longitude : 88.53653833333334
file name : Image_11112024173015087.png
|
2024-11-11 17:30:15.177382 |
127 |
68378769 |
Greywater management system |
305366 |
Greywater management system1 |
Roof laid |
-
latitude : 22.836700000000004
Longitude : 88.53671833333334
file name : Image_11112024135438831.png
|
2024-11-11 13:54:38.927317 |
128 |
68378769 |
Greywater management system |
305366 |
Greywater management system1 |
Roof laid |
-
latitude : 22.836655000000004
Longitude : 88.53671666666666
file name : Image_11112024135434988.png
|
2024-11-11 13:54:35.08499 |
129 |
68378769 |
Greywater management system |
305366 |
Greywater management system1 |
Plinth level |
-
latitude : 22.836823333333335
Longitude : 88.537025
file name : Image_28102024112334762.png
|
2024-10-28 11:23:34.871124 |
130 |
68378769 |
Greywater management system |
305366 |
Greywater management system1 |
Completion of work |
-
latitude : 22.836653333333334
Longitude : 88.53665166666666
file name : Image_03102024113335364.png
|
2024-10-03 11:33:35.50143 |
131 |
95925104 |
Construction of roads |
770636 |
Construction of roads1 |
Completion of work |
-
latitude : 22.82806333333333,22.8274834
Longitude : 88.53460500000001,88.5359478
file name : Image_28102024113359746.png
|
2024-10-28 11:33:59.837153 |
132 |
68374295 |
Construction of roads |
285347 |
Construction of roads1 |
Roof laid |
-
latitude : 22.8070231,22.8068046
Longitude : 88.5256299,88.5259479
file name : Image_08112024134638036.png
|
2024-11-08 13:46:38.117493 |
133 |
68374295 |
Construction of roads |
285347 |
Construction of roads1 |
Plinth level |
-
latitude : 22.8066994,22.8067011
Longitude : 88.5260196,88.5260157
file name : Image_21102024135815658.png
|
2024-10-21 13:58:15.77731 |
134 |
68374295 |
Construction of roads |
285347 |
Construction of roads1 |
Completion of work |
-
latitude : 22.8067006,22.8067005
Longitude : 88.5260155,88.5260144
file name : Image_21102024133647826.png
|
2024-10-21 13:36:47.926739 |
135 |
95914502 |
Creation of a new source of drinking water |
711209 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.8364783
Longitude : 88.5397642
file name : Image_08112024102053967.png
|
2024-11-08 10:20:54.055699 |
136 |
95914502 |
Creation of a new source of drinking water |
711209 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.837713333333333
Longitude : 88.53921666666665
file name : Image_28102024111042595.png
|
2024-10-28 11:10:42.695537 |
137 |
68379155 |
Greywater management system |
227087 |
Greywater management system1 |
Roof laid |
-
latitude : 22.809928333333332
Longitude : 88.52616333333332
file name : Image_08112024135203865.png
|
2024-11-08 13:52:03.946401 |
138 |
68379155 |
Greywater management system |
227087 |
Greywater management system1 |
Plinth level |
-
latitude : 22.80983666666667
Longitude : 88.52657666666667
file name : Image_21102024134958635.png
|
2024-10-21 13:49:58.717738 |
139 |
68379155 |
Greywater management system |
227087 |
Greywater management system1 |
Completion of work |
-
latitude : 22.80988166666667
Longitude : 88.52658666666666
file name : Image_21102024134253036.png
|
2024-10-21 13:42:53.121902 |
140 |
68377772 |
Creation of a new source of drinking water |
885279 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.791994999999996
Longitude : 88.53756166666666
file name : Image_29012024162845438.png
|
2024-01-29 16:28:45.55774 |
141 |
68377772 |
Creation of a new source of drinking water |
885279 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.791999999999998
Longitude : 88.53762666666668
file name : Image_27122023142416410.png
|
2023-12-27 14:24:16.509295 |
142 |
68377772 |
Creation of a new source of drinking water |
885279 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.792005000000003
Longitude : 88.53758666666666
file name : Image_22122023170822700.png
|
2023-12-22 17:08:22.792223 |
143 |
39091147 |
LOW MUST LIGHT 4 PCS |
400000 |
LOW MUST LIGHT 4 PCS1 |
Completion of work |
-
latitude : 22.8050138,22.80482382
Longitude : 88.5399385,88.53983646
file name : Image_21012022151928500.png
|
2022-01-21 15:19:28.612649 |
144 |
39091147 |
LOW MUST LIGHT 4 PCS |
400000 |
LOW MUST LIGHT 4 PCS1 |
Plinth level |
-
latitude : 22.8050133,22.8050129
Longitude : 88.5399378,88.5399326
file name : Image_21012022152527023.png
|
2022-01-21 15:25:27.114726 |
145 |
39091147 |
LOW MUST LIGHT 4 PCS |
400000 |
LOW MUST LIGHT 4 PCS1 |
Completion of work |
-
latitude : 22.80511523,22.80481185
Longitude : 88.53996177,88.53989883
file name : Image_20012022151557879.png
|
2022-01-20 15:15:57.960218 |
146 |
39085737 |
CONSTRUCTION OF PUCCA DRAIN FROM THE H/O SAHEB ALI MONDAL TO THE H/O LOKMAN MONDAL |
984076 |
CONSTRUCTION OF PUCCA DRAIN FROM THE H/O SAHEB ALI MONDAL TO THE H/O LOKMAN MONDAL 1 |
Plinth level |
-
latitude : 22.80014305,22.80009159
Longitude : 88.53303979,88.53296871
file name : Image_24022021132146196.png
|
2021-02-24 13:21:46.276855 |
147 |
39085737 |
CONSTRUCTION OF PUCCA DRAIN FROM THE H/O SAHEB ALI MONDAL TO THE H/O LOKMAN MONDAL |
984076 |
CONSTRUCTION OF PUCCA DRAIN FROM THE H/O SAHEB ALI MONDAL TO THE H/O LOKMAN MONDAL 1 |
Plinth level |
-
latitude : 22.80019033,22.80011576
Longitude : 88.53295885,88.53296479
file name : Image_24022021132229114.png
|
2021-02-24 13:22:29.179388 |
148 |
39085737 |
CONSTRUCTION OF PUCCA DRAIN FROM THE H/O SAHEB ALI MONDAL TO THE H/O LOKMAN MONDAL |
984076 |
CONSTRUCTION OF PUCCA DRAIN FROM THE H/O SAHEB ALI MONDAL TO THE H/O LOKMAN MONDAL 1 |
Completion of work |
-
latitude : 22.80020807,22.8000967
Longitude : 88.53294996,88.53299828
file name : Image_21022021131020974.png
|
2021-02-21 13:10:21.050711 |
149 |
35101933 |
PCC ROAD FROM HAT NAPARA NABA UDAYAN SANGHA TO H/O BISWANATH GHOSH VIA H/O LALMOHAN GHOSH |
371151 |
PCC ROAD FROM HAT NAPARA NABA UDAYAN SANGHA TO H/O BISWANATH GHOSH VIA H/O LALMOHAN GHOSH 1 |
Plinth level |
-
latitude : 22.8213917,22.8219671
Longitude : 88.55019,88.55047593
file name : Image_13012021125909001.png
|
2021-01-13 12:59:09.079144 |
150 |
35101933 |
PCC ROAD FROM HAT NAPARA NABA UDAYAN SANGHA TO H/O BISWANATH GHOSH VIA H/O LALMOHAN GHOSH |
371151 |
PCC ROAD FROM HAT NAPARA NABA UDAYAN SANGHA TO H/O BISWANATH GHOSH VIA H/O LALMOHAN GHOSH 1 |
Completion of work |
-
latitude : 22.82139238,22.82203968
Longitude : 88.5501873,88.55018652
file name : Image_08012021114441071.png
|
2021-01-08 11:44:41.156022 |
151 |
35145509 |
CONSTRUCTION OF PCC ROAD FROM H/O SAHAR ALI TO H/O ABDUL HAI VIA H/O-JULFIKKAR |
266361 |
CONSTRUCTION OF PCC ROAD FROM H/O SAHAR ALI TO H/O ABDUL HAI VIA H/O-JULFIKKAR1 |
Plinth level |
-
latitude : 22.82680257,22.82679857
Longitude : 88.52755663,88.52755038
file name : Image_24022021144541128.png
|
2021-02-24 14:45:41.197846 |
152 |
35145509 |
CONSTRUCTION OF PCC ROAD FROM H/O SAHAR ALI TO H/O ABDUL HAI VIA H/O-JULFIKKAR |
266361 |
CONSTRUCTION OF PCC ROAD FROM H/O SAHAR ALI TO H/O ABDUL HAI VIA H/O-JULFIKKAR1 |
Completion of work |
-
latitude : 22.82676973,22.82620341
Longitude : 88.52743764,88.52685134
file name : Image_21022021151656661.png
|
2021-02-21 15:16:56.71451 |
153 |
39082616 |
CONST OF PCC WITH DRAIN FROM THE HO ATAUR RAHAMAN TO THE HO SAJAN MONDAL |
952426 |
CONST OF PCC WITH DRAIN FROM THE HO ATAUR RAHAMAN TO THE HO SAJAN MONDAL1 |
Plinth level |
-
latitude : 22.78915164
Longitude : 88.51699461
file name : Image_24022021133420786.png
|
2021-02-24 13:34:20.864316 |
154 |
39082616 |
CONST OF PCC WITH DRAIN FROM THE HO ATAUR RAHAMAN TO THE HO SAJAN MONDAL |
952426 |
CONST OF PCC WITH DRAIN FROM THE HO ATAUR RAHAMAN TO THE HO SAJAN MONDAL1 |
Completion of work |
-
latitude : 22.78917843
Longitude : 88.51701032
file name : Image_21022021133928510.png
|
2021-02-21 13:39:28.579365 |
155 |
35098286 |
PROTECTION WALL FROM THE H/O NIJAMUDDIN TO THE H/O JAMAL GOILA VIA H/O ENAMUL |
147331 |
PROTECTION WALL FROM THE H/O NIJAMUDDIN TO THE H/O JAMAL GOILA VIA H/O ENAMUL1 |
Plinth level |
-
latitude : 22.82716524
Longitude : 88.53585061
file name : Image_24022021143752761.png
|
2021-02-24 14:37:52.830668 |
156 |
35098286 |
PROTECTION WALL FROM THE H/O NIJAMUDDIN TO THE H/O JAMAL GOILA VIA H/O ENAMUL |
147331 |
PROTECTION WALL FROM THE H/O NIJAMUDDIN TO THE H/O JAMAL GOILA VIA H/O ENAMUL1 |
Completion of work |
-
latitude : 22.82716749
Longitude : 88.53576438
file name : Image_21022021145258818.png
|
2021-02-21 14:52:58.726064 |
157 |
39086397 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O MAJNU RAHAMAN TO H/O MOYAJJEM |
512485 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O MAJNU RAHAMAN TO H/O MOYAJJEM 1 |
Plinth level |
-
latitude : 22.82962887,22.82879986
Longitude : 88.52975668,88.52925238
file name : Image_31032023120448321.png
|
2023-03-31 12:04:48.42828 |
158 |
39086397 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O MAJNU RAHAMAN TO H/O MOYAJJEM |
512485 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O MAJNU RAHAMAN TO H/O MOYAJJEM 1 |
Plinth level |
-
latitude : 22.82924868,22.8288895
Longitude : 88.52942108,88.52932627
file name : Image_22062022172434783.png
|
2022-06-22 17:24:34.87621 |
159 |
39086397 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O MAJNU RAHAMAN TO H/O MOYAJJEM |
512485 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O MAJNU RAHAMAN TO H/O MOYAJJEM 1 |
Completion of work |
-
latitude : 22.8281826,22.82902345
Longitude : 88.5282804,88.5293503
file name : Image_13062022142518605.png
|
2022-06-13 14:25:18.69902 |
160 |
46311947 |
Renovation and addition work of Grave Yeard Boundary wall of Fazlur Rahaman and ors at Talsa N |
224766 |
Renovation and addition work of Grave Yeard Boundary wall of Fazlur Rahaman and ors at Talsa N1 |
Plinth level |
-
latitude : 22.80754785
Longitude : 88.54126557
file name : Image_01022022115056606.png
|
2022-02-01 11:50:56.716234 |
161 |
46311947 |
Renovation and addition work of Grave Yeard Boundary wall of Fazlur Rahaman and ors at Talsa N |
224766 |
Renovation and addition work of Grave Yeard Boundary wall of Fazlur Rahaman and ors at Talsa N1 |
Completion of work |
-
latitude : 22.80751168
Longitude : 88.54115199
file name : Image_31012022150759382.png
|
2022-01-31 15:07:59.503181 |
162 |
46311973 |
Construction of PCC road from the Ho Ahod to the Ho Bhaben Sarkar at Paschim Narayanpur |
827560 |
Construction of PCC road from the Ho Ahod to the Ho Bhaben Sarkar at Paschim Narayanpur1 |
Plinth level |
-
latitude : 22.79204038,22.79199697
Longitude : 88.51844314,88.5184366
file name : Image_01022022135108609.png
|
2022-02-01 13:51:08.746692 |
163 |
46311973 |
Construction of PCC road from the Ho Ahod to the Ho Bhaben Sarkar at Paschim Narayanpur |
827560 |
Construction of PCC road from the Ho Ahod to the Ho Bhaben Sarkar at Paschim Narayanpur1 |
Completion of work |
-
latitude : 22.7920028,22.79198406
Longitude : 88.51840408,88.51846602
file name : Image_31012022164136291.png
|
2022-01-31 16:41:36.456003 |
164 |
46312921 |
Construction of Pucca drain with PCC road from Ho Masiar to Ho Shyamal at Talsa |
328282 |
Construction of Pucca drain with PCC road from Ho Masiar to Ho Shyamal at Talsa1 |
Roof laid |
-
latitude : 22.79324554,22.79315294
Longitude : 88.53814344,88.5369824
file name : Image_21032023152656747.png
|
2023-03-21 15:26:56.838846 |
165 |
46312921 |
Construction of Pucca drain with PCC road from Ho Masiar to Ho Shyamal at Talsa |
328282 |
Construction of Pucca drain with PCC road from Ho Masiar to Ho Shyamal at Talsa1 |
Plinth level |
-
latitude : 22.79335523,22.79332294
Longitude : 88.53732574,88.53741026
file name : Image_16032023151524121.png
|
2023-03-16 15:15:24.212893 |
166 |
46312921 |
Construction of Pucca drain with PCC road from Ho Masiar to Ho Shyamal at Talsa |
328282 |
Construction of Pucca drain with PCC road from Ho Masiar to Ho Shyamal at Talsa1 |
Completion of work |
-
latitude : 22.79332829,22.7933969
Longitude : 88.53813045,88.53714126
file name : Image_05072022120818235.png
|
2022-07-05 12:08:18.334069 |
167 |
46312921 |
Construction of Pucca drain with PCC road from Ho Masiar to Ho Shyamal at Talsa |
328282 |
Construction of Pucca drain with PCC road from Ho Masiar to Ho Shyamal at Talsa1 |
Completion of work |
-
latitude : 22.79332901,22.79323362
Longitude : 88.53789138,88.53702288
file name : Image_23062022165637539.png
|
2022-06-23 16:56:37.643545 |
168 |
46309265 |
Constr of PCC Road with Tali Piling witht Pucca Drn frm Ho Ashok Sarkar to Ho Sujit Sarkar Talsa |
486931 |
Constr of PCC Road with Tali Piling witht Pucca Drn frm Ho Ashok Sarkar to Ho Sujit Sarkar Talsa 1 |
Plinth level |
-
latitude : 22.8109642,22.81103093
Longitude : 88.54657766,88.54633682
file name : Image_22062022165544589.png
|
2022-06-22 16:55:44.768939 |
169 |
46309265 |
Constr of PCC Road with Tali Piling witht Pucca Drn frm Ho Ashok Sarkar to Ho Sujit Sarkar Talsa |
486931 |
Constr of PCC Road with Tali Piling witht Pucca Drn frm Ho Ashok Sarkar to Ho Sujit Sarkar Talsa 1 |
Completion of work |
-
latitude : 22.8054927,22.8054927
Longitude : 88.5404617,88.5404617
file name : Image_13062022142512082.png
|
2022-06-13 14:25:12.181712 |
170 |
46312632 |
Construction of Pucca Drain from Ho Enat Ali Mondal to Ho Sirajul Mondal at Randhangachha |
980268 |
Construction of Pucca Drain from Ho Enat Ali Mondal to Ho Sirajul Mondal at Randhangachha1 |
Plinth level |
-
latitude : 22.78478048,22.78448688
Longitude : 88.51203707,88.5139632
file name : Image_13062022165138265.png
|
2022-06-13 16:51:38.390479 |
171 |
46312632 |
Construction of Pucca Drain from Ho Enat Ali Mondal to Ho Sirajul Mondal at Randhangachha |
980268 |
Construction of Pucca Drain from Ho Enat Ali Mondal to Ho Sirajul Mondal at Randhangachha1 |
Completion of work |
-
latitude : 22.78474389,22.78448379
Longitude : 88.51216288,88.51405504
file name : Image_10062022151858491.png
|
2022-06-10 15:18:58.590471 |
172 |
46312001 |
Construction of PCC road with Tally Pilling from the Ho Madan Mohan Ghosh to New Masjid at Tangra |
696474 |
Construction of PCC road with Tally Pilling from the Ho Madan Mohan Ghosh to New Masjid at Tangra 1 |
Plinth level |
-
latitude : 22.80525707,22.80427503
Longitude : 88.53986003,88.53114524
file name : Image_15022022141223725.png
|
2022-02-15 14:12:23.821187 |
173 |
46312001 |
Construction of PCC road with Tally Pilling from the Ho Madan Mohan Ghosh to New Masjid at Tangra |
696474 |
Construction of PCC road with Tally Pilling from the Ho Madan Mohan Ghosh to New Masjid at Tangra 1 |
Completion of work |
-
latitude : 22.8049864,22.8045009
Longitude : 88.5307345,88.53093873
file name : Image_31012022165346805.png
|
2022-01-31 16:53:46.970146 |
174 |
46312882 |
Construction of Pucca drain from Ho Pritam Ghosh to Ho Muktar Ali at Tangra |
133473 |
Construction of Pucca drain from Ho Pritam Ghosh to Ho Muktar Ali at Tangra1 |
Plinth level |
-
latitude : 22.80282402,22.80278163
Longitude : 88.53264472,88.53263069
file name : Image_31012022170204815.png
|
2022-01-31 17:02:04.934641 |
175 |
46306407 |
Construction of PCC Road from Ho Jiban Sarkar to Ho Nur Islam Mondal at Dighra |
873334 |
Construction of PCC Road from Ho Jiban Sarkar to Ho Nur Islam Mondal at Dighra1 |
Plinth level |
-
latitude : 22.78727715,22.78732033
Longitude : 88.53339212,88.53325176
file name : Image_16062022142347881.png
|
2022-06-16 14:23:47.988161 |
176 |
46306407 |
Construction of PCC Road from Ho Jiban Sarkar to Ho Nur Islam Mondal at Dighra |
873334 |
Construction of PCC Road from Ho Jiban Sarkar to Ho Nur Islam Mondal at Dighra1 |
Completion of work |
-
latitude : 22.78682162,22.78730429
Longitude : 88.53589307,88.53322129
file name : Image_10062022144834856.png
|
2022-06-10 14:48:34.961149 |
177 |
46307089 |
Construction of PCC road from the Ho Sukumar Das to Ho Manik Ray at Dighra |
756818 |
Construction of PCC road from the Ho Sukumar Das to Ho Manik Ray at Dighra 1 |
Plinth level |
-
latitude : 22.78096342,22.78108002
Longitude : 88.52823003,88.52833937
file name : Image_16062022140444467.png
|
2022-06-16 14:04:44.56362 |
178 |
46307089 |
Construction of PCC road from the Ho Sukumar Das to Ho Manik Ray at Dighra |
756818 |
Construction of PCC road from the Ho Sukumar Das to Ho Manik Ray at Dighra 1 |
Completion of work |
-
latitude : 22.77978303,22.78125771
Longitude : 88.52763368,88.52835716
file name : Image_10062022150906669.png
|
2022-06-10 15:09:06.762511 |
179 |
46312398 |
Construction of Pucca drain both side from PMGSY to HO Ayub Ali biswas at Bagpul |
261065 |
Construction of Pucca drain both side from PMGSY to HO Ayub Ali biswas at Bagpul1 |
Roof laid |
-
latitude : 22.81965365,22.82007378
Longitude : 88.5376792,88.53763649
file name : Image_23032023120700934.png
|
2023-03-23 12:07:01.029587 |
180 |
46312398 |
Construction of Pucca drain both side from PMGSY to HO Ayub Ali biswas at Bagpul |
261065 |
Construction of Pucca drain both side from PMGSY to HO Ayub Ali biswas at Bagpul1 |
Roof laid |
-
latitude : 22.81965365,22.82007378
Longitude : 88.5376792,88.53763649
file name : Image_23032023120704082.png
|
2023-03-23 12:07:04.179432 |
181 |
46312398 |
Construction of Pucca drain both side from PMGSY to HO Ayub Ali biswas at Bagpul |
261065 |
Construction of Pucca drain both side from PMGSY to HO Ayub Ali biswas at Bagpul1 |
Plinth level |
-
latitude : 22.81974536,22.81986591
Longitude : 88.53770903,88.5376152
file name : Image_22062022171104939.png
|
2022-06-22 17:11:05.039505 |
182 |
46312398 |
Construction of Pucca drain both side from PMGSY to HO Ayub Ali biswas at Bagpul |
261065 |
Construction of Pucca drain both side from PMGSY to HO Ayub Ali biswas at Bagpul1 |
Completion of work |
-
latitude : 22.81997556,22.81973357
Longitude : 88.5376452,88.53766973
file name : Image_13062022142954139.png
|
2022-06-13 14:29:54.239936 |
183 |
46308921 |
Const of PCC road with Tally Pilling both side of Ho Abusam akunji to Ho Ramjan Akunji at Bagpul |
1084870 |
Const of PCC road with Tally Pilling both side of Ho Abusam akunji to Ho Ramjan Akunji at Bagpul1 |
Plinth level |
-
latitude : 22.82346866,22.82370074
Longitude : 88.53559829,88.53579576
file name : Image_23062022111204942.png
|
2022-06-23 11:12:05.036336 |
184 |
46308921 |
Const of PCC road with Tally Pilling both side of Ho Abusam akunji to Ho Ramjan Akunji at Bagpul |
1084870 |
Const of PCC road with Tally Pilling both side of Ho Abusam akunji to Ho Ramjan Akunji at Bagpul1 |
Completion of work |
-
latitude : 22.82372854,22.82371639
Longitude : 88.5356581,88.53574139
file name : Image_14062022112630092.png
|
2022-06-14 11:26:30.206145 |
185 |
46308921 |
Const of PCC road with Tally Pilling both side of Ho Abusam akunji to Ho Ramjan Akunji at Bagpul |
1084870 |
Const of PCC road with Tally Pilling both side of Ho Abusam akunji to Ho Ramjan Akunji at Bagpul1 |
Completion of work |
-
latitude : 22.82372472,22.82348619
Longitude : 88.53582686,88.53569159
file name : Image_14062022112633085.png
|
2022-06-14 11:26:33.224499 |
186 |
46312794 |
Construction of Pucca drain from Ho Jinnat Ali Mondal to Ho Ramjan Ali Mondal at Tangra |
484033 |
Construction of Pucca drain from Ho Jinnat Ali Mondal to Ho Ramjan Ali Mondal at Tangra1 |
Plinth level |
-
latitude : 22.80361673,22.80348861
Longitude : 88.528795,88.52879742
file name : Image_22062022161535214.png
|
2022-06-22 16:15:35.320047 |
187 |
46312794 |
Construction of Pucca drain from Ho Jinnat Ali Mondal to Ho Ramjan Ali Mondal at Tangra |
484033 |
Construction of Pucca drain from Ho Jinnat Ali Mondal to Ho Ramjan Ali Mondal at Tangra1 |
Completion of work |
-
latitude : 22.80430472,22.80433747
Longitude : 88.5281923,88.52817987
file name : Image_16062022145941028.png
|
2022-06-16 14:59:41.140211 |
188 |
46312554 |
Construction of Pucca Drain with PCC Road with from Ho Swapan Paul to Bagan Adhi at Malikberia |
348077 |
Construction of Pucca Drain with PCC Road with from Ho Swapan Paul to Bagan Adhi at Malikberia1 |
Completion of work |
-
latitude : 22.83591105,22.83587976
Longitude : 88.54153706,88.54170565
file name : Image_25112022113354559.png
|
2022-11-25 11:33:54.650583 |
189 |
46312554 |
Construction of Pucca Drain with PCC Road with from Ho Swapan Paul to Bagan Adhi at Malikberia |
348077 |
Construction of Pucca Drain with PCC Road with from Ho Swapan Paul to Bagan Adhi at Malikberia1 |
Completion of work |
-
latitude : 22.83588628,22.83582618
Longitude : 88.54147376,88.54199545
file name : Image_13122022113236209.png
|
2022-12-13 11:32:36.313925 |
190 |
67341110 |
Greywater management system |
710466 |
Greywater management system1 |
Plinth level |
-
latitude : 22.82956766
Longitude : 88.53464235
file name : Image_01052023080841504.png
|
2023-05-01 08:08:41.59762 |
191 |
67341110 |
Greywater management system |
710466 |
Greywater management system1 |
Plinth level |
-
latitude : 22.82962279
Longitude : 88.53461231
file name : Image_21042023091959341.png
|
2023-04-21 09:19:59.441086 |
192 |
67341110 |
Greywater management system |
710466 |
Greywater management system1 |
Completion of work |
-
latitude : 22.82966304
Longitude : 88.53441339
file name : Image_23032023120649009.png
|
2023-03-23 12:06:49.110147 |
193 |
67475081 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO MOMIN MONDAL AT MALIKBERIA SANSAD |
180557 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO MOMIN MONDAL AT MALIKBERIA SANSAD1 |
Plinth level |
-
latitude : 22.83528996,22.83523067
Longitude : 88.53956097,88.5396701
file name : Image_25042023140319647.png
|
2023-04-25 14:03:19.747326 |
194 |
67475081 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO MOMIN MONDAL AT MALIKBERIA SANSAD |
180557 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO MOMIN MONDAL AT MALIKBERIA SANSAD1 |
Completion of work |
-
latitude : 22.83529306,22.83525454,22.83527658
Longitude : 88.53961682,88.53966999,88.53959676
file name : Image_25042023135433098.png
|
2023-04-25 13:54:33.193489 |
195 |
67474914 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO KASEM MONDAL AT MALIKBERIA SANSAD |
272735 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO KASEM MONDAL AT MALIKBERIA SANSAD1 |
Plinth level |
-
latitude : 22.83537944,22.835365
Longitude : 88.5396569,88.53975749
file name : Image_25042023140150586.png
|
2023-04-25 14:01:50.688355 |
196 |
67474914 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO KASEM MONDAL AT MALIKBERIA SANSAD |
272735 |
CONSTRUCTION OF CONCRETE ROAD FROM PMGSY ROAD TO HO KASEM MONDAL AT MALIKBERIA SANSAD1 |
Completion of work |
-
latitude : 22.83540257,22.83536606
Longitude : 88.53962803,88.53972444
file name : Image_25042023135120123.png
|
2023-04-25 13:51:20.223903 |
197 |
68378147 |
Creation of a new source of drinking water |
884571 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.812163333333334
Longitude : 88.54669166666666
file name : Image_07082024160414749.png
|
2024-08-07 16:04:14.86013 |
198 |
68378147 |
Creation of a new source of drinking water |
884571 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.812164999999997
Longitude : 88.54668000000001
file name : Image_07082024155927027.png
|
2024-08-07 15:59:27.14774 |
199 |
68378147 |
Creation of a new source of drinking water |
884571 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.812193333333333
Longitude : 88.546675
file name : Image_02072024115722949.png
|
2024-07-02 11:57:23.063817 |
200 |
68374471 |
Construction of roads |
262843 |
Construction of roads1 |
Roof laid |
-
latitude : 22.8237037,22.82363
Longitude : 88.5413568,88.54131166666666
file name : Image_12112024122013637.png
|
2024-11-12 12:20:13.743914 |
201 |
68374471 |
Construction of roads |
262843 |
Construction of roads1 |
Plinth level |
-
latitude : 22.8237201,22.8237145
Longitude : 88.5413127,88.5413514
file name : Image_11112024141005909.png
|
2024-11-11 14:10:06.018457 |
202 |
68374471 |
Construction of roads |
262843 |
Construction of roads1 |
Completion of work |
-
latitude : 22.823698,22.8236998
Longitude : 88.5413532,88.5413546
file name : Image_28102024113844477.png
|
2024-10-28 11:38:44.587793 |
203 |
68379029 |
Greywater management system |
297815 |
Greywater management system1 |
Roof laid |
-
latitude : 22.825856666666663
Longitude : 88.52658166666667
file name : Image_11112024140235511.png
|
2024-11-11 14:02:35.680239 |
204 |
68379029 |
Greywater management system |
297815 |
Greywater management system1 |
Plinth level |
-
latitude : 22.825825000000002
Longitude : 88.52645833333332
file name : Image_28102024114732542.png
|
2024-10-28 11:47:32.639354 |
205 |
68379029 |
Greywater management system |
297815 |
Greywater management system1 |
Completion of work |
-
latitude : 22.825758333333336
Longitude : 88.52645166666667
file name : Image_03102024115924078.png
|
2024-10-03 11:59:24.196194 |