1 |
39008658 |
Sinking of deep Tube well at Dosotina Kastekumari |
162937 |
Sinking of deep Tube well at Dosotina Kastekumari1 |
Completion of work |
-
latitude : 22.35447628889233
Longitude : 88.32229753956199
file name : Image_22022021135313251.png
|
2021-02-22 13:53:13.342745 |
2 |
68628658 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.3481171
Longitude : 88.3273297
file name : Image_10112023125711919.png
|
2023-11-10 12:57:12.094454 |
3 |
68628658 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.3481075
Longitude : 88.3273382
file name : Image_09112023152753284.png
|
2023-11-09 15:27:53.518725 |
4 |
68628658 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.3481279
Longitude : 88.3273142
file name : Image_09112023144737846.png
|
2023-11-09 14:47:38.010749 |
5 |
54029554 |
Repairing and upgradation of cc road from house of Rabiyal Mondal to house of Hakim Mondal |
107705 |
Repairing and upgradation of cc road from house of Rabiyal Mondal to house of Hakim Mondal1 |
Completion of work |
-
latitude : 22.361655556596816,22.361655556596816
Longitude : 88.32130453549325,88.32130453549325
file name : Image_28032022121330578.png
|
2022-03-28 12:13:30.708201 |
6 |
54030037 |
New construction of cc road from ucchakhali main raod to house of Jaba Santra |
90953 |
New construction of cc road from ucchakhali main raod to house of Jaba Santra1 |
Completion of work |
-
latitude : 22.34695629682392,22.34695629682392
Longitude : 88.32205798476934,88.32205798476934
file name : Image_21012022123207041.png
|
2022-01-21 12:32:07.122819 |
7 |
39008735 |
Sinking of deep Tube well at Bhandaria |
202381 |
Sinking of deep Tube well at Bhandaria1 |
Roof laid |
-
latitude : 22.3451958
Longitude : 88.3347103
file name : Image_08032022135524495.png
|
2022-03-08 13:55:24.57983 |
8 |
39008735 |
Sinking of deep Tube well at Bhandaria |
202381 |
Sinking of deep Tube well at Bhandaria1 |
Plinth level |
-
latitude : 22.3451958
Longitude : 88.3347103
file name : Image_08032022134658402.png
|
2022-03-08 13:46:58.507594 |
9 |
39008735 |
Sinking of deep Tube well at Bhandaria |
202381 |
Sinking of deep Tube well at Bhandaria1 |
Completion of work |
-
latitude : 22.34498621430248
Longitude : 88.33371377550066
file name : Image_28122021125246024.png
|
2021-12-28 12:52:46.12214 |
10 |
39007025 |
New Construction of concrete road from h/o kochi Molla towards Illiyas Molla (vaia Odut mollick) |
94237 |
New Construction of concrete road from h/o kochi Molla towards Illiyas Molla (vaia Odut mollick) 1 |
Plinth level |
-
latitude : 22.35405581071973,22.35405581071973
Longitude : 88.32733967341483,88.32733967341483
file name : Image_06012021131346440.png
|
2021-01-06 13:13:46.597122 |
11 |
39007025 |
New Construction of concrete road from h/o kochi Molla towards Illiyas Molla (vaia Odut mollick) |
94237 |
New Construction of concrete road from h/o kochi Molla towards Illiyas Molla (vaia Odut mollick) 1 |
Completion of work |
-
latitude : 22.353984606452286,22.3529297,22.3529297
Longitude : 88.32726197317243,88.3262084,88.3262084
file name : Image_05012021114316733.png
|
2021-01-05 11:43:16.826565 |
12 |
39006494 |
New construction of cc road form Baruipur Road towardsBara Kabarstan |
97384 |
New construction of cc road form Baruipur Road towardsBara Kabarstan 1 |
Plinth level |
-
latitude : 22.365520200692117,22.365520200692117
Longitude : 88.31707050092518,88.31707050092518
file name : Image_06012021122748106.png
|
2021-01-06 12:27:48.20592 |
13 |
39006494 |
New construction of cc road form Baruipur Road towardsBara Kabarstan |
97384 |
New construction of cc road form Baruipur Road towardsBara Kabarstan 1 |
Completion of work |
-
latitude : 22.365494049154222,22.365494049154222
Longitude : 88.31707896664739,88.31707896664739
file name : Image_05012021115415344.png
|
2021-01-05 11:54:15.468278 |
14 |
39006518 |
New Construction of concrete road form Doulatabad simana towards Dandapat para kali mandir |
141043 |
New Construction of concrete road form Doulatabad simana towards Dandapat para kali mandir 1 |
Completion of work |
-
latitude : 22.3620691196993,22.3620691196993
Longitude : 88.30589591525495,88.30589591525495
file name : Image_06012021123245574.png
|
2021-01-06 12:32:45.651941 |
15 |
39006518 |
New Construction of concrete road form Doulatabad simana towards Dandapat para kali mandir |
141043 |
New Construction of concrete road form Doulatabad simana towards Dandapat para kali mandir 1 |
Completion of work |
-
latitude : 22.362085548229516,22.362085548229516
Longitude : 88.3058659080416,88.3058659080416
file name : Image_05012021115941612.png
|
2021-01-05 11:59:41.707699 |
16 |
39008201 |
New Construction of concrete road from h/o Arjun baur towards h/o Sandhya Samanta |
279116 |
New Construction of concrete road from h/o Arjun baur towards h/o Sandhya Samanta 1 |
Roof laid |
-
latitude : 22.340256767347455,22.340239081531763
Longitude : 88.33740508183837,88.33739686757326
file name : Image_21012021140018950.png
|
2021-01-21 14:00:19.032041 |
17 |
39008201 |
New Construction of concrete road from h/o Arjun baur towards h/o Sandhya Samanta |
279116 |
New Construction of concrete road from h/o Arjun baur towards h/o Sandhya Samanta 1 |
Completion of work |
-
latitude : 22.34022311400622,22.340279817581177
Longitude : 88.33740047179163,88.33736727945507
file name : Image_04012021131959198.png
|
2021-01-04 13:19:59.281168 |
18 |
39006959 |
New Construction of concrete road from Shop of Jumman Molla towards h/o Talem Molla |
146729 |
New Construction of concrete road from Shop of Jumman Molla towards h/o Talem Molla 1 |
Roof laid |
-
latitude : 22.350563406944275,22.350566214881837
Longitude : 88.32585557363927,88.3258577529341
file name : Image_21012021140946193.png
|
2021-01-21 14:09:46.262313 |
19 |
39006959 |
New Construction of concrete road from Shop of Jumman Molla towards h/o Talem Molla |
146729 |
New Construction of concrete road from Shop of Jumman Molla towards h/o Talem Molla 1 |
Completion of work |
-
latitude : 22.3508216,22.350596473552287
Longitude : 88.3256267,88.32586823031306
file name : Image_04012021133115073.png
|
2021-01-04 13:31:15.193839 |
20 |
39008403 |
New Construction of concrete road fromPitch Rasta Ghati haran more towards Battala |
308086 |
New Construction of concrete road fromPitch Rasta Ghati haran more towards Battala 1 |
Plinth level |
-
latitude : 22.332718879915774,22.332718879915774
Longitude : 88.31240580417216,88.31240580417216
file name : Image_02022021111928345.png
|
2021-02-02 11:19:28.431896 |
21 |
39008403 |
New Construction of concrete road fromPitch Rasta Ghati haran more towards Battala |
308086 |
New Construction of concrete road fromPitch Rasta Ghati haran more towards Battala 1 |
Completion of work |
-
latitude : 22.333209346979856,22.333209346979856
Longitude : 88.31263949163258,88.31263949163258
file name : Image_05012021122001026.png
|
2021-01-05 12:20:01.111553 |
22 |
39008214 |
New Construction of concrete road from Pich rasta towards h/o Paresh Bag |
198936 |
New Construction of concrete road from Pich rasta towards h/o Paresh Bag 1 |
Roof laid |
-
latitude : 22.338628750294447,22.338628750294447
Longitude : 88.32688411697745,88.32688411697745
file name : Image_16022021112723433.png
|
2021-02-16 11:27:23.53209 |
23 |
39008214 |
New Construction of concrete road from Pich rasta towards h/o Paresh Bag |
198936 |
New Construction of concrete road from Pich rasta towards h/o Paresh Bag 1 |
Plinth level |
-
latitude : 22.338584158569574,22.338584158569574
Longitude : 88.32688864320517,88.32688864320517
file name : Image_06012021124959269.png
|
2021-01-06 12:49:59.369593 |
24 |
39008214 |
New Construction of concrete road from Pich rasta towards h/o Paresh Bag |
198936 |
New Construction of concrete road from Pich rasta towards h/o Paresh Bag 1 |
Completion of work |
-
latitude : 22.33867564704269,22.33867564704269
Longitude : 88.32690046168864,88.32690046168864
file name : Image_05012021123147687.png
|
2021-01-05 12:31:47.77168 |
25 |
39008534 |
Sinking of deep Tube well at Gabberia |
202381 |
Sinking of deep Tube well at Gabberia1 |
Roof laid |
-
latitude : 22.362283151596785
Longitude : 88.31780140288174
file name : Image_10092021122537063.png
|
2021-09-10 12:25:37.152315 |
26 |
39008534 |
Sinking of deep Tube well at Gabberia |
202381 |
Sinking of deep Tube well at Gabberia1 |
Roof laid |
-
latitude : 22.36235238611698
Longitude : 88.31779235042632
file name : Image_10092021122540438.png
|
2021-09-10 12:25:40.521351 |
27 |
39008534 |
Sinking of deep Tube well at Gabberia |
202381 |
Sinking of deep Tube well at Gabberia1 |
Plinth level |
-
latitude : 22.36232053488493
Longitude : 88.31784867681563
file name : Image_10092021121436311.png
|
2021-09-10 12:14:36.421009 |
28 |
39008534 |
Sinking of deep Tube well at Gabberia |
202381 |
Sinking of deep Tube well at Gabberia1 |
Completion of work |
-
latitude : 22.362322714179754
Longitude : 88.31775396130979
file name : Image_09082021112737073.png
|
2021-08-09 11:27:37.155634 |
29 |
39008517 |
Sinking of deep Tube well at Gabberia |
202381 |
Sinking of deep Tube well at Gabberia1 |
Roof laid |
-
latitude : 22.359410673379898
Longitude : 88.30554898828268
file name : Image_10092021123130510.png
|
2021-09-10 12:31:30.615356 |
30 |
39008517 |
Sinking of deep Tube well at Gabberia |
202381 |
Sinking of deep Tube well at Gabberia1 |
Plinth level |
-
latitude : 22.359369015321136
Longitude : 88.30550397746265
file name : Image_10092021122917085.png
|
2021-09-10 12:29:17.177603 |
31 |
39008517 |
Sinking of deep Tube well at Gabberia |
202381 |
Sinking of deep Tube well at Gabberia1 |
Plinth level |
-
latitude : 22.359394538216293
Longitude : 88.30549869686365
file name : Image_10092021122630483.png
|
2021-09-10 12:26:30.580812 |
32 |
39008517 |
Sinking of deep Tube well at Gabberia |
202381 |
Sinking of deep Tube well at Gabberia1 |
Completion of work |
-
latitude : 22.359352544881403
Longitude : 88.30549417063594
file name : Image_09082021113322585.png
|
2021-08-09 11:33:22.668656 |
33 |
39008577 |
Sinking of deep Tube well at Dosotina |
202381 |
Sinking of deep Tube well at Dosotina1 |
Roof laid |
-
latitude : 22.360016810707748
Longitude : 88.31931064836681
file name : Image_10092021120758069.png
|
2021-09-10 12:07:58.144592 |
34 |
39008577 |
Sinking of deep Tube well at Dosotina |
202381 |
Sinking of deep Tube well at Dosotina1 |
Plinth level |
-
latitude : 22.360003567300737
Longitude : 88.31930830143392
file name : Image_10092021120300581.png
|
2021-09-10 12:03:00.656928 |
35 |
39008577 |
Sinking of deep Tube well at Dosotina |
202381 |
Sinking of deep Tube well at Dosotina1 |
Completion of work |
-
latitude : 22.359994305297732
Longitude : 88.31925784237683
file name : Image_09082021131742337.png
|
2021-08-09 13:17:42.39561 |
36 |
39008781 |
Sinking of deep Tube well at Dakshin Gouripur |
202381 |
Sinking of deep Tube well at Dakshin Gouripur1 |
Roof laid |
-
latitude : 22.348217396065593
Longitude : 88.3149943035096
file name : Image_10092021130127190.png
|
2021-09-10 13:01:27.263042 |
37 |
39008781 |
Sinking of deep Tube well at Dakshin Gouripur |
202381 |
Sinking of deep Tube well at Dakshin Gouripur1 |
Plinth level |
-
latitude : 22.348228837363422
Longitude : 88.31499371677637
file name : Image_10092021125740720.png
|
2021-09-10 12:57:40.8218 |
38 |
39008781 |
Sinking of deep Tube well at Dakshin Gouripur |
202381 |
Sinking of deep Tube well at Dakshin Gouripur1 |
Completion of work |
-
latitude : 22.348252809606493
Longitude : 88.31507745198905
file name : Image_13082021112403716.png
|
2021-08-13 11:24:03.798647 |
39 |
39008597 |
Sinking of deep Tube well at Jalilpur |
162937 |
Sinking of deep Tube well at Jalilpur1 |
Roof laid |
-
latitude : 22.36322716344148
Longitude : 88.33245565183461
file name : Image_23082021133053139.png
|
2021-08-23 13:30:53.269559 |
40 |
39008597 |
Sinking of deep Tube well at Jalilpur |
162937 |
Sinking of deep Tube well at Jalilpur1 |
Plinth level |
-
latitude : 22.36325578764081
Longitude : 88.33240561187267
file name : Image_09082021160954816.png
|
2021-08-09 16:09:54.880613 |
41 |
39008597 |
Sinking of deep Tube well at Jalilpur |
162937 |
Sinking of deep Tube well at Jalilpur1 |
Completion of work |
-
latitude : 22.36216027289629
Longitude : 88.32383167929947
file name : Image_29042021111902362.png
|
2021-04-29 11:19:02.431341 |
42 |
39008617 |
Sinking of deep Tube well at Iyerpur |
162937 |
Sinking of deep Tube well at Iyerpur1 |
Completion of work |
-
latitude : 22.34986657742411
Longitude : 88.31227873452008
file name : Image_02032021132846632.png
|
2021-03-02 13:28:46.720601 |
43 |
39008792 |
Sinking of deep Tube well at Chamni |
162937 |
Sinking of deep Tube well at Chamni1 |
Plinth level |
-
latitude : 22.35328404698521
Longitude : 88.32637818530202
file name : Image_28072021133056575.png
|
2021-07-28 13:30:56.708712 |
44 |
39008792 |
Sinking of deep Tube well at Chamni |
162937 |
Sinking of deep Tube well at Chamni1 |
Completion of work |
-
latitude : 22.348147449083626
Longitude : 88.32729265093803
file name : Image_02032021134555569.png
|
2021-03-02 13:45:55.668156 |
45 |
39008560 |
Sinking of deep Tube well at Dosotina |
202381 |
Sinking of deep Tube well at Dosotina1 |
Roof laid |
-
latitude : 22.3554612044245
Longitude : 88.32957034930587
file name : Image_22092021133807588.png
|
2021-09-22 13:38:07.670055 |
46 |
39008560 |
Sinking of deep Tube well at Dosotina |
202381 |
Sinking of deep Tube well at Dosotina1 |
Plinth level |
-
latitude : 22.3551892
Longitude : 88.3286377
file name : Image_23082021124114666.png
|
2021-08-23 12:41:14.758469 |
47 |
39008560 |
Sinking of deep Tube well at Dosotina |
202381 |
Sinking of deep Tube well at Dosotina1 |
Completion of work |
-
latitude : 22.35529528465122
Longitude : 88.32948468625546
file name : Image_09082021162423285.png
|
2021-08-09 16:24:23.362147 |
48 |
54029919 |
New construction of cc road from Chamni battala pitch rasta to Chamni F P School |
193889 |
New construction of cc road from Chamni battala pitch rasta to Chamni F P School1 |
Roof laid |
-
latitude : 22.346190777607262,22.346155866980553
Longitude : 88.31572730094194,88.31570751965046
file name : Image_28122021141059199.png
|
2021-12-28 14:10:59.263843 |
49 |
54029919 |
New construction of cc road from Chamni battala pitch rasta to Chamni F P School |
193889 |
New construction of cc road from Chamni battala pitch rasta to Chamni F P School1 |
Plinth level |
-
latitude : 22.34614111483097,22.34613830689341
Longitude : 88.31567449495196,88.31567130982876
file name : Image_28122021140743388.png
|
2021-12-28 14:07:43.452469 |
50 |
54029919 |
New construction of cc road from Chamni battala pitch rasta to Chamni F P School |
193889 |
New construction of cc road from Chamni battala pitch rasta to Chamni F P School1 |
Completion of work |
-
latitude : 22.34618130605668,22.34618382062763
Longitude : 88.31568052992225,88.31573031842709
file name : Image_28122021140336604.png
|
2021-12-28 14:03:36.66751 |
51 |
54030213 |
New construction of cc road from house of Panchanan Mondal to house of Tarapada Mondal |
126565 |
New construction of cc road from house of Panchanan Mondal to house of Tarapada Mondal1 |
Roof laid |
-
latitude : 22.348765656352043,22.348768254742026
Longitude : 88.32157937809825,88.32151684910059
file name : Image_07012022132011107.png
|
2022-01-07 13:20:11.16841 |
52 |
54030213 |
New construction of cc road from house of Panchanan Mondal to house of Tarapada Mondal |
126565 |
New construction of cc road from house of Panchanan Mondal to house of Tarapada Mondal1 |
Plinth level |
-
latitude : 22.34873988199979,22.34878581482917
Longitude : 88.32156009972095,88.32155641168356
file name : Image_07012022131451677.png
|
2022-01-07 13:14:51.738849 |
53 |
54030213 |
New construction of cc road from house of Panchanan Mondal to house of Tarapada Mondal |
126565 |
New construction of cc road from house of Panchanan Mondal to house of Tarapada Mondal1 |
Completion of work |
-
latitude : 22.34873866662383,22.348739211447537
Longitude : 88.32153093069792,88.32153956405818
file name : Image_07012022130951059.png
|
2022-01-07 13:09:51.131166 |
54 |
54030213 |
New construction of cc road from house of Panchanan Mondal to house of Tarapada Mondal |
126565 |
New construction of cc road from house of Panchanan Mondal to house of Tarapada Mondal1 |
Completion of work |
-
latitude : 22.34874553978443,22.34878996387124
Longitude : 88.32146521657705,88.32151961512864
file name : Image_28122021135208465.png
|
2021-12-28 13:52:08.552292 |
55 |
39008712 |
Sinking of deep Tube well at Bhandaria |
162937 |
Sinking of deep Tube well at Bhandaria1 |
Completion of work |
-
latitude : 22.347183907404542
Longitude : 88.3233985863626
file name : Image_22022021134210899.png
|
2021-02-22 13:42:10.986773 |
56 |
54031006 |
REPAIRING AND UPGRADATION OF CC ROAD FROM HOUSE OF NIMAI KHANRA TO HOUSE OF NIRMAL KHANRA |
165357 |
REPAIRING AND UPGRADATION OF CC ROAD FROM HOUSE OF NIMAI KHANRA TO HOUSE OF NIRMAL KHANRA1 |
Roof laid |
-
latitude : 22.34014797024429,22.340178857557476
Longitude : 88.32589798606932,88.32588750869036
file name : Image_07012022133235679.png
|
2022-01-07 13:32:35.747137 |
57 |
54031006 |
REPAIRING AND UPGRADATION OF CC ROAD FROM HOUSE OF NIMAI KHANRA TO HOUSE OF NIRMAL KHANRA |
165357 |
REPAIRING AND UPGRADATION OF CC ROAD FROM HOUSE OF NIMAI KHANRA TO HOUSE OF NIRMAL KHANRA1 |
Plinth level |
-
latitude : 22.340167919173837,22.340186443179846
Longitude : 88.3259510435164,88.32591919228435
file name : Image_07012022132557058.png
|
2022-01-07 13:25:57.119677 |
58 |
54031006 |
REPAIRING AND UPGRADATION OF CC ROAD FROM HOUSE OF NIMAI KHANRA TO HOUSE OF NIRMAL KHANRA |
165357 |
REPAIRING AND UPGRADATION OF CC ROAD FROM HOUSE OF NIMAI KHANRA TO HOUSE OF NIRMAL KHANRA1 |
Completion of work |
-
latitude : 22.340179947204888,22.340124459005892
Longitude : 88.3258749358356,88.32585297524929
file name : Image_28122021144230681.png
|
2021-12-28 14:42:30.765562 |
59 |
39006700 |
New Construction of concrete road from h/o Basudeb Mistry towards h/o Bimal Mistry |
171438 |
New Construction of concrete road from h/o Basudeb Mistry towards h/o Bimal Mistry1 |
Roof laid |
-
latitude : 22.3467257944867,22.34670295380056
Longitude : 88.31471644341946,88.3147160243243
file name : Image_28122021141652386.png
|
2021-12-28 14:16:52.45057 |
60 |
39006700 |
New Construction of concrete road from h/o Basudeb Mistry towards h/o Bimal Mistry |
171438 |
New Construction of concrete road from h/o Basudeb Mistry towards h/o Bimal Mistry1 |
Plinth level |
-
latitude : 22.346720974892378,22.346811667084694
Longitude : 88.31472256220877,88.31478324718773
file name : Image_28122021141527910.png
|
2021-12-28 14:15:27.97965 |
61 |
39006700 |
New Construction of concrete road from h/o Basudeb Mistry towards h/o Bimal Mistry |
171438 |
New Construction of concrete road from h/o Basudeb Mistry towards h/o Bimal Mistry1 |
Completion of work |
-
latitude : 22.346778390929103,22.34676334541291
Longitude : 88.3147437684238,88.31471401266754
file name : Image_28122021141332193.png
|
2021-12-28 14:13:32.265829 |
62 |
54528446 |
SINKING OF DEEP TUBEWELL AT BHANDERIA HO JAHANGIR SK |
196234 |
SINKING OF DEEP TUBEWELL AT BHANDERIA HO JAHANGIR SK1 |
Plinth level |
-
latitude : 22.346299407072365
Longitude : 88.33052035421133
file name : Image_07102021114340069.png
|
2021-10-07 11:43:40.153247 |
63 |
54528446 |
SINKING OF DEEP TUBEWELL AT BHANDERIA HO JAHANGIR SK |
196234 |
SINKING OF DEEP TUBEWELL AT BHANDERIA HO JAHANGIR SK1 |
Completion of work |
-
latitude : 22.346345172263682
Longitude : 88.33061473444104
file name : Image_07102021113606568.png
|
2021-10-07 11:36:06.646604 |
64 |
54528446 |
SINKING OF DEEP TUBEWELL AT BHANDERIA HO JAHANGIR SK |
196234 |
SINKING OF DEEP TUBEWELL AT BHANDERIA HO JAHANGIR SK1 |
Completion of work |
-
latitude : 22.3473993
Longitude : 88.3316741
file name : Image_30092021120756835.png
|
2021-09-30 12:07:56.914522 |
65 |
39008722 |
Sinking of deep Tube well at Bhandaria |
162937 |
Sinking of deep Tube well at Bhandaria1 |
Completion of work |
-
latitude : 22.33455430716276
Longitude : 88.33095235750079
file name : Image_22022021132307110.png
|
2021-02-22 13:23:07.185577 |
66 |
39008749 |
Sinking of deep Tube well at Bahadurpur |
162937 |
Sinking of deep Tube well at Bahadurpur1 |
Completion of work |
-
latitude : 22.339664795435965
Longitude : 88.32631666213274
file name : Image_22022021132833607.png
|
2021-02-22 13:28:33.677611 |
67 |
39008766 |
Sinking of deep Tube well at Bijayrampur |
162937 |
Sinking of deep Tube well at Bijayrampur1 |
Roof laid |
-
latitude : 22.340689105913043
Longitude : 88.31944283097982
file name : Image_08092021122540683.png
|
2021-09-08 12:25:40.748557 |
68 |
39008766 |
Sinking of deep Tube well at Bijayrampur |
162937 |
Sinking of deep Tube well at Bijayrampur1 |
Plinth level |
-
latitude : 22.340687555260956
Longitude : 88.31946093589067
file name : Image_08092021122135535.png
|
2021-09-08 12:21:35.604466 |
69 |
39008766 |
Sinking of deep Tube well at Bijayrampur |
162937 |
Sinking of deep Tube well at Bijayrampur1 |
Completion of work |
-
latitude : 22.340722968801856
Longitude : 88.31947426311672
file name : Image_22022021133234587.png
|
2021-02-22 13:32:34.69511 |
70 |
39008642 |
Sinking of deep Tube well at Chamni |
162937 |
Sinking of deep Tube well at Chamni1 |
Roof laid |
-
latitude : 22.347302972339094
Longitude : 88.31812301650643
file name : Image_08122021125632202.png
|
2021-12-08 12:56:32.291578 |
71 |
39008642 |
Sinking of deep Tube well at Chamni |
162937 |
Sinking of deep Tube well at Chamni1 |
Plinth level |
-
latitude : 22.347152223810554
Longitude : 88.31816551275551
file name : Image_08122021125037869.png
|
2021-12-08 12:50:37.950235 |
72 |
39008642 |
Sinking of deep Tube well at Chamni |
162937 |
Sinking of deep Tube well at Chamni1 |
Completion of work |
-
latitude : 22.346135121770203
Longitude : 88.31811882555485
file name : Image_22022021133825289.png
|
2021-02-22 13:38:25.378632 |
73 |
39008672 |
Sinking of deep Tube well at Chamni |
202381 |
Sinking of deep Tube well at Chamni1 |
Roof laid |
-
latitude : 22.349207843653858
Longitude : 88.3242191746831
file name : Image_08122021123846135.png
|
2021-12-08 12:38:46.227449 |
74 |
39008672 |
Sinking of deep Tube well at Chamni |
202381 |
Sinking of deep Tube well at Chamni1 |
Plinth level |
-
latitude : 22.349245813675225
Longitude : 88.324353704229
file name : Image_08122021123428181.png
|
2021-12-08 12:34:28.256388 |
75 |
39008672 |
Sinking of deep Tube well at Chamni |
202381 |
Sinking of deep Tube well at Chamni1 |
Completion of work |
-
latitude : 22.349241077899933
Longitude : 88.32431573420763
file name : Image_08122021122907507.png
|
2021-12-08 12:29:07.576292 |
76 |
39006537 |
New Construction of concrete road form danga of Swapan mondal towards Shibtala |
161468 |
New Construction of concrete road form danga of Swapan mondal towards Shibtala1 |
Plinth level |
-
latitude : 22.35889920964837,22.35889920964837
Longitude : 88.3193539828062,88.3193539828062
file name : Image_29042021110729053.png
|
2021-04-29 11:07:29.111227 |
77 |
39006537 |
New Construction of concrete road form danga of Swapan mondal towards Shibtala |
161468 |
New Construction of concrete road form danga of Swapan mondal towards Shibtala1 |
Roof laid |
-
latitude : 22.35890893265605,22.35892632510513
Longitude : 88.31929698586464,88.31926974467933
file name : Image_29042021111858692.png
|
2021-04-29 11:18:58.769669 |
78 |
39006537 |
New Construction of concrete road form danga of Swapan mondal towards Shibtala |
161468 |
New Construction of concrete road form danga of Swapan mondal towards Shibtala1 |
Completion of work |
-
latitude : 22.359578269533813,22.359578269533813
Longitude : 88.31977282650769,88.31977282650769
file name : Image_06012021121600259.png
|
2021-01-06 12:16:00.327881 |
79 |
54528374 |
SUB MERSIBLE TUBEWELL AT DOSOTINA KASTEKUMARI PRIMARY SCHOOL WITH WATER STORAGE SYSTEM |
298153 |
SUB MERSIBLE TUBEWELL AT DOSOTINA KASTEKUMARI PRIMARY SCHOOL WITH WATER STORAGE SYSTEM1 |
Roof laid |
-
latitude : 22.3481573
Longitude : 88.3273115
file name : Image_19012022153518297.png
|
2022-01-19 15:35:18.366581 |
80 |
54528374 |
SUB MERSIBLE TUBEWELL AT DOSOTINA KASTEKUMARI PRIMARY SCHOOL WITH WATER STORAGE SYSTEM |
298153 |
SUB MERSIBLE TUBEWELL AT DOSOTINA KASTEKUMARI PRIMARY SCHOOL WITH WATER STORAGE SYSTEM1 |
Plinth level |
-
latitude : 22.3480406
Longitude : 88.327319
file name : Image_28092021162936426.png
|
2021-09-28 16:29:36.500427 |
81 |
54528374 |
SUB MERSIBLE TUBEWELL AT DOSOTINA KASTEKUMARI PRIMARY SCHOOL WITH WATER STORAGE SYSTEM |
298153 |
SUB MERSIBLE TUBEWELL AT DOSOTINA KASTEKUMARI PRIMARY SCHOOL WITH WATER STORAGE SYSTEM1 |
Completion of work |
-
latitude : 22.3480391
Longitude : 88.3273148
file name : Image_24092021151741854.png
|
2021-09-24 15:17:41.92716 |
82 |
39008035 |
New Construction of concrete road from h/o kastekumari Huda Mollick towards h/o let Selim Mollick |
217357 |
New Construction of concrete road from h/o kastekumari Huda Mollick towards h/o let Selim Mollick 1 |
Plinth level |
-
latitude : 22.348203398287296,22.348203398287296
Longitude : 88.32719877362251,88.32719877362251
file name : Image_06012021120501912.png
|
2021-01-06 12:05:02.011572 |
83 |
39008035 |
New Construction of concrete road from h/o kastekumari Huda Mollick towards h/o let Selim Mollick |
217357 |
New Construction of concrete road from h/o kastekumari Huda Mollick towards h/o let Selim Mollick 1 |
Completion of work |
-
latitude : 22.348688542842865,22.348688542842865
Longitude : 88.33045799285173,88.33045799285173
file name : Image_06012021105627789.png
|
2021-01-06 10:56:27.889366 |
84 |
39008035 |
New Construction of concrete road from h/o kastekumari Huda Mollick towards h/o let Selim Mollick |
217357 |
New Construction of concrete road from h/o kastekumari Huda Mollick towards h/o let Selim Mollick 1 |
Completion of work |
-
latitude : 22.348736822605133,22.348736822605133
Longitude : 88.33049001172185,88.33049001172185
file name : Image_05012021130430906.png
|
2021-01-05 13:04:30.964693 |
85 |
45677511 |
U Construction of concrete Road form h/o Ambik Maity to house of Lipika Samanta |
229451 |
U Construction of concrete Road form h/o Ambik Maity to house of Lipika Samanta1 |
Roof laid |
-
latitude : 22.34102484304458,22.34102484304458
Longitude : 88.33739242516458,88.33739242516458
file name : Image_08092022123135428.png
|
2022-09-08 12:31:35.509182 |
86 |
45677511 |
U Construction of concrete Road form h/o Ambik Maity to house of Lipika Samanta |
229451 |
U Construction of concrete Road form h/o Ambik Maity to house of Lipika Samanta1 |
Plinth level |
-
latitude : 22.341039930470288,22.341039930470288
Longitude : 88.33739108406007,88.33739108406007
file name : Image_08092022122945388.png
|
2022-09-08 12:29:45.461246 |
87 |
45677511 |
U Construction of concrete Road form h/o Ambik Maity to house of Lipika Samanta |
229451 |
U Construction of concrete Road form h/o Ambik Maity to house of Lipika Samanta1 |
Completion of work |
-
latitude : 22.340998104773462,22.340998104773462
Longitude : 88.3373496774584,88.3373496774584
file name : Image_08092022122716353.png
|
2022-09-08 12:27:16.430474 |
88 |
64518838 |
U New Construction of Concrete road from h/o Susanta Manna to h/o Sanjoy Das. |
47740 |
U New Construction of Concrete road from h/o Susanta Manna to h/o Sanjoy Das.1 |
Plinth level |
-
latitude : 22.33895216602832,22.33895216602832
Longitude : 88.32813595421612,88.32813595421612
file name : Image_08092022120647648.png
|
2022-09-08 12:06:47.707815 |
89 |
64518838 |
U New Construction of Concrete road from h/o Susanta Manna to h/o Sanjoy Das. |
47740 |
U New Construction of Concrete road from h/o Susanta Manna to h/o Sanjoy Das.1 |
Roof laid |
-
latitude : 22.339378595352173,22.339378595352173
Longitude : 88.32858203910291,88.32858203910291
file name : Image_08092022121012865.png
|
2022-09-08 12:10:12.928738 |
90 |
64518838 |
U New Construction of Concrete road from h/o Susanta Manna to h/o Sanjoy Das. |
47740 |
U New Construction of Concrete road from h/o Susanta Manna to h/o Sanjoy Das.1 |
Completion of work |
-
latitude : 22.3391591,22.3391591
Longitude : 88.3271194,88.3271194
file name : Image_08092022115840992.png
|
2022-09-08 11:58:41.070443 |
91 |
64518838 |
U New Construction of Concrete road from h/o Susanta Manna to h/o Sanjoy Das. |
47740 |
U New Construction of Concrete road from h/o Susanta Manna to h/o Sanjoy Das.1 |
Completion of work |
-
latitude : 22.339146710000932,22.339146710000932
Longitude : 88.32829018123448,88.32829018123448
file name : Image_08092022115515823.png
|
2022-09-08 11:55:15.904722 |
92 |
64518453 |
U New Construction of Concrete road from Bhandaria h/o Amar Manna to h/o Dulal Manna |
82973 |
U New Construction of Concrete road from Bhandaria h/o Amar Manna to h/o Dulal Manna1 |
Roof laid |
-
latitude : 22.33864480163902,22.33864480163902
Longitude : 88.32806185819209,88.32806185819209
file name : Image_08092022120514389.png
|
2022-09-08 12:05:14.439164 |
93 |
64518453 |
U New Construction of Concrete road from Bhandaria h/o Amar Manna to h/o Dulal Manna |
82973 |
U New Construction of Concrete road from Bhandaria h/o Amar Manna to h/o Dulal Manna1 |
Plinth level |
-
latitude : 22.33865339308977,22.33865339308977
Longitude : 88.32810552790761,88.32810552790761
file name : Image_08092022120234171.png
|
2022-09-08 12:02:34.219909 |
94 |
64518453 |
U New Construction of Concrete road from Bhandaria h/o Amar Manna to h/o Dulal Manna |
82973 |
U New Construction of Concrete road from Bhandaria h/o Amar Manna to h/o Dulal Manna1 |
Completion of work |
-
latitude : 22.338999188505113,22.33898950740695
Longitude : 88.32813796587288,88.32813704386353
file name : Image_08092022120023147.png
|
2022-09-08 12:00:23.222099 |
95 |
39008922 |
Community Toilet at Karmakar Para Auto Stand |
350000 |
Community Toilet at Karmakar Para Auto Stand1 |
Completion of work |
-
latitude : 22.338447365909815
Longitude : 88.3284583222121
file name : Image_02082022133729569.png
|
2022-08-02 13:37:29.65037 |
96 |
64518239 |
U New Construction of Concrete road from Earpur Bostamtala to h/o raju Karan |
323063 |
U New Construction of Concrete road from Earpur Bostamtala to h/o raju Karan1 |
Plinth level |
-
latitude : 22.351622418500483,22.351622418500483
Longitude : 88.31053907051682,88.31053907051682
file name : Image_08092022130010921.png
|
2022-09-08 13:00:11.001463 |
97 |
64518239 |
U New Construction of Concrete road from Earpur Bostamtala to h/o raju Karan |
323063 |
U New Construction of Concrete road from Earpur Bostamtala to h/o raju Karan1 |
Completion of work |
-
latitude : 22.3512706,22.3512706
Longitude : 88.3098073,88.3098073
file name : Image_08092022125720986.png
|
2022-09-08 12:57:21.06754 |
98 |
45684821 |
T Instalation of water treatment plan Naskar para h/o Alam Sekh |
273713 |
T Instalation of water treatment plan Naskar para h/o Alam Sekh1 |
Roof laid |
-
latitude : 22.348532723262906
Longitude : 88.32155724987388
file name : Image_19122022115227148.png
|
2022-12-19 11:52:27.24569 |
99 |
45684821 |
T Instalation of water treatment plan Naskar para h/o Alam Sekh |
273713 |
T Instalation of water treatment plan Naskar para h/o Alam Sekh1 |
Plinth level |
-
latitude : 22.3485226649791
Longitude : 88.32153487019241
file name : Image_19122022115036692.png
|
2022-12-19 11:50:36.787668 |
100 |
45684821 |
T Instalation of water treatment plan Naskar para h/o Alam Sekh |
273713 |
T Instalation of water treatment plan Naskar para h/o Alam Sekh1 |
Completion of work |
-
latitude : 22.348715155385435
Longitude : 88.32158633507788
file name : Image_19122022114825347.png
|
2022-12-19 11:48:25.448304 |
101 |
45687003 |
T Instalation of water treatment plan at Hazra para near h/o Mathur Sardar |
273713 |
T Instalation of water treatment plan at Hazra para near h/o Mathur Sardar1 |
Roof laid |
-
latitude : 22.342054434120655
Longitude : 88.31338975578547
file name : Image_19122022114052520.png
|
2022-12-19 11:40:52.603491 |
102 |
45687003 |
T Instalation of water treatment plan at Hazra para near h/o Mathur Sardar |
273713 |
T Instalation of water treatment plan at Hazra para near h/o Mathur Sardar1 |
Plinth level |
-
latitude : 22.34203486237675
Longitude : 88.31333745270967
file name : Image_19122022113226243.png
|
2022-12-19 11:32:26.31736 |
103 |
45674963 |
U Construction of concrete road form Danga of Kartik Karan to h/o Goutam Bag. |
64224 |
U Construction of concrete road form Danga of Kartik Karan to h/o Goutam Bag.1 |
Roof laid |
-
latitude : 22.346567711792886,22.346567711792886
Longitude : 88.31336611881852,88.31336611881852
file name : Image_04042022174354416.png
|
2022-04-04 17:43:54.492433 |
104 |
45674963 |
U Construction of concrete road form Danga of Kartik Karan to h/o Goutam Bag. |
64224 |
U Construction of concrete road form Danga of Kartik Karan to h/o Goutam Bag.1 |
Plinth level |
-
latitude : 22.34660337679088,22.34654935542494
Longitude : 88.31340626813471,88.31335262395442
file name : Image_04042022174130573.png
|
2022-04-04 17:41:30.648903 |
105 |
45674963 |
U Construction of concrete road form Danga of Kartik Karan to h/o Goutam Bag. |
64224 |
U Construction of concrete road form Danga of Kartik Karan to h/o Goutam Bag.1 |
Completion of work |
-
latitude : 22.346594114787877,22.346566286869347
Longitude : 88.3133655320853,88.31341129727662
file name : Image_04042022173902360.png
|
2022-04-04 17:39:02.451917 |
106 |
39008188 |
New Construction of concrete road from h/o Monoranjan Khanra towards Danga of Sunil Das |
150919 |
New Construction of concrete road from h/o Monoranjan Khanra towards Danga of Sunil Das1 |
Roof laid |
-
latitude : 22.339758086018264,22.339740400202572
Longitude : 88.32822438329458,88.32821960560977
file name : Image_02062022144318909.png
|
2022-06-02 14:43:18.982927 |
107 |
39008188 |
New Construction of concrete road from h/o Monoranjan Khanra towards Danga of Sunil Das |
150919 |
New Construction of concrete road from h/o Monoranjan Khanra towards Danga of Sunil Das1 |
Completion of work |
-
latitude : 22.339753098785877,22.339748363010585
Longitude : 88.32821097224951,88.3282749261707
file name : Image_02062022144037326.png
|
2022-06-02 14:40:37.398665 |
108 |
39008188 |
New Construction of concrete road from h/o Monoranjan Khanra towards Danga of Sunil Das |
150919 |
New Construction of concrete road from h/o Monoranjan Khanra towards Danga of Sunil Das1 |
Plinth level |
-
latitude : 22.33973972965032,22.33975196722895
Longitude : 88.32819873467088,88.32819026894867
file name : Image_02062022144138492.png
|
2022-06-02 14:41:38.56708 |
109 |
39008188 |
New Construction of concrete road from h/o Monoranjan Khanra towards Danga of Sunil Das |
150919 |
New Construction of concrete road from h/o Monoranjan Khanra towards Danga of Sunil Das1 |
Completion of work |
-
latitude : 22.339762821793556,22.33976650983095
Longitude : 88.32820309326053,88.32819445990026
file name : Image_28122021150043336.png
|
2021-12-28 15:00:43.431039 |
110 |
45675836 |
U Construction of concrete road form house of Safrid Molla to house of Samsul Haque. |
146795 |
U Construction of concrete road form house of Safrid Molla to house of Samsul Haque.1 |
Roof laid |
-
latitude : 22.35128383152187,22.3512203
Longitude : 88.32446384243667,88.3246003
file name : Image_02062022142114060.png
|
2022-06-02 14:21:14.122882 |
111 |
45675836 |
U Construction of concrete road form house of Safrid Molla to house of Samsul Haque. |
146795 |
U Construction of concrete road form house of Safrid Molla to house of Samsul Haque.1 |
Plinth level |
-
latitude : 22.351253824308515,22.35129443462938
Longitude : 88.32446970976889,88.32441438920796
file name : Image_02062022141947247.png
|
2022-06-02 14:19:47.308312 |
112 |
45675836 |
U Construction of concrete road form house of Safrid Molla to house of Samsul Haque. |
146795 |
U Construction of concrete road form house of Safrid Molla to house of Samsul Haque.1 |
Completion of work |
-
latitude : 22.351331189274788,22.3513893596828
Longitude : 88.32447172142565,88.32445194013417
file name : Image_21032022153947682.png
|
2022-03-21 15:39:47.773362 |
113 |
45676595 |
U Construction of concrete road from danga of Amar Khatiyal to danga of Joydeb Bag. |
112075 |
U Construction of concrete road from danga of Amar Khatiyal to danga of Joydeb Bag.1 |
Roof laid |
-
latitude : 22.34834044240415,22.347123264335096
Longitude : 88.32723800092936,88.32313053309917
file name : Image_29092022124439295.png
|
2022-09-29 12:44:39.379208 |
114 |
45676595 |
U Construction of concrete road from danga of Amar Khatiyal to danga of Joydeb Bag. |
112075 |
U Construction of concrete road from danga of Amar Khatiyal to danga of Joydeb Bag.1 |
Plinth level |
-
latitude : 22.347239940427244,22.347225733101368
Longitude : 88.32298359833658,88.3230893779546
file name : Image_06092022134422903.png
|
2022-09-06 13:44:23.000936 |
115 |
45676595 |
U Construction of concrete road from danga of Amar Khatiyal to danga of Joydeb Bag. |
112075 |
U Construction of concrete road from danga of Amar Khatiyal to danga of Joydeb Bag.1 |
Completion of work |
-
latitude : 22.412821082398295,22.34724765177816
Longitude : 88.18553949706256,88.32308786921203
file name : Image_02082022125238213.png
|
2022-08-02 12:52:38.306266 |
116 |
45675660 |
U Construction of concrete road form main road to Habbir Sekh |
194652 |
U Construction of concrete road form main road to Habbir Sekh1 |
Roof laid |
-
latitude : 22.35273314639926,22.352795633487403
Longitude : 88.32613703794777,88.32612471655011
file name : Image_02062022141707266.png
|
2022-06-02 14:17:07.356718 |
117 |
45675660 |
U Construction of concrete road form main road to Habbir Sekh |
194652 |
U Construction of concrete road form main road to Habbir Sekh1 |
Plinth level |
-
latitude : 22.3518155,22.352760387584567
Longitude : 88.3265121,88.32609361968935
file name : Image_02062022141410109.png
|
2022-06-02 14:14:10.170261 |
118 |
45675660 |
U Construction of concrete road form main road to Habbir Sekh |
194652 |
U Construction of concrete road form main road to Habbir Sekh1 |
Completion of work |
-
latitude : 22.352790688164532,22.352790688164532
Longitude : 88.32611415535212,88.32611415535212
file name : Image_21032022153556696.png
|
2022-03-21 15:35:56.762654 |
119 |
45686334 |
T Instalation of water treatment plan at Bhandaria h/o Prakesh Khanra. |
273713 |
T Instalation of water treatment plan at Bhandaria h/o Prakesh Khanra.1 |
Roof laid |
-
latitude : 22.336067617870867
Longitude : 88.32821910269558
file name : Image_29092022135247764.png
|
2022-09-29 13:52:47.856099 |
120 |
45686334 |
T Instalation of water treatment plan at Bhandaria h/o Prakesh Khanra. |
273713 |
T Instalation of water treatment plan at Bhandaria h/o Prakesh Khanra.1 |
Plinth level |
-
latitude : 22.336021182127297
Longitude : 88.32823008298874
file name : Image_22092022131556984.png
|
2022-09-22 13:15:57.048385 |
121 |
45686334 |
T Instalation of water treatment plan at Bhandaria h/o Prakesh Khanra. |
273713 |
T Instalation of water treatment plan at Bhandaria h/o Prakesh Khanra.1 |
Completion of work |
-
latitude : 22.336065941490233
Longitude : 88.32817149348557
file name : Image_06092022141620284.png
|
2022-09-06 14:16:20.354827 |
122 |
64518606 |
U New Construction of Concrete road from Dakshin Gouripur h/o Lakshman Sardar to h/o Mathur Sardar. |
273056 |
U New Construction of Concrete road from Dakshin Gouripur h/o Lakshman Sardar to h/o Mathur Sardar.1 |
Roof laid |
-
latitude : 22.3481505,22.3481505
Longitude : 88.3273056,88.3273056
file name : Image_22092022130814850.png
|
2022-09-22 13:08:14.933299 |
123 |
64518606 |
U New Construction of Concrete road from Dakshin Gouripur h/o Lakshman Sardar to h/o Mathur Sardar. |
273056 |
U New Construction of Concrete road from Dakshin Gouripur h/o Lakshman Sardar to h/o Mathur Sardar.1 |
Plinth level |
-
latitude : 22.341976356692612,22.341968100517988
Longitude : 88.31308557651937,88.31310963258147
file name : Image_06092022141617259.png
|
2022-09-06 14:16:17.324889 |
124 |
64518606 |
U New Construction of Concrete road from Dakshin Gouripur h/o Lakshman Sardar to h/o Mathur Sardar. |
273056 |
U New Construction of Concrete road from Dakshin Gouripur h/o Lakshman Sardar to h/o Mathur Sardar.1 |
Completion of work |
-
latitude : 22.34192438889295,22.34195502474904
Longitude : 88.31310711801052,88.31313226372004
file name : Image_31082022152939677.png
|
2022-08-31 15:29:39.753326 |
125 |
64518963 |
U New construction of concrete road from Chamni h/o Mohan Mondal to danga of Kartick Mondal |
159895 |
U New construction of concrete road from Chamni h/o Mohan Mondal to danga of Kartick Mondal1 |
Roof laid |
-
latitude : 22.34958511311561,22.34958511311561
Longitude : 88.32072836346924,88.32072836346924
file name : Image_29092022124923720.png
|
2022-09-29 12:49:23.788245 |
126 |
64518963 |
U New construction of concrete road from Chamni h/o Mohan Mondal to danga of Kartick Mondal |
159895 |
U New construction of concrete road from Chamni h/o Mohan Mondal to danga of Kartick Mondal1 |
Plinth level |
-
latitude : 22.34970589634031,22.349696215242147
Longitude : 88.32076935097575,88.3207533415407
file name : Image_06092022141614145.png
|
2022-09-06 14:16:14.212029 |
127 |
64518963 |
U New construction of concrete road from Chamni h/o Mohan Mondal to danga of Kartick Mondal |
159895 |
U New construction of concrete road from Chamni h/o Mohan Mondal to danga of Kartick Mondal1 |
Completion of work |
-
latitude : 22.349658287130296,22.349658287130296
Longitude : 88.32073213532567,88.32073213532567
file name : Image_31082022153648976.png
|
2022-08-31 15:36:49.053967 |
128 |
39008627 |
Sinking of deep Tube well at Dakshin Gouripur |
202381 |
Sinking of deep Tube well at Dakshin Gouripur1 |
Roof laid |
-
latitude : 22.335913558490574
Longitude : 88.31238501705229
file name : Image_08092021124028781.png
|
2021-09-08 12:40:28.887596 |
129 |
39008627 |
Sinking of deep Tube well at Dakshin Gouripur |
202381 |
Sinking of deep Tube well at Dakshin Gouripur1 |
Plinth level |
-
latitude : 22.335899099707603
Longitude : 88.31236624158919
file name : Image_08092021123855670.png
|
2021-09-08 12:38:55.754615 |
130 |
39008627 |
Sinking of deep Tube well at Dakshin Gouripur |
202381 |
Sinking of deep Tube well at Dakshin Gouripur1 |
Completion of work |
-
latitude : 22.335894615389407
Longitude : 88.31235551275313
file name : Image_08092021123656073.png
|
2021-09-08 12:36:56.158383 |
131 |
56123497 |
U New Construction of concrete road form ho Abed Molla to ho Rahan molla |
43444 |
U New Construction of concrete road form ho Abed Molla to ho Rahan molla1 |
Completion of work |
-
latitude : 22.3481399,22.3481399,22.3481399
Longitude : 88.3272848,88.3272848,88.3272848
file name : Image_27092023162200491.png
|
2023-09-27 16:22:00.556407 |
132 |
56136671 |
Water Treatment plant at Kastekumari ICDS Center. |
286965 |
Water Treatment plant at Kastekumari ICDS Center.1 |
Roof laid |
-
latitude : 22.35464451368898,22.35464451368898,22.35464451368898
Longitude : 88.32845823839307,88.32845823839307,88.32845823839307
file name : Image_11042023135820309.png
|
2023-04-11 13:58:20.387392 |
133 |
56136671 |
Water Treatment plant at Kastekumari ICDS Center. |
286965 |
Water Treatment plant at Kastekumari ICDS Center.1 |
Plinth level |
-
latitude : 22.354745767079294,22.354745767079294,22.35472355503589
Longitude : 88.32845010794699,88.32845010794699,88.32849863916636
file name : Image_22022023144944397.png
|
2023-02-22 14:49:44.473925 |
134 |
56136671 |
Water Treatment plant at Kastekumari ICDS Center. |
286965 |
Water Treatment plant at Kastekumari ICDS Center.1 |
Completion of work |
-
latitude : 22.354668779298663,22.354668779298663,22.354665552265942
Longitude : 88.32851582206786,88.32851582206786,88.32850609906018
file name : Image_22022023144437423.png
|
2023-02-22 14:44:37.495067 |
135 |
56139285 |
Cons of Drain with cover slab from ho Ajit Naskar to the outlet point at Shyamal naskar jalashya |
349755 |
Cons of Drain with cover slab from ho Ajit Naskar to the outlet point at Shyamal naskar jalashya1 |
Roof laid |
-
latitude : 22.332777427509427,22.332777427509427,22.33274075668305
Longitude : 88.33592643029988,88.33592643029988,88.33600203506649
file name : Image_22032023142006637.png
|
2023-03-22 14:20:06.710195 |
136 |
56139285 |
Cons of Drain with cover slab from ho Ajit Naskar to the outlet point at Shyamal naskar jalashya |
349755 |
Cons of Drain with cover slab from ho Ajit Naskar to the outlet point at Shyamal naskar jalashya1 |
Plinth level |
-
latitude : 22.3327477555722,22.3327477555722
Longitude : 88.33591402508318,88.33591402508318
file name : Image_15032023172317288.png
|
2023-03-15 17:23:17.362283 |
137 |
56139285 |
Cons of Drain with cover slab from ho Ajit Naskar to the outlet point at Shyamal naskar jalashya |
349755 |
Cons of Drain with cover slab from ho Ajit Naskar to the outlet point at Shyamal naskar jalashya1 |
Completion of work |
-
latitude : 22.332741511054337,22.332741511054337
Longitude : 88.3359164558351,88.3359164558351
file name : Image_15032023172005916.png
|
2023-03-15 17:20:05.990863 |
138 |
56127191 |
U New Construction of concrete road from Main road to ho Gora Sardar |
78535 |
U New Construction of concrete road from Main road to ho Gora Sardar1 |
Roof laid |
-
latitude : 22.33397805131972,22.33397805131972
Longitude : 88.33157060667872,88.33157060667872
file name : Image_27022023140313594.png
|
2023-02-27 14:03:13.662636 |
139 |
56127191 |
U New Construction of concrete road from Main road to ho Gora Sardar |
78535 |
U New Construction of concrete road from Main road to ho Gora Sardar1 |
Plinth level |
-
latitude : 22.333936309441924,22.333936309441924
Longitude : 88.33161419257522,88.33161419257522
file name : Image_16022023132754112.png
|
2023-02-16 13:27:54.194309 |
140 |
56127191 |
U New Construction of concrete road from Main road to ho Gora Sardar |
78535 |
U New Construction of concrete road from Main road to ho Gora Sardar1 |
Completion of work |
-
latitude : 22.333990540355444,22.333990540355444
Longitude : 88.33159608766437,88.33159608766437
file name : Image_16022023125412956.png
|
2023-02-16 12:54:13.045727 |
141 |
56127107 |
U New Construction of concrete road from ho Gurupada Das to ho Kamal Dashmukh |
56438 |
U New Construction of concrete road from ho Gurupada Das to ho Kamal Dashmukh1 |
Roof laid |
-
latitude : 22.34095967374742,22.34095967374742
Longitude : 88.32657482475042,88.32657482475042
file name : Image_16022023130617282.png
|
2023-02-16 13:06:17.354555 |
142 |
56127107 |
U New Construction of concrete road from ho Gurupada Das to ho Kamal Dashmukh |
56438 |
U New Construction of concrete road from ho Gurupada Das to ho Kamal Dashmukh1 |
Completion of work |
-
latitude : 22.340965205803514,22.340965205803514
Longitude : 88.32657214254141,88.32657214254141
file name : Image_16022023124716453.png
|
2023-02-16 12:47:16.547874 |
143 |
56127107 |
U New Construction of concrete road from ho Gurupada Das to ho Kamal Dashmukh |
56438 |
U New Construction of concrete road from ho Gurupada Das to ho Kamal Dashmukh1 |
Plinth level |
-
latitude : 22.34096646308899,22.34096646308899
Longitude : 88.32660499960184,88.32660499960184
file name : Image_16022023124646144.png
|
2023-02-16 12:46:46.23219 |
144 |
56127107 |
U New Construction of concrete road from ho Gurupada Das to ho Kamal Dashmukh |
56438 |
U New Construction of concrete road from ho Gurupada Das to ho Kamal Dashmukh1 |
Completion of work |
-
latitude : 22.340965205803514,22.340965205803514
Longitude : 88.32657214254141,88.32657214254141
file name : Image_16022023124438061.png
|
2023-02-16 12:44:38.146774 |
145 |
56128199 |
U New Construction of concrete road from ho Madan Choudhury to ho Gour Choudhury |
80041 |
U New Construction of concrete road from ho Madan Choudhury to ho Gour Choudhury1 |
Roof laid |
-
latitude : 22.3405236,22.340087830089033,22.340094661340117
Longitude : 88.3149713,88.3152982313186,88.31526663154364
file name : Image_21022023134414394.png
|
2023-02-21 13:44:14.474714 |
146 |
56128199 |
U New Construction of concrete road from ho Madan Choudhury to ho Gour Choudhury |
80041 |
U New Construction of concrete road from ho Madan Choudhury to ho Gour Choudhury1 |
Plinth level |
-
latitude : 22.340132924728096,22.340132924728096,22.340132924728096,22.340132924728096
Longitude : 88.3152118138969,88.3152118138969,88.3152118138969,88.3152118138969
file name : Image_20022023145125307.png
|
2023-02-20 14:51:25.375618 |
147 |
56128199 |
U New Construction of concrete road from ho Madan Choudhury to ho Gour Choudhury |
80041 |
U New Construction of concrete road from ho Madan Choudhury to ho Gour Choudhury1 |
Roof laid |
-
latitude : 22.340182294137776,22.340182294137776,22.340182294137776
Longitude : 88.31524534150958,88.31524534150958,88.31524534150958
file name : Image_20022023145304884.png
|
2023-02-20 14:53:04.974739 |
148 |
56125054 |
U New Construction of concrete road from Chamni ho Arati Sardar to ho Bhaben Mondal |
77215 |
U New Construction of concrete road from Chamni ho Arati Sardar to ho Bhaben Mondal1 |
Completion of work |
-
latitude : 22.3476563,22.34747853130102
Longitude : 88.3204384,88.32122675143182
file name : Image_20022023141225715.png
|
2023-02-20 14:12:25.780957 |
149 |
56127362 |
U Construction of concrete Road form Jori dokan of Sahansha Khan to ho saidul Khan |
186254 |
U Construction of concrete Road form Jori dokan of Sahansha Khan to ho saidul Khan1 |
Roof laid |
-
latitude : 22.333589172922075,22.333589172922075
Longitude : 88.33457769826055,88.33457769826055
file name : Image_01032023125443660.png
|
2023-03-01 12:54:43.728635 |
150 |
56127362 |
U Construction of concrete Road form Jori dokan of Sahansha Khan to ho saidul Khan |
186254 |
U Construction of concrete Road form Jori dokan of Sahansha Khan to ho saidul Khan1 |
Plinth level |
-
latitude : 22.333129844628274,22.333129844628274
Longitude : 88.33455657586455,88.33455657586455
file name : Image_27022023121111588.png
|
2023-02-27 12:11:11.660733 |
151 |
56127362 |
U Construction of concrete Road form Jori dokan of Sahansha Khan to ho saidul Khan |
186254 |
U Construction of concrete Road form Jori dokan of Sahansha Khan to ho saidul Khan1 |
Completion of work |
-
latitude : 22.333301212638617,22.333301212638617
Longitude : 88.33451852202415,88.33451852202415
file name : Image_27022023120551393.png
|
2023-02-27 12:05:51.467179 |
152 |
56126862 |
U New Construction of concrete road from ho Amar Khatiyal to ho Khokan Khatiyal |
102368 |
U New Construction of concrete road from ho Amar Khatiyal to ho Khokan Khatiyal1 |
Roof laid |
-
latitude : 22.347815316170454,22.347815316170454
Longitude : 88.32267455756664,88.32267455756664
file name : Image_01032023124558773.png
|
2023-03-01 12:45:58.847685 |
153 |
56126862 |
U New Construction of concrete road from ho Amar Khatiyal to ho Khokan Khatiyal |
102368 |
U New Construction of concrete road from ho Amar Khatiyal to ho Khokan Khatiyal1 |
Plinth level |
-
latitude : 22.34776033088565,22.34776033088565
Longitude : 88.32269123755395,88.32269123755395
file name : Image_27022023115155237.png
|
2023-02-27 11:51:55.315516 |
154 |
56126862 |
U New Construction of concrete road from ho Amar Khatiyal to ho Khokan Khatiyal |
102368 |
U New Construction of concrete road from ho Amar Khatiyal to ho Khokan Khatiyal1 |
Completion of work |
-
latitude : 22.347287,22.347287
Longitude : 88.3207421,88.3207421
file name : Image_27022023114818871.png
|
2023-02-27 11:48:18.948969 |
155 |
56125176 |
U New Construction of concrete road from Kastekumari ho Jalil Molla to kastekumari ICDS |
82782 |
U New Construction of concrete road from Kastekumari ho Jalil Molla to kastekumari ICDS1 |
Roof laid |
-
latitude : 22.35587359406054,22.35587359406054
Longitude : 88.33035514689982,88.33035514689982
file name : Image_15032023165708484.png
|
2023-03-15 16:57:08.570261 |
156 |
56125176 |
U New Construction of concrete road from Kastekumari ho Jalil Molla to kastekumari ICDS |
82782 |
U New Construction of concrete road from Kastekumari ho Jalil Molla to kastekumari ICDS1 |
Plinth level |
-
latitude : 22.355872546322644,22.355872546322644
Longitude : 88.33034450188279,88.33034450188279
file name : Image_15032023165450557.png
|
2023-03-15 16:54:50.63324 |
157 |
56125176 |
U New Construction of concrete road from Kastekumari ho Jalil Molla to kastekumari ICDS |
82782 |
U New Construction of concrete road from Kastekumari ho Jalil Molla to kastekumari ICDS1 |
Completion of work |
-
latitude : 22.35586621798575,22.355908630415797
Longitude : 88.33036310970783,88.3303543087095
file name : Image_15032023165210103.png
|
2023-03-15 16:52:10.184035 |
158 |
45673370 |
U Construction of concrete Road form Baruipur main road h/o Gaffar Molla to h/o Nazmul Hossain |
178886 |
U Construction of concrete Road form Baruipur main road h/o Gaffar Molla to h/o Nazmul Hossain 1 |
Roof laid |
-
latitude : 22.363319154828787,22.363319154828787
Longitude : 88.32130646333098,88.32130646333098
file name : Image_22032023123724186.png
|
2023-03-22 12:37:24.267337 |
159 |
45673370 |
U Construction of concrete Road form Baruipur main road h/o Gaffar Molla to h/o Nazmul Hossain |
178886 |
U Construction of concrete Road form Baruipur main road h/o Gaffar Molla to h/o Nazmul Hossain 1 |
Plinth level |
-
latitude : 22.363325776532292,22.363325776532292
Longitude : 88.32122264429927,88.32122264429927
file name : Image_31052022132133696.png
|
2022-05-31 13:21:33.764185 |
160 |
45673370 |
U Construction of concrete Road form Baruipur main road h/o Gaffar Molla to h/o Nazmul Hossain |
178886 |
U Construction of concrete Road form Baruipur main road h/o Gaffar Molla to h/o Nazmul Hossain 1 |
Completion of work |
-
latitude : 22.36340988893062,22.36340988893062
Longitude : 88.32123907282948,88.32123907282948
file name : Image_28032022115648788.png
|
2022-03-28 11:56:48.874072 |
161 |
56125274 |
U New Construction of concrete road from Kastekumari ho Billal Molla to ho Anowar Mondal |
138644 |
U New Construction of concrete road from Kastekumari ho Billal Molla to ho Anowar Mondal1 |
Roof laid |
-
latitude : 22.353204460814595,22.353204460814595
Longitude : 88.32678319886327,88.32678319886327
file name : Image_22032023122818439.png
|
2023-03-22 12:28:18.506775 |
162 |
56125274 |
U New Construction of concrete road from Kastekumari ho Billal Molla to ho Anowar Mondal |
138644 |
U New Construction of concrete road from Kastekumari ho Billal Molla to ho Anowar Mondal1 |
Plinth level |
-
latitude : 22.35341677442193,22.35341677442193
Longitude : 88.32638371735811,88.32638371735811
file name : Image_22032023122601391.png
|
2023-03-22 12:26:01.461478 |
163 |
56125274 |
U New Construction of concrete road from Kastekumari ho Billal Molla to ho Anowar Mondal |
138644 |
U New Construction of concrete road from Kastekumari ho Billal Molla to ho Anowar Mondal1 |
Completion of work |
-
latitude : 22.35144,22.353359651751816
Longitude : 88.3262084,88.32661480642855
file name : Image_01032023123543445.png
|
2023-03-01 12:35:43.518837 |
164 |
56136808 |
Water Treatment plant at near house of Bhandaria Sekh para. |
286965 |
Water Treatment plant at near house of Bhandaria Sekh para.1 |
Plinth level |
-
latitude : 22.348469817079604,22.34846650622785
Longitude : 88.32480976358056,88.32479023374617
file name : Image_24032023121835587.png
|
2023-03-24 12:18:35.668316 |
165 |
56136808 |
Water Treatment plant at near house of Bhandaria Sekh para. |
286965 |
Water Treatment plant at near house of Bhandaria Sekh para.1 |
Completion of work |
-
latitude : 22.3487035,22.3461571
Longitude : 88.3245202,88.3195272
file name : Image_24032023121006421.png
|
2023-03-24 12:10:06.529868 |
166 |
56139215 |
Cons of Drain with cover slab from house of Gouri Khanra to danga of Madhai Bag which outlet point |
284302 |
Cons of Drain with cover slab from house of Gouri Khanra to danga of Madhai Bag which outlet point 1 |
Roof laid |
-
latitude : 22.341534798033535,22.341538066975772
Longitude : 88.32730698399246,88.3273187186569
file name : Image_02052023140459537.png
|
2023-05-02 14:04:59.629862 |
167 |
56139215 |
Cons of Drain with cover slab from house of Gouri Khanra to danga of Madhai Bag which outlet point |
284302 |
Cons of Drain with cover slab from house of Gouri Khanra to danga of Madhai Bag which outlet point 1 |
Plinth level |
-
latitude : 22.341211759485304,22.341420091688633
Longitude : 88.327282005921,88.32732726819813
file name : Image_24032023123847773.png
|
2023-03-24 12:38:47.871985 |
168 |
56139215 |
Cons of Drain with cover slab from house of Gouri Khanra to danga of Madhai Bag which outlet point |
284302 |
Cons of Drain with cover slab from house of Gouri Khanra to danga of Madhai Bag which outlet point 1 |
Completion of work |
-
latitude : 22.341159875504673,22.341446997597814
Longitude : 88.3272550161928,88.32732550799847
file name : Image_24032023123225231.png
|
2023-03-24 12:32:25.369832 |
169 |
45690902 |
T Construction of Drain from Sitala Mondir to danga of Madhai Bag. |
1084539 |
T Construction of Drain from Sitala Mondir to danga of Madhai Bag.1 |
Roof laid |
-
latitude : 22.34028627164662,22.340244655497372
Longitude : 88.32679065875709,88.32670935429633
file name : Image_02052023140720825.png
|
2023-05-02 14:07:20.938067 |
170 |
45690902 |
T Construction of Drain from Sitala Mondir to danga of Madhai Bag. |
1084539 |
T Construction of Drain from Sitala Mondir to danga of Madhai Bag.1 |
Completion of work |
-
latitude : 22.340115951374173,22.340089757926762
Longitude : 88.32675813697278,88.3262753393501
file name : Image_02082022134019348.png
|
2022-08-02 13:40:19.417533 |
171 |
45678391 |
U Construction of concrete road from Bijoyrampur Primary School to h/o Ashok Banarjee. |
295203 |
U Construction of concrete road from Bijoyrampur Primary School to h/o Ashok Banarjee. 1 |
Roof laid |
-
latitude : 22.337492583319545,22.337492583319545
Longitude : 88.31389719620347,88.31389719620347
file name : Image_02082022130808871.png
|
2022-08-02 13:08:08.933718 |
172 |
45678391 |
U Construction of concrete road from Bijoyrampur Primary School to h/o Ashok Banarjee. |
295203 |
U Construction of concrete road from Bijoyrampur Primary School to h/o Ashok Banarjee. 1 |
Plinth level |
-
latitude : 22.337479423731565,22.337486129254103
Longitude : 88.31388537772,88.3138851262629
file name : Image_02082022130122017.png
|
2022-08-02 13:01:22.098035 |
173 |
45678391 |
U Construction of concrete road from Bijoyrampur Primary School to h/o Ashok Banarjee. |
295203 |
U Construction of concrete road from Bijoyrampur Primary School to h/o Ashok Banarjee. 1 |
Completion of work |
-
latitude : 22.337540527805686,22.337532858364284
Longitude : 88.31387490034103,88.31390708684921
file name : Image_21032022155640275.png
|
2022-03-21 15:56:40.379694 |
174 |
45684493 |
T Instalation of water treatment plan at Chamni Ghosto tala |
275526 |
T Instalation of water treatment plan at Chamni Ghosto tala1 |
Roof laid |
-
latitude : 22.346128039062023
Longitude : 88.32067748531699
file name : Image_02062022142712387.png
|
2022-06-02 14:27:12.45234 |
175 |
45684493 |
T Instalation of water treatment plan at Chamni Ghosto tala |
275526 |
T Instalation of water treatment plan at Chamni Ghosto tala1 |
Plinth level |
-
latitude : 22.346183569170535
Longitude : 88.32068637013435
file name : Image_19042022173814721.png
|
2022-04-19 17:38:14.765294 |
176 |
45684493 |
T Instalation of water treatment plan at Chamni Ghosto tala |
275526 |
T Instalation of water treatment plan at Chamni Ghosto tala1 |
Completion of work |
-
latitude : 22.3460288
Longitude : 88.3202457
file name : Image_21032022154608082.png
|
2022-03-21 15:46:08.151479 |
177 |
54420434 |
Supplying & Instalation of 40 KVA 3P Koel Green Silent D. G. Generator at G.P. Office |
496000 |
Supplying & Instalation of 40 KVA 3P Koel Green Silent D. G. Generator at G.P. Office1 |
Roof laid |
-
latitude : 22.3481266
Longitude : 88.3271819
file name : Image_16082022162119586.png
|
2022-08-16 16:21:19.637575 |
178 |
56136695 |
Water Treatment plant at Kastekumari Gosta Tala. |
286965 |
Water Treatment plant at Kastekumari Gosta Tala.1 |
Plinth level |
-
latitude : 22.346545583568513,22.346639879979193
Longitude : 88.31833784468472,88.31833180971444
file name : Image_11042023133725521.png
|
2023-04-11 13:37:25.616762 |
179 |
56136695 |
Water Treatment plant at Kastekumari Gosta Tala. |
286965 |
Water Treatment plant at Kastekumari Gosta Tala.1 |
Roof laid |
-
latitude : 22.346725123934448,22.346725123934448,22.346725123934448
Longitude : 88.31840959377587,88.31840959377587,88.31840959377587
file name : Image_11042023134422040.png
|
2023-04-11 13:44:22.136002 |
180 |
56136695 |
Water Treatment plant at Kastekumari Gosta Tala. |
286965 |
Water Treatment plant at Kastekumari Gosta Tala.1 |
Completion of work |
-
latitude : 22.34681837260723,22.34681837260723,22.34681837260723
Longitude : 88.3183629065752,88.3183629065752,88.3183629065752
file name : Image_22022023143851980.png
|
2023-02-22 14:38:52.078387 |
181 |
56136825 |
Water Treatment plant at near house of Nikhal Das. |
286965 |
Water Treatment plant at near house of Nikhal Das.1 |
Plinth level |
-
latitude : 22.34121079556644,22.34121079556644
Longitude : 88.32509625703096,88.32509625703096
file name : Image_22032023120811256.png
|
2023-03-22 12:08:11.324502 |
182 |
56136825 |
Water Treatment plant at near house of Nikhal Das. |
286965 |
Water Treatment plant at near house of Nikhal Das.1 |
Completion of work |
-
latitude : 22.34123497735709,22.34123497735709
Longitude : 88.32518393173814,88.32518393173814
file name : Image_22032023120602568.png
|
2023-03-22 12:06:02.643265 |
183 |
56136902 |
Water Treatment plant at Hazra para near h/o Ranjit Hazra |
286965 |
Water Treatment plant at Hazra para near h/o Ranjit Hazra1 |
Completion of work |
-
latitude : 22.348375311121345,22.348373760469258,22.348373760469258
Longitude : 88.31367541104555,88.31367256119847,88.31367256119847
file name : Image_09082023141715249.png
|
2023-08-09 14:17:17.221199 |
184 |
56136758 |
Water Treatment plant at near house of Tamijuddin Mir. |
286965 |
Water Treatment plant at near house of Tamijuddin Mir.1 |
Completion of work |
-
latitude : 22.351209819316864,22.351209819316864,22.35118567943573
Longitude : 88.32740689627826,88.32740689627826,88.32743195816875
file name : Image_09082023143430507.png
|
2023-08-09 14:34:30.590955 |
185 |
68628041 |
New Construction of cc road from PWD main road to h/o Panab Naskar. |
60186 |
New Construction of cc road from PWD main road to h/o Panab Naskar.1 |
Plinth level |
-
latitude : 22.332816990092397,22.332816990092397,22.332816990092397
Longitude : 88.33568796515465,88.33568796515465,88.33568796515465
file name : Image_24052023140637437.png
|
2023-05-24 14:06:37.514521 |
186 |
68628041 |
New Construction of cc road from PWD main road to h/o Panab Naskar. |
60186 |
New Construction of cc road from PWD main road to h/o Panab Naskar.1 |
Completion of work |
-
latitude : 22.333352635614574,22.333316425792873
Longitude : 88.33387772552669,88.33396850153804
file name : Image_24052023135834284.png
|
2023-05-24 13:58:34.358483 |
187 |
56127288 |
U New Construction of concrete road from ho Amar Manna to ho Paban manna |
75816 |
U New Construction of concrete road from ho Amar Manna to ho Paban manna1 |
Roof laid |
-
latitude : 22.3482346,22.3482346
Longitude : 88.3272497,88.3272497
file name : Image_30052023162512443.png
|
2023-05-30 16:25:12.514326 |
188 |
56127288 |
U New Construction of concrete road from ho Amar Manna to ho Paban manna |
75816 |
U New Construction of concrete road from ho Amar Manna to ho Paban manna1 |
Plinth level |
-
latitude : 22.3482383,22.3482383
Longitude : 88.327249,88.327249
file name : Image_30052023162004091.png
|
2023-05-30 16:20:04.198142 |
189 |
56127288 |
U New Construction of concrete road from ho Amar Manna to ho Paban manna |
75816 |
U New Construction of concrete road from ho Amar Manna to ho Paban manna1 |
Completion of work |
-
latitude : 22.3482314,22.3482314
Longitude : 88.3272499,88.3272499
file name : Image_30052023161447717.png
|
2023-05-30 16:14:47.789609 |
190 |
56126720 |
U New Construction of concrete road form Uchhakhali road to ho Rafikul |
206038 |
U New Construction of concrete road form Uchhakhali road to ho Rafikul1 |
Plinth level |
-
latitude : 22.34627526719123,22.34627526719123,22.34627526719123
Longitude : 88.32151358015835,88.32151358015835,88.32151358015835
file name : Image_09082023143153307.png
|
2023-08-09 14:31:53.387396 |
191 |
56126720 |
U New Construction of concrete road form Uchhakhali road to ho Rafikul |
206038 |
U New Construction of concrete road form Uchhakhali road to ho Rafikul1 |
Completion of work |
-
latitude : 22.3476594,22.3476594,22.348298029974103
Longitude : 88.3207421,88.3207421,88.32316607236862
file name : Image_24052023132002568.png
|
2023-05-24 13:20:02.699496 |
192 |
56126954 |
U New Construction of concrete road from ho Apsar Sekh to ho Farida Bibi |
68050 |
U New Construction of concrete road from ho Apsar Sekh to ho Farida Bibi1 |
Roof laid |
-
latitude : 22.3482263,22.3482263
Longitude : 88.3272515,88.3272515
file name : Image_06062023153704086.png
|
2023-06-06 15:37:04.159468 |
193 |
56126954 |
U New Construction of concrete road from ho Apsar Sekh to ho Farida Bibi |
68050 |
U New Construction of concrete road from ho Apsar Sekh to ho Farida Bibi1 |
Plinth level |
-
latitude : 22.3482257,22.3482257
Longitude : 88.3272479,88.3272479
file name : Image_06062023153516565.png
|
2023-06-06 15:35:16.639223 |
194 |
56126954 |
U New Construction of concrete road from ho Apsar Sekh to ho Farida Bibi |
68050 |
U New Construction of concrete road from ho Apsar Sekh to ho Farida Bibi1 |
Completion of work |
-
latitude : 22.3482307,22.3482307
Longitude : 88.327249,88.327249
file name : Image_06062023153211439.png
|
2023-06-06 15:32:11.510522 |
195 |
56126593 |
U New Construction of concrete road form ho sahida Bibi to danga of Adambari Molla |
120173 |
U New Construction of concrete road form ho sahida Bibi to danga of Adambari Molla1 |
Roof laid |
-
latitude : 22.3482461,22.3482461
Longitude : 88.327244,88.327244
file name : Image_06062023154951101.png
|
2023-06-06 15:49:51.171729 |
196 |
56126593 |
U New Construction of concrete road form ho sahida Bibi to danga of Adambari Molla |
120173 |
U New Construction of concrete road form ho sahida Bibi to danga of Adambari Molla1 |
Plinth level |
-
latitude : 22.3482421,22.3482141
Longitude : 88.3272459,88.3272515
file name : Image_06062023154658184.png
|
2023-06-06 15:46:58.253669 |
197 |
56126593 |
U New Construction of concrete road form ho sahida Bibi to danga of Adambari Molla |
120173 |
U New Construction of concrete road form ho sahida Bibi to danga of Adambari Molla1 |
Plinth level |
-
latitude : 22.348244,22.348244
Longitude : 88.327247,88.327247
file name : Image_05062023153631630.png
|
2023-06-05 15:36:31.72998 |
198 |
56126593 |
U New Construction of concrete road form ho sahida Bibi to danga of Adambari Molla |
120173 |
U New Construction of concrete road form ho sahida Bibi to danga of Adambari Molla1 |
Completion of work |
-
latitude : 22.353618275374174,22.353618275374174
Longitude : 88.32563219591975,88.32563219591975
file name : Image_01032023123806252.png
|
2023-03-01 12:38:06.331515 |
199 |
68627408 |
New Construction of Concrete road from Chamni Naskarpara Masjidtala to house of Barjahan sk |
110115 |
New Construction of Concrete road from Chamni Naskarpara Masjidtala to house of Barjahan sk1 |
Roof laid |
-
latitude : 22.3482455,22.3482455
Longitude : 88.3272454,88.3272454
file name : Image_06062023155529113.png
|
2023-06-06 15:55:29.182189 |
200 |
68627408 |
New Construction of Concrete road from Chamni Naskarpara Masjidtala to house of Barjahan sk |
110115 |
New Construction of Concrete road from Chamni Naskarpara Masjidtala to house of Barjahan sk1 |
Plinth level |
-
latitude : 22.3482443,22.3482443
Longitude : 88.3272441,88.3272441
file name : Image_06062023155259358.png
|
2023-06-06 15:52:59.433835 |
201 |
68627408 |
New Construction of Concrete road from Chamni Naskarpara Masjidtala to house of Barjahan sk |
110115 |
New Construction of Concrete road from Chamni Naskarpara Masjidtala to house of Barjahan sk1 |
Completion of work |
-
latitude : 22.3482395,22.3482395
Longitude : 88.3272464,88.3272464
file name : Image_05062023144613448.png
|
2023-06-05 14:46:13.534695 |
202 |
45675468 |
U Construction of concrete Road form Dokan of Sariful to kabarsthan of Saiyed Molla |
87243 |
U Construction of concrete Road form Dokan of Sariful to kabarsthan of Saiyed Molla1 |
Roof laid |
-
latitude : 22.355557554401457,22.355571
Longitude : 88.32944663241506,88.3295486
file name : Image_09092022115616716.png
|
2022-09-09 11:56:16.793371 |
203 |
45675468 |
U Construction of concrete Road form Dokan of Sariful to kabarsthan of Saiyed Molla |
87243 |
U Construction of concrete Road form Dokan of Sariful to kabarsthan of Saiyed Molla1 |
Completion of work |
-
latitude : 22.355527337640524,22.355560990981758
Longitude : 88.32959298044443,88.32958820275962
file name : Image_31082022154903686.png
|
2022-08-31 15:49:03.774221 |
204 |
45677083 |
U Construction of concrete road from h/o Jumman Sekh to h/o Iddrish Sekh. |
50272 |
U Construction of concrete road from h/o Jumman Sekh to h/o Iddrish Sekh.1 |
Roof laid |
-
latitude : 22.346218479797244,22.346218479797244,22.346218479797244
Longitude : 88.32969255745411,88.32969255745411,88.32969255745411
file name : Image_09092022120851602.png
|
2022-09-09 12:08:51.656977 |
205 |
45677083 |
U Construction of concrete road from h/o Jumman Sekh to h/o Iddrish Sekh. |
50272 |
U Construction of concrete road from h/o Jumman Sekh to h/o Iddrish Sekh.1 |
Plinth level |
-
latitude : 22.34808043576777,22.348063294775784
Longitude : 88.32690306007862,88.32689509727061
file name : Image_09092022120552903.png
|
2022-09-09 12:05:52.955384 |
206 |
45677083 |
U Construction of concrete road from h/o Jumman Sekh to h/o Iddrish Sekh. |
50272 |
U Construction of concrete road from h/o Jumman Sekh to h/o Iddrish Sekh.1 |
Completion of work |
-
latitude : 22.346209553070366,22.346209553070366
Longitude : 88.32968995906413,88.32968995906413
file name : Image_31082022151313173.png
|
2022-08-31 15:13:13.22554 |
207 |
56126423 |
U New Construction of concrete road form ho Eyahiya Sekh to ho Mottaja Sekh |
210432 |
U New Construction of concrete road form ho Eyahiya Sekh to ho Mottaja Sekh1 |
Roof laid |
-
latitude : 22.35181386116892,22.35186800826341
Longitude : 88.32650466822088,88.32645923830569
file name : Image_25072023111010972.png
|
2023-07-25 11:10:11.065117 |
208 |
56126423 |
U New Construction of concrete road form ho Eyahiya Sekh to ho Mottaja Sekh |
210432 |
U New Construction of concrete road form ho Eyahiya Sekh to ho Mottaja Sekh1 |
Plinth level |
-
latitude : 22.351828403770924,22.35184927470982
Longitude : 88.32647298462689,88.32648161798716
file name : Image_25072023110742880.png
|
2023-07-25 11:07:42.961467 |
209 |
56126423 |
U New Construction of concrete road form ho Eyahiya Sekh to ho Mottaja Sekh |
210432 |
U New Construction of concrete road form ho Eyahiya Sekh to ho Mottaja Sekh1 |
Completion of work |
-
latitude : 22.35189076513052,22.3519073612988
Longitude : 88.32633200101554,88.32632118836045
file name : Image_25072023110300325.png
|
2023-07-25 11:03:00.398411 |
210 |
45672625 |
U Construction of concrete road form h/o Illish Sekh to h/o Abu Sekh |
129220 |
U Construction of concrete road form h/o Illish Sekh to h/o Abu Sekh1 |
Roof laid |
-
latitude : 22.3628447,22.3628447
Longitude : 88.3199979,88.3199979
file name : Image_31052022131127414.png
|
2022-05-31 13:11:27.475062 |
211 |
45672625 |
U Construction of concrete road form h/o Illish Sekh to h/o Abu Sekh |
129220 |
U Construction of concrete road form h/o Illish Sekh to h/o Abu Sekh1 |
Plinth level |
-
latitude : 22.3628417,22.36304200720042
Longitude : 88.320001,88.31994222477078
file name : Image_31052022130845441.png
|
2022-05-31 13:08:45.504466 |
212 |
45672625 |
U Construction of concrete road form h/o Illish Sekh to h/o Abu Sekh |
129220 |
U Construction of concrete road form h/o Illish Sekh to h/o Abu Sekh1 |
Completion of work |
-
latitude : 22.362077124416828,22.362077124416828
Longitude : 88.31989461556077,88.31989461556077
file name : Image_28032022120033704.png
|
2022-03-28 12:00:33.776379 |
213 |
68626966 |
New Construction of cc road from house of Gopal Mondal to house of Prabir Mondal |
239631 |
New Construction of cc road from house of Gopal Mondal to house of Prabir Mondal1 |
Roof laid |
-
latitude : 22.34816,22.34816,22.34816
Longitude : 88.327296,88.327296,88.327296
file name : Image_31072023140709598.png
|
2023-07-31 14:07:09.661693 |
214 |
68626966 |
New Construction of cc road from house of Gopal Mondal to house of Prabir Mondal |
239631 |
New Construction of cc road from house of Gopal Mondal to house of Prabir Mondal1 |
Plinth level |
-
latitude : 22.3481397,22.3481397,22.3481397
Longitude : 88.3273038,88.3273038,88.3273038
file name : Image_31072023140352278.png
|
2023-07-31 14:03:52.352293 |
215 |
68626966 |
New Construction of cc road from house of Gopal Mondal to house of Prabir Mondal |
239631 |
New Construction of cc road from house of Gopal Mondal to house of Prabir Mondal1 |
Completion of work |
-
latitude : 22.3482403,22.3482403
Longitude : 88.3272457,88.3272457
file name : Image_06062023160911147.png
|
2023-06-06 16:09:11.236635 |
216 |
68626966 |
New Construction of cc road from house of Gopal Mondal to house of Prabir Mondal |
239631 |
New Construction of cc road from house of Gopal Mondal to house of Prabir Mondal1 |
Completion of work |
-
latitude : 22.350997338071465,22.351022819057107
Longitude : 88.31108523532748,88.31103628501296
file name : Image_24052023132741134.png
|
2023-05-24 13:27:41.217526 |
217 |
45670585 |
U Construction of concrete road form Baruipur more h/o Aktiyar uddin to h/o Rahim Khan |
113875 |
U Construction of concrete road form Baruipur more h/o Aktiyar uddin to h/o Rahim Khan 1 |
Roof laid |
-
latitude : 22.36507390625775,22.365073612891138
Longitude : 88.31893254071474,88.31893262453377
file name : Image_31052022131809474.png
|
2022-05-31 13:18:09.534791 |
218 |
45670585 |
U Construction of concrete road form Baruipur more h/o Aktiyar uddin to h/o Rahim Khan |
113875 |
U Construction of concrete road form Baruipur more h/o Aktiyar uddin to h/o Rahim Khan 1 |
Plinth level |
-
latitude : 22.365063512697816,22.365063512697816
Longitude : 88.31896196119487,88.31896196119487
file name : Image_31052022131420108.png
|
2022-05-31 13:14:20.167144 |
219 |
45670585 |
U Construction of concrete road form Baruipur more h/o Aktiyar uddin to h/o Rahim Khan |
113875 |
U Construction of concrete road form Baruipur more h/o Aktiyar uddin to h/o Rahim Khan 1 |
Completion of work |
-
latitude : 22.36507855821401,22.36507855821401
Longitude : 88.31893991678953,88.31893991678953
file name : Image_28032022120344875.png
|
2022-03-28 12:03:44.947746 |
220 |
54032104 |
New Construction of cc road from Bahadurpur Masjid tala to tea shop of Gopa |
126458 |
New Construction of cc road from Bahadurpur Masjid tala to tea shop of Gopa1 |
Roof laid |
-
latitude : 22.333140866830945,22.333140866830945
Longitude : 88.32017121836543,88.32017121836543
file name : Image_16022022122051486.png
|
2022-02-16 12:20:51.549575 |
221 |
54032104 |
New Construction of cc road from Bahadurpur Masjid tala to tea shop of Gopa |
126458 |
New Construction of cc road from Bahadurpur Masjid tala to tea shop of Gopa1 |
Plinth level |
-
latitude : 22.3335039,22.3335039
Longitude : 88.3204384,88.3204384
file name : Image_16022022121923175.png
|
2022-02-16 12:19:23.238859 |
222 |
54032104 |
New Construction of cc road from Bahadurpur Masjid tala to tea shop of Gopa |
126458 |
New Construction of cc road from Bahadurpur Masjid tala to tea shop of Gopa1 |
Completion of work |
-
latitude : 22.333090407773852,22.333109811879694
Longitude : 88.32022025249898,88.32027582451701
file name : Image_16022022121649576.png
|
2022-02-16 12:16:49.637472 |
223 |
54030819 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF SWAPAN BISWAS TO HOUSE OF PRATAP BISWAS |
77890 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF SWAPAN BISWAS TO HOUSE OF PRATAP BISWAS1 |
Roof laid |
-
latitude : 22.340968223288655,22.340968223288655
Longitude : 88.32282953895628,88.32282953895628
file name : Image_21012022115906162.png
|
2022-01-21 11:59:06.251416 |
224 |
54030819 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF SWAPAN BISWAS TO HOUSE OF PRATAP BISWAS |
77890 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF SWAPAN BISWAS TO HOUSE OF PRATAP BISWAS1 |
Plinth level |
-
latitude : 22.34096403233707,22.34096403233707
Longitude : 88.32282819785178,88.32282819785178
file name : Image_21012022115742189.png
|
2022-01-21 11:57:42.275674 |
225 |
54030819 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF SWAPAN BISWAS TO HOUSE OF PRATAP BISWAS |
77890 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF SWAPAN BISWAS TO HOUSE OF PRATAP BISWAS1 |
Completion of work |
-
latitude : 22.340938886627555,22.340938886627555
Longitude : 88.3228166308254,88.3228166308254
file name : Image_21012022115621213.png
|
2022-01-21 11:56:21.443865 |
226 |
54031938 |
new construction of cc road from house of Niranjan Das to hohse of Madan Das |
58752 |
new construction of cc road from house of Niranjan Das to hohse of Madan Das1 |
Plinth level |
-
latitude : 22.339808922261,22.339808922261
Longitude : 88.32815087400377,88.32815087400377
file name : Image_21012022114121893.png
|
2022-01-21 11:41:21.974991 |
227 |
54031938 |
new construction of cc road from house of Niranjan Das to hohse of Madan Das |
58752 |
new construction of cc road from house of Niranjan Das to hohse of Madan Das1 |
Roof laid |
-
latitude : 22.3398115625605,22.3398115625605
Longitude : 88.32816487178206,88.32816487178206
file name : Image_21012022114351532.png
|
2022-01-21 11:43:51.611829 |
228 |
54031938 |
new construction of cc road from house of Niranjan Das to hohse of Madan Das |
58752 |
new construction of cc road from house of Niranjan Das to hohse of Madan Das1 |
Completion of work |
-
latitude : 22.339870110154152,22.339870110154152
Longitude : 88.32812463864684,88.32812463864684
file name : Image_21012022113853028.png
|
2022-01-21 11:38:53.104621 |
229 |
45675251 |
U Construction of concrete road from Kastekumari dokan of Mehabub Sekh to h/o Bechu Sekh |
136162 |
U Construction of concrete road from Kastekumari dokan of Mehabub Sekh to h/o Bechu Sekh1 |
Roof laid |
-
latitude : 22.35397312324494,22.35397312324494
Longitude : 88.32724730484188,88.32724730484188
file name : Image_28072022130902838.png
|
2022-07-28 13:09:02.911832 |
230 |
45675251 |
U Construction of concrete road from Kastekumari dokan of Mehabub Sekh to h/o Bechu Sekh |
136162 |
U Construction of concrete road from Kastekumari dokan of Mehabub Sekh to h/o Bechu Sekh1 |
Plinth level |
-
latitude : 22.354008494876325,22.354008494876325
Longitude : 88.3272203989327,88.3272203989327
file name : Image_28072022130718217.png
|
2022-07-28 13:07:18.282288 |
231 |
45675251 |
U Construction of concrete road from Kastekumari dokan of Mehabub Sekh to h/o Bechu Sekh |
136162 |
U Construction of concrete road from Kastekumari dokan of Mehabub Sekh to h/o Bechu Sekh1 |
Completion of work |
-
latitude : 22.35399122815579,22.35399122815579
Longitude : 88.32722953520715,88.32722953520715
file name : Image_28032022114005646.png
|
2022-03-28 11:40:05.728836 |
232 |
54031132 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF MADHAB KHANRA TO HOUSE OF KRISHNA KHANRA |
47858 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF MADHAB KHANRA TO HOUSE OF KRISHNA KHANRA1 |
Roof laid |
-
latitude : 22.340282332152128,22.340282332152128
Longitude : 88.32598373293877,88.32598373293877
file name : Image_21012022114923881.png
|
2022-01-21 11:49:23.972573 |
233 |
54031132 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF MADHAB KHANRA TO HOUSE OF KRISHNA KHANRA |
47858 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF MADHAB KHANRA TO HOUSE OF KRISHNA KHANRA1 |
Plinth level |
-
latitude : 22.340269843116403,22.340269843116403
Longitude : 88.32596772350371,88.32596772350371
file name : Image_21012022114802524.png
|
2022-01-21 11:48:02.609111 |
234 |
54031132 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF MADHAB KHANRA TO HOUSE OF KRISHNA KHANRA |
47858 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF MADHAB KHANRA TO HOUSE OF KRISHNA KHANRA1 |
Completion of work |
-
latitude : 22.340240883640945,22.340240883640945
Longitude : 88.32599303685129,88.32599303685129
file name : Image_21012022114612467.png
|
2022-01-21 11:46:12.557223 |
235 |
39006736 |
New Construction of concrete road from h/o Chamni Abbas Mollick towards h/o Ear ali Mollick |
79523 |
New Construction of concrete road from h/o Chamni Abbas Mollick towards h/o Ear ali Mollick1 |
Roof laid |
-
latitude : 22.346483934670687,22.346483934670687
Longitude : 88.3182212524116,88.3182212524116
file name : Image_16022022123328531.png
|
2022-02-16 12:33:28.597299 |
236 |
39006736 |
New Construction of concrete road from h/o Chamni Abbas Mollick towards h/o Ear ali Mollick |
79523 |
New Construction of concrete road from h/o Chamni Abbas Mollick towards h/o Ear ali Mollick1 |
Plinth level |
-
latitude : 22.34627195633948,22.34627761412412
Longitude : 88.31819359213114,88.3181990403682
file name : Image_16022022123201564.png
|
2022-02-16 12:32:01.640698 |
237 |
39006736 |
New Construction of concrete road from h/o Chamni Abbas Mollick towards h/o Ear ali Mollick |
79523 |
New Construction of concrete road from h/o Chamni Abbas Mollick towards h/o Ear ali Mollick1 |
Completion of work |
-
latitude : 22.346467254683375,22.346467254683375
Longitude : 88.31825201399624,88.31825201399624
file name : Image_21012022122617832.png
|
2022-01-21 12:26:17.910649 |
238 |
39006736 |
New Construction of concrete road from h/o Chamni Abbas Mollick towards h/o Ear ali Mollick |
79523 |
New Construction of concrete road from h/o Chamni Abbas Mollick towards h/o Ear ali Mollick1 |
Completion of work |
-
latitude : 22.346442150883377,22.346442150883377,22.346442150883377
Longitude : 88.31828872673213,88.31828872673213,88.31828872673213
file name : Image_08122021130314226.png
|
2021-12-08 13:03:14.2929 |
239 |
39008142 |
New Construction of concrete road from Jahangir Sk kol tala towards Danga Of Sahajan Sk |
73907 |
New Construction of concrete road from Jahangir Sk kol tala towards Danga Of Sahajan Sk1 |
Roof laid |
-
latitude : 22.3470113,22.3470113
Longitude : 88.3301559,88.3301559
file name : Image_21012022112235255.png
|
2022-01-21 11:22:35.317822 |
240 |
39008142 |
New Construction of concrete road from Jahangir Sk kol tala towards Danga Of Sahajan Sk |
73907 |
New Construction of concrete road from Jahangir Sk kol tala towards Danga Of Sahajan Sk1 |
Plinth level |
-
latitude : 22.3470144,22.3470144
Longitude : 88.3304596,88.3304596
file name : Image_21012022112112079.png
|
2022-01-21 11:21:12.142642 |
241 |
39008142 |
New Construction of concrete road from Jahangir Sk kol tala towards Danga Of Sahajan Sk |
73907 |
New Construction of concrete road from Jahangir Sk kol tala towards Danga Of Sahajan Sk1 |
Completion of work |
-
latitude : 22.346679526381195,22.346522323787212
Longitude : 88.33072336390615,88.33073141053319
file name : Image_21012022111804557.png
|
2022-01-21 11:18:04.62323 |
242 |
39008142 |
New Construction of concrete road from Jahangir Sk kol tala towards Danga Of Sahajan Sk |
73907 |
New Construction of concrete road from Jahangir Sk kol tala towards Danga Of Sahajan Sk1 |
Completion of work |
-
latitude : 22.34675584360957,22.346588373184204
Longitude : 88.33068740554154,88.3306442387402
file name : Image_19012022120321099.png
|
2022-01-19 12:03:21.159648 |
243 |
39008142 |
New Construction of concrete road from Jahangir Sk kol tala towards Danga Of Sahajan Sk |
73907 |
New Construction of concrete road from Jahangir Sk kol tala towards Danga Of Sahajan Sk1 |
Completion of work |
-
latitude : 22.3477717,22.3477717
Longitude : 88.3316741,88.3316741
file name : Image_08122021132838599.png
|
2021-12-08 13:28:38.679647 |
244 |
54030633 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF NUR ISLAM SK TO HOUSE OF HAKIM SK |
62561 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF NUR ISLAM SK TO HOUSE OF HAKIM SK1 |
Roof laid |
-
latitude : 22.346119,22.346119
Longitude : 88.3312356,88.3312356
file name : Image_21012022112759650.png
|
2022-01-21 11:27:59.717514 |
245 |
54030633 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF NUR ISLAM SK TO HOUSE OF HAKIM SK |
62561 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF NUR ISLAM SK TO HOUSE OF HAKIM SK1 |
Plinth level |
-
latitude : 22.3461196,22.3461196
Longitude : 88.3312416,88.3312416
file name : Image_21012022112615631.png
|
2022-01-21 11:26:15.697612 |
246 |
54030633 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF NUR ISLAM SK TO HOUSE OF HAKIM SK |
62561 |
NEW CONSTRUCTION OF CC ROAD FROM HOUSE OF NUR ISLAM SK TO HOUSE OF HAKIM SK1 |
Completion of work |
-
latitude : 22.346338843926787,22.346338843926787
Longitude : 88.331283275038,88.331283275038
file name : Image_21012022112428331.png
|
2022-01-21 11:24:28.400151 |
247 |
54029395 |
Repairing and Upgradation of cc road from shop of Tapan Das to house of Asgar Sk |
237269 |
Repairing and Upgradation of cc road from shop of Tapan Das to house of Asgar Sk1 |
Roof laid |
-
latitude : 22.362971431575716,22.362971431575716
Longitude : 88.32066918723285,88.32066918723285
file name : Image_28032022121110421.png
|
2022-03-28 12:11:10.479599 |
248 |
54029395 |
Repairing and Upgradation of cc road from shop of Tapan Das to house of Asgar Sk |
237269 |
Repairing and Upgradation of cc road from shop of Tapan Das to house of Asgar Sk1 |
Completion of work |
-
latitude : 22.36299314070493,22.3628286
Longitude : 88.32069114781916,88.3209012
file name : Image_28032022120621288.png
|
2022-03-28 12:06:21.355777 |
249 |
54029395 |
Repairing and Upgradation of cc road from shop of Tapan Das to house of Asgar Sk |
237269 |
Repairing and Upgradation of cc road from shop of Tapan Das to house of Asgar Sk1 |
Plinth level |
-
latitude : 22.362962253391743,22.362962253391743
Longitude : 88.32068058662117,88.32068058662117
file name : Image_28032022120858527.png
|
2022-03-28 12:08:58.592287 |
250 |
54029734 |
New construction of cc road from Baruipur Main Road to house of Maniktala Nur Hossin Sk |
158545 |
New construction of cc road from Baruipur Main Road to house of Maniktala Nur Hossin Sk1 |
Roof laid |
-
latitude : 22.3643808,22.3643808
Longitude : 88.3267517,88.3267517
file name : Image_28032022115347473.png
|
2022-03-28 11:53:47.548747 |
251 |
54029734 |
New construction of cc road from Baruipur Main Road to house of Maniktala Nur Hossin Sk |
158545 |
New construction of cc road from Baruipur Main Road to house of Maniktala Nur Hossin Sk1 |
Plinth level |
-
latitude : 22.364381,22.364381
Longitude : 88.3267512,88.3267512
file name : Image_28032022115205479.png
|
2022-03-28 11:52:05.552464 |
252 |
54029734 |
New construction of cc road from Baruipur Main Road to house of Maniktala Nur Hossin Sk |
158545 |
New construction of cc road from Baruipur Main Road to house of Maniktala Nur Hossin Sk1 |
Completion of work |
-
latitude : 22.364436252973974,22.364416387863457
Longitude : 88.32719290629029,88.32728074863553
file name : Image_28032022114840499.png
|
2022-03-28 11:48:40.708957 |
253 |
39008801 |
Sinking of deep Tube well at Kastekumari |
162937 |
Sinking of deep Tube well at Kastekumari1 |
Plinth level |
-
latitude : 22.354196291416883
Longitude : 88.32760621793568
file name : Image_28032022113459995.png
|
2022-03-28 11:35:00.068417 |
254 |
39008801 |
Sinking of deep Tube well at Kastekumari |
162937 |
Sinking of deep Tube well at Kastekumari1 |
Completion of work |
-
latitude : 22.352680801413953
Longitude : 88.32602011039853
file name : Image_22022021134837819.png
|
2021-02-22 13:48:37.907998 |
255 |
39006769 |
New Construction of concrete road from Chamni Ramesh Santra towards h/o Mithun Santra |
82789 |
New Construction of concrete road from Chamni Ramesh Santra towards h/o Mithun Santra 1 |
Plinth level |
-
latitude : 22.346191741526127,22.346191741526127
Longitude : 88.32176721654832,88.32176721654832
file name : Image_28072022125744358.png
|
2022-07-28 12:57:44.447736 |
256 |
39006769 |
New Construction of concrete road from Chamni Ramesh Santra towards h/o Mithun Santra |
82789 |
New Construction of concrete road from Chamni Ramesh Santra towards h/o Mithun Santra 1 |
Completion of work |
-
latitude : 22.346191741526127,22.346191741526127
Longitude : 88.32181599922478,88.32181599922478
file name : Image_28072022125306646.png
|
2022-07-28 12:53:06.747158 |
257 |
39006769 |
New Construction of concrete road from Chamni Ramesh Santra towards h/o Mithun Santra |
82789 |
New Construction of concrete road from Chamni Ramesh Santra towards h/o Mithun Santra 1 |
Completion of work |
-
latitude : 22.346166260540485,22.346166260540485
Longitude : 88.32175715826452,88.32175715826452
file name : Image_21012022123008523.png
|
2022-01-21 12:30:08.607957 |
258 |
45683463 |
T Instalation of water treatment plan at Dosotina Mollick para. |
275526 |
T Instalation of water treatment plan at Dosotina Mollick para.1 |
Roof laid |
-
latitude : 22.358603705652058
Longitude : 88.32081746309996
file name : Image_09062022124425591.png
|
2022-06-09 12:44:25.660899 |
259 |
45683463 |
T Instalation of water treatment plan at Dosotina Mollick para. |
275526 |
T Instalation of water treatment plan at Dosotina Mollick para.1 |
Plinth level |
-
latitude : 22.358662839978933
Longitude : 88.32075451500714
file name : Image_31052022130105116.png
|
2022-05-31 13:01:05.187238 |
260 |
45683463 |
T Instalation of water treatment plan at Dosotina Mollick para. |
275526 |
T Instalation of water treatment plan at Dosotina Mollick para.1 |
Completion of work |
-
latitude : 22.358408491127193
Longitude : 88.32037414424121
file name : Image_31052022125635173.png
|
2022-05-31 12:56:35.252378 |
261 |
45683463 |
T Instalation of water treatment plan at Dosotina Mollick para. |
275526 |
T Instalation of water treatment plan at Dosotina Mollick para.1 |
Completion of work |
-
latitude : 22.3587983334437
Longitude : 88.32081872038543
file name : Image_28032022121626657.png
|
2022-03-28 12:16:26.744866 |
262 |
45684670 |
T Instalation of water treatment plan at Chamni Shibtala |
273713 |
T Instalation of water treatment plan at Chamni Shibtala1 |
Plinth level |
-
latitude : 22.3465416
Longitude : 88.3315078
file name : Image_12122022112108295.png
|
2022-12-12 11:21:08.359447 |
263 |
45684670 |
T Instalation of water treatment plan at Chamni Shibtala |
273713 |
T Instalation of water treatment plan at Chamni Shibtala1 |
Completion of work |
-
latitude : 22.3468812
Longitude : 88.330474
file name : Image_24112022115007691.png
|
2022-11-24 11:50:07.776701 |
264 |
45685568 |
T Instalation of water treatment plan at near h/o Gangadhar Mondal |
273713 |
T Instalation of water treatment plan at near h/o Gangadhar Mondal1 |
Roof laid |
-
latitude : 22.346430541947484
Longitude : 88.32740589044988
file name : Image_20102022133052597.png
|
2022-10-20 13:30:52.698164 |
265 |
45685568 |
T Instalation of water treatment plan at near h/o Gangadhar Mondal |
273713 |
T Instalation of water treatment plan at near h/o Gangadhar Mondal1 |
Completion of work |
-
latitude : 22.34642936848104
Longitude : 88.3274738676846
file name : Image_09092022143900009.png
|
2022-09-09 14:39:00.09022 |
266 |
45685568 |
T Instalation of water treatment plan at near h/o Gangadhar Mondal |
273713 |
T Instalation of water treatment plan at near h/o Gangadhar Mondal1 |
Plinth level |
-
latitude : 22.34641985502094
Longitude : 88.3274466264993
file name : Image_22092022132137684.png
|
2022-09-22 13:21:37.752504 |
267 |
64519086 |
U New construction of concrete road from Chamni Naskarpara Masjidtala to h/o Barjahan Sekh |
258381 |
U New construction of concrete road from Chamni Naskarpara Masjidtala to h/o Barjahan Sekh1 |
Roof laid |
-
latitude : 22.3474487,22.3474471
Longitude : 88.3179389,88.3179403
file name : Image_20102022132157651.png
|
2022-10-20 13:21:57.737034 |
268 |
64519086 |
U New construction of concrete road from Chamni Naskarpara Masjidtala to h/o Barjahan Sekh |
258381 |
U New construction of concrete road from Chamni Naskarpara Masjidtala to h/o Barjahan Sekh1 |
Plinth level |
-
latitude : 22.347598769702017,22.347629824653268
Longitude : 88.31836676225066,88.31824866123497
file name : Image_20102022131730835.png
|
2022-10-20 13:17:30.95632 |
269 |
64519086 |
U New construction of concrete road from Chamni Naskarpara Masjidtala to h/o Barjahan Sekh |
258381 |
U New construction of concrete road from Chamni Naskarpara Masjidtala to h/o Barjahan Sekh1 |
Completion of work |
-
latitude : 22.347373547963798,22.34739114996046
Longitude : 88.31842593848705,88.31840230152011
file name : Image_31082022153036888.png
|
2022-08-31 15:30:36.961546 |
270 |
45685002 |
T Instalation of water treatment plan at Mallick Para Manjur Mollick |
273713 |
T Instalation of water treatment plan at Mallick Para Manjur Mollick1 |
Roof laid |
-
latitude : 22.35081670805812
Longitude : 88.32607903517783
file name : Image_08122022153309667.png
|
2022-12-08 15:33:09.724616 |
271 |
45685002 |
T Instalation of water treatment plan at Mallick Para Manjur Mollick |
273713 |
T Instalation of water treatment plan at Mallick Para Manjur Mollick1 |
Plinth level |
-
latitude : 22.350449161604047
Longitude : 88.32589949481189
file name : Image_22112022132927919.png
|
2022-11-22 13:29:28.387608 |
272 |
45685002 |
T Instalation of water treatment plan at Mallick Para Manjur Mollick |
273713 |
T Instalation of water treatment plan at Mallick Para Manjur Mollick1 |
Plinth level |
-
latitude : 22.35076478216797
Longitude : 88.32603159360588
file name : Image_22112022133046597.png
|
2022-11-22 13:30:47.066376 |
273 |
45685002 |
T Instalation of water treatment plan at Mallick Para Manjur Mollick |
273713 |
T Instalation of water treatment plan at Mallick Para Manjur Mollick1 |
Completion of work |
-
latitude : 22.350355074740946
Longitude : 88.32634851336479
file name : Image_23082022164326636.png
|
2022-08-23 16:43:26.690855 |
274 |
45685002 |
T Instalation of water treatment plan at Mallick Para Manjur Mollick |
273713 |
T Instalation of water treatment plan at Mallick Para Manjur Mollick1 |
Completion of work |
-
latitude : 22.350406791083515
Longitude : 88.32630936987698
file name : Image_23082022164329692.png
|
2022-08-23 16:43:29.745179 |
275 |
45685259 |
T Instalation of water treatment plan at House of Soleman Sekh |
273713 |
T Instalation of water treatment plan at House of Soleman Sekh1 |
Roof laid |
-
latitude : 22.3541651526466
Longitude : 88.32718092016876
file name : Image_08122022153817015.png
|
2022-12-08 15:38:17.082359 |
276 |
45685259 |
T Instalation of water treatment plan at House of Soleman Sekh |
273713 |
T Instalation of water treatment plan at House of Soleman Sekh1 |
Plinth level |
-
latitude : 22.354144952259958
Longitude : 88.32708771340549
file name : Image_09112022142109814.png
|
2022-11-09 14:21:09.874084 |
277 |
45685259 |
T Instalation of water treatment plan at House of Soleman Sekh |
273713 |
T Instalation of water treatment plan at House of Soleman Sekh1 |
Completion of work |
-
latitude : 22.35414403025061
Longitude : 88.32701755687594
file name : Image_23082022164416134.png
|
2022-08-23 16:44:16.198563 |
278 |
45686588 |
T Instalation of water treatment plan at Bhandaria Naskar Para Thakurtala |
275526 |
T Instalation of water treatment plan at Bhandaria Naskar Para Thakurtala1 |
Roof laid |
-
latitude : 22.332762046717107
Longitude : 88.3372637629509
file name : Image_28072022125105515.png
|
2022-07-28 12:51:05.612846 |
279 |
45686588 |
T Instalation of water treatment plan at Bhandaria Naskar Para Thakurtala |
275526 |
T Instalation of water treatment plan at Bhandaria Naskar Para Thakurtala1 |
Plinth level |
-
latitude : 22.332741720601916
Longitude : 88.337232330814
file name : Image_26072022142317647.png
|
2022-07-26 14:23:17.7108 |
280 |
45686588 |
T Instalation of water treatment plan at Bhandaria Naskar Para Thakurtala |
275526 |
T Instalation of water treatment plan at Bhandaria Naskar Para Thakurtala1 |
Completion of work |
-
latitude : 22.332678311504424
Longitude : 88.33725328557193
file name : Image_19072022154536915.png
|
2022-07-19 15:45:37.005882 |
281 |
56136858 |
Water Treatment plant at near house of Banamali Khanra. |
286965 |
Water Treatment plant at near house of Banamali Khanra.1 |
Completion of work |
-
latitude : 22.341075344011188,22.341075344011188,22.341075344011188,22.341075344011188,22.341075344011188
Longitude : 88.33734213374555,88.33734213374555,88.33734213374555,88.33734213374555,88.33734213374555
file name : Image_09082023134737002.png
|
2023-08-09 13:47:37.077942 |
282 |
56136858 |
Water Treatment plant at near house of Banamali Khanra. |
286965 |
Water Treatment plant at near house of Banamali Khanra.1 |
Completion of work |
-
latitude : 22.3410859471187,22.3410859471187,22.3410859471187
Longitude : 88.33733953535557,88.33733953535557,88.33733953535557
file name : Image_09082023134726578.png
|
2023-08-09 13:47:26.657578 |
283 |
56136858 |
Water Treatment plant at near house of Banamali Khanra. |
286965 |
Water Treatment plant at near house of Banamali Khanra.1 |
Completion of work |
-
latitude : 22.341086491942406,22.341086491942406
Longitude : 88.33734900690615,88.33734900690615
file name : Image_09082023134719657.png
|
2023-08-09 13:47:19.748727 |
284 |
56136858 |
Water Treatment plant at near house of Banamali Khanra. |
286965 |
Water Treatment plant at near house of Banamali Khanra.1 |
Completion of work |
-
latitude : 22.3482309,22.3482423
Longitude : 88.3272501,88.3272481
file name : Image_05062023162759428.png
|
2023-06-05 16:27:59.504083 |
285 |
56122685 |
U New Construction of concrete road form Baruipur road to ho Sujay Haldar |
96914 |
U New Construction of concrete road form Baruipur road to ho Sujay Haldar1 |
Plinth level |
-
latitude : 22.3518155,22.3481097,22.3481097
Longitude : 88.3265121,88.3272789,88.3272789
file name : Image_16102023153427753.png
|
2023-10-16 15:34:27.866568 |
286 |
56122685 |
U New Construction of concrete road form Baruipur road to ho Sujay Haldar |
96914 |
U New Construction of concrete road form Baruipur road to ho Sujay Haldar1 |
Completion of work |
-
latitude : 22.348116,22.348116,22.348116
Longitude : 88.3272572,88.3272572,88.3272572
file name : Image_05102023172728178.png
|
2023-10-05 17:27:28.248386 |
287 |
56123175 |
U New Construction of concrete road form Dhankal of Sahajahan Sipai to ho Manik Mondal |
146100 |
U New Construction of concrete road form Dhankal of Sahajahan Sipai to ho Manik Mondal1 |
Plinth level |
-
latitude : 22.348111,22.348111,22.348111
Longitude : 88.3272723,88.3272723,88.3272723
file name : Image_16102023153927705.png
|
2023-10-16 15:39:27.867623 |
288 |
56123175 |
U New Construction of concrete road form Dhankal of Sahajahan Sipai to ho Manik Mondal |
146100 |
U New Construction of concrete road form Dhankal of Sahajahan Sipai to ho Manik Mondal1 |
Completion of work |
-
latitude : 22.3481158,22.3481158
Longitude : 88.327257,88.327257
file name : Image_05102023172849439.png
|
2023-10-05 17:28:49.523072 |
289 |
68626475 |
New Construction of Concrete road from house of Sampad Sekh to house of Manju Sekh |
350000 |
New Construction of Concrete road from house of Sampad Sekh to house of Manju Sekh1 |
Plinth level |
-
latitude : 22.3481155,22.3481155,22.3481155
Longitude : 88.3272562,88.3272562,88.3272562
file name : Image_16102023153412622.png
|
2023-10-16 15:34:12.80102 |
290 |
68626475 |
New Construction of Concrete road from house of Sampad Sekh to house of Manju Sekh |
350000 |
New Construction of Concrete road from house of Sampad Sekh to house of Manju Sekh1 |
Completion of work |
-
latitude : 22.3518155,22.3518155,22.3481505
Longitude : 88.3265121,88.3265121,88.3273061
file name : Image_27092023161449217.png
|
2023-09-27 16:14:49.288401 |
291 |
66977508 |
Construction of roads |
89510 |
Construction of roads1 |
Roof laid |
-
latitude : 22.36145853996277,22.36145853996277,22.36145853996277,22.36145853996277
Longitude : 88.32231413573027,88.3223142195493,88.3223142195493,88.3223142195493
file name : Image_23112023123452870.png
|
2023-11-23 12:34:52.959227 |
292 |
66977508 |
Construction of roads |
89510 |
Construction of roads1 |
Plinth level |
-
latitude : 22.36143586691469,22.36143586691469,22.36143586691469,22.36143586691469
Longitude : 88.32234313711524,88.32234313711524,88.32234313711524,88.32234313711524
file name : Image_23112023123016398.png
|
2023-11-23 12:30:16.474979 |
293 |
66977508 |
Construction of roads |
89510 |
Construction of roads1 |
Completion of work |
-
latitude : 22.36388510093093,22.36388510093093,22.36388510093093
Longitude : 88.27345099300146,88.27345099300146,88.27345099300146
file name : Image_23112023122049617.png
|
2023-11-23 12:20:49.698413 |
294 |
67439485 |
Construction of Water treatment plant |
281504 |
Construction of Water treatment plant1 |
Completion of work |
-
latitude : 22.337813526391983
Longitude : 88.31169451586902
file name : Image_22112023142214036.png
|
2023-11-22 14:22:14.154759 |
295 |
67439485 |
Construction of Water treatment plant |
281504 |
Construction of Water treatment plant1 |
Completion of work |
-
latitude : 22.33782236929983
Longitude : 88.3116696216166
file name : Image_22112023142149765.png
|
2023-11-22 14:21:49.833432 |
296 |
67439485 |
Construction of Water treatment plant |
281504 |
Construction of Water treatment plant1 |
Completion of work |
-
latitude : 22.3481281
Longitude : 88.327314
file name : Image_06112023165729279.png
|
2023-11-06 16:57:29.380667 |
297 |
66967079 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.346218270249665
Longitude : 88.31819250248373
file name : Image_04102024130720077.png
|
2024-10-04 13:07:20.142022 |
298 |
66967079 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.3481088
Longitude : 88.3272704
file name : Image_04102024123001226.png
|
2024-10-04 12:30:01.303041 |
299 |
66967079 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.34621265437454
Longitude : 88.31821982748806
file name : Image_14032024125044515.png
|
2024-03-14 12:50:44.583278 |
300 |
66977515 |
Construction of roads |
133861 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3481177,22.3481177
Longitude : 88.3272692,88.3272692
file name : Image_22122023134641905.png
|
2023-12-22 13:46:41.971613 |
301 |
66977515 |
Construction of roads |
133861 |
Construction of roads1 |
Completion of work |
-
latitude : 22.363781039603055,22.363781039603055
Longitude : 88.32346773706377,88.32346773706377
file name : Image_30112023115557788.png
|
2023-11-30 11:55:57.860478 |
302 |
66977495 |
Construction of roads |
95492 |
Construction of roads1 |
Roof laid |
-
latitude : 22.36513643525541,22.36513643525541,22.36513643525541,22.36513622570783,22.36513622570783
Longitude : 88.31394547596574,88.31394547596574,88.31394547596574,88.31394581124187,88.31394581124187
file name : Image_23112023125138264.png
|
2023-11-23 12:51:38.339969 |
303 |
66977495 |
Construction of roads |
95492 |
Construction of roads1 |
Plinth level |
-
latitude : 22.365098507143557,22.36509775277227,22.365096579305828
Longitude : 88.31394681707025,88.3139406144619,88.31393089145422
file name : Image_23112023124657599.png
|
2023-11-23 12:46:57.693442 |
304 |
66977495 |
Construction of roads |
95492 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3649423,22.3649423,22.3649423
Longitude : 88.3129019,88.3129019,88.3129019
file name : Image_23112023124008465.png
|
2023-11-23 12:40:08.581668 |
305 |
66977621 |
Construction of roads |
104271 |
Construction of roads1 |
Roof laid |
-
latitude : 22.3401623,22.3401612,22.3401612,22.3401612
Longitude : 88.3258792,88.3258786,88.3258786,88.3258786
file name : Image_26122023162308759.png
|
2023-12-26 16:23:08.841406 |
306 |
66977621 |
Construction of roads |
104271 |
Construction of roads1 |
Plinth level |
-
latitude : 22.3401616,22.3401616,22.3401616
Longitude : 88.3258789,88.3258789,88.3258789
file name : Image_26122023161907634.png
|
2023-12-26 16:19:07.713048 |
307 |
66977621 |
Construction of roads |
104271 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3401602,22.3401602,22.3401602
Longitude : 88.3258766,88.3258766,88.3258766
file name : Image_26122023161131127.png
|
2023-12-26 16:11:31.219447 |
308 |
66977575 |
Construction of roads |
161608 |
Construction of roads1 |
Roof laid |
-
latitude : 22.3481199,22.3481199,22.3481199,22.3481199
Longitude : 88.3272618,88.3272618,88.3272618,88.3272618
file name : Image_28122023113718461.png
|
2023-12-28 11:37:18.53042 |
309 |
66977575 |
Construction of roads |
161608 |
Construction of roads1 |
Plinth level |
-
latitude : 22.3481189,22.3481189,22.3481189
Longitude : 88.3272685,88.3272685,88.3272685
file name : Image_28122023113431802.png
|
2023-12-28 11:34:31.875865 |
310 |
66977575 |
Construction of roads |
161608 |
Construction of roads1 |
Completion of work |
-
latitude : 22.34711199067533,22.34711199067533
Longitude : 88.32362439483404,88.32362439483404
file name : Image_26122023160913524.png
|
2023-12-26 16:09:13.606639 |
311 |
66977575 |
Construction of roads |
161608 |
Construction of roads1 |
Completion of work |
-
latitude : 22.34711199067533,22.34711199067533
Longitude : 88.32362439483404,88.32362439483404
file name : Image_26122023160828039.png
|
2023-12-26 16:08:28.125099 |
312 |
66977575 |
Construction of roads |
161608 |
Construction of roads1 |
Completion of work |
-
latitude : 22.347084623761475,22.347084623761475
Longitude : 88.32361467182636,88.32361467182636
file name : Image_26122023160823081.png
|
2023-12-26 16:08:23.154645 |
313 |
66977530 |
Construction of roads |
182514 |
Construction of roads1 |
Completion of work |
-
latitude : 22.34584883786738,22.34584883786738
Longitude : 88.31003213301301,88.31003213301301
file name : Image_28032024205643984.png
|
2024-03-28 20:56:44.051835 |
314 |
66977530 |
Construction of roads |
182514 |
Construction of roads1 |
Completion of work |
-
latitude : 22.34589548315853,22.34589548315853
Longitude : 88.31011670641601,88.31011670641601
file name : Image_28032024123752287.png
|
2024-03-28 12:37:52.351304 |
315 |
66977530 |
Construction of roads |
182514 |
Construction of roads1 |
Completion of work |
-
latitude : 22.345877923071384,22.345877923071384,22.345877923071384
Longitude : 88.31010153517127,88.31010153517127,88.31010153517127
file name : Image_28032024123748261.png
|
2024-03-28 12:37:48.326388 |
316 |
66977530 |
Construction of roads |
182514 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3481116,22.3481116,22.345901476219296,22.345901476219296,22.345902104862034
Longitude : 88.3272555,88.3272555,88.31009918823838,88.31009918823838,88.31011444330215
file name : Image_28032024123158478.png
|
2024-03-28 12:31:58.559426 |
317 |
66977530 |
Construction of roads |
182514 |
Construction of roads1 |
Completion of work |
-
latitude : 22.345883287489414,22.345883287489414,22.345883287489414
Longitude : 88.31009650602937,88.31009650602937,88.31009650602937
file name : Image_28032024123154300.png
|
2024-03-28 12:31:54.38198 |
318 |
66977530 |
Construction of roads |
182514 |
Construction of roads1 |
Roof laid |
-
latitude : 22.084582904353738,22.084582904353738,22.084582904353738
Longitude : 88.09346990659833,88.09346990659833,88.09346990659833
file name : Image_28032024210442858.png
|
2024-03-28 21:04:42.921632 |
319 |
66977530 |
Construction of roads |
182514 |
Construction of roads1 |
Plinth level |
-
latitude : 22.0846331,22.0846331
Longitude : 88.0936808,88.0936808
file name : Image_28032024205854727.png
|
2024-03-28 20:58:54.790304 |
320 |
66977530 |
Construction of roads |
182514 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3481116,22.3481116,22.345901476219296,22.345901476219296,22.345902104862034
Longitude : 88.3272555,88.3272555,88.31009918823838,88.31009918823838,88.31011444330215
file name : Image_28032024123148623.png
|
2024-03-28 12:31:48.691174 |
321 |
66977530 |
Construction of roads |
182514 |
Construction of roads1 |
Completion of work |
-
latitude : 22.345883287489414,22.345883287489414,22.345883287489414
Longitude : 88.31009650602937,88.31009650602937,88.31009650602937
file name : Image_28032024123143759.png
|
2024-03-28 12:31:43.828848 |
322 |
66977530 |
Construction of roads |
182514 |
Construction of roads1 |
Completion of work |
-
latitude : 22.345895525068045,22.345895525068045,22.345895525068045
Longitude : 88.31018250435591,88.31018250435591,88.31018250435591
file name : Image_28032024123139039.png
|
2024-03-28 12:31:39.120998 |
323 |
66977530 |
Construction of roads |
182514 |
Construction of roads1 |
Completion of work |
-
latitude : 22.345860740169883,22.345860740169883,22.345849256962538
Longitude : 88.30995736643672,88.30995736643672,88.3099586237222
file name : Image_11032024140316102.png
|
2024-03-11 14:03:16.012279 |
324 |
66977530 |
Construction of roads |
182514 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3458840418607,22.3458840418607,22.3458840418607
Longitude : 88.30997991375625,88.30997991375625,88.30997991375625
file name : Image_11032024131923907.png
|
2024-03-11 13:19:23.973373 |
325 |
66977530 |
Construction of roads |
182514 |
Construction of roads1 |
Completion of work |
-
latitude : 22.345913043245673,22.345913043245673,22.345912121236324
Longitude : 88.31010639667511,88.31010639667511,88.31011134199798
file name : Image_11032024131919388.png
|
2024-03-11 13:19:19.454624 |
326 |
67438742 |
Construction of Water treatment plant |
281504 |
Construction of Water treatment plant1 |
Roof laid |
-
latitude : 22.3481184
Longitude : 88.3272693
file name : Image_28122023124826538.png
|
2023-12-28 12:48:26.600322 |
327 |
67438742 |
Construction of Water treatment plant |
281504 |
Construction of Water treatment plant1 |
Plinth level |
-
latitude : 22.3481184
Longitude : 88.3272693
file name : Image_28122023124431332.png
|
2023-12-28 12:44:31.396506 |
328 |
67438742 |
Construction of Water treatment plant |
281504 |
Construction of Water treatment plant1 |
Completion of work |
-
latitude : 22.3481344
Longitude : 88.3273069
file name : Image_06112023165505418.png
|
2023-11-06 16:55:05.502955 |
329 |
88433638 |
New Construction of cc road from Durgatala Pramanik para time kal to h/o Nirapada Pramanik |
117100 |
New Construction of cc road from Durgatala Pramanik para time kal to h/o Nirapada Pramanik1 |
Roof laid |
-
latitude : 22.3480938,22.3480938,22.3480938
Longitude : 88.3272522,88.3272522,88.3272522
file name : Image_08012024164137813.png
|
2024-01-08 16:41:37.863643 |
330 |
88433638 |
New Construction of cc road from Durgatala Pramanik para time kal to h/o Nirapada Pramanik |
117100 |
New Construction of cc road from Durgatala Pramanik para time kal to h/o Nirapada Pramanik1 |
Plinth level |
-
latitude : 22.3480924,22.3480924,22.3480924
Longitude : 88.327254,88.327254,88.327254
file name : Image_08012024163859644.png
|
2024-01-08 16:38:59.702043 |
331 |
88433638 |
New Construction of cc road from Durgatala Pramanik para time kal to h/o Nirapada Pramanik |
117100 |
New Construction of cc road from Durgatala Pramanik para time kal to h/o Nirapada Pramanik1 |
Completion of work |
-
latitude : 22.5270448,22.5270448
Longitude : 88.3372839,88.3372839
file name : Image_05012024125330136.png
|
2024-01-05 12:53:30.19711 |
332 |
66966797 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.3481154
Longitude : 88.3272285
file name : Image_05122023145407108.png
|
2023-12-05 14:54:07.210602 |
333 |
66966797 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.360090319998562
Longitude : 88.30561981536448
file name : Image_23112023131715145.png
|
2023-11-23 13:17:15.215703 |
334 |
56136778 |
Water Treatment plant at Kastekumari near house of Sovan Mollick. |
286965 |
Water Treatment plant at Kastekumari near house of Sovan Mollick.1 |
Completion of work |
-
latitude : 22.349534612149,22.349534612149,22.349534612149,22.349534612149
Longitude : 88.3325127325952,88.3325127325952,88.3325127325952,88.3325127325952
file name : Image_22112023142145325.png
|
2023-11-22 14:21:45.410996 |
335 |
56136778 |
Water Treatment plant at Kastekumari near house of Sovan Mollick. |
286965 |
Water Treatment plant at Kastekumari near house of Sovan Mollick.1 |
Completion of work |
-
latitude : 22.349519398994744,22.349519398994744
Longitude : 88.33254349417984,88.33254349417984
file name : Image_22112023142141726.png
|
2023-11-22 14:21:41.875891 |
336 |
56136778 |
Water Treatment plant at Kastekumari near house of Sovan Mollick. |
286965 |
Water Treatment plant at Kastekumari near house of Sovan Mollick.1 |
Completion of work |
-
latitude : 22.3481294,22.3481294
Longitude : 88.3273142,88.3273142
file name : Image_06112023170558135.png
|
2023-11-06 17:05:58.202093 |
337 |
56136778 |
Water Treatment plant at Kastekumari near house of Sovan Mollick. |
286965 |
Water Treatment plant at Kastekumari near house of Sovan Mollick.1 |
Completion of work |
-
latitude : 22.348129,22.3481279
Longitude : 88.3273142,88.3273139
file name : Image_06112023170554831.png
|
2023-11-06 17:05:54.914753 |
338 |
66977511 |
Construction of roads |
87482 |
Construction of roads1 |
Roof laid |
-
latitude : 22.348138,22.348138,22.348138
Longitude : 88.3272822,88.3272822,88.3272822
file name : Image_19062024113236149.png
|
2024-06-19 11:32:36.218375 |
339 |
66977511 |
Construction of roads |
87482 |
Construction of roads1 |
Roof laid |
-
latitude : 22.3628188,22.3628188
Longitude : 88.3186365,88.3186365
file name : Image_30112023115239227.png
|
2023-11-30 11:52:39.297148 |
340 |
66977511 |
Construction of roads |
87482 |
Construction of roads1 |
Plinth level |
-
latitude : 22.3628206,22.362970509566367
Longitude : 88.3186401,88.31862727180123
file name : Image_30112023115032106.png
|
2023-11-30 11:50:32.176262 |
341 |
66977511 |
Construction of roads |
87482 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3628787,22.3628153
Longitude : 88.3158825,88.3186365
file name : Image_30112023114454392.png
|
2023-11-30 11:44:54.459105 |
342 |
66977511 |
Construction of roads |
87482 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3481073,22.3481073,22.3481073,22.3481073
Longitude : 88.3272586,88.3272586,88.3272586,88.3272586
file name : Image_29112023164156715.png
|
2023-11-29 16:41:56.783628 |
343 |
66977511 |
Construction of roads |
87482 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3481161,22.3481161
Longitude : 88.3272329,88.3272329
file name : Image_29112023164153014.png
|
2023-11-29 16:41:53.081635 |
344 |
68627741 |
New Construcion of Concrete road from house of Gopal Dandapat to house of Amit Mondal |
129768 |
New Construcion of Concrete road from house of Gopal Dandapat to house of Amit Mondal1 |
Roof laid |
-
latitude : 22.346140947192907,22.346140947192907
Longitude : 88.32089918665588,88.32089918665588
file name : Image_30112023121015318.png
|
2023-11-30 12:10:15.391487 |
345 |
68627741 |
New Construcion of Concrete road from house of Gopal Dandapat to house of Amit Mondal |
129768 |
New Construcion of Concrete road from house of Gopal Dandapat to house of Amit Mondal1 |
Plinth level |
-
latitude : 22.346143587492406,22.346143587492406
Longitude : 88.3209481369704,88.3209481369704
file name : Image_30112023120535972.png
|
2023-11-30 12:05:36.047272 |
346 |
56136644 |
Water Treatment plant at house of Kartick Mondal |
286965 |
Water Treatment plant at house of Kartick Mondal 1 |
Plinth level |
-
latitude : 22.344975862652063,22.344975862652063
Longitude : 88.30998041667044,88.30998041667044
file name : Image_30112023122249300.png
|
2023-11-30 12:22:49.366387 |
347 |
56136644 |
Water Treatment plant at house of Kartick Mondal |
286965 |
Water Treatment plant at house of Kartick Mondal 1 |
Completion of work |
-
latitude : 22.344964630901814,22.344962577335536
Longitude : 88.3099047280848,88.30991218797863
file name : Image_30112023121643947.png
|
2023-11-30 12:16:44.014884 |
348 |
56136601 |
Water Treatment plant at Earpur hazra para. |
286965 |
Water Treatment plant at Earpur hazra para.1 |
Plinth level |
-
latitude : 22.35152531415224,22.35152531415224
Longitude : 88.31045516766608,88.31045516766608
file name : Image_30112023123313341.png
|
2023-11-30 12:33:13.419135 |
349 |
56136601 |
Water Treatment plant at Earpur hazra para. |
286965 |
Water Treatment plant at Earpur hazra para.1 |
Completion of work |
-
latitude : 22.351569905877113,22.351569905877113
Longitude : 88.31053739413619,88.31053739413619
file name : Image_30112023122952639.png
|
2023-11-30 12:29:52.713312 |
350 |
56136601 |
Water Treatment plant at Earpur hazra para. |
286965 |
Water Treatment plant at Earpur hazra para.1 |
Completion of work |
-
latitude : 22.3481053,22.3481053,22.3481053
Longitude : 88.3272583,88.3272583,88.3272583
file name : Image_29112023164200431.png
|
2023-11-29 16:42:00.501998 |
351 |
56136601 |
Water Treatment plant at Earpur hazra para. |
286965 |
Water Treatment plant at Earpur hazra para.1 |
Completion of work |
-
latitude : 22.3481091,22.3481091,22.3481091
Longitude : 88.3272521,88.3272521,88.3272521
file name : Image_29112023162806586.png
|
2023-11-29 16:28:06.655737 |
352 |
66977607 |
Construction of roads |
154081 |
Construction of roads1 |
Plinth level |
-
latitude : 22.332887817174196,22.332887733355165,22.332887733355165
Longitude : 88.33996147848666,88.33996156230569,88.33996156230569
file name : Image_07032024112950180.png
|
2024-03-07 11:29:50.24697 |
353 |
66977607 |
Construction of roads |
154081 |
Construction of roads1 |
Plinth level |
-
latitude : 22.33286158181727,22.33286158181727,22.33286158181727
Longitude : 88.339983522892,88.339983522892,88.339983522892
file name : Image_07032024112207646.png
|
2024-03-07 11:22:07.721769 |
354 |
66977607 |
Construction of roads |
154081 |
Construction of roads1 |
Plinth level |
-
latitude : 22.332851313985884,22.332859695889056,22.332870005629957
Longitude : 88.33998561836779,88.33998729474843,88.33998838439584
file name : Image_07032024112052495.png
|
2024-03-07 11:20:52.572933 |
355 |
66977607 |
Construction of roads |
154081 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3326985,22.3326985,22.3326985
Longitude : 88.3404708,88.3404708,88.3404708
file name : Image_01032024141326413.png
|
2024-03-01 14:13:26.484615 |
356 |
66977607 |
Construction of roads |
154081 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3326975,22.3326975,22.3326975
Longitude : 88.340466,88.340466,88.340466
file name : Image_01032024141124163.png
|
2024-03-01 14:11:24.234 |
357 |
88433250 |
New Construction of cc road from h/o Khairul Molla to H/o Mahammad Ali Molla |
176741 |
New Construction of cc road from h/o Khairul Molla to H/o Mahammad Ali Molla1 |
Completion of work |
-
latitude : 22.348154,22.348154,22.348154
Longitude : 88.3272504,88.3272504,88.3272504
file name : Image_24012024163829680.png
|
2024-01-24 16:38:29.766842 |
358 |
88433368 |
New Construction of cc road from h/o Ganesh Khamaru to h/o Khokan Khamaru |
99228 |
New Construction of cc road from h/o Ganesh Khamaru to h/o Khokan Khamaru1 |
Completion of work |
-
latitude : 22.3481532,22.3481532,22.3481532
Longitude : 88.3272496,88.3272496,88.3272496
file name : Image_24012024165815515.png
|
2024-01-24 16:58:15.601353 |
359 |
88968464 |
New Construction of concrete road from h/o Nur Mahammad Sk to Aal Nur Masjid |
90893 |
New Construction of concrete road from h/o Nur Mahammad Sk to Aal Nur Masjid1 |
Roof laid |
-
latitude : 22.361473962664604,22.361473962664604,22.361473962664604
Longitude : 88.3233671542257,88.3233671542257,88.3233671542257
file name : Image_15042024115145938.png
|
2024-04-15 11:51:46.023373 |
360 |
88968464 |
New Construction of concrete road from h/o Nur Mahammad Sk to Aal Nur Masjid |
90893 |
New Construction of concrete road from h/o Nur Mahammad Sk to Aal Nur Masjid1 |
Plinth level |
-
latitude : 22.3634272,22.3634272,22.3634272,22.3634272
Longitude : 88.3241834,88.3241834,88.3241834,88.3241834
file name : Image_15042024114418359.png
|
2024-04-15 11:44:18.433875 |
361 |
88968464 |
New Construction of concrete road from h/o Nur Mahammad Sk to Aal Nur Masjid |
90893 |
New Construction of concrete road from h/o Nur Mahammad Sk to Aal Nur Masjid1 |
Completion of work |
-
latitude : 22.36147664487362,22.36147664487362,22.36147664487362
Longitude : 88.3233985863626,88.3233985863626,88.3233985863626
file name : Image_11032024141426621.png
|
2024-03-11 14:14:26.687012 |
362 |
66977533 |
Construction of roads |
162080 |
Construction of roads1 |
Roof laid |
-
latitude : 22.352018211968243,22.352018211968243,22.352018211968243
Longitude : 88.30722184851766,88.30722184851766,88.30722184851766
file name : Image_25072024115254252.png
|
2024-07-25 11:52:54.319519 |
363 |
66977533 |
Construction of roads |
162080 |
Construction of roads1 |
Plinth level |
-
latitude : 22.35122,22.35122,22.35122
Longitude : 88.3049465,88.3049465,88.3049465
file name : Image_25072024113740520.png
|
2024-07-25 11:37:40.589705 |
364 |
66977533 |
Construction of roads |
162080 |
Construction of roads1 |
Completion of work |
-
latitude : 22.351715709082782,22.351715709082782,22.351715709082782
Longitude : 88.30773641355336,88.30773641355336,88.30773641355336
file name : Image_14032024125930072.png
|
2024-03-14 12:59:30.152747 |
365 |
66977559 |
Construction of roads |
143420 |
Construction of roads1 |
Roof laid |
-
latitude : 22.356074508279562,22.356074508279562,22.356074508279562
Longitude : 88.33015247248113,88.33015247248113,88.33015247248113
file name : Image_25072024122349711.png
|
2024-07-25 12:23:49.775441 |
366 |
66977559 |
Construction of roads |
143420 |
Construction of roads1 |
Plinth level |
-
latitude : 22.356074508279562,22.356074508279562,22.356074508279562
Longitude : 88.330191783607,88.330191783607,88.330191783607
file name : Image_25072024120953943.png
|
2024-07-25 12:09:54.014552 |
367 |
66977559 |
Construction of roads |
143420 |
Construction of roads1 |
Completion of work |
-
latitude : 22.356098480522633,22.356100953184068,22.356100953184068
Longitude : 88.33017761819065,88.33016722463071,88.33016722463071
file name : Image_14032024122816944.png
|
2024-03-14 12:28:17.010922 |
368 |
66977544 |
Construction of roads |
189999 |
Construction of roads1 |
Roof laid |
-
latitude : 22.354238452389836,22.35423627309501,22.35423660837114
Longitude : 88.32747906446457,88.32747302949429,88.32747353240848
file name : Image_09042024132543113.png
|
2024-04-09 13:25:43.182555 |
369 |
66977544 |
Construction of roads |
189999 |
Construction of roads1 |
Plinth level |
-
latitude : 22.354202368296683,22.35420471522957,22.35420471522957
Longitude : 88.32762197591364,88.32762063480914,88.32762063480914
file name : Image_09042024131923697.png
|
2024-04-09 13:19:23.803725 |
370 |
66977544 |
Construction of roads |
189999 |
Construction of roads1 |
Completion of work |
-
latitude : 22.354252450168133,22.354252450168133,22.354252450168133
Longitude : 88.32747923210263,88.32747923210263,88.32747923210263
file name : Image_14032024122338935.png
|
2024-03-14 12:23:39.007972 |
371 |
66977506 |
Construction of roads |
126708 |
Construction of roads1 |
Plinth level |
-
latitude : 22.3481315,22.3481315
Longitude : 88.3272735,88.3272735
file name : Image_06032024161837953.png
|
2024-03-06 16:18:38.008108 |
372 |
66977506 |
Construction of roads |
126708 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3481271,22.3481271,22.3481271
Longitude : 88.3272735,88.3272735,88.3272735
file name : Image_06032024161204634.png
|
2024-03-06 16:12:04.693365 |
373 |
66977506 |
Construction of roads |
126708 |
Construction of roads1 |
Completion of work |
-
latitude : 22.35883517190814,22.35883517190814
Longitude : 88.31921157427132,88.31921157427132
file name : Image_04032024123301204.png
|
2024-03-04 12:33:03.362009 |
374 |
66977506 |
Construction of roads |
126708 |
Construction of roads1 |
Completion of work |
-
latitude : 22.358851390890777,22.358851390890777
Longitude : 88.31918735057116,88.31918735057116
file name : Image_04032024123205289.png
|
2024-03-04 12:32:06.501327 |
375 |
66977506 |
Construction of roads |
126708 |
Construction of roads1 |
Completion of work |
-
latitude : 22.358840871602297,22.358842338435352
Longitude : 88.319290028885,88.31928131170571
file name : Image_04032024122842084.png
|
2024-03-04 12:28:42.150408 |
376 |
88433527 |
New Construction of cc road from h/o Alam Molla to h/o Sahalam Molla |
143599 |
New Construction of cc road from h/o Alam Molla to h/o Sahalam Molla1 |
Roof laid |
-
latitude : 22.354086111299694,22.35408615320921,22.35408615320921
Longitude : 88.32794803194702,88.32794803194702,88.32794803194702
file name : Image_09052024131933122.png
|
2024-05-09 13:19:33.193981 |
377 |
88433527 |
New Construction of cc road from h/o Alam Molla to h/o Sahalam Molla |
143599 |
New Construction of cc road from h/o Alam Molla to h/o Sahalam Molla1 |
Plinth level |
-
latitude : 22.3518155,22.3518155
Longitude : 88.3265121,88.3265121
file name : Image_09052024130053761.png
|
2024-05-09 13:00:53.832662 |
378 |
88433527 |
New Construction of cc road from h/o Alam Molla to h/o Sahalam Molla |
143599 |
New Construction of cc road from h/o Alam Molla to h/o Sahalam Molla1 |
Completion of work |
-
latitude : 22.35412843991071,22.35412843991071
Longitude : 88.32790193147957,88.32790193147957
file name : Image_14032024124348092.png
|
2024-03-14 12:43:48.193164 |
379 |
97342348 |
New Construction of concrete road from Doulatabad Dhalai rasta to h/o Ashok Ghantu. |
182496 |
New Construction of concrete road from Doulatabad Dhalai rasta to h/o Ashok Ghantu.1 |
Roof laid |
-
latitude : 22.35204566270113,22.35204566270113
Longitude : 88.30699696205556,88.30699696205556
file name : Image_27032024124710548.png
|
2024-03-27 12:47:10.635855 |
380 |
97342348 |
New Construction of concrete road from Doulatabad Dhalai rasta to h/o Ashok Ghantu. |
182496 |
New Construction of concrete road from Doulatabad Dhalai rasta to h/o Ashok Ghantu.1 |
Plinth level |
-
latitude : 22.351972237229347,22.35196674708277
Longitude : 88.3071363531053,88.30714272335172
file name : Image_13032024140412201.png
|
2024-03-13 14:04:11.990955 |
381 |
97342348 |
New Construction of concrete road from Doulatabad Dhalai rasta to h/o Ashok Ghantu. |
182496 |
New Construction of concrete road from Doulatabad Dhalai rasta to h/o Ashok Ghantu.1 |
Completion of work |
-
latitude : 22.352040549740195,22.352040549740195
Longitude : 88.30700106918812,88.30700106918812
file name : Image_13032024135934452.png
|
2024-03-13 13:59:33.910783 |
382 |
97342348 |
New Construction of concrete road from Doulatabad Dhalai rasta to h/o Ashok Ghantu. |
182496 |
New Construction of concrete road from Doulatabad Dhalai rasta to h/o Ashok Ghantu.1 |
Completion of work |
-
latitude : 22.35199872404337,22.35199872404337
Longitude : 88.30700450576842,88.30700450576842
file name : Image_13032024135026142.png
|
2024-03-13 13:50:26.231192 |
383 |
97342566 |
New Construction of concrete road from h/o Rasida Bibi to Nargisa Bibi. |
52819 |
New Construction of concrete road from h/o Rasida Bibi to Nargisa Bibi.1 |
Roof laid |
-
latitude : 22.346610543318093,22.346610543318093,22.346617500297725,22.346616662107408
Longitude : 88.32971300929785,88.32971300929785,88.329713428393,88.32971535623074
file name : Image_24062024122313083.png
|
2024-06-24 12:23:13.159772 |
384 |
97342566 |
New Construction of concrete road from h/o Rasida Bibi to Nargisa Bibi. |
52819 |
New Construction of concrete road from h/o Rasida Bibi to Nargisa Bibi.1 |
Plinth level |
-
latitude : 22.34665752388537,22.346604634076357,22.346651111729443
Longitude : 88.32975919358432,88.32974427379668,88.32975802011788
file name : Image_24062024122037317.png
|
2024-06-24 12:20:37.386671 |
385 |
97342566 |
New Construction of concrete road from h/o Rasida Bibi to Nargisa Bibi. |
52819 |
New Construction of concrete road from h/o Rasida Bibi to Nargisa Bibi.1 |
Plinth level |
-
latitude : 22.34665752388537,22.346604634076357,22.346651111729443
Longitude : 88.32975919358432,88.32974427379668,88.32975802011788
file name : Image_24062024122033440.png
|
2024-06-24 12:20:33.510754 |
386 |
97342566 |
New Construction of concrete road from h/o Rasida Bibi to Nargisa Bibi. |
52819 |
New Construction of concrete road from h/o Rasida Bibi to Nargisa Bibi.1 |
Completion of work |
-
latitude : 22.3467733617872,22.346772691234946
Longitude : 88.32982884719968,88.3298278413713
file name : Image_15032024122532688.png
|
2024-03-15 12:25:32.773238 |
387 |
97342566 |
New Construction of concrete road from h/o Rasida Bibi to Nargisa Bibi. |
52819 |
New Construction of concrete road from h/o Rasida Bibi to Nargisa Bibi.1 |
Completion of work |
-
latitude : 22.3467733617872,22.346772691234946
Longitude : 88.32982884719968,88.3298278413713
file name : Image_15032024122505542.png
|
2024-03-15 12:25:05.619101 |
388 |
97342566 |
New Construction of concrete road from h/o Rasida Bibi to Nargisa Bibi. |
52819 |
New Construction of concrete road from h/o Rasida Bibi to Nargisa Bibi.1 |
Completion of work |
-
latitude : 22.346733883023262,22.346733883023262,22.346733883023262
Longitude : 88.32979657687247,88.32979657687247,88.32979657687247
file name : Image_15032024122452508.png
|
2024-03-15 12:24:52.582252 |
389 |
97343822 |
Creation of plastic waste storage unit |
350000 |
Creation of plastic waste storage unit 1 |
Roof laid |
-
latitude : 22.359522278420627
Longitude : 88.2975264173001
file name : Image_05102024135019466.png
|
2024-10-05 13:50:19.530438 |
390 |
97343822 |
Creation of plastic waste storage unit |
350000 |
Creation of plastic waste storage unit 1 |
Plinth level |
-
latitude : 22.34837577212602
Longitude : 88.32482828758657
file name : Image_04102024145158266.png
|
2024-10-04 14:51:58.335816 |
391 |
97343822 |
Creation of plastic waste storage unit |
350000 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 22.348269363865256
Longitude : 88.32481286488473
file name : Image_02042024140633113.png
|
2024-04-02 14:06:25.706629 |
392 |
97343599 |
Creation of a new source of drinking water |
281504 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.348761800676584
Longitude : 88.33044005557895
file name : Image_16052024143224989.png
|
2024-05-16 14:32:25.072839 |
393 |
97343599 |
Creation of a new source of drinking water |
281504 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.348744282498956
Longitude : 88.33046612329781
file name : Image_15032024132557047.png
|
2024-03-15 13:25:57.107232 |
394 |
97343599 |
Creation of a new source of drinking water |
281504 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.34873845707625
Longitude : 88.33045179024339
file name : Image_15032024131650891.png
|
2024-03-15 13:16:50.957104 |
395 |
97343409 |
Creation of a new source of drinking water |
281504 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.333259847946465
Longitude : 88.32018756307662
file name : Image_19072024143425668.png
|
2024-07-19 14:34:25.733425 |
396 |
97343409 |
Creation of a new source of drinking water |
281504 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.33331118710339
Longitude : 88.32033349201083
file name : Image_19072024142832365.png
|
2024-07-19 14:28:32.430504 |
397 |
97342896 |
New Construction of concrete road from h/o Kalyan Mondal to Ashok Mondal. |
204600 |
New Construction of concrete road from h/o Kalyan Mondal to Ashok Mondal.1 |
Roof laid |
-
latitude : 22.341920407488942,22.341920407488942,22.341920365579426
Longitude : 88.31429927609861,88.31429927609861,88.31430019810796
file name : Image_01042024121746313.png
|
2024-04-01 12:17:46.396826 |
398 |
97342896 |
New Construction of concrete road from h/o Kalyan Mondal to Ashok Mondal. |
204600 |
New Construction of concrete road from h/o Kalyan Mondal to Ashok Mondal.1 |
Plinth level |
-
latitude : 22.34193520154804,22.34193520154804,22.34193327371031
Longitude : 88.31426968798041,88.31426968798041,88.31430187448859
file name : Image_01042024121227172.png
|
2024-04-01 12:12:27.243717 |
399 |
97342896 |
New Construction of concrete road from h/o Kalyan Mondal to Ashok Mondal. |
204600 |
New Construction of concrete road from h/o Kalyan Mondal to Ashok Mondal.1 |
Plinth level |
-
latitude : 22.34197535086423,22.34197535086423
Longitude : 88.31437789835036,88.31437789835036
file name : Image_15032024124644473.png
|
2024-03-15 12:46:44.546934 |
400 |
97342896 |
New Construction of concrete road from h/o Kalyan Mondal to Ashok Mondal. |
204600 |
New Construction of concrete road from h/o Kalyan Mondal to Ashok Mondal.1 |
Completion of work |
-
latitude : 22.34190343413502,22.34190351795405,22.341903601773083
Longitude : 88.31447479315102,88.31447470933199,88.31447479315102
file name : Image_15032024123418573.png
|
2024-03-15 12:34:18.669026 |
401 |
97342104 |
New Construction of concrete road from h/o Bahar Sk to h/o Abdulla Sk. |
80864 |
New Construction of concrete road from h/o Bahar Sk to h/o Abdulla Sk.1 |
Roof laid |
-
latitude : 22.3641899,22.3641899,22.3641899,22.3641899
Longitude : 88.3268181,88.3268181,88.3268181,88.3268181
file name : Image_09052024133357279.png
|
2024-05-09 13:33:57.358329 |
402 |
97342104 |
New Construction of concrete road from h/o Bahar Sk to h/o Abdulla Sk. |
80864 |
New Construction of concrete road from h/o Bahar Sk to h/o Abdulla Sk.1 |
Plinth level |
-
latitude : 22.3643004,22.3643004
Longitude : 88.3269278,88.3269278
file name : Image_09052024132730615.png
|
2024-05-09 13:27:30.688797 |
403 |
97342104 |
New Construction of concrete road from h/o Bahar Sk to h/o Abdulla Sk. |
80864 |
New Construction of concrete road from h/o Bahar Sk to h/o Abdulla Sk.1 |
Plinth level |
-
latitude : 22.3625056,22.3625056,22.3625056
Longitude : 88.3240332,88.3240332,88.3240332
file name : Image_15042024113850309.png
|
2024-04-15 11:38:50.380855 |
404 |
97342104 |
New Construction of concrete road from h/o Bahar Sk to h/o Abdulla Sk. |
80864 |
New Construction of concrete road from h/o Bahar Sk to h/o Abdulla Sk.1 |
Completion of work |
-
latitude : 22.361570606008172,22.361570564098656
Longitude : 88.32434783689678,88.32434775307775
file name : Image_15032024130817833.png
|
2024-03-15 13:08:17.914444 |
405 |
97341746 |
New Construction of concrete road from h/o Israfil Mollick to Danga of Omar Faruk |
94471 |
New Construction of concrete road from h/o Israfil Mollick to Danga of Omar Faruk1 |
Roof laid |
-
latitude : 22.360544577240944,22.360544577240944,22.36054876819253
Longitude : 88.32262669689953,88.32262669689953,88.32262954674661
file name : Image_01042024124508084.png
|
2024-04-01 12:45:08.156242 |
406 |
97341746 |
New Construction of concrete road from h/o Israfil Mollick to Danga of Omar Faruk |
94471 |
New Construction of concrete road from h/o Israfil Mollick to Danga of Omar Faruk1 |
Plinth level |
-
latitude : 22.360522784292698,22.360522784292698,22.360506858676672
Longitude : 88.32268444821239,88.32268444821239,88.32267103716731
file name : Image_01042024124013291.png
|
2024-04-01 12:40:13.358395 |
407 |
97341746 |
New Construction of concrete road from h/o Israfil Mollick to Danga of Omar Faruk |
94471 |
New Construction of concrete road from h/o Israfil Mollick to Danga of Omar Faruk1 |
Completion of work |
-
latitude : 22.360633467324078,22.360634221695364,22.360634221695364
Longitude : 88.32270045764744,88.3226889744401,88.3226889744401
file name : Image_15032024130024549.png
|
2024-03-15 13:00:24.627057 |
408 |
67439276 |
Construction of Water treatment plant |
281504 |
Construction of Water treatment plant1 |
Roof laid |
-
latitude : 22.332923565991223
Longitude : 88.34038702771068
file name : Image_02042024133348404.png
|
2024-04-02 13:33:48.499017 |
409 |
67439276 |
Construction of Water treatment plant |
281504 |
Construction of Water treatment plant1 |
Plinth level |
-
latitude : 22.332893516868353
Longitude : 88.3403820823878
file name : Image_02042024133153919.png
|
2024-04-02 13:31:54.013281 |
410 |
67439276 |
Construction of Water treatment plant |
281504 |
Construction of Water treatment plant1 |
Completion of work |
-
latitude : 22.332909065298736
Longitude : 88.34039909765124
file name : Image_02042024132727869.png
|
2024-04-02 13:27:27.944694 |
411 |
67439417 |
Construction of Water treatment plant |
281504 |
Construction of Water treatment plant1 |
Roof laid |
-
latitude : 22.335774544626474
Longitude : 88.31684435717762
file name : Image_17012024135005631.png
|
2024-01-17 13:50:05.697523 |
412 |
67439417 |
Construction of Water treatment plant |
281504 |
Construction of Water treatment plant1 |
Plinth level |
-
latitude : 22.33571256045252
Longitude : 88.31693454645574
file name : Image_09012024165901540.png
|
2024-01-09 16:59:01.612191 |
413 |
67439417 |
Construction of Water treatment plant |
281504 |
Construction of Water treatment plant1 |
Completion of work |
-
latitude : 22.33569646719843
Longitude : 88.3168845064938
file name : Image_09012024165523388.png
|
2024-01-09 16:55:23.476407 |
414 |
67439417 |
Construction of Water treatment plant |
281504 |
Construction of Water treatment plant1 |
Completion of work |
-
latitude : 22.33569646719843
Longitude : 88.3168845064938
file name : Image_09012024165457732.png
|
2024-01-09 16:54:57.902035 |
415 |
89213496 |
Construction of roads |
87790 |
Construction of roads1 |
Plinth level |
-
latitude : 22.361140865832567,22.36120205372572
Longitude : 88.31991749815643,88.31991456449032
file name : Image_13112024115209160.png
|
2024-11-13 11:52:09.250834 |
416 |
89213496 |
Construction of roads |
87790 |
Construction of roads1 |
Completion of work |
-
latitude : 22.361260768957436,22.361260768957436
Longitude : 88.31989528611302,88.31989528611302
file name : Image_30102024141814123.png
|
2024-10-30 14:18:14.204893 |
417 |
89213522 |
Construction of roads |
96357 |
Construction of roads1 |
Plinth level |
-
latitude : 22.361294380389154,22.361309551633894
Longitude : 88.31991045735776,88.31990224309266
file name : Image_13112024114834253.png
|
2024-11-13 11:48:34.360583 |
418 |
89213522 |
Construction of roads |
96357 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3612971464172,22.3612971464172
Longitude : 88.31990995444357,88.31990995444357
file name : Image_30102024141716722.png
|
2024-10-30 14:17:16.817777 |
419 |
89213860 |
Construction of roads |
218422 |
Construction of roads1 |
Roof laid |
-
latitude : 22.354452316649258,22.354452316649258
Longitude : 88.32765525206923,88.32765525206923
file name : Image_04102024125908626.png
|
2024-10-04 12:59:08.701159 |
420 |
89213860 |
Construction of roads |
218422 |
Construction of roads1 |
Plinth level |
-
latitude : 22.354558305814862,22.354526831768453
Longitude : 88.32788500003517,88.32788022235036
file name : Image_04102024125522425.png
|
2024-10-04 12:55:22.50344 |
421 |
89213860 |
Construction of roads |
218422 |
Construction of roads1 |
Completion of work |
-
latitude : 22.354570501483977,22.354581020772457
Longitude : 88.32793923094869,88.32790360786021
file name : Image_04102024125255186.png
|
2024-10-04 12:52:55.260698 |
422 |
89213999 |
Construction of roads |
90048 |
Construction of roads1 |
Completion of work |
-
latitude : 22.345805168151855,22.345782034099102
Longitude : 88.32815431058407,88.32806529477239
file name : Image_05102024095049900.png
|
2024-10-05 09:50:49.953155 |
423 |
66981021 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools |
35000 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools1 |
Roof laid |
-
latitude : 22.3481198
Longitude : 88.3272422
file name : Image_22072024150008574.png
|
2024-07-22 15:00:08.662342 |
424 |
66981021 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools |
35000 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools1 |
Plinth level |
-
latitude : 22.3481282
Longitude : 88.3272498
file name : Image_22072024145655043.png
|
2024-07-22 14:56:55.116146 |
425 |
66981021 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools |
35000 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools1 |
Completion of work |
-
latitude : 22.3481256
Longitude : 88.327247
file name : Image_22072024135506106.png
|
2024-07-22 13:55:06.168656 |
426 |
66981421 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools |
35000 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools1 |
Roof laid |
-
latitude : 22.3481177
Longitude : 88.3272367
file name : Image_22072024145409851.png
|
2024-07-22 14:54:09.92941 |
427 |
66981421 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools |
35000 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools1 |
Plinth level |
-
latitude : 22.3481184
Longitude : 88.3272404
file name : Image_22072024145139370.png
|
2024-07-22 14:51:39.480764 |
428 |
66981421 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools |
35000 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools1 |
Completion of work |
-
latitude : 22.3481239
Longitude : 88.3272468
file name : Image_22072024135732174.png
|
2024-07-22 13:57:32.252389 |
429 |
66980947 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools |
35000 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools1 |
Roof laid |
-
latitude : 22.3481345
Longitude : 88.3272572
file name : Image_22072024150558453.png
|
2024-07-22 15:05:58.528191 |
430 |
66980947 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools |
35000 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools1 |
Plinth level |
-
latitude : 22.348121
Longitude : 88.3272425
file name : Image_22072024150320668.png
|
2024-07-22 15:03:20.797439 |
431 |
66980947 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools |
35000 |
Installation of Sanitary vending machine in Upper Primary / Secondary schools1 |
Completion of work |
-
latitude : 22.3481212
Longitude : 88.3272431
file name : Image_22072024135148434.png
|
2024-07-22 13:51:48.49828 |
432 |
97343243 |
Creation of a new source of drinking water |
281504 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.3457442317158
Longitude : 88.32822823897004
file name : Image_26072024135209061.png
|
2024-07-26 13:52:09.121032 |
433 |
97343243 |
Creation of a new source of drinking water |
281504 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.3481079
Longitude : 88.3272286
file name : Image_26072024112358245.png
|
2024-07-26 11:23:58.321105 |
434 |
97343243 |
Creation of a new source of drinking water |
281504 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.3481082
Longitude : 88.3272309
file name : Image_26072024112047378.png
|
2024-07-26 11:20:47.447011 |
435 |
66968962 |
Creation of drainage channel for management of grey water |
349998 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.3405236
Longitude : 88.3149713
file name : Image_08082024131709323.png
|
2024-08-08 13:17:09.413725 |
436 |
66968962 |
Creation of drainage channel for management of grey water |
349998 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.3481101
Longitude : 88.3272317
file name : Image_26072024111552547.png
|
2024-07-26 11:15:52.61633 |
437 |
66968962 |
Creation of drainage channel for management of grey water |
349998 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.339861812070012
Longitude : 88.31535078585148
file name : Image_15032024122550760.png
|
2024-03-15 12:25:50.841758 |
438 |
66968962 |
Creation of drainage channel for management of grey water |
349998 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.339861812070012
Longitude : 88.31535078585148
file name : Image_15032024122515948.png
|
2024-03-15 12:25:16.041135 |
439 |
97342720 |
New constrution of concrete road from Dhankol to Shib Mandir of Abani Kabiraj. |
231607 |
New constrution of concrete road from Dhankol to Shib Mandir of Abani Kabiraj.1 |
Roof laid |
-
latitude : 22.33885736670345,22.33885736670345
Longitude : 88.31185201182961,88.31185201182961
file name : Image_09082024142323709.png
|
2024-08-09 14:23:23.788524 |
440 |
97342720 |
New constrution of concrete road from Dhankol to Shib Mandir of Abani Kabiraj. |
231607 |
New constrution of concrete road from Dhankol to Shib Mandir of Abani Kabiraj.1 |
Plinth level |
-
latitude : 22.3388979351148,22.3388979351148
Longitude : 88.3116024825722,88.3116024825722
file name : Image_09082024142028111.png
|
2024-08-09 14:20:28.189572 |
441 |
97342720 |
New constrution of concrete road from Dhankol to Shib Mandir of Abani Kabiraj. |
231607 |
New constrution of concrete road from Dhankol to Shib Mandir of Abani Kabiraj.1 |
Completion of work |
-
latitude : 22.337798858061433,22.33779889997095,22.33779889997095
Longitude : 88.31200162880123,88.31200196407735,88.31200196407735
file name : Image_14032024131536487.png
|
2024-03-14 13:15:36.558732 |
442 |
89215729 |
Drainage Construction |
263786 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.3624246
Longitude : 88.3181455
file name : Image_30102024114927788.png
|
2024-10-30 11:49:27.889261 |
443 |
89215729 |
Drainage Construction |
263786 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.362983
Longitude : 88.3183336
file name : Image_30102024114522025.png
|
2024-10-30 11:45:22.124066 |
444 |
89215729 |
Drainage Construction |
263786 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.363045
Longitude : 88.31827
file name : Image_30102024113836175.png
|
2024-10-30 11:38:36.030544 |