1 |
39116267 |
Cons CC road from house of Nasiruddin to Jahuruddin Khan and PWD road to Mucha at Joypur |
200000 |
Cons CC road from house of Nasiruddin to Jahuruddin Khan and PWD road to Mucha at Joypur1 |
Roof laid |
-
latitude : 22.26099313236773,22.261033155955374
Longitude : 88.32770453765988,88.32768995314837
file name : Image_04062021154213888.png
|
2021-06-04 15:42:13.988712 |
2 |
39116267 |
Cons CC road from house of Nasiruddin to Jahuruddin Khan and PWD road to Mucha at Joypur |
200000 |
Cons CC road from house of Nasiruddin to Jahuruddin Khan and PWD road to Mucha at Joypur1 |
Plinth level |
-
latitude : 22.26101752370596,22.260997658595443
Longitude : 88.32770847715437,88.32773068919778
file name : Image_03062021122210520.png
|
2021-06-03 12:22:10.606565 |
3 |
39116267 |
Cons CC road from house of Nasiruddin to Jahuruddin Khan and PWD road to Mucha at Joypur |
200000 |
Cons CC road from house of Nasiruddin to Jahuruddin Khan and PWD road to Mucha at Joypur1 |
Completion of work |
-
latitude : 22.2609492,22.2609672
Longitude : 88.3275469,88.3275216
file name : Image_01062021120435000.png
|
2021-06-01 12:04:35.144611 |
4 |
39116277 |
Cons of CC road with Protection wall from Hari Basar to Mistry Para at Hansury |
200000 |
Cons of CC road with Protection wall from Hari Basar to Mistry Para at Hansury1 |
Roof laid |
-
latitude : 22.2565762,22.2565767
Longitude : 88.3387203,88.3387251
file name : Image_11072021114403695.png
|
2021-07-11 11:44:03.793178 |
5 |
39116277 |
Cons of CC road with Protection wall from Hari Basar to Mistry Para at Hansury |
200000 |
Cons of CC road with Protection wall from Hari Basar to Mistry Para at Hansury1 |
Plinth level |
-
latitude : 22.25736452266574,22.257438534870744
Longitude : 88.33820169791579,88.3379046432674
file name : Image_11052021130330931.png
|
2021-05-11 13:03:31.013036 |
6 |
39116277 |
Cons of CC road with Protection wall from Hari Basar to Mistry Para at Hansury |
200000 |
Cons of CC road with Protection wall from Hari Basar to Mistry Para at Hansury1 |
Completion of work |
-
latitude : 22.2565722,22.2565773
Longitude : 88.3387331,88.3387301
file name : Image_25042021093839519.png
|
2021-04-25 09:38:39.606914 |
7 |
39112172 |
Cons CC road guardwall from house of Yousuf Molla to house of Abdulla Molla at Atporui |
199690 |
Cons CC road guardwall from house of Yousuf Molla to house of Abdulla Molla at Atporui1 |
Roof laid |
-
latitude : 22.278464413248003,22.2777376
Longitude : 88.32984385080636,88.3301559
file name : Image_22032021083851416.png
|
2021-03-22 08:38:51.519575 |
8 |
39112172 |
Cons CC road guardwall from house of Yousuf Molla to house of Abdulla Molla at Atporui |
199690 |
Cons CC road guardwall from house of Yousuf Molla to house of Abdulla Molla at Atporui1 |
Plinth level |
-
latitude : 22.278276910074055,22.277719136327505,22.277480461634696
Longitude : 88.32995935343206,88.3302200306207,88.33025556989014
file name : Image_17022021120007293.png
|
2021-02-17 12:00:07.396604 |
9 |
39112172 |
Cons CC road guardwall from house of Yousuf Molla to house of Abdulla Molla at Atporui |
199690 |
Cons CC road guardwall from house of Yousuf Molla to house of Abdulla Molla at Atporui1 |
Completion of work |
-
latitude : 22.278288938105106,22.27847706992179
Longitude : 88.32990118302405,88.3298809826374
file name : Image_11022021131856482.png
|
2021-02-11 13:18:56.576561 |
10 |
39112208 |
Cons CC road from house of Jahangir Akhan to house of Jalal Molla at Atporui |
199690 |
Cons CC road from house of Jahangir Akhan to house of Jalal Molla at Atporui1 |
Roof laid |
-
latitude : 22.277736570686102,22.27681963238865
Longitude : 88.33018910139799,88.33004149608314
file name : Image_21032021191610167.png
|
2021-03-21 19:16:10.258812 |
11 |
39112208 |
Cons CC road from house of Jahangir Akhan to house of Jalal Molla at Atporui |
199690 |
Cons CC road from house of Jahangir Akhan to house of Jalal Molla at Atporui1 |
Plinth level |
-
latitude : 22.276765862479806,22.27712083607912
Longitude : 88.33009388297796,88.3301730081439
file name : Image_17022021120000770.png
|
2021-02-17 12:00:00.871077 |
12 |
39112208 |
Cons CC road from house of Jahangir Akhan to house of Jalal Molla at Atporui |
199690 |
Cons CC road from house of Jahangir Akhan to house of Jalal Molla at Atporui1 |
Completion of work |
-
latitude : 22.27654080837965,22.27735293097794
Longitude : 88.32989808171988,88.33021391183138
file name : Image_11022021131859736.png
|
2021-02-11 13:18:59.839365 |
13 |
39116201 |
Construction of Cement Concrete Road from house of Kamini Khan to pond of Madhai Mondal at Kuldia |
200401 |
Construction of Cement Concrete Road from house of Kamini Khan to pond of Madhai Mondal at Kuldia1 |
Roof laid |
-
latitude : 22.26614553015679,22.266167867928743
Longitude : 88.34879550151527,88.34867061115801
file name : Image_04062021182853151.png
|
2021-06-04 18:28:53.253018 |
14 |
39116201 |
Construction of Cement Concrete Road from house of Kamini Khan to pond of Madhai Mondal at Kuldia |
200401 |
Construction of Cement Concrete Road from house of Kamini Khan to pond of Madhai Mondal at Kuldia1 |
Plinth level |
-
latitude : 22.261534,22.266088700853288
Longitude : 88.3504292,88.34876758977771
file name : Image_06032021113729995.png
|
2021-03-06 11:37:30.103704 |
15 |
39116201 |
Construction of Cement Concrete Road from house of Kamini Khan to pond of Madhai Mondal at Kuldia |
200401 |
Construction of Cement Concrete Road from house of Kamini Khan to pond of Madhai Mondal at Kuldia1 |
Completion of work |
-
latitude : 22.26609264034778,22.266151984222233
Longitude : 88.34897261112928,88.34869181737304
file name : Image_03032021165000277.png
|
2021-03-03 16:50:00.391779 |
16 |
39112258 |
Cons of CC Road from house of Ayep Ali to house of Amir Hossain at Nainan |
200439 |
Cons of CC Road from house of Ayep Ali to house of Amir Hossain at Nainan1 |
Roof laid |
-
latitude : 22.278129011392593,22.278341073542833
Longitude : 88.35389354266226,88.35259401239455
file name : Image_04052021160100457.png
|
2021-05-04 16:01:00.544711 |
17 |
39112258 |
Cons of CC Road from house of Ayep Ali to house of Amir Hossain at Nainan |
200439 |
Cons of CC Road from house of Ayep Ali to house of Amir Hossain at Nainan1 |
Plinth level |
-
latitude : 22.278129011392593,22.27817569859326
Longitude : 88.35387837141752,88.35359506309032
file name : Image_19042021134001905.png
|
2021-04-19 13:40:02.023444 |
18 |
39112258 |
Cons of CC Road from house of Ayep Ali to house of Amir Hossain at Nainan |
200439 |
Cons of CC Road from house of Ayep Ali to house of Amir Hossain at Nainan1 |
Completion of work |
-
latitude : 22.278369613923132,22.278383024968207
Longitude : 88.35257817059755,88.35256207734346
file name : Image_06032021183136399.png
|
2021-03-06 18:31:36.498415 |
19 |
39112457 |
Con of CC road with guardwall from land of Raihan Doctor to house of Harun Laskar at Byaspur |
199951 |
Con of CC road with guardwall from land of Raihan Doctor to house of Harun Laskar at Byaspur1 |
Roof laid |
-
latitude : 22.2778758,22.2778741
Longitude : 88.3652785,88.3652747
file name : Image_02062021145122010.png
|
2021-06-02 14:51:22.108174 |
20 |
39112457 |
Con of CC road with guardwall from land of Raihan Doctor to house of Harun Laskar at Byaspur |
199951 |
Con of CC road with guardwall from land of Raihan Doctor to house of Harun Laskar at Byaspur1 |
Plinth level |
-
latitude : 22.2778743,22.2778748
Longitude : 88.3652797,88.3652774
file name : Image_02062021144140859.png
|
2021-06-02 14:41:40.964483 |
21 |
39112457 |
Con of CC road with guardwall from land of Raihan Doctor to house of Harun Laskar at Byaspur |
199951 |
Con of CC road with guardwall from land of Raihan Doctor to house of Harun Laskar at Byaspur1 |
Completion of work |
-
latitude : 22.2778836,22.2778825
Longitude : 88.3652515,88.3652211
file name : Image_04052021130102734.png
|
2021-05-04 13:01:02.823644 |
22 |
39111553 |
Sinking of Tubewell with Platform and Soak pit near house of Abdur Rafik Gazi at Byaspur |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Abdur Rafik Gazi at Byaspur1 |
Roof laid |
-
latitude : 22.27684237
Longitude : 88.3606283
file name : Image_16022022091301617.png
|
2022-02-16 09:13:01.701834 |
23 |
39111553 |
Sinking of Tubewell with Platform and Soak pit near house of Abdur Rafik Gazi at Byaspur |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Abdur Rafik Gazi at Byaspur1 |
Plinth level |
-
latitude : 22.276815567165613
Longitude : 88.36064340546727
file name : Image_01092021192313866.png
|
2021-09-01 19:23:13.968748 |
24 |
39111553 |
Sinking of Tubewell with Platform and Soak pit near house of Abdur Rafik Gazi at Byaspur |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Abdur Rafik Gazi at Byaspur1 |
Completion of work |
-
latitude : 22.276843478903174
Longitude : 88.3606159966439
file name : Image_17072021124702252.png
|
2021-07-17 12:47:02.404499 |
25 |
39111584 |
Sinking of Tubewell with Platform and Soak pit at Kuldia Purba Sardar Para |
192408 |
Sinking of Tubewell with Platform and Soak pit at Kuldia Purba Sardar Para1 |
Roof laid |
-
latitude : 22.26613400503993
Longitude : 88.3579741884023
file name : Image_18062021140844729.png
|
2021-06-18 14:08:44.815112 |
26 |
39111584 |
Sinking of Tubewell with Platform and Soak pit at Kuldia Purba Sardar Para |
192408 |
Sinking of Tubewell with Platform and Soak pit at Kuldia Purba Sardar Para1 |
Plinth level |
-
latitude : 22.266159863211215
Longitude : 88.35795373655856
file name : Image_18062021140326697.png
|
2021-06-18 14:03:26.77843 |
27 |
39111584 |
Sinking of Tubewell with Platform and Soak pit at Kuldia Purba Sardar Para |
192408 |
Sinking of Tubewell with Platform and Soak pit at Kuldia Purba Sardar Para1 |
Completion of work |
-
latitude : 22.26612620986998
Longitude : 88.35797670297325
file name : Image_19032021184746198.png
|
2021-03-19 18:47:45.986006 |
28 |
39111690 |
Sinking of tube well with Platform and Soak pit at Mirzapur Sardar Para Masjid |
192408 |
Sinking of tube well with Platform and Soak pit at Mirzapur Sardar Para Masjid1 |
Roof laid |
-
latitude : 22.263333150185645
Longitude : 88.33948840387166
file name : Image_10062021105129166.png
|
2021-06-10 10:51:29.31378 |
29 |
39111690 |
Sinking of tube well with Platform and Soak pit at Mirzapur Sardar Para Masjid |
192408 |
Sinking of tube well with Platform and Soak pit at Mirzapur Sardar Para Masjid1 |
Plinth level |
-
latitude : 22.26338004693389
Longitude : 88.33950265310705
file name : Image_19032021184728928.png
|
2021-03-19 18:47:28.710938 |
30 |
39111690 |
Sinking of tube well with Platform and Soak pit at Mirzapur Sardar Para Masjid |
192408 |
Sinking of tube well with Platform and Soak pit at Mirzapur Sardar Para Masjid1 |
Completion of work |
-
latitude : 22.263352973386645
Longitude : 88.33953919820487
file name : Image_26022021171554684.png
|
2021-02-26 17:15:54.775168 |
31 |
39063583 |
Sinking of Tubewell with Platform and Soak pit at Nainan Dakshin Para |
192408 |
Sinking of Tubewell with Platform and Soak pit at Nainan Dakshin Para1 |
Roof laid |
-
latitude : 22.273083818145096
Longitude : 88.35218681953847
file name : Image_01092021192317006.png
|
2021-09-01 19:23:17.115794 |
32 |
39063583 |
Sinking of Tubewell with Platform and Soak pit at Nainan Dakshin Para |
192408 |
Sinking of Tubewell with Platform and Soak pit at Nainan Dakshin Para1 |
Plinth level |
-
latitude : 22.27305251173675
Longitude : 88.3522180840373
file name : Image_17072021124655253.png
|
2021-07-17 12:46:55.388677 |
33 |
39063583 |
Sinking of Tubewell with Platform and Soak pit at Nainan Dakshin Para |
192408 |
Sinking of Tubewell with Platform and Soak pit at Nainan Dakshin Para1 |
Completion of work |
-
latitude : 22.273043459281325
Longitude : 88.35217332467437
file name : Image_05072021124714270.png
|
2021-07-05 12:47:14.514168 |
34 |
39111608 |
Construction of Pucca Drain from Danga of Alimuddin to house of Entaj Laskar at Kuldia |
236644 |
Construction of Pucca Drain from Danga of Alimuddin to house of Entaj Laskar at Kuldia1 |
Roof laid |
-
latitude : 22.261689291335642,22.261684639379382
Longitude : 88.35160427726805,88.35163897834718
file name : Image_10062021141333687.png
|
2021-06-10 14:13:33.773677 |
35 |
39111608 |
Construction of Pucca Drain from Danga of Alimuddin to house of Entaj Laskar at Kuldia |
236644 |
Construction of Pucca Drain from Danga of Alimuddin to house of Entaj Laskar at Kuldia1 |
Plinth level |
-
latitude : 22.261726297438145,22.2615497
Longitude : 88.35159312933683,88.3504035
file name : Image_04062021182903372.png
|
2021-06-04 18:29:03.458959 |
36 |
39111608 |
Construction of Pucca Drain from Danga of Alimuddin to house of Entaj Laskar at Kuldia |
236644 |
Construction of Pucca Drain from Danga of Alimuddin to house of Entaj Laskar at Kuldia1 |
Completion of work |
-
latitude : 22.261702199466527,22.26168032269925
Longitude : 88.35161140188575,88.35163277573884
file name : Image_03032021165006525.png
|
2021-03-03 16:50:06.645285 |
37 |
39111632 |
Construction of Cement Concrete drain from house of Chammad Sk to house of Barjahan Sk at Kuldia |
228676 |
Construction of Cement Concrete drain from house of Chammad Sk to house of Barjahan Sk at Kuldia1 |
Roof laid |
-
latitude : 22.2648787,22.26467588916421
Longitude : 88.354001,88.35468026809394
file name : Image_10062021141322048.png
|
2021-06-10 14:13:22.149496 |
38 |
39111632 |
Construction of Cement Concrete drain from house of Chammad Sk to house of Barjahan Sk at Kuldia |
228676 |
Construction of Cement Concrete drain from house of Chammad Sk to house of Barjahan Sk at Kuldia1 |
Plinth level |
-
latitude : 22.264730581082404,22.2648439
Longitude : 88.35483801551163,88.353998
file name : Image_04062021182843528.png
|
2021-06-04 18:28:43.634945 |
39 |
39111632 |
Construction of Cement Concrete drain from house of Chammad Sk to house of Barjahan Sk at Kuldia |
228676 |
Construction of Cement Concrete drain from house of Chammad Sk to house of Barjahan Sk at Kuldia1 |
Completion of work |
-
latitude : 22.264660927467048,22.26473749615252
Longitude : 88.35483759641647,88.35479870438576
file name : Image_03032021130257499.png
|
2021-03-03 13:02:57.586318 |
40 |
39112355 |
Construction of Cement Concrete road from Blacktop road to house of Jakir Sk at Byaspur |
203497 |
Construction of Cement Concrete road from Blacktop road to house of Jakir Sk at Byaspur1 |
Roof laid |
-
latitude : 22.273411341011524,22.2739789634943
Longitude : 88.35997503250837,88.36019086651504
file name : Image_13072021111820069.png
|
2021-07-13 11:18:20.14865 |
41 |
39112355 |
Construction of Cement Concrete road from Blacktop road to house of Jakir Sk at Byaspur |
203497 |
Construction of Cement Concrete road from Blacktop road to house of Jakir Sk at Byaspur1 |
Plinth level |
-
latitude : 22.27385683916509,22.273941161110997
Longitude : 88.36012800224125,88.36015968583524
file name : Image_19042021134029259.png
|
2021-04-19 13:40:29.383474 |
42 |
39112355 |
Construction of Cement Concrete road from Blacktop road to house of Jakir Sk at Byaspur |
203497 |
Construction of Cement Concrete road from Blacktop road to house of Jakir Sk at Byaspur1 |
Completion of work |
-
latitude : 22.273349734023213,22.27334290277213
Longitude : 88.35998626425862,88.3599840849638
file name : Image_06032021183143016.png
|
2021-03-06 18:31:43.100807 |
43 |
39112267 |
Cons of CC Road from house of Jane Alam Sardar to house of Israfil at Nainan |
166063 |
Cons of CC Road from house of Jane Alam Sardar to house of Israfil at Nainan1 |
Roof laid |
-
latitude : 22.278318987227976,22.27870442904532
Longitude : 88.35264975205064,88.35154744796455
file name : Image_04052021160103337.png
|
2021-05-04 16:01:03.427563 |
44 |
39112267 |
Cons of CC Road from house of Jane Alam Sardar to house of Israfil at Nainan |
166063 |
Cons of CC Road from house of Jane Alam Sardar to house of Israfil at Nainan1 |
Plinth level |
-
latitude : 22.27836165111512,22.278697011061013
Longitude : 88.35271127521992,88.35158147849143
file name : Image_19042021134011398.png
|
2021-04-19 13:40:11.506488 |
45 |
39112267 |
Cons of CC Road from house of Jane Alam Sardar to house of Israfil at Nainan |
166063 |
Cons of CC Road from house of Jane Alam Sardar to house of Israfil at Nainan1 |
Completion of work |
-
latitude : 22.277674041688442,22.27850460447371
Longitude : 88.35324830375612,88.3519968856126
file name : Image_06032021183139945.png
|
2021-03-06 18:31:40.050953 |
46 |
39112377 |
Cons of CC road from Khansama Para Khamar to house of Sahid Gazi at Byaspur |
156902 |
Cons of CC road from Khansama Para Khamar to house of Sahid Gazi at Byaspur1 |
Roof laid |
-
latitude : 22.27495638,22.27493975
Longitude : 88.35982414,88.35982522
file name : Image_02022022100849808.png
|
2022-02-02 10:08:49.891894 |
47 |
39112377 |
Cons of CC road from Khansama Para Khamar to house of Sahid Gazi at Byaspur |
156902 |
Cons of CC road from Khansama Para Khamar to house of Sahid Gazi at Byaspur1 |
Plinth level |
-
latitude : 22.274943846277893,22.274943846277893
Longitude : 88.35983790457249,88.35983790457249
file name : Image_01122021113753351.png
|
2021-12-01 11:37:53.450685 |
48 |
39112377 |
Cons of CC road from Khansama Para Khamar to house of Sahid Gazi at Byaspur |
156902 |
Cons of CC road from Khansama Para Khamar to house of Sahid Gazi at Byaspur1 |
Completion of work |
-
latitude : 22.27493030950427,22.274934793822467
Longitude : 88.35983077995479,88.35972365923226
file name : Image_04052021130106545.png
|
2021-05-04 13:01:06.643124 |
49 |
67131709 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.27265226,22.2726523
Longitude : 88.36358181,88.36358176
file name : Image_25072024090046684.png
|
2024-07-25 09:00:46.78653 |
50 |
67131709 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.27264479,22.2726381
Longitude : 88.36357486,88.36357754
file name : Image_25072024085527760.png
|
2024-07-25 08:55:27.848777 |
51 |
67131709 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.27266898,22.27266896
Longitude : 88.36355499,88.36354704
file name : Image_25072024084917737.png
|
2024-07-25 08:49:17.81894 |
52 |
67077122 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.27963581,22.27964235
Longitude : 88.33165174,88.33164388
file name : Image_15042024130335495.png
|
2024-04-15 13:03:35.594066 |
53 |
67077122 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.27961466,22.27963034
Longitude : 88.33161958,88.33165744
file name : Image_15042024125257811.png
|
2024-04-15 12:52:57.923052 |
54 |
67077122 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.27963148,22.27961879
Longitude : 88.33179017,88.33177669
file name : Image_15042024124646151.png
|
2024-04-15 12:46:46.262173 |
55 |
67136511 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.25399545,22.2542571
Longitude : 88.33754372,88.3374265
file name : Image_24072024154026209.png
|
2024-07-24 15:40:26.296598 |
56 |
67136511 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.2542598,22.2542598
Longitude : 88.3374244,88.3374244
file name : Image_24072024153726325.png
|
2024-07-24 15:37:26.420467 |
57 |
67136511 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.25400894,22.254262
Longitude : 88.33752832,88.3374263
file name : Image_24072024153346678.png
|
2024-07-24 15:33:46.77584 |
58 |
67130220 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.27561033,22.27561566
Longitude : 88.35070256,88.35070362
file name : Image_02072024115347871.png
|
2024-07-02 11:53:47.940753 |
59 |
67130220 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.2756014,22.27560124
Longitude : 88.35068604,88.3506858
file name : Image_02072024115129765.png
|
2024-07-02 11:51:29.836517 |
60 |
67130220 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.27562106,22.27561935
Longitude : 88.35065648,88.3506578
file name : Image_02072024114804386.png
|
2024-07-02 11:48:04.467876 |
61 |
67130338 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.28002629,22.28002695
Longitude : 88.35505141,88.35505034
file name : Image_12082024123601929.png
|
2024-08-12 12:36:02.023435 |
62 |
67130338 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.28002768,22.28002589
Longitude : 88.35505376,88.35505956
file name : Image_11082024171002584.png
|
2024-08-11 17:10:02.675067 |
63 |
67130338 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.28000819,22.28000843
Longitude : 88.35502761,88.35502833
file name : Image_11082024170702117.png
|
2024-08-11 17:07:02.215128 |
64 |
67130338 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.27996776,22.27997683
Longitude : 88.35501991,88.35502364
file name : Image_11082024170331886.png
|
2024-08-11 17:03:31.981986 |
65 |
67136547 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.24952778,22.24953282
Longitude : 88.33685904,88.33684731
file name : Image_03092024161247702.png
|
2024-09-03 16:12:47.95069 |
66 |
67136547 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.24954236,22.24954197
Longitude : 88.33684985,88.33684975
file name : Image_03092024160653368.png
|
2024-09-03 16:06:53.552561 |
67 |
67136547 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.24954838,22.24954838
Longitude : 88.33682229,88.3368291
file name : Image_03092024160029573.png
|
2024-09-03 16:00:30.470594 |
68 |
39111895 |
Construction of New Culvert at Kuldia Ramkunir Canal at Kuldia |
100000 |
Construction of New Culvert at Kuldia Ramkunir Canal at Kuldia1 |
Roof laid |
-
latitude : 22.26693795528263,22.26693795528263
Longitude : 88.35966339334846,88.35966339334846
file name : Image_01022022141753846.png
|
2022-02-01 14:17:53.936071 |
69 |
39111895 |
Construction of New Culvert at Kuldia Ramkunir Canal at Kuldia |
100000 |
Construction of New Culvert at Kuldia Ramkunir Canal at Kuldia1 |
Plinth level |
-
latitude : 22.267006812617183,22.267024079337716
Longitude : 88.35960756987333,88.35960044525564
file name : Image_01022022141205843.png
|
2022-02-01 14:12:05.939588 |
70 |
39111895 |
Construction of New Culvert at Kuldia Ramkunir Canal at Kuldia |
100000 |
Construction of New Culvert at Kuldia Ramkunir Canal at Kuldia1 |
Completion of work |
-
latitude : 22.26703971158713,22.26701381150633
Longitude : 88.35960497148335,88.35958292707801
file name : Image_22102021091827712.png
|
2021-10-22 09:18:27.851353 |
71 |
34265764 |
Sinking of Tubewell with Platform and Soak pit at Kuldai Naskar Para |
192408 |
Sinking of Tubewell with Platform and Soak pit at Kuldai Naskar Para1 |
Plinth level |
-
latitude : 22.26325356401503
Longitude : 88.35533858276904
file name : Image_31102021100204203.png
|
2021-10-31 10:02:04.326961 |
72 |
34265764 |
Sinking of Tubewell with Platform and Soak pit at Kuldai Naskar Para |
192408 |
Sinking of Tubewell with Platform and Soak pit at Kuldai Naskar Para1 |
Completion of work |
-
latitude : 22.263625510968268
Longitude : 88.35547931492329
file name : Image_06032021091221342.png
|
2021-03-06 09:12:21.440964 |
73 |
39112364 |
Con of CC road from Black Top Road to house of Matin Gazi at Byaspur |
179000 |
Con of CC road from Black Top Road to house of Matin Gazi at Byaspur1 |
Roof laid |
-
latitude : 22.2718907,22.2718899
Longitude : 88.3659664,88.3659652
file name : Image_16022022095209760.png
|
2022-02-16 09:52:09.870792 |
74 |
39112364 |
Con of CC road from Black Top Road to house of Matin Gazi at Byaspur |
179000 |
Con of CC road from Black Top Road to house of Matin Gazi at Byaspur1 |
Plinth level |
-
latitude : 22.2718912,22.27189
Longitude : 88.3659755,88.3659747
file name : Image_12022022102256286.png
|
2022-02-12 10:22:56.388038 |
75 |
39112364 |
Con of CC road from Black Top Road to house of Matin Gazi at Byaspur |
179000 |
Con of CC road from Black Top Road to house of Matin Gazi at Byaspur1 |
Completion of work |
-
latitude : 22.2718891,22.2712763
Longitude : 88.3659673,88.36555392
file name : Image_11022022093957174.png
|
2022-02-11 09:39:57.313415 |
76 |
39078395 |
Cons CC drain from Khamar of Jubbar Pailan to Graveyard of Nur Hossain Pailan at Nainan |
122900 |
Cons CC drain from Khamar of Jubbar Pailan to Graveyard of Nur Hossain Pailan at Nainan1 |
Roof laid |
-
latitude : 22.2718895,22.2718895
Longitude : 88.3659735,88.3659735
file name : Image_11022022103157574.png
|
2022-02-11 10:31:57.674904 |
77 |
39078395 |
Cons CC drain from Khamar of Jubbar Pailan to Graveyard of Nur Hossain Pailan at Nainan |
122900 |
Cons CC drain from Khamar of Jubbar Pailan to Graveyard of Nur Hossain Pailan at Nainan1 |
Plinth level |
-
latitude : 22.277739378623664,22.27776532061398
Longitude : 88.35732065141201,88.35736113600433
file name : Image_01022022133428049.png
|
2022-02-01 13:34:28.140074 |
78 |
39078395 |
Cons CC drain from Khamar of Jubbar Pailan to Graveyard of Nur Hossain Pailan at Nainan |
122900 |
Cons CC drain from Khamar of Jubbar Pailan to Graveyard of Nur Hossain Pailan at Nainan1 |
Completion of work |
-
latitude : 22.279883259907365,22.27988330181688
Longitude : 88.35770068690181,88.35769842378795
file name : Image_01022022132849857.png
|
2022-02-01 13:28:49.976163 |
79 |
39062519 |
Sinking of Tubewell with Platform and Soak pit near Factory of Badiyar Jamal at Nainan |
192408 |
Sinking of Tubewell with Platform and Soak pit near Factory of Badiyar Jamal at Nainan1 |
Plinth level |
-
latitude : 22.273744773119688
Longitude : 88.35224683396518
file name : Image_21012022121132506.png
|
2022-01-21 12:11:33.164653 |
80 |
39062519 |
Sinking of Tubewell with Platform and Soak pit near Factory of Badiyar Jamal at Nainan |
192408 |
Sinking of Tubewell with Platform and Soak pit near Factory of Badiyar Jamal at Nainan1 |
Plinth level |
-
latitude : 22.273746198043227
Longitude : 88.35218229331076
file name : Image_14012022122908308.png
|
2022-01-14 12:29:08.397911 |
81 |
39062519 |
Sinking of Tubewell with Platform and Soak pit near Factory of Badiyar Jamal at Nainan |
192408 |
Sinking of Tubewell with Platform and Soak pit near Factory of Badiyar Jamal at Nainan1 |
Completion of work |
-
latitude : 22.27376254275441
Longitude : 88.35217701271176
file name : Image_14012022122146536.png
|
2022-01-14 12:21:46.636075 |
82 |
39111541 |
Sinking of Tubewell with Platform and Soak pit near Pora Para Small pond at Byaspur |
192408 |
Sinking of Tubewell with Platform and Soak pit near Pora Para Small pond at Byaspur1 |
Roof laid |
-
latitude : 22.2744028
Longitude : 88.3604512
file name : Image_18022022093550452.png
|
2022-02-18 09:35:50.569651 |
83 |
39111541 |
Sinking of Tubewell with Platform and Soak pit near Pora Para Small pond at Byaspur |
192408 |
Sinking of Tubewell with Platform and Soak pit near Pora Para Small pond at Byaspur1 |
Plinth level |
-
latitude : 22.2754253
Longitude : 88.36041702
file name : Image_11022022092235956.png
|
2022-02-11 09:22:36.049334 |
84 |
39111541 |
Sinking of Tubewell with Platform and Soak pit near Pora Para Small pond at Byaspur |
192408 |
Sinking of Tubewell with Platform and Soak pit near Pora Para Small pond at Byaspur1 |
Completion of work |
-
latitude : 22.275451538152993
Longitude : 88.36044416762888
file name : Image_14012022144354459.png
|
2022-01-14 14:43:54.570757 |
85 |
39111751 |
Sinking of Tubewell with Platform and Soak pit near house of Akbar Molla at Nainan |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Akbar Molla at Nainan1 |
Plinth level |
-
latitude : 22.277828478254378
Longitude : 88.35517664439976
file name : Image_01022022131309194.png
|
2022-02-01 13:13:09.286566 |
86 |
39111751 |
Sinking of Tubewell with Platform and Soak pit near house of Akbar Molla at Nainan |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Akbar Molla at Nainan1 |
Roof laid |
-
latitude : 22.277749604545534
Longitude : 88.35519357584417
file name : Image_01022022131530613.png
|
2022-02-01 13:15:30.692415 |
87 |
39111751 |
Sinking of Tubewell with Platform and Soak pit near house of Akbar Molla at Nainan |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Akbar Molla at Nainan1 |
Plinth level |
-
latitude : 22.277843398042023
Longitude : 88.35516474209726
file name : Image_01022022131148686.png
|
2022-02-01 13:11:48.773681 |
88 |
39111751 |
Sinking of Tubewell with Platform and Soak pit near house of Akbar Molla at Nainan |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Akbar Molla at Nainan1 |
Completion of work |
-
latitude : 22.27790404111147
Longitude : 88.35526213981211
file name : Image_14012022135622323.png
|
2022-01-14 13:56:22.433431 |
89 |
34003651 |
Sinking of Tubewell with Platform and Soak pit near house of Idrish Pailan at Nainan |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Idrish Pailan at Nainan1 |
Roof laid |
-
latitude : 22.2718895
Longitude : 88.3659735
file name : Image_11022022103710715.png
|
2022-02-11 10:37:10.829184 |
90 |
34003651 |
Sinking of Tubewell with Platform and Soak pit near house of Idrish Pailan at Nainan |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Idrish Pailan at Nainan1 |
Plinth level |
-
latitude : 22.28021141141653
Longitude : 88.35772583261132
file name : Image_01022022132338733.png
|
2022-02-01 13:23:38.84476 |
91 |
34003651 |
Sinking of Tubewell with Platform and Soak pit near house of Idrish Pailan at Nainan |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Idrish Pailan at Nainan1 |
Completion of work |
-
latitude : 22.28023387491703
Longitude : 88.35785407572985
file name : Image_14012022140452144.png
|
2022-01-14 14:04:52.260584 |
92 |
39111706 |
Sinking of Tubewell with Platform and Soak pit near house of Sahabuddin Gazi at Hansury |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Sahabuddin Gazi at Hansury1 |
Roof laid |
-
latitude : 22.257158244028687
Longitude : 88.33858550526202
file name : Image_18122021112804159.png
|
2021-12-18 11:28:04.283236 |
93 |
39111706 |
Sinking of Tubewell with Platform and Soak pit near house of Sahabuddin Gazi at Hansury |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Sahabuddin Gazi at Hansury1 |
Plinth level |
-
latitude : 22.257179911248386
Longitude : 88.33857636898756
file name : Image_22112021132703235.png
|
2021-11-22 13:27:03.360759 |
94 |
39111706 |
Sinking of Tubewell with Platform and Soak pit near house of Sahabuddin Gazi at Hansury |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Sahabuddin Gazi at Hansury1 |
Completion of work |
-
latitude : 22.25713272113353
Longitude : 88.33866538479924
file name : Image_19112021160622518.png
|
2021-11-19 16:06:22.638055 |
95 |
39116240 |
Cons of CC road from house of Hasem Ali Laskar to house of Monirul Laskar at Mirzapur |
140191 |
Cons of CC road from house of Hasem Ali Laskar to house of Monirul Laskar at Mirzapur1 |
Roof laid |
-
latitude : 22.263107551261783,22.263109521009028
Longitude : 88.3402359019965,88.34029851481318
file name : Image_30112021155733836.png
|
2021-11-30 15:57:33.954679 |
96 |
39116240 |
Cons of CC road from house of Hasem Ali Laskar to house of Monirul Laskar at Mirzapur |
140191 |
Cons of CC road from house of Hasem Ali Laskar to house of Monirul Laskar at Mirzapur1 |
Plinth level |
-
latitude : 22.263134457170963,22.26315218489617
Longitude : 88.34032667800784,88.3402887918055
file name : Image_23112021132334681.png
|
2021-11-23 13:23:34.785502 |
97 |
39116240 |
Cons of CC road from house of Hasem Ali Laskar to house of Monirul Laskar at Mirzapur |
140191 |
Cons of CC road from house of Hasem Ali Laskar to house of Monirul Laskar at Mirzapur1 |
Completion of work |
-
latitude : 22.263121381402016,22.262980020605028
Longitude : 88.34033413790166,88.34021335467696
file name : Image_03082021140148437.png
|
2021-08-03 14:01:48.525022 |
98 |
34141991 |
Sinking of Drinking Water with Platform and Soak pit near house of Sakirul Molla at Atporui |
192408 |
Sinking of Drinking Water with Platform and Soak pit near house of Sakirul Molla at Atporui1 |
Roof laid |
-
latitude : 22.2596222
Longitude : 88.3349051
file name : Image_07032022162840750.png
|
2022-03-07 16:28:40.859369 |
99 |
34141991 |
Sinking of Drinking Water with Platform and Soak pit near house of Sakirul Molla at Atporui |
192408 |
Sinking of Drinking Water with Platform and Soak pit near house of Sakirul Molla at Atporui1 |
Plinth level |
-
latitude : 22.273078872822225
Longitude : 88.33034827373922
file name : Image_24112021155229374.png
|
2021-11-24 15:52:29.477411 |
100 |
34141991 |
Sinking of Drinking Water with Platform and Soak pit near house of Sakirul Molla at Atporui |
192408 |
Sinking of Drinking Water with Platform and Soak pit near house of Sakirul Molla at Atporui1 |
Completion of work |
-
latitude : 22.273111017420888
Longitude : 88.33039957098663
file name : Image_23112021163022980.png
|
2021-11-23 16:30:23.108954 |
101 |
39112196 |
Cons CC road from house of Siraj Sk to house of Asraf Sk at Atporui |
100000 |
Cons CC road from house of Siraj Sk to house of Asraf Sk at Atporui1 |
Roof laid |
-
latitude : 22.2596224,22.2596224
Longitude : 88.3349059,88.3349059
file name : Image_07032022162053995.png
|
2022-03-07 16:20:54.079825 |
102 |
39112196 |
Cons CC road from house of Siraj Sk to house of Asraf Sk at Atporui |
100000 |
Cons CC road from house of Siraj Sk to house of Asraf Sk at Atporui1 |
Plinth level |
-
latitude : 22.27950339205563,22.2795627778396
Longitude : 88.3322196174413,88.33220553584397
file name : Image_11012022123010315.png
|
2022-01-11 12:30:10.43061 |
103 |
39112196 |
Cons CC road from house of Siraj Sk to house of Asraf Sk at Atporui |
100000 |
Cons CC road from house of Siraj Sk to house of Asraf Sk at Atporui1 |
Completion of work |
-
latitude : 22.27947334293276,22.27948214393109
Longitude : 88.33220813423395,88.33221735432744
file name : Image_24112021162454998.png
|
2021-11-24 16:24:55.095659 |
104 |
39111799 |
Cons CC Drain from house of Subal Sardar to house of Salauddin Gazi at Hansury |
101016 |
Cons CC Drain from house of Subal Sardar to house of Salauddin Gazi at Hansury1 |
Roof laid |
-
latitude : 22.2542,22.2542
Longitude : 88.3372012,88.3372012
file name : Image_22022022173347071.png
|
2022-02-22 17:33:47.182571 |
105 |
39111799 |
Cons CC Drain from house of Subal Sardar to house of Salauddin Gazi at Hansury |
101016 |
Cons CC Drain from house of Subal Sardar to house of Salauddin Gazi at Hansury1 |
Plinth level |
-
latitude : 22.254199,22.2542008
Longitude : 88.3372007,88.3372014
file name : Image_21022022113713465.png
|
2022-02-21 11:37:13.579682 |
106 |
39111799 |
Cons CC Drain from house of Subal Sardar to house of Salauddin Gazi at Hansury |
101016 |
Cons CC Drain from house of Subal Sardar to house of Salauddin Gazi at Hansury1 |
Plinth level |
-
latitude : 22.254247,22.2542612
Longitude : 88.3372737,88.3372714
file name : Image_09012022105926058.png
|
2022-01-09 10:59:26.187917 |
107 |
39111799 |
Cons CC Drain from house of Subal Sardar to house of Salauddin Gazi at Hansury |
101016 |
Cons CC Drain from house of Subal Sardar to house of Salauddin Gazi at Hansury1 |
Completion of work |
-
latitude : 22.2542223,22.254225
Longitude : 88.3372934,88.3372961
file name : Image_26122021103041265.png
|
2021-12-26 10:30:41.458393 |
108 |
39111767 |
Cons CC drain from house of Ranjit Samanta to house of Jhantu Samanta at Hansury |
150000 |
Cons CC drain from house of Ranjit Samanta to house of Jhantu Samanta at Hansury1 |
Roof laid |
-
latitude : 22.257758555933833,22.257668827660382
Longitude : 88.33152232691646,88.33136013709009
file name : Image_26022022092252736.png
|
2022-02-26 09:22:52.84596 |
109 |
39111767 |
Cons CC drain from house of Ranjit Samanta to house of Jhantu Samanta at Hansury |
150000 |
Cons CC drain from house of Ranjit Samanta to house of Jhantu Samanta at Hansury1 |
Plinth level |
-
latitude : 22.257722388021648,22.257717694155872
Longitude : 88.33134270273149,88.33136592060328
file name : Image_11012022123016097.png
|
2022-01-11 12:30:16.190435 |
110 |
39111767 |
Cons CC drain from house of Ranjit Samanta to house of Jhantu Samanta at Hansury |
150000 |
Cons CC drain from house of Ranjit Samanta to house of Jhantu Samanta at Hansury1 |
Completion of work |
-
latitude : 22.257740828208625,22.25773470941931
Longitude : 88.3313786610961,88.33133256062865
file name : Image_27122021132315453.png
|
2021-12-27 13:23:15.563646 |
111 |
39112238 |
Cons of CC Road from house of Rafikul Mallick to house of Jahir Abbas Mallick at Naina |
137252 |
Cons of CC Road from house of Rafikul Mallick to house of Jahir Abbas Mallick at Naina1 |
Roof laid |
-
latitude : 22.27358083,22.27357569
Longitude : 88.35147745,88.3514874
file name : Image_07032022121748965.png
|
2022-03-07 12:17:49.04772 |
112 |
39112238 |
Cons of CC Road from house of Rafikul Mallick to house of Jahir Abbas Mallick at Naina |
137252 |
Cons of CC Road from house of Rafikul Mallick to house of Jahir Abbas Mallick at Naina1 |
Plinth level |
-
latitude : 22.27358356,22.27359353
Longitude : 88.35150936,88.35153535
file name : Image_24022022133149919.png
|
2022-02-24 13:31:50.017942 |
113 |
39112238 |
Cons of CC Road from house of Rafikul Mallick to house of Jahir Abbas Mallick at Naina |
137252 |
Cons of CC Road from house of Rafikul Mallick to house of Jahir Abbas Mallick at Naina1 |
Completion of work |
-
latitude : 22.27357579395175,22.273685638792813
Longitude : 88.35036937147379,88.35153655149043
file name : Image_19032021184742001.png
|
2021-03-19 18:47:41.772109 |
114 |
39116230 |
Cons of CC road from house of Amir Ali Laskar to house of Anarul Laskar at Mirzapur |
160811 |
Cons of CC road from house of Amir Ali Laskar to house of Anarul Laskar at Mirzapur1 |
Roof laid |
-
latitude : 22.26537975948304,22.265417058952153
Longitude : 88.34331172518432,88.343376936391
file name : Image_05012022124306460.png
|
2022-01-05 12:43:06.571368 |
115 |
39116230 |
Cons of CC road from house of Amir Ali Laskar to house of Anarul Laskar at Mirzapur |
160811 |
Cons of CC road from house of Amir Ali Laskar to house of Anarul Laskar at Mirzapur1 |
Completion of work |
-
latitude : 22.265406707301736,22.26543386466801
Longitude : 88.34337115287781,88.34339453838766
file name : Image_05012022123712503.png
|
2022-01-05 12:37:12.594494 |
116 |
39116230 |
Cons of CC road from house of Amir Ali Laskar to house of Anarul Laskar at Mirzapur |
160811 |
Cons of CC road from house of Amir Ali Laskar to house of Anarul Laskar at Mirzapur1 |
Completion of work |
-
latitude : 22.26540151052177,22.265422716736794
Longitude : 88.34328607656062,88.3433439116925
file name : Image_27122021132319010.png
|
2021-12-27 13:23:19.09536 |
117 |
45719319 |
T Water testing and Tubewell Reparing for all Sandad |
337747 |
T Water testing and Tubewell Reparing for all Sandad1 |
Completion of work |
-
latitude : 22.2596116
Longitude : 88.3348668
file name : Image_05012022153433273.png
|
2022-01-05 15:34:33.384481 |
118 |
39111878 |
Construction of New Culvert at Kuldia Doltala |
100000 |
Construction of New Culvert at Kuldia Doltala1 |
Roof laid |
-
latitude : 22.264923909679055,22.264919341541827
Longitude : 88.36539133451879,88.36539418436587
file name : Image_01022022140100535.png
|
2022-02-01 14:01:00.639837 |
119 |
39111878 |
Construction of New Culvert at Kuldia Doltala |
100000 |
Construction of New Culvert at Kuldia Doltala1 |
Plinth level |
-
latitude : 22.264907145872712,22.264907145872712
Longitude : 88.3652909193188,88.3652909193188
file name : Image_01022022135825369.png
|
2022-02-01 13:58:25.478574 |
120 |
39111878 |
Construction of New Culvert at Kuldia Doltala |
100000 |
Construction of New Culvert at Kuldia Doltala1 |
Completion of work |
-
latitude : 22.264925250783563,22.264897213317454
Longitude : 88.36532293818891,88.36526594124734
file name : Image_01022022135526880.png
|
2022-02-01 13:55:26.998614 |
121 |
39111562 |
Sinking of Tubewell with Platform and Soak pit at land of Amirul Sardar at Byaspur |
192408 |
Sinking of Tubewell with Platform and Soak pit at land of Amirul Sardar at Byaspur1 |
Roof laid |
-
latitude : 22.27802686
Longitude : 88.36505888
file name : Image_06032022095722230.png
|
2022-03-06 09:57:22.342406 |
122 |
39111562 |
Sinking of Tubewell with Platform and Soak pit at land of Amirul Sardar at Byaspur |
192408 |
Sinking of Tubewell with Platform and Soak pit at land of Amirul Sardar at Byaspur1 |
Plinth level |
-
latitude : 22.2782163
Longitude : 88.3653118
file name : Image_16022022092154086.png
|
2022-02-16 09:21:54.174048 |
123 |
39111562 |
Sinking of Tubewell with Platform and Soak pit at land of Amirul Sardar at Byaspur |
192408 |
Sinking of Tubewell with Platform and Soak pit at land of Amirul Sardar at Byaspur1 |
Completion of work |
-
latitude : 22.277993
Longitude : 88.3651697
file name : Image_14012022141909064.png
|
2022-01-14 14:19:09.292291 |
124 |
39062467 |
Sinking of Tubewell with Platform and Soak pit near house of Khatib Ali at Nainan |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Khatib Ali at Nainan1 |
Roof laid |
-
latitude : 22.27291886229068
Longitude : 88.34972647950053
file name : Image_24012022145324612.png
|
2022-01-24 14:53:24.731496 |
125 |
39062467 |
Sinking of Tubewell with Platform and Soak pit near house of Khatib Ali at Nainan |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Khatib Ali at Nainan1 |
Completion of work |
-
latitude : 22.2728798026219
Longitude : 88.3497504517436
file name : Image_21012022121330772.png
|
2022-01-21 12:13:30.863332 |
126 |
39062467 |
Sinking of Tubewell with Platform and Soak pit near house of Khatib Ali at Nainan |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Khatib Ali at Nainan1 |
Completion of work |
-
latitude : 22.272863583639264
Longitude : 88.34980510175228
file name : Image_14012022123953797.png
|
2022-01-14 12:39:53.905591 |
127 |
39111624 |
Construction of Cement Concrete drain from pond of Tapan Baddi to house of Kishori Mondal at Kuldia |
171001 |
Construction of Cement Concrete drain from pond of Tapan Baddi to house of Kishori Mondal at Kuldia1 |
Roof laid |
-
latitude : 22.264765868894756,22.264825170859694
Longitude : 88.35203250870109,88.35205597802997
file name : Image_01022022125841110.png
|
2022-02-01 12:58:41.22065 |
128 |
39111624 |
Construction of Cement Concrete drain from pond of Tapan Baddi to house of Kishori Mondal at Kuldia |
171001 |
Construction of Cement Concrete drain from pond of Tapan Baddi to house of Kishori Mondal at Kuldia1 |
Plinth level |
-
latitude : 22.26479809731245,22.264791685156524
Longitude : 88.3520732447505,88.3520838059485
file name : Image_01022022124928406.png
|
2022-02-01 12:49:28.530252 |
129 |
39111624 |
Construction of Cement Concrete drain from pond of Tapan Baddi to house of Kishori Mondal at Kuldia |
171001 |
Construction of Cement Concrete drain from pond of Tapan Baddi to house of Kishori Mondal at Kuldia1 |
Completion of work |
-
latitude : 22.264775717630982,22.264795540831983
Longitude : 88.35204089060426,88.35203938186169
file name : Image_22102021092853493.png
|
2021-10-22 09:28:53.615964 |
130 |
39112281 |
Cons of CC Road from House of Kutubuddin Sardar to house of Anarul Sk at Nainan |
150112 |
Cons of CC Road from House of Kutubuddin Sardar to house of Anarul Sk at Nainan1 |
Roof laid |
-
latitude : 22.28024371,22.28024047
Longitude : 88.35622003,88.35621954
file name : Image_07032022114538481.png
|
2022-03-07 11:45:38.601943 |
131 |
39112281 |
Cons of CC Road from House of Kutubuddin Sardar to house of Anarul Sk at Nainan |
150112 |
Cons of CC Road from House of Kutubuddin Sardar to house of Anarul Sk at Nainan1 |
Plinth level |
-
latitude : 22.28023605,22.28023063
Longitude : 88.35625365,88.35625502
file name : Image_06032022091931577.png
|
2022-03-06 09:19:31.678286 |
132 |
39112281 |
Cons of CC Road from House of Kutubuddin Sardar to house of Anarul Sk at Nainan |
150112 |
Cons of CC Road from House of Kutubuddin Sardar to house of Anarul Sk at Nainan1 |
Completion of work |
-
latitude : 22.2754926,22.2754926,22.2754926
Longitude : 88.3527777,88.3527777,88.3527777
file name : Image_18022022095835077.png
|
2022-02-18 09:58:35.193449 |
133 |
39062572 |
Construction of Cement Concrete drain from house of Anowar to house of Makbul at Nainan |
180533 |
Construction of Cement Concrete drain from house of Anowar to house of Makbul at Nainan1 |
Roof laid |
-
latitude : 22.27745978,22.27745332
Longitude : 88.3536945,88.35371668
file name : Image_23042022095455986.png
|
2022-04-23 09:54:56.122231 |
134 |
39062572 |
Construction of Cement Concrete drain from house of Anowar to house of Makbul at Nainan |
180533 |
Construction of Cement Concrete drain from house of Anowar to house of Makbul at Nainan1 |
Plinth level |
-
latitude : 22.27744443,22.27741343
Longitude : 88.35368526,88.35369741
file name : Image_07032022115517318.png
|
2022-03-07 11:55:17.499405 |
135 |
39062572 |
Construction of Cement Concrete drain from house of Anowar to house of Makbul at Nainan |
180533 |
Construction of Cement Concrete drain from house of Anowar to house of Makbul at Nainan1 |
Completion of work |
-
latitude : 22.277464661747217,22.277269489131868
Longitude : 88.35374685935676,88.35347478277981
file name : Image_06032021183133153.png
|
2021-03-06 18:31:33.239436 |
136 |
39078232 |
Construction of Cement Concrete drain from house of Daud Gazi to Kowra Pond Canal at Nainan |
153065 |
Construction of Cement Concrete drain from house of Daud Gazi to Kowra Pond Canal at Nainan1 |
Roof laid |
-
latitude : 22.2744735,22.2744832
Longitude : 88.35337979,88.35338115
file name : Image_31032022114858979.png
|
2022-03-31 11:48:59.081663 |
137 |
39078232 |
Construction of Cement Concrete drain from house of Daud Gazi to Kowra Pond Canal at Nainan |
153065 |
Construction of Cement Concrete drain from house of Daud Gazi to Kowra Pond Canal at Nainan1 |
Plinth level |
-
latitude : 22.27455913,22.27455647
Longitude : 88.35343923,88.35342178
file name : Image_09032022121419081.png
|
2022-03-09 12:14:19.173304 |
138 |
39078232 |
Construction of Cement Concrete drain from house of Daud Gazi to Kowra Pond Canal at Nainan |
153065 |
Construction of Cement Concrete drain from house of Daud Gazi to Kowra Pond Canal at Nainan1 |
Plinth level |
-
latitude : 22.2744028,22.2744028,22.2744028
Longitude : 88.3604512,88.3604512,88.3604512
file name : Image_18022022094731204.png
|
2022-02-18 09:47:31.308852 |
139 |
39078232 |
Construction of Cement Concrete drain from house of Daud Gazi to Kowra Pond Canal at Nainan |
153065 |
Construction of Cement Concrete drain from house of Daud Gazi to Kowra Pond Canal at Nainan1 |
Completion of work |
-
latitude : 22.274579317308962,22.274575964547694
Longitude : 88.35342432372272,88.35345399565995
file name : Image_06032021183126211.png
|
2021-03-06 18:31:26.321199 |
140 |
39111598 |
Construction of Cement Concrete drain from house of Icha Sk to house of Najrul Sk at Kuldia |
150449 |
Construction of Cement Concrete drain from house of Icha Sk to house of Najrul Sk at Kuldia1 |
Roof laid |
-
latitude : 22.26303667,22.26303384
Longitude : 88.35152271,88.35152156
file name : Image_11032022155357738.png
|
2022-03-11 15:53:57.833157 |
141 |
39111598 |
Construction of Cement Concrete drain from house of Icha Sk to house of Najrul Sk at Kuldia |
150449 |
Construction of Cement Concrete drain from house of Icha Sk to house of Najrul Sk at Kuldia1 |
Plinth level |
-
latitude : 22.26303262,22.26303221
Longitude : 88.35150939,88.3515089
file name : Image_11032022154834389.png
|
2022-03-11 15:48:34.495302 |
142 |
39111598 |
Construction of Cement Concrete drain from house of Icha Sk to house of Najrul Sk at Kuldia |
150449 |
Construction of Cement Concrete drain from house of Icha Sk to house of Najrul Sk at Kuldia1 |
Completion of work |
-
latitude : 22.26293941028416,22.2630108660087
Longitude : 88.35145474411547,88.35156504996121
file name : Image_22102021093410891.png
|
2021-10-22 09:34:11.057045 |
143 |
39111792 |
Cons CC Drain from house of Piyar Nabi to house of Sona Ruidas at Hansury |
146400 |
Cons CC Drain from house of Piyar Nabi to house of Sona Ruidas at Hansury1 |
Roof laid |
-
latitude : 22.2596223,22.2596223
Longitude : 88.3349017,88.3349017
file name : Image_22032022145110721.png
|
2022-03-22 14:51:10.821298 |
144 |
39111792 |
Cons CC Drain from house of Piyar Nabi to house of Sona Ruidas at Hansury |
146400 |
Cons CC Drain from house of Piyar Nabi to house of Sona Ruidas at Hansury1 |
Plinth level |
-
latitude : 22.2596223,22.2596223
Longitude : 88.3349017,88.3349017
file name : Image_22032022144852117.png
|
2022-03-22 14:48:52.226338 |
145 |
39111792 |
Cons CC Drain from house of Piyar Nabi to house of Sona Ruidas at Hansury |
146400 |
Cons CC Drain from house of Piyar Nabi to house of Sona Ruidas at Hansury1 |
Completion of work |
-
latitude : 22.2596223,22.2596223
Longitude : 88.3349017,88.3349017
file name : Image_22032022144347627.png
|
2022-03-22 14:43:47.72751 |
146 |
39116234 |
Cons of Protection wall from shop of Alimuddin Laskar to house of Saidul Haldar at Mirzapur |
269000 |
Cons of Protection wall from shop of Alimuddin Laskar to house of Saidul Haldar at Mirzapur1 |
Roof laid |
-
latitude : 22.263573,22.2635726
Longitude : 88.3411485,88.3411513
file name : Image_22032022150357293.png
|
2022-03-22 15:03:57.376082 |
147 |
39116234 |
Cons of Protection wall from shop of Alimuddin Laskar to house of Saidul Haldar at Mirzapur |
269000 |
Cons of Protection wall from shop of Alimuddin Laskar to house of Saidul Haldar at Mirzapur1 |
Plinth level |
-
latitude : 22.2635732,22.2635732
Longitude : 88.3411489,88.3411489
file name : Image_22032022150116669.png
|
2022-03-22 15:01:16.757049 |
148 |
39116234 |
Cons of Protection wall from shop of Alimuddin Laskar to house of Saidul Haldar at Mirzapur |
269000 |
Cons of Protection wall from shop of Alimuddin Laskar to house of Saidul Haldar at Mirzapur1 |
Completion of work |
-
latitude : 22.2596223,22.2596223
Longitude : 88.3349017,88.3349017
file name : Image_22032022145730013.png
|
2022-03-22 14:57:30.641096 |
149 |
39111674 |
Sinking of Tubewell with Platform and Soak pit near house of Jhantu Molla at Mirzapur |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Jhantu Molla at Mirzapur1 |
Roof laid |
-
latitude : 22.2596242
Longitude : 88.3349095
file name : Image_25032022141530337.png
|
2022-03-25 14:15:30.425984 |
150 |
39111674 |
Sinking of Tubewell with Platform and Soak pit near house of Jhantu Molla at Mirzapur |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Jhantu Molla at Mirzapur1 |
Plinth level |
-
latitude : 22.26303675
Longitude : 88.34165182
file name : Image_22032022150718745.png
|
2022-03-22 15:07:18.830035 |
151 |
39111674 |
Sinking of Tubewell with Platform and Soak pit near house of Jhantu Molla at Mirzapur |
192408 |
Sinking of Tubewell with Platform and Soak pit near house of Jhantu Molla at Mirzapur1 |
Completion of work |
-
latitude : 22.2633159
Longitude : 88.3410743
file name : Image_03082021140156193.png
|
2021-08-03 14:01:56.290535 |
152 |
67150319 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.27408569
Longitude : 88.35069177
file name : Image_03092024135618273.png
|
2024-09-03 13:56:19.088767 |
153 |
67150319 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.27405321
Longitude : 88.35068154
file name : Image_03092024134746817.png
|
2024-09-03 13:47:47.540767 |
154 |
67150319 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.27408789
Longitude : 88.35071066
file name : Image_03092024131615494.png
|
2024-09-03 13:16:15.785759 |
155 |
39116226 |
Cons of Protection wall from Mucha Haldar to house of Sahaja and to house of Khayrul at Mirzapur |
234000 |
Cons of Protection wall from Mucha Haldar to house of Sahaja and to house of Khayrul at Mirzapur1 |
Plinth level |
-
latitude : 22.263585,22.263585
Longitude : 88.3411583,88.3411583
file name : Image_25032022142257770.png
|
2022-03-25 14:22:57.881012 |
156 |
39116226 |
Cons of Protection wall from Mucha Haldar to house of Sahaja and to house of Khayrul at Mirzapur |
234000 |
Cons of Protection wall from Mucha Haldar to house of Sahaja and to house of Khayrul at Mirzapur1 |
Plinth level |
-
latitude : 22.2635754,22.2635754
Longitude : 88.3411569,88.3411569
file name : Image_22032022151655003.png
|
2022-03-22 15:16:55.085393 |
157 |
39116249 |
Cons of CC Road from house of Neburali Sardar to house Moymur at Mirzapur |
193478 |
Cons of CC Road from house of Neburali Sardar to house Moymur at Mirzapur1 |
Plinth level |
-
latitude : 22.263585,22.263585
Longitude : 88.3411583,88.3411583
file name : Image_25032022142531317.png
|
2022-03-25 14:25:31.42338 |
158 |
39116249 |
Cons of CC Road from house of Neburali Sardar to house Moymur at Mirzapur |
193478 |
Cons of CC Road from house of Neburali Sardar to house Moymur at Mirzapur1 |
Plinth level |
-
latitude : 22.2635754,22.2635754
Longitude : 88.3411569,88.3411569
file name : Image_22032022152856635.png
|
2022-03-22 15:28:56.728554 |
159 |
39116249 |
Cons of CC Road from house of Neburali Sardar to house Moymur at Mirzapur |
193478 |
Cons of CC Road from house of Neburali Sardar to house Moymur at Mirzapur1 |
Completion of work |
-
latitude : 22.2635754,22.2635754
Longitude : 88.3411569,88.3411569
file name : Image_22032022152540665.png
|
2022-03-22 15:25:40.756144 |
160 |
67201781 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.2749811,22.2750579
Longitude : 88.3557732,88.355768
file name : Image_25072024093157280.png
|
2024-07-25 09:31:57.360286 |
161 |
67201781 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.2750858,22.2750858
Longitude : 88.3557677,88.3557677
file name : Image_25072024092814829.png
|
2024-07-25 09:28:14.920019 |
162 |
67201781 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.2750089,22.2750267
Longitude : 88.3557796,88.3557761
file name : Image_25072024092344559.png
|
2024-07-25 09:23:44.643694 |
163 |
67340196 |
Creation of drainage channel for management of grey water |
240000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.2642785
Longitude : 88.3391469
file name : Image_19062024133635696.png
|
2024-06-19 13:36:35.824837 |
164 |
67340196 |
Creation of drainage channel for management of grey water |
240000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.26423992
Longitude : 88.3391525
file name : Image_19062024132904484.png
|
2024-06-19 13:29:04.606798 |
165 |
67340196 |
Creation of drainage channel for management of grey water |
240000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.26420625
Longitude : 88.33921827
file name : Image_19062024132413205.png
|
2024-06-19 13:24:13.325372 |
166 |
39112249 |
Construction of Cement Concrete Road from house of Ajet Sk to house of Ayup Sk at Nainan |
127873 |
Construction of Cement Concrete Road from house of Ajet Sk to house of Ayup Sk at Nainan1 |
Roof laid |
-
latitude : 22.2732186,22.2732186
Longitude : 88.3546662,88.3546662
file name : Image_21042022110701955.png
|
2022-04-21 11:07:02.041355 |
167 |
39112249 |
Construction of Cement Concrete Road from house of Ajet Sk to house of Ayup Sk at Nainan |
127873 |
Construction of Cement Concrete Road from house of Ajet Sk to house of Ayup Sk at Nainan1 |
Plinth level |
-
latitude : 22.2596512,22.2596512
Longitude : 88.3348849,88.3348849
file name : Image_29032022165108254.png
|
2022-03-29 16:51:08.355845 |
168 |
39112249 |
Construction of Cement Concrete Road from house of Ajet Sk to house of Ayup Sk at Nainan |
127873 |
Construction of Cement Concrete Road from house of Ajet Sk to house of Ayup Sk at Nainan1 |
Completion of work |
-
latitude : 22.2738781,22.27328360080719
Longitude : 88.3535299,88.34998296573758
file name : Image_19032021184733071.png
|
2021-03-19 18:47:32.850438 |
169 |
39112222 |
Cons of CC Road from pond of Samsuddin Mallick to pond of Chupiyan Sk at Nainan |
129704 |
Cons of CC Road from pond of Samsuddin Mallick to pond of Chupiyan Sk at Nainan1 |
Roof laid |
-
latitude : 22.27370507,22.27370339
Longitude : 88.35212402,88.35212636
file name : Image_05042022111225886.png
|
2022-04-05 11:12:26.002829 |
170 |
39112222 |
Cons of CC Road from pond of Samsuddin Mallick to pond of Chupiyan Sk at Nainan |
129704 |
Cons of CC Road from pond of Samsuddin Mallick to pond of Chupiyan Sk at Nainan1 |
Plinth level |
-
latitude : 22.2596512,22.2596512
Longitude : 88.3348849,88.3348849
file name : Image_29032022165427943.png
|
2022-03-29 16:54:28.046148 |
171 |
39112222 |
Cons of CC Road from pond of Samsuddin Mallick to pond of Chupiyan Sk at Nainan |
129704 |
Cons of CC Road from pond of Samsuddin Mallick to pond of Chupiyan Sk at Nainan1 |
Completion of work |
-
latitude : 22.274204352870584,22.274206993170083
Longitude : 88.34903949871659,88.34899448789656
file name : Image_19032021184737896.png
|
2021-03-19 18:47:37.676327 |
172 |
39112298 |
Con of CC Road with portection wall from house of Hachibul Master to Sajidul Mallick at Nainan |
200000 |
Con of CC Road with portection wall from house of Hachibul Master to Sajidul Mallick at Nainan1 |
Roof laid |
-
latitude : 22.2732186,22.2732185
Longitude : 88.3546662,88.3546695
file name : Image_21042022101606769.png
|
2022-04-21 10:16:06.880721 |
173 |
39112298 |
Con of CC Road with portection wall from house of Hachibul Master to Sajidul Mallick at Nainan |
200000 |
Con of CC Road with portection wall from house of Hachibul Master to Sajidul Mallick at Nainan1 |
Plinth level |
-
latitude : 22.27080951,22.27080953
Longitude : 88.35451181,88.35452149
file name : Image_29032022170245297.png
|
2022-03-29 17:02:45.38356 |
174 |
39112298 |
Con of CC Road with portection wall from house of Hachibul Master to Sajidul Mallick at Nainan |
200000 |
Con of CC Road with portection wall from house of Hachibul Master to Sajidul Mallick at Nainan1 |
Completion of work |
-
latitude : 22.2708183,22.2708159
Longitude : 88.35453236,88.35451842
file name : Image_29032022170013188.png
|
2022-03-29 17:00:13.301113 |
175 |
39112430 |
Cons of CC road from Black top Road to Mosraf Haldar and Nur Alam Gazi to Safiya at Byaspur |
219002 |
Cons of CC road from Black top Road to Mosraf Haldar and Nur Alam Gazi to Safiya at Byaspur1 |
Roof laid |
-
latitude : 22.2729972,22.2729972
Longitude : 88.3626291,88.3626287
file name : Image_31032022092404961.png
|
2022-03-31 09:24:05.054543 |
176 |
39112430 |
Cons of CC road from Black top Road to Mosraf Haldar and Nur Alam Gazi to Safiya at Byaspur |
219002 |
Cons of CC road from Black top Road to Mosraf Haldar and Nur Alam Gazi to Safiya at Byaspur1 |
Plinth level |
-
latitude : 22.2732083,22.2732083
Longitude : 88.3606306,88.3606306
file name : Image_30032022093116983.png
|
2022-03-30 09:31:17.093978 |
177 |
39112430 |
Cons of CC road from Black top Road to Mosraf Haldar and Nur Alam Gazi to Safiya at Byaspur |
219002 |
Cons of CC road from Black top Road to Mosraf Haldar and Nur Alam Gazi to Safiya at Byaspur1 |
Completion of work |
-
latitude : 22.2729856,22.2729847
Longitude : 88.3626288,88.3626262
file name : Image_25032022141314353.png
|
2022-03-25 14:13:14.433644 |
178 |
39112430 |
Cons of CC road from Black top Road to Mosraf Haldar and Nur Alam Gazi to Safiya at Byaspur |
219002 |
Cons of CC road from Black top Road to Mosraf Haldar and Nur Alam Gazi to Safiya at Byaspur1 |
Completion of work |
-
latitude : 22.2729858,22.2729856
Longitude : 88.3626287,88.3626289
file name : Image_25032022140232480.png
|
2022-03-25 14:02:32.560646 |
179 |
39112326 |
Cons of CC Road with protection wall from house of Nurhossain Sk to Abul Hasan Mallick at Nainan |
202608 |
Cons of CC Road with protection wall from house of Nurhossain Sk to Abul Hasan Mallick at Nainan1 |
Roof laid |
-
latitude : 22.27297961,22.2729872
Longitude : 88.3531107,88.35310982
file name : Image_04042022110757395.png
|
2022-04-04 11:07:57.484584 |
180 |
39112326 |
Cons of CC Road with protection wall from house of Nurhossain Sk to Abul Hasan Mallick at Nainan |
202608 |
Cons of CC Road with protection wall from house of Nurhossain Sk to Abul Hasan Mallick at Nainan1 |
Plinth level |
-
latitude : 22.2730367,22.27304037
Longitude : 88.35312498,88.35313576
file name : Image_02042022122453461.png
|
2022-04-02 12:24:53.570261 |
181 |
39112326 |
Cons of CC Road with protection wall from house of Nurhossain Sk to Abul Hasan Mallick at Nainan |
202608 |
Cons of CC Road with protection wall from house of Nurhossain Sk to Abul Hasan Mallick at Nainan1 |
Completion of work |
-
latitude : 22.27307208,22.27307645
Longitude : 88.35315625,88.35315653
file name : Image_07032022120612138.png
|
2022-03-07 12:06:12.226855 |
182 |
39111778 |
Cons of CC road with Culvert from Danga of Rafik Molla to house of Espar Molla at Hansury |
299999 |
Cons of CC road with Culvert from Danga of Rafik Molla to house of Espar Molla at Hansury1 |
Roof laid |
-
latitude : 22.2570306,22.2570289
Longitude : 88.3401643,88.3401648
file name : Image_22042022142545107.png
|
2022-04-22 14:25:45.212544 |
183 |
39111778 |
Cons of CC road with Culvert from Danga of Rafik Molla to house of Espar Molla at Hansury |
299999 |
Cons of CC road with Culvert from Danga of Rafik Molla to house of Espar Molla at Hansury1 |
Plinth level |
-
latitude : 22.255928,22.255928
Longitude : 88.3415013,88.3415013
file name : Image_22042022142250592.png
|
2022-04-22 14:22:50.695341 |
184 |
39111778 |
Cons of CC road with Culvert from Danga of Rafik Molla to house of Espar Molla at Hansury |
299999 |
Cons of CC road with Culvert from Danga of Rafik Molla to house of Espar Molla at Hansury1 |
Completion of work |
-
latitude : 22.2570329,22.2570329
Longitude : 88.3401626,88.3401626
file name : Image_22042022141956306.png
|
2022-04-22 14:19:56.414016 |
185 |
39112337 |
Construction of Protection wall at pond of Samiul Molla at Nainan |
150000 |
Construction of Protection wall at pond of Samiul Molla at Nainan1 |
Roof laid |
-
latitude : 22.27663159,22.27663391
Longitude : 88.35350422,88.35350373
file name : Image_23042022101050985.png
|
2022-04-23 10:10:51.092462 |
186 |
39112337 |
Construction of Protection wall at pond of Samiul Molla at Nainan |
150000 |
Construction of Protection wall at pond of Samiul Molla at Nainan1 |
Plinth level |
-
latitude : 22.27663362,22.27662561
Longitude : 88.35351155,88.35351581
file name : Image_23042022095738218.png
|
2022-04-23 09:57:38.371267 |
187 |
39112337 |
Construction of Protection wall at pond of Samiul Molla at Nainan |
150000 |
Construction of Protection wall at pond of Samiul Molla at Nainan1 |
Completion of work |
-
latitude : 22.276573539711535,22.27679616305977
Longitude : 88.35355063900352,88.35357285104692
file name : Image_06032021183129804.png
|
2021-03-06 18:31:29.914405 |
188 |
39078298 |
Cons CC drain from house of Awlad Baidya to Dasi pond near house of Rasid Sk at Nainan |
94927 |
Cons CC drain from house of Awlad Baidya to Dasi pond near house of Rasid Sk at Nainan1 |
Roof laid |
-
latitude : 22.27542502,22.27541829
Longitude : 88.35737292,88.35739215
file name : Image_21102022111459315.png
|
2022-10-21 11:14:59.406482 |
189 |
39078298 |
Cons CC drain from house of Awlad Baidya to Dasi pond near house of Rasid Sk at Nainan |
94927 |
Cons CC drain from house of Awlad Baidya to Dasi pond near house of Rasid Sk at Nainan1 |
Plinth level |
-
latitude : 22.27536342,22.27536376
Longitude : 88.3573529,88.35735969
file name : Image_27042022104344000.png
|
2022-04-27 10:43:44.111646 |
190 |
39078298 |
Cons CC drain from house of Awlad Baidya to Dasi pond near house of Rasid Sk at Nainan |
94927 |
Cons CC drain from house of Awlad Baidya to Dasi pond near house of Rasid Sk at Nainan1 |
Completion of work |
-
latitude : 22.2729977,22.2729977
Longitude : 88.3626281,88.3626281
file name : Image_30032022101629846.png
|
2022-03-30 10:16:29.945053 |
191 |
39116177 |
Cons of CC Road from Mohanpur High Madrasha to house of Jahurul Sk at Kuldia |
171442 |
Cons of CC Road from Mohanpur High Madrasha to house of Jahurul Sk at Kuldia1 |
Roof laid |
-
latitude : 22.26305189,22.26304959
Longitude : 88.35127096,88.35127075
file name : Image_26042022104735470.png
|
2022-04-26 10:47:35.580571 |
192 |
39116177 |
Cons of CC Road from Mohanpur High Madrasha to house of Jahurul Sk at Kuldia |
171442 |
Cons of CC Road from Mohanpur High Madrasha to house of Jahurul Sk at Kuldia1 |
Plinth level |
-
latitude : 22.26304681,22.26304061
Longitude : 88.35124472,88.35124161
file name : Image_26042022102453225.png
|
2022-04-26 10:24:53.321384 |
193 |
39116177 |
Cons of CC Road from Mohanpur High Madrasha to house of Jahurul Sk at Kuldia |
171442 |
Cons of CC Road from Mohanpur High Madrasha to house of Jahurul Sk at Kuldia1 |
Completion of work |
-
latitude : 22.262998837977648,22.26301157847047
Longitude : 88.35122868418694,88.35124326869845
file name : Image_03032021165003446.png
|
2021-03-03 16:50:03.558001 |
194 |
39111920 |
Construction of New Culvert at Nainan Hader Math at Nainan |
140000 |
Construction of New Culvert at Nainan Hader Math at Nainan1 |
Roof laid |
-
latitude : 22.27663255,22.27663222
Longitude : 88.35057798,88.35058963
file name : Image_27062022111153228.png
|
2022-06-27 11:11:53.324788 |
195 |
39111920 |
Construction of New Culvert at Nainan Hader Math at Nainan |
140000 |
Construction of New Culvert at Nainan Hader Math at Nainan1 |
Plinth level |
-
latitude : 22.27662634,22.27662068
Longitude : 88.35059905,88.35060511
file name : Image_26052022125706213.png
|
2022-05-26 12:57:06.355928 |
196 |
39111920 |
Construction of New Culvert at Nainan Hader Math at Nainan |
140000 |
Construction of New Culvert at Nainan Hader Math at Nainan1 |
Completion of work |
-
latitude : 22.27661183,22.27659781
Longitude : 88.35059968,88.35059272
file name : Image_26052022120617017.png
|
2022-05-26 12:06:17.114657 |
197 |
48994650 |
U Construction of cement concrete road from Kuldia High Madrasha to house of Jaharul Sk at Kuldia |
150000 |
U Construction of cement concrete road from Kuldia High Madrasha to house of Jaharul Sk at Kuldia1 |
Roof laid |
-
latitude : 22.26248674,22.262811
Longitude : 88.35191574,88.3520676
file name : Image_31052022115413270.png
|
2022-05-31 11:54:13.386117 |
198 |
48994650 |
U Construction of cement concrete road from Kuldia High Madrasha to house of Jaharul Sk at Kuldia |
150000 |
U Construction of cement concrete road from Kuldia High Madrasha to house of Jaharul Sk at Kuldia1 |
Plinth level |
-
latitude : 22.26247535,22.2628072
Longitude : 88.35191134,88.3520689
file name : Image_31052022115100579.png
|
2022-05-31 11:51:00.699373 |
199 |
48994650 |
U Construction of cement concrete road from Kuldia High Madrasha to house of Jaharul Sk at Kuldia |
150000 |
U Construction of cement concrete road from Kuldia High Madrasha to house of Jaharul Sk at Kuldia1 |
Completion of work |
-
latitude : 22.2628072,22.262811
Longitude : 88.3520689,88.3520676
file name : Image_31052022114657625.png
|
2022-05-31 11:46:57.739037 |
200 |
45718343 |
T Sinking of Tubewell with Platform and Soak pit near Hari Basar tala at Hansury Das Para |
192408 |
T Sinking of Tubewell with Platform and Soak pit near Hari Basar tala at Hansury Das Para1 |
Roof laid |
-
latitude : 22.25533711
Longitude : 88.33468374
file name : Image_07062022125345814.png
|
2022-06-07 12:53:45.923445 |
201 |
45718343 |
T Sinking of Tubewell with Platform and Soak pit near Hari Basar tala at Hansury Das Para |
192408 |
T Sinking of Tubewell with Platform and Soak pit near Hari Basar tala at Hansury Das Para1 |
Plinth level |
-
latitude : 22.25535421
Longitude : 88.33471442
file name : Image_07062022124813404.png
|
2022-06-07 12:48:13.505597 |
202 |
45718343 |
T Sinking of Tubewell with Platform and Soak pit near Hari Basar tala at Hansury Das Para |
192408 |
T Sinking of Tubewell with Platform and Soak pit near Hari Basar tala at Hansury Das Para1 |
Completion of work |
-
latitude : 22.2596201
Longitude : 88.3349064
file name : Image_07062022124204478.png
|
2022-06-07 12:42:04.579548 |
203 |
45718898 |
T Sinking of Tubewell with Platform and Soak pit near house of Sanjib Pramanik at Enayetpur Das Para |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Sanjib Pramanik at Enayetpur Das Para1 |
Roof laid |
-
latitude : 22.24834726
Longitude : 88.33230383
file name : Image_07062022130735836.png
|
2022-06-07 13:07:35.934472 |
204 |
45718898 |
T Sinking of Tubewell with Platform and Soak pit near house of Sanjib Pramanik at Enayetpur Das Para |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Sanjib Pramanik at Enayetpur Das Para1 |
Plinth level |
-
latitude : 22.24835463
Longitude : 88.33229964
file name : Image_07062022130340170.png
|
2022-06-07 13:03:40.249827 |
205 |
45718898 |
T Sinking of Tubewell with Platform and Soak pit near house of Sanjib Pramanik at Enayetpur Das Para |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Sanjib Pramanik at Enayetpur Das Para1 |
Completion of work |
-
latitude : 22.24836429
Longitude : 88.33231391
file name : Image_07062022130006152.png
|
2022-06-07 13:00:06.27897 |
206 |
48995407 |
T Construction of Concrete drain from house of Ahad to house of Mucha Sk at Kuldia |
200000 |
T Construction of Concrete drain from house of Ahad to house of Mucha Sk at Kuldia1 |
Roof laid |
-
latitude : 22.26337823,22.26336736
Longitude : 88.35112288,88.35112197
file name : Image_12062022110755128.png
|
2022-06-12 11:07:55.21734 |
207 |
48995407 |
T Construction of Concrete drain from house of Ahad to house of Mucha Sk at Kuldia |
200000 |
T Construction of Concrete drain from house of Ahad to house of Mucha Sk at Kuldia1 |
Plinth level |
-
latitude : 22.26334414,22.26334355
Longitude : 88.35119148,88.3511916
file name : Image_12062022110215668.png
|
2022-06-12 11:02:15.760345 |
208 |
48995407 |
T Construction of Concrete drain from house of Ahad to house of Mucha Sk at Kuldia |
200000 |
T Construction of Concrete drain from house of Ahad to house of Mucha Sk at Kuldia1 |
Completion of work |
-
latitude : 22.263349,22.26334672
Longitude : 88.35119873,88.35119265
file name : Image_12062022105602442.png
|
2022-06-12 10:56:02.55966 |
209 |
45715675 |
T Sinking of Tubewell with Platform and Soak pit near house of Ismail Molla at Kuldia |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Ismail Molla at Kuldia1 |
Roof laid |
-
latitude : 22.2647622
Longitude : 88.35304834
file name : Image_27062022113122651.png
|
2022-06-27 11:31:22.749081 |
210 |
45715675 |
T Sinking of Tubewell with Platform and Soak pit near house of Ismail Molla at Kuldia |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Ismail Molla at Kuldia1 |
Plinth level |
-
latitude : 22.2589064
Longitude : 88.3462458
file name : Image_12062022111539432.png
|
2022-06-12 11:15:39.530324 |
211 |
45715675 |
T Sinking of Tubewell with Platform and Soak pit near house of Ismail Molla at Kuldia |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Ismail Molla at Kuldia1 |
Completion of work |
-
latitude : 22.26475212
Longitude : 88.3530562
file name : Image_12062022105130414.png
|
2022-06-12 10:51:30.54494 |
212 |
45716056 |
T Sinking of Tubewell with Platform and Soak pit near house of Aktar sk at Kuldia |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Aktar sk at Kuldia1 |
Roof laid |
-
latitude : 22.26150955
Longitude : 88.35433312
file name : Image_27062022114630701.png
|
2022-06-27 11:46:30.815544 |
213 |
45716056 |
T Sinking of Tubewell with Platform and Soak pit near house of Aktar sk at Kuldia |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Aktar sk at Kuldia1 |
Plinth level |
-
latitude : 22.2614627
Longitude : 88.35439785
file name : Image_12062022112938384.png
|
2022-06-12 11:29:38.491921 |
214 |
45716056 |
T Sinking of Tubewell with Platform and Soak pit near house of Aktar sk at Kuldia |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Aktar sk at Kuldia1 |
Completion of work |
-
latitude : 22.2615156
Longitude : 88.35440378
file name : Image_31052022120243813.png
|
2022-05-31 12:02:43.917156 |
215 |
45717713 |
T Sinking of Tubewell with Platform and Soak pit near house Maszid at Mirzapur |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house Maszid at Mirzapur1 |
Roof laid |
-
latitude : 22.2595998
Longitude : 88.3349154
file name : Image_21062022122632946.png
|
2022-06-21 12:26:33.062474 |
216 |
45717713 |
T Sinking of Tubewell with Platform and Soak pit near house Maszid at Mirzapur |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house Maszid at Mirzapur1 |
Plinth level |
-
latitude : 22.2595998
Longitude : 88.3349154
file name : Image_21062022122322222.png
|
2022-06-21 12:23:22.339423 |
217 |
45717713 |
T Sinking of Tubewell with Platform and Soak pit near house Maszid at Mirzapur |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house Maszid at Mirzapur1 |
Completion of work |
-
latitude : 22.2595998
Longitude : 88.3349154
file name : Image_21062022121904012.png
|
2022-06-21 12:19:04.119173 |
218 |
45727857 |
U Construction of Cement Concrete road from main road to house of Ohab Pailan at Byaspur |
150000 |
U Construction of Cement Concrete road from main road to house of Ohab Pailan at Byaspur1 |
Roof laid |
-
latitude : 22.2750504,22.27458335
Longitude : 88.3589921,88.35852032
file name : Image_27062022110157583.png
|
2022-06-27 11:01:57.686342 |
219 |
45727857 |
U Construction of Cement Concrete road from main road to house of Ohab Pailan at Byaspur |
150000 |
U Construction of Cement Concrete road from main road to house of Ohab Pailan at Byaspur1 |
Plinth level |
-
latitude : 22.274444,22.2744441
Longitude : 88.3584611,88.35846
file name : Image_21062022093034773.png
|
2022-06-21 09:30:34.886589 |
220 |
45727857 |
U Construction of Cement Concrete road from main road to house of Ohab Pailan at Byaspur |
150000 |
U Construction of Cement Concrete road from main road to house of Ohab Pailan at Byaspur1 |
Completion of work |
-
latitude : 22.27456229,22.27456236
Longitude : 88.35855657,88.35855585
file name : Image_12062022103510517.png
|
2022-06-12 10:35:10.617852 |
221 |
45718591 |
T Construction of concrete drain from house of Mostakin Halder to house of Panna Molla at Hansury |
100000 |
T Construction of concrete drain from house of Mostakin Halder to house of Panna Molla at Hansury1 |
Roof laid |
-
latitude : 22.25624212,22.25624328
Longitude : 88.33899667,88.33902929
file name : Image_04072022151237762.png
|
2022-07-04 15:12:37.842625 |
222 |
45718591 |
T Construction of concrete drain from house of Mostakin Halder to house of Panna Molla at Hansury |
100000 |
T Construction of concrete drain from house of Mostakin Halder to house of Panna Molla at Hansury1 |
Plinth level |
-
latitude : 22.2566012,22.2566012
Longitude : 88.3387001,88.3387001
file name : Image_21062022131055858.png
|
2022-06-21 13:10:55.936336 |
223 |
45718591 |
T Construction of concrete drain from house of Mostakin Halder to house of Panna Molla at Hansury |
100000 |
T Construction of concrete drain from house of Mostakin Halder to house of Panna Molla at Hansury1 |
Completion of work |
-
latitude : 22.2566012,22.2566012
Longitude : 88.3387001,88.3387001
file name : Image_21062022130652643.png
|
2022-06-21 13:06:52.711998 |
224 |
45728658 |
U Construction of Cement Concrete Road from land of Mannan Molla to house of Sirajul Sk at Kuldia |
150000 |
U Construction of Cement Concrete Road from land of Mannan Molla to house of Sirajul Sk at Kuldia1 |
Roof laid |
-
latitude : 22.26383381,22.26382297
Longitude : 88.35439897,88.35440144
file name : Image_27062022115347469.png
|
2022-06-27 11:53:47.587014 |
225 |
45728658 |
U Construction of Cement Concrete Road from land of Mannan Molla to house of Sirajul Sk at Kuldia |
150000 |
U Construction of Cement Concrete Road from land of Mannan Molla to house of Sirajul Sk at Kuldia1 |
Plinth level |
-
latitude : 22.26384515,22.26384152
Longitude : 88.3544409,88.35444033
file name : Image_27062022114818759.png
|
2022-06-27 11:48:18.875681 |
226 |
45728658 |
U Construction of Cement Concrete Road from land of Mannan Molla to house of Sirajul Sk at Kuldia |
150000 |
U Construction of Cement Concrete Road from land of Mannan Molla to house of Sirajul Sk at Kuldia1 |
Completion of work |
-
latitude : 22.26384402,22.26383517
Longitude : 88.35440019,88.35441875
file name : Image_27062022113510409.png
|
2022-06-27 11:35:10.513756 |
227 |
62617018 |
Cons of CC road from Badiar Jamal Karkhana via Farhat moulana house to house of Sariful at Nainan |
200000 |
Cons of CC road from Badiar Jamal Karkhana via Farhat moulana house to house of Sariful at Nainan1 |
Roof laid |
-
latitude : 22.2732183,22.273478
Longitude : 88.35070557,88.3507985
file name : Image_27062022121630975.png
|
2022-06-27 12:16:31.095778 |
228 |
62617018 |
Cons of CC road from Badiar Jamal Karkhana via Farhat moulana house to house of Sariful at Nainan |
200000 |
Cons of CC road from Badiar Jamal Karkhana via Farhat moulana house to house of Sariful at Nainan1 |
Plinth level |
-
latitude : 22.27323341,22.27323297
Longitude : 88.35069467,88.35069768
file name : Image_27062022121313183.png
|
2022-06-27 12:13:13.31381 |
229 |
62617018 |
Cons of CC road from Badiar Jamal Karkhana via Farhat moulana house to house of Sariful at Nainan |
200000 |
Cons of CC road from Badiar Jamal Karkhana via Farhat moulana house to house of Sariful at Nainan1 |
Completion of work |
-
latitude : 22.273478,22.27323508,22.27322919
Longitude : 88.3507985,88.35071252,88.35070444
file name : Image_27062022121057719.png
|
2022-06-27 12:10:57.837005 |
230 |
62617196 |
Repairing of wooden pole at Dodalia wooden pole at Dodalia |
250000 |
Repairing of wooden pole at Dodalia wooden pole at Dodalia1 |
Roof laid |
-
latitude : 22.27260463,22.27262337
Longitude : 88.33964132,88.33964821
file name : Image_04072022153532655.png
|
2022-07-04 15:35:32.755688 |
231 |
62617196 |
Repairing of wooden pole at Dodalia wooden pole at Dodalia |
250000 |
Repairing of wooden pole at Dodalia wooden pole at Dodalia1 |
Plinth level |
-
latitude : 22.27263298,22.27263439
Longitude : 88.33966428,88.33966536
file name : Image_29062022120720502.png
|
2022-06-29 12:07:20.597427 |
232 |
62617196 |
Repairing of wooden pole at Dodalia wooden pole at Dodalia |
250000 |
Repairing of wooden pole at Dodalia wooden pole at Dodalia1 |
Completion of work |
-
latitude : 22.27264931,22.27266138
Longitude : 88.33961532,88.33960413
file name : Image_28062022114527916.png
|
2022-06-28 11:45:28.040298 |
233 |
62617430 |
Cons of CC road from Gazi Babar than to Kuldia health Centre at Kuldia |
200000 |
Cons of CC road from Gazi Babar than to Kuldia health Centre at Kuldia1 |
Roof laid |
-
latitude : 22.2633367,22.2633169
Longitude : 88.35845317,88.35843825
file name : Image_27062022155403342.png
|
2022-06-27 15:54:03.451259 |
234 |
62617430 |
Cons of CC road from Gazi Babar than to Kuldia health Centre at Kuldia |
200000 |
Cons of CC road from Gazi Babar than to Kuldia health Centre at Kuldia1 |
Plinth level |
-
latitude : 22.26333096,22.26332775
Longitude : 88.35843139,88.35843301
file name : Image_27062022154927996.png
|
2022-06-27 15:49:28.120312 |
235 |
62617430 |
Cons of CC road from Gazi Babar than to Kuldia health Centre at Kuldia |
200000 |
Cons of CC road from Gazi Babar than to Kuldia health Centre at Kuldia1 |
Completion of work |
-
latitude : 22.26333782,22.26333884
Longitude : 88.35845416,88.35845134
file name : Image_27062022154711173.png
|
2022-06-27 15:47:11.274252 |
236 |
45712755 |
T Sinking of Tubewell with Platform and Soak pit near house of Ramjan Mallick at Nainan |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Ramjan Mallick at Nainan1 |
Roof laid |
-
latitude : 22.27233597
Longitude : 88.35261832
file name : Image_13072022110406936.png
|
2022-07-13 11:04:07.01378 |
237 |
45712755 |
T Sinking of Tubewell with Platform and Soak pit near house of Ramjan Mallick at Nainan |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Ramjan Mallick at Nainan1 |
Plinth level |
-
latitude : 22.27228597
Longitude : 88.35257886
file name : Image_04072022113949402.png
|
2022-07-04 11:39:49.509926 |
238 |
45712755 |
T Sinking of Tubewell with Platform and Soak pit near house of Ramjan Mallick at Nainan |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Ramjan Mallick at Nainan1 |
Completion of work |
-
latitude : 22.2748225
Longitude : 88.3554875
file name : Image_21062022101056013.png
|
2022-06-21 10:10:56.124127 |
239 |
62617315 |
Cons of CC road from PWD road to house of Salam Khan at Joypur |
200000 |
Cons of CC road from PWD road to house of Salam Khan at Joypur1 |
Roof laid |
-
latitude : 22.26082317,22.26082034
Longitude : 88.3280513,88.32804716
file name : Image_04072022152756193.png
|
2022-07-04 15:27:56.599221 |
240 |
62617315 |
Cons of CC road from PWD road to house of Salam Khan at Joypur |
200000 |
Cons of CC road from PWD road to house of Salam Khan at Joypur1 |
Plinth level |
-
latitude : 22.26081903,22.26081777
Longitude : 88.3280102,88.32801104
file name : Image_04072022152540890.png
|
2022-07-04 15:25:40.979848 |
241 |
62617315 |
Cons of CC road from PWD road to house of Salam Khan at Joypur |
200000 |
Cons of CC road from PWD road to house of Salam Khan at Joypur1 |
Completion of work |
-
latitude : 22.26081176,22.2608063
Longitude : 88.328032,88.32804118
file name : Image_04072022152319392.png
|
2022-07-04 15:23:19.480992 |
242 |
45713741 |
T Construction of wooden pole at Kaorapukur Canal at Nainan |
150000 |
T Construction of wooden pole at Kaorapukur Canal at Nainan1 |
Roof laid |
-
latitude : 22.27888212,22.2788851
Longitude : 88.3500172,88.35001444
file name : Image_19072022115936539.png
|
2022-07-19 11:59:36.662219 |
243 |
45713741 |
T Construction of wooden pole at Kaorapukur Canal at Nainan |
150000 |
T Construction of wooden pole at Kaorapukur Canal at Nainan1 |
Plinth level |
-
latitude : 22.27886356,22.27886737
Longitude : 88.35000837,88.35001312
file name : Image_19072022115359752.png
|
2022-07-19 11:53:59.865148 |
244 |
45713741 |
T Construction of wooden pole at Kaorapukur Canal at Nainan |
150000 |
T Construction of wooden pole at Kaorapukur Canal at Nainan1 |
Completion of work |
-
latitude : 22.27886629,22.27887502
Longitude : 88.35001899,88.35003069
file name : Image_19072022114914597.png
|
2022-07-19 11:49:14.717849 |
245 |
45717875 |
T Sinking of Tubewell with Platform and Soak pit near house of Goutam Guchhait at Joypur |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Goutam Guchhait at Joypur1 |
Roof laid |
-
latitude : 22.26207737
Longitude : 88.32960032
file name : Image_19072022145058945.png
|
2022-07-19 14:50:59.065884 |
246 |
45717875 |
T Sinking of Tubewell with Platform and Soak pit near house of Goutam Guchhait at Joypur |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Goutam Guchhait at Joypur1 |
Plinth level |
-
latitude : 22.261868
Longitude : 88.3297121
file name : Image_07062022132434060.png
|
2022-06-07 13:24:34.164242 |
247 |
45717875 |
T Sinking of Tubewell with Platform and Soak pit near house of Goutam Guchhait at Joypur |
192408 |
T Sinking of Tubewell with Platform and Soak pit near house of Goutam Guchhait at Joypur1 |
Completion of work |
-
latitude : 22.2618741
Longitude : 88.3296919
file name : Image_07062022131507390.png
|
2022-06-07 13:15:07.480348 |
248 |
45729362 |
U Construction of Cement Concrete road with protection wall from house of Kalam Sardar to house of M |
200000 |
U Construction of Cement Concrete road with protection wall from house of Kalam Sardar to house of M1 |
Roof laid |
-
latitude : 22.26424895,22.26424874
Longitude : 88.3395835,88.3395945
file name : Image_27072022152744567.png
|
2022-07-27 15:27:44.694306 |
249 |
45729362 |
U Construction of Cement Concrete road with protection wall from house of Kalam Sardar to house of M |
200000 |
U Construction of Cement Concrete road with protection wall from house of Kalam Sardar to house of M1 |
Plinth level |
-
latitude : 22.26426868,22.26426881
Longitude : 88.33960829,88.33960632
file name : Image_27072022152403232.png
|
2022-07-27 15:24:03.347746 |
250 |
45729362 |
U Construction of Cement Concrete road with protection wall from house of Kalam Sardar to house of M |
200000 |
U Construction of Cement Concrete road with protection wall from house of Kalam Sardar to house of M1 |
Completion of work |
-
latitude : 22.26425684,22.26426689
Longitude : 88.34058109,88.34058488
file name : Image_27072022151840969.png
|
2022-07-27 15:18:41.072396 |
251 |
62617360 |
Cons of CC road from house of Kamini to Mirzapur pole at Mirzapur |
250000 |
Cons of CC road from house of Kamini to Mirzapur pole at Mirzapur1 |
Roof laid |
-
latitude : 22.26624993,22.26625316
Longitude : 88.34796619,88.34796935
file name : Image_02082022132654720.png
|
2022-08-02 13:26:54.826136 |
252 |
62617360 |
Cons of CC road from house of Kamini to Mirzapur pole at Mirzapur |
250000 |
Cons of CC road from house of Kamini to Mirzapur pole at Mirzapur1 |
Plinth level |
-
latitude : 22.26624885,22.26624603
Longitude : 88.34797052,88.34797098
file name : Image_02082022132459909.png
|
2022-08-02 13:25:00.019032 |
253 |
62617360 |
Cons of CC road from house of Kamini to Mirzapur pole at Mirzapur |
250000 |
Cons of CC road from house of Kamini to Mirzapur pole at Mirzapur1 |
Completion of work |
-
latitude : 22.26626208,22.26623183
Longitude : 88.34799731,88.34794607
file name : Image_02082022132253711.png
|
2022-08-02 13:22:53.825854 |
254 |
62616911 |
Cons of Pucca drain and CC road from kuldia Sardar para Jame Masjid allied area at Kuldia |
200000 |
Cons of Pucca drain and CC road from kuldia Sardar para Jame Masjid allied area at Kuldia1 |
Roof laid |
-
latitude : 22.26734933,22.26735106
Longitude : 88.35873044,88.35873232
file name : Image_02082022115657425.png
|
2022-08-02 11:56:57.536652 |
255 |
62616911 |
Cons of Pucca drain and CC road from kuldia Sardar para Jame Masjid allied area at Kuldia |
200000 |
Cons of Pucca drain and CC road from kuldia Sardar para Jame Masjid allied area at Kuldia1 |
Plinth level |
-
latitude : 22.26734903,22.267349
Longitude : 88.35872188,88.3587219
file name : Image_02082022115437392.png
|
2022-08-02 11:54:37.494945 |
256 |
62616911 |
Cons of Pucca drain and CC road from kuldia Sardar para Jame Masjid allied area at Kuldia |
200000 |
Cons of Pucca drain and CC road from kuldia Sardar para Jame Masjid allied area at Kuldia1 |
Completion of work |
-
latitude : 22.26732658,22.26732654
Longitude : 88.35873384,88.35873391
file name : Image_02082022115019314.png
|
2022-08-02 11:50:19.429649 |
257 |
45730846 |
U Construction of cement concrete road from house of Subal Sardar to Salauddin house at Hansury |
200000 |
U Construction of cement concrete road from house of Subal Sardar to Salauddin house at Hansury1 |
Roof laid |
-
latitude : 22.25350286,22.2535058
Longitude : 88.33774009,88.33773391
file name : Image_05082022143909789.png
|
2022-08-05 14:39:09.898473 |
258 |
45730846 |
U Construction of cement concrete road from house of Subal Sardar to Salauddin house at Hansury |
200000 |
U Construction of cement concrete road from house of Subal Sardar to Salauddin house at Hansury1 |
Plinth level |
-
latitude : 22.2535231,22.25351075
Longitude : 88.3377395,88.33774757
file name : Image_05082022143653989.png
|
2022-08-05 14:36:54.096095 |
259 |
45730846 |
U Construction of cement concrete road from house of Subal Sardar to Salauddin house at Hansury |
200000 |
U Construction of cement concrete road from house of Subal Sardar to Salauddin house at Hansury1 |
Completion of work |
-
latitude : 22.25350564,22.25350813
Longitude : 88.3377262,88.33772681
file name : Image_05082022143335125.png
|
2022-08-05 14:33:35.237187 |
260 |
45711475 |
T Construction of Pucca drain with cc road from house of Bapi Molla to house of Nasim Laskar at Nain |
200000 |
T Construction of Pucca drain with cc road from house of Bapi Molla to house of Nasim Laskar at Nain1 |
Roof laid |
-
latitude : 22.27619898,22.27620247
Longitude : 88.3568457,88.35687613
file name : Image_06092022111708098.png
|
2022-09-06 11:17:08.190422 |
261 |
45711475 |
T Construction of Pucca drain with cc road from house of Bapi Molla to house of Nasim Laskar at Nain |
200000 |
T Construction of Pucca drain with cc road from house of Bapi Molla to house of Nasim Laskar at Nain1 |
Plinth level |
-
latitude : 22.2760712,22.27609283
Longitude : 88.35684034,88.35682839
file name : Image_26082022113837758.png
|
2022-08-26 11:38:37.854452 |
262 |
45711475 |
T Construction of Pucca drain with cc road from house of Bapi Molla to house of Nasim Laskar at Nain |
200000 |
T Construction of Pucca drain with cc road from house of Bapi Molla to house of Nasim Laskar at Nain1 |
Completion of work |
-
latitude : 22.27614852,22.2761464
Longitude : 88.35681855,88.356868
file name : Image_18082022120210250.png
|
2022-08-18 12:02:10.335773 |
263 |
48994796 |
U Construction of CC road from house of Jamir Molla to house of Abdul Haque Molla at Nainan |
200000 |
U Construction of CC road from house of Jamir Molla to house of Abdul Haque Molla at Nainan1 |
Roof laid |
-
latitude : 22.27532726,22.27532483
Longitude : 88.35666883,88.35667404
file name : Image_30082022084436067.png
|
2022-08-30 08:44:36.166358 |
264 |
48994796 |
U Construction of CC road from house of Jamir Molla to house of Abdul Haque Molla at Nainan |
200000 |
U Construction of CC road from house of Jamir Molla to house of Abdul Haque Molla at Nainan1 |
Plinth level |
-
latitude : 22.27536282,22.27535844
Longitude : 88.35665115,88.35665377
file name : Image_26082022114019733.png
|
2022-08-26 11:40:19.836616 |
265 |
48994796 |
U Construction of CC road from house of Jamir Molla to house of Abdul Haque Molla at Nainan |
200000 |
U Construction of CC road from house of Jamir Molla to house of Abdul Haque Molla at Nainan1 |
Completion of work |
-
latitude : 22.2761464,22.2761464
Longitude : 88.356868,88.356868
file name : Image_23082022121057395.png
|
2022-08-23 12:10:57.500186 |
266 |
45728091 |
U Construction of Cement Concrete road from house of Subid ali to burial ground of Gazi at Byaspur |
312765 |
U Construction of Cement Concrete road from house of Subid ali to burial ground of Gazi at Byaspur1 |
Roof laid |
-
latitude : 22.27621965,22.27622304
Longitude : 88.35930425,88.35929008
file name : Image_17092022102832200.png
|
2022-09-17 10:28:32.296228 |
267 |
45728091 |
U Construction of Cement Concrete road from house of Subid ali to burial ground of Gazi at Byaspur |
312765 |
U Construction of Cement Concrete road from house of Subid ali to burial ground of Gazi at Byaspur1 |
Plinth level |
-
latitude : 22.27621944,22.27622016
Longitude : 88.35931225,88.35930576
file name : Image_17092022100940869.png
|
2022-09-17 10:09:40.948815 |
268 |
45728091 |
U Construction of Cement Concrete road from house of Subid ali to burial ground of Gazi at Byaspur |
312765 |
U Construction of Cement Concrete road from house of Subid ali to burial ground of Gazi at Byaspur1 |
Completion of work |
-
latitude : 22.27620827,22.27620817
Longitude : 88.35935934,88.35936387
file name : Image_17092022094447239.png
|
2022-09-17 09:44:47.344175 |
269 |
56288564 |
T sinking of Tubewell with Platform and soakpit near house of Mojaffar at Mirzapur |
207311 |
T sinking of Tubewell with Platform and soakpit near house of Mojaffar at Mirzapur1 |
Roof laid |
-
latitude : 22.26073847
Longitude : 88.3405474
file name : Image_16102023131432855.png
|
2023-10-16 13:14:32.952751 |
270 |
56288564 |
T sinking of Tubewell with Platform and soakpit near house of Mojaffar at Mirzapur |
207311 |
T sinking of Tubewell with Platform and soakpit near house of Mojaffar at Mirzapur1 |
Plinth level |
-
latitude : 22.2607381
Longitude : 88.34053384
file name : Image_16102023131129232.png
|
2023-10-16 13:11:29.330677 |
271 |
56288564 |
T sinking of Tubewell with Platform and soakpit near house of Mojaffar at Mirzapur |
207311 |
T sinking of Tubewell with Platform and soakpit near house of Mojaffar at Mirzapur1 |
Completion of work |
-
latitude : 22.26073463
Longitude : 88.34057027
file name : Image_16102023130707433.png
|
2023-10-16 13:07:07.521967 |
272 |
66940806 |
Creation of drainage channel for management of grey water |
180000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.2634849
Longitude : 88.3552891
file name : Image_18052023094505593.png
|
2023-05-18 09:45:05.689614 |
273 |
66940806 |
Creation of drainage channel for management of grey water |
180000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.2634835
Longitude : 88.3552872
file name : Image_18052023093715862.png
|
2023-05-18 09:37:15.968546 |
274 |
66940806 |
Creation of drainage channel for management of grey water |
180000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.2634833
Longitude : 88.3552862
file name : Image_18052023091502015.png
|
2023-05-18 09:15:02.120721 |
275 |
65487027 |
Construction of Tally Piling of Molla Para pond western side at Mirzapur |
82131 |
Construction of Tally Piling of Molla Para pond western side at Mirzapur1 |
Completion of work |
-
latitude : 22.26571273,22.26571574
Longitude : 88.34035826,88.34035623
file name : Image_19102022151650535.png
|
2022-10-19 15:16:50.669485 |
276 |
65486965 |
Construction of Tally Piling of Molla Para Pond eastern side at Mirzapur |
82131 |
Construction of Tally Piling of Molla Para Pond eastern side at Mirzapur1 |
Completion of work |
-
latitude : 22.26561053,22.26561851
Longitude : 88.34071432,88.34070276
file name : Image_19102022150136134.png
|
2022-10-19 15:01:36.218314 |
277 |
65487193 |
Construction of Tally Piling of Mannan Sekh pond over Kuldia Naria road at Kuldia |
99880 |
Construction of Tally Piling of Mannan Sekh pond over Kuldia Naria road at Kuldia1 |
Roof laid |
-
latitude : 22.26141558,22.26141893
Longitude : 88.35208134,88.35207068
file name : Image_19102022154945606.png
|
2022-10-19 15:49:45.735753 |
278 |
65487193 |
Construction of Tally Piling of Mannan Sekh pond over Kuldia Naria road at Kuldia |
99880 |
Construction of Tally Piling of Mannan Sekh pond over Kuldia Naria road at Kuldia1 |
Plinth level |
-
latitude : 22.26140789,22.26140156
Longitude : 88.35211399,88.35212076
file name : Image_19102022154523023.png
|
2022-10-19 15:45:23.152373 |
279 |
65487193 |
Construction of Tally Piling of Mannan Sekh pond over Kuldia Naria road at Kuldia |
99880 |
Construction of Tally Piling of Mannan Sekh pond over Kuldia Naria road at Kuldia1 |
Completion of work |
-
latitude : 22.26141214,22.26142347
Longitude : 88.35211206,88.35212018
file name : Image_19102022154042830.png
|
2022-10-19 15:40:42.96545 |
280 |
45712551 |
T Construction of Pucca drain with cc road from Bhasar Bari to Graveyard at Nainan |
100000 |
T Construction of Pucca drain with cc road from Bhasar Bari to Graveyard at Nainan1 |
Roof laid |
-
latitude : 22.27566537,22.27578
Longitude : 88.35618166,88.3574749
file name : Image_21102022114602446.png
|
2022-10-21 11:46:02.629079 |
281 |
45712551 |
T Construction of Pucca drain with cc road from Bhasar Bari to Graveyard at Nainan |
100000 |
T Construction of Pucca drain with cc road from Bhasar Bari to Graveyard at Nainan1 |
Plinth level |
-
latitude : 22.27573226,22.27573915
Longitude : 88.3562988,88.35629038
file name : Image_21102022114008694.png
|
2022-10-21 11:40:08.797538 |
282 |
45712551 |
T Construction of Pucca drain with cc road from Bhasar Bari to Graveyard at Nainan |
100000 |
T Construction of Pucca drain with cc road from Bhasar Bari to Graveyard at Nainan1 |
Completion of work |
-
latitude : 22.2761494,22.2761494
Longitude : 88.3571714,88.3571714
file name : Image_21102022105920145.png
|
2022-10-21 10:59:20.286239 |
283 |
45729221 |
U Construction of Cement Concrete road from house of Arfat Laskar to house of Mafidul Laskar at Mir |
222000 |
U Construction of Cement Concrete road from house of Arfat Laskar to house of Mafidul Laskar at Mir1 |
Roof laid |
-
latitude : 22.26628419,22.26628419
Longitude : 88.34200218,88.3420019
file name : Image_20122022142516787.png
|
2022-12-20 14:25:16.89384 |
284 |
45729221 |
U Construction of Cement Concrete road from house of Arfat Laskar to house of Mafidul Laskar at Mir |
222000 |
U Construction of Cement Concrete road from house of Arfat Laskar to house of Mafidul Laskar at Mir1 |
Plinth level |
-
latitude : 22.2663065,22.26631187
Longitude : 88.34200228,88.34201234
file name : Image_24112022143052084.png
|
2022-11-24 14:30:52.183318 |
285 |
45729221 |
U Construction of Cement Concrete road from house of Arfat Laskar to house of Mafidul Laskar at Mir |
222000 |
U Construction of Cement Concrete road from house of Arfat Laskar to house of Mafidul Laskar at Mir1 |
Completion of work |
-
latitude : 22.2663299,22.26634484
Longitude : 88.34203179,88.34203776
file name : Image_24112022141746188.png
|
2022-11-24 14:17:46.278134 |
286 |
45713198 |
T Construction of cement concrete preotection wall at pond of Ramjan Jamadar and pond of Rajab at Na |
150000 |
T Construction of cement concrete preotection wall at pond of Ramjan Jamadar and pond of Rajab at Na1 |
Roof laid |
-
latitude : 22.27656251,22.27656272
Longitude : 88.35354924,88.35353841
file name : Image_01122022090820762.png
|
2022-12-01 09:08:20.836833 |
287 |
45713198 |
T Construction of cement concrete preotection wall at pond of Ramjan Jamadar and pond of Rajab at Na |
150000 |
T Construction of cement concrete preotection wall at pond of Ramjan Jamadar and pond of Rajab at Na1 |
Plinth level |
-
latitude : 22.27657032,22.27656865
Longitude : 88.35354347,88.35353285
file name : Image_01122022090340056.png
|
2022-12-01 09:03:40.130037 |
288 |
45713198 |
T Construction of cement concrete preotection wall at pond of Ramjan Jamadar and pond of Rajab at Na |
150000 |
T Construction of cement concrete preotection wall at pond of Ramjan Jamadar and pond of Rajab at Na1 |
Completion of work |
-
latitude : 22.27660001,22.27660084
Longitude : 88.3535647,88.35356069
file name : Image_29112022083903237.png
|
2022-11-29 08:39:03.322463 |
289 |
64994941 |
Cons of CC road from house of Ujdar Sk to house of Mannan Gazi at Byaspur U |
151240 |
Cons of CC road from house of Ujdar Sk to house of Mannan Gazi at Byaspur U1 |
Roof laid |
-
latitude : 22.27534038,22.27534233
Longitude : 88.36246152,88.3624566
file name : Image_09122022091120954.png
|
2022-12-09 09:11:21.035192 |
290 |
64994941 |
Cons of CC road from house of Ujdar Sk to house of Mannan Gazi at Byaspur U |
151240 |
Cons of CC road from house of Ujdar Sk to house of Mannan Gazi at Byaspur U1 |
Plinth level |
-
latitude : 22.2753236,22.27532644
Longitude : 88.36247176,88.36247402
file name : Image_09122022090747536.png
|
2022-12-09 09:07:47.617668 |
291 |
64994941 |
Cons of CC road from house of Ujdar Sk to house of Mannan Gazi at Byaspur U |
151240 |
Cons of CC road from house of Ujdar Sk to house of Mannan Gazi at Byaspur U1 |
Completion of work |
-
latitude : 22.27533646,22.27534087
Longitude : 88.36245248,88.36246259
file name : Image_09122022085529475.png
|
2022-12-09 08:55:29.606319 |
292 |
64995689 |
Cons of CC road from house of Debu Chakraborty to shop of Sirajul Halder at Hansury U |
150000 |
Cons of CC road from house of Debu Chakraborty to shop of Sirajul Halder at Hansury U1 |
Roof laid |
-
latitude : 22.25636382,22.25636422
Longitude : 88.33826798,88.33826843
file name : Image_20122022135352377.png
|
2022-12-20 13:53:52.494397 |
293 |
64995689 |
Cons of CC road from house of Debu Chakraborty to shop of Sirajul Halder at Hansury U |
150000 |
Cons of CC road from house of Debu Chakraborty to shop of Sirajul Halder at Hansury U1 |
Plinth level |
-
latitude : 22.25633147,22.25633089
Longitude : 88.33827399,88.33827696
file name : Image_20122022134306756.png
|
2022-12-20 13:43:06.874534 |
294 |
64995689 |
Cons of CC road from house of Debu Chakraborty to shop of Sirajul Halder at Hansury U |
150000 |
Cons of CC road from house of Debu Chakraborty to shop of Sirajul Halder at Hansury U1 |
Completion of work |
-
latitude : 22.2563403,22.25633375
Longitude : 88.33826017,88.33825894
file name : Image_20122022133704003.png
|
2022-12-20 13:37:04.133752 |
295 |
45718766 |
T Construction of concrete drain from house of Abdul Molla to pond of Sadamoni at Hansury |
100000 |
T Construction of concrete drain from house of Abdul Molla to pond of Sadamoni at Hansury1 |
Roof laid |
-
latitude : 22.25715186,22.25716542
Longitude : 88.33861384,88.33861076
file name : Image_20122022135052616.png
|
2022-12-20 13:50:52.728398 |
296 |
45718766 |
T Construction of concrete drain from house of Abdul Molla to pond of Sadamoni at Hansury |
100000 |
T Construction of concrete drain from house of Abdul Molla to pond of Sadamoni at Hansury1 |
Plinth level |
-
latitude : 22.25714225,22.25713881
Longitude : 88.33860449,88.33860013
file name : Image_20122022134856378.png
|
2022-12-20 13:48:56.494002 |
297 |
45718766 |
T Construction of concrete drain from house of Abdul Molla to pond of Sadamoni at Hansury |
100000 |
T Construction of concrete drain from house of Abdul Molla to pond of Sadamoni at Hansury1 |
Completion of work |
-
latitude : 22.25715545,22.25716572
Longitude : 88.33862586,88.33862655
file name : Image_20122022133351164.png
|
2022-12-20 13:33:51.276196 |
298 |
65487257 |
Construction of Tally Piling from house of Kalimuddin to house of Arafat Gazi at Mirzapur |
90101 |
Construction of Tally Piling from house of Kalimuddin to house of Arafat Gazi at Mirzapur1 |
Roof laid |
-
latitude : 22.26659753,22.2666025
Longitude : 88.34094706,88.34094942
file name : Image_20122022141907105.png
|
2022-12-20 14:19:07.202253 |
299 |
65487257 |
Construction of Tally Piling from house of Kalimuddin to house of Arafat Gazi at Mirzapur |
90101 |
Construction of Tally Piling from house of Kalimuddin to house of Arafat Gazi at Mirzapur1 |
Plinth level |
-
latitude : 22.2665894,22.26659054
Longitude : 88.34096194,88.34096617
file name : Image_20122022141707808.png
|
2022-12-20 14:17:07.905016 |
300 |
65487257 |
Construction of Tally Piling from house of Kalimuddin to house of Arafat Gazi at Mirzapur |
90101 |
Construction of Tally Piling from house of Kalimuddin to house of Arafat Gazi at Mirzapur1 |
Completion of work |
-
latitude : 22.26659351,22.26658794
Longitude : 88.34095552,88.34095114
file name : Image_20122022141111166.png
|
2022-12-20 14:11:11.260932 |
301 |
45717547 |
T Construction of protection wall at pond of Aktar Alam Laskar at Mirzapur |
150000 |
T Construction of protection wall at pond of Aktar Alam Laskar at Mirzapur1 |
Roof laid |
-
latitude : 22.26482063,22.26483151
Longitude : 88.34243507,88.34241941
file name : Image_20122022144500430.png
|
2022-12-20 14:45:00.546514 |
302 |
45717547 |
T Construction of protection wall at pond of Aktar Alam Laskar at Mirzapur |
150000 |
T Construction of protection wall at pond of Aktar Alam Laskar at Mirzapur1 |
Plinth level |
-
latitude : 22.26484549,22.26484482
Longitude : 88.34237882,88.34237832
file name : Image_20122022144150300.png
|
2022-12-20 14:41:50.414636 |
303 |
45717547 |
T Construction of protection wall at pond of Aktar Alam Laskar at Mirzapur |
150000 |
T Construction of protection wall at pond of Aktar Alam Laskar at Mirzapur1 |
Completion of work |
-
latitude : 22.26483434,22.26483702
Longitude : 88.34236287,88.34235974
file name : Image_20122022143822907.png
|
2022-12-20 14:38:23.019611 |
304 |
64995658 |
Cons of Protectionwall near Joypur Jame Maszid pond at Joypur |
250000 |
Cons of Protectionwall near Joypur Jame Maszid pond at Joypur1 |
Roof laid |
-
latitude : 22.260992,22.2609861,22.2613219
Longitude : 88.327506,88.3275065,88.3274231
file name : Image_20122022152121634.png
|
2022-12-20 15:21:21.732392 |
305 |
64995658 |
Cons of Protectionwall near Joypur Jame Maszid pond at Joypur |
250000 |
Cons of Protectionwall near Joypur Jame Maszid pond at Joypur1 |
Roof laid |
-
latitude : 22.260989,22.2609861
Longitude : 88.3275064,88.3275065
file name : Image_20122022151918605.png
|
2022-12-20 15:19:18.701825 |
306 |
64995658 |
Cons of Protectionwall near Joypur Jame Maszid pond at Joypur |
250000 |
Cons of Protectionwall near Joypur Jame Maszid pond at Joypur1 |
Plinth level |
-
latitude : 22.2609887,22.26118379
Longitude : 88.3275059,88.32794467
file name : Image_20122022151553421.png
|
2022-12-20 15:15:53.520435 |
307 |
64995658 |
Cons of Protectionwall near Joypur Jame Maszid pond at Joypur |
250000 |
Cons of Protectionwall near Joypur Jame Maszid pond at Joypur1 |
Completion of work |
-
latitude : 22.2609909,22.2609909
Longitude : 88.3275124,88.3275124
file name : Image_20122022151124786.png
|
2022-12-20 15:11:24.885367 |
308 |
64994718 |
Cons of CC road with Protection wall from pond of Duisatin to house of Amirul Mallick at Nainan U |
74789 |
Cons of CC road with Protection wall from pond of Duisatin to house of Amirul Mallick at Nainan U1 |
Roof laid |
-
latitude : 22.27421008,22.27420541
Longitude : 88.35070384,88.35070172
file name : Image_28112023120450896.png
|
2023-11-28 12:04:51.001777 |
309 |
64994718 |
Cons of CC road with Protection wall from pond of Duisatin to house of Amirul Mallick at Nainan U |
74789 |
Cons of CC road with Protection wall from pond of Duisatin to house of Amirul Mallick at Nainan U1 |
Roof laid |
-
latitude : 22.27420201,22.27420194
Longitude : 88.34948694,88.34948699
file name : Image_09012023115344209.png
|
2023-01-09 11:53:44.323198 |
310 |
64994718 |
Cons of CC road with Protection wall from pond of Duisatin to house of Amirul Mallick at Nainan U |
74789 |
Cons of CC road with Protection wall from pond of Duisatin to house of Amirul Mallick at Nainan U1 |
Plinth level |
-
latitude : 22.27420353,22.27421437
Longitude : 88.34949546,88.34949099
file name : Image_09012023115206166.png
|
2023-01-09 11:52:06.263895 |
311 |
64994718 |
Cons of CC road with Protection wall from pond of Duisatin to house of Amirul Mallick at Nainan U |
74789 |
Cons of CC road with Protection wall from pond of Duisatin to house of Amirul Mallick at Nainan U1 |
Completion of work |
-
latitude : 22.27422374,22.27421049
Longitude : 88.34947052,88.34947854
file name : Image_09012023114950126.png
|
2023-01-09 11:49:50.216046 |
312 |
64995331 |
Cons of CC road from Tamijuddin house to Nuruddin house and Ibrahim house to Saiful house at KuldiaU |
220310 |
Cons of CC road from Tamijuddin house to Nuruddin house and Ibrahim house to Saiful house at KuldiaU1 |
Roof laid |
-
latitude : 22.2623417,22.26234336
Longitude : 88.35105789,88.35105389
file name : Image_09012023124632992.png
|
2023-01-09 12:46:33.120878 |
313 |
64995331 |
Cons of CC road from Tamijuddin house to Nuruddin house and Ibrahim house to Saiful house at KuldiaU |
220310 |
Cons of CC road from Tamijuddin house to Nuruddin house and Ibrahim house to Saiful house at KuldiaU1 |
Plinth level |
-
latitude : 22.26233118,22.26233836
Longitude : 88.35104188,88.35104503
file name : Image_09012023124157866.png
|
2023-01-09 12:41:57.981677 |
314 |
64995331 |
Cons of CC road from Tamijuddin house to Nuruddin house and Ibrahim house to Saiful house at KuldiaU |
220310 |
Cons of CC road from Tamijuddin house to Nuruddin house and Ibrahim house to Saiful house at KuldiaU1 |
Completion of work |
-
latitude : 22.26236006,22.26235213
Longitude : 88.35105024,88.35104664
file name : Image_09012023123947320.png
|
2023-01-09 12:39:47.44464 |
315 |
64996135 |
Creation of drainage channel for management of grey water |
222000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.27398579,22.273986
Longitude : 88.35180993,88.35180976
file name : Image_09012023114338208.png
|
2023-01-09 11:43:38.305446 |
316 |
64996135 |
Creation of drainage channel for management of grey water |
222000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.27399105,22.27399202
Longitude : 88.35183767,88.35183708
file name : Image_09012023114147551.png
|
2023-01-09 11:41:47.647863 |
317 |
64996135 |
Creation of drainage channel for management of grey water |
222000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.274226,22.274226
Longitude : 88.351102,88.351102
file name : Image_09012023112940281.png
|
2023-01-09 11:29:40.37433 |
318 |
64994479 |
Cons of CC road from Kuldia Thakur Tala to house of Uttam and house of Prohalad Mondal at Kuldia |
179000 |
Cons of CC road from Kuldia Thakur Tala to house of Uttam and house of Prohalad Mondal at Kuldia1 |
Roof laid |
-
latitude : 22.26689195,22.26689972
Longitude : 88.35570216,88.35568453
file name : Image_09012023122850043.png
|
2023-01-09 12:28:50.134015 |
319 |
64994479 |
Cons of CC road from Kuldia Thakur Tala to house of Uttam and house of Prohalad Mondal at Kuldia |
179000 |
Cons of CC road from Kuldia Thakur Tala to house of Uttam and house of Prohalad Mondal at Kuldia1 |
Plinth level |
-
latitude : 22.26689245,22.26690168
Longitude : 88.35566377,88.35567115
file name : Image_09012023122250352.png
|
2023-01-09 12:22:50.452466 |
320 |
64994479 |
Cons of CC road from Kuldia Thakur Tala to house of Uttam and house of Prohalad Mondal at Kuldia |
179000 |
Cons of CC road from Kuldia Thakur Tala to house of Uttam and house of Prohalad Mondal at Kuldia1 |
Completion of work |
-
latitude : 22.26693337,22.26692382
Longitude : 88.35565709,88.3556614
file name : Image_09012023122001813.png
|
2023-01-09 12:20:01.903157 |
321 |
64994784 |
Cons of CC road with protection wall from Big Graveyard to Goal Gravayard at Nainan Mallick Para U |
230000 |
Cons of CC road with protection wall from Big Graveyard to Goal Gravayard at Nainan Mallick Para U1 |
Roof laid |
-
latitude : 22.2727729,22.2727729
Longitude : 88.3547438,88.3547438
file name : Image_14032023131208572.png
|
2023-03-14 13:12:08.756088 |
322 |
64994784 |
Cons of CC road with protection wall from Big Graveyard to Goal Gravayard at Nainan Mallick Para U |
230000 |
Cons of CC road with protection wall from Big Graveyard to Goal Gravayard at Nainan Mallick Para U1 |
Plinth level |
-
latitude : 22.27270817,22.2726955
Longitude : 88.35364949,88.35365829
file name : Image_10012023113835938.png
|
2023-01-10 11:38:36.041686 |
323 |
64994784 |
Cons of CC road with protection wall from Big Graveyard to Goal Gravayard at Nainan Mallick Para U |
230000 |
Cons of CC road with protection wall from Big Graveyard to Goal Gravayard at Nainan Mallick Para U1 |
Completion of work |
-
latitude : 22.27269699,22.27269645
Longitude : 88.35362834,88.35362877
file name : Image_09012023120143610.png
|
2023-01-09 12:01:43.70649 |
324 |
64994651 |
Cons of CC road from house of Tarapada Bag to house of Shambhu Hazra at Dodalia U |
100229 |
Cons of CC road from house of Tarapada Bag to house of Shambhu Hazra at Dodalia U1 |
Roof laid |
-
latitude : 22.27786054,22.27786546
Longitude : 88.34101404,88.34101287
file name : Image_10012023150258183.png
|
2023-01-10 15:02:58.27447 |
325 |
64994651 |
Cons of CC road from house of Tarapada Bag to house of Shambhu Hazra at Dodalia U |
100229 |
Cons of CC road from house of Tarapada Bag to house of Shambhu Hazra at Dodalia U1 |
Plinth level |
-
latitude : 22.2778475,22.27786458
Longitude : 88.34102915,88.34102397
file name : Image_10012023150021572.png
|
2023-01-10 15:00:21.736852 |
326 |
64994651 |
Cons of CC road from house of Tarapada Bag to house of Shambhu Hazra at Dodalia U |
100229 |
Cons of CC road from house of Tarapada Bag to house of Shambhu Hazra at Dodalia U1 |
Completion of work |
-
latitude : 22.27784851,22.2778619
Longitude : 88.34101559,88.34102144
file name : Image_10012023145610268.png
|
2023-01-10 14:56:10.382454 |
327 |
56289596 |
T Sinking of Tubewell with Platform and soakpit near Parui Para Kali Mandir at Hansury |
207311 |
T Sinking of Tubewell with Platform and soakpit near Parui Para Kali Mandir at Hansury1 |
Roof laid |
-
latitude : 22.25860539
Longitude : 88.33609847
file name : Image_16102023133729275.png
|
2023-10-16 13:37:30.615376 |
328 |
56289596 |
T Sinking of Tubewell with Platform and soakpit near Parui Para Kali Mandir at Hansury |
207311 |
T Sinking of Tubewell with Platform and soakpit near Parui Para Kali Mandir at Hansury1 |
Plinth level |
-
latitude : 22.25858926
Longitude : 88.33609569
file name : Image_16102023133207441.png
|
2023-10-16 13:32:11.011591 |
329 |
56289596 |
T Sinking of Tubewell with Platform and soakpit near Parui Para Kali Mandir at Hansury |
207311 |
T Sinking of Tubewell with Platform and soakpit near Parui Para Kali Mandir at Hansury1 |
Completion of work |
-
latitude : 22.2585901
Longitude : 88.33611194
file name : Image_16102023132009143.png
|
2023-10-16 13:20:09.23399 |
330 |
45727459 |
U Construction of cement concrete road with preotection wall from house of Abbas Laskar to house of |
200123 |
U Construction of cement concrete road with preotection wall from house of Abbas Laskar to house of 1 |
Roof laid |
-
latitude : 22.27525125,22.27525545
Longitude : 88.35182783,88.35183117
file name : Image_14032023115148731.png
|
2023-03-14 11:51:48.849994 |
331 |
45727459 |
U Construction of cement concrete road with preotection wall from house of Abbas Laskar to house of |
200123 |
U Construction of cement concrete road with preotection wall from house of Abbas Laskar to house of 1 |
Plinth level |
-
latitude : 22.27526675,22.2742536
Longitude : 88.35179116,88.3538334
file name : Image_23012023110439196.png
|
2023-01-23 11:04:39.280682 |
332 |
45727459 |
U Construction of cement concrete road with preotection wall from house of Abbas Laskar to house of |
200123 |
U Construction of cement concrete road with preotection wall from house of Abbas Laskar to house of 1 |
Completion of work |
-
latitude : 22.27526576,22.27525791
Longitude : 88.35180671,88.35182453
file name : Image_23122022112717485.png
|
2022-12-23 11:27:17.583663 |
333 |
45713365 |
T Construction of Pacca drain from Sarkari Graveyard to house of Mohammad Lakar at Nainan Majher Par |
150000 |
T Construction of Pacca drain from Sarkari Graveyard to house of Mohammad Lakar at Nainan Majher Par1 |
Roof laid |
-
latitude : 22.27573978,22.27573989
Longitude : 88.35515431,88.35514327
file name : Image_23012023101012899.png
|
2023-01-23 10:10:13.001687 |
334 |
45713365 |
T Construction of Pacca drain from Sarkari Graveyard to house of Mohammad Lakar at Nainan Majher Par |
150000 |
T Construction of Pacca drain from Sarkari Graveyard to house of Mohammad Lakar at Nainan Majher Par1 |
Plinth level |
-
latitude : 22.275898,22.27588873
Longitude : 88.35520893,88.35520768
file name : Image_27112022101517943.png
|
2022-11-27 10:15:18.026915 |
335 |
45713365 |
T Construction of Pacca drain from Sarkari Graveyard to house of Mohammad Lakar at Nainan Majher Par |
150000 |
T Construction of Pacca drain from Sarkari Graveyard to house of Mohammad Lakar at Nainan Majher Par1 |
Completion of work |
-
latitude : 22.27588142,22.27588121
Longitude : 88.35523143,88.35523035
file name : Image_20112022095606741.png
|
2022-11-20 09:56:06.847218 |
336 |
45727656 |
U Construction of cement concrete road from house of Nachim Laskar to house of Arfat Sk at Nainan |
250000 |
U Construction of cement concrete road from house of Nachim Laskar to house of Arfat Sk at Nainan1 |
Roof laid |
-
latitude : 22.2751266,22.275123
Longitude : 88.3556408,88.3556435
file name : Image_23012023100044625.png
|
2023-01-23 10:00:44.784529 |
337 |
45727656 |
U Construction of cement concrete road from house of Nachim Laskar to house of Arfat Sk at Nainan |
250000 |
U Construction of cement concrete road from house of Nachim Laskar to house of Arfat Sk at Nainan1 |
Plinth level |
-
latitude : 22.27578008,22.2757525
Longitude : 88.35493594,88.3547438
file name : Image_27112022101647045.png
|
2022-11-27 10:16:47.132313 |
338 |
45727656 |
U Construction of cement concrete road from house of Nachim Laskar to house of Arfat Sk at Nainan |
250000 |
U Construction of cement concrete road from house of Nachim Laskar to house of Arfat Sk at Nainan1 |
Completion of work |
-
latitude : 22.27585788,22.27584831
Longitude : 88.3549137,88.35491855
file name : Image_20112022095734324.png
|
2022-11-20 09:57:34.436383 |
339 |
64994879 |
Cons of CC road from Shop of Anowar Laskar to Graveyard of Rafijuddin Molla at Nainan U |
200025 |
Cons of CC road from Shop of Anowar Laskar to Graveyard of Rafijuddin Molla at Nainan U1 |
Roof laid |
-
latitude : 22.27787046,22.2778593
Longitude : 88.35518719,88.35518707
file name : Image_23012023165638254.png
|
2023-01-23 16:56:38.373761 |
340 |
64994879 |
Cons of CC road from Shop of Anowar Laskar to Graveyard of Rafijuddin Molla at Nainan U |
200025 |
Cons of CC road from Shop of Anowar Laskar to Graveyard of Rafijuddin Molla at Nainan U1 |
Plinth level |
-
latitude : 22.27782591,22.27782577
Longitude : 88.35508826,88.35509155
file name : Image_23012023101816195.png
|
2023-01-23 10:18:16.290762 |
341 |
64994879 |
Cons of CC road from Shop of Anowar Laskar to Graveyard of Rafijuddin Molla at Nainan U |
200025 |
Cons of CC road from Shop of Anowar Laskar to Graveyard of Rafijuddin Molla at Nainan U1 |
Completion of work |
-
latitude : 22.27749333,22.27745414
Longitude : 88.35501756,88.35501089
file name : Image_10012023090913666.png
|
2023-01-10 09:09:13.748654 |
342 |
64995613 |
Cons of proctionwall from house of Mir Ali Laskar to house of Moktar Jamadar at Nainan U |
200000 |
Cons of proctionwall from house of Mir Ali Laskar to house of Moktar Jamadar at Nainan U1 |
Roof laid |
-
latitude : 22.2746107,22.2746107
Longitude : 88.352316,88.352316
file name : Image_14032023120020630.png
|
2023-03-14 12:00:20.764863 |
343 |
64995613 |
Cons of proctionwall from house of Mir Ali Laskar to house of Moktar Jamadar at Nainan U |
200000 |
Cons of proctionwall from house of Mir Ali Laskar to house of Moktar Jamadar at Nainan U1 |
Plinth level |
-
latitude : 22.2757308,22.2757307
Longitude : 88.3533201,88.3533183
file name : Image_23012023165049491.png
|
2023-01-23 16:50:49.604132 |
344 |
64995613 |
Cons of proctionwall from house of Mir Ali Laskar to house of Moktar Jamadar at Nainan U |
200000 |
Cons of proctionwall from house of Mir Ali Laskar to house of Moktar Jamadar at Nainan U1 |
Completion of work |
-
latitude : 22.27493066,22.2757307,22.2757307
Longitude : 88.35320656,88.3533212,88.3533212
file name : Image_23012023110838880.png
|
2023-01-23 11:08:38.958289 |
345 |
64995613 |
Cons of proctionwall from house of Mir Ali Laskar to house of Moktar Jamadar at Nainan U |
200000 |
Cons of proctionwall from house of Mir Ali Laskar to house of Moktar Jamadar at Nainan U1 |
Completion of work |
-
latitude : 22.27501647,22.27507939
Longitude : 88.3533866,88.35327241
file name : Image_23122022110551153.png
|
2022-12-23 11:05:51.234222 |
346 |
45728285 |
U Construction of Cement Concrete road with protection wall from Santi Sangha Club to house of Abul |
150000 |
U Construction of Cement Concrete road with protection wall from Santi Sangha Club to house of Abul 1 |
Roof laid |
-
latitude : 22.27804883,22.27804465
Longitude : 88.36417086,88.36417444
file name : Image_25012023103257200.png
|
2023-01-25 10:32:57.313135 |
347 |
45728285 |
U Construction of Cement Concrete road with protection wall from Santi Sangha Club to house of Abul |
150000 |
U Construction of Cement Concrete road with protection wall from Santi Sangha Club to house of Abul 1 |
Plinth level |
-
latitude : 22.27805399,22.27804936
Longitude : 88.36414611,88.36414532
file name : Image_25012023103044544.png
|
2023-01-25 10:30:44.660568 |
348 |
45728285 |
U Construction of Cement Concrete road with protection wall from Santi Sangha Club to house of Abul |
150000 |
U Construction of Cement Concrete road with protection wall from Santi Sangha Club to house of Abul 1 |
Completion of work |
-
latitude : 22.27804716,22.27804349
Longitude : 88.36415934,88.36413897
file name : Image_25012023102458387.png
|
2023-01-25 10:24:58.496487 |
349 |
45727240 |
U Construction of Cement Concrete road from house of Anowar Laskar to house of Makbul at Nainan |
146600 |
U Construction of Cement Concrete road from house of Anowar Laskar to house of Makbul at Nainan1 |
Roof laid |
-
latitude : 22.27759837,22.27759733
Longitude : 88.35372647,88.35372691
file name : Image_14032023120616161.png
|
2023-03-14 12:06:16.271918 |
350 |
45727240 |
U Construction of Cement Concrete road from house of Anowar Laskar to house of Makbul at Nainan |
146600 |
U Construction of Cement Concrete road from house of Anowar Laskar to house of Makbul at Nainan1 |
Plinth level |
-
latitude : 22.27766294,22.27765619
Longitude : 88.3538708,88.35386841
file name : Image_23012023165357367.png
|
2023-01-23 16:53:57.488134 |
351 |
45727240 |
U Construction of Cement Concrete road from house of Anowar Laskar to house of Makbul at Nainan |
146600 |
U Construction of Cement Concrete road from house of Anowar Laskar to house of Makbul at Nainan1 |
Completion of work |
-
latitude : 22.27763382,22.27763529
Longitude : 88.35381796,88.35381561
file name : Image_10012023092532689.png
|
2023-01-10 09:25:32.79418 |
352 |
67151634 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.26566941
Longitude : 88.33942944
file name : Image_03092024151737649.png
|
2024-09-03 15:17:37.951125 |
353 |
67151634 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.2663768
Longitude : 88.3402264
file name : Image_29082024113132998.png
|
2024-08-29 11:31:33.506557 |
354 |
67151634 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.2656683
Longitude : 88.3400571
file name : Image_28082024120444012.png
|
2024-08-28 12:04:44.146459 |
355 |
64995846 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.2598226,22.2597862
Longitude : 88.3332089,88.3332451
file name : Image_22022023131845967.png
|
2023-02-22 13:18:46.149279 |
356 |
64995846 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.2598175,22.2597903
Longitude : 88.3332147,88.3332408
file name : Image_22022023131454170.png
|
2023-02-22 13:14:54.302109 |
357 |
64995846 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.2598227,22.2598237
Longitude : 88.333197,88.3331985
file name : Image_22022023123615911.png
|
2023-02-22 12:36:16.044605 |
358 |
45728752 |
U Construction of Cement Concrete Road from house of Fazlu Sk to house of Nasir Sk at Kuldia |
134874 |
U Construction of Cement Concrete Road from house of Fazlu Sk to house of Nasir Sk at Kuldia1 |
Roof laid |
-
latitude : 22.2635871,22.26358713
Longitude : 88.35351451,88.35351019
file name : Image_22022023142457041.png
|
2023-02-22 14:24:57.170874 |
359 |
45728752 |
U Construction of Cement Concrete Road from house of Fazlu Sk to house of Nasir Sk at Kuldia |
134874 |
U Construction of Cement Concrete Road from house of Fazlu Sk to house of Nasir Sk at Kuldia1 |
Plinth level |
-
latitude : 22.2633448,22.26358577
Longitude : 88.3544996,88.35355836
file name : Image_22022023142207590.png
|
2023-02-22 14:22:07.714076 |
360 |
45728752 |
U Construction of Cement Concrete Road from house of Fazlu Sk to house of Nasir Sk at Kuldia |
134874 |
U Construction of Cement Concrete Road from house of Fazlu Sk to house of Nasir Sk at Kuldia1 |
Completion of work |
-
latitude : 22.26358551,22.26358555
Longitude : 88.35353269,88.35353788
file name : Image_22022023141802130.png
|
2023-02-22 14:18:02.252902 |
361 |
45717381 |
T Construction a culvert at Mirzapur and Mohanpur suti khal at Mirzapur |
150000 |
T Construction a culvert at Mirzapur and Mohanpur suti khal at Mirzapur1 |
Roof laid |
-
latitude : 22.25973152,22.25973315
Longitude : 88.34065568,88.34065815
file name : Image_22022023144947585.png
|
2023-02-22 14:49:47.706266 |
362 |
45717381 |
T Construction a culvert at Mirzapur and Mohanpur suti khal at Mirzapur |
150000 |
T Construction a culvert at Mirzapur and Mohanpur suti khal at Mirzapur1 |
Plinth level |
-
latitude : 22.25976667,22.25977135
Longitude : 88.34065965,88.34065705
file name : Image_22022023144636035.png
|
2023-02-22 14:46:36.164009 |
363 |
45717381 |
T Construction a culvert at Mirzapur and Mohanpur suti khal at Mirzapur |
150000 |
T Construction a culvert at Mirzapur and Mohanpur suti khal at Mirzapur1 |
Completion of work |
-
latitude : 22.2597807,22.25978075
Longitude : 88.34066653,88.34066489
file name : Image_22022023144024578.png
|
2023-02-22 14:40:24.706698 |
364 |
45727767 |
U Construction of cement concrete road from Blacktop road to house of Manirul Laskar and house of Go |
150000 |
U Construction of cement concrete road from Blacktop road to house of Manirul Laskar and house of Go1 |
Roof laid |
-
latitude : 22.2749465,22.2749393
Longitude : 88.3555493,88.35561
file name : Image_01032023122157453.png
|
2023-03-01 12:21:57.56061 |
365 |
45727767 |
U Construction of cement concrete road from Blacktop road to house of Manirul Laskar and house of Go |
150000 |
U Construction of cement concrete road from Blacktop road to house of Manirul Laskar and house of Go1 |
Plinth level |
-
latitude : 22.2749168,22.274933
Longitude : 88.3554981,88.3555454
file name : Image_21022023113054822.png
|
2023-02-21 11:30:54.942581 |
366 |
45727767 |
U Construction of cement concrete road from Blacktop road to house of Manirul Laskar and house of Go |
150000 |
U Construction of cement concrete road from Blacktop road to house of Manirul Laskar and house of Go1 |
Completion of work |
-
latitude : 22.2750113,22.2749942
Longitude : 88.355606,88.3555932
file name : Image_16012023104712756.png
|
2023-01-16 10:47:12.853975 |
367 |
56291400 |
T Water Testing and Tubewell Reparing for Kuldia Mouza |
100000 |
T Water Testing and Tubewell Reparing for Kuldia Mouza1 |
Plinth level |
-
latitude : 22.2596101
Longitude : 88.3347898
file name : Image_24022023140618867.png
|
2023-02-24 14:06:18.99225 |
368 |
56291400 |
T Water Testing and Tubewell Reparing for Kuldia Mouza |
100000 |
T Water Testing and Tubewell Reparing for Kuldia Mouza1 |
Completion of work |
-
latitude : 22.2596196
Longitude : 88.3348042
file name : Image_24022023140228597.png
|
2023-02-24 14:02:28.713114 |
369 |
56290643 |
T Water testing and Tubewell Reparing for Atporui Mouza |
76000 |
T Water testing and Tubewell Reparing for Atporui Mouza1 |
Plinth level |
-
latitude : 22.2596097
Longitude : 88.3347888
file name : Image_24022023141433244.png
|
2023-02-24 14:14:33.356781 |
370 |
56290643 |
T Water testing and Tubewell Reparing for Atporui Mouza |
76000 |
T Water testing and Tubewell Reparing for Atporui Mouza1 |
Completion of work |
-
latitude : 22.2596144
Longitude : 88.3348015
file name : Image_24022023141206515.png
|
2023-02-24 14:12:06.626537 |
371 |
56290322 |
T Cons of CC drain with cover soakpit for LWM from house of Abdul Molla to house of Jarina at Hansur |
240000 |
T Cons of CC drain with cover soakpit for LWM from house of Abdul Molla to house of Jarina at Hansur1 |
Roof laid |
-
latitude : 22.25798093,22.25797747
Longitude : 88.33875751,88.33875934
file name : Image_13032023135910954.png
|
2023-03-13 13:59:11.06024 |
372 |
56290322 |
T Cons of CC drain with cover soakpit for LWM from house of Abdul Molla to house of Jarina at Hansur |
240000 |
T Cons of CC drain with cover soakpit for LWM from house of Abdul Molla to house of Jarina at Hansur1 |
Plinth level |
-
latitude : 22.25801792,22.2580179
Longitude : 88.33879135,88.33879147
file name : Image_13032023135606600.png
|
2023-03-13 13:56:06.750554 |
373 |
56290322 |
T Cons of CC drain with cover soakpit for LWM from house of Abdul Molla to house of Jarina at Hansur |
240000 |
T Cons of CC drain with cover soakpit for LWM from house of Abdul Molla to house of Jarina at Hansur1 |
Completion of work |
-
latitude : 22.2596436,22.2596436
Longitude : 88.3348546,88.3348546
file name : Image_13032023135312674.png
|
2023-03-13 13:53:12.821857 |
374 |
56290416 |
T Sinking of Tubewell with Platform and Soakpit at Enayetpur Bagan Para |
207311 |
T Sinking of Tubewell with Platform and Soakpit at Enayetpur Bagan Para1 |
Roof laid |
-
latitude : 22.24904376
Longitude : 88.3357909
file name : Image_13032023142520105.png
|
2023-03-13 14:25:20.22038 |
375 |
56290416 |
T Sinking of Tubewell with Platform and Soakpit at Enayetpur Bagan Para |
207311 |
T Sinking of Tubewell with Platform and Soakpit at Enayetpur Bagan Para1 |
Plinth level |
-
latitude : 22.24904233
Longitude : 88.33576635
file name : Image_13032023141524747.png
|
2023-03-13 14:15:24.92869 |
376 |
56290416 |
T Sinking of Tubewell with Platform and Soakpit at Enayetpur Bagan Para |
207311 |
T Sinking of Tubewell with Platform and Soakpit at Enayetpur Bagan Para1 |
Completion of work |
-
latitude : 22.24904668
Longitude : 88.33575558
file name : Image_13032023141113744.png
|
2023-03-13 14:11:13.863043 |
377 |
56263609 |
T Sinking of Tubewell with Platform and soakpit near land of Jalal Mistry at Byaspur |
207311 |
T Sinking of Tubewell with Platform and soakpit near land of Jalal Mistry at Byaspur1 |
Roof laid |
-
latitude : 22.27502883
Longitude : 88.36236336
file name : Image_14032023124202860.png
|
2023-03-14 12:42:02.998999 |
378 |
56263609 |
T Sinking of Tubewell with Platform and soakpit near land of Jalal Mistry at Byaspur |
207311 |
T Sinking of Tubewell with Platform and soakpit near land of Jalal Mistry at Byaspur1 |
Plinth level |
-
latitude : 22.27504025
Longitude : 88.36235139
file name : Image_14032023123633672.png
|
2023-03-14 12:36:33.799542 |
379 |
56263609 |
T Sinking of Tubewell with Platform and soakpit near land of Jalal Mistry at Byaspur |
207311 |
T Sinking of Tubewell with Platform and soakpit near land of Jalal Mistry at Byaspur1 |
Completion of work |
-
latitude : 22.2750204
Longitude : 88.36240444
file name : Image_14032023123214839.png
|
2023-03-14 12:32:15.313109 |
380 |
45728401 |
U Construction of Cement Concrete road with protection wall from Khamar of Raihan Pailan to house of |
100000 |
U Construction of Cement Concrete road with protection wall from Khamar of Raihan Pailan to house of1 |
Roof laid |
-
latitude : 22.2767834,22.2767834
Longitude : 88.3665841,88.3665841
file name : Image_23032023110224840.png
|
2023-03-23 11:02:24.952239 |
381 |
45728401 |
U Construction of Cement Concrete road with protection wall from Khamar of Raihan Pailan to house of |
100000 |
U Construction of Cement Concrete road with protection wall from Khamar of Raihan Pailan to house of1 |
Plinth level |
-
latitude : 22.2767834,22.27630683
Longitude : 88.3665841,88.36641622
file name : Image_23032023110011087.png
|
2023-03-23 11:00:11.194832 |
382 |
45728401 |
U Construction of Cement Concrete road with protection wall from Khamar of Raihan Pailan to house of |
100000 |
U Construction of Cement Concrete road with protection wall from Khamar of Raihan Pailan to house of1 |
Completion of work |
-
latitude : 22.276785,22.2767843
Longitude : 88.366591,88.3665861
file name : Image_23032023105753012.png
|
2023-03-23 10:57:53.12245 |
383 |
56349488 |
U Ugradation and Decoration of Gram Panchayat Building |
300000 |
U Ugradation and Decoration of Gram Panchayat Building1 |
Completion of work |
-
latitude : 22.25960507
Longitude : 88.33500095
file name : Image_27032023150147982.png
|
2023-03-27 15:01:48.10522 |
384 |
56290733 |
T Water testing and Tubewell Reparing for Dodalia Mouza |
76000 |
T Water testing and Tubewell Reparing for Dodalia Mouza1 |
Completion of work |
-
latitude : 22.27246927
Longitude : 88.33931085
file name : Image_28032023164527337.png
|
2023-03-28 16:45:27.456654 |
385 |
64995234 |
Cons of CC road from house of Nabhas Master to house of Prohalad Mondal at Kuldia U |
100150 |
Cons of CC road from house of Nabhas Master to house of Prohalad Mondal at Kuldia U1 |
Roof laid |
-
latitude : 22.26979341,22.26979625
Longitude : 88.35529998,88.35530066
file name : Image_01042023121337791.png
|
2023-04-01 12:13:37.918205 |
386 |
64995234 |
Cons of CC road from house of Nabhas Master to house of Prohalad Mondal at Kuldia U |
100150 |
Cons of CC road from house of Nabhas Master to house of Prohalad Mondal at Kuldia U1 |
Plinth level |
-
latitude : 22.26977697,22.26976479
Longitude : 88.35530198,88.35530232
file name : Image_30032023111652495.png
|
2023-03-30 11:16:52.613986 |
387 |
64995234 |
Cons of CC road from house of Nabhas Master to house of Prohalad Mondal at Kuldia U |
100150 |
Cons of CC road from house of Nabhas Master to house of Prohalad Mondal at Kuldia U1 |
Completion of work |
-
latitude : 22.2735178,22.2701627
Longitude : 88.3547438,88.3544403
file name : Image_14032023125435526.png
|
2023-03-14 12:54:35.682184 |
388 |
64995476 |
Cons of CC road from house of Sobed Ali to house of Saharul Molla at Kuldia U |
114945 |
Cons of CC road from house of Sobed Ali to house of Saharul Molla at Kuldia U1 |
Roof laid |
-
latitude : 22.2654845,22.2654845
Longitude : 88.3538825,88.3538825
file name : Image_01042023120544691.png
|
2023-04-01 12:05:44.819496 |
389 |
64995476 |
Cons of CC road from house of Sobed Ali to house of Saharul Molla at Kuldia U |
114945 |
Cons of CC road from house of Sobed Ali to house of Saharul Molla at Kuldia U1 |
Plinth level |
-
latitude : 22.2654683,22.265518
Longitude : 88.353866,88.3538837
file name : Image_31032023111213724.png
|
2023-03-31 11:12:13.865873 |
390 |
64995476 |
Cons of CC road from house of Sobed Ali to house of Saharul Molla at Kuldia U |
114945 |
Cons of CC road from house of Sobed Ali to house of Saharul Molla at Kuldia U1 |
Completion of work |
-
latitude : 22.2654505,22.26559176
Longitude : 88.3551866,88.35428925
file name : Image_22032023120438463.png
|
2023-03-22 12:04:38.580225 |
391 |
45722025 |
U Construction of Cement Concrete road from house of Akbar Gazi to house of Bapi Molla at Atporui |
150000 |
U Construction of Cement Concrete road from house of Akbar Gazi to house of Bapi Molla at Atporui1 |
Roof laid |
-
latitude : 22.27844132,22.2784394
Longitude : 88.3307082,88.33071051
file name : Image_04042023114415051.png
|
2023-04-04 11:44:15.189169 |
392 |
45722025 |
U Construction of Cement Concrete road from house of Akbar Gazi to house of Bapi Molla at Atporui |
150000 |
U Construction of Cement Concrete road from house of Akbar Gazi to house of Bapi Molla at Atporui1 |
Plinth level |
-
latitude : 22.27844976,22.27845416
Longitude : 88.33071889,88.33072029
file name : Image_04042023114141721.png
|
2023-04-04 11:41:41.860042 |
393 |
45722025 |
U Construction of Cement Concrete road from house of Akbar Gazi to house of Bapi Molla at Atporui |
150000 |
U Construction of Cement Concrete road from house of Akbar Gazi to house of Bapi Molla at Atporui1 |
Completion of work |
-
latitude : 22.27845575,22.27845664
Longitude : 88.33066939,88.33067864
file name : Image_04042023113827579.png
|
2023-04-04 11:38:27.696711 |
394 |
45727559 |
U Construction of cement concrete road from house of Murshida Pailan to house of Idrish Pailan at Na |
180000 |
U Construction of cement concrete road from house of Murshida Pailan to house of Idrish Pailan at Na1 |
Roof laid |
-
latitude : 22.27919312,22.27919771
Longitude : 88.357516,88.35751199
file name : Image_18042023112319527.png
|
2023-04-18 11:23:19.669074 |
395 |
45727559 |
U Construction of cement concrete road from house of Murshida Pailan to house of Idrish Pailan at Na |
180000 |
U Construction of cement concrete road from house of Murshida Pailan to house of Idrish Pailan at Na1 |
Plinth level |
-
latitude : 22.27949639,22.2794972
Longitude : 88.35759238,88.35758299
file name : Image_04042023093252557.png
|
2023-04-04 09:32:52.743516 |
396 |
45727559 |
U Construction of cement concrete road from house of Murshida Pailan to house of Idrish Pailan at Na |
180000 |
U Construction of cement concrete road from house of Murshida Pailan to house of Idrish Pailan at Na1 |
Completion of work |
-
latitude : 22.27915937,22.27915997
Longitude : 88.35756142,88.35755858
file name : Image_01032023120919712.png
|
2023-03-01 12:09:19.872321 |
397 |
56288979 |
T sinking of Tubewell with Platform and soakpit infront of Sardar Para Maszid at Mirzapur |
207311 |
T sinking of Tubewell with Platform and soakpit infront of Sardar Para Maszid at Mirzapur1 |
Roof laid |
-
latitude : 22.26295183
Longitude : 88.33887275
file name : Image_18042023130332776.png
|
2023-04-18 13:03:32.854555 |
398 |
56288979 |
T sinking of Tubewell with Platform and soakpit infront of Sardar Para Maszid at Mirzapur |
207311 |
T sinking of Tubewell with Platform and soakpit infront of Sardar Para Maszid at Mirzapur1 |
Plinth level |
-
latitude : 22.26293404
Longitude : 88.33884285
file name : Image_18042023130105354.png
|
2023-04-18 13:01:05.467237 |
399 |
56288979 |
T sinking of Tubewell with Platform and soakpit infront of Sardar Para Maszid at Mirzapur |
207311 |
T sinking of Tubewell with Platform and soakpit infront of Sardar Para Maszid at Mirzapur1 |
Completion of work |
-
latitude : 22.26295388
Longitude : 88.33886347
file name : Image_18042023125703681.png
|
2023-04-18 12:57:03.79462 |
400 |
65487075 |
Construction of Cement concrete road from house of Sobed Ali to Graveyard at Mirzapur |
100000 |
Construction of Cement concrete road from house of Sobed Ali to Graveyard at Mirzapur1 |
Roof laid |
-
latitude : 22.26605785,22.26605583
Longitude : 88.33861913,88.33862301
file name : Image_20042023150828125.png
|
2023-04-20 15:08:28.242643 |
401 |
65487075 |
Construction of Cement concrete road from house of Sobed Ali to Graveyard at Mirzapur |
100000 |
Construction of Cement concrete road from house of Sobed Ali to Graveyard at Mirzapur1 |
Plinth level |
-
latitude : 22.26608885,22.26608857
Longitude : 88.33862538,88.33862493
file name : Image_20042023150450970.png
|
2023-04-20 15:04:51.104747 |
402 |
65487075 |
Construction of Cement concrete road from house of Sobed Ali to Graveyard at Mirzapur |
100000 |
Construction of Cement concrete road from house of Sobed Ali to Graveyard at Mirzapur1 |
Completion of work |
-
latitude : 22.2661565,22.26616178
Longitude : 88.33862988,88.33863119
file name : Image_20042023150132344.png
|
2023-04-20 15:01:32.470986 |
403 |
56349832 |
U Expenditure for Disaster Management for Community level |
300000 |
U Expenditure for Disaster Management for Community level1 |
Roof laid |
-
latitude : 22.24864785,22.24863692
Longitude : 88.33400228,88.33400578
file name : Image_17052023120654376.png
|
2023-05-17 12:06:54.495236 |
404 |
56349832 |
U Expenditure for Disaster Management for Community level |
300000 |
U Expenditure for Disaster Management for Community level1 |
Plinth level |
-
latitude : 22.24863193,22.248628
Longitude : 88.33401922,88.33402314
file name : Image_20042023152349580.png
|
2023-04-20 15:23:49.720133 |
405 |
56349832 |
U Expenditure for Disaster Management for Community level |
300000 |
U Expenditure for Disaster Management for Community level1 |
Completion of work |
-
latitude : 22.2486579,22.24865094
Longitude : 88.33398255,88.33398375
file name : Image_20042023152136096.png
|
2023-04-20 15:21:36.230602 |
406 |
66940894 |
Greywater management system |
120000 |
Greywater management system1 |
Roof laid |
-
latitude : 22.27073965
Longitude : 88.35931163
file name : Image_06062023090718760.png
|
2023-06-06 09:07:18.8619 |
407 |
66940894 |
Greywater management system |
120000 |
Greywater management system1 |
Plinth level |
-
latitude : 22.27074111
Longitude : 88.35935752
file name : Image_06062023090219451.png
|
2023-06-06 09:02:19.577756 |
408 |
66940894 |
Greywater management system |
120000 |
Greywater management system1 |
Completion of work |
-
latitude : 22.27074179
Longitude : 88.35928746
file name : Image_06062023085610463.png
|
2023-06-06 08:56:10.570967 |
409 |
56291046 |
T water testing and Tubewell Reparing for Nainan Muuza |
100000 |
T water testing and Tubewell Reparing for Nainan Muuza1 |
Plinth level |
-
latitude : 22.2727892
Longitude : 88.3546057
file name : Image_17052023122314356.png
|
2023-05-17 12:23:14.471877 |
410 |
56291046 |
T water testing and Tubewell Reparing for Nainan Muuza |
100000 |
T water testing and Tubewell Reparing for Nainan Muuza1 |
Completion of work |
-
latitude : 22.272799
Longitude : 88.3546101
file name : Image_17052023121844665.png
|
2023-05-17 12:18:44.766915 |
411 |
66941131 |
Creation of drainage channel for management of grey water |
180000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.25847895
Longitude : 88.33904134
file name : Image_01062023125839586.png
|
2023-06-01 12:58:39.687976 |
412 |
66941131 |
Creation of drainage channel for management of grey water |
180000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.2590513
Longitude : 88.3387323
file name : Image_01062023125621353.png
|
2023-06-01 12:56:21.460748 |
413 |
66941131 |
Creation of drainage channel for management of grey water |
180000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.2590548
Longitude : 88.3387302
file name : Image_01062023125338031.png
|
2023-06-01 12:53:38.134424 |
414 |
56349176 |
U Cons of CC road from house of Bhola Sardar to house of Kenaram Haldar at Enayetpur |
120000 |
U Cons of CC road from house of Bhola Sardar to house of Kenaram Haldar at Enayetpur1 |
Roof laid |
-
latitude : 22.24893055,22.24893137
Longitude : 88.32801307,88.32801326
file name : Image_01062023133228942.png
|
2023-06-01 13:32:29.041201 |
415 |
56349176 |
U Cons of CC road from house of Bhola Sardar to house of Kenaram Haldar at Enayetpur |
120000 |
U Cons of CC road from house of Bhola Sardar to house of Kenaram Haldar at Enayetpur1 |
Plinth level |
-
latitude : 22.24889669,22.24890634
Longitude : 88.32801162,88.32799955
file name : Image_01062023132225941.png
|
2023-06-01 13:22:26.050789 |
416 |
56349176 |
U Cons of CC road from house of Bhola Sardar to house of Kenaram Haldar at Enayetpur |
120000 |
U Cons of CC road from house of Bhola Sardar to house of Kenaram Haldar at Enayetpur1 |
Completion of work |
-
latitude : 22.24890944,22.24891009
Longitude : 88.32801491,88.32800942
file name : Image_01062023131925449.png
|
2023-06-01 13:19:25.552396 |
417 |
45722195 |
U Construction of Cement Concrete road from house of Anar Molla to house of Abdulla Molla at Atporui |
150000 |
U Construction of Cement Concrete road from house of Anar Molla to house of Abdulla Molla at Atporui1 |
Roof laid |
-
latitude : 22.28028056,22.28027945
Longitude : 88.33177729,88.33177087
file name : Image_05062023173118325.png
|
2023-06-05 17:31:18.433036 |
418 |
45722195 |
U Construction of Cement Concrete road from house of Anar Molla to house of Abdulla Molla at Atporui |
150000 |
U Construction of Cement Concrete road from house of Anar Molla to house of Abdulla Molla at Atporui1 |
Plinth level |
-
latitude : 22.28028227,22.28027969
Longitude : 88.33175396,88.33175311
file name : Image_05062023172541687.png
|
2023-06-05 17:25:51.002488 |
419 |
45722195 |
U Construction of Cement Concrete road from house of Anar Molla to house of Abdulla Molla at Atporui |
150000 |
U Construction of Cement Concrete road from house of Anar Molla to house of Abdulla Molla at Atporui1 |
Completion of work |
-
latitude : 22.28027279,22.2822101
Longitude : 88.33173695,88.3304596
file name : Image_05062023171644872.png
|
2023-06-05 17:16:44.967801 |
420 |
56291117 |
T Water testing and Tubewell Reparing for Byaspur Mouza |
76000 |
T Water testing and Tubewell Reparing for Byaspur Mouza1 |
Completion of work |
-
latitude : 22.2744898
Longitude : 88.3583628
file name : Image_01082023114700460.png
|
2023-08-01 11:47:00.567632 |
421 |
56291667 |
T Water Testing and Tubewell Reparin for Hansury Mouza |
76000 |
T Water Testing and Tubewell Reparin for Hansury Mouza1 |
Plinth level |
-
latitude : 22.2594436
Longitude : 88.334383
file name : Image_19062023180108634.png
|
2023-06-19 18:01:08.725601 |
422 |
56291667 |
T Water Testing and Tubewell Reparin for Hansury Mouza |
76000 |
T Water Testing and Tubewell Reparin for Hansury Mouza1 |
Completion of work |
-
latitude : 22.25925671
Longitude : 88.33473442
file name : Image_19062023175817107.png
|
2023-06-19 17:58:17.199944 |
423 |
66941019 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.26854552
Longitude : 88.35887313
file name : Image_24062023102529269.png
|
2023-06-24 10:25:29.360007 |
424 |
66941019 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.26842824
Longitude : 88.3588657
file name : Image_23062023134324199.png
|
2023-06-23 13:43:24.288589 |
425 |
66941019 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.26855523
Longitude : 88.35887519
file name : Image_23062023112953223.png
|
2023-06-23 11:29:53.32044 |
426 |
56262032 |
T Cons of CC drain with cover soakpit for LWM from New Maszid to house of Moyajjem at Nainan |
180000 |
T Cons of CC drain with cover soakpit for LWM from New Maszid to house of Moyajjem at Nainan1 |
Roof laid |
-
latitude : 22.27385265,22.2738545
Longitude : 88.3508505,88.35085293
file name : Image_20072023180444276.png
|
2023-07-20 18:04:44.367609 |
427 |
56262032 |
T Cons of CC drain with cover soakpit for LWM from New Maszid to house of Moyajjem at Nainan |
180000 |
T Cons of CC drain with cover soakpit for LWM from New Maszid to house of Moyajjem at Nainan1 |
Plinth level |
-
latitude : 22.273869,22.27387248
Longitude : 88.35080666,88.35080814
file name : Image_26062023121908915.png
|
2023-06-26 12:19:09.024605 |
428 |
56262032 |
T Cons of CC drain with cover soakpit for LWM from New Maszid to house of Moyajjem at Nainan |
180000 |
T Cons of CC drain with cover soakpit for LWM from New Maszid to house of Moyajjem at Nainan1 |
Completion of work |
-
latitude : 22.27381469,22.27382847
Longitude : 88.35084615,88.35084245
file name : Image_23062023180417612.png
|
2023-06-23 18:04:17.708471 |
429 |
56289129 |
T Sinking of Tubewell with Platform and soakpit near house of Pranab Samanta at Joypur |
207311 |
T Sinking of Tubewell with Platform and soakpit near house of Pranab Samanta at Joypur1 |
Roof laid |
-
latitude : 22.2605367
Longitude : 88.3298542
file name : Image_24072023124253597.png
|
2023-07-24 12:42:53.707348 |
430 |
56289129 |
T Sinking of Tubewell with Platform and soakpit near house of Pranab Samanta at Joypur |
207311 |
T Sinking of Tubewell with Platform and soakpit near house of Pranab Samanta at Joypur1 |
Plinth level |
-
latitude : 22.26016657
Longitude : 88.32996618
file name : Image_20072023141100160.png
|
2023-07-20 14:11:00.418092 |
431 |
56289129 |
T Sinking of Tubewell with Platform and soakpit near house of Pranab Samanta at Joypur |
207311 |
T Sinking of Tubewell with Platform and soakpit near house of Pranab Samanta at Joypur1 |
Completion of work |
-
latitude : 22.26017748
Longitude : 88.32995672
file name : Image_20072023135720326.png
|
2023-07-20 13:57:20.454449 |
432 |
66940636 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.26083023
Longitude : 88.32837192
file name : Image_24072023125010180.png
|
2023-07-24 12:50:10.278635 |
433 |
66940636 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.26083778
Longitude : 88.32836417
file name : Image_24072023124722169.png
|
2023-07-24 12:47:22.284525 |
434 |
66940636 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.26083659
Longitude : 88.32836981
file name : Image_20072023133707171.png
|
2023-07-20 13:37:07.612241 |
435 |
66940636 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.26084481
Longitude : 88.32835038
file name : Image_20072023132800051.png
|
2023-07-20 13:28:00.175458 |
436 |
56263426 |
T cons of CC drain with cover soakpit for LWM from Khamar of Hasem to house of Hochen Laskar at Nain |
180000 |
T cons of CC drain with cover soakpit for LWM from Khamar of Hasem to house of Hochen Laskar at Nain1 |
Roof laid |
-
latitude : 22.27629821,22.27629658
Longitude : 88.35539358,88.35539977
file name : Image_26072023095131008.png
|
2023-07-26 09:51:31.093975 |
437 |
56263426 |
T cons of CC drain with cover soakpit for LWM from Khamar of Hasem to house of Hochen Laskar at Nain |
180000 |
T cons of CC drain with cover soakpit for LWM from Khamar of Hasem to house of Hochen Laskar at Nain1 |
Plinth level |
-
latitude : 22.27631575,22.27631763
Longitude : 88.35539517,88.35539491
file name : Image_26072023094532816.png
|
2023-07-26 09:45:32.909777 |
438 |
56263426 |
T cons of CC drain with cover soakpit for LWM from Khamar of Hasem to house of Hochen Laskar at Nain |
180000 |
T cons of CC drain with cover soakpit for LWM from Khamar of Hasem to house of Hochen Laskar at Nain1 |
Completion of work |
-
latitude : 22.27620405,22.27620828
Longitude : 88.35542691,88.35542557
file name : Image_26072023094043796.png
|
2023-07-26 09:40:43.889726 |
439 |
66941177 |
Creation of drainage channel for management of grey water |
120000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.263624
Longitude : 88.35321915
file name : Image_27072023115722664.png
|
2023-07-27 11:57:22.755681 |
440 |
66941177 |
Creation of drainage channel for management of grey water |
120000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.26361301
Longitude : 88.3532074
file name : Image_27072023115444519.png
|
2023-07-27 11:54:44.62188 |
441 |
66941177 |
Creation of drainage channel for management of grey water |
120000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.26360477
Longitude : 88.35321381
file name : Image_27072023115059426.png
|
2023-07-27 11:50:59.513788 |
442 |
56288166 |
T Sinking of Tubewell with Platform and Soakpit near house of Jahur Pion at Kuldia |
207311 |
T Sinking of Tubewell with Platform and Soakpit near house of Jahur Pion at Kuldia1 |
Roof laid |
-
latitude : 22.26425203
Longitude : 88.35241395
file name : Image_27072023121835914.png
|
2023-07-27 12:18:36.001524 |
443 |
56288166 |
T Sinking of Tubewell with Platform and Soakpit near house of Jahur Pion at Kuldia |
207311 |
T Sinking of Tubewell with Platform and Soakpit near house of Jahur Pion at Kuldia1 |
Plinth level |
-
latitude : 22.2644737
Longitude : 88.3532528
file name : Image_27072023121617503.png
|
2023-07-27 12:16:17.590791 |
444 |
56288166 |
T Sinking of Tubewell with Platform and Soakpit near house of Jahur Pion at Kuldia |
207311 |
T Sinking of Tubewell with Platform and Soakpit near house of Jahur Pion at Kuldia1 |
Completion of work |
-
latitude : 22.2644758
Longitude : 88.353253
file name : Image_27072023120928074.png
|
2023-07-27 12:09:28.163647 |
445 |
64995188 |
Cons of CC road with protectionwall from house of Raosan Pailan to house of Abbas Pailan at BYaspurU |
150548 |
Cons of CC road with protectionwall from house of Raosan Pailan to house of Abbas Pailan at BYaspurU1 |
Roof laid |
-
latitude : 22.277597,22.27761963
Longitude : 88.3628671,88.36274078
file name : Image_27082023111834061.png
|
2023-08-27 11:18:34.150956 |
446 |
64995188 |
Cons of CC road with protectionwall from house of Raosan Pailan to house of Abbas Pailan at BYaspurU |
150548 |
Cons of CC road with protectionwall from house of Raosan Pailan to house of Abbas Pailan at BYaspurU1 |
Plinth level |
-
latitude : 22.2776466,22.2776212
Longitude : 88.3627633,88.3627257
file name : Image_27082023110029500.png
|
2023-08-27 11:00:29.586233 |
447 |
64995188 |
Cons of CC road with protectionwall from house of Raosan Pailan to house of Abbas Pailan at BYaspurU |
150548 |
Cons of CC road with protectionwall from house of Raosan Pailan to house of Abbas Pailan at BYaspurU1 |
Completion of work |
-
latitude : 22.2776383,22.2776208
Longitude : 88.3627598,88.3627474
file name : Image_27082023103017244.png
|
2023-08-27 10:30:17.341404 |
448 |
56291488 |
T Water Testing and Tubewell Reparing for Mirzapur Mouza |
76000 |
T Water Testing and Tubewell Reparing for Mirzapur Mouza1 |
Completion of work |
-
latitude : 22.26421595
Longitude : 88.33996203
file name : Image_01112023151215859.png
|
2023-11-01 15:12:16.055068 |
449 |
56263047 |
T Installation of Submersible Pump at Nainan Gorer Para at Nainan |
380788 |
T Installation of Submersible Pump at Nainan Gorer Para at Nainan1 |
Roof laid |
-
latitude : 22.2696509
Longitude : 88.3541394
file name : Image_11012024122810865.png
|
2024-01-11 12:28:10.962662 |
450 |
56263047 |
T Installation of Submersible Pump at Nainan Gorer Para at Nainan |
380788 |
T Installation of Submersible Pump at Nainan Gorer Para at Nainan1 |
Plinth level |
-
latitude : 22.27400417
Longitude : 88.35432155
file name : Image_09092023122121845.png
|
2023-09-09 12:21:21.959693 |
451 |
56263047 |
T Installation of Submersible Pump at Nainan Gorer Para at Nainan |
380788 |
T Installation of Submersible Pump at Nainan Gorer Para at Nainan1 |
Completion of work |
-
latitude : 22.2740964
Longitude : 88.35425937
file name : Image_09092023091709002.png
|
2023-09-09 09:17:09.079813 |
452 |
56288488 |
T Cons of CC drain with cover soakpit for LWM from house of Arfat to land of Abdul Hai at Mirzapur |
240000 |
T Cons of CC drain with cover soakpit for LWM from house of Arfat to land of Abdul Hai at Mirzapur1 |
Roof laid |
-
latitude : 22.26020736,22.26020915
Longitude : 88.34165001,88.34164934
file name : Image_15092023144806691.png
|
2023-09-15 14:48:06.774771 |
453 |
56288488 |
T Cons of CC drain with cover soakpit for LWM from house of Arfat to land of Abdul Hai at Mirzapur |
240000 |
T Cons of CC drain with cover soakpit for LWM from house of Arfat to land of Abdul Hai at Mirzapur1 |
Plinth level |
-
latitude : 22.26019745,22.26021118
Longitude : 88.3416504,88.34166187
file name : Image_15092023144518161.png
|
2023-09-15 14:45:18.239664 |
454 |
56288488 |
T Cons of CC drain with cover soakpit for LWM from house of Arfat to land of Abdul Hai at Mirzapur |
240000 |
T Cons of CC drain with cover soakpit for LWM from house of Arfat to land of Abdul Hai at Mirzapur1 |
Completion of work |
-
latitude : 22.26022716,22.26022712
Longitude : 88.34163111,88.34163114
file name : Image_15092023143922302.png
|
2023-09-15 14:39:22.391106 |
455 |
56264894 |
T Sinking of Tubewell with Platform and soakpit near houseo f Gani Pailan at Byaspur |
207311 |
T Sinking of Tubewell with Platform and soakpit near houseo f Gani Pailan at Byaspur1 |
Roof laid |
-
latitude : 22.2776113
Longitude : 88.362879
file name : Image_05102023093609238.png
|
2023-10-05 09:36:09.328373 |
456 |
56264894 |
T Sinking of Tubewell with Platform and soakpit near houseo f Gani Pailan at Byaspur |
207311 |
T Sinking of Tubewell with Platform and soakpit near houseo f Gani Pailan at Byaspur1 |
Plinth level |
-
latitude : 22.2776248
Longitude : 88.3627369
file name : Image_16092023130557437.png
|
2023-09-16 13:05:57.54718 |
457 |
56264894 |
T Sinking of Tubewell with Platform and soakpit near houseo f Gani Pailan at Byaspur |
207311 |
T Sinking of Tubewell with Platform and soakpit near houseo f Gani Pailan at Byaspur1 |
Completion of work |
-
latitude : 22.2777945
Longitude : 88.3628653
file name : Image_16092023104418725.png
|
2023-09-16 10:44:18.829592 |
458 |
45715265 |
T Sinking of Tubewell with Platform and Soak pit near house of Mahiuddin Sardar at Byaspur |
207311 |
T Sinking of Tubewell with Platform and Soak pit near house of Mahiuddin Sardar at Byaspur1 |
Plinth level |
-
latitude : 22.2777349
Longitude : 88.3628458
file name : Image_05102023093145911.png
|
2023-10-05 09:31:46.00004 |
459 |
45715265 |
T Sinking of Tubewell with Platform and Soak pit near house of Mahiuddin Sardar at Byaspur |
207311 |
T Sinking of Tubewell with Platform and Soak pit near house of Mahiuddin Sardar at Byaspur1 |
Plinth level |
-
latitude : 22.2773552
Longitude : 88.3635342
file name : Image_21092023104452934.png
|
2023-09-21 10:44:53.056085 |
460 |
45715265 |
T Sinking of Tubewell with Platform and Soak pit near house of Mahiuddin Sardar at Byaspur |
207311 |
T Sinking of Tubewell with Platform and Soak pit near house of Mahiuddin Sardar at Byaspur1 |
Completion of work |
-
latitude : 22.2773208
Longitude : 88.3634725
file name : Image_21092023095731823.png
|
2023-09-21 09:57:31.984518 |
461 |
45718015 |
T Sinking of Tubewell with Platform and Soak pit near house of Bama Charan at Joypur |
207311 |
T Sinking of Tubewell with Platform and Soak pit near house of Bama Charan at Joypur1 |
Roof laid |
-
latitude : 22.26680752
Longitude : 88.32854367
file name : Image_17102023135914355.png
|
2023-10-17 13:59:14.441415 |
462 |
45718015 |
T Sinking of Tubewell with Platform and Soak pit near house of Bama Charan at Joypur |
207311 |
T Sinking of Tubewell with Platform and Soak pit near house of Bama Charan at Joypur1 |
Plinth level |
-
latitude : 22.266807
Longitude : 88.32853368
file name : Image_17102023135618119.png
|
2023-10-17 13:56:18.203198 |
463 |
45718015 |
T Sinking of Tubewell with Platform and Soak pit near house of Bama Charan at Joypur |
207311 |
T Sinking of Tubewell with Platform and Soak pit near house of Bama Charan at Joypur1 |
Completion of work |
-
latitude : 22.26681685
Longitude : 88.32854852
file name : Image_17102023135117065.png
|
2023-10-17 13:51:17.154786 |
464 |
56289489 |
T sinking of Tubewell with Platform and Soakpit near bamboo garden of Ashoke Samanta at Hansury |
207311 |
T sinking of Tubewell with Platform and Soakpit near bamboo garden of Ashoke Samanta at Hansury1 |
Roof laid |
-
latitude : 22.25767042
Longitude : 88.33111292
file name : Image_17102023142233004.png
|
2023-10-17 14:22:33.09911 |
465 |
56289489 |
T sinking of Tubewell with Platform and Soakpit near bamboo garden of Ashoke Samanta at Hansury |
207311 |
T sinking of Tubewell with Platform and Soakpit near bamboo garden of Ashoke Samanta at Hansury1 |
Plinth level |
-
latitude : 22.25769898
Longitude : 88.33112144
file name : Image_17102023141731221.png
|
2023-10-17 14:17:31.351987 |
466 |
56289489 |
T sinking of Tubewell with Platform and Soakpit near bamboo garden of Ashoke Samanta at Hansury |
207311 |
T sinking of Tubewell with Platform and Soakpit near bamboo garden of Ashoke Samanta at Hansury1 |
Completion of work |
-
latitude : 22.25769283
Longitude : 88.33112585
file name : Image_17102023141112421.png
|
2023-10-17 14:11:12.526048 |
467 |
56262225 |
T Sinking of Tubewell qith Platform and soak pit near house of Yousuf Ali Gazi at Nainan |
207311 |
T Sinking of Tubewell qith Platform and soak pit near house of Yousuf Ali Gazi at Nainan1 |
Roof laid |
-
latitude : 22.2727178
Longitude : 88.3546202
file name : Image_17102023123723758.png
|
2023-10-17 12:37:23.989483 |
468 |
56262225 |
T Sinking of Tubewell qith Platform and soak pit near house of Yousuf Ali Gazi at Nainan |
207311 |
T Sinking of Tubewell qith Platform and soak pit near house of Yousuf Ali Gazi at Nainan1 |
Plinth level |
-
latitude : 22.272718
Longitude : 88.3545798
file name : Image_27092023121134846.png
|
2023-09-27 12:11:34.963756 |
469 |
56262225 |
T Sinking of Tubewell qith Platform and soak pit near house of Yousuf Ali Gazi at Nainan |
207311 |
T Sinking of Tubewell qith Platform and soak pit near house of Yousuf Ali Gazi at Nainan1 |
Completion of work |
-
latitude : 22.2727301
Longitude : 88.3546551
file name : Image_26092023114149415.png
|
2023-09-26 11:41:49.538826 |
470 |
66941067 |
Greywater management system |
150000 |
Greywater management system1 |
Roof laid |
-
latitude : 22.27353348
Longitude : 88.33184243
file name : Image_26062024133343216.png
|
2024-06-26 13:33:43.309649 |
471 |
66941067 |
Greywater management system |
150000 |
Greywater management system1 |
Plinth level |
-
latitude : 22.27353472
Longitude : 88.33186245
file name : Image_26062024133050518.png
|
2024-06-26 13:30:50.611288 |
472 |
66941067 |
Greywater management system |
150000 |
Greywater management system1 |
Completion of work |
-
latitude : 22.27353112
Longitude : 88.33186453
file name : Image_26062024132516106.png
|
2024-06-26 13:25:16.194733 |
473 |
56291965 |
T Water Testing and Tubewell Reparing for Joypur Mouza |
76000 |
T Water Testing and Tubewell Reparing for Joypur Mouza1 |
Completion of work |
-
latitude : 22.2642819
Longitude : 88.3305958
file name : Image_02012024153220531.png
|
2024-01-02 15:32:20.641679 |
474 |
67150474 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.27086808
Longitude : 88.3592505
file name : Image_16042024120821761.png
|
2024-04-16 12:08:21.849272 |
475 |
67150474 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.27086197
Longitude : 88.35919795
file name : Image_16042024120114930.png
|
2024-04-16 12:01:15.047818 |
476 |
67150474 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.27087965
Longitude : 88.35925882
file name : Image_16042024114914879.png
|
2024-04-16 11:49:14.975439 |
477 |
67152136 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.2581732
Longitude : 88.3349949
file name : Image_15042024132001652.png
|
2024-04-15 13:20:01.746393 |
478 |
67152136 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.25815239
Longitude : 88.33498219
file name : Image_15042024131639241.png
|
2024-04-15 13:16:39.332871 |
479 |
67152136 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.2583283
Longitude : 88.3350071
file name : Image_15042024131318500.png
|
2024-04-15 13:13:18.606836 |
480 |
67151228 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.25636109
Longitude : 88.36048097
file name : Image_23112023145815145.png
|
2023-11-23 14:58:15.244916 |
481 |
67151228 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.25636929
Longitude : 88.36048298
file name : Image_23112023145512952.png
|
2023-11-23 14:55:13.055137 |
482 |
67151228 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.25637534
Longitude : 88.3604902
file name : Image_23112023144724544.png
|
2023-11-23 14:47:24.617256 |
483 |
67132435 |
Construction of roads |
100070 |
Construction of roads1 |
Roof laid |
-
latitude : 22.26887855,22.26888128
Longitude : 88.35844885,88.35844961
file name : Image_11012024120719542.png
|
2024-01-11 12:07:19.643488 |
484 |
67132435 |
Construction of roads |
100070 |
Construction of roads1 |
Plinth level |
-
latitude : 22.26885122,22.26885535
Longitude : 88.35846606,88.35846645
file name : Image_11012024120506942.png
|
2024-01-11 12:05:07.043307 |
485 |
67132435 |
Construction of roads |
100070 |
Construction of roads1 |
Completion of work |
-
latitude : 22.26900848,22.26892752
Longitude : 88.35861296,88.35860271
file name : Image_11012024120026997.png
|
2024-01-11 12:00:27.120916 |
486 |
67132378 |
Construction of roads |
100672 |
Construction of roads1 |
Roof laid |
-
latitude : 22.26888527,22.26888419
Longitude : 88.35892565,88.35892264
file name : Image_06012024145935891.png
|
2024-01-06 14:59:35.977594 |
487 |
67132378 |
Construction of roads |
100672 |
Construction of roads1 |
Plinth level |
-
latitude : 22.2687065,22.2687065
Longitude : 88.3577783,88.3577783
file name : Image_06012024145417507.png
|
2024-01-06 14:54:17.597539 |
488 |
67132378 |
Construction of roads |
100672 |
Construction of roads1 |
Completion of work |
-
latitude : 22.26885656,22.26885799
Longitude : 88.35895595,88.35895842
file name : Image_06012024144801103.png
|
2024-01-06 14:48:01.191271 |
489 |
67132480 |
Construction of roads |
180000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.266276,22.2663522
Longitude : 88.3563408,88.3563227
file name : Image_08122023113924214.png
|
2023-12-08 11:39:24.308529 |
490 |
67132480 |
Construction of roads |
180000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.26645534,22.26644988
Longitude : 88.35685681,88.35684867
file name : Image_08122023113552796.png
|
2023-12-08 11:35:52.895048 |
491 |
67132480 |
Construction of roads |
180000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.2651832,22.2651832
Longitude : 88.3561892,88.3561892
file name : Image_24112023153831975.png
|
2023-11-24 15:38:32.096094 |
492 |
67132525 |
Construction of roads |
220012 |
Construction of roads1 |
Roof laid |
-
latitude : 22.2649378,22.2649565
Longitude : 88.3532603,88.3532336
file name : Image_09022024143700490.png
|
2024-02-09 14:37:00.583473 |
493 |
67132525 |
Construction of roads |
220012 |
Construction of roads1 |
Plinth level |
-
latitude : 22.2649562,22.2649562
Longitude : 88.3532338,88.3532338
file name : Image_09022024143324740.png
|
2024-02-09 14:33:24.846459 |
494 |
67132525 |
Construction of roads |
220012 |
Construction of roads1 |
Completion of work |
-
latitude : 22.2649362,22.2649362
Longitude : 88.3532517,88.3532517
file name : Image_09022024142955098.png
|
2024-02-09 14:29:55.187175 |
495 |
67340787 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.25534877
Longitude : 88.33780542
file name : Image_20012024121503286.png
|
2024-01-20 12:15:03.402797 |
496 |
67340787 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.25539217
Longitude : 88.33780488
file name : Image_17012024133752305.png
|
2024-01-17 13:37:52.424538 |
497 |
67340787 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.25539244
Longitude : 88.33767137
file name : Image_22112023143248843.png
|
2023-11-22 14:32:48.952746 |
498 |
67242929 |
Creation of drainage channel for management of grey water |
204695 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.26581218,22.26581493
Longitude : 88.35033427,88.35032916
file name : Image_21122023124829894.png
|
2023-12-21 12:48:30.004301 |
499 |
67242929 |
Creation of drainage channel for management of grey water |
204695 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.2658503,22.26585197
Longitude : 88.35033091,88.35032951
file name : Image_21122023124033419.png
|
2023-12-21 12:40:33.521594 |
500 |
67242929 |
Creation of drainage channel for management of grey water |
204695 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.26588205,22.26589065
Longitude : 88.35037043,88.3503778
file name : Image_30112023122614117.png
|
2023-11-30 12:26:14.207389 |
501 |
67782003 |
Installation of Computer with Internet facility |
350190 |
Installation of Computer with Internet facility1 |
|
-
latitude : 22.2596482
Longitude : 88.3348885
file name : Image_22112023141337750.png
|
2023-11-22 14:13:37.843542 |
502 |
45710549 |
T Construction of Cement Concrete drain from dui satin pukur to suti khal at Nainan |
220000 |
T Construction of Cement Concrete drain from dui satin pukur to suti khal at Nainan1 |
Completion of work |
-
latitude : 22.27419449,22.27421158
Longitude : 88.35073889,88.35077088
file name : Image_23112023121158805.png
|
2023-11-23 12:11:58.893973 |
503 |
67242673 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.26152415,22.2615276
Longitude : 88.35175393,88.35174945
file name : Image_03022024114620069.png
|
2024-02-03 11:46:20.244997 |
504 |
67242673 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.26152935,22.26153202
Longitude : 88.35175601,88.35174846
file name : Image_03022024114316926.png
|
2024-02-03 11:43:17.031762 |
505 |
67242673 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.26154427,22.26154019
Longitude : 88.35174326,88.35174721
file name : Image_03022024112504882.png
|
2024-02-03 11:25:04.981782 |
506 |
66940721 |
Greywater management system |
150000 |
Greywater management system1 |
Roof laid |
-
latitude : 22.26164256
Longitude : 88.35374311
file name : Image_08122023120329855.png
|
2023-12-08 12:03:29.958523 |
507 |
66940721 |
Greywater management system |
150000 |
Greywater management system1 |
Plinth level |
-
latitude : 22.2616403
Longitude : 88.35373928
file name : Image_08122023120053471.png
|
2023-12-08 12:00:53.571359 |
508 |
66940721 |
Greywater management system |
150000 |
Greywater management system1 |
Completion of work |
-
latitude : 22.26160318
Longitude : 88.35375504
file name : Image_08122023115704875.png
|
2023-12-08 11:57:04.964048 |
509 |
67132713 |
Construction of roads |
180634 |
Construction of roads1 |
Roof laid |
-
latitude : 22.26124591,22.26124758
Longitude : 88.33575964,88.33576028
file name : Image_22022024154128754.png
|
2024-02-22 15:41:28.891355 |
510 |
67132713 |
Construction of roads |
180634 |
Construction of roads1 |
Plinth level |
-
latitude : 22.26126326,22.26126425
Longitude : 88.33576193,88.33576021
file name : Image_22022024153534591.png
|
2024-02-22 15:35:34.689698 |
511 |
67132713 |
Construction of roads |
180634 |
Construction of roads1 |
Completion of work |
-
latitude : 22.26129371,22.2612929
Longitude : 88.33579189,88.33578439
file name : Image_10022024153231685.png
|
2024-02-10 15:32:31.79873 |
512 |
67242865 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.26282764,22.26283214
Longitude : 88.35483066,88.35483554
file name : Image_24042024111803508.png
|
2024-04-24 11:18:03.626296 |
513 |
67242865 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.2627939,22.26279451
Longitude : 88.35481869,88.3548157
file name : Image_24042024111136538.png
|
2024-04-24 11:11:36.649356 |
514 |
67242865 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.26281115,22.26281024
Longitude : 88.35482143,88.35481925
file name : Image_24042024110722269.png
|
2024-04-24 11:07:22.38175 |
515 |
67132567 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.26442029,22.26442725
Longitude : 88.35203245,88.35203233
file name : Image_24042024112448030.png
|
2024-04-24 11:24:48.135151 |
516 |
67132567 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.26441806,22.26443242
Longitude : 88.35203503,88.35203537
file name : Image_24042024105336822.png
|
2024-04-24 10:53:36.91497 |
517 |
67132567 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.26442702,22.26446967
Longitude : 88.35203688,88.35201828
file name : Image_23042024123837353.png
|
2024-04-23 12:38:37.476676 |
518 |
67202574 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.2685436,22.2685436
Longitude : 88.355037,88.355037
file name : Image_24042024104421389.png
|
2024-04-24 10:44:21.489529 |
519 |
67202574 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.2685544,22.2685544
Longitude : 88.3550248,88.3550248
file name : Image_24042024102203941.png
|
2024-04-24 10:22:04.053637 |
520 |
67202574 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.2685474,22.2685384
Longitude : 88.3550268,88.3550595
file name : Image_23042024121953588.png
|
2024-04-23 12:19:53.690257 |
521 |
56291741 |
T Water Testing and Tubewell Reparing for Enayetpur Mouza |
76000 |
T Water Testing and Tubewell Reparing for Enayetpur Mouza1 |
Completion of work |
-
latitude : 22.25527497
Longitude : 88.33477172
file name : Image_13032024124816896.png
|
2024-03-13 12:48:17.093674 |
522 |
67151996 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.26046203
Longitude : 88.32739089
file name : Image_29042024163644148.png
|
2024-04-29 16:36:44.260889 |
523 |
67151996 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.26054101
Longitude : 88.32730712
file name : Image_24112023120609896.png
|
2023-11-24 12:06:10.01249 |
524 |
67151996 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.2605216
Longitude : 88.3273268
file name : Image_24112023120208706.png
|
2023-11-24 12:02:08.819899 |
525 |
67151996 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.26054357
Longitude : 88.32731824
file name : Image_24112023114544822.png
|
2023-11-24 11:45:44.934493 |
526 |
67150079 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.27952629
Longitude : 88.33251134
file name : Image_23042024151444140.png
|
2024-04-23 15:14:44.229875 |
527 |
67150079 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.27954264
Longitude : 88.33254875
file name : Image_23112023123717444.png
|
2023-11-23 12:37:17.531789 |
528 |
67150079 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.27953879
Longitude : 88.33252551
file name : Image_23112023123217913.png
|
2023-11-23 12:32:17.996635 |
529 |
67150079 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.27952978
Longitude : 88.33254889
file name : Image_23112023122724948.png
|
2023-11-23 12:27:25.040984 |
530 |
67340638 |
Creation of drainage channel for management of grey water |
240000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.25739237
Longitude : 88.33089062
file name : Image_19062024140943964.png
|
2024-06-19 14:09:44.08695 |
531 |
67340638 |
Creation of drainage channel for management of grey water |
240000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.25741256
Longitude : 88.33090708
file name : Image_14052024132506734.png
|
2024-05-14 13:25:06.791951 |
532 |
67340638 |
Creation of drainage channel for management of grey water |
240000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.25739577
Longitude : 88.33092911
file name : Image_14052024132218287.png
|
2024-05-14 13:22:18.344694 |
533 |
56288395 |
T Sinking of Tubewell with Platform and soakpit near house of Najim Gazi at Balbalia |
207311 |
T Sinking of Tubewell with Platform and soakpit near house of Najim Gazi at Balbalia1 |
Roof laid |
-
latitude : 22.27144662
Longitude : 88.33876762
file name : Image_13122023122301709.png
|
2023-12-13 12:23:01.811587 |
534 |
56288395 |
T Sinking of Tubewell with Platform and soakpit near house of Najim Gazi at Balbalia |
207311 |
T Sinking of Tubewell with Platform and soakpit near house of Najim Gazi at Balbalia1 |
Plinth level |
-
latitude : 22.27143658
Longitude : 88.33876549
file name : Image_13122023122101504.png
|
2023-12-13 12:21:01.610018 |
535 |
56288395 |
T Sinking of Tubewell with Platform and soakpit near house of Najim Gazi at Balbalia |
207311 |
T Sinking of Tubewell with Platform and soakpit near house of Najim Gazi at Balbalia1 |
Completion of work |
-
latitude : 22.27144887
Longitude : 88.3387617
file name : Image_13122023120812743.png
|
2023-12-13 12:08:12.860572 |
536 |
67340291 |
Creation of drainage channel for management of grey water |
240000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.26039189
Longitude : 88.32749612
file name : Image_19062024140456454.png
|
2024-06-19 14:04:56.578757 |
537 |
67340291 |
Creation of drainage channel for management of grey water |
240000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.26039643
Longitude : 88.32751876
file name : Image_19062024135606760.png
|
2024-06-19 13:56:06.884435 |
538 |
67340291 |
Creation of drainage channel for management of grey water |
240000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.26038006
Longitude : 88.32749058
file name : Image_19062024135053298.png
|
2024-06-19 13:50:53.42538 |
539 |
67341341 |
Operation and Maintenance of drinking water supply system |
107645 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.27340097
Longitude : 88.35558806
file name : Image_28062024115338547.png
|
2024-06-28 11:53:38.638364 |
540 |
67341341 |
Operation and Maintenance of drinking water supply system |
107645 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.27341755
Longitude : 88.35557887
file name : Image_28062024115125861.png
|
2024-06-28 11:51:25.954324 |
541 |
67341341 |
Operation and Maintenance of drinking water supply system |
107645 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.272776
Longitude : 88.3550472
file name : Image_28062024113813972.png
|
2024-06-28 11:38:14.06299 |
542 |
67341534 |
Operation and Maintenance of drinking water supply system |
100000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.25931224
Longitude : 88.33472904
file name : Image_06092024161807365.png
|
2024-09-06 16:18:07.493743 |
543 |
67341534 |
Operation and Maintenance of drinking water supply system |
100000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.26008541
Longitude : 88.33494194
file name : Image_06092024161554522.png
|
2024-09-06 16:15:54.616609 |
544 |
67341534 |
Operation and Maintenance of drinking water supply system |
100000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.2596049
Longitude : 88.3349722
file name : Image_06092024161319229.png
|
2024-09-06 16:13:19.336643 |
545 |
67341589 |
Operation and Maintenance of drinking water supply system |
100000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.26307997
Longitude : 88.34107836
file name : Image_28062024134153768.png
|
2024-06-28 13:41:53.869528 |
546 |
67341589 |
Operation and Maintenance of drinking water supply system |
100000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.26308741
Longitude : 88.34105682
file name : Image_28062024133845437.png
|
2024-06-28 13:38:45.544211 |
547 |
67341589 |
Operation and Maintenance of drinking water supply system |
100000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.26307557
Longitude : 88.3410768
file name : Image_28062024133137227.png
|
2024-06-28 13:31:37.320275 |
548 |
67201302 |
Creation of drainage channel for management of grey water |
240000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.27236593,22.2731332
Longitude : 88.35218227,88.3535299
file name : Image_02072024113609488.png
|
2024-07-02 11:36:09.56272 |
549 |
67201302 |
Creation of drainage channel for management of grey water |
240000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.27235334,22.27235322
Longitude : 88.35216595,88.35216582
file name : Image_02072024113259749.png
|
2024-07-02 11:32:59.820383 |
550 |
67201302 |
Creation of drainage channel for management of grey water |
240000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.27237605,22.27237637
Longitude : 88.35217383,88.35217302
file name : Image_02072024112333466.png
|
2024-07-02 11:23:33.536018 |
551 |
67132629 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.25988126,22.259881
Longitude : 88.34068791,88.34068591
file name : Image_28062024135015286.png
|
2024-06-28 13:50:15.38865 |
552 |
67201478 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.27804263,22.27805075
Longitude : 88.35517053,88.35517393
file name : Image_17032024101015881.png
|
2024-03-17 10:10:15.95057 |
553 |
67201478 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.27807781,22.27807881
Longitude : 88.35518967,88.35520024
file name : Image_26022024103807420.png
|
2024-02-26 10:38:07.510885 |
554 |
67201478 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.27808011,22.27808025
Longitude : 88.35522517,88.35522506
file name : Image_24022024112134179.png
|
2024-02-24 11:21:34.285621 |
555 |
67131666 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.27546934,22.27546943
Longitude : 88.36202283,88.36202157
file name : Image_24022024095653864.png
|
2024-02-24 09:56:53.95635 |
556 |
67131666 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.27548897,22.2754845
Longitude : 88.36203132,88.36203011
file name : Image_24022024095531488.png
|
2024-02-24 09:55:31.589384 |
557 |
67131666 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.27549868,22.27554602
Longitude : 88.36160583,88.36164695
file name : Image_24022024093902334.png
|
2024-02-24 09:39:02.436474 |
558 |
56288318 |
T Cons of CC drain with cover Soakpit for LWM from house of Matin Sk to land of Atiar Sk at Kuldia |
200000 |
T Cons of CC drain with cover Soakpit for LWM from house of Matin Sk to land of Atiar Sk at Kuldia1 |
Roof laid |
-
latitude : 22.26330873,22.26330267
Longitude : 88.35061398,88.35061354
file name : Image_14032024143159203.png
|
2024-03-14 14:31:59.287395 |
559 |
56288318 |
T Cons of CC drain with cover Soakpit for LWM from house of Matin Sk to land of Atiar Sk at Kuldia |
200000 |
T Cons of CC drain with cover Soakpit for LWM from house of Matin Sk to land of Atiar Sk at Kuldia1 |
Plinth level |
-
latitude : 22.26358538,22.26358209
Longitude : 88.35072899,88.35072733
file name : Image_14032024142040675.png
|
2024-03-14 14:20:40.777851 |
560 |
56288318 |
T Cons of CC drain with cover Soakpit for LWM from house of Matin Sk to land of Atiar Sk at Kuldia |
200000 |
T Cons of CC drain with cover Soakpit for LWM from house of Matin Sk to land of Atiar Sk at Kuldia1 |
Completion of work |
-
latitude : 22.26360265,22.26360366
Longitude : 88.35075254,88.35075238
file name : Image_14032024141145203.png
|
2024-03-14 14:11:45.296177 |
561 |
90254348 |
Procurement of Computer Printer UPS, etc. |
350190 |
Procurement of Computer Printer UPS, etc.1 |
Roof laid |
-
latitude : 22.2596138
Longitude : 88.3349318
file name : Image_14082024140954989.png
|
2024-08-14 14:09:55.089158 |
562 |
90254348 |
Procurement of Computer Printer UPS, etc. |
350190 |
Procurement of Computer Printer UPS, etc.1 |
Plinth level |
-
latitude : 22.2596291
Longitude : 88.3349255
file name : Image_14082024140522323.png
|
2024-08-14 14:05:22.437091 |
563 |
90254348 |
Procurement of Computer Printer UPS, etc. |
350190 |
Procurement of Computer Printer UPS, etc.1 |
Completion of work |
-
latitude : 22.2596261
Longitude : 88.3349261
file name : Image_14082024140248328.png
|
2024-08-14 14:02:48.411871 |
564 |
56289047 |
T Sinking of Tubewell with Platform and soakpit at Joypur Guchhait Para |
207311 |
T Sinking of Tubewell with Platform and soakpit at Joypur Guchhait Para1 |
Roof laid |
-
latitude : 22.2653839
Longitude : 88.32757014
file name : Image_20042023144617001.png
|
2023-04-20 14:46:17.108911 |
565 |
56289047 |
T Sinking of Tubewell with Platform and soakpit at Joypur Guchhait Para |
207311 |
T Sinking of Tubewell with Platform and soakpit at Joypur Guchhait Para1 |
Plinth level |
-
latitude : 22.26538879
Longitude : 88.32754597
file name : Image_20042023144316141.png
|
2023-04-20 14:43:16.259008 |
566 |
56289047 |
T Sinking of Tubewell with Platform and soakpit at Joypur Guchhait Para |
207311 |
T Sinking of Tubewell with Platform and soakpit at Joypur Guchhait Para1 |
Completion of work |
-
latitude : 22.2596256
Longitude : 88.3349355
file name : Image_20042023144017371.png
|
2023-04-20 14:40:17.483063 |
567 |
66940954 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.26447782
Longitude : 88.35863335
file name : Image_20072023154851956.png
|
2023-07-20 15:48:52.097749 |
568 |
66940954 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.26450099
Longitude : 88.35864155
file name : Image_20072023154232030.png
|
2023-07-20 15:42:32.127185 |
569 |
66940954 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.26450974
Longitude : 88.35864575
file name : Image_20072023153848047.png
|
2023-07-20 15:38:48.139829 |
570 |
56265614 |
T Sinking of Tubewell with platform and soakpit near house of Basu Naskar at Kuldia |
207311 |
T Sinking of Tubewell with platform and soakpit near house of Basu Naskar at Kuldia1 |
Roof laid |
-
latitude : 22.26604138
Longitude : 88.35691335
file name : Image_20072023153138028.png
|
2023-07-20 15:31:38.127493 |
571 |
56265614 |
T Sinking of Tubewell with platform and soakpit near house of Basu Naskar at Kuldia |
207311 |
T Sinking of Tubewell with platform and soakpit near house of Basu Naskar at Kuldia1 |
Plinth level |
-
latitude : 22.26599729
Longitude : 88.35689047
file name : Image_20072023152904904.png
|
2023-07-20 15:29:05.007088 |
572 |
56265614 |
T Sinking of Tubewell with platform and soakpit near house of Basu Naskar at Kuldia |
207311 |
T Sinking of Tubewell with platform and soakpit near house of Basu Naskar at Kuldia1 |
Completion of work |
-
latitude : 22.26600563
Longitude : 88.35689578
file name : Image_20072023152603208.png
|
2023-07-20 15:26:03.317432 |
573 |
56288066 |
T Sinking of Tubewell with Platform and soakpit near hose of Hasibul KHan at Kuldia |
207311 |
T Sinking of Tubewell with Platform and soakpit near hose of Hasibul KHan at Kuldia1 |
Roof laid |
-
latitude : 22.2655304
Longitude : 88.3529321
file name : Image_17102023124800274.png
|
2023-10-17 12:48:01.966732 |
574 |
56288066 |
T Sinking of Tubewell with Platform and soakpit near hose of Hasibul KHan at Kuldia |
207311 |
T Sinking of Tubewell with Platform and soakpit near hose of Hasibul KHan at Kuldia1 |
Plinth level |
-
latitude : 22.26555423
Longitude : 88.35277174
file name : Image_10102023113815796.png
|
2023-10-10 11:38:15.886307 |
575 |
56288066 |
T Sinking of Tubewell with Platform and soakpit near hose of Hasibul KHan at Kuldia |
207311 |
T Sinking of Tubewell with Platform and soakpit near hose of Hasibul KHan at Kuldia1 |
Completion of work |
-
latitude : 22.265577
Longitude : 88.35275806
file name : Image_10102023112151100.png
|
2023-10-10 11:21:51.208226 |
576 |
67150247 |
Creation of a new source of drinking water |
380788 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.2749708
Longitude : 88.3558493
file name : Image_09012024121336669.png
|
2024-01-09 12:13:36.752748 |
577 |
67150247 |
Creation of a new source of drinking water |
380788 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.27364434
Longitude : 88.35092499
file name : Image_08012024114052181.png
|
2024-01-08 11:40:52.31517 |
578 |
67150247 |
Creation of a new source of drinking water |
380788 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.27370769
Longitude : 88.35094928
file name : Image_23112023121251546.png
|
2023-11-23 12:12:51.632049 |
579 |
67131967 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.2778808,22.2778808
Longitude : 88.3648427,88.3648427
file name : Image_19122023103711930.png
|
2023-12-19 10:37:12.053 |
580 |
67131967 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.2778808,22.2778808
Longitude : 88.3648427,88.3648427
file name : Image_19122023103443533.png
|
2023-12-19 10:34:43.641167 |
581 |
67131967 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.2778806,22.2778806
Longitude : 88.3648404,88.3648404
file name : Image_19122023102846145.png
|
2023-12-19 10:28:46.259791 |
582 |
67340716 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.2596511
Longitude : 88.3349
file name : Image_29122023143028120.png
|
2023-12-29 14:30:28.231273 |
583 |
67340716 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.2596566
Longitude : 88.3349082
file name : Image_28122023172410176.png
|
2023-12-28 17:24:10.349156 |
584 |
67340716 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.25823627
Longitude : 88.3348609
file name : Image_22112023142852254.png
|
2023-11-22 14:28:52.348031 |
585 |
45711301 |
Sinking of Tubewell withT Platform and Soak pit near Factory of Badiyar Jamal Mondal at Nainan |
207311 |
Sinking of Tubewell withT Platform and Soak pit near Factory of Badiyar Jamal Mondal at Nainan1 |
Roof laid |
-
latitude : 22.26946219
Longitude : 88.33988205
file name : Image_31102023123917453.png
|
2023-10-31 12:39:17.618234 |
586 |
45711301 |
Sinking of Tubewell withT Platform and Soak pit near Factory of Badiyar Jamal Mondal at Nainan |
207311 |
Sinking of Tubewell withT Platform and Soak pit near Factory of Badiyar Jamal Mondal at Nainan1 |
Plinth level |
-
latitude : 22.26960352
Longitude : 88.33986904
file name : Image_09102023143535085.png
|
2023-10-09 14:35:35.196025 |
587 |
45711301 |
Sinking of Tubewell withT Platform and Soak pit near Factory of Badiyar Jamal Mondal at Nainan |
207311 |
Sinking of Tubewell withT Platform and Soak pit near Factory of Badiyar Jamal Mondal at Nainan1 |
Completion of work |
-
latitude : 22.26959117
Longitude : 88.33986305
file name : Image_09102023135928288.png
|
2023-10-09 13:59:28.387145 |
588 |
67202493 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.27550105,22.27545338
Longitude : 88.3582231,88.35825489
file name : Image_20012024123340185.png
|
2024-01-20 12:33:40.30686 |
589 |
67202493 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.2755341,22.27553049
Longitude : 88.35823359,88.35823128
file name : Image_20012024122153825.png
|
2024-01-20 12:21:54.007509 |
590 |
67202493 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.2755082,22.2755082
Longitude : 88.3586734,88.3586734
file name : Image_20012024121554041.png
|
2024-01-20 12:15:54.155501 |
591 |
67243042 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.2649516,22.26541184
Longitude : 88.353219,88.35330844
file name : Image_05082024113031814.png
|
2024-08-05 11:30:31.902593 |
592 |
67243042 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.2652962,22.2654177
Longitude : 88.3534108,88.35329478
file name : Image_05082024112251642.png
|
2024-08-05 11:22:51.73093 |
593 |
67243042 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.26548534,22.26548268
Longitude : 88.353181,88.35318134
file name : Image_02082024135333837.png
|
2024-08-02 13:53:33.92816 |
594 |
67150214 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.27483341
Longitude : 88.33702882
file name : Image_14082024112439323.png
|
2024-08-14 11:24:39.408958 |
595 |
67150214 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.27481592
Longitude : 88.33700962
file name : Image_12082024124406757.png
|
2024-08-12 12:44:06.842031 |
596 |
67150214 |
Creation of a new source of drinking water |
207311 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.27482765
Longitude : 88.33704502
file name : Image_12082024124011506.png
|
2024-08-12 12:40:11.604907 |