1 |
34572217 |
Construction of concrete road from Mahaprabhu tola to Shuvendu Bhattacharya s house |
75798 |
Construction of concrete road from Mahaprabhu tola to Shuvendu Bhattacharya s house 1 |
Roof laid |
-
latitude : 23.102440237998962,23.102440237998962
Longitude : 87.73148040287197,87.73148040287197
file name : Image_04022021145710122.png
|
2021-02-04 14:57:10.245103 |
2 |
34572217 |
Construction of concrete road from Mahaprabhu tola to Shuvendu Bhattacharya s house |
75798 |
Construction of concrete road from Mahaprabhu tola to Shuvendu Bhattacharya s house 1 |
Plinth level |
-
latitude : 23.102476741187274,23.10246576089412
Longitude : 87.73139985278249,87.73148040287197
file name : Image_04022021144849150.png
|
2021-02-04 14:48:49.263656 |
3 |
34572217 |
Construction of concrete road from Mahaprabhu tola to Shuvendu Bhattacharya s house |
75798 |
Construction of concrete road from Mahaprabhu tola to Shuvendu Bhattacharya s house 1 |
Completion of work |
-
latitude : 23.102480345405638,23.10245633125305
Longitude : 87.7314167842269,87.73149540647864
file name : Image_04022021143844790.png
|
2021-02-04 14:38:44.901554 |
4 |
34580912 |
Construction of concrete road from Kalyan Roys house o Debesh Banerjees house |
300495 |
Construction of concrete road from Kalyan Roys house o Debesh Banerjees house 1 |
Roof laid |
-
latitude : 23.1055003,23.1055048
Longitude : 87.727213,87.7272129
file name : Image_04022021151903920.png
|
2021-02-04 15:19:04.019742 |
5 |
34580912 |
Construction of concrete road from Kalyan Roys house o Debesh Banerjees house |
300495 |
Construction of concrete road from Kalyan Roys house o Debesh Banerjees house 1 |
Completion of work |
-
latitude : 23.1055003,23.1055055
Longitude : 87.727213,87.7272095
file name : Image_04022021151631906.png
|
2021-02-04 15:16:31.996591 |
6 |
34580912 |
Construction of concrete road from Kalyan Roys house o Debesh Banerjees house |
300495 |
Construction of concrete road from Kalyan Roys house o Debesh Banerjees house 1 |
Completion of work |
-
latitude : 23.105505,23.105074376799166
Longitude : 87.7272118,87.72717143408954
file name : Image_04022021151131078.png
|
2021-02-04 15:11:31.16832 |
7 |
34590483 |
Construction of concrete road from PWD road to Adibasi para Araoti saren house |
137108 |
Construction of concrete road from PWD road to Adibasi para Araoti saren house 1 |
Roof laid |
-
latitude : 23.1091615,23.1091591
Longitude : 87.7305865,87.7305874
file name : Image_04022021170907522.png
|
2021-02-04 17:09:07.60432 |
8 |
34590483 |
Construction of concrete road from PWD road to Adibasi para Araoti saren house |
137108 |
Construction of concrete road from PWD road to Adibasi para Araoti saren house 1 |
Plinth level |
-
latitude : 23.1091606,23.109162
Longitude : 87.7305857,87.7305863
file name : Image_04022021170422347.png
|
2021-02-04 17:04:22.433004 |
9 |
34590483 |
Construction of concrete road from PWD road to Adibasi para Araoti saren house |
137108 |
Construction of concrete road from PWD road to Adibasi para Araoti saren house 1 |
Plinth level |
-
latitude : 23.1092422,23.1092496
Longitude : 87.7300525,87.7300306
file name : Image_21012021144219012.png
|
2021-01-21 14:42:19.11857 |
10 |
34590483 |
Construction of concrete road from PWD road to Adibasi para Araoti saren house |
137108 |
Construction of concrete road from PWD road to Adibasi para Araoti saren house 1 |
Completion of work |
-
latitude : 23.1092423,23.1092407
Longitude : 87.7300434,87.730036
file name : Image_21012021143619082.png
|
2021-01-21 14:36:19.178527 |
11 |
34566442 |
CC road with cover drain from Shibu Rakshits house to Canal pool |
301293 |
CC road with cover drain from Shibu Rakshits house to Canal pool 1 |
Roof laid |
-
latitude : 23.1036909
Longitude : 87.7358375
file name : Image_25022021175331022.png
|
2021-02-25 17:53:31.112953 |
12 |
34566442 |
CC road with cover drain from Shibu Rakshits house to Canal pool |
301293 |
CC road with cover drain from Shibu Rakshits house to Canal pool 1 |
Completion of work |
-
latitude : 23.1036053
Longitude : 87.7358522
file name : Image_25022021174814761.png
|
2021-02-25 17:48:14.862281 |
13 |
34566442 |
CC road with cover drain from Shibu Rakshits house to Canal pool |
301293 |
CC road with cover drain from Shibu Rakshits house to Canal pool 1 |
Completion of work |
-
latitude : 23.1036052
Longitude : 87.735851
file name : Image_23022021131532407.png
|
2021-02-23 13:15:32.499586 |
14 |
34567974 |
CC road with cover drain from Haradhan Dass shop to Pravas Rakshits house via Benu Hatis house |
301475 |
CC road with cover drain from Haradhan Dass shop to Pravas Rakshits house via Benu Hatis house 1 |
Roof laid |
-
latitude : 23.10292223934084,23.102946085855365
Longitude : 87.73168819025159,87.73161149583757
file name : Image_26022021163626296.png
|
2021-02-26 16:36:26.390787 |
15 |
34567974 |
CC road with cover drain from Haradhan Dass shop to Pravas Rakshits house via Benu Hatis house |
301475 |
CC road with cover drain from Haradhan Dass shop to Pravas Rakshits house via Benu Hatis house 1 |
Plinth level |
-
latitude : 23.102947385050356,23.10293074697256
Longitude : 87.73159925825894,87.73164971731603
file name : Image_25022021180135686.png
|
2021-02-25 18:01:35.768667 |
16 |
34567974 |
CC road with cover drain from Haradhan Dass shop to Pravas Rakshits house via Benu Hatis house |
301475 |
CC road with cover drain from Haradhan Dass shop to Pravas Rakshits house via Benu Hatis house 1 |
Completion of work |
-
latitude : 23.102810215204954,23.10279680415988
Longitude : 87.7315600309521,87.73154477588832
file name : Image_04022021150304998.png
|
2021-02-04 15:03:05.07704 |
17 |
34582118 |
Construction of Cummuinty Toilet at Akui high School ground |
70000 |
Construction of Cummuinty Toilet at Akui high School ground1 |
Roof laid |
-
latitude : 23.10784287750721
Longitude : 87.73136037401855
file name : Image_27012022163920669.png
|
2022-01-27 16:39:20.796869 |
18 |
34582118 |
Construction of Cummuinty Toilet at Akui high School ground |
70000 |
Construction of Cummuinty Toilet at Akui high School ground1 |
Completion of work |
-
latitude : 23.107798830606043
Longitude : 87.73133573122323
file name : Image_08122021150332530.png
|
2021-12-08 15:03:32.635184 |
19 |
34582118 |
Construction of Cummuinty Toilet at Akui high School ground |
70000 |
Construction of Cummuinty Toilet at Akui high School ground1 |
Completion of work |
-
latitude : 23.107808846980333
Longitude : 87.73143765516579
file name : Image_30102021154122648.png
|
2021-10-30 15:41:22.806827 |
20 |
48693265 |
Installation of solar street light near Kumareswar tola |
25000 |
Installation of solar street light near Kumareswar tola 1 |
Roof laid |
-
latitude : 23.104044408537447
Longitude : 87.73463451303542
file name : Image_10112022135643601.png
|
2022-11-10 13:56:43.716342 |
21 |
48693265 |
Installation of solar street light near Kumareswar tola |
25000 |
Installation of solar street light near Kumareswar tola 1 |
Plinth level |
-
latitude : 23.104087114334106
Longitude : 87.73466083221138
file name : Image_09112022154556709.png
|
2022-11-09 15:45:56.866754 |
22 |
48693265 |
Installation of solar street light near Kumareswar tola |
25000 |
Installation of solar street light near Kumareswar tola 1 |
Completion of work |
-
latitude : 23.10405853204429
Longitude : 87.73468036204576
file name : Image_23092022145238601.png
|
2022-09-23 14:52:38.704782 |
23 |
48693516 |
Installation of solar street light near Dalui para Siddeswar tola |
25000 |
Installation of solar street light near Dalui para Siddeswar tola 1 |
Roof laid |
-
latitude : 23.103608465753496
Longitude : 87.73320858366787
file name : Image_10112022140605327.png
|
2022-11-10 14:06:05.42324 |
24 |
48693516 |
Installation of solar street light near Dalui para Siddeswar tola |
25000 |
Installation of solar street light near Dalui para Siddeswar tola 1 |
Plinth level |
-
latitude : 23.102573552168906
Longitude : 87.73434022441506
file name : Image_09112022154843359.png
|
2022-11-09 15:48:43.467406 |
25 |
48693516 |
Installation of solar street light near Dalui para Siddeswar tola |
25000 |
Installation of solar street light near Dalui para Siddeswar tola 1 |
Plinth level |
-
latitude : 23.10360020957887
Longitude : 87.73320690728724
file name : Image_09112022155707089.png
|
2022-11-09 15:57:07.253257 |
26 |
34556215 |
Construction of Concrete Drain With Cover from Shanti Ghoshs house to ICDS centre |
199574 |
Construction of Concrete Drain With Cover from Shanti Ghoshs house to ICDS centre1 |
Roof laid |
-
latitude : 23.11921812593937
Longitude : 87.6982120424509
file name : Image_26022021175531067.png
|
2021-02-26 17:55:31.150258 |
27 |
34556215 |
Construction of Concrete Drain With Cover from Shanti Ghoshs house to ICDS centre |
199574 |
Construction of Concrete Drain With Cover from Shanti Ghoshs house to ICDS centre1 |
Plinth level |
-
latitude : 23.1190764
Longitude : 87.6983239
file name : Image_26022021175253682.png
|
2021-02-26 17:52:53.77756 |
28 |
34556215 |
Construction of Concrete Drain With Cover from Shanti Ghoshs house to ICDS centre |
199574 |
Construction of Concrete Drain With Cover from Shanti Ghoshs house to ICDS centre1 |
Completion of work |
-
latitude : 23.119196081534028
Longitude : 87.69822830334306
file name : Image_18022021135307615.png
|
2021-02-18 13:53:07.747935 |
29 |
34556215 |
Construction of Concrete Drain With Cover from Shanti Ghoshs house to ICDS centre |
199574 |
Construction of Concrete Drain With Cover from Shanti Ghoshs house to ICDS centre1 |
Completion of work |
-
latitude : 23.11922064051032
Longitude : 87.69819092005491
file name : Image_04022021162301402.png
|
2021-02-04 16:23:01.494209 |
30 |
48631636 |
Construction of pucca nala from Jhunta Ghosh house towards Asit Ghosh house with cover |
150000 |
Construction of pucca nala from Jhunta Ghosh house towards Asit Ghosh house with cover1 |
Roof laid |
-
latitude : 23.098581754602492,23.098581754602492
Longitude : 87.69851588644087,87.69851588644087
file name : Image_30112022164743963.png
|
2022-11-30 16:47:44.077 |
31 |
48631636 |
Construction of pucca nala from Jhunta Ghosh house towards Asit Ghosh house with cover |
150000 |
Construction of pucca nala from Jhunta Ghosh house towards Asit Ghosh house with cover1 |
Plinth level |
-
latitude : 23.098350539803505,23.098350539803505
Longitude : 87.69813970662653,87.69813970662653
file name : Image_11112022170712454.png
|
2022-11-11 17:07:12.533934 |
32 |
48631636 |
Construction of pucca nala from Jhunta Ghosh house towards Asit Ghosh house with cover |
150000 |
Construction of pucca nala from Jhunta Ghosh house towards Asit Ghosh house with cover1 |
Completion of work |
-
latitude : 23.098317766562104,23.098311773501337,23.098311773501337
Longitude : 87.69816250540316,87.69818589091301,87.69818589091301
file name : Image_10112022142736415.png
|
2022-11-10 14:27:36.509558 |
33 |
48640880 |
Construction of pucca drain from Guru Prasad Chatterjee house towards Podo pukur with cover |
159736 |
Construction of pucca drain from Guru Prasad Chatterjee house towards Podo pukur with cover1 |
Plinth level |
-
latitude : 23.1043017,23.1043017
Longitude : 87.7339893,87.7339893
file name : Image_01062022180442440.png
|
2022-06-01 18:04:42.526784 |
34 |
48640880 |
Construction of pucca drain from Guru Prasad Chatterjee house towards Podo pukur with cover |
159736 |
Construction of pucca drain from Guru Prasad Chatterjee house towards Podo pukur with cover1 |
Plinth level |
-
latitude : 23.1043008,23.1043008
Longitude : 87.7339894,87.7339894
file name : Image_31052022132048595.png
|
2022-05-31 13:20:48.767207 |
35 |
48692125 |
Construction of Concrete road from Sradindu Ghosh house to Santi Roy house |
185739 |
Construction of Concrete road from Sradindu Ghosh house to Santi Roy house1 |
Plinth level |
-
latitude : 23.1054819,23.1054819
Longitude : 87.7271995,87.7271995
file name : Image_31052022152206347.png
|
2022-05-31 15:22:06.446057 |
36 |
48692125 |
Construction of Concrete road from Sradindu Ghosh house to Santi Roy house |
185739 |
Construction of Concrete road from Sradindu Ghosh house to Santi Roy house1 |
Completion of work |
-
latitude : 23.1054827,23.1054834
Longitude : 87.7271987,87.7271992
file name : Image_07052022165100226.png
|
2022-05-07 16:51:00.366457 |
37 |
48640601 |
Construction of pucca drain from Alip Samanta house towards Baisnab gore with cover |
184000 |
Construction of pucca drain from Alip Samanta house towards Baisnab gore with cover1 |
Roof laid |
-
latitude : 23.102905391715467,23.102905391715467
Longitude : 87.73129122331738,87.73129122331738
file name : Image_27092022162638681.png
|
2022-09-27 16:26:38.77297 |
38 |
48640601 |
Construction of pucca drain from Alip Samanta house towards Baisnab gore with cover |
184000 |
Construction of pucca drain from Alip Samanta house towards Baisnab gore with cover1 |
Roof laid |
-
latitude : 23.102967459708452,23.102965992875397
Longitude : 87.73126121610403,87.73128317669034
file name : Image_27092022164950502.png
|
2022-09-27 16:49:50.618502 |
39 |
48640601 |
Construction of pucca drain from Alip Samanta house towards Baisnab gore with cover |
184000 |
Construction of pucca drain from Alip Samanta house towards Baisnab gore with cover1 |
Completion of work |
-
latitude : 23.10285577084869,23.10285577084869
Longitude : 87.73073868826032,87.73073868826032
file name : Image_07092022121301780.png
|
2022-09-07 12:13:01.872647 |
40 |
48642920 |
Consrtuction of Concrete road from Gadhar Kundu house towards Jenje pukur |
158400 |
Consrtuction of Concrete road from Gadhar Kundu house towards Jenje pukur1 |
Roof laid |
-
latitude : 23.117734864354134,23.117734864354134
Longitude : 87.69804608076811,87.69804608076811
file name : Image_13122022140430880.png
|
2022-12-13 14:04:30.96507 |
41 |
48642920 |
Consrtuction of Concrete road from Gadhar Kundu house towards Jenje pukur |
158400 |
Consrtuction of Concrete road from Gadhar Kundu house towards Jenje pukur1 |
Plinth level |
-
latitude : 23.117788257077336,23.117788257077336
Longitude : 87.6980983838439,87.6980983838439
file name : Image_19112022134519489.png
|
2022-11-19 13:45:19.59958 |
42 |
48642920 |
Consrtuction of Concrete road from Gadhar Kundu house towards Jenje pukur |
158400 |
Consrtuction of Concrete road from Gadhar Kundu house towards Jenje pukur1 |
Completion of work |
-
latitude : 23.11769978608936,23.11769978608936
Longitude : 87.69807809963822,87.69807809963822
file name : Image_15092022123221063.png
|
2022-09-15 12:32:21.165118 |
43 |
48638503 |
Construction of pucca drain from Raj kumar roy house towards Radhu Kundu Football ground via Swarup |
177973 |
Construction of pucca drain from Raj kumar roy house towards Radhu Kundu Football ground via Swarup 1 |
Roof laid |
-
latitude : 23.100777016952634,23.100777016952634
Longitude : 87.72791557945311,87.72791557945311
file name : Image_01062022143522968.png
|
2022-06-01 14:35:23.066242 |
44 |
48638503 |
Construction of pucca drain from Raj kumar roy house towards Radhu Kundu Football ground via Swarup |
177973 |
Construction of pucca drain from Raj kumar roy house towards Radhu Kundu Football ground via Swarup 1 |
Completion of work |
-
latitude : 23.10073720291257,23.100737370550632
Longitude : 87.72765859030187,87.72765800356865
file name : Image_31052022134408908.png
|
2022-05-31 13:44:09.019676 |
45 |
48638503 |
Construction of pucca drain from Raj kumar roy house towards Radhu Kundu Football ground via Swarup |
177973 |
Construction of pucca drain from Raj kumar roy house towards Radhu Kundu Football ground via Swarup 1 |
Completion of work |
-
latitude : 23.10076215,23.10076215
Longitude : 87.72809127,87.72809127
file name : Image_05052022121748998.png
|
2022-05-05 12:17:49.081999 |
46 |
48690949 |
Construction of Concrete road from Uttam Bez house to Asit Ghosh Khamr with road protection wall |
144000 |
Construction of Concrete road from Uttam Bez house to Asit Ghosh Khamr with road protection wall1 |
Completion of work |
-
latitude : 23.099593701772392,23.09959575533867
Longitude : 87.69764651544392,87.69765011966228
file name : Image_20092022173105103.png
|
2022-09-20 17:31:05.240609 |
47 |
48690949 |
Construction of Concrete road from Uttam Bez house to Asit Ghosh Khamr with road protection wall |
144000 |
Construction of Concrete road from Uttam Bez house to Asit Ghosh Khamr with road protection wall1 |
Roof laid |
-
latitude : 23.099562018178403,23.099562018178403
Longitude : 87.69772530533373,87.69772530533373
file name : Image_27092022170542196.png
|
2022-09-27 17:05:42.305158 |
48 |
48690949 |
Construction of Concrete road from Uttam Bez house to Asit Ghosh Khamr with road protection wall |
144000 |
Construction of Concrete road from Uttam Bez house to Asit Ghosh Khamr with road protection wall1 |
Completion of work |
-
latitude : 23.099507661536336,23.099507661536336
Longitude : 87.6977043505758,87.6977043505758
file name : Image_07092022123512375.png
|
2022-09-07 12:35:12.478639 |
49 |
48630408 |
Construction of pucca nala from Boliara Subrata Pauls hosue towards Ramesh Deys hosue with cover |
180000 |
Construction of pucca nala from Boliara Subrata Pauls hosue towards Ramesh Deys hosue with cover1 |
Roof laid |
-
latitude : 23.116414840333164,23.116414840333164
Longitude : 87.71539511159062,87.71539511159062
file name : Image_30112022162231762.png
|
2022-11-30 16:22:31.862691 |
50 |
48630408 |
Construction of pucca nala from Boliara Subrata Pauls hosue towards Ramesh Deys hosue with cover |
180000 |
Construction of pucca nala from Boliara Subrata Pauls hosue towards Ramesh Deys hosue with cover1 |
Plinth level |
-
latitude : 23.11632393859327,23.11632393859327
Longitude : 87.71536535583436,87.71536535583436
file name : Image_19112022135516221.png
|
2022-11-19 13:55:16.358132 |
51 |
48630408 |
Construction of pucca nala from Boliara Subrata Pauls hosue towards Ramesh Deys hosue with cover |
180000 |
Construction of pucca nala from Boliara Subrata Pauls hosue towards Ramesh Deys hosue with cover1 |
Completion of work |
-
latitude : 23.116347827017307,23.116347827017307
Longitude : 87.715361751616,87.715361751616
file name : Image_23092022134056496.png
|
2022-09-23 13:40:56.616329 |
52 |
48630408 |
Construction of pucca nala from Boliara Subrata Pauls hosue towards Ramesh Deys hosue with cover |
180000 |
Construction of pucca nala from Boliara Subrata Pauls hosue towards Ramesh Deys hosue with cover1 |
Completion of work |
-
latitude : 23.116633063182235,23.116633063182235
Longitude : 87.71548840217292,87.71548840217292
file name : Image_23092022144905784.png
|
2022-09-23 14:49:05.885688 |
53 |
48629648 |
Constuction of pucca drain from Tant Pukur towards ICDS centre |
160000 |
Constuction of pucca drain from Tant Pukur towards ICDS centre1 |
Roof laid |
-
latitude : 23.119053463451564,23.119053463451564
Longitude : 87.69813417457044,87.69813417457044
file name : Image_27092022165005532.png
|
2022-09-27 16:50:05.643112 |
54 |
48629648 |
Constuction of pucca drain from Tant Pukur towards ICDS centre |
160000 |
Constuction of pucca drain from Tant Pukur towards ICDS centre1 |
Completion of work |
-
latitude : 23.118938799016178,23.118931716307998
Longitude : 87.69806820899248,87.69807466305792
file name : Image_15092022124753513.png
|
2022-09-15 12:47:53.637016 |
55 |
48629648 |
Constuction of pucca drain from Tant Pukur towards ICDS centre |
160000 |
Constuction of pucca drain from Tant Pukur towards ICDS centre1 |
Completion of work |
-
latitude : 23.119032843969762,23.119032843969762
Longitude : 87.69817382097244,87.69817382097244
file name : Image_02092022140731240.png
|
2022-09-02 14:07:31.37407 |
56 |
48692759 |
Installation of solar street light near Kunal Dutta house |
25000 |
Installation of solar street light near Kunal Dutta house1 |
Roof laid |
-
latitude : 23.1019686
Longitude : 87.7335463
file name : Image_10112022140053245.png
|
2022-11-10 14:00:53.352962 |
57 |
48692759 |
Installation of solar street light near Kunal Dutta house |
25000 |
Installation of solar street light near Kunal Dutta house1 |
Roof laid |
-
latitude : 23.1019455
Longitude : 87.7335658
file name : Image_09112022155351252.png
|
2022-11-09 15:53:51.376407 |
58 |
48692759 |
Installation of solar street light near Kunal Dutta house |
25000 |
Installation of solar street light near Kunal Dutta house1 |
Completion of work |
-
latitude : 23.101945
Longitude : 87.7334893
file name : Image_23092022150048917.png
|
2022-09-23 15:00:49.017366 |
59 |
34562068 |
CC road with cover drain from Prymari school to Bhairab Majhis house via Sasti Mondals house |
299145 |
CC road with cover drain from Prymari school to Bhairab Majhis house via Sasti Mondals house 1 |
Roof laid |
-
latitude : 23.113781874999404,23.113779653795063
Longitude : 87.71620463579893,87.71620153449476
file name : Image_26022021170033886.png
|
2021-02-26 17:00:33.975039 |
60 |
34562068 |
CC road with cover drain from Prymari school to Bhairab Majhis house via Sasti Mondals house |
299145 |
CC road with cover drain from Prymari school to Bhairab Majhis house via Sasti Mondals house 1 |
Completion of work |
-
latitude : 23.113718926906586,23.113718926906586
Longitude : 87.71622776985168,87.71622776985168
file name : Image_26022021164648714.png
|
2021-02-26 16:46:48.829423 |
61 |
34562068 |
CC road with cover drain from Prymari school to Bhairab Majhis house via Sasti Mondals house |
299145 |
CC road with cover drain from Prymari school to Bhairab Majhis house via Sasti Mondals house 1 |
Completion of work |
-
latitude : 23.113798848353326,23.113798848353326
Longitude : 87.71619516424835,87.71619516424835
file name : Image_26022021164848077.png
|
2021-02-26 16:48:48.183004 |
62 |
34562068 |
CC road with cover drain from Prymari school to Bhairab Majhis house via Sasti Mondals house |
299145 |
CC road with cover drain from Prymari school to Bhairab Majhis house via Sasti Mondals house 1 |
Completion of work |
-
latitude : 23.113819216378033,23.11385152861476
Longitude : 87.71612031385303,87.71610916592181
file name : Image_04022021163510136.png
|
2021-02-04 16:35:10.236676 |
63 |
48693036 |
Installation of solar street light near Susanta Guha house near Panchanan tola house |
25000 |
Installation of solar street light near Susanta Guha house near Panchanan tola house1 |
Roof laid |
-
latitude : 23.10257845558226
Longitude : 87.73435472510755
file name : Image_10112022135811130.png
|
2022-11-10 13:58:11.250544 |
64 |
48693036 |
Installation of solar street light near Susanta Guha house near Panchanan tola house |
25000 |
Installation of solar street light near Susanta Guha house near Panchanan tola house1 |
Completion of work |
-
latitude : 23.102499204687774
Longitude : 87.73431340232491
file name : Image_23092022145521599.png
|
2022-09-23 14:55:21.706364 |
65 |
34565316 |
cc road with cover drain from Gobinda Deys house toKashinath Deys house via Ujjal Meddyas house |
300223 |
cc road with cover drain from Gobinda Deys house toKashinath Deys house via Ujjal Meddyas house 1 |
Roof laid |
-
latitude : 23.116600373759866,23.116606660187244
Longitude : 87.71269496530294,87.71269580349326
file name : Image_26022021175152046.png
|
2021-02-26 17:51:52.132524 |
66 |
34565316 |
cc road with cover drain from Gobinda Deys house toKashinath Deys house via Ujjal Meddyas house |
300223 |
cc road with cover drain from Gobinda Deys house toKashinath Deys house via Ujjal Meddyas house 1 |
Completion of work |
-
latitude : 23.116280562244356,23.11626363079995
Longitude : 87.71258298307657,87.7126060333103
file name : Image_26022021173931501.png
|
2021-02-26 17:39:31.591557 |
67 |
34565316 |
cc road with cover drain from Gobinda Deys house toKashinath Deys house via Ujjal Meddyas house |
300223 |
cc road with cover drain from Gobinda Deys house toKashinath Deys house via Ujjal Meddyas house 1 |
Completion of work |
-
latitude : 23.116264468990266,23.11630662996322
Longitude : 87.71260569803417,87.71264324896038
file name : Image_26022021173955318.png
|
2021-02-26 17:39:55.41046 |
68 |
34565316 |
cc road with cover drain from Gobinda Deys house toKashinath Deys house via Ujjal Meddyas house |
300223 |
cc road with cover drain from Gobinda Deys house toKashinath Deys house via Ujjal Meddyas house 1 |
Completion of work |
-
latitude : 23.116767634637654,23.116767634637654
Longitude : 87.71274391561747,87.71274391561747
file name : Image_26022021172112899.png
|
2021-02-26 17:21:12.990522 |
69 |
34565316 |
cc road with cover drain from Gobinda Deys house toKashinath Deys house via Ujjal Meddyas house |
300223 |
cc road with cover drain from Gobinda Deys house toKashinath Deys house via Ujjal Meddyas house 1 |
Completion of work |
-
latitude : 23.11678041703999,23.116783602163196
Longitude : 87.71277744323015,87.71275640465319
file name : Image_26022021173320464.png
|
2021-02-26 17:33:20.565217 |
70 |
34565316 |
cc road with cover drain from Gobinda Deys house toKashinath Deys house via Ujjal Meddyas house |
300223 |
cc road with cover drain from Gobinda Deys house toKashinath Deys house via Ujjal Meddyas house 1 |
Completion of work |
-
latitude : 23.116715038195252,23.116741650737822
Longitude : 87.71275632083416,87.71274827420712
file name : Image_04022021161700093.png
|
2021-02-04 16:17:00.178388 |
71 |
58348472 |
Purchase of tube well materials for repair and resinking ,new sinking at GP area |
400000 |
Purchase of tube well materials for repair and resinking ,new sinking at GP area1 |
Plinth level |
-
latitude : 23.1091797
Longitude : 87.7305804
file name : Image_13032023175738926.png
|
2023-03-13 17:57:39.023787 |
72 |
34574524 |
Construction of concrete road from Molkiri Pymary school to Kalimandir |
300688 |
Construction of concrete road from Molkiri Pymary school to Kalimandir 1 |
Roof laid |
-
latitude : 23.10011669062078,23.1001347117126
Longitude : 87.70029469393194,87.70030466839671
file name : Image_04022021155827766.png
|
2021-02-04 15:58:27.887868 |
73 |
34574524 |
Construction of concrete road from Molkiri Pymary school to Kalimandir |
300688 |
Construction of concrete road from Molkiri Pymary school to Kalimandir 1 |
Plinth level |
-
latitude : 23.100138525478542,23.100131987594068
Longitude : 87.70032227039337,87.70031137391925
file name : Image_04022021155456371.png
|
2021-02-04 15:54:56.487801 |
74 |
34574524 |
Construction of concrete road from Molkiri Pymary school to Kalimandir |
300688 |
Construction of concrete road from Molkiri Pymary school to Kalimandir 1 |
Completion of work |
-
latitude : 23.100080145522952,23.100127838551998
Longitude : 87.70035060122609,87.7003138884902
file name : Image_04022021154853933.png
|
2021-02-04 15:48:54.053236 |
75 |
34573873 |
Construction of concrete road from Health centre to primary school |
349227 |
Construction of concrete road from Health centre to primary school 1 |
Plinth level |
-
latitude : 23.102441746741533,23.1026085
Longitude : 87.71222985349596,87.7117405
file name : Image_04022021153828426.png
|
2021-02-04 15:38:28.53389 |
76 |
34573873 |
Construction of concrete road from Health centre to primary school |
349227 |
Construction of concrete road from Health centre to primary school 1 |
Plinth level |
-
latitude : 23.10244945809245,23.10243906453252
Longitude : 87.7122051268816,87.71222985349596
file name : Image_04022021153335547.png
|
2021-02-04 15:33:35.645509 |
77 |
34573873 |
Construction of concrete road from Health centre to primary school |
349227 |
Construction of concrete road from Health centre to primary school 1 |
Completion of work |
-
latitude : 23.1026055,23.1026016
Longitude : 87.7117456,87.7117449
file name : Image_04022021152848340.png
|
2021-02-04 15:28:48.442115 |
78 |
34568967 |
Construction of concrete road from Shambhu nath Dass house to Deb Narayan Tas house |
346983 |
Construction of concrete road from Shambhu nath Dass house to Deb Narayan Tas house 1 |
Plinth level |
-
latitude : 23.105497201904655,23.105503781698644
Longitude : 87.73406378924847,87.73403713479638
file name : Image_04022021141544070.png
|
2021-02-04 14:15:44.157733 |
79 |
34568967 |
Construction of concrete road from Shambhu nath Dass house to Deb Narayan Tas house |
346983 |
Construction of concrete road from Shambhu nath Dass house to Deb Narayan Tas house 1 |
Plinth level |
-
latitude : 23.105499758385122,23.105446994304657
Longitude : 87.73407904431224,87.73406479507685
file name : Image_04022021141132863.png
|
2021-02-04 14:11:32.952209 |
80 |
34568967 |
Construction of concrete road from Shambhu nath Dass house to Deb Narayan Tas house |
346983 |
Construction of concrete road from Shambhu nath Dass house to Deb Narayan Tas house 1 |
Completion of work |
-
latitude : 23.105376083403826,23.105560527183115
Longitude : 87.7340136654675,87.7340617775917
file name : Image_04022021140034796.png
|
2021-02-04 14:00:34.901179 |
81 |
34577418 |
Cons of concrete road from Shuva Chandi Nandis house Nathuram Maliks house via Rabi Maliks house |
299985 |
Cons of concrete road from Shuva Chandi Nandis house Nathuram Maliks house via Rabi Maliks house 1 |
Completion of work |
-
latitude : 23.094501360319555,23.094520764425397
Longitude : 87.71251726895571,87.7125191129744
file name : Image_02122021121635754.png
|
2021-12-02 12:16:35.84608 |
82 |
34577418 |
Cons of concrete road from Shuva Chandi Nandis house Nathuram Maliks house via Rabi Maliks house |
299985 |
Cons of concrete road from Shuva Chandi Nandis house Nathuram Maliks house via Rabi Maliks house 1 |
Completion of work |
-
latitude : 23.094501360319555,23.094520764425397
Longitude : 87.71251726895571,87.7125191129744
file name : Image_02122021121705370.png
|
2021-12-02 12:17:05.458195 |
83 |
34577418 |
Cons of concrete road from Shuva Chandi Nandis house Nathuram Maliks house via Rabi Maliks house |
299985 |
Cons of concrete road from Shuva Chandi Nandis house Nathuram Maliks house via Rabi Maliks house 1 |
Completion of work |
-
latitude : 23.094520554877818,23.094520554877818
Longitude : 87.71251861006021,87.71251861006021
file name : Image_02122021121730384.png
|
2021-12-02 12:17:30.474869 |
84 |
34577418 |
Cons of concrete road from Shuva Chandi Nandis house Nathuram Maliks house via Rabi Maliks house |
299985 |
Cons of concrete road from Shuva Chandi Nandis house Nathuram Maliks house via Rabi Maliks house 1 |
Completion of work |
-
latitude : 23.094603745266795,23.094603745266795
Longitude : 87.7125571668148,87.7125571668148
file name : Image_02122021124014434.png
|
2021-12-02 12:40:14.524262 |
85 |
34577418 |
Cons of concrete road from Shuva Chandi Nandis house Nathuram Maliks house via Rabi Maliks house |
299985 |
Cons of concrete road from Shuva Chandi Nandis house Nathuram Maliks house via Rabi Maliks house 1 |
Completion of work |
-
latitude : 23.101249923929572,23.094492433592677
Longitude : 87.728975052014,87.71252950653434
file name : Image_22112021164528783.png
|
2021-11-22 16:45:28.897419 |
86 |
34577418 |
Cons of concrete road from Shuva Chandi Nandis house Nathuram Maliks house via Rabi Maliks house |
299985 |
Cons of concrete road from Shuva Chandi Nandis house Nathuram Maliks house via Rabi Maliks house 1 |
Completion of work |
-
latitude : 23.09451355598867,23.094516112469137
Longitude : 87.71248248405755,87.71246898919344
file name : Image_22112021164542321.png
|
2021-11-22 16:45:42.410544 |
87 |
34577418 |
Cons of concrete road from Shuva Chandi Nandis house Nathuram Maliks house via Rabi Maliks house |
299985 |
Cons of concrete road from Shuva Chandi Nandis house Nathuram Maliks house via Rabi Maliks house 1 |
Completion of work |
-
latitude : 23.09443816076964,23.094441890716553
Longitude : 87.7126351185143,87.71262556314468
file name : Image_12112021160613624.png
|
2021-11-12 16:06:13.73742 |
88 |
34580145 |
Construction of concrete road from Vadhu Ruidass Shop to Girls School |
299985 |
Construction of concrete road from Vadhu Ruidass Shop to Girls School 1 |
Completion of work |
-
latitude : 23.106671757996082,23.106671757996082
Longitude : 87.73096525110304,87.73096525110304
file name : Image_02122021121547325.png
|
2021-12-02 12:15:47.422601 |
89 |
34580145 |
Construction of concrete road from Vadhu Ruidass Shop to Girls School |
299985 |
Construction of concrete road from Vadhu Ruidass Shop to Girls School 1 |
Completion of work |
-
latitude : 23.106645857915282,23.106737514026463
Longitude : 87.73101998493075,87.73092275485396
file name : Image_23112021121123205.png
|
2021-11-23 12:11:23.29564 |
90 |
34580145 |
Construction of concrete road from Vadhu Ruidass Shop to Girls School |
299985 |
Construction of concrete road from Vadhu Ruidass Shop to Girls School 1 |
Completion of work |
-
latitude : 23.10645709745586,23.106463719159365
Longitude : 87.73167762905359,87.73152977228165
file name : Image_30102021143819953.png
|
2021-10-30 14:38:20.058173 |
91 |
34579841 |
Construction of concrete road from Dhit pur Monsa Tola to Sabuj Deys Shop |
249976 |
Construction of concrete road from Dhit pur Monsa Tola to Sabuj Deys Shop1 |
Completion of work |
-
latitude : 23.106872169300914,23.106829170137644
Longitude : 87.73042537271976,87.73040969856083
file name : Image_23112021121127046.png
|
2021-11-23 12:11:27.13244 |
92 |
34579841 |
Construction of concrete road from Dhit pur Monsa Tola to Sabuj Deys Shop |
249976 |
Construction of concrete road from Dhit pur Monsa Tola to Sabuj Deys Shop1 |
Completion of work |
-
latitude : 23.1166145,23.10686999000609,23.10686999000609
Longitude : 87.7561768,87.73044909350574,87.73044909350574
file name : Image_30102021143630398.png
|
2021-10-30 14:36:30.511474 |
93 |
34568516 |
Construction of concrete Drain with Cover and road of Four side of Teli pukur par |
349976 |
Construction of concrete Drain with Cover and road of Four side of Teli pukur par 1 |
Completion of work |
-
latitude : 23.096081013791263
Longitude : 87.73476770147681
file name : Image_22112021170006732.png
|
2021-11-22 17:00:06.860388 |
94 |
34568516 |
Construction of concrete Drain with Cover and road of Four side of Teli pukur par |
349976 |
Construction of concrete Drain with Cover and road of Four side of Teli pukur par 1 |
Completion of work |
-
latitude : 23.096081013791263
Longitude : 87.73476770147681
file name : Image_22112021170016386.png
|
2021-11-22 17:00:16.498362 |
95 |
34568516 |
Construction of concrete Drain with Cover and road of Four side of Teli pukur par |
349976 |
Construction of concrete Drain with Cover and road of Four side of Teli pukur par 1 |
Completion of work |
-
latitude : 23.09603197965771
Longitude : 87.73471020162106
file name : Image_30102021145408621.png
|
2021-10-30 14:54:08.760521 |
96 |
34581268 |
Construction of concrete road of four side of Gaddan |
299997 |
Construction of concrete road of four side of Gaddan1 |
Completion of work |
-
latitude : 23.103893282823265,23.103893282823265
Longitude : 87.7168155927211,87.7168155927211
file name : Image_23112021125658753.png
|
2021-11-23 12:56:58.908165 |
97 |
34581268 |
Construction of concrete road of four side of Gaddan |
299997 |
Construction of concrete road of four side of Gaddan1 |
Completion of work |
-
latitude : 23.103891564533114,23.103921278379858
Longitude : 87.71683160215616,87.71683646366
file name : Image_30102021151510467.png
|
2021-10-30 15:15:10.614715 |
98 |
34589878 |
Construction of concrete road from Sefali Deb house to Main road tube well |
199565 |
Construction of concrete road from Sefali Deb house to Main road tube well 1 |
Completion of work |
-
latitude : 23.11241403222084,23.10535642784089
Longitude : 87.80143233016133,87.72834171541035
file name : Image_23112021123940947.png
|
2021-11-23 12:39:41.062824 |
99 |
34589878 |
Construction of concrete road from Sefali Deb house to Main road tube well |
199565 |
Construction of concrete road from Sefali Deb house to Main road tube well 1 |
Completion of work |
-
latitude : 23.105292515829206,23.105292515829206
Longitude : 87.72835747338831,87.72835747338831
file name : Image_30102021150535746.png
|
2021-10-30 15:05:35.870618 |
100 |
34560742 |
CC road with cover drain from Santu Nandis house Shanti Panjas |
199729 |
CC road with cover drain from Santu Nandis house Shanti Panjas 1 |
Completion of work |
-
latitude : 23.119082003831863
Longitude : 87.71310995332897
file name : Image_08122021152825676.png
|
2021-12-08 15:28:25.796924 |
101 |
34560742 |
CC road with cover drain from Santu Nandis house Shanti Panjas |
199729 |
CC road with cover drain from Santu Nandis house Shanti Panjas 1 |
Completion of work |
-
latitude : 23.119185268878937
Longitude : 87.7131459955126
file name : Image_22112021155941591.png
|
2021-11-22 15:59:41.715433 |
102 |
34560742 |
CC road with cover drain from Santu Nandis house Shanti Panjas |
199729 |
CC road with cover drain from Santu Nandis house Shanti Panjas 1 |
Completion of work |
-
latitude : 23.11865062918514
Longitude : 87.71305203437805
file name : Image_30102021152723008.png
|
2021-10-30 15:27:23.122515 |
103 |
34572863 |
Construction of concrete road from Ranjit Duta s house to Debasis Duttas house |
149909 |
Construction of concrete road from Ranjit Duta s house to Debasis Duttas house 1 |
Completion of work |
-
latitude : 23.1000094441697,23.099990375339985
Longitude : 87.73538268171251,87.7353467233479
file name : Image_22112021170011841.png
|
2021-11-22 17:00:11.980324 |
104 |
34572863 |
Construction of concrete road from Ranjit Duta s house to Debasis Duttas house |
149909 |
Construction of concrete road from Ranjit Duta s house to Debasis Duttas house 1 |
Completion of work |
-
latitude : 23.099968121387064,23.099993225187063
Longitude : 87.73537371307611,87.73535946384072
file name : Image_30102021145751342.png
|
2021-10-30 14:57:51.495302 |
105 |
34566953 |
Construction of concrete road with cover drain from Pramath Guhas house to Khokan Rakshit s house |
299967 |
Construction of concrete road with cover drain from Pramath Guhas house to Khokan Rakshit s house 1 |
Completion of work |
-
latitude : 23.102610013447702,23.102557961829007
Longitude : 87.73434542119503,87.73431893438101
file name : Image_02122021121555724.png
|
2021-12-02 12:15:55.812015 |
106 |
34566953 |
Construction of concrete road with cover drain from Pramath Guhas house to Khokan Rakshit s house |
299967 |
Construction of concrete road with cover drain from Pramath Guhas house to Khokan Rakshit s house 1 |
Completion of work |
-
latitude : 23.096155780367553,23.10255205258727
Longitude : 87.71682422608137,87.73433377034962
file name : Image_22112021164602300.png
|
2021-11-22 16:46:02.411728 |
107 |
34566953 |
Construction of concrete road with cover drain from Pramath Guhas house to Khokan Rakshit s house |
299967 |
Construction of concrete road with cover drain from Pramath Guhas house to Khokan Rakshit s house 1 |
Completion of work |
-
latitude : 23.102491199970245,23.1024831533432
Longitude : 87.73437978699803,87.7343072835356
file name : Image_30102021144746229.png
|
2021-10-30 14:47:46.32366 |
108 |
34575106 |
Construction of concrete road from PWD road to Suvash Guptas house |
300000 |
Construction of concrete road from PWD road to Suvash Guptas house 1 |
Roof laid |
-
latitude : 23.092825,23.092825
Longitude : 87.7055717,87.7055717
file name : Image_27012022165725115.png
|
2022-01-27 16:57:25.28171 |
109 |
34575106 |
Construction of concrete road from PWD road to Suvash Guptas house |
300000 |
Construction of concrete road from PWD road to Suvash Guptas house 1 |
Completion of work |
-
latitude : 23.09282728470862,23.092822590842843
Longitude : 87.70518637262285,87.70515720359981
file name : Image_13012022131832018.png
|
2022-01-13 13:18:32.103306 |
110 |
34585379 |
Construction of concrete road from Ram prasad Dharas house to ICDS centre |
300000 |
Construction of concrete road from Ram prasad Dharas house to ICDS centre 1 |
Roof laid |
-
latitude : 23.106575910933316,23.106575910933316
Longitude : 87.70868422463536,87.70868422463536
file name : Image_27012022171241915.png
|
2022-01-27 17:12:42.060416 |
111 |
34585379 |
Construction of concrete road from Ram prasad Dharas house to ICDS centre |
300000 |
Construction of concrete road from Ram prasad Dharas house to ICDS centre 1 |
Completion of work |
-
latitude : 23.10653245076537,23.10653245076537
Longitude : 87.70858665928245,87.70858665928245
file name : Image_13012022132636329.png
|
2022-01-13 13:26:36.423023 |
112 |
34565818 |
Construction of Bathing Ghat at Boral pukur West side |
150000 |
Construction of Bathing Ghat at Boral pukur West side 1 |
Roof laid |
-
latitude : 23.11470543500036
Longitude : 87.71713963709772
file name : Image_16032022134423669.png
|
2022-03-16 13:44:23.779595 |
113 |
34565818 |
Construction of Bathing Ghat at Boral pukur West side |
150000 |
Construction of Bathing Ghat at Boral pukur West side 1 |
Plinth level |
-
latitude : 23.114647390320897
Longitude : 87.71712019108236
file name : Image_04032022132839350.png
|
2022-03-04 13:28:39.467919 |
114 |
34584712 |
Construction of bathing ghat at Ranapukur |
150000 |
Construction of bathing ghat at Ranapukur 1 |
Plinth level |
-
latitude : 23.1066634
Longitude : 87.731792
file name : Image_16032022122122220.png
|
2022-03-16 12:21:22.324216 |
115 |
34584712 |
Construction of bathing ghat at Ranapukur |
150000 |
Construction of bathing ghat at Ranapukur 1 |
Plinth level |
-
latitude : 23.1066634
Longitude : 87.7317932
file name : Image_14032022162802438.png
|
2022-03-14 16:28:02.595482 |
116 |
34584712 |
Construction of bathing ghat at Ranapukur |
150000 |
Construction of bathing ghat at Ranapukur 1 |
Plinth level |
-
latitude : 23.10692250262946
Longitude : 87.73213041946292
file name : Image_04032022131925096.png
|
2022-03-04 13:19:25.184141 |
117 |
48630713 |
Construction of pucca drain from Mandra dakshin para Majhi para Kali tola towards Swapan majhi house |
169837 |
Construction of pucca drain from Mandra dakshin para Majhi para Kali tola towards Swapan majhi house1 |
Roof laid |
-
latitude : 23.1182192,23.1182192
Longitude : 87.7140594,87.7140594
file name : Image_24062022114249500.png
|
2022-06-24 11:42:49.684072 |
118 |
48630713 |
Construction of pucca drain from Mandra dakshin para Majhi para Kali tola towards Swapan majhi house |
169837 |
Construction of pucca drain from Mandra dakshin para Majhi para Kali tola towards Swapan majhi house1 |
Completion of work |
-
latitude : 23.10513138,23.10515503
Longitude : 87.71147765,87.7114939
file name : Image_05042022163930669.png
|
2022-04-05 16:39:30.791255 |
119 |
48631833 |
Construction of pucca drain from Mandra Brambhan para Achinta Ghosals house to Shyamal Chatterjees m |
159441 |
Construction of pucca drain from Mandra Brambhan para Achinta Ghosals house to Shyamal Chatterjees m1 |
Roof laid |
-
latitude : 23.102718852460384,23.102718852460384
Longitude : 87.70906509831548,87.70906509831548
file name : Image_15062022133727348.png
|
2022-06-15 13:37:27.454487 |
120 |
48631833 |
Construction of pucca drain from Mandra Brambhan para Achinta Ghosals house to Shyamal Chatterjees m |
159441 |
Construction of pucca drain from Mandra Brambhan para Achinta Ghosals house to Shyamal Chatterjees m1 |
Completion of work |
-
latitude : 23.10264307,23.10264529
Longitude : 87.70892307,87.70892746
file name : Image_05042022163825439.png
|
2022-04-05 16:38:25.592066 |
121 |
48634096 |
Construction of Pucca drain from Paschim para Durga Mandir towards Tara Dighi |
174000 |
Construction of Pucca drain from Paschim para Durga Mandir towards Tara Dighi1 |
Roof laid |
-
latitude : 23.1055059,23.1055059
Longitude : 87.7272185,87.7272185
file name : Image_27092022162725334.png
|
2022-09-27 16:27:25.42318 |
122 |
48634096 |
Construction of Pucca drain from Paschim para Durga Mandir towards Tara Dighi |
174000 |
Construction of Pucca drain from Paschim para Durga Mandir towards Tara Dighi1 |
Roof laid |
-
latitude : 23.1055069,23.1055069
Longitude : 87.7272184,87.7272184
file name : Image_27092022162820877.png
|
2022-09-27 16:28:20.972566 |
123 |
48634096 |
Construction of Pucca drain from Paschim para Durga Mandir towards Tara Dighi |
174000 |
Construction of Pucca drain from Paschim para Durga Mandir towards Tara Dighi1 |
Roof laid |
-
latitude : 23.1055069,23.1055069
Longitude : 87.7272184,87.7272184
file name : Image_27092022163328549.png
|
2022-09-27 16:33:28.645221 |
124 |
48634096 |
Construction of Pucca drain from Paschim para Durga Mandir towards Tara Dighi |
174000 |
Construction of Pucca drain from Paschim para Durga Mandir towards Tara Dighi1 |
Plinth level |
-
latitude : 23.1055068,23.1055068
Longitude : 87.7272186,87.7272186
file name : Image_15092022160017963.png
|
2022-09-15 16:00:18.120433 |
125 |
48634096 |
Construction of Pucca drain from Paschim para Durga Mandir towards Tara Dighi |
174000 |
Construction of Pucca drain from Paschim para Durga Mandir towards Tara Dighi1 |
Completion of work |
-
latitude : 23.1055056,23.1055056
Longitude : 87.727211,87.727211
file name : Image_05092022165840493.png
|
2022-09-05 16:58:40.603647 |
126 |
48686410 |
Construction of concrete from Boliar Swarasti Hati house towards Nabakumar Pauls plot |
136500 |
Construction of concrete from Boliar Swarasti Hati house towards Nabakumar Pauls plot1 |
Roof laid |
-
latitude : 23.113393122330308,23.113393122330308
Longitude : 87.7140630595386,87.7140630595386
file name : Image_05092022154336593.png
|
2022-09-05 15:43:36.705294 |
127 |
48762261 |
Rest shed at Gobpur Boral Sasan |
114000 |
Rest shed at Gobpur Boral Sasan1 |
Plinth level |
-
latitude : 23.103941227309406,23.103941227309406
Longitude : 87.72196895442903,87.72196895442903
file name : Image_06072022163158541.png
|
2022-07-06 16:31:58.6533 |
128 |
48762261 |
Rest shed at Gobpur Boral Sasan |
114000 |
Rest shed at Gobpur Boral Sasan1 |
Roof laid |
-
latitude : 23.103865748271346,23.103865748271346
Longitude : 87.72197985090315,87.72197985090315
file name : Image_04082022163631369.png
|
2022-08-04 16:36:31.468621 |
129 |
48762261 |
Rest shed at Gobpur Boral Sasan |
114000 |
Rest shed at Gobpur Boral Sasan1 |
Completion of work |
-
latitude : 23.103514001704752,23.103514001704752
Longitude : 87.7216786891222,87.7216786891222
file name : Image_15062022135051879.png
|
2022-06-15 13:50:51.995206 |
130 |
34584036 |
Construction of Cummuinty Toilet at Akui Police Fanri Bus stand |
70000 |
Construction of Cummuinty Toilet at Akui Police Fanri Bus stand 1 |
Roof laid |
-
latitude : 23.1123044
Longitude : 87.7293028
file name : Image_06072022160253401.png
|
2022-07-06 16:02:53.537655 |
131 |
34584036 |
Construction of Cummuinty Toilet at Akui Police Fanri Bus stand |
70000 |
Construction of Cummuinty Toilet at Akui Police Fanri Bus stand 1 |
Plinth level |
-
latitude : 23.1122564
Longitude : 87.7293253
file name : Image_27012022172208772.png
|
2022-01-27 17:22:09.133983 |
132 |
34584036 |
Construction of Cummuinty Toilet at Akui Police Fanri Bus stand |
70000 |
Construction of Cummuinty Toilet at Akui Police Fanri Bus stand 1 |
Completion of work |
-
latitude : 23.1122557
Longitude : 87.7292216
file name : Image_08122021155208863.png
|
2021-12-08 15:52:08.976141 |
133 |
48689445 |
Construction of concrete road from Bidyut Majhi house towards Bijan Majhi house |
149881 |
Construction of concrete road from Bidyut Majhi house towards Bijan Majhi house1 |
Roof laid |
-
latitude : 23.112907432951033,23.112907432951033
Longitude : 87.71139493212104,87.71139493212104
file name : Image_01062022135006183.png
|
2022-06-01 13:50:06.288237 |
134 |
48689445 |
Construction of concrete road from Bidyut Majhi house towards Bijan Majhi house |
149881 |
Construction of concrete road from Bidyut Majhi house towards Bijan Majhi house1 |
Roof laid |
-
latitude : 23.1164706,23.1164706
Longitude : 87.7107051,87.7107051
file name : Image_01062022134805962.png
|
2022-06-01 13:48:06.054706 |
135 |
48689445 |
Construction of concrete road from Bidyut Majhi house towards Bijan Majhi house |
149881 |
Construction of concrete road from Bidyut Majhi house towards Bijan Majhi house1 |
Completion of work |
-
latitude : 23.11294151,23.11293927
Longitude : 87.71134183,87.71134189
file name : Image_18042022164345270.png
|
2022-04-18 16:43:45.388013 |
136 |
48692208 |
Construction of Concrete road from Radharaman Das house to Radhakanta Mandir |
59995 |
Construction of Concrete road from Radharaman Das house to Radhakanta Mandir1 |
Roof laid |
-
latitude : 23.100993311963975,23.100993311963975
Longitude : 87.72815890610218,87.72815890610218
file name : Image_31052022135805202.png
|
2022-05-31 13:58:05.325912 |
137 |
48692208 |
Construction of Concrete road from Radharaman Das house to Radhakanta Mandir |
59995 |
Construction of Concrete road from Radharaman Das house to Radhakanta Mandir1 |
Completion of work |
-
latitude : 23.10101393,23.10102898
Longitude : 87.72817022,87.7281722
file name : Image_11052022124842093.png
|
2022-05-11 12:48:42.206774 |
138 |
48692208 |
Construction of Concrete road from Radharaman Das house to Radhakanta Mandir |
59995 |
Construction of Concrete road from Radharaman Das house to Radhakanta Mandir1 |
Completion of work |
-
latitude : 23.10116608,23.10116608
Longitude : 87.72811031,87.72811031
file name : Image_05052022122657256.png
|
2022-05-05 12:26:57.38765 |
139 |
48641145 |
Construction of pucca drain from Akui college gate towards Debkhal via Dhitpur |
159978 |
Construction of pucca drain from Akui college gate towards Debkhal via Dhitpur1 |
Roof laid |
-
latitude : 23.10855919495225,23.10855919495225
Longitude : 87.72825236432254,87.72825236432254
file name : Image_31052022151002633.png
|
2022-05-31 15:10:02.728243 |
140 |
48641145 |
Construction of pucca drain from Akui college gate towards Debkhal via Dhitpur |
159978 |
Construction of pucca drain from Akui college gate towards Debkhal via Dhitpur1 |
Completion of work |
-
latitude : 23.10852807,23.10852805
Longitude : 87.72852359,87.72852358
file name : Image_05042022164920142.png
|
2022-04-05 16:49:20.273121 |
141 |
48641145 |
Construction of pucca drain from Akui college gate towards Debkhal via Dhitpur |
159978 |
Construction of pucca drain from Akui college gate towards Debkhal via Dhitpur1 |
Completion of work |
-
latitude : 23.10852807,23.10852805
Longitude : 87.72852359,87.72852358
file name : Image_18042022164252322.png
|
2022-04-18 16:42:52.433432 |
142 |
48689278 |
Construction of road protection wall at pond of Khokan Das Bairagya |
127500 |
Construction of road protection wall at pond of Khokan Das Bairagya1 |
Roof laid |
-
latitude : 23.111083949916065,23.111083949916065
Longitude : 87.71510509774089,87.71510509774089
file name : Image_05092022154330813.png
|
2022-09-05 15:43:30.93662 |
143 |
48689772 |
Construction of concrete from Panchayat road towards Kashinath Panja house |
105864 |
Construction of concrete from Panchayat road towards Kashinath Panja house1 |
Roof laid |
-
latitude : 23.1109077623114,23.1109077623114
Longitude : 87.71039119921625,87.71039119921625
file name : Image_06072022163150028.png
|
2022-07-06 16:31:50.133898 |
144 |
48689772 |
Construction of concrete from Panchayat road towards Kashinath Panja house |
105864 |
Construction of concrete from Panchayat road towards Kashinath Panja house1 |
Completion of work |
-
latitude : 23.110930267721415,23.110930267721415
Longitude : 87.71038826555014,87.71038826555014
file name : Image_06072022161351159.png
|
2022-07-06 16:13:51.249866 |
145 |
48689772 |
Construction of concrete from Panchayat road towards Kashinath Panja house |
105864 |
Construction of concrete from Panchayat road towards Kashinath Panja house1 |
Completion of work |
-
latitude : 23.11093852389604,23.11093852389604
Longitude : 87.71041123196483,87.71041123196483
file name : Image_15062022132142043.png
|
2022-06-15 13:21:42.138639 |
146 |
48689772 |
Construction of concrete from Panchayat road towards Kashinath Panja house |
105864 |
Construction of concrete from Panchayat road towards Kashinath Panja house1 |
Completion of work |
-
latitude : 23.110902020707726,23.110902020707726
Longitude : 87.71036714315414,87.71036714315414
file name : Image_31052022143110359.png
|
2022-05-31 14:31:10.463582 |
147 |
48693596 |
Installation of solar street light near Baiu con of Podo pukur |
25000 |
Installation of solar street light near Baiu con of Podo pukur1 |
Roof laid |
-
latitude : 23.105706
Longitude : 87.7331927
file name : Image_10112022135157229.png
|
2022-11-10 13:51:57.34607 |
148 |
48693596 |
Installation of solar street light near Baiu con of Podo pukur |
25000 |
Installation of solar street light near Baiu con of Podo pukur1 |
Plinth level |
-
latitude : 23.10580783523619
Longitude : 87.73263517767191
file name : Image_09112022154042770.png
|
2022-11-09 15:40:42.947852 |
149 |
48633114 |
Constuction of pucca drain from chormara to sal gore |
164000 |
Constuction of pucca drain from chormara to sal gore1 |
Roof laid |
-
latitude : 23.091497495770454,23.091497495770454
Longitude : 87.70387745462358,87.70387745462358
file name : Image_27122022144237154.png
|
2022-12-27 14:42:37.276281 |
150 |
48633114 |
Constuction of pucca drain from chormara to sal gore |
164000 |
Constuction of pucca drain from chormara to sal gore1 |
Plinth level |
-
latitude : 23.091480899602175,23.09153596870601
Longitude : 87.7038764487952,87.70388600416481
file name : Image_27122022142940829.png
|
2022-12-27 14:29:40.941351 |
151 |
48633114 |
Constuction of pucca drain from chormara to sal gore |
164000 |
Constuction of pucca drain from chormara to sal gore1 |
Plinth level |
-
latitude : 23.0930792,23.0930792
Longitude : 87.7054646,87.7054646
file name : Image_13122022144539986.png
|
2022-12-13 14:45:40.120053 |
152 |
48633114 |
Constuction of pucca drain from chormara to sal gore |
164000 |
Constuction of pucca drain from chormara to sal gore1 |
Completion of work |
-
latitude : 23.091551433317363,23.091551433317363
Longitude : 87.70397946238518,87.70397946238518
file name : Image_23092022152713074.png
|
2022-09-23 15:27:13.173825 |
153 |
48692268 |
Construction of Concrete road from Anup Das house to Sumar Das house |
59086 |
Construction of Concrete road from Anup Das house to Sumar Das house1 |
Roof laid |
-
latitude : 23.10189746785909,23.10189746785909
Longitude : 87.72963227704167,87.72963227704167
file name : Image_11012023154517849.png
|
2023-01-11 15:45:17.954535 |
154 |
48692268 |
Construction of Concrete road from Anup Das house to Sumar Das house |
59086 |
Construction of Concrete road from Anup Das house to Sumar Das house1 |
Plinth level |
-
latitude : 23.1037064,23.10185555834323
Longitude : 87.742038,87.72951451130211
file name : Image_06012023160432932.png
|
2023-01-06 16:04:33.018597 |
155 |
48692268 |
Construction of Concrete road from Anup Das house to Sumar Das house |
59086 |
Construction of Concrete road from Anup Das house to Sumar Das house1 |
Completion of work |
-
latitude : 23.101882422342896,23.101882422342896
Longitude : 87.729601431638,87.729601431638
file name : Image_06012023151138119.png
|
2023-01-06 15:11:38.226935 |
156 |
48642077 |
New Sinking of tube well with Plat form and soak pit |
45000 |
New Sinking of tube well with Plat form and soak pit1 |
Roof laid |
-
latitude : 23.10860936064273
Longitude : 87.72385915741324
file name : Image_13012023154551211.png
|
2023-01-13 15:45:51.354098 |
157 |
48642077 |
New Sinking of tube well with Plat form and soak pit |
45000 |
New Sinking of tube well with Plat form and soak pit1 |
Plinth level |
-
latitude : 23.10858903452754
Longitude : 87.72382646799088
file name : Image_09012023122435043.png
|
2023-01-09 12:24:35.173121 |
158 |
48761450 |
Construction of Concrete road from Vairab Tola Main road to four side of Adibasi para |
150849 |
Construction of Concrete road from Vairab Tola Main road to four side of Adibasi para1 |
Roof laid |
-
latitude : 23.129222933202982,23.129222933202982
Longitude : 87.73122257553041,87.73122257553041
file name : Image_30012023161658127.png
|
2023-01-30 16:16:58.224263 |
159 |
48761450 |
Construction of Concrete road from Vairab Tola Main road to four side of Adibasi para |
150849 |
Construction of Concrete road from Vairab Tola Main road to four side of Adibasi para1 |
Plinth level |
-
latitude : 23.12934396788478,23.12934396788478
Longitude : 87.73104353807867,87.73104353807867
file name : Image_27012023132117379.png
|
2023-01-27 13:21:17.49217 |
160 |
48761450 |
Construction of Concrete road from Vairab Tola Main road to four side of Adibasi para |
150849 |
Construction of Concrete road from Vairab Tola Main road to four side of Adibasi para1 |
Completion of work |
-
latitude : 23.129232823848724,23.129232823848724
Longitude : 87.73103448562324,87.73103448562324
file name : Image_24012023123201146.png
|
2023-01-24 12:32:01.253873 |
161 |
48630266 |
Construction of pucca nala from ICDS center towards Nabakumar Nandis house with cover |
200000 |
Construction of pucca nala from ICDS center towards Nabakumar Nandis house with cover1 |
Roof laid |
-
latitude : 23.1172556,23.1172556
Longitude : 87.7132028,87.7132028
file name : Image_07022023173701960.png
|
2023-02-07 17:37:02.066555 |
162 |
48630266 |
Construction of pucca nala from ICDS center towards Nabakumar Nandis house with cover |
200000 |
Construction of pucca nala from ICDS center towards Nabakumar Nandis house with cover1 |
Plinth level |
-
latitude : 23.117777025327086,23.117777025327086
Longitude : 87.71305471658707,87.71305471658707
file name : Image_30012023161817097.png
|
2023-01-30 16:18:17.190955 |
163 |
48630266 |
Construction of pucca nala from ICDS center towards Nabakumar Nandis house with cover |
200000 |
Construction of pucca nala from ICDS center towards Nabakumar Nandis house with cover1 |
Completion of work |
-
latitude : 23.117988794110715,23.117988794110715
Longitude : 87.71300107240677,87.71300107240677
file name : Image_30012023153338178.png
|
2023-01-30 15:33:38.293867 |
164 |
58050261 |
Construction of concrete road from PMGSY road to Bhadreswar Soren house via Molkiri Club |
150000 |
Construction of concrete road from PMGSY road to Bhadreswar Soren house via Molkiri Club1 |
Roof laid |
-
latitude : 23.103004884906113,23.103004884906113
Longitude : 87.69631236791611,87.69631236791611
file name : Image_24022023150629579.png
|
2023-02-24 15:06:29.676524 |
165 |
58050261 |
Construction of concrete road from PMGSY road to Bhadreswar Soren house via Molkiri Club |
150000 |
Construction of concrete road from PMGSY road to Bhadreswar Soren house via Molkiri Club1 |
Plinth level |
-
latitude : 23.10290505643934,23.10290505643934
Longitude : 87.69626601599157,87.69626601599157
file name : Image_20022023140254966.png
|
2023-02-20 14:02:55.061758 |
166 |
58050261 |
Construction of concrete road from PMGSY road to Bhadreswar Soren house via Molkiri Club |
150000 |
Construction of concrete road from PMGSY road to Bhadreswar Soren house via Molkiri Club1 |
Completion of work |
-
latitude : 23.1092059,23.1092059
Longitude : 87.7305661,87.7305661
file name : Image_16022023153536875.png
|
2023-02-16 15:35:36.984055 |
167 |
58348892 |
Drinking Water Testing Charge and disinfection of tubewell |
75000 |
Drinking Water Testing Charge and disinfection of tubewell1 |
Plinth level |
-
latitude : 23.1091816
Longitude : 87.7305496
file name : Image_22022023142429219.png
|
2023-02-22 14:24:29.32483 |
168 |
58319601 |
Construction of Concrete road from Ganesh Bag house to Tarak Nath Dey house |
150000 |
Construction of Concrete road from Ganesh Bag house to Tarak Nath Dey house1 |
Roof laid |
-
latitude : 23.105574399232864,23.105574399232864
Longitude : 87.73558543995023,87.73558543995023
file name : Image_01032023165336571.png
|
2023-03-01 16:53:36.674552 |
169 |
58319601 |
Construction of Concrete road from Ganesh Bag house to Tarak Nath Dey house |
150000 |
Construction of Concrete road from Ganesh Bag house to Tarak Nath Dey house1 |
Plinth level |
-
latitude : 23.10576617717743,23.10576617717743
Longitude : 87.73546465672553,87.73546465672553
file name : Image_24022023143420967.png
|
2023-02-24 14:34:21.062078 |
170 |
58319601 |
Construction of Concrete road from Ganesh Bag house to Tarak Nath Dey house |
150000 |
Construction of Concrete road from Ganesh Bag house to Tarak Nath Dey house1 |
Completion of work |
-
latitude : 23.105572387576103,23.105572387576103
Longitude : 87.73568225093186,87.73568225093186
file name : Image_20022023130812639.png
|
2023-02-20 13:08:12.722953 |
171 |
58038110 |
Construction of concrete road from Gour Majhi house sukumar Majhi house via Vajohari Majhi house |
200000 |
Construction of concrete road from Gour Majhi house sukumar Majhi house via Vajohari Majhi house 1 |
Roof laid |
-
latitude : 23.11150459572673,23.11150459572673
Longitude : 87.71467636339366,87.71467636339366
file name : Image_13032023130447549.png
|
2023-03-13 13:04:47.741938 |
172 |
58038110 |
Construction of concrete road from Gour Majhi house sukumar Majhi house via Vajohari Majhi house |
200000 |
Construction of concrete road from Gour Majhi house sukumar Majhi house via Vajohari Majhi house 1 |
Roof laid |
-
latitude : 23.11150459572673,23.11150459572673
Longitude : 87.71467636339366,87.71467636339366
file name : Image_13032023125110541.png
|
2023-03-13 12:51:10.641431 |
173 |
58038110 |
Construction of concrete road from Gour Majhi house sukumar Majhi house via Vajohari Majhi house |
200000 |
Construction of concrete road from Gour Majhi house sukumar Majhi house via Vajohari Majhi house 1 |
Plinth level |
-
latitude : 23.111433223821223,23.111433223821223
Longitude : 87.7145141735673,87.7145141735673
file name : Image_06032023155935720.png
|
2023-03-06 15:59:35.81188 |
174 |
58038110 |
Construction of concrete road from Gour Majhi house sukumar Majhi house via Vajohari Majhi house |
200000 |
Construction of concrete road from Gour Majhi house sukumar Majhi house via Vajohari Majhi house 1 |
Completion of work |
-
latitude : 23.11143670231104,23.11143670231104
Longitude : 87.71451467648149,87.71451467648149
file name : Image_20022023140435516.png
|
2023-02-20 14:04:35.604271 |
175 |
48642164 |
Purchase of tube well materials for repair and resinking |
333000 |
Purchase of tube well materials for repair and resinking1 |
Roof laid |
-
latitude : 23.1091343
Longitude : 87.7305633
file name : Image_27042022164249130.png
|
2022-04-27 16:42:49.234439 |
176 |
48689938 |
Construction of concrete road from Suvash Basu house towards Ashok Ghoshal house |
135098 |
Construction of concrete road from Suvash Basu house towards Ashok Ghoshal house 1 |
Roof laid |
-
latitude : 23.101710467599332,23.101710635237396
Longitude : 87.71148906089365,87.71148897707462
file name : Image_31052022144910991.png
|
2022-05-31 14:49:11.109208 |
177 |
48689938 |
Construction of concrete road from Suvash Basu house towards Ashok Ghoshal house |
135098 |
Construction of concrete road from Suvash Basu house towards Ashok Ghoshal house 1 |
Plinth level |
-
latitude : 23.10179698,23.10179698
Longitude : 87.71115249,87.71115249
file name : Image_05052022124538282.png
|
2022-05-05 12:45:38.40199 |
178 |
48689938 |
Construction of concrete road from Suvash Basu house towards Ashok Ghoshal house |
135098 |
Construction of concrete road from Suvash Basu house towards Ashok Ghoshal house 1 |
Completion of work |
-
latitude : 23.1036463,23.10179548
Longitude : 87.7118736,87.71106984
file name : Image_05042022162238706.png
|
2022-04-05 16:22:38.80986 |
179 |
58321545 |
Construction of Concrete road from Roma Rakshit house to Raj kumar Chottapadhya house |
125000 |
Construction of Concrete road from Roma Rakshit house to Raj kumar Chottapadhya house1 |
Roof laid |
-
latitude : 23.10385124757886,23.10385124757886
Longitude : 87.73508830927312,87.73508830927312
file name : Image_13032023132751158.png
|
2023-03-13 13:27:51.4986 |
180 |
58321545 |
Construction of Concrete road from Roma Rakshit house to Raj kumar Chottapadhya house |
125000 |
Construction of Concrete road from Roma Rakshit house to Raj kumar Chottapadhya house1 |
Plinth level |
-
latitude : 23.103535,23.103535
Longitude : 87.7358469,87.7358469
file name : Image_24022023142434069.png
|
2023-02-24 14:24:34.165198 |
181 |
58321545 |
Construction of Concrete road from Roma Rakshit house to Raj kumar Chottapadhya house |
125000 |
Construction of Concrete road from Roma Rakshit house to Raj kumar Chottapadhya house1 |
Completion of work |
-
latitude : 23.103744629770517,23.103744629770517
Longitude : 87.73517548106611,87.73517548106611
file name : Image_16022023154808716.png
|
2023-02-16 15:48:08.828612 |
182 |
58320106 |
Construction of concrete road from Khokan Rakshit house to Ram Karfa house |
202955 |
Construction of concrete road from Khokan Rakshit house to Ram Karfa house1 |
Roof laid |
-
latitude : 23.1019918,23.1019918,23.1019916
Longitude : 87.733527,87.733527,87.7335268
file name : Image_13032023170350203.png
|
2023-03-13 17:03:50.295947 |
183 |
58320106 |
Construction of concrete road from Khokan Rakshit house to Ram Karfa house |
202955 |
Construction of concrete road from Khokan Rakshit house to Ram Karfa house1 |
Plinth level |
-
latitude : 23.1019916,23.1019916
Longitude : 87.733527,87.733527
file name : Image_02032023165042260.png
|
2023-03-02 16:50:42.354771 |
184 |
58320106 |
Construction of concrete road from Khokan Rakshit house to Ram Karfa house |
202955 |
Construction of concrete road from Khokan Rakshit house to Ram Karfa house1 |
Completion of work |
-
latitude : 23.10237712226808,23.10237712226808
Longitude : 87.73380445316434,87.73380445316434
file name : Image_16022023153748436.png
|
2023-02-16 15:37:48.537942 |
185 |
58344461 |
Construction of pucca drain from Chandan Neogi house to Satish Goswami house with cover |
190000 |
Construction of pucca drain from Chandan Neogi house to Satish Goswami house with cover 1 |
Roof laid |
-
latitude : 23.102359981276095,23.102359981276095
Longitude : 87.73381291888654,87.73381291888654
file name : Image_13032023134752819.png
|
2023-03-13 13:47:52.909595 |
186 |
58344461 |
Construction of pucca drain from Chandan Neogi house to Satish Goswami house with cover |
190000 |
Construction of pucca drain from Chandan Neogi house to Satish Goswami house with cover 1 |
Plinth level |
-
latitude : 23.10237490106374,23.10237490106374
Longitude : 87.73379758000374,87.73379758000374
file name : Image_24022023143602725.png
|
2023-02-24 14:36:02.821026 |
187 |
58344461 |
Construction of pucca drain from Chandan Neogi house to Satish Goswami house with cover |
190000 |
Construction of pucca drain from Chandan Neogi house to Satish Goswami house with cover 1 |
Completion of work |
-
latitude : 23.102610264904797,23.102610264904797
Longitude : 87.73443100042641,87.73443100042641
file name : Image_16022023154556700.png
|
2023-02-16 15:45:56.809445 |
188 |
58324360 |
Construction of Concrete road from Nabakuamr Ruidas house to Mirtunjoy Ruidas house |
50000 |
Construction of Concrete road from Nabakuamr Ruidas house to Mirtunjoy Ruidas house1 |
Roof laid |
-
latitude : 23.107962990179658,23.107962990179658
Longitude : 87.72407725453377,87.72407725453377
file name : Image_21032023154923999.png
|
2023-03-21 15:49:24.106606 |
189 |
58324360 |
Construction of Concrete road from Nabakuamr Ruidas house to Mirtunjoy Ruidas house |
50000 |
Construction of Concrete road from Nabakuamr Ruidas house to Mirtunjoy Ruidas house1 |
Plinth level |
-
latitude : 23.107981137000024,23.107981137000024
Longitude : 87.72382437251508,87.72382437251508
file name : Image_11032023142620366.png
|
2023-03-11 14:26:20.442721 |
190 |
58324360 |
Construction of Concrete road from Nabakuamr Ruidas house to Mirtunjoy Ruidas house |
50000 |
Construction of Concrete road from Nabakuamr Ruidas house to Mirtunjoy Ruidas house1 |
Plinth level |
-
latitude : 23.10799433849752,23.10799433849752
Longitude : 87.72390861064196,87.72390861064196
file name : Image_13032023122100988.png
|
2023-03-13 12:21:01.085659 |
191 |
58324360 |
Construction of Concrete road from Nabakuamr Ruidas house to Mirtunjoy Ruidas house |
50000 |
Construction of Concrete road from Nabakuamr Ruidas house to Mirtunjoy Ruidas house1 |
Completion of work |
-
latitude : 23.10809056274593,23.10809056274593
Longitude : 87.7239769231528,87.7239769231528
file name : Image_16022023165000508.png
|
2023-02-16 16:50:00.616213 |
192 |
58344798 |
Construction of pucca drain from Sadhan Ruidas cow shed to Fanindra Ruidas Land |
190000 |
Construction of pucca drain from Sadhan Ruidas cow shed to Fanindra Ruidas Land 1 |
Roof laid |
-
latitude : 23.108271486125886,23.108271486125886
Longitude : 87.72345305420458,87.72345305420458
file name : Image_29032023120039300.png
|
2023-03-29 12:00:39.433675 |
193 |
58344798 |
Construction of pucca drain from Sadhan Ruidas cow shed to Fanindra Ruidas Land |
190000 |
Construction of pucca drain from Sadhan Ruidas cow shed to Fanindra Ruidas Land 1 |
Plinth level |
-
latitude : 23.108211429789662,23.108211429789662
Longitude : 87.7233798801899,87.7233798801899
file name : Image_21032023155442821.png
|
2023-03-21 15:54:42.959235 |
194 |
58344798 |
Construction of pucca drain from Sadhan Ruidas cow shed to Fanindra Ruidas Land |
190000 |
Construction of pucca drain from Sadhan Ruidas cow shed to Fanindra Ruidas Land 1 |
Completion of work |
-
latitude : 23.107992745935917,23.107992745935917
Longitude : 87.72333377972245,87.72333377972245
file name : Image_20022023130550485.png
|
2023-02-20 13:05:50.584005 |
195 |
58333068 |
Constuction of pucca drain from Jiban Ghosh Khamar to Chand pukur Mohana with cover |
190000 |
Constuction of pucca drain from Jiban Ghosh Khamar to Chand pukur Mohana with cover 1 |
Roof laid |
-
latitude : 23.121226388029754,23.121226388029754
Longitude : 87.69932423718274,87.69932423718274
file name : Image_21032023172749090.png
|
2023-03-21 17:27:49.193576 |
196 |
58333068 |
Constuction of pucca drain from Jiban Ghosh Khamar to Chand pukur Mohana with cover |
190000 |
Constuction of pucca drain from Jiban Ghosh Khamar to Chand pukur Mohana with cover 1 |
Plinth level |
-
latitude : 23.121259370818734,23.12125798780471
Longitude : 87.69939808174968,87.69939741119742
file name : Image_22022023174236504.png
|
2023-02-22 17:42:36.59836 |
197 |
58333068 |
Constuction of pucca drain from Jiban Ghosh Khamar to Chand pukur Mohana with cover |
190000 |
Constuction of pucca drain from Jiban Ghosh Khamar to Chand pukur Mohana with cover 1 |
Plinth level |
-
latitude : 23.12126942910254,23.12126942910254
Longitude : 87.69909021444619,87.69909021444619
file name : Image_22022023174614578.png
|
2023-02-22 17:46:14.682472 |
198 |
58333068 |
Constuction of pucca drain from Jiban Ghosh Khamar to Chand pukur Mohana with cover |
190000 |
Constuction of pucca drain from Jiban Ghosh Khamar to Chand pukur Mohana with cover 1 |
Completion of work |
-
latitude : 23.1212196405977,23.1212196405977
Longitude : 87.69939598627388,87.69939598627388
file name : Image_16022023162027057.png
|
2023-02-16 16:20:27.168499 |
199 |
58347832 |
New Sinking of tube well with Plat form and soak pit at Bamun gore par |
51000 |
New Sinking of tube well with Plat form and soak pit at Bamun gore par 1 |
Roof laid |
-
latitude : 23.095017769373953
Longitude : 87.72629611194134
file name : Image_28032023132917441.png
|
2023-03-28 13:29:17.54197 |
200 |
58347832 |
New Sinking of tube well with Plat form and soak pit at Bamun gore par |
51000 |
New Sinking of tube well with Plat form and soak pit at Bamun gore par 1 |
Plinth level |
-
latitude : 23.094973554834723
Longitude : 87.72629510611296
file name : Image_28032023132009310.png
|
2023-03-28 13:20:09.474455 |
201 |
58347832 |
New Sinking of tube well with Plat form and soak pit at Bamun gore par |
51000 |
New Sinking of tube well with Plat form and soak pit at Bamun gore par 1 |
Completion of work |
-
latitude : 23.095054985024035
Longitude : 87.72623961791396
file name : Image_21032023172543201.png
|
2023-03-21 17:25:43.31012 |
202 |
58347481 |
New Sinking of tube well with Plat form and soak pit at Near Milan Roy house |
51000 |
New Sinking of tube well with Plat form and soak pit at Near Milan Roy house 1 |
Roof laid |
-
latitude : 23.10239464044571
Longitude : 87.7287567872554
file name : Image_28032023133849882.png
|
2023-03-28 13:38:49.985759 |
203 |
58347481 |
New Sinking of tube well with Plat form and soak pit at Near Milan Roy house |
51000 |
New Sinking of tube well with Plat form and soak pit at Near Milan Roy house 1 |
Plinth level |
-
latitude : 23.102459013462067
Longitude : 87.72873507812619
file name : Image_28032023133603079.png
|
2023-03-28 13:36:03.226016 |
204 |
58347481 |
New Sinking of tube well with Plat form and soak pit at Near Milan Roy house |
51000 |
New Sinking of tube well with Plat form and soak pit at Near Milan Roy house 1 |
Completion of work |
-
latitude : 23.10246324632317
Longitude : 87.72875444032252
file name : Image_21032023161650402.png
|
2023-03-21 16:16:50.488579 |
205 |
58322044 |
Construction of Concrete road from Suvash Roy house to Main road |
148060 |
Construction of Concrete road from Suvash Roy house to Main road1 |
Plinth level |
-
latitude : 23.104621502570808,23.104621502570808
Longitude : 87.73247583769262,87.73247583769262
file name : Image_23052023121221501.png
|
2023-05-23 12:12:21.600413 |
206 |
58322044 |
Construction of Concrete road from Suvash Roy house to Main road |
148060 |
Construction of Concrete road from Suvash Roy house to Main road1 |
Completion of work |
-
latitude : 23.10460134409368,23.10460134409368
Longitude : 87.73234784603119,87.73234784603119
file name : Image_16052023115400510.png
|
2023-05-16 11:54:00.616824 |
207 |
58035703 |
Construction of concrete from Boliara Shyam Pal House to Alok Dey house |
198040 |
Construction of concrete from Boliara Shyam Pal House to Alok Dey house1 |
Roof laid |
-
latitude : 23.114808155223727,23.114808155223727
Longitude : 87.7140928991139,87.7140928991139
file name : Image_31052023132604746.png
|
2023-05-31 13:26:04.845305 |
208 |
58035703 |
Construction of concrete from Boliara Shyam Pal House to Alok Dey house |
198040 |
Construction of concrete from Boliara Shyam Pal House to Alok Dey house1 |
Plinth level |
-
latitude : 23.114294637925923,23.114294637925923
Longitude : 87.71375418640673,87.71375418640673
file name : Image_26052023140758193.png
|
2023-05-26 14:07:58.285001 |
209 |
58035703 |
Construction of concrete from Boliara Shyam Pal House to Alok Dey house |
198040 |
Construction of concrete from Boliara Shyam Pal House to Alok Dey house1 |
Completion of work |
-
latitude : 23.114315131679177,23.114315131679177
Longitude : 87.71376902237535,87.71376902237535
file name : Image_16052023123235498.png
|
2023-05-16 12:32:35.605196 |
210 |
58051188 |
Construction of Concrete road from Monsa tola to Post office via Anupam Ghosh house |
201310 |
Construction of Concrete road from Monsa tola to Post office via Anupam Ghosh house1 |
Roof laid |
-
latitude : 23.094982523471117,23.094982523471117
Longitude : 87.70628163591027,87.70628163591027
file name : Image_23052023145305927.png
|
2023-05-23 14:53:06.022248 |
211 |
58051188 |
Construction of Concrete road from Monsa tola to Post office via Anupam Ghosh house |
201310 |
Construction of Concrete road from Monsa tola to Post office via Anupam Ghosh house1 |
Plinth level |
-
latitude : 23.094629938714206,23.094629938714206
Longitude : 87.70611173473299,87.70611173473299
file name : Image_17052023144354963.png
|
2023-05-17 14:43:55.068435 |
212 |
58051188 |
Construction of Concrete road from Monsa tola to Post office via Anupam Ghosh house |
201310 |
Construction of Concrete road from Monsa tola to Post office via Anupam Ghosh house1 |
Plinth level |
-
latitude : 23.094650683924556,23.094650683924556
Longitude : 87.70612380467355,87.70612380467355
file name : Image_18052023152537723.png
|
2023-05-18 15:25:37.823603 |
213 |
58051188 |
Construction of Concrete road from Monsa tola to Post office via Anupam Ghosh house |
201310 |
Construction of Concrete road from Monsa tola to Post office via Anupam Ghosh house1 |
Completion of work |
-
latitude : 23.0939172,23.0939172
Longitude : 87.7059878,87.7059878
file name : Image_15052023160853904.png
|
2023-05-15 16:08:54.008823 |
214 |
58049572 |
Construction of concrete from Ruidas para Lakshmi tola to Chapra pukur |
149785 |
Construction of concrete from Ruidas para Lakshmi tola to Chapra pukur1 |
Roof laid |
-
latitude : 23.101525981910527,23.101525981910527
Longitude : 87.71247527562082,87.71247527562082
file name : Image_23052023143743555.png
|
2023-05-23 14:37:43.662975 |
215 |
58049572 |
Construction of concrete from Ruidas para Lakshmi tola to Chapra pukur |
149785 |
Construction of concrete from Ruidas para Lakshmi tola to Chapra pukur1 |
Plinth level |
-
latitude : 23.10162832494825,23.10162832494825
Longitude : 87.71248592063785,87.71248592063785
file name : Image_22052023145114236.png
|
2023-05-22 14:51:14.44726 |
216 |
58049572 |
Construction of concrete from Ruidas para Lakshmi tola to Chapra pukur |
149785 |
Construction of concrete from Ruidas para Lakshmi tola to Chapra pukur1 |
Completion of work |
-
latitude : 23.101512319408357,23.101512319408357
Longitude : 87.71244912408292,87.71244912408292
file name : Image_16052023183617624.png
|
2023-05-16 18:36:17.719746 |
217 |
58346180 |
Maintenance of tube well with under GP area |
125000 |
Maintenance of tube well with under GP area1 |
Roof laid |
-
latitude : 23.10908448882401
Longitude : 87.73019487038255
file name : Image_17052023145659122.png
|
2023-05-17 14:56:59.218905 |
218 |
58343453 |
Construction of pucca drain from Gorer tola temata to Basanta Barat house |
129004 |
Construction of pucca drain from Gorer tola temata to Basanta Barat house 1 |
Roof laid |
-
latitude : 23.10479488223791,23.104780800640583,23.104780800640583
Longitude : 87.73246644996107,87.7324475068599,87.7324475068599
file name : Image_28062023132830025.png
|
2023-06-28 13:28:30.004383 |
219 |
58343453 |
Construction of pucca drain from Gorer tola temata to Basanta Barat house |
129004 |
Construction of pucca drain from Gorer tola temata to Basanta Barat house 1 |
Plinth level |
-
latitude : 23.10469777788967,23.10469777788967
Longitude : 87.73231968283653,87.73231968283653
file name : Image_31052023145824430.png
|
2023-05-31 14:58:24.524897 |
220 |
58343453 |
Construction of pucca drain from Gorer tola temata to Basanta Barat house |
129004 |
Construction of pucca drain from Gorer tola temata to Basanta Barat house 1 |
Completion of work |
-
latitude : 23.10533790383488,23.10533790383488
Longitude : 87.732601063326,87.732601063326
file name : Image_26052023133448078.png
|
2023-05-26 13:34:48.173518 |
221 |
48640731 |
Construction of pucca drain from Nimai Tas house towards Ira Bati ghosh house with cover |
179416 |
Construction of pucca drain from Nimai Tas house towards Ira Bati ghosh house with cover1 |
Roof laid |
-
latitude : 23.104125964455307,23.104125964455307
Longitude : 87.73470726795495,87.73470726795495
file name : Image_31052022131750146.png
|
2022-05-31 13:17:50.237649 |
222 |
48640731 |
Construction of pucca drain from Nimai Tas house towards Ira Bati ghosh house with cover |
179416 |
Construction of pucca drain from Nimai Tas house towards Ira Bati ghosh house with cover1 |
Completion of work |
-
latitude : 23.10405359,23.10399788
Longitude : 87.73466259,87.73500954
file name : Image_05052022115947747.png
|
2022-05-05 11:59:47.873719 |
223 |
58340215 |
Construction of pucca nala from Ganra Ghosh shop to Biren Ghosh Land with cover |
129004 |
Construction of pucca nala from Ganra Ghosh shop to Biren Ghosh Land with cover 1 |
Roof laid |
-
latitude : 23.101728446781635,23.101728446781635
Longitude : 87.7007195726037,87.7007195726037
file name : Image_28062023123834731.png
|
2023-06-28 12:38:34.829194 |
224 |
58340215 |
Construction of pucca nala from Ganra Ghosh shop to Biren Ghosh Land with cover |
129004 |
Construction of pucca nala from Ganra Ghosh shop to Biren Ghosh Land with cover 1 |
Plinth level |
-
latitude : 23.101721489802003,23.101721489802003
Longitude : 87.70072342827916,87.70072342827916
file name : Image_09062023155328804.png
|
2023-06-09 15:53:28.901112 |
225 |
58340215 |
Construction of pucca nala from Ganra Ghosh shop to Biren Ghosh Land with cover |
129004 |
Construction of pucca nala from Ganra Ghosh shop to Biren Ghosh Land with cover 1 |
Completion of work |
-
latitude : 23.101781252771616,23.101781252771616
Longitude : 87.70055855624378,87.70055855624378
file name : Image_02062023160108125.png
|
2023-06-02 16:01:08.223279 |
226 |
58340215 |
Construction of pucca nala from Ganra Ghosh shop to Biren Ghosh Land with cover |
129004 |
Construction of pucca nala from Ganra Ghosh shop to Biren Ghosh Land with cover 1 |
Completion of work |
-
latitude : 23.101747180335224,23.101747180335224
Longitude : 87.70076483488083,87.70076483488083
file name : Image_02062023154711262.png
|
2023-06-02 15:47:11.499788 |
227 |
58339725 |
Construction of pucca nala from Biren Rudra house to Main Nala(Bandhi Nala) with cover |
129004 |
Construction of pucca nala from Biren Rudra house to Main Nala(Bandhi Nala) with cover 1 |
Roof laid |
-
latitude : 23.111456651240587,23.111456651240587
Longitude : 87.7152203489095,87.7152203489095
file name : Image_28062023132617298.png
|
2023-06-28 13:26:17.247317 |
228 |
58339725 |
Construction of pucca nala from Biren Rudra house to Main Nala(Bandhi Nala) with cover |
129004 |
Construction of pucca nala from Biren Rudra house to Main Nala(Bandhi Nala) with cover 1 |
Plinth level |
-
latitude : 23.111314619891346,23.111314619891346
Longitude : 87.71526519209146,87.71526519209146
file name : Image_14062023153147880.png
|
2023-06-14 15:31:47.985402 |
229 |
58339725 |
Construction of pucca nala from Biren Rudra house to Main Nala(Bandhi Nala) with cover |
129004 |
Construction of pucca nala from Biren Rudra house to Main Nala(Bandhi Nala) with cover 1 |
Completion of work |
-
latitude : 23.111181808635592,23.111181808635592
Longitude : 87.71531950682402,87.71531950682402
file name : Image_26052023134812170.png
|
2023-05-26 13:48:12.273026 |
230 |
58341094 |
Constuction of pucca drain from Biswanath Mondal's house to Dom Gore with cover |
189419 |
Constuction of pucca drain from Biswanath Mondal's house to Dom Gore with cover 1 |
Plinth level |
-
latitude : 23.094505676999688,23.094505676999688
Longitude : 87.71294508129358,87.71294508129358
file name : Image_14062023183302579.png
|
2023-06-14 18:33:02.678594 |
231 |
58341094 |
Constuction of pucca drain from Biswanath Mondal's house to Dom Gore with cover |
189419 |
Constuction of pucca drain from Biswanath Mondal's house to Dom Gore with cover 1 |
Completion of work |
-
latitude : 23.094438915140927,23.094438915140927
Longitude : 87.71302278153598,87.71302278153598
file name : Image_02062023170630321.png
|
2023-06-02 17:06:30.428035 |
232 |
66604420 |
Construction of Community Sanitary Complex |
89991 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.109513223171234
Longitude : 87.72956924512982
file name : Image_28062023122227755.png
|
2023-06-28 12:22:27.896017 |
233 |
66604420 |
Construction of Community Sanitary Complex |
89991 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.109509241767228
Longitude : 87.72941233590245
file name : Image_09062023145026733.png
|
2023-06-09 14:50:26.815841 |
234 |
66604420 |
Construction of Community Sanitary Complex |
89991 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.10943979769945
Longitude : 87.72944552823901
file name : Image_17052023145804591.png
|
2023-05-17 14:58:04.709717 |
235 |
66604420 |
Construction of Community Sanitary Complex |
89991 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.109472235664725
Longitude : 87.72951484657824
file name : Image_06032023185019037.png
|
2023-03-06 18:50:19.152067 |
236 |
66604511 |
Creation of drainage channel for management of grey water |
61600 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.116168077103794,23.116168077103794
Longitude : 87.71319980733097,87.71319980733097
file name : Image_18082023152654316.png
|
2023-08-18 15:26:54.414454 |
237 |
66604511 |
Creation of drainage channel for management of grey water |
61600 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.116119587793946,23.116119587793946
Longitude : 87.71321296691895,87.71321296691895
file name : Image_21062023121803586.png
|
2023-06-21 12:18:03.704427 |
238 |
66604511 |
Creation of drainage channel for management of grey water |
61600 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.116115354932845,23.116115354932845
Longitude : 87.71297944709659,87.71297944709659
file name : Image_15062023140716003.png
|
2023-06-15 14:07:16.104064 |
239 |
58344178 |
Construction of pucca drain from Manik Hati house to Kunal Dutta house with cover |
189419 |
Construction of pucca drain from Manik Hati house to Kunal Dutta house with cover 1 |
Roof laid |
-
latitude : 23.102101902477443,23.102101902477443
Longitude : 87.73252445273101,87.73252445273101
file name : Image_08092023135257743.png
|
2023-09-08 13:52:57.839375 |
240 |
58344178 |
Construction of pucca drain from Manik Hati house to Kunal Dutta house with cover |
189419 |
Construction of pucca drain from Manik Hati house to Kunal Dutta house with cover 1 |
Plinth level |
-
latitude : 23.102169544436038,23.102169544436038
Longitude : 87.7325801923871,87.7325801923871
file name : Image_07092023170848615.png
|
2023-09-07 17:08:48.690331 |
241 |
58344178 |
Construction of pucca drain from Manik Hati house to Kunal Dutta house with cover |
189419 |
Construction of pucca drain from Manik Hati house to Kunal Dutta house with cover 1 |
Completion of work |
-
latitude : 23.10196129605174,23.10196129605174
Longitude : 87.73254130035639,87.73254130035639
file name : Image_18082023115134521.png
|
2023-08-18 11:51:34.616819 |
242 |
58323435 |
Construction of Concrete road from Ranjit Master house to Girls school |
97985 |
Construction of Concrete road from Ranjit Master house to Girls school1 |
Roof laid |
-
latitude : 23.106350395828485,23.106350395828485
Longitude : 87.73022923618555,87.73022923618555
file name : Image_04102023151533814.png
|
2023-10-04 15:15:33.944354 |
243 |
58323435 |
Construction of Concrete road from Ranjit Master house to Girls school |
97985 |
Construction of Concrete road from Ranjit Master house to Girls school1 |
Plinth level |
-
latitude : 23.106404249556363,23.106404249556363
Longitude : 87.73002530448139,87.73002530448139
file name : Image_04102023123524798.png
|
2023-10-04 12:35:25.042531 |
244 |
58323435 |
Construction of Concrete road from Ranjit Master house to Girls school |
97985 |
Construction of Concrete road from Ranjit Master house to Girls school1 |
Plinth level |
-
latitude : 23.106359699741006,23.106359699741006
Longitude : 87.73021339438856,87.73021339438856
file name : Image_26092023130242386.png
|
2023-09-26 13:02:42.505259 |
245 |
58323435 |
Construction of Concrete road from Ranjit Master house to Girls school |
97985 |
Construction of Concrete road from Ranjit Master house to Girls school1 |
Completion of work |
-
latitude : 23.10652499087155,23.10652499087155
Longitude : 87.7303855586797,87.7303855586797
file name : Image_21092023120717187.png
|
2023-09-21 12:07:17.294124 |
246 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 1 |
Completion of work |
-
latitude : 23.10398368164897
Longitude : 87.73029805161059
file name : Image_04102023154536873.png
|
2023-10-04 15:45:36.958925 |
247 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 1 |
Completion of work |
-
latitude : 23.10405237134546
Longitude : 87.7303977124393
file name : Image_26092023124343769.png
|
2023-09-26 12:43:43.88329 |
248 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 2 |
Completion of work |
-
latitude : 23.106525912880898
Longitude : 87.72815153002739
file name : Image_04102023153551782.png
|
2023-10-04 15:35:51.915933 |
249 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 2 |
Completion of work |
-
latitude : 23.10647105332464
Longitude : 87.72809067741036
file name : Image_26092023124349306.png
|
2023-09-26 12:43:49.452582 |
250 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 3 |
Plinth level |
-
latitude : 23.10879372060299
Longitude : 87.72699566558003
file name : Image_21112023163518314.png
|
2023-11-21 16:35:18.423671 |
251 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 3 |
Completion of work |
-
latitude : 23.10880788601935
Longitude : 87.72702382877469
file name : Image_04102023153043578.png
|
2023-10-04 15:30:43.665099 |
252 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 3 |
Completion of work |
-
latitude : 23.10883822850883
Longitude : 87.72713120095432
file name : Image_26092023130422935.png
|
2023-09-26 13:04:23.036768 |
253 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 4 |
Plinth level |
-
latitude : 23.12259561382234
Longitude : 87.73117739707232
file name : Image_21112023162434965.png
|
2023-11-21 16:24:35.060592 |
254 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 4 |
Plinth level |
-
latitude : 23.12259490136057
Longitude : 87.73109785281122
file name : Image_21112023162427185.png
|
2023-11-21 16:24:27.276171 |
255 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 4 |
Completion of work |
-
latitude : 23.122605294920504
Longitude : 87.73106960579753
file name : Image_04102023125436112.png
|
2023-10-04 12:54:36.21087 |
256 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 4 |
Completion of work |
-
latitude : 23.122566402889788
Longitude : 87.73102811537683
file name : Image_26092023132625774.png
|
2023-09-26 13:26:25.888 |
257 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 5 |
Plinth level |
-
latitude : 23.106868900358677
Longitude : 87.73257667198777
file name : Image_30112023130413753.png
|
2023-11-30 13:04:13.677289 |
258 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 5 |
Completion of work |
-
latitude : 23.106852555647492
Longitude : 87.73255337029696
file name : Image_04102023154015202.png
|
2023-10-04 15:40:15.293185 |
259 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 6 |
Completion of work |
-
latitude : 23.09602669905871
Longitude : 87.73393646813929
file name : Image_10102023122053525.png
|
2023-10-10 12:20:53.946207 |
260 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 6 |
Completion of work |
-
latitude : 23.09599220752716
Longitude : 87.73396756500006
file name : Image_26092023135226481.png
|
2023-09-26 13:52:26.571359 |
261 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 7 |
Completion of work |
-
latitude : 23.095575962215662
Longitude : 87.73391014896333
file name : Image_10102023122236429.png
|
2023-10-10 12:22:36.532781 |
262 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 8 |
Completion of work |
-
latitude : 23.093866892158985
Longitude : 87.73319601081312
file name : Image_10102023122112659.png
|
2023-10-10 12:21:12.766654 |
263 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 8 |
Completion of work |
-
latitude : 23.09392937924713
Longitude : 87.73320958949625
file name : Image_26092023135230879.png
|
2023-09-26 13:52:30.972402 |
264 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 9 |
Completion of work |
-
latitude : 23.10564153827727
Longitude : 87.73554973304272
file name : Image_10102023123419720.png
|
2023-10-10 12:34:19.845885 |
265 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 9 |
Completion of work |
-
latitude : 23.105704695917666
Longitude : 87.73555928841233
file name : Image_26092023142627378.png
|
2023-09-26 14:26:27.462682 |
266 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 10 |
Completion of work |
-
latitude : 23.105278140865266
Longitude : 87.73255504667759
file name : Image_04102023154853641.png
|
2023-10-04 15:48:53.72425 |
267 |
58346637 |
Construction of soak pit and plat form for tube well |
74538 |
Construction of soak pit and plat form for tube well 10 |
Completion of work |
-
latitude : 23.1052790209651
Longitude : 87.7325767558068
file name : Image_26092023142631311.png
|
2023-09-26 14:26:31.395864 |
268 |
68818803 |
Procurement of Computer |
110000 |
Procurement of Computer1 |
|
-
latitude : 23.1092004
Longitude : 87.7305636
file name : Image_21092023121144413.png
|
2023-09-21 12:11:44.647082 |
269 |
67715795 |
Construction of roads |
194898 |
Construction of roads1 |
Plinth level |
-
latitude : 23.104557674378157,23.10455247759819
Longitude : 87.73702193051577,87.73702754639089
file name : Image_03112023152345555.png
|
2023-11-03 15:23:45.813294 |
270 |
67715795 |
Construction of roads |
194898 |
Construction of roads1 |
Completion of work |
-
latitude : 23.104510442353785,23.104510442353785
Longitude : 87.7370566315949,87.7370566315949
file name : Image_02112023162814305.png
|
2023-11-02 16:28:14.386856 |
271 |
67741477 |
Creation of drainage channel for management of grey water |
179245 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.09915524441749
Longitude : 87.73511454463005
file name : Image_14122023123209890.png
|
2023-12-14 12:32:09.985814 |
272 |
67741477 |
Creation of drainage channel for management of grey water |
179245 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.09922209009528
Longitude : 87.73505955934525
file name : Image_14122023123110682.png
|
2023-12-14 12:31:10.779512 |
273 |
67741477 |
Creation of drainage channel for management of grey water |
179245 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.09886648785323
Longitude : 87.73519333451986
file name : Image_06122023155323282.png
|
2023-12-06 15:53:23.370397 |
274 |
67741477 |
Creation of drainage channel for management of grey water |
179245 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.0984787
Longitude : 87.7352106
file name : Image_06112023154224273.png
|
2023-11-06 15:42:24.387883 |
275 |
67709878 |
Construction of roads |
178447 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1159196,23.1159196
Longitude : 87.7115657,87.7115657
file name : Image_20112023131247230.png
|
2023-11-20 13:12:47.324277 |
276 |
67709878 |
Construction of roads |
178447 |
Construction of roads1 |
Plinth level |
-
latitude : 23.112956886179745,23.112956886179745
Longitude : 87.7159262727946,87.7159262727946
file name : Image_01112023170143822.png
|
2023-11-01 17:01:43.917747 |
277 |
67709878 |
Construction of roads |
178447 |
Construction of roads1 |
Completion of work |
-
latitude : 23.113078884780407,23.113078884780407
Longitude : 87.71582652814686,87.71582652814686
file name : Image_14102023145643834.png
|
2023-10-14 14:56:43.921086 |
278 |
67745824 |
Drinking water facilities |
400000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 23.1092101
Longitude : 87.7305359
file name : Image_06122023141715639.png
|
2023-12-06 14:17:15.733071 |
279 |
67745824 |
Drinking water facilities |
400000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 23.1091796
Longitude : 87.7305218
file name : Image_30112023185501057.png
|
2023-11-30 18:55:01.13947 |
280 |
67745824 |
Drinking water facilities |
400000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 23.1091812
Longitude : 87.7305265
file name : Image_30112023185220153.png
|
2023-11-30 18:52:20.231734 |
281 |
67745824 |
Drinking water facilities |
400000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 23.1091797
Longitude : 87.7305229
file name : Image_30112023185043954.png
|
2023-11-30 18:50:44.038649 |
282 |
67745824 |
Drinking water facilities |
400000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 23.1091808
Longitude : 87.7305263
file name : Image_30112023184533680.png
|
2023-11-30 18:45:33.759355 |
283 |
68825616 |
Procurement of Diesel and Petrol for Tractor Generator, Office vehicles etc. |
30000 |
Procurement of Diesel and Petrol for Tractor Generator, Office vehicles etc.1 |
Roof laid |
-
latitude : 23.1092083
Longitude : 87.7305396
file name : Image_30112023132054115.png
|
2023-11-30 13:20:54.201109 |
284 |
68825616 |
Procurement of Diesel and Petrol for Tractor Generator, Office vehicles etc. |
30000 |
Procurement of Diesel and Petrol for Tractor Generator, Office vehicles etc.1 |
Plinth level |
-
latitude : 23.1092236
Longitude : 87.7305512
file name : Image_30112023131239684.png
|
2023-11-30 13:12:39.772586 |
285 |
68825616 |
Procurement of Diesel and Petrol for Tractor Generator, Office vehicles etc. |
30000 |
Procurement of Diesel and Petrol for Tractor Generator, Office vehicles etc.1 |
Completion of work |
-
latitude : 23.1091811
Longitude : 87.7305271
file name : Image_30112023130644621.png
|
2023-11-30 13:06:43.834037 |
286 |
67746314 |
Drinking water facilities |
160000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 23.109178
Longitude : 87.7305276
file name : Image_30112023134825983.png
|
2023-11-30 13:48:26.108319 |
287 |
67746314 |
Drinking water facilities |
160000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 23.1091779
Longitude : 87.7305256
file name : Image_30112023132604105.png
|
2023-11-30 13:26:04.228117 |
288 |
67746314 |
Drinking water facilities |
160000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 23.1091775
Longitude : 87.7305274
file name : Image_30112023132344976.png
|
2023-11-30 13:23:45.115049 |
289 |
67709482 |
Construction of roads |
178447 |
Construction of roads1 |
Roof laid |
-
latitude : 23.114111367613077,23.114111367613077
Longitude : 87.7143326215446,87.7143326215446
file name : Image_30112023180814007.png
|
2023-11-30 18:08:14.163427 |
290 |
67709482 |
Construction of roads |
178447 |
Construction of roads1 |
Plinth level |
-
latitude : 23.114171298220754,23.114171298220754
Longitude : 87.7142565138638,87.7142565138638
file name : Image_20112023143007589.png
|
2023-11-20 14:30:07.704673 |
291 |
67709482 |
Construction of roads |
178447 |
Construction of roads1 |
Completion of work |
-
latitude : 23.114240365102887,23.114240365102887
Longitude : 87.71427797153592,87.71427797153592
file name : Image_03112023143026499.png
|
2023-11-03 14:30:26.596395 |
292 |
67709301 |
Construction of roads |
203899 |
Construction of roads1 |
Roof laid |
-
latitude : 23.120190552435815,23.120190552435815
Longitude : 87.6992551703006,87.6992551703006
file name : Image_14122023115824366.png
|
2023-12-14 11:58:24.471262 |
293 |
67709301 |
Construction of roads |
203899 |
Construction of roads1 |
Plinth level |
-
latitude : 23.120147679001093,23.120147679001093
Longitude : 87.69927344284952,87.69927344284952
file name : Image_11122023125701242.png
|
2023-12-11 12:57:01.377884 |
294 |
67709301 |
Construction of roads |
203899 |
Construction of roads1 |
Completion of work |
-
latitude : 23.120158156380057,23.120158156380057
Longitude : 87.6992480456829,87.6992480456829
file name : Image_01112023170147579.png
|
2023-11-01 17:01:47.764504 |
295 |
67709301 |
Construction of roads |
203899 |
Construction of roads1 |
Completion of work |
-
latitude : 23.12021527905017,23.120219260454178,23.120219260454178
Longitude : 87.69929456524551,87.69927721470594,87.69927721470594
file name : Image_18102023162934938.png
|
2023-10-18 16:29:35.032343 |
296 |
67743707 |
Creation of drainage channel for management of grey water |
179245 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.1048179
Longitude : 87.7311414
file name : Image_23122023154458590.png
|
2023-12-23 15:44:58.277989 |
297 |
67743707 |
Creation of drainage channel for management of grey water |
179245 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.1050518
Longitude : 87.7313126
file name : Image_14122023124108071.png
|
2023-12-14 12:41:08.16423 |
298 |
67743707 |
Creation of drainage channel for management of grey water |
179245 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.1048177
Longitude : 87.731141
file name : Image_11122023124101031.png
|
2023-12-11 12:41:01.117843 |
299 |
67715560 |
Construction of roads |
234098 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1034941,23.1034941
Longitude : 87.73131,87.73131
file name : Image_20032024153256469.png
|
2024-03-20 15:32:56.553339 |
300 |
67715560 |
Construction of roads |
234098 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1042314,23.1042314
Longitude : 87.7311179,87.7311179
file name : Image_11032024154848346.png
|
2024-03-11 15:48:48.445195 |
301 |
67715560 |
Construction of roads |
234098 |
Construction of roads1 |
Completion of work |
-
latitude : 23.103900365531445,23.103900365531445
Longitude : 87.73110003210604,87.73110003210604
file name : Image_02032024155348143.png
|
2024-03-02 15:53:48.243024 |
302 |
67715016 |
Construction of roads |
214947 |
Construction of roads1 |
Roof laid |
-
latitude : 23.10467782896012,23.10467782896012
Longitude : 87.72708619013429,87.72708619013429
file name : Image_27032024133244598.png
|
2024-03-27 13:32:44.7131 |
303 |
67715016 |
Construction of roads |
214947 |
Construction of roads1 |
Plinth level |
-
latitude : 23.104557800106704,23.104557800106704
Longitude : 87.72688711993396,87.72688711993396
file name : Image_20032024154153576.png
|
2024-03-20 15:41:53.660375 |
304 |
67715016 |
Construction of roads |
214947 |
Construction of roads1 |
Completion of work |
-
latitude : 23.104572133161128,23.104572133161128
Longitude : 87.7270027063787,87.7270027063787
file name : Image_01032024163106357.png
|
2024-03-01 16:31:06.463115 |
305 |
67739921 |
Creation of drainage channel for management of grey water |
203818 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.1091546
Longitude : 87.7305588
file name : Image_19072024170022610.png
|
2024-07-19 17:00:22.673462 |
306 |
67739921 |
Creation of drainage channel for management of grey water |
203818 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.12108611688018
Longitude : 87.69910647533834
file name : Image_09072024182915329.png
|
2024-07-09 18:29:15.40505 |
307 |
67739921 |
Creation of drainage channel for management of grey water |
203818 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.1210866
Longitude : 87.6983068
file name : Image_12062024171433860.png
|
2024-06-12 17:14:33.969901 |
308 |
67741292 |
Creation of drainage channel for management of grey water |
213072 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.1096224
Longitude : 87.7107963
file name : Image_05082024165155756.png
|
2024-08-05 16:51:55.826332 |
309 |
67741292 |
Creation of drainage channel for management of grey water |
213072 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.10964733362198
Longitude : 87.71086092106998
file name : Image_09072024140214904.png
|
2024-07-09 14:02:14.976446 |
310 |
67741292 |
Creation of drainage channel for management of grey water |
213072 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.109810948371887
Longitude : 87.71096644923091
file name : Image_12062024140118075.png
|
2024-06-12 14:01:18.17865 |
311 |
67740515 |
Creation of drainage channel for management of grey water |
207526 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.11621841043234
Longitude : 87.71293116733432
file name : Image_13072024152832309.png
|
2024-07-13 15:28:32.374652 |
312 |
67740515 |
Creation of drainage channel for management of grey water |
207526 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.116609719581902
Longitude : 87.71301942877471
file name : Image_02072024135333003.png
|
2024-07-02 13:53:33.074148 |
313 |
67740515 |
Creation of drainage channel for management of grey water |
207526 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.116351389326155
Longitude : 87.71305446512997
file name : Image_13062024174323217.png
|
2024-06-13 17:43:23.331288 |
314 |
67740938 |
Creation of drainage channel for management of grey water |
204334 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.111059977672994
Longitude : 87.71609206683934
file name : Image_15072024131059141.png
|
2024-07-15 13:10:59.217025 |
315 |
67740938 |
Creation of drainage channel for management of grey water |
204334 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.1113182
Longitude : 87.7163473
file name : Image_02072024135120548.png
|
2024-07-02 13:51:20.618404 |
316 |
67740938 |
Creation of drainage channel for management of grey water |
204334 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.1113013
Longitude : 87.7163615
file name : Image_12062024140125471.png
|
2024-06-12 14:01:25.561651 |
317 |
67743280 |
Creation of drainage channel for management of grey water |
206224 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.095032353885472
Longitude : 87.70644441246986
file name : Image_15072024164901812.png
|
2024-07-15 16:49:01.874964 |
318 |
67743280 |
Creation of drainage channel for management of grey water |
206224 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.09507447294891
Longitude : 87.70637802779675
file name : Image_02072024124705672.png
|
2024-07-02 12:47:05.500936 |
319 |
67743280 |
Creation of drainage channel for management of grey water |
206224 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.09498038608581
Longitude : 87.70697398111224
file name : Image_12062024173242112.png
|
2024-06-12 17:32:42.227467 |
320 |
67744710 |
Creation of drainage channel for management of grey water |
208087 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.09947006870061
Longitude : 87.7275450155139
file name : Image_22012024124325271.png
|
2024-01-22 12:43:25.388541 |
321 |
67744710 |
Creation of drainage channel for management of grey water |
208087 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.09947220608592
Longitude : 87.72758608683944
file name : Image_18122023131226619.png
|
2023-12-18 13:12:26.727622 |
322 |
67744710 |
Creation of drainage channel for management of grey water |
208087 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.09947078116238
Longitude : 87.72777065634727
file name : Image_18122023130028298.png
|
2023-12-18 13:00:28.419267 |
323 |
67742971 |
Creation of drainage channel for management of grey water |
200676 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.10182370711118
Longitude : 87.70019385963678
file name : Image_18122023114234677.png
|
2023-12-18 11:42:34.773073 |
324 |
67742971 |
Creation of drainage channel for management of grey water |
200676 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.101832969114184
Longitude : 87.69991574808955
file name : Image_11122023145355411.png
|
2023-12-11 14:53:55.513428 |
325 |
67742971 |
Creation of drainage channel for management of grey water |
200676 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.1018398841843
Longitude : 87.6998894289136
file name : Image_11122023145127276.png
|
2023-12-11 14:51:27.38036 |
326 |
67714461 |
Construction of roads |
228617 |
Construction of roads1 |
Roof laid |
-
latitude : 23.10401645489037,23.10401645489037
Longitude : 87.71218350157142,87.71218350157142
file name : Image_11062024134513034.png
|
2024-06-11 13:45:13.1471 |
327 |
67714461 |
Construction of roads |
228617 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1040553,23.1040553
Longitude : 87.7120558,87.7120558
file name : Image_22032024121632798.png
|
2024-03-22 12:16:32.953326 |
328 |
67714461 |
Construction of roads |
228617 |
Construction of roads1 |
Completion of work |
-
latitude : 23.10405744239688,23.10405744239688
Longitude : 87.71223085932434,87.71223085932434
file name : Image_02032024132431434.png
|
2024-03-02 13:24:31.527601 |
329 |
89852465 |
BharatNet Wifi Facility/ Internet / Telephone |
40000 |
BharatNet Wifi Facility/ Internet / Telephone1 |
|
-
latitude : 23.1089819
Longitude : 87.7307247
file name : Image_13112024175818678.png
|
2024-11-13 17:58:18.757119 |
330 |
89853270 |
Electric connection |
40000 |
Electric connection1 |
Roof laid |
-
latitude : 23.1089855
Longitude : 87.7307157
file name : Image_13112024175330755.png
|
2024-11-13 17:53:30.891979 |
331 |
89853270 |
Electric connection |
40000 |
Electric connection1 |
Plinth level |
-
latitude : 23.1089797
Longitude : 87.7307275
file name : Image_13112024175136558.png
|
2024-11-13 17:51:36.672547 |
332 |
89853270 |
Electric connection |
40000 |
Electric connection1 |
Completion of work |
-
latitude : 23.1089812
Longitude : 87.7307234
file name : Image_13112024174930137.png
|
2024-11-13 17:49:30.26936 |
333 |
67721530 |
Procurement of Furniture |
50000 |
Procurement of Furniture1 |
|
-
latitude : 23.1091589
Longitude : 87.7305715
file name : Image_24072024174203612.png
|
2024-07-24 17:42:03.670697 |
334 |
97957912 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
299961 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Roof laid |
-
latitude : 23.1224086554721
Longitude : 87.69802076742053
file name : Image_24102024132344576.png
|
2024-10-24 13:23:44.66572 |
335 |
97957912 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
299961 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Plinth level |
-
latitude : 23.12253966461867
Longitude : 87.6980032492429
file name : Image_24102024132057426.png
|
2024-10-24 13:20:57.511186 |
336 |
97957912 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
299961 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 23.12225719448179
Longitude : 87.69814498722553
file name : Image_15072024131202493.png
|
2024-07-15 13:12:02.573692 |
337 |
89838684 |
Construction of roads |
148053 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1179944,23.1179944
Longitude : 87.7140238,87.7140238
file name : Image_25102024141335704.png
|
2024-10-25 14:13:35.769872 |
338 |
89838684 |
Construction of roads |
148053 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1179895,23.1179895
Longitude : 87.7140148,87.7140148
file name : Image_25102024141011676.png
|
2024-10-25 14:10:11.742267 |
339 |
89838684 |
Construction of roads |
148053 |
Construction of roads1 |
Completion of work |
-
latitude : 23.118082880973816,23.118080659769475
Longitude : 87.71359928883612,87.71360121667385
file name : Image_21102024104521703.png
|
2024-10-21 10:45:20.277137 |
340 |
89843428 |
Construction of roads |
219071 |
Construction of roads1 |
Roof laid |
-
latitude : 23.10856414027512,23.10856414027512
Longitude : 87.70900793373585,87.70900793373585
file name : Image_24102024133324189.png
|
2024-10-24 13:33:24.293741 |
341 |
89843428 |
Construction of roads |
219071 |
Construction of roads1 |
Plinth level |
-
latitude : 23.10890913940966,23.10890913940966
Longitude : 87.7085733320564,87.7085733320564
file name : Image_21102024140136663.png
|
2024-10-21 14:01:36.743077 |
342 |
89843428 |
Construction of roads |
219071 |
Construction of roads1 |
Completion of work |
-
latitude : 23.10893172863871,23.10893172863871
Longitude : 87.7084493637085,87.7084493637085
file name : Image_21102024120444206.png
|
2024-10-21 12:04:44.272988 |
343 |
67746171 |
Operation and Maintenance of drinking water supply system |
302820 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.109157495200634
Longitude : 87.73018397390842
file name : Image_24072024163423528.png
|
2024-07-24 16:34:23.599598 |
344 |
67746171 |
Operation and Maintenance of drinking water supply system |
302820 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.10911847744137
Longitude : 87.73020694032311
file name : Image_24072024163154440.png
|
2024-07-24 16:31:54.516424 |
345 |
67746171 |
Operation and Maintenance of drinking water supply system |
302820 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.109074514359236
Longitude : 87.73023619316518
file name : Image_24072024162741755.png
|
2024-07-24 16:27:41.827255 |
346 |
89828283 |
Creation of drainage channel for management of grey water |
88852 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.1091757
Longitude : 87.7305369
file name : Image_02112024170040422.png
|
2024-11-02 17:00:40.509928 |
347 |
89828283 |
Creation of drainage channel for management of grey water |
88852 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.104143482632935
Longitude : 87.73024247959256
file name : Image_30102024165136178.png
|
2024-10-30 16:51:36.268784 |
348 |
89828283 |
Creation of drainage channel for management of grey water |
88852 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.1040873657912
Longitude : 87.73025061003864
file name : Image_30102024164901024.png
|
2024-10-30 16:49:01.229289 |
349 |
89828785 |
Creation of drainage channel for management of grey water |
105000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.100249879062176
Longitude : 87.73524094372988
file name : Image_13112024141918906.png
|
2024-11-13 14:19:18.482555 |
350 |
89828785 |
Creation of drainage channel for management of grey water |
105000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.100339355878532
Longitude : 87.73518964648247
file name : Image_12112024155149251.png
|
2024-11-12 15:51:50.593602 |
351 |
89828785 |
Creation of drainage channel for management of grey water |
105000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.100263751111925
Longitude : 87.73523323237896
file name : Image_30102024171914608.png
|
2024-10-30 17:19:13.478188 |
352 |
89828606 |
Creation of drainage channel for management of grey water |
102817 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.101102905347943
Longitude : 87.7344021666795
file name : Image_31102024163423592.png
|
2024-10-31 16:34:23.669003 |
353 |
89828606 |
Creation of drainage channel for management of grey water |
102817 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.1010861415416
Longitude : 87.73453418165445
file name : Image_30102024170422355.png
|
2024-10-30 17:04:22.452453 |
354 |
89828606 |
Creation of drainage channel for management of grey water |
102817 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.10100249014795
Longitude : 87.73449956439435
file name : Image_30102024170119812.png
|
2024-10-30 17:01:19.939935 |
355 |
89581881 |
Creation of drainage channel for management of grey water |
149724 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.1091717
Longitude : 87.7305398
file name : Image_02112024151059666.png
|
2024-11-02 15:10:59.762948 |
356 |
89581881 |
Creation of drainage channel for management of grey water |
149724 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.1117536
Longitude : 87.7157267
file name : Image_30102024161320615.png
|
2024-10-30 16:13:20.721215 |
357 |
89581881 |
Creation of drainage channel for management of grey water |
149724 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.112077163532376
Longitude : 87.71561723202467
file name : Image_30102024160432927.png
|
2024-10-30 16:04:33.018129 |
358 |
89828955 |
Creation of drainage channel for management of grey water |
149993 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.1033398
Longitude : 87.7338591
file name : Image_13112024142255962.png
|
2024-11-13 14:22:56.049464 |
359 |
89828955 |
Creation of drainage channel for management of grey water |
149993 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.1033392
Longitude : 87.7338513
file name : Image_12112024160313843.png
|
2024-11-12 16:03:14.002011 |
360 |
89828955 |
Creation of drainage channel for management of grey water |
149993 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.1033393
Longitude : 87.7338594
file name : Image_12112024155937047.png
|
2024-11-12 15:59:37.40044 |
361 |
89828955 |
Creation of drainage channel for management of grey water |
149993 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.1033521
Longitude : 87.7338595
file name : Image_05112024165149594.png
|
2024-11-05 16:51:49.679514 |
362 |
89838747 |
Construction of roads |
299977 |
Construction of roads1 |
Roof laid |
-
latitude : 23.112923190928996,23.112923190928996
Longitude : 87.71205886267126,87.71205886267126
file name : Image_31102024160217381.png
|
2024-10-31 16:02:17.467704 |
363 |
89838747 |
Construction of roads |
299977 |
Construction of roads1 |
Plinth level |
-
latitude : 23.112527481280267,23.112527481280267
Longitude : 87.7133119571954,87.7133119571954
file name : Image_30102024164408280.png
|
2024-10-30 16:44:08.39973 |
364 |
89838747 |
Construction of roads |
299977 |
Construction of roads1 |
Completion of work |
-
latitude : 23.112576347775757,23.112550196237862
Longitude : 87.7132495958358,87.71323065273464
file name : Image_30102024162605155.png
|
2024-10-30 16:26:05.266298 |
365 |
89838086 |
Creation of drainage channel for management of grey water |
149977 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.10797116253525
Longitude : 87.72350116632879
file name : Image_13112024140921753.png
|
2024-11-13 14:09:21.84238 |
366 |
89838086 |
Creation of drainage channel for management of grey water |
149977 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.108028913848102
Longitude : 87.72355011664331
file name : Image_12112024163658281.png
|
2024-11-12 16:36:58.361245 |
367 |
89838086 |
Creation of drainage channel for management of grey water |
149977 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.107873806729913
Longitude : 87.7234898507595
file name : Image_05112024163649245.png
|
2024-11-05 16:36:49.333424 |
368 |
89838086 |
Creation of drainage channel for management of grey water |
149977 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.10795519500971
Longitude : 87.72342790849507
file name : Image_05112024163640634.png
|
2024-11-05 16:36:40.733704 |
369 |
89838205 |
Creation of drainage channel for management of grey water |
192141 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.10843857936561
Longitude : 87.7285329066217
file name : Image_13112024140156083.png
|
2024-11-13 14:01:56.171284 |
370 |
89838205 |
Creation of drainage channel for management of grey water |
192141 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.108513094484806
Longitude : 87.72847783751786
file name : Image_12112024163830966.png
|
2024-11-12 16:38:31.06022 |
371 |
89838205 |
Creation of drainage channel for management of grey water |
192141 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.10843455605209
Longitude : 87.72851027548313
file name : Image_05112024165016864.png
|
2024-11-05 16:50:16.957805 |
372 |
58349628 |
Installation of Solar Sub mersible at Akui Hat Tola |
349999 |
Installation of Solar Sub mersible at Akui Hat Tola 1 |
Roof laid |
-
latitude : 23.10684115625918
Longitude : 87.73207560181618
file name : Image_09062023170308624.png
|
2023-06-09 17:03:08.721683 |
373 |
58349628 |
Installation of Solar Sub mersible at Akui Hat Tola |
349999 |
Installation of Solar Sub mersible at Akui Hat Tola 1 |
Plinth level |
-
latitude : 23.10689496807754
Longitude : 87.73209638893604
file name : Image_23052023120710041.png
|
2023-05-23 12:07:10.138605 |
374 |
58349628 |
Installation of Solar Sub mersible at Akui Hat Tola |
349999 |
Installation of Solar Sub mersible at Akui Hat Tola 1 |
Completion of work |
-
latitude : 23.106895848177373
Longitude : 87.7321071177721
file name : Image_19052023173211834.png
|
2023-05-19 17:32:11.931432 |
375 |
58349955 |
Installation of Solar Sub mersible at Akui Fanri more |
349999 |
Installation of Solar Sub mersible at Akui Fanri more1 |
Plinth level |
-
latitude : 23.1123331
Longitude : 87.7293265
file name : Image_23052023135141347.png
|
2023-05-23 13:51:41.44542 |
376 |
58349955 |
Installation of Solar Sub mersible at Akui Fanri more |
349999 |
Installation of Solar Sub mersible at Akui Fanri more1 |
Completion of work |
-
latitude : 23.112285
Longitude : 87.7293197
file name : Image_19052023173519740.png
|
2023-05-19 17:35:19.83115 |
377 |
67746501 |
Drinking water facilities |
269943 |
Drinking water facilities1 |
Roof laid |
-
latitude : 23.109446042217314
Longitude : 87.72953915409744
file name : Image_29122023162149089.png
|
2023-12-29 16:21:49.181641 |
378 |
67746501 |
Drinking water facilities |
269943 |
Drinking water facilities1 |
Plinth level |
-
latitude : 23.1091797
Longitude : 87.7305287
file name : Image_29122023161426338.png
|
2023-12-29 16:14:26.447056 |
379 |
67746501 |
Drinking water facilities |
269943 |
Drinking water facilities1 |
Plinth level |
-
latitude : 23.1091797
Longitude : 87.7305287
file name : Image_26122023120834807.png
|
2023-12-26 12:08:34.912885 |
380 |
67746501 |
Drinking water facilities |
269943 |
Drinking water facilities1 |
Completion of work |
-
latitude : 23.109555384144187
Longitude : 87.72940772585571
file name : Image_22122023160338469.png
|
2023-12-22 16:03:38.589579 |
381 |
67733728 |
Construction of roads |
201330 |
Construction of roads1 |
Roof laid |
-
latitude : 23.108737310394645,23.108737310394645
Longitude : 87.72700304165483,87.72700304165483
file name : Image_20032024151631509.png
|
2024-03-20 15:16:31.59528 |
382 |
67733728 |
Construction of roads |
201330 |
Construction of roads1 |
Plinth level |
-
latitude : 23.10874372255057,23.10874372255057
Longitude : 87.7270460408181,87.7270460408181
file name : Image_06032024165421192.png
|
2024-03-06 16:54:21.279182 |
383 |
67733728 |
Construction of roads |
201330 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1094859,23.1094859
Longitude : 87.7291929,87.7291929
file name : Image_01032024162835425.png
|
2024-03-01 16:28:35.512837 |
384 |
108704841 |
Construction of roads |
506118 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1091302,23.1091131,23.1091131
Longitude : 87.7305834,87.7306025,87.7306025
file name : Image_18112024153040846.png
|
2024-11-18 15:30:40.912692 |
385 |
108704841 |
Construction of roads |
506118 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1091112,23.1091112
Longitude : 87.7305927,87.7305927
file name : Image_18112024152446061.png
|
2024-11-18 15:24:46.132463 |
386 |
108704841 |
Construction of roads |
506118 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1091007,23.1091352
Longitude : 87.7306067,87.7305715
file name : Image_18112024151752180.png
|
2024-11-18 15:17:52.23834 |
387 |
108704852 |
Drainage Construction |
395699 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.1091131
Longitude : 87.7306025
file name : Image_18112024153043836.png
|
2024-11-18 15:30:43.912258 |
388 |
108704852 |
Drainage Construction |
395699 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.1091306
Longitude : 87.7305723
file name : Image_18112024152448946.png
|
2024-11-18 15:24:49.019136 |
389 |
108704852 |
Drainage Construction |
395699 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.1091352
Longitude : 87.7305715
file name : Image_18112024151755155.png
|
2024-11-18 15:17:55.22637 |
390 |
91280095 |
Drinking water facilities/ Installation of RO/ Water Filter |
160000 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Roof laid |
-
latitude : 23.109072418883443
Longitude : 87.73024055175483
file name : Image_20112024154043112.png
|
2024-11-20 15:40:43.18915 |
391 |
91280095 |
Drinking water facilities/ Installation of RO/ Water Filter |
160000 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Plinth level |
-
latitude : 23.109055780805647
Longitude : 87.73024138994515
file name : Image_20112024153855938.png
|
2024-11-20 15:38:56.02784 |
392 |
91280095 |
Drinking water facilities/ Installation of RO/ Water Filter |
160000 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Completion of work |
-
latitude : 23.10905464924872
Longitude : 87.73025144822896
file name : Image_20112024153511460.png
|
2024-11-20 15:35:11.541488 |